WEBVTT

00:00:00.000 --> 00:00:03.290
Planning and zoning commission work session for February

00:00:03.290 --> 00:00:03.859
the 8th

00:00:04.500 --> 00:00:08.429
This meeting has been duly posted and we do have a quorum

00:00:08.429 --> 00:00:11.900
present and I'm gonna call our meeting to order at 434

00:00:12.699 --> 00:00:16.620
Our first order business will be to receive clarification

00:00:16.620 --> 00:00:18.140
of agenda items

00:00:18.579 --> 00:00:22.280
And I will turn that over to Shandria for presentation.

00:00:22.280 --> 00:00:23.260
Okay. Good evening

00:00:24.100 --> 00:00:26.820
The first item that we'll go through is the approval of

00:00:26.820 --> 00:00:29.739
minutes for January 25th 2017

00:00:30.000 --> 00:00:33.159
If anybody has any discussion on that we'll open it up

00:00:34.119 --> 00:00:36.119
If not, we can move on

00:00:36.679 --> 00:00:40.439
All right, we have three items work on the consent agenda

00:00:40.439 --> 00:00:41.899
three final plaques

00:00:42.640 --> 00:00:45.359
one for the HEB site at the corner of

00:00:46.960 --> 00:00:48.960
West University and Bundy Bray

00:00:49.240 --> 00:00:52.380
We have another one at the at the corner of North Loop and

00:00:52.380 --> 00:00:55.640
Stewart Road and then a site on Pacon Creek

00:00:56.039 --> 00:00:58.740
If there's any questions about that we can bring up the

00:00:58.740 --> 00:01:00.759
case managers. If not, we'll move on

00:01:02.479 --> 00:01:04.480
Okay

00:01:05.200 --> 00:01:08.909
Under items for individual consideration there's two both

00:01:08.909 --> 00:01:10.840
of them have to deal with the

00:01:11.760 --> 00:01:14.640
establishment and nominations for a P&Z subcommittee

00:01:15.400 --> 00:01:18.890
For the didn't development code rewrite project and so we

00:01:18.890 --> 00:01:22.060
can discuss that if you need to but we'll have to actually

00:01:22.060 --> 00:01:22.359
take

00:01:22.760 --> 00:01:24.760
action on those items in regular session

00:01:25.640 --> 00:01:27.640
Okay

00:01:29.439 --> 00:01:31.439
Any questions on either of those

00:01:34.439 --> 00:01:36.280
Okay, okay

00:01:36.280 --> 00:01:41.280
On the public hearing we have three items a final reply for

00:01:42.040 --> 00:01:45.519
DISD property at North Locust and Second Street and I'll

00:01:45.519 --> 00:01:48.519
invite Julie white white up to discuss

00:01:53.519 --> 00:01:56.129
Good evening, Julie Wyatt senior planner with the city of

00:01:56.129 --> 00:01:59.879
Denton and we'll just take a look at the plot

00:02:01.560 --> 00:02:05.200
You're probably familiar with this property you've you've

00:02:05.200 --> 00:02:06.519
seen it this is

00:02:08.639 --> 00:02:11.319
The Denton ISD administration

00:02:12.840 --> 00:02:14.639
Location they are

00:02:14.639 --> 00:02:19.080
Proposing this replat in order to abandon this public alley

00:02:19.659 --> 00:02:22.759
So there's the DISD and then also there's a religious

00:02:22.759 --> 00:02:25.909
institution on this on this side. So I'll answer any

00:02:25.909 --> 00:02:26.599
questions

00:02:28.159 --> 00:02:30.159
Commissioner back. Thank you chair

00:02:30.680 --> 00:02:33.569
Currently st. Barnabas the physical church sitting there.

00:02:33.569 --> 00:02:36.699
So is that going away or they just going to convert their

00:02:36.699 --> 00:02:37.599
building into

00:02:38.680 --> 00:02:42.389
No, sir. It is actually it is it is it's going to remain

00:02:42.389 --> 00:02:44.919
and it will remain on its on its own property

00:02:44.919 --> 00:02:46.919
so this is really just to

00:02:47.599 --> 00:02:49.599
Just to abandon this

00:02:49.719 --> 00:02:52.819
Public alley that's not not really used so that they can

00:02:52.819 --> 00:02:55.060
develop the side or redevelop the side

00:02:55.060 --> 00:02:58.770
So there's notions of things in the future. They got you.

00:02:58.770 --> 00:02:59.759
Thank you sure

00:03:01.560 --> 00:03:03.840
Commissioner was out. Thank you chair. Can you walk me

00:03:03.840 --> 00:03:06.919
through the process to abandon a public?

00:03:07.840 --> 00:03:08.919
Street

00:03:08.919 --> 00:03:12.020
Is that it's like if you own the property around the street

00:03:12.020 --> 00:03:12.159
?

00:03:12.159 --> 00:03:13.680
You can just say we don't need it anymore

00:03:13.680 --> 00:03:16.520
How does that work this alley could be abandoned by the

00:03:16.520 --> 00:03:19.560
plot because all of the property owners who were affected

00:03:19.560 --> 00:03:20.439
by that alley

00:03:20.439 --> 00:03:22.439
joined in on this plot I

00:03:23.479 --> 00:03:27.849
This Gary Street was abandoned and it had to be it had to

00:03:27.849 --> 00:03:28.060
be

00:03:28.759 --> 00:03:31.860
Done by ordinance that had to be approved by City Council.

00:03:31.860 --> 00:03:32.000
So

00:03:32.919 --> 00:03:35.800
The the right away that Gary Street's a little different

00:03:35.800 --> 00:03:37.419
than the than the alley

00:03:38.439 --> 00:03:40.439
Thank you. Sure

00:03:40.919 --> 00:03:44.680
Mr. Ellis, thank you chair. Hi Julie. Hi Gary Street

00:03:45.639 --> 00:03:48.780
Doesn't exist though anymore. Correct? Correct. It was a

00:03:48.780 --> 00:03:49.000
bit

00:03:49.000 --> 00:03:52.699
I believe it was approved in December and if you recall if

00:03:52.699 --> 00:03:53.060
just

00:03:53.599 --> 00:03:55.400
in in the

00:03:55.400 --> 00:03:59.180
proposed rezoning that DISD brought forward before you they

00:03:59.180 --> 00:03:59.879
're going to

00:04:00.479 --> 00:04:02.840
Turn this into that pedestrian connection

00:04:08.800 --> 00:04:11.240
Okay, and Julie oh

00:04:12.879 --> 00:04:16.589
You're here for the next one. Yeah, that means it was only

00:04:16.589 --> 00:04:18.319
for blue beacon

00:04:21.920 --> 00:04:23.920
Okay

00:04:26.680 --> 00:04:31.319
All right, so this is z-16 18 blue beacon truck wash

00:04:33.839 --> 00:04:37.079
All right the location of the property it is adjacent to

00:04:37.079 --> 00:04:38.220
the I 35

00:04:39.680 --> 00:04:42.000
Service Road, it's it's north of

00:04:43.199 --> 00:04:45.519
Barthold or Bartle that

00:04:46.560 --> 00:04:50.490
in this location it is situated in a fairly north part of

00:04:50.490 --> 00:04:51.800
the city and

00:04:52.279 --> 00:04:55.610
The subject property does have six hundred thirty seven

00:04:55.610 --> 00:04:57.800
feet of frontage along I 35

00:04:58.639 --> 00:05:01.790
And so the request before you for this location is to

00:05:01.790 --> 00:05:03.439
consider a rezoning

00:05:04.360 --> 00:05:06.360
from RCR one

00:05:06.360 --> 00:05:09.230
Regional Center residential wine to employment center

00:05:09.230 --> 00:05:12.209
commercial the ECC district the subject property is about

00:05:12.209 --> 00:05:12.839
five acres

00:05:14.000 --> 00:05:16.389
So we'll just look at what's currently out there the zoning

00:05:16.389 --> 00:05:18.079
as well as the development

00:05:18.079 --> 00:05:20.730
So here's the subject property right here gets a little

00:05:20.730 --> 00:05:22.519
lost in the picture, but here it is

00:05:23.519 --> 00:05:26.839
It's got that RCR one. It's that lavender color. There's

00:05:26.839 --> 00:05:29.759
also some undeveloped RCR one to the north as

00:05:30.480 --> 00:05:33.579
Well as all of the property that doesn't have a color on it

00:05:33.579 --> 00:05:36.800
. That's in the extraterritorial jurisdiction. That's

00:05:36.800 --> 00:05:37.839
outside of the city limits

00:05:38.639 --> 00:05:41.740
And that that's undeveloped as well as this property that

00:05:41.740 --> 00:05:43.100
has the hatch marks

00:05:43.680 --> 00:05:45.680
That's undeveloped and that is

00:05:46.360 --> 00:05:51.310
RD 5x that's our rural residential minimum five acre zoning

00:05:51.310 --> 00:05:51.639
district

00:05:51.639 --> 00:05:53.980
That's that place holding zoning district that all

00:05:53.980 --> 00:05:56.319
properties get when they get annexed into the city

00:05:56.980 --> 00:06:00.430
To the south of the property you have some existing ECC

00:06:00.430 --> 00:06:01.720
district

00:06:01.839 --> 00:06:04.430
That is being redeveloped with a commercial use with a

00:06:04.430 --> 00:06:05.399
Travel Center use

00:06:06.360 --> 00:06:12.949
There's also some RCC in across Barthold and RCC in across

00:06:12.949 --> 00:06:15.720
I 35 and that's undeveloped as well

00:06:16.399 --> 00:06:18.399
There's a Travel Center use

00:06:20.439 --> 00:06:22.439
South of Elm

00:06:22.639 --> 00:06:26.449
Across I 35 it's RCC D and it's as I said, it's a

00:06:26.449 --> 00:06:28.839
commercial use. It's a Travel Center use

00:06:29.000 --> 00:06:31.519
So that's what's surrounding the property. That's the

00:06:31.519 --> 00:06:32.519
character of the area

00:06:33.839 --> 00:06:37.610
The future land use of the property is business innovation.

00:06:37.610 --> 00:06:39.759
I know we've seen business innovation a lot

00:06:40.639 --> 00:06:44.629
recently and just to just to refresh your memory business

00:06:44.629 --> 00:06:45.759
innovation is

00:06:46.279 --> 00:06:49.319
It's intended to encourage employment uses

00:06:49.879 --> 00:06:53.470
things like R&D or light manufacturing or large-scale

00:06:53.470 --> 00:06:56.879
office parks and also the supporting use the

00:06:57.120 --> 00:06:59.120
supporting retail uses such as

00:07:00.360 --> 00:07:04.100
Restaurants or hotels or and even some residential is

00:07:04.100 --> 00:07:04.839
encouraged

00:07:04.839 --> 00:07:08.269
So mainly employment with some commercial uses in order to

00:07:08.269 --> 00:07:10.180
support those employment areas

00:07:13.240 --> 00:07:15.279
So the considerations we looked at when we analyze this

00:07:15.279 --> 00:07:18.120
proposal is first we looked at

00:07:20.000 --> 00:07:23.139
Section 35 3 4 B in the Denton Development Code and that's

00:07:23.139 --> 00:07:26.740
the criteria for approval for rezoning cases

00:07:26.740 --> 00:07:29.319
And the first is does it conform to the future land use?

00:07:30.000 --> 00:07:34.949
In this case ECC district has a really diverse set of

00:07:34.949 --> 00:07:36.199
commercial uses

00:07:36.199 --> 00:07:39.899
It also integrates some of those employment uses and those

00:07:39.899 --> 00:07:43.120
industrial uses like light manufacturing and some

00:07:43.439 --> 00:07:43.439
Warehouse uses so it does conform to that business

00:07:43.439 --> 00:07:48.959
innovation future land use designation

00:07:49.399 --> 00:07:52.500
And then we also it has to have adequate provision of

00:07:52.500 --> 00:07:54.459
infrastructure in this in this case

00:07:54.459 --> 00:07:57.560
It does and any additional infrastructure needs would be

00:07:57.560 --> 00:07:58.399
addressed at platting

00:07:58.399 --> 00:08:01.250
So the request does meet the criteria for approval in the

00:08:01.250 --> 00:08:02.639
Denton Development Code

00:08:03.060 --> 00:08:05.959
We also looked at the character the area. We always do that

00:08:05.959 --> 00:08:09.279
just to do a little deeper dive on the analysis and

00:08:09.879 --> 00:08:12.720
When we look at at at this area

00:08:13.879 --> 00:08:15.680
the the major

00:08:15.680 --> 00:08:19.600
The major element to this property is that I 35 corridor.

00:08:19.600 --> 00:08:21.000
It's it's a pretty

00:08:21.879 --> 00:08:23.879
it stands out and

00:08:24.160 --> 00:08:26.839
And when we look at how this area is going to develop we

00:08:26.839 --> 00:08:28.889
anticipate we're going to see a lot of commercial uses

00:08:28.889 --> 00:08:29.720
along I 35

00:08:29.720 --> 00:08:33.220
Take care take advantage of that access and the visibility

00:08:33.220 --> 00:08:34.519
that I 35 provides

00:08:34.840 --> 00:08:37.500
But then it's going to transition to those employment uses.

00:08:37.500 --> 00:08:39.120
There's some very large tracks

00:08:40.279 --> 00:08:43.379
To the west of this property and so we we anticipate that

00:08:43.379 --> 00:08:46.649
it's going to be commercial toward I 35 transitioning to

00:08:46.649 --> 00:08:47.759
those employment uses

00:08:48.399 --> 00:08:51.120
And ECC is consistent with this because it does permit

00:08:51.120 --> 00:08:54.100
those commercial uses and print some at a scale

00:08:54.100 --> 00:08:57.200
That's appropriate for highway development, but then also

00:08:57.200 --> 00:09:00.429
folds in some of those employment uses so it provides that

00:09:00.429 --> 00:09:01.500
nice transition area

00:09:03.200 --> 00:09:07.000
The current zoning designation of RCR 1 it does permit

00:09:07.000 --> 00:09:08.000
commercial uses

00:09:08.080 --> 00:09:10.759
But it really does permit them at a scale that aren't

00:09:10.759 --> 00:09:13.789
something you would typically see it on the highway. It has

00:09:13.789 --> 00:09:14.840
those limitations

00:09:16.799 --> 00:09:19.720
ECC district would expand the number of commercial uses

00:09:19.720 --> 00:09:23.049
industrial uses and it would also enlarge that building

00:09:23.049 --> 00:09:23.519
envelope

00:09:23.519 --> 00:09:26.059
So it would allow that development that is consistent with

00:09:26.059 --> 00:09:27.620
what you typically see on highways

00:09:28.120 --> 00:09:31.830
And then and then just ECC is the logical continuation of

00:09:31.830 --> 00:09:33.360
that existing ECC

00:09:33.360 --> 00:09:35.399
And I believe that was his only case that came before you

00:09:35.399 --> 00:09:36.080
in 2015

00:09:36.519 --> 00:09:38.960
So it's just a continuation of what's existing

00:09:40.080 --> 00:09:42.080
Public notification was sent out

00:09:42.720 --> 00:09:44.779
There's not many people who live out there, so there weren

00:09:44.779 --> 00:09:46.669
't many that were sent out and we haven't received any

00:09:46.669 --> 00:09:47.240
responses

00:09:47.840 --> 00:09:49.860
So based upon the criteria for approval and the

00:09:49.860 --> 00:09:53.509
considerations I've listed we staff recommends approval,

00:09:53.509 --> 00:09:54.960
and I'll stand for any questions

00:09:56.120 --> 00:09:59.409
Commissioner back. Thank you chair. It seems like we're

00:09:59.409 --> 00:10:02.519
heading in the direction for this area for big trucks

00:10:03.039 --> 00:10:05.610
It's gonna appeal to big trucks, and that's fine. Don't

00:10:05.610 --> 00:10:07.639
have a problem. It's a good area for that

00:10:08.360 --> 00:10:12.279
One concern I might have is as further development goes on

00:10:13.840 --> 00:10:15.840
Heavy big

00:10:15.840 --> 00:10:18.899
Semis going up and down those service roads is that gonna

00:10:18.899 --> 00:10:19.639
be a little intimidating

00:10:20.559 --> 00:10:22.690
For smaller passenger cars as we develop those kind of

00:10:22.690 --> 00:10:26.000
businesses that would appeal to them is that

00:10:26.879 --> 00:10:28.240
consideration

00:10:28.240 --> 00:10:31.950
That is a good question. It's not it wasn't a consideration

00:10:31.950 --> 00:10:32.399
in this case

00:10:32.399 --> 00:10:36.159
We you know text dots will design the roads to accommodate

00:10:36.159 --> 00:10:39.399
all all users the large trucks as well as the smaller

00:10:39.399 --> 00:10:39.679
trucks

00:10:39.720 --> 00:10:42.440
So it wasn't actually something that we considered in this

00:10:42.440 --> 00:10:46.440
especially since this proposal did meet the future land use

00:10:48.080 --> 00:10:50.080
The other thing I'd like to bring up was something

00:10:50.080 --> 00:10:52.700
Commissioner Roselle touched on when we were talking about

00:10:52.700 --> 00:10:55.360
that Travel Center. That's just south of it

00:10:56.279 --> 00:10:58.399
If you've got these big

00:10:59.240 --> 00:11:00.720
five six

00:11:00.720 --> 00:11:04.360
Wheel axle trucks coming from heading north

00:11:05.480 --> 00:11:07.480
And they want to go to that

00:11:08.879 --> 00:11:11.590
They're gonna have our time negotiating that turn you've

00:11:11.590 --> 00:11:14.639
got that narrow turn right there that doesn't allow a lot

00:11:14.639 --> 00:11:15.240
of room and

00:11:15.679 --> 00:11:18.620
Then not only that then they've got a cut back to a hard

00:11:18.620 --> 00:11:21.480
right and that's a two lane service road

00:11:22.000 --> 00:11:25.740
Correct our whole road. No the service road right there is

00:11:25.740 --> 00:11:26.679
to learn or two way

00:11:26.840 --> 00:11:30.759
Well, and and that's gonna all come in when we when we go

00:11:30.759 --> 00:11:32.399
through the site plan

00:11:32.399 --> 00:11:36.759
I know that the applicant is actually this is this property

00:11:37.320 --> 00:11:40.419
adjacent to it is in the ETJ and they're actually looking

00:11:40.419 --> 00:11:40.559
at

00:11:41.840 --> 00:11:44.679
Potentially doing an annexation and a rezoning for that in

00:11:44.679 --> 00:11:48.080
order to expand the site to provide that kind of

00:11:49.559 --> 00:11:50.960
Turning

00:11:50.960 --> 00:11:54.220
Motions that are desired. Well, but the problem is not

00:11:54.220 --> 00:11:56.080
gonna be there so much. It's that narrow

00:11:56.879 --> 00:11:58.080
tunnel

00:11:58.080 --> 00:12:01.460
That goes under 35. Yeah under 35 or

00:12:03.480 --> 00:12:06.700
Well Barthold Barthold Road is actually gonna be a real

00:12:06.700 --> 00:12:10.440
igned so it's going to this is these two

00:12:11.200 --> 00:12:14.299
Roads are actually gonna meet so there isn't gonna have to

00:12:14.299 --> 00:12:15.799
be that little no, sir

00:12:15.799 --> 00:12:19.230
Oh, and then and then if if they can develop the site and

00:12:19.230 --> 00:12:20.000
once again

00:12:20.000 --> 00:12:23.100
this is gonna be a site planning issue or potential cases

00:12:23.100 --> 00:12:24.480
that come before you with a

00:12:25.360 --> 00:12:27.639
rezoning for for annexed property I

00:12:28.960 --> 00:12:31.500
Think their intent or what they would really like to do is

00:12:31.500 --> 00:12:33.399
take access off of

00:12:33.759 --> 00:12:38.710
Barthold Road and not I 35 in order to get those turnings

00:12:38.710 --> 00:12:40.840
turning radiuses that they like and that that makes it

00:12:40.840 --> 00:12:41.519
easier for the end

00:12:41.519 --> 00:12:44.159
User. Okay. So in other words, you'd have a straight shot

00:12:44.159 --> 00:12:44.879
of 77

00:12:45.879 --> 00:12:49.480
When I went and put the signs out I missed that little turn

00:12:49.480 --> 00:12:52.879
Yeah, little cheat turn and I had to go I went all the way

00:12:52.879 --> 00:12:53.080
around

00:12:53.240 --> 00:12:57.159
So yes, you're right. It when when Barthold is connects it

00:12:57.159 --> 00:13:00.269
will okay. It will be a lot easier to access. Okay. Thank

00:13:00.269 --> 00:13:00.440
you

00:13:01.799 --> 00:13:04.509
Mr. Roselle, thank you chair. You mentioned something in

00:13:04.509 --> 00:13:05.100
your presentation

00:13:05.100 --> 00:13:08.990
You said that in the business innovation commercial use is

00:13:08.990 --> 00:13:11.220
to support employment centers

00:13:11.220 --> 00:13:15.529
Mm-hmm, and you feel that a big rig truck washing supports

00:13:15.529 --> 00:13:17.080
employment centers

00:13:17.240 --> 00:13:20.799
Well when we look at a rezoning, we can't look at what is

00:13:21.480 --> 00:13:23.480
We're not looking at what the actual

00:13:24.519 --> 00:13:27.720
Proposed development is for that site what we have to look

00:13:27.720 --> 00:13:30.299
at is what the uses are within that zoning district

00:13:30.299 --> 00:13:33.549
And so when we look at ECC, I mean you're I I hear what you

00:13:33.549 --> 00:13:37.580
're saying about about this particular user is it

00:13:38.320 --> 00:13:41.070
Doesn't import support employment uses but what we have to

00:13:41.070 --> 00:13:43.340
look at when we analyze the zoning case is what are the

00:13:43.340 --> 00:13:44.399
permitted uses within?

00:13:44.399 --> 00:13:47.120
That zoning district we look at it much more broadly than

00:13:47.120 --> 00:13:50.519
just this this this user when we look at business

00:13:50.519 --> 00:13:51.299
innovation

00:13:51.559 --> 00:13:54.460
The ECC and the EC eyes only districts are the ones that

00:13:54.460 --> 00:13:57.279
most closely align with business innovation

00:13:57.600 --> 00:14:00.700
ECC being the more commercial of the two and EC ECI being

00:14:00.700 --> 00:14:02.539
the more industrial of the two

00:14:02.539 --> 00:14:05.059
So so yeah, I hear what you're saying, but but we have to

00:14:05.059 --> 00:14:07.490
look at it a little more broadly when we're talking about a

00:14:07.490 --> 00:14:08.100
zoning case

00:14:08.100 --> 00:14:11.470
Yeah, I know we've we've talked about this in the dais all

00:14:11.470 --> 00:14:14.700
the time about looking at a zoning case rather than the

00:14:14.700 --> 00:14:15.720
actual use of it

00:14:16.360 --> 00:14:19.590
But there is still the tension that this is being this is

00:14:19.590 --> 00:14:23.139
an application for rezoning by the person who wants to

00:14:23.139 --> 00:14:23.399
build

00:14:23.679 --> 00:14:27.320
The use sure so yes, they could get it

00:14:27.840 --> 00:14:30.590
Rezoned and then back out then you have this free zone and

00:14:30.590 --> 00:14:32.080
that we certainly it's taking consideration

00:14:32.080 --> 00:14:35.629
But to Commissioner Beck's point, I'm wondering if to the

00:14:35.629 --> 00:14:37.580
West where all the tracks of lands are and what's supposed

00:14:37.580 --> 00:14:38.519
to be business innovation

00:14:38.559 --> 00:14:40.570
When I think about that, I think about like corporate

00:14:40.570 --> 00:14:44.320
headquarters type type things may be coming to Denton and

00:14:44.320 --> 00:14:46.120
their insurance on Barthold

00:14:46.360 --> 00:14:47.519
is

00:14:47.519 --> 00:14:50.769
Through a truck park and so I'm wondering if that's a deter

00:14:50.769 --> 00:14:53.220
rent from future businesses if we have

00:14:53.399 --> 00:14:57.389
Trying to sell a corporation to come and build on this land

00:14:57.389 --> 00:14:59.000
and we go for the tour

00:14:59.440 --> 00:15:03.519
It's a truck stop on the left a little sliver of a big rig

00:15:03.919 --> 00:15:07.169
Truck washing that apparently wants to expand even bigger.

00:15:07.169 --> 00:15:10.169
I'm wondering about the impact we have on the future

00:15:10.169 --> 00:15:10.919
employment

00:15:12.879 --> 00:15:15.080
That we would like to bring in in the business innovation

00:15:15.080 --> 00:15:16.240
district

00:15:16.960 --> 00:15:21.100
additionally in the last point I have is when Barthold gets

00:15:21.100 --> 00:15:22.879
realigned to 77

00:15:22.879 --> 00:15:25.220
Is there gonna be construction to redo the underpass

00:15:25.220 --> 00:15:28.070
because Commissioner Beck's right. Although those streets

00:15:28.070 --> 00:15:29.480
might line that underpass is

00:15:30.440 --> 00:15:32.120
tiny

00:15:32.120 --> 00:15:34.120
I'm gonna call Earl Escobar

00:15:38.480 --> 00:15:40.029
Earl Escobar engineering unfortunately since it's a textile

00:15:40.029 --> 00:15:43.080
highway, there are no plans to

00:15:44.759 --> 00:15:47.039
To I guess to widen the underpass

00:15:47.039 --> 00:15:50.450
I know there's some limitations on the number of lanes that

00:15:50.450 --> 00:15:52.879
you can squeeze between the piers that support the

00:15:53.559 --> 00:15:57.279
Highway lanes itself. So and unfortunately, this is not

00:15:57.279 --> 00:15:58.039
part of the

00:15:58.879 --> 00:16:02.600
I-35 widening plans right the winding stops at 380. So

00:16:04.039 --> 00:16:07.279
But there are some signal modifications being done on

00:16:08.039 --> 00:16:10.840
part hold and 35 as well as

00:16:12.720 --> 00:16:17.480
I-35 and 77 on either end of the underpass to

00:16:18.480 --> 00:16:21.580
accommodate those larger vehicles in terms of timing and

00:16:21.580 --> 00:16:23.840
trying to maximize the number of vehicles that can pass

00:16:23.840 --> 00:16:25.039
through that underpass without any

00:16:25.039 --> 00:16:27.399
complex so and I assume that when

00:16:28.200 --> 00:16:30.440
Like an underpass is looked at they look at turn radiuses

00:16:30.440 --> 00:16:33.440
of an 18 wheel truck and make sure all those clearances

00:16:34.000 --> 00:16:36.870
Are good right in terms of stopping distance within the

00:16:36.870 --> 00:16:37.879
underpass that

00:16:38.919 --> 00:16:40.000
say

00:16:40.000 --> 00:16:43.100
You have a semi truck heading north and want to turn left

00:16:43.100 --> 00:16:46.440
towards the either the car wash or the loves

00:16:47.879 --> 00:16:51.820
The stopping point underneath the highway is set back so

00:16:51.820 --> 00:16:54.399
that the trucks can maneuver

00:16:55.120 --> 00:16:57.120
Okay. Thank you

00:16:57.120 --> 00:16:59.120
mixture

00:17:00.600 --> 00:17:03.120
Commissioner back. Thank you chair. I did have one other

00:17:03.120 --> 00:17:03.480
question

00:17:03.480 --> 00:17:06.000
I just didn't look at my notes a little concerned about the

00:17:06.000 --> 00:17:07.839
wastewater for this facility

00:17:08.000 --> 00:17:11.150
Well current drainage infrastructure accommodated and if

00:17:11.150 --> 00:17:11.920
not

00:17:12.519 --> 00:17:15.880
Will it have to be enhanced and if so who pays for that?

00:17:16.279 --> 00:17:19.829
Well, the applicant the developer would have to ensure that

00:17:19.829 --> 00:17:21.160
their development

00:17:22.319 --> 00:17:25.829
can can be accommodated so they would have to make sure

00:17:25.829 --> 00:17:26.519
that all of the

00:17:26.920 --> 00:17:29.440
Public infrastructure is there and in place in order for

00:17:29.440 --> 00:17:31.839
them to okay the applicants here today

00:17:31.880 --> 00:17:34.759
He is so he'll be here this evening to discuss. I have

00:17:34.759 --> 00:17:37.200
another question for him, but I'll wait till the clock here

00:17:37.200 --> 00:17:37.680
. Thank you

00:17:38.000 --> 00:17:40.000
Okay

00:17:44.799 --> 00:17:46.440
Thank you Julie

00:17:46.440 --> 00:17:49.759
So the next item is an ordinance amendment related to annex

00:17:49.759 --> 00:17:53.319
ation criteria and I'll invite run me Gita up for a

00:17:53.319 --> 00:17:54.200
presentation

00:17:57.359 --> 00:18:03.000
Thank You Sharon again pull up my presentation real quick

00:18:08.000 --> 00:18:10.000
Chair members of the Commission

00:18:10.359 --> 00:18:13.200
brought forward to you for your consideration as a code

00:18:13.200 --> 00:18:14.559
amendment to

00:18:15.079 --> 00:18:19.000
Bring in some annexation criteria that is

00:18:19.720 --> 00:18:23.430
Currently in our code of ordinances our code of ordinances

00:18:23.430 --> 00:18:26.680
is a separate document that separate from the DC

00:18:27.680 --> 00:18:30.519
So a little bit of background of how we got here

00:18:31.839 --> 00:18:33.680
several

00:18:33.680 --> 00:18:38.109
Months ago we we heard and we've seen applications come in

00:18:38.109 --> 00:18:39.880
that are in our ETJ

00:18:40.200 --> 00:18:44.150
But really haven't had any clear criteria direction on if

00:18:44.150 --> 00:18:47.200
those of those properties should be annexed

00:18:47.640 --> 00:18:49.640
again, we do have those

00:18:49.759 --> 00:18:53.460
annexation criteria that are in our code of ordinances,

00:18:53.460 --> 00:18:54.000
however

00:18:54.720 --> 00:18:58.069
it's not clear if those code ordinances, I'm sorry those

00:18:58.069 --> 00:18:59.319
annexation criteria are

00:19:00.559 --> 00:19:05.319
Usable because back in 2002 when we created the DDC

00:19:06.200 --> 00:19:08.200
those annexation criteria

00:19:08.759 --> 00:19:11.960
Were supposed to be repealed but they were never so it's a

00:19:11.960 --> 00:19:15.039
it's a conflict. It's there but it's it is it applicable

00:19:15.559 --> 00:19:17.559
so to clear up the

00:19:18.400 --> 00:19:20.480
confusion we're proposing to

00:19:21.319 --> 00:19:25.289
repeal expressive expressively those annexation criteria

00:19:25.289 --> 00:19:27.400
from the code of ordinances and

00:19:28.240 --> 00:19:31.339
Bring them in to the development code and that's why we're

00:19:31.339 --> 00:19:33.440
having this public hearing in front of planning zone

00:19:33.440 --> 00:19:36.039
Commission because you all review and

00:19:37.440 --> 00:19:41.380
administer the then development code so as outlined here in

00:19:41.380 --> 00:19:45.200
this slide again, I'm gonna repeat just a couple things

00:19:45.200 --> 00:19:45.680
that

00:19:46.920 --> 00:19:48.920
the recommendation that were

00:19:49.119 --> 00:19:51.640
requesting from the Commission to the plan and to the City

00:19:51.640 --> 00:19:52.079
Council is

00:19:53.119 --> 00:19:54.319
regarding

00:19:54.319 --> 00:19:55.519
expressively

00:19:55.519 --> 00:19:59.220
Repealing the section in the code of ordinances and that's

00:19:59.220 --> 00:20:02.180
34 - 35 36 and 37

00:20:02.960 --> 00:20:06.369
while doing so we're also requesting that we amend the DEM

00:20:06.369 --> 00:20:09.319
development code and add the

00:20:09.640 --> 00:20:14.099
development annexation criteria within section 35 3 of the

00:20:14.099 --> 00:20:14.480
DDC

00:20:17.160 --> 00:20:19.039
Those sections that are currently again in the code of

00:20:19.039 --> 00:20:24.359
ordinances talk about annexation policy procedure and fees

00:20:25.039 --> 00:20:27.039
Those will be repealed

00:20:28.160 --> 00:20:29.480
Because

00:20:29.480 --> 00:20:32.339
Again, we're wanting to bring it into the DDC. It's

00:20:32.339 --> 00:20:36.480
currently not in the DDC the annexation criteria

00:20:36.480 --> 00:20:40.099
and again, there was no language back in 2002 when we

00:20:40.839 --> 00:20:42.839
Created the DDC. So

00:20:42.880 --> 00:20:45.509
Again, we're trying to clean it up and bring it into the D

00:20:45.509 --> 00:20:46.599
EM development code

00:20:48.480 --> 00:20:52.319
Chapter that is going to go into is sub chapter 35 3

00:20:52.319 --> 00:20:53.319
procedures

00:20:53.799 --> 00:20:57.650
Under this section, which will be a new section 35 3 13 and

00:20:57.650 --> 00:21:00.599
it'll be under the heading of periphery development annex

00:21:00.599 --> 00:21:01.440
ation criteria

00:21:02.079 --> 00:21:05.799
In this section you we will have a criteria to determine

00:21:05.799 --> 00:21:08.460
when to annex or when not to annex

00:21:09.000 --> 00:21:12.319
but also and also it will have a list of

00:21:13.079 --> 00:21:15.079
thresholds which we will use as a

00:21:16.200 --> 00:21:19.910
Point for our staff review. It will also include procedures

00:21:19.910 --> 00:21:23.240
and a conditional use clause and those

00:21:24.119 --> 00:21:27.640
Are in your backup as exhibit to I believe in the draft

00:21:27.640 --> 00:21:30.640
ordinance that staff has prepared

00:21:34.039 --> 00:21:35.289
So really that's what we're looking for and seeking from

00:21:35.289 --> 00:21:40.039
the planning zone Commission is your recommendation and

00:21:40.440 --> 00:21:42.440
staff recommends approval of this

00:21:43.039 --> 00:21:46.380
For the reasons of we're going to be clarifying the

00:21:46.380 --> 00:21:49.839
property when a property should be annexed

00:21:49.920 --> 00:21:52.630
We're also making it more efficient as far as procedures

00:21:52.630 --> 00:21:55.420
for annexation. And again, it's consistent when the

00:21:55.420 --> 00:21:56.319
development plan

00:21:57.359 --> 00:22:00.640
Commissioner back. Thank you chair. So to be clear here

00:22:01.319 --> 00:22:05.059
The language that's in the code of ordinance. Right nothing

00:22:05.059 --> 00:22:07.960
to be in changes just being shifted over to the DDC

00:22:07.960 --> 00:22:10.549
Oh, there's is there's some there's some changes some

00:22:10.549 --> 00:22:11.380
slight changes

00:22:11.880 --> 00:22:12.920
Okay

00:22:12.920 --> 00:22:16.019
But if you read is it more streamlined if a little bit more

00:22:16.019 --> 00:22:17.160
streamlined, that's correct

00:22:17.160 --> 00:22:20.319
And it's it's for its proposed specifically just for that

00:22:20.319 --> 00:22:23.309
reason to be able to get annexations through in a more

00:22:23.309 --> 00:22:24.200
timely manner

00:22:24.480 --> 00:22:27.150
But if you look at it, it's it's essentially the same if

00:22:27.150 --> 00:22:28.880
you look at the criteria and again

00:22:28.880 --> 00:22:32.390
You have both of those as part of your backup. Okay. Thank

00:22:32.390 --> 00:22:32.660
you

00:22:33.079 --> 00:22:35.680
Commissioner Alice. Thank you chair. Hi Ron

00:22:36.519 --> 00:22:38.519
Okay, so when I read

00:22:38.799 --> 00:22:42.720
The ordinance that that were repealing and then read read

00:22:42.720 --> 00:22:44.539
the new draft ordinance

00:22:45.440 --> 00:22:49.579
Are we removing the procedure that an annexation comes

00:22:49.579 --> 00:22:51.880
before PNC and City Council?

00:22:52.400 --> 00:22:55.799
It goes to City Council. I did I did notice that

00:22:56.400 --> 00:22:59.839
Yes, the annexation will not come through the planning

00:22:59.839 --> 00:23:01.259
zoning Commission

00:23:01.599 --> 00:23:04.980
However, obviously the zoning will but correct you are

00:23:04.980 --> 00:23:07.000
correct. The annexation will not come through the planning

00:23:07.000 --> 00:23:08.359
zoning Commission. Okay

00:23:09.079 --> 00:23:11.859
Wherein it does it talk about it going to City Council?

00:23:12.400 --> 00:23:16.539
It's per state law and it should be the very last bullet of

00:23:16.539 --> 00:23:17.079
the

00:23:17.799 --> 00:23:19.799
procedure section it does not

00:23:20.240 --> 00:23:22.119
State it but that's

00:23:22.119 --> 00:23:24.480
Something that we follow through again the Texas local

00:23:24.480 --> 00:23:26.339
government code state law

00:23:32.559 --> 00:23:35.200
It's it did where it says all public hearing notification

00:23:35.200 --> 00:23:37.960
procedures will be in accordance with state law, right?

00:23:37.960 --> 00:23:41.059
We know it correct. It will go through that process and all

00:23:41.059 --> 00:23:43.559
annexation. It's a fairly lengthy process

00:23:44.200 --> 00:23:47.930
Timely manner as far as taking it through the planning. I'm

00:23:47.930 --> 00:23:49.119
sorry through the City Council

00:23:49.119 --> 00:23:52.059
There's two public hearings and then two readings of the

00:23:52.059 --> 00:23:52.680
ordinance

00:23:58.319 --> 00:24:01.450
Okay, my confusion is because all that was spelled out in

00:24:01.450 --> 00:24:03.599
the ordinance that were repealing and

00:24:04.039 --> 00:24:06.569
That it was completely removed from this new draft

00:24:06.569 --> 00:24:09.880
ordinance. We did that on purpose. Okay, just as point of

00:24:09.880 --> 00:24:10.720
order because

00:24:12.039 --> 00:24:15.319
The statutes change and we have four bills

00:24:15.319 --> 00:24:17.980
I think pending in the legislature right now that are

00:24:17.980 --> 00:24:19.640
affecting annexation

00:24:19.880 --> 00:24:22.630
So we went ahead and kept it general and just referred to

00:24:22.630 --> 00:24:23.220
state law

00:24:24.000 --> 00:24:28.950
For that reason it's a very complex procedure on the notice

00:24:28.950 --> 00:24:31.319
provisions and the publication provisions and

00:24:31.720 --> 00:24:34.200
the initial readings and everything of that nature

00:24:35.839 --> 00:24:39.000
And really the the first version did not cover at all

00:24:44.480 --> 00:24:48.490
Have another question is that okay? Thanks. I noticed added

00:24:48.490 --> 00:24:50.740
in this draft ordinance was

00:24:51.720 --> 00:24:54.279
location and intensity of gas well drilling in production

00:24:54.279 --> 00:24:56.500
which I know is not on

00:24:57.079 --> 00:25:00.210
In the ordinance that were repealing. Can you just kind of

00:25:00.210 --> 00:25:02.200
explain that a little bit how that's

00:25:03.319 --> 00:25:05.039
What that actually means and how that's taken into

00:25:05.039 --> 00:25:06.839
consideration? I?

00:25:07.720 --> 00:25:11.079
Think that's just another type of development that we know

00:25:11.079 --> 00:25:14.160
we have some of those type of developments west of town

00:25:14.160 --> 00:25:16.160
and so if those are

00:25:16.799 --> 00:25:18.400
considered

00:25:18.400 --> 00:25:21.299
potential impact that's something that's the City Council

00:25:21.299 --> 00:25:22.880
or City staff can

00:25:23.440 --> 00:25:27.480
move forward for those reasons specifically as a way of

00:25:28.480 --> 00:25:31.309
mitigating some of the potential impacts that that gas well

00:25:31.309 --> 00:25:34.880
or potential gas well could bring to adjacent properties

00:25:41.759 --> 00:25:44.319
I'm more notes. Sorry continue. Thank you. Thank you

00:25:45.559 --> 00:25:48.559
On that same the line under that

00:25:49.880 --> 00:25:52.990
Number six property that is contiguous to the city limits

00:25:52.990 --> 00:25:56.079
and is necessary to the annexation of another property

00:25:56.599 --> 00:26:00.309
Yes, I was having a hard time in my brain following that so

00:26:00.309 --> 00:26:03.880
I what I noted there was an example of that sure sure there

00:26:03.880 --> 00:26:03.880
is

00:26:03.960 --> 00:26:05.960
a property that is

00:26:06.559 --> 00:26:09.809
Per state law in order to annex a property it has to be

00:26:09.809 --> 00:26:11.980
contiguous to the city limits

00:26:12.200 --> 00:26:16.000
so if there is a property that's not contiguous and that

00:26:16.640 --> 00:26:21.000
Is something that fits the other criteria that's listed

00:26:21.000 --> 00:26:22.039
above those?

00:26:22.920 --> 00:26:26.930
the property between the city limits and subject property

00:26:26.930 --> 00:26:29.200
would be part of that annexation

00:26:30.759 --> 00:26:32.759
Does that come into play if I a

00:26:33.400 --> 00:26:37.000
private property owner requests annexation that you

00:26:37.480 --> 00:26:39.480
If they you know in one of those

00:26:39.799 --> 00:26:43.049
It can leapfrog right and we can't we can't annex a

00:26:43.049 --> 00:26:46.200
property unless it's contiguous with the city limits

00:26:46.640 --> 00:26:49.200
We still have to go after the property in the middle and

00:26:49.200 --> 00:26:51.200
build a block unless it's agricultural

00:27:02.480 --> 00:27:05.079
Okay, sorry, I'm following my notes here

00:27:06.359 --> 00:27:08.660
With regard where it talks about the procedure the staff

00:27:08.660 --> 00:27:10.799
following staff determination

00:27:11.519 --> 00:27:13.519
That the property should be considered

00:27:14.400 --> 00:27:16.400
The owner will be notified

00:27:17.400 --> 00:27:20.559
To do a voluntary petition of the city for annexation

00:27:22.400 --> 00:27:24.700
Talk about cost at that point if you're requesting that the

00:27:24.700 --> 00:27:26.200
property owner do it

00:27:26.559 --> 00:27:29.079
Cost was mentioned again in the ordinances, but it isn't

00:27:29.079 --> 00:27:31.160
mentioned here again, right, right?

00:27:31.759 --> 00:27:33.759
We're working on

00:27:34.519 --> 00:27:37.619
Currently the cost is I believe it's seven hundred fifty

00:27:37.619 --> 00:27:40.799
dollars plus notification, which is 220

00:27:41.240 --> 00:27:44.769
That's for someone that's submitting a petition for annex

00:27:44.769 --> 00:27:45.240
ation

00:27:46.240 --> 00:27:49.039
We're currently all actually working on our development

00:27:49.039 --> 00:27:49.839
review fees as well

00:27:49.839 --> 00:27:52.940
So that is something that we'll be looking into but that's

00:27:52.940 --> 00:27:55.559
that's the current cost as we speak as of today

00:27:55.799 --> 00:27:59.119
Does that need to be written of who's paying that or is

00:27:59.119 --> 00:28:01.839
that referring to state law again or?

00:28:02.559 --> 00:28:06.519
How does someone know what if you're petitioning them to?

00:28:07.359 --> 00:28:09.079
to be annexed

00:28:09.079 --> 00:28:12.200
There's no mention of what the cost will be well

00:28:12.200 --> 00:28:15.619
Well, well, obviously during that petition submittal will

00:28:15.619 --> 00:28:16.240
be able to

00:28:16.759 --> 00:28:19.529
Assess what that cost is and provide that during their

00:28:19.529 --> 00:28:21.079
review of that petition

00:28:21.079 --> 00:28:23.599
So that will be part of the development review process

00:28:23.920 --> 00:28:27.460
So we'll have fees presented to them or provided to them at

00:28:27.460 --> 00:28:28.240
that point

00:28:31.000 --> 00:28:33.000
Is to wait for them

00:28:33.440 --> 00:28:36.319
If they don't want to pay it they just wait and do nothing

00:28:36.319 --> 00:28:37.359
and then we annex them

00:28:37.640 --> 00:28:40.220
Yeah, I guess my question comes was do we need to have that

00:28:40.220 --> 00:28:41.720
in writing about who's paying fees?

00:28:42.319 --> 00:28:44.319
Because we're repealing that

00:28:45.079 --> 00:28:48.180
So right now it's in a separate ordinance. We have fees

00:28:48.180 --> 00:28:51.079
associated with the development reviews

00:28:52.480 --> 00:28:55.160
Just to interject when I'm all done. We already have an

00:28:55.160 --> 00:28:59.349
adopted ordinance that outlines our fee schedule in that

00:28:59.349 --> 00:29:00.440
fee schedule

00:29:00.440 --> 00:29:02.769
We have specific project types and one of them is a

00:29:02.769 --> 00:29:05.640
voluntary and the other one is an involuntary annexation

00:29:05.960 --> 00:29:09.059
So that being said and depending on what course that

00:29:09.059 --> 00:29:12.640
project or the annex the proposed annexation project takes

00:29:12.640 --> 00:29:13.400
we would do that

00:29:13.400 --> 00:29:17.109
So in the case if it becomes city initiated in involuntary

00:29:17.109 --> 00:29:20.000
and then obviously the fees would not be assessed in many

00:29:20.000 --> 00:29:20.200
cases

00:29:20.400 --> 00:29:23.900
Given certain developments you have pockets of annexed of

00:29:23.900 --> 00:29:25.279
ETJ property

00:29:25.279 --> 00:29:28.559
That's not annexed but in order to facilitate development

00:29:28.559 --> 00:29:30.660
they acquire them that becomes part and parcel of their

00:29:30.660 --> 00:29:33.039
overall program to then cumulatively

00:29:33.759 --> 00:29:36.160
Annex the property and then develop it comprehensively

00:29:36.640 --> 00:29:39.519
So we do have a fee schedule the reason why the fees are

00:29:39.519 --> 00:29:42.519
not specified there is because your fee schedule has to be

00:29:43.519 --> 00:29:45.000
routinely reviewed

00:29:45.000 --> 00:29:47.759
Assessed against whether these fees are indeed applicable

00:29:47.759 --> 00:29:50.640
should there be decreased should they be increased and that

00:29:51.400 --> 00:29:53.680
Transparency measure is deliberately then identified in a

00:29:53.680 --> 00:29:54.779
separate ordinance

00:29:56.759 --> 00:29:59.079
And I think my last question with regard to that is so if

00:29:59.079 --> 00:30:02.160
they if they don't annex voluntarily

00:30:04.759 --> 00:30:06.289
And you're saying they have to do that within ten calendar

00:30:06.289 --> 00:30:10.390
days is is that a reasonable it that doesn't seem like very

00:30:10.390 --> 00:30:11.599
much time to me

00:30:13.480 --> 00:30:16.279
So I guess how did you come up with the ten days well

00:30:17.240 --> 00:30:19.359
Ten days is some other

00:30:20.240 --> 00:30:22.319
Ordinances that we have that refers to ten days

00:30:23.160 --> 00:30:26.599
We actually want to make sure we act quickly and so

00:30:27.440 --> 00:30:29.440
If it's the Commission's

00:30:30.119 --> 00:30:32.119
direction or recommendation

00:30:32.240 --> 00:30:36.079
We can obviously in increase that to a certain date

00:30:36.079 --> 00:30:40.029
But ten days is a typical that we use for return for any

00:30:40.029 --> 00:30:40.880
request

00:30:53.319 --> 00:30:55.319
Commissioner back. Thank you chair

00:30:57.160 --> 00:31:00.119
Going back to the comment that Commissioner Ellis

00:31:01.000 --> 00:31:03.000
guess will really production

00:31:04.920 --> 00:31:07.079
When would the city actually want to annex

00:31:07.759 --> 00:31:10.440
That kind of property and how would we benefit by annexing

00:31:10.440 --> 00:31:11.960
that kind of property?

00:31:12.720 --> 00:31:14.720
Let's try to explain earlier

00:31:15.200 --> 00:31:19.559
We do have some obviously EGJ on the east or I'm sorry the

00:31:19.559 --> 00:31:23.440
west side of the city and if there is a proposed

00:31:23.839 --> 00:31:25.640
gas well

00:31:25.640 --> 00:31:27.640
production site that is

00:31:27.720 --> 00:31:31.240
going to impact adjacent properties and we feel that

00:31:31.640 --> 00:31:35.609
It's going to create some impact as far as wastewater or

00:31:35.609 --> 00:31:37.079
any utilities and any

00:31:37.759 --> 00:31:38.759
potential

00:31:38.759 --> 00:31:41.279
Adverse impacts to adjacent properties. That's that's

00:31:41.279 --> 00:31:44.259
another reason why would we could go for and those that's

00:31:44.259 --> 00:31:45.039
just one criteria

00:31:45.039 --> 00:31:47.240
And that's one of the reasons why we would want to move

00:31:47.240 --> 00:31:48.440
forward with an annexation

00:31:49.079 --> 00:31:52.210
It's a potential impact to adjacent properties. So that

00:31:52.210 --> 00:31:55.160
would give the city some control over that property

00:31:56.400 --> 00:31:59.500
That's correct. I mean, of course the EGJ we we don't have

00:31:59.500 --> 00:32:00.880
any control as far as juice

00:32:00.880 --> 00:32:03.400
So that that would be one of the reasons why we would move

00:32:03.400 --> 00:32:06.319
forward with an annexation. Okay. Thanks

00:32:07.640 --> 00:32:10.559
On a guess we'll see would then collect taxes also then

00:32:10.559 --> 00:32:13.660
correct, right? If it's in the state and they are she

00:32:13.660 --> 00:32:14.359
following a different

00:32:15.119 --> 00:32:17.119
taxation

00:32:25.319 --> 00:32:28.420
Commissioner Ellis, thank you chair. I think this is this

00:32:28.420 --> 00:32:31.599
is just a typo and probably question for legal

00:32:33.359 --> 00:32:37.309
The last paragraph on the large paragraph which spells out

00:32:37.309 --> 00:32:38.599
what we're repealing

00:32:40.079 --> 00:32:42.079
It says whereas

00:32:42.160 --> 00:32:46.109
After noticed published it should that be notice published.

00:32:46.109 --> 00:32:48.440
Yes. Okay. Thank you. Sorry

00:32:53.000 --> 00:32:55.000
Thank you

00:32:55.319 --> 00:32:57.319
I

00:33:00.279 --> 00:33:02.279
Thank you

00:33:03.720 --> 00:33:05.269
Commissioner Ellis, thank you chair. I'm gonna ask one more

00:33:05.269 --> 00:33:08.920
question. Okay, just please give me

00:33:10.039 --> 00:33:13.880
The reason for for removing this from the PNZ platform

00:33:14.960 --> 00:33:17.319
the planning zone for the annexation

00:33:19.559 --> 00:33:22.980
One it's not required for the state law to bring it to the

00:33:22.980 --> 00:33:24.200
planning zone Commission

00:33:24.519 --> 00:33:27.400
The other is that we talked a little bit about it is to

00:33:27.400 --> 00:33:30.599
streamline the annexation to move forward

00:33:30.599 --> 00:33:32.599
So it goes straight to City Council

00:33:34.680 --> 00:33:38.440
And run I'm not too well versed in annexation

00:33:38.440 --> 00:33:42.190
But I think I remember that the local government code has a

00:33:42.190 --> 00:33:43.000
strict timeline

00:33:43.359 --> 00:33:46.940
For when the notices have to go and when the hearing at the

00:33:46.940 --> 00:33:49.440
public hearing at the City Council has to be held

00:33:49.440 --> 00:33:52.039
And I don't know that that accommodates the two

00:33:52.960 --> 00:33:56.119
The dual public hearing process so there may be why

00:33:56.720 --> 00:33:58.880
We're going in that direction too

00:33:59.400 --> 00:34:02.480
Right again, just to quickly for annexation

00:34:02.680 --> 00:34:05.779
There's two public hearings with City Council gives the

00:34:05.779 --> 00:34:08.420
opportunity for property owners and other

00:34:09.000 --> 00:34:12.469
individuals to come in and then following that there are

00:34:12.469 --> 00:34:15.619
two readings and they all have to fit in within a

00:34:16.079 --> 00:34:17.320
45

00:34:17.320 --> 00:34:19.320
Time period and so scheduling all those

00:34:19.760 --> 00:34:23.320
Could jeopardize meeting those those sets

00:34:23.960 --> 00:34:25.119
timeframes

00:34:25.119 --> 00:34:29.429
Okay, and on that same note then it is is the city staff

00:34:29.429 --> 00:34:30.079
doing

00:34:30.480 --> 00:34:33.579
All of the prelim work and determining that it needs to be

00:34:33.579 --> 00:34:35.750
annexed and then it's going to council for the public

00:34:35.750 --> 00:34:36.219
hearings

00:34:36.800 --> 00:34:39.420
Whereas now the procedure is do you get direction from

00:34:39.420 --> 00:34:43.079
council on annexation right before you determine something

00:34:43.079 --> 00:34:43.679
is annexed

00:34:43.679 --> 00:34:46.260
Well, yeah, we that's the other reason why we're bringing

00:34:46.260 --> 00:34:48.840
it forward to is there was no clear procedure

00:34:48.840 --> 00:34:53.360
So we would as we do the development review of these

00:34:53.360 --> 00:34:56.159
projects start to develop the you know

00:34:56.639 --> 00:34:58.969
Review the criteria develop some considerations and then

00:34:58.969 --> 00:35:01.559
bring it forward to City Council for their direction

00:35:02.239 --> 00:35:04.980
Yeah, and I guess just my concern lies with I just want to

00:35:04.980 --> 00:35:07.739
make sure we've got the right checks and balances sure in

00:35:07.739 --> 00:35:08.099
place

00:35:08.519 --> 00:35:10.519
for annex land because it can be a

00:35:10.880 --> 00:35:14.590
You know a contentious situation in some regard and I know

00:35:14.590 --> 00:35:16.400
at the City Council meeting yesterday

00:35:16.920 --> 00:35:20.000
when you were asking for direction on a couple of

00:35:21.719 --> 00:35:25.679
Parcels right that I mean you didn't have unanimous, you

00:35:25.679 --> 00:35:26.119
know

00:35:26.800 --> 00:35:30.510
Approval there with the way to go. So I'm trying to figure

00:35:30.510 --> 00:35:33.000
out if we're going to run into issues as a city

00:35:35.320 --> 00:35:36.659
If we're removing some checks and balances that way so that

00:35:36.659 --> 00:35:39.960
's what I'm trying to wrap my head around okay

00:35:44.840 --> 00:35:47.679
And just as an aside and so that everyone is aware

00:35:48.280 --> 00:35:52.460
We've been annexing property since 2010 under a different

00:35:52.460 --> 00:35:56.480
procedure. And so that's why he said that it was it was

00:35:57.159 --> 00:35:59.239
expressly or not expressly repealed but

00:36:00.199 --> 00:36:03.119
It was implied that it was repealed. So we're just final

00:36:03.119 --> 00:36:06.559
izing that but we have not taken any of our annexation since

00:36:06.559 --> 00:36:07.900
2010 through PNC

00:36:07.900 --> 00:36:09.900
It's gone straight to council

00:36:11.039 --> 00:36:13.880
So it's just matching what what it is that we're doing

00:36:13.880 --> 00:36:14.260
currently

00:36:14.840 --> 00:36:16.840
Okay

00:36:21.719 --> 00:36:23.719
Thank you Ron

00:36:23.760 --> 00:36:27.309
All right, and I see that you guys have cheated so I'm

00:36:27.309 --> 00:36:29.920
gonna bring hey lit up and we're gonna hold the

00:36:30.719 --> 00:36:33.000
Report and hold a discussion on the tree code

00:36:33.880 --> 00:36:36.400
We've learned when we get these stacks of paper. We better

00:36:36.400 --> 00:36:36.639
start

00:36:44.840 --> 00:36:46.840
Good afternoon commissioners

00:36:58.039 --> 00:36:59.320
Thank you

00:36:59.320 --> 00:37:02.659
again for allowing me the audience to actually bring this

00:37:02.659 --> 00:37:06.400
item before you with regards to revisions to

00:37:07.400 --> 00:37:10.010
The tree preservation and landscape requirements of the

00:37:10.010 --> 00:37:11.639
Denton Development Code

00:37:15.840 --> 00:37:19.639
So, you know objective here today is simply to

00:37:20.239 --> 00:37:22.909
Receive report hold discussion regarding adoption of an

00:37:22.909 --> 00:37:25.239
ordinance of the city of Denton, Texas

00:37:25.880 --> 00:37:27.880
amending sub chapters

00:37:28.039 --> 00:37:30.639
35.3 procedures sub chapter

00:37:31.639 --> 00:37:36.280
35.13 site design standards and sub chapter 35 point 23

00:37:36.800 --> 00:37:36.800
definitions in terms of the Denton Development Code as

00:37:36.800 --> 00:37:43.079
relates to tree preservation and landscaping requirements

00:37:44.599 --> 00:37:48.539
So just a little bit of background on this item. This was

00:37:48.539 --> 00:37:50.719
actually started out as

00:37:51.559 --> 00:37:54.639
direction from City Council back in the fall of

00:37:55.280 --> 00:37:58.079
2014 staff was directed to

00:37:59.519 --> 00:38:02.000
update the existing tree code

00:38:03.440 --> 00:38:06.320
Since then staff has had numerous meetings with the City

00:38:06.320 --> 00:38:09.360
Council PNC and various stakeholders

00:38:10.280 --> 00:38:15.340
With regards to the update to this this part of the tree

00:38:15.340 --> 00:38:15.880
code of the code

00:38:17.480 --> 00:38:21.010
There have been multiple continuous postponements due to

00:38:21.010 --> 00:38:22.440
concerns about this item

00:38:23.800 --> 00:38:25.800
That resulted in meetings

00:38:26.719 --> 00:38:28.599
with various

00:38:28.599 --> 00:38:31.920
stakeholders including the Denton Developers Alliance

00:38:32.599 --> 00:38:34.599
Keep Denton Beautiful

00:38:34.920 --> 00:38:36.920
represents from UNT, TWU

00:38:37.159 --> 00:38:41.710
We also had a outreach to just the general citizens of Dent

00:38:41.710 --> 00:38:41.960
on

00:38:42.320 --> 00:38:46.480
Through a visual preference survey to gain the public's

00:38:46.480 --> 00:38:47.760
perception on

00:38:48.760 --> 00:38:50.760
trees in Denton

00:38:52.280 --> 00:38:55.800
We've also most recently received data from the state of

00:38:55.800 --> 00:38:58.480
Denton urban forestry forest report

00:38:59.159 --> 00:39:00.400
which

00:39:00.400 --> 00:39:04.159
Has been incorporated into the update

00:39:04.840 --> 00:39:08.679
Believe that's also an attachment into in your packet. This

00:39:08.679 --> 00:39:10.760
report was was completed

00:39:11.440 --> 00:39:13.199
just this past

00:39:13.199 --> 00:39:15.960
Fall and presented to City Council in December

00:39:16.719 --> 00:39:20.559
Just some of the quick findings of that report was that

00:39:20.559 --> 00:39:23.679
Denton has 30% tree canopy

00:39:24.440 --> 00:39:26.559
the value of the trees in Denton is

00:39:27.360 --> 00:39:30.559
estimated to be two point zero six billion dollars as

00:39:30.559 --> 00:39:31.739
billion with a B

00:39:32.639 --> 00:39:34.639
the environmental

00:39:34.840 --> 00:39:36.199
benefits

00:39:36.199 --> 00:39:39.800
Annually are estimated to be 69.8 million

00:39:41.679 --> 00:39:45.849
One of the other key things to this report was that it was

00:39:45.849 --> 00:39:50.179
revealed that 46% of Denton's tree canopy

00:39:50.960 --> 00:39:53.199
Is located on undeveloped land

00:39:53.760 --> 00:39:58.940
So 46% of that 30% is on properties that is subject to

00:39:58.940 --> 00:40:00.400
future development

00:40:05.800 --> 00:40:07.800
So

00:40:07.800 --> 00:40:11.079
Our objectives when we started out with this project was to

00:40:11.079 --> 00:40:13.960
streamline the code to make it more user-friendly

00:40:14.880 --> 00:40:17.159
align city standards with industry best management

00:40:17.159 --> 00:40:20.900
practices of the American National Standards Institute and

00:40:20.900 --> 00:40:22.800
the International Society of

00:40:23.039 --> 00:40:26.989
Abora culture and to provide a more robust code that will

00:40:26.989 --> 00:40:27.639
expand

00:40:29.000 --> 00:40:31.000
expand and protect tree canopy

00:40:31.400 --> 00:40:35.710
Consistent with the Denton plan 2030 and the city of Denton

00:40:35.710 --> 00:40:37.159
strategic plan goals

00:40:40.039 --> 00:40:42.219
So now I'm going to shift gears a little bit and I'm going

00:40:42.219 --> 00:40:45.280
to begin with the end in mind here

00:40:46.800 --> 00:40:50.610
This slide here basically represents what this tree code

00:40:50.610 --> 00:40:53.280
means what the results of this tree code means

00:40:54.440 --> 00:40:59.079
for preserving trees on undeveloped properties, so

00:40:59.960 --> 00:41:01.960
70% of the trees

00:41:02.519 --> 00:41:06.320
The developer is able to remove without any mitigation

00:41:06.320 --> 00:41:08.800
whatsoever 70% off the top

00:41:10.000 --> 00:41:12.320
10% of that existing canopy

00:41:12.960 --> 00:41:14.960
would have to be

00:41:14.960 --> 00:41:17.670
mitigated either through replanting of trees on site or

00:41:17.670 --> 00:41:19.639
payment into the city's tree fund and

00:41:21.880 --> 00:41:26.829
20% of the canopy is what must which is the bare minimum

00:41:26.829 --> 00:41:28.219
that must be left on site

00:41:29.000 --> 00:41:31.420
Based on what we are proposing here today

00:41:32.880 --> 00:41:36.179
So just to go back to this this 10% here

00:41:37.300 --> 00:41:41.480
one of the the recommendations that we have in this code is

00:41:41.480 --> 00:41:42.360
to allow for

00:41:43.239 --> 00:41:46.960
trees that are planted for mitigation to count towards

00:41:47.679 --> 00:41:51.530
Required landscape trees. So any trees are required by the

00:41:51.530 --> 00:41:54.719
landscape provisions of the ordinance where the street

00:41:54.719 --> 00:41:55.119
trees

00:41:55.599 --> 00:41:57.599
parking lot trees

00:41:57.599 --> 00:42:00.800
Whatever trees are required the same trees that you

00:42:00.800 --> 00:42:01.400
mitigate

00:42:02.039 --> 00:42:04.840
By planning can can count for those trees also

00:42:11.400 --> 00:42:13.400
So what does this look like so

00:42:14.760 --> 00:42:17.440
Our goals for for mitigation is 30%

00:42:17.920 --> 00:42:21.929
So on a site that's up for development is 30% of the trees

00:42:21.929 --> 00:42:23.119
are preserved

00:42:24.599 --> 00:42:26.599
Requirements are met. There's no further

00:42:27.719 --> 00:42:31.190
Need for mitigation or any other payments with regard to

00:42:31.190 --> 00:42:32.840
tree preservation

00:42:33.360 --> 00:42:34.920
however, if

00:42:34.920 --> 00:42:37.639
30% 30% goal cannot be met

00:42:38.239 --> 00:42:40.239
what we're proposing allows for

00:42:41.440 --> 00:42:44.800
dropping that 30% down to 20% preserved and

00:42:45.719 --> 00:42:46.880
10%

00:42:46.880 --> 00:42:47.920
mitigated

00:42:47.920 --> 00:42:51.090
So how does that look as far as when we calculate our

00:42:51.090 --> 00:42:54.320
payment into a tree fund or a number of trees that are

00:42:54.320 --> 00:42:55.280
planning?

00:42:55.280 --> 00:42:58.400
That we have to plant so tree fund payment

00:42:59.039 --> 00:43:02.980
Would be based on the the number of square feet that you

00:43:02.980 --> 00:43:04.719
would be mitigated for

00:43:05.519 --> 00:43:06.559
times

00:43:06.559 --> 00:43:10.699
$2.84 and you may say where does that $2.84 come from?

00:43:10.920 --> 00:43:14.019
Well, I go back to the state of Denton urban forest report

00:43:14.019 --> 00:43:17.800
and the value that was given for the trees and Denton and

00:43:17.800 --> 00:43:18.000
the

00:43:18.000 --> 00:43:20.360
environmental benefits that are received from those trees

00:43:21.320 --> 00:43:23.800
So am I too far away? Okay

00:43:24.960 --> 00:43:27.440
So that that $2.84

00:43:28.599 --> 00:43:31.239
basically represents the

00:43:32.480 --> 00:43:36.619
what the square foot of tree canopy costs and then based on

00:43:36.619 --> 00:43:36.920
the

00:43:37.880 --> 00:43:39.880
structural value of the trees and

00:43:40.400 --> 00:43:42.639
addition to 10 years of

00:43:43.480 --> 00:43:45.679
Environmental benefits that we're receiving from those

00:43:45.679 --> 00:43:50.079
trees that would be removed that is where the $2.84 comes

00:43:50.079 --> 00:43:50.519
to

00:43:51.760 --> 00:43:53.760
so if we are

00:43:53.760 --> 00:43:55.760
mitigating via planting

00:43:56.079 --> 00:43:58.760
We are recommending a one to six ratio

00:43:58.760 --> 00:44:01.860
I know at the previous meeting the ratio was one to four

00:44:01.860 --> 00:44:04.659
and else, you know some pushback and there was an item of

00:44:04.659 --> 00:44:05.360
concern

00:44:06.360 --> 00:44:08.360
mentioned by some of the

00:44:09.400 --> 00:44:12.219
Developers and some on the Commission here. Well after

00:44:12.219 --> 00:44:15.880
looking at the numbers and actually comparing

00:44:16.880 --> 00:44:18.719
that one to six

00:44:18.719 --> 00:44:22.150
To where we are now from with the current code and and what

00:44:22.150 --> 00:44:23.119
we're proposing

00:44:24.000 --> 00:44:27.099
Converting it, you know looking at canopy compared to

00:44:27.099 --> 00:44:31.369
diameter inch. I feel real confident and where that one to

00:44:31.369 --> 00:44:31.760
six

00:44:32.519 --> 00:44:34.670
Ratio lies and and I'll get to that in a minute. But if you

00:44:34.670 --> 00:44:37.940
're calculating the number of trees, you're going to plant

00:44:38.719 --> 00:44:41.519
You would have your your square footage of canopy that you

00:44:41.519 --> 00:44:42.559
're mitigating

00:44:43.239 --> 00:44:45.480
times six divided by

00:44:46.719 --> 00:44:48.719
1256 the

00:44:48.880 --> 00:44:52.800
1256 square feet that is the value that our code gives to

00:44:52.800 --> 00:44:56.659
the canopy of a of a mature large tree here in Denton

00:44:57.000 --> 00:44:59.840
So you plug your numbers in there and you would get your

00:44:59.840 --> 00:45:01.320
number of trees

00:45:02.199 --> 00:45:04.000
planted for the site

00:45:04.000 --> 00:45:07.239
So you may say how does this look with real numbers? So I

00:45:07.239 --> 00:45:09.320
have some real numbers in here

00:45:09.599 --> 00:45:13.460
So again all percentages here are based on the original

00:45:14.199 --> 00:45:17.929
Our existing total tree canopy on the site and for sake of

00:45:17.929 --> 00:45:20.199
this example and round us

00:45:20.599 --> 00:45:23.260
We're saying that the the total tree canopy is a hundred

00:45:23.260 --> 00:45:25.300
thousand square feet for this site

00:45:25.519 --> 00:45:30.469
So if 30% or 30,000 square feet is preserved you're done.

00:45:30.469 --> 00:45:31.679
Nothing else is needed or

00:45:32.840 --> 00:45:37.019
You can preserve as low as 20,000 square feet and mitigate

00:45:37.019 --> 00:45:39.059
for the 10,000 square feet

00:45:39.400 --> 00:45:41.480
so plug in those numbers into

00:45:43.159 --> 00:45:48.159
The formula you would multiply the 10,000 times 284 and

00:45:48.159 --> 00:45:49.800
your tree fund payment would be

00:45:51.599 --> 00:45:53.599
$28,400

00:45:54.000 --> 00:45:56.000
Plug in that same number into

00:45:56.599 --> 00:45:58.159
your

00:45:58.159 --> 00:46:00.159
ratio for tree planting

00:46:00.719 --> 00:46:03.820
you would do the 10,000 times six divided by

00:46:05.480 --> 00:46:09.980
1256 and your number of trees to plant for mitigation would

00:46:09.980 --> 00:46:11.360
be 48 trees and

00:46:11.880 --> 00:46:15.400
Again, keep in mind those 48 trees can also count towards

00:46:15.400 --> 00:46:17.480
the trees that you are required

00:46:17.840 --> 00:46:20.980
By the landscape code to plant on the site street trees

00:46:20.980 --> 00:46:22.639
parking lot trees other

00:46:23.159 --> 00:46:25.280
Landscape trees buffers what have you?

00:46:26.000 --> 00:46:28.210
So you may want to say I know and I know this came up at

00:46:28.210 --> 00:46:31.280
the last meeting was what does this look like on a real

00:46:31.280 --> 00:46:34.280
site, so we did a case study and

00:46:35.320 --> 00:46:39.460
This picture may look familiar. This was presented back in

00:46:39.460 --> 00:46:40.920
back in July

00:46:41.280 --> 00:46:43.280
So this is a before

00:46:43.679 --> 00:46:46.340
Development picture and an after development picture on

00:46:46.340 --> 00:46:48.800
this particular site

00:46:48.800 --> 00:46:51.900
This was a residential development the majority of the

00:46:51.900 --> 00:46:55.920
trees you see the cursor was preserved in this section here

00:46:56.000 --> 00:46:58.699
Which they actually did make it into a melody for the

00:46:58.699 --> 00:47:00.639
neighborhood. There's a little walking trail

00:47:00.639 --> 00:47:01.920
I think maybe a bench in there

00:47:01.920 --> 00:47:04.760
So it is something that's usable for the residents of this

00:47:04.760 --> 00:47:07.760
neighborhood and there were a few other trees

00:47:07.920 --> 00:47:11.019
That was saved on site and this picture doesn't show up if

00:47:11.019 --> 00:47:13.840
there's a couple others on the south side of the road

00:47:13.840 --> 00:47:16.300
That's also included in this development

00:47:17.239 --> 00:47:18.840
Yes

00:47:18.840 --> 00:47:21.599
Commissioner back. Thank you chair. So the trees were seen

00:47:21.599 --> 00:47:22.960
in the second picture

00:47:23.159 --> 00:47:28.320
There is the 30% that were allowed to remain no

00:47:28.320 --> 00:47:32.610
This is what was preserved under the existing code. Okay,

00:47:32.610 --> 00:47:34.519
and I'm going to get to that. Okay, okay

00:47:34.920 --> 00:47:39.039
Real quick, yes the 10% you were talking about I you know

00:47:39.039 --> 00:47:42.739
The fact that we let them actually clear out 70% of the

00:47:42.739 --> 00:47:43.800
trees bothers me

00:47:43.800 --> 00:47:47.239
But and maybe you're gonna address this later to that 10%

00:47:48.239 --> 00:47:49.840
rather than

00:47:49.840 --> 00:47:53.360
Removing them we could count those existing trees as part

00:47:53.360 --> 00:47:55.480
of their landscape requirement

00:47:55.480 --> 00:47:57.880
Is that correct or am I jumping the gun here?

00:47:57.880 --> 00:48:01.380
No any trees any any trees that are preserved on the site

00:48:01.380 --> 00:48:03.760
can also count towards the

00:48:04.000 --> 00:48:07.570
Landscape require trees on the site. So conceivably we

00:48:07.570 --> 00:48:11.000
could keep that 30% if we could get them to

00:48:11.679 --> 00:48:12.840
keep

00:48:12.840 --> 00:48:15.940
You know if they were thinking about you know knocking it

00:48:15.940 --> 00:48:18.679
down to 20% if we could get them to you know

00:48:18.679 --> 00:48:22.269
Keep that extra 10% and make it a total 30% and as part of

00:48:22.269 --> 00:48:23.639
their landscape page

00:48:24.039 --> 00:48:27.250
It's possible just kind of depends on you know, the site,

00:48:27.250 --> 00:48:31.000
you know specifics of the site and how it's laid out. Okay.

00:48:31.000 --> 00:48:31.320
Thanks

00:48:33.519 --> 00:48:35.079
Okay, so

00:48:35.079 --> 00:48:38.519
This is what this site looks like as far as what was

00:48:39.639 --> 00:48:43.139
Surveyed as canopy tree canopy on the site. So that light

00:48:43.139 --> 00:48:43.440
green

00:48:44.079 --> 00:48:48.019
Actually represents the canopy that was on that site prior

00:48:48.019 --> 00:48:49.320
to development

00:48:51.360 --> 00:48:55.119
So the total area of the site was you know, just over 25

00:48:55.119 --> 00:48:55.480
acres

00:48:56.000 --> 00:49:00.239
The total tree canopy of this site was just over 11 acres

00:49:02.480 --> 00:49:05.699
So on this map here what is showing this is what was

00:49:05.699 --> 00:49:09.079
actually shown to be preserved

00:49:09.920 --> 00:49:12.639
For this development. This is what was approved with

00:49:13.320 --> 00:49:15.519
this particular development the

00:49:16.119 --> 00:49:18.559
Shaded SS kind of a yellowish color there

00:49:19.840 --> 00:49:23.280
That pretty much represents the canopy that was preserved

00:49:24.599 --> 00:49:26.599
so

00:49:26.840 --> 00:49:30.239
The area of that area of canopy that was preserved was

00:49:31.320 --> 00:49:33.760
Just under a half acre and it amounted to

00:49:34.679 --> 00:49:39.010
Just over two thousand square feet of canopy and that was

00:49:39.010 --> 00:49:41.539
code compliant under the current code

00:49:44.079 --> 00:49:47.230
So if we you know say well what does 20% look like under

00:49:47.230 --> 00:49:50.000
what we're proposing if they were mitigating also

00:49:50.440 --> 00:49:53.920
Well, the reddish pink area here that's showing

00:49:54.699 --> 00:49:58.070
What additional tree canopy could have possibly been

00:49:58.070 --> 00:50:01.559
preserved to meet the requirements under the proposed?

00:50:02.159 --> 00:50:04.280
revision to the tree code so

00:50:05.239 --> 00:50:07.800
The pink here and a lot of this is along the backs of the

00:50:07.800 --> 00:50:10.440
properties. This is what's representing

00:50:10.880 --> 00:50:13.719
What 20% would look like on this development?

00:50:15.280 --> 00:50:18.840
So that 20% would amount to two point two four acres

00:50:19.960 --> 00:50:21.639
just under

00:50:21.639 --> 00:50:23.639
98 thousand square feet of

00:50:25.079 --> 00:50:27.079
preservation

00:50:27.679 --> 00:50:30.019
So when you're looking at if they were going to go full

00:50:30.019 --> 00:50:33.250
compliance how that would look like on the site the purple

00:50:33.250 --> 00:50:33.760
adds in

00:50:34.880 --> 00:50:38.619
What 30% would look like on this site and again that would

00:50:38.619 --> 00:50:42.840
increase the about three point three acres of trees

00:50:44.199 --> 00:50:47.920
And just under 150,000 square feet of canopy

00:50:48.800 --> 00:50:52.750
Hey, we just go back to that last slide to clarify they don

00:50:52.750 --> 00:50:56.960
't have to actually preserve this the trees in that location

00:50:56.960 --> 00:50:59.519
it's pretty much up to the developer where the

00:51:00.480 --> 00:51:02.780
The stands would be preserved, but that's just an example

00:51:02.780 --> 00:51:05.679
of where they could preserve it correct correct

00:51:05.679 --> 00:51:09.179
Yeah, this is just you know an example. That was you know

00:51:09.179 --> 00:51:09.820
that made it

00:51:10.639 --> 00:51:13.809
Convenient for our GIS guy Cody he did an excellent job

00:51:13.809 --> 00:51:14.440
with these maps

00:51:15.079 --> 00:51:18.780
So we can show what was preserved what 20% looked like and

00:51:18.780 --> 00:51:21.800
what 30% looks like on this particular site

00:51:23.119 --> 00:51:25.639
Commissioner Tyler. Thank you chair. Yeah

00:51:26.320 --> 00:51:29.920
Could you go back one more slide or one though this one? No

00:51:29.920 --> 00:51:34.019
the one with the total canopy had indicated this one

00:51:34.019 --> 00:51:35.800
so in this one

00:51:35.800 --> 00:51:40.239
This isn't species specific is it no it's not and so

00:51:40.880 --> 00:51:42.880
Is it hackberry juniper?

00:51:43.559 --> 00:51:45.559
Locust boat arc

00:51:45.719 --> 00:51:48.199
Etc none of those would have counted either

00:51:48.840 --> 00:51:51.940
Is that correct well this would pick up all trees on the

00:51:51.940 --> 00:51:55.500
site right, but I'm saying so the new ordinance

00:51:56.199 --> 00:52:00.480
says you can you can ignore the species list right of

00:52:01.280 --> 00:52:03.280
right and if

00:52:03.280 --> 00:52:05.280
Say in this particular case if

00:52:06.679 --> 00:52:08.679
The developer was looking to

00:52:09.800 --> 00:52:12.920
Reduce his total number of canopy based on those species

00:52:12.920 --> 00:52:16.940
what I would require was would be for the preparer of this

00:52:16.940 --> 00:52:17.559
survey

00:52:18.000 --> 00:52:21.570
To provide an estimate of how much what the percentage of

00:52:21.570 --> 00:52:24.960
those trees were and then we would take a deduction

00:52:25.239 --> 00:52:28.559
accordingly and so in this case if if if this was like half

00:52:29.559 --> 00:52:32.440
You know hackberry and juniper and boat arc and so forth

00:52:33.800 --> 00:52:35.869
They could they would have to do a little more work on the

00:52:35.869 --> 00:52:36.360
survey

00:52:36.360 --> 00:52:39.780
you know go out and identify species mix or use like the

00:52:39.780 --> 00:52:43.039
four band satellite to pick up species by color and

00:52:43.800 --> 00:52:47.500
Then this all these calculations on the next page would all

00:52:47.500 --> 00:52:49.079
just be cut in half basically

00:52:49.079 --> 00:52:52.400
Yeah, depending on on the percentage of those exempt trees

00:52:52.400 --> 00:52:54.019
that is correct or another way

00:52:54.019 --> 00:52:56.269
I guess they could do it is they could go ahead and clear

00:52:56.269 --> 00:52:58.000
all unprotected species

00:52:59.119 --> 00:53:01.119
first and then

00:53:01.840 --> 00:53:05.380
Then only have to count the protected species that are

00:53:05.380 --> 00:53:06.000
remaining

00:53:06.360 --> 00:53:08.679
That would not be allowed they can't they can't remove hack

00:53:08.679 --> 00:53:11.079
berry not not on a site that's up for development

00:53:11.679 --> 00:53:14.320
Because the danger with that is that you get someone out

00:53:14.320 --> 00:53:17.079
there with the bulldozer or the chainsaw

00:53:17.280 --> 00:53:19.880
That's cutting trees and you know next thing you know they

00:53:19.880 --> 00:53:20.840
have trees that are

00:53:21.280 --> 00:53:23.989
covered under the ordinance that are on the ground and then

00:53:23.989 --> 00:53:25.679
you know they're dealing with

00:53:27.039 --> 00:53:28.800
You know the the

00:53:28.800 --> 00:53:31.590
Legal ramifications of that so okay, so so they can't they

00:53:31.590 --> 00:53:33.800
really they really absolutely can't clear

00:53:35.440 --> 00:53:38.239
unprotected species until until the surveys complete

00:53:38.239 --> 00:53:39.559
correct correct

00:53:39.559 --> 00:53:42.760
There is a you know allowance if if there's you know if

00:53:42.760 --> 00:53:44.559
they need to to actually use

00:53:45.599 --> 00:53:48.119
Chainsaws to cut through to actually make it through the

00:53:48.119 --> 00:53:51.619
site because some sites is so thick or to do other ground

00:53:51.619 --> 00:53:52.000
work

00:53:52.719 --> 00:53:56.179
You know top typo topo surveys and what-have-you they are

00:53:56.179 --> 00:53:57.099
allowed to do that

00:53:57.099 --> 00:53:59.619
But not to just go in and say let's cut down everything

00:53:59.619 --> 00:54:00.599
that doesn't count

00:54:01.039 --> 00:54:04.679
And I know I've seen that it might be later in the process

00:54:04.679 --> 00:54:06.639
where a develop a site

00:54:06.639 --> 00:54:08.590
Especially like when it's covered in privet or something

00:54:08.590 --> 00:54:11.360
like that at some point pretty early in the process

00:54:11.360 --> 00:54:13.349
They go in and they clear out all the privets so they can

00:54:13.349 --> 00:54:16.599
count the trees stuff like that so okay, so

00:54:17.760 --> 00:54:21.449
So that this even this example though doesn't include the

00:54:21.449 --> 00:54:25.800
potential for a lot of mixed canopy areas

00:54:25.800 --> 00:54:27.800
I mean there are some areas that are solid oak

00:54:28.199 --> 00:54:31.300
That's that's not very common. It's only kind of a few rid

00:54:31.300 --> 00:54:32.559
ges in South Denton and

00:54:33.079 --> 00:54:35.440
You know most neighborhoods and most areas especially in

00:54:35.440 --> 00:54:37.800
the north. There's a lot of mesquite a lot of hackberry

00:54:38.039 --> 00:54:40.880
You know mixed in cedar and some areas are a lot of boat

00:54:40.880 --> 00:54:43.079
arc and so in that case

00:54:43.559 --> 00:54:45.559
There's a pretty good chance that

00:54:45.840 --> 00:54:49.840
this you know half 50% canopy might only be

00:54:51.119 --> 00:54:56.000
25% protected canopy could be yes, it's all site specific

00:54:56.800 --> 00:54:58.800
Thank you. You're welcome

00:55:00.880 --> 00:55:02.880
So

00:55:03.440 --> 00:55:06.000
Okay, so what I did was I did a comparison

00:55:07.039 --> 00:55:10.510
For that specific site and what their mitigation was under

00:55:10.510 --> 00:55:13.070
the current code and what it would look like under the

00:55:13.070 --> 00:55:13.760
proposed code

00:55:13.960 --> 00:55:15.960
so under the current code

00:55:16.000 --> 00:55:20.940
they preserve 618 diameter inches of trees which amounted

00:55:20.940 --> 00:55:21.039
to

00:55:22.000 --> 00:55:24.000
4.2 percent of the of the

00:55:24.559 --> 00:55:26.559
canopy of the site

00:55:26.800 --> 00:55:29.320
Under the proposed code they would have to preserve a bare

00:55:29.320 --> 00:55:32.400
minimum of 20% of the canopy on the site

00:55:33.880 --> 00:55:36.980
The tree fund payment for this particular site was two

00:55:36.980 --> 00:55:39.599
hundred and two thousand dollars and some change

00:55:40.800 --> 00:55:43.369
Under the proposed code if they opted to pay into the tree

00:55:43.369 --> 00:55:46.829
fund their tree fund payment would be a hundred and thirty

00:55:46.829 --> 00:55:47.519
eight thousand

00:55:48.360 --> 00:55:50.360
eight hundred dollars

00:55:51.239 --> 00:55:53.800
If they were mitigating under the

00:55:54.519 --> 00:55:57.619
Current code they would have to plant eight hundred and

00:55:57.619 --> 00:55:58.679
nine trees in

00:55:59.480 --> 00:56:02.769
Addition to any required landscaping trees which for the

00:56:02.769 --> 00:56:05.639
neighborhoods are generally going to be your street trees

00:56:07.440 --> 00:56:11.380
Under the proposed code at that one to six ratio they would

00:56:11.380 --> 00:56:15.119
have to plant two hundred and thirty four trees to mitigate

00:56:17.360 --> 00:56:20.869
So the number of lots as the site was developed under the

00:56:20.869 --> 00:56:23.099
current code was a hundred and three lots

00:56:23.920 --> 00:56:27.630
The proposed code to get that 20% preservation they lose a

00:56:27.630 --> 00:56:31.420
lot and a half basically so counting it as a hundred and

00:56:31.420 --> 00:56:32.320
one lots

00:56:34.480 --> 00:56:37.980
So under the current code based on you know

00:56:38.840 --> 00:56:41.099
Looking at some of the aerials and knowing what they

00:56:41.099 --> 00:56:41.679
planted

00:56:42.440 --> 00:56:45.360
Just counting the street trees and at least one tree per

00:56:45.360 --> 00:56:46.300
lot

00:56:46.880 --> 00:56:50.380
They planted an estimated 236 trees

00:56:52.360 --> 00:56:55.679
So what that really amounts to above what

00:56:56.760 --> 00:56:59.400
Would be required under the proposed code would be an

00:56:59.400 --> 00:57:03.079
addition of 13 trees and that's with that one to six ratio

00:57:03.280 --> 00:57:05.280
which is very important because

00:57:05.360 --> 00:57:06.760
the

00:57:06.760 --> 00:57:08.639
234 trees

00:57:08.639 --> 00:57:11.389
They're able to count towards their street trees the trees

00:57:11.389 --> 00:57:14.139
that they plant in the yards can also be a mitigation tree

00:57:15.079 --> 00:57:19.269
You know the goal is not to you know make it more difficult

00:57:19.269 --> 00:57:20.400
for developers

00:57:20.559 --> 00:57:25.500
You know my goal is you know a to make the 30% preservation

00:57:25.500 --> 00:57:27.500
if you can't make the 30% preservation

00:57:28.000 --> 00:57:31.400
Make at least a 20% and plant trees back on site

00:57:32.039 --> 00:57:34.760
Payment into the tree funds should really be the last

00:57:34.760 --> 00:57:36.320
option which means you know

00:57:36.320 --> 00:57:39.030
I can't put any additional trees on the site, and I didn't

00:57:39.030 --> 00:57:41.199
meet my preservation requirements

00:57:41.320 --> 00:57:44.360
But you know I see payment into the tree fund

00:57:44.360 --> 00:57:47.039
It is really a signal that you know we failed

00:57:47.280 --> 00:57:50.380
We failed to protect trees and we failed to put trees back

00:57:50.380 --> 00:57:54.619
on the site so for me that should always be the last option

00:57:57.079 --> 00:57:58.679
Question for you move on yes

00:57:58.679 --> 00:58:02.380
How did you do your calculation on the lot numbers they

00:58:02.380 --> 00:58:06.139
exactly the same size lots because if the 20% canopy on?

00:58:07.199 --> 00:58:10.960
11 acres is going to be two and a half

00:58:11.760 --> 00:58:15.090
Versus I think it was less than a half you got two more

00:58:15.090 --> 00:58:17.000
acres that you're losing

00:58:17.599 --> 00:58:20.679
I basically counted the lots in the neighborhood

00:58:22.239 --> 00:58:24.239
The only ones if I'm thinking

00:58:24.480 --> 00:58:27.599
That I may have missed with there was like maybe three or

00:58:27.599 --> 00:58:30.719
four that was south of of the the main street there

00:58:31.239 --> 00:58:34.389
But I basically went on the number of lots that that was

00:58:34.389 --> 00:58:38.360
that without were developed as it sits in the field today

00:58:39.119 --> 00:58:42.219
That's that I'm just doing the math in my mind from the

00:58:42.219 --> 00:58:42.800
previous

00:58:43.679 --> 00:58:47.380
Versus 20% of the 11 acres is going to be roughly two and

00:58:47.380 --> 00:58:49.840
almost two and a half acres

00:58:50.119 --> 00:58:52.119
so you got two acres less of

00:58:52.840 --> 00:58:55.610
property put lots on and those lots are probably going to

00:58:55.610 --> 00:58:55.840
be

00:58:56.639 --> 00:58:58.840
three to four lots an acre, so I'm just

00:58:59.639 --> 00:59:03.590
Curious how it works out with less acreage to develop that

00:59:03.590 --> 00:59:07.400
you get almost the same lot count and the second part that

00:59:08.159 --> 00:59:12.110
Dollar analogy doesn't take into account the acreage. That

00:59:12.110 --> 00:59:16.199
's now an undevelopable. That's not calculated in that those

00:59:16.199 --> 00:59:16.800
costs

00:59:17.679 --> 00:59:20.550
We're just talking about trees only we're not counting any

00:59:20.550 --> 00:59:21.760
of the other infrastructure

00:59:22.360 --> 00:59:25.639
Land purchase costs any of those types of things well

00:59:26.039 --> 00:59:28.369
I'm gonna pull this this slide back up because this may

00:59:28.369 --> 00:59:31.440
help to clarify what I did with looking at the 20%

00:59:32.000 --> 00:59:35.940
So on this side here. This is the two lots that were lost

00:59:35.940 --> 00:59:37.840
everything else remained

00:59:38.159 --> 00:59:41.699
As far as lots based on what is actually existing on the

00:59:41.699 --> 00:59:46.119
site this red color. That's your tree canopy so where this

00:59:47.599 --> 00:59:51.039
Tree camp is located is what would be in the back short

00:59:51.039 --> 00:59:56.119
backyards of these properties so along the west north

00:59:56.719 --> 01:00:00.170
The south side this is this this acreage that's counted for

01:00:00.170 --> 01:00:02.940
tree canopy isn't taking up acres that

01:00:03.840 --> 01:00:05.840
away from from

01:00:06.320 --> 01:00:09.420
Lots that were built with exception of the one and a half

01:00:09.420 --> 01:00:12.639
that I counted as two on this part of the property

01:00:12.800 --> 01:00:16.809
So that's where you know that acres is spread out so some

01:00:16.809 --> 01:00:19.679
of that is overlapping the lots

01:00:21.760 --> 01:00:23.760
In this example

01:00:24.199 --> 01:00:26.199
I'm just looking at the

01:00:26.760 --> 01:00:30.900
Site that you presented there were 11 acres and something

01:00:30.900 --> 01:00:33.159
of tree canopy if you've got to preserve

01:00:34.280 --> 01:00:39.230
20% minimum the ideal is 30, but a minimum is 20 on that

01:00:39.230 --> 01:00:41.320
site. You've got to then preserve at least two

01:00:42.880 --> 01:00:45.539
Two and a quarter two and a half acres of yes, that's what

01:00:45.539 --> 01:00:47.079
I calculated I understand

01:00:47.599 --> 01:00:50.849
It works out good in this example that you're able to do

01:00:50.849 --> 01:00:53.909
that because there's trees on the outside edge in this

01:00:53.909 --> 01:00:54.719
example

01:00:54.719 --> 01:00:57.559
But if the trees are in the center of the property

01:00:58.199 --> 01:01:01.500
You don't get that overhang in that fringe benefit

01:01:02.320 --> 01:01:04.860
You're gonna end up with a spot in the center there of two

01:01:04.860 --> 01:01:06.360
and a quarter two and a half acres

01:01:06.639 --> 01:01:10.119
That has to be preserved and it's not going to be overhang

01:01:10.119 --> 01:01:12.159
or whatever it is like it is

01:01:12.679 --> 01:01:15.230
Nicely in this example where it's around the edge is that

01:01:15.230 --> 01:01:15.559
make

01:01:16.199 --> 01:01:18.199
my explaining what my

01:01:18.559 --> 01:01:20.780
Looking at this and comparing to just any other site

01:01:20.780 --> 01:01:22.280
because it's around the edge

01:01:23.239 --> 01:01:26.340
It benefits this site versus this in the center of the site

01:01:26.340 --> 01:01:29.460
. It's very different. It's it's all site specific

01:01:29.460 --> 01:01:32.969
I understand and and and what it depends on is is you know,

01:01:32.969 --> 01:01:35.929
because what we what we require doesn't dictate how you

01:01:35.929 --> 01:01:36.380
know

01:01:36.380 --> 01:01:39.480
The development is laid out whether it's residential

01:01:39.480 --> 01:01:42.239
commercial. So it's it's basically, you know

01:01:42.760 --> 01:01:46.460
Being creative to a certain extent with you know, how the

01:01:46.460 --> 01:01:50.150
the subdivision is laid out to achieve, you know those

01:01:50.150 --> 01:01:50.539
numbers

01:01:51.280 --> 01:01:53.280
Okay

01:01:54.480 --> 01:01:56.000
Commissioner Zell

01:01:56.000 --> 01:01:58.000
Thank you chair. I'm not sure

01:01:58.619 --> 01:02:01.449
Who would best answer this and my the chair might be able

01:02:01.449 --> 01:02:02.880
to provide insight to this

01:02:04.480 --> 01:02:07.000
Why did the developer take down the perimeter trees to

01:02:07.000 --> 01:02:10.880
begin with when that add value to the property? I'm I'm

01:02:10.880 --> 01:02:12.159
trying to

01:02:12.880 --> 01:02:14.880
Just understand in this situation

01:02:15.440 --> 01:02:17.440
Why any of those red trees?

01:02:18.079 --> 01:02:20.719
Apart from the ones taking up the two lots

01:02:21.360 --> 01:02:24.010
Were even taken down and I don't know if there's an answer

01:02:24.010 --> 01:02:24.960
to be had by that

01:02:25.960 --> 01:02:28.630
Because it just seems like it was unnecessary to begin with

01:02:28.630 --> 01:02:31.820
if that if it didn't impact the building of those homes to

01:02:31.820 --> 01:02:32.500
begin with

01:02:33.679 --> 01:02:35.119
Is there

01:02:35.119 --> 01:02:37.119
Jared do you know what would be?

01:02:37.760 --> 01:02:41.300
Pure speculation, but why they would take the perimeter

01:02:41.300 --> 01:02:41.940
trees down

01:02:42.360 --> 01:02:46.369
Pure speculation is that when you look at a site that's as

01:02:46.369 --> 01:02:47.960
tight for most?

01:02:48.119 --> 01:02:50.230
developments that are in the city of Denton by the time you

01:02:50.230 --> 01:02:52.480
meet all the grading criteria on the lots

01:02:52.920 --> 01:02:56.019
The swales where the water has to go to the side yards and

01:02:56.019 --> 01:02:57.760
from the backyards to the front

01:02:58.199 --> 01:03:02.150
It's very difficult just to say we're gonna not touch part

01:03:02.150 --> 01:03:04.199
of it on a deal like that

01:03:04.199 --> 01:03:06.679
By the time you cut the streets and grade the pads

01:03:08.039 --> 01:03:11.280
If it's a home warranty subdivision, they typically have

01:03:11.280 --> 01:03:13.579
exclusions that you can't have any trees within so many

01:03:13.579 --> 01:03:15.159
feet of houses

01:03:15.159 --> 01:03:17.920
I think it's at least 10 feet or they don't extend coverage

01:03:18.280 --> 01:03:22.840
So I can't I'm gonna speculate sir all those things go into

01:03:22.840 --> 01:03:25.280
what makes it really difficult and

01:03:25.920 --> 01:03:29.760
Kind of what's been my concern on the tree preservation

01:03:30.400 --> 01:03:34.760
Is it's very difficult to do because of the density on

01:03:34.760 --> 01:03:35.800
these sites?

01:03:37.920 --> 01:03:40.260
To save the trees that's what I was kind of thinking I was

01:03:40.260 --> 01:03:43.210
just looking at this and and it does seem that you're

01:03:43.210 --> 01:03:44.280
presenting a

01:03:44.960 --> 01:03:47.269
Solution that would be workable for this but in my mind I

01:03:47.269 --> 01:03:49.119
was saying there had to have been a reason

01:03:51.079 --> 01:03:54.659
Logistically why why it wouldn't have happened it maybe the

01:03:54.659 --> 01:03:58.079
presentation is is maybe better in theory

01:03:58.840 --> 01:04:02.550
In terms of ease and cost to the actual development and so

01:04:02.550 --> 01:04:04.179
I appreciate you. Let me

01:04:04.840 --> 01:04:08.269
Think through that sure and I can't speak specifically to

01:04:08.269 --> 01:04:08.840
this site

01:04:08.840 --> 01:04:13.360
I can say that I've had had the opportunity to work with a

01:04:14.000 --> 01:04:17.920
developer on a different residential site where initially

01:04:17.920 --> 01:04:21.079
they weren't meeting the current tree code requirements and

01:04:21.559 --> 01:04:24.659
and meeting with the engineer that was laying out the site

01:04:24.659 --> 01:04:24.960
and

01:04:25.840 --> 01:04:28.679
Their contractor that was actually doing the on-site

01:04:28.679 --> 01:04:29.320
grading

01:04:29.920 --> 01:04:31.920
We were able to preserve

01:04:32.000 --> 01:04:34.400
additional trees to where they didn't have to

01:04:36.760 --> 01:04:38.199
Mitigate through

01:04:38.199 --> 01:04:41.300
Payment into the tree fund and and and a large part it

01:04:41.300 --> 01:04:44.679
ended up similar to this where they were trees around the

01:04:44.679 --> 01:04:44.880
perimeter

01:04:44.880 --> 01:04:46.880
That ends up in the backyards

01:04:47.239 --> 01:04:51.489
But you know like the commission strange mentioned a lot of

01:04:51.489 --> 01:04:54.039
its real site specific how is existing

01:04:55.199 --> 01:04:58.599
You know the existing slopes and everything are on the land

01:04:58.599 --> 01:04:59.679
so it it's all

01:05:00.519 --> 01:05:02.880
You know very specific to the individual site

01:05:03.480 --> 01:05:05.639
Understood. Thank you. I'll take one additional

01:05:06.199 --> 01:05:09.829
Point as we move forward in the presentation and further

01:05:09.829 --> 01:05:10.679
discussion

01:05:11.719 --> 01:05:14.369
Is there going to be some kind of an adjustment in the

01:05:14.369 --> 01:05:16.519
development code that if you?

01:05:16.719 --> 01:05:19.559
Preserve these trees you get some kind of density transfer

01:05:19.559 --> 01:05:20.679
or it's that density

01:05:21.199 --> 01:05:25.539
Lost what how's that work? There's not a density transfer

01:05:26.280 --> 01:05:29.650
There is as mentioned earlier. There's credit that's given

01:05:29.650 --> 01:05:32.199
towards required landscape canopy

01:05:32.480 --> 01:05:36.400
So you do get you know credit for those trees?

01:05:36.559 --> 01:05:39.699
Towards what you're required to to have on your site

01:05:41.360 --> 01:05:43.659
So if you end up with a site that you've got ten acres of

01:05:43.659 --> 01:05:47.039
preservation as long as it's in in the zoning

01:05:47.719 --> 01:05:50.059
You can preserve that you just may have to make your lot

01:05:50.059 --> 01:05:53.239
smaller and tighter to get your same lot count

01:05:54.840 --> 01:05:56.840
That's goes beyond my expertise

01:05:57.840 --> 01:06:00.559
Okay, yeah, well, I'd be interested to hear how that

01:06:01.400 --> 01:06:03.400
gets factored in

01:06:03.440 --> 01:06:05.440
As this goes forward

01:06:08.559 --> 01:06:10.559
Commissioner has been signed there was a question somewhere

01:06:10.559 --> 01:06:13.280
. I apologize. Thank you. So before it's too late

01:06:13.280 --> 01:06:15.590
So first I want to own a comminute. Hey, we're on a few

01:06:15.590 --> 01:06:16.480
different things

01:06:17.159 --> 01:06:20.500
So I'm I'm a static that we've been talking

01:06:21.119 --> 01:06:24.829
Lot size right because that that means you've stepped out

01:06:24.829 --> 01:06:27.760
of your normal role and understanding

01:06:28.280 --> 01:06:31.869
This this citizen we're serving and and kind of hey, I'm

01:06:31.869 --> 01:06:34.480
reaching out. I don't understand it, but I'm trying to

01:06:35.119 --> 01:06:38.670
At least purport to your lingo and and take that in

01:06:38.670 --> 01:06:39.599
consideration

01:06:39.599 --> 01:06:42.699
I think that's great and I and I wish that would happen

01:06:42.699 --> 01:06:43.079
more often

01:06:43.639 --> 01:06:46.219
And I'm gonna say this just because I don't know for what a

01:06:46.219 --> 01:06:46.719
slot is

01:06:46.719 --> 01:06:49.880
But but I'm saying I'm a static that we've gotten this far

01:06:49.880 --> 01:06:50.760
and we hadn't talked about

01:06:51.079 --> 01:06:53.599
This other city's doing this that or the other, you know

01:06:53.599 --> 01:06:56.460
that it's homegrown and it's home developed and that is

01:06:56.460 --> 01:06:57.400
encouraging to me

01:06:58.559 --> 01:07:00.559
and then

01:07:00.880 --> 01:07:03.400
There's precious few things that I've dealt with in the

01:07:03.400 --> 01:07:03.960
city that

01:07:04.920 --> 01:07:06.739
Aren't looking for money, you know

01:07:06.739 --> 01:07:09.579
So that that too is a positive that you're trying to serve

01:07:09.579 --> 01:07:11.679
a community understand that community

01:07:11.920 --> 01:07:14.530
Understand the challenges that face that community and we

01:07:14.530 --> 01:07:15.860
're not trying to you know

01:07:17.400 --> 01:07:19.539
Take their money and build a statue with it, you know,

01:07:19.539 --> 01:07:22.920
whatever so that's I'm just excited about all that

01:07:23.400 --> 01:07:25.400
And I think it's important to say

01:07:26.239 --> 01:07:27.400
before

01:07:27.400 --> 01:07:30.340
whatever else but I just think that's really a good thing

01:07:30.340 --> 01:07:34.280
to try to look into that world and then I

01:07:37.800 --> 01:07:39.800
Do

01:07:40.280 --> 01:07:42.480
For what it's worth I just think I don't know

01:07:43.840 --> 01:07:48.280
This this lays out pretty well to me, but I would ask that

01:07:49.079 --> 01:07:51.889
I'd asked I guess those have been on the panel a little

01:07:51.889 --> 01:07:55.280
longer on the Commission a little longer has a

01:07:55.920 --> 01:07:57.920
home developer ever come

01:07:58.159 --> 01:08:01.420
Do a work session do it because I mean I mean you rattle

01:08:01.420 --> 01:08:01.619
off

01:08:01.960 --> 01:08:03.519
I understand what a padside is

01:08:03.519 --> 01:08:06.059
I understand grading understand all that but if you gave me

01:08:06.059 --> 01:08:08.840
a blank piece of paper and said go beginning to end on a

01:08:08.840 --> 01:08:09.280
building

01:08:09.280 --> 01:08:12.670
Process I'd start at one with you start building and end it

01:08:12.670 --> 01:08:14.300
to you in building, you know

01:08:14.300 --> 01:08:17.050
So I think it's important that we have a developer of some

01:08:17.050 --> 01:08:17.359
sort

01:08:17.359 --> 01:08:18.439
I don't know if you've ever had it

01:08:18.439 --> 01:08:21.340
But I'd like to request that as a some sort of work session

01:08:21.340 --> 01:08:22.199
that a developer

01:08:22.199 --> 01:08:24.760
Maybe a commercial developer and a home developer two

01:08:24.760 --> 01:08:28.220
different times come just give us a give us a day in the

01:08:28.220 --> 01:08:28.619
life

01:08:29.159 --> 01:08:31.840
You know just say talk to us. What what do you do? What are

01:08:31.840 --> 01:08:33.520
you looking at? Well? Here's an example

01:08:33.520 --> 01:08:36.270
Here's how we get from a to B. Here's we have to consider.

01:08:36.270 --> 01:08:37.920
Here's the here's the bumps in the road

01:08:37.920 --> 01:08:40.729
I mean no different than any other presentation we get I

01:08:40.729 --> 01:08:42.060
think that's that's good insight

01:08:47.439 --> 01:08:50.800
Okay, I think I have maybe a couple of more slides here let

01:08:50.800 --> 01:08:53.439
me get back to where it was at so

01:08:55.760 --> 01:08:57.329
As a part of this process, you know, we solicited as I

01:08:57.329 --> 01:09:01.680
mentioned earlier input from the community via a

01:09:03.199 --> 01:09:05.199
Visual preference survey and

01:09:05.319 --> 01:09:08.439
These are some of the the main takeaways that that we got

01:09:08.439 --> 01:09:09.600
from that survey

01:09:09.880 --> 01:09:12.760
Was that the city should work to preserve and grow more

01:09:12.760 --> 01:09:14.680
trees that are well maintained

01:09:16.359 --> 01:09:18.359
Tree plantings should be

01:09:19.239 --> 01:09:21.939
Tree plantings should maintain clear line of sight and

01:09:21.939 --> 01:09:25.319
visibility of business addresses and signage

01:09:26.800 --> 01:09:29.369
nighttime pedestrian safety on sidewalks and parking lots

01:09:29.369 --> 01:09:32.760
should be a consideration with new plantings and

01:09:33.840 --> 01:09:36.279
Parking lots should be designed to provide shade

01:09:36.800 --> 01:09:40.060
But deter bird populations that nest in trees that last

01:09:40.060 --> 01:09:42.659
part you know, it's kind of a tricky one

01:09:44.600 --> 01:09:46.600
Yeah, so

01:09:51.319 --> 01:09:53.319
Yeah

01:09:54.239 --> 01:09:57.840
So at this time what I wanted to do was actually go through

01:09:58.560 --> 01:10:02.479
the proposed ordinance I put some handouts out there and

01:10:02.479 --> 01:10:04.199
what I'm going to do is just

01:10:05.479 --> 01:10:08.670
Hit the highlights of the areas that are significantly

01:10:08.670 --> 01:10:12.079
different from the previous the tree the previous code

01:10:12.520 --> 01:10:17.210
You have a red line version. Yes, I think I know we have

01:10:17.210 --> 01:10:18.079
food tonight

01:10:18.239 --> 01:10:20.000
Okay, would it now be a good time for us?

01:10:20.000 --> 01:10:22.520
Maybe take a five minute break get some food and we can

01:10:22.520 --> 01:10:24.960
just work on through till we run out of time

01:10:25.199 --> 01:10:29.960
Yes, good with that. I'm gonna call a recess at 545 and let

01:10:29.960 --> 01:10:31.359
's try to get back in here at

01:10:32.079 --> 01:10:34.079
550 and continue

01:10:42.520 --> 01:10:44.520
I

01:10:46.960 --> 01:10:49.479
Gonna call our planning is on the Commission work session

01:10:49.479 --> 01:10:52.000
back in order at 552

01:10:56.840 --> 01:11:00.329
Okay, so what I like to do now is basically do a page turn

01:11:00.329 --> 01:11:02.319
through the proposed

01:11:04.439 --> 01:11:08.449
Tree code that that we are put in fourth and what I'm going

01:11:08.449 --> 01:11:12.140
to highlight is are the things that are the major

01:11:12.840 --> 01:11:15.199
changes from the existing

01:11:16.239 --> 01:11:18.039
tree code

01:11:18.039 --> 01:11:21.140
So everyone should have a handout in front of you and the

01:11:21.140 --> 01:11:23.939
one I'm going for miss the one that's the black and white

01:11:23.939 --> 01:11:24.579
copy here

01:11:28.039 --> 01:11:29.159
So

01:11:29.159 --> 01:11:32.489
One of the things that we did with this is we looked at our

01:11:32.489 --> 01:11:35.479
definition sections as you see on page two here

01:11:36.079 --> 01:11:37.560
to

01:11:37.560 --> 01:11:38.479
actually

01:11:38.479 --> 01:11:41.079
Revise some of these definitions to be more

01:11:41.920 --> 01:11:43.479
in sync with

01:11:43.479 --> 01:11:46.140
definitions by the International Society of Abora culture

01:11:46.760 --> 01:11:50.310
Felt it was very important to not just have definitions

01:11:50.310 --> 01:11:52.319
that you know that that we feel are

01:11:54.279 --> 01:11:58.199
Unique to Denton but to have definitions that would be

01:11:59.199 --> 01:12:02.359
Universal for those who are coming in and actually having

01:12:02.359 --> 01:12:05.840
to read our code and look at the language in the code

01:12:09.159 --> 01:12:12.069
So just had you know, let's say just a few of those

01:12:12.069 --> 01:12:13.520
definitions some that

01:12:14.720 --> 01:12:18.399
Were changed the definition in here for public utilities

01:12:18.399 --> 01:12:21.909
We moved it out and are going to use the the definition in

01:12:21.909 --> 01:12:25.140
the code that's used elsewhere for basic utility

01:12:26.640 --> 01:12:31.039
The definition for qualified professional we removed that

01:12:33.000 --> 01:12:36.539
Requirement out for a qualified professional and just

01:12:36.539 --> 01:12:38.619
stated an ISA certified obris

01:12:39.159 --> 01:12:42.960
The reason being we went to the ISA certified obris was

01:12:42.960 --> 01:12:44.800
again as an international

01:12:45.600 --> 01:12:46.760
certification

01:12:46.760 --> 01:12:48.840
And it's something that I can verify

01:12:50.199 --> 01:12:53.199
Through their website if the person's credentials are

01:12:54.279 --> 01:12:55.600
valid

01:12:55.600 --> 01:12:59.560
Under the current code is really no way for me to validate

01:13:00.199 --> 01:13:04.189
Someone's credentials when they sent when they send in true

01:13:04.189 --> 01:13:06.319
preservation code short of you know

01:13:06.319 --> 01:13:08.640
Requiring them to send in a copy of their degree

01:13:09.159 --> 01:13:11.159
So

01:13:13.279 --> 01:13:15.279
Moving down

01:13:15.520 --> 01:13:19.680
Get into section a of the code we have

01:13:22.119 --> 01:13:24.800
That this mic seems to be turned down low

01:13:26.359 --> 01:13:28.359
Okay, so

01:13:28.600 --> 01:13:31.119
What we decide to do is for some of the definitions that

01:13:31.119 --> 01:13:33.119
are specific to the tree code

01:13:33.520 --> 01:13:36.619
Was we put those in at the beginning of this particular sub

01:13:36.619 --> 01:13:37.119
section?

01:13:37.960 --> 01:13:39.960
To make it you know a little more user-friendly

01:13:40.279 --> 01:13:43.380
For someone that's going through the code and you know they

01:13:43.380 --> 01:13:46.039
come across the definitions and they want to look at you

01:13:46.039 --> 01:13:46.079
know

01:13:46.079 --> 01:13:49.760
What that definition means so we added in?

01:13:51.119 --> 01:13:53.119
You know definition for

01:13:53.960 --> 01:13:55.960
cross-timbers forest here

01:13:55.960 --> 01:13:57.960
developer exempt trees

01:13:58.199 --> 01:14:02.159
Yes, why do we have developer instead of property owner?

01:14:04.439 --> 01:14:07.880
Commonplace most of the time whenever you know someone

01:14:07.880 --> 01:14:10.460
comes to the city is you know the developer that's

01:14:10.460 --> 01:14:12.840
representing the property owner that we deal with

01:14:13.680 --> 01:14:16.779
Through the development process in some instances. We may

01:14:16.779 --> 01:14:18.159
not even see the property owner

01:14:19.920 --> 01:14:23.479
Of who is being represented by the developer well

01:14:24.479 --> 01:14:26.510
Because I think it states that you know whether it's a

01:14:26.510 --> 01:14:27.880
representative or not in the code

01:14:27.880 --> 01:14:31.380
I guess my concern about this is that it somewhat misleads

01:14:31.380 --> 01:14:32.119
the public

01:14:32.560 --> 01:14:35.409
Because this tree code now doesn't just apply to property

01:14:35.409 --> 01:14:38.319
being developed it now applies to every piece of property

01:14:38.319 --> 01:14:39.239
in the city that

01:14:39.720 --> 01:14:42.880
Whether it's a single-family existing lot, so if somebody

01:14:42.880 --> 01:14:44.399
wants to

01:14:45.479 --> 01:14:47.479
put swimming pool in

01:14:47.680 --> 01:14:49.880
Make an addition to their home, and they've got to cut down

01:14:50.880 --> 01:14:52.560
two or three

01:14:52.560 --> 01:14:56.479
Protected trees 18 inch trees they will now have to follow

01:14:56.479 --> 01:14:57.640
this they'll have to pay

01:14:58.159 --> 01:15:00.680
Whatever four or five thousand dollars a tree for each one

01:15:00.680 --> 01:15:01.199
of those

01:15:02.319 --> 01:15:04.319
That's not totally accurate

01:15:04.960 --> 01:15:07.479
Straighten out me out where I'm not correct under the

01:15:07.479 --> 01:15:08.239
existing code

01:15:08.960 --> 01:15:11.340
And it's a little bit. You know confusing because they

01:15:11.340 --> 01:15:14.539
state that there's an exempt them for single-family and

01:15:15.680 --> 01:15:18.560
Duplex properties, but if you go under the permitting

01:15:18.560 --> 01:15:19.060
section

01:15:19.060 --> 01:15:22.199
It says that those same properties are required to have a

01:15:22.199 --> 01:15:24.199
permit to remove five or more trees

01:15:24.479 --> 01:15:28.760
So they had a partial exemption under the current code

01:15:29.399 --> 01:15:31.399
But not a full exemption

01:15:31.560 --> 01:15:33.560
in order right yeah and

01:15:33.720 --> 01:15:37.420
Second if it's five or more under the current code, but it

01:15:37.420 --> 01:15:38.319
doesn't specify

01:15:38.600 --> 01:15:43.140
You know five trees today five trees this week five trees

01:15:43.720 --> 01:15:46.439
You know a year. It just says five trees is very

01:15:48.199 --> 01:15:51.640
Very gray area you know when trying to actually enforce

01:15:52.600 --> 01:15:56.539
That particular section of the code as far as you're right

01:15:56.539 --> 01:15:58.439
every property would be

01:15:59.039 --> 01:16:01.039
under this existing tree code

01:16:02.000 --> 01:16:04.600
Requiring a property owner to receive to get a permit to

01:16:04.600 --> 01:16:07.520
remove a tree that's large than five inches

01:16:08.520 --> 01:16:10.520
Does a couple of things?

01:16:10.520 --> 01:16:14.750
It gives me or you know the city a chance to actually you

01:16:14.750 --> 01:16:15.439
know

01:16:15.880 --> 01:16:17.819
Work with the property owner on what they're doing in the

01:16:17.819 --> 01:16:19.680
case if they're building a swimming pool

01:16:20.760 --> 01:16:24.130
You know that request is going to come in with their you

01:16:24.130 --> 01:16:27.149
know excavation permit to actually put that pool in they

01:16:27.149 --> 01:16:27.720
will now

01:16:28.600 --> 01:16:31.699
Even under the existing code that request would come in it

01:16:31.699 --> 01:16:34.180
was five or less if it was five or less

01:16:35.079 --> 01:16:38.399
Inevitably the the question would come up about trees

01:16:39.600 --> 01:16:41.810
But what I was getting to is it gives me the chance to talk

01:16:41.810 --> 01:16:43.880
with the homeowner in some cases

01:16:44.960 --> 01:16:46.960
and I had a

01:16:47.600 --> 01:16:51.489
Request from one of our senior residents here in town where

01:16:51.489 --> 01:16:52.000
she was

01:16:53.439 --> 01:16:56.140
Was was told that the tree in her backyard need to be cut

01:16:56.140 --> 01:16:58.800
down that you know it had some issues you know about the

01:16:58.800 --> 01:17:01.199
Tree guy that she had look at it well

01:17:01.199 --> 01:17:04.050
I went out to the site and I looked up looked at the tree

01:17:04.050 --> 01:17:08.239
inspected the tree for and I didn't see any

01:17:09.439 --> 01:17:11.680
Justification to cut that tree down

01:17:12.199 --> 01:17:17.159
So by requiring a permit in some cases as this you know it

01:17:17.159 --> 01:17:19.960
gives that homeowner a little bit extra protection some

01:17:20.319 --> 01:17:24.020
Unbiased eyes to look at this tree not just the guy that

01:17:24.020 --> 01:17:26.899
wants to remove the tree and make you know

01:17:27.119 --> 01:17:29.000
A thousand bucks fifteen hundred bucks or whatever they're

01:17:29.000 --> 01:17:29.359
charging

01:17:30.079 --> 01:17:32.079
in other instances

01:17:32.319 --> 01:17:34.319
You know I had a local

01:17:34.920 --> 01:17:38.199
Commercial site you know the owners of the building came in

01:17:38.199 --> 01:17:40.199
and they wanted to remove the tree

01:17:40.199 --> 01:17:40.720
So I said well

01:17:40.720 --> 01:17:42.520
Let me come out to the site and look at the tree see

01:17:42.520 --> 01:17:44.939
exactly what you're talking about and their concern was

01:17:44.939 --> 01:17:45.319
mainly

01:17:45.359 --> 01:17:48.220
To do with visibility they had a new tenant coming in they

01:17:48.220 --> 01:17:50.279
want to make sure the sign was visible

01:17:50.279 --> 01:17:53.500
So I met with them on the site and they had you know it's

01:17:53.500 --> 01:17:54.840
two nice live oak trees

01:17:54.840 --> 01:17:57.729
And you know I pointed out to him. I was like really you

01:17:57.729 --> 01:17:57.960
can

01:17:58.720 --> 01:18:02.439
You can prune off you know these branches and accomplish

01:18:02.439 --> 01:18:05.409
the same thing without the added expense of actually

01:18:05.409 --> 01:18:06.439
removing the tree

01:18:06.800 --> 01:18:08.800
so it's really

01:18:09.439 --> 01:18:12.619
You know twofold is this you know to to have a chance to

01:18:12.619 --> 01:18:15.920
interact with the public and educate them on on their trees

01:18:16.560 --> 01:18:20.020
But and also to give them you know a second opinion that

01:18:20.020 --> 01:18:22.199
they may have received from

01:18:22.680 --> 01:18:26.109
You know a tree service that you know just like to come in

01:18:26.109 --> 01:18:27.199
and cut down their tree

01:18:27.359 --> 01:18:30.479
When the tree really doesn't need to be removed

01:18:30.479 --> 01:18:33.630
I don't have a problem with either of those examples, and

01:18:33.630 --> 01:18:36.539
that's not really what my point is my point is that we

01:18:36.539 --> 01:18:37.439
define

01:18:38.079 --> 01:18:41.529
Anybody as a developer versus as a property owner so when

01:18:41.529 --> 01:18:44.800
you read it it almost makes it seem like it's these guys

01:18:44.800 --> 01:18:45.479
over here

01:18:45.479 --> 01:18:47.279
We're not really land developers

01:18:47.279 --> 01:18:50.829
So this kind of doesn't apply and really it does apply

01:18:50.829 --> 01:18:53.760
because anybody that owns property in the city of Denton if

01:18:53.760 --> 01:18:54.319
you want to cut

01:18:54.319 --> 01:18:57.239
Down any tree in the city of Denton whether it's on a

01:18:57.239 --> 01:18:57.920
single family

01:18:58.520 --> 01:19:02.020
Larry which I know wouldn't want to cut down a tree larger

01:19:02.020 --> 01:19:03.840
than five inches on this property

01:19:04.319 --> 01:19:07.119
This applies to him he has to come in and get a permit

01:19:07.399 --> 01:19:10.500
If it's larger, and it's one of these larger trees, and he

01:19:10.500 --> 01:19:12.600
has to pay into the tree fund to do that

01:19:12.600 --> 01:19:15.920
So it applies to every citizen that lives in our city

01:19:16.279 --> 01:19:19.430
Not just a guy that's going out and doing 25 acres worth of

01:19:19.430 --> 01:19:20.420
land development

01:19:20.760 --> 01:19:23.619
Correct this new code correct, and that's why I don't think

01:19:23.619 --> 01:19:25.319
developer is a correct

01:19:25.920 --> 01:19:27.920
term to put versus

01:19:28.560 --> 01:19:29.640
citizen

01:19:29.640 --> 01:19:32.560
Property owner because it's going to apply to everybody

01:19:33.199 --> 01:19:36.449
Most most people are not going to consider themselves to be

01:19:36.449 --> 01:19:37.800
a developer

01:19:37.800 --> 01:19:40.720
and that's why we actually include the definition because

01:19:41.199 --> 01:19:44.569
Even though even with the mom and pop develop property

01:19:44.569 --> 01:19:46.399
owner when they enter

01:19:47.399 --> 01:19:50.199
When they start submitting those applications they do in

01:19:50.199 --> 01:19:53.399
fact become a developer and that doesn't change so they

01:19:53.720 --> 01:19:56.079
They do assume their role, and that's why we wanted to make

01:19:56.079 --> 01:19:57.319
it clear in the ordinance

01:20:00.159 --> 01:20:03.760
Well, I may be the only lone wolf here that has a problem

01:20:03.760 --> 01:20:06.279
with with it saying developer because I think it's

01:20:06.279 --> 01:20:07.880
misleading to the general public

01:20:08.560 --> 01:20:11.319
Because most people are not going to consider themselves to

01:20:11.319 --> 01:20:14.159
be developer when they read this they think

01:20:14.840 --> 01:20:17.939
All the way through here it refers to developer they have

01:20:17.939 --> 01:20:20.880
to come back and read what the city's definition is

01:20:21.680 --> 01:20:25.630
Versus that they are a private individual and if they want

01:20:25.630 --> 01:20:28.680
to cut down a tree on their property greater than five this

01:20:28.680 --> 01:20:30.039
applies to them not

01:20:31.399 --> 01:20:34.609
Developer I don't think anybody in a neighborhood that

01:20:34.609 --> 01:20:37.420
lives there when they read developer thinks well that

01:20:37.420 --> 01:20:38.119
applies to me

01:20:39.399 --> 01:20:42.010
Commissioner Taylor, thank you chair. I was wondering I

01:20:42.010 --> 01:20:42.720
feel like

01:20:43.479 --> 01:20:46.779
The word developer is not a common noun used in development

01:20:46.779 --> 01:20:49.520
code would something like applicants

01:20:50.239 --> 01:20:52.520
Or property owner, and then you can define property owners

01:20:52.520 --> 01:20:54.079
property owner or their agent

01:20:55.039 --> 01:20:57.590
What be more kind of in line with what most of the

01:20:57.590 --> 01:20:59.840
development code it says?

01:21:01.880 --> 01:21:05.569
Note that as a recommendation as we move forward with the

01:21:05.569 --> 01:21:06.720
ordinance

01:21:08.640 --> 01:21:10.640
Okay

01:21:11.439 --> 01:21:15.500
So moving on just gonna just briefly go through some of the

01:21:15.500 --> 01:21:17.720
additional definitions

01:21:18.279 --> 01:21:21.739
We added another definition for the International Society

01:21:21.739 --> 01:21:23.000
of Bar Culture ISA

01:21:23.680 --> 01:21:24.920
in

01:21:24.920 --> 01:21:28.840
specific relation to the requirement for an ISA certified

01:21:28.840 --> 01:21:31.119
arborist to prepare or sign off on

01:21:31.680 --> 01:21:34.640
tree preservation and tree mitigation plans

01:21:35.479 --> 01:21:37.479
with this proposed revision

01:21:38.560 --> 01:21:40.560
Actually

01:21:41.079 --> 01:21:43.960
We had in here and this should have been taken out the

01:21:43.960 --> 01:21:47.270
definition for landscape architect was in there specific to

01:21:47.270 --> 01:21:48.760
when we had qualified

01:21:48.880 --> 01:21:50.880
professionals, but that it actually should

01:21:51.640 --> 01:21:53.640
Not be in there

01:21:54.920 --> 01:21:59.869
We added in general definitions for pruning the structural

01:21:59.869 --> 01:22:01.119
value of urban of

01:22:01.760 --> 01:22:04.159
Urban forests or the urban forest structural value

01:22:05.159 --> 01:22:08.310
We had in the definition for tree oddly enough. There was

01:22:08.310 --> 01:22:10.880
not a definition for a tree in the current code

01:22:12.239 --> 01:22:16.159
We added in tree canopy tree preservation plan

01:22:16.840 --> 01:22:20.789
tree protection zone tree survey urban forestry and urban

01:22:20.789 --> 01:22:21.680
forester

01:22:26.600 --> 01:22:29.399
Okay moving on to the next page page five here

01:22:30.760 --> 01:22:33.279
The purpose and intent for the most part

01:22:34.479 --> 01:22:37.579
Stayed the same. It was reworked a little bit from the

01:22:37.579 --> 01:22:37.960
current

01:22:38.520 --> 01:22:43.760
Code the addition of adding in the expansion of tree canopy

01:22:45.720 --> 01:22:48.720
Towards one of the goals of the regulation was added

01:22:52.000 --> 01:22:54.359
Under the objectives again a lot of this was in the

01:22:54.359 --> 01:22:56.119
existing code

01:22:57.520 --> 01:22:59.520
We reworked some of the language

01:23:00.399 --> 01:23:02.399
to include in

01:23:02.920 --> 01:23:04.479
line B

01:23:04.479 --> 01:23:07.000
Through the preservation and mitigation of planting of

01:23:07.000 --> 01:23:07.199
trees

01:23:08.960 --> 01:23:12.840
We added in to promote the preservation of the remnants of

01:23:12.840 --> 01:23:15.039
of the cross timbers forests and

01:23:15.720 --> 01:23:18.890
We added in to preserve the public health and safety and

01:23:18.890 --> 01:23:21.239
general welfare of the citizens

01:23:23.239 --> 01:23:27.829
Okay, so under the applicability section which this section

01:23:27.829 --> 01:23:31.199
was worked out was reworked a lot up until today

01:23:33.479 --> 01:23:37.239
Commissioner Taylor, yes under applicability a

01:23:39.279 --> 01:23:43.119
IID yes, just just a nitpick on the word

01:23:43.359 --> 01:23:45.880
It's it's like it's about a triple negative and I think it

01:23:45.880 --> 01:23:48.960
actually excludes something. It's not supposed to exclude

01:23:49.920 --> 01:23:52.770
Governmental property that is located within the city

01:23:52.770 --> 01:23:55.680
limits unless the property is as follows

01:23:56.239 --> 01:23:58.340
Public utilities and infrastructure constructed during new

01:23:58.340 --> 01:24:00.079
development, but not reconstruction

01:24:00.920 --> 01:24:03.199
Must comply with street tree requirements only

01:24:05.079 --> 01:24:07.909
Reconstruction isn't mentioned so and it's not in the

01:24:07.909 --> 01:24:11.670
exclusion list. So that seems like reconstruction then

01:24:11.670 --> 01:24:12.640
would

01:24:13.199 --> 01:24:15.199
not be excluded I

01:24:15.680 --> 01:24:18.550
Think the goal is to exclude reconstruction altogether and

01:24:18.550 --> 01:24:21.119
new construction has to meet the street trees only

01:24:21.359 --> 01:24:23.800
All right, just a just a nitpick on the wording

01:24:30.920 --> 01:24:32.920
Not reconstruction for the public infrastructure

01:24:33.840 --> 01:24:37.680
Yes, so maybe split that into two like to say

01:24:38.520 --> 01:24:39.640
public

01:24:39.640 --> 01:24:42.750
Utilities as part of reconstruction fully excluded public

01:24:42.750 --> 01:24:45.659
utilities for new construction shall comply with street

01:24:45.659 --> 01:24:47.920
tree requirements only something like that

01:24:51.279 --> 01:24:53.640
Okay, I have a question under

01:24:54.359 --> 01:24:59.310
Building yes under a one. What is what what is the

01:24:59.310 --> 01:25:02.439
definitive part of what defines development?

01:25:02.439 --> 01:25:05.439
Is it making an application is it out there moving dirt?

01:25:06.399 --> 01:25:08.520
What what is the trigger that defines?

01:25:09.199 --> 01:25:11.199
one year or more prior to development

01:25:17.600 --> 01:25:20.699
Development is the filing of an application that's required

01:25:20.699 --> 01:25:22.800
by the government body in order to pursue

01:25:23.399 --> 01:25:25.399
So it's actual paper

01:25:26.279 --> 01:25:28.840
Filing rather than work. Okay

01:25:32.279 --> 01:25:34.279
Thank you

01:25:38.760 --> 01:25:42.640
Okay, so this section was basically reworked to

01:25:43.760 --> 01:25:46.960
Put everything under under the ability instead of having

01:25:46.960 --> 01:25:49.359
the applicability section and then a separate exemptions

01:25:49.359 --> 01:25:50.560
section

01:25:52.119 --> 01:25:56.069
So there were many things under the exemption section that

01:25:56.069 --> 01:25:57.199
you know really

01:25:59.840 --> 01:26:02.560
Could be handled by administrative decision, you know a

01:26:02.560 --> 01:26:04.199
tree farm does not need

01:26:04.560 --> 01:26:07.520
To as you know, the code does not apply to a tree farm

01:26:07.520 --> 01:26:11.470
The code does not apply to a dead tree or a tree that's

01:26:11.470 --> 01:26:12.000
hazardous

01:26:12.000 --> 01:26:15.829
You know those you know basic situation that if someone

01:26:15.829 --> 01:26:18.770
came in and you know, I say no, you know, it's dead cut it

01:26:18.770 --> 01:26:19.079
down

01:26:19.079 --> 01:26:21.079
No, you don't need to count dead trees

01:26:21.359 --> 01:26:24.760
In your survey or hazardous trees or disease trees

01:26:24.760 --> 01:26:28.710
So things like that and it balled back down to Dylan, you

01:26:28.710 --> 01:26:31.640
know mainly with the applicability to

01:26:33.359 --> 01:26:35.960
Government owned or city owned properties

01:26:37.119 --> 01:26:39.119
And what have you

01:26:40.600 --> 01:26:42.600
So on the next page here

01:26:44.079 --> 01:26:46.079
Preservation requirements and incentives

01:26:47.399 --> 01:26:51.279
Again this is totally brand new section here

01:26:52.359 --> 01:26:54.600
letter I through

01:26:55.560 --> 01:26:56.880
IV

01:26:56.880 --> 01:27:00.210
And this basically still spills out the 30% preservation

01:27:00.210 --> 01:27:03.350
requirements based on square footage of pre-development

01:27:03.350 --> 01:27:03.840
canopy

01:27:05.880 --> 01:27:11.210
It's calling out a minimum of of 20% preservation on new

01:27:11.210 --> 01:27:13.079
agricultural

01:27:14.199 --> 01:27:16.899
Development or activities on to a site and that's that

01:27:16.899 --> 01:27:20.560
covers a site that's currently not in agriculture

01:27:20.720 --> 01:27:23.750
But they come to the city and they want to do you know, say

01:27:23.750 --> 01:27:26.140
a vineyard or an aquaponics or greenhouses

01:27:26.779 --> 01:27:29.239
Set up that's what that provision

01:27:30.359 --> 01:27:34.079
Goes for that that type of agricultural development the

01:27:34.079 --> 01:27:35.020
next

01:27:36.560 --> 01:27:38.560
section

01:27:39.680 --> 01:27:41.680
III or three here

01:27:43.000 --> 01:27:46.359
Deals with property that is switching from

01:27:47.760 --> 01:27:48.880
agricultural

01:27:48.880 --> 01:27:52.770
Use to you know a subdivision or commercial development.

01:27:52.770 --> 01:27:53.680
Sorry Commissioner Sullivan

01:27:57.840 --> 01:27:59.760
Since

01:27:59.760 --> 01:28:02.529
Chairman strange brought this up. I'm looking at this in a

01:28:02.529 --> 01:28:03.840
different light. So

01:28:04.760 --> 01:28:06.920
under four preservation requirements

01:28:07.520 --> 01:28:10.920
If I substitute the word developer to homeowner

01:28:14.560 --> 01:28:16.560
Our homeowners going to be required

01:28:17.359 --> 01:28:19.359
to get the

01:28:20.640 --> 01:28:23.680
Whatever that designation is arborist I

01:28:24.960 --> 01:28:28.239
SA certified arborist to come out to

01:28:29.720 --> 01:28:33.909
To make a survey and to do all these things if it again

01:28:33.909 --> 01:28:36.340
somebody used the example putting in a pool

01:28:37.239 --> 01:28:40.340
They have to hire this arborist certified arborist to come

01:28:40.340 --> 01:28:42.760
out and look at the canopy and do all this work and

01:28:42.960 --> 01:28:45.600
And all this stuff to determine whether or not

01:28:46.720 --> 01:28:48.720
They're going to maintain that 30%

01:28:49.880 --> 01:28:53.819
Canopy to put in a pool. No for a residential homeowner

01:28:53.819 --> 01:28:55.720
putting in a pool or adding on to a

01:28:57.399 --> 01:29:00.500
Patio or deck and they you know have to take out a tree.

01:29:00.500 --> 01:29:03.880
They wouldn't be required to submit, you know a full

01:29:05.000 --> 01:29:07.000
survey for that type of

01:29:08.439 --> 01:29:10.680
You know addition to their property

01:29:11.600 --> 01:29:12.960
and

01:29:12.960 --> 01:29:15.340
That's typically handled when the

01:29:16.239 --> 01:29:19.340
Whole subdivision is developed up front. So that's

01:29:19.340 --> 01:29:21.930
something that's already taken care of before they actually

01:29:21.930 --> 01:29:22.680
purchased a lot

01:29:23.439 --> 01:29:25.439
Does that make sense?

01:29:25.439 --> 01:29:28.689
Yes, but I'm just saying that if again if the if the

01:29:28.689 --> 01:29:30.779
definition is the property owner

01:29:31.479 --> 01:29:34.890
That's the homeowner and after they bought the house ten

01:29:34.890 --> 01:29:35.720
years ago

01:29:36.319 --> 01:29:38.319
trees of all

01:29:38.359 --> 01:29:41.000
Have done what they're going to do and now I decided I want

01:29:41.000 --> 01:29:41.920
to put in the pool

01:29:42.520 --> 01:29:46.470
And I've got to now have somebody come out to tell me how

01:29:46.470 --> 01:29:50.079
much canopy I have and how much how many trees I can or

01:29:50.079 --> 01:29:52.079
Can I take down?

01:29:54.119 --> 01:29:57.560
Section four though says prior to develop mission was oh,

01:29:57.560 --> 01:29:58.060
thank you

01:29:58.119 --> 01:30:00.239
It says prior to the development of a lot. So in your

01:30:00.239 --> 01:30:02.489
situation, Commissioner Sullivan, the lots already been

01:30:02.489 --> 01:30:04.659
developed. So before wouldn't be

01:30:05.920 --> 01:30:08.220
applicable to someone who already owns a constructed home

01:30:08.220 --> 01:30:11.270
putting in a pool. I have to make an application for a

01:30:11.270 --> 01:30:11.600
permit

01:30:12.520 --> 01:30:15.399
Rather than the tree survey and preservation plan

01:30:16.479 --> 01:30:18.479
Would they wouldn't have to do that?

01:30:20.439 --> 01:30:21.930
Specific for I don't know what other permits they need but

01:30:21.930 --> 01:30:25.640
a tree survey and tree preservation plan wouldn't be needed

01:30:26.479 --> 01:30:29.609
As far as the wording is if you look at the last sentence,

01:30:29.609 --> 01:30:31.560
I think it's it answers your question

01:30:37.560 --> 01:30:39.560
Gosh

01:30:40.319 --> 01:30:42.649
I said several questions. I don't mean to take the floor.

01:30:42.649 --> 01:30:43.079
No, that's okay

01:30:43.600 --> 01:30:45.979
I'm just trying to figure out you know

01:30:46.600 --> 01:30:50.079
If just a regular kind of guy goes out and says hey, I want

01:30:50.079 --> 01:30:50.159
to

01:30:51.119 --> 01:30:53.119
put in a pool and

01:30:53.439 --> 01:30:55.729
Now I've got to do all this, you know jump through all

01:30:55.729 --> 01:30:56.319
these other hoops

01:30:56.319 --> 01:30:59.649
I'm just trying to decide if if the if the word developer

01:30:59.649 --> 01:31:02.619
means what it means throughout this whole

01:31:03.279 --> 01:31:05.279
thing or if possibly

01:31:06.079 --> 01:31:07.359
property owner

01:31:07.359 --> 01:31:10.750
Should be designated whenever it is already an established

01:31:10.750 --> 01:31:13.140
home and it's in addition to something

01:31:14.319 --> 01:31:17.210
You know just for the very reason that you know some

01:31:17.210 --> 01:31:20.960
homeowners gonna say I'm not a developer. Well, maybe is

01:31:20.960 --> 01:31:21.840
maybe is it?

01:31:21.840 --> 01:31:25.789
I don't know. Yeah, and you know the intent of this is not

01:31:25.789 --> 01:31:28.680
to you know, put any undue burden on to someone

01:31:28.680 --> 01:31:30.720
You know an existing, you know property owner

01:31:32.199 --> 01:31:35.300
You know as far as you know proving up their trees on their

01:31:35.300 --> 01:31:35.680
site

01:31:35.680 --> 01:31:37.680
That's not the intent of this

01:31:38.359 --> 01:31:40.720
Generally when we speak of you know developer or

01:31:40.720 --> 01:31:44.050
development we're talking either a site that's being you

01:31:44.050 --> 01:31:44.340
know

01:31:44.340 --> 01:31:48.289
That's you know brand new that is you know coming online or

01:31:48.289 --> 01:31:49.319
a site

01:31:49.319 --> 01:31:51.960
That's you know, it may be an old site and it's being rede

01:31:51.960 --> 01:31:52.479
veloped

01:31:52.479 --> 01:31:54.689
You know, you're raising the site and you're starting from

01:31:54.689 --> 01:31:57.520
scratch again. That's you know, the

01:31:58.399 --> 01:32:02.180
Generally what what the intent is when we state developer

01:32:02.180 --> 01:32:03.319
here is not to mean

01:32:03.600 --> 01:32:06.640
You know you as a homeowner that wants to put in a pool or

01:32:06.640 --> 01:32:09.000
a pack of your deck

01:32:09.399 --> 01:32:11.399
So so just a basic homeowner

01:32:12.079 --> 01:32:14.079
That need to worry about it

01:32:14.319 --> 01:32:17.279
As far as that goes. Yeah, I mean, of course, you know

01:32:17.279 --> 01:32:20.079
There's a requirement in for a permit and even you know a

01:32:20.079 --> 01:32:21.640
permit for a homeowner

01:32:21.800 --> 01:32:24.979
Like says really more so to have that that added point of

01:32:24.979 --> 01:32:25.579
contact

01:32:27.000 --> 01:32:29.359
There won't be it'll be really be a

01:32:30.479 --> 01:32:34.430
Non fee permit just to show okay, you know, they are, you

01:32:34.430 --> 01:32:36.239
know approved to do this

01:32:38.119 --> 01:32:40.640
Every now that I get calls from people, you know, this

01:32:40.640 --> 01:32:42.060
person's cutting down trees in their yard

01:32:42.060 --> 01:32:43.079
Are they okay to do that?

01:32:43.079 --> 01:32:46.779
I mean this allows that person to have a permit for their

01:32:46.779 --> 01:32:49.250
you know professional that's doing or whether they're doing

01:32:49.250 --> 01:32:49.840
say no see

01:32:50.239 --> 01:32:53.449
I'm okay, you know to do this the same as if they were you

01:32:53.449 --> 01:32:53.880
know

01:32:53.880 --> 01:32:56.710
Installing the fence and they you know require a permit for

01:32:56.710 --> 01:32:59.260
that or an irrigation system requires a permit

01:32:59.260 --> 01:33:02.689
There will be something along that line, but without the

01:33:02.689 --> 01:33:03.439
field hashed

01:33:05.159 --> 01:33:10.109
If I could interject he would so that everybody is clear on

01:33:10.109 --> 01:33:11.859
page 10 at the top

01:33:12.600 --> 01:33:14.890
Where it talks about the tree protection plan is where it

01:33:14.890 --> 01:33:18.359
would have said the ISA certified arborist

01:33:18.359 --> 01:33:21.460
And you still have qualified tree professional in there.

01:33:21.460 --> 01:33:25.319
Yeah, I saw that after it went to print that it still said

01:33:25.319 --> 01:33:26.119
qualified true

01:33:26.319 --> 01:33:29.460
Since that's the place where it is. It's gonna be anywhere

01:33:29.460 --> 01:33:32.149
that requires a tree protection plan. You would have to

01:33:32.149 --> 01:33:32.319
hire

01:33:32.840 --> 01:33:36.010
That professional so that would be excluding any kind of

01:33:36.010 --> 01:33:38.279
existing development for single family

01:33:38.920 --> 01:33:41.510
Yeah, there's there's two sections that was I saw that

01:33:41.510 --> 01:33:42.760
after I had already sent

01:33:43.479 --> 01:33:47.430
well, I had a clarification where it says building permit

01:33:47.430 --> 01:33:48.100
application

01:33:49.479 --> 01:33:52.579
We have a universal permit that you will

01:33:53.239 --> 01:33:55.920
Submit that's going to be a building permit. So then it

01:33:55.920 --> 01:33:56.659
does apply to

01:33:57.960 --> 01:34:00.340
Existing single-family homes if you want to do an addition

01:34:00.340 --> 01:34:04.210
or do a swimming pool am I correct about that or incorrect?

01:34:04.210 --> 01:34:04.279
I

01:34:05.720 --> 01:34:08.529
Think originally it says you still have universal permits

01:34:08.529 --> 01:34:11.460
for building. Okay, because we don't have them for regular

01:34:11.460 --> 01:34:12.520
projects. Okay

01:34:13.279 --> 01:34:15.399
So then it then it does apply

01:34:17.439 --> 01:34:20.760
So the Commissioner Sullivan's point if you want to do a

01:34:20.760 --> 01:34:23.119
swimming pool and you're gonna fill out a building permit

01:34:23.479 --> 01:34:24.640
application

01:34:24.640 --> 01:34:27.890
Which you have to do currently the universal then you have

01:34:27.890 --> 01:34:31.239
to do a tree protection plan for an individual homeowner

01:34:31.239 --> 01:34:34.949
Is that am I not reading this correctly originally? It said

01:34:34.949 --> 01:34:37.279
if required on the tree protection plan

01:34:38.039 --> 01:34:40.600
Yeah, I don't know how that came out

01:34:42.000 --> 01:34:44.239
Yeah, I have to go back and read through that but I'm

01:34:44.239 --> 01:34:46.039
letting finish and then

01:34:46.680 --> 01:34:48.770
Yeah, but you know like again, you know, that's not the

01:34:48.770 --> 01:34:51.399
intent. You know when those permits come through

01:34:52.359 --> 01:34:54.970
You know building permit could be you know, the property's

01:34:54.970 --> 01:34:55.399
already

01:34:56.680 --> 01:34:59.359
Been planted and you know, it's just being developed and

01:34:59.359 --> 01:35:00.600
they go straight to building permit

01:35:03.399 --> 01:35:07.520
That actually excludes single-family dwellings from the

01:35:08.520 --> 01:35:09.880
protection plan

01:35:09.880 --> 01:35:13.270
And what is the other one the tree survey? Yeah, we can add

01:35:13.270 --> 01:35:16.069
an affirmative provision that does that so there's no

01:35:16.069 --> 01:35:16.600
question

01:35:16.600 --> 01:35:18.300
I think that's good

01:35:18.300 --> 01:35:20.500
I think the other part of it is that people need to

01:35:20.500 --> 01:35:23.180
understand that this applies to them on the individual

01:35:23.180 --> 01:35:25.180
If you want to cut down a five inch tree or larger

01:35:26.039 --> 01:35:29.989
This this applies it doesn't apply now if you're taking out

01:35:29.989 --> 01:35:31.000
five trees or less

01:35:31.000 --> 01:35:34.439
But it will apply now if you're taking out tree five inches

01:35:35.159 --> 01:35:37.840
Or greater. I mean that's pretty small

01:35:39.439 --> 01:35:41.119
Commissioner Tiller

01:35:41.119 --> 01:35:43.760
Thank you for waiting. Thank you chair just to just

01:35:44.800 --> 01:35:47.420
Continue on in this vein. I wonder if so

01:35:48.300 --> 01:35:50.300
4a 5

01:35:50.520 --> 01:35:54.380
Has comments about site plans and plotting and then page 10

01:35:54.380 --> 01:35:59.039
also talks about plotting if and and it does require the

01:35:59.800 --> 01:36:01.399
the minimum

01:36:01.399 --> 01:36:04.279
tree canopy preservation to be added to

01:36:05.359 --> 01:36:07.359
the plat for each lot

01:36:07.920 --> 01:36:10.880
Yeah, so so I wonder if it might be good to

01:36:11.680 --> 01:36:13.680
split this into

01:36:14.079 --> 01:36:18.579
Kind of pre plotting and then on a plotted residential lot

01:36:19.319 --> 01:36:21.119
Kind of have simpler

01:36:21.119 --> 01:36:24.000
Simpler rules. So so if you're so if the homeowner on a

01:36:24.000 --> 01:36:26.340
plotted residential lot that already has a house on it

01:36:26.680 --> 01:36:29.779
Then they don't have to have you know, a qualified tree

01:36:29.779 --> 01:36:31.800
survey and all this kind of stuff

01:36:32.039 --> 01:36:34.319
They sought to have a you know, the tree removal permit or

01:36:34.319 --> 01:36:34.800
whatever

01:36:35.520 --> 01:36:38.840
but if you're developing if you're if you're plotting a

01:36:39.600 --> 01:36:42.479
Subdivision or plotting a commercial lot or something like

01:36:42.479 --> 01:36:45.100
that then have the requirements there that might be a way

01:36:45.100 --> 01:36:45.500
to split it

01:36:46.439 --> 01:36:50.390
excluding single-family residences do pre plotting versus

01:36:50.390 --> 01:36:52.399
an existing plotted lot I

01:36:54.239 --> 01:36:55.720
Think that's good

01:36:55.720 --> 01:36:58.529
Commissioner Taylor it kind of dovetails. I was preparing

01:36:58.529 --> 01:37:01.000
today to talk about the urban forest report

01:37:01.359 --> 01:37:04.460
And I don't want to get off the topic and I want to come

01:37:04.460 --> 01:37:06.760
back to this because when you read the report

01:37:07.000 --> 01:37:10.100
The vast majority of the trees that we have in the city of

01:37:10.100 --> 01:37:11.920
Denton are on single-family lots

01:37:13.680 --> 01:37:17.880
Existing 46% is located on undeveloped property the other

01:37:18.880 --> 01:37:20.319
pretty high

01:37:20.319 --> 01:37:25.060
54% would be you know other properties and single families

01:37:25.060 --> 01:37:26.560
I think by percentage wise

01:37:26.960 --> 01:37:28.960
They may have a higher

01:37:29.319 --> 01:37:31.479
Percentage of canopy that is correct

01:37:32.359 --> 01:37:34.699
So anyway, I don't want to get off though. I do want to

01:37:34.699 --> 01:37:37.239
spend some time talking about that. We may not get to it

01:37:37.239 --> 01:37:39.239
This evening because when you read the report

01:37:39.720 --> 01:37:42.079
That's when a lot of these things really begin to make

01:37:42.079 --> 01:37:45.159
sense this stuff if we're truly trying to preserve trees

01:37:45.439 --> 01:37:48.640
Where are the trees what type of property on are they on?

01:37:49.000 --> 01:37:52.100
And what is the canopy coverage not only currently in the

01:37:52.100 --> 01:37:53.720
city but also in the ETG?

01:37:53.720 --> 01:37:56.819
And where is the tree canopy actually coming from and most

01:37:56.819 --> 01:37:57.880
of it's coming from?

01:37:58.520 --> 01:38:01.460
Single family homes outside of undeveloped property its

01:38:01.460 --> 01:38:04.880
single family homes. So that's why I think it's important

01:38:04.880 --> 01:38:07.090
We need to figure out and everybody needs to understand how

01:38:07.090 --> 01:38:09.239
this is actually going to apply to

01:38:10.239 --> 01:38:12.449
Single family homeowners in the city of Denton going

01:38:12.449 --> 01:38:14.720
forward because it's gonna be very different than what

01:38:14.720 --> 01:38:16.479
people are accustomed to today

01:38:16.479 --> 01:38:19.760
I think we still need to clarify that that like

01:38:20.359 --> 01:38:22.359
Commissioner Taylor was

01:38:22.600 --> 01:38:24.600
into in his comment that

01:38:25.359 --> 01:38:27.880
there's a there's a difference between a

01:38:28.439 --> 01:38:31.140
single-family developed lot that you purchase from a

01:38:31.140 --> 01:38:32.960
developer and then one that's being

01:38:33.720 --> 01:38:37.670
The a single-family subdivision that's being developed and

01:38:37.670 --> 01:38:40.479
I think we can make that clearer in the code that would

01:38:40.479 --> 01:38:40.840
help

01:38:41.840 --> 01:38:44.640
but the intent is though that

01:38:45.159 --> 01:38:48.039
The city this ordinance applies to the city as a whole

01:38:48.039 --> 01:38:49.600
including homeowners

01:38:50.399 --> 01:38:54.829
developers in the lake so we can make those we can clear up

01:38:54.829 --> 01:38:55.159
the

01:38:55.880 --> 01:38:58.979
discrepancies with the definitions but we would like we

01:38:58.979 --> 01:39:01.399
wanted the intent of tonight was to go through the

01:39:01.399 --> 01:39:03.039
ordinance so that you can see

01:39:03.739 --> 01:39:06.039
What we have changed what we are proposing

01:39:06.760 --> 01:39:10.399
to be able to make a better decision our hope is to

01:39:11.399 --> 01:39:13.399
Show you what the work that we've done so that we can

01:39:13.399 --> 01:39:15.960
continue to move this project forward

01:39:16.399 --> 01:39:19.170
Because this has been a request from the City Council has

01:39:19.170 --> 01:39:22.600
been and out seeing an item for us for about three years

01:39:22.600 --> 01:39:22.840
now

01:39:22.840 --> 01:39:24.800
and so we would like to

01:39:24.800 --> 01:39:29.140
Move this forward to tonight and then the next meeting what

01:39:29.140 --> 01:39:31.359
we would like to have from you guys are

01:39:31.720 --> 01:39:33.720
Recommendations on the ordinance that has been prepared

01:39:35.119 --> 01:39:38.220
Any changes that you would like to forward on to the City

01:39:38.220 --> 01:39:41.359
Council to be incorporated or to be considered?

01:39:41.359 --> 01:39:43.979
That's what we are hoping to get from you tonight and then

01:39:43.979 --> 01:39:44.960
at the next meeting

01:39:48.239 --> 01:39:50.239
Commissioner back

01:39:50.640 --> 01:39:52.640
Commissioner has been yeah, I'll be brief I

01:39:54.239 --> 01:39:56.840
Think we're getting a little bogged down in naming be it

01:39:56.840 --> 01:40:00.159
applicant be it developer be it because okay

01:40:00.159 --> 01:40:02.300
So I don't turn in the application so it doesn't apply to

01:40:02.300 --> 01:40:03.859
me right it does

01:40:04.479 --> 01:40:07.000
You're required to turn an application and the fact that

01:40:07.000 --> 01:40:09.430
you don't call yourself an applicant because you subvert

01:40:09.430 --> 01:40:09.960
the process

01:40:10.560 --> 01:40:13.079
Doesn't mean it doesn't apply to you. So I mean do we boil

01:40:13.079 --> 01:40:14.699
it down and just put human in there

01:40:14.699 --> 01:40:17.800
I mean, you know me there takes a little bit of just hey,

01:40:17.800 --> 01:40:19.720
you know the rules and if you're trying to subvert the

01:40:19.720 --> 01:40:20.000
rules

01:40:20.000 --> 01:40:21.479
You're gonna subvert them

01:40:21.479 --> 01:40:25.310
And just hey everybody that's breathing oxygen fill out a

01:40:25.310 --> 01:40:28.039
form, you know, I mean it could get really really

01:40:28.560 --> 01:40:30.760
Boiled down and I don't think that's that's that's

01:40:30.760 --> 01:40:31.399
necessary

01:40:32.279 --> 01:40:35.920
If you define what it is, maybe highlight it whatever it is

01:40:35.920 --> 01:40:39.859
But I mean, I think again you you you give me any title and

01:40:39.859 --> 01:40:42.659
I can give you the opposite of why it doesn't apply to me

01:40:42.659 --> 01:40:45.479
In my little mind, right? I mean, so I just think

01:40:46.239 --> 01:40:49.520
You you have to take it on its merits take the individual

01:40:49.520 --> 01:40:52.720
on their merits if you're if it's called a developer

01:40:52.720 --> 01:40:54.699
Maybe you're developing something if you're applicant,

01:40:54.699 --> 01:40:55.680
maybe you're applying for something

01:40:56.359 --> 01:40:59.239
Whatever the terminology, but I mean if we've we've

01:41:00.439 --> 01:41:02.000
Taken about

01:41:02.000 --> 01:41:05.869
Ten minutes on something that that's not ironclad. I mean,

01:41:05.869 --> 01:41:06.600
you're not gonna get it

01:41:06.600 --> 01:41:09.699
I mean you can't lock it down enough to where someone can't

01:41:09.699 --> 01:41:11.479
use their imagination and subvert it

01:41:11.479 --> 01:41:15.199
So I just it's a lot of time. We're on page six

01:41:16.119 --> 01:41:20.319
And and we're talking about a title that's not gonna stick

01:41:21.560 --> 01:41:23.560
Well, I'm gonna make a comment on that

01:41:24.359 --> 01:41:26.119
Okay

01:41:26.119 --> 01:41:28.119
I'm gonna say that I bet you

01:41:29.000 --> 01:41:31.520
most people sitting this commission they read it and it

01:41:31.520 --> 01:41:33.439
says developer move right on to

01:41:34.319 --> 01:41:37.119
developing property and not that it actually applies to

01:41:37.119 --> 01:41:39.989
single-family individual homeowners and that if you're

01:41:39.989 --> 01:41:41.520
gonna cut down a tree on it this

01:41:41.520 --> 01:41:44.619
Applies to you too versus a guy that's out doing 25 acres

01:41:44.619 --> 01:41:46.920
and I think it is a substantial difference

01:41:47.199 --> 01:41:49.880
To make sure that everybody understands that this is a very

01:41:49.880 --> 01:41:53.640
significant change from what our current tree code is

01:41:54.239 --> 01:41:57.800
very significant and it applies to everybody now not just

01:41:58.600 --> 01:42:00.319
developers

01:42:00.319 --> 01:42:02.989
Everyone in the city and then wants to cut down a tree five

01:42:02.989 --> 01:42:05.199
inches greater has to get a permit

01:42:05.199 --> 01:42:08.069
And if it's a larger tree you will mitigate it and you will

01:42:08.069 --> 01:42:08.479
pay for it

01:42:08.479 --> 01:42:11.579
And I bet most property owners in the city of Denton if you

01:42:11.579 --> 01:42:14.359
ask them that are not going to understand it

01:42:14.359 --> 01:42:16.619
And they're probably aren't gonna be happy that they have

01:42:16.619 --> 01:42:19.000
to pay three or four thousand dollars to go cut down two or

01:42:19.000 --> 01:42:19.479
three big

01:42:19.479 --> 01:42:22.640
Post oak trees if they want to put a pool and put a garage

01:42:22.640 --> 01:42:25.840
or build a house in the back for mom to take care of

01:42:25.840 --> 01:42:28.880
I deal with that on a pretty frequent basis

01:42:29.640 --> 01:42:31.930
That's a significant change that most people don't deal

01:42:31.930 --> 01:42:32.560
with today

01:42:32.560 --> 01:42:35.909
I don't I don't disagree but I also heard them say several

01:42:35.909 --> 01:42:36.279
times

01:42:36.279 --> 01:42:38.939
It's one it's a draft and two that that's not the intent of

01:42:38.939 --> 01:42:40.760
it that they're gonna go back and fix it and then third

01:42:40.760 --> 01:42:43.119
There's a there's a whole legal aspect that I'm sure

01:42:43.119 --> 01:42:45.479
Jennifer could take a whole entire work session

01:42:45.479 --> 01:42:47.720
Let's talk about the difference between property owners of

01:42:47.720 --> 01:42:50.359
individual home in the laws that are supported there

01:42:50.640 --> 01:42:53.739
Versus a developer and the laws to support that developer

01:42:53.739 --> 01:42:56.140
and then the potential homeowner that hadn't bought the

01:42:56.140 --> 01:42:57.079
home yet in their law

01:42:57.079 --> 01:42:59.949
I mean there's a I mean again. It's just a rabbit hole, but

01:42:59.949 --> 01:43:00.380
I think

01:43:01.039 --> 01:43:03.720
They they've said a few different times that hey that those

01:43:03.720 --> 01:43:05.720
examples of the pool does not apply

01:43:06.439 --> 01:43:09.609
On the on its merits now, there's there's areas where it

01:43:09.609 --> 01:43:13.000
does and they can iron that out. But again, I

01:43:13.640 --> 01:43:17.000
Your point may be valid, but I don't I just don't I

01:43:18.279 --> 01:43:20.920
Don't know that it's worth the of the

01:43:22.000 --> 01:43:24.520
40 minutes we had to discuss this. I don't know if it

01:43:24.520 --> 01:43:25.979
require a quarter of it

01:43:26.640 --> 01:43:30.000
If I could just chime in here so I can put this to bed. I

01:43:31.119 --> 01:43:34.220
Don't have a problem with changing developer to property

01:43:34.220 --> 01:43:36.930
owner and defining property owner as the owner of the

01:43:36.930 --> 01:43:38.119
property or a

01:43:38.880 --> 01:43:41.260
representative of the owner of the property including

01:43:41.260 --> 01:43:42.239
someone doing development

01:43:43.239 --> 01:43:46.939
Because the enforcement provisions are for any person. It's

01:43:46.939 --> 01:43:49.199
not exactly to a developer. So

01:43:49.920 --> 01:43:52.779
You know somebody might come on someone's property and we

01:43:52.779 --> 01:43:55.819
're illegally removed trees and they're also going to be

01:43:55.819 --> 01:43:56.979
subject to enforcement

01:43:57.319 --> 01:44:01.899
So I think that that would be an okay change provided. Hey,

01:44:01.899 --> 01:44:03.079
what is is okay with that?

01:44:03.079 --> 01:44:05.189
But from a legal standpoint, I think that would be fine.

01:44:05.189 --> 01:44:06.239
Yeah, I don't I don't have a

01:44:10.760 --> 01:44:13.960
Commissioner Roselle, thank you chair. I know Commissioner

01:44:13.960 --> 01:44:14.500
Beck was speak

01:44:14.500 --> 01:44:16.430
I've been waiting since Commissioner Sullivan asked a

01:44:16.430 --> 01:44:18.720
question on a pool 20 minutes ago and then added to the

01:44:18.720 --> 01:44:19.520
four that

01:44:19.880 --> 01:44:23.430
Mr. Hutz was wanted to continue with so let me say I have

01:44:23.430 --> 01:44:24.920
to statement and a question

01:44:25.880 --> 01:44:28.979
First statement there's no reason not to clarify it to

01:44:28.979 --> 01:44:29.359
include

01:44:29.880 --> 01:44:31.760
Citizen because I'm right there with with chair I read

01:44:31.760 --> 01:44:33.560
developer. I'm like, I'm not developer move on

01:44:33.760 --> 01:44:37.140
there's no reason not to make an easy change to clarify

01:44:37.140 --> 01:44:39.930
because I didn't read the definitions when I was going

01:44:39.930 --> 01:44:40.840
through this and if they

01:44:41.159 --> 01:44:43.159
citizen was referred to

01:44:43.159 --> 01:44:45.159
they said you need to go to for a

01:44:45.920 --> 01:44:47.859
Four this applies to you citizens. You'd be like a

01:44:47.859 --> 01:44:51.560
developer must that's not me. So it's a no-brainer change

01:44:51.560 --> 01:44:51.720
it

01:44:51.720 --> 01:44:53.319
Thank you for the clarification

01:44:53.319 --> 01:44:56.649
Jennifer I do have a question though for a three it says

01:44:56.649 --> 01:44:59.039
aerial images are from the last 24 months

01:44:59.680 --> 01:45:02.409
Correct. Is there any requirements like not to take that in

01:45:02.409 --> 01:45:02.880
winter?

01:45:02.960 --> 01:45:05.539
Like how does that work out in terms of looking at a canopy

01:45:05.539 --> 01:45:07.000
? It would have to be leaf on

01:45:08.640 --> 01:45:11.380
Aerials not you know when the trees are defoliated. Is that

01:45:11.380 --> 01:45:15.359
an assumption or should that be more codified? I

01:45:16.760 --> 01:45:18.760
Can add that in there?

01:45:20.600 --> 01:45:22.600
That's all I got thank you all

01:45:23.479 --> 01:45:25.920
Commissioner Sullivan just to be perfectly clear

01:45:27.079 --> 01:45:29.159
So if somebody bought a house ten years ago, and they want

01:45:29.159 --> 01:45:32.250
to do something they're not going to be this is not going

01:45:32.250 --> 01:45:33.600
to be a restriction

01:45:34.239 --> 01:45:37.460
No, I have a problem saying okay. I bought this lot. It's a

01:45:37.460 --> 01:45:38.199
wooded lot

01:45:38.199 --> 01:45:42.159
I love trees and now five years six years later

01:45:42.159 --> 01:45:45.100
I want to make a change and all of a sudden the law has

01:45:45.100 --> 01:45:47.159
changed since I bought the lot and

01:45:47.760 --> 01:45:50.479
I've got to spend all this extra money to do things that

01:45:51.079 --> 01:45:54.180
Wasn't applicable back when I bought the lot to begin with

01:45:54.180 --> 01:45:54.880
otherwise

01:45:54.880 --> 01:45:58.279
I might have bought a bald lot and planted my own trees

01:45:58.279 --> 01:46:00.600
correct and and that is correct

01:46:00.600 --> 01:46:03.479
That's not the intent and let me go back to something that

01:46:03.479 --> 01:46:05.640
was mentioned as far as a single-family

01:46:06.680 --> 01:46:09.859
Exceed oh yeah, where does it say it's not if that's not

01:46:09.859 --> 01:46:10.399
the intent

01:46:11.239 --> 01:46:14.159
Again, we're going back to the definition. I'm just it's it

01:46:14.159 --> 01:46:14.600
's gone

01:46:14.600 --> 01:46:17.189
It's this somatics with you know who's considered a

01:46:17.189 --> 01:46:20.039
developer and we can include that

01:46:20.640 --> 01:46:24.560
renovation into the ordinance so if you if what I'm hearing

01:46:24.560 --> 01:46:27.100
is that you would like to see that reflected in the

01:46:27.100 --> 01:46:27.680
ordinance

01:46:28.000 --> 01:46:31.449
Will reflect it in the ordinance correct, okay? Thank you.

01:46:31.449 --> 01:46:32.119
Yeah and

01:46:34.199 --> 01:46:37.159
Just a point of clarification before I lose this

01:46:38.760 --> 01:46:42.479
If a single-family property owner, you know as we're moving

01:46:42.479 --> 01:46:42.880
a tree

01:46:42.880 --> 01:46:45.399
You know obviously it's not an intent to charge them a

01:46:45.399 --> 01:46:48.920
permit fee or to have them to go through a tree

01:46:49.039 --> 01:46:52.239
You know survey and what have you and we're going to you

01:46:52.239 --> 01:46:52.600
know

01:46:53.279 --> 01:46:56.130
Make the appropriate adjustments to clarify that but if

01:46:56.130 --> 01:47:00.199
that person comes in to build that their their pool

01:47:00.199 --> 01:47:03.920
And they have you know a tennis tree or 15 inch tree

01:47:04.159 --> 01:47:07.319
They get the permit to remove the tree for the improvement

01:47:07.319 --> 01:47:08.699
they're trying to make to their property

01:47:08.760 --> 01:47:12.579
Which is more an improvement not really a new development,

01:47:12.579 --> 01:47:14.560
but when you look at the mitigation section

01:47:14.640 --> 01:47:16.760
It calls out mitigation and the cases

01:47:17.840 --> 01:47:22.789
Dealing with the pre development canopy not you know in a

01:47:22.789 --> 01:47:24.079
situation where you're you know

01:47:24.079 --> 01:47:26.079
Basically enhancing what's already there

01:47:26.359 --> 01:47:30.310
So there isn't a requirement for a single-family property

01:47:30.310 --> 01:47:30.520
owner

01:47:30.520 --> 01:47:32.829
That's you know has to take out a tree to put in their deck

01:47:32.829 --> 01:47:35.399
or patio to mitigate for that tree

01:47:35.800 --> 01:47:38.899
There's not there's not that requirement under the

01:47:38.899 --> 01:47:40.680
mitigation section of what we're proposing

01:47:43.119 --> 01:47:45.119
Okay, we'll get it fixed

01:47:48.239 --> 01:47:50.239
Commissioner back

01:47:50.680 --> 01:47:52.930
Thank You chair just real quick there was something I

01:47:52.930 --> 01:47:55.520
wanted to address here I discussed with Shandrin

01:47:55.920 --> 01:47:58.149
Hey with her, but are we carrying this conversation into

01:47:58.149 --> 01:48:00.399
the public hearing or is this it for tonight?

01:48:00.840 --> 01:48:03.939
Tonight is just discussion on the 22nd. We'll do another

01:48:03.939 --> 01:48:06.840
workshop, and then we'll do a public hearing okay

01:48:06.840 --> 01:48:09.640
But I wanted to make a comment about dealing with who's

01:48:10.159 --> 01:48:10.159
authorized to approve variances as we discuss that should I

01:48:10.159 --> 01:48:16.399
mention that here so it's connected to a

01:48:16.840 --> 01:48:20.199
Recommendation yes, okay, so the recommendation is that?

01:48:20.960 --> 01:48:24.670
the authority to allow variances stay with the City Council

01:48:24.670 --> 01:48:27.479
as opposed to going to the ZBA or

01:48:27.960 --> 01:48:29.960
even our good friend Haywood here

01:48:30.880 --> 01:48:34.430
You have a specific provision you're referencing. Thank you

01:48:34.430 --> 01:48:35.479
referring to

01:48:36.399 --> 01:48:38.199
number 7c

01:48:38.199 --> 01:48:40.479
specifically the appeal that's the section that

01:48:41.159 --> 01:48:44.289
Previously it was actually another part of the code that we

01:48:44.289 --> 01:48:46.039
pulled into the tree code

01:48:46.840 --> 01:48:51.600
But that was a part that went from City Council to the ZBA

01:48:52.119 --> 01:48:54.880
The administrative modifications is something that was

01:48:54.880 --> 01:48:58.560
added in to what we're proposing to allow for me to

01:48:59.439 --> 01:49:02.539
Have some flexibility to work with developers on you know

01:49:02.539 --> 01:49:02.960
sites

01:49:03.520 --> 01:49:07.100
That you know may be difficult based on site constraints to

01:49:07.100 --> 01:49:09.939
meet the letter of of the code

01:49:13.479 --> 01:49:17.189
I trust they would complete completely, but it's just there

01:49:17.189 --> 01:49:17.800
's there's other

01:49:19.000 --> 01:49:22.100
So all I'm suggesting is that we don't remove this

01:49:22.100 --> 01:49:25.359
automatically that it gets discussed further, okay?

01:49:25.960 --> 01:49:28.680
And we'll make that as a recommendation to City Council

01:49:28.680 --> 01:49:31.239
because they may not want to have those projects come to

01:49:31.239 --> 01:49:32.560
them right okay

01:49:32.560 --> 01:49:34.560
Thank you

01:49:37.560 --> 01:49:39.560
Okay, so

01:49:40.000 --> 01:49:42.810
We're I don't know how much time we have for this work

01:49:42.810 --> 01:49:44.560
session with the regular

01:49:44.560 --> 01:49:47.350
I don't know how many people we have in there and somebody

01:49:47.350 --> 01:49:48.279
wants to tell us we want to just

01:49:50.079 --> 01:49:52.079
Go ahead and close

01:50:03.880 --> 01:50:06.989
In the meantime Commissioner Tyler would it be possible to

01:50:06.989 --> 01:50:09.840
get okay the draft electronically?

01:50:09.840 --> 01:50:12.619
ahead of time because I was gonna say we'll go ahead and

01:50:12.619 --> 01:50:15.380
send out another draft and then if you have any comments

01:50:15.380 --> 01:50:17.140
just send them to

01:50:17.600 --> 01:50:21.979
Shandrian or Haywood directly and they can take that into

01:50:21.979 --> 01:50:24.039
account when we meet the next time

01:50:24.039 --> 01:50:26.079
We'll have some sort of workable solution for you

01:50:39.840 --> 01:50:41.840
I

01:50:49.960 --> 01:50:52.520
Would ask that whatever comments that we get the final

01:50:52.520 --> 01:50:53.760
draft

01:50:54.800 --> 01:50:57.899
Ahead of time so we have all time to review another

01:50:57.899 --> 01:50:59.520
stakeholders that are here that want to view it

01:50:59.520 --> 01:51:01.520
It's really hard at least for me

01:51:01.800 --> 01:51:05.300
To get something the day of the meeting and then vote on it

01:51:05.300 --> 01:51:08.279
the same day when there's a lot of questions and so

01:51:09.840 --> 01:51:11.840
I

01:51:13.720 --> 01:51:15.720
Thank you

01:51:17.199 --> 01:51:21.090
With that at 633 I'm going to close our work session, and

01:51:21.090 --> 01:51:23.600
we'll reconvene as quickly as we can in council chambers

01:51:33.119 --> 01:51:35.920
Good evening and welcome to the city of Denton planning a

01:51:35.920 --> 01:51:39.079
zoning Commission meeting for February the 8th

01:51:39.600 --> 01:51:42.699
This meeting has been duly posted and we do have a quorum

01:51:42.699 --> 01:51:45.279
present and I'm gonna call our meeting to order at

01:51:46.119 --> 01:51:49.829
642 our first order of business will be to stand and give

01:51:49.829 --> 01:51:51.640
the pledge the US and the Texas flag

01:52:09.600 --> 01:52:11.600
I

01:52:33.560 --> 01:52:36.310
Next item on our agenda this evening will be to consider

01:52:36.310 --> 01:52:38.800
approval of the planning and zoning Commission meeting

01:52:39.239 --> 01:52:41.239
minutes of our last meeting

01:52:41.880 --> 01:52:44.680
Chair would entertain a motion for January 25th

01:52:45.600 --> 01:52:47.600
2017 minutes

01:52:52.000 --> 01:52:55.100
Commissioner Ellis, thank you chair. I will move to approve

01:52:55.100 --> 01:52:57.000
minutes from January 25th

01:52:57.920 --> 01:52:59.760
Commissioner Sullivan

01:52:59.760 --> 01:53:02.640
We have a first and a second for approval

01:53:03.680 --> 01:53:05.680
Commissioner Beck

01:53:07.239 --> 01:53:11.439
Okay, be abstain okay any other discussion

01:53:14.000 --> 01:53:16.000
Seeing none will call for a vote on the board

01:53:29.960 --> 01:53:32.880
Motion carries 6-0 with one recuse

01:53:34.960 --> 01:53:37.239
That will move us to our consent agenda

01:53:43.159 --> 01:53:45.159
Commissioner back

01:53:48.479 --> 01:53:50.479
I move we approve consent agenda

01:53:52.479 --> 01:53:53.960
Commissioner Zell

01:53:53.960 --> 01:53:57.250
Second we have a first and a second for approval of the

01:53:57.250 --> 01:54:00.159
consent agenda any discussion

01:54:04.560 --> 01:54:07.079
Seeing none I will call for a vote on the board

01:54:20.239 --> 01:54:25.189
Motion carries 7-0. I will move us to our items for an

01:54:25.189 --> 01:54:27.239
individual consideration

01:54:30.920 --> 01:54:34.170
Our first item will be item a consider an act on creation

01:54:34.170 --> 01:54:38.000
of a subcommittee of the planning and zoning Commission

01:54:38.359 --> 01:54:40.600
for the DDC amendment project

01:54:47.039 --> 01:54:48.560
Commissioner Taylor I

01:54:48.560 --> 01:54:51.130
Move we form a subcommittee of the planning and zoning

01:54:51.130 --> 01:54:53.949
Commission for the purpose of the Denton Development Code

01:54:53.949 --> 01:54:55.020
amendment project

01:54:58.000 --> 01:55:00.800
Commissioner Ellis, thank you chair. I will second that

01:55:00.800 --> 01:55:04.960
okay. We have a first and a second to form the subcommittee

01:55:04.960 --> 01:55:06.479
any discussion

01:55:11.560 --> 01:55:13.560
Seeing none we'll call for a vote on board

01:55:21.239 --> 01:55:23.239
Motion carries 7-0

01:55:25.079 --> 01:55:28.779
I'm gonna move for consider nominations to this newly

01:55:28.779 --> 01:55:30.560
created subcommittee and

01:55:33.159 --> 01:55:34.840
Just as a point of order how many members will we

01:55:34.840 --> 01:55:40.300
ultimately be appointing to this Commission three, okay

01:55:50.119 --> 01:55:53.220
Commissioner Taylor, thank you chair. I would like to nom

01:55:53.220 --> 01:55:54.920
inate Commissioner Ellis for this committee

01:55:55.800 --> 01:55:57.800
Okay

01:56:00.159 --> 01:56:02.159
Commissioner back

01:56:03.239 --> 01:56:05.760
Thank you, I would like to nominate Commissioner Hudson for

01:56:05.760 --> 01:56:06.760
this committee

01:56:09.920 --> 01:56:11.670
It's a point of order should we take these as individuals

01:56:11.670 --> 01:56:14.560
or do them all at the same time?

01:56:20.359 --> 01:56:21.939
I think if we can get a consensus and discussion that we

01:56:21.939 --> 01:56:24.960
can do it as one motion

01:56:25.119 --> 01:56:26.680
Okay

01:56:26.680 --> 01:56:28.680
We have one more member to a point

01:56:34.680 --> 01:56:38.119
I'll make a motion to appoint Commissioner Roselle

01:56:45.119 --> 01:56:48.279
Commissioner husband so I

01:56:49.960 --> 01:56:51.960
Don't think I'm a good fit

01:56:51.960 --> 01:56:53.680
because I'm

01:56:53.680 --> 01:56:57.630
Have future aspirations, so I'm going to but I would

01:56:57.630 --> 01:56:58.520
suggest

01:57:00.920 --> 01:57:03.479
Another member if that's if sure I do that absolutely if

01:57:03.479 --> 01:57:05.800
you'd like to withdraw so yes, so

01:57:06.279 --> 01:57:10.250
Commissioner Taylor big good fit. I believe if time allows

01:57:10.250 --> 01:57:10.560
I

01:57:11.600 --> 01:57:13.600
Was going to ask that

01:57:14.000 --> 01:57:17.960
How long is this subcommittee supposed to be working for?

01:57:22.680 --> 01:57:24.680
May of 2018

01:57:27.840 --> 01:57:32.539
I'm sorry, I respectfully decline because of my short

01:57:32.539 --> 01:57:34.680
remaining time on the Commission. Thank you

01:57:38.920 --> 01:57:41.510
Commissioner Ellis, I would like to nominate Commissioner

01:57:41.510 --> 01:57:42.100
Beck

01:57:52.680 --> 01:57:54.680
under

01:58:05.460 --> 01:58:06.250
Under advisement of legal legal is going to recommend that

01:58:06.250 --> 01:58:11.560
we do these as individuals

01:58:13.119 --> 01:58:15.319
So we have currently three

01:58:16.239 --> 01:58:18.239
nominees so we'll be taking these

01:58:18.680 --> 01:58:22.079
Individually and if we need to do by chance another one

01:58:22.079 --> 01:58:22.479
then we will

01:58:22.960 --> 01:58:27.010
Next okay, so currently I have nominations now for

01:58:27.010 --> 01:58:28.880
Commissioner Ellis

01:58:29.560 --> 01:58:32.560
Commissioner Roselle and Commissioner back

01:58:33.279 --> 01:58:37.250
So if we would look for I guess a motion for Commissioner

01:58:37.250 --> 01:58:38.560
Ellis to begin

01:58:44.479 --> 01:58:44.670
Commissioner Zell I motion that Commissioner Ellis be

01:58:44.670 --> 01:58:49.500
nominated and placed on the didn't development code

01:58:49.500 --> 01:58:52.279
amendment project, okay

01:58:53.520 --> 01:58:55.020
Commissioner back

01:58:55.020 --> 01:58:57.020
Okay, I second that motion

01:58:57.319 --> 01:59:00.949
Okay, we have a first and a second for nomination of

01:59:00.949 --> 01:59:02.600
Commissioner Ellis

01:59:03.199 --> 01:59:05.199
any discussion

01:59:05.960 --> 01:59:07.960
Okay, sir

01:59:10.800 --> 01:59:12.800
Just make sure you're okay to serve

01:59:14.359 --> 01:59:17.520
Okay to serve thank you okay all right any further

01:59:17.520 --> 01:59:18.720
discussion

01:59:21.680 --> 01:59:23.760
Seeing none we will call for a vote on board

01:59:36.640 --> 01:59:38.640
Motion carries seven to zero

01:59:50.079 --> 01:59:54.000
Chair is going to motion for nomination of Commissioner

01:59:54.000 --> 01:59:56.100
Roselle to this subcommittee

01:59:57.199 --> 02:00:00.159
Commissioner Ellis I will second that okay

02:00:00.960 --> 02:00:03.880
We have a first and a second any discussion

02:00:10.399 --> 02:00:12.399
Seeing none we'll call for a vote on the board

02:00:21.079 --> 02:00:23.079
I

02:00:23.079 --> 02:00:25.079
Motion carries seven to zero

02:00:29.279 --> 02:00:33.079
Commissioner Ellis I will motion to approve Larry back as a

02:00:33.760 --> 02:00:35.659
Appointment to the planning and zoning Commission sub

02:00:35.659 --> 02:00:38.710
committee for the denton development code amendment project,

02:00:38.710 --> 02:00:39.000
okay

02:00:40.880 --> 02:00:40.880
Commissioner Sullivan I second okay, we have a first and a

02:00:40.880 --> 02:00:47.960
second for Commissioner back any discussion

02:00:50.079 --> 02:00:52.079
I

02:00:55.199 --> 02:00:57.199
Think now we will call for a vote on board

02:01:05.520 --> 02:01:07.520
Motion carries seven zero

02:01:08.720 --> 02:01:10.930
Congratulations Commissioner Ellis Commissioner Roselle and

02:01:10.930 --> 02:01:13.840
Commissioner back on your appointments. Thank you

02:01:15.600 --> 02:01:18.250
That will move us to our public hearing section this

02:01:18.250 --> 02:01:19.039
evening

02:01:20.079 --> 02:01:24.039
At this time I'm going to open the public hearing for item

02:01:24.039 --> 02:01:25.880
a fr 16 -

02:01:27.359 --> 02:01:30.920
0003 and call on Julie white for presentation

02:01:38.119 --> 02:01:39.050
Julie Wyatt senior planner at the city of Denton and I'm

02:01:39.050 --> 02:01:42.600
presenting to you a

02:01:43.560 --> 02:01:48.869
Replat of a piece of property. It's fr 16 3 is a replat in

02:01:48.869 --> 02:01:51.500
order to abandon a public alley

02:01:51.500 --> 02:01:53.840
And I'll stand for any questions

02:01:57.239 --> 02:01:59.239
Any questions for staff

02:02:02.039 --> 02:02:04.039
Thank You Julie

02:02:05.720 --> 02:02:08.630
This is a public hearing so anyone who would like to come

02:02:08.630 --> 02:02:12.840
forward and speak on this item at this time, please do so

02:02:13.560 --> 02:02:15.560
I

02:02:18.039 --> 02:02:21.140
Seeing no one we will close the public here on this item

02:02:21.140 --> 02:02:24.359
and open the floor for motion or discussion Commissioner

02:02:24.359 --> 02:02:24.640
back

02:02:25.600 --> 02:02:27.600
Thank you chair. I move we approve

02:02:28.000 --> 02:02:30.899
the for 16 - 0003

02:02:32.640 --> 02:02:35.159
Commissioner Solomon I second that motion. Okay, I have a

02:02:35.159 --> 02:02:38.319
first and a second for approval any discussion

02:02:42.720 --> 02:02:44.720
Seeing no we'll call for a vote on board

02:02:55.800 --> 02:02:57.800
Motion carries seven zero

02:03:00.319 --> 02:03:04.760
Move us to item B public hearings. I'm going to open the

02:03:04.760 --> 02:03:05.680
public hearing for

02:03:06.600 --> 02:03:08.600
z16 -

02:03:08.840 --> 02:03:12.600
0018 a and call on Julie white for presentation

02:03:13.720 --> 02:03:15.720
All right, good evening

02:03:18.760 --> 02:03:21.600
Would you like to go through the full presentation or the

02:03:21.600 --> 02:03:23.039
summary full

02:03:25.159 --> 02:03:27.159
Okay, all right

02:03:27.319 --> 02:03:32.270
Okay, so this is a this request is z 16 18 blue beacon

02:03:32.270 --> 02:03:33.000
truck wash

02:03:34.760 --> 02:03:38.529
The location of the request is adjacent to I 35 and north

02:03:38.529 --> 02:03:40.039
of Barthol road

02:03:40.199 --> 02:03:44.840
It's in the north part of the city just to let you know

02:03:44.840 --> 02:03:49.789
There's approximately 637 feet of frontage of along I 35 on

02:03:49.789 --> 02:03:50.760
this property

02:03:51.920 --> 02:03:55.930
So the request concerning this location is to consider a

02:03:55.930 --> 02:03:57.520
rezoning on approximately

02:03:58.399 --> 02:04:02.319
5.3 acres from regional center residential one to

02:04:02.319 --> 02:04:05.180
employment center commercial district

02:04:09.039 --> 02:04:13.729
So the the the area is is currently undeveloped the site is

02:04:13.729 --> 02:04:16.779
currently undeveloped and it is will go

02:04:17.319 --> 02:04:20.479
Over what's surrounding it with the character of the area.

02:04:20.479 --> 02:04:21.640
So if you will look

02:04:22.520 --> 02:04:25.229
Just to the west of it. You have a property that doesn't

02:04:25.229 --> 02:04:27.359
have any it doesn't have a color on it

02:04:27.359 --> 02:04:30.020
That's because it's in our extraterritorial jurisdiction.

02:04:30.020 --> 02:04:31.199
It's outside of the city limits

02:04:31.880 --> 02:04:33.800
And it is undeveloped

02:04:33.800 --> 02:04:37.300
You also have property to the north here the hatch mark

02:04:37.300 --> 02:04:40.199
that has a zoning designation of RD 5x

02:04:40.199 --> 02:04:42.920
That's rural residential minimum 5 acres

02:04:43.079 --> 02:04:46.479
That's and that's actually kind of a place holding zoning

02:04:46.479 --> 02:04:49.560
for when property is recently annexed and that

02:04:50.119 --> 02:04:53.220
Much of that property is undeveloped just to the north of

02:04:53.220 --> 02:04:55.560
the property has that RCR one

02:04:56.199 --> 02:05:00.439
zoning designation is undeveloped to the south there is

02:05:01.119 --> 02:05:04.220
Existing ECC district and that property is currently being

02:05:04.220 --> 02:05:07.300
redeveloped with a commercial use with a travel center use

02:05:07.920 --> 02:05:09.920
There's also some RCC in

02:05:10.359 --> 02:05:11.880
adjacent to that

02:05:11.880 --> 02:05:16.359
RCC in across I 35 and then RCC D across

02:05:16.840 --> 02:05:20.630
35 south of Elm that is developed with the Travel Center

02:05:20.630 --> 02:05:21.840
with a commercial use

02:05:22.720 --> 02:05:27.220
And the applicant is proposing to rezone the property to E

02:05:27.220 --> 02:05:28.279
CC district

02:05:30.439 --> 02:05:33.960
The property is located in a future land use designation of

02:05:33.960 --> 02:05:35.199
business innovation

02:05:35.520 --> 02:05:38.460
Business innovation is intended for employment uses for

02:05:38.460 --> 02:05:41.960
office research and development light manufacturing

02:05:42.680 --> 02:05:46.170
As well as large office parks and also the supporting

02:05:46.170 --> 02:05:48.600
retail uses associated with that

02:05:49.600 --> 02:05:54.550
commercial uses hotels shops restaurants and some

02:05:54.550 --> 02:05:54.840
residential

02:05:57.439 --> 02:06:00.359
So considerations that we looked at when we analyzed this

02:06:00.359 --> 02:06:01.079
request were

02:06:01.600 --> 02:06:04.189
First the the criteria for approval there in the Denton

02:06:04.189 --> 02:06:07.960
Development Code and that's section 35 3 4 B

02:06:08.600 --> 02:06:11.760
the first criteria for approval is does it meet the

02:06:12.560 --> 02:06:16.939
The future land use designation in this case as I said, it

02:06:16.939 --> 02:06:17.800
's business innovation

02:06:18.319 --> 02:06:21.359
ECC district has quite a variety of

02:06:21.840 --> 02:06:25.220
Commercial uses within it and it also folds in some of

02:06:25.220 --> 02:06:28.159
those employment uses light manufacturing

02:06:29.800 --> 02:06:33.149
Warehouse so it's kind of got both of both of those

02:06:33.149 --> 02:06:34.520
elements and so

02:06:34.960 --> 02:06:38.159
ECC district does meet the intent of the business

02:06:38.159 --> 02:06:40.439
innovation future land use designation

02:06:40.439 --> 02:06:43.539
And then the second criteria for approval is is there

02:06:43.539 --> 02:06:47.079
adequate provision of public infrastructure and and the

02:06:47.079 --> 02:06:48.520
answer that is yes

02:06:49.000 --> 02:06:51.399
There may be additional requirements at platting

02:06:52.199 --> 02:06:54.439
And we also looked at the character of the area

02:06:55.319 --> 02:06:59.170
When when we look in this in this part of the city of Dent

02:06:59.170 --> 02:07:01.960
on we anticipate the growth to

02:07:02.880 --> 02:07:06.109
To kind of radiate out from that from that I 35 corridor

02:07:06.109 --> 02:07:08.520
with the commercial development

02:07:09.000 --> 02:07:11.619
Centering along that corridor it takes advantage of the

02:07:11.619 --> 02:07:14.600
visibility the access the the traffic that goes by it

02:07:14.600 --> 02:07:18.170
So we anticipate that the the commercial part of the E of

02:07:18.170 --> 02:07:21.680
the business innovation would would go more toward

02:07:21.680 --> 02:07:25.989
The 35 corridor within it transitioning to those employment

02:07:25.989 --> 02:07:28.880
uses as you go further west in those larger tracks

02:07:30.079 --> 02:07:32.079
the ECC the ECC

02:07:33.520 --> 02:07:36.039
Permitted uses are consistent with this

02:07:36.800 --> 02:07:39.409
Anticipated development pattern and then it does have the

02:07:39.409 --> 02:07:42.819
variety of commercial uses and it has and it permits them

02:07:42.819 --> 02:07:43.399
in a scale

02:07:43.560 --> 02:07:47.270
That is consistent with the type of development you see in

02:07:47.270 --> 02:07:48.399
that kind of corridor

02:07:48.840 --> 02:07:51.630
But a bit once again, it also does fold in some of those

02:07:51.630 --> 02:07:53.000
employment uses as well

02:07:54.520 --> 02:07:57.260
The current zoning of RC r1 is the commercial zoning

02:07:57.260 --> 02:08:00.380
district it does permit commercial uses, but it limits

02:08:00.380 --> 02:08:00.800
those

02:08:01.479 --> 02:08:04.020
Commercial uses in square footage and also in building

02:08:04.020 --> 02:08:04.699
envelopes

02:08:04.699 --> 02:08:07.430
So it's it's not exactly typical what the typical

02:08:07.430 --> 02:08:09.560
development pattern that you would see

02:08:09.960 --> 02:08:13.060
Or typical development scale that you would see on this

02:08:13.060 --> 02:08:14.600
type of highway corridor

02:08:15.600 --> 02:08:19.359
By rezoning to ECC district we would expand those permitted

02:08:19.359 --> 02:08:22.500
commercial uses and also enlarge that building envelope

02:08:22.600 --> 02:08:25.699
So that development could build to the scale that you

02:08:25.699 --> 02:08:29.880
typically see in this area and then ECC district

02:08:30.319 --> 02:08:34.630
The proposed ECC district is a logical continuation of that

02:08:34.630 --> 02:08:36.920
existing ECC to the south

02:08:39.119 --> 02:08:42.819
Public notification was sent out and we have not received

02:08:42.819 --> 02:08:44.359
any responses

02:08:46.520 --> 02:08:48.279
Based upon the criteria for approval staff recommend or

02:08:48.279 --> 02:08:52.119
criteria for approval staff does recommend approval

02:08:52.119 --> 02:08:55.220
I did want to add one other thing we discussed in work

02:08:55.220 --> 02:08:55.680
session

02:08:55.680 --> 02:08:58.819
I know it was brought up by Commissioner Roselle the use

02:08:58.819 --> 02:09:00.079
and and and although

02:09:00.640 --> 02:09:04.239
We we know what the proposed use is staff

02:09:05.720 --> 02:09:09.609
When we when staff looks at a rezoning case we have to look

02:09:09.609 --> 02:09:09.899
at

02:09:10.319 --> 02:09:12.600
That zoning district that proposed district in a more

02:09:12.600 --> 02:09:13.840
comprehensive fashion

02:09:14.399 --> 02:09:17.779
Of course, you could you will vote to recommend and you

02:09:17.779 --> 02:09:20.079
could look look at other factors

02:09:20.079 --> 02:09:21.920
You know the that use factor as well

02:09:21.920 --> 02:09:25.319
So I just wanted to point that out that although that wasn

02:09:25.319 --> 02:09:28.199
't a part of our analysis that it

02:09:29.119 --> 02:09:32.000
You could factor that in your recommendation. So

02:09:32.560 --> 02:09:35.119
I'll stand for any questions and the applicant is here. Do

02:09:35.119 --> 02:09:37.079
you have some questions? Commissioner Taylor?

02:09:38.039 --> 02:09:40.039
Thank You chair, so

02:09:42.760 --> 02:09:46.319
What use category is the expected development

02:09:47.159 --> 02:09:50.260
Going to be it would be a drive-through use a drive-through

02:09:50.260 --> 02:09:51.060
use. Okay

02:09:51.060 --> 02:09:53.180
So I was wondering like drive-through or quick vehicle serv

02:09:53.180 --> 02:09:55.439
icing or what what exactly it fell under it

02:09:55.439 --> 02:09:59.239
The definition of the drive-through use actually includes

02:09:59.239 --> 02:10:00.640
car washes. So I

02:10:01.279 --> 02:10:03.630
Was kind of looking at it both ways to use a quick vehicle

02:10:03.630 --> 02:10:06.920
serving but drive-through but but in the definition it

02:10:06.920 --> 02:10:07.920
actually has the

02:10:08.640 --> 02:10:09.880
the

02:10:09.880 --> 02:10:13.060
Car wash so would it be possible to bring back up the

02:10:13.060 --> 02:10:14.520
zoning map?

02:10:15.920 --> 02:10:17.920
so business innovation

02:10:19.359 --> 02:10:23.119
Has has been challenging for for this commission for a

02:10:23.119 --> 02:10:25.399
while and we have a similar area

02:10:25.399 --> 02:10:29.159
just actually straight down I 35 another mile or so where

02:10:29.159 --> 02:10:30.119
we

02:10:31.600 --> 02:10:35.909
There are great plans and we are just one parcel at a time

02:10:35.909 --> 02:10:37.960
rezoning as we go

02:10:39.880 --> 02:10:42.239
So I don't necessarily I don't feel that this is

02:10:42.239 --> 02:10:44.000
inappropriate here the ECC I

02:10:45.800 --> 02:10:47.710
Especially with the ECC immediately bordering it. I think

02:10:47.710 --> 02:10:51.640
it kind of makes them more cohesive the zoning than to have

02:10:52.439 --> 02:10:55.319
Ten acres there one five acres here or something else

02:10:55.960 --> 02:11:01.000
however, I do I do think that we're tending to put to re

02:11:01.000 --> 02:11:04.000
zone our business innovation district to

02:11:04.600 --> 02:11:07.380
EC employment center which tends toward lighter heavy

02:11:07.380 --> 02:11:08.960
industrial and

02:11:10.159 --> 02:11:13.680
I from what I can gather the purpose of our business in

02:11:13.680 --> 02:11:18.439
innovation district is really to be more office and

02:11:19.279 --> 02:11:22.829
We don't have an obvious straight office park zoning

02:11:22.829 --> 02:11:26.439
category. You can build an office in ECC

02:11:27.000 --> 02:11:30.300
You can also build an office in our like RCC

02:11:31.039 --> 02:11:35.989
that can also become more retail focused and I and I wonder

02:11:35.989 --> 02:11:36.279
if

02:11:37.119 --> 02:11:39.659
in the future as we build out our business innovation

02:11:39.659 --> 02:11:40.960
district basically from

02:11:41.800 --> 02:11:48.060
Here south if it wouldn't be better to aim for RCC D or RCC

02:11:48.060 --> 02:11:48.239
N

02:11:48.600 --> 02:11:50.359
so then you would have

02:11:50.359 --> 02:11:54.220
Retail and the ability to build smaller large office parks,

02:11:54.220 --> 02:11:56.640
but you wouldn't have industrial uses

02:11:57.479 --> 02:12:00.000
There's a really good point and we've kicked around a lot

02:12:00.000 --> 02:12:03.100
because business innovation. We don't have maybe a natural

02:12:03.600 --> 02:12:06.779
We've kind of looked at internally that the EC

02:12:07.159 --> 02:12:12.109
And ECI are probably the most natural fit fit for business

02:12:12.109 --> 02:12:12.960
innovation

02:12:12.960 --> 02:12:15.710
But yes, I could make an argument for the RCC D as well

02:12:15.710 --> 02:12:17.279
because it has a lot of those

02:12:18.199 --> 02:12:21.479
Comparable uses so just as a reminder we need to stick to

02:12:21.479 --> 02:12:22.739
the agenda item

02:12:22.960 --> 02:12:25.399
So we're going a little bit outside that well

02:12:25.399 --> 02:12:28.500
And I'm trying to I'm trying to apply this make sure that

02:12:28.500 --> 02:12:31.600
this zoning is consistent with our future land use map

02:12:32.079 --> 02:12:35.539
So as we look at the future land use map and the future

02:12:35.539 --> 02:12:38.680
land use that this parcels in that's why I'm talking about

02:12:38.680 --> 02:12:39.079
this now

02:12:39.560 --> 02:12:41.560
because I think this

02:12:42.239 --> 02:12:44.239
This is on the edge and

02:12:44.720 --> 02:12:48.260
We have to look holistically at the area around it

02:12:48.520 --> 02:12:51.840
So that's that's that's why I'm bringing this argument up

02:12:51.840 --> 02:12:55.159
now is if we continue to zone business innovation

02:12:55.880 --> 02:12:57.840
EC anything

02:12:57.840 --> 02:13:01.649
it will tend toward the heavier use the more industrial

02:13:01.649 --> 02:13:02.279
uses and

02:13:02.880 --> 02:13:05.079
that will be less appealing for

02:13:05.880 --> 02:13:06.960
the

02:13:06.960 --> 02:13:09.199
the office park uses and the retail uses

02:13:09.880 --> 02:13:14.720
So if we if we tend to make business innovation RCC D then

02:13:14.720 --> 02:13:15.159
the most

02:13:15.880 --> 02:13:18.789
Intense use that they could build would be an office park.

02:13:18.789 --> 02:13:19.640
Thank you

02:13:22.000 --> 02:13:24.560
Commissioner Mack thank you chair just quick question Julie

02:13:24.560 --> 02:13:27.399
that for clarification purposes again that frontage

02:13:27.840 --> 02:13:30.359
Slash service road that this is going to be sitting that's

02:13:30.359 --> 02:13:31.840
two-way traffic right there, right?

02:13:32.239 --> 02:13:37.739
The frontage no that is one way heading so access road goes

02:13:37.739 --> 02:13:39.279
south one way

02:13:39.279 --> 02:13:42.640
Yes, okay, somebody coming underneath I-35 could not make a

02:13:42.640 --> 02:13:44.159
right there. Well here

02:13:44.159 --> 02:13:48.479
They are as part as part of the development in this area

02:13:49.800 --> 02:13:53.789
Bartle Road will be realigned North El so that there will

02:13:53.789 --> 02:13:55.600
be an east-west connection

02:13:55.960 --> 02:13:58.539
Because you're right right now. It's sort of dead ends and

02:13:58.539 --> 02:14:01.000
there's this little little cut through

02:14:01.600 --> 02:14:05.119
Here, but that that will be changed

02:14:07.079 --> 02:14:09.079
Thank you sure

02:14:09.119 --> 02:14:11.119
Commissioner Sullivan

02:14:14.399 --> 02:14:18.029
Similar question I just want to chime in and address

02:14:18.029 --> 02:14:19.880
Commission Taylor's comment

02:14:20.439 --> 02:14:23.539
one of the things that hopefully this subcommittee the new

02:14:23.539 --> 02:14:25.680
subcommittee created will be looking into

02:14:26.199 --> 02:14:29.600
As part of the DDC amendment is to look at the zoning

02:14:30.720 --> 02:14:33.079
districts and in the uses with with regards to business

02:14:33.079 --> 02:14:36.859
innovation as Julie mentioned there is really not a natural

02:14:36.859 --> 02:14:37.880
fit obviously

02:14:38.279 --> 02:14:42.109
ECI or ECC is the closest but we certainly are going to be

02:14:42.109 --> 02:14:46.760
looking hopefully at creating or amending the EC to be more

02:14:47.520 --> 02:14:50.039
Towards what the business innovation is calling for in the

02:14:50.039 --> 02:14:51.359
data plan 2030

02:14:56.960 --> 02:14:58.960
Commissioner so

02:15:00.279 --> 02:15:02.279
Commissioner else thank you chair

02:15:03.119 --> 02:15:06.649
To Commissioner Beck's comment about the the extension this

02:15:06.649 --> 02:15:10.079
L meeting Bart hold is it that's a text-dot deal

02:15:10.119 --> 02:15:13.829
Yes, do we have any kind of timeline on that? I don't I don

02:15:13.829 --> 02:15:15.760
't have a timeline on that and oh

02:15:17.279 --> 02:15:19.640
Earl's here. I'll call Earl Escobar

02:15:26.479 --> 02:15:29.369
The realignment of Bart hold road with with Elm Street or

02:15:29.369 --> 02:15:33.840
77 across the street

02:15:33.840 --> 02:15:36.359
It's actually going to be done as part of the love Chuck

02:15:36.359 --> 02:15:37.920
stock development to the south

02:15:38.840 --> 02:15:40.840
I believe PNC approved that plot

02:15:41.600 --> 02:15:43.960
A couple sessions ago, so they're going through the

02:15:43.960 --> 02:15:45.680
contract process right now

02:15:46.199 --> 02:15:48.079
Followed by a pre-construction meeting then they'll

02:15:48.079 --> 02:15:49.199
commence construction

02:15:52.600 --> 02:15:54.600
Commissioner Ashworth

02:15:55.640 --> 02:15:57.640
Thank you

02:15:58.479 --> 02:16:00.479
So I

02:16:01.640 --> 02:16:03.640
Started to think listening to

02:16:05.119 --> 02:16:07.119
Commissioner Roselle's points and

02:16:09.680 --> 02:16:11.680
Starting the shift, but then I

02:16:12.079 --> 02:16:15.199
My question I guess is not necessary for staff, but I'd

02:16:15.199 --> 02:16:17.479
love to see what you think Commissioner Taylor on be

02:16:17.479 --> 02:16:17.960
familiar

02:16:18.479 --> 02:16:21.760
114 just by by proxy just you can see 114

02:16:22.439 --> 02:16:24.319
35w area

02:16:24.319 --> 02:16:28.050
So you have that truck that I would is that that's behind a

02:16:28.050 --> 02:16:28.680
quick trip

02:16:28.680 --> 02:16:31.399
There's like the little truck thing there, but then they

02:16:31.399 --> 02:16:33.719
have the apartments around it. You have some other

02:16:33.719 --> 02:16:35.079
corporate environments

02:16:35.079 --> 02:16:37.260
You have the farmers coffee there. That's kind of the

02:16:37.260 --> 02:16:38.079
environment. I'm

02:16:39.000 --> 02:16:42.100
Starting to see take place here, and so I'm just one. I'm

02:16:42.100 --> 02:16:42.860
just thinking out loud

02:16:42.860 --> 02:16:45.379
I'd love to get your thoughts on how you see this area

02:16:45.379 --> 02:16:47.809
developing because I did not think about the employment

02:16:47.809 --> 02:16:48.159
center

02:16:48.600 --> 02:16:51.819
Aspect of it. It's just always been the area where there's

02:16:51.819 --> 02:16:53.479
truck stops in the boot store there

02:16:53.479 --> 02:16:56.680
So as it's growing I'd love to see kind of get more

02:16:57.559 --> 02:17:00.790
How you see that going to make sure it just helps me

02:17:00.790 --> 02:17:02.020
process

02:17:03.600 --> 02:17:05.040
Commissioner time

02:17:05.040 --> 02:17:06.920
Thank You chair, so

02:17:06.920 --> 02:17:09.760
So I think the 114 area is a good example

02:17:10.479 --> 02:17:15.069
This the truck wash for example could be an RCC and or RCC

02:17:15.069 --> 02:17:15.260
D

02:17:15.959 --> 02:17:19.940
so you know that this use doesn't have to have the ec see

02:17:19.940 --> 02:17:21.319
and

02:17:22.920 --> 02:17:26.479
with ec I and ec see you you can get things like

02:17:27.200 --> 02:17:31.069
Heavy well ec see I you can get ec I you can get heavy

02:17:31.069 --> 02:17:34.440
industry like you know smelters or

02:17:34.879 --> 02:17:36.879
you know like

02:17:36.879 --> 02:17:40.719
things like that and and you don't want to have your office

02:17:40.719 --> 02:17:43.819
park next to a metal smelter or a

02:17:44.399 --> 02:17:46.399
hazardous waste disposal facility or

02:17:47.479 --> 02:17:50.700
You know something along those lines, so so I worry if we

02:17:50.700 --> 02:17:52.879
go ec the ec category is

02:17:53.920 --> 02:17:59.239
one or two of those heavier uses will drive away

02:18:00.239 --> 02:18:03.120
You know kind of office uses lighter uses

02:18:03.920 --> 02:18:07.079
So if we zone it where the heaviest intensity use is an

02:18:07.079 --> 02:18:08.040
office park

02:18:08.520 --> 02:18:11.360
You know the the fast food restaurant isn't going to drive

02:18:11.360 --> 02:18:13.920
away an office park or a little strip center

02:18:13.920 --> 02:18:16.280
Is it going to drive away an office park, but a metal pl

02:18:16.280 --> 02:18:19.159
ater or something like that might drive away an office park?

02:18:21.200 --> 02:18:24.299
I just want to add one clarification heavy manufacturing is

02:18:24.299 --> 02:18:25.879
not permitted in ec see your ec I

02:18:26.799 --> 02:18:28.799
Not ec. I just unlike manufacturing

02:18:29.520 --> 02:18:32.040
So I just want to clarify. I'm sorry. What's I thought it

02:18:32.040 --> 02:18:34.379
you see a thought you see I see I see G

02:18:34.379 --> 02:18:37.139
Yes, okay, sorry I misspoke about that, but it does it does

02:18:37.139 --> 02:18:40.520
permit life manufacturing. It does permit warehouse uses so

02:18:44.680 --> 02:18:46.680
Any other questions for staff

02:18:49.000 --> 02:18:51.000
Thank you

02:18:52.200 --> 02:18:57.819
This is a public hearing and I do have one card in support

02:18:57.819 --> 02:19:00.440
Dana Morse you would

02:19:03.600 --> 02:19:05.840
And did was to speak feel please give your name and address

02:19:05.840 --> 02:19:08.600
and you'll have four minutes

02:19:09.879 --> 02:19:11.879
My name is Dana Morse. I'm with Blue Beacon

02:19:12.719 --> 02:19:14.719
500 Grays Boulevard, Salina, Kansas

02:19:15.319 --> 02:19:17.319
Which is the home office for Blue Beacon?

02:19:21.200 --> 02:19:23.510
Think the main thing I want to talk about is if we're

02:19:23.510 --> 02:19:25.540
fortunate enough to get approval tonight

02:19:26.719 --> 02:19:31.559
In the ec see I guess to warn you we're going to come back

02:19:32.719 --> 02:19:35.059
When we started looking at this piece

02:19:35.840 --> 02:19:39.159
And we had to buy 21 acres so the piece to the

02:19:40.159 --> 02:19:42.040
to the west

02:19:42.040 --> 02:19:44.639
That doesn't have a car. Just kind of greenish color

02:19:45.280 --> 02:19:47.280
Is part of our contract?

02:19:47.879 --> 02:19:52.100
We had hoped to exit straight out onto Bartolt Road

02:19:52.639 --> 02:19:55.799
this is before we realized that there's a realignment and

02:19:56.760 --> 02:19:58.520
between our track

02:19:58.520 --> 02:20:02.840
Old Bartolt Road and new Bartolt Road is a no-man's land

02:20:03.559 --> 02:20:05.639
That we can't get on to

02:20:07.319 --> 02:20:10.399
Bartolt hold Bartolt Road realigned

02:20:11.280 --> 02:20:14.819
Another problem with that is in the preliminary designs

02:20:14.819 --> 02:20:16.500
that we're seeing from the city

02:20:17.040 --> 02:20:19.040
and from TxDOT

02:20:19.799 --> 02:20:22.430
There's a raised media in there so our trucks couldn't

02:20:22.430 --> 02:20:26.600
across that as they exit anyway, so we're going to have to

02:20:28.479 --> 02:20:32.950
Take our entrance and exit to the west to line up with the

02:20:32.950 --> 02:20:34.879
loves entrance and exit

02:20:35.479 --> 02:20:38.809
We understand what staffs telling us about that and I think

02:20:38.809 --> 02:20:42.200
for us and they in the long run that will be good for us

02:20:42.200 --> 02:20:43.680
And good for them

02:20:43.680 --> 02:20:46.000
It'll get us all the way from

02:20:47.040 --> 02:20:49.799
Far enough east that none of us are trying to exit on that

02:20:49.799 --> 02:20:53.440
curve if you can kind of remember how Bartolt Road is going

02:20:53.440 --> 02:20:53.899
to realign

02:20:55.000 --> 02:20:56.440
Excuse me

02:20:56.440 --> 02:21:00.319
So we've made application for annexation

02:21:01.200 --> 02:21:06.040
Of that entire 16 acres remaining 16 acres and for zoning

02:21:07.040 --> 02:21:11.739
To the to the ECC now honestly we don't care what we're z

02:21:11.739 --> 02:21:11.920
oned

02:21:12.559 --> 02:21:15.659
Letter wise we just want to zone that permits the truck

02:21:15.659 --> 02:21:15.879
wash

02:21:18.040 --> 02:21:20.040
We don't really want to back up either

02:21:20.680 --> 02:21:23.500
Obviously, I have some contractual time that I need to be

02:21:23.500 --> 02:21:26.799
careful of here, so but I want you to understand that

02:21:27.920 --> 02:21:30.309
If we're approved tonight, we're planning on coming back

02:21:30.309 --> 02:21:32.959
actually we have to to make this thing work

02:21:34.600 --> 02:21:36.659
There are a few questions about us that I want to want to

02:21:36.659 --> 02:21:40.370
just address real quickly, and I realize this is only

02:21:40.370 --> 02:21:41.000
matter

02:21:42.239 --> 02:21:45.340
Not really about our land use, but we don't mind certainly

02:21:45.340 --> 02:21:47.159
sharing what we do and how we do things

02:21:48.360 --> 02:21:50.360
We've been at this since 1972

02:21:51.399 --> 02:21:54.139
116 truck horses across the country so we we kind of know

02:21:54.139 --> 02:21:55.040
how to do this

02:21:57.239 --> 02:21:59.239
One thing about our traffic

02:22:01.680 --> 02:22:03.680
Wait oh wait see if I

02:22:08.120 --> 02:22:10.940
We're just clear fine since you've stopped I've made an

02:22:10.940 --> 02:22:13.479
error you are the applicant and you get ten minutes

02:22:13.479 --> 02:22:17.049
I didn't know from your card. Okay, the applicant I

02:22:17.049 --> 02:22:18.280
apologize so you get

02:22:25.799 --> 02:22:29.200
I'll slow down a little bit then our traffic is a meter

02:22:29.200 --> 02:22:29.979
traffic

02:22:30.399 --> 02:22:33.260
We're gonna start out with a double bay truck wash we can

02:22:33.260 --> 02:22:35.920
turn out a truck every 15 minutes out of those days

02:22:35.920 --> 02:22:38.559
So that's eight trucks an hour coming out of that wash

02:22:40.399 --> 02:22:45.579
Maximum 12 because on our dream plan we show three days,

02:22:45.579 --> 02:22:46.120
okay

02:22:47.159 --> 02:22:50.530
Our wastewater we've checked with the city of Denton we

02:22:50.530 --> 02:22:54.959
recycle 30 35 percent of our water our wastewater and

02:22:57.680 --> 02:22:58.639
Understanding that we're gonna have to pay some for water

02:22:58.639 --> 02:23:01.559
and sewer lines out there, but nonetheless

02:23:03.159 --> 02:23:06.260
We've not found any indication in the city that we're going

02:23:06.260 --> 02:23:09.680
to cause any problems in their plant for our discharge

02:23:10.239 --> 02:23:14.120
As far as metals oil and grease whatever we may discharge

02:23:20.000 --> 02:23:23.239
We employ about 50 to 60 people were 24/7

02:23:23.920 --> 02:23:27.020
And we'll have about 50 or 60 people only want bring in one

02:23:27.020 --> 02:23:29.280
outside person and that'll be the manager

02:23:32.079 --> 02:23:34.079
When you talk about compatibility of uses

02:23:34.559 --> 02:23:37.079
When I was making my notes back there the one that came to

02:23:37.079 --> 02:23:39.719
mind is I did a job for the company about

02:23:39.959 --> 02:23:42.879
three years ago in Carlisle, Pennsylvania, and we built

02:23:42.879 --> 02:23:46.079
next to the country club in the swimming pool and

02:23:47.840 --> 02:23:50.600
We welcome anybody to call the country club and see what we

02:23:50.600 --> 02:23:51.239
are for neighbors

02:23:52.639 --> 02:23:56.200
You got six more minutes, okay, well, I don't think I

02:23:57.200 --> 02:24:00.059
Don't think I can ramble six more minutes and maybe maybe

02:24:00.059 --> 02:24:02.920
to tell you what a long drive it is from Kansas down here

02:24:05.079 --> 02:24:07.770
Unless you have questions to me, that's all I have do you

02:24:07.770 --> 02:24:08.760
have a question for you?

02:24:09.319 --> 02:24:11.639
Commissioner back. Thanks chair. Thank you. Mr

02:24:11.639 --> 02:24:13.879
More coming down speaking to us and you did answer my

02:24:13.879 --> 02:24:15.879
biggest question concerning wastewater

02:24:15.879 --> 02:24:17.879
So we don't have to worry about

02:24:18.360 --> 02:24:20.620
Oklahoma Roadkill everything getting Washington to our

02:24:20.620 --> 02:24:21.319
drainage system

02:24:21.840 --> 02:24:24.389
Just curious though. You said you were gonna have three b

02:24:24.389 --> 02:24:24.600
ays

02:24:25.639 --> 02:24:28.979
There's a potential of three. Okay. Yes roughly how much

02:24:28.979 --> 02:24:31.079
water does each wash?

02:24:31.079 --> 02:24:34.180
You do you know what the volume is? I can't tell you on a

02:24:34.180 --> 02:24:34.479
triple

02:24:34.479 --> 02:24:37.040
I can tell you on a double bay a busy double bay, which we

02:24:37.040 --> 02:24:38.239
think this is going to be

02:24:40.399 --> 02:24:43.760
It'll be in the top 20 of ours will take about

02:24:44.440 --> 02:24:47.799
18 to 20 thousand gallons a day now is this where they're

02:24:47.799 --> 02:24:49.940
sitting in the truck. They're not getting out with

02:24:51.520 --> 02:24:54.139
Good point. Let me tell you how we do this. Okay, my driver

02:24:54.139 --> 02:24:57.840
will circle around in a queuing lane and he'll pull in

02:24:58.360 --> 02:25:00.540
He has to get out of the truck. We won't let him sit in a

02:25:00.540 --> 02:25:02.719
truck. He goes in the office pays his bill

02:25:03.799 --> 02:25:05.799
Buys a soda goes to toilet, whatever he does

02:25:06.639 --> 02:25:09.909
In that 15 minutes, we have five to six guys washing that

02:25:09.909 --> 02:25:12.079
truck with high-pressure wands

02:25:13.440 --> 02:25:15.239
We don't wash

02:25:15.239 --> 02:25:18.280
Wash out tankers. We will not touch the inside of a tanker

02:25:19.319 --> 02:25:22.420
We'll wash the inside of a box trailer if it hasn't been

02:25:22.420 --> 02:25:22.959
placarded

02:25:24.040 --> 02:25:26.040
the load before

02:25:29.399 --> 02:25:31.600
That's about it we wash the outside of those trucks

02:25:31.600 --> 02:25:35.200
majority of them are tractor-trailer washes

02:25:37.719 --> 02:25:39.719
But they are we are staffed

02:25:40.159 --> 02:25:42.479
We call the driver back out. He gets in starts it up and

02:25:42.479 --> 02:25:44.360
leaves. We don't want to be parking

02:25:44.360 --> 02:25:47.299
We don't do any other business. There are three vending

02:25:47.299 --> 02:25:50.440
machines in the office and I would guess 90% of that

02:25:50.440 --> 02:25:51.680
business is employees

02:25:52.159 --> 02:25:54.159
Grabbing a snack when they get a break

02:25:56.479 --> 02:25:58.479
Okay, thank you miss

02:25:59.760 --> 02:26:01.760
No questions for the applicant

02:26:04.920 --> 02:26:08.020
Thank you, sir, appreciate your presentation. Thank you.

02:26:08.020 --> 02:26:09.719
This is a public hearing

02:26:09.840 --> 02:26:12.360
Is there anyone else who would like to speak on this item?

02:26:12.360 --> 02:26:13.819
Please come forward at this time

02:26:14.360 --> 02:26:16.360
I

02:26:18.559 --> 02:26:22.260
Sing none close the public hearing on this item and open

02:26:22.260 --> 02:26:26.239
the dais for a motion or discussion commissioner Ozone

02:26:27.079 --> 02:26:29.079
Thank you chair. I motion to approve

02:26:30.479 --> 02:26:32.479
agenda items Z

02:26:32.840 --> 02:26:35.180
1600 18a for approval

02:26:36.959 --> 02:26:38.959
Commissioner Beck second that motion

02:26:41.520 --> 02:26:43.520
Have a first and a second for approval

02:26:44.399 --> 02:26:46.399
any discussion

02:26:50.799 --> 02:26:52.799
Seeing none I'll call for a vote on the board

02:27:01.280 --> 02:27:03.280
Motion carries seven to zero

02:27:05.600 --> 02:27:09.290
Will move us to item C and I'm going to open the public

02:27:09.290 --> 02:27:12.040
hearing for DCA 17

02:27:12.520 --> 02:27:17.049
- zero zero zero four and looks like Ron McGee to will make

02:27:17.049 --> 02:27:18.120
the presentation

02:27:19.600 --> 02:27:21.600
Thank you chair members of the Commission

02:27:27.479 --> 02:27:31.010
Before I begin with the former president just a quick

02:27:31.010 --> 02:27:32.760
background of why we're here today

02:27:34.159 --> 02:27:36.920
Several years, you know through the development review

02:27:37.479 --> 02:27:40.930
Process we we see a lot of developments that come in that

02:27:40.930 --> 02:27:43.500
are in the ETJ and the reason they come in

02:27:43.840 --> 02:27:46.600
Is because we have an interlocal agreement with the county

02:27:46.600 --> 02:27:49.879
to plot properties that are in the ETJ

02:27:50.040 --> 02:27:53.139
We the city did not have any jurisdiction as far as zoning

02:27:53.139 --> 02:27:53.799
or land use

02:27:54.360 --> 02:27:57.440
so with that staff has always

02:27:58.040 --> 02:28:00.680
Questioned if property should be annexed or not

02:28:01.479 --> 02:28:05.719
We had an excision criteria in the code of ordinances

02:28:05.920 --> 02:28:09.549
But back in 2002 when the DDC the development code was

02:28:09.549 --> 02:28:13.700
created those annexation criteria were meant to be repealed

02:28:14.079 --> 02:28:16.079
however, when they were

02:28:16.879 --> 02:28:19.079
created when the DDC was created a

02:28:19.959 --> 02:28:23.360
Ordinance that was with it did not expressly repealed those

02:28:23.360 --> 02:28:25.000
annexation criteria

02:28:25.879 --> 02:28:27.959
so to clear up the

02:28:28.959 --> 02:28:31.879
Question or where the annexation our criteria are we are

02:28:31.879 --> 02:28:33.920
proposing to

02:28:34.600 --> 02:28:38.020
Repeal those sections in den code of ordinances and apply

02:28:38.020 --> 02:28:41.319
those annexation criteria not forbidden

02:28:41.319 --> 02:28:44.079
There are some changes to the criteria into the den

02:28:44.079 --> 02:28:45.239
development code

02:28:45.239 --> 02:28:49.379
So not only the staff know what the criteria are and what

02:28:49.379 --> 02:28:50.639
the procedure is

02:28:51.680 --> 02:28:55.989
So will the applicants and property owners that are looking

02:28:55.989 --> 02:28:58.000
to develop in the ETJ

02:29:00.600 --> 02:29:03.950
The sections that were repealing refer to annexation

02:29:03.950 --> 02:29:07.719
policies procedures and fees and as stated earlier

02:29:07.719 --> 02:29:13.219
They do not are not in the DDC and again back in 2002. They

02:29:13.219 --> 02:29:13.399
weren't

02:29:14.319 --> 02:29:16.319
expressly repealed

02:29:16.920 --> 02:29:20.360
What we're proposing is to create those annexation criteria

02:29:20.360 --> 02:29:24.280
as part of sub chapter 35 3 procedures under this section

02:29:24.280 --> 02:29:27.079
Which will be a new section referred to as the prefery

02:29:27.479 --> 02:29:31.190
Preferry for referee development annexation criteria that

02:29:31.190 --> 02:29:34.469
is and we will have criteria as to when properties will be

02:29:34.469 --> 02:29:35.200
annexed as

02:29:35.680 --> 02:29:37.680
Well as a staff review

02:29:37.879 --> 02:29:41.399
threshold requirements procedures that will

02:29:42.239 --> 02:29:44.239
outline when

02:29:44.520 --> 02:29:46.520
annexations will move forward to

02:29:46.520 --> 02:29:50.340
City Council most of those procedures are covered under our

02:29:50.340 --> 02:29:51.959
Texas local government code

02:29:53.040 --> 02:29:56.860
We the city can be more restrictive. However, we follow

02:29:57.520 --> 02:30:00.350
the state local government code if nothing is in our den

02:30:00.350 --> 02:30:01.559
development code

02:30:01.559 --> 02:30:05.719
So that's almost as of a default in that reference

02:30:07.079 --> 02:30:12.030
with that staff recommends approval of the amendment and

02:30:12.030 --> 02:30:13.399
the repeal of

02:30:13.920 --> 02:30:15.479
the sections

02:30:15.479 --> 02:30:16.879
reference here

02:30:16.879 --> 02:30:20.659
for the reasons of clarifying when property should be annex

02:30:20.659 --> 02:30:21.479
ed as well as

02:30:21.920 --> 02:30:24.600
Creating a more efficient procedure for annexation

02:30:25.159 --> 02:30:28.090
per state local government code and again as this

02:30:28.090 --> 02:30:30.700
requirement or this annexation criteria is

02:30:31.159 --> 02:30:34.069
Consistent with our damn plan 2030 that concludes my

02:30:34.069 --> 02:30:36.920
presentation. I'll be happy to answer any questions

02:30:40.159 --> 02:30:42.600
Commissioner else. Thank you chair. Hi Ron

02:30:43.280 --> 02:30:46.600
Okay, so as I'm trying to wrap my head around this there

02:30:46.600 --> 02:30:47.559
since there was confusion

02:30:47.920 --> 02:30:50.459
That we're not really just taking it out of ordinances and

02:30:50.459 --> 02:30:53.420
putting it into the development cone. It's kind of been re

02:30:53.420 --> 02:30:53.799
written

02:30:54.280 --> 02:30:58.639
So can you in a nutshell tell me since it seems proced

02:30:58.639 --> 02:30:59.440
urally?

02:31:00.040 --> 02:31:03.159
There's a lot less involved in the new rewrite

02:31:04.120 --> 02:31:06.120
What is different?

02:31:06.639 --> 02:31:10.069
With this new thing going forward that we I understand that

02:31:10.069 --> 02:31:12.799
this ordinance that we're repealing was already repealed

02:31:12.799 --> 02:31:14.059
and you're really not following it

02:31:14.059 --> 02:31:17.799
Anyway, so tell me the way we are currently right now doing

02:31:17.799 --> 02:31:20.319
this and what this is going to

02:31:21.159 --> 02:31:23.159
specifically change as

02:31:24.760 --> 02:31:26.760
We discuss in the work session

02:31:27.520 --> 02:31:30.120
Because of the annexation criteria back

02:31:31.040 --> 02:31:35.979
Prior to 2002 this was in place. However, because it was

02:31:35.979 --> 02:31:37.360
never repealed or we

02:31:38.120 --> 02:31:40.809
Implicitly consider it to be repealed. We didn't

02:31:40.809 --> 02:31:42.120
technically have

02:31:42.760 --> 02:31:45.469
Criteria so there's a little confusion there. So we

02:31:45.469 --> 02:31:48.829
followed from then on the Texas local government code

02:31:48.829 --> 02:31:49.799
requirements

02:31:49.920 --> 02:31:51.920
Which is basically

02:31:52.200 --> 02:31:54.799
Establishing public hearing dates having those public

02:31:54.799 --> 02:31:57.959
hearings and then readings first and second readings that

02:31:58.600 --> 02:32:02.159
Ultimately adopts the annexation of said property the as I

02:32:02.159 --> 02:32:05.319
compared the two and as we discussed

02:32:05.840 --> 02:32:07.840
in work session

02:32:07.840 --> 02:32:10.879
The main thing that I saw different between the two

02:32:11.840 --> 02:32:15.000
procedures not the criteria but the procedures is that the

02:32:15.840 --> 02:32:17.840
prior procedures or

02:32:17.879 --> 02:32:19.239
criteria

02:32:19.239 --> 02:32:20.280
section

02:32:20.280 --> 02:32:22.579
Reference bringing it forward to the planning zoning

02:32:22.579 --> 02:32:23.159
Commission

02:32:23.920 --> 02:32:27.760
That is not what is being proposed with the new procedures

02:32:27.760 --> 02:32:30.440
as one difference

02:32:31.079 --> 02:32:33.540
the other thing is the

02:32:34.719 --> 02:32:37.159
procedures in the old section does

02:32:37.920 --> 02:32:41.760
go step by step as far as when it goes to City Council what

02:32:41.760 --> 02:32:42.680
they do and

02:32:44.120 --> 02:32:47.440
When a formal annexation proceeding can move forward

02:32:48.079 --> 02:32:50.680
That I can tell you is not

02:32:51.559 --> 02:32:55.360
Is in the new code or in the new procedure section. However

02:32:55.360 --> 02:32:59.000
, that is covered under a

02:32:59.840 --> 02:33:02.940
Texas local government code procedure, which we follow so

02:33:02.940 --> 02:33:05.440
it may not be in the proposed

02:33:06.200 --> 02:33:08.899
Procedures, but again, it's covered under Texas local

02:33:08.899 --> 02:33:10.000
government code

02:33:19.079 --> 02:33:21.079
Okay, thank you. Thank you. Thank you

02:33:22.239 --> 02:33:24.120
Okay, so

02:33:24.120 --> 02:33:27.950
When it says here that staff will determine does staff now

02:33:27.950 --> 02:33:30.360
determine make that determination

02:33:31.200 --> 02:33:35.510
That something will be annexed either voluntarily or invol

02:33:35.510 --> 02:33:40.479
untary. Yes. We we just prepare an analysis of the

02:33:41.920 --> 02:33:44.639
capacity of our public utilities our

02:33:45.120 --> 02:33:48.760
Land uses and we bring that forward to City Council for

02:33:48.760 --> 02:33:51.620
their direction seeking their direction to move forward

02:33:51.620 --> 02:33:53.000
with an annexation or not

02:33:53.000 --> 02:33:56.239
So yes, we do determine and bring it forward to City

02:33:56.239 --> 02:33:59.440
Council for ultimately their decision on the annexation

02:34:00.040 --> 02:34:02.940
That's what you're doing now, correct, but that's not what

02:34:02.940 --> 02:34:04.479
you're gonna do with this, right?

02:34:04.879 --> 02:34:08.100
No, you will have already made the decision. We still bring

02:34:08.100 --> 02:34:08.799
forward a

02:34:10.159 --> 02:34:12.159
recommendation to the City Council

02:34:13.479 --> 02:34:16.420
It is still it is still City Council's discretion to move

02:34:16.420 --> 02:34:18.299
forward with an annexation or not

02:34:21.559 --> 02:34:24.659
Because I mean the way I read this is I read it as the

02:34:24.659 --> 02:34:28.239
staff is determining that annexation will happen

02:34:28.920 --> 02:34:33.059
then you'll go to the property owner and and request them

02:34:33.059 --> 02:34:33.399
to

02:34:34.319 --> 02:34:37.200
Request to be annexed and within 10 days if they do not

02:34:37.200 --> 02:34:39.879
then you will impose involuntary annexation

02:34:40.799 --> 02:34:45.750
And staff right so I don't see any I see only City Council

02:34:45.750 --> 02:34:46.360
coming up

02:34:46.479 --> 02:34:49.000
When there's just a public hearing to have on what you've

02:34:49.000 --> 02:34:50.319
already decided is

02:34:50.760 --> 02:34:54.520
Prior to public hearing and that's that's I appreciate the

02:34:54.520 --> 02:34:57.020
the comment prior to public hearings

02:34:57.440 --> 02:34:59.559
We present to the City Council

02:35:00.600 --> 02:35:05.739
the proposed annexation and ask for them to prove public

02:35:05.739 --> 02:35:06.959
hearing dates and

02:35:07.280 --> 02:35:10.379
It is at that time they will determine if we need if they

02:35:10.379 --> 02:35:13.479
should we should go forward with those public hearings

02:35:15.399 --> 02:35:19.719
It is not and I agree it is not clearly stated in the new

02:35:20.159 --> 02:35:22.479
right because I mean my issue just with the way it's

02:35:22.479 --> 02:35:23.559
written is it just

02:35:24.719 --> 02:35:27.200
And and I mean I love staff

02:35:27.200 --> 02:35:30.010
I this is not to go against staff and how hard you work and

02:35:30.010 --> 02:35:31.639
and the knowledge that you have

02:35:31.799 --> 02:35:33.940
I'm just trying to make sure that

02:35:34.879 --> 02:35:38.049
You know we still have the checks and balances and City

02:35:38.049 --> 02:35:41.500
Council's there for a reason to represent that you know

02:35:42.120 --> 02:35:44.120
the city as a whole

02:35:44.159 --> 02:35:47.750
I'm just wondering if it if it needs to be in procedure

02:35:47.750 --> 02:35:51.200
because nowhere in this what would this

02:35:51.760 --> 02:35:55.750
Rewrite in this ordinance. Well is City Council mentioned

02:35:55.750 --> 02:35:58.840
what what I what we what I can do is work with our

02:35:59.440 --> 02:36:01.440
Jennifer to Curtis and add

02:36:01.760 --> 02:36:03.760
under procedures those

02:36:04.280 --> 02:36:07.379
Checks and balances that you're referring to and present

02:36:07.379 --> 02:36:08.540
that to City Council

02:36:15.760 --> 02:36:17.760
Commissioner so thank you

02:36:18.440 --> 02:36:21.280
To be clear. This is really more what I would consider

02:36:21.280 --> 02:36:24.090
housecleaning is that right since this is the procedure

02:36:24.090 --> 02:36:25.239
that y'all follow now

02:36:25.719 --> 02:36:27.920
That you just didn't codify it

02:36:28.840 --> 02:36:30.440
back whenever

02:36:30.440 --> 02:36:34.149
The changes made it's a little bit a little bit where we

02:36:34.149 --> 02:36:34.600
had it

02:36:34.840 --> 02:36:38.100
It was never brought forward with the den development code

02:36:38.100 --> 02:36:41.200
So there was a question or confusion as to what do we have

02:36:41.200 --> 02:36:42.219
what do we don't have?

02:36:42.559 --> 02:36:47.270
We recognize that the old or the prior annexation criteria

02:36:47.270 --> 02:36:50.020
was worth bringing forward. So that's the criteria manual

02:36:50.020 --> 02:36:52.959
I'm sorry the criteria doesn't really change. We've kind of

02:36:52.959 --> 02:36:53.559
updated the

02:36:54.079 --> 02:36:57.790
procedures to reflect a little bit more on what we're doing

02:36:57.790 --> 02:36:58.159
today

02:36:58.319 --> 02:37:01.950
We've certainly cut it down a little bit because of some

02:37:01.950 --> 02:37:05.159
legislation that we're having with the the Texas

02:37:06.600 --> 02:37:09.639
You know folks so we are trying to be as

02:37:10.280 --> 02:37:13.649
General, but I do understand the concern of how it goes to

02:37:13.649 --> 02:37:16.879
City Council and making sure that they've been given the

02:37:16.879 --> 02:37:18.100
proper notification

02:37:18.100 --> 02:37:20.100
I guess if I mean I

02:37:20.719 --> 02:37:24.139
think one of the big differences is that now this allows

02:37:24.139 --> 02:37:25.120
for a

02:37:25.440 --> 02:37:28.049
Moment where they could voluntarily annex was which is a

02:37:28.049 --> 02:37:30.440
shorter procedure. So they won't have to go through

02:37:31.239 --> 02:37:34.450
The dual public hearing process and the two readings that

02:37:34.450 --> 02:37:37.280
are outlined in the statute

02:37:37.319 --> 02:37:40.219
So the voluntary petition is very important for some

02:37:40.219 --> 02:37:41.559
property owners

02:37:41.559 --> 02:37:44.899
So it allows that time and it also allows us time to send

02:37:44.899 --> 02:37:46.799
out an intent to annex letter

02:37:46.799 --> 02:37:50.280
Which starts the clock ticking on some of those scheduling?

02:37:50.920 --> 02:37:54.020
Issues that are outlined in the statute and so that's

02:37:54.020 --> 02:37:57.579
something that we didn't have before that this will do for

02:37:57.579 --> 02:37:57.760
us

02:37:57.760 --> 02:38:01.600
So not only does it repeal and replace so that everything's

02:38:01.600 --> 02:38:04.840
efficient and just kind of put back to what we're doing now

02:38:05.040 --> 02:38:07.879
But it allows this procedure that we didn't have before

02:38:08.799 --> 02:38:10.799
and like one says the

02:38:11.159 --> 02:38:14.260
The calling the public hearing and all of that is in the

02:38:14.260 --> 02:38:15.239
statute itself

02:38:15.520 --> 02:38:19.489
So I don't know to what extent we really need to put it in

02:38:19.489 --> 02:38:19.959
here

02:38:20.920 --> 02:38:24.020
Unless the the Commission feels like it needs to be more

02:38:24.020 --> 02:38:24.840
instructive

02:38:27.120 --> 02:38:28.139
Because it's not something that the citizens will be

02:38:28.139 --> 02:38:31.360
following it's something staff will be following

02:38:31.959 --> 02:38:35.059
So this is everything they need to know. I I guess is the

02:38:35.059 --> 02:38:37.319
way to put it. I don't know if that's helpful

02:38:44.440 --> 02:38:46.440
More questions for staff

02:38:50.120 --> 02:38:52.120
Thank you Ron

02:38:53.799 --> 02:38:57.030
And this is a public hearing if there was anyone who would

02:38:57.030 --> 02:38:59.420
like to speak on this item, please come forward at this

02:38:59.420 --> 02:38:59.739
time

02:39:03.239 --> 02:39:05.260
Seeing none we will close the public hearing and we will

02:39:05.260 --> 02:39:09.440
open the floor for discussion or emotion

02:39:16.200 --> 02:39:18.200
Commissioner Hutz with

02:39:19.239 --> 02:39:21.239
noting

02:39:22.959 --> 02:39:26.040
Commissioner Ellis's concerns and

02:39:28.079 --> 02:39:31.790
Legal representations explanation I'm going to move for

02:39:31.790 --> 02:39:37.159
approval as written because I think it is something that

02:39:41.000 --> 02:39:44.969
Is worded as needed to for those that participate in it day

02:39:44.969 --> 02:39:48.600
in day out enough to give me peace with it

02:39:49.840 --> 02:39:51.840
I

02:39:52.120 --> 02:39:56.280
Second we have first and a second for approval

02:39:58.120 --> 02:40:00.120
Commissioner Ellis

02:40:00.959 --> 02:40:04.559
Okay, and I assume what we're voting on is is the draft

02:40:05.920 --> 02:40:07.719
Recommendation to City Council with the draft as is and if

02:40:07.719 --> 02:40:10.879
you have requests and want to make a friendly amendment,

02:40:10.879 --> 02:40:12.280
you're welcome to do so

02:40:13.399 --> 02:40:17.319
Yeah, I think I have support to make a friendly amendment.

02:40:17.319 --> 02:40:20.079
So I think I'm just I just can't support it

02:40:20.079 --> 02:40:22.079
I think there's too many holes in it as written

02:40:26.440 --> 02:40:28.440
Any other just Commissioner Tyler

02:40:33.719 --> 02:40:37.440
Thank You chair so so this

02:40:39.719 --> 02:40:41.979
Have been trying to figure out exactly what we've been

02:40:41.979 --> 02:40:43.799
doing in the past and so I'm going through

02:40:44.639 --> 02:40:47.440
previous years City Council minutes over here and

02:40:49.440 --> 02:40:50.760
I

02:40:50.760 --> 02:40:53.340
Lie I prefer when things are spelled out like I don't

02:40:53.340 --> 02:40:54.059
really like that

02:40:54.639 --> 02:40:57.440
Voluntary and like the voluntary annexation process is is

02:40:57.440 --> 02:40:59.559
not really mentioned in the new ordinance

02:40:59.799 --> 02:41:03.399
Obviously it exists and it defaults to I guess state law

02:41:03.399 --> 02:41:05.840
which allows the the fast track on voluntary

02:41:05.959 --> 02:41:07.959
But that we don't even it's not a criteria

02:41:08.760 --> 02:41:12.389
It's not you know, it's not in the list of reasons to

02:41:12.389 --> 02:41:14.000
approve or recommend

02:41:15.520 --> 02:41:17.120
And

02:41:17.120 --> 02:41:19.219
Then I was trying to figure out whether or not we're

02:41:19.219 --> 02:41:22.520
already following the old 34 section 34 or

02:41:23.760 --> 02:41:26.520
Or we have you know, have we been acting like it's repealed

02:41:26.520 --> 02:41:28.709
and then we realized we haven't completely technically repe

02:41:28.709 --> 02:41:29.040
aled it

02:41:29.159 --> 02:41:31.719
And it does look like I found I found these annexations

02:41:31.719 --> 02:41:35.280
from 2015 and it did not go to planning and zoning

02:41:35.479 --> 02:41:39.399
It followed the state law process and I'm guessing going

02:41:39.399 --> 02:41:41.319
back further like the 2010

02:41:41.760 --> 02:41:43.649
Annexations involuntary annexations would have been done

02:41:43.649 --> 02:41:45.040
the same way. So

02:41:46.760 --> 02:41:48.760
So it isn't necessarily the cleanest

02:41:49.799 --> 02:41:52.940
Thing it kind of falls back to state law. This is one page

02:41:52.940 --> 02:41:56.120
and state law is probably a chapter or two

02:41:57.239 --> 02:42:00.340
But it is consistent and state law changes so much and has

02:42:00.340 --> 02:42:01.799
so many requirements in this area

02:42:02.120 --> 02:42:05.500
that I I think it is a good idea to just default to state

02:42:05.500 --> 02:42:06.319
law so that

02:42:06.680 --> 02:42:10.040
If we require 30 days and they require a minimum of 45 days

02:42:10.040 --> 02:42:11.799
and we're in a bind where you know

02:42:11.799 --> 02:42:14.709
Our ordinance has to be ignored because it you know

02:42:14.709 --> 02:42:16.000
conflicts or so forth

02:42:16.959 --> 02:42:20.280
Anyway, so I'm as I'm as I'm talking talking a lot here

02:42:20.719 --> 02:42:23.899
I'm I'm I've been trying to figure out how I what I think

02:42:23.899 --> 02:42:25.139
about this and I do think that

02:42:28.000 --> 02:42:30.559
That it's not extremely clear but that this is the best

02:42:30.559 --> 02:42:33.799
option it's the way we've been doing it for 15 years and

02:42:34.479 --> 02:42:36.479
It does make it consistent with state law

02:42:38.520 --> 02:42:41.520
I'm a comment as well. I think in our work session

02:42:42.760 --> 02:42:45.889
Legal counsel may mention that there are I think four bills

02:42:45.889 --> 02:42:49.600
currently pending at state that are maybe affecting this

02:42:49.600 --> 02:42:50.319
and I think

02:42:51.879 --> 02:42:54.479
Because of that to give our city

02:42:55.280 --> 02:42:58.879
The flexibility for whatever changes happen at the state

02:42:58.879 --> 02:43:01.760
level without having to come back and change your ordinance

02:43:01.879 --> 02:43:05.319
I'm comfortable leaving it more vague and referring to

02:43:05.319 --> 02:43:08.469
whatever the current state law or wherever it has changed

02:43:08.469 --> 02:43:08.879
to is

02:43:09.760 --> 02:43:12.440
The appropriate thing at this time, so I'll be supporting

02:43:12.440 --> 02:43:14.200
this motion

02:43:17.000 --> 02:43:20.000
Any other discussion for a call for a vote on the board

02:43:24.639 --> 02:43:27.000
Seeing none we're going to call for a vote on the board

02:43:27.000 --> 02:43:30.100
We have a first and second for approval with the language

02:43:30.100 --> 02:43:32.760
as it currently exists presented before us

02:43:44.079 --> 02:43:46.680
Motion is going to carry six to one

02:43:49.079 --> 02:43:51.079
That will move us to our

02:43:51.719 --> 02:43:53.000
final

02:43:53.000 --> 02:43:57.420
Item on our agenda this evening is the project mate matrix

02:44:01.000 --> 02:44:03.000
Commissioner Ellis, thank you chair

02:44:03.719 --> 02:44:07.090
Make a request that when we are hearing a zoning change

02:44:07.090 --> 02:44:08.159
case is it possible?

02:44:09.079 --> 02:44:13.020
For staff to in our material to put a side-by-side

02:44:13.020 --> 02:44:15.500
comparison of what we're looking at

02:44:17.360 --> 02:44:20.729
Now included is like what the zoning the current zoning

02:44:20.729 --> 02:44:24.149
allows and what and then in another document is what the

02:44:24.149 --> 02:44:25.040
proposed zoning

02:44:25.120 --> 02:44:27.700
It would be super helpful because I end up doing this

02:44:27.700 --> 02:44:30.840
myself with with documents on my my own personal computer

02:44:30.840 --> 02:44:32.040
and put them side-by-side

02:44:32.479 --> 02:44:35.139
If it's not too much trouble is that something we can do

02:44:37.280 --> 02:44:39.280
In a doubt in a single document

02:44:41.319 --> 02:44:45.700
The zoning criteria the uses the uses okay the permitted

02:44:45.700 --> 02:44:47.280
use the cyber, correct, okay

02:44:48.239 --> 02:44:50.239
Okay, thank you

02:44:51.000 --> 02:44:53.000
Commissioner Hedgman

02:44:53.079 --> 02:44:57.020
Thank you chair, I would like to renew my request from the

02:44:57.020 --> 02:45:00.280
work session that I would like to select a

02:45:01.840 --> 02:45:05.200
Commercial and a residential builder to

02:45:06.200 --> 02:45:08.200
present to us at some point in in

02:45:08.719 --> 02:45:10.719
work session giving us a

02:45:11.200 --> 02:45:14.000
Just an overview day in the life. This is this is the

02:45:14.000 --> 02:45:15.280
process as we see it

02:45:15.840 --> 02:45:19.260
Those different type steps just to have a build a notebook

02:45:19.260 --> 02:45:22.879
of those things to consider as we're affecting them daily

02:45:22.879 --> 02:45:26.590
I'd like to know from their perspective with what they see

02:45:26.590 --> 02:45:27.760
the process to be

02:45:34.200 --> 02:45:36.200
Anybody else

02:45:37.600 --> 02:45:41.090
I'd like to thank staff for getting me the update on the I-

02:45:41.090 --> 02:45:43.079
35 and mail. So

02:45:43.879 --> 02:45:47.040
Appreciate that you can cross that one off the list. So

02:45:47.040 --> 02:45:47.680
thank you

02:45:50.000 --> 02:45:53.920
And with that I'm going to close our

02:45:55.120 --> 02:45:57.120
meeting this evening at

02:45:58.520 --> 02:46:00.520
737 thank you everyone