WEBVTT

00:00:00.000 --> 00:00:05.120
I'll go ahead and call the Monday, June 11, 2018,

00:00:05.120 --> 00:00:08.160
public utility board meeting to order.

00:00:08.160 --> 00:00:12.960
And we do have some guests here related

00:00:12.960 --> 00:00:16.320
to one item that's under individual consideration.

00:00:16.320 --> 00:00:19.839
So rather than going into closed and doing that first,

00:00:19.839 --> 00:00:22.079
we'll go ahead and take--

00:00:22.079 --> 00:00:28.440
as our first item will be item B under the--

00:00:30.000 --> 00:00:32.439
individual consideration part of the agenda.

00:00:32.439 --> 00:00:35.000
And that's to consider recommending adoption

00:00:35.000 --> 00:00:37.479
of an ordinance of the city of Denton, Texas, the Texas

00:00:37.479 --> 00:00:37.719
Home

00:00:37.719 --> 00:00:41.000
Real Municipal Corporation, authorizing the city manager

00:00:41.000 --> 00:00:42.960
to execute a professional services agreement

00:00:42.960 --> 00:00:45.439
with Nelson and Morgan Architects

00:00:45.439 --> 00:00:48.399
for the architectural design services

00:00:48.399 --> 00:00:52.399
for renovation of service center and 651 Mayhill

00:00:52.399 --> 00:00:56.079
as set forth in contract that's included in our backup.

00:00:56.079 --> 00:01:01.200
So I think Mario is going to do the presentation on this.

00:01:01.200 --> 00:01:02.679
Mr. Chairman, members of the PUB,

00:01:02.679 --> 00:01:03.880
thank you for having me here.

00:01:03.880 --> 00:01:06.840
Mario Kanazaro, assistant city manager.

00:01:06.840 --> 00:01:08.719
I wanted to present a number of slides

00:01:08.719 --> 00:01:13.599
to you to talk about our service center project

00:01:13.599 --> 00:01:18.439
along with the renovations to 651 Mayhill.

00:01:18.439 --> 00:01:21.959
Back in February, we made this very similar presentation

00:01:21.959 --> 00:01:22.840
to the city council.

00:01:22.840 --> 00:01:25.079
And then we followed up with a presentation

00:01:25.079 --> 00:01:27.799
to the public utilities board in March.

00:01:27.799 --> 00:01:31.680
And the issues that we covered that day or that morning

00:01:31.680 --> 00:01:33.840
were the history of the service center,

00:01:33.840 --> 00:01:36.200
just to kind of give you some background on that,

00:01:36.200 --> 00:01:39.870
the fact that the facility was built in 1980 or opened in

00:01:39.870 --> 00:01:40.560
1980

00:01:40.560 --> 00:01:43.879
and it's been expanded a few times.

00:01:43.879 --> 00:01:47.120
But we're out of space for city operations.

00:01:47.120 --> 00:01:49.359
And it's very difficult, nearly impossible,

00:01:49.359 --> 00:01:54.680
to expand unless you add additional square footage to it.

00:01:54.680 --> 00:01:57.599
Also talked about how we came up with some alternatives.

00:01:57.599 --> 00:01:59.120
Staff came through some alternatives

00:01:59.120 --> 00:02:02.560
looking at some other facilities that the city owned

00:02:02.560 --> 00:02:05.560
and the opportunity to move some existing operations out

00:02:05.560 --> 00:02:08.919
of the service center into another nearly vacant facility

00:02:08.919 --> 00:02:13.000
to allow us to expand within the service center.

00:02:13.000 --> 00:02:15.199
And we also talked about the financial implications.

00:02:15.199 --> 00:02:17.539
So I'm going to cover some of those slides here shortly.

00:02:17.539 --> 00:02:23.960
And then at the end, go through the proposal, not at length

00:02:23.960 --> 00:02:23.960
,

00:02:23.960 --> 00:02:27.960
but just briefly cover the proposal that was presented.

00:02:27.960 --> 00:02:30.000
Because at the conclusion of those two meetings

00:02:30.000 --> 00:02:33.639
back in February and March, both boards, both groups

00:02:33.639 --> 00:02:35.120
provide a recommendation to staff

00:02:35.120 --> 00:02:38.159
to go and seek some design options

00:02:38.159 --> 00:02:40.080
to bring forward as a contract.

00:02:40.080 --> 00:02:43.439
And so what we're doing here is just presenting to you

00:02:43.439 --> 00:02:46.159
a proposal from Nelson Morgan Architects

00:02:46.159 --> 00:02:50.120
that if the PUB gives us direction to move forward,

00:02:50.120 --> 00:02:53.740
we'll make the same presentation to the city council.

00:02:53.740 --> 00:02:56.159
So just to kind of give you a quick overview of the service

00:02:56.159 --> 00:02:58.840
center campus, it's 46 acres in size.

00:02:58.840 --> 00:03:00.240
It includes a number of facilities

00:03:00.240 --> 00:03:02.960
located off of Mingo Road and industrial area.

00:03:02.960 --> 00:03:04.800
It includes all of our field operations,

00:03:04.800 --> 00:03:05.960
with the exception of DME.

00:03:05.960 --> 00:03:08.080
DME actually did originate there,

00:03:08.080 --> 00:03:12.000
but over time has moved out of the service center.

00:03:12.000 --> 00:03:13.960
And so while there is a support function there

00:03:13.960 --> 00:03:16.680
at the service center through the radio operations,

00:03:16.680 --> 00:03:19.960
DME does not have a physical presence there at the moment

00:03:19.960 --> 00:03:21.719
as far as staffing and equipment.

00:03:21.719 --> 00:03:24.120
They do have some of their supplies

00:03:24.120 --> 00:03:26.280
that's administered through materials management,

00:03:26.280 --> 00:03:27.639
our purchasing function.

00:03:27.639 --> 00:03:30.479
But as far as having a physical presence there on site,

00:03:30.479 --> 00:03:32.319
they do not have that.

00:03:32.319 --> 00:03:36.400
Also our fleet services division is housed there

00:03:36.400 --> 00:03:38.960
at the service center in a separate facility

00:03:38.960 --> 00:03:42.000
where they operate and manage and maintain

00:03:42.000 --> 00:03:43.360
all of our fleet vehicles.

00:03:43.360 --> 00:03:46.120
And we also have some areas where we have dirt,

00:03:46.120 --> 00:03:49.419
fill materials that's used, various construction projects,

00:03:49.419 --> 00:03:51.719
maintenance projects throughout the city for city

00:03:51.719 --> 00:03:52.479
operations.

00:03:53.800 --> 00:03:56.780
The two facilities that we're talking about this morning

00:03:56.780 --> 00:03:58.960
and that we've been focusing on is the service center

00:03:58.960 --> 00:04:01.080
and the traffic operations building.

00:04:01.080 --> 00:04:03.240
These are the slides that you saw back in March.

00:04:03.240 --> 00:04:06.159
And to give you a few statistics here,

00:04:06.159 --> 00:04:07.719
the service center, as I mentioned earlier,

00:04:07.719 --> 00:04:09.219
was built in 1980.

00:04:09.219 --> 00:04:11.240
The traffic operations building actually was built

00:04:11.240 --> 00:04:14.120
in the 1960s with a different use,

00:04:14.120 --> 00:04:16.899
was actually our original animal shelter.

00:04:16.899 --> 00:04:19.560
Back in 1980, the population of Denton

00:04:19.560 --> 00:04:22.439
was just under 50,000.

00:04:22.439 --> 00:04:26.079
And currently, 2016, 2017,

00:04:27.639 --> 00:04:30.839
certainly we've exceeded 135,000 people by now

00:04:30.839 --> 00:04:33.079
with the amount of growth that we've had in our community.

00:04:33.079 --> 00:04:37.079
And also too, just some other quick hits as far as facts,

00:04:37.079 --> 00:04:40.800
back in 1980, the city was about just under 33 square miles

00:04:40.800 --> 00:04:43.720
and we're just now under 100 square miles in size.

00:04:43.720 --> 00:04:46.480
And so, and then lastly, the staffing when it was opened

00:04:46.480 --> 00:04:48.720
back in 1980 was 110.

00:04:48.720 --> 00:04:50.800
And the service center now houses,

00:04:50.800 --> 00:04:54.399
at least as of 2017, 250 plus employees.

00:04:54.399 --> 00:04:57.040
And so, and I would imagine it's been more

00:04:57.040 --> 00:04:59.000
because we've been able, we've added staff

00:04:59.000 --> 00:05:01.500
over the last number of months

00:05:01.500 --> 00:05:03.040
through a variety of operations

00:05:03.040 --> 00:05:05.000
and streets and engineering.

00:05:09.360 --> 00:05:12.839
Again, another visual of the service center houses,

00:05:12.839 --> 00:05:17.120
as I mentioned, just under just over 250 employees.

00:05:17.120 --> 00:05:19.759
It is cramped for space, there is no room for growth

00:05:19.759 --> 00:05:22.139
unless you build out from the building itself.

00:05:22.139 --> 00:05:24.120
But again, as I mentioned before,

00:05:24.120 --> 00:05:28.600
we came up with some options that the PUB and the council

00:05:28.600 --> 00:05:32.399
felt were favorable based on utilizing existing space.

00:05:32.399 --> 00:05:34.319
One of the key complaints that I hear

00:05:34.319 --> 00:05:36.360
from a facilities management perspective

00:05:36.360 --> 00:05:39.399
is a lack of restrooms at the service center,

00:05:39.399 --> 00:05:42.680
plus just a configuration of those restroom facilities.

00:05:42.680 --> 00:05:46.199
As I mentioned to the PUB and the council,

00:05:47.240 --> 00:05:49.639
as you walk into, and you'll see some pictures

00:05:49.639 --> 00:05:52.920
here in a minute, as you walk into the service center lobby

00:05:52.920 --> 00:05:52.920
,

00:05:52.920 --> 00:05:55.819
the restroom facilities, both male and female,

00:05:55.819 --> 00:05:58.680
are just behind a wall.

00:05:58.680 --> 00:06:01.160
But when you walk into those restroom facilities,

00:06:01.160 --> 00:06:06.160
it's your typical toilet and laboratory fixtures,

00:06:08.160 --> 00:06:10.399
but you also have shower facilities there too.

00:06:10.399 --> 00:06:13.519
So it's not the most inviting thing when you have

00:06:13.519 --> 00:06:17.199
the public or consultants or contractors come in

00:06:17.199 --> 00:06:20.319
doing business there, and we do have a lot of,

00:06:20.319 --> 00:06:22.079
quite a bit of visitors that come in and out

00:06:22.079 --> 00:06:24.019
for various meetings, bid openings,

00:06:25.560 --> 00:06:27.560
pre-construction meetings, et cetera.

00:06:27.560 --> 00:06:32.220
And when you join those functions with a,

00:06:33.279 --> 00:06:35.120
I would call it more of a private facility

00:06:35.120 --> 00:06:37.139
when it comes to restroom, with public facilities,

00:06:37.139 --> 00:06:38.639
it just doesn't intermix well.

00:06:40.480 --> 00:06:42.079
So it's not very user-friendly for the public

00:06:42.079 --> 00:06:42.920
nor the staff.

00:06:44.319 --> 00:06:46.959
To give you some pictures here, this was shown back,

00:06:46.959 --> 00:06:49.319
again, back in the spring.

00:06:49.319 --> 00:06:50.959
And again, I'm not gonna go through every picture,

00:06:50.959 --> 00:06:54.800
but as you can see, these are crammed spaces.

00:06:54.800 --> 00:06:56.560
The staff actually has been very creative

00:06:56.560 --> 00:06:59.759
in utilizing bay space for some areas

00:06:59.759 --> 00:07:02.639
where employees could eat lunch or take breaks

00:07:02.639 --> 00:07:04.399
or have staff meetings.

00:07:05.199 --> 00:07:07.720
And some of the areas here where my cursor is,

00:07:07.720 --> 00:07:11.680
if you can see this, this is the parks area.

00:07:11.680 --> 00:07:13.720
And this is actually a break room.

00:07:13.720 --> 00:07:15.839
It's kind of the far corner, but back here

00:07:15.839 --> 00:07:20.839
where my cursor is is a stove and a sink

00:07:21.720 --> 00:07:23.480
with refrigerators in the corner.

00:07:23.480 --> 00:07:26.839
But as you can see, these are basically permanent fixtures

00:07:26.839 --> 00:07:29.079
for the most part, these tables.

00:07:29.079 --> 00:07:33.120
And this is where our crew leaders and supervisors

00:07:33.120 --> 00:07:34.100
have their offices.

00:07:34.100 --> 00:07:35.639
So it's pretty crammed.

00:07:35.639 --> 00:07:39.639
And so if you're trying to have a meeting with staff,

00:07:39.639 --> 00:07:42.160
you're dealing with food and other things.

00:07:42.160 --> 00:07:44.600
And so again, they're just trying to be creative

00:07:44.600 --> 00:07:47.399
utilizing the maximizing the amount of space they have.

00:07:47.399 --> 00:07:49.839
Here below is a locker room area,

00:07:49.839 --> 00:07:52.560
which has also been converted into meeting space,

00:07:52.560 --> 00:07:55.350
because again, there just isn't any meeting space to be had

00:07:55.350 --> 00:07:55.720
.

00:07:55.720 --> 00:07:57.439
And in the front here, right in the front center

00:07:57.439 --> 00:07:59.000
is that lobby area that I mentioned to you.

00:07:59.000 --> 00:08:01.339
There's this wall next to the stairs.

00:08:01.339 --> 00:08:02.540
There's no one there to greet you.

00:08:02.540 --> 00:08:05.839
So if you're looking to go upstairs to visit

00:08:05.839 --> 00:08:07.759
with someone from purchasing,

00:08:07.759 --> 00:08:09.240
unless you know that it's upstairs,

00:08:09.240 --> 00:08:10.360
there's no one really to greet you

00:08:10.360 --> 00:08:13.480
and direct the incoming public or contractor

00:08:13.480 --> 00:08:16.920
to let them know where to go and help them facilitate

00:08:16.920 --> 00:08:19.279
and navigate through the facility.

00:08:19.279 --> 00:08:20.879
And then the bottom is that restroom facility

00:08:20.879 --> 00:08:21.720
that I mentioned.

00:08:21.720 --> 00:08:24.579
Again, the back there is the shower curtain

00:08:24.579 --> 00:08:28.399
along with the restroom stalls and the laboratory fixtures.

00:08:28.399 --> 00:08:30.720
So again, just kind of give you a perspective

00:08:30.720 --> 00:08:34.179
of the conditions that our service center employees are in.

00:08:36.120 --> 00:08:38.840
When we visited back in the spring,

00:08:38.840 --> 00:08:41.580
this is the layout of the first and second floor

00:08:41.580 --> 00:08:42.759
of the service center.

00:08:42.759 --> 00:08:46.259
And as you can see, there's a number of different functions

00:08:46.259 --> 00:08:48.080
and operations here at the service center.

00:08:48.080 --> 00:08:51.080
And one of the largest areas that encompasses

00:08:51.080 --> 00:08:52.799
a lot of the square footage of the space

00:08:52.799 --> 00:08:55.759
is materials management, just under 30,000 square feet.

00:08:55.759 --> 00:08:59.159
And actual in purchasing on the second floor,

00:08:59.159 --> 00:09:02.000
purchasing administration, Karen and her team,

00:09:02.000 --> 00:09:05.480
the buyers and some of the admin staff

00:09:05.480 --> 00:09:07.679
operate here on the second floor.

00:09:07.679 --> 00:09:09.960
And this actually, the thought is that these folks

00:09:09.960 --> 00:09:13.759
would stay, but the thought is if we had the opportunity

00:09:13.759 --> 00:09:16.399
to move 30,000 square feet of space

00:09:16.399 --> 00:09:18.399
into another existing facility,

00:09:18.399 --> 00:09:22.279
that would allow us to have the space to move into.

00:09:23.139 --> 00:09:27.840
It's level, it's tall, and so there's plenty

00:09:27.840 --> 00:09:29.080
of room for growth.

00:09:29.080 --> 00:09:33.200
And so again, that's one of the options that we considered.

00:09:33.200 --> 00:09:35.720
And so the thought would be is to move

00:09:36.639 --> 00:09:40.740
that 30,000 square feet, 30,000 square foot space

00:09:40.740 --> 00:09:42.480
over to 651 Mayhill.

00:09:45.360 --> 00:09:48.399
Again, to talk about the traffic operations building,

00:09:48.399 --> 00:09:50.519
as I mentioned, it was built in the 1960s.

00:09:50.519 --> 00:09:53.559
It's approximately 4,000 square feet size

00:09:55.519 --> 00:09:57.120
square foot facility.

00:09:57.120 --> 00:09:59.580
It's a former animal shelter two times over.

00:10:00.480 --> 00:10:04.279
And we are in a newer animal shelter facility

00:10:04.279 --> 00:10:06.759
and the former animal shelter facilities

00:10:06.759 --> 00:10:09.320
have been repurposed now a couple of times.

00:10:10.220 --> 00:10:13.440
It's been utilized by traffic since the mid 80s.

00:10:13.440 --> 00:10:16.039
We house approximately nine full-time equivalents,

00:10:16.039 --> 00:10:17.240
nine employees there.

00:10:18.080 --> 00:10:20.399
While it does have a garage area,

00:10:20.399 --> 00:10:22.960
it really has no vehicle bays because basically

00:10:22.960 --> 00:10:25.320
that's where they store some of their trailers.

00:10:25.320 --> 00:10:27.840
So they really can't keep any of their equipment indoors

00:10:27.840 --> 00:10:29.000
out of the elements.

00:10:30.000 --> 00:10:33.840
So it's, for the most part, it's either under an awning

00:10:33.840 --> 00:10:34.840
or out in the elements.

00:10:34.840 --> 00:10:38.120
So that's critical for some of our equipment that we have

00:10:38.120 --> 00:10:40.919
is to keep it indoors or at least in a bay area

00:10:40.919 --> 00:10:43.559
to keep it protected from the elements.

00:10:43.559 --> 00:10:47.159
Again, it's crammed, there's really no room to grow.

00:10:47.159 --> 00:10:49.360
And it's not designed for new technology

00:10:49.360 --> 00:10:51.559
just based on where the facility is

00:10:51.559 --> 00:10:55.340
and the type of equipment that's in there now.

00:10:57.159 --> 00:10:58.840
Some visuals to give you an idea

00:10:58.840 --> 00:11:01.200
of what's inside Traffic Ops.

00:11:01.200 --> 00:11:03.759
This is here where my cursor is, is that bay area.

00:11:03.759 --> 00:11:05.480
You can see that garage door,

00:11:05.480 --> 00:11:07.360
but that's where they keep one of their trailers

00:11:07.360 --> 00:11:09.080
and they keep their signs and markings

00:11:09.080 --> 00:11:11.120
and other inventory in there.

00:11:11.120 --> 00:11:15.840
So again, not enough room to pull in a pickup truck

00:11:15.840 --> 00:11:18.639
or some of their other equipment that they need

00:11:18.639 --> 00:11:22.159
to operate to do their jobs.

00:11:22.159 --> 00:11:24.000
And so again, very cramped for space

00:11:24.000 --> 00:11:28.279
and the technology just isn't functioning there.

00:11:28.279 --> 00:11:31.500
It's not really suitable for new technology in that

00:11:31.500 --> 00:11:32.080
building.

00:11:33.399 --> 00:11:37.519
So in that slide earlier that I showed

00:11:37.519 --> 00:11:40.360
with the materials management at 30,000 square feet,

00:11:40.360 --> 00:11:42.600
the thought was if we could move materials management

00:11:42.600 --> 00:11:46.960
out of the service center into a facility

00:11:46.960 --> 00:11:48.519
that's currently owned by the city,

00:11:48.519 --> 00:11:52.480
Solid Waste, it was purchased a number of years ago.

00:11:52.480 --> 00:11:54.519
It was a former Department of Defense warehouse.

00:11:54.519 --> 00:11:56.080
I believe that my understanding

00:11:56.080 --> 00:11:58.240
of that history of that facility

00:11:58.240 --> 00:12:01.559
is when soldiers would be deployed overseas,

00:12:01.559 --> 00:12:03.360
they would keep their belongings there,

00:12:03.360 --> 00:12:06.279
vehicles, other personal belongings that could be created.

00:12:06.279 --> 00:12:07.200
They were housed here.

00:12:07.200 --> 00:12:09.639
So again, it's basically a warehouse space.

00:12:09.639 --> 00:12:13.019
And so the thought is, it's 81,000 square feet of space.

00:12:13.019 --> 00:12:14.960
The thought is if we could move materials management

00:12:14.960 --> 00:12:17.919
into this space, retrofit it as necessary

00:12:17.919 --> 00:12:21.080
with the racks and offices and other restroom facilities

00:12:21.080 --> 00:12:25.679
that are required to maintain a functioning operation,

00:12:25.679 --> 00:12:28.480
why not utilize an underutilized space?

00:12:29.580 --> 00:12:32.919
And again, allow us to use valuable space

00:12:32.919 --> 00:12:36.879
to move some of our operations into the service center.

00:12:36.879 --> 00:12:39.679
And secondarily, if we could also,

00:12:39.679 --> 00:12:44.000
knowing that traffic operations needed space

00:12:44.000 --> 00:12:47.360
and they were actually part of the 2014 bond package

00:12:47.360 --> 00:12:49.840
to build them a new operation center,

00:12:49.840 --> 00:12:53.460
why not utilize 10,000 square feet of the space here

00:12:53.460 --> 00:12:57.559
at 651 Mayhill and move that operation over there as well?

00:12:57.559 --> 00:13:02.320
So that way you have materials management in this 651

00:13:02.320 --> 00:13:04.559
along with traffic operations.

00:13:06.159 --> 00:13:10.759
So that was, again, just kind of give you a perspective

00:13:10.759 --> 00:13:14.700
of just a visual of this square footage.

00:13:14.700 --> 00:13:18.200
Again, not drawn to scale, but 61,000 square feet

00:13:18.200 --> 00:13:22.120
of materials management would be at the 651 facility

00:13:22.120 --> 00:13:24.720
and then traffic would operate 10,000 square feet.

00:13:24.720 --> 00:13:27.480
Still leave about 10,000 for future expansion,

00:13:27.480 --> 00:13:29.320
whether for materials management or for traffic

00:13:29.320 --> 00:13:30.539
or for some other operation

00:13:30.539 --> 00:13:33.179
that might be needed here at the city.

00:13:33.179 --> 00:13:35.480
But that was the thought and that was basically

00:13:35.480 --> 00:13:38.159
the presentation that was made to PUB and the council

00:13:38.159 --> 00:13:41.720
and along with the project cost.

00:13:41.720 --> 00:13:45.360
And so just to kind of give you an opportunity

00:13:45.360 --> 00:13:47.559
to read through all the numbers.

00:13:47.559 --> 00:13:50.919
All in, if we were to do all of these projects,

00:13:50.919 --> 00:13:55.639
it's just over, just under $14,500,000.

00:13:55.639 --> 00:13:59.559
That includes construction, design, furniture and fixtures,

00:13:59.559 --> 00:14:02.200
any development fees, any type of flat work

00:14:02.200 --> 00:14:05.080
that would be required at the service center

00:14:05.080 --> 00:14:08.700
or at 651 Mayhill 'cause there would be the need

00:14:08.700 --> 00:14:11.399
to build some parking, also a lay down yard,

00:14:11.399 --> 00:14:14.000
which would allow some equipment to be placed

00:14:14.000 --> 00:14:16.879
on concrete outdoors.

00:14:17.799 --> 00:14:22.480
So all in, it's 14,500,000.

00:14:23.320 --> 00:14:28.320
3,300,000 would be for the traffic operations function.

00:14:29.960 --> 00:14:34.879
I'm sorry, 3,300,000 would be for materials management.

00:14:34.879 --> 00:14:38.279
2 million, just under 200,000 for traffic

00:14:38.279 --> 00:14:41.080
and then just under $9 million for the service center.

00:14:42.399 --> 00:14:45.360
So these were the slides and again,

00:14:45.360 --> 00:14:48.240
these have been condensed some to not go

00:14:48.240 --> 00:14:51.080
through every single slide that was presented

00:14:51.080 --> 00:14:55.279
to PUB and council but was presented back a few months ago.

00:14:55.279 --> 00:14:58.080
And then overall, based on this information,

00:14:58.080 --> 00:15:00.820
both the PUB and the council directed staff

00:15:00.820 --> 00:15:04.679
to go and seek a request for qualifications

00:15:04.679 --> 00:15:09.679
to select a design firm to do the architecture

00:15:10.519 --> 00:15:14.320
and design of both 651 and at the service center.

00:15:14.320 --> 00:15:17.919
So since then, this is what we've done.

00:15:17.919 --> 00:15:19.960
Working with purchasing, they did issue

00:15:19.960 --> 00:15:23.200
a request for qualifications for architectural services.

00:15:23.200 --> 00:15:25.600
We did receive seven proposals.

00:15:26.799 --> 00:15:28.320
Staff did receive seven proposals

00:15:28.320 --> 00:15:33.320
from a variety of firms, design firms, architectural firms.

00:15:34.399 --> 00:15:37.000
A selection committee was convened.

00:15:37.000 --> 00:15:40.399
They reviewed the qualifications of all seven firms

00:15:40.399 --> 00:15:44.159
and based on the recommendations of that committee,

00:15:44.159 --> 00:15:47.240
they selected Nelson Morgan Architects of Denton

00:15:47.240 --> 00:15:49.700
to be the architecture record for these projects.

00:15:50.720 --> 00:15:54.559
Based on negotiations with Nelson Morgan

00:15:55.960 --> 00:16:00.960
to do all three facilities, design all three facilities,

00:16:01.659 --> 00:16:06.659
it came out to $918,402.53.

00:16:08.639 --> 00:16:11.960
As you can see, this is the top graph here.

00:16:11.960 --> 00:16:16.960
This top chart is their design proposal

00:16:18.720 --> 00:16:21.279
for the three different facilities.

00:16:21.279 --> 00:16:24.080
And then below these two, on the bottom,

00:16:24.080 --> 00:16:26.200
I've broken out the cost so you can see them

00:16:26.200 --> 00:16:28.799
by respective facility, by respective building.

00:16:30.440 --> 00:16:32.360
And I know there's been discussions,

00:16:32.360 --> 00:16:34.480
certainly with council, about design fees

00:16:34.480 --> 00:16:36.299
and the cost of design fees.

00:16:36.299 --> 00:16:38.919
So I wanted to make sure that the PUB

00:16:38.919 --> 00:16:40.840
and then the council will see this as well.

00:16:40.840 --> 00:16:43.519
You can see the breakdown of the cost

00:16:43.519 --> 00:16:48.519
of what the consultant is proposing for this project.

00:16:48.519 --> 00:16:51.679
The majority of the fees are for Nelson Morgan,

00:16:51.679 --> 00:16:54.960
but there are also some fees that need to go to,

00:16:54.960 --> 00:16:58.639
whether it's mechanical engineers, structural engineers,

00:16:58.639 --> 00:17:00.720
civil, things of that nature.

00:17:00.720 --> 00:17:02.860
And so I wanted to break those down as well

00:17:02.860 --> 00:17:06.339
so you can see what's being proposed for this project.

00:17:08.380 --> 00:17:11.960
Based on that, this is basically my presentation.

00:17:11.960 --> 00:17:15.359
I just wanted to present this to you all as promised

00:17:15.359 --> 00:17:20.200
that we believe that this is the best way

00:17:20.200 --> 00:17:22.240
to move forward and move ahead

00:17:22.240 --> 00:17:23.680
and get started on these projects.

00:17:23.680 --> 00:17:28.680
Again, the staff and the space is, we need to expand,

00:17:29.839 --> 00:17:33.480
we need to add some additional space for operations.

00:17:33.480 --> 00:17:35.960
We think this is the most expeditious manner

00:17:35.960 --> 00:17:38.240
in which we can get this done

00:17:38.240 --> 00:17:42.119
and not require major expenditures

00:17:42.119 --> 00:17:45.420
because of additional facilities that might need to be

00:17:45.420 --> 00:17:45.720
built.

00:17:45.720 --> 00:17:48.160
It allows us to utilize existing space.

00:17:48.160 --> 00:17:51.119
It allows us to move pretty quickly

00:17:51.119 --> 00:17:53.039
and not have to know the interior facilities

00:17:53.039 --> 00:17:54.079
that are already there.

00:17:55.079 --> 00:17:58.599
And allows us to move ahead and get going on this.

00:17:58.599 --> 00:18:02.640
And then hopefully get into these facilities

00:18:02.640 --> 00:18:04.059
within the next year.

00:18:06.279 --> 00:18:07.759
Any questions?

00:18:07.759 --> 00:18:08.599
- Questions.

00:18:10.599 --> 00:18:13.000
- I was looking at the breakdown of the funding services.

00:18:13.000 --> 00:18:18.000
So is the traffic operations is coming from the bond fund

00:18:18.799 --> 00:18:21.440
because that bond, when that was voted on,

00:18:21.440 --> 00:18:25.279
that was about roads and traffic?

00:18:25.279 --> 00:18:26.480
- Well, there was an actual,

00:18:26.480 --> 00:18:29.039
I believe there was an actual proposition

00:18:29.039 --> 00:18:31.480
for a traffic operations building

00:18:31.480 --> 00:18:34.240
in the 2014 bond program.

00:18:36.119 --> 00:18:38.039
It was part of an overall transportation.

00:18:38.039 --> 00:18:39.880
- Okay, okay, thanks.

00:18:39.880 --> 00:18:41.559
I hadn't remembered that specifically there.

00:18:41.559 --> 00:18:43.880
And then if you could just explain kind of why

00:18:43.880 --> 00:18:48.880
the decision to have the service center come from revenue

00:18:50.920 --> 00:18:53.599
and then from materials to come from CO.

00:18:55.019 --> 00:18:58.160
- Well, my understanding on materials management

00:18:59.039 --> 00:19:02.980
with the certificates of obligation,

00:19:02.980 --> 00:19:06.759
there are some COs that are available in solid waste

00:19:06.759 --> 00:19:09.319
because it is gonna be a solid waste facility.

00:19:09.319 --> 00:19:11.440
Then materials management through,

00:19:11.440 --> 00:19:15.480
it would be basically paying solid waste back

00:19:15.480 --> 00:19:17.880
through lease payments on an annual basis or monthly basis,

00:19:17.880 --> 00:19:19.079
however it is calculated.

00:19:20.119 --> 00:19:23.599
So the thought would be to be able to provide that funding

00:19:23.599 --> 00:19:27.259
and then pay back the solid waste fund for the asset.

00:19:28.460 --> 00:19:30.799
As far as revenue funded capital,

00:19:30.799 --> 00:19:32.720
those are some available funds that are available

00:19:32.720 --> 00:19:34.799
in a variety of different departments,

00:19:34.799 --> 00:19:39.359
whether it's water, wastewater, streets, and drainage.

00:19:39.359 --> 00:19:42.359
And so the revenues are available in those respective funds

00:19:42.359 --> 00:19:46.240
to be able to at least fund the design

00:19:46.240 --> 00:19:47.680
of the service center.

00:19:47.680 --> 00:19:50.160
And then once we bring forward the construction documents

00:19:50.160 --> 00:19:52.920
and do some cost estimation with our consultant,

00:19:52.920 --> 00:19:55.000
we'll bring forward that to the board

00:19:55.000 --> 00:19:57.039
along with the council to get further direction

00:19:57.039 --> 00:19:59.079
on how to proceed before we go to bed

00:19:59.079 --> 00:20:02.640
and make sure that we're good on our numbers

00:20:02.640 --> 00:20:04.359
and they're comfortable with the numbers.

00:20:05.400 --> 00:20:08.740
- Yeah, that was my, the point I wanted to raise was,

00:20:10.240 --> 00:20:13.519
I know the traffic operations building

00:20:13.519 --> 00:20:18.519
was part of the 2014 GEO bond proposal.

00:20:21.160 --> 00:20:26.160
But I guess once we see what the cost really is,

00:20:26.279 --> 00:20:28.279
we'll come back and look at, okay,

00:20:28.279 --> 00:20:32.359
how's this gonna be funded going forward.

00:20:32.359 --> 00:20:34.119
Also, the other thing I wanted to point out

00:20:34.119 --> 00:20:37.480
is it looks like when we did the project, the estimate,

00:20:39.400 --> 00:20:40.839
I'm not sure when this was done,

00:20:40.839 --> 00:20:42.920
but it looked like the design fees

00:20:44.720 --> 00:20:48.440
in the estimate was about a million, 149.

00:20:49.799 --> 00:20:54.559
And so this actual contract is less than that.

00:20:54.559 --> 00:20:56.000
So it's under budget.

00:20:56.000 --> 00:20:56.839
- Yes, sir. - I wanna point that out

00:20:56.839 --> 00:20:57.880
as well. - Under the budget estimate.

00:20:57.880 --> 00:20:59.099
Yes, sir. - Yeah, okay.

00:21:02.079 --> 00:21:04.440
Any other questions, comments?

00:21:04.440 --> 00:21:07.339
- I have one, remind me why this is the pub issue.

00:21:08.599 --> 00:21:12.480
- Why it's being brought before the Public Utilities Board?

00:21:12.480 --> 00:21:16.559
Because it houses water, wastewater, drainage,

00:21:16.559 --> 00:21:18.440
and we wanted to make sure that we brought it forward

00:21:18.440 --> 00:21:22.160
just to present it to you and get your recommendation

00:21:22.160 --> 00:21:23.700
if you believe it's important

00:21:23.700 --> 00:21:25.940
because of those funds that are being used.

00:21:25.940 --> 00:21:27.079
And you will receive those,

00:21:27.079 --> 00:21:29.880
and you provide guidance and direction on those budgets.

00:21:30.799 --> 00:21:33.599
And because also it's a solid waste facility as well.

00:21:36.400 --> 00:21:39.039
- I have a question on the evaluation.

00:21:39.039 --> 00:21:42.640
They're very close, a 99 and a 95.

00:21:42.640 --> 00:21:47.640
What was the past experience that gave one person a 40?

00:21:47.640 --> 00:21:51.599
- Well, the past experience, and I was not on the panel.

00:21:51.599 --> 00:21:53.720
So I was not on the evaluation panel.

00:21:53.720 --> 00:21:56.839
But Nelson Morgan has assisted the city

00:21:56.839 --> 00:21:58.079
over the last number of years

00:21:58.079 --> 00:22:02.000
with our facilities master plan.

00:22:02.000 --> 00:22:05.359
So they're very familiar with the city facilities.

00:22:06.240 --> 00:22:11.240
They understood the need of getting these facilities

00:22:11.240 --> 00:22:11.240
designed

00:22:11.799 --> 00:22:13.599
and constructed as soon as possible.

00:22:14.480 --> 00:22:15.920
They had already done some of the legwork

00:22:15.920 --> 00:22:20.160
when it came to understanding the number of staff

00:22:20.160 --> 00:22:23.079
that would be added over the next number of years.

00:22:23.079 --> 00:22:24.480
So they had done some legwork.

00:22:24.480 --> 00:22:29.480
So not to have to start from scratch helped.

00:22:30.319 --> 00:22:33.640
And so that's what gave this firm the leg up.

00:22:34.720 --> 00:22:35.880
- All right, thank you.

00:22:37.960 --> 00:22:40.160
- Okay, any other questions?

00:22:40.160 --> 00:22:42.279
Do we have a motion then on item B?

00:22:45.000 --> 00:22:45.839
- I'll move.

00:22:46.880 --> 00:22:47.720
- Second.

00:22:47.720 --> 00:22:48.559
- I have a motion and a second.

00:22:48.559 --> 00:22:50.519
I'm assuming for approval.

00:22:50.519 --> 00:22:51.680
- Yes, move approval.

00:22:51.680 --> 00:22:53.119
Thank you, Randy.

00:22:53.119 --> 00:22:54.079
- Thank you.

00:22:54.079 --> 00:22:55.160
Any discussion?

00:22:56.400 --> 00:22:57.839
All in favor say aye.

00:22:57.839 --> 00:22:58.680
- Aye.

00:22:58.680 --> 00:22:59.500
- Any opposed?

00:22:59.500 --> 00:23:00.339
Same sign.

00:23:00.339 --> 00:23:03.339
Okay, thank you, Mario. - Thank you.

00:23:08.240 --> 00:23:09.240
- Okay.

00:23:12.559 --> 00:23:17.029
So at this time, there are some things on the consent

00:23:17.029 --> 00:23:17.519
agenda

00:23:17.519 --> 00:23:21.759
that we do have related to some closed meeting items.

00:23:21.759 --> 00:23:26.759
So at this time, we will convene into a closed session

00:23:28.960 --> 00:23:30.519
to discuss three items.

00:23:32.059 --> 00:23:35.519
Item A is deliberations regarding real property

00:23:36.519 --> 00:23:39.119
to discuss, deliberate, and receive information from staff

00:23:39.119 --> 00:23:40.759
and provide staff with direction

00:23:40.759 --> 00:23:43.119
pertaining to the potential purchase

00:23:43.119 --> 00:23:44.599
of certain real property interest

00:23:44.599 --> 00:23:46.279
out of the Alexander Hill server.

00:23:49.000 --> 00:23:54.000
Okay, it's about 16 minutes after 10 on June 11th.

00:23:54.359 --> 00:23:56.599
We're back into open session.

00:23:58.160 --> 00:24:03.160
In our regular meeting, first we have our consent agenda.

00:24:04.440 --> 00:24:07.880
There are four items on the consent agenda.

00:24:07.880 --> 00:24:12.880
I would ask if any member would like to have any of these

00:24:13.400 --> 00:24:15.599
pulled for individual consideration.

00:24:18.119 --> 00:24:21.000
- I would like to have item B pulled.

00:24:21.000 --> 00:24:22.000
- Pulled, okay.

00:24:22.000 --> 00:24:27.000
- I had just, full disclosure, I plan to vote against it

00:24:27.480 --> 00:24:29.359
for reasons I had stated before.

00:24:29.359 --> 00:24:32.359
So I myself don't need a whole new presentation on it,

00:24:32.359 --> 00:24:33.799
but if others would like that.

00:24:33.799 --> 00:24:34.640
- Okay.

00:24:37.039 --> 00:24:38.279
Any other item?

00:24:47.559 --> 00:24:48.680
No? - No.

00:24:48.680 --> 00:24:50.240
- None, okay.

00:24:50.240 --> 00:24:55.240
Then is there a motion for approval or motion on,

00:24:55.839 --> 00:25:00.839
excuse me, items A, C, and D on the consent agenda?

00:25:02.680 --> 00:25:03.740
- I move for approval.

00:25:04.960 --> 00:25:05.799
- Second.

00:25:05.799 --> 00:25:08.319
- We have a motion and a second for approval

00:25:08.319 --> 00:25:10.480
of items A, C, and D.

00:25:10.480 --> 00:25:11.500
Any discussion?

00:25:13.440 --> 00:25:15.039
All in favor say aye.

00:25:15.039 --> 00:25:15.940
- Aye. - Aye.

00:25:15.940 --> 00:25:16.900
- Any opposed?

00:25:18.720 --> 00:25:23.140
Very good, motion passes on items A, C, and D.

00:25:23.140 --> 00:25:25.880
Item B, which we'll look at individually,

00:25:25.880 --> 00:25:28.400
is consider recommending adoption of an ordinance

00:25:29.500 --> 00:25:32.200
of the city council, of the city of Denton,

00:25:32.200 --> 00:25:34.079
Texas Home Real Municipal Corporation,

00:25:34.079 --> 00:25:38.539
providing for, authorizing, and approving the execution

00:25:38.539 --> 00:25:40.920
by the city manager or his designee

00:25:40.920 --> 00:25:44.039
of a base contract for sale and purchase

00:25:44.039 --> 00:25:46.880
of natural gas between the city of Denton

00:25:46.880 --> 00:25:48.539
and Conoco Phillips Company.

00:25:53.759 --> 00:25:56.720
Okay, you had questions or comments?

00:25:57.799 --> 00:26:01.880
- No, I had stated my reasons before.

00:26:01.880 --> 00:26:02.720
- Sure.

00:26:03.920 --> 00:26:05.079
- They still stand.

00:26:05.960 --> 00:26:08.259
- Okay, very good.

00:26:09.440 --> 00:26:13.079
Any other questions or comments about item B?

00:26:15.240 --> 00:26:17.759
Do we have a motion on item B?

00:26:17.759 --> 00:26:19.480
- Move approval.

00:26:19.480 --> 00:26:20.440
- I second.

00:26:20.440 --> 00:26:22.680
- Motion and a second for approval.

00:26:23.759 --> 00:26:25.200
Any further discussion?

00:26:26.700 --> 00:26:28.200
All in favor say aye.

00:26:28.200 --> 00:26:29.039
- Aye. - Aye.

00:26:29.039 --> 00:26:30.079
- Any opposed?

00:26:30.079 --> 00:26:31.079
- Nay.

00:26:31.079 --> 00:26:32.240
- One nay.

00:26:34.240 --> 00:26:35.079
Okay.

00:26:37.480 --> 00:26:41.720
Next we have under individual consideration

00:26:41.720 --> 00:26:45.599
the consider approval of the public utilities board

00:26:45.599 --> 00:26:48.720
meeting minutes of May 21st, 2018.

00:26:49.640 --> 00:26:52.519
Those draft minutes have been distributed

00:26:52.519 --> 00:26:56.410
and would ask if there's any changes, suggestions,

00:26:56.410 --> 00:26:57.519
questions?

00:26:59.640 --> 00:27:00.559
Alteration?

00:27:02.160 --> 00:27:04.759
Okay, not as there are motion to approve as submitted.

00:27:06.039 --> 00:27:06.880
- So moved.

00:27:08.119 --> 00:27:09.619
- Motion and--

00:27:09.619 --> 00:27:10.460
- Second.

00:27:10.460 --> 00:27:12.000
- Second, thank you.

00:27:12.000 --> 00:27:13.119
Discussion?

00:27:13.119 --> 00:27:14.400
All in favor say aye.

00:27:14.400 --> 00:27:15.240
- Aye.

00:27:15.240 --> 00:27:16.079
- Any opposed?

00:27:16.079 --> 00:27:17.200
Same sign.

00:27:17.200 --> 00:27:20.799
Okay, we've already taken care of item B on this section

00:27:20.799 --> 00:27:24.940
so we'll go to item C, which is consider recommending

00:27:24.940 --> 00:27:27.519
approval of an ordinance of the city of Denton, Texas

00:27:27.519 --> 00:27:30.720
the Texas Home Rural Municipal Corporation,

00:27:30.720 --> 00:27:32.640
authorizing the city manager to execute

00:27:32.640 --> 00:27:35.400
a professional services agreement with Burgess

00:27:35.400 --> 00:27:40.000
and Niple Inc. for design services of the Morse Street

00:27:40.000 --> 00:27:42.759
Loop 288 to Mayhill Road Street Improvement

00:27:43.599 --> 00:27:46.900
as set forth in the contract and providing

00:27:46.900 --> 00:27:49.079
the expenditure of funds therefore

00:27:49.079 --> 00:27:52.720
and providing an effective date for design services

00:27:52.720 --> 00:27:55.480
ordered to Burgess and Niple Inc.

00:27:55.480 --> 00:27:59.160
and the Inoptic Suit amount of $255,000.

00:28:00.880 --> 00:28:03.200
- Good morning, I'm Chad Allen, Deputy City Engineer

00:28:03.200 --> 00:28:05.200
and I have a brief presentation about the Morse Street

00:28:05.200 --> 00:28:07.000
expansion project.

00:28:07.000 --> 00:28:09.599
The limits are between Loop 288 and Mayhill Road.

00:28:11.480 --> 00:28:13.940
So I'm here to ask that you consider approving

00:28:13.940 --> 00:28:17.279
a professional services agreement with the city of Denton

00:28:17.279 --> 00:28:18.680
and Burgess and Niple Inc.

00:28:18.680 --> 00:28:22.200
in the not to exceed amount of $255,000.

00:28:22.200 --> 00:28:24.920
We're bringing it to PUB because that not to exceed amount

00:28:24.920 --> 00:28:29.480
includes $24,350 in utility funds for the design

00:28:29.480 --> 00:28:31.880
of water relocation improvements associated with the

00:28:31.880 --> 00:28:32.480
project.

00:28:33.480 --> 00:28:34.920
So this is a map of the project.

00:28:34.920 --> 00:28:38.680
We're widening Morse between Loop 288 on the West End

00:28:38.680 --> 00:28:40.960
and Mayhill Road on the East End.

00:28:40.960 --> 00:28:43.720
Right now, Morse Street is four lane divided roadway

00:28:43.720 --> 00:28:46.579
between Loop 288 and Kimberly Drive.

00:28:46.579 --> 00:28:48.319
And then between Kimberly and Mayhill,

00:28:48.319 --> 00:28:49.519
it's only a two lane road.

00:28:49.519 --> 00:28:52.039
So we're gonna widen it to a four lane divided road

00:28:52.039 --> 00:28:54.279
between Kimberly and Mayhill.

00:28:54.279 --> 00:28:57.039
And then we're also going to do a mill and overlay

00:28:57.039 --> 00:29:00.880
maintenance operation on the north side of Morse Street

00:29:00.880 --> 00:29:02.319
between the Loop and Mayhill.

00:29:04.859 --> 00:29:07.039
So a little information about the background of the project

00:29:07.039 --> 00:29:09.920
and the RFQ, the Morse Street expansion project

00:29:09.920 --> 00:29:13.519
was authorized as part of the 2014 bond program.

00:29:13.519 --> 00:29:15.759
Again, we're gonna widen it between Kimberly and Mayhill

00:29:15.759 --> 00:29:17.839
to four lanes with a median.

00:29:17.839 --> 00:29:19.480
We're selecting our engineering consultant

00:29:19.480 --> 00:29:22.440
based on an RF request for qualifications

00:29:22.440 --> 00:29:24.400
for professional engineering services

00:29:24.400 --> 00:29:27.200
that was solicited using the city's formal solicitation

00:29:27.200 --> 00:29:28.359
process.

00:29:28.359 --> 00:29:31.119
In March of this year, the city council approved

00:29:31.119 --> 00:29:33.519
a pre-qualified list of engineering firms

00:29:33.519 --> 00:29:35.339
to do this type of design.

00:29:35.339 --> 00:29:38.279
So Burgess and Nopple Inc. is one of the qualified firms

00:29:38.279 --> 00:29:40.319
that submitted for the design of roadways,

00:29:40.319 --> 00:29:42.640
intersections and bridges, and we're selecting them

00:29:42.640 --> 00:29:44.440
to do the Morse Street project.

00:29:46.000 --> 00:29:47.319
The engineering scope of services

00:29:47.319 --> 00:29:49.119
includes street widening improvements,

00:29:49.119 --> 00:29:51.079
storm drain improvements, and then design

00:29:51.079 --> 00:29:52.940
of the water line relocation.

00:29:52.940 --> 00:29:55.220
That uses utility funds and that's why we're talking

00:29:55.220 --> 00:30:00.220
to PUB today, $24,350 is used from utility funds

00:30:00.359 --> 00:30:02.759
to design the water line relocation improvements.

00:30:02.759 --> 00:30:05.059
The scope also includes roadway lighting,

00:30:05.059 --> 00:30:07.000
bid and construction phase support,

00:30:07.000 --> 00:30:09.480
preparation of right of way acquisition documents,

00:30:09.480 --> 00:30:11.619
SUE and geotechnical engineering,

00:30:11.619 --> 00:30:13.319
and public involvement support.

00:30:14.480 --> 00:30:17.160
Here's a map that shows the water line relocation.

00:30:17.160 --> 00:30:20.619
This is Morse Street between Kimberly and the Loop,

00:30:20.619 --> 00:30:22.759
it's four lanes divided, and then in this section

00:30:22.759 --> 00:30:25.519
we're gonna widen it between Kimberly and Mayhill.

00:30:25.519 --> 00:30:28.400
This is the water line that we may have to relocate

00:30:28.400 --> 00:30:30.980
and move depending on whether it conflicts

00:30:30.980 --> 00:30:34.279
with the roadway improvements or if it is in bad condition.

00:30:36.240 --> 00:30:40.440
So our recommendation is that you recommend approval

00:30:40.440 --> 00:30:42.099
of the professional services agreement

00:30:42.099 --> 00:30:44.460
between the city of Denton and Burgess and Nopple Inc.

00:30:44.460 --> 00:30:49.460
for $255,000 which includes the $24,350 in utility funding.

00:30:53.400 --> 00:30:55.720
I'll try to answer any questions if you have them.

00:30:57.359 --> 00:30:58.660
- Any questions on this?

00:31:01.440 --> 00:31:06.200
Just, I was, general comment on the entire project

00:31:06.200 --> 00:31:10.779
that makes perfect sense to extend that little piece

00:31:10.779 --> 00:31:14.519
of Morse Street, especially as Mayhill gets expanded,

00:31:14.519 --> 00:31:19.519
provides a good east to west access to Mayhill

00:31:19.519 --> 00:31:21.059
from the Loop and vice versa.

00:31:21.059 --> 00:31:26.059
So it's not very many linear feet,

00:31:26.440 --> 00:31:29.990
but it'll be a good improvement for us for east to west

00:31:29.990 --> 00:31:30.720
access.

00:31:31.839 --> 00:31:34.880
- And I think, I mean the part that pertaining most to PUB,

00:31:34.880 --> 00:31:38.180
the water lines is just so necessary.

00:31:38.180 --> 00:31:39.019
- Yep.

00:31:40.759 --> 00:31:41.599
- Yep. - Absolutely.

00:31:41.599 --> 00:31:42.440
- Okay.

00:31:43.759 --> 00:31:46.960
Other comments or do we have a motion on item C?

00:31:49.279 --> 00:31:50.279
- Move for approval.

00:31:51.119 --> 00:31:53.119
- Motion to approve, is there a second?

00:31:54.680 --> 00:31:55.519
Second?

00:31:56.440 --> 00:31:57.279
Discussion?

00:31:58.400 --> 00:32:00.000
All in favor say aye.

00:32:00.000 --> 00:32:01.960
- Aye. - Any opposed?

00:32:01.960 --> 00:32:02.799
Same sign?

00:32:04.599 --> 00:32:07.519
Item D is ACM update, thank you.

00:32:08.559 --> 00:32:10.519
- Mr. Chairman, members of the board, I'll be brief.

00:32:10.519 --> 00:32:13.480
In your packet, you'll have your feature agenda item list

00:32:13.480 --> 00:32:16.079
along with the new business matrix.

00:32:16.079 --> 00:32:17.279
I believe a majority of the items

00:32:17.279 --> 00:32:20.680
of the new business matrix have been responded to back,

00:32:20.680 --> 00:32:23.880
to the PUB and believe we'd still have one outstanding item

00:32:23.880 --> 00:32:25.480
regarding solid waste that will be covered

00:32:25.480 --> 00:32:28.200
in the budget process and budget conversations.

00:32:28.200 --> 00:32:30.839
Also in your packet is a white paper

00:32:30.839 --> 00:32:33.839
that was co-presented by PS Aurora

00:32:33.839 --> 00:32:36.079
and a consultant with Black and Veatch

00:32:36.079 --> 00:32:39.440
at the 2018 conference of the Water Environment Association

00:32:39.440 --> 00:32:41.359
of Texas and it was regarding

00:32:41.359 --> 00:32:43.880
our wastewater asset management plan.

00:32:43.880 --> 00:32:46.119
So if you have any questions regarding that,

00:32:46.119 --> 00:32:48.380
Mr. Aurora is here to answer any specifics to that,

00:32:48.380 --> 00:32:51.319
but is included in your packet for your review.

00:32:51.319 --> 00:32:52.160
Nothing further.

00:32:56.039 --> 00:32:58.759
- Okay, any questions?

00:33:01.460 --> 00:33:05.680
Just as a comment, command PS.

00:33:05.680 --> 00:33:06.519
- As always.

00:33:07.599 --> 00:33:10.519
- On your presentation, it's good to see

00:33:10.519 --> 00:33:14.640
the city of Denton wastewater program is being used

00:33:14.640 --> 00:33:18.779
as a good example of how to do things right.

00:33:20.000 --> 00:33:22.039
It's always encouraged me, so thank you.

00:33:24.920 --> 00:33:25.759
Okay.

00:33:27.440 --> 00:33:32.440
Concluding items, under section 551.042,

00:33:33.160 --> 00:33:36.160
the Texas Open Meetings Act, responding inquiries

00:33:36.160 --> 00:33:38.480
from the Public Utilities Board or the public

00:33:38.480 --> 00:33:42.039
with specific factual information or recitation of policy

00:33:42.039 --> 00:33:44.839
or accept a proposal to place a matter on the agenda

00:33:44.839 --> 00:33:46.039
for an upcoming meeting.

00:33:48.079 --> 00:33:48.920
Yes.

00:33:48.920 --> 00:33:49.759
(laughing)

00:33:49.759 --> 00:33:52.319
Two, we got both sides of the room here.

00:33:52.319 --> 00:33:56.359
- I was reading recently about the markets

00:33:56.359 --> 00:33:59.200
for recycling materials and that a lot of cities

00:33:59.200 --> 00:34:03.319
are looking at not selling them because it's not

00:34:03.319 --> 00:34:07.160
advantageous and I'd like an update on that for us.

00:34:07.160 --> 00:34:11.000
And then also on commercial, I know that we don't do

00:34:11.000 --> 00:34:14.039
a lot of commercial recycling and do we have any plans

00:34:14.039 --> 00:34:16.599
to kind of increase that?

00:34:16.599 --> 00:34:20.440
I hate to see plastic and glass going into a landfill.

00:34:20.440 --> 00:34:21.280
- Yeah, I agree.

00:34:21.280 --> 00:34:22.119
- And aluminum, so.

00:34:22.119 --> 00:34:23.679
- And costing us more money than we would have.

00:34:23.679 --> 00:34:25.800
- Yes, yes, so.

00:34:25.800 --> 00:34:28.679
And I think that's where the bulk of those materials

00:34:28.679 --> 00:34:31.440
would be coming from is commercial businesses.

00:34:34.639 --> 00:34:36.639
- And we might include in that also, you know,

00:34:36.639 --> 00:34:40.199
there's some private recycling firms that contract

00:34:40.199 --> 00:34:43.079
with some of the larger users like,

00:34:44.320 --> 00:34:45.800
I don't want to give anybody as an example,

00:34:45.800 --> 00:34:46.780
but some of the big,

00:34:50.440 --> 00:34:51.679
larger retail people. - At the end of the Walmart,

00:34:51.679 --> 00:34:52.760
they do their own.

00:34:52.760 --> 00:34:56.639
- Yeah, yeah, they bail it and then it's a third party

00:34:56.639 --> 00:34:57.480
that collects it.

00:34:57.480 --> 00:34:58.400
- Right.

00:34:58.400 --> 00:35:02.119
- So that, put that in the mix, I guess.

00:35:03.119 --> 00:35:04.039
- And then Deb had.

00:35:04.039 --> 00:35:06.000
- Yes, you had one, Deb?

00:35:06.000 --> 00:35:08.800
- Yeah, so a future agenda item.

00:35:08.800 --> 00:35:10.400
And this is about the,

00:35:11.679 --> 00:35:16.199
I'd like to see a staff presentation

00:35:17.199 --> 00:35:20.000
at some point, you know, relatively soon

00:35:20.000 --> 00:35:24.920
about the different kinds of air testing

00:35:24.920 --> 00:35:28.199
that have been done, you know, the one kind that was done

00:35:28.199 --> 00:35:31.400
and then the one that's going to be done on the deck

00:35:31.400 --> 00:35:33.960
because there is confusion,

00:35:35.440 --> 00:35:40.440
including in myself as to what kind of testing

00:35:40.519 --> 00:35:42.519
had been done and what kind will be done.

00:35:42.519 --> 00:35:46.519
So I did some, you know, self-educating

00:35:46.519 --> 00:35:49.760
and it seems to me that,

00:35:50.719 --> 00:35:52.559
or from what I learned, there are these two kinds

00:35:52.559 --> 00:35:56.559
of testing that we have done and are doing.

00:35:56.559 --> 00:35:58.480
There's the, and I wrote down the acronyms here,

00:35:58.480 --> 00:36:02.400
the new source performance standard, NSPS,

00:36:02.400 --> 00:36:04.760
and then the national ambient air quality standards,

00:36:04.760 --> 00:36:07.920
NAQS, and as soon as I read about that,

00:36:07.920 --> 00:36:11.400
everything that had been confusing to me before made sense.

00:36:11.400 --> 00:36:16.400
So I would, I wonder if that would help the public

00:36:17.039 --> 00:36:20.840
and us and even council to better understand

00:36:20.840 --> 00:36:22.280
what's the difference between this.

00:36:22.280 --> 00:36:23.719
I still have to look back to what I wrote,

00:36:23.719 --> 00:36:26.800
the NSPS and the NAQS.

00:36:29.679 --> 00:36:32.920
I think that that would help to clear up a lot of confusion

00:36:32.920 --> 00:36:34.320
and would be really helpful.

00:36:35.320 --> 00:36:37.079
- We are planning on a presentation

00:36:37.079 --> 00:36:39.519
in the next two or three meetings

00:36:39.519 --> 00:36:42.280
and trying to arrange to have our black and beach team back

00:36:42.280 --> 00:36:42.519
.

00:36:42.519 --> 00:36:47.280
So with their experts in order to explain the results,

00:36:47.280 --> 00:36:50.280
they were our representative to ensure

00:36:50.280 --> 00:36:53.079
that all the air quality monitoring was done appropriately

00:36:53.079 --> 00:36:55.880
and within the contract parameter limits.

00:36:55.880 --> 00:36:58.460
So we'll get them back here and answer all of your

00:36:58.460 --> 00:36:59.320
questions.

00:36:59.320 --> 00:37:01.480
- Yep. - Good, very good.

00:37:01.480 --> 00:37:05.960
Anything else, anybody, any member would like to see

00:37:05.960 --> 00:37:07.159
on future agendas?

00:37:09.239 --> 00:37:11.880
If not, is there a motion to adjourn then?

00:37:13.639 --> 00:37:16.519
- So moved. - Motion and a second?

00:37:16.519 --> 00:37:18.360
- We didn't know what to do, Brendan wasn't here.

00:37:18.360 --> 00:37:19.760
- All in favor say aye, yeah.

00:37:19.760 --> 00:37:21.119
That's usually Brendan's job.

00:37:21.119 --> 00:37:22.119
(laughing)

00:37:22.119 --> 00:37:23.519
We are adjourned, thank you.