 all right it is nine o'clock and we have a quorum so we'll call to order the

00:00:06.120 --> 00:00:12.320
 December 13th 2021 City of Denton Public Utilities Board meeting the first item

00:00:12.320 --> 00:00:20.600
 is the public comment does anybody here wish to make public comment how about on

00:00:20.600 --> 00:00:31.300
 the phone anybody on the phone no all right and we'll go into the regular

00:00:31.300 --> 00:00:36.880
 meeting the first item is the consent agenda with items a through s I'm gonna

00:00:36.880 --> 00:00:42.680
 call pull item M does any other board member wish to pull an item yes mr. beth

00:00:42.680 --> 00:00:57.640
 okay I'll go with mr. Rybeck I'm interested in looking at item F and H

00:00:57.640 --> 00:01:11.240
 and H and mr. jumper item E okay that was E as in Evan right and a question

00:01:11.240 --> 00:01:24.400
 about J okay and then is that it all right so do we have a motion to approve

00:01:24.400 --> 00:01:42.480
 items A B C D G I L N O P Q R and S okay mr. jumper moved and Barbie second all

00:01:42.480 --> 00:01:52.040
 in favor say aye aye carries okay the first item then is item E so I think

00:01:52.040 --> 00:02:02.960
 that's Krista would you come out there she is madam chair board members what

00:02:02.960 --> 00:02:08.520
 questions can I answer related to item yeah so I was curious I think this is a

00:02:08.520 --> 00:02:14.240
 neat idea actually I was curious what what prompted the need or desire for

00:02:14.240 --> 00:02:18.040
 anything like that the virtual teller yes I'm sorry you know the virtual

00:02:18.040 --> 00:02:22.760
 teller unit is something that even pre-pandemic I had already had kind of

00:02:22.760 --> 00:02:29.440
 on my agenda and had started developing with ad comp prior to you know there's

00:02:29.440 --> 00:02:34.680
 been a desire for customer service to have kind of an outreach center where

00:02:34.680 --> 00:02:38.120
 people don't have to come all the way to City Hall East to conduct their

00:02:38.120 --> 00:02:42.240
 face-to-face business and this is something that we felt like would be a

00:02:42.240 --> 00:02:46.720
 reasonable measure of being able to provide service to the citizens as

00:02:46.720 --> 00:02:51.000
 opposed to the citizen coming to us so we'll be piloting it it's actually ready

00:02:51.000 --> 00:02:54.400
 for launch we're just waiting on a little bit of construction if you've

00:02:54.400 --> 00:02:58.080
 been in the City Hall East Lobby the acoustics are great if you want to stand

00:02:58.080 --> 00:03:01.160
 in there and sing but not so much if you want to stand in there and talk about

00:03:01.160 --> 00:03:07.640
 business so we're building in a little sound area so that we can install it as

00:03:07.640 --> 00:03:11.640
 long as we get some good public adoption then we want to be able to expand that

00:03:11.640 --> 00:03:16.720
 to maybe the UNT campus look at some overlays to see what customers are coming

00:03:16.720 --> 00:03:20.880
 into the lobby what parts of town need to be best served by doing something

00:03:20.880 --> 00:03:25.720
 with an outpost and then I was curious currently do you know kind of the

00:03:25.720 --> 00:03:30.760
 percentage the breakdown of how many folks do business online versus coming in

00:03:30.760 --> 00:03:34.320
 person versus on the phone anything like that you know I haven't looked at them

00:03:34.320 --> 00:03:37.880
 recently because we've had so much going on I don't know if you've noticed it's

00:03:37.880 --> 00:03:42.440
 very busy initiative wise and customer service currently that we usually only

00:03:42.440 --> 00:03:48.520
 have a 10% or less of our customers who come in and do their business so it's

00:03:48.520 --> 00:03:52.360
 very difficult sometimes for us to keep those two lobby windows open all the

00:03:52.360 --> 00:03:56.680
 time when we have callers you know on the phone that are holding for no

00:03:56.680 --> 00:04:01.920
 longer periods of time but we're hoping that with this particular initiative

00:04:01.920 --> 00:04:05.640
 once we get it moved out that we'll actually be able to expand so as long as

00:04:05.640 --> 00:04:10.080
 you're not making a cash payment if you need to present that alternative ID like

00:04:10.080 --> 00:04:14.280
 a foreign student that you can actually do that from your phone or PC and still

00:04:14.280 --> 00:04:18.840
 do that virtual interaction from your home or wherever you happen to be as

00:04:18.840 --> 00:04:24.180
 long as you're not doing a cash payment so we're hoping to expand this okay so

00:04:24.180 --> 00:04:28.920
 this new kiosk would be at your current facility currently it will be at the

00:04:28.920 --> 00:04:32.900
 facility I will still have our standard kiosk available outdoors to just do

00:04:32.900 --> 00:04:37.960
 their traditional kiosk business but inside the lobby if there's a line

00:04:37.960 --> 00:04:41.360
 waiting or even if there's not a customer can go to that virtual teller

00:04:41.360 --> 00:04:46.280
 and conduct their business present their IDs scan documents whatever business

00:04:46.280 --> 00:04:50.160
 they need to take care of so you consider this a pilot project then this

00:04:50.160 --> 00:05:00.080
 is a pilot project thank you yeah other questions do we have a motion to approve

00:05:00.360 --> 00:05:07.120
 okay mr. Rybex move moving and mr. Beck is seconding all in favor say aye aye

00:05:07.120 --> 00:05:18.280
 thank you very much item F that was you right Lee that was your item F okay so

00:05:18.280 --> 00:05:24.280
 we have a Daniel Kramer with our Street Department here good morning

00:05:24.280 --> 00:05:31.160
 Dana Kramer deputy director of operations question this particular

00:05:31.160 --> 00:05:36.960
 contract not to exceed 2.6 million dollars from construction material

00:05:36.960 --> 00:05:42.320
 testing and geotechnical investigation services is rather broad could you give

00:05:42.320 --> 00:05:45.920
 us a little bit more information about what these folks be doing for you yes

00:05:45.920 --> 00:05:50.640
 sir Street Department is the one that actually kicked off this contract what

00:05:50.640 --> 00:05:55.560
 we use that for is our lime series test and our subgrade tests so we know how

00:05:55.560 --> 00:06:01.120
 much lime and mix to put into the street when we're rebuilding the street we also

00:06:01.120 --> 00:06:06.060
 use it for density testing compaction testing which is what utilities use it a

00:06:06.060 --> 00:06:09.800
 lot for for the ditch lines and everything we'll use it for density to

00:06:09.800 --> 00:06:14.440
 make sure we've met the 95 percent compaction before we can patch the road

00:06:14.440 --> 00:06:18.420
 it'll also be used by DME which a lot of times we'll use that when they're

00:06:18.420 --> 00:06:22.240
 installing the poles and stuff like that same thing with the compaction testing so

00:06:22.240 --> 00:06:26.880
 this is just an on-call contract so that we can keep our construction operations

00:06:26.880 --> 00:06:30.840
 moving throughout the years is this a firm we've been working with previously

00:06:30.840 --> 00:06:39.160
 no sir we we originally had G consulting which is the one that had it for the last

00:06:39.160 --> 00:06:43.400
 one I think it was a three year if I'm not mistaken was the last terms on that

00:06:43.400 --> 00:06:48.960
 contract all right so this is a new firm providing services that another firm had

00:06:48.960 --> 00:06:54.920
 been providing and this is a not to exceed amount over the five-year period

00:06:54.920 --> 00:07:02.680
 basically on a time of material basis thank you all right any other questions

00:07:02.680 --> 00:07:09.680
 do we have a motion to approve mr. Ibex motion second and second all

00:07:09.680 --> 00:07:19.680
 favor say aye thank you item H that was also you rightly yes okay

00:07:19.680 --> 00:07:29.440
 good morning good morning board madam chairman my name is Jerry Fielder I am

00:07:29.440 --> 00:07:33.440
 the division engineering manager for didn't municipal electric I haven't in

00:07:33.440 --> 00:07:37.360
 here with me Aaron Binion who's the project manager for this project as well

00:07:37.360 --> 00:07:41.000
 as the engineering firm and we can go through a formal presentation or just

00:07:41.000 --> 00:07:44.920
 answer any questions that you may have I'll see you are going to give us a

00:07:44.920 --> 00:07:49.120
 formal presentation on this or you can no we can you want to go ahead and see

00:07:49.120 --> 00:07:52.720
 that if it's all right with sure chairwoman I'd be very interested in

00:07:52.720 --> 00:07:56.360
 seeing that yes yeah thank you

00:08:00.760 --> 00:08:08.360
 good morning give me just a moment to get this set up

00:08:20.600 --> 00:08:34.400
 I think it's being shared says that we are sharing all right I think we figured

00:08:34.400 --> 00:08:39.320
 out the technology so again thank you for letting me be here my name is Aaron

00:08:39.320 --> 00:08:44.080
 Benyon I'm an engineer with that municipal electric and today we'll just

00:08:44.080 --> 00:08:49.560
 present a little bit on our new line extension policy so up to this point the

00:08:49.560 --> 00:08:54.320
 line extension go ahead Madam Chair I would wonder if the speaker could take

00:08:54.320 --> 00:08:58.200
 his mask off I'm having a little trouble understanding him thank you thank you

00:08:58.200 --> 00:09:05.480
 I've often been told I've got a quiet engineers voice my apologies all right so

00:09:05.480 --> 00:09:10.200
 our current line extension policies are contained in the electric service

00:09:10.200 --> 00:09:15.600
 standards these standards have been around since at least 2014 the latest

00:09:15.600 --> 00:09:20.200
 version was approved in 2014 and there really haven't been any changes since

00:09:20.200 --> 00:09:26.040
 then these standards include both technical requirements as well as policy

00:09:26.040 --> 00:09:32.040
 relating to new developments extensions and developer and DME

00:09:32.040 --> 00:09:39.120
 responsibilities now there is a need to update them and so DME has proposed that

00:09:39.120 --> 00:09:43.320
 we split them out into a revised electric service standards that would

00:09:43.320 --> 00:09:48.240
 focus on the technical requirements that ensure that developers and DME are

00:09:48.240 --> 00:09:52.920
 following the applicable codes and the line extension policy would govern the

00:09:52.920 --> 00:10:02.120
 customer aid and construction contributions now the current line

00:10:02.120 --> 00:10:06.080
 extension policy that's contained in the ESS is really a one-size-fits-all

00:10:06.080 --> 00:10:12.920
 approach it's based on distance and so any extension up to 300 feet is covered

00:10:12.920 --> 00:10:22.400
 by DME and by extension the rate payers and so there's a wide variety of costs

00:10:22.400 --> 00:10:25.760
 that can be incurred in that mostly depending on what type of service is

00:10:25.760 --> 00:10:30.760
 currently available what type of customer loads are coming and so it

00:10:30.760 --> 00:10:34.880
 really leaves things pretty open for for what that can cost the existing rate

00:10:34.880 --> 00:10:39.480
 payers developers are also responsible for the civil work and DME provides

00:10:39.480 --> 00:10:47.000
 certain materials like conduit and pads for various pad mounted equipment

00:10:47.000 --> 00:10:51.080
 developers depending on the length of the extension they may pay none of the

00:10:51.080 --> 00:10:56.880
 cost or they may pay some beyond that 300 foot distance and DME covers the

00:10:56.880 --> 00:11:02.960
 rest our proposed policy would be that within the single certified areas of the

00:11:02.960 --> 00:11:10.920
 city developers would pay the full cost of any line extensions to them now DME

00:11:10.920 --> 00:11:17.520
 does have multi certified areas that we share with other electric service

00:11:17.520 --> 00:11:22.840
 providers so encore and co-serve in those areas we propose that credit be

00:11:22.840 --> 00:11:28.440
 given based on a projected rate of return and that allows us to provide an

00:11:28.440 --> 00:11:33.640
 economic development incentive and basically stay competitive with some of

00:11:33.640 --> 00:11:38.640
 the other developers go ahead thank you I'm wondering when you say multi service

00:11:38.640 --> 00:11:44.520
 area so is DME essentially bidding if you will on the future service of these

00:11:44.520 --> 00:11:49.800
 developments to an extent yes when it when a new developer comes in they have

00:11:49.800 --> 00:11:53.080
 a choice in these areas they could choose whether they would like to have

00:11:53.080 --> 00:11:58.120
 DME co-serve or encore encore depending on the area serve them and one of the

00:11:58.120 --> 00:12:02.120
 challenges that comes with that is the first one to serve a development

00:12:02.120 --> 00:12:06.160
 generally takes the whole thing because of the costs associated with trying to

00:12:06.160 --> 00:12:12.160
 get additional services from another provider in there so does this still

00:12:12.160 --> 00:12:19.280
 give DME the flexibility to work with the developers on projects even though

00:12:19.280 --> 00:12:23.680
 we have this new standard that's being proposed yes yes it does thank you

00:12:23.680 --> 00:12:27.800
 mr. Rebecca the one thing I'll tell you is the main cases in these multi

00:12:27.800 --> 00:12:32.080
 certified areas developers are already being incentivized by the city through

00:12:32.080 --> 00:12:36.880
 other economic development incentives and so then additionally they they can

00:12:36.880 --> 00:12:40.920
 either walk away from DME or request additional incentives and so there's

00:12:40.920 --> 00:12:44.120
 double and triple dipping that occurs from time to time with those

00:12:44.120 --> 00:12:47.680
 development I think this helps us kind of equalize that and at the same time

00:12:47.680 --> 00:12:52.280
 helps us address some of the some of the cost perspective cost issues that we're

00:12:52.280 --> 00:12:56.480
 having at DME and that we're trying to address yes it does appear that these

00:12:56.480 --> 00:13:02.160
 new policies are give you a little better structure in your program but I

00:13:02.160 --> 00:13:06.560
 was running if it's also taking away the flexibility to negotiate so that's my

00:13:06.560 --> 00:13:14.080
 question okay sorry did you have a question go ahead

00:13:14.080 --> 00:13:24.200
 thank you chair so I'm really conflicted on only incentivizing only giving an ROI

00:13:24.200 --> 00:13:29.880
 based discount in the fringe areas of the city like if you don't know if you

00:13:29.880 --> 00:13:36.360
 have a map in your slide deck let me skip down to that yeah so everything

00:13:36.360 --> 00:13:41.120
 blue would not receive the incentive that had to cover full full cost of

00:13:41.120 --> 00:13:46.680
 construction where if you're building a subdivision in the red area out west

00:13:46.680 --> 00:13:53.040
 you're going to get ROI you know an ROI based value on your development

00:13:53.040 --> 00:14:00.540
 mm-hmm so it will cost more to build closer to who to develop closer to the

00:14:00.540 --> 00:14:10.320
 city center I'm curious what encore and co-serve what their policies are on

00:14:10.320 --> 00:14:15.480
 their single service areas and their multiple their competitive areas do you

00:14:15.480 --> 00:14:21.520
 know that so as part of the presentation we actually do cover what encore and

00:14:21.520 --> 00:14:27.800
 co-serve do if it's okay we can jump back to that and work through that okay

00:14:27.800 --> 00:14:36.080
 excellent okay so we're we're almost there all right just a couple of

00:14:36.080 --> 00:14:40.540
 additional items on the proposed policy is that developers would be responsible

00:14:40.540 --> 00:14:44.920
 for civil work as they had been but also that they would provide some of the

00:14:44.920 --> 00:14:48.940
 materials that we've previously been providing and what that does is allow

00:14:48.940 --> 00:14:52.720
 them a little bit more flexibility they're not completely dependent on DME

00:14:52.720 --> 00:14:58.600
 providing all of these materials and it frees up our warehouse and and others

00:14:58.600 --> 00:15:04.080
 from being the the sole point of contact sometimes that becomes a bottleneck and

00:15:04.080 --> 00:15:09.280
 again down at the bottom it just states that we we would expect them to cover

00:15:09.280 --> 00:15:15.320
 the full cost of the extension except for competitive credits in those areas so

00:15:15.320 --> 00:15:19.680
 the question is then what do other utilities do these aid and construction

00:15:19.680 --> 00:15:24.920
 fees are a standard in the electric utility industry we've worked together

00:15:24.920 --> 00:15:29.520
 with the consultants and gathered research on what several other utilities

00:15:29.520 --> 00:15:37.580
 do some credit is given in various forms throughout the state of Texas and so you

00:15:37.580 --> 00:15:44.040
 can see examples of what other energy providers use some base it on the fixed

00:15:44.040 --> 00:15:50.380
 distance like DME has up to this point some use a fixed allowance a dollar

00:15:50.380 --> 00:15:56.360
 amount where once it exceeds that they're responsible for it others have a

00:15:56.360 --> 00:16:00.720
 formulaic approach that again is tied to something like a return on investment

00:16:00.720 --> 00:16:06.360
 or other formula that they've developed and then there are some utilities like

00:16:06.360 --> 00:16:12.440
 Austin Electric and Garland that they give no credit the the developers are

00:16:12.440 --> 00:16:17.720
 expected to pay for the entire cost so it's really across the board as you can

00:16:17.720 --> 00:16:22.960
 see Encore and CoServe use both the fixed distance and the formulaic

00:16:22.960 --> 00:16:28.600
 approach and and then you have others that say you know what the developers

00:16:28.600 --> 00:16:33.920
 can can cover the cost if they want to bring in do they have a split policy

00:16:33.920 --> 00:16:39.880
 between single serve and duly certified areas I don't believe that they do it's

00:16:39.880 --> 00:16:46.240
 it's across the board if you don't mind I can ensure that I used to work for

00:16:46.240 --> 00:16:50.760
 CoServe and the policy is typically you're going to get the service no

00:16:50.760 --> 00:16:55.800
 matter what it takes and so they do have in the rate manual some degree of

00:16:55.800 --> 00:16:59.920
 allowance associated with stuff but if it's a development like we're talking

00:16:59.920 --> 00:17:03.240
 about in our multi certified errors they know full well they're going to be in

00:17:03.240 --> 00:17:07.360
 competition with Encore or DME and they'll do what they need to do from an

00:17:07.360 --> 00:17:12.000
 economic standpoint also to get service to that development so it's really kind

00:17:12.000 --> 00:17:15.600
 of putting us on the same playing field as the other two competitors that we

00:17:15.600 --> 00:17:23.280
 have thank you yeah sorry board member I think the difference here is that DME as

00:17:23.280 --> 00:17:28.720
 an MOU has single certified area and multi certified area but co-ops and

00:17:28.720 --> 00:17:32.840
 IOUs or investor on utilities do not they are in a fully competitive

00:17:32.840 --> 00:17:38.360
 environment so there is no single certified area for them I'm fairly

00:17:38.360 --> 00:17:43.240
 certain that CoServe has single certified areas north of town in Cook

00:17:43.240 --> 00:17:46.920
 County and I know Encore definitely has single certified areas across the state

00:17:46.920 --> 00:17:54.720
 but this I don't have a problem with our new formula what I what I'm concerned

00:17:54.720 --> 00:18:01.120
 about is if you're in our monopoly zone we're going to charge you more if you're

00:18:01.120 --> 00:18:08.040
 across the line we're going to you know provide a discount or we're going to

00:18:08.040 --> 00:18:10.560
 take into you know and we're not providing a discount necessarily we're

00:18:10.560 --> 00:18:15.100
 taking into consideration the ROI on this infrastructure it's gonna cost a

00:18:15.100 --> 00:18:18.760
 million dollars to build it but we're going to get back line service fees over

00:18:18.760 --> 00:18:21.800
 the next 20 years half a million dollars therefore we're only going to charge you

00:18:21.800 --> 00:18:26.560
 half the cost right well it costs a million dollars to build a develop the

00:18:26.560 --> 00:18:30.480
 same service in the blue area we're gonna get back half a million dollars in

00:18:30.480 --> 00:18:37.600
 you know future you know line service fees so why would we not also give the

00:18:37.600 --> 00:18:45.560
 ROI consideration inside of our single service area and that's like I said

00:18:45.560 --> 00:18:48.800
 I otherwise I think the competitive nature I understand the competitive

00:18:48.800 --> 00:18:54.720
 nature multi-service areas and we don't want to be at a disadvantage we don't

00:18:54.720 --> 00:19:04.000
 want to bankrupt DME trying to compete but we but in like the split between our

00:19:04.000 --> 00:19:09.600
 service area and the competitive service areas where I have concerns I think the

00:19:09.600 --> 00:19:14.520
 the question and if I understand correctly you can you can validate this

00:19:14.520 --> 00:19:18.800
 formula is whether it's equitable to the developers to have two different rate

00:19:18.800 --> 00:19:24.560
 possibilities or I'm sorry not rates but credit possibilities or from the

00:19:24.560 --> 00:19:30.840
 flip side it's DME and the existing rate base and so really the goal is to

00:19:30.840 --> 00:19:34.440
 minimize cross-subsidization anytime we do give a credit we're actually

00:19:34.440 --> 00:19:39.160
 shouldering the burden on the existing rate pairs and so the goal that we're

00:19:39.160 --> 00:19:44.160
 striving for is the most equitable to the to the existing rate base and now to

00:19:44.160 --> 00:19:49.760
 be competitive there are times when when maybe we do have to give some credit to

00:19:49.760 --> 00:19:55.600
 the developers but in general we've seen a consistent desire to come to Denton to

00:19:55.600 --> 00:20:00.200
 build here and so there's less of a concern of driving away business and

00:20:00.200 --> 00:20:05.800
 it's more of trying to provide an equitable base for the existing existing

00:20:05.800 --> 00:20:22.720
 rate pairs thank you okay any any other questions okay I'll continue again along

00:20:22.720 --> 00:20:26.400
 those same lines we just clarify a little bit of the differences between

00:20:26.400 --> 00:20:30.160
 the single certified territory and the multi certified territory so as as

00:20:30.160 --> 00:20:36.520
 mentioned before the new customers pay a hundred percent the the goal was to ease

00:20:36.520 --> 00:20:42.400
 the burden on the existing rate pairs and and it's not unheard of to do this

00:20:42.400 --> 00:20:46.120
 there are several other large municipally owned coops that I'm sorry

00:20:46.120 --> 00:20:52.460
 not co-ops municipally owned providers that that do the same the multi

00:20:52.460 --> 00:20:58.840
 certified territory the focus was on a formulaic approach finding the best way

00:20:58.840 --> 00:21:04.360
 to provide an incentive and yet still have a reasonable return on investment

00:21:04.360 --> 00:21:10.840
 this allows us to be competitive the residential development credit is

00:21:10.840 --> 00:21:16.760
 slightly different in that the data for that it's it's really a wide range of

00:21:16.760 --> 00:21:20.960
 what a residential development could require and so we looked at the data

00:21:20.960 --> 00:21:25.600
 from the last five years and we were able to average out the cost per

00:21:25.600 --> 00:21:30.600
 residents of extending to a to a home in a new development so that's where that

00:21:30.600 --> 00:21:35.680
 came from but with the caveat kind of to what mr. Rybeck was asking before

00:21:35.680 --> 00:21:39.480
 there is flexibility if we need to adjust that based on the formula we we

00:21:39.480 --> 00:21:44.480
 can but that's a starting place for us and commercial and industrial credits

00:21:44.480 --> 00:21:56.320
 will be calculated using the formula okay so the requested action is that the

00:21:56.320 --> 00:22:01.200
 council I'm sorry not the council but the board recommend approval of the new

00:22:01.200 --> 00:22:09.600
 line extension policy oops and also open it up to questions

00:22:09.880 --> 00:22:15.240
 mr. Rybeck go ahead I see you turned your light on finally got it to come on

00:22:15.240 --> 00:22:22.000
 okay so this new policy is one that you guys have obviously work with the

00:22:22.000 --> 00:22:26.680
 utility to put together and really all you're looking for is for us to

00:22:26.680 --> 00:22:31.440
 recommend it on to council it eventually will have to be approved by the council

00:22:31.440 --> 00:22:37.760
 so I guess you weren't entirely wrong in your presentation I don't really have

00:22:37.760 --> 00:22:40.720
 any other questions about it I appreciate that you came today to

00:22:40.720 --> 00:22:44.800
 provide us with this information and a little more background on it like a

00:22:44.800 --> 00:22:48.880
 little surprised when I got the email took a look at it and said well what are

00:22:48.880 --> 00:22:52.520
 we looking at here I think it was appropriate to pull it out from the

00:22:52.520 --> 00:22:56.000
 consent agenda for us to have a better look at it so thank you I have no

00:22:56.000 --> 00:23:04.480
 further questions just a comment I think if you look at this as a whole it may

00:23:04.480 --> 00:23:09.280
 not be totally fair to a developer that's building inside the single

00:23:09.280 --> 00:23:13.720
 certified versus outside the certified but the end the end result is it is more

00:23:13.720 --> 00:23:22.440
 fair for the rate payers the overall rate payers all right no other questions

00:23:22.440 --> 00:23:27.560
 do we have a motion to approve mr. Rybeck's motioning do we have a second

00:23:27.560 --> 00:23:38.560
 oh mr. Beck all in favor say aye opposed so that was very fast I think I will say

00:23:38.560 --> 00:23:46.600
 yeah actually okay okay I saw you were thinking so that was off all seven days

00:23:46.600 --> 00:23:56.360
 correct all right thank you thank you very much okay the next item is J and I

00:23:56.360 --> 00:24:03.920
 don't remember who pulled J oh I just had a question do we still have a city

00:24:03.920 --> 00:24:06.640
 engineer

00:24:06.640 --> 00:24:15.720
 or is J pre-qualified engineering firms thank you so Barbara the answer the

00:24:15.720 --> 00:24:21.080
 answer is yes Becky Davini is is our city engineer this particular item is for

00:24:21.080 --> 00:24:26.080
 engineering services at DME specifically which DME handled separately well I know

00:24:26.080 --> 00:24:35.080
 you're doing a considerable amount of work and I just had wasn't aware if we

00:24:35.080 --> 00:24:39.120
 still had one with there was one on staff and now there are more yes ma'am

00:24:39.120 --> 00:24:45.760
 Becky Davini is our city engineer okay thank you that was it okay do we have a

00:24:45.760 --> 00:24:51.280
 motion to approve so he's moving and Barbara's seconding all in favor say aye

00:24:51.280 --> 00:25:05.680
 aye any nays no okay item K item J yes

00:25:05.680 --> 00:25:17.040
 okay now is item K thank you again Jerry Fielder division engineering manager for

00:25:17.040 --> 00:25:21.160
 DME about mr. Doug Brion he was an engineering supervisor that will speak

00:25:21.160 --> 00:25:30.560
 to you guys about the young dry auger billing thank you thank you I'm Doug

00:25:30.560 --> 00:25:35.280
 Brion engineering supervisor for DME and just answer any questions you have yes

00:25:35.280 --> 00:25:39.360
 sir I was have a question about this contract similar to the other one the

00:25:39.360 --> 00:25:44.240
 this is for the directional drilling appears to be for all three departments

00:25:44.240 --> 00:25:50.080
 of the utility so is this a new contractor that we're working with this

00:25:50.080 --> 00:25:53.520
 is a contractor that we've worked with before in the past but we had a contract

00:25:53.520 --> 00:25:58.000
 that expired a couple years ago and had not been renewed for this time so yes we

00:25:58.000 --> 00:26:00.960
 have worked with him okay so this is somebody we had worked with before but

00:26:00.960 --> 00:26:05.520
 this is a new contract going forward again time of material not to exceed a

00:26:05.520 --> 00:26:10.880
 given amount that's correct thank you that's really my only question okay

00:26:10.880 --> 00:26:19.720
 I'm sorry mr. jumper you have a question we have a motion to approve mr. Beck is

00:26:19.720 --> 00:26:28.040
 motioning second please seconding all in favor say aye aye opposed all right item

00:26:28.040 --> 00:26:39.080
 M we really don't have a question but mr. cheek had to recuse himself because

00:26:39.080 --> 00:26:48.400
 his company bid on it so motion to approve so moved all right in a second

00:26:48.400 --> 00:26:55.600
 okay mr. Beck's seconding all in favor say aye aye Billy recuses himself all

00:26:55.600 --> 00:27:21.880
 right I'll go I'll go you're welcome okay the next item is a recommend approval

00:27:21.880 --> 00:27:28.640
 of the November 8th minutes I did notice that there was an error on item E we had

00:27:28.640 --> 00:27:33.200
 board member Russell approving and she wasn't there so that item has been

00:27:33.200 --> 00:27:40.480
 changed and for my signature were there any other changes okay do we have a

00:27:40.480 --> 00:27:48.840
 motion to approve those with the correction Billy moves second Devin all

00:27:48.840 --> 00:27:58.240
 in favor say aye aye okay next item item B the design build agreement for the

00:27:58.240 --> 00:28:03.080
 Hickory gas insulated substation an amount of forty million four hundred and

00:28:03.080 --> 00:28:08.040
 sixty nine thousand dollars good morning count Phoebe Mark Zimmer DME

00:28:08.040 --> 00:28:28.200
 engineering excuse me sir while you're queuing up would you mind taking your

00:28:28.200 --> 00:28:39.320
 mask off so we can understand you a little better thank you yes sir we're

00:28:39.320 --> 00:28:43.680
 here this morning for your consideration of a contract to design and construct

00:28:43.680 --> 00:28:50.080
 the Hickory GIS substation so back in 2014 DME identified the need to rebuild

00:28:50.080 --> 00:28:55.700
 the existing Hickory substation due to age safety concerns and incompatibility

00:28:55.700 --> 00:29:01.520
 with future CFP projects to convert the station from 69 KV operation to 138 KB

00:29:01.520 --> 00:29:07.480
 operation in addition DME determined that the existing site is not large

00:29:07.480 --> 00:29:12.120
 enough for needed expansion to serve additional customers and load in the

00:29:12.120 --> 00:29:17.540
 area so DME held public open houses to get citizen feedback on new substation

00:29:17.540 --> 00:29:21.560
 sites that feedback was provided to council and council ultimately chose the

00:29:21.560 --> 00:29:26.000
 site directly across the street from the existing substation that site was

00:29:26.000 --> 00:29:33.220
 purchased by DME in 2015 the appearance of the new Hickory GIS substation was

00:29:33.220 --> 00:29:37.840
 some some importance to see council council directed us to use an aesthetics

00:29:37.840 --> 00:29:41.480
 committee to determine the appearance of the perimeter wall around the

00:29:41.480 --> 00:29:45.240
 substation the design that was chosen by the committee is shown here on this

00:29:45.240 --> 00:29:49.920
 slide that is the design that is included in the contract in addition to

00:29:49.920 --> 00:29:54.520
 that council directed us to convert the existing overhead electric facilities

00:29:54.520 --> 00:29:58.100
 around this project from overhead to underground that's also included in the

00:29:58.100 --> 00:30:03.520
 contract the new Hickory GIS substation will serve approximately 20% more

00:30:03.520 --> 00:30:09.340
 customers than the existing substation and because we're using gas insulated

00:30:09.340 --> 00:30:14.080
 switchgear on the site we're able to do a future expansion on the site to serve

00:30:14.080 --> 00:30:19.160
 an additional 100% more customers and because we can do that that negates the

00:30:19.160 --> 00:30:27.040
 need for Eagle substation until at least 2034 so DME prepared a request for

00:30:27.040 --> 00:30:31.400
 qualifications to qualify firms capable of performing all pieces of the project

00:30:31.400 --> 00:30:36.160
 we received seven responses and we evaluated them based on qualifications

00:30:36.160 --> 00:30:40.960
 proven success stability and safety record after evaluation we chose for

00:30:40.960 --> 00:30:45.320
 those firms to receive a request for proposals which included technical

00:30:45.320 --> 00:30:50.720
 specification as prepared by our owners engineering black and beach after

00:30:50.720 --> 00:30:54.920
 reviewing those we determined beta engineering was the highest overall

00:30:54.920 --> 00:30:59.780
 evaluated and was also the lowest cost and also due to the instability in the

00:30:59.780 --> 00:31:04.080
 market right now beta is only able to hold the cost on this project until

00:31:04.080 --> 00:31:08.840
 January 14th of next next year so any delays and awarding a contract could

00:31:08.840 --> 00:31:17.360
 result in a higher contract cost so if awarded we would issue a limited notice

00:31:17.360 --> 00:31:21.900
 to proceed in January and we would expect project completion by October of

00:31:21.900 --> 00:31:29.920
 2024 so staff recommends approval of a contract with beta engineering LLC for

00:31:29.920 --> 00:31:33.240
 design and construction of the Hickory GIS substation in an amount not to

00:31:33.240 --> 00:31:38.840
 exceed 40 million 469 thousand dollars any questions I like that last

00:31:38.840 --> 00:31:51.840
 parentheses yes yeah yeah good portion of goes in our teeth yeah could you

00:31:51.840 --> 00:31:55.760
 remind me the difference in cost on putting the structure around it I mean

00:31:55.760 --> 00:32:00.160
 I'm all in favor I know it's expensive for the perimeter wall yes yes sir the

00:32:00.160 --> 00:32:04.320
 perimeter wall is about six million dollars a typical wall is three four

00:32:04.320 --> 00:32:12.680
 hundred thousand so quite a bit more this is gonna be real pretty I was

00:32:12.680 --> 00:32:18.120
 curious you projected that you wouldn't need the eagle substation until 2034

00:32:18.120 --> 00:32:23.640
 curious how you arrived at that specific time frame and we used a projected load

00:32:23.640 --> 00:32:29.320
 growth we use a percentage load growth an annual load growth to determine when

00:32:29.320 --> 00:32:34.520
 the existing stations will need additional capacity and so based on that

00:32:34.520 --> 00:32:39.480
 because we can add to this new Hickory GIS substation we can add additional

00:32:39.480 --> 00:32:43.040
 transformers there to serve more loads how much additional capacity can you add

00:32:43.040 --> 00:32:50.640
 to the new facility current 50 NBA currently the way this new substation is

00:32:50.640 --> 00:32:55.160
 designed we will initially construct it with 50 NBA of capacity and then we can

00:32:55.160 --> 00:32:59.280
 add another 50 NBA onto that so you can essentially double the size of facility

00:32:59.280 --> 00:33:03.520
 thank you and that's because we're using the gas insulated switcher and what

00:33:03.520 --> 00:33:09.080
 approximately is the savings of pushing that project out how many millions that

00:33:09.080 --> 00:33:20.080
 was just approximately it was Jerry do you remember the numbers we've got the

00:33:20.080 --> 00:33:23.040
 number but I don't remember right off the top of my head we can certainly get

00:33:23.040 --> 00:33:29.800
 that to you guys just curious go ahead so we're going from above ground to

00:33:29.800 --> 00:33:35.840
 underground does that bring any complications in any way for any

00:33:35.840 --> 00:33:39.840
 maintenance or repairs anything like that all right so converting the

00:33:39.840 --> 00:33:43.240
 overhead facilities right around the project from overhead to underground is

00:33:43.240 --> 00:33:47.160
 of course more expensive those costs are included in the contract so that's one

00:33:47.160 --> 00:33:53.240
 one task typically you can't have failures and underground facilities and

00:33:53.240 --> 00:33:57.360
 that's accommodated for in the design so we include extra conduit and the

00:33:57.360 --> 00:34:04.080
 underground of banks to accommodate for that so that is one concern we also are

00:34:04.080 --> 00:34:07.520
 designing the project where those underground facilities would not limit

00:34:07.520 --> 00:34:11.920
 the rating of the station in any way those are some of the things you can

00:34:11.920 --> 00:34:18.160
 consider when designing those facilities okay this is the first gas insulated

00:34:18.160 --> 00:34:25.240
 this may be me are there any issues with groundwater in the area since you're

00:34:25.240 --> 00:34:29.560
 going underground yeah anytime we do a project in that and we seem to have

00:34:29.560 --> 00:34:33.640
 issues with groundwater typically when it's typically when we're doing a

00:34:33.640 --> 00:34:37.320
 transmission line design or we're digging a really deep hole we have that

00:34:37.320 --> 00:34:41.600
 problem this project we don't anticipate the need but geotechnical

00:34:41.600 --> 00:34:44.960
 reports have been done on the site and are provided to this contractor so

00:34:44.960 --> 00:34:48.320
 they're aware of the site conditions so are you required to take any additional

00:34:48.320 --> 00:34:54.560
 steps such as dewatering or anything like that not not on the side no there's of

00:34:54.560 --> 00:34:57.600
 course drainage going to be installed inside the substation but no no

00:34:57.600 --> 00:35:05.640
 additional features thank you okay go ahead dinner thank you chair if you just

00:35:05.640 --> 00:35:08.720
 a few comments and then I have some questions I'm fairly new to the

00:35:08.720 --> 00:35:13.360
 Commission so just like to get a little bit more information or the board so I

00:35:13.360 --> 00:35:17.000
 love the the breakdown of the competitive bids it's really fascinating

00:35:17.000 --> 00:35:21.640
 to see like some of the other bids are very competitive on the switchgear but

00:35:21.640 --> 00:35:26.080
 then an extra six or eight million on-site design an extra three or four

00:35:26.080 --> 00:35:31.320
 million on the wall suddenly they're no longer competitive and then just for my

00:35:31.320 --> 00:35:37.040
 own information not really pertaining to approving this the the underground

00:35:37.040 --> 00:35:41.500
 distribution out does that have to be gas insulated as well or no sir it's

00:35:41.500 --> 00:35:46.920
 just an underground duck bank just in conduit okay and and then in the

00:35:46.920 --> 00:35:53.440
 exhibits the mock-ups the photo mock-ups there appears to be one above ground

00:35:53.440 --> 00:35:58.960
 line still headed I think it's south I was like trying to tell in the picture

00:35:58.960 --> 00:36:01.840
 if there was one shown there that's probably just an error in the float

00:36:01.840 --> 00:36:06.240
 assimilation but right around the new substation side of all the underground

00:36:06.240 --> 00:36:11.520
 facilities and then and at some point does it so there's a line that runs

00:36:11.520 --> 00:36:17.520
 north to you know North Bonnie bray is that is it going to go like a thousand

00:36:17.520 --> 00:36:21.840
 feet underground and the transition above or so there's two different types

00:36:21.840 --> 00:36:24.800
 of facilities that will be converted to underground so there's overhead

00:36:24.800 --> 00:36:28.680
 transmission facilities and overhead distribution facilities the existing

00:36:28.680 --> 00:36:32.120
 overhead transmission facilities were pretty much stay in the existing

00:36:32.120 --> 00:36:35.480
 alignment as they are they will convert from overhead to

00:36:35.480 --> 00:36:40.000
 underground be on the west side of the convenience store that's right beside

00:36:40.000 --> 00:36:44.600
 the existing substation and then all of the overhead distribution facilities

00:36:44.600 --> 00:36:49.740
 will all be converted within about a block around the site okay so then the

00:36:49.740 --> 00:36:54.920
 existing transmission line runs to the current site and then and that will I

00:36:54.920 --> 00:37:00.040
 guess that will stay DME owned it'll just have no equipment just like go

00:37:00.040 --> 00:37:05.120
 underground or under them there'll be a what we call a riser structure that

00:37:05.120 --> 00:37:08.640
 converts the overhead line to underground right there around the old

00:37:08.640 --> 00:37:14.480
 hickory substation and the rest of that site will probably remain DME property

00:37:14.480 --> 00:37:18.360
 indefinitely the rest of that site we will demo the mall retire and demolish

00:37:18.360 --> 00:37:22.640
 the old station and that'll be done under a separate contract and are there

00:37:22.640 --> 00:37:31.040
 any cosmetic like fent like I know there's a lot of screening on this one

00:37:31.040 --> 00:37:37.240
 is there any plans for changing the aesthetic of the existing location not

00:37:37.240 --> 00:37:48.440
 this time okay thank you we just plan to remove it other questions okay seeing

00:37:48.440 --> 00:37:54.620
 none do we have a motion to approve this item Devin of motions so move I'll

00:37:54.620 --> 00:38:01.760
 second and then seconds all in favor say aye aye opposed thank you thank you

00:38:01.760 --> 00:38:09.360
 it's been a long time in the making next item is management reports so madam

00:38:09.360 --> 00:38:15.480
 chair and board of so there's a few items that we've provided to you contracts

00:38:15.480 --> 00:38:20.640
 for some information on country for water and wastewater chemicals I think

00:38:20.640 --> 00:38:25.280
 Council Board member Taylor had requested a red line of the solid waste

00:38:25.280 --> 00:38:30.200
 criteria menu we've provided that to you as well and then also an update on the

00:38:30.200 --> 00:38:33.600
 leak adjustment policy that recently went to the council what I'll say with

00:38:33.600 --> 00:38:37.240
 with that one and also the chemical contracts certainly we endeavor to try

00:38:37.240 --> 00:38:40.920
 to bring everything to to the board prior to going to council though

00:38:40.920 --> 00:38:44.320
 obviously these did not were providing to you providing them to you kind of

00:38:44.320 --> 00:38:48.200
 retroactive I think as we move forward the council certainly talking about

00:38:48.200 --> 00:38:53.880
 going to a strict to meeting type of schedule and so we're certainly

00:38:53.880 --> 00:38:57.800
 reinforced with our staff to make sure that that they properly plan out their

00:38:57.800 --> 00:39:02.880
 items that they come to you before they go to the council so there's a couple

00:39:02.880 --> 00:39:07.120
 staff members here if you have any questions on items one two or three and

00:39:07.120 --> 00:39:11.560
 then finally on the new business section item again we just have a couple of

00:39:11.560 --> 00:39:15.880
 items that that we've had on here for a little bit of time and do plan to bring

00:39:15.880 --> 00:39:19.640
 those back to you obviously those were previously requested by you know mr.

00:39:19.640 --> 00:39:23.680
 self who's no longer on the board but we've still kept them on there the plan

00:39:23.680 --> 00:39:27.400
 is to still bring those back to you and we are working on that I just we just

00:39:27.400 --> 00:39:31.480
 want to keep them on there too as a reminder so happy to answer any questions

00:39:31.480 --> 00:39:36.240
 certainly the staff here if you have any questions on the other items mr. Beck

00:39:36.240 --> 00:39:42.280
 thank you I'd be glad to add my name to mr. sauce on the second item there if

00:39:42.280 --> 00:39:50.840
 that would help move it along okay very well thank you any other questions oh go

00:39:50.840 --> 00:39:56.400
 ahead thank you I just wanted to thank staff and mr.

00:39:56.400 --> 00:40:00.880
 Rangita for providing the the red line version of the solid waste manual I

00:40:00.880 --> 00:40:05.200
 notice there's a lot of red line the entire sections were completely

00:40:05.200 --> 00:40:09.080
 rewritten so there wasn't there wasn't a lot of detail to see in that red line

00:40:09.080 --> 00:40:17.000
 but I think it's solid waste has an interesting aspect where a lot of the

00:40:17.000 --> 00:40:20.360
 infrastructure is privately owned where all of the other utilities they're in

00:40:20.360 --> 00:40:23.760
 easements or they're in publicly owned streets if we want to change something

00:40:23.760 --> 00:40:29.300
 well we can change our rules and we can go back and retrofit potentially solid

00:40:29.300 --> 00:40:37.320
 waste all of that pickup infrastructure is on private property and so if if the

00:40:37.320 --> 00:40:43.120
 design manual doesn't require it or allow it you know that that dictates how

00:40:43.120 --> 00:40:47.520
 decades of infrastructure are built in the city and we can't go back and say oh

00:40:47.520 --> 00:40:51.960
 now we want to use this other dumpster thing this other dumpster style and

00:40:51.960 --> 00:40:57.920
 without forcing ten or twenty or fifty thousand citizens to change their

00:40:57.920 --> 00:41:03.680
 property so I think that's a unique thing where the criteria manual reflects

00:41:03.680 --> 00:41:07.680
 a major portion of solid waste infrastructure that can't be changed in

00:41:07.680 --> 00:41:11.400
 the future so thank you for the detail

00:41:11.400 --> 00:41:18.040
 other questions all right that brings us to concluding items does any board

00:41:18.040 --> 00:41:21.840
 member wish to have something put on a future agenda or have any comments to

00:41:21.840 --> 00:41:29.360
 make to the public I see no I'll just wish everybody a Merry Christmas happy

00:41:29.360 --> 00:41:38.040
 holidays and healthy new year motion to adjourn adjourn we're adjourned