mission meeting for April 11th 2018. This meeting has been

00:00:05.719 --> 00:00:06.799
duly posted and we do

00:00:06.799 --> 00:00:11.779
have a quorum present and I will open our work session at

00:00:11.779 --> 00:00:14.619
five o'clock. We'll go

00:00:14.619 --> 00:00:21.179
into clarification of agenda items. So does anybody have

00:00:21.179 --> 00:00:23.059
any comments or changes

00:00:23.059 --> 00:00:25.620
on the minutes?

00:00:30.000 --> 00:00:36.880
Okay, as is. How about on the consent agenda?

00:00:41.439 --> 00:00:44.880
Commissioner Ellis. Thank you, Chair. It had to do with the

00:00:44.880 --> 00:00:46.079
Texas oncology. That's

00:00:46.079 --> 00:00:56.679
Haley's. Thanks Haley. You know it's really just my brain.

00:00:56.679 --> 00:00:58.259
I could not wrap myself

00:00:58.259 --> 00:01:03.009
around this vehicle generation table that was up there. Can

00:01:03.009 --> 00:01:03.439
you walk me

00:01:03.439 --> 00:01:06.510
through that at all as how those numbers were? Those are

00:01:06.510 --> 00:01:08.040
just standard numbers

00:01:08.040 --> 00:01:11.140
based on trip generation for a medical facility of this

00:01:11.140 --> 00:01:13.480
type. Okay, so not specific to this.

00:01:13.480 --> 00:01:16.549
No, it's very general just to determine what their

00:01:16.549 --> 00:01:17.239
estimated trip

00:01:17.239 --> 00:01:20.390
generation would be. It's standard data that's requested

00:01:20.390 --> 00:01:21.000
with a preliminary

00:01:21.000 --> 00:01:23.459
plat. In this case they just put it on the plat rather than

00:01:23.459 --> 00:01:24.319
submitting it as a

00:01:24.319 --> 00:01:26.840
separate document. Understood. Thank you because I haven't

00:01:26.840 --> 00:01:27.560
seen it on top there

00:01:27.560 --> 00:01:31.750
before. Thank you. Clarification, this would be specific to

00:01:31.750 --> 00:01:32.480
this site though,

00:01:32.480 --> 00:01:36.290
correct? In that it's you know for that size of a medical

00:01:36.290 --> 00:01:36.859
facility, yeah, but

00:01:36.859 --> 00:01:39.379
they're just estimates based on the ITE manuals. But

00:01:39.379 --> 00:01:42.439
nothing that was done

00:01:42.439 --> 00:01:46.629
specifically in this area for this site? It's not like a

00:01:46.629 --> 00:01:48.159
full TIA. No, this is

00:01:48.159 --> 00:01:50.200
just looking at a facility of this type. Some kind of

00:01:50.200 --> 00:01:53.799
general data? Yeah, general data from the ITE manuals.

00:01:53.799 --> 00:01:59.560
Okay. Just to help, trying to help. It's based on the site

00:01:59.560 --> 00:01:59.840
though.

00:01:59.840 --> 00:02:03.299
Specifically it's using the traffic criteria manual for a

00:02:03.299 --> 00:02:04.599
site this size to

00:02:04.599 --> 00:02:08.009
estimate what the traffic generation will be off of this in

00:02:08.009 --> 00:02:09.280
lieu of doing,

00:02:09.280 --> 00:02:13.860
because of the size of it, in lieu of doing an actual TIA.

00:02:13.860 --> 00:02:14.960
So it's kind of a

00:02:14.960 --> 00:02:18.770
staff level engineering type calculation that's done

00:02:18.770 --> 00:02:20.280
because of the size it's not

00:02:20.280 --> 00:02:23.620
so large and it doesn't have the trips to justify TIA like

00:02:23.620 --> 00:02:24.479
we've talked about.

00:02:24.479 --> 00:02:29.479
But they are having to do an actual traffic calculation for

00:02:29.479 --> 00:02:30.080
this particular

00:02:30.080 --> 00:02:34.659
site by using the criteria manual because it's not big

00:02:34.659 --> 00:02:35.240
enough to trigger

00:02:35.240 --> 00:02:38.199
TIA. So your question, I was just trying to be helpful.

00:02:38.199 --> 00:02:39.759
Yeah. I thought what you

00:02:39.759 --> 00:02:42.719
were asking is are those numbers in regards to the site?

00:02:42.719 --> 00:02:44.439
Right. Yes, they are.

00:02:44.439 --> 00:02:47.669
They're just the way it's calculated is not a true TIA.

00:02:47.669 --> 00:02:49.879
Understood. That does help.

00:02:49.879 --> 00:02:56.280
Thank you very much. Any other questions on this item or on

00:02:56.280 --> 00:02:57.199
the consent

00:02:57.199 --> 00:03:03.080
agenda? Okay. Thank you, Hayden.

00:03:05.080 --> 00:03:10.270
Then we'll move us to items for individual consideration. I

00:03:10.270 --> 00:03:10.840
'll call on

00:03:10.840 --> 00:03:15.319
Haley for presentation of 4A.

00:03:19.879 --> 00:03:27.639
All right. This item is an alternative development plan

00:03:27.639 --> 00:03:29.800
request for a tractor

00:03:29.800 --> 00:03:34.030
dealership and repair facility. So the request is for

00:03:34.030 --> 00:03:35.680
approval of an ADP that

00:03:35.680 --> 00:03:38.280
would deviate from these two specific sections of the code,

00:03:38.280 --> 00:03:39.400
perimeter fencing

00:03:39.400 --> 00:03:42.069
and screening requirements and then the parking lot

00:03:42.069 --> 00:03:43.400
screening requirements

00:03:43.400 --> 00:03:50.000
within subchapter 13. So the site itself is the northern

00:03:50.000 --> 00:03:52.080
roughly 5.4 acres of

00:03:52.080 --> 00:03:54.729
this tract outlined in yellow. We've seen a preliminary

00:03:54.729 --> 00:03:55.479
plat for this site

00:03:55.479 --> 00:03:58.780
previously. It's being split into two lots and the northern

00:03:58.780 --> 00:03:59.280
lot will be

00:03:59.280 --> 00:04:02.710
developed as a tractor dealership. As you can see here it's

00:04:02.710 --> 00:04:03.840
located on the west

00:04:03.840 --> 00:04:06.969
side of I-35. We have Windsor here across and then it's

00:04:06.969 --> 00:04:07.879
just north of Schuyler

00:04:07.879 --> 00:04:11.460
Drive. And this is located within a regional center

00:04:11.460 --> 00:04:12.400
commercial downtown

00:04:12.400 --> 00:04:16.329
zoning district. To walk you through specifically what's

00:04:16.329 --> 00:04:17.480
involved in this

00:04:17.480 --> 00:04:20.300
request I want to first look at the overall site plan. So

00:04:20.300 --> 00:04:21.079
you can see here

00:04:21.079 --> 00:04:23.740
they have about a 20,000 square foot building proposed in

00:04:23.740 --> 00:04:24.439
the middle of the

00:04:24.439 --> 00:04:28.860
site. The area here and here would be display. So this

00:04:28.860 --> 00:04:29.839
would be kind of public

00:04:29.839 --> 00:04:32.790
display like you'd see at a car lot and then this would be

00:04:32.790 --> 00:04:34.319
behind a fence. Just

00:04:34.319 --> 00:04:37.420
other display area for them. The blue areas are where

00:04:37.420 --> 00:04:38.480
customer and employee

00:04:38.480 --> 00:04:41.439
parking would be and the green is a detention pond that

00:04:41.439 --> 00:04:42.839
they're proposing at

00:04:42.839 --> 00:04:48.240
this time. So what we have on the site is 71% lot coverage

00:04:48.240 --> 00:04:49.519
and 29% landscaping

00:04:49.519 --> 00:04:53.810
total and a total of 63 parking spaces. And I did mention

00:04:53.810 --> 00:04:55.279
briefly in your backup

00:04:55.279 --> 00:04:57.600
but I wanted to bring it up here today. There is some

00:04:57.600 --> 00:04:58.800
discussion with the city

00:04:58.800 --> 00:05:01.949
of Windsor Drive possibly extending so I wanted to point

00:05:01.949 --> 00:05:03.279
out that this detention

00:05:03.279 --> 00:05:06.459
pond and some of the parking spaces may be relocated before

00:05:06.459 --> 00:05:07.740
the building permit

00:05:07.740 --> 00:05:10.149
for this site but it wouldn't alter any of the items that

00:05:10.149 --> 00:05:11.480
they've requested this

00:05:11.480 --> 00:05:16.670
alternative plan for. Commissioner Becker. Thank you Chair.

00:05:16.670 --> 00:05:19.319
Okay can you illustrate

00:05:19.319 --> 00:05:21.660
where Windsor might come no go back to the other one you

00:05:21.660 --> 00:05:22.879
had there. Where would

00:05:22.879 --> 00:05:27.360
Windsor come through? It would be on lot two of the okay if

00:05:27.360 --> 00:05:27.879
you remember the

00:05:27.879 --> 00:05:31.470
preliminary plat. Right. So lot two being roughly across

00:05:31.470 --> 00:05:33.319
here. Right. The intent

00:05:33.319 --> 00:05:36.639
would be for someday for Windsor to cross. So it wouldn't

00:05:36.639 --> 00:05:37.240
come straight

00:05:37.240 --> 00:05:40.699
across then? It would probably angle across and hopefully

00:05:40.699 --> 00:05:42.040
come somewhere in

00:05:42.040 --> 00:05:44.980
lot two but just in them dedicating that right-of-way if

00:05:44.980 --> 00:05:46.240
they if they do so it

00:05:46.240 --> 00:05:49.819
could shift their boundary line for lot two a little

00:05:49.819 --> 00:05:50.879
further north and relocate

00:05:50.879 --> 00:05:54.069
some of the parking on this side. Okay mentioned that

00:05:54.069 --> 00:05:55.279
should the Windsor come

00:05:55.279 --> 00:05:58.550
through it'd be located on the south end of the Soate

00:05:58.550 --> 00:06:00.560
property. He said if this

00:06:00.560 --> 00:06:03.009
occurs the parking and detention fill is shown on the site

00:06:03.009 --> 00:06:03.920
plan may change as

00:06:03.920 --> 00:06:08.149
you pointed out but none of the proposed deviations really

00:06:08.149 --> 00:06:09.800
requested with this ADP

00:06:09.800 --> 00:06:13.379
would be affected so the eight foot chain length fence

00:06:13.379 --> 00:06:15.120
wouldn't be the

00:06:15.120 --> 00:06:18.139
material and the landscaping all that would remain the same

00:06:18.139 --> 00:06:19.319
the location may

00:06:19.319 --> 00:06:22.600
change may change okay just to follow the boundaries of

00:06:22.600 --> 00:06:23.480
wherever the parking lot.

00:06:23.480 --> 00:06:30.839
Gotcha. Thanks. So again that they do have three specific

00:06:30.839 --> 00:06:31.420
standards they're

00:06:31.420 --> 00:06:34.720
requesting to deviate from. Our code does not allow chain

00:06:34.720 --> 00:06:36.079
link as a permitted

00:06:36.079 --> 00:06:38.430
fence material and they are as I mentioned requesting an

00:06:38.430 --> 00:06:39.079
eight foot tall

00:06:39.079 --> 00:06:42.639
chain link fence. It would be vinyl coated to tinted black

00:06:42.639 --> 00:06:43.480
so it would be

00:06:43.480 --> 00:06:46.300
non-reflective and that would be along the rear and side

00:06:46.300 --> 00:06:47.680
yards of the property.

00:06:47.680 --> 00:06:50.949
The code also specifies that fences forward of the front

00:06:50.949 --> 00:06:51.839
building line

00:06:51.839 --> 00:06:54.370
shouldn't be over three and a half feet tall. For security

00:06:54.370 --> 00:06:55.279
purposes they're

00:06:55.279 --> 00:06:57.670
requesting a total of a six foot tall wrought iron fence

00:06:57.670 --> 00:06:58.519
along the front of

00:06:58.519 --> 00:07:02.100
the property and then the code requires and if you have

00:07:02.100 --> 00:07:03.480
parking in front of a

00:07:03.480 --> 00:07:06.579
building a 15 foot wide landscaped area that includes a

00:07:06.579 --> 00:07:07.720
berm a large tree for

00:07:07.720 --> 00:07:11.829
every 40 linear feet and then either a hedgerow continuous

00:07:11.829 --> 00:07:12.560
wall or zero

00:07:12.560 --> 00:07:15.480
escaping also in that area to screen the parking because

00:07:15.480 --> 00:07:16.680
they want that display

00:07:16.680 --> 00:07:20.319
area right on I-35 for visibility purposes they were

00:07:20.319 --> 00:07:21.519
requesting to not

00:07:21.519 --> 00:07:23.990
provide that screening and instead they've proposed some

00:07:23.990 --> 00:07:24.600
alternative

00:07:24.600 --> 00:07:29.579
locations that we'll look at. So to look at the fencing the

00:07:29.579 --> 00:07:31.279
area in yellow or

00:07:31.279 --> 00:07:34.310
orange on the map is where the chain link fence is proposed

00:07:34.310 --> 00:07:35.199
right now so that

00:07:35.199 --> 00:07:38.779
would be again eight feet tall black vinyl coated chain

00:07:38.779 --> 00:07:39.720
link they are

00:07:39.720 --> 00:07:41.790
proposing to plant some trees along it to help further

00:07:41.790 --> 00:07:42.759
screen that side yard

00:07:42.759 --> 00:07:46.180
fencing. The red area would be the wrought iron fence

00:07:46.180 --> 00:07:47.079
location so that's

00:07:47.079 --> 00:07:50.980
six foot tall wrought iron fence and there would be gates

00:07:50.980 --> 00:07:52.240
here and here across

00:07:52.240 --> 00:07:56.269
the access drives to allow circulation through the site and

00:07:56.269 --> 00:07:57.199
as I mentioned

00:07:57.199 --> 00:07:59.699
they've proposed some alternatives for the landscaping so

00:07:59.699 --> 00:08:01.000
the darker green here

00:08:01.000 --> 00:08:04.069
and here on the site are trees that they're proposing to

00:08:04.069 --> 00:08:05.079
plant along that

00:08:05.079 --> 00:08:07.189
chain link fence so that the chain link isn't as visible

00:08:07.189 --> 00:08:08.160
from the right-of-way

00:08:08.160 --> 00:08:11.189
if you're driving down the frontage road and then in the

00:08:11.189 --> 00:08:12.519
lighter green these are

00:08:12.519 --> 00:08:15.589
the alternative locations so they've proposed all of the

00:08:15.589 --> 00:08:16.680
required number of

00:08:16.680 --> 00:08:19.870
trees and shrubs just in alternative sites rather than

00:08:19.870 --> 00:08:21.000
putting it directly

00:08:21.000 --> 00:08:23.040
here in front of their display yard as the code would

00:08:23.040 --> 00:08:24.360
require they're proposing

00:08:24.360 --> 00:08:27.329
clustering it around the entrances to the site and then

00:08:27.329 --> 00:08:28.560
four other trees that

00:08:28.560 --> 00:08:32.370
they couldn't fit in they've proposed to move to the back

00:08:32.370 --> 00:08:35.000
of the site. So just

00:08:35.000 --> 00:08:37.269
some of the considerations that staff looked at with this

00:08:37.269 --> 00:08:38.559
request the intent

00:08:38.559 --> 00:08:41.370
for our fencing requirements is to ensure you know visually

00:08:41.370 --> 00:08:42.120
attractive high

00:08:42.120 --> 00:08:45.309
quality materials also to ensure the visibility of

00:08:45.309 --> 00:08:46.120
buildings from the right

00:08:46.120 --> 00:08:49.539
of way being the intent for lower fencing in the front yard

00:08:49.539 --> 00:08:50.399
and then with

00:08:50.399 --> 00:08:53.019
our parking requirements the intent there being to kind of

00:08:53.019 --> 00:08:53.960
mute those visual

00:08:53.960 --> 00:08:56.370
effects of driving by and seeing just rows of parking in

00:08:56.370 --> 00:08:57.279
front of a building

00:08:57.279 --> 00:08:59.600
you know to ensure that there's not glare onto the roadways

00:08:59.600 --> 00:09:00.299
and that it's a

00:09:00.299 --> 00:09:05.509
visually attractive look along the street. So the code

00:09:05.509 --> 00:09:07.879
provides us very

00:09:07.879 --> 00:09:11.059
specific criteria for an ADP the first being preservation

00:09:11.059 --> 00:09:11.720
of existing

00:09:11.720 --> 00:09:14.899
neighborhoods it's not anticipated that this would have any

00:09:14.899 --> 00:09:15.759
negative effect on

00:09:15.759 --> 00:09:18.259
the surrounding area if you're familiar with the area there

00:09:18.259 --> 00:09:19.039
's RV dealerships

00:09:19.039 --> 00:09:21.860
directly north of there and then various other commercial

00:09:21.860 --> 00:09:22.799
uses along the frontage

00:09:22.799 --> 00:09:26.330
road as is typical. So this is consistent with the existing

00:09:26.330 --> 00:09:27.200
development pattern in

00:09:27.200 --> 00:09:31.059
the area. In terms of assuring quality development the

00:09:31.059 --> 00:09:31.919
request doesn't

00:09:31.919 --> 00:09:34.049
necessarily lower the design standards they're just

00:09:34.049 --> 00:09:36.120
proposing alternatives that

00:09:36.120 --> 00:09:38.159
aren't allowed in our code that would help them enhance the

00:09:38.159 --> 00:09:38.799
security and the

00:09:38.799 --> 00:09:42.139
visibility of the products on site. One of the other

00:09:42.139 --> 00:09:43.759
criteria is focusing new

00:09:43.759 --> 00:09:46.809
development to activity centers this is compatible with

00:09:46.809 --> 00:09:48.039
that goal in terms of

00:09:48.039 --> 00:09:50.919
if this is typical highway development it is a regional

00:09:50.919 --> 00:09:52.080
scale customer base

00:09:52.080 --> 00:09:56.059
that they have so it fits with the zoning requirements for

00:09:56.059 --> 00:09:56.759
the area.

00:09:56.919 --> 00:09:59.840
Infrastructure is in place for this development there's no

00:09:59.840 --> 00:10:00.720
concerns there

00:10:00.720 --> 00:10:03.620
that staff identified and then in terms of resulting in a

00:10:03.620 --> 00:10:04.360
high quality

00:10:04.360 --> 00:10:07.200
development that meets the intent of those standards we

00:10:07.200 --> 00:10:08.759
discussed what

00:10:08.759 --> 00:10:11.419
they're proposing is higher quality the fencing along the

00:10:11.419 --> 00:10:12.519
frontage is non-opaque

00:10:12.519 --> 00:10:15.000
so it won't necessarily reduce the visibility of the site

00:10:15.000 --> 00:10:15.720
from the right of

00:10:15.720 --> 00:10:20.049
way and they are proposing to screen the chain link fence

00:10:20.049 --> 00:10:21.240
by vinyl coating it and

00:10:21.240 --> 00:10:25.049
providing landscaping in front of it. And then in terms of

00:10:25.049 --> 00:10:25.879
the parking lot

00:10:25.879 --> 00:10:27.929
screening as I mentioned they have all of the required

00:10:27.929 --> 00:10:28.960
plantings they actually

00:10:28.960 --> 00:10:32.220
are providing eight additional street trees beyond what is

00:10:32.220 --> 00:10:33.600
required to greatly

00:10:33.600 --> 00:10:37.480
enhance those main entry points to the site but not you

00:10:37.480 --> 00:10:39.360
know visually detract

00:10:39.360 --> 00:10:43.000
from the display area for their equipment. So with all that

00:10:43.000 --> 00:10:43.639
being said

00:10:43.639 --> 00:10:46.519
staff is recommending approval of their request we found

00:10:46.519 --> 00:10:47.279
that it meet these

00:10:47.279 --> 00:10:49.850
established standards in the DDC and I can try to answer

00:10:49.850 --> 00:10:50.720
any questions about

00:10:50.720 --> 00:10:55.350
the site. Commissioner Smith. Thank You Chair. The further

00:10:55.350 --> 00:10:57.360
down along 35 Haley

00:10:57.360 --> 00:11:01.230
like James Wood and then across on the east side with

00:11:01.230 --> 00:11:02.759
Classic and one other used

00:11:02.759 --> 00:11:06.120
car lot is it still is it RCCD over there as well?

00:11:06.120 --> 00:11:13.860
35 East? Yeah 35 East but further south of Mayhill. I

00:11:13.860 --> 00:11:14.639
believe most of that is RCCD

00:11:14.639 --> 00:11:18.240
there is some PD zoning in that area but most of those are

00:11:18.240 --> 00:11:20.200
RCCD. So what makes

00:11:20.200 --> 00:11:23.240
I mean the what makes it to where if we approve this we

00:11:23.240 --> 00:11:24.720
wouldn't see like James

00:11:24.720 --> 00:11:26.929
Wood or some other because it seems like they're requesting

00:11:26.929 --> 00:11:27.480
the six foot

00:11:27.480 --> 00:11:29.960
wrought iron fence in the front purely for security

00:11:29.960 --> 00:11:31.799
purposes. They're a tractor

00:11:31.799 --> 00:11:33.990
and repair shop and get it I mean how but how much

00:11:33.990 --> 00:11:35.679
difference are they in

00:11:35.679 --> 00:11:39.000
comparison to James Wood or to Classic or some of those

00:11:39.000 --> 00:11:40.159
other car dealerships

00:11:40.159 --> 00:11:43.389
who would have the same amount of security concerns what

00:11:43.389 --> 00:11:44.200
would what would

00:11:44.200 --> 00:11:46.889
preclude them from coming along and asking for the exact

00:11:46.889 --> 00:11:48.519
same type of change

00:11:48.519 --> 00:11:50.730
within the change and be able to build a new fence as well

00:11:50.730 --> 00:11:51.600
be able for security

00:11:51.600 --> 00:11:54.309
purposes and we didn't have a just six six foot wrought

00:11:54.309 --> 00:11:55.360
iron fences all up and down

00:11:55.360 --> 00:11:58.169
35. Certainly and in discussing it with the applicant the

00:11:58.169 --> 00:11:59.480
concern was with the

00:11:59.480 --> 00:12:01.960
type of equipment that the typical low fencing you see at

00:12:01.960 --> 00:12:02.799
car lots in the front

00:12:02.799 --> 00:12:06.389
wouldn't necessarily be sufficient and they they found that

00:12:06.389 --> 00:12:07.080
some of the

00:12:07.080 --> 00:12:10.169
neighbors in this area have taller fences that predate our

00:12:10.169 --> 00:12:11.080
current code so

00:12:11.080 --> 00:12:13.620
they just wanted to be consistent with what the neighbors

00:12:13.620 --> 00:12:14.600
have and ensure that

00:12:14.600 --> 00:12:18.049
extra level of security based on the large equipment that

00:12:18.049 --> 00:12:19.120
they're dealing

00:12:19.120 --> 00:12:22.190
with and why why is the current zoning only three and a

00:12:22.190 --> 00:12:23.120
half is just for a

00:12:23.120 --> 00:12:26.519
visibility issues or what was the that is not based on

00:12:26.519 --> 00:12:27.679
zoning the fence

00:12:27.679 --> 00:12:30.340
requirement is that applies citywide unless you are an

00:12:30.340 --> 00:12:31.200
industrial or an

00:12:31.200 --> 00:12:35.279
agricultural use so if this were an industrial site they

00:12:35.279 --> 00:12:35.759
would be allowed to

00:12:35.759 --> 00:12:39.759
have a six or eight foot fence in the front yard but got it

00:12:39.759 --> 00:12:40.120
for commercial

00:12:40.120 --> 00:12:43.309
uses it's not allowed and then the the screening the the it

00:12:43.309 --> 00:12:44.320
's like a fabric

00:12:44.320 --> 00:12:46.940
correct like what you'd see on construction sites as well

00:12:46.940 --> 00:12:47.480
the screen

00:12:47.480 --> 00:12:49.799
the screening within the chain link no I believe it's

00:12:49.799 --> 00:12:51.000
actual vinyl coating on

00:12:51.000 --> 00:12:54.799
the metal chain link itself okay all right so it's not it's

00:12:54.799 --> 00:12:55.240
not the screen

00:12:55.240 --> 00:12:57.960
like you see on construction sites where it's got it my I

00:12:57.960 --> 00:12:58.600
was gonna ask about

00:12:58.600 --> 00:13:01.309
maintenance on that stuff gets raggedy after a while but

00:13:01.309 --> 00:13:02.360
yeah now I understand

00:13:02.360 --> 00:13:05.000
thank you that's all I have commissioner Rizzo thank you

00:13:05.000 --> 00:13:07.679
chair the ADP would apply

00:13:07.679 --> 00:13:14.340
to both lots correct the the ADP is specific to the site

00:13:14.340 --> 00:13:15.000
plan for this

00:13:15.000 --> 00:13:17.639
Kubota dealership so just the five point eight acres they

00:13:17.639 --> 00:13:18.600
have no plans at this

00:13:18.600 --> 00:13:21.299
point for what would go on lot two but if lot two one of

00:13:21.299 --> 00:13:22.519
the same conditions

00:13:22.519 --> 00:13:25.240
they would have to come back and get an ADP yes it is

00:13:25.240 --> 00:13:27.000
specific to the the Kubota

00:13:27.000 --> 00:13:29.820
sites that we're looking at tonight and maybe we can talk

00:13:29.820 --> 00:13:30.720
about this in the

00:13:30.720 --> 00:13:33.100
other room but I'm with the Commissioner Smith on this I

00:13:33.100 --> 00:13:33.919
don't I'm trying to

00:13:33.919 --> 00:13:37.070
understand why they need a six foot fence maybe it's my

00:13:37.070 --> 00:13:37.919
ignorant ignorance

00:13:37.919 --> 00:13:40.789
and the tractor business but I think those equipments are

00:13:40.789 --> 00:13:42.399
enclosed just like

00:13:42.399 --> 00:13:47.610
a car would be so I don't I'm not understanding why they

00:13:47.610 --> 00:13:48.639
need a six foot

00:13:48.639 --> 00:13:52.129
fence but no car dealership has ever asked for that and I

00:13:52.129 --> 00:13:52.799
don't I don't know

00:13:52.799 --> 00:13:55.769
I'd be interested if the applicants here to understand

00:13:55.769 --> 00:13:56.840
their rationale because

00:13:56.840 --> 00:14:02.049
it doesn't seem like a six foot rod iron fence is necessary

00:14:02.049 --> 00:14:02.879
and the

00:14:02.879 --> 00:14:05.720
applicant will be here this evening at the regular session

00:14:05.720 --> 00:14:06.559
to discuss this

00:14:06.559 --> 00:14:09.600
further my understanding from them as I said it's because

00:14:09.600 --> 00:14:10.559
they they're going to

00:14:10.559 --> 00:14:13.659
have this large display area in the front with large tract

00:14:13.659 --> 00:14:14.559
ors rather than

00:14:14.559 --> 00:14:17.639
smaller cars that couldn't necessarily cross a lower fence

00:14:17.639 --> 00:14:18.840
I guess the concern

00:14:18.840 --> 00:14:22.480
would be tractors and heavy equipment may be able to do

00:14:22.480 --> 00:14:24.460
that so they were they

00:14:24.460 --> 00:14:26.940
felt that the six foot height and the wrought iron material

00:14:26.940 --> 00:14:27.799
was necessary for

00:14:27.799 --> 00:14:31.379
security but I believe they could speak more to the

00:14:31.379 --> 00:14:37.679
specifics on that okay I

00:14:37.679 --> 00:14:42.889
have a more general question rather than specific in the D

00:14:42.889 --> 00:14:44.620
DC update that we have

00:14:44.620 --> 00:14:49.149
coming which and maybe I have a different opinion these

00:14:49.149 --> 00:14:49.879
seem to be

00:14:49.879 --> 00:14:53.820
fairly minor to me are these things that possibly with the

00:14:53.820 --> 00:14:55.200
DDC update be handled

00:14:55.200 --> 00:14:58.659
administratively rather than these are still going to be

00:14:58.659 --> 00:14:59.679
required as ADPs

00:14:59.679 --> 00:15:03.230
because of this some of the small changes trying to think

00:15:03.230 --> 00:15:04.080
back to some of

00:15:04.080 --> 00:15:06.000
the specifics I think some of the fencing requirements we

00:15:06.000 --> 00:15:06.440
're trying to

00:15:06.440 --> 00:15:09.789
address to allow a little more flexibility there for

00:15:09.789 --> 00:15:10.919
certain uses and

00:15:10.919 --> 00:15:13.620
then in terms of landscaping I don't think we quite have

00:15:13.620 --> 00:15:14.720
that nailed down yet

00:15:14.720 --> 00:15:17.200
but the intent is for it to be more administrative approval

00:15:17.200 --> 00:15:17.600
for you know

00:15:17.600 --> 00:15:20.519
that were actually the way that the current the current

00:15:20.519 --> 00:15:21.480
draft is written

00:15:21.480 --> 00:15:24.169
there would not be an ADP process anymore there would be

00:15:24.169 --> 00:15:25.080
some flexibility

00:15:25.080 --> 00:15:29.360
with with staff having some some some minor the ability to

00:15:29.360 --> 00:15:29.919
do some minor

00:15:29.919 --> 00:15:33.320
adjustments like 10% I think it is on certain standards

00:15:33.320 --> 00:15:34.519
fence I just don't

00:15:34.519 --> 00:15:37.860
recall off the top my head regarding this the height in the

00:15:37.860 --> 00:15:39.840
front

00:15:40.840 --> 00:15:53.679
anybody else thank you having that will move us to 4b and I

00:15:53.679 --> 00:15:54.679
have a conflict of

00:15:54.679 --> 00:15:59.309
interest on 4b I was in the partnership that sold this

00:15:59.309 --> 00:16:00.440
property to this current

00:16:00.440 --> 00:16:03.259
owner and so even though it's been a number of years ago I

00:16:03.259 --> 00:16:04.159
'm going to recuse

00:16:04.159 --> 00:16:10.299
myself just to make sure there's no appearance of conflict

00:16:10.299 --> 00:16:10.759
of interest a

00:16:10.759 --> 00:16:13.799
moment turn the meeting over to Commissioner Roselle at

00:16:13.799 --> 00:16:13.879
this time thank

00:16:13.879 --> 00:16:17.120
you chair and I believe Haley is presenting this item as

00:16:17.120 --> 00:16:23.879
well item 4b

00:16:24.519 --> 00:16:27.799
yes so this item is a site plan for a medical office

00:16:27.799 --> 00:16:29.759
building within the razor

00:16:29.759 --> 00:16:35.000
ranch overlay district so the request is from prime Denton

00:16:35.000 --> 00:16:36.039
properties for

00:16:36.039 --> 00:16:39.879
approval of a site plan to allow a medical office building

00:16:39.879 --> 00:16:40.879
on lot one block

00:16:40.879 --> 00:16:43.929
four which is part of the razor ranch south edition to look

00:16:43.929 --> 00:16:45.039
at the site more

00:16:45.039 --> 00:16:48.840
specifically it's outlined here in red on this this aerial

00:16:48.840 --> 00:16:49.600
to give you a

00:16:49.600 --> 00:16:53.659
reference as to where this is in relation to the convention

00:16:53.659 --> 00:16:54.679
center the

00:16:54.679 --> 00:16:58.320
hospital next door so it's on the I-35 frontage road

00:16:58.320 --> 00:16:59.440
between Scripture and Pan

00:16:59.440 --> 00:17:04.640
handle it's just over four acres total in terms of the

00:17:04.640 --> 00:17:06.359
razor ranch overlay it's

00:17:06.359 --> 00:17:11.359
on the very southern portion within the south mixed use

00:17:11.359 --> 00:17:15.960
district so in 2011 they

00:17:15.960 --> 00:17:19.150
adopted very specific standards for this lot you've heard

00:17:19.150 --> 00:17:20.240
me mention before that

00:17:20.240 --> 00:17:22.369
the south mixed use district we don't have a lot of those

00:17:22.369 --> 00:17:23.279
standards adopted in

00:17:23.279 --> 00:17:26.319
the overlay yet this lot specifically had those developed

00:17:26.319 --> 00:17:27.759
in 2011 with the

00:17:27.759 --> 00:17:30.279
intent of developing it with a similar medical use that we

00:17:30.279 --> 00:17:32.240
're seeing tonight as

00:17:32.240 --> 00:17:35.480
with other razor site plans what was required of them was

00:17:35.480 --> 00:17:36.440
to provide a site

00:17:36.440 --> 00:17:40.319
plan a landscape plan and building elevations at this time

00:17:40.319 --> 00:17:42.119
so the criteria

00:17:42.119 --> 00:17:44.460
for approval for a site plan for razor is that it

00:17:44.460 --> 00:17:46.000
substantially complies with

00:17:46.000 --> 00:17:48.829
the concept and schematic plan that it provides for a

00:17:48.829 --> 00:17:50.319
compatible arrangement of

00:17:50.319 --> 00:17:52.359
buildings and land uses that wouldn't adversely affect

00:17:52.359 --> 00:17:53.559
neighboring properties

00:17:53.559 --> 00:17:56.950
that it provides for safe vehicular circulation and that it

00:17:56.950 --> 00:17:58.599
complies with the

00:17:58.599 --> 00:18:03.579
requirements of the overlay district so looking at their

00:18:03.579 --> 00:18:04.920
site plan you can tell

00:18:04.920 --> 00:18:07.759
they at this point they're developing phase one of what

00:18:07.759 --> 00:18:08.680
would be a larger

00:18:08.680 --> 00:18:10.769
development so at this time we're only looking at the

00:18:10.769 --> 00:18:11.920
southern half of the slot

00:18:11.920 --> 00:18:16.900
so the northern portion will be developed at some future

00:18:16.900 --> 00:18:17.799
time but what

00:18:17.799 --> 00:18:21.099
they're proposing tonight is a 22,000 square foot medical

00:18:21.099 --> 00:18:22.519
office building it

00:18:22.519 --> 00:18:25.180
would include 110 parking spaces which is what's required

00:18:25.180 --> 00:18:26.000
based on the square

00:18:26.000 --> 00:18:29.230
footage and the site would have direct access from

00:18:29.230 --> 00:18:30.759
scripture Street so no no

00:18:30.759 --> 00:18:32.890
direct tie-in to the frontage road all traffic would be

00:18:32.890 --> 00:18:33.680
routed to the site

00:18:33.680 --> 00:18:36.869
through scripture it does have a tie-in to the adjoining

00:18:36.869 --> 00:18:38.000
medical facility and

00:18:38.000 --> 00:18:40.380
then you can see where they've stubbed out to someday

00:18:40.380 --> 00:18:41.599
provide connectivity to

00:18:41.599 --> 00:18:46.039
the northern half of the lot and ultimately to panhandle

00:18:46.039 --> 00:18:48.000
looking at the

00:18:48.000 --> 00:18:52.480
site they have a total of 22% landscaping 20% was is what's

00:18:52.480 --> 00:18:52.920
required by

00:18:52.920 --> 00:18:56.990
the overlay there isn't a specific tree canopy requirement

00:18:56.990 --> 00:18:57.799
for the overall lot

00:18:57.799 --> 00:19:02.160
within the standards the parking lot did have a 22% tree

00:19:02.160 --> 00:19:03.160
canopy and 10%

00:19:03.160 --> 00:19:06.289
landscaping requirements so they have exceeded those as we

00:19:06.289 --> 00:19:07.319
can see here on the

00:19:07.319 --> 00:19:11.579
plan and I wanted to point out just some features you'll

00:19:11.579 --> 00:19:12.440
notice there there are

00:19:12.440 --> 00:19:15.509
no street trees directly provided along I-35 due to the

00:19:15.509 --> 00:19:16.519
amount of utility

00:19:16.519 --> 00:19:19.420
easements in that area they've relocated those in between

00:19:19.420 --> 00:19:20.640
the buildings which the

00:19:20.640 --> 00:19:23.230
flexibility for that is allowed for within the overlay and

00:19:23.230 --> 00:19:24.480
then they do have

00:19:24.480 --> 00:19:28.559
all of the required street trees here along scripture

00:19:28.559 --> 00:19:30.480
looking at the building

00:19:30.480 --> 00:19:34.339
elevations this top area is what would face internal to the

00:19:34.339 --> 00:19:35.720
parking lot this

00:19:35.720 --> 00:19:39.299
would be the side along I-35 and then we have here the two

00:19:39.299 --> 00:19:40.839
side elevations which

00:19:40.839 --> 00:19:44.339
you can see are kind of mirrors of each other so scripture

00:19:44.339 --> 00:19:45.559
and then facing north

00:19:45.559 --> 00:19:48.289
which would ultimately about the other building and the

00:19:48.289 --> 00:19:49.519
building is proposed to

00:19:49.519 --> 00:19:52.920
be built primarily of Texas limestone and ephis materials

00:19:52.920 --> 00:19:54.240
so fairly typical

00:19:54.240 --> 00:19:58.660
and staff is recommending approval of the site plan request

00:19:58.660 --> 00:19:59.839
we found it to be

00:19:59.839 --> 00:20:02.079
compatible with all the requirements of the razor range

00:20:02.079 --> 00:20:03.519
overlay district and I

00:20:03.519 --> 00:20:07.519
can stand for any questions Christian back thank you by

00:20:07.519 --> 00:20:09.279
chair signage

00:20:09.279 --> 00:20:12.380
would they be able to put signs on the back of their

00:20:12.380 --> 00:20:14.680
building that faces 35 and

00:20:14.680 --> 00:20:17.869
if so what would they look like they haven't provided sign

00:20:17.869 --> 00:20:18.680
plans at this time

00:20:18.680 --> 00:20:21.559
all signs are handled as separate permits at the time of

00:20:21.559 --> 00:20:22.519
building permit

00:20:22.519 --> 00:20:25.329
but they would be allowed to have wall signs the exact

00:20:25.329 --> 00:20:26.519
square footage I'm not

00:20:26.519 --> 00:20:30.829
sure off the top of my head but illuminated I'm sorry

00:20:30.829 --> 00:20:31.759
illuminated signs

00:20:31.759 --> 00:20:36.740
are they pliable I believe illumination is permitted okay

00:20:36.740 --> 00:20:37.400
the other thing

00:20:37.400 --> 00:20:41.210
noticing that the only entrance into this is all scripture

00:20:41.210 --> 00:20:42.680
going back to your

00:20:42.680 --> 00:20:46.180
traffic analysis for the Texas oncology which is just right

00:20:46.180 --> 00:20:47.240
down the road did

00:20:47.240 --> 00:20:50.339
was that taking consideration that we were also building

00:20:50.339 --> 00:20:51.480
this unit that was

00:20:51.480 --> 00:20:54.609
going to bring in the I don't believe this site was

00:20:54.609 --> 00:20:56.000
accounted for in the Texas

00:20:56.000 --> 00:20:59.839
oncology numbers that plat started long before this came

00:20:59.839 --> 00:21:01.079
along but there has

00:21:01.079 --> 00:21:03.789
been traffic studies for the overall razor ranch area that

00:21:03.789 --> 00:21:04.559
included all of

00:21:04.559 --> 00:21:07.569
razor ranch so you know all of the necessary improvements

00:21:07.569 --> 00:21:08.519
to the perimeter

00:21:08.519 --> 00:21:14.400
streets and accounted for okay Trish or Sullivan I think is

00:21:14.400 --> 00:21:15.839
it thanks sir chair

00:21:15.839 --> 00:21:19.420
as an add-on to a commissioner back I guess I was a similar

00:21:19.420 --> 00:21:21.319
question is that

00:21:21.319 --> 00:21:26.559
we've got a thousand thirty four vehicle trips on oncology

00:21:26.559 --> 00:21:27.960
coming on to

00:21:27.960 --> 00:21:32.220
scripture and then we have only one plate one entrance and

00:21:32.220 --> 00:21:33.400
exit from this

00:21:33.400 --> 00:21:38.720
location on the scripture and driving on scripture quite

00:21:38.720 --> 00:21:40.720
often for one of a

00:21:40.720 --> 00:21:45.920
reason there's two lanes on the eastbound side and one lane

00:21:45.920 --> 00:21:46.640
coming on to

00:21:46.640 --> 00:21:50.220
the service road which means those two sides are going to

00:21:50.220 --> 00:21:52.200
generate a thousand

00:21:52.200 --> 00:21:55.420
two thousand three thousand cars a day and they're going to

00:21:55.420 --> 00:21:56.279
be going on to a

00:21:56.279 --> 00:22:01.559
one lane street to then get onto the service road to go

00:22:01.559 --> 00:22:03.440
wherever they're

00:22:03.440 --> 00:22:09.359
going to go from there has I mean is there no other I mean

00:22:09.359 --> 00:22:09.839
what's what's

00:22:09.839 --> 00:22:14.650
their other plan to get all those cars out of that area for

00:22:14.650 --> 00:22:15.960
the time being the

00:22:15.960 --> 00:22:18.930
traffic would be on scripture the ultimate goal is that

00:22:18.930 --> 00:22:19.920
they would have a

00:22:19.920 --> 00:22:22.299
you know what like we saw on their site plan they are stub

00:22:22.299 --> 00:22:23.240
bing out to the north

00:22:23.240 --> 00:22:26.819
so eventually this lot will have access via panhandle and

00:22:26.819 --> 00:22:27.920
scripture when the

00:22:27.920 --> 00:22:31.420
northern portion develops at this time this site would have

00:22:31.420 --> 00:22:32.480
the one driveway

00:22:32.480 --> 00:22:35.809
you know somewhere in this area and then they're also

00:22:35.809 --> 00:22:37.519
connecting to this existing

00:22:37.519 --> 00:22:40.039
facility here so there there would be cross connectivity

00:22:40.039 --> 00:22:41.880
between the sites that

00:22:41.880 --> 00:22:44.759
would offer another means in and out of the parking lot if

00:22:44.759 --> 00:22:46.559
that were a concern

00:22:46.559 --> 00:22:50.369
but scripture for the time being would be the only access

00:22:50.369 --> 00:22:51.720
to the site until that

00:22:51.720 --> 00:22:57.180
northern half develops thank you pressure Sanchez you

00:22:57.180 --> 00:22:58.519
mentioned that the

00:22:58.519 --> 00:23:01.630
parking parking is based on the number of the square

00:23:01.630 --> 00:23:03.240
footage is that for a

00:23:03.240 --> 00:23:07.680
medical facility yes okay specific for mad yeah leave a

00:23:07.680 --> 00:23:08.720
parking ratio I believe

00:23:08.720 --> 00:23:11.279
it's a one to two hundred square feet for medical offices

00:23:11.279 --> 00:23:11.960
oh it's what's

00:23:11.960 --> 00:23:16.599
required so they're right at that number

00:23:17.960 --> 00:23:25.759
any other questions for Haley thank you very much

00:23:35.640 --> 00:23:59.599
would be possible to call chair back in item 5a that public

00:23:59.599 --> 00:24:00.400
height that's being

00:24:00.400 --> 00:24:03.420
withdrawn from staff so we won't that'll come back at a

00:24:03.420 --> 00:24:04.039
later time it'll be

00:24:04.039 --> 00:24:16.950
re-advertised the access bank project is withdrawn so that

00:24:16.950 --> 00:24:19.119
we reposted it'll be

00:24:19.119 --> 00:24:24.329
completely reposted renoticed react re-advertised okay

00:24:24.329 --> 00:24:26.759
perfect and just to

00:24:26.759 --> 00:24:29.769
give you there was an issue with I think most most are

00:24:29.769 --> 00:24:31.000
probably aware there was

00:24:31.000 --> 00:24:34.329
an issue with the signposting so as a result that item is

00:24:34.329 --> 00:24:35.559
being withdrawn from

00:24:35.559 --> 00:24:39.559
staff and we'll be requiring them to just re-notice repost

00:24:39.559 --> 00:24:41.279
properly in the

00:24:41.279 --> 00:24:44.490
interim were adjusted some administrative policies with

00:24:44.490 --> 00:24:44.880
respect to

00:24:44.880 --> 00:24:48.089
signposting technically it's not a code requirement but it

00:24:48.089 --> 00:24:49.480
has been a directive

00:24:49.480 --> 00:24:54.640
from City Council so we'll clarify a few items moving

00:24:54.640 --> 00:24:54.640
forward

00:24:55.319 --> 00:24:59.509
Commissioner Ellis thank you vice-chair we don't have to do

00:24:59.509 --> 00:25:00.319
anything though this

00:25:00.319 --> 00:25:05.069
is just going to be pulled from our meeting today but we're

00:25:05.069 --> 00:25:05.519
pulling with

00:25:05.519 --> 00:25:10.230
that we can move on to agenda item 5b chair I give it back

00:25:10.230 --> 00:25:11.519
to you thank you

00:25:11.519 --> 00:25:20.920
that we will move on to 5b and ask for Cindy Jackson for

00:25:20.920 --> 00:25:22.279
presentation thank you

00:25:22.279 --> 00:25:30.279
chairman commissioners c17 - 0 0 3 3 is a request to rezone

00:25:30.279 --> 00:25:33.000
0.3 acres well it's

00:25:33.000 --> 00:25:37.119
not really a rezoning is to assign an initial zoning to 0.3

00:25:37.119 --> 00:25:39.720
acres on to see em

00:25:39.720 --> 00:25:45.460
see mg you can see the site is located here along old Alton

00:25:45.460 --> 00:25:46.680
Road just south of

00:25:46.680 --> 00:25:54.390
Teasley current zoning is already 5x the site was recently

00:25:54.390 --> 00:25:55.640
annexed into the city

00:25:55.640 --> 00:25:59.220
and it's currently got a holding zoning designation of

00:25:59.220 --> 00:26:01.480
already 5x and the

00:26:01.480 --> 00:26:07.359
proposed zoning is CMG which is concurrent with the

00:26:07.359 --> 00:26:09.519
property to the

00:26:09.519 --> 00:26:14.299
north I'd like to mention that this lot the subject lot and

00:26:14.299 --> 00:26:15.279
the property to the

00:26:15.279 --> 00:26:18.289
north are all one lot for some reason they were plotted

00:26:18.289 --> 00:26:19.480
with part in the city

00:26:19.480 --> 00:26:24.759
and part in the county once the app if this is rezoned the

00:26:24.759 --> 00:26:25.759
applicant plans to

00:26:25.759 --> 00:26:29.940
get the site plan approved and construct a vehicle repair

00:26:29.940 --> 00:26:33.119
facility on the site

00:26:34.160 --> 00:26:38.490
the site has a future land use designation of community

00:26:38.490 --> 00:26:40.519
mixed use the

00:26:40.519 --> 00:26:45.500
types and uses the types and scale of uses permitted within

00:26:45.500 --> 00:26:46.599
the CMG district

00:26:46.599 --> 00:26:49.500
conforms to the goals of the community mixed use

00:26:49.500 --> 00:26:52.519
designation the zoning also

00:26:52.519 --> 00:26:56.369
conforms to the industrial commerce area and rural areas

00:26:56.369 --> 00:26:57.960
that is surrounding it

00:26:57.960 --> 00:27:01.490
we've got some moderate residential further up the street

00:27:01.490 --> 00:27:04.279
however this along

00:27:04.279 --> 00:27:12.000
old Alton Road is our site right here the requested CMDG

00:27:12.000 --> 00:27:13.440
district would be a

00:27:13.440 --> 00:27:16.559
continuation of the existing CMG district the use is

00:27:16.559 --> 00:27:18.119
permitted in the CMG

00:27:18.119 --> 00:27:21.130
district would be consistent with the uses that are exist

00:27:21.130 --> 00:27:22.079
in the area today

00:27:22.079 --> 00:27:27.519
which I include vehicle repair which is across the street

00:27:27.519 --> 00:27:29.839
come over here in the

00:27:29.839 --> 00:27:36.279
ETJ offices to the south self storage to the east and some

00:27:36.279 --> 00:27:37.440
institutional uses

00:27:37.440 --> 00:27:43.240
Geier high school as well as a there over here is a

00:27:43.240 --> 00:27:46.039
electrical transformer

00:27:46.039 --> 00:27:53.930
site substation the site will take access from old Alton

00:27:53.930 --> 00:27:55.279
Road currently old

00:27:55.279 --> 00:28:01.690
Alton Road is designated as a future secondary arterial

00:28:01.690 --> 00:28:04.240
roadway Teasley is a

00:28:04.240 --> 00:28:08.509
primary arterial roadway the subject site also has water

00:28:08.509 --> 00:28:09.839
and sewer available

00:28:09.839 --> 00:28:13.450
which you can see from these very thin blue and red lines

00:28:13.450 --> 00:28:14.960
the blue is water and

00:28:14.960 --> 00:28:23.309
the red is sewer staff sent out notifications on March 25th

00:28:23.309 --> 00:28:24.839
we sent out

00:28:24.839 --> 00:28:30.519
five via certified mail and 11 courtesy notices so far we

00:28:30.519 --> 00:28:32.240
have not received any

00:28:32.240 --> 00:28:36.759
response to those notices a sign was posted on the site I

00:28:36.759 --> 00:28:37.759
did verify that

00:28:37.759 --> 00:28:43.549
earlier today staff recommends approval of this request as

00:28:43.549 --> 00:28:45.680
the requested zoning

00:28:45.680 --> 00:28:48.299
is consistent with the goals and objectives of the Denton

00:28:48.299 --> 00:28:49.559
plan 2030 and

00:28:49.559 --> 00:28:53.619
the CMG is compatible with the surrounded property in terms

00:28:53.619 --> 00:28:55.519
of permitted uses that

00:28:55.519 --> 00:29:00.599
concludes my presentation I'll answer any questions

00:29:00.599 --> 00:29:04.180
Commissioner Smith thank you chair whenever we did this we

00:29:04.180 --> 00:29:04.880
proved the

00:29:04.880 --> 00:29:08.859
northern part of this of this plot we proved it back in

00:29:08.859 --> 00:29:10.400
October why wasn't it

00:29:10.400 --> 00:29:13.740
included in the rezoning at that point in time is because

00:29:13.740 --> 00:29:14.319
they only do in the

00:29:14.319 --> 00:29:20.000
city okay we the annexation happened in yesterday it final

00:29:20.000 --> 00:29:29.079
ized yesterday if I

00:29:29.079 --> 00:29:32.130
could just add the annexation we went through altogether I

00:29:32.130 --> 00:29:34.039
think five between

00:29:34.039 --> 00:29:37.680
public hearings public meetings five different meetings for

00:29:37.680 --> 00:29:38.640
a small piece of

00:29:38.640 --> 00:29:42.980
property but exactly those are the rules thank you for your

00:29:42.980 --> 00:29:44.559
hard work it started

00:29:44.559 --> 00:29:51.269
in February cool anything else Commissioner Sanchez on the

00:29:51.269 --> 00:29:51.680
north side

00:29:51.680 --> 00:29:55.490
that's gonna be a garage right there that's what they're

00:29:55.490 --> 00:29:56.640
working on and then

00:29:56.640 --> 00:30:00.700
it's just gonna be an extension yes this is all gonna be

00:30:00.700 --> 00:30:01.200
one side and it's all

00:30:01.200 --> 00:30:06.400
gonna be a garage that's correct which will have access off

00:30:06.400 --> 00:30:07.240
of old Alton right

00:30:07.240 --> 00:30:15.359
about here okay Commissioner Ellis thank you chair so when

00:30:15.359 --> 00:30:16.200
they combine the two

00:30:16.200 --> 00:30:19.619
still only access off old Alton there that's for the whole

00:30:19.619 --> 00:30:21.000
development okay

00:30:21.000 --> 00:30:25.740
thanks this this looks like a lot here but what it actually

00:30:25.740 --> 00:30:26.799
is it's right of

00:30:26.799 --> 00:30:37.599
wife or Teasley Commissioner Beck I just like a publicly

00:30:37.599 --> 00:30:38.920
apologize to the staff

00:30:38.920 --> 00:30:42.019
for sending up a false red flag about the sign on that my

00:30:42.019 --> 00:30:42.940
bad I was looking on

00:30:42.940 --> 00:30:48.150
the wrong side of the road so I sincerely apologize for

00:30:48.150 --> 00:30:49.319
that thank you

00:30:53.519 --> 00:30:58.140
just as a note looks like the current zoning map hasn't

00:30:58.140 --> 00:31:00.000
been updated for the

00:31:00.000 --> 00:31:04.329
site to the north that we've rezoned I think that's on LCMG

00:31:04.329 --> 00:31:05.440
also correct yeah I

00:31:05.440 --> 00:31:07.920
don't think I don't think it has been updated quite yet

00:31:07.920 --> 00:31:10.400
okay any other

00:31:10.400 --> 00:31:17.759
questions for staff on this okay thank you Cindy thank you

00:31:20.920 --> 00:31:28.519
that will move us to Adam see Haley

00:31:51.480 --> 00:31:51.609
so this is a proposed amendment to the DVC to remove

00:31:51.609 --> 00:31:58.680
limitation 34 so the

00:31:58.680 --> 00:32:01.240
request before you as I mentioned is to remove limitation

00:32:01.240 --> 00:32:02.400
34 from sub chapter

00:32:02.400 --> 00:32:06.789
5 our zoning districts and limitations this limitation only

00:32:06.789 --> 00:32:07.839
applies to the

00:32:07.839 --> 00:32:10.680
distribution center warehouse and warehouse retail uses

00:32:10.680 --> 00:32:11.240
within our

00:32:11.240 --> 00:32:11.240
employment center districts so a little bit of background

00:32:11.240 --> 00:32:17.400
this was taken to City

00:32:17.400 --> 00:32:17.400
Council as a work session item and they recommended that we

00:32:17.400 --> 00:32:20.519
bring it forward

00:32:20.519 --> 00:32:25.180
prior to the overall code update so what we're proposing is

00:32:25.180 --> 00:32:26.559
to remove limitation

00:32:26.559 --> 00:32:31.240
34 entirely from the code what limitation 34 states is that

00:32:31.240 --> 00:32:31.440
the

00:32:31.440 --> 00:32:34.400
warehouse and distribution center uses are permitted with

00:32:34.400 --> 00:32:36.279
no more than 150,000

00:32:36.279 --> 00:32:39.089
gross square feet and eight truck docks it further stip

00:32:39.089 --> 00:32:40.259
ulates that all of the

00:32:40.259 --> 00:32:42.289
docks and bays shall be to the rear or side of the

00:32:42.289 --> 00:32:43.519
structure not visible from

00:32:43.519 --> 00:32:46.519
the street and that buffering standards apply to any

00:32:46.519 --> 00:32:47.920
outdoor storage as well as

00:32:47.920 --> 00:32:51.559
the loading docks just to give you a point of reference for

00:32:51.559 --> 00:32:52.880
150,000 square

00:32:52.880 --> 00:32:56.690
feet equates to this is the Walmart at razor ranch it's

00:32:56.690 --> 00:32:58.240
just over that size and

00:32:58.240 --> 00:33:00.680
has six truck docks on it so we're talking about this

00:33:00.680 --> 00:33:01.640
applying to something

00:33:01.640 --> 00:33:06.200
roughly the size of a Walmart or larger just a little bit

00:33:06.200 --> 00:33:07.440
of background so

00:33:07.440 --> 00:33:11.559
limitation 34 has been in the code since it was adopted in

00:33:11.559 --> 00:33:13.920
2002 in 2012 we

00:33:13.920 --> 00:33:17.940
changed some of the warehouse and distribution center type

00:33:17.940 --> 00:33:18.880
uses so prior

00:33:18.880 --> 00:33:21.599
to this we had wholesale storage and distribution and

00:33:21.599 --> 00:33:23.000
distribution centers as

00:33:23.000 --> 00:33:28.000
separate uses and l34 only applied to the wholesale storage

00:33:28.000 --> 00:33:29.160
use within the ECI

00:33:29.160 --> 00:33:33.279
district both of those uses were completely removed in 2012

00:33:33.279 --> 00:33:33.779
and we got

00:33:33.779 --> 00:33:36.589
our current uses which is distribution center slash

00:33:36.589 --> 00:33:37.920
warehouse general and

00:33:37.920 --> 00:33:42.440
warehouse retail and then we extended the applicability of

00:33:42.440 --> 00:33:43.599
limitation 34

00:33:43.599 --> 00:33:46.750
to apply to both of those uses within ECI and then to

00:33:46.750 --> 00:33:48.240
retail warehouses within

00:33:48.240 --> 00:33:54.660
ECC so we did a little bit of internal analysis just to see

00:33:54.660 --> 00:33:55.839
how much property

00:33:55.839 --> 00:34:00.819
this would affect within the ECI zoning district if you run

00:34:00.819 --> 00:34:02.640
just some basic math

00:34:02.640 --> 00:34:04.740
on a site to see what would it take to fit a hundred and

00:34:04.740 --> 00:34:05.680
fifty thousand square

00:34:05.680 --> 00:34:08.949
foot building allowing for parking at a rate of one to one

00:34:08.949 --> 00:34:10.079
thousand and then

00:34:10.079 --> 00:34:12.739
accounting for the lot coverage with an ECI which is a

00:34:12.739 --> 00:34:14.699
maximum of 85% what we

00:34:14.699 --> 00:34:18.630
find is that you need a site that's a minimum of 5.2 acres

00:34:18.630 --> 00:34:19.920
to fit a structure

00:34:19.920 --> 00:34:23.559
that size and adequately provide for parking of it so just

00:34:23.559 --> 00:34:24.480
looking at our map

00:34:24.480 --> 00:34:27.300
all it's a little hard to see but all of the sites that are

00:34:27.300 --> 00:34:27.960
in the black

00:34:27.960 --> 00:34:30.170
outlining with the hatch marks on them are the sites that

00:34:30.170 --> 00:34:31.000
that would actually

00:34:31.000 --> 00:34:34.829
fit so we're not talking about all that much property that

00:34:34.829 --> 00:34:35.679
this would change

00:34:35.679 --> 00:34:38.869
anything for within the ECI district I believe the total

00:34:38.869 --> 00:34:40.400
was just over 400

00:34:40.400 --> 00:34:46.309
acres and it was 23 properties across the city and they're

00:34:46.309 --> 00:34:47.500
running along that

00:34:47.500 --> 00:34:51.139
same thought process within the ECC district to see what

00:34:51.139 --> 00:34:52.239
size of property

00:34:52.239 --> 00:34:55.639
you would have to have to actually be able to fit 150,000

00:34:55.639 --> 00:34:56.920
square feet we found

00:34:56.920 --> 00:35:00.730
your minimum lot size would be 5.5 acres so that applied to

00:35:00.730 --> 00:35:02.199
about 150 acres total

00:35:02.199 --> 00:35:08.309
in the city that was limited to these six properties some

00:35:08.309 --> 00:35:10.079
further considerations

00:35:10.079 --> 00:35:13.010
we did do a comparison of several neighboring cities you

00:35:13.010 --> 00:35:13.880
can see the list

00:35:13.880 --> 00:35:17.460
here we found none of them had anything even remotely

00:35:17.460 --> 00:35:19.519
similar to this that in

00:35:19.519 --> 00:35:22.619
terms of limitations on warehouses or distribution centers

00:35:22.619 --> 00:35:23.519
within McKinney

00:35:23.519 --> 00:35:26.920
within their town center they limit warehouses to 20,000

00:35:26.920 --> 00:35:27.599
square feet other

00:35:27.599 --> 00:35:31.150
than that there are no limitations and then within Carroll

00:35:31.150 --> 00:35:32.360
ton warehouses are

00:35:32.360 --> 00:35:34.909
limited to being an accessory used within their corporate

00:35:34.909 --> 00:35:35.480
commercial

00:35:35.480 --> 00:35:38.630
district which is intended to be more for office office

00:35:38.630 --> 00:35:39.579
campuses but you could

00:35:39.579 --> 00:35:44.079
have an accessory warehouse at those facilities further

00:35:44.079 --> 00:35:45.440
looking at what we're

00:35:45.440 --> 00:35:48.659
permit currently without limitation in our ECC and ECI

00:35:48.659 --> 00:35:49.639
districts light

00:35:49.639 --> 00:35:52.980
manufacturing is permitted by right no limitations on size

00:35:52.980 --> 00:35:53.920
or the number of

00:35:53.920 --> 00:35:56.150
base that you can have at a facility if you're

00:35:56.150 --> 00:35:57.760
manufacturing craft alcohol

00:35:57.760 --> 00:36:00.880
production also permitted by right so if you had a site

00:36:00.880 --> 00:36:01.960
that was actually

00:36:01.960 --> 00:36:04.900
producing alcohol or another product they could have as

00:36:04.900 --> 00:36:06.119
many bays and as much

00:36:06.119 --> 00:36:08.150
square footage as they wanted but if it's solely a

00:36:08.150 --> 00:36:09.039
distribution center

00:36:09.039 --> 00:36:12.409
that's where our limitations would currently apply and just

00:36:12.409 --> 00:36:13.239
in speaking with

00:36:13.239 --> 00:36:16.820
our economic development team they do see a lot of requests

00:36:16.820 --> 00:36:17.679
for property where

00:36:17.679 --> 00:36:20.570
you could put a large warehouse and the average minimum

00:36:20.570 --> 00:36:21.440
size that these

00:36:21.440 --> 00:36:24.320
corporations are looking for is 200 to 300 thousand square

00:36:24.320 --> 00:36:25.639
feet of building so

00:36:25.639 --> 00:36:29.730
currently we limit greatly where those facilities could go

00:36:29.730 --> 00:36:31.639
in the city with all

00:36:31.639 --> 00:36:35.449
that being said staff is recommending removing l34 from all

00:36:35.449 --> 00:36:36.239
of the employment

00:36:36.239 --> 00:36:38.280
center districts as we've discussed here and I'd be happy

00:36:38.280 --> 00:36:39.039
to answer any other

00:36:39.039 --> 00:36:43.619
questions Commissioner Beck thank you chair just to satisfy

00:36:43.619 --> 00:36:44.880
my own curiosity I

00:36:44.880 --> 00:36:48.530
assume Walmart got an exception to the ruling when they

00:36:48.530 --> 00:36:49.400
built that as what a

00:36:49.400 --> 00:36:52.880
part of the razor-range overlay Walmart is actually just

00:36:52.880 --> 00:36:53.960
considered retail so

00:36:53.960 --> 00:36:56.150
this limitation didn't apply I was just using that for a

00:36:56.150 --> 00:36:57.119
size comparison to let

00:36:57.119 --> 00:36:59.500
you know what type of or size of facility that we were

00:36:59.500 --> 00:37:02.679
looking at thanks

00:37:04.960 --> 00:37:13.650
any other questions for Haley okay thank you that will run

00:37:13.650 --> 00:37:16.199
us through our agenda

00:37:16.199 --> 00:37:21.539
for this evening and it will take us to back in our work

00:37:21.539 --> 00:37:23.920
session to receive our

00:37:23.920 --> 00:37:30.980
work session report and I don't know which withers okay

00:37:30.980 --> 00:37:33.840
good evening chair

00:37:33.840 --> 00:37:36.880
commissioners Scott McDonald director of development

00:37:36.880 --> 00:37:38.000
services just want to give

00:37:38.000 --> 00:37:43.760
you a brief update on the development code review committee

00:37:43.760 --> 00:37:45.159
took some action

00:37:45.159 --> 00:37:47.889
at City Council last night there's been a little bit of

00:37:47.889 --> 00:37:48.960
confusion as to the

00:37:48.960 --> 00:37:53.449
makeup and how it is that the the group is going to

00:37:53.449 --> 00:37:56.599
function so through a

00:37:56.599 --> 00:38:00.559
resolution with council the committee is comprised of a

00:38:00.559 --> 00:38:02.039
total of six members

00:38:02.039 --> 00:38:05.619
three members which are council or considered the voting

00:38:05.619 --> 00:38:06.800
members two of

00:38:06.800 --> 00:38:11.090
those council members make a quorum the council members

00:38:11.090 --> 00:38:13.199
will serve as chair vice

00:38:13.199 --> 00:38:17.519
chair three P&Z members are ex officios and part of that

00:38:17.519 --> 00:38:19.440
committee ultimately

00:38:19.440 --> 00:38:23.489
some of that conversation and just as a heads up on this

00:38:23.489 --> 00:38:25.280
that there won't be a

00:38:25.280 --> 00:38:27.969
great deal of voting that will take place this is going to

00:38:27.969 --> 00:38:29.519
be more gathering

00:38:29.519 --> 00:38:35.349
input seeking input from both P&Z and council this

00:38:35.349 --> 00:38:37.639
committee also will have a

00:38:37.639 --> 00:38:43.809
sunset date of December of 2018 and council has the option

00:38:43.809 --> 00:38:45.559
of of course

00:38:45.559 --> 00:38:50.769
changing that but that's that's the way that the resolution

00:38:50.769 --> 00:38:52.280
is set it is also

00:38:52.280 --> 00:38:57.489
the intent that staff will come back before this group and

00:38:57.489 --> 00:38:59.480
report what status

00:38:59.480 --> 00:39:03.639
were the were the committee the work group is steps that

00:39:03.639 --> 00:39:04.519
have been achieved

00:39:04.519 --> 00:39:09.519
and and kind of address what the committee's concerns are

00:39:09.519 --> 00:39:10.440
it is our intent

00:39:10.440 --> 00:39:17.360
to walk through our we have the as you know three modules

00:39:17.360 --> 00:39:18.880
and we'll be

00:39:18.880 --> 00:39:22.050
presenting before this group next week with module three

00:39:22.050 --> 00:39:23.320
which are their final

00:39:23.320 --> 00:39:26.199
sub chapters but the subcommittee is going to be walking

00:39:26.199 --> 00:39:27.199
through it as if it

00:39:27.199 --> 00:39:31.469
is the development code beginning with sub chapter one and

00:39:31.469 --> 00:39:32.519
then we'll just work

00:39:32.519 --> 00:39:36.480
through at a pace that's comfortable for the subcommittee

00:39:36.480 --> 00:39:38.079
and if you have any

00:39:38.079 --> 00:39:40.630
questions as far as organizational Ron is going to bring

00:39:40.630 --> 00:39:41.599
you just a little bit

00:39:41.599 --> 00:39:44.309
of an update of it and kind of where we're at and where we

00:39:44.309 --> 00:39:46.000
're going the next

00:39:46.000 --> 00:39:50.550
meeting is on next Wednesday for the subcommittee and that

00:39:50.550 --> 00:39:51.400
will be an

00:39:51.400 --> 00:39:54.630
organizational meeting where it is that will set the chair

00:39:54.630 --> 00:39:57.239
vice chair capture

00:39:57.239 --> 00:40:01.119
the minutes from previous meetings and ultimately work on

00:40:01.119 --> 00:40:02.440
really those goals

00:40:02.440 --> 00:40:05.699
and it'll be an overview while clearing is here of the

00:40:05.699 --> 00:40:07.199
contents of module three

00:40:07.199 --> 00:40:10.639
and answer any questions that they have

00:40:10.719 --> 00:40:15.929
Commissioner Roselle thank you with with some of the

00:40:15.929 --> 00:40:17.280
committee members rolling

00:40:17.280 --> 00:40:19.360
off council do you have an update of what three council

00:40:19.360 --> 00:40:20.159
members are on that

00:40:20.159 --> 00:40:23.869
committee thank you yes I intended to to bring that as well

00:40:23.869 --> 00:40:26.360
so councilperson

00:40:26.360 --> 00:40:30.849
Sarah Baguier ultimately is coming off and council

00:40:30.849 --> 00:40:34.039
appointed mayor Watts to to

00:40:34.039 --> 00:40:39.239
be that third member so the members then in turn will be Ke

00:40:39.239 --> 00:40:43.039
ely Briggs John

00:40:43.039 --> 00:40:49.800
Ryan thank you and Chris Watts thank you

00:40:52.679 --> 00:40:56.599
Commissioner Ellis thank you chair Scott I know this the

00:40:56.599 --> 00:40:57.400
draft resolution

00:40:57.400 --> 00:41:00.769
changed because I read it and then it was different this

00:41:00.769 --> 00:41:01.960
morning so can you

00:41:01.960 --> 00:41:04.170
walk me through that discussion I'm just trying to figure

00:41:04.170 --> 00:41:05.039
out exactly what our

00:41:05.039 --> 00:41:08.920
role is now just because at one point it was going to be a

00:41:08.920 --> 00:41:09.920
six-person committee

00:41:09.920 --> 00:41:14.159
and it kind of still is sort of not really because you got

00:41:14.159 --> 00:41:15.039
a quorum really

00:41:15.039 --> 00:41:17.880
with two of three council people so will you just walk me

00:41:17.880 --> 00:41:19.079
through that a little

00:41:19.079 --> 00:41:24.289
bit yes and ultimately discuss this in work session and

00:41:24.289 --> 00:41:26.480
there was some some

00:41:26.480 --> 00:41:30.360
dialogue that went back and forth with council and it was

00:41:30.360 --> 00:41:31.920
councils intent that

00:41:31.920 --> 00:41:37.119
because the original committee that was created and I don't

00:41:37.119 --> 00:41:38.199
recall what year was

00:41:38.199 --> 00:41:41.440
three council persons and they wanted to keep it in that in

00:41:41.440 --> 00:41:42.960
that context but they

00:41:42.960 --> 00:41:48.170
also did value the input of P&Z so it was important to keep

00:41:48.170 --> 00:41:48.880
the three members

00:41:48.880 --> 00:41:53.300
the resolution then just makes that committee a committee

00:41:53.300 --> 00:41:54.440
of six which is

00:41:54.440 --> 00:41:58.250
three of the council three of the P&Z P&Z acting in an ex

00:41:58.250 --> 00:41:59.639
officio capacity I

00:41:59.639 --> 00:42:03.460
can tell you for me personally that it is my intent that

00:42:03.460 --> 00:42:05.079
really it's the voices

00:42:05.079 --> 00:42:08.150
that I hear in the differing opinions as to how it is that

00:42:08.150 --> 00:42:09.360
we move forward and

00:42:09.360 --> 00:42:12.469
what we do with that ultimately council has the final

00:42:12.469 --> 00:42:14.159
decision on how it is that

00:42:14.159 --> 00:42:17.969
we adopt and what we adopt and I and I really don't think

00:42:17.969 --> 00:42:19.159
that there will be

00:42:19.159 --> 00:42:22.630
too many opportunities that we're really gonna have to vote

00:42:22.630 --> 00:42:23.440
really it's gonna be

00:42:23.440 --> 00:42:26.829
a recommendation of the committee to move what we're

00:42:26.829 --> 00:42:28.519
proposing forward if that

00:42:28.519 --> 00:42:33.369
helps what does but what we're proposing for will be voted

00:42:33.369 --> 00:42:34.539
on by the three

00:42:34.539 --> 00:42:38.679
council people correct if if a vote is necessary that would

00:42:38.679 --> 00:42:39.920
be how the voting

00:42:39.920 --> 00:42:43.309
would take place would ultimately be the three council

00:42:43.309 --> 00:42:46.719
people correct right okay

00:42:48.840 --> 00:42:51.730
only question I would have on the the meetings that you're

00:42:51.730 --> 00:42:53.320
talking about are

00:42:53.320 --> 00:42:57.659
those televised or live stream where we can watch those or

00:42:57.659 --> 00:42:58.719
do you have to

00:42:58.719 --> 00:43:01.300
actually come and attend them you'd have to come and attend

00:43:01.300 --> 00:43:02.679
them they're they're

00:43:02.679 --> 00:43:06.250
open to the public of course they're posted and I think we

00:43:06.250 --> 00:43:07.760
'll have a regular a

00:43:07.760 --> 00:43:12.760
regularly scheduled time that that we're gonna work to do

00:43:12.760 --> 00:43:15.559
day and time okay

00:43:17.039 --> 00:43:19.900
and you know then Ron will give you a brief update of where

00:43:19.900 --> 00:43:21.000
we're at and where

00:43:21.000 --> 00:43:25.239
we're going okay thank you Scott thank you

00:43:27.840 --> 00:43:30.309
thank you chair members of the Commission I'll try to make

00:43:30.309 --> 00:43:31.320
it brief our

00:43:31.320 --> 00:43:36.719
meeting last Friday was two hours so I don't plan on taking

00:43:36.719 --> 00:43:38.719
two hours but we'll

00:43:38.719 --> 00:43:44.679
go through this really quickly my presentation real quick

00:43:52.880 --> 00:43:56.880
so as Scott said we met with the Advisory Committee there's

00:43:56.880 --> 00:43:57.400
really high

00:43:57.400 --> 00:44:00.699
level went over the purpose of the DEN development code

00:44:00.699 --> 00:44:02.000
update of course our

00:44:02.000 --> 00:44:05.360
DEN plan 2030 to be consistent with that but also

00:44:05.360 --> 00:44:06.719
consistent with the vision of

00:44:06.719 --> 00:44:11.079
the DEN plan 2030 we are looking at updating our code not

00:44:11.079 --> 00:44:12.800
only in the the

00:44:12.800 --> 00:44:18.010
zoning districts but also the development standards as well

00:44:18.010 --> 00:44:18.920
the

00:44:18.920 --> 00:44:22.730
chapters that we will get into a little more into detail

00:44:22.730 --> 00:44:24.679
later are here shown

00:44:24.679 --> 00:44:29.230
here they are eight total sub chapters we're going from 24

00:44:29.230 --> 00:44:31.320
to 8 again we we

00:44:31.320 --> 00:44:35.590
went through with Clary on last the 28 that is with

00:44:35.590 --> 00:44:38.079
chapters 1 & 2 we will go

00:44:38.079 --> 00:44:45.519
through 6 7 & 8 next Wednesday I won't go through each one

00:44:45.519 --> 00:44:46.519
of this but again

00:44:46.519 --> 00:44:49.730
sub chapter 1 is general provisions sub chapter 2 is

00:44:49.730 --> 00:44:50.760
administration and

00:44:50.760 --> 00:44:55.090
procedures and again you heard that again from Clary on a

00:44:55.090 --> 00:44:56.480
couple weeks ago

00:44:56.559 --> 00:45:01.139
sub chapter 3 our zoning district and sub chapter 4 overlay

00:45:01.139 --> 00:45:02.440
districts is

00:45:02.440 --> 00:45:05.780
important these are important sub chapters this is where we

00:45:05.780 --> 00:45:06.639
see a lot of

00:45:06.639 --> 00:45:11.130
our zoning cases come through and this is where everything

00:45:11.130 --> 00:45:12.480
is put in for

00:45:12.480 --> 00:45:18.239
example the sub chapter 3 we are going from 28 I'm sorry

00:45:18.239 --> 00:45:19.920
yes 28 zoning

00:45:19.920 --> 00:45:23.730
districts currently down to 14 so there's going to be a lot

00:45:23.730 --> 00:45:24.679
of consolidation

00:45:24.679 --> 00:45:31.050
elimination revised and also new zoning districts as well

00:45:31.050 --> 00:45:32.480
included in that sub

00:45:32.480 --> 00:45:36.480
chapters are dimensional standards the maximum height

00:45:36.480 --> 00:45:39.039
maximum lot coverage the

00:45:39.039 --> 00:45:44.250
minimum setbacks and minimum lot area sub chapter 4 will

00:45:44.250 --> 00:45:45.800
contain our overlay

00:45:45.800 --> 00:45:48.900
and historic districts none of those will change they will

00:45:48.900 --> 00:45:50.320
carry forward and move

00:45:50.320 --> 00:45:56.800
over to this sub chapter sub chapter 5 is our use

00:45:56.800 --> 00:45:58.760
regulations this is where we

00:45:58.760 --> 00:46:01.949
look at what uses are permitted in each zoning district it

00:46:01.949 --> 00:46:03.880
will advise us as to

00:46:03.880 --> 00:46:09.090
if it's permitted by right by SUP or permitted by a use

00:46:09.090 --> 00:46:11.440
specific standard now

00:46:11.440 --> 00:46:14.940
you specific standard is it's basically our limitations so

00:46:14.940 --> 00:46:15.800
what you see is

00:46:15.800 --> 00:46:19.199
limitations they're just renaming it as you specific

00:46:19.199 --> 00:46:21.880
standards one big thing

00:46:21.880 --> 00:46:27.090
that is not included in this sub chapter moving forward the

00:46:27.090 --> 00:46:28.719
mixed use residential

00:46:28.719 --> 00:46:31.900
overlay protection will no longer be included in that and

00:46:31.900 --> 00:46:32.920
the hope is that

00:46:32.920 --> 00:46:35.650
the development standards as proposed will address

00:46:35.650 --> 00:46:38.440
compatibility moving forward

00:46:38.440 --> 00:46:42.449
included in this sub chapter are our accessory uses and

00:46:42.449 --> 00:46:44.159
structures temporary

00:46:44.159 --> 00:46:50.059
uses our wireless telecommunication and gas well standards

00:46:50.059 --> 00:46:53.599
as well some of those

00:46:53.599 --> 00:46:57.860
are ready sub chapter 6 is our development standards this

00:46:57.860 --> 00:46:58.599
is the the

00:46:58.599 --> 00:47:02.179
largest sub chapter it contains a number of sections that

00:47:02.179 --> 00:47:02.960
are currently

00:47:02.960 --> 00:47:06.309
different sub chapters in our current code as you can see

00:47:06.309 --> 00:47:08.079
here this is what it

00:47:08.079 --> 00:47:11.269
will include from land disturbing activities only through

00:47:11.269 --> 00:47:11.760
parking

00:47:11.760 --> 00:47:15.579
buildings and site design down to water and wastewater

00:47:15.579 --> 00:47:21.039
standards sub chapter 7

00:47:21.039 --> 00:47:23.880
is our subdivision regulations and that includes our plat

00:47:23.880 --> 00:47:24.880
ting requirements

00:47:24.880 --> 00:47:30.079
public improvements requirements more on how subdivisions

00:47:30.079 --> 00:47:32.559
are handled and yes

00:47:32.559 --> 00:47:37.199
that's true definitions we know a definition this is

00:47:37.199 --> 00:47:37.719
important right

00:47:37.719 --> 00:47:40.349
because a lot of times we want to make sure we understand

00:47:40.349 --> 00:47:41.239
what the use is or

00:47:41.239 --> 00:47:45.139
what the term is and that's where the sub chapter 8 will

00:47:45.139 --> 00:47:46.360
contain all of our

00:47:46.360 --> 00:47:52.039
definitions so that being said we've got a lot to bring

00:47:52.039 --> 00:47:54.400
forward all of the public

00:47:54.400 --> 00:47:58.659
drafts are online as we speak that's all of those sub

00:47:58.659 --> 00:48:00.460
chapters 1 through 8 so

00:48:00.460 --> 00:48:05.019
anybody that's watching please go to den code 2030 comm you

00:48:05.019 --> 00:48:05.800
can view those

00:48:05.800 --> 00:48:09.869
sub chapters and you can make comments online you can also

00:48:09.869 --> 00:48:11.239
call or provide us

00:48:11.239 --> 00:48:14.429
an email or send us an email that is with any comments

00:48:14.429 --> 00:48:16.440
moving forward we've

00:48:16.440 --> 00:48:21.650
already gone through the module 1 we've done module 2 last

00:48:21.650 --> 00:48:23.039
month we are going to

00:48:23.039 --> 00:48:26.429
be doing module 3 next week we see here this is the

00:48:26.429 --> 00:48:28.679
schedule as clarion will be

00:48:28.679 --> 00:48:32.199
visiting us next week we will start with a work session

00:48:32.199 --> 00:48:33.480
with council and go

00:48:33.480 --> 00:48:37.599
through these meetings and end it with a public open house

00:48:37.599 --> 00:48:39.119
which will be held on

00:48:39.119 --> 00:48:44.699
Wednesday from 6 to 8 at the den that should say Civic

00:48:44.699 --> 00:48:45.840
Center I should change

00:48:45.840 --> 00:48:50.820
that that's Civic Center on April 10th which was yesterday

00:48:50.820 --> 00:48:52.400
our zoning map went

00:48:52.400 --> 00:48:58.440
online as well so our proposed only map was that is drafted

00:48:58.440 --> 00:48:59.559
was put online so

00:48:59.559 --> 00:49:03.429
those folks that are able to can also view that zoning map

00:49:03.429 --> 00:49:05.159
on our website den

00:49:05.159 --> 00:49:11.679
code 2030 comm to help answer questions and address any

00:49:11.679 --> 00:49:13.659
concerns or issues we

00:49:13.659 --> 00:49:17.889
have put together a series of public open houses that you

00:49:17.889 --> 00:49:20.039
see here the first

00:49:20.039 --> 00:49:23.909
one will start on April 23rd at the Fred Moore High School

00:49:23.909 --> 00:49:25.260
from 6 to 8 we will

00:49:25.260 --> 00:49:29.670
have staff available to answer questions we've got we had a

00:49:29.670 --> 00:49:31.679
total of seven the

00:49:31.679 --> 00:49:36.000
committee suggested that we add more at any public

00:49:36.000 --> 00:49:38.199
libraries to assist or to

00:49:38.199 --> 00:49:41.530
provide those that are able to go to a library through

00:49:41.530 --> 00:49:43.199
public transit it's a

00:49:43.199 --> 00:49:47.090
more of a central or public place that they can make it to

00:49:47.090 --> 00:49:48.480
so we are proposing

00:49:48.480 --> 00:49:52.059
three additional workshops or a public open space open

00:49:52.059 --> 00:49:54.199
houses that is at the

00:49:54.199 --> 00:49:57.690
three libraries that we have again those dates have not yet

00:49:57.690 --> 00:49:58.920
been determined but

00:49:58.920 --> 00:50:02.519
we will schedule those as soon as possible and post it

00:50:02.519 --> 00:50:04.119
online as well

00:50:04.119 --> 00:50:09.889
these dates also were included in a postcard that was sent

00:50:09.889 --> 00:50:11.000
out I believe it

00:50:11.000 --> 00:50:14.949
was last week so every property owner should have received

00:50:14.949 --> 00:50:16.079
a postcard with

00:50:16.079 --> 00:50:20.179
these public open house dates and times so if they didn't

00:50:20.179 --> 00:50:21.199
catch it here

00:50:21.199 --> 00:50:24.780
hopefully they will catch it when they get their postcard

00:50:24.780 --> 00:50:25.880
in their mail they

00:50:25.880 --> 00:50:31.690
should have received it by either today or tomorrow there's

00:50:31.690 --> 00:50:33.119
a postcard I failed

00:50:33.119 --> 00:50:35.489
to notice that that was the next slide so this is the post

00:50:35.489 --> 00:50:36.360
card that went out

00:50:36.360 --> 00:50:39.550
and as you can see hard to see maybe on my screen but the

00:50:39.550 --> 00:50:41.000
the dates that I just

00:50:41.000 --> 00:50:46.210
went over the seven are included with the the postcard

00:50:46.210 --> 00:50:47.440
again we are trying to

00:50:47.440 --> 00:50:50.840
direct post folks to the website again a lot of information

00:50:50.840 --> 00:50:51.920
is on the website

00:50:51.920 --> 00:50:58.349
including the zoning map so again denco 2030 comm so we we

00:50:58.349 --> 00:50:59.400
send those to

00:50:59.400 --> 00:51:02.699
property owners but we also know that citizens residents

00:51:02.699 --> 00:51:03.679
that don't own

00:51:03.679 --> 00:51:07.110
property are also interested so we are trying to make sure

00:51:07.110 --> 00:51:08.119
that we get them

00:51:08.119 --> 00:51:12.090
involved and engaged with this process these are the list

00:51:12.090 --> 00:51:13.360
that you see up here

00:51:13.360 --> 00:51:17.750
our our communication plan to get the word out we we also

00:51:17.750 --> 00:51:18.920
rely on the planning

00:51:18.920 --> 00:51:21.250
zoning Commission to help spread that word so any

00:51:21.250 --> 00:51:22.599
information that you can or

00:51:22.599 --> 00:51:26.940
any feedback or any ways that we can do better please let

00:51:26.940 --> 00:51:28.480
us know but we also

00:51:28.480 --> 00:51:31.659
encourage you to help spread that word about what's going

00:51:31.659 --> 00:51:32.880
on with the den code

00:51:32.880 --> 00:51:38.280
update we have a dedicated website I probably said it three

00:51:38.280 --> 00:51:39.440
times already but

00:51:39.440 --> 00:51:45.579
den code 2030 comm is where everything is being put in we

00:51:45.579 --> 00:51:47.320
've got links to all

00:51:47.320 --> 00:51:51.420
of the sub chapters as well as the zoning map and any other

00:51:51.420 --> 00:51:52.280
information

00:51:52.280 --> 00:51:59.329
that is relevant to this process when we're at the public

00:51:59.329 --> 00:52:01.000
open houses we hope

00:52:01.000 --> 00:52:04.030
that there are a lot of people there that have questions we

00:52:04.030 --> 00:52:04.880
hopefully can

00:52:04.880 --> 00:52:09.239
answer them but if we cannot we will take their comments

00:52:09.239 --> 00:52:10.639
write it down and

00:52:10.639 --> 00:52:15.849
document it and so when we start to revise our draft we we

00:52:15.849 --> 00:52:17.159
can refer back

00:52:17.159 --> 00:52:20.969
to these common cards so at those public open houses we'll

00:52:20.969 --> 00:52:22.119
have a fair number of

00:52:22.119 --> 00:52:25.059
these comic cards available so that people can fill out and

00:52:25.059 --> 00:52:25.840
make sure that

00:52:25.840 --> 00:52:35.320
they provide it back to us so this next few slides is

00:52:35.320 --> 00:52:37.639
regarding the zoning map

00:52:37.639 --> 00:52:42.500
update I can go through it it's a fairly lengthy discussion

00:52:42.500 --> 00:52:43.760
I don't know chair if

00:52:43.760 --> 00:52:48.159
you want to take a break there's food available and then we

00:52:48.159 --> 00:52:48.760
can go through this

00:52:48.760 --> 00:52:52.260
so we don't have to break the presentation that's up to y'

00:52:52.260 --> 00:52:52.960
all it'd be

00:52:52.960 --> 00:52:58.050
a great suggestion so why don't we call a recess at 553 and

00:52:58.050 --> 00:52:59.159
we'll try to get back by 6.

00:52:59.159 --> 00:53:15.880
Going to reopen our work session at 6.01 and let Ron go

00:53:15.880 --> 00:53:16.840
ahead and continue

00:53:16.840 --> 00:53:20.480
this presentation. Great thank you chair members of the

00:53:20.480 --> 00:53:22.280
commission I felt you

00:53:22.280 --> 00:53:26.809
emphasize this one important change that's being proposed

00:53:26.809 --> 00:53:28.079
with the den code

00:53:28.079 --> 00:53:32.340
update and that with the new 14 zoning districts I

00:53:32.340 --> 00:53:33.480
mentioned that we have

00:53:33.480 --> 00:53:41.440
minimum lot areas minimum setbacks we also have maximum

00:53:41.440 --> 00:53:42.800
maximum heights and

00:53:42.800 --> 00:53:47.159
maximum lock coverage that being said the proposal is we

00:53:47.159 --> 00:53:48.440
will no longer as

00:53:48.440 --> 00:53:52.360
proposed have any density requirements so there will be no

00:53:52.360 --> 00:53:55.119
density so you're for

00:53:55.119 --> 00:53:58.409
example in our four four units per acre none of that it

00:53:58.409 --> 00:53:59.599
will be based on the

00:53:59.599 --> 00:54:03.519
development regulations parking lot coverage landscaping

00:54:03.519 --> 00:54:06.519
that will set the

00:54:06.519 --> 00:54:10.329
development for that property so I hope that I know that

00:54:10.329 --> 00:54:11.420
was a big one for me

00:54:11.420 --> 00:54:16.630
too so I wanted to make sure that I got that through.

00:54:16.630 --> 00:54:17.559
Commissioner back. Thank you

00:54:17.559 --> 00:54:20.469
chair. I appreciate you mentioned it Ron I'd encourage Ron

00:54:20.469 --> 00:54:21.119
to bring that out

00:54:21.119 --> 00:54:24.719
because that was kind of a scary thing for us I think the

00:54:24.719 --> 00:54:25.719
concern was by

00:54:25.719 --> 00:54:29.949
removing that limitation there we've got to rely on lot

00:54:29.949 --> 00:54:31.840
coverage and and building

00:54:31.840 --> 00:54:34.260
height stuff like that so the concern was you know could

00:54:34.260 --> 00:54:35.239
they build them higher

00:54:35.239 --> 00:54:38.260
and put more in there because it could build them higher so

00:54:38.260 --> 00:54:38.960
that's just

00:54:38.960 --> 00:54:43.789
something you know we need to as a commission need to kind

00:54:43.789 --> 00:54:44.559
of watch as we

00:54:44.559 --> 00:54:47.380
move along there that one that one I think bothered a

00:54:47.380 --> 00:54:48.880
couple people. That was

00:54:48.880 --> 00:54:53.079
a big one so I apologize I went through that I didn't mean

00:54:53.079 --> 00:54:54.280
to but I want to

00:54:54.280 --> 00:54:58.760
make sure that that was clear that we are proposing as it

00:54:58.760 --> 00:55:01.239
is no density

00:55:01.239 --> 00:55:08.690
maximums or requirements. Ron if I could just add one one

00:55:08.690 --> 00:55:11.199
notion within the each

00:55:11.199 --> 00:55:14.780
zoning new zoning district there are you know there are the

00:55:14.780 --> 00:55:15.639
standards the setback

00:55:15.639 --> 00:55:19.280
requirements we are looking at adjusting some some of those

00:55:19.280 --> 00:55:20.440
where some might be a

00:55:20.440 --> 00:55:26.199
six foot side setback they may be reduced to five given the

00:55:26.199 --> 00:55:27.440
majority of

00:55:27.440 --> 00:55:31.360
the NR4 lots that we have now and so I just wanted to point

00:55:31.360 --> 00:55:32.039
that out because we

00:55:32.039 --> 00:55:35.829
haven't we haven't adjusted that yet from from module one

00:55:35.829 --> 00:55:36.960
so that'll be taken

00:55:36.960 --> 00:55:39.460
care of after module three when we do the complete draft so

00:55:39.460 --> 00:55:40.199
just wanted to

00:55:40.199 --> 00:55:42.820
point that out in case somebody sees that and thinks that

00:55:42.820 --> 00:55:43.760
their property now

00:55:43.760 --> 00:55:47.250
will be non-conforming we we're still looking at adjusting

00:55:47.250 --> 00:55:48.840
that. When will that

00:55:48.840 --> 00:55:51.320
adjustment come out you say? With the public draft of the

00:55:51.320 --> 00:55:53.880
entire code. That's set for

00:55:53.880 --> 00:55:58.280
June, July so as soon as we get comments from these sets of

00:55:58.280 --> 00:55:59.800
public drafts the

00:55:59.800 --> 00:56:02.760
consultants will go back and make necessary revisions and

00:56:02.760 --> 00:56:03.599
then bring back

00:56:03.599 --> 00:56:06.840
a draft that we can present back to the Commission and to

00:56:06.840 --> 00:56:07.800
the rest of the

00:56:07.800 --> 00:56:13.239
public. Thank you. Again yeah just to add to what Richard

00:56:13.239 --> 00:56:14.599
said in addition to those

00:56:14.599 --> 00:56:19.809
zoning dimensional standards also the use standards or use

00:56:19.809 --> 00:56:20.639
table we're also

00:56:20.639 --> 00:56:22.969
looking at updating as well so there there will be some

00:56:22.969 --> 00:56:23.639
changes and we

00:56:23.639 --> 00:56:27.659
anticipate additional input as we get through this process

00:56:27.659 --> 00:56:28.679
so a lot of a lot

00:56:28.679 --> 00:56:32.480
of input a lot of revisions but hopefully we can get to

00:56:32.480 --> 00:56:33.880
approve of a

00:56:33.880 --> 00:56:39.159
development code update. Okay so next important topic is

00:56:39.159 --> 00:56:41.639
zoning. Zoning map.

00:56:41.639 --> 00:56:46.920
The zoning map as you know we has to be updated because we

00:56:46.920 --> 00:56:48.599
have new zoning

00:56:48.599 --> 00:56:53.309
districts we're going from 28 to 14 and those 14 don't

00:56:53.309 --> 00:56:54.880
share the same name or

00:56:54.880 --> 00:56:58.840
the same you know some of them don't share the same

00:56:58.840 --> 00:57:00.519
intensity or density so

00:57:00.519 --> 00:57:03.079
there are going to be some properties that are going to be

00:57:03.079 --> 00:57:04.000
changed our hope is

00:57:04.000 --> 00:57:07.800
that we can just convert convert that is those zoning

00:57:07.800 --> 00:57:09.199
districts that we have now

00:57:09.199 --> 00:57:14.389
to a zoning district that is being proposed and I've got a

00:57:14.389 --> 00:57:15.280
table or a chart

00:57:15.280 --> 00:57:19.260
that shows how that's going to be done but we've went

00:57:19.260 --> 00:57:21.039
through the a process

00:57:21.039 --> 00:57:23.489
it's it's not it wasn't a simple process but I want to make

00:57:23.489 --> 00:57:24.800
sure that you all

00:57:24.800 --> 00:57:28.320
understand it it is still a draft in that we're going to

00:57:28.320 --> 00:57:29.440
need to update it but

00:57:29.440 --> 00:57:34.230
this is our first brush of trying to make a zoning map out

00:57:34.230 --> 00:57:35.760
of the new zoning

00:57:35.760 --> 00:57:39.340
district so I won't go through this list because I've got a

00:57:39.340 --> 00:57:40.440
slide for each of

00:57:40.440 --> 00:57:45.389
these criteria a total of 16 so I'll go ahead and start

00:57:45.389 --> 00:57:46.480
with the first one of

00:57:46.480 --> 00:57:49.780
course we started off with the DIM plan 2030 looked at the

00:57:49.780 --> 00:57:50.639
goals and object

00:57:50.639 --> 00:57:55.159
objectives as it relates to a lane use and zoning the big

00:57:55.159 --> 00:57:55.960
one there is our

00:57:55.960 --> 00:57:58.960
community vision statement we we want to make sure that

00:57:58.960 --> 00:58:00.079
that's the focus that's

00:58:00.079 --> 00:58:03.480
what the citizens approved back in 2015 and we want to make

00:58:03.480 --> 00:58:04.599
sure it's consistent

00:58:04.599 --> 00:58:12.139
with the vision of the city after the the the vision and

00:58:12.139 --> 00:58:13.639
the the goals and

00:58:13.639 --> 00:58:16.760
objectives we looked at the future land use map that you

00:58:16.760 --> 00:58:18.440
see here and you often

00:58:18.440 --> 00:58:22.440
hear from us from staff these future land use designations

00:58:22.440 --> 00:58:23.519
from rural areas

00:58:23.519 --> 00:58:27.099
down to business innovation all the way through you know

00:58:27.099 --> 00:58:28.039
neighborhood

00:58:28.039 --> 00:58:32.619
compatibility areas these are the future land use design

00:58:32.619 --> 00:58:34.599
ations as shown on our

00:58:34.599 --> 00:58:38.480
future land use map so here's the chart that I was

00:58:38.480 --> 00:58:41.360
referring to earlier on the

00:58:41.360 --> 00:58:45.730
left is the future land use designation in our DIM plan

00:58:45.730 --> 00:58:49.719
2030 to the right is

00:58:49.719 --> 00:58:53.619
the the middle column is the current zoning districts and

00:58:53.619 --> 00:58:54.840
this is how we see

00:58:54.840 --> 00:58:58.840
these zoning districts where they fall under that specific

00:58:58.840 --> 00:59:00.159
future land use

00:59:00.159 --> 00:59:05.369
designation so for example in our one would be considered

00:59:05.369 --> 00:59:07.440
low residential the

00:59:07.440 --> 00:59:15.320
NR 2346 is moderate residential and so on and so forth the

00:59:15.320 --> 00:59:17.039
farthest right column

00:59:17.039 --> 00:59:20.429
is our proposed zoning district that is the 14 zoning

00:59:20.429 --> 00:59:21.639
districts that I was

00:59:21.639 --> 00:59:26.889
referring to this is how we see them being converted from

00:59:26.889 --> 00:59:28.440
not only the

00:59:28.440 --> 00:59:31.539
current zoning district but from the future land use

00:59:31.539 --> 00:59:32.880
designation so I'm gonna

00:59:32.880 --> 00:59:35.900
keep this up here for a little bit and ask if anybody has

00:59:35.900 --> 00:59:37.800
any questions with

00:59:37.800 --> 00:59:41.610
this chart and I apologize none of this was provided in

00:59:41.610 --> 00:59:43.239
advance but wanted just

00:59:43.239 --> 00:59:47.050
to give y'all some time since we have time to go over the

00:59:47.050 --> 00:59:48.079
process of our

00:59:48.079 --> 00:59:57.280
update of our zoning map so the next step was we had this

00:59:57.280 --> 01:00:00.599
methodology of not

01:00:00.599 --> 01:00:06.599
not splitting parcel we purposely left parcels the way they

01:00:06.599 --> 01:00:07.679
are we didn't want

01:00:07.679 --> 01:00:13.260
to zone a property half one zoning and half the other so if

01:00:13.260 --> 01:00:14.880
you see a parcel

01:00:14.880 --> 01:00:20.199
that extends long from from here to here this probably

01:00:20.199 --> 01:00:23.039
should be zone geo general

01:00:23.039 --> 01:00:26.519
office but because we didn't want to split parcels we left

01:00:26.519 --> 01:00:27.320
it alone because

01:00:27.320 --> 01:00:30.960
we felt that that would cause even more confusion or more

01:00:30.960 --> 01:00:32.320
issues in the future

01:00:32.320 --> 01:00:37.880
so we left it based on parcels moving forward Ron question

01:00:37.880 --> 01:00:39.519
for on that yes sir

01:00:39.519 --> 01:00:44.730
if you have on a on a current parcel split zoning did you

01:00:44.730 --> 01:00:47.400
go with the more

01:00:47.400 --> 01:00:51.090
dense or the higher zoning rather than down zoning them for

01:00:51.090 --> 01:00:52.000
a lot of those

01:00:52.000 --> 01:00:55.809
chair there the ones I recall are primarily around the

01:00:55.809 --> 01:00:56.920
downtown or around

01:00:56.920 --> 01:01:00.920
the the University because we're limited we're limiting the

01:01:00.920 --> 01:01:01.559
amount of zoning

01:01:01.559 --> 01:01:05.539
districts that automatically was zone whatever the zoning

01:01:05.539 --> 01:01:07.119
that was closest to

01:01:07.119 --> 01:01:10.510
the area so so to the to your answer to answer your

01:01:10.510 --> 01:01:12.880
question that is yes but the

01:01:12.880 --> 01:01:17.260
majority of it we didn't deal with that specifically well I

01:01:17.260 --> 01:01:18.400
'm just going through

01:01:18.400 --> 01:01:21.800
my memory of how many cases have come here over the years

01:01:21.800 --> 01:01:22.719
and split zonings

01:01:22.719 --> 01:01:26.380
right and so obviously there's probably still some of those

01:01:26.380 --> 01:01:27.760
out there so on

01:01:27.760 --> 01:01:33.929
split zoning cases you had to take that parcel now it's

01:01:33.929 --> 01:01:35.440
owned right with one

01:01:35.440 --> 01:01:38.789
running rather than two in the one I recall it was the one

01:01:38.789 --> 01:01:39.800
off of Scripture

01:01:39.800 --> 01:01:43.099
normal that one comes to mind that's the one I can I mean

01:01:43.099 --> 01:01:44.639
in the example I gave

01:01:44.639 --> 01:01:49.849
you the response I gave you we gave that a zoning that was

01:01:49.849 --> 01:01:51.880
suitable for both for

01:01:51.880 --> 01:02:02.199
example that was I believe dr2 and DCG right and so in that

01:02:02.199 --> 01:02:04.079
area we we don't

01:02:04.079 --> 01:02:10.000
amend because our current I'm sorry our proposed MD would

01:02:10.000 --> 01:02:11.599
not apply there so in

01:02:11.599 --> 01:02:16.920
essence we took care of that split zoning by the proposed

01:02:16.920 --> 01:02:18.519
zoning proposed

01:02:18.519 --> 01:02:22.099
again because we were dealing with less zoning districts so

01:02:22.099 --> 01:02:23.119
there there wasn't a

01:02:23.119 --> 01:02:26.969
lot of where we had split zoning to begin with or as a

01:02:26.969 --> 01:02:29.360
result so I guess to

01:02:29.360 --> 01:02:32.960
carry the conversation one step further mm-hmm in that

01:02:32.960 --> 01:02:33.960
example since you brought

01:02:33.960 --> 01:02:38.139
it up that parcel had DCG and dr2 right and so instead of

01:02:38.139 --> 01:02:39.079
that parcel becoming

01:02:39.079 --> 01:02:44.289
an MD that parcels become an MN correct so back to my

01:02:44.289 --> 01:02:46.039
question that property

01:02:46.039 --> 01:02:51.239
really it's probably down zone rather than up zoned correct

01:02:51.239 --> 01:02:52.320
okay and we will

01:02:52.320 --> 01:02:54.820
get to that that is there's something that's part of this

01:02:54.820 --> 01:02:56.320
presentation and how

01:02:56.320 --> 01:03:00.719
we deal with down zoning and some up zoning as well okay

01:03:00.719 --> 01:03:03.460
but good question so

01:03:03.460 --> 01:03:08.659
the next step in the methodology was we applied the HC

01:03:08.659 --> 01:03:10.039
which is a highway

01:03:10.039 --> 01:03:13.690
corridor zoning district and what we did is we apply that

01:03:13.690 --> 01:03:14.699
to properties or

01:03:14.699 --> 01:03:20.639
parcels that is a long I 35 and we use a thousand foot

01:03:20.639 --> 01:03:22.320
extension from the center

01:03:22.320 --> 01:03:27.760
line of the highway so as you can see this is I 35 where

01:03:27.760 --> 01:03:29.639
there are the car

01:03:29.639 --> 01:03:34.849
dealerships some regional or commercial retail establish

01:03:34.849 --> 01:03:36.679
ments in as you can see

01:03:36.679 --> 01:03:40.280
based on what you see here majority of it roughly is about

01:03:40.280 --> 01:03:41.559
a thousand foot deep

01:03:41.559 --> 01:03:46.769
now that may be a bit longer or deeper than normal but we

01:03:46.769 --> 01:03:48.159
wanted to capture as

01:03:48.159 --> 01:03:51.969
much as we can and we went back and made sure that if there

01:03:51.969 --> 01:03:52.880
are existing

01:03:52.880 --> 01:03:58.090
neighborhoods or existing uses that would not fit the HC

01:03:58.090 --> 01:03:59.639
zoning district we

01:03:59.639 --> 01:04:03.219
went in and modified it and you can see some of it over

01:04:03.219 --> 01:04:05.239
here as well the other

01:04:05.239 --> 01:04:09.599
important thing is where there is a PD or a zoning overlay

01:04:09.599 --> 01:04:11.079
and we'll get into

01:04:11.079 --> 01:04:14.610
that a little bit more we left those alone as well those

01:04:14.610 --> 01:04:16.440
existing PDs and

01:04:16.440 --> 01:04:23.500
existing zoning overlays will carry forward as PDs the

01:04:23.500 --> 01:04:25.239
other zoning district

01:04:25.239 --> 01:04:30.570
that we use along major corridor was the suburban quarter

01:04:30.570 --> 01:04:32.440
zoning district and

01:04:32.440 --> 01:04:35.630
again we use the a thousand a thousand foot central from

01:04:35.630 --> 01:04:37.039
the center line this

01:04:37.039 --> 01:04:44.840
is loop 288 it also applied on University on Teasley and

01:04:44.840 --> 01:04:45.320
Fort Worth

01:04:45.320 --> 01:04:51.000
Drive as well so the idea here again is we want to capture

01:04:51.000 --> 01:04:52.920
any highway or I'm

01:04:52.920 --> 01:04:56.500
sorry suburban corridor and we use a thousand foot again as

01:04:56.500 --> 01:04:57.800
the start but as

01:04:57.800 --> 01:05:00.329
I explained earlier we went back and made sure that we

01:05:00.329 --> 01:05:01.519
weren't impacting any

01:05:01.519 --> 01:05:07.929
existing development or residential development here's a

01:05:07.929 --> 01:05:09.440
here's an example

01:05:09.440 --> 01:05:14.420
of how that was done so the one to your left is University

01:05:14.420 --> 01:05:15.840
Drive and again this

01:05:15.840 --> 01:05:21.050
area here is looked at or is being being proposed as

01:05:21.050 --> 01:05:22.719
suburban corridor and if

01:05:22.719 --> 01:05:25.849
there was a neighborhood adjacent to it and it is an

01:05:25.849 --> 01:05:27.800
established neighborhood we

01:05:27.800 --> 01:05:31.610
made sure that we went back and made it right and cleaned

01:05:31.610 --> 01:05:32.880
it up and it's more

01:05:32.880 --> 01:05:36.679
obviously better it's not better but it is existing

01:05:36.679 --> 01:05:37.800
established neighborhoods

01:05:37.800 --> 01:05:41.820
and they should be zoned the way they are and so that is we

01:05:41.820 --> 01:05:42.079
're going to be

01:05:42.079 --> 01:05:46.829
receiving an R2 because of the conversion that we talked

01:05:46.829 --> 01:05:47.840
about prior

01:05:47.840 --> 01:05:51.840
yes sir commissioner back thank you chair so I'm

01:05:51.840 --> 01:05:54.690
assuming that black line we've seen and we'll actually take

01:05:54.690 --> 01:05:55.599
a dip and go around

01:05:55.599 --> 01:05:58.880
that neighborhood right yeah it will not know that that's

01:05:58.880 --> 01:05:59.360
just to illustrate

01:05:59.360 --> 01:06:04.619
where that thousand foot extension was taken to the same

01:06:04.619 --> 01:06:07.039
thing for I-35 we we

01:06:07.039 --> 01:06:11.679
did the the HC and you can see here this is the Southridge

01:06:11.679 --> 01:06:13.000
neighborhood we know

01:06:13.000 --> 01:06:15.190
that that's not going to be to see that's established an

01:06:15.190 --> 01:06:15.639
established

01:06:15.639 --> 01:06:18.309
neighborhood and it's residential so we went and we made

01:06:18.309 --> 01:06:19.360
sure that we zoned it

01:06:19.360 --> 01:06:25.219
the way it should be zoned I talked about this somewhat

01:06:25.219 --> 01:06:27.840
earlier PDs the big

01:06:27.840 --> 01:06:32.789
one that we know of or as well known as the ropes and range

01:06:32.789 --> 01:06:34.000
plan development

01:06:34.000 --> 01:06:39.570
those PDs that we have a total of 15 legal conforming PDs

01:06:39.570 --> 01:06:41.440
will carry forward

01:06:41.440 --> 01:06:47.960
as PDs so they will be moved over and will not be altered

01:06:47.960 --> 01:06:49.480
or of any way

01:06:50.400 --> 01:06:55.610
master plan communities we've got three four technically

01:06:55.610 --> 01:06:57.159
but three coal ranch

01:06:57.159 --> 01:07:02.559
hills of den and hunter ranch those MPCs will be carried

01:07:02.559 --> 01:07:04.719
over as PDs so moving

01:07:04.719 --> 01:07:11.429
forward they will be PDs as part of the draft zoning map

01:07:11.429 --> 01:07:14.039
zoning overlays these

01:07:14.039 --> 01:07:19.019
are different from your special purpose overlay districts

01:07:19.019 --> 01:07:20.440
such as the fry Street

01:07:20.440 --> 01:07:23.630
special purpose overlay district these are zoning overlays

01:07:23.630 --> 01:07:25.119
these are the zoning

01:07:25.119 --> 01:07:28.019
cases that was brought forward to the planning zoning

01:07:28.019 --> 01:07:29.840
Commission and to and

01:07:29.840 --> 01:07:34.030
then into to council that is and if there was a restriction

01:07:34.030 --> 01:07:35.159
or a condition

01:07:35.159 --> 01:07:43.329
placed on this zoning case they technically are not the

01:07:43.329 --> 01:07:44.719
true zoning so

01:07:44.719 --> 01:07:48.139
they're referred to as zoning overlays and we have

01:07:48.139 --> 01:07:50.360
approximately 32 of these

01:07:50.360 --> 01:07:56.360
currently since 2002 and they will be carried forward as PD

01:07:56.360 --> 01:07:57.440
s as part of the

01:07:57.440 --> 01:08:01.519
draft zoning map any questions on this one because this

01:08:01.519 --> 01:08:03.280
this provided or had

01:08:03.280 --> 01:08:05.880
some discussion with the advisory committee so I didn't

01:08:05.880 --> 01:08:06.559
know I want to

01:08:06.559 --> 01:08:10.730
offer an opportunity for the playing zoning Commission to

01:08:10.730 --> 01:08:14.280
ask questions okay

01:08:16.279 --> 01:08:18.819
I think everybody remembers this one this one I try to find

01:08:18.819 --> 01:08:19.840
one that was

01:08:19.840 --> 01:08:24.329
somewhat recent this is the one of Audra where they were

01:08:24.329 --> 01:08:27.420
proposing an NR six

01:08:27.420 --> 01:08:33.000
but truly they needed four point five and so that's that's

01:08:33.000 --> 01:08:34.119
the reduction

01:08:34.119 --> 01:08:37.310
Commissioner Smith nature who's gonna keep track of these

01:08:37.310 --> 01:08:37.960
overlays because

01:08:37.960 --> 01:08:40.359
they're all gonna be so different everything else that I

01:08:40.359 --> 01:08:40.920
mean it's it's

01:08:40.920 --> 01:08:43.279
not just even taking like we've got it we got a variation

01:08:43.279 --> 01:08:44.840
or an overlay on an

01:08:44.840 --> 01:08:48.840
R2 or something like that now and then we go in and it's

01:08:48.840 --> 01:08:49.840
everything becomes PD

01:08:49.840 --> 01:08:52.659
we don't even see in the signifier of it was it in our two

01:08:52.659 --> 01:08:53.720
or in our four in our

01:08:53.720 --> 01:08:56.779
six with extra little overlays or emissions everything else

01:08:56.779 --> 01:08:57.560
who's keeping

01:08:57.560 --> 01:09:01.449
track of it is it written it's it's it's gonna be by

01:09:01.449 --> 01:09:03.039
ordinance so we will have

01:09:03.039 --> 01:09:06.489
that go back through and be able to currently currently

01:09:06.489 --> 01:09:07.880
with the current PDs

01:09:07.880 --> 01:09:11.689
we've got a folder system with each PD sure that identifies

01:09:11.689 --> 01:09:12.920
you know what it is

01:09:12.920 --> 01:09:16.310
their development standards their zoning regulations so the

01:09:16.310 --> 01:09:17.119
ordinance part I get

01:09:17.119 --> 01:09:19.449
I think I think the part I'm more looking at is that if

01:09:19.449 --> 01:09:20.399
there is ever any

01:09:20.399 --> 01:09:23.470
extra development in any of these areas that have an

01:09:23.470 --> 01:09:25.520
overlay on it the current

01:09:25.520 --> 01:09:28.649
system we have now at least gives you just from the outset

01:09:28.649 --> 01:09:29.720
of just being able

01:09:29.720 --> 01:09:34.930
to see it's in our two at least gives you some idea of

01:09:34.930 --> 01:09:35.939
knowing at least how

01:09:35.939 --> 01:09:38.569
many how many dwellings per acre and then you can kind of

01:09:38.569 --> 01:09:39.279
figure out the

01:09:39.279 --> 01:09:42.159
overlays from there once you do PD you know in our six with

01:09:42.159 --> 01:09:43.640
overlays and two

01:09:43.640 --> 01:09:47.489
with overlays well no I mean it actually I guess just log

01:09:47.489 --> 01:09:48.319
istically I don't want

01:09:48.319 --> 01:09:51.140
over overburdened city with having to ask right answer a

01:09:51.140 --> 01:09:52.119
bunch of questions

01:09:52.119 --> 01:09:55.729
maybe I'm I think it might be even easier if we put them as

01:09:55.729 --> 01:09:56.439
PDs because if

01:09:56.439 --> 01:09:58.840
you left them as zoning you don't know there's a PD and you

01:09:58.840 --> 01:09:59.680
can assume it's

01:09:59.680 --> 01:10:02.090
this with the PD you can see okay it's not it's gonna have

01:10:02.090 --> 01:10:03.119
an overlay yes you

01:10:03.119 --> 01:10:06.390
know to go to if you click on it in our interactive map you

01:10:06.390 --> 01:10:07.079
can click on an

01:10:07.079 --> 01:10:10.100
existing PD sure it tells you what number it is what name

01:10:10.100 --> 01:10:10.800
it is and then

01:10:10.800 --> 01:10:13.680
you can reference that there's an ordinance number so it

01:10:13.680 --> 01:10:14.880
almost helps that

01:10:14.880 --> 01:10:18.069
there is a PD it's a PD versus just a underlying zone

01:10:18.069 --> 01:10:18.899
industry so smart Ron

01:10:18.899 --> 01:10:26.779
thank you okay so the other after we did all that we also

01:10:26.779 --> 01:10:27.760
looked at the preferred

01:10:27.760 --> 01:10:32.210
growth concept which is in our didn't plan 2030 our again

01:10:32.210 --> 01:10:33.520
our our vision our

01:10:33.520 --> 01:10:37.699
hope is that we try to develop sustainability a sustainable

01:10:37.699 --> 01:10:38.359
with with

01:10:38.359 --> 01:10:41.079
the intent of you know sustaining our resources so we want

01:10:41.079 --> 01:10:42.000
to develop within

01:10:42.000 --> 01:10:46.229
the core and then work our way out eventually so any areas

01:10:46.229 --> 01:10:47.560
that were in the

01:10:47.560 --> 01:10:52.750
periphery of the city we left or try to leave as rural

01:10:52.750 --> 01:10:54.199
residential our our that's

01:10:54.199 --> 01:10:59.409
the least intense zoning district so similar to what we

01:10:59.409 --> 01:11:01.439
have now is RD 5 they

01:11:01.439 --> 01:11:04.020
will just be our art and again we those are going to be

01:11:04.020 --> 01:11:05.119
those areas that are

01:11:05.119 --> 01:11:11.100
along the periphery of the city we also looked at you know

01:11:11.100 --> 01:11:12.920
areas that we weren't

01:11:12.920 --> 01:11:16.500
really familiar with we use aerial photography Google

01:11:16.500 --> 01:11:17.680
Street View and

01:11:17.680 --> 01:11:22.180
visited each site so I asked the committee I asked you all

01:11:22.180 --> 01:11:22.800
know where this

01:11:22.800 --> 01:11:25.819
is this is actually University Drive and this is mingo

01:11:25.819 --> 01:11:27.479
right next to the railroad

01:11:27.479 --> 01:11:31.470
does anybody know that this well I guess we weren't as

01:11:31.470 --> 01:11:33.199
familiar with it than as

01:11:33.199 --> 01:11:37.979
you all were so I I didn't know that building was there or

01:11:37.979 --> 01:11:39.399
you know what it

01:11:39.399 --> 01:11:42.590
was and so we had to research it and so we we had to make

01:11:42.590 --> 01:11:43.960
sure that we knew each

01:11:43.960 --> 01:11:46.689
parcel before we put a zoning on it so that's that's to

01:11:46.689 --> 01:11:48.000
show you that there was

01:11:48.000 --> 01:11:54.300
there was some time spent doing that city properties city

01:11:54.300 --> 01:11:56.039
properties where

01:11:56.039 --> 01:12:00.210
they made sense that they were the use that's currently on

01:12:00.210 --> 01:12:01.560
that property was

01:12:01.560 --> 01:12:05.199
permitted on in that proposed zoning district we left it as

01:12:05.199 --> 01:12:06.399
is so this is in

01:12:06.399 --> 01:12:10.630
the downtown area the blue here that you see is the square

01:12:10.630 --> 01:12:11.920
and so all this

01:12:11.920 --> 01:12:14.359
property and this is where we are right now this is where

01:12:14.359 --> 01:12:16.399
we're currently at MD

01:12:16.399 --> 01:12:23.550
mixed use downtown is primarily high intensity I can't say

01:12:23.550 --> 01:12:24.760
high density I say

01:12:24.760 --> 01:12:28.800
high intensity because it allows a lot of different uses

01:12:28.800 --> 01:12:29.880
and allows for a

01:12:29.880 --> 01:12:35.090
certain height maximum and lot coverage as well but the

01:12:35.090 --> 01:12:36.800
uses looking at the

01:12:36.800 --> 01:12:41.289
allowed uses it also allowed for the those those type of

01:12:41.289 --> 01:12:42.600
uses in the MD when

01:12:42.600 --> 01:12:46.279
we left it empty we didn't change it at all

01:12:46.439 --> 01:12:51.630
for larger areas that we feel needs a little bit more

01:12:51.630 --> 01:12:53.000
attention such as the

01:12:53.000 --> 01:12:58.680
airport the landfill large DME facilities and so on we have

01:12:58.680 --> 01:12:59.520
the option

01:12:59.520 --> 01:13:04.729
or the zoning district called PF plant public facilities

01:13:04.729 --> 01:13:06.000
and again that is

01:13:06.000 --> 01:13:10.199
defined as lands that are meant for public and quasi public

01:13:10.199 --> 01:13:11.159
community uses

01:13:11.159 --> 01:13:15.489
and this zoning would apply to and should apply to these

01:13:15.489 --> 01:13:16.600
type or these

01:13:16.600 --> 01:13:20.180
areas in the city that the city owns so we have it for

01:13:20.180 --> 01:13:21.840
large areas such as the

01:13:21.840 --> 01:13:27.789
airport we also have them for UNT and TW now we're also

01:13:27.789 --> 01:13:29.640
considering an

01:13:29.640 --> 01:13:33.840
institutional zoning district for these two universities

01:13:33.840 --> 01:13:34.880
that's that's something

01:13:34.880 --> 01:13:38.689
that will most likely come as part of the amendment but for

01:13:38.689 --> 01:13:39.960
now they're zone

01:13:39.960 --> 01:13:45.170
SPF Commissioner Roseau thank you chair can you help me

01:13:45.170 --> 01:13:45.680
understand the

01:13:45.680 --> 01:13:49.550
rationale of making of their own zoning district when they

01:13:49.550 --> 01:13:50.760
de facto do what they

01:13:50.760 --> 01:13:54.590
want anyways we have to give them some zoning district so I

01:13:54.590 --> 01:13:55.880
think institutional

01:13:55.880 --> 01:13:57.909
zoning district that's what that's a good question because

01:13:57.909 --> 01:13:58.399
we thought the

01:13:58.399 --> 01:14:02.970
same thing if they didn't receive any zoning is like we we

01:14:02.970 --> 01:14:04.300
wouldn't have you

01:14:04.300 --> 01:14:06.640
know a designation for them but you're right there is there

01:14:06.640 --> 01:14:07.319
they don't have to

01:14:07.319 --> 01:14:12.840
comply with our regs as far as the zoning regulations so

01:14:12.840 --> 01:14:14.000
what would be the

01:14:14.000 --> 01:14:17.640
benefit of having a separate zoning that's used twice in

01:14:17.640 --> 01:14:18.800
our city just for

01:14:18.800 --> 01:14:22.800
them I think there may be I don't know if Richard can help

01:14:22.800 --> 01:14:25.560
me with this one part

01:14:25.560 --> 01:14:29.680
of it is just to avoid any confusion with the p.l. I have

01:14:29.680 --> 01:14:31.439
seen in in past

01:14:31.439 --> 01:14:36.649
cities where where it had a residential designation and

01:14:36.649 --> 01:14:38.039
this particular

01:14:38.039 --> 01:14:40.430
University had a campus plan but they felt as though they

01:14:40.430 --> 01:14:41.079
had they were

01:14:41.079 --> 01:14:44.500
entitled as a result of the zoning for a certain amount of

01:14:44.500 --> 01:14:46.239
density not the case

01:14:46.239 --> 01:14:48.869
here since we don't have density but all in all it's I

01:14:48.869 --> 01:14:50.020
think it's it's just

01:14:50.020 --> 01:14:53.310
better to capture them as their own ideally it would be to

01:14:53.310 --> 01:14:54.159
have a master

01:14:54.159 --> 01:14:57.260
plan but I think at that point it would just defer to that

01:14:57.260 --> 01:14:58.359
for whatever whatever

01:14:58.359 --> 01:15:01.430
they do yeah that makes sense thank you I'd have a follow-

01:15:01.430 --> 01:15:02.880
up question on that

01:15:02.880 --> 01:15:06.689
you say if I should are they're gonna become a separate

01:15:06.689 --> 01:15:08.800
zoning category yes

01:15:08.800 --> 01:15:12.680
we're thinking of adding a zoning district called just

01:15:12.680 --> 01:15:13.319
institutional

01:15:13.319 --> 01:15:17.590
zoning district for the universities and all these other

01:15:17.590 --> 01:15:18.960
properties those are the

01:15:18.960 --> 01:15:22.770
properties that the University of North Texas currently

01:15:22.770 --> 01:15:24.560
owns yes so with the

01:15:24.560 --> 01:15:28.800
with the rules that all the other zoning categories have to

01:15:28.800 --> 01:15:30.039
meet then if I heard

01:15:30.039 --> 01:15:33.270
you right these don't have to meet those same categories or

01:15:33.270 --> 01:15:34.560
requirements the

01:15:34.560 --> 01:15:42.060
University the institutional one here didn't I see doesn't

01:15:42.060 --> 01:15:43.439
fall under

01:15:43.439 --> 01:15:46.939
institutional just DST would be under public facilities

01:15:46.939 --> 01:15:47.800
just the first two

01:15:47.800 --> 01:15:52.399
yeah just these two okay I misunderstood I just thought all

01:15:52.399 --> 01:15:53.239
of those were going

01:15:53.239 --> 01:15:57.079
into oh no no no no those those my mistake misunderstanding

01:15:57.079 --> 01:15:57.279
yeah

01:15:57.279 --> 01:16:02.260
apologies Commissioner Smith nature if they acquire new

01:16:02.260 --> 01:16:04.000
land after we go

01:16:04.000 --> 01:16:07.810
through to a reason rezone that's technically go through a

01:16:07.810 --> 01:16:08.479
zoning change

01:16:08.479 --> 01:16:11.159
then if they let's say they go buy something that's just

01:16:11.159 --> 01:16:11.960
they think they

01:16:11.960 --> 01:16:14.789
sorry they would they would have that would that come in

01:16:14.789 --> 01:16:15.479
front of us we would

01:16:15.479 --> 01:16:18.250
just vote on that because zoning change technically or what

01:16:18.250 --> 01:16:18.279
would that go be

01:16:18.279 --> 01:16:20.539
automatic when they purchase it it will be up to them to

01:16:20.539 --> 01:16:21.479
decide if they want to

01:16:21.479 --> 01:16:25.430
rezone it or just keep it as this so it's it's it's it

01:16:25.430 --> 01:16:27.119
makes it simple for us

01:16:27.119 --> 01:16:32.000
right now right but if they grow and they acquire any type

01:16:32.000 --> 01:16:33.399
of the property it

01:16:33.399 --> 01:16:37.520
we did be complicated again at some point if I can just say

01:16:37.520 --> 01:16:38.159
you know another

01:16:38.159 --> 01:16:40.189
and I was thinking about this actually earlier it's kind of

01:16:40.189 --> 01:16:41.800
funny one way we we

01:16:41.800 --> 01:16:44.619
might want to consider and just sort of talk it out more

01:16:44.619 --> 01:16:45.720
with legal is there's

01:16:45.720 --> 01:16:48.899
kind of the concept of a floating zone so whether this

01:16:48.899 --> 01:16:50.020
becomes sort of a

01:16:50.020 --> 01:16:52.920
floating zone and as they acquire property just become sort

01:16:52.920 --> 01:16:53.319
of self

01:16:53.319 --> 01:16:56.760
executing again I want to talk that over with with legal

01:16:56.760 --> 01:16:57.960
whether that's even a

01:16:57.960 --> 01:17:00.310
possibility but I think it's just sort of looking at at

01:17:00.310 --> 01:17:01.439
those options or sort of

01:17:01.439 --> 01:17:06.760
every quarter do we do a true up of properties of David

01:17:06.760 --> 01:17:08.319
Clark yeah I think

01:17:08.319 --> 01:17:10.819
it's also to understand where they're they obviously have a

01:17:10.819 --> 01:17:11.479
plan of how they

01:17:11.479 --> 01:17:14.630
want to sure I guess I guess for me it was more to not have

01:17:14.630 --> 01:17:15.840
to bog us down as

01:17:15.840 --> 01:17:19.649
a as a as a commission to not to come to the see it's a

01:17:19.649 --> 01:17:21.119
here have Haley get

01:17:21.119 --> 01:17:23.149
there and talk for ten minutes about why we're gonna reason

01:17:23.149 --> 01:17:23.560
on it and it just

01:17:23.560 --> 01:17:29.279
like I was just going on it sorry for picking on you Haley

01:17:29.279 --> 01:17:31.680
one follow-up on that on the

01:17:31.680 --> 01:17:35.800
on the reverse is true though - these entities do sell

01:17:35.800 --> 01:17:37.680
properties they do come

01:17:37.680 --> 01:17:41.699
so what would be the zoning or how would you handle going

01:17:41.699 --> 01:17:43.760
from institutional that

01:17:43.760 --> 01:17:46.689
there there is no zoning on that parcel so for example like

01:17:46.689 --> 01:17:47.560
the city of debt

01:17:47.560 --> 01:17:50.409
parcel that's for sale here on Locust Street I bought

01:17:50.409 --> 01:17:51.920
property from DISD

01:17:51.920 --> 01:17:58.680
before if it's institutional so TISD would would not be the

01:17:58.680 --> 01:17:59.319
institutional it

01:17:59.319 --> 01:18:02.039
would be there's just the universities I guess I'm still

01:18:02.039 --> 01:18:03.399
yeah sorry I'm having a

01:18:03.399 --> 01:18:08.270
hard time with it got wrote written in stone and it doesn't

01:18:08.270 --> 01:18:10.439
come out right actually

01:18:10.439 --> 01:18:13.170
if I can just give another another example because this is

01:18:13.170 --> 01:18:14.239
a real example

01:18:14.239 --> 01:18:19.479
TWU in this case probably wouldn't want to rezone to

01:18:19.479 --> 01:18:21.319
institutional they've

01:18:21.319 --> 01:18:24.359
acquired it was a piece of property they acquired to to

01:18:24.359 --> 01:18:25.880
build apartments for the

01:18:25.880 --> 01:18:29.460
students so in that case they kept it but they were

01:18:29.460 --> 01:18:30.199
contracting out with a

01:18:30.199 --> 01:18:32.680
different party to sort of build and manage that so in that

01:18:32.680 --> 01:18:33.359
case they kept

01:18:33.359 --> 01:18:36.039
the the zoning and went and are going through through our

01:18:36.039 --> 01:18:37.600
site plan process so

01:18:37.600 --> 01:18:41.729
in that regard we may want to have them rezone or again I

01:18:41.729 --> 01:18:43.720
think there's other we

01:18:43.720 --> 01:18:46.739
can look at it as as we move forward but part of it is to

01:18:46.739 --> 01:18:47.600
sort of try to

01:18:47.600 --> 01:18:51.869
understand also what what their long-term plans are

01:18:51.869 --> 01:18:53.199
Commissioner Osello

01:18:53.199 --> 01:18:57.119
I'm gonna restate chairs question a little bit differently

01:18:57.119 --> 01:18:58.399
the public

01:18:58.399 --> 01:19:01.699
facilities can sell and what would that zoning would just

01:19:01.699 --> 01:19:02.800
be public facilities

01:19:02.800 --> 01:19:05.949
until the new property owner came back through the rezone

01:19:05.949 --> 01:19:09.600
yes okay and a lot of

01:19:09.600 --> 01:19:14.039
I did speak with DISD the county text I mean text on and DC

01:19:14.039 --> 01:19:15.039
T a you know

01:19:15.039 --> 01:19:18.300
individually and I told them this is what is happening and

01:19:18.300 --> 01:19:18.720
they were

01:19:18.720 --> 01:19:22.239
comfortable with what we were proposing for example DISD

01:19:22.239 --> 01:19:23.359
the schools are

01:19:23.359 --> 01:19:26.180
permitted in all zoning district from majority except for

01:19:26.180 --> 01:19:28.399
like the HI the L I

01:19:28.399 --> 01:19:31.829
so you don't want schools in those areas so we did we did

01:19:31.829 --> 01:19:33.279
talk to these agencies

01:19:33.279 --> 01:19:38.060
before we made this public I know we have a couple minutes

01:19:38.060 --> 01:19:39.439
left this is

01:19:39.439 --> 01:19:41.630
probably the more important slide but I just wanted to

01:19:41.630 --> 01:19:43.000
share this with you really

01:19:43.000 --> 01:19:48.399
quickly we have approximately 38,496 parcels in the city

01:19:48.399 --> 01:19:49.800
and we did an

01:19:49.800 --> 01:19:55.039
analysis where we took a parcel and if it went from an R4

01:19:55.039 --> 01:19:56.479
with the conversion

01:19:56.479 --> 01:20:02.039
and we zoned it on R2 for because of maybe consistency or

01:20:02.039 --> 01:20:03.680
compatibility that

01:20:03.680 --> 01:20:08.890
is considered a zoning down and vice versa if we saw an LI

01:20:08.890 --> 01:20:10.439
and probably more

01:20:10.439 --> 01:20:15.069
suitable for an HI that would be a zoning up so we did that

01:20:15.069 --> 01:20:15.479
we did that

01:20:15.479 --> 01:20:18.909
conversion we did that analysis and we came up with

01:20:18.909 --> 01:20:21.680
approximately 2800 parcels

01:20:21.680 --> 01:20:24.800
that are being zoning up being zoned up in about 1800 are

01:20:24.800 --> 01:20:25.720
gonna be zoned down

01:20:25.720 --> 01:20:30.930
now out of 38,000 that's pretty good that tells us that the

01:20:30.930 --> 01:20:31.680
majority of these

01:20:31.680 --> 01:20:36.680
parcels are being converted to the zoning district that

01:20:36.680 --> 01:20:37.880
they either are or

01:20:37.880 --> 01:20:42.020
roughly are so and not not a big change so just give you

01:20:42.020 --> 01:20:44.199
guys an insight of what

01:20:44.199 --> 01:20:48.329
that number is or how we're how we've done our our zoning

01:20:48.329 --> 01:20:50.159
map update so that

01:20:50.159 --> 01:20:53.159
concludes my presentation unless there's anything else I

01:20:53.159 --> 01:20:55.359
appreciate the time

01:20:55.359 --> 01:21:00.760
thank you Ron and just one quick note we'll have a standing

01:21:00.760 --> 01:21:02.520
work session item

01:21:02.520 --> 01:21:06.109
so that we can update the Commission on the actions of the

01:21:06.109 --> 01:21:07.279
committee and what's

01:21:07.279 --> 01:21:12.260
being presented and where we're going great thank you with

01:21:12.260 --> 01:21:13.600
that I'll close our

01:21:13.600 --> 01:21:17.479
work session at 629 and we'll reconvene as quickly as

01:21:17.479 --> 01:21:18.439
possible in council

01:21:18.439 --> 01:21:25.399
chambers good evening and welcome to the city of Denton

01:21:25.399 --> 01:21:26.359
planning and zoning

01:21:26.359 --> 01:21:31.340
Commission meeting for April the 11th 2018 this meeting's

01:21:31.340 --> 01:21:32.520
been duly posted and

01:21:32.520 --> 01:21:36.470
we do have a quorum present and we'll call us to order at 6

01:21:36.470 --> 01:21:38.199
37 our first order

01:21:38.199 --> 01:21:40.760
of business will be to stand and give the pledge the US and

01:21:40.760 --> 01:21:43.560
the Texas flags

01:22:02.720 --> 01:22:04.069
honor the Texas flag I pledge allegiance to the Texas one

01:22:04.069 --> 01:22:11.159
state under God one

01:22:11.159 --> 01:22:14.159
and indivisible

01:22:22.760 --> 01:22:25.479
our next order of business will be to consider a motion for

01:22:25.479 --> 01:22:28.640
our minutes for

01:22:28.640 --> 01:22:33.319
March the 21st 2018 Commissioner Smith I'm most to approve

01:22:33.319 --> 01:22:34.680
okay Mr. Beck

01:22:34.680 --> 01:22:38.720
second okay we have a first and a second for approval any

01:22:38.720 --> 01:22:41.439
comments or questions

01:22:41.439 --> 01:22:45.760
seeing none to call for a vote on the board

01:22:58.640 --> 01:23:12.970
oh most is going to carry five zero with two abstain and we

01:23:12.970 --> 01:23:15.880
'll move us to our

01:23:15.880 --> 01:23:22.699
consent agenda Commissioner Beck I move we approve consent

01:23:22.699 --> 01:23:23.520
agenda okay

01:23:23.520 --> 01:23:27.109
Commissioner Smith second that motion okay we have a first

01:23:27.109 --> 01:23:28.840
and a second for approval any

01:23:28.840 --> 01:23:35.600
discussion seeing none call for a vote on board

01:23:40.560 --> 01:23:49.149
most is going to carry seven zero I will move us to item

01:23:49.149 --> 01:23:51.800
for a individual

01:23:51.800 --> 01:23:56.520
consideration call on Haley for presentation

01:24:04.239 --> 01:24:08.050
good evening this request is for an alternative development

01:24:08.050 --> 01:24:08.359
plan for a

01:24:08.359 --> 01:24:12.159
tractor dealership and repair facility the request for this

01:24:12.159 --> 01:24:12.960
alternative

01:24:12.960 --> 01:24:15.529
development plan is to specifically deviate from the

01:24:15.529 --> 01:24:16.680
perimeter fencing and

01:24:16.680 --> 01:24:19.380
screening requirements and then the parking screening

01:24:19.380 --> 01:24:20.520
requirements found in

01:24:20.520 --> 01:24:24.789
subchapter 13 of the Ditten Development Code the site is

01:24:24.789 --> 01:24:26.239
part of a larger

01:24:26.239 --> 01:24:29.210
tract of land located on I-35 the property has been

01:24:29.210 --> 01:24:30.359
preliminary platted

01:24:30.359 --> 01:24:33.460
not yet final platted to separate this into two lots this

01:24:33.460 --> 01:24:34.920
ADP specifically

01:24:34.920 --> 01:24:38.840
applies to the northern 5.4 acres of the site and the

01:24:38.840 --> 01:24:40.279
property is currently zoned

01:24:40.279 --> 01:24:46.000
regional center commercial commercial downtown looking at

01:24:46.000 --> 01:24:47.680
the site you can see

01:24:47.680 --> 01:24:51.260
they have approximately a 20,000 square foot building in

01:24:51.260 --> 01:24:52.560
the roughly the middle

01:24:52.560 --> 01:24:55.750
of the site that's outland here in yellow in blue you see

01:24:55.750 --> 01:24:56.760
the designated

01:24:56.760 --> 01:25:00.569
parking areas and the area in green is a large detention

01:25:00.569 --> 01:25:02.119
pond overall the site

01:25:02.119 --> 01:25:08.159
has 71% lot coverage 29% landscaping and 63 parking spaces

01:25:08.159 --> 01:25:09.560
as I mentioned

01:25:09.560 --> 01:25:12.000
briefly at work session the city is in some discussions

01:25:12.000 --> 01:25:13.039
regarding the future

01:25:13.039 --> 01:25:16.140
alignment of Windsor the general location of parking and

01:25:16.140 --> 01:25:16.920
this detention

01:25:16.920 --> 01:25:20.479
pond could shift but the requested items tonight in terms

01:25:20.479 --> 01:25:21.680
of the fencing and

01:25:21.680 --> 01:25:25.279
screening would not be affected by that

01:25:25.560 --> 01:25:29.409
specifically the request the first item is to permit a

01:25:29.409 --> 01:25:30.960
chain link fencing

01:25:30.960 --> 01:25:33.409
material currently this isn't a permitted fence material in

01:25:33.409 --> 01:25:33.800
the code

01:25:33.800 --> 01:25:37.100
what the applicants requesting on the side and rear yards

01:25:37.100 --> 01:25:38.359
is an eight foot tall

01:25:38.359 --> 01:25:42.460
black vinyl coated chain link fence they're also proposing

01:25:42.460 --> 01:25:43.380
to plant trees

01:25:43.380 --> 01:25:47.189
along that fence on the side yards to further screen it the

01:25:47.189 --> 01:25:48.319
second request is

01:25:48.319 --> 01:25:51.199
for a front fence that will exceed the three and a half

01:25:51.199 --> 01:25:52.319
foot maximum in the

01:25:52.319 --> 01:25:55.359
code what they've proposed is a six foot tall ornamental wr

01:25:55.359 --> 01:25:56.079
ought iron fence

01:25:56.079 --> 01:26:00.470
along the front property line and then the third item when

01:26:00.470 --> 01:26:01.800
you have parking in

01:26:01.800 --> 01:26:05.609
front of a building the code requires a 15 foot wide area

01:26:05.609 --> 01:26:06.920
that is to include a

01:26:06.920 --> 01:26:09.970
berm one large tree per every 40 linear feet and then

01:26:09.970 --> 01:26:11.640
either zero scaping hedges

01:26:11.640 --> 01:26:16.850
or a continuous wall to enhance their display visibility

01:26:16.850 --> 01:26:17.560
from the street the

01:26:17.560 --> 01:26:20.479
applicant is proposing to not provide the screening yard

01:26:20.479 --> 01:26:21.680
there are they are

01:26:21.680 --> 01:26:24.090
proposing to include all of those required landscaping

01:26:24.090 --> 01:26:24.920
elements for that

01:26:24.920 --> 01:26:27.539
area and have them in alternative locations on the site

01:26:27.539 --> 01:26:28.260
that we'll see

01:26:28.260 --> 01:26:32.840
here in a moment so looking at the fencing requirements the

01:26:32.840 --> 01:26:33.600
yellowish

01:26:33.600 --> 01:26:37.520
orange color is the location for the black eight foot chain

01:26:37.520 --> 01:26:38.520
link fence you

01:26:38.520 --> 01:26:41.399
can see here they do have trees proposed along the sides of

01:26:41.399 --> 01:26:42.000
that to further

01:26:42.000 --> 01:26:44.819
screen the parts that would be visible from the road and

01:26:44.819 --> 01:26:45.760
then the area in red

01:26:45.760 --> 01:26:49.399
is the location for that six foot tall wrought iron fence

01:26:49.399 --> 01:26:50.359
they're requested

01:26:50.359 --> 01:26:53.720
along the frontage and to further elaborate on that the wr

01:26:53.720 --> 01:26:54.399
ought iron

01:26:54.399 --> 01:26:57.880
fencing is like I said proposed for security because this

01:26:57.880 --> 01:26:58.960
is a display yard

01:26:58.960 --> 01:27:02.329
here in the front it would have gates here on the access

01:27:02.329 --> 01:27:03.439
drives to allow

01:27:03.439 --> 01:27:06.250
traffic in and out of the site but its primary purpose

01:27:06.250 --> 01:27:07.439
would be for security

01:27:07.439 --> 01:27:10.189
and to still allow visibility of the site and it is

01:27:10.189 --> 01:27:11.640
generally consistent with

01:27:11.640 --> 01:27:14.449
other fences that you would see along this part of the

01:27:14.449 --> 01:27:15.800
service road on I-35

01:27:15.800 --> 01:27:18.949
from our research those other fences in this area predate

01:27:18.949 --> 01:27:20.119
the code requirements

01:27:20.119 --> 01:27:23.930
so that's how they were permitted at a taller height

01:27:23.930 --> 01:27:25.359
looking at this in a little

01:27:25.359 --> 01:27:28.180
more detail the dark green areas are the areas where they

01:27:28.180 --> 01:27:29.359
're providing trees to

01:27:29.359 --> 01:27:32.409
help screen the fencing as we discussed and then the

01:27:32.409 --> 01:27:34.119
lighter green areas you see

01:27:34.119 --> 01:27:36.489
here all of the required street trees and parking lot

01:27:36.489 --> 01:27:37.640
screening trees as well

01:27:37.640 --> 01:27:40.470
as the shrubs that would have made up that continuous hed

01:27:40.470 --> 01:27:41.680
gerow are all

01:27:41.680 --> 01:27:44.560
provided in these areas you see them clustered around the

01:27:44.560 --> 01:27:45.319
two main drive

01:27:45.319 --> 01:27:47.779
entries to the site and then a few of the trees have been

01:27:47.779 --> 01:27:48.760
provided along the

01:27:48.760 --> 01:27:51.720
back part of the property and in addition to the required

01:27:51.720 --> 01:27:52.600
plantings they

01:27:52.600 --> 01:27:54.939
are proposing eight additional street trees as well to

01:27:54.939 --> 01:27:55.960
further enhance these

01:27:55.960 --> 01:28:01.720
entries to the site so with an ADP we always like to look

01:28:01.720 --> 01:28:02.239
back at what the

01:28:02.239 --> 01:28:04.920
intent of the code requirements are the DDCs fencing

01:28:04.920 --> 01:28:06.359
requirements are meant to

01:28:06.359 --> 01:28:10.159
ensure high quality you know long durability fencing

01:28:10.159 --> 01:28:12.159
materials and then

01:28:12.159 --> 01:28:15.460
specifically within our residential and mixed-use districts

01:28:15.460 --> 01:28:16.760
we have that limited

01:28:16.760 --> 01:28:19.149
height requirement to ensure that the buildings and you

01:28:19.149 --> 01:28:20.079
know the entire site

01:28:20.079 --> 01:28:23.270
is still visible from the right-of-way with our parking lot

01:28:23.270 --> 01:28:24.119
screening the intent

01:28:24.119 --> 01:28:27.039
there is muting the visual effects of parking from the

01:28:27.039 --> 01:28:28.359
right-of-way so that as

01:28:28.359 --> 01:28:30.699
you drive down the street you have you know a visually

01:28:30.699 --> 01:28:32.079
appealing street front

01:28:32.079 --> 01:28:34.180
edge and there's no light or glare from the parking lots

01:28:34.180 --> 01:28:35.079
interfering with the

01:28:35.079 --> 01:28:40.289
roadway so to go briefly through the criteria for approval

01:28:40.289 --> 01:28:41.159
for an ADP the

01:28:41.159 --> 01:28:43.699
first is preservation of existing neighborhoods it's not

01:28:43.699 --> 01:28:44.560
anticipated that

01:28:44.560 --> 01:28:46.920
this would negatively affect the surrounding area it is

01:28:46.920 --> 01:28:47.760
consistent with

01:28:47.760 --> 01:28:50.109
the other development specifically to the north there are

01:28:50.109 --> 01:28:50.960
several other large

01:28:50.960 --> 01:28:54.359
RV sales facilities and then south there's a mixture of

01:28:54.359 --> 01:28:55.079
institutional and

01:28:55.079 --> 01:28:59.409
commercial uses this request would not necessarily lower

01:28:59.409 --> 01:29:00.479
the site design

01:29:00.479 --> 01:29:03.380
standards in the Denton Development Code they're intended

01:29:03.380 --> 01:29:04.479
to provide enhanced

01:29:04.479 --> 01:29:08.319
security and visibility for the site in terms of focusing

01:29:08.319 --> 01:29:09.840
new development and

01:29:09.840 --> 01:29:13.300
activity centers what we see here is typical highway scale

01:29:13.300 --> 01:29:14.199
development this is

01:29:14.199 --> 01:29:17.500
a regional zoning a regional commercial center by zoning

01:29:17.500 --> 01:29:19.399
and future land use and

01:29:19.399 --> 01:29:21.890
this use would be something that we would expect to have a

01:29:21.890 --> 01:29:22.840
regional customer

01:29:22.840 --> 01:29:27.359
base that fits with that infrastructure is not a concern

01:29:27.359 --> 01:29:28.359
here there is existing

01:29:28.359 --> 01:29:30.829
infrastructure in terms of roadways water and sewer

01:29:30.829 --> 01:29:31.920
available to the site

01:29:31.920 --> 01:29:35.970
and the end result here would still be a high quality

01:29:35.970 --> 01:29:37.920
development that would

01:29:37.920 --> 01:29:41.250
generally meet the intent of the code by providing the

01:29:41.250 --> 01:29:42.640
screening for that chain

01:29:42.640 --> 01:29:45.289
link fencing and vinyl coating it they would reduce you

01:29:45.289 --> 01:29:46.239
know the the reflective

01:29:46.239 --> 01:29:50.550
typical material see with chain link and they are providing

01:29:50.550 --> 01:29:51.880
a non-opaque high

01:29:51.880 --> 01:29:54.689
quality fence along the frontage as well the height is

01:29:54.689 --> 01:29:55.840
higher for security

01:29:55.840 --> 01:29:59.039
purposes but the material itself is a permitted high

01:29:59.039 --> 01:30:00.760
quality material and then

01:30:00.760 --> 01:30:02.859
in terms of parking lot screening as I mentioned they are

01:30:02.859 --> 01:30:03.680
providing all of the

01:30:03.680 --> 01:30:06.750
required elements just in alternate locations on the site

01:30:06.750 --> 01:30:07.680
and they are also

01:30:07.680 --> 01:30:11.479
providing those additional eight trees so with that staff

01:30:11.479 --> 01:30:12.479
is recommending

01:30:12.479 --> 01:30:14.510
approval of the request because we found it to meet all of

01:30:14.510 --> 01:30:15.939
these criteria and I

01:30:15.939 --> 01:30:18.359
could stand for any questions do you have a question

01:30:18.359 --> 01:30:19.479
Commissioner Beck thank

01:30:19.479 --> 01:30:23.289
you chair Haley just for clarification again can you go

01:30:23.289 --> 01:30:24.319
back to the diagram the

01:30:24.319 --> 01:30:32.960
site location show us that the Google yeah okay so when you

01:30:32.960 --> 01:30:33.800
're talking about

01:30:33.800 --> 01:30:37.380
this is one tract of land but it's gonna be in two

01:30:37.380 --> 01:30:39.760
different lots yes there is a

01:30:39.760 --> 01:30:42.949
preliminary plan that's been approved it would split the

01:30:42.949 --> 01:30:44.119
lot into two pieces

01:30:44.119 --> 01:30:46.939
this would be the northern roughly five and a half acres

01:30:46.939 --> 01:30:48.000
and then there would be

01:30:48.000 --> 01:30:51.189
a second lot okay okay and I don't know why that wasn't

01:30:51.189 --> 01:30:52.159
clear to me before so

01:30:52.159 --> 01:30:55.149
we're basically building in that area where the least

01:30:55.149 --> 01:30:56.279
amount of trees are

01:30:56.279 --> 01:30:59.239
right now correct yes is what you're doing and that is the

01:30:59.239 --> 01:31:00.560
five point three

01:31:00.560 --> 01:31:07.039
eight acres yes what is the total acreage for the whole I'm

01:31:07.039 --> 01:31:08.840
guessing 11

01:31:08.840 --> 01:31:11.119
maybe

01:31:13.119 --> 01:31:17.460
I believe the other lot is just over two acres but I want

01:31:17.460 --> 01:31:20.199
to confirm that yes I

01:31:20.199 --> 01:31:23.500
believe the totals about seven point one acres okay so they

01:31:23.500 --> 01:31:24.720
're using about five

01:31:24.720 --> 01:31:27.609
and a half and then be a remainder of about two so when we

01:31:27.609 --> 01:31:28.520
're talking about

01:31:28.520 --> 01:31:33.500
putting fencing on that I guess it'd be the south end to

01:31:33.500 --> 01:31:35.119
kind of obscure the

01:31:35.119 --> 01:31:40.579
view in there actually it's gonna be covered up by a couple

01:31:40.579 --> 01:31:42.880
of acres so yes

01:31:42.880 --> 01:31:46.930
why is the fencing even an issue as far as a barrier of

01:31:46.930 --> 01:31:48.880
some kind is that where

01:31:48.880 --> 01:31:51.779
the roads gonna run through and no the code doesn't permit

01:31:51.779 --> 01:31:52.960
chain-link material

01:31:52.960 --> 01:31:58.170
at all it's not a man material yeah but you talk about

01:31:58.170 --> 01:31:59.279
trees and bushes being

01:31:59.279 --> 01:32:04.680
planted to landscaping on that south end to cover the view

01:32:04.680 --> 01:32:05.199
of the chain link

01:32:05.199 --> 01:32:09.279
fence but can we even really see it if there's two acres

01:32:09.279 --> 01:32:10.279
roughly two acres

01:32:10.279 --> 01:32:13.239
south of that once that sites developed it probably wouldn

01:32:13.239 --> 01:32:14.279
't be visible no but

01:32:14.279 --> 01:32:17.119
in the meantime it would provide that additional screening

01:32:17.119 --> 01:32:18.560
and okay they're

01:32:18.560 --> 01:32:21.039
using that to meet all of their other tree and landscaping

01:32:21.039 --> 01:32:22.520
requirements as well

01:32:22.520 --> 01:32:29.479
okay thank you any other questions for Haley

01:32:30.479 --> 01:32:33.670
thank you Amy I believe the applicant is here if you had

01:32:33.670 --> 01:32:34.479
any questions for them

01:32:34.479 --> 01:32:38.289
as well this is an item for individual consideration and if

01:32:38.289 --> 01:32:38.920
there's anyone who

01:32:38.920 --> 01:32:41.579
would like to speak on this item especially the applicant

01:32:41.579 --> 01:32:42.279
you're welcome

01:32:42.279 --> 01:32:45.479
to come forward this time

01:32:49.060 --> 01:32:54.039
my name is Richard Mason I'm with icon consulting group I

01:32:54.039 --> 01:32:56.239
am the project

01:32:56.239 --> 01:33:00.140
architect on it and I appreciate your time to speak this

01:33:00.140 --> 01:33:01.640
evening we have been

01:33:01.640 --> 01:33:05.630
through quite a bit of give-and-take with Haley and her

01:33:05.630 --> 01:33:06.960
group to to get to

01:33:06.960 --> 01:33:10.539
this point and as most of you know where the current

01:33:10.539 --> 01:33:12.079
location of Zimmer or

01:33:12.079 --> 01:33:16.340
Kubota is they're busting at the seams and ready to get to

01:33:16.340 --> 01:33:18.359
a bigger site you know to

01:33:18.359 --> 01:33:22.560
expand and and get into a nicer building that kind of thing

01:33:22.560 --> 01:33:23.239
and so that's

01:33:23.239 --> 01:33:27.689
basically the whole development there and and what we're

01:33:27.689 --> 01:33:29.359
asking for again we're

01:33:29.359 --> 01:33:33.000
trying to meet the intent of what in working with Haley and

01:33:33.000 --> 01:33:34.159
the intent of the

01:33:34.159 --> 01:33:37.960
code with the materials and those types of things

01:33:37.960 --> 01:33:39.640
recognizing that the front of

01:33:39.640 --> 01:33:42.970
this is going to be a display area for various types of

01:33:42.970 --> 01:33:44.439
equipment that Zimmer

01:33:44.439 --> 01:33:49.649
sells and and so and then the security issue of being in a

01:33:49.649 --> 01:33:51.239
transient zone that

01:33:51.239 --> 01:33:53.810
are along the highway those are the main two things that we

01:33:53.810 --> 01:33:54.760
're trying to to

01:33:54.760 --> 01:33:57.989
accomplish keep the site secure but also keep it

01:33:57.989 --> 01:33:59.800
individually pleasing and

01:33:59.800 --> 01:34:06.250
architecturally aesthetically pleasing space in short I'll

01:34:06.250 --> 01:34:06.840
keep it short but

01:34:06.840 --> 01:34:12.670
that's basically what our agenda is okay any questions for

01:34:12.670 --> 01:34:14.720
the applicant thank

01:34:14.720 --> 01:34:17.880
you for coming out thank you for your time you bet sir

01:34:17.880 --> 01:34:25.890
anybody else want to speak on this item seeing none chair

01:34:25.890 --> 01:34:27.399
entertaining motion

01:34:27.399 --> 01:34:32.039
discussion Commissioner Ellis thank you chair I'm gonna

01:34:32.039 --> 01:34:34.680
move to approve ADP 17

01:34:34.680 --> 01:34:41.680
for Commissioner Beck second first and second any further

01:34:41.680 --> 01:34:42.279
discussion or

01:34:42.279 --> 01:34:50.159
comments I'll make a quick comment just say so good to see

01:34:50.159 --> 01:34:51.319
a local company do

01:34:51.319 --> 01:34:55.130
well and glad that you all are going to be able to stay in

01:34:55.130 --> 01:34:56.399
town and expand and

01:34:56.399 --> 01:35:00.380
continue to run your business here congratulations with

01:35:00.380 --> 01:35:01.560
that call for a

01:35:01.560 --> 01:35:11.289
vote on the board motion carries seven zero good luck with

01:35:11.289 --> 01:35:15.239
your project that

01:35:15.239 --> 01:35:18.670
will move us to well before I go to 4b I want to make this

01:35:18.670 --> 01:35:19.319
a general

01:35:19.319 --> 01:35:23.739
announcement on our agenda I've got a couple people here in

01:35:23.739 --> 01:35:25.000
the room let

01:35:25.000 --> 01:35:28.329
everyone know that in our public hearing sections item 5a

01:35:28.329 --> 01:35:30.840
has been withdrawn so

01:35:30.840 --> 01:35:33.409
if you're waiting for that item it has been withdrawn and

01:35:33.409 --> 01:35:34.199
it's going to be

01:35:34.199 --> 01:35:36.800
renoticed so do want to let you all know that if any of you

01:35:36.800 --> 01:35:37.920
are waiting for that

01:35:37.920 --> 01:35:44.310
item that will move us on to item 4b and I'm going to rec

01:35:44.310 --> 01:35:45.560
use myself on this item

01:35:45.560 --> 01:35:49.010
due to the fact that I was in a part of the partnership

01:35:49.010 --> 01:35:50.600
that owned this property

01:35:50.600 --> 01:35:53.670
originally and has sold it several years ago to the present

01:35:53.670 --> 01:35:54.479
owner and so I'm

01:35:54.479 --> 01:35:57.670
going to recuse myself on this item and I'll yield to the

01:35:57.670 --> 01:35:58.920
vice chair on this

01:35:58.920 --> 01:36:03.229
item thank you chair for item 4b I'll call Haley for

01:36:03.229 --> 01:36:08.720
presentation good evening

01:36:08.720 --> 01:36:11.729
this item is a site plan request for a medical office

01:36:11.729 --> 01:36:13.079
building in the razor

01:36:13.079 --> 01:36:18.289
branch overlay district so specifically this is for a

01:36:18.289 --> 01:36:19.640
medical office on lot 1

01:36:19.640 --> 01:36:23.520
block 4 of the razor ranch south edition you can see the

01:36:23.520 --> 01:36:25.039
property here outlined

01:36:25.039 --> 01:36:29.649
in red it's total of just over four acres it's located

01:36:29.649 --> 01:36:30.640
along the I-35

01:36:30.640 --> 01:36:34.430
frontage road scripture currently runs on the south side of

01:36:34.430 --> 01:36:35.199
the property on the

01:36:35.199 --> 01:36:38.260
north will be the future extension of panhandle drive that

01:36:38.260 --> 01:36:39.399
's being extended as

01:36:39.399 --> 01:36:43.899
part of the razor ranch development within the overlay

01:36:43.899 --> 01:36:45.760
district this lot

01:36:45.760 --> 01:36:49.560
specifically is located within the south mixed-use district

01:36:49.560 --> 01:36:50.479
we've discussed

01:36:50.479 --> 01:36:53.010
previously that there haven't been design standards

01:36:53.010 --> 01:36:53.920
developed for the

01:36:53.920 --> 01:36:57.520
majority of the south mixed-use district but this specific

01:36:57.520 --> 01:36:58.560
lot did have an

01:36:58.560 --> 01:37:01.609
amendment to the overlay passed in 2011 that adopted a site

01:37:01.609 --> 01:37:02.720
design standard just

01:37:02.720 --> 01:37:06.359
for this lot and as you're familiar with these site plans

01:37:06.359 --> 01:37:07.439
for razor ranch

01:37:07.439 --> 01:37:09.710
require submittal of a site plan landscape plan and

01:37:09.710 --> 01:37:10.760
building elevations

01:37:10.760 --> 01:37:15.609
for your consideration the criteria for approval generally

01:37:15.609 --> 01:37:16.439
are that the site

01:37:16.439 --> 01:37:19.260
can comply with the concept and schematic plan that we just

01:37:19.260 --> 01:37:19.800
looked at

01:37:19.800 --> 01:37:23.189
that the site provide for compatible arrangement of

01:37:23.189 --> 01:37:24.720
buildings and uses to not

01:37:24.720 --> 01:37:28.529
net negatively impact adjoining properties that there be

01:37:28.529 --> 01:37:29.359
adequate and

01:37:29.359 --> 01:37:31.859
safe circulation of vehicular traffic and that the site

01:37:31.859 --> 01:37:32.920
comply with all other

01:37:32.920 --> 01:37:37.710
aspects of the overlay so we'll look at the site plan here

01:37:37.710 --> 01:37:39.079
the proposed building

01:37:39.079 --> 01:37:44.319
is 22,000 square feet this is intended to be phase one of a

01:37:44.319 --> 01:37:45.199
larger development

01:37:45.199 --> 01:37:47.630
so you can see they're generally developing the southern

01:37:47.630 --> 01:37:48.279
half of the lot

01:37:48.279 --> 01:37:52.289
the intent would be to develop another medical office or

01:37:52.289 --> 01:37:53.640
similar use on the

01:37:53.640 --> 01:37:56.189
north part of this property to make one larger development

01:37:56.189 --> 01:37:56.840
that would be

01:37:56.840 --> 01:38:01.109
interconnected for this phase they're providing 110 parking

01:38:01.109 --> 01:38:02.119
spaces which is

01:38:02.119 --> 01:38:05.930
the exact requirement based on the parking ratios in our

01:38:05.930 --> 01:38:06.960
code of one space

01:38:06.960 --> 01:38:10.960
for 200 square feet of office and you can see here access

01:38:10.960 --> 01:38:12.300
to the site would be

01:38:12.300 --> 01:38:15.880
provided on the south side from a single driveway along

01:38:15.880 --> 01:38:17.920
scripture Street based on

01:38:17.920 --> 01:38:19.960
the drive aisles and their parking lot they do intend to

01:38:19.960 --> 01:38:21.239
interconnect so that

01:38:21.239 --> 01:38:23.710
eventually when the northern half develops there will also

01:38:23.710 --> 01:38:24.239
be access to

01:38:24.239 --> 01:38:27.729
the site from panhandle and they also have cross-connect

01:38:27.729 --> 01:38:29.159
ivity to the existing

01:38:29.159 --> 01:38:33.800
medical facility east of this property looking at the

01:38:33.800 --> 01:38:35.640
landscaping they have

01:38:35.640 --> 01:38:37.899
exceeded all of the landscape requirements in the razor

01:38:37.899 --> 01:38:38.720
ranch overlay

01:38:38.720 --> 01:38:42.529
for this particular lot a total of 22 percent landscape or

01:38:42.529 --> 01:38:43.039
20 percent

01:38:43.039 --> 01:38:46.850
landscaping was required they're providing 22 and then

01:38:46.850 --> 01:38:47.279
specifically

01:38:47.279 --> 01:38:50.119
within the parking lot they were required 22 percent tree

01:38:50.119 --> 01:38:50.880
canopy and 10

01:38:50.880 --> 01:38:55.090
percent landscaping so they have exceeded those numbers the

01:38:55.090 --> 01:38:56.039
building

01:38:56.039 --> 01:38:59.210
elevations are in compliance with the requirements of the

01:38:59.210 --> 01:39:00.359
overlay what you see

01:39:00.359 --> 01:39:04.170
here on the top is the side that would face face east into

01:39:04.170 --> 01:39:06.079
the site the middle

01:39:06.079 --> 01:39:09.250
elevation is what would be visible along the right of way

01:39:09.250 --> 01:39:11.039
of I-35 and then on the

01:39:11.039 --> 01:39:13.069
bottom you see the two the north and south end of the

01:39:13.069 --> 01:39:14.039
building and the

01:39:14.039 --> 01:39:17.329
building would be constructed of if his material similar to

01:39:17.329 --> 01:39:19.439
stucco and Texas

01:39:19.439 --> 01:39:24.050
limestone staff is recommending approval of the site plan

01:39:24.050 --> 01:39:25.079
request it was found to

01:39:25.079 --> 01:39:27.390
be compliant with all of the applicable regulations within

01:39:27.390 --> 01:39:28.039
the razor ranch

01:39:28.039 --> 01:39:31.069
overlay district and I can stand for any questions thank

01:39:31.069 --> 01:39:32.159
you Haley any questions

01:39:32.159 --> 01:39:38.199
for Haley commissioner Ellis thank you vice-chair Haley

01:39:38.199 --> 01:39:38.920
when they do develop

01:39:38.920 --> 01:39:41.470
the other site you did say that they would come back with a

01:39:41.470 --> 01:39:42.119
site plan for

01:39:42.119 --> 01:39:46.789
that as well that would be something separate yes thank you

01:39:46.789 --> 01:39:48.920
I do not see any

01:39:48.920 --> 01:39:52.380
other questions thank you Haley as this is an individual

01:39:52.380 --> 01:39:53.640
consideration item

01:39:53.640 --> 01:39:56.880
anyone who would like to speak and certainly do so is there

01:39:56.880 --> 01:39:57.960
anyone here who

01:39:57.960 --> 01:40:03.409
would like to speak about this item great see none the vice

01:40:03.409 --> 01:40:03.760
-chair will

01:40:03.760 --> 01:40:07.430
entertain a motion or discussion commissioner Smith motion

01:40:07.430 --> 01:40:08.119
to approve SP

01:40:08.119 --> 01:40:13.329
18 - 0 0 0 1 commissioner Ellis second is there any

01:40:13.329 --> 01:40:15.560
discussion I'll call for a

01:40:15.560 --> 01:40:18.079
vote on the board

01:40:26.800 --> 01:40:31.239
motion passes passes 6-0 with one recusal with that we'll

01:40:31.239 --> 01:40:32.560
move into our

01:40:32.560 --> 01:40:36.159
public agenda item B will be first and before that I'll

01:40:36.159 --> 01:40:37.479
call the chair back in

01:40:37.479 --> 01:40:40.479
the meeting

01:41:07.479 --> 01:41:23.939
thank you chairman and commissioners z 17 - 0 0 3 3 is a

01:41:23.939 --> 01:41:25.399
request for approval of

01:41:25.399 --> 01:41:30.930
an initial zoning designation of CMG on the subject site

01:41:30.930 --> 01:41:34.000
located on the map here

01:41:34.000 --> 01:41:39.409
it's located on the east side of old out and road south of

01:41:39.409 --> 01:41:43.319
Teasley given that the

01:41:43.319 --> 01:41:46.140
site was recently annexed into the city it has a holding

01:41:46.140 --> 01:41:47.119
zone designation of

01:41:47.119 --> 01:41:53.069
RD 5x and here you see the zoning map as it will look if

01:41:53.069 --> 01:41:54.119
this request is

01:41:54.119 --> 01:42:01.079
approved the subject site is designated as community mixed

01:42:01.079 --> 01:42:02.680
use the intent of

01:42:02.680 --> 01:42:09.050
community mixed use is to achieve a mix of uses basically

01:42:09.050 --> 01:42:10.520
commercial uses but

01:42:10.520 --> 01:42:15.960
also some residential and other service uses the types of

01:42:15.960 --> 01:42:17.560
uses and the scale of

01:42:17.560 --> 01:42:21.140
the development that is permitted in the CMG district

01:42:21.140 --> 01:42:22.960
conforms to the goals and

01:42:22.960 --> 01:42:28.470
of the community mixed use designation the requested CMG

01:42:28.470 --> 01:42:30.279
district would actually

01:42:30.279 --> 01:42:35.180
be a continuation of the existing CMG district that you see

01:42:35.180 --> 01:42:36.399
to the north this

01:42:36.399 --> 01:42:40.239
little site right here this point three acres is actually

01:42:40.239 --> 01:42:41.560
part of the lot that

01:42:41.560 --> 01:42:45.630
is located to the north when the site was plotted it was

01:42:45.630 --> 01:42:46.680
plotted with the city

01:42:46.680 --> 01:42:52.600
limit line going through the lower third of it the uses

01:42:52.600 --> 01:42:55.039
permitted in the CMG

01:42:55.039 --> 01:42:58.390
district are consistent with the uses that are in the area

01:42:58.390 --> 01:42:59.479
today specifically

01:42:59.479 --> 01:43:04.460
vehicle repair offices self storage we have institutional

01:43:04.460 --> 01:43:05.640
uses across the

01:43:05.640 --> 01:43:11.789
street as well as commercial the site will take access from

01:43:11.789 --> 01:43:13.359
old Alton Road old

01:43:13.359 --> 01:43:18.340
out and road is designated as a future secondary arterial

01:43:18.340 --> 01:43:20.000
you can see Teasley

01:43:20.000 --> 01:43:23.800
Road right here which is a primary arterial the site has

01:43:23.800 --> 01:43:25.319
access to water

01:43:25.319 --> 01:43:29.130
and sewer you can see the water and sewer lines water are

01:43:29.130 --> 01:43:30.239
blue and the sewer

01:43:30.239 --> 01:43:37.579
lines are red notices were sent out on March 25th we sent

01:43:37.579 --> 01:43:38.640
out five notices via

01:43:38.640 --> 01:43:42.020
certified mail to property owners within 200 feet of the

01:43:42.020 --> 01:43:43.359
site and we sent 11

01:43:43.359 --> 01:43:47.449
notices courtesy notices to property owners with it with

01:43:47.449 --> 01:43:48.359
excuse me to

01:43:48.359 --> 01:43:52.840
properties within 500 feet of the site we have at this time

01:43:52.840 --> 01:43:53.779
received no

01:43:53.779 --> 01:43:59.720
response to the mailing staff recommends approval of this

01:43:59.720 --> 01:44:01.600
request as it conforms

01:44:01.600 --> 01:44:06.079
with the standards for rezoning specifically the CMG

01:44:06.079 --> 01:44:06.600
district is

01:44:06.600 --> 01:44:09.600
consistent with the goals and objectives of the Denton plan

01:44:09.600 --> 01:44:10.920
2030 and the CMG

01:44:10.920 --> 01:44:14.729
district is compatible with the surrounding land uses and

01:44:14.729 --> 01:44:15.600
that concludes

01:44:15.600 --> 01:44:18.319
my presentation

01:44:22.880 --> 01:44:27.039
so any questions for Cindy

01:44:33.039 --> 01:44:38.250
I think in the transition of me stepping back in and you

01:44:38.250 --> 01:44:39.520
already being here we

01:44:39.520 --> 01:44:44.010
didn't open the public hearing so just for clarification I

01:44:44.010 --> 01:44:45.359
didn't know where we

01:44:45.359 --> 01:44:52.489
were my apologies so we're gonna open the public hearing

01:44:52.489 --> 01:44:54.600
for item 5b do you

01:44:54.600 --> 01:44:58.119
want me to go through my presentation again

01:45:02.039 --> 01:45:05.220
I'll ask for that is there anyone in the audience that

01:45:05.220 --> 01:45:06.880
would like to hear the

01:45:06.880 --> 01:45:13.520
presentation again seeing none public hearings open and we

01:45:13.520 --> 01:45:13.920
've had our

01:45:13.920 --> 01:45:22.840
presentation any questions for Cindy seeing none this is a

01:45:22.840 --> 01:45:23.840
public hearing so

01:45:23.840 --> 01:45:26.279
if there's anyone here who would like to speak on this item

01:45:26.279 --> 01:45:27.439
please come forward

01:45:27.439 --> 01:45:29.920
at this time

01:45:33.439 --> 01:45:36.420
seeing none it'll close the public hearing and open the

01:45:36.420 --> 01:45:38.279
floor for discussion

01:45:38.279 --> 01:45:44.159
or emotion Commissioner Smith motion approves e 17 - 0 0 3

01:45:44.159 --> 01:45:45.520
3 a commissioner

01:45:45.520 --> 01:45:49.100
is out I second okay we have a first and a second for

01:45:49.100 --> 01:45:53.680
approval any questions or

01:45:53.680 --> 01:46:01.920
comments so none we will call for a vote on the board

01:46:08.520 --> 01:46:13.720
motion is going to carry 7 0 we'll move us to item C this

01:46:13.720 --> 01:46:17.520
time I'm going to open

01:46:17.520 --> 01:46:23.420
the public hearing for DCA 18 - 0 0 0 2 and call on Haley

01:46:23.420 --> 01:46:25.199
for presentation

01:46:39.279 --> 01:46:39.699
so this is a proposed amendment to the Denton Development

01:46:39.699 --> 01:46:43.399
Code to remove

01:46:43.399 --> 01:46:47.460
limitation 34 so the request before you is to consider

01:46:47.460 --> 01:46:49.279
making a recommendation

01:46:49.279 --> 01:46:52.710
to council regarding removing limitation 34 from subchapter

01:46:52.710 --> 01:46:53.640
5 of the Denton

01:46:53.640 --> 01:46:56.449
Development Code this limitation is applicable to

01:46:56.449 --> 01:46:57.680
distribution center

01:46:57.680 --> 01:47:00.800
warehouse general and warehouse retail uses within our

01:47:00.800 --> 01:47:01.920
employment center

01:47:01.920 --> 01:47:07.199
districts so for a bit of background staff is proposing to

01:47:07.199 --> 01:47:08.680
remove l34

01:47:08.680 --> 01:47:10.779
entirely from the code in all places where it applies

01:47:10.779 --> 01:47:11.720
within the employment

01:47:11.720 --> 01:47:15.239
center districts this limitation specifically as I

01:47:15.239 --> 01:47:15.960
mentioned applies to

01:47:15.960 --> 01:47:19.260
distribution centers and warehouses and permits no more

01:47:19.260 --> 01:47:21.199
than 150,000 gross

01:47:21.199 --> 01:47:24.100
square feet and eight truck docks it further stipulates

01:47:24.100 --> 01:47:25.319
that all the docks and

01:47:25.319 --> 01:47:28.220
bays have to be to the rear or side not viewable from the

01:47:28.220 --> 01:47:29.119
street and that

01:47:29.119 --> 01:47:32.930
buffering standards apply for outdoor storage and the

01:47:32.930 --> 01:47:34.479
loading docks just for

01:47:34.479 --> 01:47:38.010
size comparison purposes the Walmart at razor ranch that

01:47:38.010 --> 01:47:39.479
you see here is just

01:47:39.479 --> 01:47:42.789
over 150,000 square feet and contains six truck docks so

01:47:42.789 --> 01:47:44.000
that would be a rough

01:47:44.000 --> 01:47:46.529
comparison of the type of facility where this limitation

01:47:46.529 --> 01:47:50.000
would start applying a

01:47:50.000 --> 01:47:54.159
little bit more background l34 has been in the code since

01:47:54.159 --> 01:47:55.880
it was adopted in 2002

01:47:55.880 --> 01:47:58.920
in 2012 we did make some changes that expanded the applic

01:47:58.920 --> 01:48:00.079
ability of it though

01:48:00.079 --> 01:48:05.289
we changed uses in 2012 so we previously had wholesale

01:48:05.289 --> 01:48:06.680
storage and distribution

01:48:06.680 --> 01:48:10.260
and distribution centers as separate uses with this with an

01:48:10.260 --> 01:48:11.720
ordinance in 2012 we

01:48:11.720 --> 01:48:15.529
removed both of those and adopted instead distribution

01:48:15.529 --> 01:48:16.239
center slash

01:48:16.239 --> 01:48:20.050
warehouse as a use and warehouse retail as another use and

01:48:20.050 --> 01:48:21.680
then we along with

01:48:21.680 --> 01:48:25.710
that expanded l34 to not only apply in the ECI district to

01:48:25.710 --> 01:48:26.920
wholesale storage

01:48:26.920 --> 01:48:31.560
but to apply to both of these new uses in the employment

01:48:31.560 --> 01:48:34.640
center districts we did

01:48:34.640 --> 01:48:36.970
some comparisons just to see what types of properties this

01:48:36.970 --> 01:48:37.800
would affect in the

01:48:37.800 --> 01:48:41.720
city so to develop a site that would have these limitations

01:48:41.720 --> 01:48:42.920
with 150,000

01:48:42.920 --> 01:48:46.289
square foot or larger building to provide for adequate

01:48:46.289 --> 01:48:48.000
parking and allow

01:48:48.000 --> 01:48:51.220
for the required landscaping area on the site within the EC

01:48:51.220 --> 01:48:52.199
I district you would

01:48:52.199 --> 01:48:56.560
have to have a minimum size property of 5.2 acres so

01:48:56.560 --> 01:48:59.000
looking at where we have

01:48:59.000 --> 01:49:01.590
that size of property with this zoning we found that it

01:49:01.590 --> 01:49:02.319
would affect

01:49:02.319 --> 01:49:05.439
approximately 23 different properties in the city that

01:49:05.439 --> 01:49:06.840
totaled approximately

01:49:06.840 --> 01:49:10.979
429 acres total so in the grand scheme of things not all

01:49:10.979 --> 01:49:12.840
that many properties

01:49:12.840 --> 01:49:16.420
would even be eligible for a facility as large as this

01:49:16.420 --> 01:49:17.920
limitation applies to

01:49:17.920 --> 01:49:22.600
properties within ECC we did ran the same comparison again

01:49:22.600 --> 01:49:23.560
to just see where

01:49:23.560 --> 01:49:26.560
this would start to kick in and we found the minimum size

01:49:26.560 --> 01:49:27.920
property where this

01:49:27.920 --> 01:49:31.350
would affect would be about five and a half acres a total

01:49:31.350 --> 01:49:32.520
of six properties

01:49:32.520 --> 01:49:39.079
were affected by this at just approximately 150 acres total

01:49:39.079 --> 01:49:39.399
so some

01:49:39.399 --> 01:49:42.050
further considerations that staff had we looked at what

01:49:42.050 --> 01:49:42.960
other cities in this

01:49:42.960 --> 01:49:45.300
area have in terms of limitations on warehouse or

01:49:45.300 --> 01:49:47.199
distribution facilities we

01:49:47.199 --> 01:49:50.600
found nothing comparable to what we have here none of the

01:49:50.600 --> 01:49:51.800
comparison cities had

01:49:51.800 --> 01:49:54.239
any limitation on the number of bays only two had

01:49:54.239 --> 01:49:55.760
limitations on warehouses

01:49:55.760 --> 01:49:58.720
at all with McKinney limiting the size of a warehouse in

01:49:58.720 --> 01:50:00.000
their town center to

01:50:00.000 --> 01:50:04.260
20,000 square feet and Carrollton limiting warehouses to be

01:50:04.260 --> 01:50:04.840
an accessory

01:50:04.840 --> 01:50:07.920
use only within their corporate commercial district which

01:50:07.920 --> 01:50:08.640
is where they

01:50:08.640 --> 01:50:13.489
have zoning in place to allow for large office campuses

01:50:13.489 --> 01:50:14.479
looking at other uses

01:50:14.479 --> 01:50:17.060
that can be permitted by right in these districts today

01:50:17.060 --> 01:50:18.239
craft alcohol production

01:50:18.239 --> 01:50:21.060
and light manufacturing are permitted with no limitation

01:50:21.060 --> 01:50:21.800
those facilities

01:50:21.800 --> 01:50:24.609
could include warehouses or distribution centers and not be

01:50:24.609 --> 01:50:26.520
limited in size but

01:50:26.520 --> 01:50:28.640
if you're strictly wanting to warehouse or distribute

01:50:28.640 --> 01:50:30.680
things that's where we for

01:50:30.680 --> 01:50:33.939
some reason have this limitation in place and speaking with

01:50:33.939 --> 01:50:34.520
economic

01:50:34.520 --> 01:50:36.909
developments they do frequently get requests for this type

01:50:36.909 --> 01:50:37.720
of facilities and

01:50:37.720 --> 01:50:40.680
places where they could go within the city and in general

01:50:40.680 --> 01:50:41.319
when those

01:50:41.319 --> 01:50:43.649
applicants come to them they're looking for places to put a

01:50:43.649 --> 01:50:45.039
200 to 300,000

01:50:45.039 --> 01:50:48.180
square foot building minimum so this limitation does

01:50:48.180 --> 01:50:49.439
inhibit in that way a

01:50:49.439 --> 01:50:53.250
lot of property that could be eligible for development with

01:50:53.250 --> 01:50:54.279
that being said

01:50:54.279 --> 01:50:58.090
staff is recommending approval of removing L34 from the

01:50:58.090 --> 01:50:59.000
Employment Center

01:50:59.000 --> 01:51:04.899
districts and I could answer any questions any questions

01:51:04.899 --> 01:51:07.239
for Haley okay

01:51:07.239 --> 01:51:11.949
thank you Commissioner Ellis thank you Jim Haley was there

01:51:11.949 --> 01:51:12.760
any discussion among

01:51:12.760 --> 01:51:16.000
staff with the other part of the limitation removing the

01:51:16.000 --> 01:51:17.159
size and that but

01:51:17.159 --> 01:51:20.000
where it talks about the screening and the loading ducks

01:51:20.000 --> 01:51:21.000
being the back did you

01:51:21.000 --> 01:51:25.000
have discussion over perhaps certainly entertaining them

01:51:25.000 --> 01:51:27.279
and we currently have

01:51:27.279 --> 01:51:31.359
standards that that accomplish those same goals within sub

01:51:31.359 --> 01:51:33.199
chapter 13 we have

01:51:33.199 --> 01:51:36.050
requirements for of course buffering between uses we

01:51:36.050 --> 01:51:37.279
already require that

01:51:37.279 --> 01:51:40.460
docs not be accessible or visible directly from the street

01:51:40.460 --> 01:51:41.479
so all of those

01:51:41.479 --> 01:51:44.430
same things are accomplished just in other places in the

01:51:44.430 --> 01:51:45.680
code okay so

01:51:45.680 --> 01:51:49.260
redundant yeah we're not removing any protections there

01:51:49.260 --> 01:51:49.960
necessarily by

01:51:49.960 --> 01:51:52.779
eliminating the location okay and then the way I read this

01:51:52.779 --> 01:51:53.720
is this limitation

01:51:53.720 --> 01:51:58.539
wasn't just two buildings that were 150,000 square feet it

01:51:58.539 --> 01:51:59.039
's just they

01:51:59.039 --> 01:52:02.439
couldn't be over 150,000 square feet exactly so I don't

01:52:02.439 --> 01:52:03.640
quite follow the map

01:52:03.640 --> 01:52:08.840
thing because so really we're removing any this from any

01:52:08.840 --> 01:52:10.079
distribution center of

01:52:10.079 --> 01:52:13.720
any size yes the intent with that exercise was just to see

01:52:13.720 --> 01:52:14.880
at what point

01:52:14.880 --> 01:52:17.430
would you start being limited so if you did have a property

01:52:17.430 --> 01:52:18.640
that was 5.2 acres

01:52:18.640 --> 01:52:20.829
that's when we would start seeing this because any site

01:52:20.829 --> 01:52:21.680
smaller than that

01:52:21.680 --> 01:52:27.079
couldn't even hold a facility that would this would apply

01:52:27.079 --> 01:52:29.199
to okay okay thank you

01:52:30.199 --> 01:52:37.850
any other questions for Haley okay thank you this is a

01:52:37.850 --> 01:52:40.039
public hearing so if

01:52:40.039 --> 01:52:42.069
there's anyone who would like to speak on this item please

01:52:42.069 --> 01:52:42.720
come forward at this

01:52:42.720 --> 01:52:49.989
time seeing none will close the public hearing and open the

01:52:49.989 --> 01:52:50.479
floor for

01:52:50.479 --> 01:52:53.479
discussion or motion

01:52:54.640 --> 01:52:58.520
Commissioner Smith thank you chair motion approved DCA 18 -

01:52:58.520 --> 01:53:00.319
0 0 0 2 okay

01:53:00.319 --> 01:53:03.920
Commissioner back second okay we have a first and a second

01:53:03.920 --> 01:53:05.199
for approval any

01:53:05.199 --> 01:53:12.960
further discussion seeing none of clothes and call for a

01:53:12.960 --> 01:53:15.560
vote on the board

01:53:21.479 --> 01:53:25.279
most is going to carry seven zero and we'll move us to our

01:53:25.279 --> 01:53:28.760
project matrix for

01:53:28.760 --> 01:53:31.279
this evening

01:53:34.039 --> 01:53:37.539
Commissioner Ellis thank you chair well I'm going to bring

01:53:37.539 --> 01:53:39.960
up that notification

01:53:39.960 --> 01:53:39.960
practice once again here as some questions came to light

01:53:39.960 --> 01:53:46.079
today so I guess

01:53:46.079 --> 01:53:51.289
I want to know who currently enforces it is that something

01:53:51.289 --> 01:53:52.039
that maybe we can have

01:53:52.039 --> 01:53:56.489
a discussion about to know how that is enforced and then I

01:53:56.489 --> 01:53:57.560
know we have an

01:53:57.560 --> 01:54:01.430
affidavit I believe that the applicant is supposed to

01:54:01.430 --> 01:54:03.520
supply to the city can we

01:54:03.520 --> 01:54:06.090
maybe get that in our backup materials that that was

01:54:06.090 --> 01:54:07.319
received or get a copy of

01:54:07.319 --> 01:54:10.510
it or something I know I don't want to be the sign police

01:54:10.510 --> 01:54:11.760
even though I do drive

01:54:11.760 --> 01:54:16.970
by all of our you know zoning issues but I would like to

01:54:16.970 --> 01:54:18.960
know and you know who

01:54:18.960 --> 01:54:22.539
is enforcing that so that things are properly done

01:54:22.539 --> 01:54:24.000
certainly and it's our

01:54:24.000 --> 01:54:26.829
responsibility to to to police that in this regard I

01:54:26.829 --> 01:54:28.279
believe in this specific

01:54:28.279 --> 01:54:32.829
case I believe they did submit an affidavit I can't tell

01:54:32.829 --> 01:54:33.840
you I have

01:54:33.840 --> 01:54:38.340
already updated the application and criteria as far as what

01:54:38.340 --> 01:54:38.800
needs to be

01:54:38.800 --> 01:54:44.279
posted and how and I sent that to to all of staff tonight

01:54:44.279 --> 01:54:45.760
and we will be

01:54:45.760 --> 01:54:48.670
reviewing that Monday morning at our staff meeting and so

01:54:48.670 --> 01:54:49.720
once we finalize

01:54:49.720 --> 01:54:52.810
that I will include that in the packet for the next PNC

01:54:52.810 --> 01:54:54.359
meeting to review okay

01:54:54.359 --> 01:54:57.550
thank you can I ask one more question if if an applicant

01:54:57.550 --> 01:54:59.000
submits an affidavit

01:54:59.000 --> 01:55:03.170
which is a notarized document and it is it compliant I mean

01:55:03.170 --> 01:55:04.079
is there a do we

01:55:04.079 --> 01:55:08.550
have a penalty or is there there's a requirement that it

01:55:08.550 --> 01:55:09.399
needs to be

01:55:09.399 --> 01:55:15.960
submitted prior to the to the meeting the way it's written

01:55:15.960 --> 01:55:16.640
unfortunately it's

01:55:16.640 --> 01:55:22.479
not a code requirement and so there's there's not a it's

01:55:22.479 --> 01:55:23.760
not as tight as it

01:55:23.760 --> 01:55:25.789
should be I mean there's not there's simply no other way to

01:55:25.789 --> 01:55:27.239
put it so the the

01:55:27.239 --> 01:55:31.409
what I attempted to do this evening is working to sort of

01:55:31.409 --> 01:55:32.960
clarify that where

01:55:32.960 --> 01:55:36.630
staff will be designating exactly where those signs need to

01:55:36.630 --> 01:55:38.000
be located they'll

01:55:38.000 --> 01:55:41.029
still be responsible for putting them up but we will be

01:55:41.029 --> 01:55:42.560
able to tell them exactly

01:55:42.560 --> 01:55:44.989
where to put them and how they need to be placed thank you

01:55:44.989 --> 01:55:45.840
I look forward to

01:55:45.840 --> 01:55:48.220
that update because I know we've made such good progress

01:55:48.220 --> 01:55:49.239
forward I don't want

01:55:49.239 --> 01:55:52.560
to go backwards now especially on something this absolutely

01:55:52.560 --> 01:55:53.399
simple thank

01:55:53.399 --> 01:55:55.800
you

01:55:58.640 --> 01:56:05.659
anything else on the matrix this evening okay with that I

01:56:05.659 --> 01:56:08.039
will close this at 7 10

01:56:08.039 --> 01:56:10.920
thank you everyone