1 00:00:00,000 --> 00:00:09,440 Good afternoon and welcome to the City of Denton's Planning and Zoning Commission meeting for 2 00:00:09,440 --> 00:00:15,580 Wednesday, November 17th, 2021. This is our work session and with the quorum present, 3 00:00:15,580 --> 00:00:21,240 I will call us to order at 5.02 p.m. I'll let the record show that Commissioners Cole 4 00:00:21,240 --> 00:00:27,360 and Smith are absent at this time. First item on the agenda is citizen comment on consent 5 00:00:27,360 --> 00:00:34,440 agenda items. Is there anyone in the audience wishing to speak on that? And staff, is there 6 00:00:34,440 --> 00:00:42,160 anyone on the phone for that? No, there's not. Okay, thank you. That will move us to 7 00:00:42,160 --> 00:00:48,040 our work session reports. Our first one, 2A, is receive a report, hold a discussion regarding 8 00:00:48,040 --> 00:01:14,440 fire and emergency response planning related to new development. Hi. Good evening. How 9 00:01:14,440 --> 00:01:19,800 are you doing tonight? Doing well. Thank you for being here. My name is Megan Chuth and 10 00:01:19,800 --> 00:01:28,480 I am the assistant fire marshal. I'm David Becker, assistant fire chief and fire marshal. 11 00:01:28,480 --> 00:01:33,560 So tonight we have prepared a presentation, hopefully that will address some of the issues 12 00:01:33,560 --> 00:01:40,960 that I think have come up in past Commission meetings. So I'll start with our part in development 13 00:01:40,960 --> 00:01:48,920 review. The fire department is involved in all parts of development review from pre-development 14 00:01:48,920 --> 00:01:55,000 through projects, through building permits, all the way through inspections and final 15 00:01:55,000 --> 00:02:01,040 inspections. We're a member of the city's development assistance team. So we are part 16 00:02:01,040 --> 00:02:07,360 of those internal meetings with other city departments. We are a part of all of the pre-development 17 00:02:07,360 --> 00:02:11,720 meetings as well as any applicant meetings and we review all of the projects that come 18 00:02:11,720 --> 00:02:21,240 through. Our role in these meetings is to provide feedback to developers on ensuring 19 00:02:21,240 --> 00:02:26,400 that they meet compliance with our adopted fire code, which is the 2012 international 20 00:02:26,400 --> 00:02:35,800 fire code with amendments. We're hoping to adopt the 2021 code in February. So the two 21 00:02:35,800 --> 00:02:43,040 main items that we review in the development phase is water and access. For water, we're 22 00:02:43,040 --> 00:02:47,360 just checking to make sure that there's a hydrant close to the building. The code requires 23 00:02:47,360 --> 00:02:54,240 it to be within 400 feet. That distance increases to 600 feet if the building is sprinkler. 24 00:02:54,240 --> 00:02:59,600 We also check hydrants in residential developments to make sure that they're spaced out on average 25 00:02:59,600 --> 00:03:08,000 of 500 feet. For access at a minimum, the fire code requires a 20-foot fire lane that 26 00:03:08,000 --> 00:03:14,520 reaches within 150 feet of all portions of the building. If a building is sprinkler, 27 00:03:14,520 --> 00:03:21,600 that can be extended. And we look at those on a case-by-case basis. If the building is 28 00:03:21,600 --> 00:03:28,340 over 30 feet in height, then we require aerial apparatus access, which is a 26-foot fire 29 00:03:28,340 --> 00:03:40,400 lane situated 15 to 30 feet from the building. And that is to assist in ladder deployment. 30 00:03:40,400 --> 00:03:49,280 So the fun part. The fire code dictates when two points of access are required for development. 31 00:03:49,280 --> 00:03:54,220 If it is a commercial development, two points of access are required if the building is 32 00:03:54,220 --> 00:04:03,920 over 30 feet in height or over three stories. If a property has multiple buildings and the 33 00:04:03,920 --> 00:04:11,680 building area is over 62,000 square feet, or if it's a large building or if all the 34 00:04:11,680 --> 00:04:19,100 buildings are sprinkler, that goes up to 124,000 square feet. Then two points of access are 35 00:04:19,100 --> 00:04:30,400 required. For residential, more than 100 dwelling units requires two points of access, unless 36 00:04:30,400 --> 00:04:35,360 all of the buildings are sprinkler. So if it's an apartment complex and they have a 37 00:04:35,360 --> 00:04:43,200 clubhouse, everything has to be sprinkler. Then it can go up to 200. But any multifamily 38 00:04:43,200 --> 00:04:50,120 developments that have more than 200 dwelling units has to have two points of access. For 39 00:04:50,120 --> 00:04:55,540 one- and two-family dwelling developments, over 30 dwelling units requires two points 40 00:04:55,540 --> 00:05:02,000 of access. There is an exception for that if all of the homes are sprinkler. Then only 41 00:05:02,000 --> 00:05:08,560 one point of access is required. And just a little side note, that is a different type 42 00:05:08,560 --> 00:05:12,880 of sprinkler system than like a commercial sprinkler system. It's connected to the domestic 43 00:05:12,880 --> 00:05:18,660 water. It's a much lower cost sprinkler system that the intent is not to save property, but 44 00:05:18,660 --> 00:05:29,520 to save lives. So when two points of access are required, the code requires that they 45 00:05:29,520 --> 00:05:38,520 meet remoteness. With the exception of multifamily apartments, this is not required to me for 46 00:05:38,520 --> 00:05:45,240 apartments. However, in the 2021 code, that changes and apartments will be, multifamily 47 00:05:45,240 --> 00:05:50,960 is included in having to meet remoteness. So when we adopt the 2021 code, this will 48 00:05:50,960 --> 00:06:02,040 apply to any time two points of access is required. So remoteness refers to, I'm going 49 00:06:02,040 --> 00:06:07,360 to try to explain this the best I can, but I do have pictures that help. Remoteness refers 50 00:06:07,360 --> 00:06:15,520 to the distance of the two access points and it has to be equal or greater than the total 51 00:06:15,520 --> 00:06:23,840 diagonal distance of the lot or area to be served. So again, I think pictures help so 52 00:06:23,840 --> 00:06:31,800 much more with this. This is kind of an easy one, but this is single family development 53 00:06:31,800 --> 00:06:41,040 over 30 homes. So two points of access are required. We take the total diagonal dimension, 54 00:06:41,040 --> 00:06:48,960 which is the diagonal measurement of the lot is 1400 feet. Half of that is 700. So that 55 00:06:48,960 --> 00:06:55,800 means their two access points have to be more than 700 feet apart. And you can see here 56 00:06:55,800 --> 00:07:01,880 they have access points, two access points on Mills Road that are 800 feet apart. So 57 00:07:01,880 --> 00:07:11,360 they meet remoteness. As we know, a lot of lots are not this simple and we do have to 58 00:07:11,360 --> 00:07:19,720 get creative sometimes when applying remoteness. It's not always just a nice square or rectangle 59 00:07:19,720 --> 00:07:26,840 of that. I think what we're looking for is to make sure that they meet the intent of 60 00:07:26,840 --> 00:07:33,920 the code. So let's look at one more that I know has been a subject of discussion. This 61 00:07:33,920 --> 00:07:40,880 is a development between Buckees and the South Ridge Village Shopping Center. It's a very 62 00:07:40,880 --> 00:07:47,920 long narrow lot and the developer was having a really challenging time meeting two points 63 00:07:47,920 --> 00:07:55,320 of access. This development is a one multi-story building, but just one building. It is over 64 00:07:55,320 --> 00:08:02,660 30 feet in height, so it requires two remote points of access. So since the code specifically 65 00:08:02,660 --> 00:08:11,000 says that that diagonal measurement is for the lot or area to be served, we consider 66 00:08:11,000 --> 00:08:16,160 the building to be the area to be served. On the backside of the property, it's just 67 00:08:16,160 --> 00:08:23,720 access roads. So what we did was in order to try to assist this developer, we measured 68 00:08:23,720 --> 00:08:30,680 the diagonal distance of the building, which was 650 feet. Take half of that, that's 325 69 00:08:30,680 --> 00:08:35,480 feet, and that was the distance that their two access points had to be apart. So they 70 00:08:35,480 --> 00:08:41,360 have one access point up on I-35 Frontage Road and they were able to get a second access 71 00:08:41,360 --> 00:08:50,000 point that connected to the fire lane of the South Ridge Village Shopping Center. So again, 72 00:08:50,000 --> 00:08:57,000 maybe not like the previous example, but again, it's us trying to work with developers so 73 00:08:57,000 --> 00:09:03,200 that lots don't become undevelopable based on them requiring two points of access. And 74 00:09:03,200 --> 00:09:08,120 we felt like this was a good example because it truly does meet the intent of the code 75 00:09:08,120 --> 00:09:14,520 where the fire department has access and we can come in off the frontage road or off Lillian 76 00:09:14,520 --> 00:09:19,000 Miller and through the fire lane and the shopping center. 77 00:09:19,000 --> 00:09:22,000 Can I stop you there for just one second? He's got a question it looks like. Commissioner 78 00:09:22,000 --> 00:09:23,000 Anderson. 79 00:09:23,000 --> 00:09:29,160 Yeah, I do have a quick question. This remoteness, the apartment complex, I'm glad you brought 80 00:09:29,160 --> 00:09:36,000 that up because I had it on my notes here to write down. When did this little second 81 00:09:36,000 --> 00:09:41,660 entrance become, when did that become part of the project? Was that recently? Because 82 00:09:41,660 --> 00:09:46,760 I don't think that was on the thing that we approved. 83 00:09:46,760 --> 00:09:53,160 So the development project when the commission considered it was required to have a second 84 00:09:53,160 --> 00:09:58,140 point of access, they were coordinating with the off-site assisted living care facility 85 00:09:58,140 --> 00:10:02,240 and so they were going to obtain that second point of access through that adjoining site. 86 00:10:02,240 --> 00:10:07,040 But they're saying that they don't have that access. They're saying they have one behind 87 00:10:07,040 --> 00:10:09,240 like the Goodwill Center, pretty much. 88 00:10:09,240 --> 00:10:10,240 Right. 89 00:10:10,240 --> 00:10:13,400 I was going to say, Haley was the project manager. Maybe she can provide. 90 00:10:13,400 --> 00:10:16,520 Yeah, that is definitely a different schematic than we saw. 91 00:10:16,520 --> 00:10:20,420 I just wanted to clarify, this particular site plan looks like it was for a previous 92 00:10:20,420 --> 00:10:24,880 proposal on that property. This is not the Millennium Crest site plan that you all recently 93 00:10:24,880 --> 00:10:29,600 saw. This is that same property, but a prior development that never came to fruition. 94 00:10:29,600 --> 00:10:39,920 Okay. So the apartment complex that got passed through us, they don't have two access points. 95 00:10:39,920 --> 00:10:43,960 Their proposal was to get a similar concept to this with that second point of access being 96 00:10:43,960 --> 00:10:46,000 through the adjacent site to the west. 97 00:10:46,000 --> 00:10:48,160 Have they received that? Do you know? 98 00:10:48,160 --> 00:10:51,880 They have not submitted anything further to us, but I do know they're working on finalizing 99 00:10:51,880 --> 00:10:55,040 a site plan for the property. But this was a previous development. 100 00:10:55,040 --> 00:10:58,720 Okay. Because I was confused because I was like, this is not what we saw. 101 00:10:58,720 --> 00:11:03,560 Correct. This was an elderly housing development that never came to fruition. Millennium Crest 102 00:11:03,560 --> 00:11:06,000 hasn't come back in yet. So we don't know what that will look like for them. 103 00:11:06,000 --> 00:11:07,000 Okay. All right. Thanks. 104 00:11:07,000 --> 00:11:08,000 This was just an example Megan was using. 105 00:11:08,000 --> 00:11:10,640 All right. Thank you, Haley. Another quick question. 106 00:11:10,640 --> 00:11:14,440 Sure. And I apologize for that confusion. I was struggling just trying to find some sort 107 00:11:14,440 --> 00:11:15,440 of pictures. 108 00:11:15,440 --> 00:11:16,440 No, I'm glad you brought this up because that was- 109 00:11:16,440 --> 00:11:18,440 It's a good example. 110 00:11:18,440 --> 00:11:22,880 This was on a point that I wanted to make also about the other property that we talked 111 00:11:22,880 --> 00:11:28,920 about. The other one that says, we had, and I maybe jumped the gun. I apologize. But it's 112 00:11:28,920 --> 00:11:33,400 talking about, they have to have access. And how does the development here on, well, I 113 00:11:33,400 --> 00:11:38,360 can mark that one out. That was the good one. That just recently passed on Loop 288 and 114 00:11:38,360 --> 00:11:43,520 McKinney Street here behind the 711, that apartment complex. They're going to be here 115 00:11:43,520 --> 00:11:48,120 off of Loop 288. They're going to make an entrance, but I don't think they have a second 116 00:11:48,120 --> 00:11:55,240 access point. Would that be yours? Can I ask that? 117 00:11:55,240 --> 00:11:58,880 I believe the development you're talking about is the Pebblebrook Parkside development. 118 00:11:58,880 --> 00:11:59,880 Right behind the 711? 119 00:11:59,880 --> 00:12:00,880 Yes. 120 00:12:00,880 --> 00:12:01,880 Yes. 121 00:12:01,880 --> 00:12:05,600 So they did have two points of access. They had a Southern entry point, which would have 122 00:12:05,600 --> 00:12:14,800 full access with a traffic signal. And then the Northern access was exit only and had 123 00:12:14,800 --> 00:12:21,720 a, or it was a 3/4 access. In order to meet the fire access, especially the aerial apparatus, 124 00:12:21,720 --> 00:12:29,280 they had rollover curbs on the four-story building off the right of way. So they could basically 125 00:12:29,280 --> 00:12:34,960 enter off of Loop 288, go over the rollover curbs, and be able to have that ladder access. 126 00:12:34,960 --> 00:12:35,960 Okay. 127 00:12:35,960 --> 00:12:36,960 Is it Amy? 128 00:12:36,960 --> 00:12:37,960 Yeah. 129 00:12:37,960 --> 00:12:38,960 All right. 130 00:12:38,960 --> 00:12:39,960 All right. Thank you. 131 00:12:39,960 --> 00:12:42,840 Yeah, no, and thank you for bringing that up too, because it does just make the point 132 00:12:42,840 --> 00:12:49,280 that for the two required points of access, it's not always just a traditional fire lane 133 00:12:49,280 --> 00:12:57,520 or access point. A lot of times due to maybe resident concerns on adjacent properties, 134 00:12:57,520 --> 00:13:02,400 they might have to, I think as long as we approve it, they might have to do either a 135 00:13:02,400 --> 00:13:09,500 gate with an ox lock or an opti-com or just something else that still meets this requirement 136 00:13:09,500 --> 00:13:13,080 but allows them to continue on with their development. 137 00:13:13,080 --> 00:13:14,080 Thank you. 138 00:13:14,080 --> 00:13:17,680 We're about to move on, but do y'all have any other questions that you would like to 139 00:13:17,680 --> 00:13:18,680 ask me about? 140 00:13:18,680 --> 00:13:20,680 No, not at this time. Go ahead. Please. Thank you. 141 00:13:20,680 --> 00:13:26,040 And as I said, I'm David Becker, Assistant Chief, and I agree with Megan, but at this 142 00:13:26,040 --> 00:13:30,320 point in the last couple of years of me being in this position, we really do try to work 143 00:13:30,320 --> 00:13:35,400 with the developers. And as you can see, as we all run together, we try to work together 144 00:13:35,400 --> 00:13:40,440 and have these conversations to try to find the best access. And I mean, our ultimate 145 00:13:40,440 --> 00:13:43,240 golden fireside is Las Aguilera. 146 00:13:43,240 --> 00:13:49,960 So there was a couple of questions in the packet about response times. So Megan did 147 00:13:49,960 --> 00:13:54,080 the first half of PowerPoint. I'll do a little bit more with pictures and just talk you through 148 00:13:54,080 --> 00:13:59,280 it. But if you look in that top right corner, you can see where the existing fire station 149 00:13:59,280 --> 00:14:07,240 is at. And if you were to remove Station 8 from that position, in the old days, we basically 150 00:14:07,240 --> 00:14:10,920 took a compass, we drew about a four-mile circle, we considered about a five-minute 151 00:14:10,920 --> 00:14:18,080 response time, tried to meet NFPA 1710 to meet, you know, ISO needs, you know, patient 152 00:14:18,080 --> 00:14:23,280 safety, EMS, fire, all that type of response. 153 00:14:23,280 --> 00:14:28,920 Now as you look below that, in today's world with ArcGIS and heat mapping, you can see 154 00:14:28,920 --> 00:14:33,240 the dark green kind of shows what we can cover in a four-minute response, NFPA X that we 155 00:14:33,240 --> 00:14:38,920 look at, NFPA 1710 that we look at, four-minute response and eight-minute response. And you 156 00:14:38,920 --> 00:14:44,040 can see in there, even with that previous stations, that we have some gaps in there. 157 00:14:44,040 --> 00:14:48,440 But the light green is an eight-minute response, which is what the question was aimed at, you 158 00:14:48,440 --> 00:14:52,720 know, what do we look for eight-minute responses? 159 00:14:52,720 --> 00:14:59,080 The slide that's actually with the red, the green, in the middle of the page, this isn't 160 00:14:59,080 --> 00:15:03,800 what we can do with our mapping now. We can basically drop a pin, look at how the current 161 00:15:03,800 --> 00:15:08,480 streets are set up, how that works, where can we be in four minutes and where can we 162 00:15:08,480 --> 00:15:13,080 be in eight minutes? So we're using technology to help us get to that point, where do we 163 00:15:13,080 --> 00:15:17,680 build future fire stations? So as we continue to develop the city of Denton, we're not drawing 164 00:15:17,680 --> 00:15:23,720 concentric circles anymore. We're looking at the major roads that go through town and 165 00:15:23,720 --> 00:15:29,840 give us that access. And this one here is one that we're looking at off of a 380 West. 166 00:15:29,840 --> 00:15:37,480 And we'd be doing the same thing if we start looking at the new fire station. Questions? 167 00:15:37,480 --> 00:15:41,800 And then the last question, and as we know, we're getting more and more residential, we're 168 00:15:41,800 --> 00:15:45,720 packing in the city, we're trying to develop the land around us, but we got fire stations 169 00:15:45,720 --> 00:15:50,560 sitting there. So one of the questions was code one versus code three response. Code 170 00:15:50,560 --> 00:15:56,320 one, no lights, no sirens are driving down the road. And code three, lights and sirens 171 00:15:56,320 --> 00:16:02,600 are visual and audio alarms. 90% of what we do is a code three response. If somebody's 172 00:16:02,600 --> 00:16:07,280 having a heart attack, it's your house is on fire. 70% of what we do in the city of 173 00:16:07,280 --> 00:16:14,840 Denton is EMS based. The next is a lot of responding to automatic alarms. And we do 174 00:16:14,840 --> 00:16:20,640 allow our captains to ask questions, is there, you know, what's the sensor being sent? And 175 00:16:20,640 --> 00:16:24,880 they can make that decision, do I want to bump down to code one or do I want to continue 176 00:16:24,880 --> 00:16:29,880 code three based on what those responses are from dispatch? And then the code one responses 177 00:16:29,880 --> 00:16:34,400 are, you know, just going out and doing welfare checks or something that's, you know, a little 178 00:16:34,400 --> 00:16:39,160 bit pub ads and those kinds of things. So the question is, is we are looking at code 179 00:16:39,160 --> 00:16:44,480 two response. We've had several emails, we're dealing with the legal department. PD is easily 180 00:16:44,480 --> 00:16:51,000 covered under code two response because sometimes they need to not have lots of sirens on because 181 00:16:51,000 --> 00:16:54,720 they have to sneak up on a criminal. You know, they have to show up without everybody knowing 182 00:16:54,720 --> 00:16:58,320 they're in the neighborhood. We make a lot of noise when we show up in the neighborhood. 183 00:16:58,320 --> 00:17:03,480 You know, we got that big red calling card that we run with. So we're looking at transportation 184 00:17:03,480 --> 00:17:10,100 code and it doesn't really, it's not specific to what we can do at the fire department. 185 00:17:10,100 --> 00:17:16,040 We are set up code one, code three. We're having legal look into it and see if we could 186 00:17:16,040 --> 00:17:20,240 set up our own city ordinances, our own policies, and maybe address some of that and some of 187 00:17:20,240 --> 00:17:29,040 those issues where maybe we could use visual alarms or the lights and not the audible or 188 00:17:29,040 --> 00:17:34,120 the siren. So it's a topic conversation around the fire department and especially as we see 189 00:17:34,120 --> 00:17:39,680 that the apartment complex is going in next to station five and that we see around our 190 00:17:39,680 --> 00:17:43,680 new station eight and the hotels that are there, we're trying to be good neighbors, 191 00:17:43,680 --> 00:17:49,080 but as we'd all say, if it's your mom or your house, you know, you want us there quickly. 192 00:17:49,080 --> 00:17:54,080 So we're trying to, we're trying to be good stewards of the, of the power that you've 193 00:17:54,080 --> 00:18:02,920 given us, but we will make sure that we're doing the right job. So any questions on? 194 00:18:02,920 --> 00:18:03,920 Commissioner Pruitt. 195 00:18:03,920 --> 00:18:09,340 Thank you. First, I guess just a brief question on this and then I want to go back to response 196 00:18:09,340 --> 00:18:15,760 times. When you have a code three call and you, you know, you roll the doors up and you 197 00:18:15,760 --> 00:18:23,400 start going out is, are the sirens active from the moment the truck leaves the bay or 198 00:18:23,400 --> 00:18:25,680 how does that process work? 199 00:18:25,680 --> 00:18:31,000 The normally as they hit the end of the ramp, based on traffic, those kinds of things, when 200 00:18:31,000 --> 00:18:35,920 they turn the lights on, they turn the sirens on with it. So as they're making that response, 201 00:18:35,920 --> 00:18:39,880 it's just automatic. They engage both at the same time. They are different switches, but 202 00:18:39,880 --> 00:18:43,920 they are engaging them both. And it's usually, you know, the inner traffic middle of the 203 00:18:43,920 --> 00:18:47,860 night is probably not uncommon that it takes a second or so they get it flipped on, you 204 00:18:47,860 --> 00:18:50,800 know, and there's not a lot of traffic. 205 00:18:50,800 --> 00:18:54,700 One of the things is, is even whether we're driving code three or code one with the good 206 00:18:54,700 --> 00:18:59,440 stewards of the road, you know, we just because we have lots of sirens on, we're only asking 207 00:18:59,440 --> 00:19:05,080 permission to run a red light, only asking permission to go the wrong way down the street. 208 00:19:05,080 --> 00:19:10,800 It's still our responsibility to make sure that we do it safely. So with code one, we're 209 00:19:10,800 --> 00:19:16,680 obeying all the traffic laws, just as you are. In code two, we would be still obeying 210 00:19:16,680 --> 00:19:20,400 all those traffic laws. The only thing that would be different would be we would have 211 00:19:20,400 --> 00:19:21,400 the lights running. 212 00:19:21,400 --> 00:19:29,120 Okay. And just forgive me for my terminology question, but by end of ramp, is that the 213 00:19:29,120 --> 00:19:39,400 exit from the the parking area or inside the fire station property? Okay. Okay. Thank you. 214 00:19:39,400 --> 00:19:43,760 And then a question about the response times. If you could go back to that slide that showed 215 00:19:43,760 --> 00:19:53,080 the map. I think one thing I've been interested in when we see proposals for, you know, especially 216 00:19:53,080 --> 00:19:58,160 for rezonings and that sort of thing. One of the criteria in our comprehensive plan 217 00:19:58,160 --> 00:20:06,280 is to seek to optimize the usage of our existing facility, public facilities. And part of that 218 00:20:06,280 --> 00:20:14,200 is fire stations and personnel. And I think what we've seen so far is that if that development 219 00:20:14,200 --> 00:20:19,640 was within an eight-minute response time, that's sort of a pass/fail grade that we've 220 00:20:19,640 --> 00:20:25,840 seen on our applications. I guess what I'm interested in is understanding if you have, 221 00:20:25,840 --> 00:20:33,640 say, a development that goes in that has a seven-minute response time, over time, would 222 00:20:33,640 --> 00:20:40,440 that be a development that you would look to add additional fire stations to to reduce 223 00:20:40,440 --> 00:20:49,280 it down to that four-minute goal of NFPA 1710? How do you make those decisions? Because from 224 00:20:49,280 --> 00:20:57,600 my perspective, it's just, you know, we want to make sure that we grow smartly for lack 225 00:20:57,600 --> 00:21:03,000 of a better term. And part of that is to make sure that we don't necessarily saddle ourselves 226 00:21:03,000 --> 00:21:09,840 with overextending stations or requiring stations down the road that we may have a difficulty 227 00:21:09,840 --> 00:21:15,680 affording, if that makes sense. That's a great question. 1710 is what the 228 00:21:15,680 --> 00:21:21,040 intent is, and I'm speaking from memory, is that we can provide that service to 80 percent 229 00:21:21,040 --> 00:21:26,640 of our population. And so as we grow, sometimes we'll have those outliners. And what we try 230 00:21:26,640 --> 00:21:30,840 to do is look to the future and try to find ways. And it's one of the reasons that this 231 00:21:30,840 --> 00:21:34,760 morning we were at the mobility plan meetings, because we want to know where future roads 232 00:21:34,760 --> 00:21:38,760 are going in, because if we know that, we can start looking for land in that area and 233 00:21:38,760 --> 00:21:43,020 we can have those discussions. One of the other things that we do currently, even with 234 00:21:43,020 --> 00:21:47,840 our residents of Robeson Ranch, we go into mutual aid agreements or automatic aid agreements 235 00:21:47,840 --> 00:21:53,200 with other agencies that, and they have a fire station just south of the entry. So we 236 00:21:53,200 --> 00:21:56,320 actually are in agreement with them and they respond to that area, which helps them with 237 00:21:56,320 --> 00:22:02,280 their insurance, but it also helps us get to the scene faster, treat the medical patient 238 00:22:02,280 --> 00:22:06,680 or get on the scene faster and knock the fire down, because we know it's exponentially growing. 239 00:22:06,680 --> 00:22:12,280 So when we have those outliers, as you were saying, as we do our studies, we also look 240 00:22:12,280 --> 00:22:19,360 for ways to get creative, you know, even fiscally creative to cover that area. 241 00:22:19,360 --> 00:22:23,920 Okay. But if you had an area that was, say, a seven-minute response time, that would be 242 00:22:23,920 --> 00:22:28,160 one area that you would try to reduce that down to the four minutes in one of those creative 243 00:22:28,160 --> 00:22:30,980 ways? At some point, as it continues to grow, as 244 00:22:30,980 --> 00:22:34,720 we know with Cole Hunter Ranch going in, we know more stations going there, and that's 245 00:22:34,720 --> 00:22:40,040 actually going to help the residents of the Robeson Ranch area also. So as the city continues 246 00:22:40,040 --> 00:22:45,260 to grow, we will continue to look for areas that we can put a fire station in that can 247 00:22:45,260 --> 00:22:51,840 have great reach at major intersections or can gain access to an area. We try not to 248 00:22:51,840 --> 00:22:56,440 bury our fire stations into a residential district, because once again, now it inhibits 249 00:22:56,440 --> 00:23:01,320 me from getting out to provide that. I hope I'm answering your question. 250 00:23:01,320 --> 00:23:11,360 I think you are. Yeah. Thank you. Okay. Any other questions? Did you have more to 251 00:23:11,360 --> 00:23:23,320 your presentation, or was that? Hold on. Wait. Wait. Thank you for the opportunity. 252 00:23:23,320 --> 00:23:28,880 Thank you so much. Great information. Obviously, yeah, that comes before us often, just in 253 00:23:28,880 --> 00:23:35,120 our backup, and you helped to let us understand that further of how the process works. So 254 00:23:35,120 --> 00:23:39,920 thank you so much for being here. Oh, we do. Commissioner McDade, we do have a question. 255 00:23:39,920 --> 00:23:48,800 All right. Thank you. I have just a question in general. In my neighborhood, we're actually 256 00:23:48,800 --> 00:23:56,440 having traffic issues, really speeding, and we've asked about speed bumps. And the response 257 00:23:56,440 --> 00:24:03,120 we got was, well, they're not warranted because it affects a fire. And I just want to know 258 00:24:03,120 --> 00:24:08,360 what the logic is behind that, so I can get back with the community. Does it slow down 259 00:24:08,360 --> 00:24:14,160 the response time, or what is the effect of a speed bump when it comes to the fire trucks? 260 00:24:14,160 --> 00:24:22,120 Sorry, I couldn't answer that. The International Fire Code actually prohibits the use of speed 261 00:24:22,120 --> 00:24:27,600 bumps for regulating speed and traffic, but a lot of that goes back to that. But it also 262 00:24:27,600 --> 00:24:33,040 puts it on the fire official's plate to kind of make smart decisions. Can we find traffic 263 00:24:33,040 --> 00:24:38,280 calming devices to slow that area? Can we use enforcement by our PD officers to slow 264 00:24:38,280 --> 00:24:42,360 down speeding in that area? Can we put in, you know, and so we've been working with, 265 00:24:42,360 --> 00:24:45,960 I don't say engineering, we actually have several conversations. It's something that 266 00:24:45,960 --> 00:24:52,520 we're working on, and to the fact that we don't want to outlaw them completely, but 267 00:24:52,520 --> 00:24:57,000 we do want to help design them, what the shape is of them, that helps our trucks. We've actually 268 00:24:57,000 --> 00:25:01,920 had damage to our apparatus because the weight must be, you may not realize, but we have 269 00:25:01,920 --> 00:25:07,520 500 pounds, I mean, 500 gallons of 8 pounds of water in those trucks, and they don't go 270 00:25:07,520 --> 00:25:11,640 over the speed bumps very well. The other problem is, is there are studies out there 271 00:25:11,640 --> 00:25:16,640 that show for every speed bump you put in, you can put in about a 10 second reduction 272 00:25:16,640 --> 00:25:21,520 in response time. So if you have one in the center of your street, we can probably get 273 00:25:21,520 --> 00:25:25,400 around it. As long as we, and that's the things that we're working on with engineering now, 274 00:25:25,400 --> 00:25:30,280 to try to come up with a better plan on how we can address safety in your neighborhoods 275 00:25:30,280 --> 00:25:35,600 because ultimately we care about safety, but we also don't want to slow our response times 276 00:25:35,600 --> 00:25:40,080 because we've had areas in the Sea of Denton that we've had to cross 8 or 10 of them, and 277 00:25:40,080 --> 00:25:47,200 all of a sudden now we've taken our response time from 4 minutes to 8 minutes and all the 278 00:25:47,200 --> 00:25:51,440 work that we do to reduce our time out the door, down the road, putting our stations 279 00:25:51,440 --> 00:25:56,700 in the right place, and a few speed bumps can slow that down. So we're not completely 280 00:25:56,700 --> 00:26:01,080 against them, and I'm hoping I'm answering your question, but we are reviewing that with 281 00:26:01,080 --> 00:26:08,620 engineering and there are other traffic calming devices and other techniques that we can use, 282 00:26:08,620 --> 00:26:12,800 and that's something that we're working on to try to implement in the City of Denton. 283 00:26:12,800 --> 00:26:20,320 Alright, thank you. Awesome, thank you. Anybody else? Okay, thank you again for being here. 284 00:26:20,320 --> 00:26:27,640 Well thank you for having us. Appreciate it. Okay, our next agenda item in our work session 285 00:26:27,640 --> 00:26:33,920 reports is receive a report, hold a discussion regarding the city's plotting process, and 286 00:26:33,920 --> 00:26:47,480 I will call up Karina for discussion there. Alright, good evening. Karina Maldonado, Associate 287 00:26:47,480 --> 00:26:52,680 Planner. So I won't spend too much time on some of these slides. There was a previous 288 00:26:52,680 --> 00:26:59,560 presentation on plotting earlier this year, but what we wanted to focus in on was on the 289 00:26:59,560 --> 00:27:05,440 shot clock and how it affects the process, as well as go over some questions. I'll just 290 00:27:05,440 --> 00:27:11,400 skip this slide. So PNZ had requested in a previous meeting some additional information 291 00:27:11,400 --> 00:27:15,040 about the plot approval process, and some of those questions that were brought forward 292 00:27:15,040 --> 00:27:22,520 were, you know, why are some plots brought back as denials and some as requests for extensions, 293 00:27:22,520 --> 00:27:26,960 and then why do some recommendations change after the agenda is posted, even up to the 294 00:27:26,960 --> 00:27:32,040 meeting time. So those questions kind of go back to our process, and more specifically 295 00:27:32,040 --> 00:27:37,440 how the process was changed due to HB 3167. So I'll focus on that, and please feel free 296 00:27:37,440 --> 00:27:42,760 to stop me during the presentation if you have questions. So I'll go over this pretty 297 00:27:42,760 --> 00:27:48,720 briefly. So HB 3167, otherwise known as the shot clock, that legislation was passed through 298 00:27:48,720 --> 00:27:56,260 the Texas legislation in 2019, which required that municipalities have 30 days to act upon 299 00:27:56,260 --> 00:28:03,320 a plat or construction plans. That legislation required that we approve, approve with conditions, 300 00:28:03,320 --> 00:28:09,760 or deny a plat within 30 days of its submittal. The City of Denton actually just approves 301 00:28:09,760 --> 00:28:18,680 or denies plats because an approval with conditions follows the same process as a denial. And 302 00:28:18,680 --> 00:28:22,200 some of the key areas from this slide that I'll touch on was obviously there was changes 303 00:28:22,200 --> 00:28:29,560 to our submittal process we followed. Based on P&Z meeting dates, we had submittal schedules 304 00:28:29,560 --> 00:28:35,960 that would allow the 30 days within that period. We did require that supplemental applications 305 00:28:35,960 --> 00:28:41,880 like your TIAs, your field assessments, that those things were completed prior to plat 306 00:28:41,880 --> 00:28:49,600 submittals so that it wouldn't hold up that plat application. Other things were it allowed 307 00:28:49,600 --> 00:28:55,440 30 day extensions. That would be a one time extension and we are seeing those more frequently 308 00:28:55,440 --> 00:29:01,480 as you guys can see during our frequent meetings. And then it changed our staff report. So the 309 00:29:01,480 --> 00:29:06,120 staff report that you see specifically have to indicate why we're denying a plat, how 310 00:29:06,120 --> 00:29:18,680 it applies to specific DDC references or state law or other regulations. So again, I'll just 311 00:29:18,680 --> 00:29:24,160 briefly go over this. So the general information that we typically tell you all is if it meets 312 00:29:24,160 --> 00:29:29,040 all our requirements, we're obligated to or the P&Z is obligated to approve the plat. 313 00:29:29,040 --> 00:29:36,400 If it does not meet these regulations or requirements, then you may deny the plat. And so some of 314 00:29:36,400 --> 00:29:41,920 the things that we consider as the development review team, which includes planning, engineering, 315 00:29:41,920 --> 00:29:47,760 fire, and some other technical review staff, sometimes these denials are based off of just 316 00:29:47,760 --> 00:29:52,760 general insufficient information. Maybe they're not providing enough of that background information 317 00:29:52,760 --> 00:29:59,240 in order to approve the plat. That can be plat notes, that can be graphic information. 318 00:29:59,240 --> 00:30:03,920 They can also just not be meeting our DDC. So our development standards are included 319 00:30:03,920 --> 00:30:11,240 in subchapter seven. That's things like water, wastewater, access, site and building design, 320 00:30:11,240 --> 00:30:17,200 ESAs. So if they're not meeting the requirements in that section through their supplementary 321 00:30:17,200 --> 00:30:23,360 information that they provide with the plat, then that's a basis for denial. Other things 322 00:30:23,360 --> 00:30:28,060 like just our subdivision standards. So whether they have sufficient access, are they meeting 323 00:30:28,060 --> 00:30:33,420 the minimum lot requirements and setbacks? Even HOA documents, those are some things 324 00:30:33,420 --> 00:30:37,340 that you'll see. And then of course, I mentioned supplemental applications. So that's things 325 00:30:37,340 --> 00:30:42,360 like our tree preservation. We review that with the preliminary plots, civil engineering 326 00:30:42,360 --> 00:30:48,600 plans, flood studies. If those supplementary plans don't meet our code and it ties to the 327 00:30:48,600 --> 00:30:55,480 plat, then that's a basis for denial. So this is just kind of a screenshot. We showed 328 00:30:55,480 --> 00:31:01,080 this last time. We mentioned that basis for denial sometimes is based on the preliminary 329 00:31:01,080 --> 00:31:06,320 plat checklist, the final plat checklist. This is just a brief screenshot of that. Supplemental 330 00:31:06,320 --> 00:31:10,640 sheets that are typically provided with the preliminary plots. That's things like drainage 331 00:31:10,640 --> 00:31:15,320 sheets. So your pre and post conditions. Tree preservation. So they have to provide the 332 00:31:15,320 --> 00:31:23,160 survey and the preservation plan. Utility layout is another item. And also grading. 333 00:31:23,160 --> 00:31:27,640 So these are all the things in the background that you don't see in your backup. But as 334 00:31:27,640 --> 00:31:32,120 we review this, mark it up, go through the process, these are some things that kind of 335 00:31:32,120 --> 00:31:38,680 hold up an application. And so going back to those questions, why would one plat come 336 00:31:38,680 --> 00:31:47,200 forth as a denial and another one as a recommendation for an extension? So here's just some markups 337 00:31:47,200 --> 00:31:52,800 and some of them are pretty simple, just to convey the information. So just provided a 338 00:31:52,800 --> 00:31:59,080 markup here. Graphic information. Sometimes it's as simple as lot and block, not matching 339 00:31:59,080 --> 00:32:05,560 or being consistent with what we would require. So as this example, they've provided a single 340 00:32:05,560 --> 00:32:13,920 lot as a lot 41 block F. Well, there's no block A and there's no lot one through 40. 341 00:32:13,920 --> 00:32:18,160 So that's kind of one of those simple things like, could you please change this? And you 342 00:32:18,160 --> 00:32:24,840 can see that it's simple enough that they've changed it. So as an example, if maybe this 343 00:32:24,840 --> 00:32:30,400 was one of five comments that was simple enough for staff to review, they would be able to 344 00:32:30,400 --> 00:32:36,880 work with staff to clear that out before P and Z. Simple things like just wording on an 345 00:32:36,880 --> 00:32:43,720 owner's dedication. And here's a more complicated one is meeting the minimum lot standards. 346 00:32:43,720 --> 00:32:50,000 So for this lot, the minimum lot depth was 80 feet. They didn't dimension it, so staff 347 00:32:50,000 --> 00:32:55,160 could not review to make sure that it complied with the code. So these are some examples 348 00:32:55,160 --> 00:33:01,400 of some minor issues that are pretty easy to resolve. It's just a matter of adding the 349 00:33:01,400 --> 00:33:07,280 information to the plat. It's simple enough. Things like what you see on these supplemental 350 00:33:07,280 --> 00:33:13,920 sheets, if they need calculations that are missing that require staff to verify whether 351 00:33:13,920 --> 00:33:18,200 they're meeting drainage or not, those are more complicated and would require a full 352 00:33:18,200 --> 00:33:23,040 submittal. So sometimes you'll see they'll just ask for their extension. They don't have 353 00:33:23,040 --> 00:33:29,400 the time to go back and do the thorough review. And so hopefully the next slide will help 354 00:33:29,400 --> 00:33:34,080 kind of explain that a little bit more. So in current, if I could just interrupt you, 355 00:33:34,080 --> 00:33:40,200 they have until up to the start of the meeting, correct? To be able to, yes. And just to add 356 00:33:40,200 --> 00:33:46,240 on that, sometimes it depends on staff workload. You know, is if it's available for staff to 357 00:33:46,240 --> 00:33:53,380 provide that informal review, then we can have that changed. If it's a very lengthy 358 00:33:53,380 --> 00:33:59,240 review that's required, it's difficult to have staff review an hour before the meeting. 359 00:33:59,240 --> 00:34:05,360 So we'll just kick it back to a formal review. Understood. And hopefully to better explain 360 00:34:05,360 --> 00:34:11,360 the process of the 30 day shot clock, I've outlined the process, kind of just showing 361 00:34:11,360 --> 00:34:17,880 you from day zero to day 30 what that looks like. So day zero is the day that you submit 362 00:34:17,880 --> 00:34:23,880 your application. They've submitted it by 5 p.m. Typically that's a Tuesday, so that 363 00:34:23,880 --> 00:34:30,520 they could get that in. Between day zero and day two, we do a completeness review. So making 364 00:34:30,520 --> 00:34:36,080 sure that they have all the correct information in order for us to sufficiently review it. 365 00:34:36,080 --> 00:34:41,480 Then it goes to the development review team. So that's, as you can see, day 3 through 13, 366 00:34:41,480 --> 00:34:47,320 that's about 10 days for staff to review. I do want to clarify, that is calendar days, 367 00:34:47,320 --> 00:34:52,380 not business days. So that will be, you know, we'll get a review on a Thursday and it's 368 00:34:52,380 --> 00:34:59,600 due on Monday. So just to give you a sense of what that looks like. Day 14, we get together 369 00:34:59,600 --> 00:35:04,140 as a group, the development assistance team, that's all the reviewers. We go over our comments 370 00:35:04,140 --> 00:35:10,600 and we make sure that a planning comment doesn't conflict with the FHIR code comment. So we 371 00:35:10,600 --> 00:35:15,120 make sure that each reviewer has an opportunity to say, okay, here are the issues with this 372 00:35:15,120 --> 00:35:25,560 plat. So if issue with planning for access also is an issue for FHIR, it allows an opportunity 373 00:35:25,560 --> 00:35:32,220 to set up meetings on the side to help the applicant understand these are the 10 comments 374 00:35:32,220 --> 00:35:39,240 that you need to address in order to get this approved. As it moves forward, so this is 375 00:35:39,240 --> 00:35:44,120 just where the internal meeting happens. Then the project facilitator, so that's not planning. 376 00:35:44,120 --> 00:35:50,280 This is a separate person. The project facilitator issues those comments directly to the applicant. 377 00:35:50,280 --> 00:35:56,520 At the time they're told, okay, you have outstanding comments, we're recommending denial at P&Z, 378 00:35:56,520 --> 00:36:01,760 or you've met all our requirements, so we're recommending approval. With a first review, 379 00:36:01,760 --> 00:36:08,400 that's more than not a recommendation for denial. We do have a few like our minor administratively 380 00:36:08,400 --> 00:36:15,760 approved plat sets sometimes do reach that at an earlier date. Skipping from that point 381 00:36:15,760 --> 00:36:22,880 to day 29, that is when you guys see the plat come forth for P&Z for either an extension 382 00:36:22,880 --> 00:36:30,840 of approval or approval of an extension request, approval of a plat or denial. And I just wanted 383 00:36:30,840 --> 00:36:36,800 to highlight three days that kind of interrupt that. So as you can see, day 20, that's when 384 00:36:36,800 --> 00:36:43,760 staff is drafting the agenda items, including the draft staffed in analysis. And that's 385 00:36:43,760 --> 00:36:50,480 where we compile all the denial comments based on the review. So we'll compile engineering 386 00:36:50,480 --> 00:36:57,520 comments, fire, any review where that comes forth with outstanding items. And then we 387 00:36:57,520 --> 00:37:02,680 go through the agenda finalization process. So agendas are always finalized the Friday 388 00:37:02,680 --> 00:37:07,440 before. I think commissioner Anderson has a question. 389 00:37:07,440 --> 00:37:17,280 Thank you. From when the development assistant team looks at a plat and knows that it may 390 00:37:17,280 --> 00:37:27,920 be recommended for denial, do they get with the submitter? Is it on day 29 or could you 391 00:37:27,920 --> 00:37:33,600 all let these because my question basically is if you know it's going to be submitted 392 00:37:33,600 --> 00:37:41,640 for denial on day 13 or 14, why wait till day 29 to let the person know that's going 393 00:37:41,640 --> 00:37:46,920 to be denied? That's two weeks. Why don't we let these people know earlier so they can 394 00:37:46,920 --> 00:37:49,680 go ahead and work on it before it comes to us? Does it make sense? 395 00:37:49,680 --> 00:37:54,720 Yeah. And it's really at the discretion of the project facilitator. So within that time 396 00:37:54,720 --> 00:38:01,000 period, plats are not the only applications that staff accepts. We accept our zoning applications 397 00:38:01,000 --> 00:38:07,720 and PDs and things like that on off weeks. So the time period that's allowed to staff 398 00:38:07,720 --> 00:38:14,160 really also captures staff workload and being able to address other applications as they 399 00:38:14,160 --> 00:38:21,600 come in in order. Some plats might not take a lot of staff time. Some might may take more. 400 00:38:21,600 --> 00:38:26,320 But in general, if maybe planning knows that there's three comments we do as staff reach 401 00:38:26,320 --> 00:38:31,600 out to the applicant through the project facilitator to say these are pretty minor. Can you address 402 00:38:31,600 --> 00:38:38,080 them? But for the most part, because reviewers have different workloads and different availability 403 00:38:38,080 --> 00:38:43,000 to complete that review, sometimes it's it's beneficial for them to receive all their comments 404 00:38:43,000 --> 00:38:52,160 at once, which would be when day 16 arrives. So at day 16, y'all can let them know that 405 00:38:52,160 --> 00:38:59,880 there's issues that arise. So they have another 13 days, basically two weeks to get that corrected 406 00:38:59,880 --> 00:39:05,280 back to you before you ever submit it. OK, I just want I just I just would like the people 407 00:39:05,280 --> 00:39:08,800 to know, but instead of blindside them at the last day going, Hey, sorry, today's day 408 00:39:08,800 --> 00:39:13,440 nine. Sorry, we're gonna spend it for denial. They did not give them the opportunity to 409 00:39:13,440 --> 00:39:19,840 have the to to correct the plat to make sense. I think Tina wanted to jump in. Well, and 410 00:39:19,840 --> 00:39:25,600 I was just going to add. So, yes, I mean, so the we try to do a good job of communicating 411 00:39:25,600 --> 00:39:29,120 to our applicants, especially if we have concerns regarding if we're not going to be able to 412 00:39:29,120 --> 00:39:34,000 recommend approval of their in this case, the plots, right? But even any development 413 00:39:34,000 --> 00:39:39,960 application that we're working on, you know, I think engineers who have been doing this 414 00:39:39,960 --> 00:39:44,040 for while planners as well, you know, they'll have a good sense based upon the nature of 415 00:39:44,040 --> 00:39:48,280 the comments that are received as to how quickly they'll be able to turn around that the shot 416 00:39:48,280 --> 00:39:55,680 clock bill has really. It's made it more challenging for municipalities because we're obligated 417 00:39:55,680 --> 00:40:01,240 to perform within a certain amount of time. The development community is not. So if if 418 00:40:01,240 --> 00:40:05,240 a developer is really wanting to get a project through, then they need to be on their engineer 419 00:40:05,240 --> 00:40:08,640 that they've retained to make sure that the engineers doing their job in it and addressing 420 00:40:08,640 --> 00:40:13,080 comments accordingly. Folks that do regular business here at the city of Denton are going 421 00:40:13,080 --> 00:40:17,520 to have probably a good idea of what we were typically looking for. And they'll know and 422 00:40:17,520 --> 00:40:21,640 have a good sense what the status of their project will be in all likelihood. So the 423 00:40:21,640 --> 00:40:25,760 more experienced. Now, if the first time someone's doing business might be a little bit different 424 00:40:25,760 --> 00:40:29,880 situation or their second time. It's just part of a learning process because while cities 425 00:40:29,880 --> 00:40:35,080 are similar, you know, we have also some different processes. But but we do try to be proactive 426 00:40:35,080 --> 00:40:39,600 in educating applicants accordingly. I just want to make sure like under example, like 427 00:40:39,600 --> 00:40:44,320 lot block need to be changed from, you know, whatever that they didn't wait till they wouldn't 428 00:40:44,320 --> 00:40:48,600 wait till day twenty nine to try to let these people know. And that kind of. Yeah, that's 429 00:40:48,600 --> 00:40:52,560 something that's so simple that you could call and go, hey, this is all your plat needs 430 00:40:52,560 --> 00:40:57,120 to be finalized. Just fix this real quick. Absolutely. And that's why sometimes you'll 431 00:40:57,120 --> 00:41:03,520 see maybe a last minute change at the podium. So maybe the the agenda will say it's for 432 00:41:03,520 --> 00:41:08,960 a denial. They've already had their extension in the last. Maybe two comments are that simple. 433 00:41:08,960 --> 00:41:12,560 And then when we get to the podium, you'll see they've addressed our comments now. So 434 00:41:12,560 --> 00:41:16,240 we're recommend recommending for approval. So those are some of the situations staff 435 00:41:16,240 --> 00:41:23,440 will reach out to them to clarify those. If it again, if it's more complicated, they they've 436 00:41:23,440 --> 00:41:27,440 usually been told at a certain time, like this, this may not work. We need to sit and 437 00:41:27,440 --> 00:41:33,040 talk about options for you. How how to address these comments because there's options of 438 00:41:33,040 --> 00:41:38,560 withdrawal or depending on the severity of the issues. I appreciate it. Thank you. And 439 00:41:38,560 --> 00:41:42,560 I think your next slide addresses some of that resubmission and how we are trying to 440 00:41:42,560 --> 00:41:47,160 accommodate getting plots back to the commission. Yes. And so this is kind of just the overview 441 00:41:47,160 --> 00:41:55,200 of a simple 30 day process. As you can see here, date Day 28 is kind of like we offer 442 00:41:55,200 --> 00:42:00,640 based on our submittal schedule again to meet the 30 day window of resubmittal. So the second 443 00:42:00,640 --> 00:42:08,880 review of a of a plat they can submit that on Day 28. So before PNC, assuming they are 444 00:42:08,880 --> 00:42:13,960 going to request an extension so that they can add an additional 30 days to their review. 445 00:42:13,960 --> 00:42:19,720 So overall, they're getting 60 days of a review period before they're actually receiving either 446 00:42:19,720 --> 00:42:26,920 a denial or approval. So Day 28 they submit. It doesn't actually get forwarded until PNC 447 00:42:26,920 --> 00:42:33,360 approves the extension. And then we kind of move past this. So next slide, I kind of just 448 00:42:33,360 --> 00:42:39,420 highlighted those same first two dots would be the request to resubmit PNC approves the 449 00:42:39,420 --> 00:42:45,400 extension. At that time, Day 37, they've already had their second review. They get comments 450 00:42:45,400 --> 00:42:49,960 again. Again, staff will communicate if if it's simple enough that it's been addressed 451 00:42:49,960 --> 00:42:55,720 or not in some instances. And again, this is based off the 30 days and the submittal 452 00:42:55,720 --> 00:42:59,820 schedule and I'll go over that just briefly. Sometimes there's an opportunity for a third 453 00:42:59,820 --> 00:43:08,800 review. So they've even got kind of two extra reviews in within that 30 day, 60 day period. 454 00:43:08,800 --> 00:43:16,000 So you'll see if they've already received an extension, they might get a denial or they 455 00:43:16,000 --> 00:43:23,160 might even have time to have another review in to then get the approval. So overall, within 456 00:43:23,160 --> 00:43:28,240 the 60 day period, sometimes you'll see them come back several times. Depending on the 457 00:43:28,240 --> 00:43:33,160 severity of the comments or the simple simplicity of the comments, you might see where it's 458 00:43:33,160 --> 00:43:40,040 a very simple extension approval or just an approval and some we've seen it's complicated 459 00:43:40,040 --> 00:43:44,480 enough or maybe they've dropped the ball on their end. They didn't look at our resubmittal 460 00:43:44,480 --> 00:43:50,240 schedule and you'll see very simple comments actually will just end up in a denial multiple 461 00:43:50,240 --> 00:43:56,440 times. We don't like to see that. But sometimes maybe the applicant has too many projects 462 00:43:56,440 --> 00:44:03,760 or their staff has not unfortunately done a great job. So that's kind of the situation 463 00:44:03,760 --> 00:44:10,320 that it ends up being. Lastly, I just want to leave you with our actual submittal schedule 464 00:44:10,320 --> 00:44:16,320 that's on our land development webpage. So as you can see, there's two highlighted areas. 465 00:44:16,320 --> 00:44:22,400 This is how we base our submittal schedules based on when we can meet the 30 days on a 466 00:44:22,400 --> 00:44:30,040 P and Z date. So you'll see first is the initial submittal. This is when comments are due in 467 00:44:30,040 --> 00:44:35,000 the second column. Here's a resubmittal date that they're allowed to resubmit if they have 468 00:44:35,000 --> 00:44:42,080 the extension. And then this is what the actual P and Z date would be. Then it goes all the 469 00:44:42,080 --> 00:44:48,000 way down the second review when comments are due and then even a third review if it's permitted. 470 00:44:48,000 --> 00:44:54,300 So this is available on our website. All the applicants have access to this. And so anytime 471 00:44:54,300 --> 00:44:58,480 it gets updated, it's posted and there's kind of like a massive email that goes out to developers 472 00:44:58,480 --> 00:45:03,320 to let them know this is what our submittal schedule is. So here are the opportunities 473 00:45:03,320 --> 00:45:09,520 for you to submit or resubmit your PLA applications. And with that, I can answer any additional 474 00:45:09,520 --> 00:45:14,680 questions that you'll have. >> Great, Karina, thank you. Questions? Commissioner 475 00:45:14,680 --> 00:45:19,480 Villarreal? >> Yes. Could you explain from staff's perspective 476 00:45:19,480 --> 00:45:24,840 what you would want to see from us if we decide to approve a plat that's recommended for denial 477 00:45:24,840 --> 00:45:31,200 or deny a plat that's recommended for approval? Because I understand you would like to see 478 00:45:31,200 --> 00:45:38,160 citations and from staff's perspective, what would you like us to do if, say, four of us 479 00:45:38,160 --> 00:45:43,280 decide to, again, approve something that is recommended for denial? What would that process 480 00:45:43,280 --> 00:45:46,880 look like? >> I'll shoot that over to Tina to answer. 481 00:45:46,880 --> 00:45:54,200 >> So with PLATs, keep in mind, it's a technical review. It either meets or it doesn't meet. 482 00:45:54,200 --> 00:45:59,280 And so we're obligated by state law, we staff on administrative approvals, but the commission 483 00:45:59,280 --> 00:46:04,320 also in your role, where you are obligated to approve the plat if it meets it. When it 484 00:46:04,320 --> 00:46:08,840 comes to denials, if we are telling you that this plat does not comply with our development 485 00:46:08,840 --> 00:46:14,040 standard requirements, regardless of what the issue may be, then I would strongly encourage 486 00:46:14,040 --> 00:46:20,360 you to deny the plat. When it comes to PLATs, I would discourage you from going against 487 00:46:20,360 --> 00:46:27,280 staff's recommendation on that. It's because we don't want to get into a point where we're 488 00:46:27,280 --> 00:46:33,440 engineering the document here at the DIAS. So, you know, some communities allow for approval 489 00:46:33,440 --> 00:46:39,980 with conditions. As Karina mentioned here, approval with conditions is similarly treated 490 00:46:39,980 --> 00:46:45,000 as a denial. There are some communities that would, you know, will do the approval and 491 00:46:45,000 --> 00:46:49,080 have the laundry list of conditions to try and have the applicant be able to address 492 00:46:49,080 --> 00:46:53,560 those. So we do not go down that path. It's my understanding because, again, just from 493 00:46:53,560 --> 00:46:59,840 a process standpoint and because either the, in our opinion, a plat either needs to meet 494 00:46:59,840 --> 00:47:05,840 or it needs to be denied. It's, you know, it's different than on a zoning case or a 495 00:47:05,840 --> 00:47:12,880 specific use permit where that's a more subjective review that can fall into play. You can, you 496 00:47:12,880 --> 00:47:19,240 know, we can agree to disagree on zoning and the specific use permits. But when it comes 497 00:47:19,240 --> 00:47:23,920 to PLATs, if we're recommending denial, then we're recommending denial for a reason and 498 00:47:23,920 --> 00:47:27,960 we've cited that reason in the staff analysis. So we would respectfully request that you 499 00:47:27,960 --> 00:47:31,560 concur with us and deny the plat accordingly. 500 00:47:31,560 --> 00:47:38,080 And then if I might just add, Tina, to that, if you have a question on a plat that staff 501 00:47:38,080 --> 00:47:43,280 is recommending approval or denial on, by all means, reach out to them as soon as possible. 502 00:47:43,280 --> 00:47:48,360 If there is something that was missed or there's something that you need clarified so that you 503 00:47:48,360 --> 00:47:52,120 can feel comfortable with their recommendation, by all means, reach out to them ahead of the 504 00:47:52,120 --> 00:47:58,120 meeting so that discussion can be started. Because oftentimes it might just be something 505 00:47:58,120 --> 00:48:05,680 that's not quite understood. And you can, you know, get a quick answer to your concerns. 506 00:48:05,680 --> 00:48:10,320 So that would certainly be something I'd offer to that question. 507 00:48:10,320 --> 00:48:14,880 The other thing I'll add is keep in mind, the PLATs may have engineering plans associated 508 00:48:14,880 --> 00:48:19,320 with them. So as part of our review of the engineering plans, there's, you know, potentially 509 00:48:19,320 --> 00:48:23,520 a significant issue that's still having to be worked through and which affects the plat 510 00:48:23,520 --> 00:48:28,040 that is submitted in-house. And so hence why a plat may also need to be denied is because 511 00:48:28,040 --> 00:48:32,640 of the engineering plans have not been fully addressed. Because keep in mind, there's a 512 00:48:32,640 --> 00:48:37,040 linkage between PLATs and the engineering plans, because the engineering plans are typically, 513 00:48:37,040 --> 00:48:41,000 in addition to just regular site improvements, they're also addressing the public infrastructure. 514 00:48:41,000 --> 00:48:44,360 So that's where the platting is important, because in addition to showing the property 515 00:48:44,360 --> 00:48:48,000 boundaries, if there are any easements that are being proposed on the property, then those 516 00:48:48,000 --> 00:48:52,040 easements are typically synced up with improvements that are being shown in those engineering 517 00:48:52,040 --> 00:48:57,360 plans. For example, drainage improvements. The applicant may not have addressed all of 518 00:48:57,360 --> 00:49:01,120 the drainage considerations associated with their civil engineering plans, which then 519 00:49:01,120 --> 00:49:05,120 could affect the size of an easement or the location of an easement, or even if an off-site 520 00:49:05,120 --> 00:49:10,640 easement is needed associated with it. So hence why we take our denial recommendations 521 00:49:10,640 --> 00:49:15,880 very seriously, because we realize that that's cost and time, or excuse me, money and time 522 00:49:15,880 --> 00:49:21,840 to the applicant. So when we're recommending denial of a plat, we've identified why it's 523 00:49:21,840 --> 00:49:27,000 deficient and we take that very seriously. So our goal actually is to try and work with 524 00:49:27,000 --> 00:49:31,960 applicants to get the plat where we can approve them, because at the end of the day, we want 525 00:49:31,960 --> 00:49:37,200 it in and out. We want to be able to allow folks to be able to get under construction 526 00:49:37,200 --> 00:49:42,280 on their projects. The last thing we want is documents that continue to linger and linger 527 00:49:42,280 --> 00:49:46,520 and linger within our department and non-responsive applicants, because that just burns more of 528 00:49:46,520 --> 00:49:50,840 our time when we could be spending our time more effectively on other projects, right? 529 00:49:50,840 --> 00:49:55,600 So that's why we even give the applicants the ability to submit that corrected plat 530 00:49:55,600 --> 00:50:01,040 up to your meeting. Like Corina said, if it's something that's easy to be able to address 531 00:50:01,040 --> 00:50:04,760 and get that review done, in all likelihood, we're going to try to accommodate that review 532 00:50:04,760 --> 00:50:08,160 and make that happen, because it's easier for us to turn around and stand up here and 533 00:50:08,160 --> 00:50:13,360 tell you that that plat complies instead of taking our own sweet time on getting a review, 534 00:50:13,360 --> 00:50:16,800 because then we're finding ourselves having to write another staff analysis, and that's 535 00:50:16,800 --> 00:50:21,680 having to go in the packet. Corina's writing, I'm reviewing, Haley's reviewing, Selena's 536 00:50:21,680 --> 00:50:25,360 pulling the packet together. That just adds time and effort that we otherwise would not 537 00:50:25,360 --> 00:50:31,480 need to be able to have to be spending. So we do try to be accommodating from that perspective. 538 00:50:31,480 --> 00:50:38,720 Any other questions? Commissioner Perret? Thank you, Chair. On plat applications, do 539 00:50:38,720 --> 00:50:44,280 the applicants have an option for a pre-development conference? Yes. Actually, all applications 540 00:50:44,280 --> 00:50:48,360 that come through development services, we highly recommend that they have a pre-application 541 00:50:48,360 --> 00:50:54,360 conference, and then at that meeting, along with technical staff comments, they're provided 542 00:50:54,360 --> 00:50:59,040 with a list of applications that they need to go through the process, as well as development 543 00:50:59,040 --> 00:51:04,720 fees and kind of a general timeline for their project. You know, that sounds like common 544 00:51:04,720 --> 00:51:10,560 sense to me, especially given the situation we're in. I hate to suggest that we try to 545 00:51:10,560 --> 00:51:17,520 track more things, because I know it's hard, but if it seems like those applicants that 546 00:51:17,520 --> 00:51:21,420 come in for pre-development conferences have a really high success rate of getting things 547 00:51:21,420 --> 00:51:26,600 through the first time, whereas those that choose not to don't, I wonder if that's something 548 00:51:26,600 --> 00:51:31,080 that we could try to publicize in the development meetings with the development professionals 549 00:51:31,080 --> 00:51:37,560 that we have. So we are not allowed to recommend who an applicant could use, so we have to 550 00:51:37,560 --> 00:51:45,160 be very careful of that. So we can post who has submitted, and if someone is interested 551 00:51:45,160 --> 00:51:50,560 in seeing who are engineers that have happened to file applications with us for the last 552 00:51:50,560 --> 00:51:55,080 three submittal cycles, we can post that kind of information, but we can't recommend who 553 00:51:55,080 --> 00:52:02,040 they might use. So we have to be impartial on that. Trust me, there are times where we 554 00:52:02,040 --> 00:52:07,920 would like to recommend who someone might use, but we can't, because of ethical obligations, 555 00:52:07,920 --> 00:52:10,080 but also we just need to remain impartial on that. 556 00:52:10,080 --> 00:52:16,960 Okay. Well, hopefully everybody will get the word sooner than later. Thank you. 557 00:52:16,960 --> 00:52:22,640 Any other questions for Corina? Thank you, Corina, for that. I think you all have done 558 00:52:22,640 --> 00:52:28,400 a great job. This shot clock bill has, you know, been so difficult to work with, and 559 00:52:28,400 --> 00:52:34,520 putting that schedule together, I know has just done wonders for workflow. 560 00:52:34,520 --> 00:52:39,040 You can thank Sean for that schedule. He's put a lot of time and effort into it. You 561 00:52:39,040 --> 00:52:43,040 can thank Sean for that schedule. He's put a lot of time and effort to make sure that, 562 00:52:43,040 --> 00:52:47,480 one, we make sure we line it up with P&Z appropriately, but also even the holiday schedule. We'll 563 00:52:47,480 --> 00:52:54,480 make sure it doesn't pose a problem for our developers during that process, and even for 564 00:52:54,480 --> 00:53:01,720 staff so we can take a little bit of a break. Yeah, exactly. Great job. Thank you very much. 565 00:53:01,720 --> 00:53:08,200 Okay. Moving through our agenda, we are on to clarification of tonight's agenda. First 566 00:53:08,200 --> 00:53:17,840 is our minutes for November 3rd. Any discussion on that needed? Okay. How about consent agenda 567 00:53:17,840 --> 00:53:29,480 for tonight? Okay. Seeing none, we'll go to individual consideration items. We have, I 568 00:53:29,480 --> 00:53:34,480 believe we had a change in the meeting calendar, which is why it is back before us. Tina, I'll 569 00:53:34,480 --> 00:53:40,000 take that. Yes, that's correct. We made a few slight adjustments since the last time 570 00:53:40,000 --> 00:53:45,040 we presented this to you. So as we noted in the staff report, we removed a meeting in 571 00:53:45,040 --> 00:53:50,800 July to be more consistent with council. Having the one meeting and being able to practice 572 00:53:50,800 --> 00:53:57,120 the being able to absorb into the holiday during July. Also, and I think this was a 573 00:53:57,120 --> 00:54:00,280 result of Commissioner Pruitt, one of your conversations, you mentioned something that 574 00:54:00,280 --> 00:54:03,640 caught Sean's attention with respect to that shot clock bill, and we went back and just 575 00:54:03,640 --> 00:54:07,280 double checked our date. So we had to move one of the November meeting dates because 576 00:54:07,280 --> 00:54:11,560 of that. And then I know we added the holidays that have been approved to the calendar for 577 00:54:11,560 --> 00:54:16,640 your benefit. But otherwise, the calendar remains as is as we noted last time we were 578 00:54:16,640 --> 00:54:20,960 proposing to go to the second and fourth Wednesdays of every month instead of the first and third 579 00:54:20,960 --> 00:54:26,320 because that will also assist our team in being able to process not only our agenda 580 00:54:26,320 --> 00:54:31,320 items that are needed for your consideration, but it gets us a little relief and where our 581 00:54:31,320 --> 00:54:35,240 agenda item preparation is not syncing up with typically what we have going to council. 582 00:54:35,240 --> 00:54:40,760 So and also it removes us from back to back meeting situations where we're here on Tuesday 583 00:54:40,760 --> 00:54:46,360 night and Wednesday night back to back. So but otherwise, the happy entertain any questions 584 00:54:46,360 --> 00:54:49,640 that you may have if you find the calendar acceptable, then staff's recommendation would 585 00:54:49,640 --> 00:54:56,840 be that you approve this as submitted. Any questions on the calendar? Okay, moving to 586 00:54:56,840 --> 00:55:03,920 four B. We'll have staff come up at the public meeting unless someone has a question. Per 587 00:55:03,920 --> 00:55:10,440 the backup, there is an extension request on this to the date or date certain of 1215. 588 00:55:10,440 --> 00:55:21,600 Any questions? Okay, moving on to four C. Same. This is a plat with an extension request 589 00:55:21,600 --> 00:55:37,600 for 1215. Four C. Same. I'm sorry, four D. Same. Extension request to 1215. Any questions? 590 00:55:37,600 --> 00:55:50,240 Okay. Four E. Final plat with an extension request to 1215. Okay. Four F. Is recommended 591 00:55:50,240 --> 00:56:00,600 for denial. Any questions on that for staff at work session? Okay. That will bring us 592 00:56:00,600 --> 00:56:13,920 to our public hearing item for the evening. I will invite Mark Laird up to discuss. Hi, 593 00:56:13,920 --> 00:56:34,340 Mark. Thank you. All right. Good evening, guys. My name is Mark Laird. I'm a planner 594 00:56:34,340 --> 00:56:38,440 in the development service department. This evening for your review consideration, I have 595 00:56:38,440 --> 00:56:46,800 a request to rezone one acre track from rural residential to residential one. This site is 596 00:56:46,800 --> 00:56:53,640 generally located 190 feet east of Miller and Marsh Branch Road and is currently vacant. 597 00:56:53,640 --> 00:57:02,840 It's surrounded by rural residential, residential one, and residential two. The property owner 598 00:57:02,840 --> 00:57:08,640 is requesting the rezoning for site compliance to develop the property for single family 599 00:57:08,640 --> 00:57:16,960 use. Staff has made an analysis of this request and a copy of that analysis has been included 600 00:57:16,960 --> 00:57:23,440 in your backup. Based on that analysis, staff recommends approval of this request. I stand 601 00:57:23,440 --> 00:57:30,280 for any questions that you have. Thank you, Mark. This looks like we've had a rezoning 602 00:57:30,280 --> 00:57:35,280 case on this same road, correct? That's correct. About a month ago, we had another rezoning 603 00:57:35,280 --> 00:57:41,680 request. I remember that. Any questions for Mark on this item? I don't see any. We'll 604 00:57:41,680 --> 00:57:47,800 see you at the meeting. All right. Thank you. With that, that ends our work session items 605 00:57:47,800 --> 00:57:52,360 for this evening. I will adjourn us at 6 p.m. We will see you back here at 630 for the public 606 00:57:52,360 --> 00:58:01,400 meeting. Good evening and welcome to the City of Denton's Planning and Zoning Commission 607 00:58:01,400 --> 00:58:07,760 meeting for Wednesday, November 17th, 2021. With the quorum present, I will call us to 608 00:58:07,760 --> 00:58:14,960 order at 634 p.m. I'll let the record show that Commissioner Smith is absent. First item 609 00:58:14,960 --> 00:58:22,740 of business is the Pledge of Allegiance to the U.S. and Texas Flags. I pledge allegiance 610 00:58:22,740 --> 00:58:46,640 to the flag of the United States of America and to the republic for which it stands, one 611 00:58:46,640 --> 00:58:47,640 nation, under God, indivisible, with liberty and justice for all. Honor the Texas flag. 612 00:58:47,640 --> 00:58:48,640 I pledge allegiance to the city of Texas, one state, under God, one indivisible. Thank 613 00:58:48,640 --> 00:58:53,720 you. Our next item on the agenda is to consider approval of the Planning and Zoning minutes 614 00:58:53,720 --> 00:59:04,040 for November 3rd. Commissioner Anderson? Commissioner Pruitt? Second. We have a first and a second 615 00:59:04,040 --> 00:59:18,480 for approval discussion. Seeing none, let's vote on the board, please. Motion carries 616 00:59:18,480 --> 00:59:28,560 6-0. Next item on the agenda is our Consent Agenda. Commissioner Villarreal? Move to approve 617 00:59:28,560 --> 00:59:33,080 the Consent Agenda. We have a first for approval of the Consent Agenda this evening. Commissioner 618 00:59:33,080 --> 00:59:39,800 Anderson? Second. First and a second for approval of Consent Agenda. Any discussion? Seeing 619 00:59:39,800 --> 00:59:53,040 none, let's vote on the board, please. Motion carries 6-0. Brings us to agenda item 4. Items 620 00:59:53,040 --> 00:59:59,800 for individual consideration. 4A is consider approval of the 2022 Planning and Zoning Commission 621 00:59:59,800 --> 01:00:07,080 meeting calendar. Commissioner Villarreal? Move to approve the 2022 Planning and Zoning 622 01:00:07,080 --> 01:00:13,560 meeting calendar. Commissioner Pruitt? Second. We have a first and a second for approval 623 01:00:13,560 --> 01:00:24,800 of the meeting calendar as presented. Let's vote on the board, please. Motion carries 624 01:00:24,800 --> 01:00:38,080 6-0 for B. It's PP21-0030. I'll invite Lisa up for this item presentation. Good evening. 625 01:00:38,080 --> 01:01:07,160 Hi, Lisa. Here we go. Apparently we're not sharing the screen. Okay. There we go. Okay. 626 01:01:07,160 --> 01:01:11,960 Good evening. Lisa Payne, principal planner for the City of Denton. The item before you 627 01:01:11,960 --> 01:01:19,960 is PP21-30, which is a preliminary plot containing approximately 56 acres and located on the 628 01:01:19,960 --> 01:01:25,880 northeast corner of Mingo Road and Loop 288. The preliminary plot will create three lots 629 01:01:25,880 --> 01:01:31,640 for warehouse development on property zoned light industrial. Staff is recommending denial 630 01:01:31,640 --> 01:01:38,160 as it does not meet the established criteria for approval. However, the applicant has requested 631 01:01:38,160 --> 01:01:43,800 a 30-day extension to allow for additional time for review and staff has no objection 632 01:01:43,800 --> 01:01:50,720 to that going to P&Z on December 15th. And I'm available for questions. Thank you, Lisa. 633 01:01:50,720 --> 01:01:57,480 Any questions? I do not see any. Thanks, Lisa. Commissioner Villarreal? I'll move to approve 634 01:01:57,480 --> 01:02:04,120 the extension to the December 15th, 2021. Okay. We have an approval. Second. Commissioner 635 01:02:04,120 --> 01:02:08,800 Cole, second. Okay. First and a second to approve the extension request to a date certain 636 01:02:08,800 --> 01:02:20,320 of 12/15. Discussion? Let's vote on the board, please. Motion carries six zero, taking us 637 01:02:20,320 --> 01:02:40,720 to 4C, PP21-0028. Cameron Robertson is here to present. So good evening, commissioners. 638 01:02:40,720 --> 01:02:44,680 My name is Cameron Robertson. I am a principal planner and historic preservation officer 639 01:02:44,680 --> 01:02:54,960 for the city of Denton. So this is PP21-0028. This is for approximately 34.5 acres at Corbin 640 01:02:54,960 --> 01:03:02,480 Road, just north of Corbin Road, west of I-35 west. So staff is recommending denial of this 641 01:03:02,480 --> 01:03:08,000 plot as it does not meet our established criteria for approval, but staff has no objection for 642 01:03:08,000 --> 01:03:15,160 the requested extension to December 15th at the PNC meeting. I can stand for any questions. 643 01:03:15,160 --> 01:03:21,080 Thank you, Cameron. I do not see any questions. Commissioner Villarreal? Move to approve the 644 01:03:21,080 --> 01:03:27,280 extension request to December 15th, 2021. Commissioner Anderson? Second. We have a first 645 01:03:27,280 --> 01:03:35,280 and a second to approve the requested extension to 12/15. Any discussion? Let's vote on the 646 01:03:35,280 --> 01:03:48,880 board, please. Motion carries six zero, moving us to 4D, PP21-0029. I believe that is Julie 647 01:03:48,880 --> 01:04:04,980 Wyatt. Hi, Julie. Good evening. Good evening. I'm Julie Wyatt, senior planner with the city 648 01:04:04,980 --> 01:04:13,400 of Denton and I'm presenting PP21-0029. It's for the Holland edition. The proposed plot 649 01:04:13,400 --> 01:04:19,800 is a preliminary plot for a residential development located on the east side of Loop 288. They 650 01:04:19,800 --> 01:04:24,280 do have some additional comments they do need to address and so staff is recommending denial. 651 01:04:24,280 --> 01:04:29,560 However, we have no objection to their requested extension to the December 15th PNC meeting 652 01:04:29,560 --> 01:04:35,080 and I'll be happy to answer any questions. Thanks, Julie. I do not see any questions. 653 01:04:35,080 --> 01:04:43,960 Appreciate it. Commissioner Anderson? Make a motion to extend the request to December 654 01:04:43,960 --> 01:04:48,400 15th. Commissioner Villarreal? Second. We've got a first and a second to approve the extension 655 01:04:48,400 --> 01:05:00,520 request to a date certain of 12/15. Discussion? Seeing none, let's vote on the board, please. 656 01:05:00,520 --> 01:05:18,280 That motion carries 6-0. Item 4E, FP21-34. I'll leave it to Julie again. All right. This 657 01:05:18,280 --> 01:05:26,000 is FP21-0034. The request is for a final plot for the Mission Street offices edition. It 658 01:05:26,000 --> 01:05:30,200 is for a commercial development. They do have additional comments they've got to address 659 01:05:30,200 --> 01:05:35,760 prior to staff recommending approval. And so we do recommend denial. However, we have 660 01:05:35,760 --> 01:05:39,920 no objection to their requested extension to December 15th and I'll be happy to answer 661 01:05:39,920 --> 01:05:51,520 any questions. Thanks, Julie. I do not see any questions. I can entertain a motion. Commissioner 662 01:05:51,520 --> 01:06:02,600 Cole? I move to move the case till the December 15th. We've got an extension request to a 663 01:06:02,600 --> 01:06:08,640 date certain of 12/15. Yes, 12/15. Okay. Commissioner Villarreal? Second. All right. We've got a 664 01:06:08,640 --> 01:06:16,120 first and a second to approve the extension request to a date certain of 12/15. Seeing 665 01:06:16,120 --> 01:06:32,600 no discussion, let's vote on the board, please. Motion carries 6-0. Next is item 4F, AFP21-0006. 666 01:06:32,600 --> 01:06:53,840 Hi, Ron. Good evening, Madam Chair, members of the commission. Here we go. This item is 667 01:06:53,840 --> 01:07:03,000 for an amending final plat, AFP21-0006. It is for phase 4 of the Eagle Creek development. 668 01:07:03,000 --> 01:07:10,840 It is approximately 32.67 acres in total. This is an administrative plat because it's 669 01:07:10,840 --> 01:07:17,880 an amending plat. The applicant has already submitted an extension to staff directly, 670 01:07:17,880 --> 01:07:23,000 and they have already gone through another 30 days of review. There are still some comments 671 01:07:23,000 --> 01:07:29,320 that are outstanding because this is a -- they have not addressed those outstanding comments. 672 01:07:29,320 --> 01:07:35,360 This is a recommendation for denial. The P&Z must consider this application. Therefore, 673 01:07:35,360 --> 01:07:40,880 staff recommends denial of this plat as it does not meet the application criteria manual 674 01:07:40,880 --> 01:07:45,760 or criteria approval for an amending final plat. I'll stand for any questions. Thanks, 675 01:07:45,760 --> 01:07:50,880 Ron. And then just to clarify, staff just does not have the administrative right to 676 01:07:50,880 --> 01:07:55,120 deny. Is that why it's before us? Correct. And that's why it is before the P&Z. And they 677 01:07:55,120 --> 01:07:58,720 already had an extension through you? They already did, yes. Understood. Okay. Thank 678 01:07:58,720 --> 01:08:06,440 you, Ron. Commissioner Villarreal. I move to deny the plat. Okay. We have a first for denial, 679 01:08:06,440 --> 01:08:11,960 Commissioner Anderson. Second. Okay. We have a first and a second for denial of this item. 680 01:08:11,960 --> 01:08:25,240 Any discussion? Seeing none, let's vote on the board, please. Motion carries 6-0. That 681 01:08:25,240 --> 01:08:31,440 brings us to our public hearing item for this evening. It's 5AZ210015. I'll invite Mark 682 01:08:31,440 --> 01:08:43,920 Laird up for presentation. Hi, Mark. And allow me to say that I will open the public hearing 683 01:08:43,920 --> 01:08:51,400 at this time. Good evening. My name is Mark Laird. I'm a planner in the development service 684 01:08:51,400 --> 01:08:56,680 department. This evening for your review and consideration, I have a request to rezone 685 01:08:56,680 --> 01:09:03,080 a 1-acre tract from rural residential to residential 1. The property is located east of the intersection 686 01:09:03,080 --> 01:09:09,600 of Miller Road and Mosh Branch Road and is currently vacant. The site is surrounded by 687 01:09:09,600 --> 01:09:17,520 rural residential, residential 2, residential 1, and also the ETJ. The property owner has 688 01:09:17,520 --> 01:09:23,120 requested the rezoning to allow for site compliance to develop the property for single-family 689 01:09:23,120 --> 01:09:30,640 use. Staff has provided has made an analysis of this request. And a copy of that analysis 690 01:09:30,640 --> 01:09:36,480 has been provided in your backup. And based on that analysis, staff is recommending approval 691 01:09:36,480 --> 01:09:43,400 of this request. I stand for any questions that you may have. Thank you, Mark. Any questions 692 01:09:43,400 --> 01:09:50,600 for Mark on this item? I do not see any at this time. Thank you. I do not have any cards 693 01:09:50,600 --> 01:09:56,480 here nor do I see anyone in the audience wishing to speak. Staff, is there anyone on the phone 694 01:09:56,480 --> 01:10:04,360 wishing to speak on this public hearing item? No, there is not. Thank you. Okay. With that, 695 01:10:04,360 --> 01:10:09,120 I will close the public hearing and open the floor for discussion or a motion. Commissioner 696 01:10:09,120 --> 01:10:16,120 Anderson? Make a motion to approve. Commissioner Cole? Second. Got a first and a second for 697 01:10:16,120 --> 01:10:30,280 approval of this item. Any discussion? Seeing none, let's vote on the board, please. Motion 698 01:10:30,280 --> 01:10:37,440 carries 6-0. That will bring us to our planning and zoning matrix, and I will give the floor 699 01:10:37,440 --> 01:10:44,840 to Tina. Thank you, Chairman. So there are no updates to provide to the commission based 700 01:10:44,840 --> 01:10:49,440 upon recent council action. We did not have any project -- any zoning cases or specific 701 01:10:49,440 --> 01:10:57,120 use permits on council's meeting yesterday evening or even last week. So you have a hiatus 702 01:10:57,120 --> 01:11:01,760 from that portion of the report. Otherwise, we have amended the attendance -- or excuse 703 01:11:01,760 --> 01:11:07,480 me -- the matrix that's included in your packet to include the two items that were requested 704 01:11:07,480 --> 01:11:12,400 at your previous meeting, so -- which we're discussing prioritizing future area plans, 705 01:11:12,400 --> 01:11:16,120 as well as then the requests related to the e-comment feature for the Planning and Zoning 706 01:11:16,120 --> 01:11:23,160 Commission meetings to have it be more visible on the website. We did address two items on 707 01:11:23,160 --> 01:11:27,960 the agenda. So one is the -- discuss the plotting processes, in particular why plots are being 708 01:11:27,960 --> 01:11:32,460 brought forth for denial or extension requests. So that one will come off as well as the one 709 01:11:32,460 --> 01:11:37,200 related to the fire department presenting about their emergency service operations. 710 01:11:37,200 --> 01:11:40,920 But I'm happy to address any additional questions you may have or if there are other items that 711 01:11:40,920 --> 01:11:43,200 you're interested in having added to the matrix. 712 01:11:43,200 --> 01:11:55,840 Thanks, Tina. Anything for the matrix? I do not see any. Moving us to concluding items. 713 01:11:55,840 --> 01:12:02,840 Any concluding items? No, I'll just say thanks to staff for the work session reports today. 714 01:12:02,840 --> 01:12:08,160 They were incredibly informative and appreciate you working down the matrix list for us. It's 715 01:12:08,160 --> 01:12:09,160 very helpful. 716 01:12:09,160 --> 01:12:14,720 Absolutely. And if I might just take a quick brief moment and recognize Mark Laird on our 717 01:12:14,720 --> 01:12:20,880 team. He's still back there. So Mark is going to be taking on a position on our real estate 718 01:12:20,880 --> 01:12:24,960 team, which is where he came from originally. But we appreciate all the work that Mark has 719 01:12:24,960 --> 01:12:29,760 done being part of the planning department and evaluating development applications and 720 01:12:29,760 --> 01:12:33,680 presenting before the commission. So we'll miss having him as part of our team, but he'll 721 01:12:33,680 --> 01:12:36,720 still be close by because we'll still be able to collaborate on real estate issues. 722 01:12:36,720 --> 01:12:42,160 Excellent. Thank you, Mark. Best of luck back in real estate. Awesome. 723 01:12:42,160 --> 01:12:43,160 Congratulations. 724 01:12:43,160 --> 01:12:47,440 Okay. With that, I will adjourn us at 6.49 p.m. Thanks, everyone.