WEBVTT

00:00:00.000 --> 00:00:04.679
Zoning Commission meeting for February 7th 2018. This

00:00:04.679 --> 00:00:05.759
meeting has been duly

00:00:05.759 --> 00:00:09.830
posted and we do have a quorum present and I will call us

00:00:09.830 --> 00:00:12.400
to order at 5 o 1. We

00:00:12.400 --> 00:00:15.039
are going to go into our work session and our first order

00:00:15.039 --> 00:00:16.039
of business will be

00:00:16.039 --> 00:00:21.530
to receive clarification of agenda items listed on our

00:00:21.530 --> 00:00:24.879
meeting this evening. Does

00:00:24.879 --> 00:00:28.109
anybody have I guess just to start kind of at the beginning

00:00:28.109 --> 00:00:29.079
and then we'll come back

00:00:29.079 --> 00:00:33.090
to our work session reports. Does anybody have any comments

00:00:33.090 --> 00:00:34.880
changes on our minutes

00:00:34.880 --> 00:00:45.679
of our last meeting? How about plats on the consent agenda?

00:00:48.079 --> 00:00:56.969
All right we're gonna make good time this evening. Public

00:00:56.969 --> 00:01:00.280
hearings item A. So

00:01:00.280 --> 00:01:03.729
Rayser investments by Shandrian. Anybody have questions on

00:01:03.729 --> 00:01:09.280
this item? This is a

00:01:09.280 --> 00:01:14.670
parcel up on I think on University for some restaurant pads

00:01:14.670 --> 00:01:14.680
.

00:01:18.120 --> 00:01:20.480
Questions?

00:01:21.680 --> 00:01:31.599
Nope? Okay. Then we've got 4B, Denture Search Care. It's

00:01:31.599 --> 00:01:34.879
the apartments.

00:01:36.480 --> 00:01:41.280
You have some questions on that? Okay.

00:01:48.359 --> 00:01:51.590
Do you all want to do let me back up do we want to to do

00:01:51.590 --> 00:01:54.239
like a small

00:01:54.239 --> 00:01:57.439
presentation on these items whether we have questions or

00:01:57.439 --> 00:01:58.640
not or just kind of go

00:01:58.640 --> 00:02:06.040
through? Do? Okay. Do y'all want to want to back up and

00:02:06.040 --> 00:02:08.680
then on 4A and have

00:02:08.680 --> 00:02:12.419
Shandrian just do an initial presentation on the the Rayser

00:02:12.419 --> 00:02:13.719
or are you okay with

00:02:13.719 --> 00:02:18.120
that being pretty straightforward and going on here to 4B?

00:02:18.120 --> 00:02:20.280
I am on that one. Okay.

00:02:20.280 --> 00:02:24.180
Well let's stay on 4B with Haley and we'll do presentation

00:02:24.180 --> 00:02:27.120
on on this one.

00:02:29.520 --> 00:02:33.120
Okay together. So we can go through both of those. Just for

00:02:33.120 --> 00:02:33.800
clarification we'll

00:02:33.800 --> 00:02:39.719
take those as two separate votes. So yes. Yeah one

00:02:39.719 --> 00:02:39.719
presentation with two votes. Okay.

00:02:39.879 --> 00:02:43.449
All right so there are two requests for this property. The

00:02:43.449 --> 00:02:44.840
rezoning is a request

00:02:44.840 --> 00:02:47.599
to change from community mixed-use general to neighborhood

00:02:47.599 --> 00:02:48.240
residential

00:02:48.240 --> 00:02:51.800
mixed-use and that is for the entire 11.4 acres that's

00:02:51.800 --> 00:02:53.280
outlined in red on the

00:02:53.280 --> 00:02:57.409
map. The SUP request is to allow for a multifamily use and

00:02:57.409 --> 00:02:59.080
it is only for 10.6

00:02:59.080 --> 00:03:01.750
8 out of that total acreage so that's the yellow boundary

00:03:01.750 --> 00:03:03.159
you see. It is

00:03:03.159 --> 00:03:06.150
excluding a medical office that is existing down in the

00:03:06.150 --> 00:03:07.280
southeast corner of

00:03:07.280 --> 00:03:10.539
the property. And just to give you a reference this is I-35

00:03:10.539 --> 00:03:11.360
here on the north,

00:03:11.360 --> 00:03:16.280
Sandbass Boulevard on the west, and Londonderry Drive on

00:03:16.280 --> 00:03:18.520
the south. So the

00:03:18.520 --> 00:03:21.500
rezoning as I mentioned would be from CMG to NRMU so here's

00:03:21.500 --> 00:03:22.319
a look of what

00:03:22.319 --> 00:03:25.819
that would look like on the zoning map. For rezoning as you

00:03:25.819 --> 00:03:26.780
know there's two

00:03:26.780 --> 00:03:29.599
criteria for approval. Consistency with the future land use

00:03:29.599 --> 00:03:31.199
plan and then the

00:03:31.199 --> 00:03:35.099
facilitation of public infrastructure. The future land use

00:03:35.099 --> 00:03:36.180
for this area is

00:03:36.180 --> 00:03:38.770
community mixed-use which is intended to provide a mixture

00:03:38.770 --> 00:03:39.479
of commercial

00:03:39.479 --> 00:03:42.969
residential and service uses. The NRMU district does fit

00:03:42.969 --> 00:03:44.120
within that. It

00:03:44.120 --> 00:03:47.969
provides for a variety of residential uses as well as

00:03:47.969 --> 00:03:49.639
commercial uses that

00:03:49.639 --> 00:03:52.229
are at a similar scale to CMG so lot coverage building

00:03:52.229 --> 00:03:53.120
height things like

00:03:53.120 --> 00:03:57.090
that are generally the same between the two districts.

00:03:57.090 --> 00:03:58.639
Looking at infrastructure

00:03:58.639 --> 00:04:01.680
in the area there are our water and sewer immediately

00:04:01.680 --> 00:04:02.280
available to the

00:04:02.280 --> 00:04:05.710
property. The red lines on the map being existing sewer and

00:04:05.710 --> 00:04:06.639
blue being the water

00:04:06.639 --> 00:04:10.599
lines. Both Sandbass and Londonderry are currently two lane

00:04:10.599 --> 00:04:12.000
undivided roads.

00:04:12.000 --> 00:04:14.969
They're both collector streets so they're intended to say

00:04:14.969 --> 00:04:16.680
two lane undivided with

00:04:16.680 --> 00:04:19.120
sidewalks. Commissioner Beck. Thank you Chair. When you say

00:04:19.120 --> 00:04:21.560
two lane undivided it's

00:04:21.560 --> 00:04:24.990
designed just for one car each way? Yes sir yeah just one

00:04:24.990 --> 00:04:26.040
lane of traffic each

00:04:26.040 --> 00:04:29.720
way with no median in between. I went by there today but it

00:04:29.720 --> 00:04:30.680
seems like it's wide

00:04:30.680 --> 00:04:36.079
enough where you could actually create two lanes each way.

00:04:36.079 --> 00:04:37.600
Is that considering all the

00:04:37.600 --> 00:04:40.009
traffic we've got over there and are fixing to generate

00:04:40.009 --> 00:04:42.889
more. I'm just wondering if that's a...and this may not be

00:04:42.889 --> 00:04:46.600
the time to raise it but is that something to consider?

00:04:46.600 --> 00:04:48.480
These type of streets are typically designed wide enough to

00:04:48.480 --> 00:04:50.360
have one lane of traffic going each way with

00:04:50.360 --> 00:04:53.790
parking and sidewalks on each side would be the ultimate

00:04:53.790 --> 00:04:55.120
intent for that roadway.

00:04:55.120 --> 00:05:00.560
Okay okay thanks. Commissioner Sanchez. Yes I was looking

00:05:00.560 --> 00:05:01.240
at the what it says

00:05:01.240 --> 00:05:04.800
upland habitat area of minimum of 10 acres in size and

00:05:04.800 --> 00:05:06.160
contains remnants of

00:05:06.160 --> 00:05:09.879
cross timber habitat. How much when it says remnants is a

00:05:09.879 --> 00:05:13.639
percentage of upland

00:05:13.639 --> 00:05:16.319
habitat which I'm assuming because we're in cross timbers

00:05:16.319 --> 00:05:18.040
it would be a mixture

00:05:18.040 --> 00:05:23.019
of cross oak and blackjack oaks is that I was trying to

00:05:23.019 --> 00:05:24.040
figure that out.

00:05:24.040 --> 00:05:28.040
To my knowledge there's no upland habitat on this property.

00:05:28.040 --> 00:05:29.959
Okay because I went up

00:05:29.959 --> 00:05:32.850
there I drove by there and there's a little that whole top

00:05:32.850 --> 00:05:34.759
area is a lot of

00:05:34.759 --> 00:05:41.439
blackjack and post oaks and and that's to me upland habitat

00:05:41.439 --> 00:05:43.279
for the cross

00:05:43.279 --> 00:05:47.899
timbers. What do you all define upland habitat? For it to

00:05:47.899 --> 00:05:48.839
be upland habitat it

00:05:48.839 --> 00:05:52.519
has to be I believe that's 10 contiguous acres so this

00:05:52.519 --> 00:05:54.199
entire property would have

00:05:54.199 --> 00:05:56.449
had to been covered in that for it to even possibly be

00:05:56.449 --> 00:05:57.399
considered upland

00:05:57.399 --> 00:06:00.029
habitat so there are a large amount of trees and they will

00:06:00.029 --> 00:06:00.839
have to meet the

00:06:00.839 --> 00:06:03.860
city's tree preservation requirements but it doesn't meet

00:06:03.860 --> 00:06:04.759
that 10 acre

00:06:04.759 --> 00:06:10.060
contiguous lump of you know habitat to be qualified as up

00:06:10.060 --> 00:06:11.720
land. Okay because what

00:06:11.720 --> 00:06:15.279
it says a minimum of 10 acres in size that contains

00:06:15.279 --> 00:06:18.680
remnants so the whole 10

00:06:18.680 --> 00:06:25.490
acres or is it remnants within those 10 acres? Please come

00:06:25.490 --> 00:06:29.720
on up to the mic Bob.

00:06:29.720 --> 00:06:32.920
When it's talking about remnants it's talking about the

00:06:32.920 --> 00:06:34.120
whole eco region of

00:06:34.120 --> 00:06:37.810
the cross timbers region which goes up from Oklahoma down

00:06:37.810 --> 00:06:38.959
into Texas we have

00:06:38.959 --> 00:06:41.149
remnants of it in this area. Right right. It's not talking

00:06:41.149 --> 00:06:42.639
about remnants within

00:06:42.639 --> 00:06:46.889
that 10 acres it's got to be a 10 contiguous acre block of

00:06:46.889 --> 00:06:47.680
the post oak

00:06:47.680 --> 00:06:50.920
and blackjack. Correct. Okay that's and if you look at that

00:06:50.920 --> 00:06:52.600
area right there that

00:06:52.600 --> 00:06:56.920
north side from that's pretty contiguous and I mean it's

00:06:56.920 --> 00:06:59.279
not large oaks but they

00:06:59.279 --> 00:07:03.279
are post oak and blackjack oaks. I'm not disagreeing with

00:07:03.279 --> 00:07:04.439
you. No I'm a tree

00:07:04.439 --> 00:07:07.529
guy. I wish I was things were written a little different

00:07:07.529 --> 00:07:08.600
but the way our ESA

00:07:08.600 --> 00:07:12.089
regulations are written it's got to be a 10 contiguous acre

00:07:12.089 --> 00:07:13.240
block. Okay. So it

00:07:13.240 --> 00:07:15.519
doesn't fall on our map if we pull up our ESA map it won't

00:07:15.519 --> 00:07:16.879
fall in there. Okay

00:07:16.879 --> 00:07:19.160
okay.

00:07:25.480 --> 00:07:28.620
So looking at the compatibility of the request as I

00:07:28.620 --> 00:07:30.720
mentioned NRMU and CMG are

00:07:30.720 --> 00:07:33.480
very similar they're consistent in terms of lot coverage

00:07:33.480 --> 00:07:34.759
landscaping requirements

00:07:34.759 --> 00:07:36.800
and the lot dimensions and building height that would be

00:07:36.800 --> 00:07:37.560
permitted there so

00:07:37.560 --> 00:07:41.160
it's going to be a fairly comparable product in either

00:07:41.160 --> 00:07:42.560
zoning district. The

00:07:42.560 --> 00:07:45.509
proposed use is permitted under CMG but there is a

00:07:45.509 --> 00:07:47.240
limitation that would require

00:07:47.240 --> 00:07:50.670
ground floor commercial uses be developed on both Sam Bass

00:07:50.670 --> 00:07:52.000
and Londonderry.

00:07:52.000 --> 00:07:55.899
Given this area and how well established it is with multif

00:07:55.899 --> 00:07:56.879
amily and then the

00:07:56.879 --> 00:08:00.680
industrial use across Sam Bass we felt like commercials not

00:08:00.680 --> 00:08:01.639
likely to survive

00:08:01.639 --> 00:08:03.910
on the ground floor there it's not a very compact walkable

00:08:03.910 --> 00:08:04.759
environment where

00:08:04.759 --> 00:08:08.810
you would typically get that type of product. So staff is

00:08:08.810 --> 00:08:09.920
recommending

00:08:09.920 --> 00:08:12.079
approval of the request it is consistent with the goals and

00:08:12.079 --> 00:08:12.800
objectives of the

00:08:12.800 --> 00:08:17.250
Denton plan 2030 and then moving into the second aspect of

00:08:17.250 --> 00:08:17.920
their request and

00:08:17.920 --> 00:08:20.550
the reason for the rezoning would be to me Commissioner

00:08:20.550 --> 00:08:21.560
Roselle. Thank you chair

00:08:21.560 --> 00:08:26.360
real fast Haley. Yeah. And the backup it has that

00:08:26.360 --> 00:08:27.680
recommendation for the

00:08:27.680 --> 00:08:33.179
rezoning has a condition of the SUP being approved. Did my

00:08:33.179 --> 00:08:34.159
page print out

00:08:34.159 --> 00:08:39.039
weird or I don't think there's a condition on the rezoning

00:08:39.039 --> 00:08:39.360
but it does

00:08:39.360 --> 00:08:43.700
say staff recommends approval the SUP and I don't know if

00:08:43.700 --> 00:08:44.960
that was just a... It

00:08:44.960 --> 00:08:50.200
might be a trying to get to that page.

00:08:51.840 --> 00:08:54.090
Yeah so the recommendation is just kind of lumped together

00:08:54.090 --> 00:08:55.279
because we did it as

00:08:55.279 --> 00:08:57.379
one report so the rezoning recommendation is with no

00:08:57.379 --> 00:08:57.960
conditions

00:08:57.960 --> 00:09:00.879
and then the SUP is a recommendation with a condition. Okay

00:09:00.879 --> 00:09:03.639
gotcha thank you.

00:09:03.919 --> 00:09:07.450
Yeah so the SUP would be for a straight multifamily use

00:09:07.450 --> 00:09:08.840
with no associated

00:09:08.840 --> 00:09:12.360
commercial development. Our criteria for approval of an SUP

00:09:12.360 --> 00:09:13.039
is kind of a

00:09:13.039 --> 00:09:15.850
compatibility analysis between the requested use and the

00:09:15.850 --> 00:09:16.519
surrounding

00:09:16.519 --> 00:09:18.879
properties to ensure it wouldn't impede development of

00:09:18.879 --> 00:09:20.039
other properties, wouldn't

00:09:20.039 --> 00:09:23.789
generate any nuisances and would be generally compatible.

00:09:23.789 --> 00:09:25.820
So looking at the

00:09:25.820 --> 00:09:28.970
site plan for this what they've proposed here is kind of a

00:09:28.970 --> 00:09:30.080
second phase of the

00:09:30.080 --> 00:09:32.870
existing Coventry departments or apartments. They're

00:09:32.870 --> 00:09:33.679
currently accessible

00:09:33.679 --> 00:09:37.200
off of I-35. Here on this map they would be located just on

00:09:37.200 --> 00:09:38.360
the top side here so

00:09:38.360 --> 00:09:40.940
you can see there is a drive that would be connecting

00:09:40.940 --> 00:09:41.759
between the two

00:09:41.759 --> 00:09:44.120
developments so that amenities could be shared between them

00:09:44.120 --> 00:09:45.759
. They're proposing

00:09:45.759 --> 00:09:49.639
right now at 283 units that puts them at about 26 units per

00:09:49.639 --> 00:09:51.159
acre so below the 30

00:09:51.159 --> 00:09:54.440
maximum for NRMU. It would be a mixture of one two and

00:09:54.440 --> 00:09:55.799
three bedroom units.

00:09:55.799 --> 00:09:58.970
They're proposing a total of six buildings they'd be a

00:09:58.970 --> 00:09:59.899
mixture of three

00:09:59.899 --> 00:10:02.250
and four stories in height. I believe the four stories

00:10:02.250 --> 00:10:04.080
would be here along Sam Bass

00:10:04.080 --> 00:10:07.940
and the site would maintain a total of about 38% landsca

00:10:07.940 --> 00:10:09.559
ping. You can see the

00:10:09.559 --> 00:10:11.879
way they've configured them as L-shaped buildings that each

00:10:11.879 --> 00:10:12.519
have their own

00:10:12.519 --> 00:10:18.120
courtyard. Commissioner Beck. Thank you chair. You said the

00:10:18.120 --> 00:10:20.960
density was 30 per

00:10:20.960 --> 00:10:25.620
acre for residents for an NRMU but aren't we switching it

00:10:25.620 --> 00:10:26.720
to an NRMU? We want to go

00:10:26.720 --> 00:10:32.120
from a CMG to an NRMU 12 which would have a lower density.

00:10:32.120 --> 00:10:33.919
The request

00:10:33.919 --> 00:10:40.080
is for NRMU not NRMU 12. Okay then what's on here is wrong.

00:10:40.080 --> 00:10:42.360
Yeah the request is for NRMU.

00:10:42.360 --> 00:10:46.519
Okay okay. Yeah so CMG doesn't actually have a maximum

00:10:46.519 --> 00:10:47.960
density so they are

00:10:47.960 --> 00:10:51.629
imposing with this rezoning a maximum of 30 units per acre

00:10:51.629 --> 00:10:53.039
on the property. Now by

00:10:53.039 --> 00:10:55.799
unit excuse me just follow up by unit we're talking about

00:10:55.799 --> 00:10:57.440
each apartment? Yes.

00:10:57.440 --> 00:11:02.590
Okay thank you. So we found that the request for this use

00:11:02.590 --> 00:11:04.559
is consistent with the

00:11:04.559 --> 00:11:08.519
Benton plan 2030. It does call for the provision of higher

00:11:08.519 --> 00:11:09.440
density housing in

00:11:09.440 --> 00:11:12.019
areas that won't impact established single-family

00:11:12.019 --> 00:11:13.200
neighborhoods with this

00:11:13.200 --> 00:11:15.830
being an area that has a mixture of existing multifamily

00:11:15.830 --> 00:11:16.519
and even some

00:11:16.519 --> 00:11:18.570
industrial across the street there would be no

00:11:18.570 --> 00:11:20.600
neighborhoods affected by this

00:11:20.600 --> 00:11:24.049
higher density there. The development would be consistent

00:11:24.049 --> 00:11:24.860
with the existing

00:11:24.860 --> 00:11:27.649
land use pattern and it would be required to comply with

00:11:27.649 --> 00:11:28.200
all other

00:11:28.200 --> 00:11:31.169
provisions of the DDCs parking landscaping tree

00:11:31.169 --> 00:11:32.679
preservation and all of

00:11:32.679 --> 00:11:35.580
our site design requirements and the use would generally be

00:11:35.580 --> 00:11:37.120
unlikely to generate

00:11:37.120 --> 00:11:39.309
any nuisances that you know things that aren't already in

00:11:39.309 --> 00:11:40.039
the area with the

00:11:40.039 --> 00:11:44.059
existing multifamily development. We did send notification

00:11:44.059 --> 00:11:45.639
for the request before

00:11:45.639 --> 00:11:47.740
the meeting I passed out the one response that we'd

00:11:47.740 --> 00:11:48.600
received which was a

00:11:48.600 --> 00:11:51.830
favorable request from the former property owner here on

00:11:51.830 --> 00:11:52.679
the south side.

00:11:52.679 --> 00:11:56.110
I believe the transaction was recent so he received that

00:11:56.110 --> 00:11:57.279
notice and let us know

00:11:57.279 --> 00:11:59.860
that he was in support of it. The applicant did hold a

00:11:59.860 --> 00:12:00.480
neighborhood meeting

00:12:00.480 --> 00:12:03.240
this past Monday. I attended the meeting and there were

00:12:03.240 --> 00:12:04.240
representatives from two

00:12:04.240 --> 00:12:06.809
adjoining apartment complexes that came just to see what

00:12:06.809 --> 00:12:07.759
the proposal was they

00:12:07.759 --> 00:12:12.429
didn't voice any opinions either way about it. And staff is

00:12:12.429 --> 00:12:13.200
recommending

00:12:13.200 --> 00:12:17.059
approval of the SUP with the condition that this site plan

00:12:17.059 --> 00:12:17.799
we saw here tonight

00:12:17.799 --> 00:12:20.450
would be considered conditional so a full site plan submitt

00:12:20.450 --> 00:12:21.279
al would still be

00:12:21.279 --> 00:12:24.879
conceptual. They would still do the full site plan submitt

00:12:24.879 --> 00:12:25.919
al just to make

00:12:25.919 --> 00:12:28.500
sure they comply with all aspects of the DDC and that it's

00:12:28.500 --> 00:12:29.480
generally conforming

00:12:29.480 --> 00:12:33.269
to what was presented here tonight. And I can stand for any

00:12:33.269 --> 00:12:35.120
other questions.

00:12:35.519 --> 00:12:38.809
Commissioner Beck. Thank you chair. I was just curious just

00:12:38.809 --> 00:12:39.960
as an item of interest

00:12:39.960 --> 00:12:43.480
I'm sure everybody noticed that this area was zoned this

00:12:43.480 --> 00:12:44.039
whole area is

00:12:44.039 --> 00:12:48.600
zoned CMG and I asked you about you know evidently these

00:12:48.600 --> 00:12:49.279
apartments that are

00:12:49.279 --> 00:12:51.710
there now don't have commercial properties underneath them

00:12:51.710 --> 00:12:52.639
because they

00:12:52.639 --> 00:12:55.960
were built prior to that but when I look at the future land

00:12:55.960 --> 00:12:56.960
use map and seeing

00:12:56.960 --> 00:13:00.200
what we had there why wasn't it considered to change it at

00:13:00.200 --> 00:13:01.000
that time from

00:13:01.000 --> 00:13:06.080
CMG to NRMU knowing that we had pretty much that condition

00:13:06.080 --> 00:13:07.639
there already?

00:13:07.639 --> 00:13:10.700
All the other zonings occurred at the with the citywide rez

00:13:10.700 --> 00:13:12.720
oning in 2002 and

00:13:12.720 --> 00:13:15.090
as you mentioned all those apartments that are there did

00:13:15.090 --> 00:13:16.480
predate that rezoning

00:13:16.480 --> 00:13:19.460
and CMG is generally considered the most directly

00:13:19.460 --> 00:13:20.960
compatible with community

00:13:20.960 --> 00:13:23.970
mixed-use but there are as with all of our future land use

00:13:23.970 --> 00:13:25.000
destinations there's

00:13:25.000 --> 00:13:27.639
multiple districts that could fall into that. I suspect

00:13:27.639 --> 00:13:29.120
just given the the close

00:13:29.120 --> 00:13:32.549
proximity to the highway and the mix of uses in that area

00:13:32.549 --> 00:13:33.879
that they felt CMG was

00:13:33.879 --> 00:13:40.769
probably appropriate for it. Okay thanks. Commissioner Ros

00:13:40.769 --> 00:13:43.879
sell. You sure? Go ahead.

00:13:43.879 --> 00:13:48.330
So if I understood you correctly apartments can be built in

00:13:48.330 --> 00:13:49.960
CMG and so

00:13:49.960 --> 00:13:53.899
I'm wondering if this agenda item is clear enough to

00:13:53.899 --> 00:13:56.240
understand what the

00:13:56.240 --> 00:13:59.539
SUP is for because the SUP just says to allow multifamily

00:13:59.539 --> 00:14:00.720
use but that's allowed

00:14:00.720 --> 00:14:05.840
in CMG correct? Yes so there are within CMG there are two

00:14:05.840 --> 00:14:07.659
limitations the L6 and

00:14:07.659 --> 00:14:11.799
L4 so it either has to be mixed use or have an SUP under L4

00:14:11.799 --> 00:14:12.919
and then L6

00:14:12.919 --> 00:14:16.350
requires specifically ground floor commercial so the rez

00:14:16.350 --> 00:14:17.000
oning is to

00:14:17.000 --> 00:14:21.639
eliminate L6 essentially because under NRMU L4 still

00:14:21.639 --> 00:14:22.639
applies so they still

00:14:22.639 --> 00:14:26.419
have to either do mixed use or obtain the SUP. It's just

00:14:26.419 --> 00:14:27.360
getting rid of that

00:14:27.360 --> 00:14:31.620
ground floor commercial requirement. I think I understand

00:14:31.620 --> 00:14:32.840
that I just I hope

00:14:32.840 --> 00:14:36.799
that the do we need to word that in our motion because it

00:14:36.799 --> 00:14:38.559
says staff recommends

00:14:38.559 --> 00:14:41.690
approval the rezoning request which I understand then it

00:14:41.690 --> 00:14:42.759
says staff recommends

00:14:42.759 --> 00:14:46.190
approval the SUP request the following conditions but that

00:14:46.190 --> 00:14:46.919
the condition

00:14:46.919 --> 00:14:51.480
doesn't necessarily address ground floor use or the L6

00:14:51.480 --> 00:14:52.840
requirement. I don't know

00:14:52.840 --> 00:14:55.600
if that's needed or not I'm just curious if I just read

00:14:55.600 --> 00:14:58.879
this I'm not sure that's

00:14:58.879 --> 00:15:03.539
stated as clearly as possible. The SUP could would only

00:15:03.539 --> 00:15:05.879
apply if the rezoning is

00:15:05.879 --> 00:15:08.460
obtained so once the rezoning is obtained L6 goes away and

00:15:08.460 --> 00:15:09.279
there would no longer

00:15:09.279 --> 00:15:11.929
be any requirement under the current zoning for ground

00:15:11.929 --> 00:15:13.039
floor commercial so we

00:15:13.039 --> 00:15:16.690
didn't feel the need to specify that. So any SUP regardless

00:15:16.690 --> 00:15:17.240
of what the

00:15:17.240 --> 00:15:20.700
SUP is for eliminates L6 on the property? Am I

00:15:20.700 --> 00:15:21.639
understanding that? The rezoning

00:15:21.639 --> 00:15:26.230
itself is what would eliminate limitation six because that

00:15:26.230 --> 00:15:26.879
only applies

00:15:26.879 --> 00:15:30.120
under CMG it doesn't apply under NRMU so if the first

00:15:30.120 --> 00:15:31.440
request is approved that

00:15:31.440 --> 00:15:38.389
limitation goes away. Gotcha thank you. That's along the

00:15:38.389 --> 00:15:39.759
lines of where my

00:15:39.759 --> 00:15:43.299
question was going and looking a little farther ahead on

00:15:43.299 --> 00:15:44.600
our agenda our agenda

00:15:44.600 --> 00:15:49.710
item E is going to be the repeal of the requirement of the

00:15:49.710 --> 00:15:52.519
L6 and so my question

00:15:52.519 --> 00:15:57.080
is do you still have to have an SUP and CMG to do multif

00:15:57.080 --> 00:15:59.480
amily or not? L4 would

00:15:59.480 --> 00:16:04.320
still be in place even if L6 is repealed so the it would

00:16:04.320 --> 00:16:05.039
either have to be a

00:16:05.039 --> 00:16:10.940
mixed-use development or obtain an SUP. Okay but then they

00:16:10.940 --> 00:16:12.080
are putting a

00:16:12.080 --> 00:16:15.509
limitation on themselves by essentially down zoning from CM

00:16:15.509 --> 00:16:16.960
G to NRMU as far as

00:16:16.960 --> 00:16:19.720
the number of units. Yes they're imposing that density

00:16:19.720 --> 00:16:20.799
limitation then. Where they

00:16:20.799 --> 00:16:24.950
don't have that in CMG. Yes. Are they aware that this item

00:16:24.950 --> 00:16:25.759
E is coming before

00:16:25.759 --> 00:16:28.980
us this evening on their zoning and they've decided just to

00:16:28.980 --> 00:16:30.039
continue forward?

00:16:30.039 --> 00:16:32.620
Yeah the timelines for the two requests we're gonna run

00:16:32.620 --> 00:16:33.759
concurrently so they

00:16:33.759 --> 00:16:36.379
decided just to go ahead and move forward with their

00:16:36.379 --> 00:16:37.679
request and see how it goes.

00:16:37.679 --> 00:16:46.110
Okay great thank you. Any other questions Commissioner Beck

00:16:46.110 --> 00:16:47.960
? Thank you chair. Going

00:16:47.960 --> 00:16:54.100
back to the roads again it mentions in our material it

00:16:54.100 --> 00:16:54.759
doesn't have a page

00:16:54.759 --> 00:16:58.419
under site that it says commercial mixed-use collectors are

00:16:58.419 --> 00:16:59.200
intended to

00:16:59.200 --> 00:17:02.720
be two lane roadways with parking along each side and total

00:17:02.720 --> 00:17:04.279
73 be a driveway

00:17:04.279 --> 00:17:07.710
which is what you told me. This type of road is designed to

00:17:07.710 --> 00:17:09.319
handle between 1,000

00:17:09.319 --> 00:17:13.400
and 8,000 vehicles per day and it's full width. Do we know

00:17:13.400 --> 00:17:14.240
how close we are to

00:17:14.240 --> 00:17:18.480
that now? Again everything that's over there are we getting

00:17:18.480 --> 00:17:19.640
precariously close

00:17:19.640 --> 00:17:23.269
to that or we still got a long ways to go? I don't recall

00:17:23.269 --> 00:17:24.440
the exact width of that

00:17:24.440 --> 00:17:28.039
right away I could try to measure that. Well I'm just gonna

00:17:28.039 --> 00:17:29.799
know is with what's there

00:17:29.799 --> 00:17:34.059
can does it handle are we getting precariously close to

00:17:34.059 --> 00:17:37.680
that 8,000? Oh as far as the trips I

00:17:37.680 --> 00:17:41.109
haven't seen any trip calculations for this. To date I'm

00:17:41.109 --> 00:17:42.099
not sure what the

00:17:42.099 --> 00:17:46.680
current capacity or use of Londonderry or San Bas is.

00:17:46.680 --> 00:17:48.200
Should we be considering

00:17:48.200 --> 00:17:51.279
that considering that there's a lot of traffic over there

00:17:51.279 --> 00:17:52.460
these roads should be

00:17:52.460 --> 00:17:55.039
able to handle it but we're building some more would it be

00:17:55.039 --> 00:17:55.720
out of place to

00:17:55.720 --> 00:17:59.599
say let's take a look at it make sure we're not going over

00:17:59.599 --> 00:18:00.039
the limit you know how we

00:18:00.039 --> 00:18:02.960
run into these problems with people say there's too many

00:18:02.960 --> 00:18:04.400
cars on the road now

00:18:04.400 --> 00:18:09.799
and I wouldn't disagree with that but as a P&Z Commission

00:18:09.799 --> 00:18:11.000
could we could we ask

00:18:11.000 --> 00:18:15.140
for that to see where we're at with a traffic analysis on

00:18:15.140 --> 00:18:17.359
the existing roads now?

00:18:17.359 --> 00:18:24.380
I'll ask staff to address that. Yeah I don't think there's

00:18:24.380 --> 00:18:25.920
any just in our you know

00:18:25.920 --> 00:18:30.240
initial discussions there there in the near future there

00:18:30.240 --> 00:18:31.640
aren't any specific

00:18:31.640 --> 00:18:36.240
plans to widen it right now I know they are looking at the

00:18:36.240 --> 00:18:39.359
light on Teasley

00:18:39.359 --> 00:18:43.349
there's the light at Londonderry where traffic kind of gets

00:18:43.349 --> 00:18:44.640
congested with

00:18:44.640 --> 00:18:48.380
folks making the left in the morning school just to the

00:18:48.380 --> 00:18:50.160
school and then at

00:18:50.160 --> 00:18:53.589
before you get to Lillian for I guess when that transitions

00:18:53.589 --> 00:18:55.160
into right before

00:18:55.160 --> 00:18:58.160
35 in between the two apartment complexes there's another

00:18:58.160 --> 00:18:59.359
light so our

00:18:59.359 --> 00:19:02.890
engine engineering is is looking at the possibility of

00:19:02.890 --> 00:19:04.519
having that light taken

00:19:04.519 --> 00:19:09.140
out because of the timing issue because you have almost

00:19:09.140 --> 00:19:09.880
really three lights

00:19:09.880 --> 00:19:14.210
right in a row and and they net particularly in the morning

00:19:14.210 --> 00:19:14.799
and I go

00:19:14.799 --> 00:19:17.710
that way every morning it they're never timed correctly and

00:19:17.710 --> 00:19:18.819
so it really causes

00:19:18.819 --> 00:19:22.250
causes some some issues but in the very near future other

00:19:22.250 --> 00:19:24.039
than other than that

00:19:24.039 --> 00:19:27.759
it's if they're not at that at those levels yet and we don

00:19:27.759 --> 00:19:28.880
't think we need to

00:19:28.880 --> 00:19:32.930
do that now considering that we're fixing to add to that

00:19:32.930 --> 00:19:34.640
not at not at this

00:19:34.640 --> 00:19:38.630
time in a sense it's also it were also looking at it's sort

00:19:38.630 --> 00:19:40.640
of a down zone from

00:19:40.640 --> 00:19:44.690
from the most intense that they could do today by right

00:19:44.690 --> 00:19:46.640
okay again I just want to

00:19:46.640 --> 00:19:48.980
point out under the current zoning if they did develop they

00:19:48.980 --> 00:19:49.759
would be required

00:19:49.759 --> 00:19:51.839
to have that ground floor commercial which would further

00:19:51.839 --> 00:19:52.519
increase the traffic

00:19:52.519 --> 00:19:55.670
over what would be proposed here no no I you know I don't

00:19:55.670 --> 00:19:57.319
disagree going to an

00:19:57.319 --> 00:20:02.119
NRM you is okay I'm just saying the roads that are there

00:20:02.119 --> 00:20:02.839
are expected to

00:20:02.839 --> 00:20:05.140
handle between one and eight thousand vehicles per day at

00:20:05.140 --> 00:20:06.119
the full load and

00:20:06.119 --> 00:20:08.940
when you throw in the school traffic with people don't even

00:20:08.940 --> 00:20:09.839
live there you

00:20:09.839 --> 00:20:14.400
know or how how closer do we to that now and are we so

00:20:14.400 --> 00:20:17.440
close that by adding 30

00:20:17.440 --> 00:20:20.519
units per acre over there you know a few more with a lot

00:20:20.519 --> 00:20:21.720
more traffic are we

00:20:21.720 --> 00:20:25.859
gonna be bumping close to the limit are we still safe you

00:20:25.859 --> 00:20:26.640
need to worry about

00:20:26.640 --> 00:20:30.900
that in the future I guess is what I'm asking and you don't

00:20:30.900 --> 00:20:31.960
think we do rich

00:20:31.960 --> 00:20:36.910
no I think as we you know part of the problem we don't have

00:20:36.910 --> 00:20:38.079
a lot of traffic

00:20:38.079 --> 00:20:41.980
that unfortunately and I know that that pre-tem is working

00:20:41.980 --> 00:20:43.000
on getting that I

00:20:43.000 --> 00:20:46.559
was just trying to think just based on the current density

00:20:46.559 --> 00:20:47.519
whether or not we

00:20:47.519 --> 00:20:52.839
can determine just based on trips theoretically where they

00:20:52.839 --> 00:20:54.160
could be but we

00:20:54.160 --> 00:20:59.170
don't have any any current traffic traffic counts I'll step

00:20:59.170 --> 00:21:00.720
in here and kind

00:21:00.720 --> 00:21:04.839
of watch over me and help me under the current code the

00:21:04.839 --> 00:21:06.039
only thing that this

00:21:06.039 --> 00:21:10.029
development would be responsible for is where they actually

00:21:10.029 --> 00:21:11.440
attached to Sam Bass

00:21:11.440 --> 00:21:15.400
or Londonderry correct they don't have any responsibility

00:21:15.400 --> 00:21:16.119
from anything on

00:21:16.119 --> 00:21:18.170
Londonderry to the West and they don't have any

00:21:18.170 --> 00:21:19.759
responsibility on the Sam Bass

00:21:19.759 --> 00:21:24.319
southern portion correct so if to answer from my point of

00:21:24.319 --> 00:21:25.880
view your question the

00:21:25.880 --> 00:21:29.109
only thing that we have an ability to do something is in

00:21:29.109 --> 00:21:30.319
the width where they

00:21:30.319 --> 00:21:34.140
border Sam Bass or the width where they border London

00:21:34.140 --> 00:21:35.200
perimeter correct and it

00:21:35.200 --> 00:21:37.450
gets back to the same issue we've talked about the last

00:21:37.450 --> 00:21:39.079
several times is whose

00:21:39.079 --> 00:21:42.789
responsibility is to do that they'll have to do I assume a

00:21:42.789 --> 00:21:43.920
TIA based on the

00:21:43.920 --> 00:21:47.640
number of trips because of the number of units and then the

00:21:47.640 --> 00:21:48.799
city will decide

00:21:48.799 --> 00:21:52.619
whether they won't take the fees off of the number of units

00:21:52.619 --> 00:21:53.799
and whether we want

00:21:53.799 --> 00:21:56.359
to spend it and do improvements to Sam Bass and Londonderry

00:21:56.359 --> 00:21:57.079
or somewhere else

00:21:57.079 --> 00:22:01.079
within the area that this parcel those improvements have to

00:22:01.079 --> 00:22:02.079
be done in that

00:22:02.079 --> 00:22:04.900
area or where they're going to ask them to do perimeter

00:22:04.900 --> 00:22:06.200
improvements on their

00:22:06.200 --> 00:22:11.200
properties and that's my understanding of how that works

00:22:11.200 --> 00:22:14.619
correct and I don't disagree that I wasn't necessarily

00:22:14.619 --> 00:22:16.279
trying to dump this

00:22:16.279 --> 00:22:19.160
on the developer at all in fact I was kind of expecting the

00:22:19.160 --> 00:22:20.000
city to step in

00:22:20.000 --> 00:22:25.099
here and do this kind of analysis to see that if we're

00:22:25.099 --> 00:22:27.480
reaching the limit to what

00:22:27.480 --> 00:22:30.480
these roads can handle should we be building which I don't

00:22:30.480 --> 00:22:31.160
think we are but

00:22:31.160 --> 00:22:34.480
I just I'm curious to how close we are right now so I was

00:22:34.480 --> 00:22:35.720
really kind of

00:22:35.720 --> 00:22:38.299
expecting the city to take a look at this and not so much

00:22:38.299 --> 00:22:38.980
expecting the

00:22:38.980 --> 00:22:43.130
developer so that's that's that was where I was coming from

00:22:43.130 --> 00:22:43.759
my comment is

00:22:43.759 --> 00:22:47.279
there's a city will de facto they're going to require the

00:22:47.279 --> 00:22:48.000
developer to do a

00:22:48.000 --> 00:22:51.420
TIA and study the whole area and give the data to the city

00:22:51.420 --> 00:22:52.920
okay now we'll help

00:22:52.920 --> 00:22:56.069
or we'll pay for it now we'll help with the numbers to show

00:22:56.069 --> 00:22:57.440
where we're at that

00:22:57.440 --> 00:23:01.839
will give current traffic counts okay

00:23:03.920 --> 00:23:09.039
Commissioner yeah okay sure Commissioner Sullivan so let me

00:23:09.039 --> 00:23:10.720
get this straight

00:23:10.720 --> 00:23:15.519
we've got the numbers here is designed to handle a hundred

00:23:15.519 --> 00:23:16.480
a thousand eight

00:23:16.480 --> 00:23:20.549
thousand vehicles but we have no clue how many vehicles are

00:23:20.549 --> 00:23:21.819
there we have no

00:23:21.819 --> 00:23:26.839
clue who's going to be responsible if ever what's the point

00:23:26.839 --> 00:23:28.160
if we never have

00:23:28.160 --> 00:23:31.309
traffic surveys we never know how many cars are actually

00:23:31.309 --> 00:23:32.440
there we don't know

00:23:32.440 --> 00:23:36.490
how many cars are going to be added everybody's flying

00:23:36.490 --> 00:23:38.480
blind I guess I'm

00:23:38.480 --> 00:23:42.339
just baffled and bewildered over the fact that we even have

00:23:42.339 --> 00:23:43.519
the numbers in

00:23:43.519 --> 00:23:48.710
here because it makes no difference I think it kind of goes

00:23:48.710 --> 00:23:49.839
back to the fact

00:23:49.839 --> 00:23:55.529
that ironic right if they were to add more development to

00:23:55.529 --> 00:23:56.839
the site ie

00:23:56.839 --> 00:24:00.640
commercial which would be more even intensive than then

00:24:00.640 --> 00:24:01.759
additional

00:24:01.759 --> 00:24:05.509
residential units we wouldn't we wouldn't even be we wouldn

00:24:05.509 --> 00:24:06.440
't even be here today

00:24:06.440 --> 00:24:09.589
they would just be able to go in as of right and so that's

00:24:09.589 --> 00:24:10.519
sort of what we

00:24:10.519 --> 00:24:13.170
looked at it's really sort of a down zone of what they

00:24:13.170 --> 00:24:14.240
could potentially

00:24:14.240 --> 00:24:18.500
build it at the max I can't I mean we just don't have

00:24:18.500 --> 00:24:19.240
unfortunately we don't

00:24:19.240 --> 00:24:21.880
have that data to say you know right now the road is at a

00:24:21.880 --> 00:24:24.480
level of service C by

00:24:24.480 --> 00:24:29.039
adding X number of trips it's going to degrade it to you

00:24:29.039 --> 00:24:31.160
know whatever a D or

00:24:31.160 --> 00:24:36.349
it's going to maintain it at a C right now we don't we're

00:24:36.349 --> 00:24:37.480
in the process of

00:24:37.480 --> 00:24:42.049
putting all of that together I'm just confused where the

00:24:42.049 --> 00:24:43.559
planning comes into

00:24:43.559 --> 00:24:47.309
play we got planning and zoning we zone but we don't plan

00:24:47.309 --> 00:24:49.119
we're getting there

00:24:49.119 --> 00:24:53.029
don't play it because nobody does any studies to tell us

00:24:53.029 --> 00:24:54.480
where we are to find

00:24:54.480 --> 00:24:57.119
out whether or not all these apartments are going to add

00:24:57.119 --> 00:24:58.359
anything to the traffic

00:24:58.359 --> 00:25:00.940
load which we know they will and at the same time they're

00:25:00.940 --> 00:25:01.759
going to take away a

00:25:01.759 --> 00:25:05.609
light which is the only thing that controls it coming in

00:25:05.609 --> 00:25:06.240
and off of

00:25:06.240 --> 00:25:10.539
streets you know all of that together makes I have a hard

00:25:10.539 --> 00:25:11.119
time where the

00:25:11.119 --> 00:25:17.109
planning is involved if I might mr. chair sure Scott

00:25:17.109 --> 00:25:19.319
McDonald I'm just to

00:25:19.319 --> 00:25:21.440
touch on that we absolutely have been having the

00:25:21.440 --> 00:25:22.799
conversations about doing a

00:25:22.799 --> 00:25:26.890
traffic study and looking at the entire city we haven't we

00:25:26.890 --> 00:25:28.079
haven't taken a

00:25:28.079 --> 00:25:32.059
comprehensive approach to traffic management we're working

00:25:32.059 --> 00:25:32.839
site by site

00:25:32.839 --> 00:25:35.599
the numbers that you have before you ultimately are set up

00:25:35.599 --> 00:25:36.400
for what the road

00:25:36.400 --> 00:25:41.490
will handle as we propose this or the applicants proposing

00:25:41.490 --> 00:25:42.599
this it's a less

00:25:42.599 --> 00:25:46.619
intense use than what is eligible by right that's why staff

00:25:46.619 --> 00:25:47.359
s confident in the

00:25:47.359 --> 00:25:50.509
fact that this isn't going to create a burden it actually

00:25:50.509 --> 00:25:51.680
would lessen some

00:25:51.680 --> 00:25:55.250
potential burden and we will we will and have already had

00:25:55.250 --> 00:25:56.640
the conversations about

00:25:56.640 --> 00:26:00.069
how it is to take the approach to traffic management across

00:26:00.069 --> 00:26:00.759
the city so

00:26:00.759 --> 00:26:04.579
we've got some some steps that we need to take and some

00:26:04.579 --> 00:26:06.359
actions that we intend

00:26:06.359 --> 00:26:09.789
to take to look at that more comprehensively we recognize

00:26:09.789 --> 00:26:10.359
there's a

00:26:10.359 --> 00:26:14.089
deficiency in our traffic management it's just the steps to

00:26:14.089 --> 00:26:15.119
get there and as

00:26:15.119 --> 00:26:18.549
we take the steps and really trying to look at the overall

00:26:18.549 --> 00:26:19.660
zoning of the city

00:26:19.660 --> 00:26:23.130
and the planning and and tying it to the dent in 2030 that

00:26:23.130 --> 00:26:24.160
's a component of that

00:26:24.160 --> 00:26:27.119
that we will be looking at in the very very near future

00:26:27.119 --> 00:26:30.240
hope that helps

00:26:30.759 --> 00:26:49.480
any other questions on B or C for Haley on this item thank

00:26:49.480 --> 00:26:53.000
you Haley item D just

00:26:53.000 --> 00:26:58.849
for my clarification I assume we'll open this item and then

00:26:58.849 --> 00:27:00.119
we will do a vote to

00:27:00.119 --> 00:27:05.180
postpone to date certain of February 21st okay and leave

00:27:05.180 --> 00:27:07.359
open okay

00:27:14.680 --> 00:27:21.099
that will take us to E and Haley all right so very closely

00:27:21.099 --> 00:27:22.240
related to what we

00:27:22.240 --> 00:27:28.559
just talked about staff is proposing an amendment to the

00:27:28.559 --> 00:27:29.079
Denton Development

00:27:29.079 --> 00:27:32.869
Code to kind of provide some immediate relief for some some

00:27:32.869 --> 00:27:34.160
projects going on

00:27:34.160 --> 00:27:38.720
in here in town so the request is to consider making a

00:27:38.720 --> 00:27:39.519
recommendation to City

00:27:39.519 --> 00:27:42.640
Council regarding a proposed revision to subchapter 5

00:27:42.640 --> 00:27:43.640
specifically to our

00:27:43.640 --> 00:27:46.400
limitations that apply to mixed-use development

00:27:46.400 --> 00:27:47.079
requirements for

00:27:47.079 --> 00:27:50.509
multifamily so just a little bit of background that we kind

00:27:50.509 --> 00:27:50.960
of touched on

00:27:50.960 --> 00:27:53.839
with the last project we currently have two limitations

00:27:53.839 --> 00:27:55.000
that can apply to the

00:27:55.000 --> 00:27:59.140
multifamily use that impose mixed-use restrictions on them

00:27:59.140 --> 00:28:01.160
L4 requires in

00:28:01.160 --> 00:28:03.940
certain districts that multifamilies only permitted either

00:28:03.940 --> 00:28:04.720
with an SUP as we

00:28:04.720 --> 00:28:08.150
just saw or as part of a mixed-use development unless it

00:28:08.150 --> 00:28:08.720
can meet one of

00:28:08.720 --> 00:28:12.150
these other criteria that it very rarely can being part of

00:28:12.150 --> 00:28:12.839
a master plan

00:28:12.839 --> 00:28:17.140
development or if it received approval prior to 2005 or as

00:28:17.140 --> 00:28:18.400
part of a small area

00:28:18.400 --> 00:28:21.920
plan so really those top two are what is most often seen

00:28:21.920 --> 00:28:22.960
then the other

00:28:22.960 --> 00:28:26.920
limitation is limitation 6 that permits multifamily only on

00:28:26.920 --> 00:28:27.920
the second story and

00:28:27.920 --> 00:28:31.369
above when it has an office retail or other commercial use

00:28:31.369 --> 00:28:32.400
on the ground floor

00:28:32.400 --> 00:28:36.369
along any Avenue collector or arterial Street so other than

00:28:36.369 --> 00:28:37.200
neighborhood

00:28:37.200 --> 00:28:40.319
residential streets though that pretty much covers every

00:28:40.319 --> 00:28:41.400
street type that we

00:28:41.400 --> 00:28:45.990
would see in here in the city so just to look at how these

00:28:45.990 --> 00:28:47.160
apply across the code

00:28:47.160 --> 00:28:50.200
you can see L4 applies in all of our mixed-use districts

00:28:50.200 --> 00:28:50.720
from the

00:28:50.720 --> 00:28:53.480
neighborhood residential through the community mixed use

00:28:53.480 --> 00:28:54.240
and the regional

00:28:54.240 --> 00:29:00.250
mixed-use districts L6 supplies only in CMG CME RCCN and R

00:29:00.250 --> 00:29:02.079
CCD and then the only

00:29:02.079 --> 00:29:06.720
other limitation we have is within NRMU and SUP is required

00:29:06.720 --> 00:29:08.039
so regardless of

00:29:08.039 --> 00:29:11.809
the whether they did mixed use the SUP is required in that

00:29:11.809 --> 00:29:13.960
district so staff is

00:29:13.960 --> 00:29:16.720
proposing to remove L6 from all of those districts where it

00:29:16.720 --> 00:29:18.480
applies just within

00:29:18.480 --> 00:29:22.150
the past two years 2016 and 2017 we had five rezoning cases

00:29:22.150 --> 00:29:23.079
that were applied

00:29:23.079 --> 00:29:26.509
for we've had countless other projects that have come in as

00:29:26.509 --> 00:29:27.079
pre-development

00:29:27.079 --> 00:29:29.769
meetings or just as people calling and asking about

00:29:29.769 --> 00:29:31.079
property that have been

00:29:31.079 --> 00:29:34.160
squashed because of that ground floor commercial

00:29:34.160 --> 00:29:36.160
requirement looking at how

00:29:36.160 --> 00:29:39.019
this requirement applies across the city remember it

00:29:39.019 --> 00:29:40.160
applied in the community

00:29:40.160 --> 00:29:43.210
mixed use in the regional districts so essentially all of

00:29:43.210 --> 00:29:44.160
the the purple the

00:29:44.160 --> 00:29:46.240
kind of fuchsia color and then the light pink that you see

00:29:46.240 --> 00:29:47.000
on the map is where

00:29:47.000 --> 00:29:51.130
that L6 would apply just keeping in mind that our

00:29:51.130 --> 00:29:52.240
comprehensive plan does call

00:29:52.240 --> 00:29:54.640
for a mixture of housing types because we are a city with

00:29:54.640 --> 00:29:56.680
diverse housing needs

00:29:56.680 --> 00:30:00.789
and then looking at where this limitation applies on mostly

00:30:00.789 --> 00:30:01.279
on the

00:30:01.279 --> 00:30:04.759
outskirts of the city it doesn't make the most sense

00:30:04.759 --> 00:30:05.720
potentially for ground

00:30:05.720 --> 00:30:09.160
floor commercial to be in these areas. Commissioner Ellis.

00:30:09.160 --> 00:30:10.119
Thank you Chair.

00:30:10.119 --> 00:30:13.650
So on that note when was this put into place because I was

00:30:13.650 --> 00:30:14.440
trying to get a

00:30:14.440 --> 00:30:17.660
context on you know when you look at that zoning map this

00:30:17.660 --> 00:30:18.920
limitation doesn't

00:30:18.920 --> 00:30:22.119
make any sense at all. It has been there since the code was

00:30:22.119 --> 00:30:24.240
adopted in 2002.

00:30:24.240 --> 00:30:28.630
Trying to get what was the intent because it just when you

00:30:28.630 --> 00:30:29.079
it just doesn't

00:30:29.079 --> 00:30:31.710
makes it makes great sense downtown when you when you you

00:30:31.710 --> 00:30:32.720
know when you've got

00:30:32.720 --> 00:30:36.019
those compact places but yeah boy that doesn't make any

00:30:36.019 --> 00:30:37.480
sense so yeah this is a

00:30:37.480 --> 00:30:41.859
good thing. So yeah now that you have an idea of where that

00:30:41.859 --> 00:30:42.920
applies looking a

00:30:42.920 --> 00:30:45.500
little more specifically like you just said we see this

00:30:45.500 --> 00:30:46.400
type of development

00:30:46.400 --> 00:30:50.960
where it is not required in downtown and compact walkable

00:30:50.960 --> 00:30:52.519
environments. So just

00:30:52.519 --> 00:30:55.089
some examples you know we have several of these downtown

00:30:55.089 --> 00:30:55.680
but you know on

00:30:55.680 --> 00:30:58.940
Hickory and Locust the two that are doing very well. It

00:30:58.940 --> 00:30:59.799
makes sense in those

00:30:59.799 --> 00:31:03.450
areas where people are out walking to get to these things

00:31:03.450 --> 00:31:04.640
and you see here on

00:31:04.640 --> 00:31:06.990
the bottom examples of where properties where this is

00:31:06.990 --> 00:31:08.519
specifically required on

00:31:08.519 --> 00:31:12.509
Brinker and then out on loop 288. Ground floor commercial

00:31:12.509 --> 00:31:13.359
isn't necessarily

00:31:13.359 --> 00:31:16.559
feasible in those places. The intent of that limitation

00:31:16.559 --> 00:31:17.680
wouldn't really be

00:31:17.680 --> 00:31:21.940
served well in those areas. Commissioner Beck. Thank you

00:31:21.940 --> 00:31:24.480
chair. Kind of pulling in

00:31:24.480 --> 00:31:29.779
on Commissioner Elst's comment and I agree that L6 is a

00:31:29.779 --> 00:31:31.359
pain in the butt you know

00:31:31.359 --> 00:31:35.970
in some areas but if we remove this the downtown area is a

00:31:35.970 --> 00:31:37.440
good area to use this.

00:31:37.440 --> 00:31:40.559
Do we lose it there too and they can just go ahead and

00:31:40.559 --> 00:31:42.000
build apartments in

00:31:42.000 --> 00:31:44.759
without the commercial development? That limitation does

00:31:44.759 --> 00:31:45.480
not apply in the

00:31:45.480 --> 00:31:48.319
downtown districts at all. So there's nothing requiring

00:31:48.319 --> 00:31:49.039
that that type of

00:31:49.039 --> 00:31:51.619
development occur there it just naturally does because of

00:31:51.619 --> 00:31:52.319
the environment.

00:31:52.319 --> 00:31:54.900
Okay so we don't have to worry about that. Yeah multi-

00:31:54.900 --> 00:31:56.400
family can go in with or without

00:31:56.400 --> 00:32:00.259
ground floor commercial in downtown. Can go in with or

00:32:00.259 --> 00:32:01.839
without? Yes. Ground floor?

00:32:01.839 --> 00:32:06.400
Okay. Yeah the use is permitted by right in our downtown

00:32:06.400 --> 00:32:08.279
districts. It just so

00:32:08.279 --> 00:32:11.839
happens that because of the nature of downtown we do see

00:32:11.839 --> 00:32:12.279
the ground floor commercial.

00:32:12.279 --> 00:32:17.240
Okay okay thank you. Haley if I make it's market driven the

00:32:17.240 --> 00:32:18.200
property owner decides

00:32:18.200 --> 00:32:20.440
whether they want to include that in their project or say

00:32:20.440 --> 00:32:21.079
you know what I

00:32:21.079 --> 00:32:23.119
don't think it's a viable option and we're just gonna do

00:32:23.119 --> 00:32:24.240
straight multi-family.

00:32:24.240 --> 00:32:28.559
Certainly. That correct? Certainly. Yeah and just to give

00:32:28.559 --> 00:32:29.359
you a little peace of

00:32:29.359 --> 00:32:32.019
mind if you remember back to the table L4 would still apply

00:32:32.019 --> 00:32:32.759
in all of these

00:32:32.759 --> 00:32:36.190
districts so the multi-family use itself would still either

00:32:36.190 --> 00:32:37.160
come before you and

00:32:37.160 --> 00:32:40.150
City Council as an SUP or it would be part of a larger

00:32:40.150 --> 00:32:41.799
mixed use development

00:32:41.799 --> 00:32:44.680
providing that it meets the definition of mixed use which

00:32:44.680 --> 00:32:45.599
is simply three or

00:32:45.599 --> 00:32:49.250
more interrelated and compatible uses on a property but it

00:32:49.250 --> 00:32:50.359
can be vertically or

00:32:50.359 --> 00:32:54.220
horizontally mixed. Commissioner Rossell. Thank you chair.

00:32:54.220 --> 00:32:55.759
I know you have listed

00:32:55.759 --> 00:32:58.839
here in the back of the different zones but remember serves

00:32:58.839 --> 00:32:59.680
me correctly multi-

00:32:59.680 --> 00:33:02.819
family is not allowed by right in any zoning classification

00:33:02.819 --> 00:33:03.440
in the city

00:33:03.440 --> 00:33:08.039
correct? All multi-family has to be SUP? No in the downtown

00:33:08.039 --> 00:33:09.119
districts it has a

00:33:09.119 --> 00:33:11.700
limitation but it's just a limitation related to density

00:33:11.700 --> 00:33:13.519
calculation. Okay. So it

00:33:13.519 --> 00:33:17.539
could occur in like the DCG district or in the DR2. All

00:33:17.539 --> 00:33:20.359
other areas has to come

00:33:20.359 --> 00:33:23.400
before us for the SUP or mixed use development. That is

00:33:23.400 --> 00:33:24.599
correct. Or the others.

00:33:24.599 --> 00:33:26.720
That is correct yeah. The downtown districts would be the

00:33:26.720 --> 00:33:27.720
only ones really

00:33:27.720 --> 00:33:33.569
excluded from this. Thanks. So yeah as I was saying you L4

00:33:33.569 --> 00:33:34.200
would still apply in

00:33:34.200 --> 00:33:36.029
all of these districts so there's still that extra level of

00:33:36.029 --> 00:33:36.680
scrutiny it either

00:33:36.680 --> 00:33:39.609
has to be meet the definition of mixed use which is very

00:33:39.609 --> 00:33:41.160
specific or it would

00:33:41.160 --> 00:33:45.210
have to come before you as an SUP. We did publish

00:33:45.210 --> 00:33:46.880
notification about the requests

00:33:46.880 --> 00:33:49.710
didn't receive any responses to it and we are recommending

00:33:49.710 --> 00:33:51.359
approval so can

00:33:51.359 --> 00:33:53.970
answer any questions. Commissioner Beck. Okay well I was

00:33:53.970 --> 00:33:54.920
confused and I was under

00:33:54.920 --> 00:33:57.680
the impression we were gonna get rid of L4 and L6 you're

00:33:57.680 --> 00:33:58.759
just wanting to remove

00:33:58.759 --> 00:34:11.760
L6. Just L6. Gotcha. Just on density NRMU allows 12 units

00:34:11.760 --> 00:34:15.639
per acre NRMU allows 30

00:34:15.639 --> 00:34:21.909
units per acre. So CMG what's the density on that? There is

00:34:21.909 --> 00:34:22.880
no maximum density in

00:34:22.880 --> 00:34:25.719
the community mixed use district so multifamily could

00:34:25.719 --> 00:34:26.800
develop on a site at

00:34:26.800 --> 00:34:29.619
whatever density it wanted so long as they could provide

00:34:29.619 --> 00:34:30.760
adequate parking for

00:34:30.760 --> 00:34:34.869
it. Parking would be the kind of natural limit. Yeah okay

00:34:34.869 --> 00:34:37.679
all right thanks.

00:34:39.719 --> 00:34:45.940
Any other questions for Haley on this item? Okay with that

00:34:45.940 --> 00:34:47.559
our item F is going

00:34:47.559 --> 00:34:55.639
to tie into the work session that we have on sub chapter 17

00:34:55.639 --> 00:34:57.480
and I'll just ask

00:34:57.480 --> 00:35:01.579
Deborah if you're getting ready I don't know how long you

00:35:01.579 --> 00:35:03.480
think your presentation

00:35:03.480 --> 00:35:06.309
will be if we should go ahead and break and get food and

00:35:06.309 --> 00:35:07.480
get started if you have

00:35:07.480 --> 00:35:12.199
quite a bit or if we... I have like two or three more

00:35:12.199 --> 00:35:15.760
slides to go. We left at the upland

00:35:15.760 --> 00:35:18.889
habitat discussion this time that's where we're going to

00:35:18.889 --> 00:35:19.639
retake the the

00:35:19.639 --> 00:35:23.500
discussion and then after that I believe will be the

00:35:23.500 --> 00:35:25.440
criteria for approval of

00:35:25.440 --> 00:35:30.489
alternative ESA plans. So you I can wait until you are you

00:35:30.489 --> 00:35:33.360
know ready to eat is

00:35:33.360 --> 00:35:38.280
completely up to you. I just want to take a break to eat or

00:35:38.280 --> 00:35:39.119
you want to press on

00:35:39.119 --> 00:35:41.730
through and see where we go and then we have to we may have

00:35:41.730 --> 00:35:43.480
to stop you at 615

00:35:43.480 --> 00:35:48.969
or something if we're running long and do a quick eat. Okay

00:35:48.969 --> 00:35:49.559
let's go and get

00:35:49.559 --> 00:35:52.639
started if you got don't mind.

00:36:03.360 --> 00:36:21.940
Good evening Commission my name is Deborah Vera I'm with

00:36:21.940 --> 00:36:22.519
the Environmental

00:36:22.519 --> 00:36:27.559
Services Department. Last time two weeks ago we started

00:36:27.559 --> 00:36:28.400
going over the

00:36:28.400 --> 00:36:33.510
changes made to or proposed changes to sub chapter 17. We

00:36:33.510 --> 00:36:34.719
stopped at the

00:36:34.719 --> 00:36:38.019
discussion of upland habitat and I'm going to resume with a

00:36:38.019 --> 00:36:38.800
definition

00:36:38.800 --> 00:36:42.300
because I believe there was some concerns about the changes

00:36:42.300 --> 00:36:42.960
and why would

00:36:42.960 --> 00:36:48.869
apply. Currently the definition of a of upland habitat is

00:36:48.869 --> 00:36:49.920
areas of minimum of

00:36:49.920 --> 00:36:53.449
10 acres in size that contain remnants of the Easter cross

00:36:53.449 --> 00:36:54.960
timber habitat. We

00:36:54.960 --> 00:36:58.920
have revised the definition just a little bit just to take

00:36:58.920 --> 00:36:59.880
out the eastern

00:36:59.880 --> 00:37:03.639
part of it and just have the entire cross timber habitat.

00:37:03.639 --> 00:37:05.280
However in

00:37:05.280 --> 00:37:10.260
practicality what you will see present in Denton would

00:37:10.260 --> 00:37:12.000
pretty much correspond to

00:37:12.000 --> 00:37:15.070
what is considered Easter cross timber. So we have not

00:37:15.070 --> 00:37:17.139
changed the species we

00:37:17.139 --> 00:37:21.079
have not changed the minimum area that is required so in

00:37:21.079 --> 00:37:22.360
that regard the

00:37:22.360 --> 00:37:25.909
definition stays the same. I believe Commissioner Sanchez

00:37:25.909 --> 00:37:26.719
was concerned about

00:37:26.719 --> 00:37:31.869
providing definition if you look into 17.5 we'll see all

00:37:31.869 --> 00:37:32.840
the four type of

00:37:32.840 --> 00:37:37.710
eases defined in that section including upland habitat. Yes

00:37:37.710 --> 00:37:37.920
sir.

00:37:37.920 --> 00:37:41.519
Commissioner Sanchez. Still reading that it says areas of

00:37:41.519 --> 00:37:43.039
minimum 10 acres in

00:37:43.039 --> 00:37:47.090
size okay you're talking about 10 acres that contain

00:37:47.090 --> 00:37:49.920
remnants so it's referring

00:37:49.920 --> 00:37:53.519
to the 10 acres the way I read it that refers to the 10

00:37:53.519 --> 00:37:54.480
acres it doesn't

00:37:54.480 --> 00:37:58.730
refer to as we were told earlier that a 10 acre remnant is

00:37:58.730 --> 00:38:00.119
we're looking at the

00:38:00.119 --> 00:38:05.079
whole cross timbers area we're looking at just these 10

00:38:05.079 --> 00:38:06.519
acres and it's kind of

00:38:06.519 --> 00:38:09.559
confusing the way it's at least for me it is okay because

00:38:09.559 --> 00:38:10.559
it's referring to the

00:38:10.559 --> 00:38:13.349
10 acres and the remnants are referring to the 10 acres it

00:38:13.349 --> 00:38:14.039
's not referring to

00:38:14.039 --> 00:38:17.559
the whole cross timbers okay so it should be clarified a

00:38:17.559 --> 00:38:18.079
little bit better.

00:38:18.079 --> 00:38:24.559
Sure we can we can rework that definition such as areas

00:38:24.559 --> 00:38:26.239
typically found or

00:38:26.239 --> 00:38:30.900
habitats are typically found in areas of the Easter cross

00:38:30.900 --> 00:38:32.960
timber habitat of a 10

00:38:32.960 --> 00:38:37.119
acres in size you want that definition to be reworks in

00:38:37.119 --> 00:38:38.079
that way will be clear.

00:38:38.079 --> 00:38:41.510
I think it'd be it helped to be a little bit clearer I mean

00:38:41.510 --> 00:38:42.920
I may be just

00:38:42.920 --> 00:38:45.679
as far as you know I may just not be understanding it but

00:38:45.679 --> 00:38:46.679
that's it seems to

00:38:46.679 --> 00:38:48.679
me it refers to the 10 acres when you're talking about

00:38:48.679 --> 00:38:49.679
remnants.

00:38:49.679 --> 00:38:54.829
Okay what we can do is I can rework the ordinance and when

00:38:54.829 --> 00:38:56.760
if you decide to make a

00:38:56.760 --> 00:39:00.760
recommendation we can add that amendment as a part of the

00:39:00.760 --> 00:39:01.719
of the motion is that

00:39:01.719 --> 00:39:07.119
something that you would like? Sure Commissioner Ellis.

00:39:07.119 --> 00:39:08.039
Thank You Chair I

00:39:08.039 --> 00:39:11.159
don't know that it has to be reworked that much but maybe I

00:39:11.159 --> 00:39:12.179
think Bob used the

00:39:12.179 --> 00:39:15.980
word contiguous I mean maybe you just need to add just a

00:39:15.980 --> 00:39:17.400
little bit clearer

00:39:17.400 --> 00:39:19.750
definition so that when someone reads it they have a

00:39:19.750 --> 00:39:21.000
picture in their mind that

00:39:21.000 --> 00:39:28.409
it's 10 acres of contiguous. Okay okay we can do that let

00:39:28.409 --> 00:39:29.719
us work out during the

00:39:29.719 --> 00:39:35.309
now on a hearing and we will provide some new language for

00:39:35.309 --> 00:39:40.400
you. So what one of

00:39:40.400 --> 00:39:44.039
the substantial changes is right now currently we require

00:39:44.039 --> 00:39:45.400
the preservation of

00:39:45.400 --> 00:39:48.980
upland habitat if you were to develop residential

00:39:48.980 --> 00:39:50.599
development meaning

00:39:50.599 --> 00:39:55.800
multifamily 2f single-family homes. Any non-residential

00:39:55.800 --> 00:39:57.480
development that will

00:39:57.480 --> 00:40:03.329
encroach into a upland area designated upland habitat they

00:40:03.329 --> 00:40:04.360
don't have to

00:40:04.360 --> 00:40:08.260
preserve the 50%. When we talk about the preservation of

00:40:08.260 --> 00:40:09.719
the upland habitat we

00:40:09.719 --> 00:40:12.480
not only look in the preservation of the tree canopy but we

00:40:12.480 --> 00:40:13.480
also look into the

00:40:13.480 --> 00:40:17.449
preservation of the habitat on the understory because

00:40:17.449 --> 00:40:19.079
ultimately we are

00:40:19.079 --> 00:40:22.719
looking to the preservation of the viability of the entire

00:40:22.719 --> 00:40:24.280
habitat ecosystem

00:40:24.280 --> 00:40:29.800
present. The proposed changes would maintain the 50%

00:40:29.800 --> 00:40:30.699
preservation of the

00:40:30.699 --> 00:40:35.559
residential as is currently stated in the code however we

00:40:35.559 --> 00:40:38.639
have staff and the

00:40:38.639 --> 00:40:43.239
COE have given the the direction to actually require the

00:40:43.239 --> 00:40:44.360
preservation the

00:40:44.360 --> 00:40:48.920
30% preservation of upland habitat for non-residential

00:40:48.920 --> 00:40:52.440
development. The 30% we

00:40:52.440 --> 00:40:57.000
kind of landed on the 30% because we were looking at what

00:40:57.000 --> 00:40:58.719
the new tree code

00:40:58.719 --> 00:41:02.789
was looking as a preservation and they agree and they were

00:41:02.789 --> 00:41:04.440
having the 30%.

00:41:04.440 --> 00:41:10.760
Previously two weeks ago we discussed the changes to the

00:41:10.760 --> 00:41:13.320
credit section and

00:41:13.320 --> 00:41:18.969
let's say that you have a non-residential development encro

00:41:18.969 --> 00:41:19.480
aching

00:41:19.480 --> 00:41:23.519
into an upland habitat if they were to preserve the 30%

00:41:23.519 --> 00:41:25.199
that will actually make

00:41:25.199 --> 00:41:28.949
them comply with the tree code anyway so the two will

00:41:28.949 --> 00:41:33.000
actually match. But

00:41:33.000 --> 00:41:36.510
definitely this is one of the major changes policy wise

00:41:36.510 --> 00:41:37.719
that the proposed

00:41:37.719 --> 00:41:44.530
changes are you know showing. Commissioner Roselle. Thank

00:41:44.530 --> 00:41:45.679
you chair if I

00:41:45.679 --> 00:41:49.280
understand this correctly a non-residential development

00:41:49.280 --> 00:41:50.960
there is no

00:41:50.960 --> 00:41:54.449
increased measure to protect upland habitat apart from any

00:41:54.449 --> 00:41:55.400
other standard

00:41:55.400 --> 00:41:59.650
trees on the property. Correct if right now somebody were

00:41:59.650 --> 00:42:00.679
to develop a

00:42:00.679 --> 00:42:04.619
non-residential development what they have to preserve is

00:42:04.619 --> 00:42:06.239
the tree based on

00:42:06.239 --> 00:42:09.760
the tree code okay and they can't they have a minimum

00:42:09.760 --> 00:42:11.519
percentage of preservation

00:42:11.519 --> 00:42:14.739
that could be further reduced if they pay into the tree

00:42:14.739 --> 00:42:17.599
fund okay but the

00:42:17.599 --> 00:42:21.929
habitat per se is not protected. What you are protecting

00:42:21.929 --> 00:42:23.159
under the tree code is

00:42:23.159 --> 00:42:28.760
actually the tree canopy not the habitat. So if I

00:42:28.760 --> 00:42:29.719
understand correctly if a

00:42:29.719 --> 00:42:33.039
residential element goes in they have to maintain 50% cont

00:42:33.039 --> 00:42:34.280
iguous. Correct they

00:42:34.280 --> 00:42:38.840
pick which part is contiguous we don't designate that. Well

00:42:38.840 --> 00:42:39.719
part is strongly

00:42:39.719 --> 00:42:44.679
encouraged. Correct. And then the non-residential upland

00:42:44.679 --> 00:42:45.079
habitat really

00:42:45.079 --> 00:42:48.360
doesn't even matter. Correct. Can you help me understand

00:42:48.360 --> 00:42:49.639
why a more intensive use

00:42:49.639 --> 00:42:53.800
of the property there's not a stronger inclination to

00:42:53.800 --> 00:42:55.199
protect the habitat? Yeah

00:42:55.199 --> 00:42:59.000
in 2002 when the code was first draft the City Council at

00:42:59.000 --> 00:43:00.280
the moment understood

00:43:00.280 --> 00:43:05.699
that when you buy a tree lot in a residential lot you most

00:43:05.699 --> 00:43:06.599
of the time you

00:43:06.599 --> 00:43:11.559
are paying a premium for it therefore they saw a direct

00:43:11.559 --> 00:43:13.199
compensation for the

00:43:13.199 --> 00:43:17.219
making the developer to preserve those areas because they

00:43:17.219 --> 00:43:19.639
will be somehow

00:43:19.639 --> 00:43:24.199
compensated economically because they will be paid a

00:43:24.199 --> 00:43:25.639
premium for it. In

00:43:25.639 --> 00:43:28.510
residential in commercial development that is a little bit

00:43:28.510 --> 00:43:29.320
different that

00:43:29.320 --> 00:43:35.599
doesn't play out differently. The other aspects that I

00:43:35.599 --> 00:43:37.320
remember be part of the

00:43:37.320 --> 00:43:41.880
conversation at that time was that sometimes developers

00:43:41.880 --> 00:43:43.159
come with a preset

00:43:43.159 --> 00:43:49.639
site plan that they would like to to to develop and not

00:43:49.639 --> 00:43:51.920
everybody it seems or

00:43:51.920 --> 00:43:56.480
what seem to be open to tweak those site plans to actually

00:43:56.480 --> 00:43:58.559
incorporate the ESA in

00:43:58.559 --> 00:44:03.880
it. So for those two factors the City Council at the time

00:44:03.880 --> 00:44:04.880
decided to

00:44:04.880 --> 00:44:08.699
only require the preservation the mandatory preservation to

00:44:08.699 --> 00:44:09.559
residential

00:44:09.559 --> 00:44:14.119
development. However I think that we all have seen

00:44:14.119 --> 00:44:16.920
successful commercial

00:44:16.920 --> 00:44:20.400
developers who have actually incorporated the trees as a

00:44:20.400 --> 00:44:21.039
part of the

00:44:21.039 --> 00:44:26.750
plan those side seems to be more aesthetically pleasing. I

00:44:26.750 --> 00:44:27.679
think that it

00:44:27.679 --> 00:44:32.239
adds value to it when you are working with a existing

00:44:32.239 --> 00:44:34.760
established area. So

00:44:34.760 --> 00:44:40.610
that's that's one of the reasons that I think we decided to

00:44:40.610 --> 00:44:42.559
just to take an

00:44:42.559 --> 00:44:46.280
approach. However in the same spirit to not to tax

00:44:46.280 --> 00:44:48.880
developers or tag them twice

00:44:48.880 --> 00:44:53.440
three tree code and upland habitat then we we are

00:44:53.440 --> 00:44:55.079
consistent on the percentage.

00:44:55.079 --> 00:44:59.719
By meeting the 30% of upland habitat they will also meet

00:44:59.719 --> 00:45:01.519
what the tree code

00:45:01.519 --> 00:45:07.369
is looking to to have to require. So personally have have

00:45:07.369 --> 00:45:08.760
some friction with

00:45:08.760 --> 00:45:12.780
that thought process but that that friction would probably

00:45:12.780 --> 00:45:13.519
be helped

00:45:13.519 --> 00:45:17.420
defined a little bit to know what is the overlay of upland

00:45:17.420 --> 00:45:19.199
habitat in our city to

00:45:19.199 --> 00:45:22.119
commercial uses. If there's not a lot of upland habitat in

00:45:22.119 --> 00:45:23.360
zoned commercial areas

00:45:23.360 --> 00:45:26.789
then this issue kind of solves itself and it might be an

00:45:26.789 --> 00:45:28.039
uphill battle I don't

00:45:28.039 --> 00:45:33.710
need to fight but it does create a little bit of concern in

00:45:33.710 --> 00:45:34.679
my mind that

00:45:34.679 --> 00:45:40.719
there's economic reasons for our developers remarketing or

00:45:40.719 --> 00:45:41.199
or whatever it

00:45:41.199 --> 00:45:43.449
is rather than actually protecting the environment. It

00:45:43.449 --> 00:45:44.320
seems like the upland

00:45:44.320 --> 00:45:50.460
habitat the the retention of that percentage of upland

00:45:50.460 --> 00:45:51.320
habitat should be

00:45:51.320 --> 00:45:54.519
for the purpose of maintaining the habitat not if a

00:45:54.519 --> 00:45:56.039
developer can market it

00:45:56.039 --> 00:45:58.480
at an increased price or if a commercial developer doesn't

00:45:58.480 --> 00:46:00.800
care about trees.

00:46:00.800 --> 00:46:03.670
It sounds like that was a motivating factor historically I

00:46:03.670 --> 00:46:04.519
don't think it

00:46:04.519 --> 00:46:07.090
should be going forward but again it might be a non-issue

00:46:07.090 --> 00:46:07.840
and so it might be

00:46:07.840 --> 00:46:12.880
helpful if there's a way to present or if you could tell me

00:46:12.880 --> 00:46:14.920
offline how many

00:46:14.920 --> 00:46:18.619
commercial properties have upland habitat to know if this

00:46:18.619 --> 00:46:19.639
is even an issue.

00:46:19.639 --> 00:46:24.730
Well the issue would be it we one thing is develop

00:46:24.730 --> 00:46:27.480
commercial okay and other

00:46:27.480 --> 00:46:33.329
thing is vacant land that is zoned for zoning district or

00:46:33.329 --> 00:46:34.480
category that allows

00:46:34.480 --> 00:46:39.989
some sort of commercial district so those are two separate.

00:46:39.989 --> 00:46:41.159
I will have to

00:46:41.159 --> 00:46:45.719
probably go back and try to overlay the two to give you a

00:46:45.719 --> 00:46:47.000
estimate of how much

00:46:47.000 --> 00:46:54.059
is that. I will tell you that most of the upland habitat it

00:46:54.059 --> 00:46:55.599
will be on the eastern

00:46:55.599 --> 00:47:00.960
part if you take I-35W corridor most of the cross timbers

00:47:00.960 --> 00:47:02.480
are in the east part

00:47:02.480 --> 00:47:07.039
of town when you move across the western part of it the

00:47:07.039 --> 00:47:09.440
actually acreage and art

00:47:09.440 --> 00:47:14.840
prairies so you don't see a lot of trees in that area for

00:47:14.840 --> 00:47:16.719
that reason so and

00:47:16.719 --> 00:47:20.739
that's the areas of town that are more ripe for development

00:47:20.739 --> 00:47:21.719
at this point

00:47:21.719 --> 00:47:24.909
especially industrial and things like that so it will be

00:47:24.909 --> 00:47:26.599
zoning districts that

00:47:26.599 --> 00:47:31.639
allow some sort of commercial use that we have a whole slew

00:47:31.639 --> 00:47:33.199
of those that are

00:47:33.199 --> 00:47:40.980
pretty much east of I-35 corridor. And I can look as well

00:47:40.980 --> 00:47:41.599
it seems like the

00:47:41.599 --> 00:47:46.719
Mayhill reconstruction east of Mayhill is where we've seen

00:47:46.719 --> 00:47:47.400
historically there's

00:47:47.400 --> 00:47:50.190
the neighborhood behind the Ford dealership that had an up

00:47:50.190 --> 00:47:51.639
land habitat in

00:47:51.639 --> 00:47:55.920
that neighborhood I just and maybe between meetings I can

00:47:55.920 --> 00:47:56.559
look to see what

00:47:56.559 --> 00:48:02.409
the upland habitat is over on that side so those are my

00:48:02.409 --> 00:48:02.679
thoughts.

00:48:02.679 --> 00:48:06.969
Yeah I can probably look into the interactive map and turn

00:48:06.969 --> 00:48:07.840
the ESA layer

00:48:07.840 --> 00:48:12.400
for you and then see if in that way you have an idea of

00:48:12.400 --> 00:48:14.159
where they are. Thank you.

00:48:14.159 --> 00:48:18.280
Commissioner Beck. Yeah thank you chair and this is

00:48:18.280 --> 00:48:19.840
probably kind of self evident but

00:48:19.840 --> 00:48:23.659
when you say that non-residential development when it encro

00:48:23.659 --> 00:48:24.679
aches upland

00:48:24.679 --> 00:48:30.199
habitat it has to preserve 30%. 50%? Non-residential.

00:48:30.199 --> 00:48:36.679
Okay. Yes. It would be great if it was. Okay. So we're

00:48:36.679 --> 00:48:39.519
talking about just say you've got a 10

00:48:39.519 --> 00:48:42.300
acre track of upland habitat but they're only going to

00:48:42.300 --> 00:48:43.800
affect a thousand square

00:48:43.800 --> 00:48:48.360
feet so the 30% they're expected is going to be brought

00:48:48.360 --> 00:48:50.079
roughly 300 square feet

00:48:50.079 --> 00:48:54.190
in or are we taking in to consideration that whole 10 acre

00:48:54.190 --> 00:48:55.880
track? No you're

00:48:55.880 --> 00:48:59.900
assuming that the entire 10 acres is in their site and that

00:48:59.900 --> 00:49:01.000
's something that we

00:49:01.000 --> 00:49:04.860
have to clarify. The 10 acres doesn't have to be in one

00:49:04.860 --> 00:49:06.139
parcel owned by one

00:49:06.139 --> 00:49:10.039
owner. Those are tree stands that might be spread out about

00:49:10.039 --> 00:49:11.719
multiple land owners.

00:49:11.719 --> 00:49:17.159
Okay let's say that they are 10 acres for owners equally

00:49:17.159 --> 00:49:19.559
distributed 2.5 okay

00:49:19.559 --> 00:49:22.719
let's say that I'm owner number one I'm going in and I'm

00:49:22.719 --> 00:49:24.719
going to do

00:49:24.719 --> 00:49:29.329
resident non-residential. So what what are the calculation

00:49:29.329 --> 00:49:30.880
is going to be based

00:49:30.880 --> 00:49:36.059
on how much of the upland habitat is in my parcel? That

00:49:36.059 --> 00:49:38.940
will be 2.5 and then the

00:49:38.940 --> 00:49:46.639
2. it will be 30% out of that 2.5 acres. So that's what you

00:49:46.639 --> 00:49:49.599
will be required to do.

00:49:49.599 --> 00:49:55.019
So hopefully the theory behind it is if everyone develops

00:49:55.019 --> 00:49:56.280
at the same

00:49:56.280 --> 00:50:00.199
type of development residential and all are subject to 30%

00:50:00.199 --> 00:50:01.840
after everybody

00:50:01.840 --> 00:50:06.960
preserve their 30% overall we will have three acres of up

00:50:06.960 --> 00:50:08.440
land habitat left from

00:50:08.440 --> 00:50:12.280
the original 10. So it's only 30% of the trees that you're

00:50:12.280 --> 00:50:13.719
directly going to

00:50:13.719 --> 00:50:19.800
impact. Correct. Of what is on your property. Right right

00:50:19.800 --> 00:50:20.199
thank you.

00:50:20.199 --> 00:50:24.579
Commissioner Ellis. Thank you chair. I actually wanted to

00:50:24.579 --> 00:50:25.320
ask Commissioner

00:50:25.320 --> 00:50:28.280
Rozelle a question with regard to what we were just

00:50:28.280 --> 00:50:29.719
discussing. What's the

00:50:29.719 --> 00:50:33.440
percentage that you have in your mind when you ask the

00:50:33.440 --> 00:50:35.320
question that you do? I

00:50:35.320 --> 00:50:40.400
mean if we're non-residential I would think you'd be equal.

00:50:40.400 --> 00:50:41.960
It's hard for me

00:50:41.960 --> 00:50:49.099
to see why a non-invasive neighborhood that's homes that

00:50:49.099 --> 00:50:50.199
they're gonna put bird

00:50:50.199 --> 00:50:52.619
feeders up and they actually would probably help with the

00:50:52.619 --> 00:50:53.639
underlying habitat

00:50:53.639 --> 00:50:57.170
more than commercial would have a steeper regulation than

00:50:57.170 --> 00:50:58.760
commercial that

00:50:58.760 --> 00:51:02.530
might not be as inclined to keep the habitat intact apart

00:51:02.530 --> 00:51:03.679
from the canopy.

00:51:03.679 --> 00:51:07.110
Because it seems residential has to be contiguous has to be

00:51:07.110 --> 00:51:08.559
50% and they're

00:51:08.559 --> 00:51:10.989
they have the same encouragement but on the non-residential

00:51:10.989 --> 00:51:12.000
it's 30% is that to

00:51:12.000 --> 00:51:15.199
be contiguous it just keep the tree canopy and so I'm just

00:51:15.199 --> 00:51:15.840
curious about

00:51:15.840 --> 00:51:19.320
what are we trying to protect and why the different

00:51:19.320 --> 00:51:20.719
standards based on

00:51:20.719 --> 00:51:24.019
development if if we're worried about the the birds and the

00:51:24.019 --> 00:51:25.519
critters I think

00:51:25.519 --> 00:51:28.099
it should be zoned the agnostic in terms of protecting that

00:51:28.099 --> 00:51:29.760
that habitat. I guess

00:51:29.760 --> 00:51:33.039
I understand then but it's probably because a commercial

00:51:33.039 --> 00:51:33.559
development is

00:51:33.559 --> 00:51:37.380
gonna have a bigger footprint overall it might impede the

00:51:37.380 --> 00:51:38.000
development all

00:51:38.000 --> 00:51:41.860
together if you require the same just because residential

00:51:41.860 --> 00:51:42.719
and commercial

00:51:42.719 --> 00:51:46.050
they're just not the same type of development so. Totally

00:51:46.050 --> 00:51:46.880
understand it it

00:51:46.880 --> 00:51:51.440
just seems to me that I don't want to use language

00:51:51.440 --> 00:51:52.400
inappropriate but it's a

00:51:52.400 --> 00:51:56.190
it's a it's a weak protection of the upland habitat if

00:51:56.190 --> 00:51:57.400
depending on what the

00:51:57.400 --> 00:52:00.090
use is if you want to put an office park in don't worry

00:52:00.090 --> 00:52:00.960
about the habitat we don't

00:52:00.960 --> 00:52:02.960
we don't care about if you want an office park if you want

00:52:02.960 --> 00:52:03.880
houses we do care

00:52:03.880 --> 00:52:06.989
about the habitat that's what it's it's communicating to me

00:52:06.989 --> 00:52:08.039
and again it might

00:52:08.039 --> 00:52:11.599
be inconsequential to the amount of development that overl

00:52:11.599 --> 00:52:12.559
aps non-residential

00:52:12.559 --> 00:52:16.460
and upland but it doesn't it doesn't seem to be speaking

00:52:16.460 --> 00:52:17.400
the same voice from

00:52:17.400 --> 00:52:19.980
the city's perspective of what we want to protect if there

00:52:19.980 --> 00:52:21.000
's a dual standard

00:52:21.000 --> 00:52:27.239
based on use. Commissioner Sullivan. Thank you. What is the

00:52:27.239 --> 00:52:28.360
what definition are we

00:52:28.360 --> 00:52:32.179
using for residential development in other words is this

00:52:32.179 --> 00:52:33.840
more than ten houses

00:52:33.840 --> 00:52:38.469
more than 20 houses or a single house? It could be a single

00:52:38.469 --> 00:52:39.900
house the use is

00:52:39.900 --> 00:52:43.329
residential so it could be single-family it could be multi-

00:52:43.329 --> 00:52:44.599
family or it could be

00:52:44.599 --> 00:52:47.400
two-f. Those are pretty much. What I'm saying is if an

00:52:47.400 --> 00:52:50.880
individual comes in and buys a lot in a

00:52:50.880 --> 00:52:54.400
neighborhood that's pretty well built out they're gonna be

00:52:54.400 --> 00:52:55.159
treated as a

00:52:55.159 --> 00:52:59.119
developer rather than the fact that they bought the lot

00:52:59.119 --> 00:53:00.360
they bought the trees

00:53:00.360 --> 00:53:03.840
there way too many trees because the lot's not big enough

00:53:03.840 --> 00:53:04.960
to hold the house

00:53:04.960 --> 00:53:09.139
they want and so they're gonna be held to this 50% cont

00:53:09.139 --> 00:53:10.880
iguous as a developer

00:53:10.880 --> 00:53:14.420
was which I'm sure was intended to not come in and clear-

00:53:14.420 --> 00:53:16.559
cut 20 acres of trees

00:53:16.559 --> 00:53:22.480
to put in the houses. I'm curious as to where does the home

00:53:22.480 --> 00:53:23.440
owner you know the

00:53:23.440 --> 00:53:28.840
landowner rights come into play versus again this are

00:53:28.840 --> 00:53:30.239
arbitrary contiguous

00:53:30.239 --> 00:53:34.840
50% number. Okay well in this scenario that you that you

00:53:34.840 --> 00:53:36.199
are playing you are

00:53:36.199 --> 00:53:41.320
it there's an existing neighborhood so we are talking a inf

00:53:41.320 --> 00:53:42.199
ield almost an

00:53:42.199 --> 00:53:45.619
infield situation okay where they have been one big tract

00:53:45.619 --> 00:53:46.679
skipped from

00:53:46.679 --> 00:53:51.309
development. The chances are that there's a tree that there

00:53:51.309 --> 00:53:53.280
's a large parcel ten

00:53:53.280 --> 00:54:00.679
acres or more who is covered you know inch for inch of tree

00:54:00.679 --> 00:54:02.639
it is not very

00:54:02.639 --> 00:54:08.800
often I will not rule out the possibility but it is very

00:54:08.800 --> 00:54:10.519
unlikely. If

00:54:10.519 --> 00:54:16.119
you are just building one house for example you can clear

00:54:16.119 --> 00:54:18.559
50% of that

00:54:18.559 --> 00:54:25.980
habitat by right that should give you enough if you have a

00:54:25.980 --> 00:54:28.039
ten acre tract

00:54:28.039 --> 00:54:31.500
cover with trees and you are in time. I'm not talking about

00:54:31.500 --> 00:54:32.960
ten acre I'm talking about a quarter acre or

00:54:32.960 --> 00:54:36.110
half acre. Well I'm talking about it in you know in a

00:54:36.110 --> 00:54:38.199
residential area in a

00:54:38.199 --> 00:54:41.840
development that's already been developed for several years

00:54:41.840 --> 00:54:42.800
but there's

00:54:42.800 --> 00:54:45.760
three or four scattered lots and they happen to have a

00:54:45.760 --> 00:54:46.920
bunch of trees on it

00:54:46.920 --> 00:54:50.820
people like to have a bunch of trees around their house.

00:54:50.820 --> 00:54:53.119
Yeah I see that the

00:54:53.119 --> 00:54:58.090
possibility however I think that if you are on a quarter

00:54:58.090 --> 00:55:00.440
lot and you are entitled

00:55:00.440 --> 00:55:06.440
to clear 50% of the upland habitat by right that chances

00:55:06.440 --> 00:55:06.880
are that

00:55:06.880 --> 00:55:10.559
will be enough for you to be able to accommodate your

00:55:10.559 --> 00:55:13.039
building footprint, your

00:55:13.039 --> 00:55:16.679
driveway, your sidewalk. You may have some upland habitat

00:55:16.679 --> 00:55:18.719
on your backyard that

00:55:18.719 --> 00:55:25.039
possibility exists but because the 50% that you have to

00:55:25.039 --> 00:55:26.840
clear that should give

00:55:26.840 --> 00:55:36.199
you enough area for a house. So basically the city owns 50%

00:55:36.199 --> 00:55:36.679
of my lot

00:55:36.679 --> 00:55:41.860
when I buy this single quarter acre lot to put in the 3,000

00:55:41.860 --> 00:55:43.320
square foot house

00:55:43.320 --> 00:55:52.929
and a pool I am I've got to keep 50% contiguous canopy

00:55:52.929 --> 00:55:55.039
coverage trees on my

00:55:55.039 --> 00:55:59.889
lot even though I want to put in a pool. You're gonna tell

00:55:59.889 --> 00:56:00.840
me oh sorry Mr.

00:56:00.840 --> 00:56:05.119
Salvin you're you know you've taken down 60% you can't do

00:56:05.119 --> 00:56:07.320
that. Yeah well the

00:56:07.320 --> 00:56:11.579
city will not own it because that is not the the upland

00:56:11.579 --> 00:56:13.000
habitat is not dedicated

00:56:13.000 --> 00:56:18.360
to the city or given a fee simple so you still own the up

00:56:18.360 --> 00:56:21.119
land habitat is yours.

00:56:21.119 --> 00:56:27.090
The option let's say that you would like to clear more than

00:56:27.090 --> 00:56:28.239
the 50%.

00:56:28.239 --> 00:56:31.190
There's a mechanism that you that you could go and it's

00:56:31.190 --> 00:56:32.360
called the alternative

00:56:32.360 --> 00:56:36.099
ASA plan. The alternative ASA plan you can look at it

00:56:36.099 --> 00:56:37.079
almost like a variance

00:56:37.079 --> 00:56:42.079
process. Then look at the facts you know what it is this is

00:56:42.079 --> 00:56:43.519
the last remainder

00:56:43.519 --> 00:56:49.010
making lot so on and so forth and then you can provide some

00:56:49.010 --> 00:56:51.280
mitigation if for

00:56:51.280 --> 00:56:55.119
the to it in exchange of the encroachment. So there is a

00:56:55.119 --> 00:56:56.000
mechanism

00:56:56.000 --> 00:57:00.559
where developers who actually find themselves as or

00:57:00.559 --> 00:57:01.400
consider the

00:57:01.400 --> 00:57:04.369
preservation of the upland habitat as a hardship they can

00:57:04.369 --> 00:57:06.400
pursue that option.

00:57:06.400 --> 00:57:10.300
And we will discuss the next item is the is the criteria

00:57:10.300 --> 00:57:11.840
for the alternative ASA

00:57:11.840 --> 00:57:15.309
plan so we will you will be able to see what we are looking

00:57:15.309 --> 00:57:16.400
. I just have a

00:57:16.400 --> 00:57:19.179
problem with an individual landowner being treated as a

00:57:19.179 --> 00:57:20.199
developer that's

00:57:20.199 --> 00:57:26.440
that's my concern. They're all being treated the same and

00:57:26.440 --> 00:57:28.199
they're not the same.

00:57:28.199 --> 00:57:34.440
Thank you. I think staff want to make a clarification. Just

00:57:34.440 --> 00:57:35.199
for clarification

00:57:35.199 --> 00:57:37.889
this would not apply to anything under 10 acres right

00:57:37.889 --> 00:57:39.360
because it would in order

00:57:39.360 --> 00:57:41.610
to you would need to have that 10 contiguous acres for it

00:57:41.610 --> 00:57:42.199
to qualify as

00:57:42.199 --> 00:57:45.630
cross timbers. The possible scenario is that you have an

00:57:45.630 --> 00:57:46.960
existing subdivision

00:57:46.960 --> 00:57:50.449
that had that preserved the tempers that had some of the up

00:57:50.449 --> 00:57:51.960
land habitat that

00:57:51.960 --> 00:57:57.920
preserved the 50% that they were responsible for and then

00:57:57.920 --> 00:57:58.800
you have this

00:57:58.800 --> 00:58:03.500
additional and let's let's let's say that they end up

00:58:03.500 --> 00:58:05.320
having to preserve

00:58:05.320 --> 00:58:11.309
9.75 acres. Okay you have this small owner to have one

00:58:11.309 --> 00:58:12.719
quarter of an

00:58:12.719 --> 00:58:18.570
acre and all together makes the 10 acre tree stand minimum

00:58:18.570 --> 00:58:20.079
size. That that would

00:58:20.079 --> 00:58:26.039
be the situations. Most of the time that's when I see that

00:58:26.039 --> 00:58:26.639
as scenario

00:58:26.639 --> 00:58:31.679
playing out. It's just somebody already preserved 9.75

00:58:31.679 --> 00:58:32.840
acres of upland

00:58:32.840 --> 00:58:36.739
habitat and then this is adjacent to a part of the tree

00:58:36.739 --> 00:58:38.320
stand and it still

00:58:38.320 --> 00:58:50.079
makes the 10 acre cut out. I see it differently. Kind of

00:58:50.079 --> 00:58:51.280
tying into the tree

00:58:51.280 --> 00:58:55.250
code since that's not before us but I know it's coming. My

00:58:55.250 --> 00:58:56.679
understanding of how

00:58:56.679 --> 00:58:58.789
the tree code has been written is once you make the

00:58:58.789 --> 00:59:00.840
preservation those trees

00:59:00.840 --> 00:59:03.440
whether they're in upland or any other those are

00:59:03.440 --> 00:59:05.480
permanently identified that

00:59:05.480 --> 00:59:09.929
those have to be preserved. So to Commissioner Sullivan's

00:59:09.929 --> 00:59:10.559
point which is

00:59:10.559 --> 00:59:14.260
I know he and I have been having sharing some of the same

00:59:14.260 --> 00:59:15.320
concerns about this is

00:59:15.320 --> 00:59:18.349
once that designation is put there the individual property

00:59:18.349 --> 00:59:19.800
owner can't remove

00:59:19.800 --> 00:59:26.750
those. Am I correct in my understanding of that? There are

00:59:26.750 --> 00:59:27.679
provisions on

00:59:27.679 --> 00:59:32.480
on nine oh I'm sorry on 17 for the removal of trees within

00:59:32.480 --> 00:59:33.679
upland habitat

00:59:33.679 --> 00:59:39.400
for this for this health of the trees okay but beyond any

00:59:39.400 --> 00:59:41.559
clearing that is

00:59:41.559 --> 00:59:45.380
advisable to preserve the health of the trees and habitat

00:59:45.380 --> 00:59:47.519
then yes that would be

00:59:47.519 --> 00:59:50.949
they would have to go through some sort of alternative ASA

00:59:50.949 --> 00:59:53.199
plan. Correct. Sure.

00:59:53.199 --> 00:59:57.760
You wanna call legal for clarification. I just want the

00:59:57.760 --> 00:59:59.360
Commission to

00:59:59.360 --> 01:00:04.079
understand and and I'm sure you guys are but just for just

01:00:04.079 --> 01:00:05.400
reminding the

01:00:05.400 --> 01:00:10.480
Commission again is you have the ESSA ordinance and then

01:00:10.480 --> 01:00:11.199
you have the

01:00:11.199 --> 01:00:15.460
tree code ordinance and so what I think there was reminding

01:00:15.460 --> 01:00:16.400
us are these

01:00:16.400 --> 01:00:21.039
regulations for ESSAs and I think a lot of the comments

01:00:21.039 --> 01:00:23.599
will be addressed today

01:00:23.599 --> 01:00:28.159
will be addressed under the tree code revisions but my

01:00:28.159 --> 01:00:29.519
question maybe to Deborah

01:00:29.519 --> 01:00:33.510
is these requirements mirror those requirements in the tree

01:00:33.510 --> 01:00:34.199
code is that

01:00:34.199 --> 01:00:38.760
correct? The proposed tree code so what we are we have been

01:00:38.760 --> 01:00:39.840
talking about be

01:00:39.840 --> 01:00:43.380
consistent making the regulation consistent throughout last

01:00:43.380 --> 01:00:44.360
time that I

01:00:44.360 --> 01:00:48.179
checked the tree code that was the 30% let's put that

01:00:48.179 --> 01:00:51.079
caveat out there and what

01:00:51.079 --> 01:00:56.190
we are trying to do is just to be consistent throughout and

01:00:56.190 --> 01:00:57.239
to provide

01:00:57.239 --> 01:01:01.880
opportunities for developers to meet multiple requirements

01:01:01.880 --> 01:01:03.000
at once and not

01:01:03.000 --> 01:01:09.480
double tag the developers with multiple preservations of

01:01:09.480 --> 01:01:11.280
things so that's what

01:01:11.280 --> 01:01:17.159
staff was trying to attain when we crafted the language. So

01:01:17.159 --> 01:01:17.840
just one more

01:01:17.840 --> 01:01:22.679
time that these revisions would make the ESSA ordinance

01:01:22.679 --> 01:01:24.019
consistent with a tree

01:01:24.019 --> 01:01:28.320
ordinance. Correct. I'm gonna backtrack because we're

01:01:28.320 --> 01:01:29.119
getting kind of down in the

01:01:29.119 --> 01:01:33.909
weeds and I want to come back to the substantive changes

01:01:33.909 --> 01:01:35.519
that we're making

01:01:35.519 --> 01:01:38.190
and I just want to make sure I'm correct on what we

01:01:38.190 --> 01:01:39.800
currently have and what we're

01:01:39.800 --> 01:01:44.360
proposing to do. Currently my understanding on residential

01:01:44.360 --> 01:01:44.840
development

01:01:44.840 --> 01:01:49.940
and upland habitat if you have the 10 acre site you have to

01:01:49.940 --> 01:01:52.079
preserve 50% of it

01:01:52.079 --> 01:01:55.900
but you also then have the option if you need to to make

01:01:55.900 --> 01:01:57.960
your project work design

01:01:57.960 --> 01:02:01.269
whatever that is you have the opportunity to mitigate up to

01:02:01.269 --> 01:02:03.000
50% or

01:02:03.000 --> 01:02:07.050
half of that five acres is that correct you end up

01:02:07.050 --> 01:02:09.519
preserving 25% and

01:02:09.519 --> 01:02:13.309
mitigating paying into the tree fund or planting trees that

01:02:13.309 --> 01:02:14.320
25% you need to

01:02:14.320 --> 01:02:18.960
remove yeah you are talking about the tree code you are

01:02:18.960 --> 01:02:20.440
preserving the

01:02:20.440 --> 01:02:25.960
individual trees okay now the habitat now the understory

01:02:25.960 --> 01:02:27.719
okay so if you were

01:02:27.719 --> 01:02:33.920
to have 10 acres on the upland habitat okay let's play this

01:02:33.920 --> 01:02:34.559
now that is not

01:02:34.559 --> 01:02:38.320
upland okay you can go in you preserve your percentage your

01:02:38.320 --> 01:02:39.480
minimum percentage

01:02:39.480 --> 01:02:43.280
and you can go in and you can clear the understory okay

01:02:43.280 --> 01:02:44.300
because the tree code

01:02:44.300 --> 01:02:48.860
what is the preservation of it is the tree canopy okay let

01:02:48.860 --> 01:02:51.079
's add a wrinkle to

01:02:51.079 --> 01:02:55.639
it and let's call that 10 acres in upland habitat okay the

01:02:55.639 --> 01:02:57.320
50% preservation

01:02:57.320 --> 01:03:02.510
is not only the trees the canopy itself but also the under

01:03:02.510 --> 01:03:04.480
story that comes with

01:03:04.480 --> 01:03:09.889
it that's the major difference between tree code and upland

01:03:09.889 --> 01:03:12.480
habitat and the

01:03:12.480 --> 01:03:15.630
other thing is a tree code allows you to further reduce

01:03:15.630 --> 01:03:17.079
your percentage by

01:03:17.079 --> 01:03:22.000
paying into the tree fund the ESA the only mechanism that

01:03:22.000 --> 01:03:23.239
will allow you to

01:03:23.239 --> 01:03:26.969
reduce your preservation would be going through an

01:03:26.969 --> 01:03:29.639
alternative ESA plan okay so

01:03:29.639 --> 01:03:34.690
back to my my question and forgive me whether I'm back and

01:03:34.690 --> 01:03:35.760
forth between the

01:03:35.760 --> 01:03:39.619
tree code or the upland habitat if you've got upland

01:03:39.619 --> 01:03:41.480
habitat 10 acres on

01:03:41.480 --> 01:03:46.360
your parcel contiguous currently you can take up to half of

01:03:46.360 --> 01:03:46.880
it out in a

01:03:46.880 --> 01:03:50.630
residential use and then if you need to take out more than

01:03:50.630 --> 01:03:51.719
that you can take

01:03:51.719 --> 01:03:55.769
another half of that but you have to mitigate it and then

01:03:55.769 --> 01:03:57.519
if I can finish my

01:03:57.519 --> 01:04:01.969
point under this you can just go to the 50% now you can't

01:04:01.969 --> 01:04:02.960
mitigate the other

01:04:02.960 --> 01:04:08.690
portion if you needed to I think the current language doesn

01:04:08.690 --> 01:04:10.280
't tell you that

01:04:10.280 --> 01:04:16.320
you cannot reduce below the 50% it tells you that you will

01:04:16.320 --> 01:04:17.360
have to do that

01:04:17.360 --> 01:04:21.920
through a alternative ESA mechanism let's say that you have

01:04:21.920 --> 01:04:23.039
you preserve your

01:04:23.039 --> 01:04:27.889
50 but you want to actually reduce it to 10% get rid of the

01:04:27.889 --> 01:04:29.079
40% that you are

01:04:29.079 --> 01:04:32.829
required to do if you go through there through the

01:04:32.829 --> 01:04:34.519
alternative ESA plan and

01:04:34.519 --> 01:04:39.440
then you get a final approval from City Council you are

01:04:39.440 --> 01:04:41.559
entitled to clear that

01:04:41.559 --> 01:04:46.940
40% because you have vetted that request through planning

01:04:46.940 --> 01:04:47.800
and sorting Commission

01:04:47.800 --> 01:04:54.489
and City Council so there's no cap on on how much encro

01:04:54.489 --> 01:04:56.519
achment you can have as

01:04:56.519 --> 01:05:01.079
long as if you go below the 50% you do it through an

01:05:01.079 --> 01:05:04.440
alternative ESA plan

01:05:04.760 --> 01:05:09.320
currently or with this correct you can do it currently or

01:05:09.320 --> 01:05:11.039
with this mechanism

01:05:11.039 --> 01:05:14.550
correct so we are not changing we are not changing that the

01:05:14.550 --> 01:05:15.599
only thing that

01:05:15.599 --> 01:05:23.000
we are changing is we are adding non-residential

01:05:23.000 --> 01:05:26.639
development be subject

01:05:26.639 --> 01:05:29.860
to preservation of Oakland habitat that's the only process

01:05:29.860 --> 01:05:30.480
that we are

01:05:30.480 --> 01:05:35.159
changing okay well I'm gonna call on Commissioner Sullivan

01:05:35.159 --> 01:05:36.000
and he's being

01:05:36.000 --> 01:05:41.599
patient I have this similar concern with the direction that

01:05:41.599 --> 01:05:42.400
this is going the

01:05:42.400 --> 01:05:47.460
same concern that we've talked about with the tree cone the

01:05:47.460 --> 01:05:49.159
concern I have is

01:05:49.159 --> 01:05:52.309
we all throw the term developer out but that's that guy

01:05:52.309 --> 01:05:53.719
over here that's going

01:05:53.719 --> 01:05:57.110
to take care of that and really it's the individual

01:05:57.110 --> 01:05:58.639
property owners that own

01:05:58.639 --> 01:06:02.150
these properties that are the ones that bear the burden of

01:06:02.150 --> 01:06:03.400
these code changes

01:06:03.400 --> 01:06:07.219
that we make and we are making city policy for the good of

01:06:07.219 --> 01:06:08.320
the public and

01:06:08.320 --> 01:06:12.179
private individuals are bearing the burden of the cost of

01:06:12.179 --> 01:06:14.679
these and that's

01:06:14.679 --> 01:06:17.250
just the fact of the way that works and so people can say

01:06:17.250 --> 01:06:18.079
it's a developer

01:06:18.079 --> 01:06:20.840
that's not how that really works the developer says it's

01:06:20.840 --> 01:06:21.880
got 10 acres of

01:06:21.880 --> 01:06:25.309
upland habitat on it that they can't do anything with or I

01:06:25.309 --> 01:06:27.440
can only use half not

01:06:27.440 --> 01:06:31.159
going to offer to pay for that portion your property is now

01:06:31.159 --> 01:06:32.239
worth X because

01:06:32.239 --> 01:06:38.239
that property is not usable it's for the good of the public

01:06:38.239 --> 01:06:39.920
the person that owns

01:06:39.920 --> 01:06:42.940
that property that has a designation on there suffers a

01:06:42.940 --> 01:06:44.360
financial loss because

01:06:44.360 --> 01:06:47.500
it has a designation that's put on their property for the

01:06:47.500 --> 01:06:48.840
good of the public that

01:06:48.840 --> 01:06:51.860
they're going to bear privately and I have a concern about

01:06:51.860 --> 01:06:52.639
that I don't think

01:06:52.639 --> 01:06:56.929
it's fair to people to ask them for the good of the public

01:06:56.929 --> 01:06:58.719
and the community and

01:06:58.719 --> 01:07:01.320
all of these things and the benefits and the reasons why we

01:07:01.320 --> 01:07:02.320
're preserving them

01:07:02.320 --> 01:07:06.900
for individual people to bear those burdens and cost I don

01:07:06.900 --> 01:07:08.199
't know what the

01:07:08.199 --> 01:07:12.809
right mechanism is to preserve these things and to be fair

01:07:12.809 --> 01:07:14.480
to private property

01:07:14.480 --> 01:07:17.909
owners and the city of Denton benefits I don't know how to

01:07:17.909 --> 01:07:19.119
solve that problem I

01:07:19.119 --> 01:07:22.889
get to serve for a few hours every two weeks and a few

01:07:22.889 --> 01:07:24.599
hours before to try to

01:07:24.599 --> 01:07:27.420
read and prepare all you know for a meeting and have a

01:07:27.420 --> 01:07:28.599
hopefully a logical

01:07:28.599 --> 01:07:32.329
discussion and bring up some points and then look to city

01:07:32.329 --> 01:07:33.800
staff with the 13

01:07:33.800 --> 01:07:36.239
months of however long y'all have worked on it to go

01:07:36.239 --> 01:07:37.440
through all of those

01:07:37.440 --> 01:07:41.400
discussions to say how do we equitably solve this problem

01:07:41.400 --> 01:07:43.039
and to go a step

01:07:43.039 --> 01:07:47.599
further there's no consideration to what the values are so

01:07:47.599 --> 01:07:48.679
if you have a

01:07:48.679 --> 01:07:54.530
commercial corner maybe it's worth $30 a square foot I don

01:07:54.530 --> 01:07:56.760
't know a million to

01:07:56.760 --> 01:08:00.909
maybe there's 10 acres it's on a corner just like this that

01:08:00.909 --> 01:08:01.880
's the same value

01:08:01.880 --> 01:08:05.900
there's no consideration to how much money does our city

01:08:05.900 --> 01:08:08.199
lose in potential

01:08:08.199 --> 01:08:11.630
property taxes and all the revenues that come off of that

01:08:11.630 --> 01:08:13.239
site versus if it's in

01:08:13.239 --> 01:08:16.279
the very back corner and it's worth a dollar a square foot

01:08:16.279 --> 01:08:17.159
there's no

01:08:17.159 --> 01:08:21.960
mechanism for there to be flexibility to say well we have a

01:08:21.960 --> 01:08:23.359
track right here in

01:08:23.359 --> 01:08:27.109
our city that our city could have a million dollars in

01:08:27.109 --> 01:08:28.840
property taxes off of

01:08:28.840 --> 01:08:32.579
but the one back here in the back that we get twenty twenty

01:08:32.579 --> 01:08:33.279
thousand dollars

01:08:33.279 --> 01:08:37.260
off of there's no consideration of what does this really

01:08:37.260 --> 01:08:38.239
cost us how do we

01:08:38.239 --> 01:08:41.119
figure out well gosh the property owners should be able to

01:08:41.119 --> 01:08:42.560
be able to make a

01:08:42.560 --> 01:08:46.239
decision and say I want to pay into the tree fund or I want

01:08:46.239 --> 01:08:47.640
to go buy a site and

01:08:47.640 --> 01:08:52.720
give you a we don't call it a tree bank or an upland cavity

01:08:52.720 --> 01:08:54.920
habitat bank and I

01:08:54.920 --> 01:08:57.489
can buy that piece of property for a much different price

01:08:57.489 --> 01:08:58.239
and preserve that

01:08:58.239 --> 01:09:01.529
and here's a prime piece of property those are the concerns

01:09:01.529 --> 01:09:02.479
that I have when

01:09:02.479 --> 01:09:05.760
we bring these things up we don't spend any time on this

01:09:05.760 --> 01:09:06.680
commission talking

01:09:06.680 --> 01:09:09.850
about those we talk about go through this right quick and

01:09:09.850 --> 01:09:10.880
put it into place

01:09:10.880 --> 01:09:13.949
and there's not a conversation of what does this really

01:09:13.949 --> 01:09:15.159
mean when we put this

01:09:15.159 --> 01:09:18.159
in place how does it affect our city how does it affect

01:09:18.159 --> 01:09:19.199
individual property

01:09:19.199 --> 01:09:24.500
owners and those are the concerns that I have that I'd like

01:09:24.500 --> 01:09:26.359
to have some further

01:09:26.359 --> 01:09:31.149
discussion about how we address those things and what's

01:09:31.149 --> 01:09:32.520
what's reasonable and

01:09:32.520 --> 01:09:36.130
fair to individual property owners and what's in the best

01:09:36.130 --> 01:09:37.000
interest of the city

01:09:37.000 --> 01:09:42.600
and how do those two things equitably get put into place

01:09:42.600 --> 01:09:44.039
commissioner Sullivan

01:09:44.039 --> 01:09:48.600
and then I'll tell you commissioner Sanchez this is if I

01:09:48.600 --> 01:09:49.119
understand this

01:09:49.119 --> 01:09:54.800
this is for 10 acres or more is that the intent of this how

01:09:54.800 --> 01:09:57.079
many how many

01:09:57.079 --> 01:10:02.399
parcels of land within the city of Denton are undeveloped

01:10:02.399 --> 01:10:04.279
that comprise 10

01:10:04.279 --> 01:10:07.279
acres or more

01:10:34.279 --> 01:10:40.260
and so are we making much to do about nothing I mean is

01:10:40.260 --> 01:10:42.159
that if we're talking

01:10:42.159 --> 01:10:47.020
about you know 10 acres you know is the the big you know

01:10:47.020 --> 01:10:48.760
the cutoff point you

01:10:48.760 --> 01:10:51.550
know anything over 10 acres or more I believe you just

01:10:51.550 --> 01:10:52.079
nailed it I think

01:10:52.079 --> 01:10:54.659
we're beating a horse here that doesn't need to be beat

01:10:54.659 --> 01:10:55.640
because there's not a

01:10:55.640 --> 01:10:58.210
lot left in the city now when you get to the tree code that

01:10:58.210 --> 01:10:59.119
's a different issue

01:10:59.119 --> 01:11:01.460
okay because the tree code is going to be concerned with

01:11:01.460 --> 01:11:02.520
individual trees we're

01:11:02.520 --> 01:11:06.010
talking about contiguous stand of trees 10 acres that are

01:11:06.010 --> 01:11:07.359
together there's very

01:11:07.359 --> 01:11:10.430
few left on there and there is a mechanism it's called an

01:11:10.430 --> 01:11:11.239
alternative

01:11:11.239 --> 01:11:14.920
visa you can put in it for an alternative environmental and

01:11:14.920 --> 01:11:15.399
it'll go

01:11:15.399 --> 01:11:18.010
through the process just like through a zoning change

01:11:18.010 --> 01:11:19.239
whereas if you want to go

01:11:19.239 --> 01:11:22.989
in there develop it we had a project that came in today it

01:11:22.989 --> 01:11:24.600
had every ESA that

01:11:24.600 --> 01:11:27.359
the city has it on the piece property we did not tell that

01:11:27.359 --> 01:11:28.399
developer he couldn't

01:11:28.399 --> 01:11:31.090
do it he's just got extra hurdles he's got a run through to

01:11:31.090 --> 01:11:31.960
make his project

01:11:31.960 --> 01:11:36.079
happen this is not going to stop a developer okay it may

01:11:36.079 --> 01:11:37.039
cause him part to

01:11:37.039 --> 01:11:40.500
pause for a little bit and rethink his plan but it's not

01:11:40.500 --> 01:11:41.520
going to stop him I'd

01:11:41.520 --> 01:11:45.970
like to stop right there and if you let me just kind of

01:11:45.970 --> 01:11:48.359
thought those parcels

01:11:48.359 --> 01:11:53.020
of land how is all this going to be conveyed to them as to

01:11:53.020 --> 01:11:54.439
what they're now

01:11:54.439 --> 01:11:57.409
what the property has been designated how it's going to

01:11:57.409 --> 01:11:58.520
affect them what's

01:11:58.520 --> 01:12:02.119
going to happen who's going to talk to these people about

01:12:02.119 --> 01:12:03.319
that or is all you're

01:12:03.319 --> 01:12:08.359
just gonna kind of get it done and sneak away in the middle

01:12:08.359 --> 01:12:09.920
of the night the

01:12:09.920 --> 01:12:13.560
designation of upland habitat we are not changing okay

01:12:13.560 --> 01:12:14.920
whatever is showing on the

01:12:14.920 --> 01:12:18.119
map as upland habitat have been shown on the map since 2002

01:12:18.119 --> 01:12:19.399
when the ESA map was

01:12:19.399 --> 01:12:23.470
created so this is not a new information why would it be

01:12:23.470 --> 01:12:26.079
new information if this

01:12:26.079 --> 01:12:31.000
changes were to be approved okay it is that if they were

01:12:31.000 --> 01:12:32.399
marketing their site

01:12:32.399 --> 01:12:36.300
for commercial development they may have that and I may

01:12:36.300 --> 01:12:37.760
have a potential solution

01:12:37.760 --> 01:12:41.199
for the mechanism that we can discuss when we talk about

01:12:41.199 --> 01:12:42.720
the alternative ESA

01:12:42.720 --> 01:12:48.869
plan let me allow me to entertain that that idea so right

01:12:48.869 --> 01:12:52.560
now we are not putting

01:12:52.560 --> 01:12:56.890
or designated new areas of upland habitat we are not what

01:12:56.890 --> 01:12:58.039
we are doing is

01:12:58.039 --> 01:13:03.149
that if those areas were to be developed for non-resident

01:13:03.149 --> 01:13:05.800
ial purposes then they

01:13:05.800 --> 01:13:09.819
will be subject to 30% preservation of but the designation

01:13:09.819 --> 01:13:10.359
we are not

01:13:10.359 --> 01:13:15.920
designated new upland habitats on people's property is not

01:13:15.920 --> 01:13:17.359
the other issue

01:13:17.359 --> 01:13:22.750
that is another wrinkle to it is the tempers the 10 acre

01:13:22.750 --> 01:13:24.920
tree stand could be

01:13:24.920 --> 01:13:30.960
spread among multiple parcels okay so for for us to do an

01:13:30.960 --> 01:13:32.439
analysis to say

01:13:32.439 --> 01:13:37.869
which parcels include at least 10 acres of open habitat on

01:13:37.869 --> 01:13:40.279
it we will be further

01:13:40.279 --> 01:13:43.520
reducing that because that's not very common chances are

01:13:43.520 --> 01:13:44.920
those are tree stand

01:13:44.920 --> 01:13:49.720
that they don't they don't stop a property property lines

01:13:49.720 --> 01:13:50.359
they they can

01:13:50.359 --> 01:13:54.550
they continue and spread out among so the analysis is a

01:13:54.550 --> 01:13:56.520
little bit challenging

01:13:56.520 --> 01:14:01.079
in that regard because we are not talking about three ten

01:14:01.079 --> 01:14:02.319
acres on one

01:14:02.319 --> 01:14:08.170
single parcel because then we will be further reducing the

01:14:08.170 --> 01:14:09.680
amount of areas

01:14:09.680 --> 01:14:14.239
that have good habitat good upland habitat that should be

01:14:14.239 --> 01:14:15.319
preserved just

01:14:15.319 --> 01:14:22.199
because we are limited to one ownership 10 acres come back

01:14:22.199 --> 01:14:23.119
I know there's a

01:14:23.119 --> 01:14:25.909
number of parcels that have more than that I've looked at

01:14:25.909 --> 01:14:27.100
them familiar with

01:14:27.100 --> 01:14:29.960
it and I guess the other point I want to bring up and kind

01:14:29.960 --> 01:14:31.279
of respond to Bob is

01:14:31.279 --> 01:14:34.369
that what you what you do when you do an alternative visa

01:14:34.369 --> 01:14:35.800
plan it becomes a

01:14:35.800 --> 01:14:38.979
political issue then it comes before this Commission it

01:14:38.979 --> 01:14:40.159
becomes before City

01:14:40.159 --> 01:14:43.170
Council and I've sat on this Council or Commission before

01:14:43.170 --> 01:14:44.319
and those things are

01:14:44.319 --> 01:14:46.899
voted down we're not going to allow an alternative visa for

01:14:46.899 --> 01:14:47.760
this particular

01:14:47.760 --> 01:14:51.579
site in a discussion so there's all kinds of great ways to

01:14:51.579 --> 01:14:52.119
talk about will

01:14:52.119 --> 01:14:56.449
you have a process well if it works that's great but I've

01:14:56.449 --> 01:14:57.359
seen on countless

01:14:57.359 --> 01:15:00.670
occasions where it comes before us and so we want to do an

01:15:00.670 --> 01:15:02.720
alternative no we're

01:15:02.720 --> 01:15:06.680
not gonna allow you to go do that that property there's not

01:15:06.680 --> 01:15:07.640
a mechanism there

01:15:07.640 --> 01:15:10.659
that mechanism although it sounds like it's an option may

01:15:10.659 --> 01:15:11.800
not work and it

01:15:11.800 --> 01:15:14.770
doesn't provide any relief and that's the concern I have

01:15:14.770 --> 01:15:15.800
when we talk about

01:15:15.800 --> 01:15:18.380
changing these things and say well you can go through that

01:15:18.380 --> 01:15:19.359
process well when it

01:15:19.359 --> 01:15:24.279
comes back no well okay you're gonna preserve 30% or 50%

01:15:24.279 --> 01:15:25.720
into question we're

01:15:25.720 --> 01:15:31.380
not going to approve that so those are the concerns that I

01:15:31.380 --> 01:15:33.159
have in in moving

01:15:33.159 --> 01:15:36.840
these forward I want you to get through your presentation

01:15:36.840 --> 01:15:38.560
we're out of time and

01:15:38.560 --> 01:15:41.520
one of the other things that I have a concern and what's

01:15:41.520 --> 01:15:42.600
going to get to the

01:15:42.600 --> 01:15:47.609
very end is the application when you go back at 35-17-2 it

01:15:47.609 --> 01:15:48.699
says within the

01:15:48.699 --> 01:15:52.960
corporate limits of the city but then further on when you

01:15:52.960 --> 01:15:55.319
read through this

01:15:55.319 --> 01:16:02.090
it says the official maps and 35-17-6 it says the official

01:16:02.090 --> 01:16:03.319
map that identifies

01:16:03.319 --> 01:16:10.340
areas designated as ESA I don't know where that map is but

01:16:10.340 --> 01:16:11.840
when it me for my

01:16:11.840 --> 01:16:15.060
purview and preparing for the meeting I just went to the

01:16:15.060 --> 01:16:16.279
city website pull up

01:16:16.279 --> 01:16:20.350
the interactive map and turn on ESA's and not only is it in

01:16:20.350 --> 01:16:21.560
the city a limit

01:16:21.560 --> 01:16:26.199
city limits of Denton it's all out in the ETJ so my

01:16:26.199 --> 01:16:28.800
question is when we do

01:16:28.800 --> 01:16:33.399
this and it says see limits limits but then it's on the map

01:16:33.399 --> 01:16:34.039
does this also

01:16:34.039 --> 01:16:39.760
apply out in the ETJ also because it shows on our map the

01:16:39.760 --> 01:16:42.220
only ESA that we

01:16:42.220 --> 01:16:45.970
have jurisdiction outside the ETJ and that is granted by

01:16:45.970 --> 01:16:47.199
the ETJ or city

01:16:47.199 --> 01:16:52.159
limits outside the city limits in the ETJ okay so in the ET

01:16:52.159 --> 01:16:54.119
J okay so the only type

01:16:54.119 --> 01:16:57.039
of ESA that the city have jurisdiction for the protection

01:16:57.039 --> 01:16:58.079
and that protection

01:16:58.079 --> 01:17:00.979
is granted to the city by the Texas Local Government Code

01:17:00.979 --> 01:17:01.960
is for floodplain

01:17:01.960 --> 01:17:07.270
ESAS the riparian buffer the water related and the upland

01:17:07.270 --> 01:17:08.640
habitat outside

01:17:08.640 --> 01:17:14.489
the city limits we don't have a make it out if they were to

01:17:14.489 --> 01:17:16.159
be encroached clear

01:17:16.159 --> 01:17:21.649
we cannot protect those the only ESA that we have some say

01:17:21.649 --> 01:17:23.720
to it is for

01:17:23.720 --> 01:17:27.149
floodplain and the reason why is a protect as a protection

01:17:27.149 --> 01:17:27.720
of water

01:17:27.720 --> 01:17:31.470
resources and that is granted by the state of Texas to the

01:17:31.470 --> 01:17:33.000
cities so to

01:17:33.000 --> 01:17:35.649
answer the question I assess for clarification not only

01:17:35.649 --> 01:17:36.760
does this apply in

01:17:36.760 --> 01:17:40.579
the city limits of Denton it also is going to apply in the

01:17:40.579 --> 01:17:41.920
ETJ for those

01:17:41.920 --> 01:17:49.039
particular items correct and that is outlined in I'm sorry

01:17:49.039 --> 01:17:53.039
17.2 B floodplain

01:17:53.039 --> 01:17:55.869
standard of this sub chapter shall apply to all land and

01:17:55.869 --> 01:17:57.359
all development with the

01:17:57.359 --> 01:18:00.560
extra territorial jurisdiction of the city that's the only

01:18:00.560 --> 01:18:01.680
one that we would

01:18:01.680 --> 01:18:05.760
have a say I'll have some more questions about that I know

01:18:05.760 --> 01:18:07.119
we're out of time and

01:18:07.119 --> 01:18:11.300
everybody probably wants to get a quick bite I'm gonna call

01:18:11.300 --> 01:18:13.119
a recess at 620 and

01:18:13.119 --> 01:18:16.069
let's get something to eat and then we'll start again at 6

01:18:16.069 --> 01:18:17.079
30 in council

01:18:17.079 --> 01:18:21.640
chambers and I guess we'll have to continue this at our

01:18:21.640 --> 01:18:22.680
next meeting

01:18:37.680 --> 01:18:39.159
are we voting on this tonight supposed to be it's on our

01:18:39.159 --> 01:18:45.119
agenda as a vote for

01:18:45.119 --> 01:18:50.479
City Council as is okay so based

01:19:07.119 --> 01:19:09.119
on the

01:19:24.960 --> 01:19:26.329
good evening and welcome to the city of Denton planning and

01:19:26.329 --> 01:19:29.039
zoning Commission

01:19:29.039 --> 01:19:34.189
meeting for February 7th 2018 this meeting has been duly

01:19:34.189 --> 01:19:35.199
posted and we do

01:19:35.199 --> 01:19:40.250
have a quorum present and I will call us to order at 643 I

01:19:40.250 --> 01:19:41.000
'm sorry we ran a

01:19:41.000 --> 01:19:43.819
little long and work session our first order of business

01:19:43.819 --> 01:19:44.840
will be to stand and

01:19:44.840 --> 01:19:48.720
give the pledge the US and the Texas flags

01:20:05.199 --> 01:20:12.279
Texas flag I pledge allegiance to the Texas one state under

01:20:12.279 --> 01:20:13.640
God one

01:20:24.520 --> 01:20:26.930
our next item on our agenda will be to consider approval of

01:20:26.930 --> 01:20:29.800
our minutes

01:20:29.800 --> 01:20:34.359
Commissioner Roselle I move to approve the minutes from

01:20:34.359 --> 01:20:35.840
January 24th okay

01:20:35.840 --> 01:20:38.840
thank you chair I second we have a first and a second for

01:20:38.840 --> 01:20:40.239
approval any further

01:20:40.239 --> 01:20:46.760
discussion seeing none call for a vote on the board

01:20:51.800 --> 01:21:00.050
motion carries six to zero will take us to our consent

01:21:00.050 --> 01:21:01.239
agenda

01:21:02.960 --> 01:21:08.560
Commissioner Beck I move we approve consent agenda okay

01:21:08.880 --> 01:21:12.899
Commissioner Rizel second okay we have a first and a second

01:21:12.899 --> 01:21:14.720
for approval any

01:21:14.720 --> 01:21:21.680
further discussion seeing none will call for a vote on the

01:21:21.680 --> 01:21:28.640
board and we'll move

01:21:28.640 --> 01:21:32.289
us to our public hearing section this evening our first

01:21:32.289 --> 01:21:34.520
item will be item a

01:21:34.520 --> 01:21:40.069
and I will open the public hearing to Z 17 - 0 0 2 7 a and

01:21:40.069 --> 01:21:41.279
I will call on

01:21:41.279 --> 01:21:52.810
Shandrin for presentation good evening commissioners Shand

01:21:52.810 --> 01:21:53.640
rin Jarvis with

01:21:53.640 --> 01:21:59.489
development services the next item is Z 1727 is a rezoning

01:21:59.489 --> 01:22:00.479
request for property

01:22:00.479 --> 01:22:05.779
located along University Boulevard the request is to resign

01:22:05.779 --> 01:22:06.560
approximately two

01:22:06.560 --> 01:22:10.840
acres from a neighborhood residential mixed use 12 district

01:22:10.840 --> 01:22:11.840
to a community

01:22:11.840 --> 01:22:15.460
mixed use general district the property is located here

01:22:15.460 --> 01:22:17.560
along West University

01:22:17.560 --> 01:22:22.350
razor elementary is here on this tract and then just to

01:22:22.350 --> 01:22:23.560
give you some

01:22:23.560 --> 01:22:27.489
reference Malone Street is here and then Fulton Street is

01:22:27.489 --> 01:22:29.720
here the property is

01:22:29.720 --> 01:22:35.750
currently undeveloped and it's not platted again when we

01:22:35.750 --> 01:22:37.399
look at rezoning

01:22:37.399 --> 01:22:41.850
requests we typically consider two criteria does it meet

01:22:41.850 --> 01:22:42.680
the future land

01:22:42.680 --> 01:22:47.399
use plan and does it facilitate the provision of public

01:22:47.399 --> 01:22:50.039
infrastructure when

01:22:50.039 --> 01:22:55.090
we looked at the future land use plan we noticed that this

01:22:55.090 --> 01:22:56.600
request does is

01:22:56.600 --> 01:23:00.539
consistent with the future land use plan for this area it's

01:23:00.539 --> 01:23:01.800
designated for

01:23:01.800 --> 01:23:05.399
commercial use which is intended to promote regional

01:23:05.399 --> 01:23:06.800
community and neighbor

01:23:06.800 --> 01:23:11.359
neighborhood shopping centers CMG which is what the

01:23:11.359 --> 01:23:12.840
applicant is requesting

01:23:12.840 --> 01:23:16.319
would be a logical extension of the existing CMG districts

01:23:16.319 --> 01:23:17.640
that are located

01:23:17.640 --> 01:23:22.510
along the north side of University and also to the east of

01:23:22.510 --> 01:23:24.600
the property and it

01:23:24.600 --> 01:23:31.149
would promote a cohesive development pattern and then just

01:23:31.149 --> 01:23:32.960
to take another

01:23:32.960 --> 01:23:37.520
look at the existing zoning districts again you see the CMG

01:23:37.520 --> 01:23:38.800
along the north

01:23:38.800 --> 01:23:43.920
side of University on the south there's some inner in our

01:23:43.920 --> 01:23:45.239
three neighborhood

01:23:45.239 --> 01:23:50.539
residential three on the south this area and I intended to

01:23:50.539 --> 01:23:52.479
update the map this is

01:23:52.479 --> 01:23:58.760
primarily flat plane and so it's not really developable

01:23:58.760 --> 01:23:59.760
with developable at

01:23:59.760 --> 01:24:04.800
this point there's some NRMU 12 here on the east and this

01:24:04.800 --> 01:24:06.000
is mostly developed

01:24:06.000 --> 01:24:10.829
with offices so basically the area the this area is

01:24:10.829 --> 01:24:14.319
primarily commercial in in

01:24:14.319 --> 01:24:17.930
use and the applicant is actually requesting this zoning

01:24:17.930 --> 01:24:18.920
change in order

01:24:18.920 --> 01:24:23.880
to facilitate retail and restaurant development on the site

01:24:23.880 --> 01:24:25.760
when we look at

01:24:25.760 --> 01:24:29.270
the available public infrastructure there's water and

01:24:29.270 --> 01:24:30.840
wastewater utility in

01:24:30.840 --> 01:24:36.989
the right away of West University and obviously if when

01:24:36.989 --> 01:24:38.960
this does develop the

01:24:38.960 --> 01:24:42.130
property would need to do some extensions into the site but

01:24:42.130 --> 01:24:42.560
that is

01:24:42.560 --> 01:24:48.229
available as far as access West University is currently a

01:24:48.229 --> 01:24:49.119
six lane

01:24:49.119 --> 01:24:52.869
divided in the mobility plan calls for a six lane divided

01:24:52.869 --> 01:24:54.239
with bike lanes and

01:24:54.239 --> 01:24:57.840
sidewalks so any dedication or perimeter street

01:24:57.840 --> 01:25:00.840
improvements would be collected

01:25:00.840 --> 01:25:07.390
at the subdivision stage as I mentioned there's floodplain

01:25:07.390 --> 01:25:08.760
easter on the

01:25:08.760 --> 01:25:14.789
southwest corner of the site but there's no existing tree

01:25:14.789 --> 01:25:15.600
canopy

01:25:17.479 --> 01:25:22.039
according in accordance with the local government code we

01:25:22.039 --> 01:25:25.359
issued 11 letters to

01:25:25.359 --> 01:25:29.920
property owners within 200 feet of the subject property we

01:25:29.920 --> 01:25:32.199
received one and we

01:25:32.199 --> 01:25:37.649
actually issued 26 courtesy notices to properties within

01:25:37.649 --> 01:25:39.560
500 feet and we

01:25:39.560 --> 01:25:44.859
received one response in favor of the of the request which

01:25:44.859 --> 01:25:46.800
that fell in the 500

01:25:46.800 --> 01:25:50.939
foot buffer the applicant didn't did not hold the

01:25:50.939 --> 01:25:51.960
neighborhood meeting but they

01:25:51.960 --> 01:25:58.310
did contact the area HOA's who had no objections to the

01:25:58.310 --> 01:26:01.439
request so in summary

01:26:01.439 --> 01:26:05.239
CMG we filled CMG is consistent with the goals and

01:26:05.239 --> 01:26:07.439
objectives of the den 20 2030

01:26:07.439 --> 01:26:11.550
plan it's compatible with the surrounding property in terms

01:26:11.550 --> 01:26:11.840
of

01:26:11.840 --> 01:26:15.020
permitted density in the uses that would be allowed and

01:26:15.020 --> 01:26:16.000
therefore we recommend

01:26:16.000 --> 01:26:19.170
approval so that concludes my presentation and I will stand

01:26:19.170 --> 01:26:19.319
for

01:26:19.319 --> 01:26:21.600
questions

01:26:23.319 --> 01:26:27.920
I don't see any questions thank you okay this is a public

01:26:27.920 --> 01:26:29.279
hearing anyone who would

01:26:29.279 --> 01:26:31.869
like to speak on this item please come forward at this time

01:26:31.869 --> 01:26:34.079
I do not have any

01:26:34.079 --> 01:26:36.899
cards wishing to speak but again this is a public hearing

01:26:36.899 --> 01:26:38.039
anyone who would like

01:26:38.039 --> 01:26:42.670
to speak on this item please come forward seeing none will

01:26:42.670 --> 01:26:43.399
close the

01:26:43.399 --> 01:26:47.960
public hearing and open the floor for discussion or emotion

01:26:47.960 --> 01:26:48.880
Commissioner Ellis

01:26:48.880 --> 01:26:55.510
thank you chair I move approval of a z 1727 a Commissioner

01:26:55.510 --> 01:26:57.199
Sanchez okay I have

01:26:57.199 --> 01:27:02.560
a first and a second for approval any further discussion

01:27:02.560 --> 01:27:04.600
seeing none I'll call

01:27:04.600 --> 01:27:07.359
for a vote on the board

01:27:12.359 --> 01:27:14.939
that motion will carry six to zero we'll move us to our

01:27:14.939 --> 01:27:17.760
next item on our agenda

01:27:17.760 --> 01:27:24.319
I'm going to open the public hearing for z 17 - 0 0 0 3 a

01:27:24.319 --> 01:27:26.439
we'll call on Haley for

01:27:26.439 --> 01:27:29.159
presentation

01:27:41.119 --> 01:27:41.260
good evening and as we did at work session I'll do one

01:27:41.260 --> 01:27:45.119
presentation for

01:27:45.119 --> 01:27:48.039
both the rezoning and the SUP request but it would require

01:27:48.039 --> 01:27:49.159
two separate motions

01:27:49.159 --> 01:27:55.010
and votes all right so this is case z 17 3 and s 17 11 for

01:27:55.010 --> 01:27:55.699
the Coventry two

01:27:55.699 --> 01:27:59.720
apartments as I mentioned there are two separate requests

01:27:59.720 --> 01:28:00.640
the first being a

01:28:00.640 --> 01:28:03.649
rezoning from community mixed-use general to neighborhood

01:28:03.649 --> 01:28:04.359
residential

01:28:04.359 --> 01:28:07.579
mixed-use district and the second aspect of the request if

01:28:07.579 --> 01:28:08.239
the rezoning is

01:28:08.239 --> 01:28:10.819
approved would be for a specific use permit to allow for

01:28:10.819 --> 01:28:11.520
multifamily

01:28:11.520 --> 01:28:14.770
residential use on the property you can see two boundaries

01:28:14.770 --> 01:28:15.920
outlined here on the

01:28:15.920 --> 01:28:18.609
map the red boundary is the boundary of the rezoning so it

01:28:18.609 --> 01:28:20.239
's 11.42 acres and

01:28:20.239 --> 01:28:24.689
then the yellow boundary within that is the 10.68 acres for

01:28:24.689 --> 01:28:25.760
the SUP requests

01:28:25.760 --> 01:28:27.989
which excludes an existing office building on the south

01:28:27.989 --> 01:28:28.479
side of the

01:28:28.479 --> 01:28:33.039
property and for reference we have I 35 to the north of the

01:28:33.039 --> 01:28:34.000
property Sam bass

01:28:34.000 --> 01:28:38.560
forms the western boundary and Londonderry Lane is on the

01:28:38.560 --> 01:28:40.340
south side to

01:28:40.340 --> 01:28:42.920
look at the rezoning request first we have the existing

01:28:42.920 --> 01:28:43.920
zoning map on the left

01:28:43.920 --> 01:28:47.430
you see it's the whole area is primarily zone CMG and then

01:28:47.430 --> 01:28:48.319
on the right would be

01:28:48.319 --> 01:28:52.880
the proposed zoning map if this request for NRM you is

01:28:52.880 --> 01:28:54.760
approved there are two

01:28:54.760 --> 01:28:56.859
criteria for approval isn't of an SUP as Shandrian

01:28:56.859 --> 01:28:58.039
mentioned the first being

01:28:58.039 --> 01:29:00.279
conformance with the future land use plan and the second

01:29:00.279 --> 01:29:00.760
being the

01:29:00.760 --> 01:29:05.140
facilitation of public infrastructure looking at the first

01:29:05.140 --> 01:29:05.800
of those two

01:29:05.800 --> 01:29:08.560
components the future land use for this area is community

01:29:08.560 --> 01:29:09.520
mixed-use which is

01:29:09.520 --> 01:29:12.369
intended to promote a mixture of commercial residential and

01:29:12.369 --> 01:29:13.039
service uses

01:29:13.039 --> 01:29:16.470
NRM you we found to be generally consistent with this it's

01:29:16.470 --> 01:29:16.739
very

01:29:16.739 --> 01:29:19.560
comparable to CMG in terms of the scale of development as

01:29:19.560 --> 01:29:20.520
well as the type of

01:29:20.520 --> 01:29:22.750
development there it allows for a wide mixture of

01:29:22.750 --> 01:29:24.119
residential and commercial

01:29:24.119 --> 01:29:29.430
uses looking at the existing public infrastructure there

01:29:29.430 --> 01:29:30.920
there are existing

01:29:30.920 --> 01:29:32.880
water and sewer lines in the area that would be available

01:29:32.880 --> 01:29:33.680
for the development

01:29:33.680 --> 01:29:37.819
with possibly some internal extensions required Sam bass

01:29:37.819 --> 01:29:39.159
and Londonderry are

01:29:39.159 --> 01:29:42.729
both currently two lane undivided roads they are commercial

01:29:42.729 --> 01:29:44.000
mixed-use collectors

01:29:44.000 --> 01:29:47.310
which means that they're intended to stay two lane undivid

01:29:47.310 --> 01:29:48.220
ed but with the

01:29:48.220 --> 01:29:50.899
availability for parking and sidewalks on the side of the

01:29:50.899 --> 01:29:51.560
roads and any

01:29:51.560 --> 01:29:54.449
dedications or improvements for this development would be

01:29:54.449 --> 01:29:55.399
done either at the

01:29:55.399 --> 01:29:57.979
time that they replat that if they replat the property or

01:29:57.979 --> 01:29:58.680
when they get to

01:29:58.680 --> 01:30:04.340
site plan looking at some other compatibility factors here

01:30:04.340 --> 01:30:04.619
as I

01:30:04.619 --> 01:30:07.289
mentioned we did find NRM you to be consistent with the

01:30:07.289 --> 01:30:08.279
existing zoning in

01:30:08.279 --> 01:30:11.039
many ways a lot coverage building height landscaping

01:30:11.039 --> 01:30:12.399
requirements are all the

01:30:12.399 --> 01:30:15.720
same between these two districts and I also wanted to point

01:30:15.720 --> 01:30:16.479
out that the

01:30:16.479 --> 01:30:19.439
proposed use for multifamily is permitted under the current

01:30:19.439 --> 01:30:20.039
zoning the

01:30:20.039 --> 01:30:23.029
intent of the request is to get rid of a limitation that

01:30:23.029 --> 01:30:24.279
exists within CMG that

01:30:24.279 --> 01:30:27.300
requires ground floor commercial development ground floor

01:30:27.300 --> 01:30:27.939
commercial

01:30:27.939 --> 01:30:30.630
would probably be tricky in this location given how far it

01:30:30.630 --> 01:30:31.119
is off the

01:30:31.119 --> 01:30:34.189
freeway and the existing development pattern because we

01:30:34.189 --> 01:30:35.199
have multifamily on

01:30:35.199 --> 01:30:38.359
almost all sides and then industrial with the Acme brick

01:30:38.359 --> 01:30:39.420
plant on the

01:30:39.420 --> 01:30:44.319
opposite side of Sam Bass with that staff is recommending

01:30:44.319 --> 01:30:45.239
approval of the

01:30:45.239 --> 01:30:47.670
rezoning request because of this consistency with the goals

01:30:47.670 --> 01:30:47.880
and

01:30:47.880 --> 01:30:52.439
objectives of the Denton plan 2030 the second aspect of the

01:30:52.439 --> 01:30:53.039
request then

01:30:53.039 --> 01:30:55.609
pending approval of the rezoning would be for the specific

01:30:55.609 --> 01:30:56.359
use permit for the

01:30:56.359 --> 01:31:00.329
multifamily use when we look at an SUP request we look for

01:31:00.329 --> 01:31:00.960
general

01:31:00.960 --> 01:31:03.619
compatibility between the use that's proposed and the

01:31:03.619 --> 01:31:04.960
surrounding property in

01:31:04.960 --> 01:31:08.569
terms of no impediments to development of other properties

01:31:08.569 --> 01:31:09.520
in the area and

01:31:09.520 --> 01:31:14.079
nuisance generation potential and things of that nature so

01:31:14.079 --> 01:31:15.960
this is the concept

01:31:15.960 --> 01:31:18.529
plan that's been proposed for this development this would

01:31:18.529 --> 01:31:19.119
be the second

01:31:19.119 --> 01:31:22.210
phase of an existing apartment complex it's to the east of

01:31:22.210 --> 01:31:23.159
the property for

01:31:23.159 --> 01:31:26.659
reference on this map it would be here on the the top side

01:31:26.659 --> 01:31:27.880
so you can see this

01:31:27.880 --> 01:31:30.939
existing driveway would allow connectivity between the two

01:31:30.939 --> 01:31:31.439
phases of

01:31:31.439 --> 01:31:36.390
the apartment complex this plan shows 283 units a mixture

01:31:36.390 --> 01:31:37.439
of one two and three

01:31:37.439 --> 01:31:41.550
bedrooms that puts it at around 26 dwelling units per acre

01:31:41.550 --> 01:31:42.399
for density

01:31:42.399 --> 01:31:45.239
which is well below that maximum of 30 that they would have

01:31:45.239 --> 01:31:46.399
under NRM you if

01:31:46.399 --> 01:31:49.520
the rezoning is approved you can see six buildings laid out

01:31:49.520 --> 01:31:50.760
here mixture of three

01:31:50.760 --> 01:31:53.649
and four stories in height one of the key features of the

01:31:53.649 --> 01:31:54.840
site being that each

01:31:54.840 --> 01:31:58.800
one of these buildings is designed in an L shape with a

01:31:58.800 --> 01:32:00.119
common area with

01:32:00.119 --> 01:32:02.399
landscaping and a kind of a courtyard effect for each

01:32:02.399 --> 01:32:03.520
building so they do have

01:32:03.520 --> 01:32:09.159
about 38% landscaping overall as it's proposed we found

01:32:09.159 --> 01:32:09.800
this request to be

01:32:09.800 --> 01:32:12.739
consistent with the Denton plan 2030 both for that future

01:32:12.739 --> 01:32:13.760
land use designation

01:32:13.760 --> 01:32:17.479
and for the fact that our our comprehensive plan calls for

01:32:17.479 --> 01:32:17.840
higher

01:32:17.840 --> 01:32:21.270
density housing to be provided in areas that don't impact

01:32:21.270 --> 01:32:22.399
existing single-family

01:32:22.399 --> 01:32:24.720
neighborhoods and as we saw with this one that it's

01:32:24.720 --> 01:32:26.239
surrounded by like uses

01:32:26.239 --> 01:32:28.819
there wouldn't be any direct connectivity with single-

01:32:28.819 --> 01:32:29.720
family so it

01:32:29.720 --> 01:32:32.869
would limit any impacts that could occur there the use is

01:32:32.869 --> 01:32:34.319
consistent with the

01:32:34.319 --> 01:32:37.319
existing development pattern in the area and the site would

01:32:37.319 --> 01:32:38.399
be required to comply

01:32:38.399 --> 01:32:40.979
with all other components of the DDC in terms of tree

01:32:40.979 --> 01:32:42.279
preservation landscaping

01:32:42.279 --> 01:32:45.039
parking site lighting and those types of things and it

01:32:45.039 --> 01:32:46.079
would be generally

01:32:46.079 --> 01:32:48.840
unlikely to generate any nuisances because of its

01:32:48.840 --> 01:32:50.000
consistency with the

01:32:50.000 --> 01:32:54.560
surrounding development pattern notices were sent for this

01:32:54.560 --> 01:32:55.520
request for the local

01:32:55.520 --> 01:32:58.699
government code we received one response in favor from the

01:32:58.699 --> 01:32:59.960
former property owner

01:32:59.960 --> 01:33:02.859
for the southern portion of the tract and the applicant did

01:33:02.859 --> 01:33:03.199
hold a

01:33:03.199 --> 01:33:05.350
neighborhood meeting this past Monday and they had

01:33:05.350 --> 01:33:06.479
representatives from two

01:33:06.479 --> 01:33:11.079
nearby complexes that attended to see what the proposal was

01:33:11.079 --> 01:33:12.239
staff is

01:33:12.239 --> 01:33:15.430
recommending approval of the SUP with the condition that

01:33:15.430 --> 01:33:16.479
the site plan we saw

01:33:16.479 --> 01:33:19.409
tonight be considered conceptual in nature so they would

01:33:19.409 --> 01:33:19.760
still go through

01:33:19.760 --> 01:33:22.649
the full site plan submittal where all of the specifics of

01:33:22.649 --> 01:33:23.600
the site would be

01:33:23.600 --> 01:33:26.359
be nailed down to ensure compliance with the net and

01:33:26.359 --> 01:33:27.800
development code and with

01:33:27.800 --> 01:33:34.279
that I can stand for any questions any questions for having

01:33:34.279 --> 01:33:36.840
there you go

01:33:36.840 --> 01:33:41.989
Commissioner back thank you just as the owner here the

01:33:41.989 --> 01:33:43.600
applicant here and gonna

01:33:43.600 --> 01:33:47.720
speak to us tonight yes the applicant is here thank you

01:33:47.720 --> 01:33:52.279
have any other questions thank you having this is a public

01:33:52.279 --> 01:33:53.760
hearing so anyone

01:33:53.760 --> 01:33:56.119
who would like to speak on this item please come forward at

01:33:56.119 --> 01:33:56.760
this time I do

01:33:56.760 --> 01:34:02.609
not have any cards currently so believe it was stay the

01:34:02.609 --> 01:34:03.720
applicants here if the

01:34:03.720 --> 01:34:07.319
applicants here would you like to speak on this item

01:34:16.479 --> 01:34:21.199
I'm Josh I'm with Western Securities we've been here in

01:34:21.199 --> 01:34:23.439
Denton for since 2001

01:34:23.439 --> 01:34:28.000
we actually did a project called Coventry we love that

01:34:28.000 --> 01:34:29.079
project we really

01:34:29.079 --> 01:34:31.739
want to improve Denton as well it's we feel like this

01:34:31.739 --> 01:34:32.920
projects is going to

01:34:32.920 --> 01:34:36.500
improve the neighborhood around the existing project and we

01:34:36.500 --> 01:34:37.399
feel like this

01:34:37.399 --> 01:34:41.960
is a catalyst for us to be able to help develop the entire

01:34:41.960 --> 01:34:43.680
area as well do you

01:34:43.680 --> 01:34:47.199
have one question for you Commissioner Beck hey you chair

01:34:47.199 --> 01:34:48.159
Josh thanks for coming

01:34:48.159 --> 01:34:50.920
down and speaking and I like what I'm seeing pretty much

01:34:50.920 --> 01:34:52.319
too I'm one of those

01:34:52.319 --> 01:34:54.930
though that always hates to see trees go and I noticed in

01:34:54.930 --> 01:34:56.039
your conceptual plan

01:34:56.039 --> 01:34:59.779
you've got some big courtyards there so I'm just kind of

01:34:59.779 --> 01:35:01.279
hoping that when you

01:35:01.279 --> 01:35:04.539
come back with a site plans final that we'll see a lot a

01:35:04.539 --> 01:35:05.720
lot of areas there

01:35:05.720 --> 01:35:07.659
that you can salvage a lot of those trees I went over and

01:35:07.659 --> 01:35:08.439
looked at them today

01:35:08.439 --> 01:35:11.520
most of them are post oak they're native trees so what's

01:35:11.520 --> 01:35:12.840
your sentiment on that

01:35:12.840 --> 01:35:16.539
if you don't mind asking this this is not our first entry

01:35:16.539 --> 01:35:18.520
into a large tree

01:35:18.520 --> 01:35:22.270
saving community we actually believe in saving as many

01:35:22.270 --> 01:35:23.479
trees as possible I want

01:35:23.479 --> 01:35:28.579
to try and create a feeling of being in a park and not

01:35:28.579 --> 01:35:30.800
having where you can see

01:35:30.800 --> 01:35:34.390
from one unit to another across the street I want to

01:35:34.390 --> 01:35:35.439
actually create that

01:35:35.439 --> 01:35:40.869
that feeling of seeing life so that's something that I

01:35:40.869 --> 01:35:43.119
really try and strive

01:35:43.119 --> 01:35:49.479
to protect ultimately that's not really viable in every

01:35:49.479 --> 01:35:50.520
situation but I want to

01:35:50.520 --> 01:35:54.020
try and do as best I can for that yes good luck to you on

01:35:54.020 --> 01:35:56.199
that thank you I

01:35:56.199 --> 01:35:59.880
don't see any other questions thank you sir appreciate you

01:35:59.880 --> 01:36:01.479
again this is a public

01:36:01.479 --> 01:36:03.689
hearing anyone who would like to speak on this item please

01:36:03.689 --> 01:36:04.479
come forward at this

01:36:04.479 --> 01:36:10.520
time seeing none I'll close the public hearing and open the

01:36:10.520 --> 01:36:11.640
floor for discussion

01:36:11.640 --> 01:36:14.159
or emotion

01:36:16.479 --> 01:36:20.810
Commissioner Roselle I motion to approve the zoning agenda

01:36:20.810 --> 01:36:25.199
item Z 17 - 0 0 3 a

01:36:25.199 --> 01:36:29.239
Commissioner Beck second okay the first and the second for

01:36:29.239 --> 01:36:30.479
approval any other

01:36:30.479 --> 01:36:37.520
discussion seeing none I'll call for a vote on the board

01:36:45.800 --> 01:36:51.939
motions going to carry six to zero that item passes and we

01:36:51.939 --> 01:36:54.000
have a Richard at

01:36:54.000 --> 01:36:56.569
staff would like to make an announcement on C before I open

01:36:56.569 --> 01:36:57.119
it and make some

01:36:57.119 --> 01:37:00.939
clarifications if there is a recommendation to approve this

01:37:00.939 --> 01:37:01.880
item based

01:37:01.880 --> 01:37:04.829
on the condition I just wanted to add a sentence at the end

01:37:04.829 --> 01:37:06.600
just so there's it's

01:37:06.600 --> 01:37:10.829
clear moving forward and that would be but shall be in

01:37:10.829 --> 01:37:11.760
conformance with the

01:37:11.760 --> 01:37:14.029
concept plan as presented I think there was a there's a

01:37:14.029 --> 01:37:15.159
discussion last night at

01:37:15.159 --> 01:37:17.789
City Council as as to whether or not they're required to

01:37:17.789 --> 01:37:18.800
comply with with the

01:37:18.800 --> 01:37:21.050
concept plan that was always our intent but we just wanted

01:37:21.050 --> 01:37:21.680
to get it on the

01:37:21.680 --> 01:37:27.859
record so so it's clear that's all thank you for that

01:37:27.859 --> 01:37:30.920
clarification condition if

01:37:30.920 --> 01:37:34.189
we get to that point and with that I'm going to open the

01:37:34.189 --> 01:37:35.560
public hearing for s

01:37:35.560 --> 01:37:42.319
17 - 0 0 11 a we'll call on Haley for if we do a

01:37:42.319 --> 01:37:43.760
presentation or if we just take

01:37:43.760 --> 01:37:50.539
a vote on the SUP portion if there's anything you'd like me

01:37:50.539 --> 01:37:50.880
to run back

01:37:50.880 --> 01:37:56.539
through on the presentation I can okay all right well thank

01:37:56.539 --> 01:37:58.279
you for that and I

01:37:58.279 --> 01:38:01.710
will ask if there's any additional comments this is a

01:38:01.710 --> 01:38:02.760
public hearing I

01:38:02.760 --> 01:38:05.840
don't have any cards on this item so if there's anyone who

01:38:05.840 --> 01:38:07.000
would like to speak

01:38:07.000 --> 01:38:10.659
or if the applicant would like to address the additional

01:38:10.659 --> 01:38:11.920
clarification on

01:38:11.920 --> 01:38:15.060
the condition if there's any questions about that we happy

01:38:15.060 --> 01:38:15.840
to entertain that

01:38:15.840 --> 01:38:19.590
with you no okay with that I'm gonna close the public

01:38:19.590 --> 01:38:21.159
hearing and I will open

01:38:21.159 --> 01:38:25.279
the floor for discussion or motion

01:38:26.720 --> 01:38:30.149
Commissioner Ellis thank you chair I move approval of s 17

01:38:30.149 --> 01:38:31.800
11 a with staff's

01:38:31.800 --> 01:38:36.720
condition as stated so the condition we have in our agenda

01:38:36.720 --> 01:38:37.560
along with the

01:38:37.560 --> 01:38:41.399
clarification by Richard okay great Commissioner Sullivan

01:38:41.399 --> 01:38:42.760
okay we have a

01:38:42.760 --> 01:38:48.359
first and a second for approval any further discussion

01:38:48.359 --> 01:38:50.479
seeing now call for a

01:38:50.479 --> 01:38:53.079
vote on board

01:38:58.840 --> 01:39:05.369
motions going to carry six to zero that will move us to our

01:39:05.369 --> 01:39:07.800
item D and I'm

01:39:07.800 --> 01:39:13.649
going to open the public hearing for z 18 - 0 0 0 1 and

01:39:13.649 --> 01:39:15.800
this is the item that we

01:39:15.800 --> 01:39:20.159
will need a motion to continue and leave open

01:39:23.279 --> 01:39:28.680
Commissioner Roselle I motion to move agenda z 1 8 - 0 0 0

01:39:28.680 --> 01:39:30.039
1 postponed to a

01:39:30.039 --> 01:39:33.899
date certain of February 21st 2018 okay Commissioner Ellis

01:39:33.899 --> 01:39:34.680
thank you chair

01:39:34.680 --> 01:39:38.539
second we have a first and a second on this item and we are

01:39:38.539 --> 01:39:39.319
going to leave it

01:39:39.319 --> 01:39:44.119
open and I will call for a vote on board

01:39:48.840 --> 01:39:54.689
this motion is going to carry six to zero move us to item E

01:39:54.689 --> 01:39:56.159
we'll open the

01:39:56.159 --> 01:40:03.939
public hearing for DCA 18 - 0 0 0 1 we'll call on Haley for

01:40:03.939 --> 01:40:06.239
this presentation

01:40:15.479 --> 01:40:20.920
good evening this is case DCA 18 1 it's a proposed code

01:40:20.920 --> 01:40:22.880
update so the request

01:40:22.880 --> 01:40:25.020
before you is to hold a public hearing and consider making

01:40:25.020 --> 01:40:25.760
a recommendation

01:40:25.760 --> 01:40:28.659
to the City Council regarding a proposed revision to the

01:40:28.659 --> 01:40:29.760
Denton development code

01:40:29.760 --> 01:40:33.279
specifically to amend the limitations in subchapter 5 as it

01:40:33.279 --> 01:40:34.479
relates to mixed use

01:40:34.479 --> 01:40:38.590
development requirements for multifamily uses to give you a

01:40:38.590 --> 01:40:39.119
little

01:40:39.119 --> 01:40:42.300
background there are two limitations in the development

01:40:42.300 --> 01:40:43.520
code today that would

01:40:43.520 --> 01:40:46.439
apply to multifamily uses within our mixed use districts

01:40:46.439 --> 01:40:47.439
the first of those

01:40:47.439 --> 01:40:51.890
is limitation 4 which allows multifamily with either a

01:40:51.890 --> 01:40:53.199
specific use permit as

01:40:53.199 --> 01:40:55.779
part of a mixed use development or if it meets one of the

01:40:55.779 --> 01:40:57.000
other three criteria

01:40:57.000 --> 01:41:00.149
being part of a master plan development or previously

01:41:00.149 --> 01:41:01.399
approved as part of a

01:41:01.399 --> 01:41:05.779
small area plan the second limitation that applies along

01:41:05.779 --> 01:41:07.079
with L4 and several

01:41:07.079 --> 01:41:10.810
districts is limitation 6 that permits multifamily uses

01:41:10.810 --> 01:41:11.840
only on the second

01:41:11.840 --> 01:41:14.989
story and above when office retail or other permitted

01:41:14.989 --> 01:41:16.239
commercial uses are

01:41:16.239 --> 01:41:19.140
provided on the ground floor along any Avenue collector or

01:41:19.140 --> 01:41:21.439
arterial street if

01:41:21.439 --> 01:41:24.340
you have looked at our mobility plan those are our primary

01:41:24.340 --> 01:41:25.159
street types other

01:41:25.159 --> 01:41:28.270
than you know residential streets within subdivisions so

01:41:28.270 --> 01:41:30.239
this would apply in many

01:41:30.239 --> 01:41:35.600
locations so looking at how these two often apply together

01:41:35.600 --> 01:41:36.760
you'd see here that

01:41:36.760 --> 01:41:39.670
L4 applies in all of the mixed use districts so anywhere

01:41:39.670 --> 01:41:40.520
multifamily is

01:41:40.520 --> 01:41:45.079
permitted outside of the downtown districts L4 applies

01:41:45.079 --> 01:41:46.399
limitation 6 is

01:41:46.399 --> 01:41:49.239
added in four of the districts the community mixed use

01:41:49.239 --> 01:41:50.319
districts and then

01:41:50.319 --> 01:41:55.109
our regional center neighborhood and downtown districts as

01:41:55.109 --> 01:41:56.920
well what staff is

01:41:56.920 --> 01:42:00.350
proposing is to remove L6 from all four of those districts

01:42:00.350 --> 01:42:01.119
we're not proposing

01:42:01.119 --> 01:42:04.270
any changes to L4 it would remain in place L6 we would like

01:42:04.270 --> 01:42:05.000
to strike from

01:42:05.000 --> 01:42:08.609
all four districts where it currently applies in the past

01:42:08.609 --> 01:42:10.119
two years in 2016 and

01:42:10.119 --> 01:42:13.050
2017 we had five rezoning request as a result of this

01:42:13.050 --> 01:42:14.479
limitation we saw one of

01:42:14.479 --> 01:42:17.239
them here tonight but there have been countless other

01:42:17.239 --> 01:42:18.159
projects that haven't

01:42:18.159 --> 01:42:21.279
moved forward because of the requirement for ground floor

01:42:21.279 --> 01:42:23.239
commercial just to look

01:42:23.239 --> 01:42:25.819
at how this applies across the city it applies in our

01:42:25.819 --> 01:42:27.039
community mixed use in our

01:42:27.039 --> 01:42:30.350
regional center districts on the map here that would be the

01:42:30.350 --> 01:42:31.439
purple colors the

01:42:31.439 --> 01:42:34.550
kind of fuchsia colors and then the areas of light pink so

01:42:34.550 --> 01:42:35.800
you can see here

01:42:35.800 --> 01:42:39.090
out on the freeway and the loop we have a large area of

01:42:39.090 --> 01:42:40.439
this we have CMG along

01:42:40.439 --> 01:42:43.270
McKinney and University and then other pockets of the

01:42:43.270 --> 01:42:44.680
regional district here on

01:42:44.680 --> 01:42:47.699
the north side of the city primarily along the loop in the

01:42:47.699 --> 01:42:49.359
interstate our

01:42:49.359 --> 01:42:51.979
comprehensive plans and notes that we have a strong need

01:42:51.979 --> 01:42:52.880
for a diversity of

01:42:52.880 --> 01:42:55.850
housing types in Denton multifamily being a key one of

01:42:55.850 --> 01:42:56.880
those especially with

01:42:56.880 --> 01:43:00.939
our universities here and requiring ground floor commercial

01:43:00.939 --> 01:43:02.039
that would work

01:43:02.039 --> 01:43:05.079
best in walkable compact environments and areas out on the

01:43:05.079 --> 01:43:05.680
loop or on the

01:43:05.680 --> 01:43:10.239
freeway is a bit onerous and not always feasible for these

01:43:10.239 --> 01:43:12.079
developments so

01:43:12.079 --> 01:43:15.079
looking at how these apply I mentioned in the downtown

01:43:15.079 --> 01:43:16.119
multifamilies permitted by

01:43:16.119 --> 01:43:19.000
right but we do often see the type of development that L6

01:43:19.000 --> 01:43:19.640
is trying to

01:43:19.640 --> 01:43:23.390
achieve ground floor commercial as a market decision works

01:43:23.390 --> 01:43:24.000
well in the

01:43:24.000 --> 01:43:27.500
downtown where you have that compact urban environment so

01:43:27.500 --> 01:43:28.840
you see a couple of

01:43:28.840 --> 01:43:31.739
examples here on the right of how we have that development

01:43:31.739 --> 01:43:32.720
in downtown today

01:43:32.720 --> 01:43:35.350
on the bottom of the screen just to give you an example or

01:43:35.350 --> 01:43:37.199
a couple of sites one

01:43:37.199 --> 01:43:40.279
zone CMG that's on the loop and another one's own RC CD out

01:43:40.279 --> 01:43:41.279
on Brinker where

01:43:41.279 --> 01:43:44.039
the ground floor commercial would be required you can tell

01:43:44.039 --> 01:43:44.600
these are

01:43:44.600 --> 01:43:47.539
primarily auto oriented areas where people are not likely

01:43:47.539 --> 01:43:48.399
to be walking along

01:43:48.399 --> 01:43:52.850
the sidewalk going shopping at their neighborhood stores

01:43:52.850 --> 01:43:54.039
further wanted to

01:43:54.039 --> 01:43:57.039
point out as I mentioned earlier that L4 would still apply

01:43:57.039 --> 01:43:57.800
in all of these

01:43:57.800 --> 01:44:00.149
districts in any of our mixed-use districts there would

01:44:00.149 --> 01:44:00.840
still either be

01:44:00.840 --> 01:44:04.289
the requirement for multifamily to be part of mixed use so

01:44:04.289 --> 01:44:05.039
to be part of a

01:44:05.039 --> 01:44:07.800
larger development with three or more uses of which multif

01:44:07.800 --> 01:44:08.600
amily can only be

01:44:08.600 --> 01:44:12.710
one so commercial would be a requirement there or it would

01:44:12.710 --> 01:44:13.800
be required to have an

01:44:13.800 --> 01:44:16.239
SUP is like the case we saw before this so there would

01:44:16.239 --> 01:44:17.479
still be that high level

01:44:17.479 --> 01:44:21.380
of scrutiny on multifamily development in most of the city

01:44:21.380 --> 01:44:22.760
we did publish

01:44:22.760 --> 01:44:25.689
notification in the newspaper for this request and received

01:44:25.689 --> 01:44:26.560
no responses and

01:44:26.560 --> 01:44:30.810
staff is recommending approval and with that I can stand

01:44:30.810 --> 01:44:33.720
for any questions any

01:44:33.720 --> 01:44:38.609
questions for having I'll make a comment I'm glad to see

01:44:38.609 --> 01:44:39.960
this come before us

01:44:39.960 --> 01:44:43.229
because to your point we've had a lot of instances over the

01:44:43.229 --> 01:44:44.359
only the last year

01:44:44.359 --> 01:44:47.319
but prior to this on this item and I think it's a good

01:44:47.319 --> 01:44:48.720
change and I'm glad to

01:44:48.720 --> 01:44:52.979
see us clean this up and make life easier for everybody on

01:44:52.979 --> 01:44:53.720
this particular

01:44:53.720 --> 01:44:57.680
item so thank you for bringing this to us

01:44:59.199 --> 01:45:04.350
no more questions thank you Haley this is a public hearing

01:45:04.350 --> 01:45:05.199
so anyone who would

01:45:05.199 --> 01:45:07.789
like to speak on this item please come forward at this time

01:45:07.789 --> 01:45:09.439
I do not have any

01:45:09.439 --> 01:45:14.590
carts here before me to call on someone so again this is a

01:45:14.590 --> 01:45:16.159
public hearing

01:45:16.960 --> 01:45:20.479
seeing none I'll close the public hearing and open the

01:45:20.479 --> 01:45:21.520
floor for discussion

01:45:21.520 --> 01:45:26.560
or emotion Commissioner Ellis thank you chair I will

01:45:26.560 --> 01:45:28.680
happily move approval of DCA

01:45:28.680 --> 01:45:33.829
18 1 Commissioner back I agree this is a good move I second

01:45:33.829 --> 01:45:35.159
the motion we have a

01:45:35.159 --> 01:45:40.460
first and a second for approval any further discussion

01:45:40.460 --> 01:45:42.800
seeing none we'll call

01:45:42.800 --> 01:45:45.600
for a vet on the board

01:45:49.840 --> 01:45:54.630
motions going to carry six to zero that will take us to

01:45:54.630 --> 01:45:57.319
item F at this time I'm

01:45:57.319 --> 01:46:03.300
going to open the public hearing for DCA 17 - 0 0 1 1 and

01:46:03.300 --> 01:46:05.399
we'll call on Deborah

01:46:05.399 --> 01:46:08.600
here for presentation

01:46:17.359 --> 01:46:19.750
good evening Commission my name is Deborah beer and with

01:46:19.750 --> 01:46:20.920
the environmental

01:46:20.920 --> 01:46:24.619
services tonight we are bringing forward as a public

01:46:24.619 --> 01:46:25.640
hearing the proposed

01:46:25.640 --> 01:46:30.199
revisions to sub chapter 17 and for the past two pence

01:46:30.199 --> 01:46:31.520
meetings we have been

01:46:31.520 --> 01:46:35.350
having a discussion in details about what they are my

01:46:35.350 --> 01:46:36.760
presentation tonight is

01:46:36.760 --> 01:46:40.859
going to be you know that the general concepts behind and

01:46:40.859 --> 01:46:42.159
then we will zoom

01:46:42.159 --> 01:46:46.720
in into the proposed changes to the alternative ESA plan

01:46:46.720 --> 01:46:47.960
approval criteria

01:46:47.960 --> 01:46:50.920
if that's okay with the Commission sure just a question are

01:46:50.920 --> 01:46:51.880
we going to do like

01:46:51.880 --> 01:46:55.590
a page turn of the actual ordinance is that part of your

01:46:55.590 --> 01:46:57.840
presentation no no

01:46:57.840 --> 01:47:01.500
well what I was planning and just to go over the why the

01:47:01.500 --> 01:47:02.720
changes are needed and

01:47:02.720 --> 01:47:06.239
so forth then highlights the substantial changes and naming

01:47:06.239 --> 01:47:07.399
one by one and then

01:47:07.399 --> 01:47:15.239
discuss in detail the last one perfect okay sure thank you

01:47:20.520 --> 01:47:25.460
so if you excuse me sometimes I would kind of skip between

01:47:25.460 --> 01:47:26.720
slides but

01:47:26.720 --> 01:47:30.439
hopefully you can bear with me currently the development

01:47:30.439 --> 01:47:31.800
code provides protection

01:47:31.800 --> 01:47:35.020
for four type of environmental sensitivities area those are

01:47:35.020 --> 01:47:35.399
flood

01:47:35.399 --> 01:47:38.939
plains which are further classifying to develop and unde

01:47:38.939 --> 01:47:40.840
veloped riparian buffers

01:47:40.840 --> 01:47:44.689
a water-related habitats and upland habitats the first

01:47:44.689 --> 01:47:45.880
three type of ESAs

01:47:45.880 --> 01:47:48.819
they tend to co-locate or be nested inside each other

01:47:48.819 --> 01:47:50.199
because the three are

01:47:50.199 --> 01:47:53.720
dependent on the presence for some period of time of water

01:47:53.720 --> 01:47:55.039
upland habitat

01:47:55.039 --> 01:48:04.720
those are more dry land driven habitat so why do we protect

01:48:04.720 --> 01:48:07.359
the ESAs first it

01:48:07.359 --> 01:48:12.039
really helps the city to actually meet the where MS4 permit

01:48:12.039 --> 01:48:13.239
MS4 stands for

01:48:13.239 --> 01:48:17.800
municipal separate storm sewer system that deals with the

01:48:17.800 --> 01:48:19.439
management of runoff

01:48:19.439 --> 01:48:22.989
and some water into the city having those areas that

01:48:22.989 --> 01:48:25.760
actually protects the

01:48:25.760 --> 01:48:30.319
the water bodies that filter all that pollution it is

01:48:30.319 --> 01:48:31.920
actually part of our MS

01:48:31.920 --> 01:48:38.319
MS4 permit with TCEQ that also allow us to meet our

01:48:38.319 --> 01:48:39.680
construction general permit

01:48:39.680 --> 01:48:43.739
with TCEQ when you have ESAs in your construction site and

01:48:43.739 --> 01:48:44.319
you preserve

01:48:44.319 --> 01:48:48.909
those you can actually use them as a best management

01:48:48.909 --> 01:48:51.399
practices the protection

01:48:51.399 --> 01:48:55.380
of ESAs especially the floodplain ESAs actually give us

01:48:55.380 --> 01:48:56.960
some points in the

01:48:56.960 --> 01:49:00.390
national floodplain insurance program those are program

01:49:00.390 --> 01:49:01.720
that based on how well

01:49:01.720 --> 01:49:06.279
the city managed the floodplain we can provide discounts

01:49:06.279 --> 01:49:07.720
towards the floodplain

01:49:07.720 --> 01:49:13.220
insurance owner so the better we do managing our floodplain

01:49:13.220 --> 01:49:14.239
the better

01:49:14.239 --> 01:49:17.630
insurance rate they can get so it is something that

01:49:17.630 --> 01:49:20.199
everybody benefits and

01:49:20.199 --> 01:49:26.720
the protection of ESAs is important for obtaining the sewer

01:49:26.720 --> 01:49:28.640
level ice wind city

01:49:28.640 --> 01:49:35.659
designation that we obtained in 2016 why are we proposing

01:49:35.659 --> 01:49:38.039
the revisions to sub

01:49:38.039 --> 01:49:42.600
chapter 17 first of all when the development code was

01:49:42.600 --> 01:49:43.920
written originally

01:49:43.920 --> 01:49:50.159
in 2002 many of the sub chapters had some sort of overlap

01:49:50.159 --> 01:49:51.119
and or hinges on

01:49:51.119 --> 01:49:54.029
the environmental sensitive area many of those chapters

01:49:54.029 --> 01:49:55.520
have been already revised

01:49:55.520 --> 01:50:00.310
however the correspond the citations and references were

01:50:00.310 --> 01:50:01.600
not carried through so

01:50:01.600 --> 01:50:05.779
right now we have some inconsistencies between sub chapter

01:50:05.779 --> 01:50:07.319
17 and other sections

01:50:07.319 --> 01:50:13.520
of the development code the development community have

01:50:13.520 --> 01:50:16.760
indicated to us that the

01:50:16.760 --> 01:50:20.189
code could benefit from improving the wording and phrasing

01:50:20.189 --> 01:50:21.079
so in that way is

01:50:21.079 --> 01:50:27.039
more understandable understandable is lacking clarity in

01:50:27.039 --> 01:50:29.680
some instances with

01:50:29.680 --> 01:50:34.539
that with the implementation of with the approval of the D

01:50:34.539 --> 01:50:39.439
DC back in 2002 the ESA

01:50:39.439 --> 01:50:43.239
were the first attempt policy wise to the protection of

01:50:43.239 --> 01:50:44.920
those areas many of

01:50:44.920 --> 01:50:48.989
those policies that were written at the time were not given

01:50:48.989 --> 01:50:49.479
clear

01:50:49.479 --> 01:50:54.039
implementation of it so one one example is the clustering

01:50:54.039 --> 01:50:54.960
development it is

01:50:54.960 --> 01:51:00.000
permitted but there's so much guidance on how to go by it

01:51:00.000 --> 01:51:04.239
have been over 15 16

01:51:04.239 --> 01:51:08.689
years since the adoption of the DDC it's time for all for

01:51:08.689 --> 01:51:09.960
us to revaluate those

01:51:09.960 --> 01:51:13.500
policies are they are they making sense do we need to

01:51:13.500 --> 01:51:15.239
change them or do we need

01:51:15.239 --> 01:51:19.010
to keep them and definitely we need to start considering

01:51:19.010 --> 01:51:20.159
new policies if

01:51:20.159 --> 01:51:24.470
necessary so it have been you know we have a fair try and

01:51:24.470 --> 01:51:25.720
if they are not

01:51:25.720 --> 01:51:30.529
working or their new things why not to consider those so

01:51:30.529 --> 01:51:33.479
this process of

01:51:33.479 --> 01:51:38.039
writing changes was better through the committee on the

01:51:38.039 --> 01:51:39.000
environment which is a

01:51:39.000 --> 01:51:42.989
subcommittee from the City Council we spent approximately

01:51:42.989 --> 01:51:44.560
13 months with the

01:51:44.560 --> 01:51:50.100
committee going step-by-step changes changes changes we

01:51:50.100 --> 01:51:52.119
organize all the

01:51:52.119 --> 01:51:57.640
co-revisions in four different categories corrections those

01:51:57.640 --> 01:51:58.420
were typos

01:51:58.420 --> 01:52:04.960
grammatical errors or simple references that were outdated

01:52:04.960 --> 01:52:06.640
the second was

01:52:06.640 --> 01:52:10.699
language clarification and the third was language addition

01:52:10.699 --> 01:52:11.640
the difference between

01:52:11.640 --> 01:52:15.069
the two is language clarification is the policies there we

01:52:15.069 --> 01:52:15.960
are not making changes

01:52:15.960 --> 01:52:19.460
to the policy whatsoever we are adding to what is out there

01:52:19.460 --> 01:52:20.079
to make it more

01:52:20.079 --> 01:52:23.979
clear code language additions we are not changing policy

01:52:23.979 --> 01:52:26.000
either but the initial

01:52:26.000 --> 01:52:30.880
wording have no go-by whatsoever so we are adding new

01:52:30.880 --> 01:52:32.279
language however the

01:52:32.279 --> 01:52:40.970
policy is intact and voices changes during this time we

01:52:40.970 --> 01:52:43.399
have vetted these

01:52:43.399 --> 01:52:49.359
changes through different platform medias we have sent

01:52:49.359 --> 01:52:51.279
emails to the

01:52:51.279 --> 01:52:56.239
development code through the web page we I did

01:52:56.239 --> 01:52:58.199
presentations when Clarion was

01:52:58.199 --> 01:53:03.600
doing the open house meetings about the rewrite of the DDC

01:53:03.600 --> 01:53:04.720
I partnered with

01:53:04.720 --> 01:53:08.399
them so in that way everybody had the opportunity to to see

01:53:08.399 --> 01:53:09.479
the two going

01:53:09.479 --> 01:53:15.840
together we also sent a email through the project doc so

01:53:15.840 --> 01:53:17.119
anybody who has been an

01:53:17.119 --> 01:53:20.590
applicant through the development process should have gone

01:53:20.590 --> 01:53:21.560
an email about

01:53:21.560 --> 01:53:26.979
the changes and inviting them to provide comments and we I

01:53:26.979 --> 01:53:28.920
have solicited input

01:53:28.920 --> 01:53:33.479
from local and out-of-town developers consultants and so

01:53:33.479 --> 01:53:35.319
forth at this point we

01:53:35.319 --> 01:53:40.680
have got up I believe 61 comments total from the different

01:53:40.680 --> 01:53:43.000
different people so

01:53:43.000 --> 01:53:49.579
and this public hearing was also advertised through the

01:53:49.579 --> 01:53:51.720
newspaper so what

01:53:51.720 --> 01:53:56.520
what I have done is highlight what are the most substantial

01:53:56.520 --> 01:53:57.399
changes and I'm

01:53:57.399 --> 01:54:01.300
going quickly through them so stop me if you need to go

01:54:01.300 --> 01:54:03.680
over those we are

01:54:03.680 --> 01:54:07.840
proposing to create a new ESA criteria manual the ESA

01:54:07.840 --> 01:54:08.800
criteria manual is a

01:54:08.800 --> 01:54:12.880
hopefully will provide guidance to the homeowner who

01:54:12.880 --> 01:54:14.800
happens to have an ESA on

01:54:14.800 --> 01:54:19.359
site but doesn't know how to manage them and also it will

01:54:19.359 --> 01:54:20.680
provide some technical

01:54:20.680 --> 01:54:24.640
guidance for the scientists and the biologists and the one

01:54:24.640 --> 01:54:25.199
put in a

01:54:25.199 --> 01:54:30.289
restoration program for ESA so we are trying to see to to

01:54:30.289 --> 01:54:31.560
try to provide some

01:54:31.560 --> 01:54:36.600
some guidance those are common questions that we have come

01:54:36.600 --> 01:54:37.800
across over and over

01:54:37.800 --> 01:54:41.039
you know we have the homeowner that doesn't have not not

01:54:41.039 --> 01:54:42.520
much or really

01:54:42.520 --> 01:54:46.510
interested in doing the right thing and we have the more

01:54:46.510 --> 01:54:48.920
technical people we

01:54:48.920 --> 01:54:51.869
have increased and expanded the credits given by

01:54:51.869 --> 01:54:54.039
preservation of ESAs currently

01:54:54.039 --> 01:54:57.720
the code talks about giving you credits for the landscape

01:54:57.720 --> 01:54:58.920
and tree ordinance

01:54:58.920 --> 01:55:02.180
however we have expanded those credits to also give you

01:55:02.180 --> 01:55:03.119
credit for the

01:55:03.119 --> 01:55:07.180
preservation of trees we have increased the ratio on those

01:55:07.180 --> 01:55:08.920
and also because we

01:55:08.920 --> 01:55:12.739
acknowledge that Denton is within two ecoregions one on the

01:55:12.739 --> 01:55:13.640
eastern side is

01:55:13.640 --> 01:55:16.609
where you see the crust timbers on the western side is the

01:55:16.609 --> 01:55:17.600
prairie which are

01:55:17.600 --> 01:55:21.189
dominated for more herbaceous plant we also want to

01:55:21.189 --> 01:55:23.079
acknowledge that and give

01:55:23.079 --> 01:55:27.880
them credit if you are preserving those habitats as well

01:55:27.880 --> 01:55:28.920
establish an appeal

01:55:28.920 --> 01:55:32.819
process for the ESA staff determination in the past 15

01:55:32.819 --> 01:55:35.960
years we have not have a

01:55:35.960 --> 01:55:40.529
process for which a applicant can challenge the staff

01:55:40.529 --> 01:55:42.279
determination about

01:55:42.279 --> 01:55:46.920
the presence or absence of ESA these process these new

01:55:46.920 --> 01:55:47.920
mechanism would allow

01:55:47.920 --> 01:55:54.210
that the designation and depiction of developed and unde

01:55:54.210 --> 01:55:55.039
veloped floodplain

01:55:55.039 --> 01:56:00.409
habitats and this is one of the major concern when the ESA

01:56:00.409 --> 01:56:02.000
map map was created

01:56:02.000 --> 01:56:07.100
back I would say in 2000 the designation the floodplain

01:56:07.100 --> 01:56:08.880
were designated and when

01:56:08.880 --> 01:56:12.699
we go back and see those especially in the western part of

01:56:12.699 --> 01:56:13.960
town you see a lot

01:56:13.960 --> 01:56:17.390
of switch between developed undeveloped and there's no

01:56:17.390 --> 01:56:19.000
inconsistency throughout

01:56:19.000 --> 01:56:24.460
and when you see that from an aerial standpoint the

01:56:24.460 --> 01:56:26.279
developed designation

01:56:26.279 --> 01:56:29.079
doesn't correspond to what is in the ground so we are

01:56:29.079 --> 01:56:30.680
proposing to maintain

01:56:30.680 --> 01:56:34.579
the designation what we are doing is changing the map are

01:56:34.579 --> 01:56:35.239
calling it

01:56:35.239 --> 01:56:39.800
everything floodplain ESA when the development is ready to

01:56:39.800 --> 01:56:40.800
happen we have a

01:56:40.800 --> 01:56:44.270
development proposal in our hands a staff will go out and

01:56:44.270 --> 01:56:44.840
make the

01:56:44.840 --> 01:56:48.060
determination of what is currently out there the applicant

01:56:48.060 --> 01:56:49.199
will always have the

01:56:49.199 --> 01:56:52.630
options to hire the own consultant to do it that is up to

01:56:52.630 --> 01:56:53.840
them however what we

01:56:53.840 --> 01:57:00.550
are trying to do is just to be consistent throughout the

01:57:00.550 --> 01:57:03.319
exception of

01:57:03.319 --> 01:57:06.750
roadways identified in the city thoroughfare plan from the

01:57:06.750 --> 01:57:07.319
limits of

01:57:07.319 --> 01:57:12.960
unfilled and vegetation disturbance something that comes to

01:57:12.960 --> 01:57:14.119
to your mind

01:57:14.119 --> 01:57:19.560
probably is the Ryan Meadows development where they were

01:57:19.560 --> 01:57:20.760
required to extend

01:57:20.760 --> 01:57:24.409
Creekdale through the floodplain on the southern part of

01:57:24.409 --> 01:57:25.560
the development

01:57:25.560 --> 01:57:31.430
unfortunately they we didn't have a provision to allow that

01:57:31.430 --> 01:57:32.119
to happen

01:57:32.119 --> 01:57:35.550
without them going through an alternative ESA plan this

01:57:35.550 --> 01:57:36.439
Commission

01:57:36.439 --> 01:57:41.000
have spoken and have shown interest in for that to be

01:57:41.000 --> 01:57:42.840
changed and we have

01:57:42.840 --> 01:57:47.399
incorporated what we have done is we have floodplain and

01:57:47.399 --> 01:57:48.119
repair and buffers

01:57:48.119 --> 01:57:51.159
most of the time the repair and buffer are nested inside

01:57:51.159 --> 01:57:52.760
the floodplain so we

01:57:52.760 --> 01:57:56.510
have make sure that is considered that that allowance is

01:57:56.510 --> 01:57:57.720
not only consistent

01:57:57.720 --> 01:58:00.890
through the floodplain but also within the repair and

01:58:00.890 --> 01:58:02.319
buffer and water related

01:58:02.319 --> 01:58:07.770
so that there should be a smooth pathway mitigation will be

01:58:07.770 --> 01:58:09.520
required they will

01:58:09.520 --> 01:58:12.100
have to restore that area that have been the vegetation

01:58:12.100 --> 01:58:13.039
have been removed and

01:58:13.039 --> 01:58:18.640
make sure that the slopes are consistent and they're not

01:58:18.640 --> 01:58:20.199
will not end up or

01:58:20.199 --> 01:58:22.779
resulting in erosion so but that mitigation will be

01:58:22.779 --> 01:58:23.680
approved at staff

01:58:23.680 --> 01:58:28.739
level so that will expedite it would make the process run

01:58:28.739 --> 01:58:30.079
smoothly and faster

01:58:30.079 --> 01:58:35.960
for the applicant the non-residential development to

01:58:35.960 --> 01:58:37.279
preserve 30% of

01:58:37.279 --> 01:58:40.710
cross timber upland habitat this is a change this is a

01:58:40.710 --> 01:58:42.560
major change in policy

01:58:42.560 --> 01:58:46.720
currently the DDC requires the preservation of 50% of the

01:58:46.720 --> 01:58:47.239
upland

01:58:47.239 --> 01:58:50.670
habitat for residential uses that includes multi-family

01:58:50.670 --> 01:58:51.680
single-family and

01:58:51.680 --> 01:58:57.720
do bless it however if you were to develop any non-resident

01:58:57.720 --> 01:58:58.840
ial use you don't

01:58:58.840 --> 01:59:03.399
have to preserve the upland habitat upland habitat

01:59:03.399 --> 01:59:04.199
preservation is a little

01:59:04.199 --> 01:59:08.479
bit different from tree code preservation mainly because

01:59:08.479 --> 01:59:09.119
what we're

01:59:09.119 --> 01:59:12.390
looking is the preservation of the of the habitat as a

01:59:12.390 --> 01:59:13.960
entire as a unit we are

01:59:13.960 --> 01:59:16.960
interested in in the trees but we're also interested in the

01:59:16.960 --> 01:59:17.840
understory and

01:59:17.840 --> 01:59:21.859
everything that goes with it why because for preserving

01:59:21.859 --> 01:59:23.079
that if you remove the

01:59:23.079 --> 01:59:27.640
understory from a habitat the chances are that the vi

01:59:27.640 --> 01:59:29.560
ability of the habitat to to

01:59:29.560 --> 01:59:34.359
last longer the benches so that's the reason why we while

01:59:34.359 --> 01:59:35.000
we are moving and

01:59:35.000 --> 01:59:38.079
again you have species that they don't climb up to the to

01:59:38.079 --> 01:59:39.039
the to the tree

01:59:39.039 --> 01:59:42.079
canopy they live on the bottom of that area so we are

01:59:42.079 --> 01:59:43.760
providing how the

01:59:43.760 --> 01:59:49.289
protection of the habitat as a whole and finally we are

01:59:49.289 --> 01:59:51.600
providing a criteria for

01:59:51.600 --> 01:59:55.130
approving an alternative ASAP and this is where I want to

01:59:55.130 --> 01:59:56.159
delve into more

01:59:56.159 --> 02:00:08.470
detail if you allow me back in when the DDC was first

02:00:08.470 --> 02:00:12.840
drafted the alternative ESA

02:00:12.840 --> 02:00:17.289
plan were envisioned to run parallel on the same process as

02:00:17.289 --> 02:00:18.079
an alternative

02:00:18.079 --> 02:00:21.939
development plan nowadays the development the alternative

02:00:21.939 --> 02:00:22.439
development

02:00:22.439 --> 02:00:26.050
plan comes to the planning and zoning Commission and gets

02:00:26.050 --> 02:00:27.159
the final approval

02:00:27.159 --> 02:00:30.979
before that and I will say approximately eight years ago AD

02:00:30.979 --> 02:00:32.000
Ps required the

02:00:32.000 --> 02:00:34.689
approval of a planning and zoning Commission and the

02:00:34.689 --> 02:00:35.600
approval of City

02:00:35.600 --> 02:00:39.460
Council very similar to a zoning change request that have

02:00:39.460 --> 02:00:42.439
changed and the city

02:00:42.439 --> 02:00:47.090
decide to keep to change the process for alternative ESA

02:00:47.090 --> 02:00:49.399
plan but to maintain

02:00:49.399 --> 02:00:53.960
the process for the alternative ESA plan meaning that

02:00:53.960 --> 02:00:55.439
alternative ESA plan have

02:00:55.439 --> 02:00:57.380
to go through the planning and zoning Commission get a

02:00:57.380 --> 02:00:58.319
recommendation and then

02:00:58.319 --> 02:01:00.899
move forward for final approval through the City Council

02:01:00.899 --> 02:01:02.560
however when you

02:01:02.560 --> 02:01:07.119
separated the two there was no criteria for alternative ESA

02:01:07.119 --> 02:01:08.920
plan so at this point

02:01:08.920 --> 02:01:12.350
even though a staff provide some guidance to applicant and

02:01:12.350 --> 02:01:13.039
to this body

02:01:13.039 --> 02:01:17.640
and City Council on the merits of the alternative ESA plan

02:01:17.640 --> 02:01:18.520
we want to

02:01:18.520 --> 02:01:22.180
officialize to formalize that process in that way you have

02:01:22.180 --> 02:01:23.479
a clear guidance to

02:01:23.479 --> 02:01:31.840
judge a proposal by so this is a complete new new change so

02:01:31.840 --> 02:01:34.000
this is the

02:01:34.000 --> 02:01:37.489
approval process the alternative ESA plan provides an

02:01:37.489 --> 02:01:39.100
option to address the

02:01:39.100 --> 02:01:41.680
regulations were in a flexible discretionary process

02:01:41.680 --> 02:01:42.359
utilizing the

02:01:42.359 --> 02:01:47.279
zoning amendment procedure outlines of chapter 3.4 that

02:01:47.279 --> 02:01:48.239
language have no

02:01:48.239 --> 02:01:51.449
change is the same that we currently have what is different

02:01:51.449 --> 02:01:52.239
is the criteria

02:01:52.239 --> 02:01:57.239
for approval you have heard me multiple times when I come

02:01:57.239 --> 02:01:58.359
and present before you

02:01:58.359 --> 02:02:04.239
about how staff the preferences for staff on mitigation I

02:02:04.239 --> 02:02:05.279
have always tell

02:02:05.279 --> 02:02:09.010
you that you work with what you have if you have a repair

02:02:09.010 --> 02:02:10.279
and buffer that you

02:02:10.279 --> 02:02:13.520
going to partially encroach on but you have more of that

02:02:13.520 --> 02:02:14.960
habitat go and take a

02:02:14.960 --> 02:02:18.779
look and see if you can make that habitat better it might

02:02:18.779 --> 02:02:20.039
be chances are

02:02:20.039 --> 02:02:23.000
that they will be so invasive species that could be removed

02:02:23.000 --> 02:02:24.479
that you can plant

02:02:24.479 --> 02:02:28.119
more native on it maybe that channel is already eroding if

02:02:28.119 --> 02:02:29.119
you stabilize the

02:02:29.119 --> 02:02:33.020
channel you are you are improving the chat the the habitat

02:02:33.020 --> 02:02:34.520
as a whole so my

02:02:34.520 --> 02:02:39.170
own what my first approach is work what you have and that's

02:02:39.170 --> 02:02:40.560
number two

02:02:40.560 --> 02:02:43.319
mitigation goals are obtained by preserving environmental

02:02:43.319 --> 02:02:44.119
sensitive area

02:02:44.119 --> 02:02:47.689
above the minimum requirement exchanges between different

02:02:47.689 --> 02:02:49.479
type of ESO installing

02:02:49.479 --> 02:02:53.130
pollution prevention controls and implementing best

02:02:53.130 --> 02:02:54.399
management practices

02:02:54.399 --> 02:02:57.510
or any other approaches that result in the improvement of

02:02:57.510 --> 02:02:58.720
the environment being

02:02:58.720 --> 02:03:02.819
impacted so before this I don't know if you remember Magn

02:03:02.819 --> 02:03:03.680
olia an apartment

02:03:03.680 --> 02:03:08.239
complex on Nottingham and mingle they exchange they

02:03:08.239 --> 02:03:09.500
impacted a repair and

02:03:09.500 --> 02:03:13.489
buffer in exchange they mitigated with preserving more open

02:03:13.489 --> 02:03:14.640
habitat that one

02:03:14.640 --> 02:03:18.829
they needed even though we are not talking apples to apples

02:03:18.829 --> 02:03:20.399
we try to what

02:03:20.399 --> 02:03:23.390
I call to find a common currency between the two type of

02:03:23.390 --> 02:03:24.840
habitat in that case we

02:03:24.840 --> 02:03:27.710
use the amount of trees preserve how many trees were

02:03:27.710 --> 02:03:30.239
removed by encroaching

02:03:30.239 --> 02:03:32.909
into the repair and buffer how much additional trees you

02:03:32.909 --> 02:03:34.039
are preserving so

02:03:34.039 --> 02:03:37.939
as long as we have some nexus between the two I think that

02:03:37.939 --> 02:03:38.600
that's a viable

02:03:38.600 --> 02:03:44.189
option sometimes you don't have that the only ESA that you

02:03:44.189 --> 02:03:45.199
have on site is the

02:03:45.199 --> 02:03:51.050
one that you are encroaching so in those instances because

02:03:51.050 --> 02:03:52.479
all those eases they

02:03:52.479 --> 02:03:58.640
provide a pollution control mechanism sometimes those

02:03:58.640 --> 02:04:01.479
pollution benefits could

02:04:01.479 --> 02:04:06.779
be obtained by the implementation of best management

02:04:06.779 --> 02:04:07.840
practices or some water

02:04:07.840 --> 02:04:12.560
controls so those are the we wanted to provide as much

02:04:12.560 --> 02:04:14.880
possibility as we could

02:04:14.880 --> 02:04:21.109
for applicants to provide mitigation and the last areas

02:04:21.109 --> 02:04:22.840
offer as a mitigation are

02:04:22.840 --> 02:04:26.810
linked to existing or plan open space of conserved area to

02:04:26.810 --> 02:04:28.239
provide an overall

02:04:28.239 --> 02:04:32.800
open space that language is already in the code it is under

02:04:32.800 --> 02:04:35.840
section 17.10 so

02:04:35.840 --> 02:04:39.390
what we have done many any many of that language that was

02:04:39.390 --> 02:04:40.680
in that section have

02:04:40.680 --> 02:04:45.880
been moved into this new section and made a criteria for

02:04:45.880 --> 02:04:46.560
approving an

02:04:46.560 --> 02:04:49.979
alternative ESA plan so that language is it we're just

02:04:49.979 --> 02:04:51.479
changing the position

02:04:51.479 --> 02:04:56.270
where it is in the code development is arranged for maxim

02:04:56.270 --> 02:04:57.560
izing access and

02:04:57.560 --> 02:05:01.470
utilization of the environments sensitive area by citizen

02:05:01.470 --> 02:05:03.239
that code that

02:05:03.239 --> 02:05:06.680
language is already in our code areas offers a mitigation

02:05:06.680 --> 02:05:07.800
or place either on a

02:05:07.800 --> 02:05:10.880
lot lots that incorporate permanent conservation in that

02:05:10.880 --> 02:05:12.600
language is already

02:05:12.600 --> 02:05:15.760
in the code we're just using it as a criteria for approval

02:05:15.760 --> 02:05:16.680
and the

02:05:16.680 --> 02:05:21.239
alternative ESA plan shall demonstrate that the developers

02:05:21.239 --> 02:05:21.920
alternative proposal

02:05:21.920 --> 02:05:25.470
results in a high quality development meeting the intent of

02:05:25.470 --> 02:05:26.520
the standard of

02:05:26.520 --> 02:05:29.960
the development code that is the only language that you

02:05:29.960 --> 02:05:31.439
currently have for the

02:05:31.439 --> 02:05:35.409
approval of alternative ESA plan so as you say it was a

02:05:35.409 --> 02:05:37.720
combination of options

02:05:37.720 --> 02:05:43.159
that we are wanting to provide the developers when they're

02:05:43.159 --> 02:05:44.560
contemplating

02:05:44.560 --> 02:05:49.119
applying for a alternative ESA plus you just using current

02:05:49.119 --> 02:05:50.199
language that is

02:05:50.199 --> 02:05:54.020
already in the code I just use it as a criteria so with

02:05:54.020 --> 02:05:57.279
that said we are in the

02:05:57.279 --> 02:06:03.439
process of making of actually creating the a criteria

02:06:03.439 --> 02:06:04.960
mental for ESA is not

02:06:04.960 --> 02:06:10.000
finished yet many of the comments that we have received

02:06:10.000 --> 02:06:11.319
from the development

02:06:11.319 --> 02:06:16.920
community could go into that or could guide the cut that to

02:06:16.920 --> 02:06:17.880
to finalize the

02:06:17.880 --> 02:06:26.239
content of the criteria manual so at this point the staff

02:06:26.239 --> 02:06:27.000
you have received

02:06:27.000 --> 02:06:31.560
copy of the compilation of the of the public input received

02:06:31.560 --> 02:06:32.800
I'm very happy

02:06:32.800 --> 02:06:38.220
with the with the active participation of the public there

02:06:38.220 --> 02:06:40.880
's good good comments

02:06:40.880 --> 02:06:44.000
that I would like to incorporate some of them could go

02:06:44.000 --> 02:06:45.960
straight to the criteria

02:06:45.960 --> 02:06:51.090
manual one comment that struck me and I wish I would have

02:06:51.090 --> 02:06:52.399
thought about it when

02:06:52.399 --> 02:06:55.319
when I was drafting the comment was to actually the

02:06:55.319 --> 02:06:56.800
definition of a water

02:06:56.800 --> 02:07:01.359
related habitat I think that the water related habitat

02:07:01.359 --> 02:07:02.640
definition is not clear

02:07:02.640 --> 02:07:08.319
enough and this new definition I think will help the the

02:07:08.319 --> 02:07:09.119
applicants and

02:07:09.119 --> 02:07:14.649
professionals when assessing those if you were interested

02:07:14.649 --> 02:07:17.119
that would be if you

02:07:17.119 --> 02:07:29.920
bear with me common number 28 on the list so it's pretty

02:07:29.920 --> 02:07:32.159
much saying that we

02:07:32.159 --> 02:07:37.479
need to include clearly stated that bottomland hardwoods

02:07:37.479 --> 02:07:40.840
should be are

02:07:40.840 --> 02:07:44.300
considered water related and I think that that addition it

02:07:44.300 --> 02:07:45.520
really clarifies

02:07:45.520 --> 02:07:50.079
for everybody this is not something new we are not

02:07:50.079 --> 02:07:52.199
expanding this is currently

02:07:52.199 --> 02:07:56.760
when somebody does a is a field assessment or when staff

02:07:56.760 --> 02:07:57.600
perform those

02:07:57.600 --> 02:08:00.720
assessment bottomlands that meet that criteria would also

02:08:00.720 --> 02:08:01.600
be considered so

02:08:01.600 --> 02:08:06.170
this is just putting it right in something that we are

02:08:06.170 --> 02:08:07.680
currently doing

02:08:09.159 --> 02:08:13.800
with that that concludes my presentation I'm available to

02:08:13.800 --> 02:08:15.560
answer any questions

02:08:15.560 --> 02:08:18.680
that you might have Commissioner bed thank you chair

02:08:18.680 --> 02:08:20.199
Deborah can you go back

02:08:20.199 --> 02:08:25.500
one slide with the writing in red just once like now okay

02:08:25.500 --> 02:08:26.600
number five it says

02:08:26.600 --> 02:08:30.100
there is offered as a mitigation or placed either in a lot

02:08:30.100 --> 02:08:30.800
or lots that

02:08:30.800 --> 02:08:34.250
incorporate a permanent conservation easement restricted co

02:08:34.250 --> 02:08:35.319
venants so on so

02:08:35.319 --> 02:08:41.699
is this suggesting that if we can't preserve enough trees

02:08:41.699 --> 02:08:42.880
in the developed

02:08:42.880 --> 02:08:47.800
area that we can find another parcel of land either nearby

02:08:47.800 --> 02:08:48.920
or maybe in some other

02:08:48.920 --> 02:08:54.119
parts of the city so we can conserve a certain percentage

02:08:54.119 --> 02:08:56.319
of tree canopy and

02:08:56.319 --> 02:09:01.840
upland habitat is that what that's suggesting that leave

02:09:01.840 --> 02:09:03.359
the door open for

02:09:03.359 --> 02:09:08.039
that option to happen I have been doing development review

02:09:08.039 --> 02:09:09.439
for 18 years and

02:09:09.439 --> 02:09:14.000
doing is as for over 10 and we have had a couple of

02:09:14.000 --> 02:09:16.079
instances where developer

02:09:16.079 --> 02:09:21.279
have tried that this the size of the preservation area

02:09:21.279 --> 02:09:22.680
matters especially

02:09:22.680 --> 02:09:25.319
because you wanted to put some sort of in some sort of

02:09:25.319 --> 02:09:26.880
conservation easement so

02:09:26.880 --> 02:09:30.960
if you are talking about less than one acre chances are

02:09:30.960 --> 02:09:31.880
that you will find

02:09:31.880 --> 02:09:35.510
somebody who might be interested in do a conservation area

02:09:35.510 --> 02:09:36.760
for one acre will be

02:09:36.760 --> 02:09:42.920
hard so what I'm saying is given that the right conditions

02:09:42.920 --> 02:09:44.720
given the right

02:09:44.720 --> 02:09:49.689
layers it is a possibility have not been done however I

02:09:49.689 --> 02:09:52.920
will not try to exclude

02:09:52.920 --> 02:09:56.579
that option because have not happened yet but that

02:09:56.579 --> 02:09:58.800
provision leave the door

02:09:58.800 --> 02:10:02.619
open for that to happen and that would probably suggest

02:10:02.619 --> 02:10:03.520
that the city get

02:10:03.520 --> 02:10:09.380
involved financially to cover that causes that probably

02:10:09.380 --> 02:10:10.640
true to or are

02:10:10.640 --> 02:10:13.220
there other ways in other words if we're gonna you know

02:10:13.220 --> 02:10:14.760
well no I take that back

02:10:14.760 --> 02:10:18.579
the developer would come in to play their own part of that

02:10:18.579 --> 02:10:19.720
but we'd have to

02:10:19.720 --> 02:10:24.670
set some kind of areas aside that within the city that I

02:10:24.670 --> 02:10:26.279
guess this Commission

02:10:26.279 --> 02:10:31.310
City Council could agree on well if you're referring as a

02:10:31.310 --> 02:10:32.359
creating a

02:10:32.359 --> 02:10:38.000
mitigation bank where developers can go and purchase that

02:10:38.000 --> 02:10:40.079
right now if we use

02:10:40.079 --> 02:10:43.560
the example that the Court of Engineer uses for wetland

02:10:43.560 --> 02:10:45.319
mitigation those are

02:10:45.319 --> 02:10:49.880
actually probably owned by entities okay and they have

02:10:49.880 --> 02:10:51.399
aside those areas that

02:10:51.399 --> 02:10:55.319
provide the half wetlands and things like that and then the

02:10:55.319 --> 02:10:56.439
developer goes

02:10:56.439 --> 02:11:00.489
like they will go to any other bank and say I'm interesting

02:11:00.489 --> 02:11:01.920
on purchasing from

02:11:01.920 --> 02:11:05.649
you X number of credit the number of credits are determined

02:11:05.649 --> 02:11:06.479
by the Court of

02:11:06.479 --> 02:11:13.060
Engineers based on the proposed meeting impact so and have

02:11:13.060 --> 02:11:15.399
worked so far is a

02:11:15.399 --> 02:11:19.960
private driven market to be honest with you where they

02:11:19.960 --> 02:11:21.800
establish the the price

02:11:21.800 --> 02:11:26.859
for those units and so far so at this point I don't know if

02:11:26.859 --> 02:11:27.840
the city will

02:11:27.840 --> 02:11:33.130
entertain the idea to actually create a bank like that but

02:11:33.130 --> 02:11:34.840
I would say I will

02:11:34.840 --> 02:11:38.470
not say that it's not possible but the that option if

02:11:38.470 --> 02:11:40.199
somebody happens to have

02:11:40.199 --> 02:11:45.600
to see that as a more credible idea somebody can pursue it

02:11:45.600 --> 02:11:46.760
they could be a

02:11:46.760 --> 02:11:51.319
part of future discussion definitely okay okay thank you

02:11:51.319 --> 02:11:52.199
Commissioner Rizzo

02:11:52.199 --> 02:11:54.779
thank you chair thank you Deborah for the presentation I

02:11:54.779 --> 02:11:56.720
need to hopefully get

02:11:56.720 --> 02:11:58.750
some clarification before I ask a question can you go back

02:11:58.750 --> 02:11:59.199
to your very

02:11:59.199 --> 02:12:03.039
first slide where it talked about the reasons or the

02:12:03.039 --> 02:12:06.560
motives for this

02:12:08.720 --> 02:12:20.039
no no no one more it talked about MS4 okay so these four

02:12:20.039 --> 02:12:21.319
items listed here are

02:12:21.319 --> 02:12:26.960
all economic benefits to the city I'm wondering is the sole

02:12:26.960 --> 02:12:29.119
intent and motive

02:12:29.119 --> 02:12:33.699
behind this manual to protect the economics of the city or

02:12:33.699 --> 02:12:35.039
to protect the

02:12:35.039 --> 02:12:39.090
actual habitats found in S to the B because as you

02:12:39.090 --> 02:12:42.000
mentioned the four items that are

02:12:42.000 --> 02:12:45.079
adding value to the city you're not mentioning tree canopy

02:12:45.079 --> 02:12:46.359
critters birds

02:12:46.359 --> 02:12:49.460
any of that listed here it's all economic value so I'm

02:12:49.460 --> 02:12:50.520
wondering if you

02:12:50.520 --> 02:12:54.569
can clarify the city's motive in all of this and I

02:12:54.569 --> 02:12:57.159
apologize that one of the

02:12:57.159 --> 02:13:01.210
slides that I that I skipped was actually the six basic

02:13:01.210 --> 02:13:02.199
functions of

02:13:02.199 --> 02:13:06.000
environmental sensitive area first is to provide habitat

02:13:06.000 --> 02:13:07.720
and most of the time is

02:13:07.720 --> 02:13:13.020
is their methods to quantify that in a monotonous way to

02:13:13.020 --> 02:13:14.760
provide some because

02:13:14.760 --> 02:13:17.979
most of the time what they they do is how much it will take

02:13:17.979 --> 02:13:18.880
for us to mimic

02:13:18.880 --> 02:13:23.439
that habitat and we can make those those numbers but

02:13:23.439 --> 02:13:24.640
sometimes it is hard to

02:13:24.640 --> 02:13:29.479
quantify that so by preserving is as we are preserving

02:13:29.479 --> 02:13:30.399
habitat which is a

02:13:30.399 --> 02:13:35.279
benefit not only for the wildlife but for for for for us

02:13:35.279 --> 02:13:37.239
surface as a conduit

02:13:37.239 --> 02:13:41.689
all those these are allows that the the wildlife the plants

02:13:41.689 --> 02:13:43.119
the material to move

02:13:43.119 --> 02:13:47.760
from point A to point B it works as a barrier for example

02:13:47.760 --> 02:13:48.479
sedimentation

02:13:48.479 --> 02:13:52.189
pollutants it stops that even hydrocarbons when we have a

02:13:52.189 --> 02:13:52.880
spill and

02:13:52.880 --> 02:13:56.439
that hydrocarbons is allowed to go through some sort of

02:13:56.439 --> 02:13:57.840
grassy area all of

02:13:57.840 --> 02:14:02.720
that hydrocarbons are captured by the by the vegetation

02:14:02.720 --> 02:14:04.279
filter pollutants

02:14:04.279 --> 02:14:09.640
sediments is a pollutant source of resources and provide

02:14:09.640 --> 02:14:10.760
supply like

02:14:10.760 --> 02:14:15.319
organic matter nutrients and aquifer recharge all the

02:14:15.319 --> 02:14:16.359
vegetation that you see

02:14:16.359 --> 02:14:20.920
a lone Creek all the foliage that falls into the water

02:14:20.920 --> 02:14:23.520
those are actually the

02:14:23.520 --> 02:14:27.340
food that the creature downstream are going to use to feed

02:14:27.340 --> 02:14:28.359
from and those

02:14:28.359 --> 02:14:33.409
creatures are the food of fish and then you can see how how

02:14:33.409 --> 02:14:35.079
the chain progresses

02:14:35.079 --> 02:14:41.899
all the way to to us and it's a source of resources we have

02:14:41.899 --> 02:14:44.520
our one of the one

02:14:44.520 --> 02:14:48.260
of our sort of portable water is Lake Lewisville so the

02:14:48.260 --> 02:14:50.460
cleaner we we keep the

02:14:50.460 --> 02:14:54.029
water going to discharge into the lake the less treatment

02:14:54.029 --> 02:14:55.640
that we are having to

02:14:55.640 --> 02:14:59.899
provide to make that water portable and sink and sequest

02:14:59.899 --> 02:15:01.399
ration of pollutant

02:15:01.399 --> 02:15:05.579
carbon would be one of those that have been linked to the

02:15:05.579 --> 02:15:07.720
climate change so

02:15:07.720 --> 02:15:12.840
those are the more environmental functions that we get out

02:15:12.840 --> 02:15:13.319
of it

02:15:13.319 --> 02:15:19.810
interesting enough is approximately over 50% of the tree

02:15:19.810 --> 02:15:22.000
canopy in the in the

02:15:22.000 --> 02:15:31.109
city is within some sort of ESA so just by 50% of the tree

02:15:31.109 --> 02:15:32.800
canopy is within some

02:15:32.800 --> 02:15:37.800
sort of ESA so just by preserving the ESA we also

02:15:37.800 --> 02:15:40.279
maintaining our tree canopy

02:15:40.279 --> 02:15:43.710
for the city which is something that the community have

02:15:43.710 --> 02:15:45.239
rated highly important

02:15:45.239 --> 02:15:49.689
for them so those are the the the environmentally more

02:15:49.689 --> 02:15:50.760
driven reasons to

02:15:50.760 --> 02:15:55.319
why to maintain but there are more pragmatic uses to also

02:15:55.319 --> 02:15:56.359
preserve ESAs and

02:15:56.359 --> 02:16:01.159
those are for compliance with permitting improving our

02:16:01.159 --> 02:16:02.840
score in the floodplain

02:16:02.840 --> 02:16:07.659
management so forth so a little bit of more less

02:16:07.659 --> 02:16:10.159
quantitative and the other

02:16:10.159 --> 02:16:13.710
sides more quantitative so thank you very much I really

02:16:13.710 --> 02:16:14.840
appreciate that and

02:16:14.840 --> 02:16:18.270
and based on on those six things just to bring back what I

02:16:18.270 --> 02:16:19.520
talked about in work

02:16:19.520 --> 02:16:22.680
session it seems like we would want to protect these six

02:16:22.680 --> 02:16:23.800
things regardless of

02:16:23.800 --> 02:16:28.920
the use going into the property in the new rules it's 50%

02:16:28.920 --> 02:16:29.720
for residential and

02:16:29.720 --> 02:16:33.200
30% for non-residential and talking to staff I understand

02:16:33.200 --> 02:16:34.399
that non-residential

02:16:34.399 --> 02:16:37.290
does have landscape requirements and barriers that they do

02:16:37.290 --> 02:16:37.959
add but those

02:16:37.959 --> 02:16:42.520
aren't creating SS those are function of some beaut

02:16:42.520 --> 02:16:44.760
ification of the property and

02:16:44.760 --> 02:16:47.520
I would say residential property owners want to put trees

02:16:47.520 --> 02:16:48.559
in their front yards

02:16:48.559 --> 02:16:50.500
and they have landscaping around there in front of the

02:16:50.500 --> 02:16:51.239
house and in their

02:16:51.239 --> 02:16:56.930
backyard and so I I think those should be equal I think

02:16:56.930 --> 02:16:59.280
especially if one of

02:16:59.280 --> 02:17:02.450
the reasons why their residential use is 50% is because

02:17:02.450 --> 02:17:03.719
developers can charge

02:17:03.719 --> 02:17:06.520
more for treating property I think that is not an

02:17:06.520 --> 02:17:08.879
appropriate reason to have an

02:17:08.879 --> 02:17:13.329
increased amount of upland habitat specifically on the

02:17:13.329 --> 02:17:14.159
property just

02:17:14.159 --> 02:17:17.809
because we assume that developers gonna make more money off

02:17:17.809 --> 02:17:20.159
of it and so I don't

02:17:20.159 --> 02:17:24.209
want to belabor the point but I do feel that I have yet to

02:17:24.209 --> 02:17:26.159
be convinced why the

02:17:26.159 --> 02:17:31.809
city is proposing two different percentages based on use

02:17:31.809 --> 02:17:33.040
when I think if

02:17:33.040 --> 02:17:35.620
we are about protecting upland habitat then it shouldn't

02:17:35.620 --> 02:17:36.840
matter who's destroying

02:17:36.840 --> 02:17:42.350
it we want to protect it so I think either non-residential

02:17:42.350 --> 02:17:42.959
you should go to

02:17:42.959 --> 02:17:46.409
50% or seemingly because of the other points brought up in

02:17:46.409 --> 02:17:47.440
work session about

02:17:47.440 --> 02:17:50.430
the issues with residential property owners not having

02:17:50.430 --> 02:17:51.319
access to their

02:17:51.319 --> 02:17:54.440
property I'd be more of opponent proponent of dropping the

02:17:54.440 --> 02:17:55.360
residential

02:17:55.360 --> 02:18:00.659
use down to 30% but I just think it and maybe I'm missing

02:18:00.659 --> 02:18:01.360
something you can help

02:18:01.360 --> 02:18:07.030
me understand I don't understand why non-residential are

02:18:07.030 --> 02:18:07.959
allowed to tear down

02:18:07.959 --> 02:18:12.409
more upland habitat and not keep it contiguous and that

02:18:12.409 --> 02:18:13.879
they can just keep

02:18:13.879 --> 02:18:16.579
the tree canopy in line with the potential tree code

02:18:16.579 --> 02:18:18.159
provisions okay well

02:18:18.159 --> 02:18:22.440
we are starting from right now that we preserving zero on

02:18:22.440 --> 02:18:23.479
non-residential

02:18:23.479 --> 02:18:27.420
development for upland habitat to a 30% which is is an

02:18:27.420 --> 02:18:29.840
improvement okay

02:18:29.840 --> 02:18:33.739
non-residential development they have parking areas loading

02:18:33.739 --> 02:18:35.200
docks maneuvering

02:18:35.200 --> 02:18:40.040
geometry that they have to maintain to make their site plan

02:18:40.040 --> 02:18:42.319
workable okay they

02:18:42.319 --> 02:18:46.500
also are some of them they will come to the city with a

02:18:46.500 --> 02:18:48.520
preconceived site plan

02:18:48.520 --> 02:18:51.950
which it worked for them in other locations and would like

02:18:51.950 --> 02:18:53.040
to implement the

02:18:53.040 --> 02:19:00.530
same here so I see why that the 30% to the to the non-

02:19:00.530 --> 02:19:02.399
residential is given

02:19:02.399 --> 02:19:08.280
that the other side was when I was reviewing this the tree

02:19:08.280 --> 02:19:09.120
code was also

02:19:09.120 --> 02:19:16.399
being redrafted okay and the 30% was something that is

02:19:16.399 --> 02:19:18.319
where the language

02:19:18.319 --> 02:19:26.799
which I believe still there it was trying to attain so in

02:19:26.799 --> 02:19:28.479
we want to make

02:19:28.479 --> 02:19:35.379
development in that and feasible okay so we try to by

02:19:35.379 --> 02:19:37.479
maintaining that 30%

02:19:37.479 --> 02:19:41.930
consistency if they were to have to preserve 30% for tree

02:19:41.930 --> 02:19:43.159
canopy they can use

02:19:43.159 --> 02:19:48.219
the open habitat to meet that code as well so it was a way

02:19:48.219 --> 02:19:50.040
to improve of what

02:19:50.040 --> 02:19:55.159
we currently have from 0 to 30 and also to provide some

02:19:55.159 --> 02:19:57.040
place flexibility to

02:19:57.040 --> 02:20:04.059
non-residential developer and to actually trying to pass

02:20:04.059 --> 02:20:05.600
the benefit of

02:20:05.600 --> 02:20:09.399
preserving our plan and make them count towards other

02:20:09.399 --> 02:20:10.799
requirements so that was

02:20:10.799 --> 02:20:15.520
the intent behind that however if this Commissioner would

02:20:15.520 --> 02:20:16.600
like to change that

02:20:16.600 --> 02:20:19.469
percentage and make and make that part of your

02:20:19.469 --> 02:20:21.680
recommendation a staff would

02:20:21.680 --> 02:20:27.129
pass that recommendation to City Council as well so just if

02:20:27.129 --> 02:20:28.799
there's something in

02:20:28.799 --> 02:20:32.229
the code right now that you are not hundred percent if the

02:20:32.229 --> 02:20:32.760
Commission as a

02:20:32.760 --> 02:20:36.440
whole is not hundred percent what it either want to

02:20:36.440 --> 02:20:38.319
increase or actually want

02:20:38.319 --> 02:20:43.500
to make the requirements lesser let us know and make that

02:20:43.500 --> 02:20:44.399
part of your

02:20:44.399 --> 02:20:49.479
recommendation and we will pass that so I don't want to

02:20:49.479 --> 02:20:51.639
because we have not you

02:20:51.639 --> 02:20:54.799
are not agreeing with every single word of that is just

02:20:54.799 --> 02:20:56.760
prevent you to actually

02:20:56.760 --> 02:21:00.079
move forward with it with the proposed changes that some of

02:21:00.079 --> 02:21:01.040
them are really

02:21:01.040 --> 02:21:06.989
needed I appreciate the context thank you Commissioner

02:21:06.989 --> 02:21:10.399
Sullivan yes has I

02:21:10.399 --> 02:21:14.049
haven't heard anything so I'm just curious you know to

02:21:14.049 --> 02:21:15.399
state and national

02:21:15.399 --> 02:21:20.110
level there is a process whereby you can turn land over to

02:21:20.110 --> 02:21:21.879
the state into the

02:21:21.879 --> 02:21:26.120
national federal government in return you get tax benefits

02:21:26.120 --> 02:21:27.040
and so forth

02:21:27.040 --> 02:21:31.760
conservation easements and is there any provision whereby

02:21:31.760 --> 02:21:33.479
the changes to the

02:21:33.479 --> 02:21:39.840
code renders either all or a portion of somebody's property

02:21:39.840 --> 02:21:42.159
unusable in other

02:21:42.159 --> 02:21:44.959
words they can't make any changes it's a certain

02:21:44.959 --> 02:21:49.559
designation ESA whatever and it

02:21:49.559 --> 02:21:54.860
basically renders it unusable is there any thought to

02:21:54.860 --> 02:21:57.200
saying you know what you

02:21:57.200 --> 02:21:59.780
deed this over to the city because the city is telling you

02:21:59.780 --> 02:22:00.520
you can't do anything

02:22:00.520 --> 02:22:03.959
within this area you deed it over to the city the city

02:22:03.959 --> 02:22:05.440
takes it over in an

02:22:05.440 --> 02:22:10.000
exchange whether for cash or for tax benefit making a

02:22:10.000 --> 02:22:11.120
charitable contribution

02:22:11.120 --> 02:22:15.569
to the city or something of that effect whereby the land

02:22:15.569 --> 02:22:17.360
owner gets some benefit

02:22:17.360 --> 02:22:22.659
by the city effectively taking that land from them well the

02:22:22.659 --> 02:22:23.760
conservation easement

02:22:23.760 --> 02:22:26.129
most of the time they are not driven by the city they are

02:22:26.129 --> 02:22:27.319
actually institution

02:22:27.319 --> 02:22:31.700
that manage them and how they work this let's say that you

02:22:31.700 --> 02:22:33.479
have hundred acres of

02:22:33.479 --> 02:22:37.340
development you can actually restrict the development

02:22:37.340 --> 02:22:39.319
rights on your property

02:22:39.319 --> 02:22:44.680
let's say that is a farm right now with potential to be rez

02:22:44.680 --> 02:22:46.260
oned into single

02:22:46.260 --> 02:22:51.700
family and being a subdivision you can actually put a

02:22:51.700 --> 02:22:52.879
conservation easement

02:22:52.879 --> 02:22:58.799
where you say this area will not be developed more than

02:22:58.799 --> 02:23:01.159
this amount of units

02:23:01.159 --> 02:23:06.149
okay even though I'm capping that and then you're trading

02:23:06.149 --> 02:23:07.559
your development

02:23:07.559 --> 02:23:14.340
rights and by doing that you can get some tax reduction

02:23:14.340 --> 02:23:16.559
because you are your

02:23:16.559 --> 02:23:21.190
the property the value of the property no longer allows for

02:23:21.190 --> 02:23:22.840
maximizing hundred

02:23:22.840 --> 02:23:27.510
units per acre now is limited to 30 so the value of your

02:23:27.510 --> 02:23:29.120
property changes

02:23:29.120 --> 02:23:32.920
according to it and you get the benefits through some sort

02:23:32.920 --> 02:23:33.840
of tax but those

02:23:33.840 --> 02:23:37.739
conservations easements are not provided by the city they

02:23:37.739 --> 02:23:39.239
're usually run by

02:23:39.239 --> 02:23:44.280
institution we have some in the state of Texas we have some

02:23:44.280 --> 02:23:46.399
landowners most of

02:23:46.399 --> 02:23:50.399
time big ranches that actually pursue that but it's not

02:23:50.399 --> 02:23:51.399
through city

02:23:51.399 --> 02:23:54.239
government through conservation easement and those

02:23:54.239 --> 02:23:56.159
organizations who manage them

02:23:56.159 --> 02:24:00.149
but the effect of the property owner is the same and that

02:24:00.149 --> 02:24:01.360
is that they are

02:24:01.360 --> 02:24:05.379
giving up a portion of their land not necessarily because

02:24:05.379 --> 02:24:06.959
they want to but

02:24:06.959 --> 02:24:10.389
because of these changes being made to the code require

02:24:10.389 --> 02:24:12.799
them to give up some of

02:24:12.799 --> 02:24:17.920
the land so in effect the city really is taking that land

02:24:17.920 --> 02:24:19.159
and now you have all

02:24:19.159 --> 02:24:24.110
kinds of issues going on and so you know I think there's

02:24:24.110 --> 02:24:26.079
needs to be some talk as

02:24:26.079 --> 02:24:28.969
Commissioner Roselle is talking it seems like it's sort of

02:24:28.969 --> 02:24:30.000
all faith in the favor

02:24:30.000 --> 02:24:32.920
of the city well I think the city needs to give some of

02:24:32.920 --> 02:24:34.079
that back to the homeowner

02:24:34.079 --> 02:24:38.799
to the landowner so that if they're willing to abide by

02:24:38.799 --> 02:24:40.520
these rules then

02:24:40.520 --> 02:24:44.159
deed it to the city let the city take it over and get some

02:24:44.159 --> 02:24:45.920
tax benefit for the

02:24:45.920 --> 02:24:52.350
landowner for example the flood plain is the is that number

02:24:52.350 --> 02:24:53.719
one type of visa that

02:24:53.719 --> 02:24:56.819
is larger in acreage you know because it's a floodplain if

02:24:56.819 --> 02:24:58.000
you were to

02:24:58.000 --> 02:25:00.579
developed if you were to develop property who has a flood

02:25:00.579 --> 02:25:02.879
penny a floodplain FEMA

02:25:02.879 --> 02:25:07.440
hundred-year floodplain most of that area the city would

02:25:07.440 --> 02:25:09.600
not allow you to do to

02:25:09.600 --> 02:25:13.799
put any structures to it why because when you do that you

02:25:13.799 --> 02:25:14.319
are actually

02:25:14.319 --> 02:25:18.000
reducing the the value storage you are increasing the water

02:25:18.000 --> 02:25:18.959
surface elevation

02:25:18.959 --> 02:25:21.659
and you are making condition the flooding conditions

02:25:21.659 --> 02:25:22.600
downstream of you

02:25:22.600 --> 02:25:27.299
worst okay so in those instances the city is required you

02:25:27.299 --> 02:25:28.760
to put a drainage

02:25:28.760 --> 02:25:33.399
easement on it what it means is you own the land is yours

02:25:33.399 --> 02:25:34.559
what you are doing is

02:25:34.559 --> 02:25:38.090
restricting they use the development of that of that

02:25:38.090 --> 02:25:39.840
section of your property

02:25:39.840 --> 02:25:44.649
because it is within a essay we have three type of ESA that

02:25:44.649 --> 02:25:45.639
most of the time

02:25:45.639 --> 02:25:49.299
are nested in floodplaining essay so when you put a

02:25:49.299 --> 02:25:51.200
drainage easement on your

02:25:51.200 --> 02:25:55.899
property just to meet the floodplain requirements nothing

02:25:55.899 --> 02:25:57.239
else just to you

02:25:57.239 --> 02:26:02.639
are preserving for the most time those three both of ESA so

02:26:02.639 --> 02:26:04.520
in those and that's

02:26:04.520 --> 02:26:09.610
why some of our definitions are crafted very carefully to

02:26:09.610 --> 02:26:11.479
make sure that when

02:26:11.479 --> 02:26:15.299
development happens if they're already having to provide a

02:26:15.299 --> 02:26:16.360
drainage easement

02:26:16.360 --> 02:26:19.459
because floodplain conditions then you already meeting the

02:26:19.459 --> 02:26:20.680
ESA floodplain so

02:26:20.680 --> 02:26:25.469
use us in the way that have been it doesn't work in every

02:26:25.469 --> 02:26:26.040
in every instance

02:26:26.040 --> 02:26:29.000
hundred percent but most of the time we have crafted the

02:26:29.000 --> 02:26:31.120
language to allow the

02:26:31.120 --> 02:26:36.969
developers and homeowners to actually meet multiple

02:26:36.969 --> 02:26:39.520
requirements drainage

02:26:40.120 --> 02:26:45.680
landscape opens minimum open space and so on by preserving

02:26:45.680 --> 02:26:49.079
the essay so we are

02:26:49.079 --> 02:26:53.639
look we are open to to other options but the condition that

02:26:53.639 --> 02:26:54.920
the code have been

02:26:54.920 --> 02:27:02.129
drafted with that mentality already I've got a couple more

02:27:02.129 --> 02:27:03.840
questions that we

02:27:03.840 --> 02:27:08.879
didn't get to in work session I've got a question on in

02:27:08.879 --> 02:27:10.760
regards to the page turn

02:27:10.760 --> 02:27:23.319
I guess this would be section 17.7 be section 3 standard

02:27:23.319 --> 02:27:24.120
for fill and

02:27:24.120 --> 02:27:31.600
undeveloped floodplains okay yes and as I read this it says

02:27:31.600 --> 02:27:33.719
filling of any flood

02:27:33.719 --> 02:27:37.680
plane of a stream that drains more

02:27:37.920 --> 02:27:42.479
and one square miles per unless the fill on any lot is less

02:27:42.479 --> 02:27:44.280
than 50 cubic yards

02:27:44.280 --> 02:27:49.479
or 300 cubic feet per acre whichever is greater and further

02:27:49.479 --> 02:27:50.879
on in E it talks

02:27:50.879 --> 02:27:54.600
about fill being concrete or aggregate and there's a

02:27:54.600 --> 02:27:56.040
description of what is

02:27:56.040 --> 02:28:02.649
Phil my question is thinking like I think is that if you

02:28:02.649 --> 02:28:03.520
have a lot or a

02:28:03.520 --> 02:28:06.639
piece of property that has undeveloped floodplain on it and

02:28:06.639 --> 02:28:07.840
it's considered a

02:28:07.840 --> 02:28:12.760
lot or an acre you can't come do in excess of 50 cubic

02:28:12.760 --> 02:28:14.680
yards of material on

02:28:14.680 --> 02:28:18.479
that lot anywhere the way that this is written it doesn't

02:28:18.479 --> 02:28:19.239
say it's in the flood

02:28:19.239 --> 02:28:23.229
plane it just says unless the fill on any lot is less than

02:28:23.229 --> 02:28:24.959
50 cubic yards so if

02:28:24.959 --> 02:28:28.780
you have a lot that has undeveloped floodplain on it you

02:28:28.780 --> 02:28:30.479
can't put 50 cubic

02:28:30.479 --> 02:28:36.000
yards of material on it well this is meant they the ESA is

02:28:36.000 --> 02:28:36.799
the floodplain

02:28:36.799 --> 02:28:43.079
itself okay so this call deals with with those ESA the

02:28:43.079 --> 02:28:44.600
limitation on the field is

02:28:44.600 --> 02:28:50.489
is intended to to be within the floodplain so if your lot

02:28:50.489 --> 02:28:52.159
is partially

02:28:52.159 --> 02:28:56.610
outside of the floodplain and you are willing to put a fill

02:28:56.610 --> 02:28:57.799
on that lot but

02:28:57.799 --> 02:29:00.930
not encumber into the floodplain you are allowed the

02:29:00.930 --> 02:29:03.120
problem is when you want you

02:29:03.120 --> 02:29:08.159
decide is to go over that threshold within the floodplain

02:29:08.159 --> 02:29:10.600
this is it have

02:29:10.600 --> 02:29:15.959
two connections first by the I understand that part I'm

02:29:15.959 --> 02:29:16.719
just reading

02:29:16.719 --> 02:29:23.520
what it says okay is that if you have floodplain on there

02:29:23.520 --> 02:29:25.260
it's prohibited

02:29:25.260 --> 02:29:29.170
unless the fill is on any lot less than 50 cubic yards it

02:29:29.170 --> 02:29:30.559
doesn't say that if

02:29:30.559 --> 02:29:34.010
it's in the floodplain it just says if it's on the lot so

02:29:34.010 --> 02:29:35.360
for clarification

02:29:35.360 --> 02:29:39.319
purposes I think it needs to be clarified kind of what you

02:29:39.319 --> 02:29:39.639
're describing

02:29:39.639 --> 02:29:42.729
is that it can't be in the floodplain because the way I

02:29:42.729 --> 02:29:44.040
read it now is that it

02:29:44.040 --> 02:29:46.889
can't be on the lot if a piece of the lot is in the flood

02:29:46.889 --> 02:29:47.760
plain does that make

02:29:47.760 --> 02:29:51.700
sense yeah I can definitely rework that lot language to

02:29:51.700 --> 02:29:53.200
make it clear okay

02:29:53.200 --> 02:29:55.969
because you at that point if you have a lot that has any

02:29:55.969 --> 02:29:57.200
floodplain on it it's

02:29:57.200 --> 02:30:03.760
an unbuildable lot essentially yes so that was one just

02:30:03.760 --> 02:30:05.399
item that was pretty

02:30:05.399 --> 02:30:10.549
straightforward I had some questions in work session I want

02:30:10.549 --> 02:30:11.680
to revisit a couple

02:30:11.680 --> 02:30:16.239
of them really quickly just since we're in public session

02:30:16.239 --> 02:30:16.879
for those that may

02:30:16.879 --> 02:30:20.309
have not been watching work session one of the things that

02:30:20.309 --> 02:30:21.399
I would like for us

02:30:21.399 --> 02:30:25.959
to take a look at and get some clarification on is back in

02:30:25.959 --> 02:30:28.799
35 17.2 a it

02:30:28.799 --> 02:30:32.229
says within the corporate limits of the city of Denton

02:30:32.229 --> 02:30:33.600
except is otherwise

02:30:33.600 --> 02:30:37.139
specifically provided for in this subsection when you go

02:30:37.139 --> 02:30:39.559
farther into this

02:30:39.559 --> 02:30:45.700
subsection and go to 35 17 6 it says official maps it says

02:30:45.700 --> 02:30:47.040
the official map

02:30:47.040 --> 02:30:52.340
that identifies areas designated as ESA's and my question

02:30:52.340 --> 02:30:53.760
at work session was

02:30:53.760 --> 02:30:57.190
when you first read this it sounds like it just applies to

02:30:57.190 --> 02:30:58.120
the corporate limits

02:30:58.120 --> 02:31:02.680
city limits of Denton but when you go to this provision

02:31:02.680 --> 02:31:03.879
that I just brought up

02:31:03.879 --> 02:31:08.959
about applicable or official maps it actually some of this

02:31:08.959 --> 02:31:10.319
applies to the ETJ

02:31:10.319 --> 02:31:13.510
and I think you clarified in work session that it's not the

02:31:13.510 --> 02:31:14.319
open habitat

02:31:14.319 --> 02:31:19.620
but it has to do with wet yeah with a plane so cleaners

02:31:19.620 --> 02:31:23.360
yeah the item 17 point

02:31:23.360 --> 02:31:26.840
two point B it says the floodplain standard of this sub

02:31:26.840 --> 02:31:28.120
chapter shall apply

02:31:28.120 --> 02:31:31.120
to all land and all development within the extra-territory

02:31:31.120 --> 02:31:32.120
jurisdiction of the

02:31:32.120 --> 02:31:37.780
city and that is granted to the city by the state based on

02:31:37.780 --> 02:31:38.959
the protection of

02:31:38.959 --> 02:31:44.590
water resources that's the reason behind it so that's why

02:31:44.590 --> 02:31:45.479
we made the

02:31:45.479 --> 02:31:51.329
clarification upland habitat water related habitat or

02:31:51.329 --> 02:31:53.680
repairing buffer that

02:31:53.680 --> 02:31:57.520
is located outside the city limits a we have no

02:31:57.520 --> 02:32:00.639
jurisdiction over those okay the

02:32:00.639 --> 02:32:05.790
ESA regulations does not apply to those the only ESA that

02:32:05.790 --> 02:32:07.000
we have jurisdiction

02:32:07.000 --> 02:32:12.639
in the ETJ is floodplain and most of the time when

02:32:12.639 --> 02:32:14.520
development happens in the ETJ

02:32:14.520 --> 02:32:18.100
because it's floodplain that area will be set aside through

02:32:18.100 --> 02:32:19.360
some sort of drainage

02:32:19.360 --> 02:32:23.979
easement so through that through providing that mechanism

02:32:23.979 --> 02:32:24.879
on the plot

02:32:24.879 --> 02:32:28.520
itself they are providing they are meeting the protection

02:32:28.520 --> 02:32:29.360
of the floodplain

02:32:29.360 --> 02:32:34.489
ESA if you don't mind would you pull up the interactive map

02:32:34.489 --> 02:32:35.319
for the city of

02:32:35.319 --> 02:32:40.620
Denton and then go on the links where it says ESA just bear

02:32:40.620 --> 02:32:46.520
with me sure so

02:33:06.319 --> 02:33:07.319
, thank you.

02:33:35.319 --> 02:33:37.319
, thank you.

02:34:06.319 --> 02:34:06.459
So when you go over on the ESA's and hit the button to

02:34:06.459 --> 02:34:14.040
expand it the little

02:34:14.040 --> 02:34:14.040
triangle to the left would you just click on the bottom

02:34:14.040 --> 02:34:18.479
where it says ESA

02:34:18.479 --> 02:34:18.479
floodplain designations and let's light up what that

02:34:18.479 --> 02:34:29.799
entails there you go so

02:34:29.799 --> 02:34:29.799
that's everything that's floodplain okay and if you'll

02:34:29.799 --> 02:34:35.040
click on then the

02:34:35.040 --> 02:34:40.000
skip the ESA habitats but click on the one that says ESA

02:34:40.000 --> 02:34:41.520
stream buffers

02:34:49.040 --> 02:34:55.180
it is shown in pale yellow very skinny line inside the

02:34:55.180 --> 02:34:59.399
floodplain you might zoom in a little

02:35:02.440 --> 02:35:06.629
if you'll click it back off the last button we just put on

02:35:06.629 --> 02:35:08.399
there the ESA

02:35:08.399 --> 02:35:15.110
stream buffers yes that's what we're talking about that you

02:35:15.110 --> 02:35:15.959
all do regulate

02:35:15.959 --> 02:35:19.420
so not only the floodplain within all of these stream buff

02:35:19.420 --> 02:35:20.799
ers are the areas that

02:35:20.799 --> 02:35:23.370
you regulate not only in the city of Denton but then also

02:35:23.370 --> 02:35:24.319
out in the ETJ is

02:35:24.319 --> 02:35:31.620
it correct well if there is a riparian buffer okay and if

02:35:31.620 --> 02:35:33.760
you read what the

02:35:33.760 --> 02:35:37.250
regulations are between floodplain and riparian buffers and

02:35:37.250 --> 02:35:38.280
water related you

02:35:38.280 --> 02:35:41.180
will find that the regulations of water related and rip

02:35:41.180 --> 02:35:42.440
arian buffers are more

02:35:42.440 --> 02:35:46.819
stringent the reason why is because that's the last line of

02:35:46.819 --> 02:35:47.920
defense before a

02:35:47.920 --> 02:35:52.600
pollutant can get waterborne okay so you will see that the

02:35:52.600 --> 02:35:53.360
requirements are a

02:35:53.360 --> 02:35:59.209
little bit more stringent in those so if you are in the ETJ

02:35:59.209 --> 02:36:02.799
for example we will

02:36:02.799 --> 02:36:09.020
be able to regulate within the floodplain okay but we will

02:36:09.020 --> 02:36:10.360
not be able

02:36:10.360 --> 02:36:16.819
to regulate the riparian buffer okay so in some extent you

02:36:16.819 --> 02:36:18.879
would be entitled to

02:36:18.879 --> 02:36:26.399
do the requirements in the ETJ because it's just limited to

02:36:26.399 --> 02:36:27.040
the floodplain

02:36:27.040 --> 02:36:30.280
and not the riparian buffer and not the water related in

02:36:30.280 --> 02:36:31.719
some extent are a little

02:36:31.719 --> 02:36:37.299
bit lesser than what will be in the city limits okay so I

02:36:37.299 --> 02:36:39.879
could not tell them for

02:36:39.879 --> 02:36:44.940
example that they will have to work under the riparian

02:36:44.940 --> 02:36:46.360
buffer for the

02:36:46.360 --> 02:36:52.350
installation of something because if it is a permitted use

02:36:52.350 --> 02:36:54.719
within the floodplain

02:36:54.719 --> 02:36:59.290
for example installation of a utility line by open trench

02:36:59.290 --> 02:37:01.760
ing so if you were to

02:37:01.760 --> 02:37:06.809
do that in the ETJ you can probably open trench all through

02:37:06.809 --> 02:37:08.959
it okay because the

02:37:08.959 --> 02:37:12.049
only thing that I have regulations on is the floodplain not

02:37:12.049 --> 02:37:13.680
the riparian buffer or

02:37:13.680 --> 02:37:19.530
the water related I may have misunderstood what you said

02:37:19.530 --> 02:37:20.360
when you were

02:37:20.360 --> 02:37:23.639
stating that the only thing that you could do in the ETJ

02:37:23.639 --> 02:37:24.680
where the water

02:37:24.680 --> 02:37:30.079
related I'm sorry is floodplain floodplain so when you

02:37:30.079 --> 02:37:30.479
click on the

02:37:30.479 --> 02:37:35.209
button back again where it says stream buffers all those

02:37:35.209 --> 02:37:36.659
that pop up in the

02:37:36.659 --> 02:37:40.319
city limits and when you go outside into the ETJ they're

02:37:40.319 --> 02:37:41.639
nice to be on the map

02:37:41.639 --> 02:37:44.219
but you don't have any regulation of those or you do

02:37:44.219 --> 02:37:45.959
correct no I don't have

02:37:45.959 --> 02:37:50.030
and they one of the reason is the the ESA map is also a

02:37:50.030 --> 02:37:51.639
tool for us when we

02:37:51.639 --> 02:37:54.709
are considering annexations for example those are lands

02:37:54.709 --> 02:37:55.879
that are currently in

02:37:55.879 --> 02:38:00.440
the ETJ and when they are they come in they will be subject

02:38:00.440 --> 02:38:01.040
to all city

02:38:01.040 --> 02:38:04.469
regulations so in those instances when we do the evaluation

02:38:04.469 --> 02:38:05.200
it helps them

02:38:05.200 --> 02:38:12.000
understand what is it is very typical of me then when I

02:38:12.000 --> 02:38:14.680
review a proposal in the

02:38:14.680 --> 02:38:19.540
ETJ I I acknowledge the presence of all the type of ESS I

02:38:19.540 --> 02:38:20.959
made me very clear

02:38:20.959 --> 02:38:24.760
which one we have jurisdiction on however we always for

02:38:24.760 --> 02:38:25.760
example if there's

02:38:25.760 --> 02:38:29.510
open habitat even though I cannot require preservation of

02:38:29.510 --> 02:38:31.040
it I said you

02:38:31.040 --> 02:38:34.510
know if you could consider the preservation of the of the

02:38:34.510 --> 02:38:35.159
existing

02:38:35.159 --> 02:38:38.159
habitat on your property so some of them are many

02:38:38.159 --> 02:38:40.479
developers they see that as a

02:38:40.479 --> 02:38:43.870
added value to the property and they already have

02:38:43.870 --> 02:38:45.180
incorporated the

02:38:45.180 --> 02:38:50.719
preservation into it so it is a suggestion at that point

02:38:50.719 --> 02:38:52.000
but we try to

02:38:52.000 --> 02:38:56.329
at least educate the applicant of the value of the habitat

02:38:56.329 --> 02:38:57.739
that they have on

02:38:57.739 --> 02:39:02.299
site okay so when you when you turn those back off and it's

02:39:02.299 --> 02:39:02.920
just a purple

02:39:02.920 --> 02:39:04.579
those are the things they're in floodplain and then

02:39:04.579 --> 02:39:05.360
everything else that's

02:39:05.360 --> 02:39:09.409
in brown that's there in the city limits is what you're

02:39:09.409 --> 02:39:11.239
talking about as far as

02:39:11.239 --> 02:39:15.110
the authority and possibly going on into ETJ on some of

02:39:15.110 --> 02:39:16.959
those correct and for

02:39:16.959 --> 02:39:22.639
this map for example all that red stuff means that those

02:39:22.639 --> 02:39:23.659
are repairing buffer

02:39:23.659 --> 02:39:26.889
designation that have been removed why it because that is

02:39:26.889 --> 02:39:28.040
the pecan Creek going

02:39:28.040 --> 02:39:32.010
through the middle of town who have been heavily harnessed

02:39:32.010 --> 02:39:34.280
concreted in so we have

02:39:34.280 --> 02:39:37.829
removed those designation we still show them on the map but

02:39:37.829 --> 02:39:38.760
if you click on

02:39:38.760 --> 02:39:41.379
information it will tell you that there was an ESAP field

02:39:41.379 --> 02:39:43.040
assessment done and so

02:39:43.040 --> 02:39:50.139
on so you kind of have all that paper trail created so we

02:39:50.139 --> 02:39:52.459
provide sometimes

02:39:52.459 --> 02:39:56.040
we provide more information and that you know create some

02:39:56.040 --> 02:39:57.959
confusion but

02:39:57.959 --> 02:40:01.350
sometimes the more we provide the better so in that way

02:40:01.350 --> 02:40:03.280
developers can make a

02:40:03.280 --> 02:40:07.139
educated decision so is this the official map essentially

02:40:07.139 --> 02:40:07.520
or is there

02:40:07.520 --> 02:40:10.950
someplace else that you can get a copy this is this is just

02:40:10.950 --> 02:40:11.760
the interactive

02:40:11.760 --> 02:40:16.799
map if we have a paper copy it would look like just keep in

02:40:16.799 --> 02:40:18.239
mind the ESA map

02:40:18.239 --> 02:40:23.329
is amended on a regular basis the map by no means is

02:40:23.329 --> 02:40:26.559
hundred percent accurate but

02:40:26.559 --> 02:40:31.120
it's a good it's a good start it's a good indication to

02:40:31.120 --> 02:40:32.479
make us pause for a

02:40:32.479 --> 02:40:36.420
moment and say we have to reassess few things if there are

02:40:36.420 --> 02:40:38.159
questions about the

02:40:38.159 --> 02:40:42.719
presence of the of the ESAS we can do a city field

02:40:42.719 --> 02:40:44.959
assessment at no cost to the

02:40:44.959 --> 02:40:48.610
applicant and we will go we have a specific criteria for

02:40:48.610 --> 02:40:49.959
each type of ESA

02:40:49.959 --> 02:40:56.399
if that criteria is not met then we will require we will

02:40:56.399 --> 02:40:57.879
conclude that that

02:40:57.879 --> 02:41:01.629
designation should be removed we notify the the planning

02:41:01.629 --> 02:41:03.079
director about the need

02:41:03.079 --> 02:41:07.639
of changing and what area needs to be changed so we the ESA

02:41:07.639 --> 02:41:09.399
map is a living

02:41:09.399 --> 02:41:13.959
document it changes all the changes that are from time to

02:41:13.959 --> 02:41:15.440
time happen is when

02:41:15.440 --> 02:41:19.569
FEMA reissue firms which is the floodplain insurance map

02:41:19.569 --> 02:41:20.239
and they

02:41:20.239 --> 02:41:25.799
sometimes they take ten years to change those when the

02:41:25.799 --> 02:41:27.920
floodplain when the FEMA

02:41:27.920 --> 02:41:32.569
floodplain changes our boundary changes as well because in

02:41:32.569 --> 02:41:33.680
the way that we have

02:41:33.680 --> 02:41:38.239
defined the floodplain ESA it matches that boundary when

02:41:38.239 --> 02:41:39.600
somebody wants to do

02:41:39.600 --> 02:41:43.510
a reclamation of the floodplain meaning that they will do

02:41:43.510 --> 02:41:45.479
some type of exclamation

02:41:45.479 --> 02:41:49.360
to reduce or to modify the change of it that goes through a

02:41:49.360 --> 02:41:50.719
clomer which stands

02:41:50.719 --> 02:41:53.879
for conditional letter of man revision and then goes

02:41:53.879 --> 02:41:55.319
through a long more process

02:41:55.319 --> 02:41:59.180
and that is approved by the city and by FEMA when FEMA

02:41:59.180 --> 02:42:00.879
changes the boundary

02:42:00.879 --> 02:42:04.930
through the long more process it changes the definition of

02:42:04.930 --> 02:42:06.639
the floodplain with it

02:42:06.639 --> 02:42:14.909
so the ESA map is a living document that changes just I

02:42:14.909 --> 02:42:17.000
think I think you

02:42:17.000 --> 02:42:21.559
addressed those changes amendments to the map correct in

02:42:21.559 --> 02:42:22.540
there and I think it's

02:42:22.540 --> 02:42:29.760
on there 35 17 6 B is that correct with those we all the

02:42:29.760 --> 02:42:30.760
would that be the

02:42:30.760 --> 02:42:33.600
process for amendments

02:42:40.360 --> 02:42:49.969
okay I had one final question on 17.5 D water related

02:42:49.969 --> 02:42:51.680
habitat it says areas

02:42:51.680 --> 02:42:56.719
designated as wetland is there a definition for that or

02:42:56.719 --> 02:42:57.799
where do we find

02:42:57.799 --> 02:43:02.360
that and how is that determined what land those are

02:43:02.360 --> 02:43:03.920
transitional have from

02:43:03.920 --> 02:43:06.889
from my ecological I'm going to give you the ecological

02:43:06.889 --> 02:43:08.719
definition of it okay the

02:43:08.719 --> 02:43:11.309
ecological definition of a wetlands that they are

02:43:11.309 --> 02:43:13.760
transitional habitat which

02:43:13.760 --> 02:43:18.319
withstand some sort of flood condition for some period of

02:43:18.319 --> 02:43:20.239
time okay because the

02:43:20.239 --> 02:43:24.260
inundation conditions that they experience there's certain

02:43:24.260 --> 02:43:25.959
type of plant

02:43:25.959 --> 02:43:31.270
species that live there because they are they tolerate the

02:43:31.270 --> 02:43:33.920
inundation process

02:43:33.920 --> 02:43:38.979
the soils change characteristics and also they are

02:43:38.979 --> 02:43:41.239
hydraulic characteristics so

02:43:41.239 --> 02:43:48.950
you will see a watermark depicted and you see the oxidation

02:43:48.950 --> 02:43:49.639
reduction of the

02:43:49.639 --> 02:43:54.200
soil and that's where the watermark is or that so those are

02:43:54.200 --> 02:43:55.040
characteristic those

02:43:55.040 --> 02:44:00.450
are the scientific ecological definition of what a wetland

02:44:00.450 --> 02:44:02.479
is many of the people

02:44:02.479 --> 02:44:05.280
many of the comments have addressed or hinges upon the

02:44:05.280 --> 02:44:06.200
definition of what

02:44:06.200 --> 02:44:11.340
wetlands by the Court of Engineers is if you read the Court

02:44:11.340 --> 02:44:12.600
of Engineers

02:44:12.600 --> 02:44:17.159
definition all that is is tied to navigable waters to

02:44:17.159 --> 02:44:18.319
commerce to be able

02:44:18.319 --> 02:44:24.200
to promote commerce in your state comments okay so when

02:44:24.200 --> 02:44:26.239
they were so the

02:44:26.239 --> 02:44:31.239
wetlands that are protected by the core are those who are

02:44:31.239 --> 02:44:32.399
hydrologically

02:44:32.399 --> 02:44:41.000
connected to a water body that is deemed navigable okay so

02:44:41.000 --> 02:44:43.719
if we take that limited

02:44:43.719 --> 02:44:49.860
concept of it then if we go by the definition of the core

02:44:49.860 --> 02:44:51.680
more it will be

02:44:51.680 --> 02:44:56.280
less areas protected of wetlands wetlands are incredible

02:44:56.280 --> 02:44:57.680
habitats they do

02:44:57.680 --> 02:45:05.370
fantastic services as filtration devices okay so if we

02:45:05.370 --> 02:45:07.120
limit that to what the

02:45:07.120 --> 02:45:10.260
court in the way that the court defined wetlands or provide

02:45:10.260 --> 02:45:11.319
protections to it

02:45:11.319 --> 02:45:17.239
then many of the habitats that are good to maintain will be

02:45:17.239 --> 02:45:18.520
our order of

02:45:18.520 --> 02:45:25.649
protection so our definition as it is it is more broad than

02:45:25.649 --> 02:45:28.079
what other state or

02:45:28.079 --> 02:45:33.680
federal agencies define what is that in here somewhere no

02:45:33.680 --> 02:45:35.079
that's the only

02:45:35.079 --> 02:45:41.719
definition is that something that you would like to it's

02:45:41.719 --> 02:45:42.680
stuff to expand

02:45:42.680 --> 02:45:47.309
provide a definition on on wetlands I think it's necessary

02:45:47.309 --> 02:45:48.319
to define the term

02:45:48.319 --> 02:45:52.879
especially if for your discussion if city didn't has a

02:45:52.879 --> 02:45:53.719
determination of what

02:45:53.719 --> 02:45:56.290
what a wetland is which is different than what the state or

02:45:56.290 --> 02:45:56.879
the federal

02:45:56.879 --> 02:45:59.559
government says I think it needs to be spelled out here's

02:45:59.559 --> 02:46:00.440
what the city of

02:46:00.440 --> 02:46:04.090
Denton determines as a wetland for everybody to understand

02:46:04.090 --> 02:46:05.120
if you have this

02:46:05.120 --> 02:46:08.510
on your property you have for the city of Denton a wetland

02:46:08.510 --> 02:46:10.879
okay okay so I'm

02:46:10.879 --> 02:46:13.639
familiar with where your what you're defining because I see

02:46:13.639 --> 02:46:15.079
them in phase one

02:46:15.079 --> 02:46:17.979
reports it'll have a designation on it that this is on the

02:46:17.979 --> 02:46:19.600
map and if it's not

02:46:19.600 --> 02:46:24.520
on that map you proceed forward with it however the city

02:46:24.520 --> 02:46:25.239
didn't may have a

02:46:25.239 --> 02:46:30.729
different determination what a wetland is versus what's on

02:46:30.729 --> 02:46:32.879
the maps that all

02:46:32.879 --> 02:46:36.440
these people that do this for a living produce for us and

02:46:36.440 --> 02:46:37.399
say yeah this

02:46:37.399 --> 02:46:40.270
property's got a clean phase one on it and it's nothing on

02:46:40.270 --> 02:46:41.680
it you say that's

02:46:41.680 --> 02:46:47.680
wetland on it because we are creating the E-Secretary

02:46:47.680 --> 02:46:49.239
manual where all the

02:46:49.239 --> 02:46:52.860
more technical part would be would this be something that

02:46:52.860 --> 02:46:54.159
you would like to see

02:46:54.159 --> 02:46:58.959
in the DDC as a part of 17 or would you like to see that as

02:46:58.959 --> 02:47:00.040
a part of the

02:47:00.040 --> 02:47:04.219
criteria manual as I recall as I read this it says that if

02:47:04.219 --> 02:47:05.760
it's more stringent

02:47:05.760 --> 02:47:09.969
in the code and what's in the criteria manual then what's

02:47:09.969 --> 02:47:11.920
in the code prevails

02:47:11.920 --> 02:47:15.879
is that correct on how this is written so I think it should

02:47:15.879 --> 02:47:16.959
be in the actual

02:47:16.959 --> 02:47:23.610
code rather than in the criteria maybe put it in both you

02:47:23.610 --> 02:47:24.239
know

02:47:46.959 --> 02:47:58.520
thank you I got a couple more questions Commissioner Ellis

02:47:58.520 --> 02:47:59.559
thank you chair

02:47:59.559 --> 02:48:02.989
Deborah thanks for your work in this my question has to do

02:48:02.989 --> 02:48:04.239
with the alternative

02:48:04.239 --> 02:48:11.260
ESA plan so you can basically walk me through why we're

02:48:11.260 --> 02:48:12.440
considering it a

02:48:12.440 --> 02:48:17.229
zoning amendment procedure a zoning amendment procedure if

02:48:17.229 --> 02:48:17.920
you go back to

02:48:17.920 --> 02:48:22.200
sub chapter three three I believe on the DDC establishes a

02:48:22.200 --> 02:48:23.000
different processes

02:48:23.000 --> 02:48:26.069
and the is called the process the zoning amendment

02:48:26.069 --> 02:48:27.559
procedure just because

02:48:27.559 --> 02:48:30.239
requires the public hearing process before the planning and

02:48:30.239 --> 02:48:31.079
zoning Commission

02:48:31.079 --> 02:48:34.870
and City Council that's that's the reason why it's called a

02:48:34.870 --> 02:48:35.559
zoning amendment

02:48:35.559 --> 02:48:38.319
procedure because it really is nothing to do with zoning

02:48:38.319 --> 02:48:39.319
this all has to do with

02:48:39.319 --> 02:48:42.799
development yeah the zoning is not in question is just

02:48:42.799 --> 02:48:44.000
followed the steps

02:48:44.000 --> 02:48:51.040
require through a any zoning change which is planning and

02:48:51.040 --> 02:48:51.520
zoning

02:48:51.520 --> 02:48:55.709
notification newspaper public hearing before the planning

02:48:55.709 --> 02:48:56.639
and zoning Commission

02:48:56.639 --> 02:48:59.620
recommendation from the planning and zoning Commission and

02:48:59.620 --> 02:49:00.159
the final

02:49:00.159 --> 02:49:05.469
approval of City Council okay just so I understand so so

02:49:05.469 --> 02:49:07.159
going this route so it

02:49:07.159 --> 02:49:09.520
can be a public hearing is that what you're saying correct

02:49:09.520 --> 02:49:11.959
okay thank you

02:49:11.959 --> 02:49:18.100
Commissioner Sanchez yeah I worked as a biologist biologist

02:49:18.100 --> 02:49:19.680
for 30 years and we

02:49:19.680 --> 02:49:23.639
talked about habitat wetland habitat it was based primarily

02:49:23.639 --> 02:49:25.120
on the vegetation and

02:49:25.120 --> 02:49:28.579
the soils and that's what we would look at we go in there I

02:49:28.579 --> 02:49:30.000
mean you just that's

02:49:30.000 --> 02:49:34.450
the definition primarily you can't deviate from that yeah

02:49:34.450 --> 02:49:35.520
and the other

02:49:35.520 --> 02:49:40.590
question I had is when we talk we talked a lot a lot about

02:49:40.590 --> 02:49:42.840
upland habitat and

02:49:42.840 --> 02:49:48.690
preserving that you know Mother Nature did a good job here

02:49:48.690 --> 02:49:49.520
in the cross timbers

02:49:49.520 --> 02:49:55.799
fire was a big proponent of managing the cross-land timbers

02:49:55.799 --> 02:49:57.079
we've taken that out

02:49:57.079 --> 02:50:00.510
of there so a lot of these habitats that we have are very

02:50:00.510 --> 02:50:02.600
deteriorated so I it's

02:50:02.600 --> 02:50:06.829
hard for me when we start talking about little areas five

02:50:06.829 --> 02:50:09.079
ten twenty acres they're

02:50:09.079 --> 02:50:12.510
really going to be if without burning they're just going to

02:50:12.510 --> 02:50:13.840
deteriorate so I'm

02:50:13.840 --> 02:50:18.540
just wondering why are we maintaining these small areas

02:50:18.540 --> 02:50:21.079
when they really don't

02:50:21.079 --> 02:50:25.639
really see what's the word I want they're not they're not

02:50:25.639 --> 02:50:26.479
going to do a

02:50:26.479 --> 02:50:31.180
whole lot because they're over time they're just deterior

02:50:31.180 --> 02:50:32.799
ating yeah because

02:50:32.799 --> 02:50:35.479
fire is a big part of the understory I mean the grasses are

02:50:35.479 --> 02:50:36.319
a big part of the

02:50:36.319 --> 02:50:38.520
understory and that's what would carry through the fires

02:50:38.520 --> 02:50:39.559
through the through

02:50:39.559 --> 02:50:43.040
this habitat and as and as I see a lot of areas you don't

02:50:43.040 --> 02:50:43.680
have a lot of

02:50:43.680 --> 02:50:46.989
vegetation on the ground on the ground on the surface you

02:50:46.989 --> 02:50:48.079
know a lot of has

02:50:48.079 --> 02:50:51.139
just deteriorated you have just invade invasive grasses so

02:50:51.139 --> 02:50:52.079
you're just

02:50:52.079 --> 02:50:56.969
maintaining primarily you're maintaining the woodlands you

02:50:56.969 --> 02:50:58.520
know but even those

02:50:58.520 --> 02:51:02.209
it's hard for me to see how we're maintaining upland

02:51:02.209 --> 02:51:03.840
habitat without

02:51:03.840 --> 02:51:09.149
managing them somehow yeah well so and that that brings a

02:51:09.149 --> 02:51:11.879
very good point in

02:51:11.879 --> 02:51:16.600
nature if if this were not within the urban setting okay

02:51:16.600 --> 02:51:18.920
fire is a big

02:51:18.920 --> 02:51:22.360
management tool okay this is how habitats they renew

02:51:22.360 --> 02:51:23.440
themselves that's

02:51:23.440 --> 02:51:28.250
how invasive species are control and so on sometimes you

02:51:28.250 --> 02:51:29.680
need to even open up

02:51:29.680 --> 02:51:33.680
the canopy to allow the understory and the juvenile to be

02:51:33.680 --> 02:51:34.479
able to reach out

02:51:34.479 --> 02:51:39.530
enough sunlight to grow so these areas are should be

02:51:39.530 --> 02:51:41.719
managed and I want to use

02:51:41.719 --> 02:51:46.700
carefully the word managed okay if you see all the all the

02:51:46.700 --> 02:51:48.079
permitted uses

02:51:48.079 --> 02:51:51.559
within all the top of the four type of ESA some sort of

02:51:51.559 --> 02:51:53.440
management provision is

02:51:53.440 --> 02:52:00.489
allowed removal or of invasive planting of native pruning

02:52:00.489 --> 02:52:02.280
up to 25% of the

02:52:02.280 --> 02:52:08.129
canopy of upland habitat for the health of the habitat so

02:52:08.129 --> 02:52:12.319
these eases are meant

02:52:12.319 --> 02:52:19.959
to be managed that is different from manicuring the ESA

02:52:19.959 --> 02:52:22.280
okay it's different

02:52:22.280 --> 02:52:25.360
perspective so that's why I wanted to use the word

02:52:25.360 --> 02:52:27.920
management carefully if you

02:52:27.920 --> 02:52:32.579
if those are you needs to be intervene to actually restore

02:52:32.579 --> 02:52:33.639
them make them

02:52:33.639 --> 02:52:38.200
better you are allowed to do it by right okay because

02:52:38.200 --> 02:52:39.799
sometimes you need it

02:52:39.799 --> 02:52:46.530
repairing buffers if the if the watershed have been urban

02:52:46.530 --> 02:52:47.159
ized for

02:52:47.159 --> 02:52:50.239
example you are putting more runoff through those through

02:52:50.239 --> 02:52:51.120
those channels

02:52:51.120 --> 02:52:57.659
that if it's not been dealt or if it is a watershed that

02:52:57.659 --> 02:52:58.680
have been developed

02:52:58.680 --> 02:53:01.770
under you know long time ago where none of the floodplain

02:53:01.770 --> 02:53:03.200
standards were in place

02:53:03.200 --> 02:53:06.850
probably those those channels are eroding already and the

02:53:06.850 --> 02:53:07.840
vegetation might

02:53:07.840 --> 02:53:13.489
be gone because that's the way that the creek adjust the

02:53:13.489 --> 02:53:14.520
channel adjust to the

02:53:14.520 --> 02:53:20.780
changes so in those instances by all means go there and if

02:53:20.780 --> 02:53:22.440
you can do it you

02:53:22.440 --> 02:53:27.270
are entitled to do it so yeah those those eases are meant

02:53:27.270 --> 02:53:29.600
to be in some level

02:53:29.600 --> 02:53:36.309
managed if they need to thank you for answering all of our

02:53:36.309 --> 02:53:38.000
questions I don't

02:53:38.000 --> 02:53:43.399
have anymore this is a public hearing I don't have any

02:53:43.399 --> 02:53:44.639
cards on this item but

02:53:44.639 --> 02:53:46.780
anyone who would like to speak on this item please come

02:53:46.780 --> 02:53:48.639
forward at this time if

02:53:48.639 --> 02:53:55.579
you'll give us your name and address and please an old hand

02:53:55.579 --> 02:53:56.559
at this he's already

02:53:56.559 --> 02:54:00.360
got a card filled out thank you Lee certainly good evening

02:54:00.360 --> 02:54:01.040
my name is Lee

02:54:01.040 --> 02:54:04.299
Allison with Allison engineering group didn't in Texas I'm

02:54:04.299 --> 02:54:05.319
here to speak on

02:54:05.319 --> 02:54:08.129
behalf of the Denton Community Development Alliance as I

02:54:08.129 --> 02:54:09.280
get into it

02:54:09.280 --> 02:54:12.610
I'd like to put the emphasis on community development we're

02:54:12.610 --> 02:54:13.180
not the

02:54:13.180 --> 02:54:16.229
developers Alliance we're not here to try and get the city

02:54:16.229 --> 02:54:17.200
to redact all its

02:54:17.200 --> 02:54:20.069
rules so developers can come in and do what they want but

02:54:20.069 --> 02:54:21.760
we're here working on

02:54:21.760 --> 02:54:24.680
behalf of the community and the property owners and the

02:54:24.680 --> 02:54:25.559
people who maintain

02:54:25.559 --> 02:54:29.559
property and manage property and live in property and work

02:54:29.559 --> 02:54:31.079
and play here to have a

02:54:31.079 --> 02:54:37.299
community that develops providing opportunities similar for

02:54:37.299 --> 02:54:37.639
the

02:54:37.639 --> 02:54:40.590
undeveloped elements of the community that the development

02:54:40.590 --> 02:54:41.680
commit elements had

02:54:41.680 --> 02:54:46.299
when they came here and in general we not sure where we

02:54:46.299 --> 02:54:47.520
stand on this

02:54:47.520 --> 02:54:52.360
particular ordinance when it when I worked on ordinances or

02:54:52.360 --> 02:54:53.319
items similar to

02:54:53.319 --> 02:54:59.510
this we usually start with with before principles and

02:54:59.510 --> 02:55:02.680
practices we we have I

02:55:02.680 --> 02:55:05.670
had the word in the head top my head a minute ago and now I

02:55:05.670 --> 02:55:06.760
forgot it but what

02:55:06.760 --> 02:55:09.340
are the guiding things we know we want to keep the water

02:55:09.340 --> 02:55:10.120
quality in Lake

02:55:10.120 --> 02:55:13.200
Louisville it's a it's where our drinking water comes from

02:55:13.200 --> 02:55:14.040
that's a fact

02:55:14.040 --> 02:55:18.600
a principle a policy is that we don't want development to

02:55:18.600 --> 02:55:20.159
degrade the water

02:55:20.159 --> 02:55:23.770
quality in Lake Louisville is and then what are the

02:55:23.770 --> 02:55:25.399
practices we provide

02:55:25.399 --> 02:55:28.489
protections against what would degrade development

02:55:28.489 --> 02:55:30.159
practices that would degrade

02:55:30.159 --> 02:55:33.829
the water quality and maybe we provide incentives for those

02:55:33.829 --> 02:55:34.840
practices that

02:55:34.840 --> 02:55:38.270
might help improve the water quality above what it is today

02:55:38.270 --> 02:55:39.120
certainly we don't

02:55:39.120 --> 02:55:44.020
have a Boston Harbor issue or a Chicago issue where we got

02:55:44.020 --> 02:55:45.399
meat fats floating on

02:55:45.399 --> 02:55:48.420
top of the river allowing it to burn across town and and

02:55:48.420 --> 02:55:49.600
destroy the rest of

02:55:49.600 --> 02:55:59.280
the city the DCDA submitted 43 comments to staff those are

02:55:59.280 --> 02:56:00.920
included in the 61 in

02:56:00.920 --> 02:56:04.639
the list that you were given our concern is that in that

02:56:04.639 --> 02:56:06.079
list what is missing is

02:56:06.079 --> 02:56:10.069
a column there's not a column in there that shows the staff

02:56:10.069 --> 02:56:11.239
comments related

02:56:11.239 --> 02:56:13.510
to responses to our comments how they might have been

02:56:13.510 --> 02:56:14.600
addressed or thought of

02:56:14.600 --> 02:56:18.540
or whether they were good or not good or should be included

02:56:18.540 --> 02:56:19.440
in the TCM or

02:56:19.440 --> 02:56:22.059
whatever there's that's there's just nothing there related

02:56:22.059 --> 02:56:22.680
to the staff's

02:56:22.680 --> 02:56:27.260
position secondly related to that the draft ordinance you

02:56:27.260 --> 02:56:28.280
have tonight is the

02:56:28.280 --> 02:56:31.059
same draft ordinance that we were given the comment on a

02:56:31.059 --> 02:56:33.159
couple of months ago so

02:56:33.159 --> 02:56:35.750
apparently our comments were not very impressive because it

02:56:35.750 --> 02:56:36.520
made absolutely

02:56:36.520 --> 02:56:41.319
zero changes in the ordinance that's being presented

02:56:41.319 --> 02:56:43.920
tonight again when it

02:56:43.920 --> 02:56:48.479
comes to policy I believe Deborah stated there was only one

02:56:48.479 --> 02:56:49.799
policy change in the

02:56:49.799 --> 02:56:54.360
overall ordinance and that was increasing to require

02:56:54.360 --> 02:56:54.959
commercial

02:56:54.959 --> 02:56:57.920
properties to be subject to the upland habitat prepers

02:56:57.920 --> 02:57:02.639
preservations and that's the only one that we saw that that

02:57:02.639 --> 02:57:03.600
was addressed or

02:57:03.600 --> 02:57:05.899
thought of in all the comments we had and I can't say that

02:57:05.899 --> 02:57:06.680
's a movement in the

02:57:06.680 --> 02:57:08.840
wrong direction just saying that's the only policy

02:57:08.840 --> 02:57:10.000
statement that seems to have

02:57:10.000 --> 02:57:12.950
been addressed in all this and when it comes to practices

02:57:12.950 --> 02:57:13.920
we don't see that

02:57:13.920 --> 02:57:17.079
there are any changes a couple of things that we have most

02:57:17.079 --> 02:57:18.200
interest in and one of

02:57:18.200 --> 02:57:21.159
them is the process the fact that has to go through a

02:57:21.159 --> 02:57:23.559
zoning ordinance ESA's oh

02:57:23.559 --> 02:57:27.360
man I'm going fast ESA's are land characteristics not land

02:57:27.360 --> 02:57:29.239
uses the

02:57:29.239 --> 02:57:33.819
council can hear a plat if it wants to it has the authority

02:57:33.819 --> 02:57:35.079
to delegate plat

02:57:35.079 --> 02:57:39.159
approvals to PNZ this could be kept going to council it

02:57:39.159 --> 02:57:39.959
could have public

02:57:39.959 --> 02:57:42.799
hearings but with the zoning ordinance is subject to the

02:57:42.799 --> 02:57:43.959
supermajority rules

02:57:43.959 --> 02:57:47.489
and the neighbors opposing and I've got a couple of

02:57:47.489 --> 02:57:49.280
examples of ESA's I wouldn't

02:57:49.280 --> 02:57:51.440
do one for a client unless I get paid in front because they

02:57:51.440 --> 02:57:52.120
got very little

02:57:52.120 --> 02:57:54.879
chance of getting through because of the zoning process and

02:57:54.879 --> 02:57:55.799
I think there's other

02:57:55.799 --> 02:57:59.520
processes that could do that when it comes to the 50 cubic

02:57:59.520 --> 02:58:00.600
yards of fill on a

02:58:00.600 --> 02:58:05.159
piece of land that's less than a half inch over an acre we

02:58:05.159 --> 02:58:07.719
have meaningless

02:58:07.719 --> 02:58:11.829
offers of how you can get into the developed floodplain

02:58:11.829 --> 02:58:13.120
because it's not

02:58:13.120 --> 02:58:16.639
worth getting into for that little mountain so could go on

02:58:16.639 --> 02:58:18.799
and on but I'll obviously stop thank you

02:58:18.799 --> 02:58:22.360
I have a question for you yes did you have any meetings

02:58:22.360 --> 02:58:22.760
with city

02:58:22.760 --> 02:58:26.200
staff on your 43 comments or did you submit the comments

02:58:26.200 --> 02:58:27.920
and no follow-up

02:58:27.920 --> 02:58:31.040
meetings to talk about them Deborah and I met on December

02:58:31.040 --> 02:58:33.360
the 22nd and went over

02:58:33.360 --> 02:58:36.149
them I hand my comments were mostly handwritten at that

02:58:36.149 --> 02:58:37.159
time and we discussed

02:58:37.159 --> 02:58:40.010
them and she explained to me the history of the why they're

02:58:40.010 --> 02:58:40.879
using the zoning

02:58:40.879 --> 02:58:44.610
ordinance and not another mechanism to bring those items

02:58:44.610 --> 02:58:46.440
before counsel and then

02:58:46.440 --> 02:58:51.000
I wrote up all of the comments and submitted to her on

02:58:51.000 --> 02:58:52.579
behalf of DCDA after

02:58:52.579 --> 02:58:56.010
that okay but did you have any follow-up conversations of

02:58:56.010 --> 02:58:57.680
what have we done on

02:58:57.680 --> 02:59:00.850
item for aid or whatever it's just these are the comments

02:59:00.850 --> 02:59:02.040
and then there's no

02:59:02.040 --> 02:59:05.719
follow-up of no Deborah did help me become aware when it

02:59:05.719 --> 02:59:07.040
was going to come as

02:59:07.040 --> 02:59:12.750
a workshop item but we had no real discussions back and

02:59:12.750 --> 02:59:13.719
forth or with our

02:59:13.719 --> 02:59:19.110
group regarding the merits of any any particular item that

02:59:19.110 --> 02:59:21.840
was brought up okay

02:59:21.840 --> 02:59:26.799
Commissioner Ellis thank you chair hi mr. Allison can you

02:59:26.799 --> 02:59:27.799
share with me how you

02:59:27.799 --> 02:59:29.950
would like to see the procedure would you like it to have

02:59:29.950 --> 02:59:31.079
its own procedure as

02:59:31.079 --> 02:59:37.520
far as an alternative ECA yes a the alternative ESA is fine

02:59:37.520 --> 02:59:38.239
it's just that

02:59:38.239 --> 02:59:44.459
instead of going forward as a zoning it could go forward as

02:59:44.459 --> 02:59:46.120
either a subdivision

02:59:46.120 --> 02:59:49.979
variance or just like an alternative development plan does

02:59:49.979 --> 02:59:51.040
now it's just that

02:59:51.040 --> 02:59:54.469
the council could say for I believe they can and I'm not

02:59:54.469 --> 02:59:55.559
gonna ask you to chime in

02:59:55.559 --> 02:59:59.260
now mr. Flores but you'll give the final say so I think the

02:59:59.260 --> 03:00:00.239
council could say

03:00:00.239 --> 03:00:03.959
we're not gonna delegate approval of alternative ESAs to PN

03:00:03.959 --> 03:00:04.959
Z and it has to go

03:00:04.959 --> 03:00:08.239
to City Council well I was just gonna make a comment after

03:00:08.239 --> 03:00:09.639
after you finished

03:00:09.639 --> 03:00:12.889
but maybe if I can have Deborah come up because I know we

03:00:12.889 --> 03:00:14.879
discussed this because

03:00:14.879 --> 03:00:17.459
there's been some talk about what the process or appeal

03:00:17.459 --> 03:00:18.200
process would be

03:00:18.200 --> 03:00:22.760
Deborah would you mind explaining the difference between

03:00:22.760 --> 03:00:24.360
designation of an ESA

03:00:24.360 --> 03:00:30.729
and then approval of an alternative plan the designation of

03:00:30.729 --> 03:00:31.680
an ESA is

03:00:31.680 --> 03:00:36.739
determined by a field assessment okay we have we have the E

03:00:36.739 --> 03:00:38.120
SA map which is a

03:00:38.120 --> 03:00:43.420
first chance to to to look into areas that should be

03:00:43.420 --> 03:00:45.760
protected if the ESAs if

03:00:45.760 --> 03:00:50.319
there is questions about the validity of the map as is

03:00:50.319 --> 03:00:52.719
shown the applicant has

03:00:52.719 --> 03:00:57.299
the right to request a field assessment either staff will

03:00:57.299 --> 03:00:59.079
do it at the applicant

03:00:59.079 --> 03:01:02.879
request or the applicant can hire a consultant a biologist

03:01:02.879 --> 03:01:04.680
to do it and what

03:01:04.680 --> 03:01:11.559
it does is go through a criteria of vegetation of soil and

03:01:11.559 --> 03:01:13.440
hydrology okay and

03:01:13.440 --> 03:01:16.770
we look into what is in the back what is about the bank and

03:01:16.770 --> 03:01:19.479
so on so it is a the

03:01:19.479 --> 03:01:22.059
criteria that we use is the same very similar to what the

03:01:22.059 --> 03:01:22.920
Court of Engineers

03:01:22.920 --> 03:01:27.979
have been used when we did our research we research not

03:01:27.979 --> 03:01:30.159
only state of Texas but

03:01:30.159 --> 03:01:34.319
nationwide and so on so this is the typical criteria that a

03:01:34.319 --> 03:01:35.520
for example a

03:01:35.520 --> 03:01:41.379
wetland delineator we use okay so after we go to this to

03:01:41.379 --> 03:01:42.639
the side we do the

03:01:42.639 --> 03:01:46.219
assessment or the applicants submit their assessment

03:01:46.219 --> 03:01:47.680
through a third party

03:01:47.680 --> 03:01:53.840
we review it if we concord with the with the conclusions

03:01:53.840 --> 03:01:55.079
either the ESA is there

03:01:55.079 --> 03:02:00.229
or the ESA is there but not as shown is moved around or the

03:02:00.229 --> 03:02:01.559
type of ESA is

03:02:01.559 --> 03:02:06.530
different then we will issue a memo to the planning

03:02:06.530 --> 03:02:08.120
director to request the

03:02:08.120 --> 03:02:11.700
change the officially change of the map I guess my question

03:02:11.700 --> 03:02:12.440
is to be more

03:02:12.440 --> 03:02:17.840
specific is the the appellate board or the board that would

03:02:17.840 --> 03:02:18.680
that would hear the

03:02:18.680 --> 03:02:24.879
the appeal for one for for ESA determinations and two for

03:02:24.879 --> 03:02:25.319
alternative

03:02:25.319 --> 03:02:29.180
plans okay the new process proposed for appealing and again

03:02:29.180 --> 03:02:29.840
this is completely

03:02:29.840 --> 03:02:34.510
new is it would be through the zoning board of adjustment

03:02:34.510 --> 03:02:36.239
process meaning that

03:02:36.239 --> 03:02:39.399
there will be a public hearing advertisement and all that

03:02:39.399 --> 03:02:40.280
and it will

03:02:40.280 --> 03:02:42.860
be the applicant will have a chance to make their case a

03:02:42.860 --> 03:02:44.520
staff would provide a

03:02:44.520 --> 03:02:50.569
recommendation and then that's how the appeal of a staff

03:02:50.569 --> 03:02:52.520
determination of what

03:02:52.520 --> 03:02:55.799
type of ESA or the president of the ESA is going to be okay

03:02:55.799 --> 03:02:56.719
the difference

03:02:56.719 --> 03:03:00.010
between that and the alternative ESA plan is that it goes

03:03:00.010 --> 03:03:01.040
through the planning

03:03:01.040 --> 03:03:04.729
and zoning Commission and City Council now is the

03:03:04.729 --> 03:03:07.399
alternative is that process

03:03:07.399 --> 03:03:13.659
any different than it is currently no no it is is is follow

03:03:13.659 --> 03:03:14.719
the same so the only

03:03:14.719 --> 03:03:19.319
difference the only change to the ESA ordinance is the

03:03:19.319 --> 03:03:21.319
additional appellate

03:03:21.319 --> 03:03:25.920
procedure before be zoning board of adjustment correct for

03:03:25.920 --> 03:03:26.120
ESA

03:03:26.120 --> 03:03:33.559
determinations at the outset correct okay and mr. Allison I

03:03:33.559 --> 03:03:34.399
'm not sure that

03:03:34.399 --> 03:03:39.700
helps or answers clarifies in any of the questions you had

03:03:39.700 --> 03:03:41.920
not at all

03:03:43.079 --> 03:03:47.639
he says they're still not in my mind still not a zoning

03:03:47.639 --> 03:03:49.920
issue and when you're

03:03:49.920 --> 03:03:53.819
looking at the presence of an ESA and staff determination

03:03:53.819 --> 03:03:55.040
that can be appealed

03:03:55.040 --> 03:03:58.059
via the zoning board of adjustments again you're back into

03:03:58.059 --> 03:03:59.000
the zone but I've

03:03:59.000 --> 03:04:01.649
never really had any issues with that then once it's

03:04:01.649 --> 03:04:03.200
established that there is

03:04:03.200 --> 03:04:06.959
an ESA and you want to modify that ESA then you have to go

03:04:06.959 --> 03:04:07.879
through the

03:04:07.879 --> 03:04:10.920
alternative ESA problem because the alternative ESA is not

03:04:10.920 --> 03:04:11.760
addressed whether

03:04:11.760 --> 03:04:14.520
it's there or not it's how do we deal with the one that is

03:04:14.520 --> 03:04:15.559
there and then

03:04:15.559 --> 03:04:19.290
that gets run through as a zoning process and the real

03:04:19.290 --> 03:04:20.399
issue with the

03:04:20.399 --> 03:04:25.399
zoning process is not rather P&Z and City Council hear it

03:04:25.399 --> 03:04:26.239
not whether there's

03:04:26.239 --> 03:04:31.239
a public hearing or not the real issue is driving the super

03:04:31.239 --> 03:04:32.399
majority requirement

03:04:32.399 --> 03:04:36.959
I've had instances where staff is recommended approval and

03:04:36.959 --> 03:04:37.680
because of

03:04:37.680 --> 03:04:41.479
neighbors public opinion that drove a super majority

03:04:41.479 --> 03:04:43.040
council voted against it

03:04:43.040 --> 03:04:45.920
I had a previous P&Z member come to me one time and say why

03:04:45.920 --> 03:04:46.840
don't y'all put

03:04:46.840 --> 03:04:49.420
that retaining wall there you should have moved it way up

03:04:49.420 --> 03:04:50.079
closer I said

03:04:50.079 --> 03:04:52.959
because you wouldn't let us you know you wouldn't approve

03:04:52.959 --> 03:04:54.760
that alternate ESA and

03:04:54.760 --> 03:05:00.979
I won't go further into that but that's the kind of things

03:05:00.979 --> 03:05:02.760
we're dealing with

03:05:02.760 --> 03:05:05.149
with that type of the process the alternative ESA in

03:05:05.149 --> 03:05:06.319
general is not an

03:05:06.319 --> 03:05:10.389
issue with it it's the actual process with the not even the

03:05:10.389 --> 03:05:11.700
public hearing is

03:05:11.700 --> 03:05:15.299
the potential of the super majority as you would for land

03:05:15.299 --> 03:05:16.760
use versus modifying

03:05:16.760 --> 03:05:21.319
land characteristics FEMA doesn't have to go through a

03:05:21.319 --> 03:05:23.079
zoning process to change

03:05:23.079 --> 03:05:26.709
the maps and yet we have to go through that to let us do

03:05:26.709 --> 03:05:28.239
things that FEMA would

03:05:28.239 --> 03:05:33.040
allow us to do that the city doesn't even allow us to do

03:05:33.040 --> 03:05:34.559
and it's kind of

03:05:34.559 --> 03:05:38.309
like well just like the National Flood Insurance Program do

03:05:38.309 --> 03:05:39.559
our ordinances help

03:05:39.559 --> 03:05:43.309
set a maximum insurance rate here yes what are the

03:05:43.309 --> 03:05:45.360
insurance company charging

03:05:45.360 --> 03:05:49.209
here should we relax our ordinances to let that maximum

03:05:49.209 --> 03:05:50.280
come down I've seen

03:05:50.280 --> 03:05:55.200
that with fire a good reason to have ordinances is to keep

03:05:55.200 --> 03:05:56.639
your maximum rate

03:05:56.639 --> 03:05:59.270
down but if the insurance companies aren't charging

03:05:59.270 --> 03:06:00.280
anywhere near that rate

03:06:00.280 --> 03:06:03.809
anyway are we realizing that economic benefit are we really

03:06:03.809 --> 03:06:04.639
accomplishing our

03:06:04.639 --> 03:06:12.629
goals maybe Deborah if you could explain the rationale

03:06:12.629 --> 03:06:16.159
behind having it before

03:06:16.159 --> 03:06:21.559
PNC versus MUE originally the alternative ESA plan and the

03:06:21.559 --> 03:06:22.319
ADP follow

03:06:22.319 --> 03:06:27.360
the same process it was meant for to go through PNC and

03:06:27.360 --> 03:06:29.680
City Council the then

03:06:29.680 --> 03:06:36.180
that the ADP were process change and ESA stand following

03:06:36.180 --> 03:06:37.159
the the original

03:06:37.159 --> 03:06:42.719
procedure the reason why PNC City Council of retain is they

03:06:42.719 --> 03:06:46.000
feel that they

03:06:46.000 --> 03:06:50.729
want to have the ability to hear those cases as a public

03:06:50.729 --> 03:06:53.840
hearing I correct me

03:06:53.840 --> 03:06:56.780
if around if there's any other procedures current

03:06:56.780 --> 03:06:58.079
procedures outline in

03:06:58.079 --> 03:07:01.879
subchapter 3 that go through public hearings without the

03:07:01.879 --> 03:07:02.760
super majority

03:07:02.760 --> 03:07:12.520
that's there's not so that would have been for for to take

03:07:12.520 --> 03:07:15.360
the super majority

03:07:15.360 --> 03:07:19.540
possibility out of the context of the hearing then a new

03:07:19.540 --> 03:07:21.040
process will have to

03:07:21.040 --> 03:07:28.139
be crafted and spell out in subchapter 3 and then sub

03:07:28.139 --> 03:07:29.959
chapter 17 will have to

03:07:29.959 --> 03:07:35.149
say this process the alternative ESA plan will follow this

03:07:35.149 --> 03:07:37.639
new process

03:07:37.799 --> 03:07:41.229
well I'll just chime in and I'm a recognized Commissioner

03:07:41.229 --> 03:07:42.120
back that was

03:07:42.120 --> 03:07:45.200
one of the things I mentioned in work session that's a

03:07:45.200 --> 03:07:46.799
concern of mine as well

03:07:46.799 --> 03:07:50.620
is that it's it's great to offer that as an alternative

03:07:50.620 --> 03:07:51.799
kind of a lot of the

03:07:51.799 --> 03:07:54.450
discussion that we had but at the end of the day it becomes

03:07:54.450 --> 03:07:55.479
a political decision

03:07:55.479 --> 03:07:58.959
as to whether you're going to get an alternative ESA plan

03:07:58.959 --> 03:08:00.280
granted or not it's

03:08:00.280 --> 03:08:03.959
not a criteria if you do these four things it gets approved

03:08:03.959 --> 03:08:05.239
it's you can do

03:08:05.239 --> 03:08:08.670
all these things and we still may as a body not approve it

03:08:08.670 --> 03:08:09.959
and so that's one of

03:08:09.959 --> 03:08:12.620
the concerns that I shared at work session I want to just

03:08:12.620 --> 03:08:13.479
bring back here

03:08:13.479 --> 03:08:18.879
at this point to Commissioner back thank you chair Lee

03:08:18.879 --> 03:08:20.680
first of all thanks for

03:08:20.680 --> 03:08:23.520
coming up and making your presentation it makes me a little

03:08:23.520 --> 03:08:24.440
bit more aware of

03:08:24.440 --> 03:08:27.680
what's out there and you know you and I usually stand on

03:08:27.680 --> 03:08:28.600
opposite sides of thing

03:08:28.600 --> 03:08:31.770
but I have a lot of respect for you and as a result of that

03:08:31.770 --> 03:08:32.479
I am kind of

03:08:32.479 --> 03:08:35.520
disappointed here that how many of these suggestions that

03:08:35.520 --> 03:08:36.559
are here did you say

03:08:36.559 --> 03:08:43.459
were yours about 30 or 60 percent of them listed there now

03:08:43.459 --> 03:08:44.840
other people may

03:08:44.840 --> 03:08:48.260
have commented on the same thing but we submitted 43

03:08:48.260 --> 03:08:49.920
comments that got included

03:08:49.920 --> 03:08:54.000
in that full list of 61 by us and others and I think you

03:08:54.000 --> 03:08:54.600
should have a fair

03:08:54.600 --> 03:08:56.739
hearing on that I know in the past we've talked about the

03:08:56.739 --> 03:08:57.520
tree code we talked

03:08:57.520 --> 03:09:00.120
about doing workshops on that because there was a the devil

03:09:00.120 --> 03:09:00.719
's are in the the

03:09:00.719 --> 03:09:03.659
devil is in the details and we haven't had that yet either

03:09:03.659 --> 03:09:04.760
and I hope we do

03:09:04.760 --> 03:09:07.379
because I want to hear both sides the argument I don't want

03:09:07.379 --> 03:09:08.200
anybody to be

03:09:08.200 --> 03:09:12.989
railroaded so would workshops as much as I know staff would

03:09:12.989 --> 03:09:14.239
like to see this go

03:09:14.239 --> 03:09:18.350
forward I kind of like to see it go forward too but at the

03:09:18.350 --> 03:09:18.920
same time I'd

03:09:18.920 --> 03:09:22.909
like to make sure that everybody's had a fair hearing so

03:09:22.909 --> 03:09:24.280
workshops with that

03:09:24.280 --> 03:09:27.969
benefit you where we can all sit down and hear your griev

03:09:27.969 --> 03:09:29.239
ances along with

03:09:29.239 --> 03:09:33.389
staff that would be appreciated and I'd also like to say in

03:09:33.389 --> 03:09:34.680
the last year the

03:09:34.680 --> 03:09:37.870
staff across the board has been making noble efforts to try

03:09:37.870 --> 03:09:38.840
and correct a lot

03:09:38.840 --> 03:09:42.030
of things and fix a lot of things and thanks for saying I

03:09:42.030 --> 03:09:43.159
get up talk about

03:09:43.159 --> 03:09:46.000
the one or two things we have an issue with versus the

03:09:46.000 --> 03:09:47.360
thousands of things that

03:09:47.360 --> 03:09:50.790
are going great but yes that we have appreciated okay well

03:09:50.790 --> 03:09:51.159
that'd be something

03:09:51.159 --> 03:09:54.079
to consider them thank you

03:09:55.360 --> 03:09:59.920
I see no other questions thank you this is a public hearing

03:09:59.920 --> 03:10:00.680
anyone else who would

03:10:00.680 --> 03:10:04.319
like to come speak on this island please come forward at

03:10:04.319 --> 03:10:09.239
this time seeing none

03:10:09.239 --> 03:10:12.440
will close the public hearing and I will open the floor for

03:10:12.440 --> 03:10:13.319
discussion or a

03:10:13.319 --> 03:10:27.159
motion Commissioner Beck thank you chair now as I mentioned

03:10:27.159 --> 03:10:30.319
mr. Allison for the

03:10:30.319 --> 03:10:32.750
most part I have no problem with this revision there's a

03:10:32.750 --> 03:10:33.879
lot of good stuff to

03:10:33.879 --> 03:10:37.920
it but on the other hand and I've heard expressed with

03:10:37.920 --> 03:10:39.319
commissioners in the in

03:10:39.319 --> 03:10:42.840
our work session too that some more discussion is probably

03:10:42.840 --> 03:10:44.040
needed on this so

03:10:44.040 --> 03:10:47.840
I wouldn't be reluctant to putting this off a little bit

03:10:47.840 --> 03:10:49.319
longer I know it's been

03:10:49.319 --> 03:10:52.549
13 months never know you're eager to but I want to make

03:10:52.549 --> 03:10:53.959
sure that both sides are

03:10:53.959 --> 03:10:57.549
heard and there is counter arguments to the concerns

03:10:57.549 --> 03:10:59.239
everybody has here that I'd

03:10:59.239 --> 03:11:02.030
like to present to and get them out there in the open and

03:11:02.030 --> 03:11:02.440
have that

03:11:02.440 --> 03:11:08.290
opportunity so you know if we consider this a motion to

03:11:08.290 --> 03:11:09.760
move forward I wouldn't

03:11:09.760 --> 03:11:12.340
be opposed to that I'm not gonna make a motion at this time

03:11:12.340 --> 03:11:14.799
okay

03:11:14.799 --> 03:11:17.719
you mean Commissioner Ellis thank you chair yeah I mean I

03:11:17.719 --> 03:11:18.559
have some of those

03:11:18.559 --> 03:11:22.889
same thoughts we we have too many unanswered questions I

03:11:22.889 --> 03:11:23.760
think and too

03:11:23.760 --> 03:11:26.340
many things that that I guess haven't been addressed

03:11:26.340 --> 03:11:27.379
whether we haven't had

03:11:27.379 --> 03:11:32.680
enough time together to to to address them or not but it

03:11:32.680 --> 03:11:34.319
does seem like we

03:11:34.319 --> 03:11:39.149
need more discussion just to get those things answered so

03:11:39.149 --> 03:11:41.360
that that we can move

03:11:41.360 --> 03:11:44.440
forward with a recommendation most of this I like there

03:11:44.440 --> 03:11:46.399
just seems to be a few

03:11:46.399 --> 03:11:49.520
questions out there and in concerns that that haven't been

03:11:49.520 --> 03:11:51.139
answered yet and I

03:11:51.139 --> 03:11:53.350
think it's been lack of time both of our work sessions the

03:11:53.350 --> 03:11:54.159
last two meetings

03:11:54.159 --> 03:11:57.360
we've literally run out of time in the middle of your

03:11:57.360 --> 03:11:58.920
presentation so I don't

03:11:58.920 --> 03:12:01.930
know how we can fix that if we can if we can move that to

03:12:01.930 --> 03:12:03.319
another work session or

03:12:03.319 --> 03:12:07.139
how we do that but we need some kind of uninterrupted time

03:12:07.139 --> 03:12:08.360
to be able to I think

03:12:08.360 --> 03:12:12.409
get to the bottom of some of these concerns so that we can

03:12:12.409 --> 03:12:13.440
give a

03:12:13.440 --> 03:12:16.520
recommendation I don't think we're there tonight

03:12:16.520 --> 03:12:21.079
Commissioner Sanchez yeah I know we we spent a lot of time

03:12:21.079 --> 03:12:22.159
discussing this and

03:12:22.159 --> 03:12:25.069
I'm still kind of confused this whole thing since this is

03:12:25.069 --> 03:12:26.799
the first time I you

03:12:26.799 --> 03:12:30.430
know I'm relatively new again but I think we need more time

03:12:30.430 --> 03:12:31.360
to discuss it

03:12:31.360 --> 03:12:34.670
that was I think one of the things we said at our work

03:12:34.670 --> 03:12:36.079
session is that we need

03:12:36.079 --> 03:12:39.510
a little bit more time so I'd like to see this postponed

03:12:39.510 --> 03:12:41.559
and have another run

03:12:41.559 --> 03:12:47.479
at it and see what comes out of the more understanding

03:12:50.399 --> 03:12:57.040
staff is willing to do a and another work session we can

03:12:57.040 --> 03:12:58.239
either have a regular

03:12:58.239 --> 03:13:02.200
work session of an hour just for ESA or we can have an

03:13:02.200 --> 03:13:04.200
early work session or we

03:13:04.200 --> 03:13:08.909
can have just a work session not right before the regular P

03:13:08.909 --> 03:13:10.799
NC sessions in that

03:13:10.799 --> 03:13:13.670
way there will be more time for discussion if that's

03:13:13.670 --> 03:13:14.799
something that you

03:13:14.799 --> 03:13:20.110
would like to to do this is a public hearing we already

03:13:20.110 --> 03:13:21.879
notified so if you

03:13:21.879 --> 03:13:27.430
can determine that a date to continue and then between now

03:13:27.430 --> 03:13:28.879
and that day to

03:13:28.879 --> 03:13:31.459
have the work session meeting with you the staff is

03:13:31.459 --> 03:13:32.760
perfectly fine with that

03:13:32.760 --> 03:13:41.000
and then I have the 61 comments I have answers for those

03:13:41.000 --> 03:13:44.360
the the reason why that

03:13:44.360 --> 03:13:48.350
those were not reflected on the draft that you were reading

03:13:48.350 --> 03:13:49.399
is because those

03:13:49.399 --> 03:13:56.010
were the changes that COE have heard and was vetted through

03:13:56.010 --> 03:13:57.680
it however that

03:13:57.680 --> 03:14:01.649
doesn't means that you can make a proposed change to the to

03:14:01.649 --> 03:14:02.639
the language

03:14:02.639 --> 03:14:05.520
and that as a part of your recommendation when the public

03:14:05.520 --> 03:14:05.879
hearing

03:14:05.879 --> 03:14:15.040
is done so we will provide answers for those for you 61

03:14:15.040 --> 03:14:17.760
comments right now if

03:14:17.760 --> 03:14:22.639
you have a specific questions please please please send it

03:14:22.639 --> 03:14:24.239
to me and I will

03:14:24.239 --> 03:14:30.590
make sure that those items are extensively discussed during

03:14:30.590 --> 03:14:31.200
the work

03:14:31.200 --> 03:14:35.440
session items some of you have sent me questions by email

03:14:35.440 --> 03:14:36.959
and those have been

03:14:36.959 --> 03:14:42.360
answered as well so please take the chance to send me those

03:14:42.360 --> 03:14:43.079
emails in that

03:14:43.079 --> 03:14:47.639
way I can really tailor the work session to address those

03:14:47.639 --> 03:14:49.120
comments or those

03:14:49.120 --> 03:14:53.260
questions to your question I guess I'll give some thoughts

03:14:53.260 --> 03:14:56.360
and feedback so the

03:14:56.360 --> 03:14:59.790
the backup that we had with all the comments the process

03:14:59.790 --> 03:15:00.959
went those went to

03:15:00.959 --> 03:15:10.290
the COE and they chose essentially to not from October of

03:15:10.290 --> 03:15:15.200
2016 through I'm sorry

03:15:15.200 --> 03:15:21.780
August of 2013 of 2016 through August of 2017 so those are

03:15:21.780 --> 03:15:23.239
the the 13 month

03:15:23.239 --> 03:15:26.319
abetting process that we did with the COE when we have

03:15:26.319 --> 03:15:27.520
finished all those

03:15:27.520 --> 03:15:32.829
comments those were the the draft posted online for public

03:15:32.829 --> 03:15:35.920
input so the COE have

03:15:35.920 --> 03:15:41.409
not seen those comments and we were hoping that after going

03:15:41.409 --> 03:15:42.799
through PNC we

03:15:42.799 --> 03:15:46.399
collect your input your recommendation whatever changes you

03:15:46.399 --> 03:15:47.479
are proposing and

03:15:47.479 --> 03:15:52.370
forward those to the the City Council as a whole and

03:15:52.370 --> 03:15:54.719
showing what the COE have

03:15:54.719 --> 03:16:00.149
proposed what the PNC is now proposing and then show the

03:16:00.149 --> 03:16:02.319
list of public input

03:16:02.319 --> 03:16:05.549
that we have received if necessary we will provide a

03:16:05.549 --> 03:16:07.040
written a response for

03:16:07.040 --> 03:16:11.639
every single of them I went through them I have responses

03:16:11.639 --> 03:16:14.399
so we can do that so in

03:16:14.399 --> 03:16:18.459
that way everybody who has been involved in the process

03:16:18.459 --> 03:16:20.120
from the get-go can see

03:16:20.120 --> 03:16:24.170
the changes throughout and City Council can make a final

03:16:24.170 --> 03:16:25.120
recommendation or a

03:16:25.120 --> 03:16:29.840
final decision well I think that would be a good step for

03:16:29.840 --> 03:16:32.360
us to have I know for

03:16:32.360 --> 03:16:34.450
this Commission and a lot of times we sit up here and one

03:16:34.450 --> 03:16:35.000
of the first

03:16:35.000 --> 03:16:37.629
questions we ask when it's a private have y'all had a

03:16:37.629 --> 03:16:39.079
neighborhood meeting and

03:16:39.079 --> 03:16:43.020
this is a neighborhood meeting comment to me and when we

03:16:43.020 --> 03:16:44.159
have those come to us

03:16:44.159 --> 03:16:46.399
the first thing we turn around to the developer of all

03:16:46.399 --> 03:16:47.440
these things that were

03:16:47.440 --> 03:16:50.479
brought up in your neighborhood meeting what you do about

03:16:50.479 --> 03:16:52.159
them and usually the

03:16:52.159 --> 03:16:55.760
reception is we didn't do anything with them is not

03:16:55.760 --> 03:16:58.000
received well and I think

03:16:58.000 --> 03:17:00.899
it's good just from the city standpoint when we ask people

03:17:00.899 --> 03:17:01.719
to do that even

03:17:01.719 --> 03:17:04.920
though it's not mandatory it's highly encouraged go have a

03:17:04.920 --> 03:17:05.319
neighborhood

03:17:05.319 --> 03:17:08.600
meeting hopefully there's some resolution there if there

03:17:08.600 --> 03:17:09.040
can't be we

03:17:09.040 --> 03:17:11.899
understand we want to hear both sides of it and then this

03:17:11.899 --> 03:17:13.079
board or Commission can

03:17:13.079 --> 03:17:16.059
make a determination and move it to City Council I think

03:17:16.059 --> 03:17:17.399
that's an important step

03:17:17.399 --> 03:17:22.120
for us as a city to lead by example that we ask other

03:17:22.120 --> 03:17:23.719
people to do that and I

03:17:23.719 --> 03:17:26.659
think we should do that too to be able to say hey we got 60

03:17:26.659 --> 03:17:27.959
-something comments

03:17:27.959 --> 03:17:31.860
20 of them we addressed 20 of them we didn't agree with and

03:17:31.860 --> 03:17:32.959
20 of these we'd

03:17:32.959 --> 03:17:35.319
like to throw up here and you guys can bat them around and

03:17:35.319 --> 03:17:35.959
decide which

03:17:35.959 --> 03:17:37.899
direction you want to go on them and I think that's

03:17:37.899 --> 03:17:39.040
something that should be

03:17:39.040 --> 03:17:42.290
incorporated to your point of kind of next steps how we

03:17:42.290 --> 03:17:44.040
move this forward I'd

03:17:44.040 --> 03:17:47.280
like to see it continued like to see these comments

03:17:47.280 --> 03:17:48.319
addressed so that we can

03:17:48.319 --> 03:17:52.879
come back and say okay we see the processes has moved

03:17:52.879 --> 03:17:54.559
forward and I think

03:17:54.559 --> 03:17:57.729
one of the other comments I would give the difficulty that

03:17:57.729 --> 03:17:59.239
I have when at least

03:17:59.239 --> 03:18:01.940
for me personally is I know there's a tremendous amount of

03:18:01.940 --> 03:18:02.920
effort and work that

03:18:02.920 --> 03:18:06.670
goes on behind the scenes to get the ordinance to place to

03:18:06.670 --> 03:18:07.239
bring it here

03:18:07.239 --> 03:18:09.940
before us and it always seemed like there's been a

03:18:09.940 --> 03:18:11.399
tremendous amount of time

03:18:11.399 --> 03:18:14.370
and then we see it and y'all vote on it and move it and I'm

03:18:14.370 --> 03:18:15.879
like what's the

03:18:15.879 --> 03:18:18.319
process for us to review it what's the process for us to

03:18:18.319 --> 03:18:19.200
get to people that

03:18:19.200 --> 03:18:23.110
send emails telephone calls add those things in there

03:18:23.110 --> 03:18:24.639
versus you see it it

03:18:24.639 --> 03:18:27.409
needs to move to the next level there doesn't that's an

03:18:27.409 --> 03:18:28.680
issue that I personally

03:18:28.680 --> 03:18:31.290
have when we have a lot of these changes I think a lot of

03:18:31.290 --> 03:18:32.200
things clean up lives

03:18:32.200 --> 03:18:35.120
are good in here there's some things as I pointed out

03:18:35.120 --> 03:18:36.280
tonight that I read it I

03:18:36.280 --> 03:18:40.000
go well the intention may be this but that's not what it

03:18:40.000 --> 03:18:41.360
says it needs to be

03:18:41.360 --> 03:18:45.219
cleaned up so that it is very clear you can fill or not

03:18:45.219 --> 03:18:46.840
fill and how you do it

03:18:46.840 --> 03:18:49.139
and some of the other things I brought up and don't want

03:18:49.139 --> 03:18:50.879
rehash and I think

03:18:50.879 --> 03:18:54.129
those are the things that need to happen when these things

03:18:54.129 --> 03:18:54.959
come to us as a

03:18:54.959 --> 03:19:00.520
commission is to have an opportunity to review them make

03:19:00.520 --> 03:19:01.799
comments to their

03:19:01.799 --> 03:19:04.579
suggestions and changes get it good and hopefully move it

03:19:04.579 --> 03:19:05.559
to City Council but

03:19:05.559 --> 03:19:08.200
when it does get the City Council hopefully it's been very

03:19:08.200 --> 03:19:08.799
well vetted

03:19:08.799 --> 03:19:11.889
very clean and they can look at and go you know this looks

03:19:11.889 --> 03:19:12.959
great there's two

03:19:12.959 --> 03:19:15.829
things on here we do different and let's vote on it versus

03:19:15.829 --> 03:19:16.879
it gets to City

03:19:16.879 --> 03:19:20.629
Council and there's 60 questions and people are coming and

03:19:20.629 --> 03:19:21.719
going none of this

03:19:21.719 --> 03:19:24.819
has been addressed and it turns into a bog and those City

03:19:24.819 --> 03:19:26.079
Council spends a lot

03:19:26.079 --> 03:19:29.399
more time on these things than we do and I think one of the

03:19:29.399 --> 03:19:30.879
jobs is us as P&Z

03:19:30.879 --> 03:19:34.020
Commissioners is hopefully to clean it up and do as best as

03:19:34.020 --> 03:19:34.879
we can here and

03:19:34.879 --> 03:19:37.200
move it to them that they can look at and go you know what

03:19:37.200 --> 03:19:38.000
the folks that we

03:19:38.000 --> 03:19:41.899
appointed that board did a good job and we know we're gonna

03:19:41.899 --> 03:19:43.159
do our piece to it

03:19:43.159 --> 03:19:46.729
and approve it not approve it change it or whatever and so

03:19:46.729 --> 03:19:48.000
those would be some

03:19:48.000 --> 03:19:50.760
of my thoughts I know you pose a question and we're still

03:19:50.760 --> 03:19:51.399
open and so I'm

03:19:51.399 --> 03:19:54.450
gonna recognize Commissioner Beck to throw out some other

03:19:54.450 --> 03:19:55.159
things and hopefully

03:19:55.159 --> 03:19:57.590
we can get something put together on next steps for us

03:19:57.590 --> 03:19:58.360
thank you chair

03:19:58.360 --> 03:20:00.680
actually you pretty much said it all what I wanted to do

03:20:00.680 --> 03:20:01.200
was kind of

03:20:01.200 --> 03:20:06.760
encapsulate what we probably should do is set a specific

03:20:06.760 --> 03:20:08.639
work session either

03:20:08.639 --> 03:20:11.409
prior to a regular work session P&Z or maybe even on a

03:20:11.409 --> 03:20:13.760
different day I know I'm

03:20:13.760 --> 03:20:17.200
retired here so I can pretty much do it anytime but it

03:20:17.200 --> 03:20:18.200
makes it difficult for the

03:20:18.200 --> 03:20:20.239
other ones work so that would have to be taking

03:20:20.239 --> 03:20:23.680
consideration right Andrew so but

03:20:23.680 --> 03:20:26.510
we it needs to be distinctive needs to be at least an hour

03:20:26.510 --> 03:20:27.639
I would think you

03:20:27.639 --> 03:20:31.829
know maybe a little bit longer and prior to that if you

03:20:31.829 --> 03:20:33.239
would send us your

03:20:33.239 --> 03:20:36.959
responses to the 60 questions so we can mull over them plus

03:20:36.959 --> 03:20:38.920
we need to have Mr.

03:20:38.920 --> 03:20:43.639
Allison and others in his area his field of expertise come

03:20:43.639 --> 03:20:44.799
there and defend their

03:20:44.799 --> 03:20:47.840
positions on that and I think that way we get a good

03:20:47.840 --> 03:20:49.280
rounded deal so I think if

03:20:49.280 --> 03:20:51.860
we just kind of if I can get a nod from everybody here if

03:20:51.860 --> 03:20:52.840
that's okay I could

03:20:52.840 --> 03:20:56.489
make that motion and we can move forward does anybody see

03:20:56.489 --> 03:20:57.760
problem with that

03:20:57.760 --> 03:21:02.450
process as I just line laid out I think the only point of

03:21:02.450 --> 03:21:03.680
that is just a

03:21:03.680 --> 03:21:08.969
timeframe right I would suggest we want to get it done as

03:21:08.969 --> 03:21:09.319
soon as possible

03:21:09.319 --> 03:21:17.000
probably 21st two weeks two weeks has had enough time for

03:21:17.000 --> 03:21:18.680
everybody we've seen

03:21:18.680 --> 03:21:25.700
a lot of it there's just just a smaller stuff now I'll call

03:21:25.700 --> 03:21:26.360
on make sure that we

03:21:26.360 --> 03:21:28.940
can we can get it done because that's about a week

03:21:28.940 --> 03:21:33.680
turnaround okay okay so

03:21:33.680 --> 03:21:37.870
maybe have a work session start like at 4 o'clock or even 3

03:21:37.870 --> 03:21:43.440
o'clock okay and date

03:21:43.440 --> 03:21:48.750
certain of the 21st with prior to that with the responses

03:21:48.750 --> 03:21:51.280
from Deborah on the

03:21:51.280 --> 03:21:56.920
60 questions and it includes Lee and other members of his

03:21:56.920 --> 03:21:58.799
group that want to

03:21:58.799 --> 03:22:07.760
have their inputs it from from Lee you wanted no actually I

03:22:07.760 --> 03:22:08.639
want your response

03:22:08.639 --> 03:22:12.729
you said you had responses for all that's all we want in an

03:22:12.729 --> 03:22:14.239
email okay and

03:22:14.239 --> 03:22:18.229
Lee just needs to be there to defend his own positions okay

03:22:18.229 --> 03:22:19.319
but by the time he

03:22:19.319 --> 03:22:21.899
gets there will have read your responses to it so we can

03:22:21.899 --> 03:22:23.200
anticipate what he's

03:22:23.200 --> 03:22:33.649
gonna say so that's my motion okay commissioner Ellis thank

03:22:33.649 --> 03:22:34.319
you chair I

03:22:34.319 --> 03:22:37.149
guess just to maybe clarify that you know you've got that

03:22:37.149 --> 03:22:38.159
spreadsheet with

03:22:38.159 --> 03:22:41.719
all the questions in it and if you just add another column

03:22:41.719 --> 03:22:43.280
that just says why or

03:22:43.280 --> 03:22:47.180
why not this is already addressed here you know that would

03:22:47.180 --> 03:22:48.000
that would be really

03:22:48.000 --> 03:22:51.819
helpful you know we want public comment and obviously you

03:22:51.819 --> 03:22:53.040
know you're not going

03:22:53.040 --> 03:22:56.469
to take all those suggestions and incorporate it I'm sure

03:22:56.469 --> 03:22:58.399
but I think you

03:22:58.399 --> 03:23:01.889
know whoever made the comment certainly should know why or

03:23:01.889 --> 03:23:03.559
what your response is

03:23:03.559 --> 03:23:06.739
to the comment and we certainly would love to see that you

03:23:06.739 --> 03:23:07.760
know just it

03:23:07.760 --> 03:23:10.459
doesn't have to be long and drawn out just this is why or

03:23:10.459 --> 03:23:11.440
this is where it's

03:23:11.440 --> 03:23:14.500
located or this is why we can't do that or this is how it's

03:23:14.500 --> 03:23:15.399
addressed or or

03:23:15.399 --> 03:23:19.799
what have you that would be really helpful thank you

03:23:20.799 --> 03:23:27.239
do we need to continue the public hearing to a certain day

03:23:27.239 --> 03:23:32.639
we will thank

03:23:32.639 --> 03:23:37.200
you Commissioner Roselle so first I just wanted to second

03:23:37.200 --> 03:23:38.280
or echo everything that

03:23:38.280 --> 03:23:41.180
the chair said including the appreciation for the amount of

03:23:41.180 --> 03:23:41.479
work

03:23:41.479 --> 03:23:43.719
going into this I don't I know for me it's it's not

03:23:43.719 --> 03:23:45.840
overlooked this seems like

03:23:45.840 --> 03:23:49.649
a lot of work and certainly our my feedback and our

03:23:49.649 --> 03:23:50.799
feedback hopefully is

03:23:50.799 --> 03:23:53.379
not belittling of any of those efforts but I think there

03:23:53.379 --> 03:23:54.360
might be opportunities

03:23:54.360 --> 03:23:59.559
to as chair said strengthen the efficiency of this process

03:23:59.559 --> 03:24:00.319
but with that

03:24:00.319 --> 03:24:04.000
I will second the Commissioner Beck's motion to continue

03:24:04.000 --> 03:24:05.079
this item to date

03:24:05.079 --> 03:24:09.870
certain February 21st with a additional allocation of time

03:24:09.870 --> 03:24:16.159
for work session okay

03:24:16.159 --> 03:24:18.959
we have a first and a second do we have any further

03:24:18.959 --> 03:24:20.120
discussion or is there

03:24:20.120 --> 03:24:30.120
anything legal or staff needs to add to our motion okay

03:24:30.120 --> 03:24:33.120
seeing no further

03:24:33.120 --> 03:24:36.639
discussion I will call for a vote on the board to continue

03:24:36.639 --> 03:24:37.760
to date certain of the

03:24:37.760 --> 03:24:51.770
21st motion to continue carry six to zero that will take us

03:24:51.770 --> 03:24:52.760
to our I think

03:24:52.760 --> 03:25:00.440
our final agenda item this evening is going to be our

03:25:00.440 --> 03:25:02.440
project matrix

03:25:02.440 --> 03:25:06.340
Commissioner Roselle thank you chair I have two things that

03:25:06.340 --> 03:25:07.799
I would like to bring

03:25:07.799 --> 03:25:10.729
up for maybe action items in the future the first is

03:25:10.729 --> 03:25:12.159
recently brought to my

03:25:12.159 --> 03:25:16.719
attention that we have a downtown implementation plan of

03:25:16.719 --> 03:25:19.319
2010 that speaks

03:25:19.319 --> 03:25:23.700
of eight tenants for planning the downtown area one of

03:25:23.700 --> 03:25:24.719
those eight tenants

03:25:24.719 --> 03:25:28.579
is form-based zoning for the downtown development I would

03:25:28.579 --> 03:25:30.079
like an update if

03:25:30.079 --> 03:25:33.690
that is still in existence if that's been amended if the

03:25:33.690 --> 03:25:35.840
overarching plan for

03:25:35.840 --> 03:25:38.600
downtown is still the downtown implementation plan 2010

03:25:38.600 --> 03:25:39.639
what do we as a

03:25:39.639 --> 03:25:44.840
P&Z Commission need to do to fulfill the approved P&Z and

03:25:44.840 --> 03:25:46.719
council plan for

03:25:46.719 --> 03:25:51.840
form-based zoning downtown and maybe second to that what is

03:25:51.840 --> 03:25:52.399
form-based

03:25:52.399 --> 03:25:55.180
zoning and an education of that if we need to proceed

03:25:55.180 --> 03:25:56.200
forward with that I

03:25:56.200 --> 03:25:58.319
don't know the accuracy of that because that downtown

03:25:58.319 --> 03:25:59.399
implementation plan also

03:25:59.399 --> 03:26:02.280
talks about forward in parking and now we do reverse

03:26:02.280 --> 03:26:03.760
parking downtown so I don't

03:26:03.760 --> 03:26:06.879
I don't know the accuracy of that document but I would like

03:26:06.879 --> 03:26:07.680
information

03:26:07.680 --> 03:26:12.469
about that downtown implementation plan of 2010 that's the

03:26:12.469 --> 03:26:14.600
first thing the

03:26:14.600 --> 03:26:21.450
second thing is Scott McDonald talked earlier about traffic

03:26:21.450 --> 03:26:22.760
planning and the

03:26:22.760 --> 03:26:26.260
future of that and I think the Commission has all said kind

03:26:26.260 --> 03:26:26.879
of today in

03:26:26.879 --> 03:26:30.760
different ways that we do a whole lot of zoning here and I

03:26:30.760 --> 03:26:32.639
think the planning

03:26:32.639 --> 03:26:36.170
portion of our responsibilities could be strengthened and I

03:26:36.170 --> 03:26:38.760
think one way to kind

03:26:38.760 --> 03:26:42.000
of step into strengthening the planning is to really figure

03:26:42.000 --> 03:26:43.079
out what's going on

03:26:43.079 --> 03:26:47.370
from a traffic standpoint it seems as though that's always

03:26:47.370 --> 03:26:48.000
a recurrent issue

03:26:48.000 --> 03:26:50.780
and especially considering the council's momentum from

03:26:50.780 --> 03:26:52.200
yesterday talking about

03:26:52.200 --> 03:26:55.950
bike sharing I just think that as we as a commission try to

03:26:55.950 --> 03:26:56.840
plan one of those

03:26:56.840 --> 03:27:01.290
purviews is mobility plan and so I think to help maybe

03:27:01.290 --> 03:27:03.200
guide council and come

03:27:03.200 --> 03:27:06.379
together with them on that effort I'd be really interested

03:27:06.379 --> 03:27:09.159
in figuring out that

03:27:09.159 --> 03:27:12.250
piece of our planning responsibility in terms of traffic

03:27:12.250 --> 03:27:14.239
and I think a broad

03:27:14.239 --> 03:27:19.100
stroke would be good but I think it could include biking

03:27:19.100 --> 03:27:20.680
and roads and

03:27:20.680 --> 03:27:25.510
proactively what where are we able to proactively look at

03:27:25.510 --> 03:27:26.959
road I know a lot of

03:27:26.959 --> 03:27:30.760
roads and mobility plan have bond tie-ins and they're all

03:27:30.760 --> 03:27:32.079
prioritized but

03:27:32.079 --> 03:27:35.809
it's it's very rare that we ever proactively look to

03:27:35.809 --> 03:27:37.159
increase a road

03:27:37.159 --> 03:27:39.860
construction it's always retroactively and if that has to

03:27:39.860 --> 03:27:40.760
happen why those

03:27:40.760 --> 03:27:44.229
type of questions I'd love to know more about so that we

03:27:44.229 --> 03:27:45.440
can as a commission be

03:27:45.440 --> 03:27:50.799
more proactive in the planning aspect of this of this job

03:27:50.799 --> 03:27:51.520
certainly in fact well

03:27:51.520 --> 03:27:56.079
one thing that we've been starting to put together is just

03:27:56.079 --> 03:27:57.079
the number of

03:27:57.079 --> 03:28:00.819
applications that are pending platting site plan some that

03:28:00.819 --> 03:28:01.680
may not come to

03:28:01.680 --> 03:28:05.500
public hearing and just sort of generally looking at what's

03:28:05.500 --> 03:28:06.280
I mean there's

03:28:06.280 --> 03:28:08.860
all sorts of things that go into a TIA but broad picture

03:28:08.860 --> 03:28:09.920
what are what are the

03:28:09.920 --> 03:28:13.430
trips generating and then starting to look at that on a

03:28:13.430 --> 03:28:14.840
citywide basis and

03:28:14.840 --> 03:28:17.930
trying to really basically tie into what you're saying you

03:28:17.930 --> 03:28:18.920
start to plan for

03:28:18.920 --> 03:28:22.790
these types of things so I'll prepare an item and then have

03:28:22.790 --> 03:28:23.600
some of that backup

03:28:23.600 --> 03:28:29.739
so so so we can have that discussion that sounds great and

03:28:29.739 --> 03:28:31.239
maybe it would be

03:28:31.239 --> 03:28:35.180
also helpful to clarify our general role in guiding council

03:28:35.180 --> 03:28:36.360
and some of these

03:28:36.360 --> 03:28:41.719
things the the idea of the bike share decision that

03:28:41.719 --> 03:28:42.440
happened at council

03:28:42.440 --> 03:28:46.100
yesterday seems like it naturally should have come through

03:28:46.100 --> 03:28:46.959
the commission

03:28:46.959 --> 03:28:50.219
charged with working through mobility plans and so I don't

03:28:50.219 --> 03:28:51.280
know if that is our

03:28:51.280 --> 03:28:53.840
purview I know they had discussion about permitting which

03:28:53.840 --> 03:28:55.500
is apart from us but we

03:28:55.500 --> 03:28:58.260
didn't provide any kind of insight that I know of to

03:28:58.260 --> 03:28:59.840
council about mobility as it

03:28:59.840 --> 03:29:03.959
comes to to bikes maybe they were using old report or old

03:29:03.959 --> 03:29:04.600
minutes but I don't

03:29:04.600 --> 03:29:07.709
know where our responsibility falls from like an actual

03:29:07.709 --> 03:29:08.920
legal perspective of

03:29:08.920 --> 03:29:12.770
what's been charged to us to counsel them and direct them

03:29:12.770 --> 03:29:13.719
for and so maybe

03:29:13.719 --> 03:29:16.540
that would be helpful just to know like what what we can do

03:29:16.540 --> 03:29:19.319
within those bounds

03:29:23.319 --> 03:29:30.750
that sounds great thank you commissioner Sullivan yes seems

03:29:30.750 --> 03:29:32.639
the last two meetings

03:29:32.639 --> 03:29:38.229
or so we've spent a lot of time and looking at residential

03:29:38.229 --> 03:29:40.399
zoning in our 1 2

03:29:40.399 --> 03:29:47.549
3 4 6 in our MU 12 in our MU and that the one place that we

03:29:47.549 --> 03:29:48.840
seem to be caught

03:29:48.840 --> 03:29:56.049
up on a lot is why don't we have an NR 5 you know we've

03:29:56.049 --> 03:29:57.959
spent last meeting I

03:29:57.959 --> 03:30:01.709
don't know how much time cussing and discussing the uses

03:30:01.709 --> 03:30:02.639
and abuses of

03:30:02.639 --> 03:30:06.799
overlays and we come in here and we vote for an overlay and

03:30:06.799 --> 03:30:08.559
so which could have

03:30:08.559 --> 03:30:14.200
been avoided because of point 2 density and I'm just

03:30:14.200 --> 03:30:15.440
thinking that you know

03:30:15.440 --> 03:30:17.950
that's not the first time that that's happened there is one

03:30:17.950 --> 03:30:18.680
I think one or two

03:30:18.680 --> 03:30:21.879
meetings prior to that I'm just wondering why don't we have

03:30:21.879 --> 03:30:23.840
an NR 5 that

03:30:23.840 --> 03:30:29.149
would catch those that are kind of leaking over a little

03:30:29.149 --> 03:30:30.760
bit that we don't

03:30:30.760 --> 03:30:37.239
have to employ an overlay to accomplish the goal in the

03:30:37.239 --> 03:30:39.319
very near future as part

03:30:39.319 --> 03:30:44.700
of the DDC update you will see that in fact one of the one

03:30:44.700 --> 03:30:45.959
of the the the ways

03:30:45.959 --> 03:30:48.079
that we're going with this now is actually to kind of go

03:30:48.079 --> 03:30:48.799
back to where we

03:30:48.799 --> 03:30:53.170
were and not regulate by density but by lot size I had made

03:30:53.170 --> 03:30:54.200
a statement

03:30:54.200 --> 03:30:58.459
yesterday at City Council on those Audra projects where the

03:30:58.459 --> 03:30:58.920
surroundings

03:30:58.920 --> 03:31:02.510
subdivisions were at like a 4.3 or 4.4 density and the

03:31:02.510 --> 03:31:04.399
reason is that it is

03:31:04.399 --> 03:31:07.659
because the minimum lots at that time were 10,000 square

03:31:07.659 --> 03:31:09.120
feet so divide 43 by

03:31:09.120 --> 03:31:12.840
560 by 10 and you get 4.3 or depending how you around 4.4

03:31:12.840 --> 03:31:14.120
and so it's really

03:31:14.120 --> 03:31:19.760
caused a problem and now we have a multitude of overlay

03:31:19.760 --> 03:31:20.440
districts that

03:31:20.440 --> 03:31:23.870
aren't the best to to manage you know moving forward 10-20

03:31:23.870 --> 03:31:24.920
years from now and

03:31:24.920 --> 03:31:28.350
so that's where we're now looking at looking at those lot

03:31:28.350 --> 03:31:29.200
sizes and then

03:31:29.200 --> 03:31:31.780
trying to really fit everybody in and not make anybody

03:31:31.780 --> 03:31:33.000
really non-conforming

03:31:33.000 --> 03:31:38.200
over 0.2 density or anything like that with that if I just

03:31:38.200 --> 03:31:40.799
may add at the next

03:31:40.799 --> 03:31:44.969
work session what Ron is actually working on is sort of a

03:31:44.969 --> 03:31:46.120
public engagement plan

03:31:46.120 --> 03:31:49.709
we're going to be moving very swiftly in the very near

03:31:49.709 --> 03:31:51.760
future with with the

03:31:51.760 --> 03:31:55.989
modules for the DDC update and so within that plan will be

03:31:55.989 --> 03:31:56.840
in that engagement

03:31:56.840 --> 03:32:01.719
plan will be community meetings subcommittee meetings P&Z

03:32:01.719 --> 03:32:02.479
and so that

03:32:02.479 --> 03:32:05.049
way before we finalize that we can kind of get it out there

03:32:05.049 --> 03:32:05.840
to everybody and

03:32:05.840 --> 03:32:08.489
then have have a discussion of do we want to hold you know

03:32:08.489 --> 03:32:09.280
separate meetings

03:32:09.280 --> 03:32:11.860
or how do we want to proceed moving forward and so we

03:32:11.860 --> 03:32:12.799
wanted to get that to

03:32:12.799 --> 03:32:15.379
wanted to get that in front of you sooner than later and

03:32:15.379 --> 03:32:15.920
have that

03:32:15.920 --> 03:32:18.280
discussion

03:32:23.280 --> 03:32:28.280
okay with that at 855 I will close us this evening and

03:32:28.280 --> 03:32:29.360
thank you everybody for

03:32:29.360 --> 03:32:32.280
all your time and efforts