1 00:00:00,000 --> 00:00:05,719 mission meeting for April 11th 2018. This meeting has been 2 00:00:05,719 --> 00:00:06,799 duly posted and we do 3 00:00:06,799 --> 00:00:11,779 have a quorum present and I will open our work session at 4 00:00:11,779 --> 00:00:14,619 five o'clock. We'll go 5 00:00:14,619 --> 00:00:21,179 into clarification of agenda items. So does anybody have 6 00:00:21,179 --> 00:00:23,059 any comments or changes 7 00:00:23,059 --> 00:00:25,620 on the minutes? 8 00:00:30,000 --> 00:00:36,880 Okay, as is. How about on the consent agenda? 9 00:00:41,439 --> 00:00:44,880 Commissioner Ellis. Thank you, Chair. It had to do with the 10 00:00:44,880 --> 00:00:46,079 Texas oncology. That's 11 00:00:46,079 --> 00:00:56,679 Haley's. Thanks Haley. You know it's really just my brain. 12 00:00:56,679 --> 00:00:58,259 I could not wrap myself 13 00:00:58,259 --> 00:01:03,009 around this vehicle generation table that was up there. Can 14 00:01:03,009 --> 00:01:03,439 you walk me 15 00:01:03,439 --> 00:01:06,510 through that at all as how those numbers were? Those are 16 00:01:06,510 --> 00:01:08,040 just standard numbers 17 00:01:08,040 --> 00:01:11,140 based on trip generation for a medical facility of this 18 00:01:11,140 --> 00:01:13,480 type. Okay, so not specific to this. 19 00:01:13,480 --> 00:01:16,549 No, it's very general just to determine what their 20 00:01:16,549 --> 00:01:17,239 estimated trip 21 00:01:17,239 --> 00:01:20,390 generation would be. It's standard data that's requested 22 00:01:20,390 --> 00:01:21,000 with a preliminary 23 00:01:21,000 --> 00:01:23,459 plat. In this case they just put it on the plat rather than 24 00:01:23,459 --> 00:01:24,319 submitting it as a 25 00:01:24,319 --> 00:01:26,840 separate document. Understood. Thank you because I haven't 26 00:01:26,840 --> 00:01:27,560 seen it on top there 27 00:01:27,560 --> 00:01:31,750 before. Thank you. Clarification, this would be specific to 28 00:01:31,750 --> 00:01:32,480 this site though, 29 00:01:32,480 --> 00:01:36,290 correct? In that it's you know for that size of a medical 30 00:01:36,290 --> 00:01:36,859 facility, yeah, but 31 00:01:36,859 --> 00:01:39,379 they're just estimates based on the ITE manuals. But 32 00:01:39,379 --> 00:01:42,439 nothing that was done 33 00:01:42,439 --> 00:01:46,629 specifically in this area for this site? It's not like a 34 00:01:46,629 --> 00:01:48,159 full TIA. No, this is 35 00:01:48,159 --> 00:01:50,200 just looking at a facility of this type. Some kind of 36 00:01:50,200 --> 00:01:53,799 general data? Yeah, general data from the ITE manuals. 37 00:01:53,799 --> 00:01:59,560 Okay. Just to help, trying to help. It's based on the site 38 00:01:59,560 --> 00:01:59,840 though. 39 00:01:59,840 --> 00:02:03,299 Specifically it's using the traffic criteria manual for a 40 00:02:03,299 --> 00:02:04,599 site this size to 41 00:02:04,599 --> 00:02:08,009 estimate what the traffic generation will be off of this in 42 00:02:08,009 --> 00:02:09,280 lieu of doing, 43 00:02:09,280 --> 00:02:13,860 because of the size of it, in lieu of doing an actual TIA. 44 00:02:13,860 --> 00:02:14,960 So it's kind of a 45 00:02:14,960 --> 00:02:18,770 staff level engineering type calculation that's done 46 00:02:18,770 --> 00:02:20,280 because of the size it's not 47 00:02:20,280 --> 00:02:23,620 so large and it doesn't have the trips to justify TIA like 48 00:02:23,620 --> 00:02:24,479 we've talked about. 49 00:02:24,479 --> 00:02:29,479 But they are having to do an actual traffic calculation for 50 00:02:29,479 --> 00:02:30,080 this particular 51 00:02:30,080 --> 00:02:34,659 site by using the criteria manual because it's not big 52 00:02:34,659 --> 00:02:35,240 enough to trigger 53 00:02:35,240 --> 00:02:38,199 TIA. So your question, I was just trying to be helpful. 54 00:02:38,199 --> 00:02:39,759 Yeah. I thought what you 55 00:02:39,759 --> 00:02:42,719 were asking is are those numbers in regards to the site? 56 00:02:42,719 --> 00:02:44,439 Right. Yes, they are. 57 00:02:44,439 --> 00:02:47,669 They're just the way it's calculated is not a true TIA. 58 00:02:47,669 --> 00:02:49,879 Understood. That does help. 59 00:02:49,879 --> 00:02:56,280 Thank you very much. Any other questions on this item or on 60 00:02:56,280 --> 00:02:57,199 the consent 61 00:02:57,199 --> 00:03:03,080 agenda? Okay. Thank you, Hayden. 62 00:03:05,080 --> 00:03:10,270 Then we'll move us to items for individual consideration. I 63 00:03:10,270 --> 00:03:10,840 'll call on 64 00:03:10,840 --> 00:03:15,319 Haley for presentation of 4A. 65 00:03:19,879 --> 00:03:27,639 All right. This item is an alternative development plan 66 00:03:27,639 --> 00:03:29,800 request for a tractor 67 00:03:29,800 --> 00:03:34,030 dealership and repair facility. So the request is for 68 00:03:34,030 --> 00:03:35,680 approval of an ADP that 69 00:03:35,680 --> 00:03:38,280 would deviate from these two specific sections of the code, 70 00:03:38,280 --> 00:03:39,400 perimeter fencing 71 00:03:39,400 --> 00:03:42,069 and screening requirements and then the parking lot 72 00:03:42,069 --> 00:03:43,400 screening requirements 73 00:03:43,400 --> 00:03:50,000 within subchapter 13. So the site itself is the northern 74 00:03:50,000 --> 00:03:52,080 roughly 5.4 acres of 75 00:03:52,080 --> 00:03:54,729 this tract outlined in yellow. We've seen a preliminary 76 00:03:54,729 --> 00:03:55,479 plat for this site 77 00:03:55,479 --> 00:03:58,780 previously. It's being split into two lots and the northern 78 00:03:58,780 --> 00:03:59,280 lot will be 79 00:03:59,280 --> 00:04:02,710 developed as a tractor dealership. As you can see here it's 80 00:04:02,710 --> 00:04:03,840 located on the west 81 00:04:03,840 --> 00:04:06,969 side of I-35. We have Windsor here across and then it's 82 00:04:06,969 --> 00:04:07,879 just north of Schuyler 83 00:04:07,879 --> 00:04:11,460 Drive. And this is located within a regional center 84 00:04:11,460 --> 00:04:12,400 commercial downtown 85 00:04:12,400 --> 00:04:16,329 zoning district. To walk you through specifically what's 86 00:04:16,329 --> 00:04:17,480 involved in this 87 00:04:17,480 --> 00:04:20,300 request I want to first look at the overall site plan. So 88 00:04:20,300 --> 00:04:21,079 you can see here 89 00:04:21,079 --> 00:04:23,740 they have about a 20,000 square foot building proposed in 90 00:04:23,740 --> 00:04:24,439 the middle of the 91 00:04:24,439 --> 00:04:28,860 site. The area here and here would be display. So this 92 00:04:28,860 --> 00:04:29,839 would be kind of public 93 00:04:29,839 --> 00:04:32,790 display like you'd see at a car lot and then this would be 94 00:04:32,790 --> 00:04:34,319 behind a fence. Just 95 00:04:34,319 --> 00:04:37,420 other display area for them. The blue areas are where 96 00:04:37,420 --> 00:04:38,480 customer and employee 97 00:04:38,480 --> 00:04:41,439 parking would be and the green is a detention pond that 98 00:04:41,439 --> 00:04:42,839 they're proposing at 99 00:04:42,839 --> 00:04:48,240 this time. So what we have on the site is 71% lot coverage 100 00:04:48,240 --> 00:04:49,519 and 29% landscaping 101 00:04:49,519 --> 00:04:53,810 total and a total of 63 parking spaces. And I did mention 102 00:04:53,810 --> 00:04:55,279 briefly in your backup 103 00:04:55,279 --> 00:04:57,600 but I wanted to bring it up here today. There is some 104 00:04:57,600 --> 00:04:58,800 discussion with the city 105 00:04:58,800 --> 00:05:01,949 of Windsor Drive possibly extending so I wanted to point 106 00:05:01,949 --> 00:05:03,279 out that this detention 107 00:05:03,279 --> 00:05:06,459 pond and some of the parking spaces may be relocated before 108 00:05:06,459 --> 00:05:07,740 the building permit 109 00:05:07,740 --> 00:05:10,149 for this site but it wouldn't alter any of the items that 110 00:05:10,149 --> 00:05:11,480 they've requested this 111 00:05:11,480 --> 00:05:16,670 alternative plan for. Commissioner Becker. Thank you Chair. 112 00:05:16,670 --> 00:05:19,319 Okay can you illustrate 113 00:05:19,319 --> 00:05:21,660 where Windsor might come no go back to the other one you 114 00:05:21,660 --> 00:05:22,879 had there. Where would 115 00:05:22,879 --> 00:05:27,360 Windsor come through? It would be on lot two of the okay if 116 00:05:27,360 --> 00:05:27,879 you remember the 117 00:05:27,879 --> 00:05:31,470 preliminary plat. Right. So lot two being roughly across 118 00:05:31,470 --> 00:05:33,319 here. Right. The intent 119 00:05:33,319 --> 00:05:36,639 would be for someday for Windsor to cross. So it wouldn't 120 00:05:36,639 --> 00:05:37,240 come straight 121 00:05:37,240 --> 00:05:40,699 across then? It would probably angle across and hopefully 122 00:05:40,699 --> 00:05:42,040 come somewhere in 123 00:05:42,040 --> 00:05:44,980 lot two but just in them dedicating that right-of-way if 124 00:05:44,980 --> 00:05:46,240 they if they do so it 125 00:05:46,240 --> 00:05:49,819 could shift their boundary line for lot two a little 126 00:05:49,819 --> 00:05:50,879 further north and relocate 127 00:05:50,879 --> 00:05:54,069 some of the parking on this side. Okay mentioned that 128 00:05:54,069 --> 00:05:55,279 should the Windsor come 129 00:05:55,279 --> 00:05:58,550 through it'd be located on the south end of the Soate 130 00:05:58,550 --> 00:06:00,560 property. He said if this 131 00:06:00,560 --> 00:06:03,009 occurs the parking and detention fill is shown on the site 132 00:06:03,009 --> 00:06:03,920 plan may change as 133 00:06:03,920 --> 00:06:08,149 you pointed out but none of the proposed deviations really 134 00:06:08,149 --> 00:06:09,800 requested with this ADP 135 00:06:09,800 --> 00:06:13,379 would be affected so the eight foot chain length fence 136 00:06:13,379 --> 00:06:15,120 wouldn't be the 137 00:06:15,120 --> 00:06:18,139 material and the landscaping all that would remain the same 138 00:06:18,139 --> 00:06:19,319 the location may 139 00:06:19,319 --> 00:06:22,600 change may change okay just to follow the boundaries of 140 00:06:22,600 --> 00:06:23,480 wherever the parking lot. 141 00:06:23,480 --> 00:06:30,839 Gotcha. Thanks. So again that they do have three specific 142 00:06:30,839 --> 00:06:31,420 standards they're 143 00:06:31,420 --> 00:06:34,720 requesting to deviate from. Our code does not allow chain 144 00:06:34,720 --> 00:06:36,079 link as a permitted 145 00:06:36,079 --> 00:06:38,430 fence material and they are as I mentioned requesting an 146 00:06:38,430 --> 00:06:39,079 eight foot tall 147 00:06:39,079 --> 00:06:42,639 chain link fence. It would be vinyl coated to tinted black 148 00:06:42,639 --> 00:06:43,480 so it would be 149 00:06:43,480 --> 00:06:46,300 non-reflective and that would be along the rear and side 150 00:06:46,300 --> 00:06:47,680 yards of the property. 151 00:06:47,680 --> 00:06:50,949 The code also specifies that fences forward of the front 152 00:06:50,949 --> 00:06:51,839 building line 153 00:06:51,839 --> 00:06:54,370 shouldn't be over three and a half feet tall. For security 154 00:06:54,370 --> 00:06:55,279 purposes they're 155 00:06:55,279 --> 00:06:57,670 requesting a total of a six foot tall wrought iron fence 156 00:06:57,670 --> 00:06:58,519 along the front of 157 00:06:58,519 --> 00:07:02,100 the property and then the code requires and if you have 158 00:07:02,100 --> 00:07:03,480 parking in front of a 159 00:07:03,480 --> 00:07:06,579 building a 15 foot wide landscaped area that includes a 160 00:07:06,579 --> 00:07:07,720 berm a large tree for 161 00:07:07,720 --> 00:07:11,829 every 40 linear feet and then either a hedgerow continuous 162 00:07:11,829 --> 00:07:12,560 wall or zero 163 00:07:12,560 --> 00:07:15,480 escaping also in that area to screen the parking because 164 00:07:15,480 --> 00:07:16,680 they want that display 165 00:07:16,680 --> 00:07:20,319 area right on I-35 for visibility purposes they were 166 00:07:20,319 --> 00:07:21,519 requesting to not 167 00:07:21,519 --> 00:07:23,990 provide that screening and instead they've proposed some 168 00:07:23,990 --> 00:07:24,600 alternative 169 00:07:24,600 --> 00:07:29,579 locations that we'll look at. So to look at the fencing the 170 00:07:29,579 --> 00:07:31,279 area in yellow or 171 00:07:31,279 --> 00:07:34,310 orange on the map is where the chain link fence is proposed 172 00:07:34,310 --> 00:07:35,199 right now so that 173 00:07:35,199 --> 00:07:38,779 would be again eight feet tall black vinyl coated chain 174 00:07:38,779 --> 00:07:39,720 link they are 175 00:07:39,720 --> 00:07:41,790 proposing to plant some trees along it to help further 176 00:07:41,790 --> 00:07:42,759 screen that side yard 177 00:07:42,759 --> 00:07:46,180 fencing. The red area would be the wrought iron fence 178 00:07:46,180 --> 00:07:47,079 location so that's 179 00:07:47,079 --> 00:07:50,980 six foot tall wrought iron fence and there would be gates 180 00:07:50,980 --> 00:07:52,240 here and here across 181 00:07:52,240 --> 00:07:56,269 the access drives to allow circulation through the site and 182 00:07:56,269 --> 00:07:57,199 as I mentioned 183 00:07:57,199 --> 00:07:59,699 they've proposed some alternatives for the landscaping so 184 00:07:59,699 --> 00:08:01,000 the darker green here 185 00:08:01,000 --> 00:08:04,069 and here on the site are trees that they're proposing to 186 00:08:04,069 --> 00:08:05,079 plant along that 187 00:08:05,079 --> 00:08:07,189 chain link fence so that the chain link isn't as visible 188 00:08:07,189 --> 00:08:08,160 from the right-of-way 189 00:08:08,160 --> 00:08:11,189 if you're driving down the frontage road and then in the 190 00:08:11,189 --> 00:08:12,519 lighter green these are 191 00:08:12,519 --> 00:08:15,589 the alternative locations so they've proposed all of the 192 00:08:15,589 --> 00:08:16,680 required number of 193 00:08:16,680 --> 00:08:19,870 trees and shrubs just in alternative sites rather than 194 00:08:19,870 --> 00:08:21,000 putting it directly 195 00:08:21,000 --> 00:08:23,040 here in front of their display yard as the code would 196 00:08:23,040 --> 00:08:24,360 require they're proposing 197 00:08:24,360 --> 00:08:27,329 clustering it around the entrances to the site and then 198 00:08:27,329 --> 00:08:28,560 four other trees that 199 00:08:28,560 --> 00:08:32,370 they couldn't fit in they've proposed to move to the back 200 00:08:32,370 --> 00:08:35,000 of the site. So just 201 00:08:35,000 --> 00:08:37,269 some of the considerations that staff looked at with this 202 00:08:37,269 --> 00:08:38,559 request the intent 203 00:08:38,559 --> 00:08:41,370 for our fencing requirements is to ensure you know visually 204 00:08:41,370 --> 00:08:42,120 attractive high 205 00:08:42,120 --> 00:08:45,309 quality materials also to ensure the visibility of 206 00:08:45,309 --> 00:08:46,120 buildings from the right 207 00:08:46,120 --> 00:08:49,539 of way being the intent for lower fencing in the front yard 208 00:08:49,539 --> 00:08:50,399 and then with 209 00:08:50,399 --> 00:08:53,019 our parking requirements the intent there being to kind of 210 00:08:53,019 --> 00:08:53,960 mute those visual 211 00:08:53,960 --> 00:08:56,370 effects of driving by and seeing just rows of parking in 212 00:08:56,370 --> 00:08:57,279 front of a building 213 00:08:57,279 --> 00:08:59,600 you know to ensure that there's not glare onto the roadways 214 00:08:59,600 --> 00:09:00,299 and that it's a 215 00:09:00,299 --> 00:09:05,509 visually attractive look along the street. So the code 216 00:09:05,509 --> 00:09:07,879 provides us very 217 00:09:07,879 --> 00:09:11,059 specific criteria for an ADP the first being preservation 218 00:09:11,059 --> 00:09:11,720 of existing 219 00:09:11,720 --> 00:09:14,899 neighborhoods it's not anticipated that this would have any 220 00:09:14,899 --> 00:09:15,759 negative effect on 221 00:09:15,759 --> 00:09:18,259 the surrounding area if you're familiar with the area there 222 00:09:18,259 --> 00:09:19,039 's RV dealerships 223 00:09:19,039 --> 00:09:21,860 directly north of there and then various other commercial 224 00:09:21,860 --> 00:09:22,799 uses along the frontage 225 00:09:22,799 --> 00:09:26,330 road as is typical. So this is consistent with the existing 226 00:09:26,330 --> 00:09:27,200 development pattern in 227 00:09:27,200 --> 00:09:31,059 the area. In terms of assuring quality development the 228 00:09:31,059 --> 00:09:31,919 request doesn't 229 00:09:31,919 --> 00:09:34,049 necessarily lower the design standards they're just 230 00:09:34,049 --> 00:09:36,120 proposing alternatives that 231 00:09:36,120 --> 00:09:38,159 aren't allowed in our code that would help them enhance the 232 00:09:38,159 --> 00:09:38,799 security and the 233 00:09:38,799 --> 00:09:42,139 visibility of the products on site. One of the other 234 00:09:42,139 --> 00:09:43,759 criteria is focusing new 235 00:09:43,759 --> 00:09:46,809 development to activity centers this is compatible with 236 00:09:46,809 --> 00:09:48,039 that goal in terms of 237 00:09:48,039 --> 00:09:50,919 if this is typical highway development it is a regional 238 00:09:50,919 --> 00:09:52,080 scale customer base 239 00:09:52,080 --> 00:09:56,059 that they have so it fits with the zoning requirements for 240 00:09:56,059 --> 00:09:56,759 the area. 241 00:09:56,919 --> 00:09:59,840 Infrastructure is in place for this development there's no 242 00:09:59,840 --> 00:10:00,720 concerns there 243 00:10:00,720 --> 00:10:03,620 that staff identified and then in terms of resulting in a 244 00:10:03,620 --> 00:10:04,360 high quality 245 00:10:04,360 --> 00:10:07,200 development that meets the intent of those standards we 246 00:10:07,200 --> 00:10:08,759 discussed what 247 00:10:08,759 --> 00:10:11,419 they're proposing is higher quality the fencing along the 248 00:10:11,419 --> 00:10:12,519 frontage is non-opaque 249 00:10:12,519 --> 00:10:15,000 so it won't necessarily reduce the visibility of the site 250 00:10:15,000 --> 00:10:15,720 from the right of 251 00:10:15,720 --> 00:10:20,049 way and they are proposing to screen the chain link fence 252 00:10:20,049 --> 00:10:21,240 by vinyl coating it and 253 00:10:21,240 --> 00:10:25,049 providing landscaping in front of it. And then in terms of 254 00:10:25,049 --> 00:10:25,879 the parking lot 255 00:10:25,879 --> 00:10:27,929 screening as I mentioned they have all of the required 256 00:10:27,929 --> 00:10:28,960 plantings they actually 257 00:10:28,960 --> 00:10:32,220 are providing eight additional street trees beyond what is 258 00:10:32,220 --> 00:10:33,600 required to greatly 259 00:10:33,600 --> 00:10:37,480 enhance those main entry points to the site but not you 260 00:10:37,480 --> 00:10:39,360 know visually detract 261 00:10:39,360 --> 00:10:43,000 from the display area for their equipment. So with all that 262 00:10:43,000 --> 00:10:43,639 being said 263 00:10:43,639 --> 00:10:46,519 staff is recommending approval of their request we found 264 00:10:46,519 --> 00:10:47,279 that it meet these 265 00:10:47,279 --> 00:10:49,850 established standards in the DDC and I can try to answer 266 00:10:49,850 --> 00:10:50,720 any questions about 267 00:10:50,720 --> 00:10:55,350 the site. Commissioner Smith. Thank You Chair. The further 268 00:10:55,350 --> 00:10:57,360 down along 35 Haley 269 00:10:57,360 --> 00:11:01,230 like James Wood and then across on the east side with 270 00:11:01,230 --> 00:11:02,759 Classic and one other used 271 00:11:02,759 --> 00:11:06,120 car lot is it still is it RCCD over there as well? 272 00:11:06,120 --> 00:11:13,860 35 East? Yeah 35 East but further south of Mayhill. I 273 00:11:13,860 --> 00:11:14,639 believe most of that is RCCD 274 00:11:14,639 --> 00:11:18,240 there is some PD zoning in that area but most of those are 275 00:11:18,240 --> 00:11:20,200 RCCD. So what makes 276 00:11:20,200 --> 00:11:23,240 I mean the what makes it to where if we approve this we 277 00:11:23,240 --> 00:11:24,720 wouldn't see like James 278 00:11:24,720 --> 00:11:26,929 Wood or some other because it seems like they're requesting 279 00:11:26,929 --> 00:11:27,480 the six foot 280 00:11:27,480 --> 00:11:29,960 wrought iron fence in the front purely for security 281 00:11:29,960 --> 00:11:31,799 purposes. They're a tractor 282 00:11:31,799 --> 00:11:33,990 and repair shop and get it I mean how but how much 283 00:11:33,990 --> 00:11:35,679 difference are they in 284 00:11:35,679 --> 00:11:39,000 comparison to James Wood or to Classic or some of those 285 00:11:39,000 --> 00:11:40,159 other car dealerships 286 00:11:40,159 --> 00:11:43,389 who would have the same amount of security concerns what 287 00:11:43,389 --> 00:11:44,200 would what would 288 00:11:44,200 --> 00:11:46,889 preclude them from coming along and asking for the exact 289 00:11:46,889 --> 00:11:48,519 same type of change 290 00:11:48,519 --> 00:11:50,730 within the change and be able to build a new fence as well 291 00:11:50,730 --> 00:11:51,600 be able for security 292 00:11:51,600 --> 00:11:54,309 purposes and we didn't have a just six six foot wrought 293 00:11:54,309 --> 00:11:55,360 iron fences all up and down 294 00:11:55,360 --> 00:11:58,169 35. Certainly and in discussing it with the applicant the 295 00:11:58,169 --> 00:11:59,480 concern was with the 296 00:11:59,480 --> 00:12:01,960 type of equipment that the typical low fencing you see at 297 00:12:01,960 --> 00:12:02,799 car lots in the front 298 00:12:02,799 --> 00:12:06,389 wouldn't necessarily be sufficient and they they found that 299 00:12:06,389 --> 00:12:07,080 some of the 300 00:12:07,080 --> 00:12:10,169 neighbors in this area have taller fences that predate our 301 00:12:10,169 --> 00:12:11,080 current code so 302 00:12:11,080 --> 00:12:13,620 they just wanted to be consistent with what the neighbors 303 00:12:13,620 --> 00:12:14,600 have and ensure that 304 00:12:14,600 --> 00:12:18,049 extra level of security based on the large equipment that 305 00:12:18,049 --> 00:12:19,120 they're dealing 306 00:12:19,120 --> 00:12:22,190 with and why why is the current zoning only three and a 307 00:12:22,190 --> 00:12:23,120 half is just for a 308 00:12:23,120 --> 00:12:26,519 visibility issues or what was the that is not based on 309 00:12:26,519 --> 00:12:27,679 zoning the fence 310 00:12:27,679 --> 00:12:30,340 requirement is that applies citywide unless you are an 311 00:12:30,340 --> 00:12:31,200 industrial or an 312 00:12:31,200 --> 00:12:35,279 agricultural use so if this were an industrial site they 313 00:12:35,279 --> 00:12:35,759 would be allowed to 314 00:12:35,759 --> 00:12:39,759 have a six or eight foot fence in the front yard but got it 315 00:12:39,759 --> 00:12:40,120 for commercial 316 00:12:40,120 --> 00:12:43,309 uses it's not allowed and then the the screening the the it 317 00:12:43,309 --> 00:12:44,320 's like a fabric 318 00:12:44,320 --> 00:12:46,940 correct like what you'd see on construction sites as well 319 00:12:46,940 --> 00:12:47,480 the screen 320 00:12:47,480 --> 00:12:49,799 the screening within the chain link no I believe it's 321 00:12:49,799 --> 00:12:51,000 actual vinyl coating on 322 00:12:51,000 --> 00:12:54,799 the metal chain link itself okay all right so it's not it's 323 00:12:54,799 --> 00:12:55,240 not the screen 324 00:12:55,240 --> 00:12:57,960 like you see on construction sites where it's got it my I 325 00:12:57,960 --> 00:12:58,600 was gonna ask about 326 00:12:58,600 --> 00:13:01,309 maintenance on that stuff gets raggedy after a while but 327 00:13:01,309 --> 00:13:02,360 yeah now I understand 328 00:13:02,360 --> 00:13:05,000 thank you that's all I have commissioner Rizzo thank you 329 00:13:05,000 --> 00:13:07,679 chair the ADP would apply 330 00:13:07,679 --> 00:13:14,340 to both lots correct the the ADP is specific to the site 331 00:13:14,340 --> 00:13:15,000 plan for this 332 00:13:15,000 --> 00:13:17,639 Kubota dealership so just the five point eight acres they 333 00:13:17,639 --> 00:13:18,600 have no plans at this 334 00:13:18,600 --> 00:13:21,299 point for what would go on lot two but if lot two one of 335 00:13:21,299 --> 00:13:22,519 the same conditions 336 00:13:22,519 --> 00:13:25,240 they would have to come back and get an ADP yes it is 337 00:13:25,240 --> 00:13:27,000 specific to the the Kubota 338 00:13:27,000 --> 00:13:29,820 sites that we're looking at tonight and maybe we can talk 339 00:13:29,820 --> 00:13:30,720 about this in the 340 00:13:30,720 --> 00:13:33,100 other room but I'm with the Commissioner Smith on this I 341 00:13:33,100 --> 00:13:33,919 don't I'm trying to 342 00:13:33,919 --> 00:13:37,070 understand why they need a six foot fence maybe it's my 343 00:13:37,070 --> 00:13:37,919 ignorant ignorance 344 00:13:37,919 --> 00:13:40,789 and the tractor business but I think those equipments are 345 00:13:40,789 --> 00:13:42,399 enclosed just like 346 00:13:42,399 --> 00:13:47,610 a car would be so I don't I'm not understanding why they 347 00:13:47,610 --> 00:13:48,639 need a six foot 348 00:13:48,639 --> 00:13:52,129 fence but no car dealership has ever asked for that and I 349 00:13:52,129 --> 00:13:52,799 don't I don't know 350 00:13:52,799 --> 00:13:55,769 I'd be interested if the applicants here to understand 351 00:13:55,769 --> 00:13:56,840 their rationale because 352 00:13:56,840 --> 00:14:02,049 it doesn't seem like a six foot rod iron fence is necessary 353 00:14:02,049 --> 00:14:02,879 and the 354 00:14:02,879 --> 00:14:05,720 applicant will be here this evening at the regular session 355 00:14:05,720 --> 00:14:06,559 to discuss this 356 00:14:06,559 --> 00:14:09,600 further my understanding from them as I said it's because 357 00:14:09,600 --> 00:14:10,559 they they're going to 358 00:14:10,559 --> 00:14:13,659 have this large display area in the front with large tract 359 00:14:13,659 --> 00:14:14,559 ors rather than 360 00:14:14,559 --> 00:14:17,639 smaller cars that couldn't necessarily cross a lower fence 361 00:14:17,639 --> 00:14:18,840 I guess the concern 362 00:14:18,840 --> 00:14:22,480 would be tractors and heavy equipment may be able to do 363 00:14:22,480 --> 00:14:24,460 that so they were they 364 00:14:24,460 --> 00:14:26,940 felt that the six foot height and the wrought iron material 365 00:14:26,940 --> 00:14:27,799 was necessary for 366 00:14:27,799 --> 00:14:31,379 security but I believe they could speak more to the 367 00:14:31,379 --> 00:14:37,679 specifics on that okay I 368 00:14:37,679 --> 00:14:42,889 have a more general question rather than specific in the D 369 00:14:42,889 --> 00:14:44,620 DC update that we have 370 00:14:44,620 --> 00:14:49,149 coming which and maybe I have a different opinion these 371 00:14:49,149 --> 00:14:49,879 seem to be 372 00:14:49,879 --> 00:14:53,820 fairly minor to me are these things that possibly with the 373 00:14:53,820 --> 00:14:55,200 DDC update be handled 374 00:14:55,200 --> 00:14:58,659 administratively rather than these are still going to be 375 00:14:58,659 --> 00:14:59,679 required as ADPs 376 00:14:59,679 --> 00:15:03,230 because of this some of the small changes trying to think 377 00:15:03,230 --> 00:15:04,080 back to some of 378 00:15:04,080 --> 00:15:06,000 the specifics I think some of the fencing requirements we 379 00:15:06,000 --> 00:15:06,440 're trying to 380 00:15:06,440 --> 00:15:09,789 address to allow a little more flexibility there for 381 00:15:09,789 --> 00:15:10,919 certain uses and 382 00:15:10,919 --> 00:15:13,620 then in terms of landscaping I don't think we quite have 383 00:15:13,620 --> 00:15:14,720 that nailed down yet 384 00:15:14,720 --> 00:15:17,200 but the intent is for it to be more administrative approval 385 00:15:17,200 --> 00:15:17,600 for you know 386 00:15:17,600 --> 00:15:20,519 that were actually the way that the current the current 387 00:15:20,519 --> 00:15:21,480 draft is written 388 00:15:21,480 --> 00:15:24,169 there would not be an ADP process anymore there would be 389 00:15:24,169 --> 00:15:25,080 some flexibility 390 00:15:25,080 --> 00:15:29,360 with with staff having some some some minor the ability to 391 00:15:29,360 --> 00:15:29,919 do some minor 392 00:15:29,919 --> 00:15:33,320 adjustments like 10% I think it is on certain standards 393 00:15:33,320 --> 00:15:34,519 fence I just don't 394 00:15:34,519 --> 00:15:37,860 recall off the top my head regarding this the height in the 395 00:15:37,860 --> 00:15:39,840 front 396 00:15:40,840 --> 00:15:53,679 anybody else thank you having that will move us to 4b and I 397 00:15:53,679 --> 00:15:54,679 have a conflict of 398 00:15:54,679 --> 00:15:59,309 interest on 4b I was in the partnership that sold this 399 00:15:59,309 --> 00:16:00,440 property to this current 400 00:16:00,440 --> 00:16:03,259 owner and so even though it's been a number of years ago I 401 00:16:03,259 --> 00:16:04,159 'm going to recuse 402 00:16:04,159 --> 00:16:10,299 myself just to make sure there's no appearance of conflict 403 00:16:10,299 --> 00:16:10,759 of interest a 404 00:16:10,759 --> 00:16:13,799 moment turn the meeting over to Commissioner Roselle at 405 00:16:13,799 --> 00:16:13,879 this time thank 406 00:16:13,879 --> 00:16:17,120 you chair and I believe Haley is presenting this item as 407 00:16:17,120 --> 00:16:23,879 well item 4b 408 00:16:24,519 --> 00:16:27,799 yes so this item is a site plan for a medical office 409 00:16:27,799 --> 00:16:29,759 building within the razor 410 00:16:29,759 --> 00:16:35,000 ranch overlay district so the request is from prime Denton 411 00:16:35,000 --> 00:16:36,039 properties for 412 00:16:36,039 --> 00:16:39,879 approval of a site plan to allow a medical office building 413 00:16:39,879 --> 00:16:40,879 on lot one block 414 00:16:40,879 --> 00:16:43,929 four which is part of the razor ranch south edition to look 415 00:16:43,929 --> 00:16:45,039 at the site more 416 00:16:45,039 --> 00:16:48,840 specifically it's outlined here in red on this this aerial 417 00:16:48,840 --> 00:16:49,600 to give you a 418 00:16:49,600 --> 00:16:53,659 reference as to where this is in relation to the convention 419 00:16:53,659 --> 00:16:54,679 center the 420 00:16:54,679 --> 00:16:58,320 hospital next door so it's on the I-35 frontage road 421 00:16:58,320 --> 00:16:59,440 between Scripture and Pan 422 00:16:59,440 --> 00:17:04,640 handle it's just over four acres total in terms of the 423 00:17:04,640 --> 00:17:06,359 razor ranch overlay it's 424 00:17:06,359 --> 00:17:11,359 on the very southern portion within the south mixed use 425 00:17:11,359 --> 00:17:15,960 district so in 2011 they 426 00:17:15,960 --> 00:17:19,150 adopted very specific standards for this lot you've heard 427 00:17:19,150 --> 00:17:20,240 me mention before that 428 00:17:20,240 --> 00:17:22,369 the south mixed use district we don't have a lot of those 429 00:17:22,369 --> 00:17:23,279 standards adopted in 430 00:17:23,279 --> 00:17:26,319 the overlay yet this lot specifically had those developed 431 00:17:26,319 --> 00:17:27,759 in 2011 with the 432 00:17:27,759 --> 00:17:30,279 intent of developing it with a similar medical use that we 433 00:17:30,279 --> 00:17:32,240 're seeing tonight as 434 00:17:32,240 --> 00:17:35,480 with other razor site plans what was required of them was 435 00:17:35,480 --> 00:17:36,440 to provide a site 436 00:17:36,440 --> 00:17:40,319 plan a landscape plan and building elevations at this time 437 00:17:40,319 --> 00:17:42,119 so the criteria 438 00:17:42,119 --> 00:17:44,460 for approval for a site plan for razor is that it 439 00:17:44,460 --> 00:17:46,000 substantially complies with 440 00:17:46,000 --> 00:17:48,829 the concept and schematic plan that it provides for a 441 00:17:48,829 --> 00:17:50,319 compatible arrangement of 442 00:17:50,319 --> 00:17:52,359 buildings and land uses that wouldn't adversely affect 443 00:17:52,359 --> 00:17:53,559 neighboring properties 444 00:17:53,559 --> 00:17:56,950 that it provides for safe vehicular circulation and that it 445 00:17:56,950 --> 00:17:58,599 complies with the 446 00:17:58,599 --> 00:18:03,579 requirements of the overlay district so looking at their 447 00:18:03,579 --> 00:18:04,920 site plan you can tell 448 00:18:04,920 --> 00:18:07,759 they at this point they're developing phase one of what 449 00:18:07,759 --> 00:18:08,680 would be a larger 450 00:18:08,680 --> 00:18:10,769 development so at this time we're only looking at the 451 00:18:10,769 --> 00:18:11,920 southern half of the slot 452 00:18:11,920 --> 00:18:16,900 so the northern portion will be developed at some future 453 00:18:16,900 --> 00:18:17,799 time but what 454 00:18:17,799 --> 00:18:21,099 they're proposing tonight is a 22,000 square foot medical 455 00:18:21,099 --> 00:18:22,519 office building it 456 00:18:22,519 --> 00:18:25,180 would include 110 parking spaces which is what's required 457 00:18:25,180 --> 00:18:26,000 based on the square 458 00:18:26,000 --> 00:18:29,230 footage and the site would have direct access from 459 00:18:29,230 --> 00:18:30,759 scripture Street so no no 460 00:18:30,759 --> 00:18:32,890 direct tie-in to the frontage road all traffic would be 461 00:18:32,890 --> 00:18:33,680 routed to the site 462 00:18:33,680 --> 00:18:36,869 through scripture it does have a tie-in to the adjoining 463 00:18:36,869 --> 00:18:38,000 medical facility and 464 00:18:38,000 --> 00:18:40,380 then you can see where they've stubbed out to someday 465 00:18:40,380 --> 00:18:41,599 provide connectivity to 466 00:18:41,599 --> 00:18:46,039 the northern half of the lot and ultimately to panhandle 467 00:18:46,039 --> 00:18:48,000 looking at the 468 00:18:48,000 --> 00:18:52,480 site they have a total of 22% landscaping 20% was is what's 469 00:18:52,480 --> 00:18:52,920 required by 470 00:18:52,920 --> 00:18:56,990 the overlay there isn't a specific tree canopy requirement 471 00:18:56,990 --> 00:18:57,799 for the overall lot 472 00:18:57,799 --> 00:19:02,160 within the standards the parking lot did have a 22% tree 473 00:19:02,160 --> 00:19:03,160 canopy and 10% 474 00:19:03,160 --> 00:19:06,289 landscaping requirements so they have exceeded those as we 475 00:19:06,289 --> 00:19:07,319 can see here on the 476 00:19:07,319 --> 00:19:11,579 plan and I wanted to point out just some features you'll 477 00:19:11,579 --> 00:19:12,440 notice there there are 478 00:19:12,440 --> 00:19:15,509 no street trees directly provided along I-35 due to the 479 00:19:15,509 --> 00:19:16,519 amount of utility 480 00:19:16,519 --> 00:19:19,420 easements in that area they've relocated those in between 481 00:19:19,420 --> 00:19:20,640 the buildings which the 482 00:19:20,640 --> 00:19:23,230 flexibility for that is allowed for within the overlay and 483 00:19:23,230 --> 00:19:24,480 then they do have 484 00:19:24,480 --> 00:19:28,559 all of the required street trees here along scripture 485 00:19:28,559 --> 00:19:30,480 looking at the building 486 00:19:30,480 --> 00:19:34,339 elevations this top area is what would face internal to the 487 00:19:34,339 --> 00:19:35,720 parking lot this 488 00:19:35,720 --> 00:19:39,299 would be the side along I-35 and then we have here the two 489 00:19:39,299 --> 00:19:40,839 side elevations which 490 00:19:40,839 --> 00:19:44,339 you can see are kind of mirrors of each other so scripture 491 00:19:44,339 --> 00:19:45,559 and then facing north 492 00:19:45,559 --> 00:19:48,289 which would ultimately about the other building and the 493 00:19:48,289 --> 00:19:49,519 building is proposed to 494 00:19:49,519 --> 00:19:52,920 be built primarily of Texas limestone and ephis materials 495 00:19:52,920 --> 00:19:54,240 so fairly typical 496 00:19:54,240 --> 00:19:58,660 and staff is recommending approval of the site plan request 497 00:19:58,660 --> 00:19:59,839 we found it to be 498 00:19:59,839 --> 00:20:02,079 compatible with all the requirements of the razor range 499 00:20:02,079 --> 00:20:03,519 overlay district and I 500 00:20:03,519 --> 00:20:07,519 can stand for any questions Christian back thank you by 501 00:20:07,519 --> 00:20:09,279 chair signage 502 00:20:09,279 --> 00:20:12,380 would they be able to put signs on the back of their 503 00:20:12,380 --> 00:20:14,680 building that faces 35 and 504 00:20:14,680 --> 00:20:17,869 if so what would they look like they haven't provided sign 505 00:20:17,869 --> 00:20:18,680 plans at this time 506 00:20:18,680 --> 00:20:21,559 all signs are handled as separate permits at the time of 507 00:20:21,559 --> 00:20:22,519 building permit 508 00:20:22,519 --> 00:20:25,329 but they would be allowed to have wall signs the exact 509 00:20:25,329 --> 00:20:26,519 square footage I'm not 510 00:20:26,519 --> 00:20:30,829 sure off the top of my head but illuminated I'm sorry 511 00:20:30,829 --> 00:20:31,759 illuminated signs 512 00:20:31,759 --> 00:20:36,740 are they pliable I believe illumination is permitted okay 513 00:20:36,740 --> 00:20:37,400 the other thing 514 00:20:37,400 --> 00:20:41,210 noticing that the only entrance into this is all scripture 515 00:20:41,210 --> 00:20:42,680 going back to your 516 00:20:42,680 --> 00:20:46,180 traffic analysis for the Texas oncology which is just right 517 00:20:46,180 --> 00:20:47,240 down the road did 518 00:20:47,240 --> 00:20:50,339 was that taking consideration that we were also building 519 00:20:50,339 --> 00:20:51,480 this unit that was 520 00:20:51,480 --> 00:20:54,609 going to bring in the I don't believe this site was 521 00:20:54,609 --> 00:20:56,000 accounted for in the Texas 522 00:20:56,000 --> 00:20:59,839 oncology numbers that plat started long before this came 523 00:20:59,839 --> 00:21:01,079 along but there has 524 00:21:01,079 --> 00:21:03,789 been traffic studies for the overall razor ranch area that 525 00:21:03,789 --> 00:21:04,559 included all of 526 00:21:04,559 --> 00:21:07,569 razor ranch so you know all of the necessary improvements 527 00:21:07,569 --> 00:21:08,519 to the perimeter 528 00:21:08,519 --> 00:21:14,400 streets and accounted for okay Trish or Sullivan I think is 529 00:21:14,400 --> 00:21:15,839 it thanks sir chair 530 00:21:15,839 --> 00:21:19,420 as an add-on to a commissioner back I guess I was a similar 531 00:21:19,420 --> 00:21:21,319 question is that 532 00:21:21,319 --> 00:21:26,559 we've got a thousand thirty four vehicle trips on oncology 533 00:21:26,559 --> 00:21:27,960 coming on to 534 00:21:27,960 --> 00:21:32,220 scripture and then we have only one plate one entrance and 535 00:21:32,220 --> 00:21:33,400 exit from this 536 00:21:33,400 --> 00:21:38,720 location on the scripture and driving on scripture quite 537 00:21:38,720 --> 00:21:40,720 often for one of a 538 00:21:40,720 --> 00:21:45,920 reason there's two lanes on the eastbound side and one lane 539 00:21:45,920 --> 00:21:46,640 coming on to 540 00:21:46,640 --> 00:21:50,220 the service road which means those two sides are going to 541 00:21:50,220 --> 00:21:52,200 generate a thousand 542 00:21:52,200 --> 00:21:55,420 two thousand three thousand cars a day and they're going to 543 00:21:55,420 --> 00:21:56,279 be going on to a 544 00:21:56,279 --> 00:22:01,559 one lane street to then get onto the service road to go 545 00:22:01,559 --> 00:22:03,440 wherever they're 546 00:22:03,440 --> 00:22:09,359 going to go from there has I mean is there no other I mean 547 00:22:09,359 --> 00:22:09,839 what's what's 548 00:22:09,839 --> 00:22:14,650 their other plan to get all those cars out of that area for 549 00:22:14,650 --> 00:22:15,960 the time being the 550 00:22:15,960 --> 00:22:18,930 traffic would be on scripture the ultimate goal is that 551 00:22:18,930 --> 00:22:19,920 they would have a 552 00:22:19,920 --> 00:22:22,299 you know what like we saw on their site plan they are stub 553 00:22:22,299 --> 00:22:23,240 bing out to the north 554 00:22:23,240 --> 00:22:26,819 so eventually this lot will have access via panhandle and 555 00:22:26,819 --> 00:22:27,920 scripture when the 556 00:22:27,920 --> 00:22:31,420 northern portion develops at this time this site would have 557 00:22:31,420 --> 00:22:32,480 the one driveway 558 00:22:32,480 --> 00:22:35,809 you know somewhere in this area and then they're also 559 00:22:35,809 --> 00:22:37,519 connecting to this existing 560 00:22:37,519 --> 00:22:40,039 facility here so there there would be cross connectivity 561 00:22:40,039 --> 00:22:41,880 between the sites that 562 00:22:41,880 --> 00:22:44,759 would offer another means in and out of the parking lot if 563 00:22:44,759 --> 00:22:46,559 that were a concern 564 00:22:46,559 --> 00:22:50,369 but scripture for the time being would be the only access 565 00:22:50,369 --> 00:22:51,720 to the site until that 566 00:22:51,720 --> 00:22:57,180 northern half develops thank you pressure Sanchez you 567 00:22:57,180 --> 00:22:58,519 mentioned that the 568 00:22:58,519 --> 00:23:01,630 parking parking is based on the number of the square 569 00:23:01,630 --> 00:23:03,240 footage is that for a 570 00:23:03,240 --> 00:23:07,680 medical facility yes okay specific for mad yeah leave a 571 00:23:07,680 --> 00:23:08,720 parking ratio I believe 572 00:23:08,720 --> 00:23:11,279 it's a one to two hundred square feet for medical offices 573 00:23:11,279 --> 00:23:11,960 oh it's what's 574 00:23:11,960 --> 00:23:16,599 required so they're right at that number 575 00:23:17,960 --> 00:23:25,759 any other questions for Haley thank you very much 576 00:23:35,640 --> 00:23:59,599 would be possible to call chair back in item 5a that public 577 00:23:59,599 --> 00:24:00,400 height that's being 578 00:24:00,400 --> 00:24:03,420 withdrawn from staff so we won't that'll come back at a 579 00:24:03,420 --> 00:24:04,039 later time it'll be 580 00:24:04,039 --> 00:24:16,950 re-advertised the access bank project is withdrawn so that 581 00:24:16,950 --> 00:24:19,119 we reposted it'll be 582 00:24:19,119 --> 00:24:24,329 completely reposted renoticed react re-advertised okay 583 00:24:24,329 --> 00:24:26,759 perfect and just to 584 00:24:26,759 --> 00:24:29,769 give you there was an issue with I think most most are 585 00:24:29,769 --> 00:24:31,000 probably aware there was 586 00:24:31,000 --> 00:24:34,329 an issue with the signposting so as a result that item is 587 00:24:34,329 --> 00:24:35,559 being withdrawn from 588 00:24:35,559 --> 00:24:39,559 staff and we'll be requiring them to just re-notice repost 589 00:24:39,559 --> 00:24:41,279 properly in the 590 00:24:41,279 --> 00:24:44,490 interim were adjusted some administrative policies with 591 00:24:44,490 --> 00:24:44,880 respect to 592 00:24:44,880 --> 00:24:48,089 signposting technically it's not a code requirement but it 593 00:24:48,089 --> 00:24:49,480 has been a directive 594 00:24:49,480 --> 00:24:54,640 from City Council so we'll clarify a few items moving 595 00:24:54,640 --> 00:24:54,640 forward 596 00:24:55,319 --> 00:24:59,509 Commissioner Ellis thank you vice-chair we don't have to do 597 00:24:59,509 --> 00:25:00,319 anything though this 598 00:25:00,319 --> 00:25:05,069 is just going to be pulled from our meeting today but we're 599 00:25:05,069 --> 00:25:05,519 pulling with 600 00:25:05,519 --> 00:25:10,230 that we can move on to agenda item 5b chair I give it back 601 00:25:10,230 --> 00:25:11,519 to you thank you 602 00:25:11,519 --> 00:25:20,920 that we will move on to 5b and ask for Cindy Jackson for 603 00:25:20,920 --> 00:25:22,279 presentation thank you 604 00:25:22,279 --> 00:25:30,279 chairman commissioners c17 - 0 0 3 3 is a request to rezone 605 00:25:30,279 --> 00:25:33,000 0.3 acres well it's 606 00:25:33,000 --> 00:25:37,119 not really a rezoning is to assign an initial zoning to 0.3 607 00:25:37,119 --> 00:25:39,720 acres on to see em 608 00:25:39,720 --> 00:25:45,460 see mg you can see the site is located here along old Alton 609 00:25:45,460 --> 00:25:46,680 Road just south of 610 00:25:46,680 --> 00:25:54,390 Teasley current zoning is already 5x the site was recently 611 00:25:54,390 --> 00:25:55,640 annexed into the city 612 00:25:55,640 --> 00:25:59,220 and it's currently got a holding zoning designation of 613 00:25:59,220 --> 00:26:01,480 already 5x and the 614 00:26:01,480 --> 00:26:07,359 proposed zoning is CMG which is concurrent with the 615 00:26:07,359 --> 00:26:09,519 property to the 616 00:26:09,519 --> 00:26:14,299 north I'd like to mention that this lot the subject lot and 617 00:26:14,299 --> 00:26:15,279 the property to the 618 00:26:15,279 --> 00:26:18,289 north are all one lot for some reason they were plotted 619 00:26:18,289 --> 00:26:19,480 with part in the city 620 00:26:19,480 --> 00:26:24,759 and part in the county once the app if this is rezoned the 621 00:26:24,759 --> 00:26:25,759 applicant plans to 622 00:26:25,759 --> 00:26:29,940 get the site plan approved and construct a vehicle repair 623 00:26:29,940 --> 00:26:33,119 facility on the site 624 00:26:34,160 --> 00:26:38,490 the site has a future land use designation of community 625 00:26:38,490 --> 00:26:40,519 mixed use the 626 00:26:40,519 --> 00:26:45,500 types and uses the types and scale of uses permitted within 627 00:26:45,500 --> 00:26:46,599 the CMG district 628 00:26:46,599 --> 00:26:49,500 conforms to the goals of the community mixed use 629 00:26:49,500 --> 00:26:52,519 designation the zoning also 630 00:26:52,519 --> 00:26:56,369 conforms to the industrial commerce area and rural areas 631 00:26:56,369 --> 00:26:57,960 that is surrounding it 632 00:26:57,960 --> 00:27:01,490 we've got some moderate residential further up the street 633 00:27:01,490 --> 00:27:04,279 however this along 634 00:27:04,279 --> 00:27:12,000 old Alton Road is our site right here the requested CMDG 635 00:27:12,000 --> 00:27:13,440 district would be a 636 00:27:13,440 --> 00:27:16,559 continuation of the existing CMG district the use is 637 00:27:16,559 --> 00:27:18,119 permitted in the CMG 638 00:27:18,119 --> 00:27:21,130 district would be consistent with the uses that are exist 639 00:27:21,130 --> 00:27:22,079 in the area today 640 00:27:22,079 --> 00:27:27,519 which I include vehicle repair which is across the street 641 00:27:27,519 --> 00:27:29,839 come over here in the 642 00:27:29,839 --> 00:27:36,279 ETJ offices to the south self storage to the east and some 643 00:27:36,279 --> 00:27:37,440 institutional uses 644 00:27:37,440 --> 00:27:43,240 Geier high school as well as a there over here is a 645 00:27:43,240 --> 00:27:46,039 electrical transformer 646 00:27:46,039 --> 00:27:53,930 site substation the site will take access from old Alton 647 00:27:53,930 --> 00:27:55,279 Road currently old 648 00:27:55,279 --> 00:28:01,690 Alton Road is designated as a future secondary arterial 649 00:28:01,690 --> 00:28:04,240 roadway Teasley is a 650 00:28:04,240 --> 00:28:08,509 primary arterial roadway the subject site also has water 651 00:28:08,509 --> 00:28:09,839 and sewer available 652 00:28:09,839 --> 00:28:13,450 which you can see from these very thin blue and red lines 653 00:28:13,450 --> 00:28:14,960 the blue is water and 654 00:28:14,960 --> 00:28:23,309 the red is sewer staff sent out notifications on March 25th 655 00:28:23,309 --> 00:28:24,839 we sent out 656 00:28:24,839 --> 00:28:30,519 five via certified mail and 11 courtesy notices so far we 657 00:28:30,519 --> 00:28:32,240 have not received any 658 00:28:32,240 --> 00:28:36,759 response to those notices a sign was posted on the site I 659 00:28:36,759 --> 00:28:37,759 did verify that 660 00:28:37,759 --> 00:28:43,549 earlier today staff recommends approval of this request as 661 00:28:43,549 --> 00:28:45,680 the requested zoning 662 00:28:45,680 --> 00:28:48,299 is consistent with the goals and objectives of the Denton 663 00:28:48,299 --> 00:28:49,559 plan 2030 and 664 00:28:49,559 --> 00:28:53,619 the CMG is compatible with the surrounded property in terms 665 00:28:53,619 --> 00:28:55,519 of permitted uses that 666 00:28:55,519 --> 00:29:00,599 concludes my presentation I'll answer any questions 667 00:29:00,599 --> 00:29:04,180 Commissioner Smith thank you chair whenever we did this we 668 00:29:04,180 --> 00:29:04,880 proved the 669 00:29:04,880 --> 00:29:08,859 northern part of this of this plot we proved it back in 670 00:29:08,859 --> 00:29:10,400 October why wasn't it 671 00:29:10,400 --> 00:29:13,740 included in the rezoning at that point in time is because 672 00:29:13,740 --> 00:29:14,319 they only do in the 673 00:29:14,319 --> 00:29:20,000 city okay we the annexation happened in yesterday it final 674 00:29:20,000 --> 00:29:29,079 ized yesterday if I 675 00:29:29,079 --> 00:29:32,130 could just add the annexation we went through altogether I 676 00:29:32,130 --> 00:29:34,039 think five between 677 00:29:34,039 --> 00:29:37,680 public hearings public meetings five different meetings for 678 00:29:37,680 --> 00:29:38,640 a small piece of 679 00:29:38,640 --> 00:29:42,980 property but exactly those are the rules thank you for your 680 00:29:42,980 --> 00:29:44,559 hard work it started 681 00:29:44,559 --> 00:29:51,269 in February cool anything else Commissioner Sanchez on the 682 00:29:51,269 --> 00:29:51,680 north side 683 00:29:51,680 --> 00:29:55,490 that's gonna be a garage right there that's what they're 684 00:29:55,490 --> 00:29:56,640 working on and then 685 00:29:56,640 --> 00:30:00,700 it's just gonna be an extension yes this is all gonna be 686 00:30:00,700 --> 00:30:01,200 one side and it's all 687 00:30:01,200 --> 00:30:06,400 gonna be a garage that's correct which will have access off 688 00:30:06,400 --> 00:30:07,240 of old Alton right 689 00:30:07,240 --> 00:30:15,359 about here okay Commissioner Ellis thank you chair so when 690 00:30:15,359 --> 00:30:16,200 they combine the two 691 00:30:16,200 --> 00:30:19,619 still only access off old Alton there that's for the whole 692 00:30:19,619 --> 00:30:21,000 development okay 693 00:30:21,000 --> 00:30:25,740 thanks this this looks like a lot here but what it actually 694 00:30:25,740 --> 00:30:26,799 is it's right of 695 00:30:26,799 --> 00:30:37,599 wife or Teasley Commissioner Beck I just like a publicly 696 00:30:37,599 --> 00:30:38,920 apologize to the staff 697 00:30:38,920 --> 00:30:42,019 for sending up a false red flag about the sign on that my 698 00:30:42,019 --> 00:30:42,940 bad I was looking on 699 00:30:42,940 --> 00:30:48,150 the wrong side of the road so I sincerely apologize for 700 00:30:48,150 --> 00:30:49,319 that thank you 701 00:30:53,519 --> 00:30:58,140 just as a note looks like the current zoning map hasn't 702 00:30:58,140 --> 00:31:00,000 been updated for the 703 00:31:00,000 --> 00:31:04,329 site to the north that we've rezoned I think that's on LCMG 704 00:31:04,329 --> 00:31:05,440 also correct yeah I 705 00:31:05,440 --> 00:31:07,920 don't think I don't think it has been updated quite yet 706 00:31:07,920 --> 00:31:10,400 okay any other 707 00:31:10,400 --> 00:31:17,759 questions for staff on this okay thank you Cindy thank you 708 00:31:20,920 --> 00:31:28,519 that will move us to Adam see Haley 709 00:31:51,480 --> 00:31:51,609 so this is a proposed amendment to the DVC to remove 710 00:31:51,609 --> 00:31:58,680 limitation 34 so the 711 00:31:58,680 --> 00:32:01,240 request before you as I mentioned is to remove limitation 712 00:32:01,240 --> 00:32:02,400 34 from sub chapter 713 00:32:02,400 --> 00:32:06,789 5 our zoning districts and limitations this limitation only 714 00:32:06,789 --> 00:32:07,839 applies to the 715 00:32:07,839 --> 00:32:10,680 distribution center warehouse and warehouse retail uses 716 00:32:10,680 --> 00:32:11,240 within our 717 00:32:11,240 --> 00:32:11,240 employment center districts so a little bit of background 718 00:32:11,240 --> 00:32:17,400 this was taken to City 719 00:32:17,400 --> 00:32:17,400 Council as a work session item and they recommended that we 720 00:32:17,400 --> 00:32:20,519 bring it forward 721 00:32:20,519 --> 00:32:25,180 prior to the overall code update so what we're proposing is 722 00:32:25,180 --> 00:32:26,559 to remove limitation 723 00:32:26,559 --> 00:32:31,240 34 entirely from the code what limitation 34 states is that 724 00:32:31,240 --> 00:32:31,440 the 725 00:32:31,440 --> 00:32:34,400 warehouse and distribution center uses are permitted with 726 00:32:34,400 --> 00:32:36,279 no more than 150,000 727 00:32:36,279 --> 00:32:39,089 gross square feet and eight truck docks it further stip 728 00:32:39,089 --> 00:32:40,259 ulates that all of the 729 00:32:40,259 --> 00:32:42,289 docks and bays shall be to the rear or side of the 730 00:32:42,289 --> 00:32:43,519 structure not visible from 731 00:32:43,519 --> 00:32:46,519 the street and that buffering standards apply to any 732 00:32:46,519 --> 00:32:47,920 outdoor storage as well as 733 00:32:47,920 --> 00:32:51,559 the loading docks just to give you a point of reference for 734 00:32:51,559 --> 00:32:52,880 150,000 square 735 00:32:52,880 --> 00:32:56,690 feet equates to this is the Walmart at razor ranch it's 736 00:32:56,690 --> 00:32:58,240 just over that size and 737 00:32:58,240 --> 00:33:00,680 has six truck docks on it so we're talking about this 738 00:33:00,680 --> 00:33:01,640 applying to something 739 00:33:01,640 --> 00:33:06,200 roughly the size of a Walmart or larger just a little bit 740 00:33:06,200 --> 00:33:07,440 of background so 741 00:33:07,440 --> 00:33:11,559 limitation 34 has been in the code since it was adopted in 742 00:33:11,559 --> 00:33:13,920 2002 in 2012 we 743 00:33:13,920 --> 00:33:17,940 changed some of the warehouse and distribution center type 744 00:33:17,940 --> 00:33:18,880 uses so prior 745 00:33:18,880 --> 00:33:21,599 to this we had wholesale storage and distribution and 746 00:33:21,599 --> 00:33:23,000 distribution centers as 747 00:33:23,000 --> 00:33:28,000 separate uses and l34 only applied to the wholesale storage 748 00:33:28,000 --> 00:33:29,160 use within the ECI 749 00:33:29,160 --> 00:33:33,279 district both of those uses were completely removed in 2012 750 00:33:33,279 --> 00:33:33,779 and we got 751 00:33:33,779 --> 00:33:36,589 our current uses which is distribution center slash 752 00:33:36,589 --> 00:33:37,920 warehouse general and 753 00:33:37,920 --> 00:33:42,440 warehouse retail and then we extended the applicability of 754 00:33:42,440 --> 00:33:43,599 limitation 34 755 00:33:43,599 --> 00:33:46,750 to apply to both of those uses within ECI and then to 756 00:33:46,750 --> 00:33:48,240 retail warehouses within 757 00:33:48,240 --> 00:33:54,660 ECC so we did a little bit of internal analysis just to see 758 00:33:54,660 --> 00:33:55,839 how much property 759 00:33:55,839 --> 00:34:00,819 this would affect within the ECI zoning district if you run 760 00:34:00,819 --> 00:34:02,640 just some basic math 761 00:34:02,640 --> 00:34:04,740 on a site to see what would it take to fit a hundred and 762 00:34:04,740 --> 00:34:05,680 fifty thousand square 763 00:34:05,680 --> 00:34:08,949 foot building allowing for parking at a rate of one to one 764 00:34:08,949 --> 00:34:10,079 thousand and then 765 00:34:10,079 --> 00:34:12,739 accounting for the lot coverage with an ECI which is a 766 00:34:12,739 --> 00:34:14,699 maximum of 85% what we 767 00:34:14,699 --> 00:34:18,630 find is that you need a site that's a minimum of 5.2 acres 768 00:34:18,630 --> 00:34:19,920 to fit a structure 769 00:34:19,920 --> 00:34:23,559 that size and adequately provide for parking of it so just 770 00:34:23,559 --> 00:34:24,480 looking at our map 771 00:34:24,480 --> 00:34:27,300 all it's a little hard to see but all of the sites that are 772 00:34:27,300 --> 00:34:27,960 in the black 773 00:34:27,960 --> 00:34:30,170 outlining with the hatch marks on them are the sites that 774 00:34:30,170 --> 00:34:31,000 that would actually 775 00:34:31,000 --> 00:34:34,829 fit so we're not talking about all that much property that 776 00:34:34,829 --> 00:34:35,679 this would change 777 00:34:35,679 --> 00:34:38,869 anything for within the ECI district I believe the total 778 00:34:38,869 --> 00:34:40,400 was just over 400 779 00:34:40,400 --> 00:34:46,309 acres and it was 23 properties across the city and they're 780 00:34:46,309 --> 00:34:47,500 running along that 781 00:34:47,500 --> 00:34:51,139 same thought process within the ECC district to see what 782 00:34:51,139 --> 00:34:52,239 size of property 783 00:34:52,239 --> 00:34:55,639 you would have to have to actually be able to fit 150,000 784 00:34:55,639 --> 00:34:56,920 square feet we found 785 00:34:56,920 --> 00:35:00,730 your minimum lot size would be 5.5 acres so that applied to 786 00:35:00,730 --> 00:35:02,199 about 150 acres total 787 00:35:02,199 --> 00:35:08,309 in the city that was limited to these six properties some 788 00:35:08,309 --> 00:35:10,079 further considerations 789 00:35:10,079 --> 00:35:13,010 we did do a comparison of several neighboring cities you 790 00:35:13,010 --> 00:35:13,880 can see the list 791 00:35:13,880 --> 00:35:17,460 here we found none of them had anything even remotely 792 00:35:17,460 --> 00:35:19,519 similar to this that in 793 00:35:19,519 --> 00:35:22,619 terms of limitations on warehouses or distribution centers 794 00:35:22,619 --> 00:35:23,519 within McKinney 795 00:35:23,519 --> 00:35:26,920 within their town center they limit warehouses to 20,000 796 00:35:26,920 --> 00:35:27,599 square feet other 797 00:35:27,599 --> 00:35:31,150 than that there are no limitations and then within Carroll 798 00:35:31,150 --> 00:35:32,360 ton warehouses are 799 00:35:32,360 --> 00:35:34,909 limited to being an accessory used within their corporate 800 00:35:34,909 --> 00:35:35,480 commercial 801 00:35:35,480 --> 00:35:38,630 district which is intended to be more for office office 802 00:35:38,630 --> 00:35:39,579 campuses but you could 803 00:35:39,579 --> 00:35:44,079 have an accessory warehouse at those facilities further 804 00:35:44,079 --> 00:35:45,440 looking at what we're 805 00:35:45,440 --> 00:35:48,659 permit currently without limitation in our ECC and ECI 806 00:35:48,659 --> 00:35:49,639 districts light 807 00:35:49,639 --> 00:35:52,980 manufacturing is permitted by right no limitations on size 808 00:35:52,980 --> 00:35:53,920 or the number of 809 00:35:53,920 --> 00:35:56,150 base that you can have at a facility if you're 810 00:35:56,150 --> 00:35:57,760 manufacturing craft alcohol 811 00:35:57,760 --> 00:36:00,880 production also permitted by right so if you had a site 812 00:36:00,880 --> 00:36:01,960 that was actually 813 00:36:01,960 --> 00:36:04,900 producing alcohol or another product they could have as 814 00:36:04,900 --> 00:36:06,119 many bays and as much 815 00:36:06,119 --> 00:36:08,150 square footage as they wanted but if it's solely a 816 00:36:08,150 --> 00:36:09,039 distribution center 817 00:36:09,039 --> 00:36:12,409 that's where our limitations would currently apply and just 818 00:36:12,409 --> 00:36:13,239 in speaking with 819 00:36:13,239 --> 00:36:16,820 our economic development team they do see a lot of requests 820 00:36:16,820 --> 00:36:17,679 for property where 821 00:36:17,679 --> 00:36:20,570 you could put a large warehouse and the average minimum 822 00:36:20,570 --> 00:36:21,440 size that these 823 00:36:21,440 --> 00:36:24,320 corporations are looking for is 200 to 300 thousand square 824 00:36:24,320 --> 00:36:25,639 feet of building so 825 00:36:25,639 --> 00:36:29,730 currently we limit greatly where those facilities could go 826 00:36:29,730 --> 00:36:31,639 in the city with all 827 00:36:31,639 --> 00:36:35,449 that being said staff is recommending removing l34 from all 828 00:36:35,449 --> 00:36:36,239 of the employment 829 00:36:36,239 --> 00:36:38,280 center districts as we've discussed here and I'd be happy 830 00:36:38,280 --> 00:36:39,039 to answer any other 831 00:36:39,039 --> 00:36:43,619 questions Commissioner Beck thank you chair just to satisfy 832 00:36:43,619 --> 00:36:44,880 my own curiosity I 833 00:36:44,880 --> 00:36:48,530 assume Walmart got an exception to the ruling when they 834 00:36:48,530 --> 00:36:49,400 built that as what a 835 00:36:49,400 --> 00:36:52,880 part of the razor-range overlay Walmart is actually just 836 00:36:52,880 --> 00:36:53,960 considered retail so 837 00:36:53,960 --> 00:36:56,150 this limitation didn't apply I was just using that for a 838 00:36:56,150 --> 00:36:57,119 size comparison to let 839 00:36:57,119 --> 00:36:59,500 you know what type of or size of facility that we were 840 00:36:59,500 --> 00:37:02,679 looking at thanks 841 00:37:04,960 --> 00:37:13,650 any other questions for Haley okay thank you that will run 842 00:37:13,650 --> 00:37:16,199 us through our agenda 843 00:37:16,199 --> 00:37:21,539 for this evening and it will take us to back in our work 844 00:37:21,539 --> 00:37:23,920 session to receive our 845 00:37:23,920 --> 00:37:30,980 work session report and I don't know which withers okay 846 00:37:30,980 --> 00:37:33,840 good evening chair 847 00:37:33,840 --> 00:37:36,880 commissioners Scott McDonald director of development 848 00:37:36,880 --> 00:37:38,000 services just want to give 849 00:37:38,000 --> 00:37:43,760 you a brief update on the development code review committee 850 00:37:43,760 --> 00:37:45,159 took some action 851 00:37:45,159 --> 00:37:47,889 at City Council last night there's been a little bit of 852 00:37:47,889 --> 00:37:48,960 confusion as to the 853 00:37:48,960 --> 00:37:53,449 makeup and how it is that the the group is going to 854 00:37:53,449 --> 00:37:56,599 function so through a 855 00:37:56,599 --> 00:38:00,559 resolution with council the committee is comprised of a 856 00:38:00,559 --> 00:38:02,039 total of six members 857 00:38:02,039 --> 00:38:05,619 three members which are council or considered the voting 858 00:38:05,619 --> 00:38:06,800 members two of 859 00:38:06,800 --> 00:38:11,090 those council members make a quorum the council members 860 00:38:11,090 --> 00:38:13,199 will serve as chair vice 861 00:38:13,199 --> 00:38:17,519 chair three P&Z members are ex officios and part of that 862 00:38:17,519 --> 00:38:19,440 committee ultimately 863 00:38:19,440 --> 00:38:23,489 some of that conversation and just as a heads up on this 864 00:38:23,489 --> 00:38:25,280 that there won't be a 865 00:38:25,280 --> 00:38:27,969 great deal of voting that will take place this is going to 866 00:38:27,969 --> 00:38:29,519 be more gathering 867 00:38:29,519 --> 00:38:35,349 input seeking input from both P&Z and council this 868 00:38:35,349 --> 00:38:37,639 committee also will have a 869 00:38:37,639 --> 00:38:43,809 sunset date of December of 2018 and council has the option 870 00:38:43,809 --> 00:38:45,559 of of course 871 00:38:45,559 --> 00:38:50,769 changing that but that's that's the way that the resolution 872 00:38:50,769 --> 00:38:52,280 is set it is also 873 00:38:52,280 --> 00:38:57,489 the intent that staff will come back before this group and 874 00:38:57,489 --> 00:38:59,480 report what status 875 00:38:59,480 --> 00:39:03,639 were the were the committee the work group is steps that 876 00:39:03,639 --> 00:39:04,519 have been achieved 877 00:39:04,519 --> 00:39:09,519 and and kind of address what the committee's concerns are 878 00:39:09,519 --> 00:39:10,440 it is our intent 879 00:39:10,440 --> 00:39:17,360 to walk through our we have the as you know three modules 880 00:39:17,360 --> 00:39:18,880 and we'll be 881 00:39:18,880 --> 00:39:22,050 presenting before this group next week with module three 882 00:39:22,050 --> 00:39:23,320 which are their final 883 00:39:23,320 --> 00:39:26,199 sub chapters but the subcommittee is going to be walking 884 00:39:26,199 --> 00:39:27,199 through it as if it 885 00:39:27,199 --> 00:39:31,469 is the development code beginning with sub chapter one and 886 00:39:31,469 --> 00:39:32,519 then we'll just work 887 00:39:32,519 --> 00:39:36,480 through at a pace that's comfortable for the subcommittee 888 00:39:36,480 --> 00:39:38,079 and if you have any 889 00:39:38,079 --> 00:39:40,630 questions as far as organizational Ron is going to bring 890 00:39:40,630 --> 00:39:41,599 you just a little bit 891 00:39:41,599 --> 00:39:44,309 of an update of it and kind of where we're at and where we 892 00:39:44,309 --> 00:39:46,000 're going the next 893 00:39:46,000 --> 00:39:50,550 meeting is on next Wednesday for the subcommittee and that 894 00:39:50,550 --> 00:39:51,400 will be an 895 00:39:51,400 --> 00:39:54,630 organizational meeting where it is that will set the chair 896 00:39:54,630 --> 00:39:57,239 vice chair capture 897 00:39:57,239 --> 00:40:01,119 the minutes from previous meetings and ultimately work on 898 00:40:01,119 --> 00:40:02,440 really those goals 899 00:40:02,440 --> 00:40:05,699 and it'll be an overview while clearing is here of the 900 00:40:05,699 --> 00:40:07,199 contents of module three 901 00:40:07,199 --> 00:40:10,639 and answer any questions that they have 902 00:40:10,719 --> 00:40:15,929 Commissioner Roselle thank you with with some of the 903 00:40:15,929 --> 00:40:17,280 committee members rolling 904 00:40:17,280 --> 00:40:19,360 off council do you have an update of what three council 905 00:40:19,360 --> 00:40:20,159 members are on that 906 00:40:20,159 --> 00:40:23,869 committee thank you yes I intended to to bring that as well 907 00:40:23,869 --> 00:40:26,360 so councilperson 908 00:40:26,360 --> 00:40:30,849 Sarah Baguier ultimately is coming off and council 909 00:40:30,849 --> 00:40:34,039 appointed mayor Watts to to 910 00:40:34,039 --> 00:40:39,239 be that third member so the members then in turn will be Ke 911 00:40:39,239 --> 00:40:43,039 ely Briggs John 912 00:40:43,039 --> 00:40:49,800 Ryan thank you and Chris Watts thank you 913 00:40:52,679 --> 00:40:56,599 Commissioner Ellis thank you chair Scott I know this the 914 00:40:56,599 --> 00:40:57,400 draft resolution 915 00:40:57,400 --> 00:41:00,769 changed because I read it and then it was different this 916 00:41:00,769 --> 00:41:01,960 morning so can you 917 00:41:01,960 --> 00:41:04,170 walk me through that discussion I'm just trying to figure 918 00:41:04,170 --> 00:41:05,039 out exactly what our 919 00:41:05,039 --> 00:41:08,920 role is now just because at one point it was going to be a 920 00:41:08,920 --> 00:41:09,920 six-person committee 921 00:41:09,920 --> 00:41:14,159 and it kind of still is sort of not really because you got 922 00:41:14,159 --> 00:41:15,039 a quorum really 923 00:41:15,039 --> 00:41:17,880 with two of three council people so will you just walk me 924 00:41:17,880 --> 00:41:19,079 through that a little 925 00:41:19,079 --> 00:41:24,289 bit yes and ultimately discuss this in work session and 926 00:41:24,289 --> 00:41:26,480 there was some some 927 00:41:26,480 --> 00:41:30,360 dialogue that went back and forth with council and it was 928 00:41:30,360 --> 00:41:31,920 councils intent that 929 00:41:31,920 --> 00:41:37,119 because the original committee that was created and I don't 930 00:41:37,119 --> 00:41:38,199 recall what year was 931 00:41:38,199 --> 00:41:41,440 three council persons and they wanted to keep it in that in 932 00:41:41,440 --> 00:41:42,960 that context but they 933 00:41:42,960 --> 00:41:48,170 also did value the input of P&Z so it was important to keep 934 00:41:48,170 --> 00:41:48,880 the three members 935 00:41:48,880 --> 00:41:53,300 the resolution then just makes that committee a committee 936 00:41:53,300 --> 00:41:54,440 of six which is 937 00:41:54,440 --> 00:41:58,250 three of the council three of the P&Z P&Z acting in an ex 938 00:41:58,250 --> 00:41:59,639 officio capacity I 939 00:41:59,639 --> 00:42:03,460 can tell you for me personally that it is my intent that 940 00:42:03,460 --> 00:42:05,079 really it's the voices 941 00:42:05,079 --> 00:42:08,150 that I hear in the differing opinions as to how it is that 942 00:42:08,150 --> 00:42:09,360 we move forward and 943 00:42:09,360 --> 00:42:12,469 what we do with that ultimately council has the final 944 00:42:12,469 --> 00:42:14,159 decision on how it is that 945 00:42:14,159 --> 00:42:17,969 we adopt and what we adopt and I and I really don't think 946 00:42:17,969 --> 00:42:19,159 that there will be 947 00:42:19,159 --> 00:42:22,630 too many opportunities that we're really gonna have to vote 948 00:42:22,630 --> 00:42:23,440 really it's gonna be 949 00:42:23,440 --> 00:42:26,829 a recommendation of the committee to move what we're 950 00:42:26,829 --> 00:42:28,519 proposing forward if that 951 00:42:28,519 --> 00:42:33,369 helps what does but what we're proposing for will be voted 952 00:42:33,369 --> 00:42:34,539 on by the three 953 00:42:34,539 --> 00:42:38,679 council people correct if if a vote is necessary that would 954 00:42:38,679 --> 00:42:39,920 be how the voting 955 00:42:39,920 --> 00:42:43,309 would take place would ultimately be the three council 956 00:42:43,309 --> 00:42:46,719 people correct right okay 957 00:42:48,840 --> 00:42:51,730 only question I would have on the the meetings that you're 958 00:42:51,730 --> 00:42:53,320 talking about are 959 00:42:53,320 --> 00:42:57,659 those televised or live stream where we can watch those or 960 00:42:57,659 --> 00:42:58,719 do you have to 961 00:42:58,719 --> 00:43:01,300 actually come and attend them you'd have to come and attend 962 00:43:01,300 --> 00:43:02,679 them they're they're 963 00:43:02,679 --> 00:43:06,250 open to the public of course they're posted and I think we 964 00:43:06,250 --> 00:43:07,760 'll have a regular a 965 00:43:07,760 --> 00:43:12,760 regularly scheduled time that that we're gonna work to do 966 00:43:12,760 --> 00:43:15,559 day and time okay 967 00:43:17,039 --> 00:43:19,900 and you know then Ron will give you a brief update of where 968 00:43:19,900 --> 00:43:21,000 we're at and where 969 00:43:21,000 --> 00:43:25,239 we're going okay thank you Scott thank you 970 00:43:27,840 --> 00:43:30,309 thank you chair members of the Commission I'll try to make 971 00:43:30,309 --> 00:43:31,320 it brief our 972 00:43:31,320 --> 00:43:36,719 meeting last Friday was two hours so I don't plan on taking 973 00:43:36,719 --> 00:43:38,719 two hours but we'll 974 00:43:38,719 --> 00:43:44,679 go through this really quickly my presentation real quick 975 00:43:52,880 --> 00:43:56,880 so as Scott said we met with the Advisory Committee there's 976 00:43:56,880 --> 00:43:57,400 really high 977 00:43:57,400 --> 00:44:00,699 level went over the purpose of the DEN development code 978 00:44:00,699 --> 00:44:02,000 update of course our 979 00:44:02,000 --> 00:44:05,360 DEN plan 2030 to be consistent with that but also 980 00:44:05,360 --> 00:44:06,719 consistent with the vision of 981 00:44:06,719 --> 00:44:11,079 the DEN plan 2030 we are looking at updating our code not 982 00:44:11,079 --> 00:44:12,800 only in the the 983 00:44:12,800 --> 00:44:18,010 zoning districts but also the development standards as well 984 00:44:18,010 --> 00:44:18,920 the 985 00:44:18,920 --> 00:44:22,730 chapters that we will get into a little more into detail 986 00:44:22,730 --> 00:44:24,679 later are here shown 987 00:44:24,679 --> 00:44:29,230 here they are eight total sub chapters we're going from 24 988 00:44:29,230 --> 00:44:31,320 to 8 again we we 989 00:44:31,320 --> 00:44:35,590 went through with Clary on last the 28 that is with 990 00:44:35,590 --> 00:44:38,079 chapters 1 & 2 we will go 991 00:44:38,079 --> 00:44:45,519 through 6 7 & 8 next Wednesday I won't go through each one 992 00:44:45,519 --> 00:44:46,519 of this but again 993 00:44:46,519 --> 00:44:49,730 sub chapter 1 is general provisions sub chapter 2 is 994 00:44:49,730 --> 00:44:50,760 administration and 995 00:44:50,760 --> 00:44:55,090 procedures and again you heard that again from Clary on a 996 00:44:55,090 --> 00:44:56,480 couple weeks ago 997 00:44:56,559 --> 00:45:01,139 sub chapter 3 our zoning district and sub chapter 4 overlay 998 00:45:01,139 --> 00:45:02,440 districts is 999 00:45:02,440 --> 00:45:05,780 important these are important sub chapters this is where we 1000 00:45:05,780 --> 00:45:06,639 see a lot of 1001 00:45:06,639 --> 00:45:11,130 our zoning cases come through and this is where everything 1002 00:45:11,130 --> 00:45:12,480 is put in for 1003 00:45:12,480 --> 00:45:18,239 example the sub chapter 3 we are going from 28 I'm sorry 1004 00:45:18,239 --> 00:45:19,920 yes 28 zoning 1005 00:45:19,920 --> 00:45:23,730 districts currently down to 14 so there's going to be a lot 1006 00:45:23,730 --> 00:45:24,679 of consolidation 1007 00:45:24,679 --> 00:45:31,050 elimination revised and also new zoning districts as well 1008 00:45:31,050 --> 00:45:32,480 included in that sub 1009 00:45:32,480 --> 00:45:36,480 chapters are dimensional standards the maximum height 1010 00:45:36,480 --> 00:45:39,039 maximum lot coverage the 1011 00:45:39,039 --> 00:45:44,250 minimum setbacks and minimum lot area sub chapter 4 will 1012 00:45:44,250 --> 00:45:45,800 contain our overlay 1013 00:45:45,800 --> 00:45:48,900 and historic districts none of those will change they will 1014 00:45:48,900 --> 00:45:50,320 carry forward and move 1015 00:45:50,320 --> 00:45:56,800 over to this sub chapter sub chapter 5 is our use 1016 00:45:56,800 --> 00:45:58,760 regulations this is where we 1017 00:45:58,760 --> 00:46:01,949 look at what uses are permitted in each zoning district it 1018 00:46:01,949 --> 00:46:03,880 will advise us as to 1019 00:46:03,880 --> 00:46:09,090 if it's permitted by right by SUP or permitted by a use 1020 00:46:09,090 --> 00:46:11,440 specific standard now 1021 00:46:11,440 --> 00:46:14,940 you specific standard is it's basically our limitations so 1022 00:46:14,940 --> 00:46:15,800 what you see is 1023 00:46:15,800 --> 00:46:19,199 limitations they're just renaming it as you specific 1024 00:46:19,199 --> 00:46:21,880 standards one big thing 1025 00:46:21,880 --> 00:46:27,090 that is not included in this sub chapter moving forward the 1026 00:46:27,090 --> 00:46:28,719 mixed use residential 1027 00:46:28,719 --> 00:46:31,900 overlay protection will no longer be included in that and 1028 00:46:31,900 --> 00:46:32,920 the hope is that 1029 00:46:32,920 --> 00:46:35,650 the development standards as proposed will address 1030 00:46:35,650 --> 00:46:38,440 compatibility moving forward 1031 00:46:38,440 --> 00:46:42,449 included in this sub chapter are our accessory uses and 1032 00:46:42,449 --> 00:46:44,159 structures temporary 1033 00:46:44,159 --> 00:46:50,059 uses our wireless telecommunication and gas well standards 1034 00:46:50,059 --> 00:46:53,599 as well some of those 1035 00:46:53,599 --> 00:46:57,860 are ready sub chapter 6 is our development standards this 1036 00:46:57,860 --> 00:46:58,599 is the the 1037 00:46:58,599 --> 00:47:02,179 largest sub chapter it contains a number of sections that 1038 00:47:02,179 --> 00:47:02,960 are currently 1039 00:47:02,960 --> 00:47:06,309 different sub chapters in our current code as you can see 1040 00:47:06,309 --> 00:47:08,079 here this is what it 1041 00:47:08,079 --> 00:47:11,269 will include from land disturbing activities only through 1042 00:47:11,269 --> 00:47:11,760 parking 1043 00:47:11,760 --> 00:47:15,579 buildings and site design down to water and wastewater 1044 00:47:15,579 --> 00:47:21,039 standards sub chapter 7 1045 00:47:21,039 --> 00:47:23,880 is our subdivision regulations and that includes our plat 1046 00:47:23,880 --> 00:47:24,880 ting requirements 1047 00:47:24,880 --> 00:47:30,079 public improvements requirements more on how subdivisions 1048 00:47:30,079 --> 00:47:32,559 are handled and yes 1049 00:47:32,559 --> 00:47:37,199 that's true definitions we know a definition this is 1050 00:47:37,199 --> 00:47:37,719 important right 1051 00:47:37,719 --> 00:47:40,349 because a lot of times we want to make sure we understand 1052 00:47:40,349 --> 00:47:41,239 what the use is or 1053 00:47:41,239 --> 00:47:45,139 what the term is and that's where the sub chapter 8 will 1054 00:47:45,139 --> 00:47:46,360 contain all of our 1055 00:47:46,360 --> 00:47:52,039 definitions so that being said we've got a lot to bring 1056 00:47:52,039 --> 00:47:54,400 forward all of the public 1057 00:47:54,400 --> 00:47:58,659 drafts are online as we speak that's all of those sub 1058 00:47:58,659 --> 00:48:00,460 chapters 1 through 8 so 1059 00:48:00,460 --> 00:48:05,019 anybody that's watching please go to den code 2030 comm you 1060 00:48:05,019 --> 00:48:05,800 can view those 1061 00:48:05,800 --> 00:48:09,869 sub chapters and you can make comments online you can also 1062 00:48:09,869 --> 00:48:11,239 call or provide us 1063 00:48:11,239 --> 00:48:14,429 an email or send us an email that is with any comments 1064 00:48:14,429 --> 00:48:16,440 moving forward we've 1065 00:48:16,440 --> 00:48:21,650 already gone through the module 1 we've done module 2 last 1066 00:48:21,650 --> 00:48:23,039 month we are going to 1067 00:48:23,039 --> 00:48:26,429 be doing module 3 next week we see here this is the 1068 00:48:26,429 --> 00:48:28,679 schedule as clarion will be 1069 00:48:28,679 --> 00:48:32,199 visiting us next week we will start with a work session 1070 00:48:32,199 --> 00:48:33,480 with council and go 1071 00:48:33,480 --> 00:48:37,599 through these meetings and end it with a public open house 1072 00:48:37,599 --> 00:48:39,119 which will be held on 1073 00:48:39,119 --> 00:48:44,699 Wednesday from 6 to 8 at the den that should say Civic 1074 00:48:44,699 --> 00:48:45,840 Center I should change 1075 00:48:45,840 --> 00:48:50,820 that that's Civic Center on April 10th which was yesterday 1076 00:48:50,820 --> 00:48:52,400 our zoning map went 1077 00:48:52,400 --> 00:48:58,440 online as well so our proposed only map was that is drafted 1078 00:48:58,440 --> 00:48:59,559 was put online so 1079 00:48:59,559 --> 00:49:03,429 those folks that are able to can also view that zoning map 1080 00:49:03,429 --> 00:49:05,159 on our website den 1081 00:49:05,159 --> 00:49:11,679 code 2030 comm to help answer questions and address any 1082 00:49:11,679 --> 00:49:13,659 concerns or issues we 1083 00:49:13,659 --> 00:49:17,889 have put together a series of public open houses that you 1084 00:49:17,889 --> 00:49:20,039 see here the first 1085 00:49:20,039 --> 00:49:23,909 one will start on April 23rd at the Fred Moore High School 1086 00:49:23,909 --> 00:49:25,260 from 6 to 8 we will 1087 00:49:25,260 --> 00:49:29,670 have staff available to answer questions we've got we had a 1088 00:49:29,670 --> 00:49:31,679 total of seven the 1089 00:49:31,679 --> 00:49:36,000 committee suggested that we add more at any public 1090 00:49:36,000 --> 00:49:38,199 libraries to assist or to 1091 00:49:38,199 --> 00:49:41,530 provide those that are able to go to a library through 1092 00:49:41,530 --> 00:49:43,199 public transit it's a 1093 00:49:43,199 --> 00:49:47,090 more of a central or public place that they can make it to 1094 00:49:47,090 --> 00:49:48,480 so we are proposing 1095 00:49:48,480 --> 00:49:52,059 three additional workshops or a public open space open 1096 00:49:52,059 --> 00:49:54,199 houses that is at the 1097 00:49:54,199 --> 00:49:57,690 three libraries that we have again those dates have not yet 1098 00:49:57,690 --> 00:49:58,920 been determined but 1099 00:49:58,920 --> 00:50:02,519 we will schedule those as soon as possible and post it 1100 00:50:02,519 --> 00:50:04,119 online as well 1101 00:50:04,119 --> 00:50:09,889 these dates also were included in a postcard that was sent 1102 00:50:09,889 --> 00:50:11,000 out I believe it 1103 00:50:11,000 --> 00:50:14,949 was last week so every property owner should have received 1104 00:50:14,949 --> 00:50:16,079 a postcard with 1105 00:50:16,079 --> 00:50:20,179 these public open house dates and times so if they didn't 1106 00:50:20,179 --> 00:50:21,199 catch it here 1107 00:50:21,199 --> 00:50:24,780 hopefully they will catch it when they get their postcard 1108 00:50:24,780 --> 00:50:25,880 in their mail they 1109 00:50:25,880 --> 00:50:31,690 should have received it by either today or tomorrow there's 1110 00:50:31,690 --> 00:50:33,119 a postcard I failed 1111 00:50:33,119 --> 00:50:35,489 to notice that that was the next slide so this is the post 1112 00:50:35,489 --> 00:50:36,360 card that went out 1113 00:50:36,360 --> 00:50:39,550 and as you can see hard to see maybe on my screen but the 1114 00:50:39,550 --> 00:50:41,000 the dates that I just 1115 00:50:41,000 --> 00:50:46,210 went over the seven are included with the the postcard 1116 00:50:46,210 --> 00:50:47,440 again we are trying to 1117 00:50:47,440 --> 00:50:50,840 direct post folks to the website again a lot of information 1118 00:50:50,840 --> 00:50:51,920 is on the website 1119 00:50:51,920 --> 00:50:58,349 including the zoning map so again denco 2030 comm so we we 1120 00:50:58,349 --> 00:50:59,400 send those to 1121 00:50:59,400 --> 00:51:02,699 property owners but we also know that citizens residents 1122 00:51:02,699 --> 00:51:03,679 that don't own 1123 00:51:03,679 --> 00:51:07,110 property are also interested so we are trying to make sure 1124 00:51:07,110 --> 00:51:08,119 that we get them 1125 00:51:08,119 --> 00:51:12,090 involved and engaged with this process these are the list 1126 00:51:12,090 --> 00:51:13,360 that you see up here 1127 00:51:13,360 --> 00:51:17,750 our our communication plan to get the word out we we also 1128 00:51:17,750 --> 00:51:18,920 rely on the planning 1129 00:51:18,920 --> 00:51:21,250 zoning Commission to help spread that word so any 1130 00:51:21,250 --> 00:51:22,599 information that you can or 1131 00:51:22,599 --> 00:51:26,940 any feedback or any ways that we can do better please let 1132 00:51:26,940 --> 00:51:28,480 us know but we also 1133 00:51:28,480 --> 00:51:31,659 encourage you to help spread that word about what's going 1134 00:51:31,659 --> 00:51:32,880 on with the den code 1135 00:51:32,880 --> 00:51:38,280 update we have a dedicated website I probably said it three 1136 00:51:38,280 --> 00:51:39,440 times already but 1137 00:51:39,440 --> 00:51:45,579 den code 2030 comm is where everything is being put in we 1138 00:51:45,579 --> 00:51:47,320 've got links to all 1139 00:51:47,320 --> 00:51:51,420 of the sub chapters as well as the zoning map and any other 1140 00:51:51,420 --> 00:51:52,280 information 1141 00:51:52,280 --> 00:51:59,329 that is relevant to this process when we're at the public 1142 00:51:59,329 --> 00:52:01,000 open houses we hope 1143 00:52:01,000 --> 00:52:04,030 that there are a lot of people there that have questions we 1144 00:52:04,030 --> 00:52:04,880 hopefully can 1145 00:52:04,880 --> 00:52:09,239 answer them but if we cannot we will take their comments 1146 00:52:09,239 --> 00:52:10,639 write it down and 1147 00:52:10,639 --> 00:52:15,849 document it and so when we start to revise our draft we we 1148 00:52:15,849 --> 00:52:17,159 can refer back 1149 00:52:17,159 --> 00:52:20,969 to these common cards so at those public open houses we'll 1150 00:52:20,969 --> 00:52:22,119 have a fair number of 1151 00:52:22,119 --> 00:52:25,059 these comic cards available so that people can fill out and 1152 00:52:25,059 --> 00:52:25,840 make sure that 1153 00:52:25,840 --> 00:52:35,320 they provide it back to us so this next few slides is 1154 00:52:35,320 --> 00:52:37,639 regarding the zoning map 1155 00:52:37,639 --> 00:52:42,500 update I can go through it it's a fairly lengthy discussion 1156 00:52:42,500 --> 00:52:43,760 I don't know chair if 1157 00:52:43,760 --> 00:52:48,159 you want to take a break there's food available and then we 1158 00:52:48,159 --> 00:52:48,760 can go through this 1159 00:52:48,760 --> 00:52:52,260 so we don't have to break the presentation that's up to y' 1160 00:52:52,260 --> 00:52:52,960 all it'd be 1161 00:52:52,960 --> 00:52:58,050 a great suggestion so why don't we call a recess at 553 and 1162 00:52:58,050 --> 00:52:59,159 we'll try to get back by 6. 1163 00:52:59,159 --> 00:53:15,880 Going to reopen our work session at 6.01 and let Ron go 1164 00:53:15,880 --> 00:53:16,840 ahead and continue 1165 00:53:16,840 --> 00:53:20,480 this presentation. Great thank you chair members of the 1166 00:53:20,480 --> 00:53:22,280 commission I felt you 1167 00:53:22,280 --> 00:53:26,809 emphasize this one important change that's being proposed 1168 00:53:26,809 --> 00:53:28,079 with the den code 1169 00:53:28,079 --> 00:53:32,340 update and that with the new 14 zoning districts I 1170 00:53:32,340 --> 00:53:33,480 mentioned that we have 1171 00:53:33,480 --> 00:53:41,440 minimum lot areas minimum setbacks we also have maximum 1172 00:53:41,440 --> 00:53:42,800 maximum heights and 1173 00:53:42,800 --> 00:53:47,159 maximum lock coverage that being said the proposal is we 1174 00:53:47,159 --> 00:53:48,440 will no longer as 1175 00:53:48,440 --> 00:53:52,360 proposed have any density requirements so there will be no 1176 00:53:52,360 --> 00:53:55,119 density so you're for 1177 00:53:55,119 --> 00:53:58,409 example in our four four units per acre none of that it 1178 00:53:58,409 --> 00:53:59,599 will be based on the 1179 00:53:59,599 --> 00:54:03,519 development regulations parking lot coverage landscaping 1180 00:54:03,519 --> 00:54:06,519 that will set the 1181 00:54:06,519 --> 00:54:10,329 development for that property so I hope that I know that 1182 00:54:10,329 --> 00:54:11,420 was a big one for me 1183 00:54:11,420 --> 00:54:16,630 too so I wanted to make sure that I got that through. 1184 00:54:16,630 --> 00:54:17,559 Commissioner back. Thank you 1185 00:54:17,559 --> 00:54:20,469 chair. I appreciate you mentioned it Ron I'd encourage Ron 1186 00:54:20,469 --> 00:54:21,119 to bring that out 1187 00:54:21,119 --> 00:54:24,719 because that was kind of a scary thing for us I think the 1188 00:54:24,719 --> 00:54:25,719 concern was by 1189 00:54:25,719 --> 00:54:29,949 removing that limitation there we've got to rely on lot 1190 00:54:29,949 --> 00:54:31,840 coverage and and building 1191 00:54:31,840 --> 00:54:34,260 height stuff like that so the concern was you know could 1192 00:54:34,260 --> 00:54:35,239 they build them higher 1193 00:54:35,239 --> 00:54:38,260 and put more in there because it could build them higher so 1194 00:54:38,260 --> 00:54:38,960 that's just 1195 00:54:38,960 --> 00:54:43,789 something you know we need to as a commission need to kind 1196 00:54:43,789 --> 00:54:44,559 of watch as we 1197 00:54:44,559 --> 00:54:47,380 move along there that one that one I think bothered a 1198 00:54:47,380 --> 00:54:48,880 couple people. That was 1199 00:54:48,880 --> 00:54:53,079 a big one so I apologize I went through that I didn't mean 1200 00:54:53,079 --> 00:54:54,280 to but I want to 1201 00:54:54,280 --> 00:54:58,760 make sure that that was clear that we are proposing as it 1202 00:54:58,760 --> 00:55:01,239 is no density 1203 00:55:01,239 --> 00:55:08,690 maximums or requirements. Ron if I could just add one one 1204 00:55:08,690 --> 00:55:11,199 notion within the each 1205 00:55:11,199 --> 00:55:14,780 zoning new zoning district there are you know there are the 1206 00:55:14,780 --> 00:55:15,639 standards the setback 1207 00:55:15,639 --> 00:55:19,280 requirements we are looking at adjusting some some of those 1208 00:55:19,280 --> 00:55:20,440 where some might be a 1209 00:55:20,440 --> 00:55:26,199 six foot side setback they may be reduced to five given the 1210 00:55:26,199 --> 00:55:27,440 majority of 1211 00:55:27,440 --> 00:55:31,360 the NR4 lots that we have now and so I just wanted to point 1212 00:55:31,360 --> 00:55:32,039 that out because we 1213 00:55:32,039 --> 00:55:35,829 haven't we haven't adjusted that yet from from module one 1214 00:55:35,829 --> 00:55:36,960 so that'll be taken 1215 00:55:36,960 --> 00:55:39,460 care of after module three when we do the complete draft so 1216 00:55:39,460 --> 00:55:40,199 just wanted to 1217 00:55:40,199 --> 00:55:42,820 point that out in case somebody sees that and thinks that 1218 00:55:42,820 --> 00:55:43,760 their property now 1219 00:55:43,760 --> 00:55:47,250 will be non-conforming we we're still looking at adjusting 1220 00:55:47,250 --> 00:55:48,840 that. When will that 1221 00:55:48,840 --> 00:55:51,320 adjustment come out you say? With the public draft of the 1222 00:55:51,320 --> 00:55:53,880 entire code. That's set for 1223 00:55:53,880 --> 00:55:58,280 June, July so as soon as we get comments from these sets of 1224 00:55:58,280 --> 00:55:59,800 public drafts the 1225 00:55:59,800 --> 00:56:02,760 consultants will go back and make necessary revisions and 1226 00:56:02,760 --> 00:56:03,599 then bring back 1227 00:56:03,599 --> 00:56:06,840 a draft that we can present back to the Commission and to 1228 00:56:06,840 --> 00:56:07,800 the rest of the 1229 00:56:07,800 --> 00:56:13,239 public. Thank you. Again yeah just to add to what Richard 1230 00:56:13,239 --> 00:56:14,599 said in addition to those 1231 00:56:14,599 --> 00:56:19,809 zoning dimensional standards also the use standards or use 1232 00:56:19,809 --> 00:56:20,639 table we're also 1233 00:56:20,639 --> 00:56:22,969 looking at updating as well so there there will be some 1234 00:56:22,969 --> 00:56:23,639 changes and we 1235 00:56:23,639 --> 00:56:27,659 anticipate additional input as we get through this process 1236 00:56:27,659 --> 00:56:28,679 so a lot of a lot 1237 00:56:28,679 --> 00:56:32,480 of input a lot of revisions but hopefully we can get to 1238 00:56:32,480 --> 00:56:33,880 approve of a 1239 00:56:33,880 --> 00:56:39,159 development code update. Okay so next important topic is 1240 00:56:39,159 --> 00:56:41,639 zoning. Zoning map. 1241 00:56:41,639 --> 00:56:46,920 The zoning map as you know we has to be updated because we 1242 00:56:46,920 --> 00:56:48,599 have new zoning 1243 00:56:48,599 --> 00:56:53,309 districts we're going from 28 to 14 and those 14 don't 1244 00:56:53,309 --> 00:56:54,880 share the same name or 1245 00:56:54,880 --> 00:56:58,840 the same you know some of them don't share the same 1246 00:56:58,840 --> 00:57:00,519 intensity or density so 1247 00:57:00,519 --> 00:57:03,079 there are going to be some properties that are going to be 1248 00:57:03,079 --> 00:57:04,000 changed our hope is 1249 00:57:04,000 --> 00:57:07,800 that we can just convert convert that is those zoning 1250 00:57:07,800 --> 00:57:09,199 districts that we have now 1251 00:57:09,199 --> 00:57:14,389 to a zoning district that is being proposed and I've got a 1252 00:57:14,389 --> 00:57:15,280 table or a chart 1253 00:57:15,280 --> 00:57:19,260 that shows how that's going to be done but we've went 1254 00:57:19,260 --> 00:57:21,039 through the a process 1255 00:57:21,039 --> 00:57:23,489 it's it's not it wasn't a simple process but I want to make 1256 00:57:23,489 --> 00:57:24,800 sure that you all 1257 00:57:24,800 --> 00:57:28,320 understand it it is still a draft in that we're going to 1258 00:57:28,320 --> 00:57:29,440 need to update it but 1259 00:57:29,440 --> 00:57:34,230 this is our first brush of trying to make a zoning map out 1260 00:57:34,230 --> 00:57:35,760 of the new zoning 1261 00:57:35,760 --> 00:57:39,340 district so I won't go through this list because I've got a 1262 00:57:39,340 --> 00:57:40,440 slide for each of 1263 00:57:40,440 --> 00:57:45,389 these criteria a total of 16 so I'll go ahead and start 1264 00:57:45,389 --> 00:57:46,480 with the first one of 1265 00:57:46,480 --> 00:57:49,780 course we started off with the DIM plan 2030 looked at the 1266 00:57:49,780 --> 00:57:50,639 goals and object 1267 00:57:50,639 --> 00:57:55,159 objectives as it relates to a lane use and zoning the big 1268 00:57:55,159 --> 00:57:55,960 one there is our 1269 00:57:55,960 --> 00:57:58,960 community vision statement we we want to make sure that 1270 00:57:58,960 --> 00:58:00,079 that's the focus that's 1271 00:58:00,079 --> 00:58:03,480 what the citizens approved back in 2015 and we want to make 1272 00:58:03,480 --> 00:58:04,599 sure it's consistent 1273 00:58:04,599 --> 00:58:12,139 with the vision of the city after the the the vision and 1274 00:58:12,139 --> 00:58:13,639 the the goals and 1275 00:58:13,639 --> 00:58:16,760 objectives we looked at the future land use map that you 1276 00:58:16,760 --> 00:58:18,440 see here and you often 1277 00:58:18,440 --> 00:58:22,440 hear from us from staff these future land use designations 1278 00:58:22,440 --> 00:58:23,519 from rural areas 1279 00:58:23,519 --> 00:58:27,099 down to business innovation all the way through you know 1280 00:58:27,099 --> 00:58:28,039 neighborhood 1281 00:58:28,039 --> 00:58:32,619 compatibility areas these are the future land use design 1282 00:58:32,619 --> 00:58:34,599 ations as shown on our 1283 00:58:34,599 --> 00:58:38,480 future land use map so here's the chart that I was 1284 00:58:38,480 --> 00:58:41,360 referring to earlier on the 1285 00:58:41,360 --> 00:58:45,730 left is the future land use designation in our DIM plan 1286 00:58:45,730 --> 00:58:49,719 2030 to the right is 1287 00:58:49,719 --> 00:58:53,619 the the middle column is the current zoning districts and 1288 00:58:53,619 --> 00:58:54,840 this is how we see 1289 00:58:54,840 --> 00:58:58,840 these zoning districts where they fall under that specific 1290 00:58:58,840 --> 00:59:00,159 future land use 1291 00:59:00,159 --> 00:59:05,369 designation so for example in our one would be considered 1292 00:59:05,369 --> 00:59:07,440 low residential the 1293 00:59:07,440 --> 00:59:15,320 NR 2346 is moderate residential and so on and so forth the 1294 00:59:15,320 --> 00:59:17,039 farthest right column 1295 00:59:17,039 --> 00:59:20,429 is our proposed zoning district that is the 14 zoning 1296 00:59:20,429 --> 00:59:21,639 districts that I was 1297 00:59:21,639 --> 00:59:26,889 referring to this is how we see them being converted from 1298 00:59:26,889 --> 00:59:28,440 not only the 1299 00:59:28,440 --> 00:59:31,539 current zoning district but from the future land use 1300 00:59:31,539 --> 00:59:32,880 designation so I'm gonna 1301 00:59:32,880 --> 00:59:35,900 keep this up here for a little bit and ask if anybody has 1302 00:59:35,900 --> 00:59:37,800 any questions with 1303 00:59:37,800 --> 00:59:41,610 this chart and I apologize none of this was provided in 1304 00:59:41,610 --> 00:59:43,239 advance but wanted just 1305 00:59:43,239 --> 00:59:47,050 to give y'all some time since we have time to go over the 1306 00:59:47,050 --> 00:59:48,079 process of our 1307 00:59:48,079 --> 00:59:57,280 update of our zoning map so the next step was we had this 1308 00:59:57,280 --> 01:00:00,599 methodology of not 1309 01:00:00,599 --> 01:00:06,599 not splitting parcel we purposely left parcels the way they 1310 01:00:06,599 --> 01:00:07,679 are we didn't want 1311 01:00:07,679 --> 01:00:13,260 to zone a property half one zoning and half the other so if 1312 01:00:13,260 --> 01:00:14,880 you see a parcel 1313 01:00:14,880 --> 01:00:20,199 that extends long from from here to here this probably 1314 01:00:20,199 --> 01:00:23,039 should be zone geo general 1315 01:00:23,039 --> 01:00:26,519 office but because we didn't want to split parcels we left 1316 01:00:26,519 --> 01:00:27,320 it alone because 1317 01:00:27,320 --> 01:00:30,960 we felt that that would cause even more confusion or more 1318 01:00:30,960 --> 01:00:32,320 issues in the future 1319 01:00:32,320 --> 01:00:37,880 so we left it based on parcels moving forward Ron question 1320 01:00:37,880 --> 01:00:39,519 for on that yes sir 1321 01:00:39,519 --> 01:00:44,730 if you have on a on a current parcel split zoning did you 1322 01:00:44,730 --> 01:00:47,400 go with the more 1323 01:00:47,400 --> 01:00:51,090 dense or the higher zoning rather than down zoning them for 1324 01:00:51,090 --> 01:00:52,000 a lot of those 1325 01:00:52,000 --> 01:00:55,809 chair there the ones I recall are primarily around the 1326 01:00:55,809 --> 01:00:56,920 downtown or around 1327 01:00:56,920 --> 01:01:00,920 the the University because we're limited we're limiting the 1328 01:01:00,920 --> 01:01:01,559 amount of zoning 1329 01:01:01,559 --> 01:01:05,539 districts that automatically was zone whatever the zoning 1330 01:01:05,539 --> 01:01:07,119 that was closest to 1331 01:01:07,119 --> 01:01:10,510 the area so so to the to your answer to answer your 1332 01:01:10,510 --> 01:01:12,880 question that is yes but the 1333 01:01:12,880 --> 01:01:17,260 majority of it we didn't deal with that specifically well I 1334 01:01:17,260 --> 01:01:18,400 'm just going through 1335 01:01:18,400 --> 01:01:21,800 my memory of how many cases have come here over the years 1336 01:01:21,800 --> 01:01:22,719 and split zonings 1337 01:01:22,719 --> 01:01:26,380 right and so obviously there's probably still some of those 1338 01:01:26,380 --> 01:01:27,760 out there so on 1339 01:01:27,760 --> 01:01:33,929 split zoning cases you had to take that parcel now it's 1340 01:01:33,929 --> 01:01:35,440 owned right with one 1341 01:01:35,440 --> 01:01:38,789 running rather than two in the one I recall it was the one 1342 01:01:38,789 --> 01:01:39,800 off of Scripture 1343 01:01:39,800 --> 01:01:43,099 normal that one comes to mind that's the one I can I mean 1344 01:01:43,099 --> 01:01:44,639 in the example I gave 1345 01:01:44,639 --> 01:01:49,849 you the response I gave you we gave that a zoning that was 1346 01:01:49,849 --> 01:01:51,880 suitable for both for 1347 01:01:51,880 --> 01:02:02,199 example that was I believe dr2 and DCG right and so in that 1348 01:02:02,199 --> 01:02:04,079 area we we don't 1349 01:02:04,079 --> 01:02:10,000 amend because our current I'm sorry our proposed MD would 1350 01:02:10,000 --> 01:02:11,599 not apply there so in 1351 01:02:11,599 --> 01:02:16,920 essence we took care of that split zoning by the proposed 1352 01:02:16,920 --> 01:02:18,519 zoning proposed 1353 01:02:18,519 --> 01:02:22,099 again because we were dealing with less zoning districts so 1354 01:02:22,099 --> 01:02:23,119 there there wasn't a 1355 01:02:23,119 --> 01:02:26,969 lot of where we had split zoning to begin with or as a 1356 01:02:26,969 --> 01:02:29,360 result so I guess to 1357 01:02:29,360 --> 01:02:32,960 carry the conversation one step further mm-hmm in that 1358 01:02:32,960 --> 01:02:33,960 example since you brought 1359 01:02:33,960 --> 01:02:38,139 it up that parcel had DCG and dr2 right and so instead of 1360 01:02:38,139 --> 01:02:39,079 that parcel becoming 1361 01:02:39,079 --> 01:02:44,289 an MD that parcels become an MN correct so back to my 1362 01:02:44,289 --> 01:02:46,039 question that property 1363 01:02:46,039 --> 01:02:51,239 really it's probably down zone rather than up zoned correct 1364 01:02:51,239 --> 01:02:52,320 okay and we will 1365 01:02:52,320 --> 01:02:54,820 get to that that is there's something that's part of this 1366 01:02:54,820 --> 01:02:56,320 presentation and how 1367 01:02:56,320 --> 01:03:00,719 we deal with down zoning and some up zoning as well okay 1368 01:03:00,719 --> 01:03:03,460 but good question so 1369 01:03:03,460 --> 01:03:08,659 the next step in the methodology was we applied the HC 1370 01:03:08,659 --> 01:03:10,039 which is a highway 1371 01:03:10,039 --> 01:03:13,690 corridor zoning district and what we did is we apply that 1372 01:03:13,690 --> 01:03:14,699 to properties or 1373 01:03:14,699 --> 01:03:20,639 parcels that is a long I 35 and we use a thousand foot 1374 01:03:20,639 --> 01:03:22,320 extension from the center 1375 01:03:22,320 --> 01:03:27,760 line of the highway so as you can see this is I 35 where 1376 01:03:27,760 --> 01:03:29,639 there are the car 1377 01:03:29,639 --> 01:03:34,849 dealerships some regional or commercial retail establish 1378 01:03:34,849 --> 01:03:36,679 ments in as you can see 1379 01:03:36,679 --> 01:03:40,280 based on what you see here majority of it roughly is about 1380 01:03:40,280 --> 01:03:41,559 a thousand foot deep 1381 01:03:41,559 --> 01:03:46,769 now that may be a bit longer or deeper than normal but we 1382 01:03:46,769 --> 01:03:48,159 wanted to capture as 1383 01:03:48,159 --> 01:03:51,969 much as we can and we went back and made sure that if there 1384 01:03:51,969 --> 01:03:52,880 are existing 1385 01:03:52,880 --> 01:03:58,090 neighborhoods or existing uses that would not fit the HC 1386 01:03:58,090 --> 01:03:59,639 zoning district we 1387 01:03:59,639 --> 01:04:03,219 went in and modified it and you can see some of it over 1388 01:04:03,219 --> 01:04:05,239 here as well the other 1389 01:04:05,239 --> 01:04:09,599 important thing is where there is a PD or a zoning overlay 1390 01:04:09,599 --> 01:04:11,079 and we'll get into 1391 01:04:11,079 --> 01:04:14,610 that a little bit more we left those alone as well those 1392 01:04:14,610 --> 01:04:16,440 existing PDs and 1393 01:04:16,440 --> 01:04:23,500 existing zoning overlays will carry forward as PDs the 1394 01:04:23,500 --> 01:04:25,239 other zoning district 1395 01:04:25,239 --> 01:04:30,570 that we use along major corridor was the suburban quarter 1396 01:04:30,570 --> 01:04:32,440 zoning district and 1397 01:04:32,440 --> 01:04:35,630 again we use the a thousand a thousand foot central from 1398 01:04:35,630 --> 01:04:37,039 the center line this 1399 01:04:37,039 --> 01:04:44,840 is loop 288 it also applied on University on Teasley and 1400 01:04:44,840 --> 01:04:45,320 Fort Worth 1401 01:04:45,320 --> 01:04:51,000 Drive as well so the idea here again is we want to capture 1402 01:04:51,000 --> 01:04:52,920 any highway or I'm 1403 01:04:52,920 --> 01:04:56,500 sorry suburban corridor and we use a thousand foot again as 1404 01:04:56,500 --> 01:04:57,800 the start but as 1405 01:04:57,800 --> 01:05:00,329 I explained earlier we went back and made sure that we 1406 01:05:00,329 --> 01:05:01,519 weren't impacting any 1407 01:05:01,519 --> 01:05:07,929 existing development or residential development here's a 1408 01:05:07,929 --> 01:05:09,440 here's an example 1409 01:05:09,440 --> 01:05:14,420 of how that was done so the one to your left is University 1410 01:05:14,420 --> 01:05:15,840 Drive and again this 1411 01:05:15,840 --> 01:05:21,050 area here is looked at or is being being proposed as 1412 01:05:21,050 --> 01:05:22,719 suburban corridor and if 1413 01:05:22,719 --> 01:05:25,849 there was a neighborhood adjacent to it and it is an 1414 01:05:25,849 --> 01:05:27,800 established neighborhood we 1415 01:05:27,800 --> 01:05:31,610 made sure that we went back and made it right and cleaned 1416 01:05:31,610 --> 01:05:32,880 it up and it's more 1417 01:05:32,880 --> 01:05:36,679 obviously better it's not better but it is existing 1418 01:05:36,679 --> 01:05:37,800 established neighborhoods 1419 01:05:37,800 --> 01:05:41,820 and they should be zoned the way they are and so that is we 1420 01:05:41,820 --> 01:05:42,079 're going to be 1421 01:05:42,079 --> 01:05:46,829 receiving an R2 because of the conversion that we talked 1422 01:05:46,829 --> 01:05:47,840 about prior 1423 01:05:47,840 --> 01:05:51,840 yes sir commissioner back thank you chair so I'm 1424 01:05:51,840 --> 01:05:54,690 assuming that black line we've seen and we'll actually take 1425 01:05:54,690 --> 01:05:55,599 a dip and go around 1426 01:05:55,599 --> 01:05:58,880 that neighborhood right yeah it will not know that that's 1427 01:05:58,880 --> 01:05:59,360 just to illustrate 1428 01:05:59,360 --> 01:06:04,619 where that thousand foot extension was taken to the same 1429 01:06:04,619 --> 01:06:07,039 thing for I-35 we we 1430 01:06:07,039 --> 01:06:11,679 did the the HC and you can see here this is the Southridge 1431 01:06:11,679 --> 01:06:13,000 neighborhood we know 1432 01:06:13,000 --> 01:06:15,190 that that's not going to be to see that's established an 1433 01:06:15,190 --> 01:06:15,639 established 1434 01:06:15,639 --> 01:06:18,309 neighborhood and it's residential so we went and we made 1435 01:06:18,309 --> 01:06:19,360 sure that we zoned it 1436 01:06:19,360 --> 01:06:25,219 the way it should be zoned I talked about this somewhat 1437 01:06:25,219 --> 01:06:27,840 earlier PDs the big 1438 01:06:27,840 --> 01:06:32,789 one that we know of or as well known as the ropes and range 1439 01:06:32,789 --> 01:06:34,000 plan development 1440 01:06:34,000 --> 01:06:39,570 those PDs that we have a total of 15 legal conforming PDs 1441 01:06:39,570 --> 01:06:41,440 will carry forward 1442 01:06:41,440 --> 01:06:47,960 as PDs so they will be moved over and will not be altered 1443 01:06:47,960 --> 01:06:49,480 or of any way 1444 01:06:50,400 --> 01:06:55,610 master plan communities we've got three four technically 1445 01:06:55,610 --> 01:06:57,159 but three coal ranch 1446 01:06:57,159 --> 01:07:02,559 hills of den and hunter ranch those MPCs will be carried 1447 01:07:02,559 --> 01:07:04,719 over as PDs so moving 1448 01:07:04,719 --> 01:07:11,429 forward they will be PDs as part of the draft zoning map 1449 01:07:11,429 --> 01:07:14,039 zoning overlays these 1450 01:07:14,039 --> 01:07:19,019 are different from your special purpose overlay districts 1451 01:07:19,019 --> 01:07:20,440 such as the fry Street 1452 01:07:20,440 --> 01:07:23,630 special purpose overlay district these are zoning overlays 1453 01:07:23,630 --> 01:07:25,119 these are the zoning 1454 01:07:25,119 --> 01:07:28,019 cases that was brought forward to the planning zoning 1455 01:07:28,019 --> 01:07:29,840 Commission and to and 1456 01:07:29,840 --> 01:07:34,030 then into to council that is and if there was a restriction 1457 01:07:34,030 --> 01:07:35,159 or a condition 1458 01:07:35,159 --> 01:07:43,329 placed on this zoning case they technically are not the 1459 01:07:43,329 --> 01:07:44,719 true zoning so 1460 01:07:44,719 --> 01:07:48,139 they're referred to as zoning overlays and we have 1461 01:07:48,139 --> 01:07:50,360 approximately 32 of these 1462 01:07:50,360 --> 01:07:56,360 currently since 2002 and they will be carried forward as PD 1463 01:07:56,360 --> 01:07:57,440 s as part of the 1464 01:07:57,440 --> 01:08:01,519 draft zoning map any questions on this one because this 1465 01:08:01,519 --> 01:08:03,280 this provided or had 1466 01:08:03,280 --> 01:08:05,880 some discussion with the advisory committee so I didn't 1467 01:08:05,880 --> 01:08:06,559 know I want to 1468 01:08:06,559 --> 01:08:10,730 offer an opportunity for the playing zoning Commission to 1469 01:08:10,730 --> 01:08:14,280 ask questions okay 1470 01:08:16,279 --> 01:08:18,819 I think everybody remembers this one this one I try to find 1471 01:08:18,819 --> 01:08:19,840 one that was 1472 01:08:19,840 --> 01:08:24,329 somewhat recent this is the one of Audra where they were 1473 01:08:24,329 --> 01:08:27,420 proposing an NR six 1474 01:08:27,420 --> 01:08:33,000 but truly they needed four point five and so that's that's 1475 01:08:33,000 --> 01:08:34,119 the reduction 1476 01:08:34,119 --> 01:08:37,310 Commissioner Smith nature who's gonna keep track of these 1477 01:08:37,310 --> 01:08:37,960 overlays because 1478 01:08:37,960 --> 01:08:40,359 they're all gonna be so different everything else that I 1479 01:08:40,359 --> 01:08:40,920 mean it's it's 1480 01:08:40,920 --> 01:08:43,279 not just even taking like we've got it we got a variation 1481 01:08:43,279 --> 01:08:44,840 or an overlay on an 1482 01:08:44,840 --> 01:08:48,840 R2 or something like that now and then we go in and it's 1483 01:08:48,840 --> 01:08:49,840 everything becomes PD 1484 01:08:49,840 --> 01:08:52,659 we don't even see in the signifier of it was it in our two 1485 01:08:52,659 --> 01:08:53,720 or in our four in our 1486 01:08:53,720 --> 01:08:56,779 six with extra little overlays or emissions everything else 1487 01:08:56,779 --> 01:08:57,560 who's keeping 1488 01:08:57,560 --> 01:09:01,449 track of it is it written it's it's it's gonna be by 1489 01:09:01,449 --> 01:09:03,039 ordinance so we will have 1490 01:09:03,039 --> 01:09:06,489 that go back through and be able to currently currently 1491 01:09:06,489 --> 01:09:07,880 with the current PDs 1492 01:09:07,880 --> 01:09:11,689 we've got a folder system with each PD sure that identifies 1493 01:09:11,689 --> 01:09:12,920 you know what it is 1494 01:09:12,920 --> 01:09:16,310 their development standards their zoning regulations so the 1495 01:09:16,310 --> 01:09:17,119 ordinance part I get 1496 01:09:17,119 --> 01:09:19,449 I think I think the part I'm more looking at is that if 1497 01:09:19,449 --> 01:09:20,399 there is ever any 1498 01:09:20,399 --> 01:09:23,470 extra development in any of these areas that have an 1499 01:09:23,470 --> 01:09:25,520 overlay on it the current 1500 01:09:25,520 --> 01:09:28,649 system we have now at least gives you just from the outset 1501 01:09:28,649 --> 01:09:29,720 of just being able 1502 01:09:29,720 --> 01:09:34,930 to see it's in our two at least gives you some idea of 1503 01:09:34,930 --> 01:09:35,939 knowing at least how 1504 01:09:35,939 --> 01:09:38,569 many how many dwellings per acre and then you can kind of 1505 01:09:38,569 --> 01:09:39,279 figure out the 1506 01:09:39,279 --> 01:09:42,159 overlays from there once you do PD you know in our six with 1507 01:09:42,159 --> 01:09:43,640 overlays and two 1508 01:09:43,640 --> 01:09:47,489 with overlays well no I mean it actually I guess just log 1509 01:09:47,489 --> 01:09:48,319 istically I don't want 1510 01:09:48,319 --> 01:09:51,140 over overburdened city with having to ask right answer a 1511 01:09:51,140 --> 01:09:52,119 bunch of questions 1512 01:09:52,119 --> 01:09:55,729 maybe I'm I think it might be even easier if we put them as 1513 01:09:55,729 --> 01:09:56,439 PDs because if 1514 01:09:56,439 --> 01:09:58,840 you left them as zoning you don't know there's a PD and you 1515 01:09:58,840 --> 01:09:59,680 can assume it's 1516 01:09:59,680 --> 01:10:02,090 this with the PD you can see okay it's not it's gonna have 1517 01:10:02,090 --> 01:10:03,119 an overlay yes you 1518 01:10:03,119 --> 01:10:06,390 know to go to if you click on it in our interactive map you 1519 01:10:06,390 --> 01:10:07,079 can click on an 1520 01:10:07,079 --> 01:10:10,100 existing PD sure it tells you what number it is what name 1521 01:10:10,100 --> 01:10:10,800 it is and then 1522 01:10:10,800 --> 01:10:13,680 you can reference that there's an ordinance number so it 1523 01:10:13,680 --> 01:10:14,880 almost helps that 1524 01:10:14,880 --> 01:10:18,069 there is a PD it's a PD versus just a underlying zone 1525 01:10:18,069 --> 01:10:18,899 industry so smart Ron 1526 01:10:18,899 --> 01:10:26,779 thank you okay so the other after we did all that we also 1527 01:10:26,779 --> 01:10:27,760 looked at the preferred 1528 01:10:27,760 --> 01:10:32,210 growth concept which is in our didn't plan 2030 our again 1529 01:10:32,210 --> 01:10:33,520 our our vision our 1530 01:10:33,520 --> 01:10:37,699 hope is that we try to develop sustainability a sustainable 1531 01:10:37,699 --> 01:10:38,359 with with 1532 01:10:38,359 --> 01:10:41,079 the intent of you know sustaining our resources so we want 1533 01:10:41,079 --> 01:10:42,000 to develop within 1534 01:10:42,000 --> 01:10:46,229 the core and then work our way out eventually so any areas 1535 01:10:46,229 --> 01:10:47,560 that were in the 1536 01:10:47,560 --> 01:10:52,750 periphery of the city we left or try to leave as rural 1537 01:10:52,750 --> 01:10:54,199 residential our our that's 1538 01:10:54,199 --> 01:10:59,409 the least intense zoning district so similar to what we 1539 01:10:59,409 --> 01:11:01,439 have now is RD 5 they 1540 01:11:01,439 --> 01:11:04,020 will just be our art and again we those are going to be 1541 01:11:04,020 --> 01:11:05,119 those areas that are 1542 01:11:05,119 --> 01:11:11,100 along the periphery of the city we also looked at you know 1543 01:11:11,100 --> 01:11:12,920 areas that we weren't 1544 01:11:12,920 --> 01:11:16,500 really familiar with we use aerial photography Google 1545 01:11:16,500 --> 01:11:17,680 Street View and 1546 01:11:17,680 --> 01:11:22,180 visited each site so I asked the committee I asked you all 1547 01:11:22,180 --> 01:11:22,800 know where this 1548 01:11:22,800 --> 01:11:25,819 is this is actually University Drive and this is mingo 1549 01:11:25,819 --> 01:11:27,479 right next to the railroad 1550 01:11:27,479 --> 01:11:31,470 does anybody know that this well I guess we weren't as 1551 01:11:31,470 --> 01:11:33,199 familiar with it than as 1552 01:11:33,199 --> 01:11:37,979 you all were so I I didn't know that building was there or 1553 01:11:37,979 --> 01:11:39,399 you know what it 1554 01:11:39,399 --> 01:11:42,590 was and so we had to research it and so we we had to make 1555 01:11:42,590 --> 01:11:43,960 sure that we knew each 1556 01:11:43,960 --> 01:11:46,689 parcel before we put a zoning on it so that's that's to 1557 01:11:46,689 --> 01:11:48,000 show you that there was 1558 01:11:48,000 --> 01:11:54,300 there was some time spent doing that city properties city 1559 01:11:54,300 --> 01:11:56,039 properties where 1560 01:11:56,039 --> 01:12:00,210 they made sense that they were the use that's currently on 1561 01:12:00,210 --> 01:12:01,560 that property was 1562 01:12:01,560 --> 01:12:05,199 permitted on in that proposed zoning district we left it as 1563 01:12:05,199 --> 01:12:06,399 is so this is in 1564 01:12:06,399 --> 01:12:10,630 the downtown area the blue here that you see is the square 1565 01:12:10,630 --> 01:12:11,920 and so all this 1566 01:12:11,920 --> 01:12:14,359 property and this is where we are right now this is where 1567 01:12:14,359 --> 01:12:16,399 we're currently at MD 1568 01:12:16,399 --> 01:12:23,550 mixed use downtown is primarily high intensity I can't say 1569 01:12:23,550 --> 01:12:24,760 high density I say 1570 01:12:24,760 --> 01:12:28,800 high intensity because it allows a lot of different uses 1571 01:12:28,800 --> 01:12:29,880 and allows for a 1572 01:12:29,880 --> 01:12:35,090 certain height maximum and lot coverage as well but the 1573 01:12:35,090 --> 01:12:36,800 uses looking at the 1574 01:12:36,800 --> 01:12:41,289 allowed uses it also allowed for the those those type of 1575 01:12:41,289 --> 01:12:42,600 uses in the MD when 1576 01:12:42,600 --> 01:12:46,279 we left it empty we didn't change it at all 1577 01:12:46,439 --> 01:12:51,630 for larger areas that we feel needs a little bit more 1578 01:12:51,630 --> 01:12:53,000 attention such as the 1579 01:12:53,000 --> 01:12:58,680 airport the landfill large DME facilities and so on we have 1580 01:12:58,680 --> 01:12:59,520 the option 1581 01:12:59,520 --> 01:13:04,729 or the zoning district called PF plant public facilities 1582 01:13:04,729 --> 01:13:06,000 and again that is 1583 01:13:06,000 --> 01:13:10,199 defined as lands that are meant for public and quasi public 1584 01:13:10,199 --> 01:13:11,159 community uses 1585 01:13:11,159 --> 01:13:15,489 and this zoning would apply to and should apply to these 1586 01:13:15,489 --> 01:13:16,600 type or these 1587 01:13:16,600 --> 01:13:20,180 areas in the city that the city owns so we have it for 1588 01:13:20,180 --> 01:13:21,840 large areas such as the 1589 01:13:21,840 --> 01:13:27,789 airport we also have them for UNT and TW now we're also 1590 01:13:27,789 --> 01:13:29,640 considering an 1591 01:13:29,640 --> 01:13:33,840 institutional zoning district for these two universities 1592 01:13:33,840 --> 01:13:34,880 that's that's something 1593 01:13:34,880 --> 01:13:38,689 that will most likely come as part of the amendment but for 1594 01:13:38,689 --> 01:13:39,960 now they're zone 1595 01:13:39,960 --> 01:13:45,170 SPF Commissioner Roseau thank you chair can you help me 1596 01:13:45,170 --> 01:13:45,680 understand the 1597 01:13:45,680 --> 01:13:49,550 rationale of making of their own zoning district when they 1598 01:13:49,550 --> 01:13:50,760 de facto do what they 1599 01:13:50,760 --> 01:13:54,590 want anyways we have to give them some zoning district so I 1600 01:13:54,590 --> 01:13:55,880 think institutional 1601 01:13:55,880 --> 01:13:57,909 zoning district that's what that's a good question because 1602 01:13:57,909 --> 01:13:58,399 we thought the 1603 01:13:58,399 --> 01:14:02,970 same thing if they didn't receive any zoning is like we we 1604 01:14:02,970 --> 01:14:04,300 wouldn't have you 1605 01:14:04,300 --> 01:14:06,640 know a designation for them but you're right there is there 1606 01:14:06,640 --> 01:14:07,319 they don't have to 1607 01:14:07,319 --> 01:14:12,840 comply with our regs as far as the zoning regulations so 1608 01:14:12,840 --> 01:14:14,000 what would be the 1609 01:14:14,000 --> 01:14:17,640 benefit of having a separate zoning that's used twice in 1610 01:14:17,640 --> 01:14:18,800 our city just for 1611 01:14:18,800 --> 01:14:22,800 them I think there may be I don't know if Richard can help 1612 01:14:22,800 --> 01:14:25,560 me with this one part 1613 01:14:25,560 --> 01:14:29,680 of it is just to avoid any confusion with the p.l. I have 1614 01:14:29,680 --> 01:14:31,439 seen in in past 1615 01:14:31,439 --> 01:14:36,649 cities where where it had a residential designation and 1616 01:14:36,649 --> 01:14:38,039 this particular 1617 01:14:38,039 --> 01:14:40,430 University had a campus plan but they felt as though they 1618 01:14:40,430 --> 01:14:41,079 had they were 1619 01:14:41,079 --> 01:14:44,500 entitled as a result of the zoning for a certain amount of 1620 01:14:44,500 --> 01:14:46,239 density not the case 1621 01:14:46,239 --> 01:14:48,869 here since we don't have density but all in all it's I 1622 01:14:48,869 --> 01:14:50,020 think it's it's just 1623 01:14:50,020 --> 01:14:53,310 better to capture them as their own ideally it would be to 1624 01:14:53,310 --> 01:14:54,159 have a master 1625 01:14:54,159 --> 01:14:57,260 plan but I think at that point it would just defer to that 1626 01:14:57,260 --> 01:14:58,359 for whatever whatever 1627 01:14:58,359 --> 01:15:01,430 they do yeah that makes sense thank you I'd have a follow- 1628 01:15:01,430 --> 01:15:02,880 up question on that 1629 01:15:02,880 --> 01:15:06,689 you say if I should are they're gonna become a separate 1630 01:15:06,689 --> 01:15:08,800 zoning category yes 1631 01:15:08,800 --> 01:15:12,680 we're thinking of adding a zoning district called just 1632 01:15:12,680 --> 01:15:13,319 institutional 1633 01:15:13,319 --> 01:15:17,590 zoning district for the universities and all these other 1634 01:15:17,590 --> 01:15:18,960 properties those are the 1635 01:15:18,960 --> 01:15:22,770 properties that the University of North Texas currently 1636 01:15:22,770 --> 01:15:24,560 owns yes so with the 1637 01:15:24,560 --> 01:15:28,800 with the rules that all the other zoning categories have to 1638 01:15:28,800 --> 01:15:30,039 meet then if I heard 1639 01:15:30,039 --> 01:15:33,270 you right these don't have to meet those same categories or 1640 01:15:33,270 --> 01:15:34,560 requirements the 1641 01:15:34,560 --> 01:15:42,060 University the institutional one here didn't I see doesn't 1642 01:15:42,060 --> 01:15:43,439 fall under 1643 01:15:43,439 --> 01:15:46,939 institutional just DST would be under public facilities 1644 01:15:46,939 --> 01:15:47,800 just the first two 1645 01:15:47,800 --> 01:15:52,399 yeah just these two okay I misunderstood I just thought all 1646 01:15:52,399 --> 01:15:53,239 of those were going 1647 01:15:53,239 --> 01:15:57,079 into oh no no no no those those my mistake misunderstanding 1648 01:15:57,079 --> 01:15:57,279 yeah 1649 01:15:57,279 --> 01:16:02,260 apologies Commissioner Smith nature if they acquire new 1650 01:16:02,260 --> 01:16:04,000 land after we go 1651 01:16:04,000 --> 01:16:07,810 through to a reason rezone that's technically go through a 1652 01:16:07,810 --> 01:16:08,479 zoning change 1653 01:16:08,479 --> 01:16:11,159 then if they let's say they go buy something that's just 1654 01:16:11,159 --> 01:16:11,960 they think they 1655 01:16:11,960 --> 01:16:14,789 sorry they would they would have that would that come in 1656 01:16:14,789 --> 01:16:15,479 front of us we would 1657 01:16:15,479 --> 01:16:18,250 just vote on that because zoning change technically or what 1658 01:16:18,250 --> 01:16:18,279 would that go be 1659 01:16:18,279 --> 01:16:20,539 automatic when they purchase it it will be up to them to 1660 01:16:20,539 --> 01:16:21,479 decide if they want to 1661 01:16:21,479 --> 01:16:25,430 rezone it or just keep it as this so it's it's it's it 1662 01:16:25,430 --> 01:16:27,119 makes it simple for us 1663 01:16:27,119 --> 01:16:32,000 right now right but if they grow and they acquire any type 1664 01:16:32,000 --> 01:16:33,399 of the property it 1665 01:16:33,399 --> 01:16:37,520 we did be complicated again at some point if I can just say 1666 01:16:37,520 --> 01:16:38,159 you know another 1667 01:16:38,159 --> 01:16:40,189 and I was thinking about this actually earlier it's kind of 1668 01:16:40,189 --> 01:16:41,800 funny one way we we 1669 01:16:41,800 --> 01:16:44,619 might want to consider and just sort of talk it out more 1670 01:16:44,619 --> 01:16:45,720 with legal is there's 1671 01:16:45,720 --> 01:16:48,899 kind of the concept of a floating zone so whether this 1672 01:16:48,899 --> 01:16:50,020 becomes sort of a 1673 01:16:50,020 --> 01:16:52,920 floating zone and as they acquire property just become sort 1674 01:16:52,920 --> 01:16:53,319 of self 1675 01:16:53,319 --> 01:16:56,760 executing again I want to talk that over with with legal 1676 01:16:56,760 --> 01:16:57,960 whether that's even a 1677 01:16:57,960 --> 01:17:00,310 possibility but I think it's just sort of looking at at 1678 01:17:00,310 --> 01:17:01,439 those options or sort of 1679 01:17:01,439 --> 01:17:06,760 every quarter do we do a true up of properties of David 1680 01:17:06,760 --> 01:17:08,319 Clark yeah I think 1681 01:17:08,319 --> 01:17:10,819 it's also to understand where they're they obviously have a 1682 01:17:10,819 --> 01:17:11,479 plan of how they 1683 01:17:11,479 --> 01:17:14,630 want to sure I guess I guess for me it was more to not have 1684 01:17:14,630 --> 01:17:15,840 to bog us down as 1685 01:17:15,840 --> 01:17:19,649 a as a as a commission to not to come to the see it's a 1686 01:17:19,649 --> 01:17:21,119 here have Haley get 1687 01:17:21,119 --> 01:17:23,149 there and talk for ten minutes about why we're gonna reason 1688 01:17:23,149 --> 01:17:23,560 on it and it just 1689 01:17:23,560 --> 01:17:29,279 like I was just going on it sorry for picking on you Haley 1690 01:17:29,279 --> 01:17:31,680 one follow-up on that on the 1691 01:17:31,680 --> 01:17:35,800 on the reverse is true though - these entities do sell 1692 01:17:35,800 --> 01:17:37,680 properties they do come 1693 01:17:37,680 --> 01:17:41,699 so what would be the zoning or how would you handle going 1694 01:17:41,699 --> 01:17:43,760 from institutional that 1695 01:17:43,760 --> 01:17:46,689 there there is no zoning on that parcel so for example like 1696 01:17:46,689 --> 01:17:47,560 the city of debt 1697 01:17:47,560 --> 01:17:50,409 parcel that's for sale here on Locust Street I bought 1698 01:17:50,409 --> 01:17:51,920 property from DISD 1699 01:17:51,920 --> 01:17:58,680 before if it's institutional so TISD would would not be the 1700 01:17:58,680 --> 01:17:59,319 institutional it 1701 01:17:59,319 --> 01:18:02,039 would be there's just the universities I guess I'm still 1702 01:18:02,039 --> 01:18:03,399 yeah sorry I'm having a 1703 01:18:03,399 --> 01:18:08,270 hard time with it got wrote written in stone and it doesn't 1704 01:18:08,270 --> 01:18:10,439 come out right actually 1705 01:18:10,439 --> 01:18:13,170 if I can just give another another example because this is 1706 01:18:13,170 --> 01:18:14,239 a real example 1707 01:18:14,239 --> 01:18:19,479 TWU in this case probably wouldn't want to rezone to 1708 01:18:19,479 --> 01:18:21,319 institutional they've 1709 01:18:21,319 --> 01:18:24,359 acquired it was a piece of property they acquired to to 1710 01:18:24,359 --> 01:18:25,880 build apartments for the 1711 01:18:25,880 --> 01:18:29,460 students so in that case they kept it but they were 1712 01:18:29,460 --> 01:18:30,199 contracting out with a 1713 01:18:30,199 --> 01:18:32,680 different party to sort of build and manage that so in that 1714 01:18:32,680 --> 01:18:33,359 case they kept 1715 01:18:33,359 --> 01:18:36,039 the the zoning and went and are going through through our 1716 01:18:36,039 --> 01:18:37,600 site plan process so 1717 01:18:37,600 --> 01:18:41,729 in that regard we may want to have them rezone or again I 1718 01:18:41,729 --> 01:18:43,720 think there's other we 1719 01:18:43,720 --> 01:18:46,739 can look at it as as we move forward but part of it is to 1720 01:18:46,739 --> 01:18:47,600 sort of try to 1721 01:18:47,600 --> 01:18:51,869 understand also what what their long-term plans are 1722 01:18:51,869 --> 01:18:53,199 Commissioner Osello 1723 01:18:53,199 --> 01:18:57,119 I'm gonna restate chairs question a little bit differently 1724 01:18:57,119 --> 01:18:58,399 the public 1725 01:18:58,399 --> 01:19:01,699 facilities can sell and what would that zoning would just 1726 01:19:01,699 --> 01:19:02,800 be public facilities 1727 01:19:02,800 --> 01:19:05,949 until the new property owner came back through the rezone 1728 01:19:05,949 --> 01:19:09,600 yes okay and a lot of 1729 01:19:09,600 --> 01:19:14,039 I did speak with DISD the county text I mean text on and DC 1730 01:19:14,039 --> 01:19:15,039 T a you know 1731 01:19:15,039 --> 01:19:18,300 individually and I told them this is what is happening and 1732 01:19:18,300 --> 01:19:18,720 they were 1733 01:19:18,720 --> 01:19:22,239 comfortable with what we were proposing for example DISD 1734 01:19:22,239 --> 01:19:23,359 the schools are 1735 01:19:23,359 --> 01:19:26,180 permitted in all zoning district from majority except for 1736 01:19:26,180 --> 01:19:28,399 like the HI the L I 1737 01:19:28,399 --> 01:19:31,829 so you don't want schools in those areas so we did we did 1738 01:19:31,829 --> 01:19:33,279 talk to these agencies 1739 01:19:33,279 --> 01:19:38,060 before we made this public I know we have a couple minutes 1740 01:19:38,060 --> 01:19:39,439 left this is 1741 01:19:39,439 --> 01:19:41,630 probably the more important slide but I just wanted to 1742 01:19:41,630 --> 01:19:43,000 share this with you really 1743 01:19:43,000 --> 01:19:48,399 quickly we have approximately 38,496 parcels in the city 1744 01:19:48,399 --> 01:19:49,800 and we did an 1745 01:19:49,800 --> 01:19:55,039 analysis where we took a parcel and if it went from an R4 1746 01:19:55,039 --> 01:19:56,479 with the conversion 1747 01:19:56,479 --> 01:20:02,039 and we zoned it on R2 for because of maybe consistency or 1748 01:20:02,039 --> 01:20:03,680 compatibility that 1749 01:20:03,680 --> 01:20:08,890 is considered a zoning down and vice versa if we saw an LI 1750 01:20:08,890 --> 01:20:10,439 and probably more 1751 01:20:10,439 --> 01:20:15,069 suitable for an HI that would be a zoning up so we did that 1752 01:20:15,069 --> 01:20:15,479 we did that 1753 01:20:15,479 --> 01:20:18,909 conversion we did that analysis and we came up with 1754 01:20:18,909 --> 01:20:21,680 approximately 2800 parcels 1755 01:20:21,680 --> 01:20:24,800 that are being zoning up being zoned up in about 1800 are 1756 01:20:24,800 --> 01:20:25,720 gonna be zoned down 1757 01:20:25,720 --> 01:20:30,930 now out of 38,000 that's pretty good that tells us that the 1758 01:20:30,930 --> 01:20:31,680 majority of these 1759 01:20:31,680 --> 01:20:36,680 parcels are being converted to the zoning district that 1760 01:20:36,680 --> 01:20:37,880 they either are or 1761 01:20:37,880 --> 01:20:42,020 roughly are so and not not a big change so just give you 1762 01:20:42,020 --> 01:20:44,199 guys an insight of what 1763 01:20:44,199 --> 01:20:48,329 that number is or how we're how we've done our our zoning 1764 01:20:48,329 --> 01:20:50,159 map update so that 1765 01:20:50,159 --> 01:20:53,159 concludes my presentation unless there's anything else I 1766 01:20:53,159 --> 01:20:55,359 appreciate the time 1767 01:20:55,359 --> 01:21:00,760 thank you Ron and just one quick note we'll have a standing 1768 01:21:00,760 --> 01:21:02,520 work session item 1769 01:21:02,520 --> 01:21:06,109 so that we can update the Commission on the actions of the 1770 01:21:06,109 --> 01:21:07,279 committee and what's 1771 01:21:07,279 --> 01:21:12,260 being presented and where we're going great thank you with 1772 01:21:12,260 --> 01:21:13,600 that I'll close our 1773 01:21:13,600 --> 01:21:17,479 work session at 629 and we'll reconvene as quickly as 1774 01:21:17,479 --> 01:21:18,439 possible in council 1775 01:21:18,439 --> 01:21:25,399 chambers good evening and welcome to the city of Denton 1776 01:21:25,399 --> 01:21:26,359 planning and zoning 1777 01:21:26,359 --> 01:21:31,340 Commission meeting for April the 11th 2018 this meeting's 1778 01:21:31,340 --> 01:21:32,520 been duly posted and 1779 01:21:32,520 --> 01:21:36,470 we do have a quorum present and we'll call us to order at 6 1780 01:21:36,470 --> 01:21:38,199 37 our first order 1781 01:21:38,199 --> 01:21:40,760 of business will be to stand and give the pledge the US and 1782 01:21:40,760 --> 01:21:43,560 the Texas flags 1783 01:22:02,720 --> 01:22:04,069 honor the Texas flag I pledge allegiance to the Texas one 1784 01:22:04,069 --> 01:22:11,159 state under God one 1785 01:22:11,159 --> 01:22:14,159 and indivisible 1786 01:22:22,760 --> 01:22:25,479 our next order of business will be to consider a motion for 1787 01:22:25,479 --> 01:22:28,640 our minutes for 1788 01:22:28,640 --> 01:22:33,319 March the 21st 2018 Commissioner Smith I'm most to approve 1789 01:22:33,319 --> 01:22:34,680 okay Mr. Beck 1790 01:22:34,680 --> 01:22:38,720 second okay we have a first and a second for approval any 1791 01:22:38,720 --> 01:22:41,439 comments or questions 1792 01:22:41,439 --> 01:22:45,760 seeing none to call for a vote on the board 1793 01:22:58,640 --> 01:23:12,970 oh most is going to carry five zero with two abstain and we 1794 01:23:12,970 --> 01:23:15,880 'll move us to our 1795 01:23:15,880 --> 01:23:22,699 consent agenda Commissioner Beck I move we approve consent 1796 01:23:22,699 --> 01:23:23,520 agenda okay 1797 01:23:23,520 --> 01:23:27,109 Commissioner Smith second that motion okay we have a first 1798 01:23:27,109 --> 01:23:28,840 and a second for approval any 1799 01:23:28,840 --> 01:23:35,600 discussion seeing none call for a vote on board 1800 01:23:40,560 --> 01:23:49,149 most is going to carry seven zero I will move us to item 1801 01:23:49,149 --> 01:23:51,800 for a individual 1802 01:23:51,800 --> 01:23:56,520 consideration call on Haley for presentation 1803 01:24:04,239 --> 01:24:08,050 good evening this request is for an alternative development 1804 01:24:08,050 --> 01:24:08,359 plan for a 1805 01:24:08,359 --> 01:24:12,159 tractor dealership and repair facility the request for this 1806 01:24:12,159 --> 01:24:12,960 alternative 1807 01:24:12,960 --> 01:24:15,529 development plan is to specifically deviate from the 1808 01:24:15,529 --> 01:24:16,680 perimeter fencing and 1809 01:24:16,680 --> 01:24:19,380 screening requirements and then the parking screening 1810 01:24:19,380 --> 01:24:20,520 requirements found in 1811 01:24:20,520 --> 01:24:24,789 subchapter 13 of the Ditten Development Code the site is 1812 01:24:24,789 --> 01:24:26,239 part of a larger 1813 01:24:26,239 --> 01:24:29,210 tract of land located on I-35 the property has been 1814 01:24:29,210 --> 01:24:30,359 preliminary platted 1815 01:24:30,359 --> 01:24:33,460 not yet final platted to separate this into two lots this 1816 01:24:33,460 --> 01:24:34,920 ADP specifically 1817 01:24:34,920 --> 01:24:38,840 applies to the northern 5.4 acres of the site and the 1818 01:24:38,840 --> 01:24:40,279 property is currently zoned 1819 01:24:40,279 --> 01:24:46,000 regional center commercial commercial downtown looking at 1820 01:24:46,000 --> 01:24:47,680 the site you can see 1821 01:24:47,680 --> 01:24:51,260 they have approximately a 20,000 square foot building in 1822 01:24:51,260 --> 01:24:52,560 the roughly the middle 1823 01:24:52,560 --> 01:24:55,750 of the site that's outland here in yellow in blue you see 1824 01:24:55,750 --> 01:24:56,760 the designated 1825 01:24:56,760 --> 01:25:00,569 parking areas and the area in green is a large detention 1826 01:25:00,569 --> 01:25:02,119 pond overall the site 1827 01:25:02,119 --> 01:25:08,159 has 71% lot coverage 29% landscaping and 63 parking spaces 1828 01:25:08,159 --> 01:25:09,560 as I mentioned 1829 01:25:09,560 --> 01:25:12,000 briefly at work session the city is in some discussions 1830 01:25:12,000 --> 01:25:13,039 regarding the future 1831 01:25:13,039 --> 01:25:16,140 alignment of Windsor the general location of parking and 1832 01:25:16,140 --> 01:25:16,920 this detention 1833 01:25:16,920 --> 01:25:20,479 pond could shift but the requested items tonight in terms 1834 01:25:20,479 --> 01:25:21,680 of the fencing and 1835 01:25:21,680 --> 01:25:25,279 screening would not be affected by that 1836 01:25:25,560 --> 01:25:29,409 specifically the request the first item is to permit a 1837 01:25:29,409 --> 01:25:30,960 chain link fencing 1838 01:25:30,960 --> 01:25:33,409 material currently this isn't a permitted fence material in 1839 01:25:33,409 --> 01:25:33,800 the code 1840 01:25:33,800 --> 01:25:37,100 what the applicants requesting on the side and rear yards 1841 01:25:37,100 --> 01:25:38,359 is an eight foot tall 1842 01:25:38,359 --> 01:25:42,460 black vinyl coated chain link fence they're also proposing 1843 01:25:42,460 --> 01:25:43,380 to plant trees 1844 01:25:43,380 --> 01:25:47,189 along that fence on the side yards to further screen it the 1845 01:25:47,189 --> 01:25:48,319 second request is 1846 01:25:48,319 --> 01:25:51,199 for a front fence that will exceed the three and a half 1847 01:25:51,199 --> 01:25:52,319 foot maximum in the 1848 01:25:52,319 --> 01:25:55,359 code what they've proposed is a six foot tall ornamental wr 1849 01:25:55,359 --> 01:25:56,079 ought iron fence 1850 01:25:56,079 --> 01:26:00,470 along the front property line and then the third item when 1851 01:26:00,470 --> 01:26:01,800 you have parking in 1852 01:26:01,800 --> 01:26:05,609 front of a building the code requires a 15 foot wide area 1853 01:26:05,609 --> 01:26:06,920 that is to include a 1854 01:26:06,920 --> 01:26:09,970 berm one large tree per every 40 linear feet and then 1855 01:26:09,970 --> 01:26:11,640 either zero scaping hedges 1856 01:26:11,640 --> 01:26:16,850 or a continuous wall to enhance their display visibility 1857 01:26:16,850 --> 01:26:17,560 from the street the 1858 01:26:17,560 --> 01:26:20,479 applicant is proposing to not provide the screening yard 1859 01:26:20,479 --> 01:26:21,680 there are they are 1860 01:26:21,680 --> 01:26:24,090 proposing to include all of those required landscaping 1861 01:26:24,090 --> 01:26:24,920 elements for that 1862 01:26:24,920 --> 01:26:27,539 area and have them in alternative locations on the site 1863 01:26:27,539 --> 01:26:28,260 that we'll see 1864 01:26:28,260 --> 01:26:32,840 here in a moment so looking at the fencing requirements the 1865 01:26:32,840 --> 01:26:33,600 yellowish 1866 01:26:33,600 --> 01:26:37,520 orange color is the location for the black eight foot chain 1867 01:26:37,520 --> 01:26:38,520 link fence you 1868 01:26:38,520 --> 01:26:41,399 can see here they do have trees proposed along the sides of 1869 01:26:41,399 --> 01:26:42,000 that to further 1870 01:26:42,000 --> 01:26:44,819 screen the parts that would be visible from the road and 1871 01:26:44,819 --> 01:26:45,760 then the area in red 1872 01:26:45,760 --> 01:26:49,399 is the location for that six foot tall wrought iron fence 1873 01:26:49,399 --> 01:26:50,359 they're requested 1874 01:26:50,359 --> 01:26:53,720 along the frontage and to further elaborate on that the wr 1875 01:26:53,720 --> 01:26:54,399 ought iron 1876 01:26:54,399 --> 01:26:57,880 fencing is like I said proposed for security because this 1877 01:26:57,880 --> 01:26:58,960 is a display yard 1878 01:26:58,960 --> 01:27:02,329 here in the front it would have gates here on the access 1879 01:27:02,329 --> 01:27:03,439 drives to allow 1880 01:27:03,439 --> 01:27:06,250 traffic in and out of the site but its primary purpose 1881 01:27:06,250 --> 01:27:07,439 would be for security 1882 01:27:07,439 --> 01:27:10,189 and to still allow visibility of the site and it is 1883 01:27:10,189 --> 01:27:11,640 generally consistent with 1884 01:27:11,640 --> 01:27:14,449 other fences that you would see along this part of the 1885 01:27:14,449 --> 01:27:15,800 service road on I-35 1886 01:27:15,800 --> 01:27:18,949 from our research those other fences in this area predate 1887 01:27:18,949 --> 01:27:20,119 the code requirements 1888 01:27:20,119 --> 01:27:23,930 so that's how they were permitted at a taller height 1889 01:27:23,930 --> 01:27:25,359 looking at this in a little 1890 01:27:25,359 --> 01:27:28,180 more detail the dark green areas are the areas where they 1891 01:27:28,180 --> 01:27:29,359 're providing trees to 1892 01:27:29,359 --> 01:27:32,409 help screen the fencing as we discussed and then the 1893 01:27:32,409 --> 01:27:34,119 lighter green areas you see 1894 01:27:34,119 --> 01:27:36,489 here all of the required street trees and parking lot 1895 01:27:36,489 --> 01:27:37,640 screening trees as well 1896 01:27:37,640 --> 01:27:40,470 as the shrubs that would have made up that continuous hed 1897 01:27:40,470 --> 01:27:41,680 gerow are all 1898 01:27:41,680 --> 01:27:44,560 provided in these areas you see them clustered around the 1899 01:27:44,560 --> 01:27:45,319 two main drive 1900 01:27:45,319 --> 01:27:47,779 entries to the site and then a few of the trees have been 1901 01:27:47,779 --> 01:27:48,760 provided along the 1902 01:27:48,760 --> 01:27:51,720 back part of the property and in addition to the required 1903 01:27:51,720 --> 01:27:52,600 plantings they 1904 01:27:52,600 --> 01:27:54,939 are proposing eight additional street trees as well to 1905 01:27:54,939 --> 01:27:55,960 further enhance these 1906 01:27:55,960 --> 01:28:01,720 entries to the site so with an ADP we always like to look 1907 01:28:01,720 --> 01:28:02,239 back at what the 1908 01:28:02,239 --> 01:28:04,920 intent of the code requirements are the DDCs fencing 1909 01:28:04,920 --> 01:28:06,359 requirements are meant to 1910 01:28:06,359 --> 01:28:10,159 ensure high quality you know long durability fencing 1911 01:28:10,159 --> 01:28:12,159 materials and then 1912 01:28:12,159 --> 01:28:15,460 specifically within our residential and mixed-use districts 1913 01:28:15,460 --> 01:28:16,760 we have that limited 1914 01:28:16,760 --> 01:28:19,149 height requirement to ensure that the buildings and you 1915 01:28:19,149 --> 01:28:20,079 know the entire site 1916 01:28:20,079 --> 01:28:23,270 is still visible from the right-of-way with our parking lot 1917 01:28:23,270 --> 01:28:24,119 screening the intent 1918 01:28:24,119 --> 01:28:27,039 there is muting the visual effects of parking from the 1919 01:28:27,039 --> 01:28:28,359 right-of-way so that as 1920 01:28:28,359 --> 01:28:30,699 you drive down the street you have you know a visually 1921 01:28:30,699 --> 01:28:32,079 appealing street front 1922 01:28:32,079 --> 01:28:34,180 edge and there's no light or glare from the parking lots 1923 01:28:34,180 --> 01:28:35,079 interfering with the 1924 01:28:35,079 --> 01:28:40,289 roadway so to go briefly through the criteria for approval 1925 01:28:40,289 --> 01:28:41,159 for an ADP the 1926 01:28:41,159 --> 01:28:43,699 first is preservation of existing neighborhoods it's not 1927 01:28:43,699 --> 01:28:44,560 anticipated that 1928 01:28:44,560 --> 01:28:46,920 this would negatively affect the surrounding area it is 1929 01:28:46,920 --> 01:28:47,760 consistent with 1930 01:28:47,760 --> 01:28:50,109 the other development specifically to the north there are 1931 01:28:50,109 --> 01:28:50,960 several other large 1932 01:28:50,960 --> 01:28:54,359 RV sales facilities and then south there's a mixture of 1933 01:28:54,359 --> 01:28:55,079 institutional and 1934 01:28:55,079 --> 01:28:59,409 commercial uses this request would not necessarily lower 1935 01:28:59,409 --> 01:29:00,479 the site design 1936 01:29:00,479 --> 01:29:03,380 standards in the Denton Development Code they're intended 1937 01:29:03,380 --> 01:29:04,479 to provide enhanced 1938 01:29:04,479 --> 01:29:08,319 security and visibility for the site in terms of focusing 1939 01:29:08,319 --> 01:29:09,840 new development and 1940 01:29:09,840 --> 01:29:13,300 activity centers what we see here is typical highway scale 1941 01:29:13,300 --> 01:29:14,199 development this is 1942 01:29:14,199 --> 01:29:17,500 a regional zoning a regional commercial center by zoning 1943 01:29:17,500 --> 01:29:19,399 and future land use and 1944 01:29:19,399 --> 01:29:21,890 this use would be something that we would expect to have a 1945 01:29:21,890 --> 01:29:22,840 regional customer 1946 01:29:22,840 --> 01:29:27,359 base that fits with that infrastructure is not a concern 1947 01:29:27,359 --> 01:29:28,359 here there is existing 1948 01:29:28,359 --> 01:29:30,829 infrastructure in terms of roadways water and sewer 1949 01:29:30,829 --> 01:29:31,920 available to the site 1950 01:29:31,920 --> 01:29:35,970 and the end result here would still be a high quality 1951 01:29:35,970 --> 01:29:37,920 development that would 1952 01:29:37,920 --> 01:29:41,250 generally meet the intent of the code by providing the 1953 01:29:41,250 --> 01:29:42,640 screening for that chain 1954 01:29:42,640 --> 01:29:45,289 link fencing and vinyl coating it they would reduce you 1955 01:29:45,289 --> 01:29:46,239 know the the reflective 1956 01:29:46,239 --> 01:29:50,550 typical material see with chain link and they are providing 1957 01:29:50,550 --> 01:29:51,880 a non-opaque high 1958 01:29:51,880 --> 01:29:54,689 quality fence along the frontage as well the height is 1959 01:29:54,689 --> 01:29:55,840 higher for security 1960 01:29:55,840 --> 01:29:59,039 purposes but the material itself is a permitted high 1961 01:29:59,039 --> 01:30:00,760 quality material and then 1962 01:30:00,760 --> 01:30:02,859 in terms of parking lot screening as I mentioned they are 1963 01:30:02,859 --> 01:30:03,680 providing all of the 1964 01:30:03,680 --> 01:30:06,750 required elements just in alternate locations on the site 1965 01:30:06,750 --> 01:30:07,680 and they are also 1966 01:30:07,680 --> 01:30:11,479 providing those additional eight trees so with that staff 1967 01:30:11,479 --> 01:30:12,479 is recommending 1968 01:30:12,479 --> 01:30:14,510 approval of the request because we found it to meet all of 1969 01:30:14,510 --> 01:30:15,939 these criteria and I 1970 01:30:15,939 --> 01:30:18,359 could stand for any questions do you have a question 1971 01:30:18,359 --> 01:30:19,479 Commissioner Beck thank 1972 01:30:19,479 --> 01:30:23,289 you chair Haley just for clarification again can you go 1973 01:30:23,289 --> 01:30:24,319 back to the diagram the 1974 01:30:24,319 --> 01:30:32,960 site location show us that the Google yeah okay so when you 1975 01:30:32,960 --> 01:30:33,800 're talking about 1976 01:30:33,800 --> 01:30:37,380 this is one tract of land but it's gonna be in two 1977 01:30:37,380 --> 01:30:39,760 different lots yes there is a 1978 01:30:39,760 --> 01:30:42,949 preliminary plan that's been approved it would split the 1979 01:30:42,949 --> 01:30:44,119 lot into two pieces 1980 01:30:44,119 --> 01:30:46,939 this would be the northern roughly five and a half acres 1981 01:30:46,939 --> 01:30:48,000 and then there would be 1982 01:30:48,000 --> 01:30:51,189 a second lot okay okay and I don't know why that wasn't 1983 01:30:51,189 --> 01:30:52,159 clear to me before so 1984 01:30:52,159 --> 01:30:55,149 we're basically building in that area where the least 1985 01:30:55,149 --> 01:30:56,279 amount of trees are 1986 01:30:56,279 --> 01:30:59,239 right now correct yes is what you're doing and that is the 1987 01:30:59,239 --> 01:31:00,560 five point three 1988 01:31:00,560 --> 01:31:07,039 eight acres yes what is the total acreage for the whole I'm 1989 01:31:07,039 --> 01:31:08,840 guessing 11 1990 01:31:08,840 --> 01:31:11,119 maybe 1991 01:31:13,119 --> 01:31:17,460 I believe the other lot is just over two acres but I want 1992 01:31:17,460 --> 01:31:20,199 to confirm that yes I 1993 01:31:20,199 --> 01:31:23,500 believe the totals about seven point one acres okay so they 1994 01:31:23,500 --> 01:31:24,720 're using about five 1995 01:31:24,720 --> 01:31:27,609 and a half and then be a remainder of about two so when we 1996 01:31:27,609 --> 01:31:28,520 're talking about 1997 01:31:28,520 --> 01:31:33,500 putting fencing on that I guess it'd be the south end to 1998 01:31:33,500 --> 01:31:35,119 kind of obscure the 1999 01:31:35,119 --> 01:31:40,579 view in there actually it's gonna be covered up by a couple 2000 01:31:40,579 --> 01:31:42,880 of acres so yes 2001 01:31:42,880 --> 01:31:46,930 why is the fencing even an issue as far as a barrier of 2002 01:31:46,930 --> 01:31:48,880 some kind is that where 2003 01:31:48,880 --> 01:31:51,779 the roads gonna run through and no the code doesn't permit 2004 01:31:51,779 --> 01:31:52,960 chain-link material 2005 01:31:52,960 --> 01:31:58,170 at all it's not a man material yeah but you talk about 2006 01:31:58,170 --> 01:31:59,279 trees and bushes being 2007 01:31:59,279 --> 01:32:04,680 planted to landscaping on that south end to cover the view 2008 01:32:04,680 --> 01:32:05,199 of the chain link 2009 01:32:05,199 --> 01:32:09,279 fence but can we even really see it if there's two acres 2010 01:32:09,279 --> 01:32:10,279 roughly two acres 2011 01:32:10,279 --> 01:32:13,239 south of that once that sites developed it probably wouldn 2012 01:32:13,239 --> 01:32:14,279 't be visible no but 2013 01:32:14,279 --> 01:32:17,119 in the meantime it would provide that additional screening 2014 01:32:17,119 --> 01:32:18,560 and okay they're 2015 01:32:18,560 --> 01:32:21,039 using that to meet all of their other tree and landscaping 2016 01:32:21,039 --> 01:32:22,520 requirements as well 2017 01:32:22,520 --> 01:32:29,479 okay thank you any other questions for Haley 2018 01:32:30,479 --> 01:32:33,670 thank you Amy I believe the applicant is here if you had 2019 01:32:33,670 --> 01:32:34,479 any questions for them 2020 01:32:34,479 --> 01:32:38,289 as well this is an item for individual consideration and if 2021 01:32:38,289 --> 01:32:38,920 there's anyone who 2022 01:32:38,920 --> 01:32:41,579 would like to speak on this item especially the applicant 2023 01:32:41,579 --> 01:32:42,279 you're welcome 2024 01:32:42,279 --> 01:32:45,479 to come forward this time 2025 01:32:49,060 --> 01:32:54,039 my name is Richard Mason I'm with icon consulting group I 2026 01:32:54,039 --> 01:32:56,239 am the project 2027 01:32:56,239 --> 01:33:00,140 architect on it and I appreciate your time to speak this 2028 01:33:00,140 --> 01:33:01,640 evening we have been 2029 01:33:01,640 --> 01:33:05,630 through quite a bit of give-and-take with Haley and her 2030 01:33:05,630 --> 01:33:06,960 group to to get to 2031 01:33:06,960 --> 01:33:10,539 this point and as most of you know where the current 2032 01:33:10,539 --> 01:33:12,079 location of Zimmer or 2033 01:33:12,079 --> 01:33:16,340 Kubota is they're busting at the seams and ready to get to 2034 01:33:16,340 --> 01:33:18,359 a bigger site you know to 2035 01:33:18,359 --> 01:33:22,560 expand and and get into a nicer building that kind of thing 2036 01:33:22,560 --> 01:33:23,239 and so that's 2037 01:33:23,239 --> 01:33:27,689 basically the whole development there and and what we're 2038 01:33:27,689 --> 01:33:29,359 asking for again we're 2039 01:33:29,359 --> 01:33:33,000 trying to meet the intent of what in working with Haley and 2040 01:33:33,000 --> 01:33:34,159 the intent of the 2041 01:33:34,159 --> 01:33:37,960 code with the materials and those types of things 2042 01:33:37,960 --> 01:33:39,640 recognizing that the front of 2043 01:33:39,640 --> 01:33:42,970 this is going to be a display area for various types of 2044 01:33:42,970 --> 01:33:44,439 equipment that Zimmer 2045 01:33:44,439 --> 01:33:49,649 sells and and so and then the security issue of being in a 2046 01:33:49,649 --> 01:33:51,239 transient zone that 2047 01:33:51,239 --> 01:33:53,810 are along the highway those are the main two things that we 2048 01:33:53,810 --> 01:33:54,760 're trying to to 2049 01:33:54,760 --> 01:33:57,989 accomplish keep the site secure but also keep it 2050 01:33:57,989 --> 01:33:59,800 individually pleasing and 2051 01:33:59,800 --> 01:34:06,250 architecturally aesthetically pleasing space in short I'll 2052 01:34:06,250 --> 01:34:06,840 keep it short but 2053 01:34:06,840 --> 01:34:12,670 that's basically what our agenda is okay any questions for 2054 01:34:12,670 --> 01:34:14,720 the applicant thank 2055 01:34:14,720 --> 01:34:17,880 you for coming out thank you for your time you bet sir 2056 01:34:17,880 --> 01:34:25,890 anybody else want to speak on this item seeing none chair 2057 01:34:25,890 --> 01:34:27,399 entertaining motion 2058 01:34:27,399 --> 01:34:32,039 discussion Commissioner Ellis thank you chair I'm gonna 2059 01:34:32,039 --> 01:34:34,680 move to approve ADP 17 2060 01:34:34,680 --> 01:34:41,680 for Commissioner Beck second first and second any further 2061 01:34:41,680 --> 01:34:42,279 discussion or 2062 01:34:42,279 --> 01:34:50,159 comments I'll make a quick comment just say so good to see 2063 01:34:50,159 --> 01:34:51,319 a local company do 2064 01:34:51,319 --> 01:34:55,130 well and glad that you all are going to be able to stay in 2065 01:34:55,130 --> 01:34:56,399 town and expand and 2066 01:34:56,399 --> 01:35:00,380 continue to run your business here congratulations with 2067 01:35:00,380 --> 01:35:01,560 that call for a 2068 01:35:01,560 --> 01:35:11,289 vote on the board motion carries seven zero good luck with 2069 01:35:11,289 --> 01:35:15,239 your project that 2070 01:35:15,239 --> 01:35:18,670 will move us to well before I go to 4b I want to make this 2071 01:35:18,670 --> 01:35:19,319 a general 2072 01:35:19,319 --> 01:35:23,739 announcement on our agenda I've got a couple people here in 2073 01:35:23,739 --> 01:35:25,000 the room let 2074 01:35:25,000 --> 01:35:28,329 everyone know that in our public hearing sections item 5a 2075 01:35:28,329 --> 01:35:30,840 has been withdrawn so 2076 01:35:30,840 --> 01:35:33,409 if you're waiting for that item it has been withdrawn and 2077 01:35:33,409 --> 01:35:34,199 it's going to be 2078 01:35:34,199 --> 01:35:36,800 renoticed so do want to let you all know that if any of you 2079 01:35:36,800 --> 01:35:37,920 are waiting for that 2080 01:35:37,920 --> 01:35:44,310 item that will move us on to item 4b and I'm going to rec 2081 01:35:44,310 --> 01:35:45,560 use myself on this item 2082 01:35:45,560 --> 01:35:49,010 due to the fact that I was in a part of the partnership 2083 01:35:49,010 --> 01:35:50,600 that owned this property 2084 01:35:50,600 --> 01:35:53,670 originally and has sold it several years ago to the present 2085 01:35:53,670 --> 01:35:54,479 owner and so I'm 2086 01:35:54,479 --> 01:35:57,670 going to recuse myself on this item and I'll yield to the 2087 01:35:57,670 --> 01:35:58,920 vice chair on this 2088 01:35:58,920 --> 01:36:03,229 item thank you chair for item 4b I'll call Haley for 2089 01:36:03,229 --> 01:36:08,720 presentation good evening 2090 01:36:08,720 --> 01:36:11,729 this item is a site plan request for a medical office 2091 01:36:11,729 --> 01:36:13,079 building in the razor 2092 01:36:13,079 --> 01:36:18,289 branch overlay district so specifically this is for a 2093 01:36:18,289 --> 01:36:19,640 medical office on lot 1 2094 01:36:19,640 --> 01:36:23,520 block 4 of the razor ranch south edition you can see the 2095 01:36:23,520 --> 01:36:25,039 property here outlined 2096 01:36:25,039 --> 01:36:29,649 in red it's total of just over four acres it's located 2097 01:36:29,649 --> 01:36:30,640 along the I-35 2098 01:36:30,640 --> 01:36:34,430 frontage road scripture currently runs on the south side of 2099 01:36:34,430 --> 01:36:35,199 the property on the 2100 01:36:35,199 --> 01:36:38,260 north will be the future extension of panhandle drive that 2101 01:36:38,260 --> 01:36:39,399 's being extended as 2102 01:36:39,399 --> 01:36:43,899 part of the razor ranch development within the overlay 2103 01:36:43,899 --> 01:36:45,760 district this lot 2104 01:36:45,760 --> 01:36:49,560 specifically is located within the south mixed-use district 2105 01:36:49,560 --> 01:36:50,479 we've discussed 2106 01:36:50,479 --> 01:36:53,010 previously that there haven't been design standards 2107 01:36:53,010 --> 01:36:53,920 developed for the 2108 01:36:53,920 --> 01:36:57,520 majority of the south mixed-use district but this specific 2109 01:36:57,520 --> 01:36:58,560 lot did have an 2110 01:36:58,560 --> 01:37:01,609 amendment to the overlay passed in 2011 that adopted a site 2111 01:37:01,609 --> 01:37:02,720 design standard just 2112 01:37:02,720 --> 01:37:06,359 for this lot and as you're familiar with these site plans 2113 01:37:06,359 --> 01:37:07,439 for razor ranch 2114 01:37:07,439 --> 01:37:09,710 require submittal of a site plan landscape plan and 2115 01:37:09,710 --> 01:37:10,760 building elevations 2116 01:37:10,760 --> 01:37:15,609 for your consideration the criteria for approval generally 2117 01:37:15,609 --> 01:37:16,439 are that the site 2118 01:37:16,439 --> 01:37:19,260 can comply with the concept and schematic plan that we just 2119 01:37:19,260 --> 01:37:19,800 looked at 2120 01:37:19,800 --> 01:37:23,189 that the site provide for compatible arrangement of 2121 01:37:23,189 --> 01:37:24,720 buildings and uses to not 2122 01:37:24,720 --> 01:37:28,529 net negatively impact adjoining properties that there be 2123 01:37:28,529 --> 01:37:29,359 adequate and 2124 01:37:29,359 --> 01:37:31,859 safe circulation of vehicular traffic and that the site 2125 01:37:31,859 --> 01:37:32,920 comply with all other 2126 01:37:32,920 --> 01:37:37,710 aspects of the overlay so we'll look at the site plan here 2127 01:37:37,710 --> 01:37:39,079 the proposed building 2128 01:37:39,079 --> 01:37:44,319 is 22,000 square feet this is intended to be phase one of a 2129 01:37:44,319 --> 01:37:45,199 larger development 2130 01:37:45,199 --> 01:37:47,630 so you can see they're generally developing the southern 2131 01:37:47,630 --> 01:37:48,279 half of the lot 2132 01:37:48,279 --> 01:37:52,289 the intent would be to develop another medical office or 2133 01:37:52,289 --> 01:37:53,640 similar use on the 2134 01:37:53,640 --> 01:37:56,189 north part of this property to make one larger development 2135 01:37:56,189 --> 01:37:56,840 that would be 2136 01:37:56,840 --> 01:38:01,109 interconnected for this phase they're providing 110 parking 2137 01:38:01,109 --> 01:38:02,119 spaces which is 2138 01:38:02,119 --> 01:38:05,930 the exact requirement based on the parking ratios in our 2139 01:38:05,930 --> 01:38:06,960 code of one space 2140 01:38:06,960 --> 01:38:10,960 for 200 square feet of office and you can see here access 2141 01:38:10,960 --> 01:38:12,300 to the site would be 2142 01:38:12,300 --> 01:38:15,880 provided on the south side from a single driveway along 2143 01:38:15,880 --> 01:38:17,920 scripture Street based on 2144 01:38:17,920 --> 01:38:19,960 the drive aisles and their parking lot they do intend to 2145 01:38:19,960 --> 01:38:21,239 interconnect so that 2146 01:38:21,239 --> 01:38:23,710 eventually when the northern half develops there will also 2147 01:38:23,710 --> 01:38:24,239 be access to 2148 01:38:24,239 --> 01:38:27,729 the site from panhandle and they also have cross-connect 2149 01:38:27,729 --> 01:38:29,159 ivity to the existing 2150 01:38:29,159 --> 01:38:33,800 medical facility east of this property looking at the 2151 01:38:33,800 --> 01:38:35,640 landscaping they have 2152 01:38:35,640 --> 01:38:37,899 exceeded all of the landscape requirements in the razor 2153 01:38:37,899 --> 01:38:38,720 ranch overlay 2154 01:38:38,720 --> 01:38:42,529 for this particular lot a total of 22 percent landscape or 2155 01:38:42,529 --> 01:38:43,039 20 percent 2156 01:38:43,039 --> 01:38:46,850 landscaping was required they're providing 22 and then 2157 01:38:46,850 --> 01:38:47,279 specifically 2158 01:38:47,279 --> 01:38:50,119 within the parking lot they were required 22 percent tree 2159 01:38:50,119 --> 01:38:50,880 canopy and 10 2160 01:38:50,880 --> 01:38:55,090 percent landscaping so they have exceeded those numbers the 2161 01:38:55,090 --> 01:38:56,039 building 2162 01:38:56,039 --> 01:38:59,210 elevations are in compliance with the requirements of the 2163 01:38:59,210 --> 01:39:00,359 overlay what you see 2164 01:39:00,359 --> 01:39:04,170 here on the top is the side that would face face east into 2165 01:39:04,170 --> 01:39:06,079 the site the middle 2166 01:39:06,079 --> 01:39:09,250 elevation is what would be visible along the right of way 2167 01:39:09,250 --> 01:39:11,039 of I-35 and then on the 2168 01:39:11,039 --> 01:39:13,069 bottom you see the two the north and south end of the 2169 01:39:13,069 --> 01:39:14,039 building and the 2170 01:39:14,039 --> 01:39:17,329 building would be constructed of if his material similar to 2171 01:39:17,329 --> 01:39:19,439 stucco and Texas 2172 01:39:19,439 --> 01:39:24,050 limestone staff is recommending approval of the site plan 2173 01:39:24,050 --> 01:39:25,079 request it was found to 2174 01:39:25,079 --> 01:39:27,390 be compliant with all of the applicable regulations within 2175 01:39:27,390 --> 01:39:28,039 the razor ranch 2176 01:39:28,039 --> 01:39:31,069 overlay district and I can stand for any questions thank 2177 01:39:31,069 --> 01:39:32,159 you Haley any questions 2178 01:39:32,159 --> 01:39:38,199 for Haley commissioner Ellis thank you vice-chair Haley 2179 01:39:38,199 --> 01:39:38,920 when they do develop 2180 01:39:38,920 --> 01:39:41,470 the other site you did say that they would come back with a 2181 01:39:41,470 --> 01:39:42,119 site plan for 2182 01:39:42,119 --> 01:39:46,789 that as well that would be something separate yes thank you 2183 01:39:46,789 --> 01:39:48,920 I do not see any 2184 01:39:48,920 --> 01:39:52,380 other questions thank you Haley as this is an individual 2185 01:39:52,380 --> 01:39:53,640 consideration item 2186 01:39:53,640 --> 01:39:56,880 anyone who would like to speak and certainly do so is there 2187 01:39:56,880 --> 01:39:57,960 anyone here who 2188 01:39:57,960 --> 01:40:03,409 would like to speak about this item great see none the vice 2189 01:40:03,409 --> 01:40:03,760 -chair will 2190 01:40:03,760 --> 01:40:07,430 entertain a motion or discussion commissioner Smith motion 2191 01:40:07,430 --> 01:40:08,119 to approve SP 2192 01:40:08,119 --> 01:40:13,329 18 - 0 0 0 1 commissioner Ellis second is there any 2193 01:40:13,329 --> 01:40:15,560 discussion I'll call for a 2194 01:40:15,560 --> 01:40:18,079 vote on the board 2195 01:40:26,800 --> 01:40:31,239 motion passes passes 6-0 with one recusal with that we'll 2196 01:40:31,239 --> 01:40:32,560 move into our 2197 01:40:32,560 --> 01:40:36,159 public agenda item B will be first and before that I'll 2198 01:40:36,159 --> 01:40:37,479 call the chair back in 2199 01:40:37,479 --> 01:40:40,479 the meeting 2200 01:41:07,479 --> 01:41:23,939 thank you chairman and commissioners z 17 - 0 0 3 3 is a 2201 01:41:23,939 --> 01:41:25,399 request for approval of 2202 01:41:25,399 --> 01:41:30,930 an initial zoning designation of CMG on the subject site 2203 01:41:30,930 --> 01:41:34,000 located on the map here 2204 01:41:34,000 --> 01:41:39,409 it's located on the east side of old out and road south of 2205 01:41:39,409 --> 01:41:43,319 Teasley given that the 2206 01:41:43,319 --> 01:41:46,140 site was recently annexed into the city it has a holding 2207 01:41:46,140 --> 01:41:47,119 zone designation of 2208 01:41:47,119 --> 01:41:53,069 RD 5x and here you see the zoning map as it will look if 2209 01:41:53,069 --> 01:41:54,119 this request is 2210 01:41:54,119 --> 01:42:01,079 approved the subject site is designated as community mixed 2211 01:42:01,079 --> 01:42:02,680 use the intent of 2212 01:42:02,680 --> 01:42:09,050 community mixed use is to achieve a mix of uses basically 2213 01:42:09,050 --> 01:42:10,520 commercial uses but 2214 01:42:10,520 --> 01:42:15,960 also some residential and other service uses the types of 2215 01:42:15,960 --> 01:42:17,560 uses and the scale of 2216 01:42:17,560 --> 01:42:21,140 the development that is permitted in the CMG district 2217 01:42:21,140 --> 01:42:22,960 conforms to the goals and 2218 01:42:22,960 --> 01:42:28,470 of the community mixed use designation the requested CMG 2219 01:42:28,470 --> 01:42:30,279 district would actually 2220 01:42:30,279 --> 01:42:35,180 be a continuation of the existing CMG district that you see 2221 01:42:35,180 --> 01:42:36,399 to the north this 2222 01:42:36,399 --> 01:42:40,239 little site right here this point three acres is actually 2223 01:42:40,239 --> 01:42:41,560 part of the lot that 2224 01:42:41,560 --> 01:42:45,630 is located to the north when the site was plotted it was 2225 01:42:45,630 --> 01:42:46,680 plotted with the city 2226 01:42:46,680 --> 01:42:52,600 limit line going through the lower third of it the uses 2227 01:42:52,600 --> 01:42:55,039 permitted in the CMG 2228 01:42:55,039 --> 01:42:58,390 district are consistent with the uses that are in the area 2229 01:42:58,390 --> 01:42:59,479 today specifically 2230 01:42:59,479 --> 01:43:04,460 vehicle repair offices self storage we have institutional 2231 01:43:04,460 --> 01:43:05,640 uses across the 2232 01:43:05,640 --> 01:43:11,789 street as well as commercial the site will take access from 2233 01:43:11,789 --> 01:43:13,359 old Alton Road old 2234 01:43:13,359 --> 01:43:18,340 out and road is designated as a future secondary arterial 2235 01:43:18,340 --> 01:43:20,000 you can see Teasley 2236 01:43:20,000 --> 01:43:23,800 Road right here which is a primary arterial the site has 2237 01:43:23,800 --> 01:43:25,319 access to water 2238 01:43:25,319 --> 01:43:29,130 and sewer you can see the water and sewer lines water are 2239 01:43:29,130 --> 01:43:30,239 blue and the sewer 2240 01:43:30,239 --> 01:43:37,579 lines are red notices were sent out on March 25th we sent 2241 01:43:37,579 --> 01:43:38,640 out five notices via 2242 01:43:38,640 --> 01:43:42,020 certified mail to property owners within 200 feet of the 2243 01:43:42,020 --> 01:43:43,359 site and we sent 11 2244 01:43:43,359 --> 01:43:47,449 notices courtesy notices to property owners with it with 2245 01:43:47,449 --> 01:43:48,359 excuse me to 2246 01:43:48,359 --> 01:43:52,840 properties within 500 feet of the site we have at this time 2247 01:43:52,840 --> 01:43:53,779 received no 2248 01:43:53,779 --> 01:43:59,720 response to the mailing staff recommends approval of this 2249 01:43:59,720 --> 01:44:01,600 request as it conforms 2250 01:44:01,600 --> 01:44:06,079 with the standards for rezoning specifically the CMG 2251 01:44:06,079 --> 01:44:06,600 district is 2252 01:44:06,600 --> 01:44:09,600 consistent with the goals and objectives of the Denton plan 2253 01:44:09,600 --> 01:44:10,920 2030 and the CMG 2254 01:44:10,920 --> 01:44:14,729 district is compatible with the surrounding land uses and 2255 01:44:14,729 --> 01:44:15,600 that concludes 2256 01:44:15,600 --> 01:44:18,319 my presentation 2257 01:44:22,880 --> 01:44:27,039 so any questions for Cindy 2258 01:44:33,039 --> 01:44:38,250 I think in the transition of me stepping back in and you 2259 01:44:38,250 --> 01:44:39,520 already being here we 2260 01:44:39,520 --> 01:44:44,010 didn't open the public hearing so just for clarification I 2261 01:44:44,010 --> 01:44:45,359 didn't know where we 2262 01:44:45,359 --> 01:44:52,489 were my apologies so we're gonna open the public hearing 2263 01:44:52,489 --> 01:44:54,600 for item 5b do you 2264 01:44:54,600 --> 01:44:58,119 want me to go through my presentation again 2265 01:45:02,039 --> 01:45:05,220 I'll ask for that is there anyone in the audience that 2266 01:45:05,220 --> 01:45:06,880 would like to hear the 2267 01:45:06,880 --> 01:45:13,520 presentation again seeing none public hearings open and we 2268 01:45:13,520 --> 01:45:13,920 've had our 2269 01:45:13,920 --> 01:45:22,840 presentation any questions for Cindy seeing none this is a 2270 01:45:22,840 --> 01:45:23,840 public hearing so 2271 01:45:23,840 --> 01:45:26,279 if there's anyone here who would like to speak on this item 2272 01:45:26,279 --> 01:45:27,439 please come forward 2273 01:45:27,439 --> 01:45:29,920 at this time 2274 01:45:33,439 --> 01:45:36,420 seeing none it'll close the public hearing and open the 2275 01:45:36,420 --> 01:45:38,279 floor for discussion 2276 01:45:38,279 --> 01:45:44,159 or emotion Commissioner Smith motion approves e 17 - 0 0 3 2277 01:45:44,159 --> 01:45:45,520 3 a commissioner 2278 01:45:45,520 --> 01:45:49,100 is out I second okay we have a first and a second for 2279 01:45:49,100 --> 01:45:53,680 approval any questions or 2280 01:45:53,680 --> 01:46:01,920 comments so none we will call for a vote on the board 2281 01:46:08,520 --> 01:46:13,720 motion is going to carry 7 0 we'll move us to item C this 2282 01:46:13,720 --> 01:46:17,520 time I'm going to open 2283 01:46:17,520 --> 01:46:23,420 the public hearing for DCA 18 - 0 0 0 2 and call on Haley 2284 01:46:23,420 --> 01:46:25,199 for presentation 2285 01:46:39,279 --> 01:46:39,699 so this is a proposed amendment to the Denton Development 2286 01:46:39,699 --> 01:46:43,399 Code to remove 2287 01:46:43,399 --> 01:46:47,460 limitation 34 so the request before you is to consider 2288 01:46:47,460 --> 01:46:49,279 making a recommendation 2289 01:46:49,279 --> 01:46:52,710 to council regarding removing limitation 34 from subchapter 2290 01:46:52,710 --> 01:46:53,640 5 of the Denton 2291 01:46:53,640 --> 01:46:56,449 Development Code this limitation is applicable to 2292 01:46:56,449 --> 01:46:57,680 distribution center 2293 01:46:57,680 --> 01:47:00,800 warehouse general and warehouse retail uses within our 2294 01:47:00,800 --> 01:47:01,920 employment center 2295 01:47:01,920 --> 01:47:07,199 districts so for a bit of background staff is proposing to 2296 01:47:07,199 --> 01:47:08,680 remove l34 2297 01:47:08,680 --> 01:47:10,779 entirely from the code in all places where it applies 2298 01:47:10,779 --> 01:47:11,720 within the employment 2299 01:47:11,720 --> 01:47:15,239 center districts this limitation specifically as I 2300 01:47:15,239 --> 01:47:15,960 mentioned applies to 2301 01:47:15,960 --> 01:47:19,260 distribution centers and warehouses and permits no more 2302 01:47:19,260 --> 01:47:21,199 than 150,000 gross 2303 01:47:21,199 --> 01:47:24,100 square feet and eight truck docks it further stipulates 2304 01:47:24,100 --> 01:47:25,319 that all the docks and 2305 01:47:25,319 --> 01:47:28,220 bays have to be to the rear or side not viewable from the 2306 01:47:28,220 --> 01:47:29,119 street and that 2307 01:47:29,119 --> 01:47:32,930 buffering standards apply for outdoor storage and the 2308 01:47:32,930 --> 01:47:34,479 loading docks just for 2309 01:47:34,479 --> 01:47:38,010 size comparison purposes the Walmart at razor ranch that 2310 01:47:38,010 --> 01:47:39,479 you see here is just 2311 01:47:39,479 --> 01:47:42,789 over 150,000 square feet and contains six truck docks so 2312 01:47:42,789 --> 01:47:44,000 that would be a rough 2313 01:47:44,000 --> 01:47:46,529 comparison of the type of facility where this limitation 2314 01:47:46,529 --> 01:47:50,000 would start applying a 2315 01:47:50,000 --> 01:47:54,159 little bit more background l34 has been in the code since 2316 01:47:54,159 --> 01:47:55,880 it was adopted in 2002 2317 01:47:55,880 --> 01:47:58,920 in 2012 we did make some changes that expanded the applic 2318 01:47:58,920 --> 01:48:00,079 ability of it though 2319 01:48:00,079 --> 01:48:05,289 we changed uses in 2012 so we previously had wholesale 2320 01:48:05,289 --> 01:48:06,680 storage and distribution 2321 01:48:06,680 --> 01:48:10,260 and distribution centers as separate uses with this with an 2322 01:48:10,260 --> 01:48:11,720 ordinance in 2012 we 2323 01:48:11,720 --> 01:48:15,529 removed both of those and adopted instead distribution 2324 01:48:15,529 --> 01:48:16,239 center slash 2325 01:48:16,239 --> 01:48:20,050 warehouse as a use and warehouse retail as another use and 2326 01:48:20,050 --> 01:48:21,680 then we along with 2327 01:48:21,680 --> 01:48:25,710 that expanded l34 to not only apply in the ECI district to 2328 01:48:25,710 --> 01:48:26,920 wholesale storage 2329 01:48:26,920 --> 01:48:31,560 but to apply to both of these new uses in the employment 2330 01:48:31,560 --> 01:48:34,640 center districts we did 2331 01:48:34,640 --> 01:48:36,970 some comparisons just to see what types of properties this 2332 01:48:36,970 --> 01:48:37,800 would affect in the 2333 01:48:37,800 --> 01:48:41,720 city so to develop a site that would have these limitations 2334 01:48:41,720 --> 01:48:42,920 with 150,000 2335 01:48:42,920 --> 01:48:46,289 square foot or larger building to provide for adequate 2336 01:48:46,289 --> 01:48:48,000 parking and allow 2337 01:48:48,000 --> 01:48:51,220 for the required landscaping area on the site within the EC 2338 01:48:51,220 --> 01:48:52,199 I district you would 2339 01:48:52,199 --> 01:48:56,560 have to have a minimum size property of 5.2 acres so 2340 01:48:56,560 --> 01:48:59,000 looking at where we have 2341 01:48:59,000 --> 01:49:01,590 that size of property with this zoning we found that it 2342 01:49:01,590 --> 01:49:02,319 would affect 2343 01:49:02,319 --> 01:49:05,439 approximately 23 different properties in the city that 2344 01:49:05,439 --> 01:49:06,840 totaled approximately 2345 01:49:06,840 --> 01:49:10,979 429 acres total so in the grand scheme of things not all 2346 01:49:10,979 --> 01:49:12,840 that many properties 2347 01:49:12,840 --> 01:49:16,420 would even be eligible for a facility as large as this 2348 01:49:16,420 --> 01:49:17,920 limitation applies to 2349 01:49:17,920 --> 01:49:22,600 properties within ECC we did ran the same comparison again 2350 01:49:22,600 --> 01:49:23,560 to just see where 2351 01:49:23,560 --> 01:49:26,560 this would start to kick in and we found the minimum size 2352 01:49:26,560 --> 01:49:27,920 property where this 2353 01:49:27,920 --> 01:49:31,350 would affect would be about five and a half acres a total 2354 01:49:31,350 --> 01:49:32,520 of six properties 2355 01:49:32,520 --> 01:49:39,079 were affected by this at just approximately 150 acres total 2356 01:49:39,079 --> 01:49:39,399 so some 2357 01:49:39,399 --> 01:49:42,050 further considerations that staff had we looked at what 2358 01:49:42,050 --> 01:49:42,960 other cities in this 2359 01:49:42,960 --> 01:49:45,300 area have in terms of limitations on warehouse or 2360 01:49:45,300 --> 01:49:47,199 distribution facilities we 2361 01:49:47,199 --> 01:49:50,600 found nothing comparable to what we have here none of the 2362 01:49:50,600 --> 01:49:51,800 comparison cities had 2363 01:49:51,800 --> 01:49:54,239 any limitation on the number of bays only two had 2364 01:49:54,239 --> 01:49:55,760 limitations on warehouses 2365 01:49:55,760 --> 01:49:58,720 at all with McKinney limiting the size of a warehouse in 2366 01:49:58,720 --> 01:50:00,000 their town center to 2367 01:50:00,000 --> 01:50:04,260 20,000 square feet and Carrollton limiting warehouses to be 2368 01:50:04,260 --> 01:50:04,840 an accessory 2369 01:50:04,840 --> 01:50:07,920 use only within their corporate commercial district which 2370 01:50:07,920 --> 01:50:08,640 is where they 2371 01:50:08,640 --> 01:50:13,489 have zoning in place to allow for large office campuses 2372 01:50:13,489 --> 01:50:14,479 looking at other uses 2373 01:50:14,479 --> 01:50:17,060 that can be permitted by right in these districts today 2374 01:50:17,060 --> 01:50:18,239 craft alcohol production 2375 01:50:18,239 --> 01:50:21,060 and light manufacturing are permitted with no limitation 2376 01:50:21,060 --> 01:50:21,800 those facilities 2377 01:50:21,800 --> 01:50:24,609 could include warehouses or distribution centers and not be 2378 01:50:24,609 --> 01:50:26,520 limited in size but 2379 01:50:26,520 --> 01:50:28,640 if you're strictly wanting to warehouse or distribute 2380 01:50:28,640 --> 01:50:30,680 things that's where we for 2381 01:50:30,680 --> 01:50:33,939 some reason have this limitation in place and speaking with 2382 01:50:33,939 --> 01:50:34,520 economic 2383 01:50:34,520 --> 01:50:36,909 developments they do frequently get requests for this type 2384 01:50:36,909 --> 01:50:37,720 of facilities and 2385 01:50:37,720 --> 01:50:40,680 places where they could go within the city and in general 2386 01:50:40,680 --> 01:50:41,319 when those 2387 01:50:41,319 --> 01:50:43,649 applicants come to them they're looking for places to put a 2388 01:50:43,649 --> 01:50:45,039 200 to 300,000 2389 01:50:45,039 --> 01:50:48,180 square foot building minimum so this limitation does 2390 01:50:48,180 --> 01:50:49,439 inhibit in that way a 2391 01:50:49,439 --> 01:50:53,250 lot of property that could be eligible for development with 2392 01:50:53,250 --> 01:50:54,279 that being said 2393 01:50:54,279 --> 01:50:58,090 staff is recommending approval of removing L34 from the 2394 01:50:58,090 --> 01:50:59,000 Employment Center 2395 01:50:59,000 --> 01:51:04,899 districts and I could answer any questions any questions 2396 01:51:04,899 --> 01:51:07,239 for Haley okay 2397 01:51:07,239 --> 01:51:11,949 thank you Commissioner Ellis thank you Jim Haley was there 2398 01:51:11,949 --> 01:51:12,760 any discussion among 2399 01:51:12,760 --> 01:51:16,000 staff with the other part of the limitation removing the 2400 01:51:16,000 --> 01:51:17,159 size and that but 2401 01:51:17,159 --> 01:51:20,000 where it talks about the screening and the loading ducks 2402 01:51:20,000 --> 01:51:21,000 being the back did you 2403 01:51:21,000 --> 01:51:25,000 have discussion over perhaps certainly entertaining them 2404 01:51:25,000 --> 01:51:27,279 and we currently have 2405 01:51:27,279 --> 01:51:31,359 standards that that accomplish those same goals within sub 2406 01:51:31,359 --> 01:51:33,199 chapter 13 we have 2407 01:51:33,199 --> 01:51:36,050 requirements for of course buffering between uses we 2408 01:51:36,050 --> 01:51:37,279 already require that 2409 01:51:37,279 --> 01:51:40,460 docs not be accessible or visible directly from the street 2410 01:51:40,460 --> 01:51:41,479 so all of those 2411 01:51:41,479 --> 01:51:44,430 same things are accomplished just in other places in the 2412 01:51:44,430 --> 01:51:45,680 code okay so 2413 01:51:45,680 --> 01:51:49,260 redundant yeah we're not removing any protections there 2414 01:51:49,260 --> 01:51:49,960 necessarily by 2415 01:51:49,960 --> 01:51:52,779 eliminating the location okay and then the way I read this 2416 01:51:52,779 --> 01:51:53,720 is this limitation 2417 01:51:53,720 --> 01:51:58,539 wasn't just two buildings that were 150,000 square feet it 2418 01:51:58,539 --> 01:51:59,039 's just they 2419 01:51:59,039 --> 01:52:02,439 couldn't be over 150,000 square feet exactly so I don't 2420 01:52:02,439 --> 01:52:03,640 quite follow the map 2421 01:52:03,640 --> 01:52:08,840 thing because so really we're removing any this from any 2422 01:52:08,840 --> 01:52:10,079 distribution center of 2423 01:52:10,079 --> 01:52:13,720 any size yes the intent with that exercise was just to see 2424 01:52:13,720 --> 01:52:14,880 at what point 2425 01:52:14,880 --> 01:52:17,430 would you start being limited so if you did have a property 2426 01:52:17,430 --> 01:52:18,640 that was 5.2 acres 2427 01:52:18,640 --> 01:52:20,829 that's when we would start seeing this because any site 2428 01:52:20,829 --> 01:52:21,680 smaller than that 2429 01:52:21,680 --> 01:52:27,079 couldn't even hold a facility that would this would apply 2430 01:52:27,079 --> 01:52:29,199 to okay okay thank you 2431 01:52:30,199 --> 01:52:37,850 any other questions for Haley okay thank you this is a 2432 01:52:37,850 --> 01:52:40,039 public hearing so if 2433 01:52:40,039 --> 01:52:42,069 there's anyone who would like to speak on this item please 2434 01:52:42,069 --> 01:52:42,720 come forward at this 2435 01:52:42,720 --> 01:52:49,989 time seeing none will close the public hearing and open the 2436 01:52:49,989 --> 01:52:50,479 floor for 2437 01:52:50,479 --> 01:52:53,479 discussion or motion 2438 01:52:54,640 --> 01:52:58,520 Commissioner Smith thank you chair motion approved DCA 18 - 2439 01:52:58,520 --> 01:53:00,319 0 0 0 2 okay 2440 01:53:00,319 --> 01:53:03,920 Commissioner back second okay we have a first and a second 2441 01:53:03,920 --> 01:53:05,199 for approval any 2442 01:53:05,199 --> 01:53:12,960 further discussion seeing none of clothes and call for a 2443 01:53:12,960 --> 01:53:15,560 vote on the board 2444 01:53:21,479 --> 01:53:25,279 most is going to carry seven zero and we'll move us to our 2445 01:53:25,279 --> 01:53:28,760 project matrix for 2446 01:53:28,760 --> 01:53:31,279 this evening 2447 01:53:34,039 --> 01:53:37,539 Commissioner Ellis thank you chair well I'm going to bring 2448 01:53:37,539 --> 01:53:39,960 up that notification 2449 01:53:39,960 --> 01:53:39,960 practice once again here as some questions came to light 2450 01:53:39,960 --> 01:53:46,079 today so I guess 2451 01:53:46,079 --> 01:53:51,289 I want to know who currently enforces it is that something 2452 01:53:51,289 --> 01:53:52,039 that maybe we can have 2453 01:53:52,039 --> 01:53:56,489 a discussion about to know how that is enforced and then I 2454 01:53:56,489 --> 01:53:57,560 know we have an 2455 01:53:57,560 --> 01:54:01,430 affidavit I believe that the applicant is supposed to 2456 01:54:01,430 --> 01:54:03,520 supply to the city can we 2457 01:54:03,520 --> 01:54:06,090 maybe get that in our backup materials that that was 2458 01:54:06,090 --> 01:54:07,319 received or get a copy of 2459 01:54:07,319 --> 01:54:10,510 it or something I know I don't want to be the sign police 2460 01:54:10,510 --> 01:54:11,760 even though I do drive 2461 01:54:11,760 --> 01:54:16,970 by all of our you know zoning issues but I would like to 2462 01:54:16,970 --> 01:54:18,960 know and you know who 2463 01:54:18,960 --> 01:54:22,539 is enforcing that so that things are properly done 2464 01:54:22,539 --> 01:54:24,000 certainly and it's our 2465 01:54:24,000 --> 01:54:26,829 responsibility to to to police that in this regard I 2466 01:54:26,829 --> 01:54:28,279 believe in this specific 2467 01:54:28,279 --> 01:54:32,829 case I believe they did submit an affidavit I can't tell 2468 01:54:32,829 --> 01:54:33,840 you I have 2469 01:54:33,840 --> 01:54:38,340 already updated the application and criteria as far as what 2470 01:54:38,340 --> 01:54:38,800 needs to be 2471 01:54:38,800 --> 01:54:44,279 posted and how and I sent that to to all of staff tonight 2472 01:54:44,279 --> 01:54:45,760 and we will be 2473 01:54:45,760 --> 01:54:48,670 reviewing that Monday morning at our staff meeting and so 2474 01:54:48,670 --> 01:54:49,720 once we finalize 2475 01:54:49,720 --> 01:54:52,810 that I will include that in the packet for the next PNC 2476 01:54:52,810 --> 01:54:54,359 meeting to review okay 2477 01:54:54,359 --> 01:54:57,550 thank you can I ask one more question if if an applicant 2478 01:54:57,550 --> 01:54:59,000 submits an affidavit 2479 01:54:59,000 --> 01:55:03,170 which is a notarized document and it is it compliant I mean 2480 01:55:03,170 --> 01:55:04,079 is there a do we 2481 01:55:04,079 --> 01:55:08,550 have a penalty or is there there's a requirement that it 2482 01:55:08,550 --> 01:55:09,399 needs to be 2483 01:55:09,399 --> 01:55:15,960 submitted prior to the to the meeting the way it's written 2484 01:55:15,960 --> 01:55:16,640 unfortunately it's 2485 01:55:16,640 --> 01:55:22,479 not a code requirement and so there's there's not a it's 2486 01:55:22,479 --> 01:55:23,760 not as tight as it 2487 01:55:23,760 --> 01:55:25,789 should be I mean there's not there's simply no other way to 2488 01:55:25,789 --> 01:55:27,239 put it so the the 2489 01:55:27,239 --> 01:55:31,409 what I attempted to do this evening is working to sort of 2490 01:55:31,409 --> 01:55:32,960 clarify that where 2491 01:55:32,960 --> 01:55:36,630 staff will be designating exactly where those signs need to 2492 01:55:36,630 --> 01:55:38,000 be located they'll 2493 01:55:38,000 --> 01:55:41,029 still be responsible for putting them up but we will be 2494 01:55:41,029 --> 01:55:42,560 able to tell them exactly 2495 01:55:42,560 --> 01:55:44,989 where to put them and how they need to be placed thank you 2496 01:55:44,989 --> 01:55:45,840 I look forward to 2497 01:55:45,840 --> 01:55:48,220 that update because I know we've made such good progress 2498 01:55:48,220 --> 01:55:49,239 forward I don't want 2499 01:55:49,239 --> 01:55:52,560 to go backwards now especially on something this absolutely 2500 01:55:52,560 --> 01:55:53,399 simple thank 2501 01:55:53,399 --> 01:55:55,800 you 2502 01:55:58,640 --> 01:56:05,659 anything else on the matrix this evening okay with that I 2503 01:56:05,659 --> 01:56:08,039 will close this at 7 10 2504 01:56:08,039 --> 01:56:10,920 thank you everyone