1 00:00:00,000 --> 00:00:14,800 Okay, let's call the May 22, 2017 Public Utility Board 2 00:00:14,800 --> 00:00:19,920 meeting to order. 3 00:00:19,920 --> 00:00:22,359 Our first item is our consent agenda. 4 00:00:22,359 --> 00:00:24,839 We have three items on the consent agenda. 5 00:00:24,839 --> 00:00:29,760 Would any member like to pull any of those items for 6 00:00:29,760 --> 00:00:35,679 individual consideration? 7 00:00:35,679 --> 00:00:38,719 Hearing none then, is there a motion to approve the consent 8 00:00:38,719 --> 00:00:43,240 agenda as presented? 9 00:00:43,240 --> 00:00:45,240 Motion from Lillian? 10 00:00:45,240 --> 00:00:46,240 Second. 11 00:00:46,240 --> 00:00:47,240 Second. 12 00:00:47,240 --> 00:00:48,240 Any discussion? 13 00:00:48,240 --> 00:00:51,240 All in favor say aye. 14 00:00:51,240 --> 00:00:52,240 Aye. 15 00:00:52,240 --> 00:00:53,240 Any opposed? 16 00:00:53,240 --> 00:00:57,640 Same sign, consent agenda passes. 17 00:00:57,640 --> 00:01:01,869 Next we have the Public Utility Board meeting minutes of 18 00:01:01,869 --> 00:01:04,000 May 8, 2017. 19 00:01:04,000 --> 00:01:07,120 Those have been distributed prior to. 20 00:01:07,120 --> 00:01:09,799 Any corrections, amendments to those? 21 00:01:09,799 --> 00:01:13,400 Any one? 22 00:01:13,400 --> 00:01:19,519 Hearing none then those will be approved as submitted. 23 00:01:19,519 --> 00:01:34,200 Item B, and I think Dr. Banks is going to do the 24 00:01:34,200 --> 00:01:42,000 presentation on this. 25 00:01:42,000 --> 00:01:43,000 Good morning everyone. 26 00:01:43,000 --> 00:01:46,239 I can't think of a more exciting topic to have on a Monday 27 00:01:46,239 --> 00:01:47,760 morning than to talk about 28 00:01:47,760 --> 00:01:50,799 fire sprinkler tap fees and tap and meter fees. 29 00:01:50,799 --> 00:01:55,159 So I hope you all enjoy the ride. 30 00:01:55,159 --> 00:02:00,959 This is a topic that has a little bit of history associated 31 00:02:00,959 --> 00:02:02,480 with it that I think is important 32 00:02:02,480 --> 00:02:03,760 to this discussion. 33 00:02:03,760 --> 00:02:08,560 And so I want to talk a little bit, talk about what a fire 34 00:02:08,560 --> 00:02:12,159 sprinkler tap fee actually is 35 00:02:12,159 --> 00:02:14,319 and then give you a little bit of that history to kind of 36 00:02:14,319 --> 00:02:17,259 show you what led up to the point 37 00:02:17,259 --> 00:02:18,259 that we're at. 38 00:02:18,259 --> 00:02:23,000 So a fire sprinkler tap is just a water line tap fee. 39 00:02:23,000 --> 00:02:28,770 It is usually a larger line than you'll see for a service 40 00:02:28,770 --> 00:02:29,599 tap. 41 00:02:29,599 --> 00:02:32,439 That's really about the only distinction there. 42 00:02:32,439 --> 00:02:34,199 The tap is made on the line itself. 43 00:02:34,199 --> 00:02:37,650 A gate valve is installed and then the person that's 44 00:02:37,650 --> 00:02:40,120 requiring the fire sprinkler tap is 45 00:02:40,120 --> 00:02:44,060 responsible for the expenses of extending that service to 46 00:02:44,060 --> 00:02:45,360 their facility. 47 00:02:45,360 --> 00:02:49,590 The fees do depend on tap size and then the installation 48 00:02:49,590 --> 00:02:51,840 type, whether it's a paved or 49 00:02:51,840 --> 00:02:54,719 unpaved situation. 50 00:02:54,719 --> 00:02:59,389 Fees are based on our average installation cost, which is 51 00:02:59,389 --> 00:03:01,560 always we try to base our fees 52 00:03:01,560 --> 00:03:04,080 on cost of service. 53 00:03:04,080 --> 00:03:06,400 And so these are no exceptions. 54 00:03:06,400 --> 00:03:09,830 We take a look at the cost and every year we put together a 55 00:03:09,830 --> 00:03:11,500 cost of service analysis 56 00:03:11,500 --> 00:03:17,280 that will show what these fees actually are. 57 00:03:17,280 --> 00:03:20,169 This is included in the utility fee schedule that you'll 58 00:03:20,169 --> 00:03:21,560 see every year at the end of 59 00:03:21,560 --> 00:03:25,840 the budget process and then it goes on to be adopted by 60 00:03:25,840 --> 00:03:28,400 ordinance by the city council. 61 00:03:28,400 --> 00:03:32,000 And if site conditions differ substantially from average 62 00:03:32,000 --> 00:03:34,199 conditions or if we have a specific 63 00:03:34,199 --> 00:03:38,050 requirement that's requested by fire, charges are based on 64 00:03:38,050 --> 00:03:40,280 the actual cost of the installation 65 00:03:40,280 --> 00:03:41,759 itself. 66 00:03:41,759 --> 00:03:44,719 So a little bit of history on this. 67 00:03:44,719 --> 00:03:48,659 The fees were charged for fire sprinkler taps just like any 68 00:03:48,659 --> 00:03:51,120 other tap prior to 1991. 69 00:03:51,120 --> 00:03:55,280 And in '91 there was a new fire sprinkler system ordinance 70 00:03:55,280 --> 00:03:57,639 that was adopted citywide. 71 00:03:57,639 --> 00:04:02,240 And at the time that was a much more stringent ordinance 72 00:04:02,240 --> 00:04:05,280 than existed in the DFW Metroplex. 73 00:04:05,280 --> 00:04:09,030 And so there was discussion and ultimately an agreement by 74 00:04:09,030 --> 00:04:10,879 council to waive these fees 75 00:04:10,879 --> 00:04:14,879 for a temporary but unspecified period of time. 76 00:04:14,879 --> 00:04:20,300 So basically the language that you see in the utility code 77 00:04:20,300 --> 00:04:22,879 of ordinances stated upon 78 00:04:22,879 --> 00:04:25,699 written request to the superintendent, the utility 79 00:04:25,699 --> 00:04:27,920 department shall waive the installation 80 00:04:27,920 --> 00:04:32,050 charges for water taps exclusively dedicated to fire sprink 81 00:04:32,050 --> 00:04:32,920 ler taps. 82 00:04:32,920 --> 00:04:36,220 The superintendent shall have sole discretion in the 83 00:04:36,220 --> 00:04:38,480 application of this subsection. 84 00:04:38,480 --> 00:04:41,029 Similar language was actually included in the water rate 85 00:04:41,029 --> 00:04:42,519 schedules and has been in place 86 00:04:42,519 --> 00:04:44,040 since 1992. 87 00:04:44,040 --> 00:04:48,160 That language is in there today. 88 00:04:48,160 --> 00:04:51,680 And around 2000 there were conversations between fire and 89 00:04:51,680 --> 00:04:53,800 water department staff that indicated 90 00:04:53,800 --> 00:04:56,939 that the Denton sprinkler ordinance was consistent now with 91 00:04:56,939 --> 00:04:58,439 other Metroplex cities. 92 00:04:58,439 --> 00:05:02,370 In other words those Metroplex cities had caught up with 93 00:05:02,370 --> 00:05:03,279 our code. 94 00:05:03,279 --> 00:05:07,709 This prompted in 2001 the water department to survey 41 95 00:05:07,709 --> 00:05:10,000 cities, 21 were from Texas, 96 00:05:10,000 --> 00:05:14,319 9 were in the Metroplex, 20 from around the United States 97 00:05:14,319 --> 00:05:16,160 and tried to determine whether 98 00:05:16,160 --> 00:05:19,279 fire tap fees were actually charged by these entities. 99 00:05:19,279 --> 00:05:23,430 All of them required the developer or building owner to pay 100 00:05:23,430 --> 00:05:25,759 a fire tap and connection fee. 101 00:05:25,759 --> 00:05:28,170 And this prompted an item to be brought to the public 102 00:05:28,170 --> 00:05:30,680 utility board in March 2001 recommending 103 00:05:30,680 --> 00:05:33,720 charging for the fire sprinkler taps. 104 00:05:33,720 --> 00:05:37,379 And based on the PV direction at the time staff began to 105 00:05:37,379 --> 00:05:40,040 assess fire tap fees in 2001 106 00:05:40,040 --> 00:05:41,839 and have been doing so since that time. 107 00:05:41,839 --> 00:05:45,790 However, that language was not changed in either the code 108 00:05:45,790 --> 00:05:47,720 of ordinances or in the rate 109 00:05:47,720 --> 00:05:48,959 schedule itself. 110 00:05:48,959 --> 00:05:54,050 And that has caused some confusion through the years as to 111 00:05:54,050 --> 00:05:57,199 why that language still exists. 112 00:05:57,199 --> 00:06:02,839 We were asked to bring this information to the council on 113 00:06:02,839 --> 00:06:06,000 February 14th and that was 114 00:06:06,000 --> 00:06:08,000 a request by the mayor. 115 00:06:08,000 --> 00:06:10,670 And in April this item was brought forward as a part of 116 00:06:10,670 --> 00:06:12,620 bringing this information forward 117 00:06:12,620 --> 00:06:14,639 as a work session to council. 118 00:06:14,639 --> 00:06:20,180 We conducted a survey of 19 area cities in March of 2017. 119 00:06:20,180 --> 00:06:23,810 We felt that the previous 41 city survey was quite dated 120 00:06:23,810 --> 00:06:25,560 and we wanted to be sure that 121 00:06:25,560 --> 00:06:28,790 this information that we were bringing forward was as 122 00:06:28,790 --> 00:06:30,279 current as possible. 123 00:06:30,279 --> 00:06:34,439 18 of these cities charged fire tap fees as a part of the 124 00:06:34,439 --> 00:06:35,959 regular tap fees. 125 00:06:35,959 --> 00:06:40,110 One charged a separate fee for the water line tap for a 126 00:06:40,110 --> 00:06:42,639 fire tap plus a one-time demand 127 00:06:42,639 --> 00:06:44,759 charge that was based on the tap size. 128 00:06:44,759 --> 00:06:48,870 So they all charged this one was just did it in a little 129 00:06:48,870 --> 00:06:50,899 bit of a different way. 130 00:06:50,899 --> 00:06:55,050 So as I stated, we had a request to bring this forward in 131 00:06:55,050 --> 00:06:56,040 February. 132 00:06:56,040 --> 00:07:00,069 We ended up having a work session on April 18th with the 133 00:07:00,069 --> 00:07:00,959 council. 134 00:07:00,959 --> 00:07:04,079 The council was direction from that work session was to 135 00:07:04,079 --> 00:07:06,439 remove references to waiving fees for 136 00:07:06,439 --> 00:07:12,189 fire sprinkler taps from 26-126-1 of the code of ordinances 137 00:07:12,189 --> 00:07:14,439 and to remove that language 138 00:07:14,439 --> 00:07:18,720 from the water rate schedule and continue to collect fire 139 00:07:18,720 --> 00:07:20,920 sprinkler tap fees as we have 140 00:07:20,920 --> 00:07:23,920 been since 2001. 141 00:07:23,920 --> 00:07:26,579 We did get into a discussion about clarifying what is 142 00:07:26,579 --> 00:07:28,439 included in the standard water tap 143 00:07:28,439 --> 00:07:30,199 and meter fee. 144 00:07:30,199 --> 00:07:32,899 The council felt that our rate schedule needed some 145 00:07:32,899 --> 00:07:35,300 additional language so that the applicants 146 00:07:35,300 --> 00:07:39,529 would understand exactly what the fee they were paying 147 00:07:39,529 --> 00:07:42,000 actually went towards and what 148 00:07:42,000 --> 00:07:45,439 the applicant was responsible for. 149 00:07:45,439 --> 00:07:48,920 And so we were asked to clarify what was included in the 150 00:07:48,920 --> 00:07:51,399 standard water tap and meter fee and 151 00:07:51,399 --> 00:07:56,889 clarify when a special price quote to perform nonstandard 152 00:07:56,889 --> 00:07:58,860 work would apply. 153 00:07:58,860 --> 00:08:03,180 So exhibits two and three of your agenda information sheets 154 00:08:03,180 --> 00:08:05,680 show the changes that we have made 155 00:08:05,680 --> 00:08:08,639 in response to the council request. 156 00:08:08,639 --> 00:08:12,189 We removed the 1991 language about waiving fire tap fees 157 00:08:12,189 --> 00:08:14,120 from the code of ordinances and 158 00:08:14,120 --> 00:08:18,899 from the current and future water rate schedules. 159 00:08:18,899 --> 00:08:26,740 We are looking at clarifying language for the rate schedule 160 00:08:26,740 --> 00:08:27,519 itself. 161 00:08:27,519 --> 00:08:30,939 And all of these will have to be taken forward to the city 162 00:08:30,939 --> 00:08:33,159 council with an ordinance to enact 163 00:08:33,159 --> 00:08:34,159 these changes. 164 00:08:34,159 --> 00:08:39,539 So right now the current water rate schedule, if the board 165 00:08:39,539 --> 00:08:42,200 direction is to move forward 166 00:08:42,200 --> 00:08:46,919 with this, will be modified outside of our normal sequence. 167 00:08:46,919 --> 00:08:49,799 We'll try to get that done as quickly as we can with the 168 00:08:49,799 --> 00:08:50,519 council. 169 00:08:50,519 --> 00:08:53,460 So that will happen before it would usually happen at the 170 00:08:53,460 --> 00:08:54,980 end of the budget cycle when 171 00:08:54,980 --> 00:08:59,240 we adopt the entire rate schedule. 172 00:08:59,240 --> 00:09:01,539 Real quickly, I know this is a bit tedious because it's 173 00:09:01,539 --> 00:09:03,440 code language, but I wanted to 174 00:09:03,440 --> 00:09:06,620 be sure that we worked through the additions that we have 175 00:09:06,620 --> 00:09:08,360 made to the rate schedule. 176 00:09:08,360 --> 00:09:12,129 For the water taps with meter section, we added the text 177 00:09:12,129 --> 00:09:13,919 that you see on the screen 178 00:09:13,919 --> 00:09:18,539 to the beginning of that section basically explaining that 179 00:09:18,539 --> 00:09:20,919 the installation of the water 180 00:09:20,919 --> 00:09:23,830 main tap, service line from the main to the water meter, 181 00:09:23,830 --> 00:09:25,580 the meter box and the water meter 182 00:09:25,580 --> 00:09:29,399 itself are actually included in those fees. 183 00:09:29,399 --> 00:09:32,120 Water impact fees are not included. 184 00:09:32,120 --> 00:09:38,029 And for situations where portions of the installation 185 00:09:38,029 --> 00:09:42,679 requires a pavement cut or the repair or water 186 00:09:42,679 --> 00:09:46,559 service line has to be bored underneath the street, the 187 00:09:46,559 --> 00:09:48,860 paved street fee shall apply. 188 00:09:48,860 --> 00:09:52,080 We do have a nuance with some of our streets that are 189 00:09:52,080 --> 00:09:54,759 constructed of full concrete panels. 190 00:09:54,759 --> 00:10:01,200 Those panels are weakened if you just cut them and patch 191 00:10:01,200 --> 00:10:02,200 them. 192 00:10:02,200 --> 00:10:05,779 And so what we are requiring on those is a full concrete 193 00:10:05,779 --> 00:10:07,879 panel section replacement. 194 00:10:07,879 --> 00:10:12,529 And so in that particular instance, if you've got a meter 195 00:10:12,529 --> 00:10:15,279 that's larger than two inches 196 00:10:15,279 --> 00:10:19,389 or a full concrete panel section that has to be removed, 197 00:10:19,389 --> 00:10:21,600 that takes you to the special 198 00:10:21,600 --> 00:10:26,720 price quote section which is called fees for installations 199 00:10:26,720 --> 00:10:28,000 not listed. 200 00:10:28,000 --> 00:10:32,570 Water meter fees, just the meter itself, this would be 201 00:10:32,570 --> 00:10:35,320 installation for water meters for 202 00:10:35,320 --> 00:10:38,730 new developments and existing properties that are 203 00:10:38,730 --> 00:10:41,399 requesting a larger water meter as long 204 00:10:41,399 --> 00:10:45,110 as they have an adequately sized water tap and service line 205 00:10:45,110 --> 00:10:45,399 . 206 00:10:45,399 --> 00:10:48,639 This fee would include the installation and setup of a new 207 00:10:48,639 --> 00:10:50,279 meter, new water meter box 208 00:10:50,279 --> 00:10:52,360 if required. 209 00:10:52,360 --> 00:10:54,720 Impact fees are not included. 210 00:10:54,720 --> 00:10:57,549 And again, for those meters that are larger than two inches 211 00:10:57,549 --> 00:10:59,000 , we would provide a special 212 00:10:59,000 --> 00:11:01,899 price quotation. 213 00:11:01,899 --> 00:11:06,009 For the relocates, this is for relocating an existing water 214 00:11:06,009 --> 00:11:07,799 meter to remove them from 215 00:11:07,799 --> 00:11:10,820 a conflict like if someone wanted to put in a driveway or 216 00:11:10,820 --> 00:11:12,759 sidewalk or other type of surface 217 00:11:12,759 --> 00:11:15,639 obstruction. 218 00:11:15,639 --> 00:11:19,370 This fee would cover relocation of the meter box itself and 219 00:11:19,370 --> 00:11:21,519 the water meter, water service 220 00:11:21,519 --> 00:11:23,840 line up to 10 feet. 221 00:11:23,840 --> 00:11:27,559 It does not include pavement removal or replacement. 222 00:11:27,559 --> 00:11:31,559 And for distances longer than 10 feet, we'll provide a 223 00:11:31,559 --> 00:11:33,960 price quotation in increments of 224 00:11:33,960 --> 00:11:36,759 10 feet. 225 00:11:36,759 --> 00:11:39,889 The taps themselves, one of the things that we've done that 226 00:11:39,889 --> 00:11:41,320 was causing a little bit of 227 00:11:41,320 --> 00:11:44,759 a confusion was that the water line tap section currently 228 00:11:44,759 --> 00:11:46,759 has taps for one inch and two inch 229 00:11:46,759 --> 00:11:47,759 lines. 230 00:11:47,759 --> 00:11:51,500 Those are covered elsewhere in the fee schedule, so we 231 00:11:51,500 --> 00:11:54,120 simply removed those from the -- from 232 00:11:54,120 --> 00:11:56,000 this section. 233 00:11:56,000 --> 00:11:59,809 This will cover larger than two inch diameter service lines 234 00:11:59,809 --> 00:12:01,679 and those fire lines that are 235 00:12:01,679 --> 00:12:04,240 installed by a private contractor. 236 00:12:04,240 --> 00:12:07,730 The fee includes the tapping sleeve itself and the 237 00:12:07,730 --> 00:12:10,679 isolation gate valve, the installation 238 00:12:10,679 --> 00:12:14,909 of the tap and removal and restoration of the pavement for 239 00:12:14,909 --> 00:12:17,399 water tap installation only. 240 00:12:17,399 --> 00:12:20,490 The contractor in this case is responsible for installing 241 00:12:20,490 --> 00:12:22,440 the main line extensions, service 242 00:12:22,440 --> 00:12:26,120 lines, and fire lines from that tapping sleeve isolation 243 00:12:26,120 --> 00:12:28,240 valve to its point of service. 244 00:12:28,240 --> 00:12:31,879 As I stated, we removed the one inch and two inch taps. 245 00:12:31,879 --> 00:12:35,649 And for those taps that impact a concrete pavement that 246 00:12:35,649 --> 00:12:37,679 require a full panel removal 247 00:12:37,679 --> 00:12:41,840 and replacement, we'll provide a special price quote. 248 00:12:41,840 --> 00:12:44,990 We did want to put in there -- this is asked of us on 249 00:12:44,990 --> 00:12:47,120 occasion -- we can offer to make 250 00:12:47,120 --> 00:12:49,940 a short extension of the main or service line to the 251 00:12:49,940 --> 00:12:51,799 backside of the street curb. 252 00:12:51,799 --> 00:12:54,190 That makes it a little bit easier for the contractor to 253 00:12:54,190 --> 00:12:55,519 pick that up and take that on 254 00:12:55,519 --> 00:12:58,159 to the point of service. 255 00:12:58,159 --> 00:13:01,409 And so while we're out there doing that, if they so choose, 256 00:13:01,409 --> 00:13:02,919 we can provide a special price 257 00:13:02,919 --> 00:13:06,440 quote for doing that activity. 258 00:13:06,440 --> 00:13:10,549 And then for the fees for installations, not listed section 259 00:13:10,549 --> 00:13:12,519 , we modified this to make it 260 00:13:12,519 --> 00:13:16,639 consistent with 126.1. 261 00:13:16,639 --> 00:13:21,649 It was a little bit different in the fee schedule requiring 262 00:13:21,649 --> 00:13:23,559 a 50% upfront. 263 00:13:23,559 --> 00:13:27,289 That was inconsistent with 126.1, which required an upfront 264 00:13:27,289 --> 00:13:29,000 payment based on an estimate and 265 00:13:29,000 --> 00:13:34,389 then the final payment based on the actual cost of doing 266 00:13:34,389 --> 00:13:35,600 the work. 267 00:13:35,600 --> 00:13:37,879 So we made that change. 268 00:13:37,879 --> 00:13:41,370 So I know that was a bit tedious and a lot of information, 269 00:13:41,370 --> 00:13:43,019 but those are the changes 270 00:13:43,019 --> 00:13:46,659 that we're proposing as staff to address the council 271 00:13:46,659 --> 00:13:47,639 concerns. 272 00:13:47,639 --> 00:13:50,240 And I'll be happy to answer any questions anyone has. 273 00:13:50,240 --> 00:13:53,879 I have one on this last slide. 274 00:13:53,879 --> 00:13:58,200 The change is from paying 50% upfront to the entire amount. 275 00:13:58,200 --> 00:13:59,200 That's correct. 276 00:13:59,200 --> 00:14:00,200 Right. 277 00:14:00,200 --> 00:14:02,730 And that is currently what is required in our code of ordin 278 00:14:02,730 --> 00:14:03,240 ances. 279 00:14:03,240 --> 00:14:09,080 Barbara, thank you for the question. 280 00:14:09,080 --> 00:14:13,799 You mentioned on page two, there are a couple of terms on 281 00:14:13,799 --> 00:14:16,519 page two and page seven talking 282 00:14:16,519 --> 00:14:22,240 about average conditions and nonstandard. 283 00:14:22,240 --> 00:14:24,240 Are there definitions for that? 284 00:14:24,240 --> 00:14:28,240 How does one know? 285 00:14:28,240 --> 00:14:32,750 What we do when we set a meter fee cost of service is that 286 00:14:32,750 --> 00:14:35,159 we are, when we're going out 287 00:14:35,159 --> 00:14:37,720 there and doing the work, we're actually collecting 288 00:14:37,720 --> 00:14:40,080 information on the cost of materials, the 289 00:14:40,080 --> 00:14:45,720 cost of labor, what it takes to do a line bore, anything 290 00:14:45,720 --> 00:14:47,840 that goes into it. 291 00:14:47,840 --> 00:14:51,289 And we come up with a standard fee or an average fee that 292 00:14:51,289 --> 00:14:53,799 actually goes into the rate schedule. 293 00:14:53,799 --> 00:15:01,659 And so that is based on our normal conditions of installing 294 00:15:01,659 --> 00:15:03,159 a meter. 295 00:15:03,159 --> 00:15:09,610 We look at that every year and base our fees on that actual 296 00:15:09,610 --> 00:15:10,679 cost. 297 00:15:10,679 --> 00:15:17,379 And so what we will look at is basically are we going to be 298 00:15:17,379 --> 00:15:21,440 within the range of that cost? 299 00:15:21,440 --> 00:15:26,110 And we have a tendency to deviate maybe 10% on either side 300 00:15:26,110 --> 00:15:27,279 on average. 301 00:15:27,279 --> 00:15:30,990 And so if we're substantially above that, that kind of 302 00:15:30,990 --> 00:15:33,480 pushes us into that nonstandard realm. 303 00:15:33,480 --> 00:15:36,700 And so what we're trying to do is we're trying to set a fee 304 00:15:36,700 --> 00:15:38,840 that makes it easy to administer 305 00:15:38,840 --> 00:15:42,559 and that everybody understands what that fee is. 306 00:15:42,559 --> 00:15:46,730 But at the same time, if we've got an installation that is 307 00:15:46,730 --> 00:15:49,919 much more expensive than the established 308 00:15:49,919 --> 00:15:53,769 fee, then the cost of service approach would indicate that 309 00:15:53,769 --> 00:15:55,600 we need to do a special price 310 00:15:55,600 --> 00:15:56,840 quote. 311 00:15:56,840 --> 00:16:01,309 And the person that would be in that position would know 312 00:16:01,309 --> 00:16:03,919 before they began how much they 313 00:16:03,919 --> 00:16:05,200 were going to have to pay? 314 00:16:05,200 --> 00:16:07,750 As a part of the development review process, what they're 315 00:16:07,750 --> 00:16:09,139 proposing, we'd be able to go 316 00:16:09,139 --> 00:16:13,690 out there and take a look at the situation and come up with 317 00:16:13,690 --> 00:16:15,799 if they're in a situation 318 00:16:15,799 --> 00:16:18,740 where we have a nonstandard, they would know that 319 00:16:18,740 --> 00:16:19,720 beforehand. 320 00:16:19,720 --> 00:16:20,720 Okay. 321 00:16:20,720 --> 00:16:21,720 Thank you. 322 00:16:21,720 --> 00:16:22,720 Any other questions? 323 00:16:22,720 --> 00:16:27,000 No? 324 00:16:27,000 --> 00:16:31,279 Okay. 325 00:16:31,279 --> 00:16:32,279 Thank you, Kenny. 326 00:16:32,279 --> 00:16:33,279 Appreciate it. 327 00:16:33,279 --> 00:16:34,279 Thank you. 328 00:16:34,279 --> 00:16:35,279 Is there a recommendation? 329 00:16:35,279 --> 00:16:36,279 Yeah. 330 00:16:36,279 --> 00:16:38,960 I was about to get to that. 331 00:16:38,960 --> 00:16:45,309 Is there a, excuse me, a motion then for recommendation on 332 00:16:45,309 --> 00:16:48,600 to adopt this as presented? 333 00:16:48,600 --> 00:16:49,600 Second. 334 00:16:49,600 --> 00:16:50,600 Okay. 335 00:16:50,600 --> 00:16:51,600 First and second. 336 00:16:51,600 --> 00:16:52,600 Any further discussion? 337 00:16:52,600 --> 00:16:53,600 All in favor say aye. 338 00:16:53,600 --> 00:16:54,600 Aye. 339 00:16:54,600 --> 00:16:55,600 Any opposed? 340 00:16:55,600 --> 00:16:56,600 Same sign. 341 00:16:56,600 --> 00:16:57,600 Okay. 342 00:16:57,600 --> 00:16:58,600 Motion passes. 343 00:16:58,600 --> 00:16:59,600 Item C is a matrix. 344 00:16:59,600 --> 00:17:00,600 And AC, or excuse me, ACM report. 345 00:17:00,600 --> 00:17:01,600 I don't know. 346 00:17:01,600 --> 00:17:26,119 I think the only thing... 347 00:17:26,119 --> 00:17:31,920 Okay. 348 00:17:31,920 --> 00:17:35,799 Yes. 349 00:17:35,799 --> 00:17:38,799 Barbara? 350 00:17:38,799 --> 00:17:41,799 Are you ready for us to add something? 351 00:17:41,799 --> 00:17:42,799 Sure. 352 00:17:42,799 --> 00:17:43,799 Absolutely. 353 00:17:43,799 --> 00:17:48,509 I'd just like an update on the sale of the coal plant and 354 00:17:48,509 --> 00:17:51,240 where we are on our electrical 355 00:17:51,240 --> 00:17:52,240 work. 356 00:17:52,240 --> 00:18:00,099 I'm seeing the lot on 288 grow void of equipment and 357 00:18:00,099 --> 00:18:01,079 materials. 358 00:18:01,079 --> 00:18:05,519 And I just, if you could bring us up to date on how close 359 00:18:05,519 --> 00:18:08,079 we are to being done, how much 360 00:18:08,079 --> 00:18:09,079 is left? 361 00:18:09,079 --> 00:18:12,079 All the transmission is still going. 362 00:18:12,079 --> 00:18:13,079 Okay. 363 00:18:13,079 --> 00:18:18,839 I guess that'd be two separate items then. 364 00:18:18,839 --> 00:18:19,839 Yes, sir. 365 00:18:19,839 --> 00:18:20,839 Okay. 366 00:18:20,839 --> 00:18:22,559 Any other additions to the matrix? 367 00:18:22,559 --> 00:18:23,559 Questions? 368 00:18:23,559 --> 00:18:26,559 Would like to see for future agendas? 369 00:18:26,559 --> 00:18:27,559 Okay. 370 00:18:27,559 --> 00:18:32,559 Hearing none, then nobody here. 371 00:18:32,559 --> 00:18:37,880 Looks like the seats are empty, so no public comments. 372 00:18:37,880 --> 00:18:39,519 So is there a motion to adjourn? 373 00:18:39,519 --> 00:18:40,519 So moved. 374 00:18:40,519 --> 00:18:46,359 We don't even let you do it, Brendan. 375 00:18:46,359 --> 00:18:47,359 Second. 376 00:18:47,359 --> 00:18:48,359 And Brendan? 377 00:18:48,359 --> 00:18:49,359 All in favor say aye. 378 00:18:49,359 --> 00:18:50,359 Aye. 379 00:18:50,359 --> 00:18:51,359 Thank you. 380 00:18:51,359 --> 00:18:51,359 I think that's a record, by the way.