 Good afternoon and welcome to the City of Denton's Planning and Zoning Commission meeting for

00:00:09.440 --> 00:00:15.580
 Wednesday, November 17th, 2021. This is our work session and with the quorum present,

00:00:15.580 --> 00:00:21.240
 I will call us to order at 5.02 p.m. I'll let the record show that Commissioners Cole

00:00:21.240 --> 00:00:27.360
 and Smith are absent at this time. First item on the agenda is citizen comment on consent

00:00:27.360 --> 00:00:34.440
 agenda items. Is there anyone in the audience wishing to speak on that? And staff, is there

00:00:34.440 --> 00:00:42.160
 anyone on the phone for that? No, there's not. Okay, thank you. That will move us to

00:00:42.160 --> 00:00:48.040
 our work session reports. Our first one, 2A, is receive a report, hold a discussion regarding

00:00:48.040 --> 00:01:14.440
 fire and emergency response planning related to new development. Hi. Good evening. How

00:01:14.440 --> 00:01:19.800
 are you doing tonight? Doing well. Thank you for being here. My name is Megan Chuth and

00:01:19.800 --> 00:01:28.480
 I am the assistant fire marshal. I'm David Becker, assistant fire chief and fire marshal.

00:01:28.480 --> 00:01:33.560
 So tonight we have prepared a presentation, hopefully that will address some of the issues

00:01:33.560 --> 00:01:40.960
 that I think have come up in past Commission meetings. So I'll start with our part in development

00:01:40.960 --> 00:01:48.920
 review. The fire department is involved in all parts of development review from pre-development

00:01:48.920 --> 00:01:55.000
 through projects, through building permits, all the way through inspections and final

00:01:55.000 --> 00:02:01.040
 inspections. We're a member of the city's development assistance team. So we are part

00:02:01.040 --> 00:02:07.360
 of those internal meetings with other city departments. We are a part of all of the pre-development

00:02:07.360 --> 00:02:11.720
 meetings as well as any applicant meetings and we review all of the projects that come

00:02:11.720 --> 00:02:21.240
 through. Our role in these meetings is to provide feedback to developers on ensuring

00:02:21.240 --> 00:02:26.400
 that they meet compliance with our adopted fire code, which is the 2012 international

00:02:26.400 --> 00:02:35.800
 fire code with amendments. We're hoping to adopt the 2021 code in February. So the two

00:02:35.800 --> 00:02:43.040
 main items that we review in the development phase is water and access. For water, we're

00:02:43.040 --> 00:02:47.360
 just checking to make sure that there's a hydrant close to the building. The code requires

00:02:47.360 --> 00:02:54.240
 it to be within 400 feet. That distance increases to 600 feet if the building is sprinkler.

00:02:54.240 --> 00:02:59.600
 We also check hydrants in residential developments to make sure that they're spaced out on average

00:02:59.600 --> 00:03:08.000
 of 500 feet. For access at a minimum, the fire code requires a 20-foot fire lane that

00:03:08.000 --> 00:03:14.520
 reaches within 150 feet of all portions of the building. If a building is sprinkler,

00:03:14.520 --> 00:03:21.600
 that can be extended. And we look at those on a case-by-case basis. If the building is

00:03:21.600 --> 00:03:28.340
 over 30 feet in height, then we require aerial apparatus access, which is a 26-foot fire

00:03:28.340 --> 00:03:40.400
 lane situated 15 to 30 feet from the building. And that is to assist in ladder deployment.

00:03:40.400 --> 00:03:49.280
 So the fun part. The fire code dictates when two points of access are required for development.

00:03:49.280 --> 00:03:54.220
 If it is a commercial development, two points of access are required if the building is

00:03:54.220 --> 00:04:03.920
 over 30 feet in height or over three stories. If a property has multiple buildings and the

00:04:03.920 --> 00:04:11.680
 building area is over 62,000 square feet, or if it's a large building or if all the

00:04:11.680 --> 00:04:19.100
 buildings are sprinkler, that goes up to 124,000 square feet. Then two points of access are

00:04:19.100 --> 00:04:30.400
 required. For residential, more than 100 dwelling units requires two points of access, unless

00:04:30.400 --> 00:04:35.360
 all of the buildings are sprinkler. So if it's an apartment complex and they have a

00:04:35.360 --> 00:04:43.200
 clubhouse, everything has to be sprinkler. Then it can go up to 200. But any multifamily

00:04:43.200 --> 00:04:50.120
 developments that have more than 200 dwelling units has to have two points of access. For

00:04:50.120 --> 00:04:55.540
 one- and two-family dwelling developments, over 30 dwelling units requires two points

00:04:55.540 --> 00:05:02.000
 of access. There is an exception for that if all of the homes are sprinkler. Then only

00:05:02.000 --> 00:05:08.560
 one point of access is required. And just a little side note, that is a different type

00:05:08.560 --> 00:05:12.880
 of sprinkler system than like a commercial sprinkler system. It's connected to the domestic

00:05:12.880 --> 00:05:18.660
 water. It's a much lower cost sprinkler system that the intent is not to save property, but

00:05:18.660 --> 00:05:29.520
 to save lives. So when two points of access are required, the code requires that they

00:05:29.520 --> 00:05:38.520
 meet remoteness. With the exception of multifamily apartments, this is not required to me for

00:05:38.520 --> 00:05:45.240
 apartments. However, in the 2021 code, that changes and apartments will be, multifamily

00:05:45.240 --> 00:05:50.960
 is included in having to meet remoteness. So when we adopt the 2021 code, this will

00:05:50.960 --> 00:06:02.040
 apply to any time two points of access is required. So remoteness refers to, I'm going

00:06:02.040 --> 00:06:07.360
 to try to explain this the best I can, but I do have pictures that help. Remoteness refers

00:06:07.360 --> 00:06:15.520
 to the distance of the two access points and it has to be equal or greater than the total

00:06:15.520 --> 00:06:23.840
 diagonal distance of the lot or area to be served. So again, I think pictures help so

00:06:23.840 --> 00:06:31.800
 much more with this. This is kind of an easy one, but this is single family development

00:06:31.800 --> 00:06:41.040
 over 30 homes. So two points of access are required. We take the total diagonal dimension,

00:06:41.040 --> 00:06:48.960
 which is the diagonal measurement of the lot is 1400 feet. Half of that is 700. So that

00:06:48.960 --> 00:06:55.800
 means their two access points have to be more than 700 feet apart. And you can see here

00:06:55.800 --> 00:07:01.880
 they have access points, two access points on Mills Road that are 800 feet apart. So

00:07:01.880 --> 00:07:11.360
 they meet remoteness. As we know, a lot of lots are not this simple and we do have to

00:07:11.360 --> 00:07:19.720
 get creative sometimes when applying remoteness. It's not always just a nice square or rectangle

00:07:19.720 --> 00:07:26.840
 of that. I think what we're looking for is to make sure that they meet the intent of

00:07:26.840 --> 00:07:33.920
 the code. So let's look at one more that I know has been a subject of discussion. This

00:07:33.920 --> 00:07:40.880
 is a development between Buckees and the South Ridge Village Shopping Center. It's a very

00:07:40.880 --> 00:07:47.920
 long narrow lot and the developer was having a really challenging time meeting two points

00:07:47.920 --> 00:07:55.320
 of access. This development is a one multi-story building, but just one building. It is over

00:07:55.320 --> 00:08:02.660
 30 feet in height, so it requires two remote points of access. So since the code specifically

00:08:02.660 --> 00:08:11.000
 says that that diagonal measurement is for the lot or area to be served, we consider

00:08:11.000 --> 00:08:16.160
 the building to be the area to be served. On the backside of the property, it's just

00:08:16.160 --> 00:08:23.720
 access roads. So what we did was in order to try to assist this developer, we measured

00:08:23.720 --> 00:08:30.680
 the diagonal distance of the building, which was 650 feet. Take half of that, that's 325

00:08:30.680 --> 00:08:35.480
 feet, and that was the distance that their two access points had to be apart. So they

00:08:35.480 --> 00:08:41.360
 have one access point up on I-35 Frontage Road and they were able to get a second access

00:08:41.360 --> 00:08:50.000
 point that connected to the fire lane of the South Ridge Village Shopping Center. So again,

00:08:50.000 --> 00:08:57.000
 maybe not like the previous example, but again, it's us trying to work with developers so

00:08:57.000 --> 00:09:03.200
 that lots don't become undevelopable based on them requiring two points of access. And

00:09:03.200 --> 00:09:08.120
 we felt like this was a good example because it truly does meet the intent of the code

00:09:08.120 --> 00:09:14.520
 where the fire department has access and we can come in off the frontage road or off Lillian

00:09:14.520 --> 00:09:19.000
 Miller and through the fire lane and the shopping center.

00:09:19.000 --> 00:09:22.000
 Can I stop you there for just one second? He's got a question it looks like. Commissioner

00:09:22.000 --> 00:09:23.000
 Anderson.

00:09:23.000 --> 00:09:29.160
 Yeah, I do have a quick question. This remoteness, the apartment complex, I'm glad you brought

00:09:29.160 --> 00:09:36.000
 that up because I had it on my notes here to write down. When did this little second

00:09:36.000 --> 00:09:41.660
 entrance become, when did that become part of the project? Was that recently? Because

00:09:41.660 --> 00:09:46.760
 I don't think that was on the thing that we approved.

00:09:46.760 --> 00:09:53.160
 So the development project when the commission considered it was required to have a second

00:09:53.160 --> 00:09:58.140
 point of access, they were coordinating with the off-site assisted living care facility

00:09:58.140 --> 00:10:02.240
 and so they were going to obtain that second point of access through that adjoining site.

00:10:02.240 --> 00:10:07.040
 But they're saying that they don't have that access. They're saying they have one behind

00:10:07.040 --> 00:10:09.240
 like the Goodwill Center, pretty much.

00:10:09.240 --> 00:10:10.240
 Right.

00:10:10.240 --> 00:10:13.400
 I was going to say, Haley was the project manager. Maybe she can provide.

00:10:13.400 --> 00:10:16.520
 Yeah, that is definitely a different schematic than we saw.

00:10:16.520 --> 00:10:20.420
 I just wanted to clarify, this particular site plan looks like it was for a previous

00:10:20.420 --> 00:10:24.880
 proposal on that property. This is not the Millennium Crest site plan that you all recently

00:10:24.880 --> 00:10:29.600
 saw. This is that same property, but a prior development that never came to fruition.

00:10:29.600 --> 00:10:39.920
 Okay. So the apartment complex that got passed through us, they don't have two access points.

00:10:39.920 --> 00:10:43.960
 Their proposal was to get a similar concept to this with that second point of access being

00:10:43.960 --> 00:10:46.000
 through the adjacent site to the west.

00:10:46.000 --> 00:10:48.160
 Have they received that? Do you know?

00:10:48.160 --> 00:10:51.880
 They have not submitted anything further to us, but I do know they're working on finalizing

00:10:51.880 --> 00:10:55.040
 a site plan for the property. But this was a previous development.

00:10:55.040 --> 00:10:58.720
 Okay. Because I was confused because I was like, this is not what we saw.

00:10:58.720 --> 00:11:03.560
 Correct. This was an elderly housing development that never came to fruition. Millennium Crest

00:11:03.560 --> 00:11:06.000
 hasn't come back in yet. So we don't know what that will look like for them.

00:11:06.000 --> 00:11:07.000
 Okay. All right. Thanks.

00:11:07.000 --> 00:11:08.000
 This was just an example Megan was using.

00:11:08.000 --> 00:11:10.640
 All right. Thank you, Haley. Another quick question.

00:11:10.640 --> 00:11:14.440
 Sure. And I apologize for that confusion. I was struggling just trying to find some sort

00:11:14.440 --> 00:11:15.440
 of pictures.

00:11:15.440 --> 00:11:16.440
 No, I'm glad you brought this up because that was-

00:11:16.440 --> 00:11:18.440
 It's a good example.

00:11:18.440 --> 00:11:22.880
 This was on a point that I wanted to make also about the other property that we talked

00:11:22.880 --> 00:11:28.920
 about. The other one that says, we had, and I maybe jumped the gun. I apologize. But it's

00:11:28.920 --> 00:11:33.400
 talking about, they have to have access. And how does the development here on, well, I

00:11:33.400 --> 00:11:38.360
 can mark that one out. That was the good one. That just recently passed on Loop 288 and

00:11:38.360 --> 00:11:43.520
 McKinney Street here behind the 711, that apartment complex. They're going to be here

00:11:43.520 --> 00:11:48.120
 off of Loop 288. They're going to make an entrance, but I don't think they have a second

00:11:48.120 --> 00:11:55.240
 access point. Would that be yours? Can I ask that?

00:11:55.240 --> 00:11:58.880
 I believe the development you're talking about is the Pebblebrook Parkside development.

00:11:58.880 --> 00:11:59.880
 Right behind the 711?

00:11:59.880 --> 00:12:00.880
 Yes.

00:12:00.880 --> 00:12:01.880
 Yes.

00:12:01.880 --> 00:12:05.600
 So they did have two points of access. They had a Southern entry point, which would have

00:12:05.600 --> 00:12:14.800
 full access with a traffic signal. And then the Northern access was exit only and had

00:12:14.800 --> 00:12:21.720
 a, or it was a 3/4 access. In order to meet the fire access, especially the aerial apparatus,

00:12:21.720 --> 00:12:29.280
 they had rollover curbs on the four-story building off the right of way. So they could basically

00:12:29.280 --> 00:12:34.960
 enter off of Loop 288, go over the rollover curbs, and be able to have that ladder access.

00:12:34.960 --> 00:12:35.960
 Okay.

00:12:35.960 --> 00:12:36.960
 Is it Amy?

00:12:36.960 --> 00:12:37.960
 Yeah.

00:12:37.960 --> 00:12:38.960
 All right.

00:12:38.960 --> 00:12:39.960
 All right. Thank you.

00:12:39.960 --> 00:12:42.840
 Yeah, no, and thank you for bringing that up too, because it does just make the point

00:12:42.840 --> 00:12:49.280
 that for the two required points of access, it's not always just a traditional fire lane

00:12:49.280 --> 00:12:57.520
 or access point. A lot of times due to maybe resident concerns on adjacent properties,

00:12:57.520 --> 00:13:02.400
 they might have to, I think as long as we approve it, they might have to do either a

00:13:02.400 --> 00:13:09.500
 gate with an ox lock or an opti-com or just something else that still meets this requirement

00:13:09.500 --> 00:13:13.080
 but allows them to continue on with their development.

00:13:13.080 --> 00:13:14.080
 Thank you.

00:13:14.080 --> 00:13:17.680
 We're about to move on, but do y'all have any other questions that you would like to

00:13:17.680 --> 00:13:18.680
 ask me about?

00:13:18.680 --> 00:13:20.680
 No, not at this time. Go ahead. Please. Thank you.

00:13:20.680 --> 00:13:26.040
 And as I said, I'm David Becker, Assistant Chief, and I agree with Megan, but at this

00:13:26.040 --> 00:13:30.320
 point in the last couple of years of me being in this position, we really do try to work

00:13:30.320 --> 00:13:35.400
 with the developers. And as you can see, as we all run together, we try to work together

00:13:35.400 --> 00:13:40.440
 and have these conversations to try to find the best access. And I mean, our ultimate

00:13:40.440 --> 00:13:43.240
 golden fireside is Las Aguilera.

00:13:43.240 --> 00:13:49.960
 So there was a couple of questions in the packet about response times. So Megan did

00:13:49.960 --> 00:13:54.080
 the first half of PowerPoint. I'll do a little bit more with pictures and just talk you through

00:13:54.080 --> 00:13:59.280
 it. But if you look in that top right corner, you can see where the existing fire station

00:13:59.280 --> 00:14:07.240
 is at. And if you were to remove Station 8 from that position, in the old days, we basically

00:14:07.240 --> 00:14:10.920
 took a compass, we drew about a four-mile circle, we considered about a five-minute

00:14:10.920 --> 00:14:18.080
 response time, tried to meet NFPA 1710 to meet, you know, ISO needs, you know, patient

00:14:18.080 --> 00:14:23.280
 safety, EMS, fire, all that type of response.

00:14:23.280 --> 00:14:28.920
 Now as you look below that, in today's world with ArcGIS and heat mapping, you can see

00:14:28.920 --> 00:14:33.240
 the dark green kind of shows what we can cover in a four-minute response, NFPA X that we

00:14:33.240 --> 00:14:38.920
 look at, NFPA 1710 that we look at, four-minute response and eight-minute response. And you

00:14:38.920 --> 00:14:44.040
 can see in there, even with that previous stations, that we have some gaps in there.

00:14:44.040 --> 00:14:48.440
 But the light green is an eight-minute response, which is what the question was aimed at, you

00:14:48.440 --> 00:14:52.720
 know, what do we look for eight-minute responses?

00:14:52.720 --> 00:14:59.080
 The slide that's actually with the red, the green, in the middle of the page, this isn't

00:14:59.080 --> 00:15:03.800
 what we can do with our mapping now. We can basically drop a pin, look at how the current

00:15:03.800 --> 00:15:08.480
 streets are set up, how that works, where can we be in four minutes and where can we

00:15:08.480 --> 00:15:13.080
 be in eight minutes? So we're using technology to help us get to that point, where do we

00:15:13.080 --> 00:15:17.680
 build future fire stations? So as we continue to develop the city of Denton, we're not drawing

00:15:17.680 --> 00:15:23.720
 concentric circles anymore. We're looking at the major roads that go through town and

00:15:23.720 --> 00:15:29.840
 give us that access. And this one here is one that we're looking at off of a 380 West.

00:15:29.840 --> 00:15:37.480
 And we'd be doing the same thing if we start looking at the new fire station. Questions?

00:15:37.480 --> 00:15:41.800
 And then the last question, and as we know, we're getting more and more residential, we're

00:15:41.800 --> 00:15:45.720
 packing in the city, we're trying to develop the land around us, but we got fire stations

00:15:45.720 --> 00:15:50.560
 sitting there. So one of the questions was code one versus code three response. Code

00:15:50.560 --> 00:15:56.320
 one, no lights, no sirens are driving down the road. And code three, lights and sirens

00:15:56.320 --> 00:16:02.600
 are visual and audio alarms. 90% of what we do is a code three response. If somebody's

00:16:02.600 --> 00:16:07.280
 having a heart attack, it's your house is on fire. 70% of what we do in the city of

00:16:07.280 --> 00:16:14.840
 Denton is EMS based. The next is a lot of responding to automatic alarms. And we do

00:16:14.840 --> 00:16:20.640
 allow our captains to ask questions, is there, you know, what's the sensor being sent? And

00:16:20.640 --> 00:16:24.880
 they can make that decision, do I want to bump down to code one or do I want to continue

00:16:24.880 --> 00:16:29.880
 code three based on what those responses are from dispatch? And then the code one responses

00:16:29.880 --> 00:16:34.400
 are, you know, just going out and doing welfare checks or something that's, you know, a little

00:16:34.400 --> 00:16:39.160
 bit pub ads and those kinds of things. So the question is, is we are looking at code

00:16:39.160 --> 00:16:44.480
 two response. We've had several emails, we're dealing with the legal department. PD is easily

00:16:44.480 --> 00:16:51.000
 covered under code two response because sometimes they need to not have lots of sirens on because

00:16:51.000 --> 00:16:54.720
 they have to sneak up on a criminal. You know, they have to show up without everybody knowing

00:16:54.720 --> 00:16:58.320
 they're in the neighborhood. We make a lot of noise when we show up in the neighborhood.

00:16:58.320 --> 00:17:03.480
 You know, we got that big red calling card that we run with. So we're looking at transportation

00:17:03.480 --> 00:17:10.100
 code and it doesn't really, it's not specific to what we can do at the fire department.

00:17:10.100 --> 00:17:16.040
 We are set up code one, code three. We're having legal look into it and see if we could

00:17:16.040 --> 00:17:20.240
 set up our own city ordinances, our own policies, and maybe address some of that and some of

00:17:20.240 --> 00:17:29.040
 those issues where maybe we could use visual alarms or the lights and not the audible or

00:17:29.040 --> 00:17:34.120
 the siren. So it's a topic conversation around the fire department and especially as we see

00:17:34.120 --> 00:17:39.680
 that the apartment complex is going in next to station five and that we see around our

00:17:39.680 --> 00:17:43.680
 new station eight and the hotels that are there, we're trying to be good neighbors,

00:17:43.680 --> 00:17:49.080
 but as we'd all say, if it's your mom or your house, you know, you want us there quickly.

00:17:49.080 --> 00:17:54.080
 So we're trying to, we're trying to be good stewards of the, of the power that you've

00:17:54.080 --> 00:18:02.920
 given us, but we will make sure that we're doing the right job. So any questions on?

00:18:02.920 --> 00:18:03.920
 Commissioner Pruitt.

00:18:03.920 --> 00:18:09.340
 Thank you. First, I guess just a brief question on this and then I want to go back to response

00:18:09.340 --> 00:18:15.760
 times. When you have a code three call and you, you know, you roll the doors up and you

00:18:15.760 --> 00:18:23.400
 start going out is, are the sirens active from the moment the truck leaves the bay or

00:18:23.400 --> 00:18:25.680
 how does that process work?

00:18:25.680 --> 00:18:31.000
 The normally as they hit the end of the ramp, based on traffic, those kinds of things, when

00:18:31.000 --> 00:18:35.920
 they turn the lights on, they turn the sirens on with it. So as they're making that response,

00:18:35.920 --> 00:18:39.880
 it's just automatic. They engage both at the same time. They are different switches, but

00:18:39.880 --> 00:18:43.920
 they are engaging them both. And it's usually, you know, the inner traffic middle of the

00:18:43.920 --> 00:18:47.860
 night is probably not uncommon that it takes a second or so they get it flipped on, you

00:18:47.860 --> 00:18:50.800
 know, and there's not a lot of traffic.

00:18:50.800 --> 00:18:54.700
 One of the things is, is even whether we're driving code three or code one with the good

00:18:54.700 --> 00:18:59.440
 stewards of the road, you know, we just because we have lots of sirens on, we're only asking

00:18:59.440 --> 00:19:05.080
 permission to run a red light, only asking permission to go the wrong way down the street.

00:19:05.080 --> 00:19:10.800
 It's still our responsibility to make sure that we do it safely. So with code one, we're

00:19:10.800 --> 00:19:16.680
 obeying all the traffic laws, just as you are. In code two, we would be still obeying

00:19:16.680 --> 00:19:20.400
 all those traffic laws. The only thing that would be different would be we would have

00:19:20.400 --> 00:19:21.400
 the lights running.

00:19:21.400 --> 00:19:29.120
 Okay. And just forgive me for my terminology question, but by end of ramp, is that the

00:19:29.120 --> 00:19:39.400
 exit from the the parking area or inside the fire station property? Okay. Okay. Thank you.

00:19:39.400 --> 00:19:43.760
 And then a question about the response times. If you could go back to that slide that showed

00:19:43.760 --> 00:19:53.080
 the map. I think one thing I've been interested in when we see proposals for, you know, especially

00:19:53.080 --> 00:19:58.160
 for rezonings and that sort of thing. One of the criteria in our comprehensive plan

00:19:58.160 --> 00:20:06.280
 is to seek to optimize the usage of our existing facility, public facilities. And part of that

00:20:06.280 --> 00:20:14.200
 is fire stations and personnel. And I think what we've seen so far is that if that development

00:20:14.200 --> 00:20:19.640
 was within an eight-minute response time, that's sort of a pass/fail grade that we've

00:20:19.640 --> 00:20:25.840
 seen on our applications. I guess what I'm interested in is understanding if you have,

00:20:25.840 --> 00:20:33.640
 say, a development that goes in that has a seven-minute response time, over time, would

00:20:33.640 --> 00:20:40.440
 that be a development that you would look to add additional fire stations to to reduce

00:20:40.440 --> 00:20:49.280
 it down to that four-minute goal of NFPA 1710? How do you make those decisions? Because from

00:20:49.280 --> 00:20:57.600
 my perspective, it's just, you know, we want to make sure that we grow smartly for lack

00:20:57.600 --> 00:21:03.000
 of a better term. And part of that is to make sure that we don't necessarily saddle ourselves

00:21:03.000 --> 00:21:09.840
 with overextending stations or requiring stations down the road that we may have a difficulty

00:21:09.840 --> 00:21:15.680
 affording, if that makes sense. That's a great question. 1710 is what the

00:21:15.680 --> 00:21:21.040
 intent is, and I'm speaking from memory, is that we can provide that service to 80 percent

00:21:21.040 --> 00:21:26.640
 of our population. And so as we grow, sometimes we'll have those outliners. And what we try

00:21:26.640 --> 00:21:30.840
 to do is look to the future and try to find ways. And it's one of the reasons that this

00:21:30.840 --> 00:21:34.760
 morning we were at the mobility plan meetings, because we want to know where future roads

00:21:34.760 --> 00:21:38.760
 are going in, because if we know that, we can start looking for land in that area and

00:21:38.760 --> 00:21:43.020
 we can have those discussions. One of the other things that we do currently, even with

00:21:43.020 --> 00:21:47.840
 our residents of Robeson Ranch, we go into mutual aid agreements or automatic aid agreements

00:21:47.840 --> 00:21:53.200
 with other agencies that, and they have a fire station just south of the entry. So we

00:21:53.200 --> 00:21:56.320
 actually are in agreement with them and they respond to that area, which helps them with

00:21:56.320 --> 00:22:02.280
 their insurance, but it also helps us get to the scene faster, treat the medical patient

00:22:02.280 --> 00:22:06.680
 or get on the scene faster and knock the fire down, because we know it's exponentially growing.

00:22:06.680 --> 00:22:12.280
 So when we have those outliers, as you were saying, as we do our studies, we also look

00:22:12.280 --> 00:22:19.360
 for ways to get creative, you know, even fiscally creative to cover that area.

00:22:19.360 --> 00:22:23.920
 Okay. But if you had an area that was, say, a seven-minute response time, that would be

00:22:23.920 --> 00:22:28.160
 one area that you would try to reduce that down to the four minutes in one of those creative

00:22:28.160 --> 00:22:30.980
 ways? At some point, as it continues to grow, as

00:22:30.980 --> 00:22:34.720
 we know with Cole Hunter Ranch going in, we know more stations going there, and that's

00:22:34.720 --> 00:22:40.040
 actually going to help the residents of the Robeson Ranch area also. So as the city continues

00:22:40.040 --> 00:22:45.260
 to grow, we will continue to look for areas that we can put a fire station in that can

00:22:45.260 --> 00:22:51.840
 have great reach at major intersections or can gain access to an area. We try not to

00:22:51.840 --> 00:22:56.440
 bury our fire stations into a residential district, because once again, now it inhibits

00:22:56.440 --> 00:23:01.320
 me from getting out to provide that. I hope I'm answering your question.

00:23:01.320 --> 00:23:11.360
 I think you are. Yeah. Thank you. Okay. Any other questions? Did you have more to

00:23:11.360 --> 00:23:23.320
 your presentation, or was that? Hold on. Wait. Wait. Thank you for the opportunity.

00:23:23.320 --> 00:23:28.880
 Thank you so much. Great information. Obviously, yeah, that comes before us often, just in

00:23:28.880 --> 00:23:35.120
 our backup, and you helped to let us understand that further of how the process works. So

00:23:35.120 --> 00:23:39.920
 thank you so much for being here. Oh, we do. Commissioner McDade, we do have a question.

00:23:39.920 --> 00:23:48.800
 All right. Thank you. I have just a question in general. In my neighborhood, we're actually

00:23:48.800 --> 00:23:56.440
 having traffic issues, really speeding, and we've asked about speed bumps. And the response

00:23:56.440 --> 00:24:03.120
 we got was, well, they're not warranted because it affects a fire. And I just want to know

00:24:03.120 --> 00:24:08.360
 what the logic is behind that, so I can get back with the community. Does it slow down

00:24:08.360 --> 00:24:14.160
 the response time, or what is the effect of a speed bump when it comes to the fire trucks?

00:24:14.160 --> 00:24:22.120
 Sorry, I couldn't answer that. The International Fire Code actually prohibits the use of speed

00:24:22.120 --> 00:24:27.600
 bumps for regulating speed and traffic, but a lot of that goes back to that. But it also

00:24:27.600 --> 00:24:33.040
 puts it on the fire official's plate to kind of make smart decisions. Can we find traffic

00:24:33.040 --> 00:24:38.280
 calming devices to slow that area? Can we use enforcement by our PD officers to slow

00:24:38.280 --> 00:24:42.360
 down speeding in that area? Can we put in, you know, and so we've been working with,

00:24:42.360 --> 00:24:45.960
 I don't say engineering, we actually have several conversations. It's something that

00:24:45.960 --> 00:24:52.520
 we're working on, and to the fact that we don't want to outlaw them completely, but

00:24:52.520 --> 00:24:57.000
 we do want to help design them, what the shape is of them, that helps our trucks. We've actually

00:24:57.000 --> 00:25:01.920
 had damage to our apparatus because the weight must be, you may not realize, but we have

00:25:01.920 --> 00:25:07.520
 500 pounds, I mean, 500 gallons of 8 pounds of water in those trucks, and they don't go

00:25:07.520 --> 00:25:11.640
 over the speed bumps very well. The other problem is, is there are studies out there

00:25:11.640 --> 00:25:16.640
 that show for every speed bump you put in, you can put in about a 10 second reduction

00:25:16.640 --> 00:25:21.520
 in response time. So if you have one in the center of your street, we can probably get

00:25:21.520 --> 00:25:25.400
 around it. As long as we, and that's the things that we're working on with engineering now,

00:25:25.400 --> 00:25:30.280
 to try to come up with a better plan on how we can address safety in your neighborhoods

00:25:30.280 --> 00:25:35.600
 because ultimately we care about safety, but we also don't want to slow our response times

00:25:35.600 --> 00:25:40.080
 because we've had areas in the Sea of Denton that we've had to cross 8 or 10 of them, and

00:25:40.080 --> 00:25:47.200
 all of a sudden now we've taken our response time from 4 minutes to 8 minutes and all the

00:25:47.200 --> 00:25:51.440
 work that we do to reduce our time out the door, down the road, putting our stations

00:25:51.440 --> 00:25:56.700
 in the right place, and a few speed bumps can slow that down. So we're not completely

00:25:56.700 --> 00:26:01.080
 against them, and I'm hoping I'm answering your question, but we are reviewing that with

00:26:01.080 --> 00:26:08.620
 engineering and there are other traffic calming devices and other techniques that we can use,

00:26:08.620 --> 00:26:12.800
 and that's something that we're working on to try to implement in the City of Denton.

00:26:12.800 --> 00:26:20.320
 Alright, thank you. Awesome, thank you. Anybody else? Okay, thank you again for being here.

00:26:20.320 --> 00:26:27.640
 Well thank you for having us. Appreciate it. Okay, our next agenda item in our work session

00:26:27.640 --> 00:26:33.920
 reports is receive a report, hold a discussion regarding the city's plotting process, and

00:26:33.920 --> 00:26:47.480
 I will call up Karina for discussion there. Alright, good evening. Karina Maldonado, Associate

00:26:47.480 --> 00:26:52.680
 Planner. So I won't spend too much time on some of these slides. There was a previous

00:26:52.680 --> 00:26:59.560
 presentation on plotting earlier this year, but what we wanted to focus in on was on the

00:26:59.560 --> 00:27:05.440
 shot clock and how it affects the process, as well as go over some questions. I'll just

00:27:05.440 --> 00:27:11.400
 skip this slide. So PNZ had requested in a previous meeting some additional information

00:27:11.400 --> 00:27:15.040
 about the plot approval process, and some of those questions that were brought forward

00:27:15.040 --> 00:27:22.520
 were, you know, why are some plots brought back as denials and some as requests for extensions,

00:27:22.520 --> 00:27:26.960
 and then why do some recommendations change after the agenda is posted, even up to the

00:27:26.960 --> 00:27:32.040
 meeting time. So those questions kind of go back to our process, and more specifically

00:27:32.040 --> 00:27:37.440
 how the process was changed due to HB 3167. So I'll focus on that, and please feel free

00:27:37.440 --> 00:27:42.760
 to stop me during the presentation if you have questions. So I'll go over this pretty

00:27:42.760 --> 00:27:48.720
 briefly. So HB 3167, otherwise known as the shot clock, that legislation was passed through

00:27:48.720 --> 00:27:56.260
 the Texas legislation in 2019, which required that municipalities have 30 days to act upon

00:27:56.260 --> 00:28:03.320
 a plat or construction plans. That legislation required that we approve, approve with conditions,

00:28:03.320 --> 00:28:09.760
 or deny a plat within 30 days of its submittal. The City of Denton actually just approves

00:28:09.760 --> 00:28:18.680
 or denies plats because an approval with conditions follows the same process as a denial. And

00:28:18.680 --> 00:28:22.200
 some of the key areas from this slide that I'll touch on was obviously there was changes

00:28:22.200 --> 00:28:29.560
 to our submittal process we followed. Based on P&Z meeting dates, we had submittal schedules

00:28:29.560 --> 00:28:35.960
 that would allow the 30 days within that period. We did require that supplemental applications

00:28:35.960 --> 00:28:41.880
 like your TIAs, your field assessments, that those things were completed prior to plat

00:28:41.880 --> 00:28:49.600
 submittals so that it wouldn't hold up that plat application. Other things were it allowed

00:28:49.600 --> 00:28:55.440
 30 day extensions. That would be a one time extension and we are seeing those more frequently

00:28:55.440 --> 00:29:01.480
 as you guys can see during our frequent meetings. And then it changed our staff report. So the

00:29:01.480 --> 00:29:06.120
 staff report that you see specifically have to indicate why we're denying a plat, how

00:29:06.120 --> 00:29:18.680
 it applies to specific DDC references or state law or other regulations. So again, I'll just

00:29:18.680 --> 00:29:24.160
 briefly go over this. So the general information that we typically tell you all is if it meets

00:29:24.160 --> 00:29:29.040
 all our requirements, we're obligated to or the P&Z is obligated to approve the plat.

00:29:29.040 --> 00:29:36.400
 If it does not meet these regulations or requirements, then you may deny the plat. And so some of

00:29:36.400 --> 00:29:41.920
 the things that we consider as the development review team, which includes planning, engineering,

00:29:41.920 --> 00:29:47.760
 fire, and some other technical review staff, sometimes these denials are based off of just

00:29:47.760 --> 00:29:52.760
 general insufficient information. Maybe they're not providing enough of that background information

00:29:52.760 --> 00:29:59.240
 in order to approve the plat. That can be plat notes, that can be graphic information.

00:29:59.240 --> 00:30:03.920
 They can also just not be meeting our DDC. So our development standards are included

00:30:03.920 --> 00:30:11.240
 in subchapter seven. That's things like water, wastewater, access, site and building design,

00:30:11.240 --> 00:30:17.200
 ESAs. So if they're not meeting the requirements in that section through their supplementary

00:30:17.200 --> 00:30:23.360
 information that they provide with the plat, then that's a basis for denial. Other things

00:30:23.360 --> 00:30:28.060
 like just our subdivision standards. So whether they have sufficient access, are they meeting

00:30:28.060 --> 00:30:33.420
 the minimum lot requirements and setbacks? Even HOA documents, those are some things

00:30:33.420 --> 00:30:37.340
 that you'll see. And then of course, I mentioned supplemental applications. So that's things

00:30:37.340 --> 00:30:42.360
 like our tree preservation. We review that with the preliminary plots, civil engineering

00:30:42.360 --> 00:30:48.600
 plans, flood studies. If those supplementary plans don't meet our code and it ties to the

00:30:48.600 --> 00:30:55.480
 plat, then that's a basis for denial. So this is just kind of a screenshot. We showed

00:30:55.480 --> 00:31:01.080
 this last time. We mentioned that basis for denial sometimes is based on the preliminary

00:31:01.080 --> 00:31:06.320
 plat checklist, the final plat checklist. This is just a brief screenshot of that. Supplemental

00:31:06.320 --> 00:31:10.640
 sheets that are typically provided with the preliminary plots. That's things like drainage

00:31:10.640 --> 00:31:15.320
 sheets. So your pre and post conditions. Tree preservation. So they have to provide the

00:31:15.320 --> 00:31:23.160
 survey and the preservation plan. Utility layout is another item. And also grading.

00:31:23.160 --> 00:31:27.640
 So these are all the things in the background that you don't see in your backup. But as

00:31:27.640 --> 00:31:32.120
 we review this, mark it up, go through the process, these are some things that kind of

00:31:32.120 --> 00:31:38.680
 hold up an application. And so going back to those questions, why would one plat come

00:31:38.680 --> 00:31:47.200
 forth as a denial and another one as a recommendation for an extension? So here's just some markups

00:31:47.200 --> 00:31:52.800
 and some of them are pretty simple, just to convey the information. So just provided a

00:31:52.800 --> 00:31:59.080
 markup here. Graphic information. Sometimes it's as simple as lot and block, not matching

00:31:59.080 --> 00:32:05.560
 or being consistent with what we would require. So as this example, they've provided a single

00:32:05.560 --> 00:32:13.920
 lot as a lot 41 block F. Well, there's no block A and there's no lot one through 40.

00:32:13.920 --> 00:32:18.160
 So that's kind of one of those simple things like, could you please change this? And you

00:32:18.160 --> 00:32:24.840
 can see that it's simple enough that they've changed it. So as an example, if maybe this

00:32:24.840 --> 00:32:30.400
 was one of five comments that was simple enough for staff to review, they would be able to

00:32:30.400 --> 00:32:36.880
 work with staff to clear that out before P and Z. Simple things like just wording on an

00:32:36.880 --> 00:32:43.720
 owner's dedication. And here's a more complicated one is meeting the minimum lot standards.

00:32:43.720 --> 00:32:50.000
 So for this lot, the minimum lot depth was 80 feet. They didn't dimension it, so staff

00:32:50.000 --> 00:32:55.160
 could not review to make sure that it complied with the code. So these are some examples

00:32:55.160 --> 00:33:01.400
 of some minor issues that are pretty easy to resolve. It's just a matter of adding the

00:33:01.400 --> 00:33:07.280
 information to the plat. It's simple enough. Things like what you see on these supplemental

00:33:07.280 --> 00:33:13.920
 sheets, if they need calculations that are missing that require staff to verify whether

00:33:13.920 --> 00:33:18.200
 they're meeting drainage or not, those are more complicated and would require a full

00:33:18.200 --> 00:33:23.040
 submittal. So sometimes you'll see they'll just ask for their extension. They don't have

00:33:23.040 --> 00:33:29.400
 the time to go back and do the thorough review. And so hopefully the next slide will help

00:33:29.400 --> 00:33:34.080
 kind of explain that a little bit more. So in current, if I could just interrupt you,

00:33:34.080 --> 00:33:40.200
 they have until up to the start of the meeting, correct? To be able to, yes. And just to add

00:33:40.200 --> 00:33:46.240
 on that, sometimes it depends on staff workload. You know, is if it's available for staff to

00:33:46.240 --> 00:33:53.380
 provide that informal review, then we can have that changed. If it's a very lengthy

00:33:53.380 --> 00:33:59.240
 review that's required, it's difficult to have staff review an hour before the meeting.

00:33:59.240 --> 00:34:05.360
 So we'll just kick it back to a formal review. Understood. And hopefully to better explain

00:34:05.360 --> 00:34:11.360
 the process of the 30 day shot clock, I've outlined the process, kind of just showing

00:34:11.360 --> 00:34:17.880
 you from day zero to day 30 what that looks like. So day zero is the day that you submit

00:34:17.880 --> 00:34:23.880
 your application. They've submitted it by 5 p.m. Typically that's a Tuesday, so that

00:34:23.880 --> 00:34:30.520
 they could get that in. Between day zero and day two, we do a completeness review. So making

00:34:30.520 --> 00:34:36.080
 sure that they have all the correct information in order for us to sufficiently review it.

00:34:36.080 --> 00:34:41.480
 Then it goes to the development review team. So that's, as you can see, day 3 through 13,

00:34:41.480 --> 00:34:47.320
 that's about 10 days for staff to review. I do want to clarify, that is calendar days,

00:34:47.320 --> 00:34:52.380
 not business days. So that will be, you know, we'll get a review on a Thursday and it's

00:34:52.380 --> 00:34:59.600
 due on Monday. So just to give you a sense of what that looks like. Day 14, we get together

00:34:59.600 --> 00:35:04.140
 as a group, the development assistance team, that's all the reviewers. We go over our comments

00:35:04.140 --> 00:35:10.600
 and we make sure that a planning comment doesn't conflict with the FHIR code comment. So we

00:35:10.600 --> 00:35:15.120
 make sure that each reviewer has an opportunity to say, okay, here are the issues with this

00:35:15.120 --> 00:35:25.560
 plat. So if issue with planning for access also is an issue for FHIR, it allows an opportunity

00:35:25.560 --> 00:35:32.220
 to set up meetings on the side to help the applicant understand these are the 10 comments

00:35:32.220 --> 00:35:39.240
 that you need to address in order to get this approved. As it moves forward, so this is

00:35:39.240 --> 00:35:44.120
 just where the internal meeting happens. Then the project facilitator, so that's not planning.

00:35:44.120 --> 00:35:50.280
 This is a separate person. The project facilitator issues those comments directly to the applicant.

00:35:50.280 --> 00:35:56.520
 At the time they're told, okay, you have outstanding comments, we're recommending denial at P&Z,

00:35:56.520 --> 00:36:01.760
 or you've met all our requirements, so we're recommending approval. With a first review,

00:36:01.760 --> 00:36:08.400
 that's more than not a recommendation for denial. We do have a few like our minor administratively

00:36:08.400 --> 00:36:15.760
 approved plat sets sometimes do reach that at an earlier date. Skipping from that point

00:36:15.760 --> 00:36:22.880
 to day 29, that is when you guys see the plat come forth for P&Z for either an extension

00:36:22.880 --> 00:36:30.840
 of approval or approval of an extension request, approval of a plat or denial. And I just wanted

00:36:30.840 --> 00:36:36.800
 to highlight three days that kind of interrupt that. So as you can see, day 20, that's when

00:36:36.800 --> 00:36:43.760
 staff is drafting the agenda items, including the draft staffed in analysis. And that's

00:36:43.760 --> 00:36:50.480
 where we compile all the denial comments based on the review. So we'll compile engineering

00:36:50.480 --> 00:36:57.520
 comments, fire, any review where that comes forth with outstanding items. And then we

00:36:57.520 --> 00:37:02.680
 go through the agenda finalization process. So agendas are always finalized the Friday

00:37:02.680 --> 00:37:07.440
 before. I think commissioner Anderson has a question.

00:37:07.440 --> 00:37:17.280
 Thank you. From when the development assistant team looks at a plat and knows that it may

00:37:17.280 --> 00:37:27.920
 be recommended for denial, do they get with the submitter? Is it on day 29 or could you

00:37:27.920 --> 00:37:33.600
 all let these because my question basically is if you know it's going to be submitted

00:37:33.600 --> 00:37:41.640
 for denial on day 13 or 14, why wait till day 29 to let the person know that's going

00:37:41.640 --> 00:37:46.920
 to be denied? That's two weeks. Why don't we let these people know earlier so they can

00:37:46.920 --> 00:37:49.680
 go ahead and work on it before it comes to us? Does it make sense?

00:37:49.680 --> 00:37:54.720
 Yeah. And it's really at the discretion of the project facilitator. So within that time

00:37:54.720 --> 00:38:01.000
 period, plats are not the only applications that staff accepts. We accept our zoning applications

00:38:01.000 --> 00:38:07.720
 and PDs and things like that on off weeks. So the time period that's allowed to staff

00:38:07.720 --> 00:38:14.160
 really also captures staff workload and being able to address other applications as they

00:38:14.160 --> 00:38:21.600
 come in in order. Some plats might not take a lot of staff time. Some might may take more.

00:38:21.600 --> 00:38:26.320
 But in general, if maybe planning knows that there's three comments we do as staff reach

00:38:26.320 --> 00:38:31.600
 out to the applicant through the project facilitator to say these are pretty minor. Can you address

00:38:31.600 --> 00:38:38.080
 them? But for the most part, because reviewers have different workloads and different availability

00:38:38.080 --> 00:38:43.000
 to complete that review, sometimes it's it's beneficial for them to receive all their comments

00:38:43.000 --> 00:38:52.160
 at once, which would be when day 16 arrives. So at day 16, y'all can let them know that

00:38:52.160 --> 00:38:59.880
 there's issues that arise. So they have another 13 days, basically two weeks to get that corrected

00:38:59.880 --> 00:39:05.280
 back to you before you ever submit it. OK, I just want I just I just would like the people

00:39:05.280 --> 00:39:08.800
 to know, but instead of blindside them at the last day going, Hey, sorry, today's day

00:39:08.800 --> 00:39:13.440
 nine. Sorry, we're gonna spend it for denial. They did not give them the opportunity to

00:39:13.440 --> 00:39:19.840
 have the to to correct the plat to make sense. I think Tina wanted to jump in. Well, and

00:39:19.840 --> 00:39:25.600
 I was just going to add. So, yes, I mean, so the we try to do a good job of communicating

00:39:25.600 --> 00:39:29.120
 to our applicants, especially if we have concerns regarding if we're not going to be able to

00:39:29.120 --> 00:39:34.000
 recommend approval of their in this case, the plots, right? But even any development

00:39:34.000 --> 00:39:39.960
 application that we're working on, you know, I think engineers who have been doing this

00:39:39.960 --> 00:39:44.040
 for while planners as well, you know, they'll have a good sense based upon the nature of

00:39:44.040 --> 00:39:48.280
 the comments that are received as to how quickly they'll be able to turn around that the shot

00:39:48.280 --> 00:39:55.680
 clock bill has really. It's made it more challenging for municipalities because we're obligated

00:39:55.680 --> 00:40:01.240
 to perform within a certain amount of time. The development community is not. So if if

00:40:01.240 --> 00:40:05.240
 a developer is really wanting to get a project through, then they need to be on their engineer

00:40:05.240 --> 00:40:08.640
 that they've retained to make sure that the engineers doing their job in it and addressing

00:40:08.640 --> 00:40:13.080
 comments accordingly. Folks that do regular business here at the city of Denton are going

00:40:13.080 --> 00:40:17.520
 to have probably a good idea of what we were typically looking for. And they'll know and

00:40:17.520 --> 00:40:21.640
 have a good sense what the status of their project will be in all likelihood. So the

00:40:21.640 --> 00:40:25.760
 more experienced. Now, if the first time someone's doing business might be a little bit different

00:40:25.760 --> 00:40:29.880
 situation or their second time. It's just part of a learning process because while cities

00:40:29.880 --> 00:40:35.080
 are similar, you know, we have also some different processes. But but we do try to be proactive

00:40:35.080 --> 00:40:39.600
 in educating applicants accordingly. I just want to make sure like under example, like

00:40:39.600 --> 00:40:44.320
 lot block need to be changed from, you know, whatever that they didn't wait till they wouldn't

00:40:44.320 --> 00:40:48.600
 wait till day twenty nine to try to let these people know. And that kind of. Yeah, that's

00:40:48.600 --> 00:40:52.560
 something that's so simple that you could call and go, hey, this is all your plat needs

00:40:52.560 --> 00:40:57.120
 to be finalized. Just fix this real quick. Absolutely. And that's why sometimes you'll

00:40:57.120 --> 00:41:03.520
 see maybe a last minute change at the podium. So maybe the the agenda will say it's for

00:41:03.520 --> 00:41:08.960
 a denial. They've already had their extension in the last. Maybe two comments are that simple.

00:41:08.960 --> 00:41:12.560
 And then when we get to the podium, you'll see they've addressed our comments now. So

00:41:12.560 --> 00:41:16.240
 we're recommend recommending for approval. So those are some of the situations staff

00:41:16.240 --> 00:41:23.440
 will reach out to them to clarify those. If it again, if it's more complicated, they they've

00:41:23.440 --> 00:41:27.440
 usually been told at a certain time, like this, this may not work. We need to sit and

00:41:27.440 --> 00:41:33.040
 talk about options for you. How how to address these comments because there's options of

00:41:33.040 --> 00:41:38.560
 withdrawal or depending on the severity of the issues. I appreciate it. Thank you. And

00:41:38.560 --> 00:41:42.560
 I think your next slide addresses some of that resubmission and how we are trying to

00:41:42.560 --> 00:41:47.160
 accommodate getting plots back to the commission. Yes. And so this is kind of just the overview

00:41:47.160 --> 00:41:55.200
 of a simple 30 day process. As you can see here, date Day 28 is kind of like we offer

00:41:55.200 --> 00:42:00.640
 based on our submittal schedule again to meet the 30 day window of resubmittal. So the second

00:42:00.640 --> 00:42:08.880
 review of a of a plat they can submit that on Day 28. So before PNC, assuming they are

00:42:08.880 --> 00:42:13.960
 going to request an extension so that they can add an additional 30 days to their review.

00:42:13.960 --> 00:42:19.720
 So overall, they're getting 60 days of a review period before they're actually receiving either

00:42:19.720 --> 00:42:26.920
 a denial or approval. So Day 28 they submit. It doesn't actually get forwarded until PNC

00:42:26.920 --> 00:42:33.360
 approves the extension. And then we kind of move past this. So next slide, I kind of just

00:42:33.360 --> 00:42:39.420
 highlighted those same first two dots would be the request to resubmit PNC approves the

00:42:39.420 --> 00:42:45.400
 extension. At that time, Day 37, they've already had their second review. They get comments

00:42:45.400 --> 00:42:49.960
 again. Again, staff will communicate if if it's simple enough that it's been addressed

00:42:49.960 --> 00:42:55.720
 or not in some instances. And again, this is based off the 30 days and the submittal

00:42:55.720 --> 00:42:59.820
 schedule and I'll go over that just briefly. Sometimes there's an opportunity for a third

00:42:59.820 --> 00:43:08.800
 review. So they've even got kind of two extra reviews in within that 30 day, 60 day period.

00:43:08.800 --> 00:43:16.000
 So you'll see if they've already received an extension, they might get a denial or they

00:43:16.000 --> 00:43:23.160
 might even have time to have another review in to then get the approval. So overall, within

00:43:23.160 --> 00:43:28.240
 the 60 day period, sometimes you'll see them come back several times. Depending on the

00:43:28.240 --> 00:43:33.160
 severity of the comments or the simple simplicity of the comments, you might see where it's

00:43:33.160 --> 00:43:40.040
 a very simple extension approval or just an approval and some we've seen it's complicated

00:43:40.040 --> 00:43:44.480
 enough or maybe they've dropped the ball on their end. They didn't look at our resubmittal

00:43:44.480 --> 00:43:50.240
 schedule and you'll see very simple comments actually will just end up in a denial multiple

00:43:50.240 --> 00:43:56.440
 times. We don't like to see that. But sometimes maybe the applicant has too many projects

00:43:56.440 --> 00:44:03.760
 or their staff has not unfortunately done a great job. So that's kind of the situation

00:44:03.760 --> 00:44:10.320
 that it ends up being. Lastly, I just want to leave you with our actual submittal schedule

00:44:10.320 --> 00:44:16.320
 that's on our land development webpage. So as you can see, there's two highlighted areas.

00:44:16.320 --> 00:44:22.400
 This is how we base our submittal schedules based on when we can meet the 30 days on a

00:44:22.400 --> 00:44:30.040
 P and Z date. So you'll see first is the initial submittal. This is when comments are due in

00:44:30.040 --> 00:44:35.000
 the second column. Here's a resubmittal date that they're allowed to resubmit if they have

00:44:35.000 --> 00:44:42.080
 the extension. And then this is what the actual P and Z date would be. Then it goes all the

00:44:42.080 --> 00:44:48.000
 way down the second review when comments are due and then even a third review if it's permitted.

00:44:48.000 --> 00:44:54.300
 So this is available on our website. All the applicants have access to this. And so anytime

00:44:54.300 --> 00:44:58.480
 it gets updated, it's posted and there's kind of like a massive email that goes out to developers

00:44:58.480 --> 00:45:03.320
 to let them know this is what our submittal schedule is. So here are the opportunities

00:45:03.320 --> 00:45:09.520
 for you to submit or resubmit your PLA applications. And with that, I can answer any additional

00:45:09.520 --> 00:45:14.680
 questions that you'll have. >> Great, Karina, thank you. Questions? Commissioner

00:45:14.680 --> 00:45:19.480
 Villarreal? >> Yes. Could you explain from staff's perspective

00:45:19.480 --> 00:45:24.840
 what you would want to see from us if we decide to approve a plat that's recommended for denial

00:45:24.840 --> 00:45:31.200
 or deny a plat that's recommended for approval? Because I understand you would like to see

00:45:31.200 --> 00:45:38.160
 citations and from staff's perspective, what would you like us to do if, say, four of us

00:45:38.160 --> 00:45:43.280
 decide to, again, approve something that is recommended for denial? What would that process

00:45:43.280 --> 00:45:46.880
 look like? >> I'll shoot that over to Tina to answer.

00:45:46.880 --> 00:45:54.200
 >> So with PLATs, keep in mind, it's a technical review. It either meets or it doesn't meet.

00:45:54.200 --> 00:45:59.280
 And so we're obligated by state law, we staff on administrative approvals, but the commission

00:45:59.280 --> 00:46:04.320
 also in your role, where you are obligated to approve the plat if it meets it. When it

00:46:04.320 --> 00:46:08.840
 comes to denials, if we are telling you that this plat does not comply with our development

00:46:08.840 --> 00:46:14.040
 standard requirements, regardless of what the issue may be, then I would strongly encourage

00:46:14.040 --> 00:46:20.360
 you to deny the plat. When it comes to PLATs, I would discourage you from going against

00:46:20.360 --> 00:46:27.280
 staff's recommendation on that. It's because we don't want to get into a point where we're

00:46:27.280 --> 00:46:33.440
 engineering the document here at the DIAS. So, you know, some communities allow for approval

00:46:33.440 --> 00:46:39.980
 with conditions. As Karina mentioned here, approval with conditions is similarly treated

00:46:39.980 --> 00:46:45.000
 as a denial. There are some communities that would, you know, will do the approval and

00:46:45.000 --> 00:46:49.080
 have the laundry list of conditions to try and have the applicant be able to address

00:46:49.080 --> 00:46:53.560
 those. So we do not go down that path. It's my understanding because, again, just from

00:46:53.560 --> 00:46:59.840
 a process standpoint and because either the, in our opinion, a plat either needs to meet

00:46:59.840 --> 00:47:05.840
 or it needs to be denied. It's, you know, it's different than on a zoning case or a

00:47:05.840 --> 00:47:12.880
 specific use permit where that's a more subjective review that can fall into play. You can, you

00:47:12.880 --> 00:47:19.240
 know, we can agree to disagree on zoning and the specific use permits. But when it comes

00:47:19.240 --> 00:47:23.920
 to PLATs, if we're recommending denial, then we're recommending denial for a reason and

00:47:23.920 --> 00:47:27.960
 we've cited that reason in the staff analysis. So we would respectfully request that you

00:47:27.960 --> 00:47:31.560
 concur with us and deny the plat accordingly.

00:47:31.560 --> 00:47:38.080
 And then if I might just add, Tina, to that, if you have a question on a plat that staff

00:47:38.080 --> 00:47:43.280
 is recommending approval or denial on, by all means, reach out to them as soon as possible.

00:47:43.280 --> 00:47:48.360
 If there is something that was missed or there's something that you need clarified so that you

00:47:48.360 --> 00:47:52.120
 can feel comfortable with their recommendation, by all means, reach out to them ahead of the

00:47:52.120 --> 00:47:58.120
 meeting so that discussion can be started. Because oftentimes it might just be something

00:47:58.120 --> 00:48:05.680
 that's not quite understood. And you can, you know, get a quick answer to your concerns.

00:48:05.680 --> 00:48:10.320
 So that would certainly be something I'd offer to that question.

00:48:10.320 --> 00:48:14.880
 The other thing I'll add is keep in mind, the PLATs may have engineering plans associated

00:48:14.880 --> 00:48:19.320
 with them. So as part of our review of the engineering plans, there's, you know, potentially

00:48:19.320 --> 00:48:23.520
 a significant issue that's still having to be worked through and which affects the plat

00:48:23.520 --> 00:48:28.040
 that is submitted in-house. And so hence why a plat may also need to be denied is because

00:48:28.040 --> 00:48:32.640
 of the engineering plans have not been fully addressed. Because keep in mind, there's a

00:48:32.640 --> 00:48:37.040
 linkage between PLATs and the engineering plans, because the engineering plans are typically,

00:48:37.040 --> 00:48:41.000
 in addition to just regular site improvements, they're also addressing the public infrastructure.

00:48:41.000 --> 00:48:44.360
 So that's where the platting is important, because in addition to showing the property

00:48:44.360 --> 00:48:48.000
 boundaries, if there are any easements that are being proposed on the property, then those

00:48:48.000 --> 00:48:52.040
 easements are typically synced up with improvements that are being shown in those engineering

00:48:52.040 --> 00:48:57.360
 plans. For example, drainage improvements. The applicant may not have addressed all of

00:48:57.360 --> 00:49:01.120
 the drainage considerations associated with their civil engineering plans, which then

00:49:01.120 --> 00:49:05.120
 could affect the size of an easement or the location of an easement, or even if an off-site

00:49:05.120 --> 00:49:10.640
 easement is needed associated with it. So hence why we take our denial recommendations

00:49:10.640 --> 00:49:15.880
 very seriously, because we realize that that's cost and time, or excuse me, money and time

00:49:15.880 --> 00:49:21.840
 to the applicant. So when we're recommending denial of a plat, we've identified why it's

00:49:21.840 --> 00:49:27.000
 deficient and we take that very seriously. So our goal actually is to try and work with

00:49:27.000 --> 00:49:31.960
 applicants to get the plat where we can approve them, because at the end of the day, we want

00:49:31.960 --> 00:49:37.200
 it in and out. We want to be able to allow folks to be able to get under construction

00:49:37.200 --> 00:49:42.280
 on their projects. The last thing we want is documents that continue to linger and linger

00:49:42.280 --> 00:49:46.520
 and linger within our department and non-responsive applicants, because that just burns more of

00:49:46.520 --> 00:49:50.840
 our time when we could be spending our time more effectively on other projects, right?

00:49:50.840 --> 00:49:55.600
 So that's why we even give the applicants the ability to submit that corrected plat

00:49:55.600 --> 00:50:01.040
 up to your meeting. Like Corina said, if it's something that's easy to be able to address

00:50:01.040 --> 00:50:04.760
 and get that review done, in all likelihood, we're going to try to accommodate that review

00:50:04.760 --> 00:50:08.160
 and make that happen, because it's easier for us to turn around and stand up here and

00:50:08.160 --> 00:50:13.360
 tell you that that plat complies instead of taking our own sweet time on getting a review,

00:50:13.360 --> 00:50:16.800
 because then we're finding ourselves having to write another staff analysis, and that's

00:50:16.800 --> 00:50:21.680
 having to go in the packet. Corina's writing, I'm reviewing, Haley's reviewing, Selena's

00:50:21.680 --> 00:50:25.360
 pulling the packet together. That just adds time and effort that we otherwise would not

00:50:25.360 --> 00:50:31.480
 need to be able to have to be spending. So we do try to be accommodating from that perspective.

00:50:31.480 --> 00:50:38.720
 Any other questions? Commissioner Perret? Thank you, Chair. On plat applications, do

00:50:38.720 --> 00:50:44.280
 the applicants have an option for a pre-development conference? Yes. Actually, all applications

00:50:44.280 --> 00:50:48.360
 that come through development services, we highly recommend that they have a pre-application

00:50:48.360 --> 00:50:54.360
 conference, and then at that meeting, along with technical staff comments, they're provided

00:50:54.360 --> 00:50:59.040
 with a list of applications that they need to go through the process, as well as development

00:50:59.040 --> 00:51:04.720
 fees and kind of a general timeline for their project. You know, that sounds like common

00:51:04.720 --> 00:51:10.560
 sense to me, especially given the situation we're in. I hate to suggest that we try to

00:51:10.560 --> 00:51:17.520
 track more things, because I know it's hard, but if it seems like those applicants that

00:51:17.520 --> 00:51:21.420
 come in for pre-development conferences have a really high success rate of getting things

00:51:21.420 --> 00:51:26.600
 through the first time, whereas those that choose not to don't, I wonder if that's something

00:51:26.600 --> 00:51:31.080
 that we could try to publicize in the development meetings with the development professionals

00:51:31.080 --> 00:51:37.560
 that we have. So we are not allowed to recommend who an applicant could use, so we have to

00:51:37.560 --> 00:51:45.160
 be very careful of that. So we can post who has submitted, and if someone is interested

00:51:45.160 --> 00:51:50.560
 in seeing who are engineers that have happened to file applications with us for the last

00:51:50.560 --> 00:51:55.080
 three submittal cycles, we can post that kind of information, but we can't recommend who

00:51:55.080 --> 00:52:02.040
 they might use. So we have to be impartial on that. Trust me, there are times where we

00:52:02.040 --> 00:52:07.920
 would like to recommend who someone might use, but we can't, because of ethical obligations,

00:52:07.920 --> 00:52:10.080
 but also we just need to remain impartial on that.

00:52:10.080 --> 00:52:16.960
 Okay. Well, hopefully everybody will get the word sooner than later. Thank you.

00:52:16.960 --> 00:52:22.640
 Any other questions for Corina? Thank you, Corina, for that. I think you all have done

00:52:22.640 --> 00:52:28.400
 a great job. This shot clock bill has, you know, been so difficult to work with, and

00:52:28.400 --> 00:52:34.520
 putting that schedule together, I know has just done wonders for workflow.

00:52:34.520 --> 00:52:39.040
 You can thank Sean for that schedule. He's put a lot of time and effort into it. You

00:52:39.040 --> 00:52:43.040
 can thank Sean for that schedule. He's put a lot of time and effort to make sure that,

00:52:43.040 --> 00:52:47.480
 one, we make sure we line it up with P&Z appropriately, but also even the holiday schedule. We'll

00:52:47.480 --> 00:52:54.480
 make sure it doesn't pose a problem for our developers during that process, and even for

00:52:54.480 --> 00:53:01.720
 staff so we can take a little bit of a break. Yeah, exactly. Great job. Thank you very much.

00:53:01.720 --> 00:53:08.200
 Okay. Moving through our agenda, we are on to clarification of tonight's agenda. First

00:53:08.200 --> 00:53:17.840
 is our minutes for November 3rd. Any discussion on that needed? Okay. How about consent agenda

00:53:17.840 --> 00:53:29.480
 for tonight? Okay. Seeing none, we'll go to individual consideration items. We have, I

00:53:29.480 --> 00:53:34.480
 believe we had a change in the meeting calendar, which is why it is back before us. Tina, I'll

00:53:34.480 --> 00:53:40.000
 take that. Yes, that's correct. We made a few slight adjustments since the last time

00:53:40.000 --> 00:53:45.040
 we presented this to you. So as we noted in the staff report, we removed a meeting in

00:53:45.040 --> 00:53:50.800
 July to be more consistent with council. Having the one meeting and being able to practice

00:53:50.800 --> 00:53:57.120
 the being able to absorb into the holiday during July. Also, and I think this was a

00:53:57.120 --> 00:54:00.280
 result of Commissioner Pruitt, one of your conversations, you mentioned something that

00:54:00.280 --> 00:54:03.640
 caught Sean's attention with respect to that shot clock bill, and we went back and just

00:54:03.640 --> 00:54:07.280
 double checked our date. So we had to move one of the November meeting dates because

00:54:07.280 --> 00:54:11.560
 of that. And then I know we added the holidays that have been approved to the calendar for

00:54:11.560 --> 00:54:16.640
 your benefit. But otherwise, the calendar remains as is as we noted last time we were

00:54:16.640 --> 00:54:20.960
 proposing to go to the second and fourth Wednesdays of every month instead of the first and third

00:54:20.960 --> 00:54:26.320
 because that will also assist our team in being able to process not only our agenda

00:54:26.320 --> 00:54:31.320
 items that are needed for your consideration, but it gets us a little relief and where our

00:54:31.320 --> 00:54:35.240
 agenda item preparation is not syncing up with typically what we have going to council.

00:54:35.240 --> 00:54:40.760
 So and also it removes us from back to back meeting situations where we're here on Tuesday

00:54:40.760 --> 00:54:46.360
 night and Wednesday night back to back. So but otherwise, the happy entertain any questions

00:54:46.360 --> 00:54:49.640
 that you may have if you find the calendar acceptable, then staff's recommendation would

00:54:49.640 --> 00:54:56.840
 be that you approve this as submitted. Any questions on the calendar? Okay, moving to

00:54:56.840 --> 00:55:03.920
 four B. We'll have staff come up at the public meeting unless someone has a question. Per

00:55:03.920 --> 00:55:10.440
 the backup, there is an extension request on this to the date or date certain of 1215.

00:55:10.440 --> 00:55:21.600
 Any questions? Okay, moving on to four C. Same. This is a plat with an extension request

00:55:21.600 --> 00:55:37.600
 for 1215. Four C. Same. I'm sorry, four D. Same. Extension request to 1215. Any questions?

00:55:37.600 --> 00:55:50.240
 Okay. Four E. Final plat with an extension request to 1215. Okay. Four F. Is recommended

00:55:50.240 --> 00:56:00.600
 for denial. Any questions on that for staff at work session? Okay. That will bring us

00:56:00.600 --> 00:56:13.920
 to our public hearing item for the evening. I will invite Mark Laird up to discuss. Hi,

00:56:13.920 --> 00:56:34.340
 Mark. Thank you. All right. Good evening, guys. My name is Mark Laird. I'm a planner

00:56:34.340 --> 00:56:38.440
 in the development service department. This evening for your review consideration, I have

00:56:38.440 --> 00:56:46.800
 a request to rezone one acre track from rural residential to residential one. This site is

00:56:46.800 --> 00:56:53.640
 generally located 190 feet east of Miller and Marsh Branch Road and is currently vacant.

00:56:53.640 --> 00:57:02.840
 It's surrounded by rural residential, residential one, and residential two. The property owner

00:57:02.840 --> 00:57:08.640
 is requesting the rezoning for site compliance to develop the property for single family

00:57:08.640 --> 00:57:16.960
 use. Staff has made an analysis of this request and a copy of that analysis has been included

00:57:16.960 --> 00:57:23.440
 in your backup. Based on that analysis, staff recommends approval of this request. I stand

00:57:23.440 --> 00:57:30.280
 for any questions that you have. Thank you, Mark. This looks like we've had a rezoning

00:57:30.280 --> 00:57:35.280
 case on this same road, correct? That's correct. About a month ago, we had another rezoning

00:57:35.280 --> 00:57:41.680
 request. I remember that. Any questions for Mark on this item? I don't see any. We'll

00:57:41.680 --> 00:57:47.800
 see you at the meeting. All right. Thank you. With that, that ends our work session items

00:57:47.800 --> 00:57:52.360
 for this evening. I will adjourn us at 6 p.m. We will see you back here at 630 for the public

00:57:52.360 --> 00:58:01.400
 meeting. Good evening and welcome to the City of Denton's Planning and Zoning Commission

00:58:01.400 --> 00:58:07.760
 meeting for Wednesday, November 17th, 2021. With the quorum present, I will call us to

00:58:07.760 --> 00:58:14.960
 order at 634 p.m. I'll let the record show that Commissioner Smith is absent. First item

00:58:14.960 --> 00:58:22.740
 of business is the Pledge of Allegiance to the U.S. and Texas Flags. I pledge allegiance

00:58:22.740 --> 00:58:46.640
 to the flag of the United States of America and to the republic for which it stands, one

00:58:46.640 --> 00:58:47.640
 nation, under God, indivisible, with liberty and justice for all. Honor the Texas flag.

00:58:47.640 --> 00:58:48.640
 I pledge allegiance to the city of Texas, one state, under God, one indivisible. Thank

00:58:48.640 --> 00:58:53.720
 you. Our next item on the agenda is to consider approval of the Planning and Zoning minutes

00:58:53.720 --> 00:59:04.040
 for November 3rd. Commissioner Anderson? Commissioner Pruitt? Second. We have a first and a second

00:59:04.040 --> 00:59:18.480
 for approval discussion. Seeing none, let's vote on the board, please. Motion carries

00:59:18.480 --> 00:59:28.560
 6-0. Next item on the agenda is our Consent Agenda. Commissioner Villarreal? Move to approve

00:59:28.560 --> 00:59:33.080
 the Consent Agenda. We have a first for approval of the Consent Agenda this evening. Commissioner

00:59:33.080 --> 00:59:39.800
 Anderson? Second. First and a second for approval of Consent Agenda. Any discussion? Seeing

00:59:39.800 --> 00:59:53.040
 none, let's vote on the board, please. Motion carries 6-0. Brings us to agenda item 4. Items

00:59:53.040 --> 00:59:59.800
 for individual consideration. 4A is consider approval of the 2022 Planning and Zoning Commission

00:59:59.800 --> 01:00:07.080
 meeting calendar. Commissioner Villarreal? Move to approve the 2022 Planning and Zoning

01:00:07.080 --> 01:00:13.560
 meeting calendar. Commissioner Pruitt? Second. We have a first and a second for approval

01:00:13.560 --> 01:00:24.800
 of the meeting calendar as presented. Let's vote on the board, please. Motion carries

01:00:24.800 --> 01:00:38.080
 6-0 for B. It's PP21-0030. I'll invite Lisa up for this item presentation. Good evening.

01:00:38.080 --> 01:01:07.160
 Hi, Lisa. Here we go. Apparently we're not sharing the screen. Okay. There we go. Okay.

01:01:07.160 --> 01:01:11.960
 Good evening. Lisa Payne, principal planner for the City of Denton. The item before you

01:01:11.960 --> 01:01:19.960
 is PP21-30, which is a preliminary plot containing approximately 56 acres and located on the

01:01:19.960 --> 01:01:25.880
 northeast corner of Mingo Road and Loop 288. The preliminary plot will create three lots

01:01:25.880 --> 01:01:31.640
 for warehouse development on property zoned light industrial. Staff is recommending denial

01:01:31.640 --> 01:01:38.160
 as it does not meet the established criteria for approval. However, the applicant has requested

01:01:38.160 --> 01:01:43.800
 a 30-day extension to allow for additional time for review and staff has no objection

01:01:43.800 --> 01:01:50.720
 to that going to P&Z on December 15th. And I'm available for questions. Thank you, Lisa.

01:01:50.720 --> 01:01:57.480
 Any questions? I do not see any. Thanks, Lisa. Commissioner Villarreal? I'll move to approve

01:01:57.480 --> 01:02:04.120
 the extension to the December 15th, 2021. Okay. We have an approval. Second. Commissioner

01:02:04.120 --> 01:02:08.800
 Cole, second. Okay. First and a second to approve the extension request to a date certain

01:02:08.800 --> 01:02:20.320
 of 12/15. Discussion? Let's vote on the board, please. Motion carries six zero, taking us

01:02:20.320 --> 01:02:40.720
 to 4C, PP21-0028. Cameron Robertson is here to present. So good evening, commissioners.

01:02:40.720 --> 01:02:44.680
 My name is Cameron Robertson. I am a principal planner and historic preservation officer

01:02:44.680 --> 01:02:54.960
 for the city of Denton. So this is PP21-0028. This is for approximately 34.5 acres at Corbin

01:02:54.960 --> 01:03:02.480
 Road, just north of Corbin Road, west of I-35 west. So staff is recommending denial of this

01:03:02.480 --> 01:03:08.000
 plot as it does not meet our established criteria for approval, but staff has no objection for

01:03:08.000 --> 01:03:15.160
 the requested extension to December 15th at the PNC meeting. I can stand for any questions.

01:03:15.160 --> 01:03:21.080
 Thank you, Cameron. I do not see any questions. Commissioner Villarreal? Move to approve the

01:03:21.080 --> 01:03:27.280
 extension request to December 15th, 2021. Commissioner Anderson? Second. We have a first

01:03:27.280 --> 01:03:35.280
 and a second to approve the requested extension to 12/15. Any discussion? Let's vote on the

01:03:35.280 --> 01:03:48.880
 board, please. Motion carries six zero, moving us to 4D, PP21-0029. I believe that is Julie

01:03:48.880 --> 01:04:04.980
 Wyatt. Hi, Julie. Good evening. Good evening. I'm Julie Wyatt, senior planner with the city

01:04:04.980 --> 01:04:13.400
 of Denton and I'm presenting PP21-0029. It's for the Holland edition. The proposed plot

01:04:13.400 --> 01:04:19.800
 is a preliminary plot for a residential development located on the east side of Loop 288. They

01:04:19.800 --> 01:04:24.280
 do have some additional comments they do need to address and so staff is recommending denial.

01:04:24.280 --> 01:04:29.560
 However, we have no objection to their requested extension to the December 15th PNC meeting

01:04:29.560 --> 01:04:35.080
 and I'll be happy to answer any questions. Thanks, Julie. I do not see any questions.

01:04:35.080 --> 01:04:43.960
 Appreciate it. Commissioner Anderson? Make a motion to extend the request to December

01:04:43.960 --> 01:04:48.400
 15th. Commissioner Villarreal? Second. We've got a first and a second to approve the extension

01:04:48.400 --> 01:05:00.520
 request to a date certain of 12/15. Discussion? Seeing none, let's vote on the board, please.

01:05:00.520 --> 01:05:18.280
 That motion carries 6-0. Item 4E, FP21-34. I'll leave it to Julie again. All right. This

01:05:18.280 --> 01:05:26.000
 is FP21-0034. The request is for a final plot for the Mission Street offices edition. It

01:05:26.000 --> 01:05:30.200
 is for a commercial development. They do have additional comments they've got to address

01:05:30.200 --> 01:05:35.760
 prior to staff recommending approval. And so we do recommend denial. However, we have

01:05:35.760 --> 01:05:39.920
 no objection to their requested extension to December 15th and I'll be happy to answer

01:05:39.920 --> 01:05:51.520
 any questions. Thanks, Julie. I do not see any questions. I can entertain a motion. Commissioner

01:05:51.520 --> 01:06:02.600
 Cole? I move to move the case till the December 15th. We've got an extension request to a

01:06:02.600 --> 01:06:08.640
 date certain of 12/15. Yes, 12/15. Okay. Commissioner Villarreal? Second. All right. We've got a

01:06:08.640 --> 01:06:16.120
 first and a second to approve the extension request to a date certain of 12/15. Seeing

01:06:16.120 --> 01:06:32.600
 no discussion, let's vote on the board, please. Motion carries 6-0. Next is item 4F, AFP21-0006.

01:06:32.600 --> 01:06:53.840
 Hi, Ron. Good evening, Madam Chair, members of the commission. Here we go. This item is

01:06:53.840 --> 01:07:03.000
 for an amending final plat, AFP21-0006. It is for phase 4 of the Eagle Creek development.

01:07:03.000 --> 01:07:10.840
 It is approximately 32.67 acres in total. This is an administrative plat because it's

01:07:10.840 --> 01:07:17.880
 an amending plat. The applicant has already submitted an extension to staff directly,

01:07:17.880 --> 01:07:23.000
 and they have already gone through another 30 days of review. There are still some comments

01:07:23.000 --> 01:07:29.320
 that are outstanding because this is a -- they have not addressed those outstanding comments.

01:07:29.320 --> 01:07:35.360
 This is a recommendation for denial. The P&Z must consider this application. Therefore,

01:07:35.360 --> 01:07:40.880
 staff recommends denial of this plat as it does not meet the application criteria manual

01:07:40.880 --> 01:07:45.760
 or criteria approval for an amending final plat. I'll stand for any questions. Thanks,

01:07:45.760 --> 01:07:50.880
 Ron. And then just to clarify, staff just does not have the administrative right to

01:07:50.880 --> 01:07:55.120
 deny. Is that why it's before us? Correct. And that's why it is before the P&Z. And they

01:07:55.120 --> 01:07:58.720
 already had an extension through you? They already did, yes. Understood. Okay. Thank

01:07:58.720 --> 01:08:06.440
 you, Ron. Commissioner Villarreal. I move to deny the plat. Okay. We have a first for denial,

01:08:06.440 --> 01:08:11.960
 Commissioner Anderson. Second. Okay. We have a first and a second for denial of this item.

01:08:11.960 --> 01:08:25.240
 Any discussion? Seeing none, let's vote on the board, please. Motion carries 6-0. That

01:08:25.240 --> 01:08:31.440
 brings us to our public hearing item for this evening. It's 5AZ210015. I'll invite Mark

01:08:31.440 --> 01:08:43.920
 Laird up for presentation. Hi, Mark. And allow me to say that I will open the public hearing

01:08:43.920 --> 01:08:51.400
 at this time. Good evening. My name is Mark Laird. I'm a planner in the development service

01:08:51.400 --> 01:08:56.680
 department. This evening for your review and consideration, I have a request to rezone

01:08:56.680 --> 01:09:03.080
 a 1-acre tract from rural residential to residential 1. The property is located east of the intersection

01:09:03.080 --> 01:09:09.600
 of Miller Road and Mosh Branch Road and is currently vacant. The site is surrounded by

01:09:09.600 --> 01:09:17.520
 rural residential, residential 2, residential 1, and also the ETJ. The property owner has

01:09:17.520 --> 01:09:23.120
 requested the rezoning to allow for site compliance to develop the property for single-family

01:09:23.120 --> 01:09:30.640
 use. Staff has provided has made an analysis of this request. And a copy of that analysis

01:09:30.640 --> 01:09:36.480
 has been provided in your backup. And based on that analysis, staff is recommending approval

01:09:36.480 --> 01:09:43.400
 of this request. I stand for any questions that you may have. Thank you, Mark. Any questions

01:09:43.400 --> 01:09:50.600
 for Mark on this item? I do not see any at this time. Thank you. I do not have any cards

01:09:50.600 --> 01:09:56.480
 here nor do I see anyone in the audience wishing to speak. Staff, is there anyone on the phone

01:09:56.480 --> 01:10:04.360
 wishing to speak on this public hearing item? No, there is not. Thank you. Okay. With that,

01:10:04.360 --> 01:10:09.120
 I will close the public hearing and open the floor for discussion or a motion. Commissioner

01:10:09.120 --> 01:10:16.120
 Anderson? Make a motion to approve. Commissioner Cole? Second. Got a first and a second for

01:10:16.120 --> 01:10:30.280
 approval of this item. Any discussion? Seeing none, let's vote on the board, please. Motion

01:10:30.280 --> 01:10:37.440
 carries 6-0. That will bring us to our planning and zoning matrix, and I will give the floor

01:10:37.440 --> 01:10:44.840
 to Tina. Thank you, Chairman. So there are no updates to provide to the commission based

01:10:44.840 --> 01:10:49.440
 upon recent council action. We did not have any project -- any zoning cases or specific

01:10:49.440 --> 01:10:57.120
 use permits on council's meeting yesterday evening or even last week. So you have a hiatus

01:10:57.120 --> 01:11:01.760
 from that portion of the report. Otherwise, we have amended the attendance -- or excuse

01:11:01.760 --> 01:11:07.480
 me -- the matrix that's included in your packet to include the two items that were requested

01:11:07.480 --> 01:11:12.400
 at your previous meeting, so -- which we're discussing prioritizing future area plans,

01:11:12.400 --> 01:11:16.120
 as well as then the requests related to the e-comment feature for the Planning and Zoning

01:11:16.120 --> 01:11:23.160
 Commission meetings to have it be more visible on the website. We did address two items on

01:11:23.160 --> 01:11:27.960
 the agenda. So one is the -- discuss the plotting processes, in particular why plots are being

01:11:27.960 --> 01:11:32.460
 brought forth for denial or extension requests. So that one will come off as well as the one

01:11:32.460 --> 01:11:37.200
 related to the fire department presenting about their emergency service operations.

01:11:37.200 --> 01:11:40.920
 But I'm happy to address any additional questions you may have or if there are other items that

01:11:40.920 --> 01:11:43.200
 you're interested in having added to the matrix.

01:11:43.200 --> 01:11:55.840
 Thanks, Tina. Anything for the matrix? I do not see any. Moving us to concluding items.

01:11:55.840 --> 01:12:02.840
 Any concluding items? No, I'll just say thanks to staff for the work session reports today.

01:12:02.840 --> 01:12:08.160
 They were incredibly informative and appreciate you working down the matrix list for us. It's

01:12:08.160 --> 01:12:09.160
 very helpful.

01:12:09.160 --> 01:12:14.720
 Absolutely. And if I might just take a quick brief moment and recognize Mark Laird on our

01:12:14.720 --> 01:12:20.880
 team. He's still back there. So Mark is going to be taking on a position on our real estate

01:12:20.880 --> 01:12:24.960
 team, which is where he came from originally. But we appreciate all the work that Mark has

01:12:24.960 --> 01:12:29.760
 done being part of the planning department and evaluating development applications and

01:12:29.760 --> 01:12:33.680
 presenting before the commission. So we'll miss having him as part of our team, but he'll

01:12:33.680 --> 01:12:36.720
 still be close by because we'll still be able to collaborate on real estate issues.

01:12:36.720 --> 01:12:42.160
 Excellent. Thank you, Mark. Best of luck back in real estate. Awesome.

01:12:42.160 --> 01:12:43.160
 Congratulations.

01:12:43.160 --> 01:12:47.440
 Okay. With that, I will adjourn us at 6.49 p.m. Thanks, everyone.