Jun 05, 2018 City Council on 2018-06-05 12:00 PM
June 05, 2018 City Council
Full Transcript
Welcome everybody to this meeting of the Denton City
Council on Tuesday, June 5, 2018.
We do have everyone here, so we have a quorum.
It is 12 noon.
We'll move through our work session agenda item beginning
with agenda item one, citizen
comment on consented items.
We do have a blue card.
Mr. Robert Donley speaking on consent agenda item 4J.
If you'll come, state your name and address.
Your time will begin.
My name is Robert Donley.
I live at 3900 Quail Creek Road, Denton, Texas.
And I'm here to say that item 4J is a bad decision and
should not be done until an approved
route is selected and approved by the City Council as an
alternative.
This item is not a $467,000 decrease.
It's a $19 million increase to the project.
If you pass this, the Mayhill Road project will stop just
north of my neighbor's driveway,
leaving almost half a mile of no project.
Staff has only provided a questionable sketch done, I
assume, last week with some lines
on it that show possible routes and maybe routes, and those
have even changed, and possible
ways you can connect the two loose ends you're going to
create by canceling this part of
the project.
To pass this without an approved route to finish the
project would border on negligence
on your part.
You end up with a $57 million project that you either can't
use or creates two bottlenecks
for years and years to come.
This less than $4 million project has already taken eight
years, and no semen has been poured
for a roadway to date.
By resetting the limit of the project with no approved
route, it could be another eight
years, and the people of Denton deserve better than that.
You need a way this is going to end.
Just put the horse in front of the cart, get you an
approved route, and once you have it
and it's nailed down, then cancel this part of the project.
But to do so, I mean, that's the only sensible, logical,
and responsible thing to do.
I mean, to do a 3.9-mile project, which is what the Mayhill
Road project is, you have
to -- you can't have a plan for a 3.5-mile project, and if
you cancel this, you have
no plan beyond that.
I'll be happy to answer any questions you might have if I
've said things you don't
understand.
>> Any questions, comments?
Okay.
Thank you very much.
>> Thank you, Mr. Donnelly.
Okay.
The next agenda item is request for clarification of agenda
items listed for today's agenda.
Councilmember Briggs?
>> So I have a few.
I've already gotten clarification on one, but -- so I want
to start with B, and there
are a couple actually, B and P, on food concessions at the
parks.
On B, my question is, does this include Evers -- Evers
baseball field concessions?
>> Somebody hear that?
Oh, okay.
Sorry.
>> Hi.
Good afternoon, Mayor, Councilmembers.
My name is Laura Behrens.
I'm the Assistant Director for Parks and Recreation, and
you were asking about item B, is that
correct?
>> Yes, it's going to be on the mega promotions.
Yes, this includes -- actually, this is for our adult
athletic.
It does not include our youth sports.
Those are still managed by the youth sports associations.
>> Okay.
Just for clarification on that.
And also, since you're up here, may I go ahead and skip to
P?
It's the other concessions for the water park and the Civic
Center pool.
I know that the water park is a newer -- it's a new con
cession, so those prices will just
be what they are.
But my concern is the Civic Center pool area.
Do you know -- will those prices for those items be
increasing with this contract?
>> For the -- you know, for the lower -- well, for the main
stay items, they will essentially
be the same.
It's going to be the added items at the new concession
because we have the ability to
offer more at the water park with the new concession stand.
Those items -- not only will they be new, so the prices,
you know, obviously are going
to be a little bit different, but there will just be slight
increases on some of the other
items that were previously offered.
>> At the Civic Center pool?
>> At the water park.
>> Okay, yeah.
>> Right, because there's an expansion of the menu there.
>> I'm not so concerned about the water park as I am the
Civic Center pool.
At the Civic Center pool, the prices will remain steady.
>> Okay.
So they're not going to be increased?
>> There's not -- it's my understanding, and I can look at
this again really quick,
but there's not going to be a significant increase on those
items there because we're
not really expanding the menu there.
>> Okay.
>> Correct.
>> I just wanted to clarify.
>> Yes.
>> Okay.
Thank you very much.
>> So to follow up on that, if you could maybe just verify
that because I'd hate for you
to say something and then all of a sudden if there's a
penny change or that somehow
-- so just -- yeah, just make sure we know for sure and
then if something changes during
the course of the season, then we can find that out.
>> I will.
Definitely.
Thank you.
>> Okay.
Good.
Yep.
>> Okay.
>> Anything else for parks?
>> No.
>> Does anybody have anything on a park question while Ms.
Barons is up?
Okay.
No.
>> Thanks.
>> Thank you.
Appreciate it.
Okay.
Thank you.
The next one is F, the landfill.
>> Afternoon.
>> Hello.
So as district 2 and the landfills in my district, I do
receive quite a bit of calls on the smell
at the landfill.
>> Sure.
>> And I assume that this purchase is to help contain the
odor.
>> It is.
So my question is, are there any environmental issues with
increasing the chemical here at
the landfill?
>> No, there's not.
In fact, in your backup material, as we discussed with the
public utilities board, we've included
the safety data sheet.
So we're actually going to be switching to what we would
consider a better alternative
from an environmental and health standpoint from what we've
used in the past.
It's 100% biodegradable.
It's non-carcinogenic.
It's actually safe for use in the food industry is what we
've learned as well.
And so our use of the product, we essentially have a
perimeter fence that disperses some
vapor to knock down odors trying to escape the landfill.
This will actually be used in our water trucks and some on-
site vapor systems to suppress
the odor at its source.
>> Okay.
Thank you.
I would like to pull item J for a separate vote.
>> Okay.
>> Okay.
My next -- >> Did you want any presentation on J?
>> I don't really need one unless somebody else on the
council needs one.
Maybe our new council member would like a --
>> Yes, I would like to hear about item J in particular
with regard to the points or
the questions raised by the citizen.
>> Okay.
All right.
Go ahead, council member.
>> So L, I guess this would be for Carla or --
>> Or Scott.
So I know that we do not have any maternity leave currently
.
And I know that when we talk about leave, it's the FMLA
that we are allowed in the -- if
somebody wants to take off, they use their sick time and
vacation time.
So I just want to make sure that passing this or removing
this policy is not going to affect
those individuals in any negative way to add more stress to
what they may be going through.
>> Hi.
Passing this policy will not affect the FMLA.
So they will still be entitled to those benefits.
And if they have additional leave, again, we will consider
that as an accommodation,
additional vacation or sick that they can use.
>> Okay.
All right.
Thank you.
I think that's it.
>> Okay.
Anybody else?
Request clarification.
Yes.
>> I would like to pull out item R just because some folks
will follow the work session on
that.
But some won't and will only pay attention to the evening.
So I'm sure the public will be interested in it.
>> Okay.
All right.
Anything else?
Yes.
Council member Hatsbett.
>> Question.
What's the sidewalk list that staff sent me?
Is that in the backup?
Did I miss it?
If not, I may want to just flash that just so people can
see what's all in that just
as it can be done here maybe.
>> Which agenda item are you talking about?
>> So that is -- I'm getting it.
>> Okay.
Is it K?
>> Yes.
>> All right.
>> Good afternoon, mayor, council members.
This is pre-Tem.
Yes, the list is in the backup.
It's exhibit A to the actual contract, second attachment.
>> Got it.
Okay.
>> So I think it's buried somewhere under there.
>> Very good.
Okay.
Thank you.
>> Thank you.
Anyone else?
So I have that we're pulling agenda items J and R. And R is
primarily -- staff presentation
is not required.
Just because it's not staff, it's being presented in the
work session.
You just wanted to have it on the boat.
Or you wanting to have a whole other presentation?
>> I think it could be a short version of it.
But, yes, my point in asking for it to be pulled out is
because I think the public is
interested in the issue and would like to hear a little
about it.
I think it could be very brief.
>> Okay.
All right.
Thank you.
Anything else?
All right.
We'll move on then to agenda items three.
Long set of agenda item work sessions.
So first one is agenda item 3A.
We just were talking about that.
Receive report and hold discussion.
Give staff direction regarding University of North Texas
bike share pilot proposal and
proposed interlocal agreement between the City of Denton
and the University of North Texas.
>> Good afternoon, Mayor, members of council.
My name is Martin Nelson, director of transportation here
with the City of Denton.
We're visiting with you this afternoon regarding a pilot
program in conjunction with University
of North Texas as it relates to a bike share program.
As you may recall earlier this year, council passed
ordinance 18-277, which is a pilot
in and of itself, is an ordinance establishing a pilot
program for dockless or stationless
bike share here in our community.
Since that point in time, University of North Texas has
approached City of Denton staff
to see if there were an opportunity to look into a little
more robust program.
And so understanding that, here momentarily I'll ask that
Dr. Alan Clark, associate vice
president for information services and transportation come
and provide a presentation.
But as you stated, Mayor, there is a partner item on the
consent agenda that has been pulled
off for individual consideration.
In front of you is a hard copy of that particular document,
which is the interlocal agreement
with the ordinance attached to it.
In there we made a -- there was a nominal change to
paragraph.
It's actually section 3D, and it just has at the very end
of that paragraph it's as
amended.
And so I can bring that up if you wish, but it's
essentially outlining just in case it's
here on page 4 of that document, essentially an add in case
there's a change to that particular
ordinance that the proposed UNT bike program follows that
ordinance, and that ordinance
is set to sunset in the September of 2018 timeframe.
And as you'll see here momentarily with Dr. Clark's
presentation, if approved, the UNT
program would take a pilot program out to May of 2019,
which would encompass the summer
session, the fall semester, as well as the spring semester.
So with that, I can come back once Dr. Clark's done
presenting and help answer any questions
that you have.
Without any further ado, I'd like to ask Dr. Clark to come
up and present this particular
item.
>> Thank you.
I am very grateful for the opportunity to stand before you,
and I appreciate the work
that you do for the city.
As an alumni for UNT and TWU, when I came here in 1995,
there was around 23,000 students.
This past year we got to 38,000 students.
And so it's growing.
When I was given the responsibility for transportation
services about three years ago, the first
thing that happened to me was we lost 1,200 spaces for
construction.
And so with that, we have to move from an idea of parking
to an idea of transportation,
transportation from outside the city, within the city,
around the city, and within the
university itself.
And so with that, you know, we're excited with the idea of
spikes being part of that
transportation plan, because what is happening is the
university is the -- where you have
to come connect to the university is getting further and
further away from the center of
campus.
The students are all parking now over across 35 over at
Victory and by Apogee Stadium,
and so they'll need to be able to commute coming over.
Something to let you know is we have -- right now we have
73 parking lots.
We have 15 resident halls.
And so if we put a bike at each one of those locations,
just one bike at each one of those
locations, we're in the range of 84 bikes already.
And so what we have been working -- and I'm very grateful
to the city staff as they have
helped us work through this.
We're working to the point where we want to do a pilot that
is 250 bikes.
Something to be recognized is we were recognized as a
bicycle-friendly university.
That's one of six universities in the state of Texas.
We received a bronze rating as far as a part of that.
And part of that is because of the work that the city has
done by giving us bicycle lanes
that go through Highland that are going to go through Oak.
And with that, we have started ourselves a program by which
there is a committee of students
that come together.
Thank you to Councilmember Gregory's statement for letting
us receive documentation that
y'all have prepared for bike-friendly safety, and that is
now part of our orientation session.
So we have moved greatly in that area.
What are we trying to fix by doing this?
One, I introduced to you the idea that we're further out.
So students are bringing their own bikes.
And so we have around 1,100 bikes that are on campus.
And as you can see, they're connected and tied to anything
that's standing straight
up.
And so what we're wanting to do is to get to that point
where we go tell parents, leave
your bicycles at home.
Let us provide a bicycle to you.
The bicycle is there when you need it, but you don't have
to keep up with it and keep
it isolated to one individual.
So through this bicycle share program, the first thing we
're wanting to do is to get
rid of what you see over on your right-hand side of where
bikes are just chained to anything
that is there.
We have about 150, it depends upon the year, about 150 to
200 of those bikes are abandoned.
And we also have some problems with those bikes being in
ways for ADA reasons as well,
tripping hazards because they're sticking out into the
concrete area for the walkway.
With that, we are going through and trying to organize
parking with the campus and the
bicycles themselves.
What is a bike share program?
Well, it's a way for us to have students who can share inv
itations for that bicycle.
What we are suggesting at this point is that we would use
Lyft as someone who handles the
logistics on a daily basis.
I'm sorry, not Lyft, SPIN.
We're working with DCTA as well, I apologize.
But work with SPIN to go through and handle the logistics
every day.
Go get bikes wherever they're dispersed, bring them back in
at 7 o'clock that morning.
Use the onboard GPS so we as staff can go in and make sure
that that is taking place.
And make sure that these bikes each day support what we're
trying to do as a campus.
The goals for the bike share program itself is to reduce
the campus traffic inside the
campus itself, move outward, have a bike culture that
understands the safety of bikes and also
understands the use of bikes among 38,000 students.
Provide a community that gives alternate modes of
transportation.
Allow for congestion.
How do we deal with that in itself?
And have a healthy and reduce the carbon footprint
associated with the campus itself.
The bike share, as I stated, we're contracting with SPIN.
We start out with a pilot for 100 bikes this summer.
We've got to fill our way through this.
Where we want to get to is in the fall, sometime in that
time period, to 250 bikes where we're
working with the resident halls and remote parking areas to
have those bikes repositioned
every day and to be able to come back.
The ground operations for the insurance of the SPIN will be
going through and following
the ordinance.
So will the University of North Texas.
And making it accessible to the students that are on campus
.
SPIN will regroup the bikes by 7 o'clock each morning.
How do we deal with the fact that we have bikes that we've
seen other municipalities
where it comes together?
We feel like by this method, instead of people owning their
own bike, we have the ability
now to tell what bikes are used, where they're at, and
where do we need them to be instead
of just chained to a location and staying there.
So we as staff members for the University will coordinate
and work with SPIN if it's
every morning that we have to do that to ensure that those
bikes are in that location.
Concerns.
How will we collect additional data via social media,
electronic data, and information captured
from SPIN?
We want to collect as much information as we possibly can
on ridership, location of
the bikes, commutes per day, individuals, number of
individuals and how they're using
the bikes as well.
We share that information with the city and also share that
information with TWU so we
as a group look to see what the effect is on bikes
themselves in the area and on campus.
We want to have lessons learned and then come back after
the pilot and say what do we do
moving forward?
Is that number 250 the right number for the Denton campus?
Does it need to be more than that?
Does it need to be less than that?
So but we feel like we've got to work through this over the
next year and so the interlocal
agreement was devised so that we as UNT are working with
the city of Denton and the ordinance
that is there to be ensured that the insurance is there,
the money is put up as a statement
of good faith that we are going to do what we need to do
and hopefully lessen the role
of what the city has to do in the repositioning of those
bikes.
So anyway, I quickly went through this.
I welcome any questions that you have about what we're
trying to do, how we're working
to get this done and so I will hush and let y'all bring
forth the questions.
Councilmember Briggs and Councilmember Gregory and Council
member Hutsbeth.
I have just a few.
So what would the cost of service be to the students?
We the University of North Texas are going to pay for the
cost of the service for the
students so they will have to register so we know who is
using the bike, what shape
they leave the bike, where they leave the bike, but the
cost itself will be carried
by the University of North Texas.
So it'll be free for them and so I'm assuming this is for
internal use of the campus generally.
I mean that's what the idea is for.
That's correct and to set a geo fence around what we say
the campus is and so when we go
take that seven o'clock look, it's anything outside that
geo fence that is part of the
University of North Texas campus.
Because when under the parameters and requirement because
it says outside or in the city of
Denton and so there are many city owned streets through
your campus and so when you define
city it's not necessarily outside of campus since we have
the streets and right away within
UNT.
So what I hear you saying is that there will more be a
boundary that when those bikes are
out of not necessarily that that will be by seven o'clock
removed.
That is correct and you're exactly right.
That's why we felt like we needed to go do this interlocal
agreement.
If they step on that bike and get on the street they're in
the city of Denton.
And riding on the city of Denton transportation ways and so
that was the beginning from when
we started and met with Mark and his staff.
How do we manage that with and we know we're going to have
to have more than a hundred
bikes and part of that is going to be through the thorough
fare of the University itself
but also the city and so we want to gather information as a
part of that but you are
correct.
We're talking about a geo fence boundary and those bikes
would stay within that perimeter.
Okay thank you.
That's my Gregory.
V-bikes has been gone for a couple of months and apparently
the technology that they used
to locate their bikes was not sufficient because there are
still V-bikes around town.
And they seem to not be able to locate them.
So my question is in the repositioning of bikes and rebal
ancing of bikes what do you
know about Spence ability to accurately locate a bike that
might have been left on the courthouse
lawn or at the Quaker Town Park so that it could be found
within a close proximity and
then repositioned back on campus.
So our discovery in that process was okay how close can you
come to where that bike
is and our discussion with Spence was that they within nine
feet of what that says on
the GIS information to where that's at and we found we felt
like we can at least find
it within nine feet.
So that's what we're working on and if that's not the case
then we've got a problem.
I hope it works because having a bike share program in town
is important and I think that
this is a great way to test it out.
Clearly the ordinance that we wrote is somewhat lacking
since it scared people off and nobody
else wanted to come.
Councilmember Hesford.
Thank you.
Thank you for a great presentation.
If you could go back to the slide where the bikes were kind
of scattered about.
You bet.
That'll help.
Okay great and so I'll get to that.
Initially out of the gate can you walk me through how you
envision the 7 a.m. rebalancing.
So obviously it's not all simultaneous so they'll start let
's say at 5.30, 6 and they start
working their magic.
Let's say someone takes it before they finish at 7 and ride
off.
How do you kind of what at what point are you saying okay
all present and accounted
for.
Ordinance calls for a number so I'm assuming they'll be
numbered and you're able to kind
of get a snapshot in time and say okay done.
I just want to understand how that 7 a.m. works and the
accountability of that.
There's kind of different programs when you get into bike
share.
Some are freestanding and some are within a low cow or a
locker that they need to be
in and you have students ride to from lawn locker to the
other locker.
This is kind of a modified process in this.
We are going to expect let's say by Fouts Field that
parking lot is going to need several
of the bikes to be there.
We will have a designated lot secured area where we're
going to expect.
Let's go with the number 20.
We expect 20 bikes to be there at 7 o'clock.
And then at the resident hall we expect five bikes to be
there.
And so it's not just allow them to wonder about and
hopefully they get there.
We feel like we have a population that's going to start
moving about 7 o'clock in the morning.
And so we're going to have to have designated counts.
And to us that's where we get into the control of this is
by having counts.
And if we can't start with 20 bikes by Fouts Field, then we
personally are going to have
to go find out where that bike is and get it there because
our students are going to
be expecting that mode of transportation to be there every
morning.
Okay.
Very good.
And then kind of to bring everyone else up to speed, I
talked to Mark and you by proxy,
I guess, about an idea.
And so I want to share with my peers that given this
scenario where the bikes are kind
of thrown about and the university ultimately would have to
go collect them, my question
to Mark was is there an opportunity for kind of UNT to
partner with Denton ISD at the ATC
and repair?
So you have to remove those bikes at some point.
They're unaccounted for.
Is there an opportunity to then work an agreement with ATC
where some engineering, some repair
type class can be established to then repurpose those parts
and end up with a final product
and what you do with that.
It could be donated.
It could be -- I don't know what that looks like.
But I just asked that question for them to explore that.
And so that's kind of in the works, in the background.
And for me, it was one, give the kids some experience.
And the reference I used is kind of the experience going
back to Roger's Bike Shop for those
that live here long enough.
That kind of experience, I mean, that to me, that art form
is kind of done by the wayside.
There's more -- there's better bikes.
They're more, you know, technical but just kind of old,
just traditional bike.
What do you do with it?
You know?
And so -- and it also gives those kids that experience.
So that's what I'm thinking.
They've given me some feedback already.
I just wanted to bring everyone else up to speed on that
conversation.
So thank you.
>> Thank you.
>> Yes, Councilmember Rathbun.
>> I'm not quite sure who might be able to address this,
but I imagine the public also
would like to be reminded of what the intent was behind the
100 bike limit in the ordinance
and how that -- you know, how that looks in comparison with
the -- with what's being proposed
here.
>> So Councilmember, if I understand the question, the
original ordinance, ordinance 18-277,
the original intent was to limit the number of bikes per
operator to 100.
At the time we were interfacing with a minimum of four with
the potential of maybe two or
three more.
And our concern as a community or there was a concern
within the community and on council
that maybe there might be upwards to five, seven, 800 bikes
that would inundate our community
and how frequently are those particular bikes utilized.
And so with that interest in mind and a good neighbor
policy, limit the total number of
bikes that an operator could have so that we did not end up
with stacks of bikes on
street corners and creating not only aesthetic issues but,
you know, safety issues with respect
to ADA and access to homes, businesses, et cetera.
>> Joe, sure.
>> So was the issue just where they're left overnight or
was it just 100 total because
of whatever their presence might be during the day?
You know, I'm trying to just assess, you know, we're sort
of being asked to view this program
in light of that ordinance and I'm not quite sure I see,
you know, how it matches up because
what I'm hearing, just if I can expand a little, you know,
what I'm hearing is that we'll catch
them all at the end of the day.
But, you know, how do we know?
I mean, and I don't know frankly if I would have been for
the ordinance or not but since
that is the ordinance, you know, would ideally, you know,
should an alert go off when there
are 100 off the campus, whatever time of day?
Is that sort of the spirit of the ordinance?
>> Mr. Mayor, if I can, I can respond fairly quickly and I
understand you.
So I think Councilmember Gregory brought up a very
interesting comment with respect to
the bikes and we're still dealing with that issue now and
that they did not have the GPS
system deployed or on the bikes that they deployed.
And so how do they know?
We're still calling them.
We still have staff time involved with trying to corral
those bikes and remove those from
the street and as clutter and art form of some sort.
We weren't particularly impressed with all of the bike
share operators and having that
GPS system deployed as well as the total number, you know,
as well as abiding by a total number
of bikes.
We had some bike share operators say, oh, we don't see a
need for a limit.
We need them to be ubiquitous on every street corner and so
by doing that we're going to
flood the market.
And so we knew that there was a couple of three different
bike operators that their
MO was essentially to put more bikes out there than would
ever be used.
In fact, we got some information back that said, you know,
gosh, we've got X number of
thousands of bikes deployed in a particular community and
they were really excited that
maybe 15% of those bikes got used over the weekend.
Well, you know, 1,500 rides with 10,000 bikes in your
community really wasn't a model that
I think that we were willing to engage in.
Sure.
A little background.
I mean, I think for me, I can only speak for myself, the
100 limitation was per operator.
So I'm hearing total of 100, that's per operator.
So you could have four or five operators.
My biggest concern was that we didn't have any data, which
I think this pilot program
will allow us to obtain.
We didn't have any data about who's riding, where they're
riding, how often are they riding.
And so we were just sort of arbitrarily putting a number of
bikes out there, not based on
anything other than just the company who was placing them.
So it wasn't, from my perspective, wasn't an opposition to
a bike share program.
It was let's try to gather some data to see what the need
is and make an informed choice
on that.
So I don't think it was necessarily an arbitrary number.
We just knew we didn't want a thousand bikes in here
without knowing that, you know, half
of them or 75% of them won't be ridden.
So Council Member Gregory and then Council Member Duff.
I think also part of the situation was we had basically two
options for how to go forward
to work with dockless bike share.
And one was to pass an ordinance, as we did, and to set
these number limits without data,
which came close to arbitrary, but it was just because we
didn't know and we don't
have much information to do that.
The other option, which in retrospect might be a better
option, was to do an RFP with
an individual company and work out an arrangement with them
where we were more certain that
they would have the capabilities of rebalancing
sufficiently.
But we opted to go with the ordinance rather than an RFP.
What we're actually seeing now is a version B of an RFP
with our partners at UNT, and
I think it'll be a good experiment to see if that works
better than the ordinance did.
Because there were concerns, a lot of concerns about where
the bikes were being left and
the inability of the operator, and it could be multiple
operators of being able to adequately
rebalance them.
And the operators were saying they could do it, but they
couldn't.
Yeah, I think this is very much a work in progress.
Because until we get all the data to know how many bikes we
need out there, what's going
to happen with them, and that kind of thing, I noticed that
I was in Seattle last week,
and I was kind of amazed when I looked around how orderly
their bikes were.
They had them in permanent locations.
So I think as we go along on this, we're going to get more
data and we're going to make changes.
At this point, I don't think we really know where we're
going on this.
Yes?
So I want to make sure I understand what's being proposed.
It's a pilot of 100 first and then scale to 250.
Am I making that up?
That is 100 first.
So the 100 is within the existing ordinance anyway.
And then we'll have a readout on the data through the inter
local agreement before going
from the 100 to 250?
That's correct.
And we could conceivably recraft the ordinance at that
point once we're smarter.
So I think that's really encouraging.
Yeah, and I appreciate that, but that's not how I
understand the read here.
And I have a couple questions on the actual interlocal
agreement specifically.
First is on section 3B.
It states UN treaties agrees to operate the pilot, et
cetera.
Bike share pilot proposal dated April 11, 2018 and attached
here to as exhibit A. And
I believe that's referring to the white paper.
Exhibit A is the white paper.
When I read that, I really didn't see that as a proposal.
I mean, actually, more -- a proposal structure is more
contained in the interlocal agreement.
So the white paper doesn't really give details about --
that are contained.
So help me understand what we're supposed to be looking for
in the white paper that
is supposed to act as the pilot proposal.
It just seems more like an informational paper.
It does provide a level of information, but the ordinance
-- or this actually references
that ordinance 18-277.
So essentially the ILA would follow ordinance 18-277.
And what this particular ILA is requesting or what the
variance would be to the existing
pilots would be one total number of bikes to be deployed at
a time, 250 versus the 100,
which we've been discussing.
And then the other would be the term of the particular
pilot program.
UNT is wishing or is requesting to have that extended out
through the fall and spring semester
so that data that we've been talking about trying to gather
that data can be -- better
data can be gathered and then craft a better program for
the out years or for future -- for
future ordinance.
>> The only thing -- if y'all could maybe look at y'all
being -- the university representative
and yourself, do we need that white paper attached?
Because it says that it's going to be the pilot program in
accordance with UNT bike share
pilot proposal dated April 11, 2018 and attached here to
exhibit A.
It doesn't really seem like a -- what I would consider a
proposal.
So if it's needed, still fine.
If not, because I think the proposal -- there's more of the
proposal in the actual interlocal
agreement than there is in the white paper.
So if it doesn't need to -- and if it needs to be -- it
doesn't matter to me.
But when I was reading it, I was expecting to see terms and
things in April about here's
where we're going to put them, here's what's going to
happen.
And it's just more informational in some of the issues that
arise.
>> Understood.
And I understand that this particular item, item R, on the
consent has been pulled.
So if I may, I'll visit with our colleagues at UNT as well
as our legal staff and see
if we can present that.
>> And if not, that's fine, too.
So what I understand is going to the 250, yeah, UNT is
going to make some study.
Is that something that's needed?
But as far as the city goes, that this agreement is saying
that there won't be more than 100
in the city, quote, unquote, at any given time.
>> That is correct.
Yes.
>> So really, it won't -- if they have 250, it's not going
to be in violation of our ordinance
if there's not 100 because as it states, which I agree with
in section C, the city agrees
that neither it nor ordinance 2018-2-6 regulates the
parking of additional bicycles on UNT
or state of Texas property in and around the UNT campus.
And my understanding is that's correct.
I mean, they don't necessarily have to -- I mean, we don't
regulate that when it's on
private.
>> I think the interest, Mayor, is really just to set the
parameters of what everybody's
understanding was in terms of, you know, where those bikes
would be and just have a document
that each agency could look at and agree and say, yes, this
is --
>> Oh, no, I agree with that.
I think it's well written.
I think it's pretty clear to me that if they go to 250,
there's not an anticipation that
we're saying you can have 250 bikes in the city of Denton
at any one time.
It's saying, hey, we got 100.
You guys got 100 in the city and you got 150 on campus.
We're all good.
Am I misreading -- am I misunderstanding the reading of the
agreement?
>> That's correct.
>> Okay.
>> Mayor and members of council, I would also, you know,
indicate that we're not naive enough
to think that these bikes won't migrate off campus.
Regardless of the geofencing, we anticipate some of those
to migrate off campus.
There -- University of North Texas will have staff assigned
along with spin, you know,
to bring those back.
Are there going to be onesies and twosies here and there
that they don't catch the first
time around?
Most likely.
But that's part of that review process.
What can we do better?
But generally speaking, it's that total of 100, you know,
outside or off of general campus
area and off of the city of Denton ride.
>> Oh, I think it's a great opportunity.
I think it's a great opportunity to gather the data that UN
T is willing to share with
us that they gather from their pilot program.
I mean, number of bicycles deployed, specific trip data,
monthly trip total, rebalancing.
I mean, this is going to be data that I think we can use to
refine and maybe tweak our ordinance
as we move forward because it's going to be critical in
helping us understand what are
some of the major destinations from the campus in the city
and will help us -- it would be
a great planning tool.
So I think it's a great partnership between the city and
the University of North Texas
that we both can learn a tremendous amount from this pilot
program.
>> And I would mention one other thing as well.
SPIN, and it referenced it in the backup material, the
information sheet, but SPIN is the only
bike share operator who has submitted for a permit and
actually provided the deployment
plan to our traffic engineering group to approve.
And so, you know, no other bike share operator has really
stepped up and said, yeah, we can
abide by the existing ordinance.
And to that extent, they have deployed some bikes at Texas
Women's University.
So Dr. Clark referenced TWU.
So we see that it's going to be not only TWU and University
of North Texas, but the city
working hand in hand as we move this forward to, you know,
implement lessons learned.
>> Well, and I think, too, with the data, if there are
particular parts of town or specific
locations where there seems to be a lot of trips and it
falls within the number of bikes,
you know, at least for now, who's to say that we can't
modify the agreement to say, okay,
instead of you picking up every bike, if we have a place at
these major locations where
people are going, I mean, I think it's going to really help
us to try to find the best
of both worlds here.
And I'm really excited about the opportunity and I thank
the university for really taking
the lead in that and working with us to really make this a
win-win for both organizations.
So the only question I do have, which it's just the lawyer
in me, so I apologize, when
it talks about there wouldn't be X amount of bikes in the
city, we're just going to
have to have that understanding that if there is, they're
just going to get it fixed.
I mean, we don't have really any remedy or any kind of -- I
mean, we have something in
the ordinance that it's violated, but I mean, I think once
this gets rolling, I think they
will definitely, on the rebalancing, we're not going to see
what we saw.
>> Correct.
>> But I mean, because they're still around.
I mean, somebody mentioned -- I mean, I've seen one
somewhere that a dad drive by, and
I thought, well, okay.
So no, I appreciate staff working with the university and
coming up with this creative
sort of solution and opportunity for us to both learn what
would be the best for our
respective institutions.
So thank you so much for that.
>> One final comment I do want to mention is that there
would be -- there may be an
opportunity or a need to come back with that, with the
existing ordinance 18-277 to do some
amendment because we've not had a mobility committee
meeting.
We wanted to get this out in front so the University of
North Texas could implement
this if it is approved by council.
You know, probably coming back through the mobility
committee at a later date, later
this summer.
>> Do you mean to amend our ordinance to match this inter
local agreement, or are you meaning
to amend it once we have data where we might want to move
some things differently?
>> I think it's probably neither one of those two options.
I suspect that UNT is not going to deploy this until the
fall semester, or at least
the data that you accumulate, a substantial amount of data
won't be available until sometime
in the fall or early or even the wintertime.
And if so, our ordinance expires before that.
So we would at least at a minimum extend our ordinance to
coincide with that data receipt.
>> So it may just be extending it, renewing it so that it
just doesn't expire.
>> Most likely sometime in July or August or certainly
before September, mid September.
>> All right.
Councilmember Briggs.
>> So on the bikes, because after that conversation I
started thinking, so if a bike ends up off
the campus into our area and a regular citizen sees it and
they want to ride it, that's not
going to be possible, right, because they have to be
registered?
Because, you know, bike share normally would be like, oh, I
see a bike, I'm going to hop
on it and I'm going to go, but these will be your specific
ones and you're paying for
them.
And so just, I mean, I'm just kind of curious how that --
the only way that a bike can be
removed is if it's physically picked up by the company and
brought back to campus.
>> One of the options is for faculty and staff to be able
to ride that bike as well.
And so these are going to be, yes, they'll be branded green
and black with white lettering
with UNT numbers and phone numbers on there, but they will
have the ability, other people
will have the ability to activate that bike.
I think that's something we need to go discuss with SPIN.
I never considered somebody else wanting to get on there
because it was a green and black
university bike itself.
>> Well, I honestly, I like the idea of having TW and UNT
bikes in our city because that's,
you know, what defines us that makes it, you know, a neater
bike to ride.
But so, okay.
And also in the presentation later, may I?
>> Sure.
>> I'm just -- I'm curious the number of actually how many
students live on UNT campus
and also if you could just put up a boundary map of the
campus and where the geofencing
would be just for visual representation tonight.
>> We can make that happen.
>> Thank you.
>> I want to make sure I understood Councilmember Briggs,
your response to Councilmember Briggs
about if these bikes are out in public, if some citizen of
Denton or someone who's a
non-student wants to ride it, that's really not been
considered so there might be some
discussion around that or is that my understanding of what
that is?
>> Right.
I understood that SPIN would have the ability just with
their credit card capability to
allow you or me or any member of the general public to
access the bike, but it also has
the capability to use the student ID or the faculty ID to
activate when they activate
off of that student or faculty ID, then it's a free ride or
at least it's subsidized by
the University of Texas to their transportation fee.
>> Okay.
All right.
Did you have a follow up, Councilmember Briggs?
>> So that would actually be helpful to us to know the
difference to divide up what citizens
actually use or are using the bike and what students are
actually using the bike.
So that will be -- that data will be available to us.
>> That would be part of some of the metrics and stuff that
we could gather and bring back
on a periodic basis.
Yes, ma'am.
>> Thank you.
>> So at what point will that decision be made and if it's
not -- because I'm still
-- I'm thinking it hasn't been made, but if SPIN and UNT
decide that, yes, a non-student
can use it and that's more of a transaction between SPIN
and the non-student that it doesn't
have any bearing on UNT or doesn't go through any kind of
-- in other words, it's a separate
account, separate -- when will that decision be made if it
hasn't been made and if it has
been made, how do we, you know, get that out to the public?
>> Quite frankly, I think it's just a clarification, Mr.
Mayor.
I think my understanding was that that was the capability
of the program.
If I'm misunderstanding, I apologize, but we'll get that
clarified before the presentation.
>> That's a good question and it's something that I think
will be helpful to the citizens
as well.
>> In my understanding, regardless, it should be a
technological fix.
It's just programming the bike.
>> Okay.
Councilmember Briggs?
>> Just to that point, sorry, I just keep coming up with
questions, but in our ordinance,
there's a registration fee if it's used in the city per
bike or per, I think, the amount
of bikes.
So that brings me to -- and if that is where our citizens
can ride these bikes, how does
that -- >> University of North Texas is abiding by
everything
in the existing ordinance.
So they'll be charged the fee per number of bikes deployed.
So if it's 100 or if it's 250, they'll be charged on a per
basis with the permitting
process.
>> Oh, by the city?
Okay.
>> They'll be submitting an application, a permit
application for that whole process.
>> Okay.
>> Councilmember Hatsbeth?
>> Briefly.
I would just -- wherever we end up on that issue, I'd like
to change the wording or try
to sell you on some wording, be it registered, not
registered, right?
Because I think we can get -- as far as the bike user, so
as he pointed out, if you register,
you can use a bike at no cost.
If you use -- if ultimately down the road you can use your
credit card, then that person's
not registered -- because it may be a student that didn't
register that uses the bike with
its credit card.
You know, so I think if you're getting a student, non-st
udent, citizen, I mean, to me that gets
a little inaccurate at that point.
It's just either we have a record this student registered
and/or this staff member registered
and they're using a bike or they didn't register and it was
used that way.
So I just -- I hear people say student, citizen, you know,
and so I think that can -- whenever
that data comes back become inaccurate if we assign a label
of, okay, well, these are
citizens and now we have 50 citizens that use a bike.
Well, that's not accurate.
It may be a student that didn't register that just used a
credit card to ride the bike.
You know, so I think ultimately when you -- to start off
with good, clean data is going to
be imperative and I think it's more -- it's just really
those two columns as I see it.
Okay.
Great.
Anything else?
Any other questions?
All right.
Thank you very much.
Appreciate it.
Great presentation.
Could you flash up the picture, the first slide of this
presentation?
When I pulled it up on the backup, I thought that is a
beautiful, beautiful shot of the
campus.
So I just needed to say that.
That's a wonderful picture.
I'd like to have one like that.
So if you guys ever decide to sell them, let me know.
Okay.
Thank you all so much for that.
That's a good opportunity.
We'll go on to our work session agenda item 3B.
Receive report from staff and -- how do you pronounce that?
Icon?
Icon.
Consultants hold discussion, give staff direction regarding
design and construction of the American
Legion Hall Senior Center.
Good afternoon, Mayor, City Council, Gary Pack, and Parks
and Recreation.
I want to present to you today a proposal on the American
Legion Hall.
Provide you a little history on the project, some designs,
some options, and seek some
direction from City Council on our next steps.
James Beers, who is from Icon Consulting, is here as well.
He was the main person on the project on behalf of the city
.
So in case he needs to step in, he's available as well.
So just a little history, ALH is located at 629 Lackey
Street.
It consists of two structures, one built in 1957, which is
the south building, it's 2,500
square feet, and the north building at 2,000 square feet,
that is 2,600 square feet.
That does not include the restrooms that -- the square
footage for the restrooms that are
for the park, which are located on this north section of
that new building.
Do you know what that --
That's about 700 square feet.
Okay.
So I won't be using that square footage.
Okay.
The original building I get, again, I suggested it started
in -- it was built in 1957.
It's primarily used for drop-in, passive recreation for our
seniors, computer space, meeting,
event space.
We serve lunches there.
We have food available for drop-in activities as well.
Some of the renderings, you can see it's just an open space
building.
We have -- we'll set tables and chairs out based on the
event.
There's an area for TV for people to gather for social
activities.
And then just some of the exterior of the south building,
you can see some of the structural
challenges that we'll talk about here in a little bit, as
well as some of the structural
challenges on the entryway to the building itself.
The north building was built in 2003.
It's 2,600 square feet.
It has fitness equipment, meeting space, pool table, and
restrooms.
Again, you can see this is just an open space building.
Staff is using it the best they can for whatever
programming they can offer.
So again, you can see tables and chairs that we'll bring
out.
There's not a real -- a lot of storage in that facility.
So we have them on carts.
And then you can see we actually have fitness equipment
over in the corner of the building
that we'll provide for our users as well.
And then a pool table, and then both buildings are
basically connected with a little structure
just to keep people out of the weather if they're going
back and forth between the
buildings.
The original scope, when ICON was hired to do an
engineering study, was basically deemed
for a one-for-one, they were looking at the south building
only.
If it was going to be a replacement or a remodel of that
south building, that was their focus
with no intentional work on the north structure at all.
During that process, they provided a report, a building
assessment report in May of 2017.
They found a number of items, primarily foundation and
perimeter wall challenges, groundwater
and surface water runoff is impacting the foundation.
>> Real quick, is this for both buildings or one building?
>> This is the south building.
>> South building, okay.
The slab for the south building is free-floating.
It's not structurally tied into the walls.
The walls are not sitting on the slab, but there's actually
an elevation difference of
between four and six inches between the various sizes or
locations of the foundation.
The roof needed to be replaced.
There were sagging issues due to reduced support.
We have non-compliant accessibility from the parking lot.
We don't have a sprinkler system in the building, and there
's an opportunity to replace the
fire alarm and change lighting to LED, if determined.
Based on the report findings, ICON provided options for
renovating the building as well
as for rebuilding the structure.
The south building renovation was approximately $250,000,
and replacement of the entire structure
was $614,000.
At that time, I think it was September of 2017, city
council decided to allocate $614,000
for reconstruction of the building, and that was a one-for-
one replacement of the 2,500
square foot facility.
Later that fall in 2017, ICON again was selected to do the
architectural design of the structure,
and they met with staff and users of the facility.
I think there was approximately 10 meetings over the course
of the timeframe, including
residents and staff as well.
They also used user surveys to identify some information,
and one of the things was how
they could better utilize the space for the south building
and provide dedicated space
for activities such as computer labs, fitness rooms, or
meeting space.
In the spring of 2018, based on that feedback from the
users, ICON provided a recommendation
and actually provided a change of course from the original
direction of the complete one-for-one
redevelopment of the south building.
They were to renovate, the suggestion was to renovate the
north building and provide
some additional support functions in that structure,
rebuild and expand the footprint
of the south building to meet programming needs, and
rebuild it as one giant structure
and connect the buildings.
Total square footage is 7100 square feet, and the adjusted
cost of that would be $857,000.
Question on that.
So, I can't remember the square footage is on the north and
south building currently.
I think it's 2300.
25 and 2600.
25, which one is the north building?
The north building is 2600.
2600.
So, right now you've got 5100 out there.
The 2500 we were going to think about scraping and
replacing altogether.
So we're looking at adding another 2000 square feet.
Okay.
All right.
I just want to make sure I've got all that.
And that doesn't include the 700 square foot for the
restroom?
No, I'm not talking about that at all.
Okay.
I just want to make sure that that's still.
So I added the slide.
Yes.
I'm sorry.
So, just to see if I'm tracking, is the 2000 primarily the
area that's where the breezeway
is now, the additional square footage?
Primarily, yes.
Okay, I added the slide, so this is not your presentation.
Just to kind of recapture the difference between the
original scope and the adjusted scope.
So the original scope was demolish and rebuild the south
building.
No improvements again to the north building.
They were two separate buildings of 5100 square feet at a
total cost of $614,000.
Additional considerations from the feedback from the
community.
And they requested some dedicated space for structured
programming to connect the buildings.
So they provide improved flow, use, and management.
Management could see both buildings at the same time.
There would be some restroom reallocation.
They'd take the restrooms that would be built in the south
building and move those over
to the north side and just expand the existing restroom
facility.
Add some life safety and IT systems to it.
And then the overall expansion of that footprint of about
2000 square feet you had mentioned.
So I have a question.
Go ahead and finish because it may come up later on.
Okay.
Sorry.
Go ahead.
So the adjusted scope based on ICON's recommendation was
demolish the south building, rebuild and
expand the footprint of the south building, connect to the
north building, do some renovations
as well in the north building at the same time.
And then that would improve the overall function of all the
space.
And it was about 7100 square feet.
Total cost of $857,000.
Okay.
This is -- yeah, go back to that last slide because these
are the add-ons.
So I want to -- so here our first one was replace the south
building at a cost of $614,000.
Do nothing to the north building.
Then there was some recommendations of let's renovate a
little bit of the north building
to make it a little bit more functional.
Do we know what the estimated cost for that was by itself?
Just the north building?
Yeah.
I mean, because you got in this cost of $857,000, you've
got the building of a new building.
And from what I just heard, the 2,000 square feet isn't
going to be under airspace.
It's going to be more breezeway space.
And if that's not correct, then somebody can correct that.
It's replacing that breezeway space.
Let me go to our future.
So -- so let me go back to the original.
So here's the two buildings.
This is the north building, this is the south building, and
this is that breezeway that's
connecting the two.
Which that's not 2,000 feet.
No.
No.
But this is the footprint of the north building right now.
Got you.
Okay.
Here's the park restrooms that we're not talking about.
And then this is being added.
So that is 590 square feet in itself.
And then this is being added as well.
So between the two of these is 1,300 square feet.
And then there's a little bit of additional space over here
to really expand that original
footprint of the south building.
Okay.
All right.
Yeah, hold on.
Okay.
So that's really not usable space.
It's just transit space under air.
Am I right?
A little bit of it is, but the rest is just sort of a walk
way or?
It's a corridor connecting people to the spaces.
And then that front entry space could be used for pre-
registration.
It could be used for Co-Check, for special events, that
type of thing.
So then in -- so if I'm starting with a base of 614 to
replace the south building, we're
doing remodeling to the north building.
And then we're reconfiguring the breezeway and adding some
space in there.
And that's increasing the cost from the original 614 by $2
40,000 basically.
That's correct.
Is that right?
Of that 240, do we know how much of that was sort of slated
for reconfiguring the north
building?
I'm trying to get an idea of the reconfiguration of the
additional 2,000 feet breezeway under
air is this much -- because it has to be somewhere in that
cost.
Do you all have a breakdown of that?
Yeah.
Good afternoon.
Thank you.
James Beers with ICON.
So to answer your question, inside the north building we
have an addition.
So in a second there's a slide coming up.
But right now the base building in that number is to renov
ate the existing bathroom.
So instead of spending the money in the old replacement of
the south building, we're able
to combine the bathrooms in the existing -- and if I could
flash forward here.
Sure.
Can I walk around and point?
Would that help?
Yeah, you've got to stay behind the mic so that the people
on the -- being broadcasted
can hear.
So effectively what you see here is the option where you
see the multi -- in the meeting
room in the -- I can't see it at this angle.
Where is it here?
Oh, there we go.
Perfect.
So right now this is the edge of the existing north
building.
This will all be condition space.
Just to be clear.
The only renovation in the base expansion that you see is
to update the bathrooms and to
provide this corridor to get to those bathrooms and provide
egress.
In the base expansion.
Yes.
And you're thinking that's -- Roughly around $127,000 is
what we had allocated
based on the bathroom fixture count and what we need to get
through that space and demolition.
Okay.
All right.
All right.
That's helpful.
I've got a couple of hands I know that are around.
Councilmember Gregory.
My question comes with the issue of programming.
And I've stopped by there periodically just to say hi and
visit.
And I'm not seeing very much intensive programming going on
.
And so I'm seeing 2,000 additional square feet and I'm
seeing in that new floor plan
some rooms that are closed off.
So I'm thinking about are we looking at what kind of added
programming are we talking about?
What kind of added staffing are we going to need in order
to support that programming?
And is this still -- this has always been basically a -- in
practicality it's been for
seniors.
Is that what the programming is envisioned for in the
future?
So currently right now it's very passive programming for
the seniors.
More like drop-in activities, cards, dominoes, those types
of things.
And in addition to rentals, right now we have approximately
204 rentals a year in that facility
alone.
MLK is the most rented at 226.
So just in that area of the community there's a significant
amount of rentals.
And those are for meetings, graduation parties, family
gatherings, that type of thing.
And then the next highest is North Lakes at 174.
So there's a lot of rental activity in there.
And that's primarily after hours.
The day timing hours would be expanded slightly once the
new facility comes on board with
an intended more aggressive programming.
Both to the passive and then maybe a little more of
aggressive fitness programs, structured
arts and crafts type things.
But primarily in the past it's been more drop-in type
activities for seniors.
Now you don't have to be a senior to be able to rent the
facility after hours either.
And it's really a sister facility to MLK that it's under
the same budget as MLK and staff
is shared for that facility as well.
Thank you.
Yes, Council Member Brie.
So on the North building, it was built I think it's 15
years old, which is not really that
old for a building.
What was the original use and how much did we pay for that?
Do you know how much we paid for it to have it built?
I don't have that number.
I don't know if Dean has it.
I don't have the original cost for that.
Okay.
I'd like to know that at some point.
And so I'm...
We built that in 2003 was on an indefinite quantity
contract and I can look back in our
records and get that cost for you.
Okay.
All right.
Thank you.
And so when I saw this, so this is kind of like a senior
center and is it, are we trying
to make it equal or equitable to this senior center over
here?
I mean is it going to function the same?
Will we have staff there all the time?
Will people come in and have a card, pay a fee to use the
workout room?
And I mean is this what we're looking at?
In some aspects, yes.
You'll be able to register for programs.
Right now you can't because we don't have access to our
internet software there.
But you'll be able to come in, participate in programs,
fitness area.
Now the difference between is this senior center has a lot
more square footage.
So they have the woodworking space, those types of things
that we can't offer, but they
can come to this downtown facility for that.
But there will be structured programming for people.
Okay.
Councilmember Hotsmith.
Thank you.
And I was going to, I'll wait.
I'll read, I'm going to say it again probably once we get
to the other aspects of it.
But I guess let me start by saying there's some stuff that
's used that's not been
touched on.
And I think the span usage of Meals on Wheels operates out
of there that hadn't been touched
on.
I think important to note that the state school sends kids
over there to kind of interact
and get that kind of a connection and that type of therapy
if you will.
So that hadn't been mentioned.
In my estimation to support what the parks has noted, it's
one of the most utilized buildings
in our city.
And I think that's because of the sense of community around
there.
And I think noteworthy that I requested, so it's round
numbers, $16,000 in 2017 that was
earned for the city through that building as it sits now.
And so ultimately when we get to the final layout with the
additions, I'm really going
to have a hard time, or better said, I'm going to solicit.
I'm going to solicit this council to support this project
at its fullest because it was
this same council that the majority of people supported a
parking lot that cost $829,454
that generates zero revenue.
Does it add to the community?
Absolutely.
But I'm supporting this project because one, it generates
revenue.
One it touches a cross section of our community that often
buildings don't.
You talk about what other facility in our arsenal has the
ability to support SPAN, support
the Denton State School, support seniors, support that
level of rental.
And so I think when you put it in context of due
consideration but supporting a parking
lot at near $1 million to not support this building that
has community input that is
highly activated.
And to that point, so I'll stop and I'll ask James because
he went to the facility
and sat in and looked for his own eyes as he was drafting
it and making this.
So I'll allow him to paint a picture of the different
activities and kind of what he saw
through his own eyes just kind of if you can translate what
you saw in that building when
you went to go visit to prepare your plans, your scope.
Just be a conversation if you want to interrupt me, please
do so.
Sure.
I think one of the key things was and early on is this is a
living building.
Can you hear me okay?
It's a living building.
So the intent is we had to see how they function.
We had to see how the other MLK, we went to MLK.
But seeing with inside the building what's going on and the
programming needs, it was
quite occupied during our visits as far as transient or
walking in activities as you
come into the building, but functional activities as well
too.
One of the key things that we noticed was there was a
separation within the plan precipitating
the programming is that it was very wide open.
It wasn't a safe space.
So within those activities from fitness to activities and
recreation from like playing
pool or doing other activities within the space, it seemed
to just be something that
was just thrown up against the wall and used.
So there was a function there.
But each building was active when we were there.
We had programming discussions multiple times with staff
and also too with the users.
So seeing what those usages were, they didn't have the
space that was conducive to what
their needs were and they're always overbooked.
They always needed more space.
They did have an issue with parking.
Again, we can't fix the streets in the parking.
However, with inside the space is that's what precipitated
how the building was going to
be used.
So when the building was parsed off or divided and tables
were being used, they have a very
eclectic set of equipment, which we want to talk about that
as well too through the FF&E
piece.
But the intent is that every area of that building is fully
used and utilized within
the times that we've been there and through input through
when we're not there, kind of
seeing the activities that are going on at different times
of day too.
So whether it be in the mornings or, you know, working into
the evenings or even on the weekend
when there is an activity and it's quite an active space.
Thank you.
Thank you very much.
Did that help?
Yes, Councilmember Nelson.
Then we'll go ahead and finish I think you've got a few
more slides so we can because yeah.
It's called the Senior Center and we're talking about it as
the Senior Center.
But you addressed the rentals and apart from the income
that the rentals generate, you
know, to the extent that that's an indication of how the
community sees it, is it not accurate
to say that this facility gets about three times the rent
als that Denton Senior Center
gets?
So the Denton Senior Center, they have five rooms that are
available for rentals and they
have 69 rentals from outside.
Versus over 200 for this, right?
For two rooms.
So I mean, you know, I guess that suggests to me that it is
accurate but not sufficient
to see it just as a Senior Center, you know, that it seems
to function more as a community
center, you know, for all those life events that people,
you know, seek rentals for.
And then I want to ask you, how does its condition compare
with other kind of community centers
we have like Deena and North Lakes?
You know, is it, are they all similarly aged and sagging
and so on or is this uniquely,
you know, in need of a relook?
Yeah, I mean, with the structural challenges from the
outside of the south building, it's,
I think it's our oldest structure that we have.
The Senior Center downtown is old, it's an old structure,
but this one is a little bit
more needed at this time.
You know, MLK was built in 1995ish?
Is that correct?
Don't quote me on that, but 89, okay, 89.
And the north building is built in 2003, structurally that
's fine as well.
So there was no need to tear that down.
So that was one of the reasons why I just remodel it and
add to it.
So it was more functional space instead of having two
buildings next to each other.
Yes.
This is on a slightly different tack.
Placement of restrooms.
To the extent that it is a Senior Center, you know, during
the day, you know, have you
vetted with the folks who use it during the day or the
folks who oversee that operation,
the distance from the multi-purpose room, which is where
most of their activities happen,
to the restroom?
Because you've got folks who are mobility challenged and,
you know, I'm wondering about
that long corridor.
That's a great question.
It was addressed.
There's two trade-offs.
One is the cost to look at doing a shotgun situation where
the bathrooms are in the back
like the existing facility.
And the other one was the compromise to utilizing existing
plumbing to make it more functional
and economically sensible to the overall budget.
So the travel distance as it stands right now without
expansion, the meeting room you
see here still would be that function for the day-to-day
daily operations.
The multi-purpose in the meeting room would be for the
events.
So the main daily functions would occur in both spaces,
depending on need.
But the distance from the middle of the building, if you
look up to the top, you're talking
roughly about 40 feet of difference and change of a walkway
.
So that's about from where I'm standing to that wall.
So depending on where the bathrooms would have been to
where it was, it is accessible.
All the floors are maintained accessible within the
building and throughout.
So yes, it is a travel distance, but it's not more in
common than if we were here to
walk to the restrooms in the corridor.
But it's a little bit less than that based on what we have.
So there's a trade-off between economics and also to
function.
And we tried to marry those two things up together as best
we could to be sensible and
spend the money in the areas where the program functions
could probably serve a better purpose
or a higher level.
I don't claim to know more than you.
And I'm just sharing an observation.
You do have that storage space right now positioned by the
kitchen.
The kitchen's got the plumbing too.
So I would just suggest that there's dominoes that can move
around and still take advantage
of plumbing fixtures.
But, you know, it's not my expertise.
Yeah, I'm going to tell you, you start moving bathrooms in
a slab with four-inch drain lines
for toilets and things like that.
I mean, yeah, kitchens, they have two-inch drain lines
typically.
Toilets require four.
And now you're -- I mean, there may not even be a four-inch
drain line in -- so I hear
what you're saying, but when you start talking about that
kind of remodeling, you're going
to add about 30%, 20% or 30% to that just to jackhammer and
move.
Is that inaccurate?
It's accurate.
I mean, we are demoing the building, so it's a build back.
But to get the inverts and all the drainage, the technical,
it was more cost-effective
and functional to see if we can adapt that building.
And yes, there is plumbing, lesser drain line.
But we're also adding a sprinkler room to the building too.
So that's another accommodation to make this function work.
So the supporting function within the multipurpose was the
kitchen and the storage.
And that's still something that we're programming as we see
, but that's the need and the fit
to support those two multipurpose spaces.
So if you were to exit that, you would go to the bathrooms.
If you're front or back, there's a difference about 12 feet
.
If there was a bathroom in the south, that 12 feet didn't
make sense to spend the money.
At least right now, we consider it where all options are
open because this is still in
concept.
Yeah, it's a new build too.
Correct.
What about the mayor training that would tell me about that
?
No, no, it's not -- it's just -- unfortunately, it's scar
tissue.
Thank you.
It's knowing because you've made that mistake.
Yeah.
And just to add to that as well, before in the north
building and the south building,
we basically could have two events going on at the same
time.
Now we can have a meeting going on in this space, somebody
in the fitness area for drop-in.
We could have some sort of a rec thing going on here in the
rec room and then two events
going on in these two spaces.
So if a restroom was here, that would just service this
room or these two sides.
So we could actually have four or five things going on at
the same time in this facility.
So that way everybody can use the same restroom and there's
a way to get to that.
Right.
Okay.
All right.
In addition to the base and the adjusted costs that we
discussed earlier, the patrons asked
for some additional considerations which were at alternates
.
One was a wall for the computer lab in the classroom, a
glass divider for the fitness
area instead of a solid wall and then some additional
finishes at $45,000.
Installation of a solid glass wall at the main entry and I
'll show you some drawings
of this and the difference here in a second.
And then the installation of a terrace, a concrete overlook
that's overlooking the park
and the basketball area.
So you can kind of spill outside the building a little bit.
Is that covered or uncovered?
That's uncovered.
So it's just uncovered at this point.
Just concrete slab?
Yes, sir.
Yes.
But that's on the sort of the east side so for afternoon or
evening events it's going
to be a little more palatable for folks to use, right?
That's correct.
Okay.
And then furniture fixtures and equipment, that's
replacement of tables, chairs, fitness
equipment, that type of thing, it's $35,000.
And then additional design fee of $35,000.
So just to give you the base bid, here's the front entry
area that we just talked about.
These in the base bid are punch out windows so they're just
regular square windows.
Two multipurpose rooms, a rec room, an open space meeting
room.
You have your restrooms that are expanded here and then a
fitness area and that is $857,000.
The alternates are in color so here's your terrace space on
the northeast section of
the building or east section.
We took the large meeting room and split it into two so you
have a dedicated computer
lab as well as a classroom for programming.
And then this space instead of being a solid wall, it's a
glass wall so you can see in
and outside of the fitness area and the rec space.
And then the front entry area, instead of having a solid
wall with punch out windows,
it's all glass so you can see inside the space.
>> Councilmember Briggs?
>> Do you have a question?
>> I'm curious about what kind of glass it is and if it's
-- since it's -- if it can
be busted out really easily.
I mean, there's -- I know that we put glass in the police
department that was really,
really expensive, but it can't be destroyed.
So I'm just concerned here with that much glass in the
front of a building if it's,
you know, broken.
>> This is commercial glass.
It's not going to be a bulletproof film and such.
And yes, there's always the risk of damage or, you know,
someone breaking a window.
But the intent is to treat the lower part of the window
with tempered glass, the upper
parts with, you know, typical insulated glass with the
color and such so that it protects
it from the environment.
As far as putting a bulletproof screen, we have not
considered that within the budget.
So windows can be broken, so yes, more glass, more
opportunity for breaking.
It's more of an aesthetic.
It's more of a conversation that we've been having.
That's why it's an option.
It wasn't the base.
It could improve the look of the building.
Again, too, we would consider energy consumption, things
like that, you know, as we go through
the process.
So I want to make sure we're clear on that, too.
>> I was thinking more about baseballs, not really bullets,
but --
>> Well, if I could just point out, too, that the
activities really are here.
So this is the corner of Lackey and Wilson.
So this is facing effectively the front entryway of the
current south building is where the
picture that -- that carried up with the sign, and I could
flash back if that would help.
Let me see if I get that right.
Did I get it?
There we go.
So this is at the corner.
So that facade is directly behind the sign that would be
relocated as well, too.
So what you see here is the breezeway to the building.
So where the shadow is, unfortunately, this is kind of
where that curve would be resting
as you see.
So it's up facing the street.
Unless it's through the balls in the street and such,
things could happen.
There is some landscaping as well, too.
So it's a standard kind of front to a building, not much
like what we see out of the window
here.
>> And they'd be extremely energy efficient?
>> The intent is, yes, it would be an energy efficient gla
zing, insulated glass, correct.
All the windows, regardless if they're -- the option or the
base option would be that from
an energy and comm check standpoint.
>> It would still have to meet the energy requirements for
the city, energy code requirements
for the city.
>> Correct.
>> And the comm check for the mechanical, the shell, I mean
, that's what we'd be providing
as well, too, to make sure that what we spec will, you know
, pass the energy code.
>> Chancellor Gregory?
>> Would you go back to that -- the last slide that we were
looking at the most recent.
>> Sure.
>> There you go.
I'm all for the addition, the concept of rebuilding and
connecting the two buildings together.
I'm for most of those alternatives.
I'm uncomfortable with the glass on that entrance simply
because it's west and I don't care
how efficient the windows are on the west.
That's not as energy efficient as if you had the other
concept with the -- have some windows
but not have as much sunlight coming in.
But I'm for -- I appreciate the changes.
I think it's going to make the programming much better and
much more useful for a variety
of purposes.
And so that's -- >> Thank you.
>> That's my recommendation for direction.
>> Yes, Councilmember.
>> No, I think that's a good point on the windows in the
front.
I think -- and I'll just tell you, for me, the terrorist
component is huge because you're
talking that many rentals.
Well, you have kids, it's inevitable they're going to the
park and now you have a parent
that can't keep an eye on their kid but you can't keep them
from it.
So I think that to me will be great and you have the
natural shade of the building to
kind of keep you out of the heat as well or at least
periodically to go check.
I think that will be great.
>> Any comments, questions?
I want to make sure.
More slides?
>> I do.
>> Let's go ahead and wrap it up and then we'll get --
>> Just as the original building cost $250,000 in 2003, the
north building.
So just some summary slides here.
Total base costs, $850,000 adjusted base.
The alternates, $85,000.
Design fees of $99,000 in total.
FF&E of $75,000 which is a total cost of $1.1 million if we
were to do everything as presented.
What caused the difference?
We already covered that in the additional slide.
I'll skip over that since we already covered that.
And then here's the breakdown specifically of the expenses
and revenues.
So the original project scope was $614,000 which you
approved in September of 2017.
Original design fee was $64,000.
Additional scope of work was $243,000.
With the alternates, FF&E and additional design, that's the
$1.1 million I just mentioned.
Original project funding which you guys provided, $614,000.
So we had to come up with funding to balance that if
council decided to move in this direction.
We identified park development and land dedication funds
from Fredmore Park at $249,000 as an
option as well as $100,000 in gas funding that was
allocated in the budget this year
for a project which we can use as well as $153,000 in
interest from our park bond projects
that have accrued over the years.
That would get us the total funding based off the current
estimate from ICON's proposed
design.
Council Member Briggs.
Okay, so that's good to see that there's not anything
coming out of our general budget.
So it's all accounted for, the money.
So I'm okay with the project but parking was brought up
earlier and that there's not really
much we can do about it but I'm just curious as far as
since we are expanding the square
footage if the parking that we have available is sufficient
for the new parking ordinance
that we just passed.
Great question as far as the parking.
So the expansion of the building per the code and parking
is we actually overpark even as
we stand now.
So we have the same amount of handicap spaces which reside
in the south side.
We're going to reconfigure those just because of
accessibility and grading issues but there's
no extra impact on parking as it sits based on the
requirement of the current parking
and zoning code.
Okay.
So we're actually below it based on the actual square
footage.
So I think we're over by two spaces last we checked.
It could be three depending on ADA.
Okay, thank you.
Just to add to that, we have reached out to one of the
local churches down the street
and a lot of park users use one of their parking lots and
we're trying to figure out how we
could work together to make sure we're being fair to them
because our park users are using
their space so we're having discussions about some
partnership opportunities there.
Okay, so last slide.
Yep.
Okay.
There's three options here for council's consideration.
Option one would be basically to move in the direction that
we talked about last fall which
would be to demolish the south building, rebuild it on its
existing footprint at about the
$614,000.
The one thing that was not accounted for originally was the
design cost so that's why that's been
added.
Option two is demolish the south building, renovate the
north building without the alternates.
And then option three is basically option two with the
alternates and obviously we could
drop or add those alternates as deemed necessary when we
actually get the bid prices for council's
consideration.
So there's three options for council's consideration.
We're looking for direction and which way to move in
regards to design and we'd be willing
to move forward as soon as possible.
Council's pleasure.
Three?
Yes, sir.
Okay.
I'm okay with three but without the glass as well I'm
concerned about the sun and the heating
of the building, cooling it because utility bills are an
issue.
I just want to make sure that the rents that we charge to
reserve the space are not going
to increase, that they're going to stay affordable for the
community.
I don't know if there's a plan for that or not but I just
want to make sure.
We haven't discussed about raising the fees.
Our fees for the rental rooms are all the same whether it's
a large room or a small
room.
Right now those are $20 for a resident, $25 for a non-
resident so they're pretty affordable.
Yeah, okay.
Thank you.
There's an additional fee for after hours for staff too in
regards to that.
Yes, Council Member Meltzer.
I'm in agreement with what Council Member Briggs said and
if I'm not mistaken I believe
the original building was not built by the city.
I believe it was built by veterans from the community as a
gift to the community at least
so I've been told and well I'd like to know if that's true.
You're exactly right, it was built I think by the veterans.
If you all remember Councilman Carl Young was on council
and his dad was real instrumental
in providing that and getting that building up and
operational.
I think those veterans would be very pleased to see this
structure embraced by the community
the way it's been.
I think it'll make the neighborhood better and the city
better.
So option three?
Council Member Duff?
Yeah option three without the glass.
Okay.
I'm good.
Same here option three without the glass.
Okay without glass I presume.
Yeah I mean option three for me with or without glass I
mean I certainly understand so I'm
sort of indifferent to that.
More important, this is not going to come as a surprise.
I think we can do better on some of the costs when I look
at $45,000 put in a couple walls.
I mean you're already doing construction so I think if we
're going to approach this the
same way that we talked about after having the discussion
about the Bella Park as far
as trying to do some value engineering because I just it
just it's very frustrating to see
sometimes what what so a question on the terrace.
I saw steps.
I saw some steps there.
So the terrace is going to be elevated?
Correct.
Do we know how?
It's currently at the same grade as the finish for the
building.
Right.
Which is approximately 30 inches above the basketball floor
level.
Okay so that's that.
So we're not changing the existing grade outside of our
property.
Gotcha.
It's just going to go back with it's just going to keep it
at that same grade so it'll
be either some piers with some fill dirt and four inch or
five inch slab.
Is there is there a fence or is it will there be a?
There'll be a handrail.
A handrail around it?
A handrail and necessary code railings for the steps.
Correct.
I'm okay I think this will be a great addition to the
community.
I just my concern is just make sure that we really twist
the screws on the cost because
it's it's basically two restrooms a kitchen and then a lot
of open space and so we will
we will hire an independent estimator after we've got a
final design and a final estimate
just to make sure that we're comfortable and we're working
with city attorney staff right
now on creating some different contract templates to allow
us to negotiate line by line on those
types of projects.
We're trying to find projects or contract formats that will
provide us a little bit
more flexibility up front.
Okay.
Can I add just in the original structure the agreement
which is still intact is we will
be doing a pending a probable cost third party will be
doing that to vet it out so when you
see just walls there's other things lights flooring.
So there's amendments to that too so it's a way to just
collect it it's kind of hard
to get too down into the to the weeds on that today but
that's what we'll be doing as we
step through the process and working along with with the
city as well.
Yep.
Councilmember Gregory.
Where the terrace is on the far north side next to the
building and the outdoor restrooms
are those HVAC units.
Those are the existing condensing units that are in place
that's where they've been we
kind of have to accept it.
Really.
Yeah, it is what it is to support the mechanical.
It's new it's a very good shape they're only if you know
less than 15 years old.
I'm just thinking about them in relation to the terrace.
We understand we've talked about possibly some wall
screening and that too again to
looking at that so there may be some additional cost that
we have to look at to kind of see
what those are to just put up a screen wall but it's not
that much you know just deflecting
that sound.
So you know.
No, I just it's a running joke.
I mean they think I'm lunatic so it doesn't matter.
I move.
Yes.
Yes.
I'm glad I could provide some humility here.
Thank you.
Yeah, no I just want to say I sat in on I was only make
able to make a couple of meetings
with James and James and his partner forget his name that
were at the meeting but really
really great group to work with and very responsive and
very flexible as the kind of Miss Betty
would point out this that or the other.
They were very amenable to that and again was nice enough
to stop by on a Thursday and
kind of take everything in and see it in action.
So really really great job and looking here at your website
and seeing you have an office
in Sanger in Plano and I think what D. Okay, I was trying
to see maybe whenever you get
to third office Denton you know is a great place.
I've lived there all my life so it's just as a thank you.
Okay anybody else believe you have your direction option
three with you know some caveats and
costs and all those kind of things.
So forward.
Yep.
Fantastic.
Thank you.
Thank you.
Thank you gentlemen.
You bet.
Thank you very much.
Great job.
Let's go and take about a five or 10 minute break before we
move on to agenda item C.
Welcome back to this meeting of the Denton City Council.
Tuesday June the fifth 2018.
It is 147 we're moving through our work session reports.
We are currently on agenda item 3C.
Receive report hold discussion give staff direction
regarding the various options to
cost effectively complete reconstruction projects for the
street rehab bond program.
Good afternoon Mayor City Council apologize for what you
have in front of you.
I think you have a couple of slides that were added at the
request of a few folks and we
made that change this morning for clarification on some of
the things that we have done.
So you have that in front of you and I'm just going to run
through those first three slides
just as a quick reminder of where we have come from just in
the short 12 months since
not even 12 months since I've been here and then right
after I run through the first part
Danny Kramer who is our deputy director of operations for
streets and drainage.
He will proceed on with the discussion of streets rehab OCI
those really fun things
that we have to talk about.
As far as capital projects department which streets and
drainage are part of we have gone
through whole house and reorganized that particular
department so that we can focus on project
delivery make sure that the projects that have lingered
over the time in the form of
just not getting out the door fast enough not getting
designed quickly not being performed
effectively.
We have restructured ourselves and refocused our efforts to
make sure that that's all taking
place.
Those things have been in the form of putting in project
managers to streamlining the design
process so that we can go through a every three year
procurement of engineering services
professional services that are needed to deliver these
projects.
We also have been taking a hard look at internal services
what do we do if streets and drainage
have limited resources in the in the form of manpower what
's the best way to deliver
what we've committed to the community that we would get out
there.
Do we need to outsource some of that construction so we can
make up for the gap that we've
had over time and not being able to deliver.
Those are all things that are ongoing currently.
We've also been focusing our efforts and making sure that
anytime we do a project we're
always working with external stakeholders in the form of
text on franchise utilities
at most is one that we've been working a lot with lately to
just make sure that we're
on top of where they are where we're going to be and we
really focus and plan those efforts
so that it's more of a partnership.
We can get a much better project when we partner with water
and wastewater they have recently
condensed and consolidated their water and wastewater
construction efforts so that there's
one point of contact there and which has made it much
easier for us to also focus our efforts
as a conjoined project as one complete project and not
going out multiple phases and people
wondering well who's coming next.
We've also put in place a project management or a program
management office so that we
can better coordinate all those efforts that we do as a
city.
Right now our focus has been on establishing that PMO in
regard to streets and drainage
and bringing in the water and wastewater component but the
intent is long term how do we coordinate
the field work the work we're doing on just the things that
come up on a daily basis a
water main break and then we got to go repave it or
something that we're doing that is
just a spur of the moment or high priority now issue.
Those can be coordinated along with the long term plan
projects like every one of our major
roadway projects or a large water line project.
We put a lot of emphasis on making sure that we don't
repeat some of the problems that
have occurred in the past when projects take a long time to
get out the door construction
inflation can catch up to you quickly across the nation
nationally that average sits at
about four and a half percent annually in construction
inflation in the Metroplex here
in the Dallas Fort Worth area with all the projects that
the state has going all the
other communities in the area they have work going on we're
actually seeing a localized
construction inflation of about one percent per month so
that nets out somewhere between
twelve and a half to thirteen percent annually so a much
greater inflation to the cost of
the project as we delay getting started on construction.
So our efforts have been focused on making sure that one
budgets for projects have been
secured in the fact that they may not have taken this into
account when they were priced
originally so we have taken that into account circle back
and look at every one of our projects
and make sure that we're appropriately funded now.
And the other things we've been trying our best to do is
look at projects that have similarities
that can be bundled together to make sure that we get the
best scaling we take advantage
of scales of economy.
We bundle those so that we do a better job of delivering
the project just from a scheduling
standpoint and efficiency standpoint.
You also have a little snapshot here at the bottom is a
segue into Danny's part of this
discussion.
Some of the street segments that we had initiated as far as
what was in the 2012 and 2014 bond
program in that program there were four hundred and three
segments in both bond programs.
Now the 2012 bond program started out looking at what was
our lowest OCI scored roadways
and it focused on that.
The problem is is when you only focus on the number you
forget that this particular segment
sits right next to another segment of roadway that the OCI
is not so bad.
So it may not be great may not be a high OCI score but it
may be sitting in the middle
and doesn't look so bad.
But do you really want to go and impact the neighborhood or
the folks in the area multiple
times over the next four or five years or do you want to do
it one time.
So one of the things that we have seen is with the 14 bond
program there was an attempt
to close that gap a little better make sure we got more of
the roadways that really needed
to work out under construction and then we close the gap in
trying to put a complete
project together so we took in more of those streets that
had a little higher OCI than
what we looked at before.
So one of our plans was to look at what can what did we
deliver in the past 13 14 15 and
this is with two construction crews in house and then with
some kind of contract helping
those two crews typically J go public.
So production may look a little small in the 13 14 we were
ramping up the 2012 bond program
so you had a lot of O&M funding that went into some of
those streets and then you have
15 16 17 where we have steadily increased but you also have
the infusion of 2014 bond
dollars as we made holistic projects and not just focus on
one isolated area.
There was a little dip in 17 that is purely giving you the
number of the 2012 and 2014
bond projects.
They actually performed somewhere close to 60 to 63
segments that year and that was made
up in O&M funded streets where the OCI wasn't bad enough to
make it on either of the bonds
but they were significant enough that instead of coming
back two or three years later or
the next bond program and impacting that neighborhood
streets went out and said let's do this now
one time.
So they infused that O&M money to make that happen and then
you see our projections for
18 19 and 20 as we ramp up our efforts through this
bringing in contract help to make us
to make these projects get out the door faster we focus on
better ways of getting the streets
constructed and built and complete this 2012 2014 bond
program by the end of 2020 as our
goal right now.
Just as a brief overview this gives you a brief
illustration of the green line is the
percent of streets and both the 2012 and 2014 bond packages
that were complete over on the
left.
These are the number of segments completed per year so this
just really goes back to
the previous slide we saw the chart but it gives you a
visual reference of how many of
each of these years do we accomplish in 2012 bond projects
or bond segments that are these
dark blue segments and the lighter blue is the 14.
The 2012 does kind of ramp down a little bit as we go but
it is taking into account more
of this holistic approach to the project.
And with that I'm gonna let Dan Kramer take over from here.
Good afternoon.
So we're gonna go over just some basics streets make sure
by we're all on the same page understands
what we're talking about as we go through.
So city of Denton we maintain 426.4 miles of roadway as
that's not counting our alleyways
but that's our main roads in the city.
You know 934 our asphalt 380 our concrete in lane miles
with the total replacement cost
of about 843,000 per lane mile that equals about 385
million with 909,000 vehicle trips
per day on our roadways.
Now you've heard everybody talk about OCI and what that
stands for is overall condition
index and what that is is a number from 0 to 100, 0 being
the worst 100 being the best
and we do these studies we've had three studies in the past
that have gone through we have
an outside contractor they'll come in run over it with
their vehicle with different
sensors and 80% of it is for the pavement condition index
and 20% is for a ride index
on how the road actually rides.
So you know out of those out of those tests we had one in
2003, 2009 and 2015 so we do
it roughly every five years to get those numbers.
Now as we get those numbers we place them into our system
our internal system where
we track them and it tracks all of our information every
change that we've made we go out we'll
put work orders in it'll show the improvements or the
decrease over time as how all these
roads act over the years.
So here's your basic scoring system raising from you know
100 down to 0.
Your main categories that we're looking at is you can
bundle these up into technically
three different categories you got your excellent and very
good which are your minor maintenance
which is either our micro seal and crack seal sections you
know from anywhere from 100 to
a 75 then you also have your good and fair to marginal
which is your 75 to 65 which those
ranges usually are mill and overlays all depending on what
level they are as to how deep we have
to mill and do our overlay on that and then your poor to
very poor which is 45 to 0 is
pretty much reconstructed.
It's gone far enough the deterioration is bad enough that
we can't do anything else
past that but go ahead and reconstruct the road.
So basically a pavement life cycle curve so as you start
out as road first comes up it's
100 and every day as it goes by it slowly deteriorates or
just over time over normal
wear and tear.
So the goal is to look at your your minor maintenance and
keep on top of those because
in your first 40 percent of life there's only a 15 percent
drop in quality.
So if we can go out there and stay on top of these roads
and do our due diligence which
is usually anywhere between five and seven years depending
on the traffic and what area
the street it is on our asphalt roads we can go back and do
a micro seal on these and keep
coming back and that'll bring it up it won't bring it back
up to 100 but as it drops down
to you know close to a 75 or so you're bringing it back up
to a 90 85 90 and keeps our roads
continuing so you can get the same life out of an asphalt
road as you can a concrete road
as long as you keep all these maintenance up to date just
like changing the oil on your
car you need to stay on top of it or you're going to have
issues down the road.
So here's a condition comparison that we had so these are
the 2015 numbers as you can see
here in this column of when they came by and did the OCI
study you know of how many percentage
of our streets were in this category and then we have the
current data which is from our
excuse me our in-house system where we keep all the
improvements that we've done and
algorithms over time as the deterioration keeps coming down
.
So as you can see we've had a drop in some of our roads you
know our biggest our excellent
and very good both decreased two percent our good to
marginal you know our good increase
three percent because some of those were dropping down our
fair to marginal five percent and
poor stayed the same but our very poor increased to five
percent which showing us back and
forth it's not a good option.
Our bond program and how we're doing this was the more we
're looking into it was underfunded
and looking at the projects or we weren't looking at using
it the most efficient way
that we could to get it done.
You know our crews have been focusing really hard on
getting the bonds getting everything
done and part of it I think comes into a little bit of our
maintenance program is not up to
par where it should be and that's part of our reconstruct
and how we're looking at going
in and pulling that back up so we get it where we're at
where it needs to be.
So here's another comparison of us and cities around the
area and we're still waiting on
a few more to get back to us but this is what we had at the
time you know and so we're
something to point out you know like Frisco you know 95
percent average OCI most of their
roads are concrete and they're newer so a concrete roadway
versus an asphalt concrete
up front there's less maintenance coming on but as you get
farther down in the life of
it you have a lot more more expensive maintenance and it's
you're talking about shutting roads
down more often have more issues as you're doing the
maintenance.
As long as you keep the maintenance up little by little
they can last just as long and we
don't have as much you know problems with our citizens as
we're shutting whole roadways
down just coming in to do a little bit here and there.
So some of the OCI activities that are taken care of you
got your minor which is your crack
seal and micro seal your major which are mill and overlay
and those are for your asphalt.
Now concrete also has minor repair which is just your joint
and crack seal as you have
those come up panel replacement that gets into a little bit
more but you replace in
the section instead of a whole roadway and then you also
have your majors reconstructs.
Another thing I want to bring up is as our crews are out
there as our normal budget as
we have sitting in front of us we have so much of our
budget is used for OCI and so
much of it is used for you know the non-OCI activities and
a lot of those non-OCI activities
are the emergency funds you know we have hard rain we get
more potholes the guys have to
go out there pull off the jobs that they're on go out and
work on those get those repaired
we have you know utility cuts that they work on curb and
gutter replacement you know a
lot of these options that we have out there are needed but
we got to remember that those
don't go into our OCI budget improve the overall score for
the city those are just things that
have to get done as we go.
You know our in-house as you can see there on the on the
left that's mainly what we
do contract services we use some of our concrete
contractors to get some of this you know basic
stuff done because specialized equipment and we go from
there.
Daniel real quick question sir as far as the percentage of
staff time how would you break
down the non-OCI related activities to OCI related in other
words percentage 30% non-70
or what would it's based on prior years we're sitting
pretty close to 60 40% 60 60 OCI 40%
non-OCI.
Thank you.
Yes sir.
So looking at the numbers and trying to get some base
numbers that we've asked for in
order to go back to repair all the poor and very poor
streets if we were just given a
number today to get them all back to 100 and go through we
're looking at about 193 million
dollars.
So you know that would get now that's not counting any of
the utilities or anything
that's just the street repair as we have right there.
So that's all the extra costs and everything else you have
to get utility cuts we have
to get at miss we'd have to get everybody else to go in and
work on that.
You know so that roughly works out to about five hundred
and seventy five thousand a lane
mile for those numbers on the reconstructs.
How many lane miles is that do you know?
That is for reconstruct that's three hundred and thirty
five.
And we have how many lane miles was it if I remember twelve
hundred right under thirteen
right under fourteen hundred with more coming on as some
new subdivisions come into the
area.
Yes Councilmember Maltzer.
Is your second bullet indicating that it would take five
years to accomplish all that assuming
that it were funded?
What we did is we put you know best case scenario if we
were given a hundred ninety three million
and we could get every contractor in the area to come in
here and work and shut down every
street in Denton we could get it done for that amount of
money.
But we'd have a lot of happy people on that so probably
wouldn't be the best thing.
So what we did on the second bullet point we said based on
inflation you know you're
looking at two hundred and fifty million over the course of
five years which that is probably
still steep but that is more reasonable for us to start
looking at and we got to go back
and sharpen our pencils and look at all the timing and look
at the schedules and figure
out the best way that we can actually get this accomplished
and get it done.
But rough estimates to get the numbers that's really what
we're sitting at for an investment.
And I understand the dollar part but my question was about
the duration.
Yes.
Yes you're saying more than five years because you know you
can't do it all once right?
Well the other question as you know Todd brought up earlier
as we're working with engineering
and going into our bundles internally no we are not going
to be able to do that at all
internally with our crews and as I'll talk here in a little
bit what we're looking at
for our internal crews is to turn them more into a
maintenance section where they're working
more on you know the micro seals and getting those roads
done the crack seals the pothole
repairs and everything that we have going on and then the
small projects that are going
to take you know a month two months and then.
I'm sorry I kind of misdirected you.
Just give me the full picture where I'm going with this
question.
You showed us a couple of slides ago was that from 2015 to
today five percent of the roads
slipped from I think it was fair to very poor.
So you know during the time that we're working on the poor
and very poor if it's five years
five years plus won't another seven eight percent I don't
know you tell me slip into
very poor where they require reconstruct.
Yes.
You know then it kind of how do you how do you figure that
into the you know into this
obviously moving target.
Well what we're looking at with with our cost right here
for the for the investment would
be with the bundling we're able to put more streets in
there and make it more palatable
for you know a contractor to come in because we're giving
them a good lump sum we're giving
them a lot of work so we can get more bids on it we can get
more contractors coming into
area and doing the bigger projects and what that will leave
our guys capable of our in
house crews to be able to do the maintenance be able to go
back and do the get the minor
maintenance which the micro seal we outsource because it's
very specialized equipment but
the major maintenance which is the mill and overlay we have
the equipment here and we
go through and we'll do the mills and we'll do the overlays
so our job would be keeping
there are going to be some slippages because there's some
that we will not be able to fix
in that time but our job is to get on the major maintenance
internally and some of the
minor maintenance and keep those where they're at and the
best to bring them up so that there's
very minimal slip into the reconstruct area which the
contractors will be taking care
of that.
So one way we're doing this and I know it's small but it
was hard to fit everything on
one slide.
What I've been working on here is we've had a plan now it's
been on an Excel spreadsheet
and if there's a change or something else comes up here
there it's very hard to adjust
everything in the timeline so that everybody can see where
we're at and what's going on
so this right here is our reconstruct including O&M and
bonds you know all the way out to
2020.
So what we're doing is the plan is to get everything into
right now we're using project
but whatever you know what we decide to use the scheduling
software in the future but
our goal is to have a 60 day outlook that's on a dashboard
of some sort which anybody
can look at so show us because we've looked at the timing
and see where we're at and
we can reasonably say that within 60 days our timing is
going to be pretty consistent
that we can go by anything past that you know you start
tossing up to weather delays different
areas that we didn't see issues with that are coming up you
know the whole schedule
is going to be out there but the goal is at first to get a
60 day schedule out there hopefully
extend it to 90 but have it where we can see the dashboard
see what's getting accomplished
see what's out there see what's on the schedule so
everybody can go and look at it anytime
when they'd like to and these are updated on a weekly basis
and the goal is to get all
of them as we're working through you know the micro seal
our milling overlay schedules
and everything out there and with our PMO group tied into
this what they'll take is
they'll take our schedules and they'll get it with water
wastewater and the public all
of our franchise utilities and work everything together
into one group so we can see an overall
city of dentin schedule so that we can verify and we don't
have any of some of the issues
that we've had in the past with things popping up that we
haven't seen or we didn't foresee
and you know in proper planning.
Yes Council Member Gregory.
I think I see it under November of 18.
Yes sir.
I see the words bundle Hinkle Drive.
Now let me tell you something I went out there this spring
my wife and I went to a birthday
party Carol Rittlesberger turned 100 and when I got out to
the car I said honey we can't
go in the car we got to go in the pickup it's got 10 ply
tires I think that we can make
it on Hinkle Drive the 10 ply tires but and I see Mrs. Ritt
lesberger every Sunday at church
100 years old and I can avoid her because I'm a little bit
faster than she is I can
get because every week she says Hinkle Drive when you're
going to do something about it
so are we really going to start working on it in 2018 and
do you think that it'll be
finished so that she can see the finished product.
So short answer is yes we'll be working on it in 2018 the
package actually goes out to
bid later this month.
Hot dogs.
We're making a few minor modifications to the plans right
now just in light of some
of the public feedback we've gotten but we are going to go
to bid this month.
Well she's very healthy so she may she'll enjoy seeing it
completed.
And for that for that conversation I think this that's why
I just want to say I really
like this graphic I mean it is fantastic because it allows
you to if there's things that need
to be shifted or whatever I mean it but at least gives you
it starts that conversation
right and so as we were talking earlier it's like hey be
clearly wrong early give some
people you know it's like hey here's here's what we have
and if there is Jocelyn and around
why and that sort of thing but at least it gives you
something to shoot at so I just
wanted to whoever you know kind of put it I mean because
that's a lot of data entry
and all that so I appreciate time and effort to get that
squared away and then when I that
way when I go kicking and screaming about something you I
get I get the positives out
of the way early.
Thank you.
Yes.
So on this chart if there is not a street listed on there
then that means it's not covered
by the bond this is just for the bonds like say Spencer or
Mills Road like okay and is
there a chart a swim chart like this for for those type of
streets because those are also
people want to know the timing on on those as well.
Yes every project that we're working on capital projects
which is more what we're talking
about Spencer in regard to Mayhill and McKinney they have
their own individual project and
because they're a little bit broader in scope and and just
cost they do have their own particular
project and what the PMO is working on right now is a roll
up of all of those projects
in tune with what Danny's put together here and the kudos
Councilman Radsmith actually
they really do go to him he put that together and and got
that put together but they will
be overlaid and the intent is to find a good layout of that
so that public council can
see exactly where we are at any given time.
You know as I as I said earlier our goal is to have 60 day
and hopefully all the way up
to a 90 day we consistently see a farther breakdown of
where it's starting by weeks
everything past that we have set up on a quarter basis we
're gonna start in you know first
quarter second third or third fourth you know and so forth
just where we're at so we have
placeholders and then as we set it up in this if we have
you know something changes we have
some issues all it is is put in that new date and
everything can shift out from there so
we can really see what the whole schedule is going to look
like so it'll really help
us in planning and making sure that we get you know the
right people in the apartment
we have enough people in there to get everything done that
we need to get done and it also
will allow everybody to see what's going on in the city and
where we're at.
Thank you Mayor is there a process as we you know are
aggressively knocking off all these
projects where by we engage the communities before we set
the calendar in stone so that
particularly if businesses need things to go a little way
this way a little way that
way you know to keep functioning that we take that into
account.
So that public engagement part of these projects whether it
's the streets bundled projects
or its capital projects in general that's something that we
're focusing on this year
absolutely and it is to make sure that we get to the public
early talk about the project
early before we've made any significant decisions as far as
to its scope and its schedule here's
what the project is try to get that feedback from them who
live it on a daily basis of
what potential impacts we might have both during the
construction and then what might
we not see just because they see it on a daily basis they
give us that feedback what you
will see this year is us reaching out to the public more
frequently either through neighborhood
association meetings or general public meetings or even if
we're in the business sectors
reaching out to those individual businesses on a one-on-one
basis so we can really talk
to them about what's coming up but that is a program we're
developing with the public
communications office and making sure that we're a lot more
front and center with the
public about that.
And I appreciate hearing that I think citizens will too and
do we also coordinate with text
dots calendars because what I hear from citizens is
sometimes it feels like they're blocked
in with no escape route and then you know we hear well that
's not us that's text dot
but are we coordinating in an overt way with them?
Yes we meet monthly with them to talk about a variety of
projects we actually have two
meetings monthly with them one is in regard to the major
projects the text dot has ongoing
like the I-35s and the FM 2181s the big projects that they
are working on and then we have
another meeting that is primarily focused on development
projects and capital projects
we generate that will touch their areas or generate traffic
that might impact them so
it's a it's a back and forth.
We also meet every other month with local emergency
services not just our fire department
and police department but local communities that come to
the local hospitals as well as
the county and collaborate with those entities as well on a
one-on-one basis.
For now some of these routes are DCTA bus routes right and
some aren't now I know we've
talked about the that in general the life of asphalt versus
concrete but in conditions
where you've got regular heavy bus traffic you know do we
target those routes for concrete
and rebar?
That's an ongoing discussion and debate that you're seeing
in a lot of communities right
now not just ours but it's one we're having as well the
trade-off that you have with concrete
and asphalt comes down to not just how often do I maintain
it but it's the cost of maintenance
and then it's how long do you have that roadway when you do
have to maintain it out of service.
Concrete by its nature I can ramp up the cost significantly
and keep it under construction
on a shorter basis by going with a high early strength
concrete but you do ramp the cost
up significantly doing that.
You'll add another 25 to 30 percent to the project
potentially depending on how much
of that you put in place so we try to minimize that to
locations where we just have to do
that in a very short time frame or just a very small area.
Asphalt what we've seen over time is asphalt will perform
as well as concrete over the
long haul as long as you do the maintenance.
You can get 30 to 50 years out of asphalt as long as you've
built the foundation for
the road well which was not done real well in the 70s 80s
and 90s arguably the 70s they
did a really good job with that but coming into the late 70
s we transitioned to the 80s
and so on I mean it's a little history of the construction
of roadways but you are getting
thinner and thinner to minimize cost and then you're
sitting here in an area of the state
where we have very clay soil so you got a lot of
contraction expansion so the roadway
flexes a lot.
The problem with concrete when I'm sitting on that type of
soil is concrete by its nature
is very rigid.
So anytime something happens underneath the concrete until
the concrete fails we really
don't know what's going on.
The advantage of asphalt is that if I build it right to
take on the weight the traffic
the amount of traffic and its longer lifespan I'll see flex
ing of the pavement underneath
the actual pavement itself so the foundation starts to give
I can see it and I can address
it quickly when it's less expensive but it does mean you
have to be watching it you have
to keep an eye on it you have to be doing the routine
maintenance that Danny is trying
to make sure that we do that every year as we go forward.
Councilmember Gregory has a question.
Councilmember Meltzer reminded me of something that I want
to put out there when you were
talking about the DCTA roofs because a few years ago I
think it was shortly after I got
it we had some roads reconstructed and some of the money
came from DCTA because it was
roots that they used regularly and they had some funding
available for that and I think
that we ought to just maybe put a note somewhere to that
effect go back and do the research
on how that money came about if that was RTC money that
they got or what and if there might
be any more available because certainly those heavier buses
have a bigger impact than all
of the automobiles.
Some of the key takeaways is you know the lack of the bond
implementation what we're
going to do to work on that is refocusing our internal
crews on maintenance and small
reconstruct projects that's our main goal to get our guys
to be able to work we're
mobile we can go do you know our small projects that we
need to get done that don't have
a long duration and then we can work on the emergency
repairs that have to get done on
a daily time you know work you know on the bonds bundling
and contracting out as much
as possible so that we can get more bidders in more
contractors and have the ability to
get some better pricing as we're going through and we can
get more work done because if I
throw a contractor out there tell them they're starting at
a and they're ending at B they're
on that road the whole time until they get it finished you
know if I have our guys out
there and we have an emergency somewhere I got to juggle
which crew I need to pull off
to pull them to somewhere else to fix that emergency and
that job may sit idle for a
few days while they're fixing that emergency you know and
that's never good in the public
side is to be able to see that road that started working on
it and then they come by three
four days out of a week and then there's no one there and
it just seems like we don't
know what we're doing so you know that's one of our things
to work on our current street
budget our proposed budget currently is sitting around 15
million that's what we propose so
far this year we're going back and we're relooking at some
stuff but if we look at it you know
an increase of close to 20 to 25 million that would really
get us to where we need to be
to get our the correct amount of micro seal because this
year we have 57.9 lane miles
which we're doing micro seal on and that is seven hundred
and eighty eight thousand dollars
to get that amount done now this goes up and down based on
the price for everything but
that's what this bid was for so looking at the next years
we need to look at and we're
putting the plan together now and I don't have all the
numbers for you but we're looking
at what we need to do to keep our maintenance schedule
going and keep it where it needs
to be you know every five to seven years you need to go out
and do something to an asphalt
road so what we're looking at implementing is we have we
have the ability we just haven't
been using it in the proper way that we can I want to put
flags out on our on our cartograph
system which tells us what our OCI's are so that when it
comes up on each road it's on
a rotating schedule every five to seven years it pops up
based on you know where we're at
on the road every five years it throws a flag up and says
hey we need to go take a look
at this road we need to check it we'll have the guys go out
take a look does it need to
be micro sealed this year can it last another two years
where we're at on that and if it
if it you know comes up and says we do okay we'll put it on
the next year and that's one
that we plan and just keep going that way so we keep a
constant you know constant cycle
through all of our roads so all of them are getting looked
at and where we're at you know
and that's all in just getting the software set up that we
have and looking to what we
need to do to make sure that we are using all the tools to
the best of our ability you
know and you know like I said earlier the 2012-2014 bond
package together was roughly
about 44 million you know and just again to reinstate to
really get everything from the
poor very poor which is 45 below that's almost 250 million
when you look at that spread out
over five years based on inflation going with the 12.5
percent based on the construction
area you know that's and we are currently going back
looking at all the numbers verifying
all that but that's you know kind of where it looks like it
's sitting as of right now
and yes sir now they have the question side so what exactly
does that assuming we figure
out where to find it does the 25 million buy versus the 15
million in terms of the the
profile you know of our of our OCI spectrum let's say and
isn't there is there a point
where you know we start seeing benefits like is this a
surge so to speak where eventually
you know we're going to see it settle down because you know
I saw a slide earlier it
says spend the dollar here you don't have to spend eight
dollars there correct right
so it's a 15 million pardon me 25 million dollars inde
finitely or just for a period
of time and then where does it settle out to so really get
and what's the sure kind
of prospects so you've got a lot of things at play as that
long list of roadways you
saw in there broken down into categories obviously every
year those roads start to fall into
a different category unless something's done to them so
what the 25 million is based on
is what would be the ongoing maintenance cost to maintain
what we have once they're at an
acceptable level that's what you're looking at today but we
got to get the vast majority
of those roadways up to that point so that we can maintain
that just like your car you
can drive your car for 10 15 20 years if you maintain it
but at some point the thing's
still going to fall apart or you're going to want a new one
but what we're looking
at is if you drive it that long you're that dedicated your
car at some point there becomes
a point where that car is not safe to drive you're going to
have that with roads at some
point I don't care if it's concrete asphalt you're going to
hit 30 40 50 years if we've
done the proper maintenance to it and that road is still
going to fall into such a fashion
that we can't maintain it at an acceptable level so you're
always going to have somewhere
in the neighborhood of five to ten percent of your total
roadway inventory that's going
to fall into that level of I need to reconstruct it and
that goes into your next I would propose
that goes into your next bond program those are your
capital projects come the next time
around but you get away from where we are now where we're
at 25 percent of our roads
that fall into that category and you get it down to a
manageable level so I'm not out
there trying to chase 40 to 45 million dollars a year to
reconstruct roadways by themselves
just to catch up if I wanted to reset everything in five
years.
Just make sure I'm tracking so the 25 million is covering
the the bringing the marginal
and the fair you know and and the good up to right over the
sort of second tier was
right let me just throw that back up yeah that that 25
million maintains these top three
knowing that some of these down here are old age roads just
in a typical scenario not these
actual numbers some of those would be falling off into that
very poor scenario because they're
just getting that old and they need that kind of work but
this would maintain these top
tiers and about half of this bottom tier here in the minor
maintenance it would bring those
back up into either a very good or good status so that we
could continue to get extended
life out of those and so that's kind of an ongoing view as
long as we have roads and
if we don't do that at 15 million we're always going to be
having roads you know high level
of roads in the poor and very poor right that's part of
what you've seen in the past if you
just look at these bottom two numbers where we've grown
from 20 to 25 percent that's where
that gap is starting to break itself apart is if I add the
additional funding to streets
maintenance that helps prevent my loss in the total number
of roadways that fall into these
major reconstruct category.
Where's the street impact fees that have been bearing on
this discussion?
Roadway impact fees yep they can be used for a lot of
different things typically they end
up going towards infrastructure improvements that are
needed by the city but are usually
developer generated but they can go in a variety of places
as long as they fall within that
particular service area.
I thought well when you say infrastructure I thought road
impact fees were for roads
they are but that's what I'm talking infrastructure yeah.
Yes Councilmember Hutsworth.
How was and I think are we phase one on Mockingbird is that
what we just finished or because I
know it's all the way done but I think I saw on your
calendar it stands and I think if
I remember correctly from the presentations we did the p
aving piece is what we're missing
at this point we're finishing I think believe we have
finished up all the utilities and
I'll get you a better update on that one than what I have
off top of my head right now I
know the utilities are complete the paving portion is what
we're waiting on.
Well I drove the whole stretch from McKinney to whatever
that backside is so that what's
that thank you that's right and so it's paid but maybe it's
curve component anyway my point
is our question is how did that go because that's a
obviously there's a large neighborhood
there and I'm assuming you've deployed some I mean there
were one there was a large educational
piece before we started but how did that go was how was
there feedback as far as during
that construction were there any points of contention I
would have to deal with our street
superintendent give you a better idea of that I don't have
that fingertips but I can certainly
get it for you okay yeah I just like to know that that to
me is a good sampling because
of the large neighborhood in that area and it was a
complete rebuild sure so just kind
of understanding how we're doing and I'm impairing that
with the large efforts up front to communicate
what was coming how it was working out and to kind of take
that understand how that went
and use that information in the future as we're getting
into some of these projects
again the messaging that sort of thing so absolutely thank
you cut a question I remember
when we've done the OCI before I have it before you were
here I also would like I wanted some
information on the reliability of that science so to speak
because we're placing a lot of
emphasis on this one kind of standard of measurement and
what I see is in 2015 was when our last
quote unquote OCI official kind of drive by did they drive
every street in Denton yes
every street all right so current Denton streets this is
based upon some kind of model of deterioration
yes is that correct yes that's how you are coming up with
this so I don't need to know
it now but if offline maybe you could send out a report to
the council on that model
how that model is calculated based upon expenses because
what I'm hearing is you're talking
about twenty five million dollars but yet forty percent of
our budget for street maintenance
goes to non-related OCI activities so I mean obviously we
have a lot of things that we
are responsible for other than those things that sort of
maintain you know reduce the
or mitigate the level of deterioration over time yes so I'd
like to see that model sure
and and just you know refresher of the information on OCI
in general because and we'll have a
good comparison here shortly the OCI study is being redone
now they're getting started
soon yeah we should have the revised OCI models from actual
sampling this year and we can
compare the two models to see the degradation and how they
match up but the model does take
into account previous OCI studies as well as we started and
we can put that into that
summary sure because what would be interesting is the roads
that we've reconstructed because
let's face it we've seen roads that have been reconstructed
that within a couple of I mean
I've seen it myself a couple two or three years they'll be
cracks two inches wide and
so it's not just it's also are we ensuring that either the
contractors or ourselves and
this isn't impugning anybody it's just saying are we doing
the best following best practices
as far as because I've always understood it was the
foundation of the road that is the
most critical that it's not the asphalt or the concrete it
's how you prepare that road
bed absolutely and it would be interesting to see some of
the OCI ratings on roads that
are only four or five years old either that we performed in
-house we can reconstruct it
in-house or that were reconstructed using contractors as we
've noticed we've got the
engineering firm to look at some of these cracks in our
concrete subdivisions and things
such as that so yeah I think just to refresh your course on
that whole model and OCI and
because I remember when that first came online when I was
on council I thought okay this
sounds good but we're basing a tremendous amount of money
budgets you know reporting
of you know our streets are falling apart and they're
degrading every day and you know
seems like other people are using it too but just nice to
be refreshed on what that really
entails I mean absolutely 20 percent is rideability okay I
mean I guess the road could ride pretty
rough but still be in good shape and it can ride pretty
smooth to be in horrible shape
yeah is that my understanding yes okay okay yes I don't
know if this is the right comparison
but maybe you can build on this thought but would you have
access to knowing safer flower
mound what their annual budget dollars per road mile you
know that they have in their
total network is you know just as a benchmark for whether
you know our estimation makes
sense or if there's anything we could learn from others who
apparently are keeping up
their their OCI's if that is the right measure we can
absolutely take a look at that and
get you an update on that one we did get some information
from them for a flower mound with
the 95 you know 95 percent OCI their annual budget for the
roadway was five million sorry
that was Frisco we'll check on the rest of them to get that
obviously quite different
because it's all new and all concrete right that's flower
man I thought might be more
comparable plus you know it's a more more attainable I
think was 80 percent so anyway
that's just a suggestion maybe there are others because and
then it also kind of raises the
question maybe for finance of you know how do other
communities finance other communities
that maintain their roads well how do they how do they
finance this level of you know
road maintenance you know we're obviously not the only city
that has to maintain roads
but you know do they have higher tax rates or do they you
know starve other services
or you know how how how do they accomplish it so as we give
you a little bit of a preview
that what you'll see we are putting together the 2018-19
budget right now basically same
approach we took last year balancing it to the effective
rate but we're gonna do we're
gonna provide you some different alternatives this year and
that's gonna basically be for
every one cent we're gonna put some together some strata
there and some decision-making
points one of the one of a couple things in the base budget
probably gonna be funding
another five to seven inspectors for the roads because we
've seen the obvious I think you're
absolutely right mayor in terms of the inspections
inspection time of our roads not being adequate
and that plays a little bit of a part in it the tech it's
so it's not going to matter
what they're funding the rates at how they're funding the
roads if they're not being built
right to begin with and they're all coming in at different
levels we're all at a different
point in time in terms of where our roads surface it how we
how we pay for it how old
they are how aggressive we've been historically so the
inspectors is going to be a major key
budget ask for the for the council next year and during the
last two bond committee discussions
my understanding is that there was up to a three cent
increases approved by the voters
for the bond programs the city never took advantage of that
so one of the things that
we may be taking time giving you a choice on is maybe maybe
we budget to the effective
rate and you add a petty or two leverage that funding to
make those bond programs whole
the bond programs are probably somewhere in the sixty to
seventy percent value of what
it was actually approved because there was not engineering
plans for the major roads
that were ready to go when the bonds are passed so all that
time takes time and you're seeing
inflation erode those bond packages also the cost of just
simply designing the roads wasn't
built into the bond packages that's further eroding the
bond packages so we've got a
number of suggestions for you that you'll be able to kind
of bite into and and and we've
got another I think it's roughly right now just another
seven hundred thousand dollars
a year going towards the road maintenance just from the
natural growth in the franchise
fee taxes so this is huge on our list it's going to be a
major point of discussion for
you and where you're going to see most of our
recommendations being made there's still
some things in public safety that we want to discuss with
you but staffing of the roads
building them properly engineering them up front and and
then continuing to move dollars
into that bond program to make those programs whole I think
those are probably going to
be the crux of our discussion with council this year and I
think if we can expedite some
of that reconstruct route reconstruct money up there and be
a little bit more aggressive
on the maintenance it should make a big difference over the
next three four or five years as
we're preparing for the next bond package but there's no
sense trying to throw you know
20 million 25 million dollars a year of maintenance on
roads until you get them built right to
begin with so that's really going to be the you know the
discussion that we have with
you I think it makes sense it's just a matter of philosoph
ically where do you want to set
the tax rate and we're going to give you those choices and
we'll move forward as aggressively
as you want us to.
Councilmember Ryan.
Thank you Mayor.
On the OCI rating I've seen the segment by segment list do
we have that as a GIS at all
is it on a map that we can we'd be able to look at.
We do.
And I asked that from we've got you know right now we're
discussing reconstruction as putting
back the same as what we had but we've got Bonnie Bray May
hill you know some other roads
that we may want to think about for the next bond package
that it'd be interesting to know
the roads that we're actually going to increase capacity on
are they you know where are we
on OCI on those I would assume that the street like Bonnie
Bray right now it's pothole repair
we're not going to go in and do anything we're going to be
ready reconstructing it so.
We can give you that information pretty quickly the map
here shows you every street and then
we've got it broken out where we can give you a map that
shows you just the worst ones.
Obviously yes you're absolutely correct every one of our
capital projects that are streets
related they have an OCI related to that roadway and the O
CI will reset itself once the construction
is complete.
And we can give you that breakdown.
Okay I think that would also be helpful for the bond
committee when we get into the next
round to not only what we want to reconstruct but you know
which you know is it is it time
for Ryan road to be widened or you know I know capacity
also falls into that category
absolutely I think the OCI will be an important factor on
those decisions.
Yes sir.
Yes.
Just to follow up on my earlier point I completely
appreciate what you're sort of preparing us
for Mr. City Manager.
The sort of additional ask that I'm putting out there is
whether we can learn from cities
that already have a history of being good at maintaining
roads because we don't have
that history and in terms of seeing how they approach you
know what's the breakout of their
budgets and what's their tax rates right because this is
you know it looks almost like a well
it looks like a really daunting lift but you know clearly
there are other communities that
do it so how are they different from us.
That's my ask to see if that could help us you know give us
guidance as we try to make
our choices.
We'll put together a matrix that makes it simple to see I
think there's always going
to be that caveat we're not starting from the same point
but we can at least we can
at least give you some data in terms of how we compare and
where we are I think I think
it ultimately at the end of the day I go back to repeat the
you know repeat what I said
again we've got to lift a number of those streets up to the
good to excellent category
aggressively maintain them and make sure that we've got the
proper inspection staff over
time it will start changing but it you know there's just
the numbers they're showing
you are in my opinion merely interesting because that 250
million dollars you saw doesn't include
you know tens of millions of dollars of water and
wastewater infrastructure to go ahead
with that which would require significant rate increases so
I think I think this incremental
approach and giving you some choices about where you
believe the public tolerance is
is probably the best way to go and then what I like about
what Todd Daniel they're making
it look easy it's not been easy getting this organized over
the last year but what I like
about where they're going with this is it makes it very
simple to have discussions with
the next bond committee you know it becomes that time to
discuss when it's time to go
out you know how to size a bond package they've got the
information ready to go I think the
big change that we've been talking about is before we start
you know is we're starting
to get permission to move forward with the next bond
package if it gets approved is making
sure that we've got all the engineering done up front that
is really the thing that has
hurt this bond these last couple bond packages the most is
having to wait several couple
of years and then and we're just now engineering Hinkle
after that cost estimate of that roadway
is eroded 30 40 percent so that is probably the biggest
lesson learned out of all this
is scheduling it making sure that we you know are
appropriately taking care of in-house
what we can and then making sure that the engineering is
done up front to help hold
inflation to in check the best that we can anyway.
Yes, Mr. City Manager I have an ask for a surprise a
graphic that would capture exactly
what you just said because it's come up now twice and as we
go into the budget I know
it's going to come up more is there's a legacy issue as far
as here's the data that was compiled
and here's what supported that data versus then versus now
so not to put your staff I'm
trying to make it is is vanilla as possible but I think I
do need some sort of timeline
or a procedure list that says here's how we approach bonds
in 2017 2018 and here's how
the bonds best we can tell were approached then and so
there may be 10 steps now and
then maybe five steps then I just need to better see and be
able to because I think
that's going to be an educational component when you say if
and when we go to the voters
and we say hey we want you to support these bonds and they
say well you're 200 roads behind
or wherever we are we're closing ground I think it's
important to say no no no here's
the difference in approaches and and and be able to educate
how we got there that sort
of thing and what's changed and and and so it's not all
because that's educational for
me it's not all just it didn't happen it was we weren't
prepared to make it happen and
then we lost money and so it kind of just kind of rolled
downhill so I think that education
will prove will prove helpful and answer a lot of questions
when we get to that point
again we're happy to do it all right okay anybody else oh
did you have more slides no
we got the questions this time so very helpful thank you I
appreciate that great great report
great data good data okay if there's no more questions we
'll move on to our next agenda
item which is agenda item 3d receive report and hold
discussion give staff direction regarding
the city of denton drainage system improvements planned or
implemented since and or planned
or implemented since the 2007 flood so I also didn't have a
complete presentation on Friday
so I'm passing out a few maps I created this weekend that
were not in the backup on Friday
but they did get in on Monday morning so just in case you
didn't see those these are the
additional maps and we will we will provide I know somebody
will ask the question we will
provide these these new updates to our city secretaries she
can help post this to the
website okay they're already on the website they are now
yes they are thank you they got
put on the website Monday morning okay good afternoon mayor
council members I'm Chad Allen
deputy city engineer and I was invited here today to give
an update about drainage projects
that have been implemented or constructed since the 2007
flood so I'm going to talk
about 25 different projects 17 of them are past drainage
projects and eight of them are
more current drainage projects that are happening right now
so the past range projects are in
two categories the projects that were specifically funded
after the flooding event in 2000 and
seven and then there's ten additional projects I'm going to
talk about that were already
on the radar but were expedited after that flood so in
April of 2007 a huge storm hovered
over Denton and unleashed a huge amount of rain in the city
and caused flooding around
the city and in the downtown area in October of that year
city council approved the sale
and delivery of two seven million twenty five thousand
dollars in certificates of obligation
specifically for the design and construction of drainage
projects so at that time seven
projects were identified to be designed and constructed
with the CEOs also there's ten
additional projects that were expedited after that flood so
these are the seven CEO projects
five of these projects have been completed and two of them
are still ongoing the Kings
Road drainage project actor Street Mingo Road and Paisley
box culverts Magnolia and Strickland
ponds those have all been completed between September of
2009 and February of 2012 the
last two projects Mingo Road at Cooper Creek and peck for
drainage improvements are still
ongoing here's a map that shows those projects and where
they lie around the city these projects
consist of box culver improvements like down here at Mingo
Road new curb inlets and storm
drain in roads that didn't have that kind of infrastructure
like an actor Street two
different detention ponds and Magnolia and Strickland and
then sort of a combination of
culvert and channel improvements at Kings Row again peck
for and Mingo Road are still
ongoing these are the ten additional drainage projects that
were expedited after the flood
and constructed they've all been completed between early
2008 and the end of 2015 all
of these projects were built the city of didn't spend about
six point three million dollars
on these drainage improvements again here's a map that
shows those projects and again
these are culvert improvement projects channelization
projects and then street storm sewer and curb
inlet type projects and then these are more current
drainage projects in 2014 bond program
five drainage projects were identified and funded as part
of the program that's a error
on the slide sorry there's five of the projects and then
there's some more recent smaller
revenue funded drainage projects these are funded with the
drainage fee they're designed
by in-house staff and constructed by in-house construction
crews so these are the five 2014
bond drainage projects they're all ongoing the completion
dates in the right column are
when we expect construction to be completed councilmember
sir has a question sure will
you be sharing with us what the phases of PEC for are yes I
will be okay okay so the
next slide is going to more detail about each of these more
current projects this is Eagle
Drive drainage phase two the blue part on this map is phase
two phase one was constructed
as part of the ten additional projects in the past projects
category this project is
complete we're going to pick up at the upstream end of the
phase one project and build this
new large box culvert crossing elm down Myrtle down to
Eagle where it connects to an existing
box underground the benefits of this project is it's going
to alleviate long-term recurring
flooding in Eagle each of these intersections in Myrtle and
in this entire area this neighborhood
area that had flooded for years and years yes councilmember
Briggs so on the you said
all that will be underground this is all this box culvert
is all underground there's inlets
on the surface of the ground that capture water and put it
into the boxes and then there's
curb inlets and Eagle Drive that do the same thing and in
elm and in locust so the engineers
opinion of probable construction costs for Eagle Drive
drainage phase two is 1.9 million
we just opened bids for this project last month low bid was
2.1 million and we're about
to go to construction we anticipate starting construction
on Eagle Drive drainage phase
two in August of this year we've received bids we've opened
them we're working on the
contracts now construction will be beginning in August we
believe this is Magnolia drainage
phase two phase one of Magnolia drainage was construction
of this detention pond up here
I showed it earlier it was one of the seven initial
projects funded after the flood that
phase one detention pond really reduced the amount of water
that flowed into this neighborhood
this neighborhood is flooded for decades it has an
underside storm drain system and so
this detention pond kept some of the water from getting
down in this neighborhood Magnolia
drainage phase two will also reroute additional water
instead of coming into the neighborhood
it's going to be rerouted in these box culverts down Winds
or and then down Hinkle to North
Pecan Creek so this is really going to improve flooding
conditions in this neighborhood as
part of this project we're also reconstructing Hinkle Drive
this is the bundle this is the
famous Hinkle bundle so we're reconstructing Hinkle Drive
from University up to Windsor
and then we're reconstructing Windsor from Hinkle to Elm
the engineers probable opinion
of probable construction cost is six point seven three
million dollars we're advertising
for bids for this project this month and we anticipate
construction beginning in October
in November of this year this is the downtown drainage
trunk line South Bell and Oak Street
project this shows all phases of the project we're breaking
it into two phases phases one
and phase two this project came about because of a downtown
master drainage plan that was
created in June of 2013 five projects came out of that
master plan that would allow improving
street drainage in the downtown area this project
represents three of the five top projects
again we're going to build it in phases because phase two
we're anticipating coordination
issues with the railroad we wanted to expedite phase one
and go ahead and get it under construction
and also build this segment in Oak Street adjacent to a
development that's happening
right here the engineers opinion of probable construction
cost for phase one is seven hundred
and eighty thousand dollars we anticipate advertising for b
ids for phase one in August
of 2018 and we expect construction to start at the end of
the year for phase one phase
two is going to follow up with that after we coordinate
with Union Pacific Railroad
Chad on the ones that you're giving us the construction
commencement date yep could you
go back in and offline and just say what are you thinking
is the construction time like
on Hinkle and Magnolia that's a big project uh-huh I mean
that just the drainage alone
that's so and then the reconstruction of the street so yeah
we're going to start it maybe
this year but it may take two or three years I mean I don't
have any idea so it'd be nice
if maybe if you went back and as best as you could
obviously and if you don't comfortable
doing that understand but just trying to get an idea of
okay what what what a reasonable
completion time would be given that things are you don't
have a lot of you know extenuating
circumstances that really okay yeah well you don't need to
do that you don't need to do
that on these now I'm just saying go back no no no I have
basically a beginning date
on this slide and then a completion date right here okay
though that's good yes that'll work
we can do some subtraction that'll work okay so yeah Eagle
Drive we're gonna start in
August of 2018 we expect it to take about a year so we're
expecting to finish in September
of 2019 do you want to go through all the projects like
that no no just no just and
when you get to this slide we'll see it and and uh I mean
if you've got it on there I'll
just go back and review the backup again so we're okay yep
thank you all right yep we're
good okay I believe I was on peck four so this is the peck
four project it consists
of drainage improvements shown indicated by this red line
on the map and then we've also
combined it with utility reconstruction project in locust
and an elm the blue lines on this
map represent the utility reconstruction that we need to do
and then the red line is the
construction of the large box culverts they're going to
help remove the floodplain and cure
flooding in the downtown area so what are the utility
improvements is it water wastewater
so it's water and wastewater lines that are very old we
have a history of breaks that
we have a lot of problems on these lines they're right in
the middle of the text dot roads
locust and elm and it's taken us a long time to get permits
from text dot in order to rebuild
those utilities because text dot doesn't want you to reloc
ate those and and leave them in
the roadway so for a long long time for years they refused
to give us a permit for this
project because they wanted us to move the utilities
outside the roadways and there's
no room you know there's no room so finally we're
coordinating with text dot we've done
a really good taw's done a really good job of this over the
last year to coordinate with
text dot and to organize this turn back of these roadways
after they're rebuilt and as
part of that process text is going to let us rebuild the
utilities in the road but we
need to do it at the same time or before we do these
drainage improvements so we've coordinated
all the projects together okay we're going to go to council
member Gregory and then councilmember
did you have a question and then councilmember hudson yeah
so then what i think i'm hearing
you say is that we already have a long-term phased in
agreement with text dot for transfer
of the roads from elm and locust from being text dot
facilities to being city facilities
and and part of that is contingent on we're redoing the
utilities under those roads they're
going to rebuild those roads and then they turn them over
to us after they've been rebuilt
and they become our responsibility is that the three phases
so that is exactly what the
agreement is going to be right now basically we have a very
short memorandum that says
this is our plan text out we want to work with you to
implement what you just described
but we do not have that agreement signed just because we
told them we're going to work with
you to implement that they've allowed us to move forward
with these projects how do you
want to say anything else about that you keep creeping up
on me trying to make you nervous
so part of the ongoing coordination efforts that we have
with text that has been this
discussion of how do we phase the roadway piece before the
roadways become the city
of dentons and they they leave text dot control text that's
required to upgrade that roadway
they need to bring it to current standard and out of disrep
air so this is a very concerted
effort on our part and text dots we may not have a written
agreement but what we have
is several conversations from folks in the text dot area
office and district offices
saying that they are tailoring all their maintenance to
come and do these roadway improvements
beginning next summer so there's an impetus on impetus on
us to get all this done as fast
as possible so they can come in and pave element locust all
the way up to university drive
so this is really just step one and a very big project but
you know they change those
folks in that office pretty frequently so if we could get
it on paper it would be helpful
I think we will work to memorialize that the what happens
to us highway 77 and us highway
377 do they get moved over to is that a route that goes
over to 35 or does it go over to
Carroll Boulevard what happens it would merge essentially
377 would basically 377 77 would
basically become I 35 and they would just merge as the same
designation through town
thank you yes so whenever text dot will redo these roads
will that include sidewalks or
just repayment of the roads their part is just doing the
repayment of the roadways that
is what they're required to do part of what we are talking
to the Council of Governments
about is how do we utilize a long-standing sidewalk
improvement plan that the city has
had and get that additional funding so when we finish all
the improvements on them and
look as they do include that pedestrian component that
would be really nice and so on this there
are some current old rock channels there kind of historical
and so will they be messed with
during this project some of them will they are now part of
the problem that we have with
those rock line channels is is they are old and they you
know they were there to reinforce
but they weren't there to reinforce forever so part of that
is an ongoing maintenance
hazard for us especially as storm water more and more imper
vious area is introduced into
the downtown area you do have water that comes through
there faster than was originally designed
for and it causes issues for us so you do have some ongoing
maintenance there that's
a problem for us we will be preserving what we can but I
cannot promise that we will be
able to preserve all of it and so when you're not
preserving something are you making it
bigger and larger and more concrete these are all enclosed
underground okay so you you
what you will see it be the surface treatment whether it's
grass because it's in a landscaped
area where it's a roadway or parking lot or wherever it is
okay okay thank you very much
I think you answered my question but just to sum up give me
the give me the time frame
again for what do you what do you envision the rollover
work being done what is that
kind of general time frame and then and then is my the
little curb cut mixed in do I have
to wait for that or will that happen before then and will
so the the pecan and sycamore
intersect I think you're talking about we're going to be
doing that beforehand because
that just needs to happen for accessibility reasons as far
as the overall schedule as
we talked about just a few minutes ago there are multiple
components to this turn back
and it even extends beyond just eagle and university there
's discussion ongoing discussion
right now textile would like to turn over all of 77 from 35
e where Dallas Drive comes
down all the way up to 35 north of 288 so that's in the
background and some of the discussions
all we're focused on right now is the part that we've
talked about turning over the
segment of element locust from eagle to university so the
way this would work is we phase in
all the utility work we do the utility work in locust first
that would be where we would
focus the drainage in the utility relocations on the
southern end of locust and because
text out wants to be able to start the paving from the very
southern end and continue all
the way north to university drive we have another project
that is completing design
right now it's about 95 percent complete that we anticipate
letting to do utility relocations
on the northern segment of locust so by the time tech star
starts paving they can just
do the entire road all the way to the north then while they
're paving we're going to
jump back over to elm and hit the southern segment to
complete out the drainage piece
and the utility relocations and then go do the northern
relocations on elm about that
time it's a very coordinated concert of construction ballet
so we say okay very good thank you
yes yes member message nelson so uh with both this project
as well as eagle driver wherever
we introduce fox culverts um but we're going to end up with
basically land where there
was a channel with with triple water before and do we have
the rights to that land so
that drainage easement does that continue to be seen by
them so right now they're they
are in containing what we would call a drainage easement
they're specifically for us to be
able to construct and then maintain drainage to be able to
do something beyond that we'd
have to go back to the property owners and talk to them
about a pedestrian easement or
some similar right of pedestrian use or public use through
there that we could convey with
that same easement so there's there's that early
considering just so others can tell
from heading to obviously we'll chat about this uh you've
got a surface set somehow sure
uh would it be uh would it be particularly more expensive
or less expensive for those
surfaces where they're right now to become safe off-road
hiking bike paths potentially
within green space there's absolutely a chance uh there's a
very good opportunity and a lot
of communities are recognizing that where we can utilize
flood prone or flood prone or
drainage areas for more of a park or recreational aspect
trails um picnic areas things like
that we can look at that and that is part of an effort that
we have ongoing we just
this week we had a discussion with economic development
about how do we put together a
potential stormwater master plan that would look at exactly
those kinds of areas as well
as redevelopment based in those drainage and flood prone
areas.
Could we look at how these paths would intersect with uh
with our mobility plan generally whether
they intersect with existing bike travel lanes and just
there's a way to uh kind of add value
to that.
Absolutely and we would propose to cross-reference that
with the parks trail system as well.
Councilmember Gregory.
And along those lines would that mean that we could use uh
parks dedication fees that
we're collecting for the downtown area to help uh buy those
uh pedestrian bicycle path
easements.
That's out of my room of expertise.
We'll certainly take a look at that that's a good idea so
we'll see if we can uh what
restrictions are placed on those funds right now.
So just to emphasize and I mean these are great ideas but
you said something that is
very critical and that is you've got to go back and get a
different type of easement
for every one of these sections where we just have an eas
ement and so these things run behind
people's homes uh next to their yards so that's it's going
to be uh if that's going to be
the the direction of council that's great but it's probably
going to be an interesting
endeavor.
I don't know if it'd be a challenge or not.
I don't know uh and I don't know what those things are
worth some people may dedicate
them what happens if you get some who want to do it and
some who don't so you got all
these different segments so um that that's a big challenge
that we certainly are have
the option to pursue um but I just don't know how all that
configures down through there
amongst the neighborhoods.
Yes councilmember.
It's a good point and uh pre-tm was at the last bike Texas
conference and uh got some
interesting information that that uh those kinds of
facilities next to a property actually
increase the value of those properties uh so so um if we if
we communicate that information
to those folks pro properly that this is an enhancement to
their property we could probably
do it without without having to go through condemnation.
Yeah I'd be and I'd be really hesitant to start condemning
people for pedestrian pedestrian
walkways on drainage improvements um but uh yeah and I
think that also is dependent upon
the increase of value that's very site specific that's very
city specific I mean I can see
that in some places and in some places I so I hear that but
I just would like to get more
into that process to determine what the what the status is
of that.
Yes councilmember Melzer.
Will you be getting into uh what the area is that will be
removed from the floodplain
and uh oh yes that is it that's coming out right sorry don
't make you push ahead you're
you're getting there uh and then I'll just ask you this is
phase one and two out of I
think four phases.
Yes and and will you be describing what phase three and
four are.
I didn't include phase three and four.
I mean just uh you know in a sentence.
Sure yeah phases three and four extend the project up to
the north and the west and they
end at Mulberry and Bernard and um again it's box culvert
up past the Denton County Historic
Park and then up to Mulberry and over to Bernard there is a
big section of that rock line channel
that's kind of north of Mulberry that we're going to leave
open local drainage on either
side you know that's a low point local drainage flows into
that rock line channel and then
we'll eventually get into the culvert system so that's
probably going to stay um that project's
under design right now we're designing phases three and
four.
And the same issues would pertain to but the benefits and
the challenges of making that
into pedestrian and bike.
The engineer's opinion profession construction cost is um 8
.5 million dollars we're about
to advertise for bids for PEC four phases one and two
including utilities in July and
we expect construction to begin in October and November.
I think oh yeah and then these last three projects are the
smaller revenue funded projects
that were designed by in-house staff and they're being
built by in-house construction crews.
I passed out a revised slide because this had some errors
on it I apologize.
Kingswood Court is um the construction is complete.
Canterbury Court construction's 80 percent complete and
Royal Lane and Rockwood Drain
Improvements is still in the design process it's 60 percent
complete.
So here's a map that shows those projects um Kingswood
Court is a little cul-de-sac
down here by Teasley Lane that flooded at the southern end
where it was low water would
spill over the curb and flood some properties in this area
so we built a storm drain in
the cul-de-sac and we're draining up to London Dairy Lane.
Canterbury Court includes alley improvements in this area
and underground storm drain that
prevents flooding of some houses downstream of the alley
here and then Royal Lane and
Rockwood Drain Improvements includes storm drain and inlet
construction in Royal Lane,
Rockwood and Misty Lane that's going to prevent flooding of
these neighborhoods these homes
right here by Nettie Schultz Park.
So these are the revenue funded drainage projects that are
currently under design and construction
and that's all the drainage projects the 25 drainage
projects major drainage projects
that we've been working on since the 2007 flood.
Council Member Gregory.
Thank you.
On page three you were showing two projects from the 2007
CO bonds that were not completed
and you've explained PEC 4 but you didn't explain Mingo
Road and Cooper Creek.
Okay so Todd's gonna help me with this one.
Okay.
So Mingo Road has been very first of all it's been a
complicated technical design process.
A lot of the delay associated with Mingo Road has been has
had to do with the railroad the
Union Pacific Railroad but before we even get there it wasn
't really all about Mingo
Road it was about how to fix the entire drainage watershed
in in particular Cooper Creek so
we didn't just look at Mingo Road improvements we looked at
we conducted a study and we looked
at detention pond and regional detention improvements
upstream so our consultant Jacobs studied
the whole Cooper Creek basin and decided we needed to do
multiple types of improvements
regional detention and then improvements in Sherman and
improvements in Mingo.
So when this project was originally funded we kind of went
through that whole process
of looking at the basin as a whole and then we started
working with the Union Pacific
Railroad.
So we realized a couple years after starting the project
that the railroad was going to
be a key constriction for flow downstream of Mingo Road so
we started coordinating with
them and it took us years to participate with them to
rebuild their bridge we actually gave
money to the rebuilding of the Union Pacific Railroad
bridge adjacent to Mingo Road.
I think we finally I think the railroad finished that
project in 2015 and we had executed a
contract with them about a year before to help fund those
improvements.
Unfortunately there were some issues with the design of the
railroad it didn't add the
capacity that was needed in order to benefit the upstream
areas it was originally expected
to lower the water service elevation when they when they
widened that bridge but in
the end it did not do what it was supposed to do after it
was constructed so we started
dealing with those issues and then now we're looking at M
ingo Road and more of a sort of
large project and corridor type level.
Todd can talk to you about that if you'd like to do that.
Well I'll wait till he's done and then I'll ask my follow-
up.
So part of what we've done is you the Mingo Road culverts
washed out what two years ago?
Yes.
So new culverts were put back in place after the roadway
being closed for a good portion
of time.
I don't remember what the exact time was.
Two years.
Two years.
So then culverts were put in place.
The constriction that we have continually to provide some
kind of or level of safety
for or at least reduce the flood control measures within
that neighborhood to the north it's
it's all west no west east of Old North Road on the north
side of University Drive it's
impacted by this.
You can think of it like trying to put a bunch of water
through a little tiny hose and that
hose is the railroad bridge crossing.
We could not get it widened far enough to really remove the
flood restrictions that
were causing the backup into the neighborhood.
So what we've done right now is we are currently looking to
engage based on the selection process
the RFQ that we put through last fall stormwater design to
look at that entire area from much
more refined and global perspective and then tying that
into what does mingle road need
to be long term from Bell Avenue all the way up to Old
North and just beyond to include
this Cooper Creek crossing.
It's a much more holistic approach to how are we going to
resolve this scenario.
Okay couple of follow ups.
So when Union Pacific rebuilt that trestle.
Yes sir.
It increased capacity didn't it.
To a degree yes but it didn't significantly draw the water
surface elevation down.
It did bring it down a little bit but not much.
Okay.
Is but but aren't the culverts that we have on mingle road
even more restricting the capacity
than the railroad is.
No not not really.
So if mingle road was the only thing there it would be the
cause but the issue is is
the railroads here and mingle road is down here right so
the pipes underneath the road
they pass water but the vast majority of the stormwater
goes over the road and what's holding
up the water is the passage of water underneath the
railroad bridge.
It's more restrictive because it just can't go anywhere
until it gets much higher and
goes over the top of the railroad.
We may have to talk offline because it seems to me if you
've got a dam here and a dam here
and the water is piling up here it's this dam the mingle
road dam that's holding it
up and that's why it's going over.
But that's true but you have a couple of things that happen
when anytime and use a good analogy
as a dam anytime you cross a creek with a culvert crossing
that's a very good analogy
because that's exactly what happens.
Anytime you put some kind of culvert underneath the road
there's a restriction in the amount
of flood maybe minimal but just because you're trying to
take a wide expanse of water and
force it into a little straw it does have an impact on how
much water can get through.
Now mingle is why that thing washed out right but it had
been there a very long time before
it finally washed out so part of what happens is you had
corrugated metal underneath the
roadway which rusts over time and as it rusts the
structural integrity erodes and the soil
goes underneath it the whole thing goes away.
Part of what we're dealing with is I have two dams back to
back one higher than the
other with just a small hole that may be a little bit
bigger but it's still a problem
because I can't get a vast majority of the water over and
through that railroad bridge
so it holds more water back than mingle does kind of the
lesser of two evils.
Mingle is it sized appropriately to pass it outside of the
hundred year storm no but
it is what we would term more of a low water crossing.
So we have we had spent some money already to start
designing yes a bridge over Cooper
Creek at mingle when the culverts blew out.
How much money did we spend on that how much money did we
spend to put the culverts back
which are clearly a temporary solution.
They are temporary solution I don't have an answer for how
much money was actually put
into that and I can find that out.
Okay I'd like to know that but but in the long run then
what you're saying is there
needs to be another solution.
Yes we don't know what it is right.
The solution that was presented under the previous design
was elevating a bridge much
higher than it arguably should have because the water
surface elevations are that much
higher so you're building a very expensive bridge for a
fairly low use road compared
to other roads that we have in the city.
Once you're not only building it for the road you're
building it so that the water passes
through so that those right put relief to those houses up
restraint correct and the
restriction though is still the bridge because once you
elevated the roadway to where it
was say out of there out of the condition that it was
causing the flooding the bridge
still caused the flooding.
Okay.
Councilman Briggs.
Shortly after I started I think there was a staring contest
going on with the city and
the railroad and they had just come in and made the
improvements put in a bunch of rip
wrap neck down the capacity of that and we're not about to
spend any more money on that
railroad crossing and so that was the rub is all that
design work that the city had
done and some of the assumptions they've made about having
a wider mouth there did not come
to fruition therefore the design work that had been done
was not of any real use at that
point and that was the problem you know is there was not
enough coordination on the front
end and even if even if they even if the railroad had
indicated that they would build that additional
capacities for more water could move forward there was
nothing in writing holding them
to that and so they just flat weren't going to spend any
more money on that railroad underpass
and there was nothing more to be done with mingo other than
open the road or leave it
shut so it would you know we are we're in the process of
having to look for a different
kind of a solution because their railroad is just not going
to make that investment
they made it clear after and I think there was an
assumption that they they would be
more cooperative than it ended up being I think is the only
is the best way I could
put I mean Chad do you have anything to add to that so no I
understand that I also understand
that that we have some partners in the region with the
regional transportation council that
that have to work with up and that sometimes that by by
working with them we can we can
be a little more convincing than if it's just us alone
trying to talk to them about about
working with municipalities of course I've always imagined
that I'm sure that there's
a good reason that our lawyer will tell us why my idea is
wrong of going ahead and building
a bridge that will really handle all that water and if it
washes out the UP line well
we told him but I'm sure that our lawyer would have a
reason for for telling me why that's
a bad idea in fact our mayor probably just looking from the
expression on his face your
lawyer probably would have said don't say that in public
but I won't be involved in
those closed-door discussions yes I mean I just I just want
it I want to clear it and
you are right and we have used the Council of Government's
assistance for instance to
get the quiet zones moving finally but it's a whole other
thing when you're talking about
a brand new investment in the bridge and moving that
forward from some of the smaller projects
they've been very helpful and it's not only helping us it's
helping DCTA trying to eventually
get sick of more straightened out down there but with
something like that it was just too
big of a lift and they were not going to blink so we had to
go back to the drawing board
and that's about much as I could share not sure who's on
base go ahead Councilmember
Brayson to that point it's unfortunate that it's taken so
long but it's good because it
it's opened up opportunities for us with mingo and to maybe
provide a path through that area
in the future so I have a few questions I think we're at
the end of the presentation
right or close to it anyway so so when you're changing the
drainage do you have to do any
environmental environmental impact studies I mean is that
required or do you just you
do that naturally no we have to look through that and part
of that's a partnership with
our internal group the stormwater group making sure that if
we're in an environment sensitive
area that we take matters into account when we're actually
working with it or designing
with it or just avoiding it all together the other thing
that we're looking at is just
what kinds of presence are out there in the form of the
Corps of Engineers and have a
waterways wetlands areas animals that only live in specific
areas that are directly related
to that so we have to go through the environmental
assessment before we do anything significant
okay that's good to know for me when I hear drainage
improvements just because I had a
shocking experience when I first got on council with you
know concreting in natural natural
creeks so and I know that that is not any any of these
projects and I'm glad to hear
that but we are doing an underground and then providing
land on top which is a little bit
different so I'm just I'm glad to hear that so I did hear
you mention Mistywood and that's
in district 2 and you were doing some improvements there
and I heard the word inlet and I'm not
really sure what that means and so I'm wondering if you
could expand on that since we do have
a natural creek running through our neighborhood I'm just
kind of confirming that that's not
going to be impacted I hope I said the street name right it
's this road right here at the
end of Rockwood is when I mentioned Mistywood Lane so a lot
of water flows from the east
to the west and it gets into Rockwood Lane and there's no
storm drain in Rockwood right
now so all of the water flows over the west curb line and
into the houses west of that
between Rockwood and the park and for years we've heard
resident reports about the flooding
in their backyards we've gone out there to visit with them
and we've seen it and we've
talked to them about a solution and so we've been planning
this small revenue funded drainage
project for a long time after repeatedly meeting with these
residents who get flooded so the
inlet what's the inlets we're talking about in Mistywood it
's just we're installing an
underground pipe in Mistywood up Rockwood down Royal Lane
to the park where the creek
is and we're going to put some curb inlets in Mistywood and
in Rockwood and in Royal
Lane to gather to collect water and put it into the
underground storm drain system and
then it and then it'll just drain into into the natural
creek in the park yes the pipe
flows down to the creek in the park okay that's where the
outlet is okay thank you very much
sure I had asked before if we're going to get into the
implications of the area taken
out of the floodplain related to pack four but it's okay
with me if we you know pick
that up at a later time but I would suggest is you know
that that conversation perhaps
be done jointly with development to just understand what
kind of new development becomes possible
once you do that how would it change the profile of
downtown you know and whether that has
implications for planning where we are currently we're
currently yes to your point we are currently
running modeling right now to try to ascertain what the pre
project and post project values
would be downtown and what that what opportunities it might
have for future development so it's
a significant enhancement to the area caroline do you have
that handy caroline booth economic
development our report was included in your backup and we
are estimating that increase
in value would be about sixteen point six million dollars
for the comparable we did
a comp a sales comp comparison and that's about a twenty
three percent increase in the
value so I don't know what more detail you would like to
have you know projections like
this are are helpful and they're useful to to kind of get
us thinking but of course we
don't know exactly how something might develop we provided
the land use breakdown for the
area that's currently in the floodplain also for what
surrounding it that's not in the
floodplain just to give us a reference point it's fair to
say values going to increase
it's going to bring a lot of land that's not usable right
now into play and there are a
lot of people that are interested in that but as far as
exactly how it could develop
and how that might integrate with the changes that are
going on with the zoning and the
code downtown I think that's you know maybe further
conversations will need to be had
about that yeah those are why I suggested maybe we do this
jointly with the development
department so we could see what what might that look like
what's not permitted now what
would be permitted you know how might that influence the
way we think about the design
of public space around it a lot of implications it's kind
of a fresh chance to consider how
dentin how dentin den looks anybody else going around the
horn nobody all right was that
the conclusion of your presentation yes it is fantastic I
appreciate that sure good job
good information thank you when did we take a break class 2
1 30 at 1 30 oh we'll go
ahead and take another one then 10 minutes every two hours
we'll take one every two hours
we are reconvening at 3 40 p.m. moving back through our
work session reports agenda item
three we'll go to agenda item 3e which is receive report
hold discussion receive departmental
presentations can't read in preparation for the fy 2018 19
proposed budget capital improvement
program and five-year financial forecast some error city
council Tony pointed director
finance I'm actually not doing this presentation melissa
will but wanted to open it up just
wanted to clarify that this is a continuation of what we've
done what we started last year
is to have our departments come in front of you and to to
present a little bit about their
budgets let you know what their goals and accomplishments
are what type of initiatives
they're engaging in we did get some feedback back from the
council on last year's process
and so this presentation along with the various
presentations that you'll get between now
and July when we come back to you with a proposed budget
will incorporate many of those things
and so one of the items that I'll just point out when you
when you start looking at the
revenues the expenditures we've provided now a three-year
history to give you a little
bit more trending analysis if you will to that so I just
wanted to state that over the
next couple months we'll there'll be a number of
departments all our departments will come
in front of you and talk a little bit about their
departments and about any funds that
they might manage so yeah and and then maybe in future
presentations because I know in
this one as well we're using some reserve funds to make up
the difference between the
expenses and revenue but it's not really showing on the
sheet I mean so if you could just maybe
show that as either revenue side or something moving
forward at least we'll we'll know how
they they're balancing even though we know implicitly it's
reserve funds but yeah that's
what I think. Good afternoon council may city manager
Melissa
craft from the chief technology officer we'll get started.
Some of the goals and accomplishments for tech overall we
completed 74 projects we fulfilled
around 8600 service instance requests and held the uptime
of 99.96 percent also over
the past year we launched our new IT service management
system the reason it's not on here
I don't have a year's full of data so we looked at our
customer satisfaction index previously
we would do it on a three point scale over the past year we
're doing it on a five point
scale and as of October 1st the current we are at four
point eight out of five point
oh and also one of the new metrics we started collecting
this past October is called our
first call resolution of 93 percent so this is the goal to
try to take care of an issue
on a first time first serve and our percentage is 93
percent our industry average is around
75 80 percent so we're slightly above average in that area
also we've gone through an application
consolidation reduction initiative so over the past year we
decommissioned 39 applications
resulting in a savings of one hundred and seventy thousand
dollars these are hard licensing
costs this does not include soft costs such as people's
time it also doesn't even include
some of the deferred costs which is additional storage
capacity and things for these applications
I just want to point that out we also did quite a bit of
organizational changes within
tech services we consolidated our DME GIS and radio fiber
that was previously under
DME electric they have been centralized and consolidated
under tech services to facilitate
better communication organization efficiency and cost
savings as a result of that as you'll
see in the upcoming slides there is a transfer of 1.6
million of personnel materials operations
and maintenance in 1819 and also if you look at the
previous year for the radio fiber team
we were able to reduce their proposed budget by two hundred
and forty eight thousand we
also completed several projects I'm gonna go down through
all of the list already talked
about our IT service management system we also assisted HR
and some of the automation
processes for their onboarding we also provided a remote
access for customer service so they
can have employees work from home and the Denton energy
center SCADA system some of
the software upgrades that we've implemented over the past
year was our JD Edwards ERP
financial system we actually completed that within six
weeks our Pico Terra parks one
rec system and so forth thank you some of our upcoming
goals a lot of our this also emphasizes
a lot of our key initiatives as part of our five-year
capital CIP plan our Cisco equipment
refresh our network equipment is over seven years old and
will need to be replaced this
project is estimated at 1.1 million we already have funding
in our current project drop cost
accounts our desktop laptops are at the end of their five-
year lifecycle will need to
be replaced this project is estimated at 1.8 million also
the radio p25 upgrade radio system
is over 18 years old and will need to be replaced this is a
significant project and we're actually
coming back to talk to you about that in our June 12
presentation this project is currently
estimated at 7.6 million quick question yes what do you do
with the computers that you
replace so the last time we did our refresh we actually
donated them to the jail and they
were able to repurpose that within the jail system so
typically we either try to utilize
that source if we can if not it will just go out to auction
like all of our other IT
assets you also are looking at implementing I'm sorry
council member I'm sorry council
member has to have a question it doesn't have to be today
but can you can you send your
general spec so obviously you have a spec in mind for your
laptops you're going to
source if you can just send me kind of those I'd appreciate
it okay also some of the new
implementation new software we have a budget software
customer relationship management
system and our power bi initiative we're also in the
process of replacing our computer aided
dispatch and records management system for public safety
and this project is estimated
at 3 million we're also looking at consolidating some of
the DME GIS functionality into our
general city functionality to consolidate hardware software
and storage capacity right
now is a little segmented we're also in the process of
upgrading a router utility skater
network and our goal this upcoming years to complete 75 of
124 projects again some of
our budget emphasis is really on our capital infrastructure
improvement program right now
we have around 2.5 million in current CIP program again
most of our equipment's over
five years old this includes you know everything from
connectivity to all the different 45
buildings we provide support to our primary data center
backup data center desktops laptops
in the radio system combining all of those projects are
estimated at 10 million dollars
we're also looking at provided integrated services where
possible again this is in an
effort to help give the ability to departments to report
and access data these projects are
estimated at a hundred thousand we're also looking at
consolidating a lot of the DME
infrastructure with some of our general sources project
projected cost savings of a hundred
thousand dollars as a result quick question was it council
member Malter yes yeah there
was a figure on the previous slide that is just kind of
stuck in my mind you said your
goals to complete 75 of 124 projects yes so there it is so
you know what's the nature
of the projects that just don't make the cut so really the
way we try to historically
the way tech services is address projects it's not a first
come first serve right now
we're doing it based on priority and impact so it's going
to be dependent on does the
project impact multiple departments does a project meet
certain dollar threshold whether
that be a medium sized project 50,000 or large sized
project of over a hundred K and so forth
so we have certain predetermined criteria we try to do that
with also some other things
is the mobile data computer replacement that's a fancy way
of saying of ruggedized computers
for public safety we also have a lot of growing
infrastructure needs as we're having aging
infrastructure we're also seeing a lot of folks really over
this past year to utilize
a lot of our technical resources as a result we're seeing
our storage capacity increased
by 25 percent and the next step is the IT security
enhancement so we are proposing a
new anti-spam solution as well too with the project
estimated at 50,000 some of our cost
containment strategies I think previously mentioned our
consolidation reduction of applications
there was 170,000 we were able to save we took a different
approach when we were upgrading
our ERP system this past year before we used to do turnkey
hands off I think we did more
of a collaborative joined effort as a result we were able
to save $200,000 as opposed to
the last time we upgraded we also develop a formal
requirements process so before a
tech services employee or the app team starts to kick off a
project we try to define scope
of work with deliverables before we engage with our
different departments we also did
a phone air card audit which resulted in $25,000 savings
and we've also consolidated some of
our infrastructure to improve reliability and availability
with some of the DME components
and some of the other components some of our process
improvements we also have an ongoing
business initiative review process to determine application
necessity and total cost of ownership
applications so as new departments are wanting to embark on
maybe a new application new hardware
we sit with them to try to look at well what's that total
cost of ownership over the next
five years how much does that cost do we have any
alternative solutions or existing solutions
they can potentially take advantage of so far we've
performed over 25 of those this
past year we also consolidated DME GIS and DME
communications into technology services
to facilitate better communication and organizational
efficiency and cost savings we also implemented
our IT service management system I think I talked about
that previously we also centralized
the management of the DME computers to kind of keep them on
a standardized upgrade process
we also partnered up with CML and data analytics lunch and
learn program to me this is one
of the fun projects that we have around 15 members through
between 15 different departments
throughout the city we come in work through lunch to try to
talk about how do we standardize
data reporting data gathering data language as far as data
analytics so that's been a
fun project too with the city manager's office so here's
the tech services five-year forecast
so we're anticipating at the end of this fiscal year to
have an ending fund balance of 1.5
million we're requesting as part of our proposal for the
next year to draw down on fund balance
of 1.16 currently yes oh yeah I'm sorry go ahead yes I'm
sorry I just I don't actually
understand what technology services revenues are those just
transfer payments between departments
is that how that works okay yes essentially our cost of
service of what it costs for tech
so we're requesting to draw down a fund balance of 1.16
million as you know our capital infrastructure
program of 2.5 million we try to offset that through any
savings and fund balance to try
to keep our cost of service at a very predictable level we
try to avoid any you know high overages
or just try to maintain kind of a steady state with that so
as a result of that that's why
we're requesting to keep our effective fund balance down to
around 2% quick question on
that yes when I saw this I didn't quite understand first of
all how did we get 1.5 million in
the fund balance and secondly you I think you just said
that you're drawing it down
for capital projects or for I guess equipment replacement
so is that is that like will that
be built up again in another five years when we have to do
this same thing five years ago
five years from now yes all right so that's what happens my
only my only thought is when
I look at the projection out to 22 23 which is only three
years the fund balance really
isn't changing so how is that accumulation if I'm if I'm on
the right track if I'm not
then just tell me okay you're not you're not understanding
or something but so does that
make sense my question makes sense okay so really in our
past year we had several tech
services vacancies so a good portion of savings has been
our vacancies within our positions
okay typically for us to recruit someone it can take up to
six months sometimes even eight
months to fill that position just because of the IT market
in the DFW area other times
you know as you saw the hundred and seventy K and reduction
of applications we let that
roll into fund balance so usually as we're trying to do the
lifecycle management of applications
and hardware typically we try to negotiate either better
pricing or centralization where
possible so it's a combination of all those different
aspects so usually it's own savings
salary savings and reduction initiatives so then if you
were if I were to ask you okay
then for these things that you have to expend funds for
capital funds and like over a five
year interval replacing of computers yes maybe some
software upgrades and all that those
capital requirements typically range is it the 2.5 or the
two million dollars every every
five years or yes and I have an upcoming slide that can
kind of show you our capital infrastructure
program for the next five years so you can kind of have an
idea great and I guess as
we move forward then I'd like to sort of see how we are
looking at maybe trying to get
because if we're using the fund balance to help pay for
those cash fund them basically
absolutely then this there's got to be something that's
going to be happening here that helps
get that money in there so I mean yeah I think it's it's an
interesting approach because
we're sort of moving our own money around we could we could
sweep that fund balance
each year which many internal service funds do and zero it
out as a pass through and then
all you're doing is increasing your cost of service
payments the next year so really what
she's done this year she's had so many cost savings
initiatives and vacancies she's just
instead of returning that to the other funds we're just
using those funds that are still
sitting there to buy down the capital project so one way or
another it's the same money
no no understand that I guess what I'm hearing you say then
is that here we're using this
money to cash fund in previous years of course you wouldn't
I mean just one year but have
typically they've been have they've been typically funded
with debt or still cash funded we've
done the pay as you go program since at least oh wait okay
so then somehow that fund balance
is going to have to get built back up to a two million or
something over the next five
yeah and to your point as we look out we can we can
increase cost of service a little bit
I would never advocate issuing debt for gotcha no no I
understand so just that was my concern
is how do we get that back up to where we were not in that
situation yeah so I think
the way she's done it's it just made life a little bit
easier from the county perspective
but in theory we could have returned that money the other
funds and just got ahead of
transfer it back and it didn't make sense to do no no
understand that but you what you're
saying is you the way you get it built back up is you just
increase the transfer cost
exactly okay you know at this point we're trying to avoid
doing that try to keep the
stream understand yep okay so a little some of our key
users these are the people that
really utilize technology as a service you know out of our
budget DME encompasses 34%
of the budget they're around 5.8 million public safety is
another big user of technology services
they make up 20% of our budget and our third user of IT
service is water at 966,000 some
of our revenue expenditures also includes a lot of recent
consolidation reorganization
again those 11 FTEs from DME at 1.6 million as part of our
allocation costs for next fiscal
year general fund did increase 241,000 but if you look at
that 3.6% of that was because
of the recent consolidation with the DME radio into fiber
folks we'll say this proposed
budget does not include include costs for the radio upgrade
replacement to the p25 again
we'll we'll come back on June 12th to discuss that a little
more but we'll say the radio
systems over 18 years old it's currently not supported by
Motorola parts are difficult
to find interoperability which is key for our public safety
to be able to talk with
others within the same jurisdiction is very difficult we
have experienced failures on
a system here recently so the reliability might not be at
100% so what we're recommending
is to replace the radio solution with the new p25 system
enjoying Denton County's core
to hopefully share costs with us in the county and also
help expand coverage and capacity
and some of the options we were looking at were to either
do a lease purchase or government
bond funding so our next steps will bring those initial
conversations on June 12th with
hoping to bring you a plan for next year's fiscal 18 19
budget so here's a breakdown
of our FTEs by functional areas you can see over time we
did have a change in FTEs between
fiscal year 16 17 17 18 that was the consolidation of the
DME GIS folks that kind of gave us
when it came underway you can see it go from 8 to 12 for
dedicated staff for DME and also
from 16 17 17 18 we added another position for the CAD
administrator for public safety
you can see the increase of the 11 FTEs that were
transferred as part of the DME consolidation
as well.
So our key organizational changes again the radio fiber
team I keep bringing it up because
that really did have a big fiscal impact on the tech
services budget of 1.6 million so
when we start seeing our revenues and expenditures you're
going to see it kind of really jump
up they were a big big part of that we also consolidated
security under our enterprise
security manager so we perform security services for PCI C
GS for our water wastewater folks
and for DME now they're under one central manager for that
purpose we also have a dedicated
CAD administrator who repurposed one position to IT project
manager and we also repurposed
one position for dedicated support for a water wastewater
SCADA we also created a new deputy
IT director position too.
So here are some of our budget highlights again you can see
here some of those increases
from 6.6 to 7.2 on the general fund not only are we seeing
a lot of and I think that's
what you're alluding to mayor this does include those not
those funds for the 2.4 million
for a capital infrastructure program so if you look at the
breakdown on how it affects
all the funds you can see we were really trying to offset
some of those cost of service costs
we also experienced a lot of growth as part of that too
just in the gen fund we added
23 cameras 11 credit card devices 31 laser fish licenses we
also added 259,000 for public
safety computer replacements 50,000 for police training
facility PC replacement 42k for public
safety e-ticketing maintenance replacements we also had our
radio allocation of 241,000
that was not previously in our budget so if you start to
look at some of those variances
and changes a lot of it's been been due to that.
So here are some of our budget highlights again you can
kind of see our personnel services
go from 5.1 to 7 7 million since 2017 2018 between a
transfer of the 11 FTEs through
the radio fiber and the additional four FTEs that's 15 FTEs
that were not there previously
in our forecast that was not anticipated.
Again materials and supplies you do see it kind of double
half of that is really for
a radio fiber team for radio replacement and fiber changes.
Again you can see our kind of capital infrastructure
program over time you can see it back in 1415
that was not the case because we were under warranty under
support so we really try to
take it anywhere from a five to seven year life cycle as
part of our capital infrastructure
program.
So here's kind of a high level overview of our five year
capital plan you can see in
1819 we're proposing an Adobe upgrade we're looking at
replacement of our service storage
capacity at 310,000 our network equipment at 565,000 so
this is going to replace equipment
again we provide support to almost 50 different facilities
so as they interconnect we have
to change those interconnecting components.
We also have some application software upgrades that are
projected at 50,000 and miscellaneous
equipment refresh that's 729,000 around 600,000 is for PC
refresh for the entire city and
again that 259 for public safety and also the tech DME
infrastructure capital refresh
at 830,000.
That's all I have.
So on that last slide what I think I hear you saying is
that this is what I think I
hear you saying Todd is that for these capital requirements
20 21 22 these numbers down here
that somewhere somehow that as those budgets move forward
there'll be an accumulation
somewhere of money to pay for that it cash which typically
will maybe go down to the
fund balance is that is that it could it's either going to
come out of savings and fund
balance or it'll come through a transfer from all the
various funds paying their proportionate
shares is that usually a one time thing or do you try to do
that incrementally over the
years well I think the thing that's important here and
Melissa's done a nice job of smoothing
the five-year plan and we're ranging from two five to 1.8
million over the next five
years and I think that's what's important to all the funds
in terms of giving them that
certainty is trying to avoid any huge spikes there's just
makes a little bit easier to
budget for it and that's always going to be the goal I
think the one the only outlier
and the only thing that might contradict a little I said is
just that radio system project
that we're gonna see next year that tends to have a as you
saw we're on 18 years but
it tends to have about a 15 year life expectancy so that
would be one that would be financed
a little differently because it's done so infrequently so
we'll be talking about the
need for that project next week and financing options for
you but in terms of your normal
day-to-day expenditures with systems the last five years or
less we're gonna aggregate
and smooth the funding each year so so didn't help me
understand I think this is where I'm
lost yeah so we've got this slide that shows the I'm gonna
say 18 19 so it's the five-year
projection of the capital need if you'll go back to the the
forecast on the actual budget
it's in there no I'm going I'm talking about the the one
where it showed you taking the
fund balance in this year and it's so 38 or 39 this one
right here so in this forecast
revenues expenditures where is the for each year you've got
a 2.5 2.4 1.8 where in here
is that number built is that number built in it's it's
built in there as part of our
proposed it's in the expenditures for every year in the
five-year forecast and so the
fixed asset okay Adam that she shows you in all the
expenses so it's in the expenditure
line right so it's in there okay gotcha all right back down
here to the fixed asset number
that you see there that's it all right so that's built into
the cause of transfer that you
budget all of those costs we're trying to build those in as
Todd said to try to have
the certainty for all the funds on what kind of costs they
're going to have in the future
we try to budget for those any kinds of savings that she
generates they go into the bottom
line and then each year we look at rebalancing those needs
with what the costs are I think
where I was confused was because for this budget year there
's such a large fund balance
that you're taking it out of there and so that's where I
thought it was coming out of
what you're saying from for budgeting moving forward it's
included in the expenditure line
instead of oh gotcha yeah in some cases in the past we have
tried to build up the fund
balance intentionally knowing that we have a large project
coming forward fair enough
yeah I got it I got it thank you yeah technology is not
cheap so we try to offset some of those
costs cost of service we want to keep it consistent I know
a sister city that essentially doubled
their budget sure team million because they didn't
streamline it that I appreciate that
impact so very good explanation thank you yes customer
husband few questions so when
you when you talk about Adobe and some of those softwares
are you are you software as
a service online or are you Adobe is software service
online okay so we do provide that
so as part of our kind of our technology services strategy
we try to do a cloud first specifically
for software as a service so recently like our SharePoint
online it's in the cloud our
budget software would be in the cloud our contract
management is in the cloud so we
try to use a hybrid approach so we have some data we keep
on site just for regulatory reasons
and instances where it just makes better sense to keep it
in the cloud keep mobile yeah so
like Adobe is that gonna is that low local machines or is
it like a Windows 36 I mean
Microsoft 365 something where it's an Adobe for those that
have Adobe professional those
are on site but it has cloud storage attached to it okay
got it and then where do we fall
as far as so as I think these kind of go together so my
concern is ransomware issues and as
we move further to more apps right we're looking at more
apps coming out where are we on some
sort of security for that component I know there's I'm
aware of a few different companies
that are providing that and I think that's going to be
become more pressing for us thank
you and I'm glad you mentioned that because as part of one
of our requests is to replace
our current and I spam more solution we are seeing a lot
more traffic get through because
of that so we generally as part of our O&M we do bring in a
third party to kind of come
in and assess us from a procedural from a technology
perspective to kind of see where
we're at from that threshold so we typically take I would
say a defense in-depth approach
so we have certain components that help us keep protected
but we also try to ramp up
our security program so for instance we've done six
training sessions with our high risk
departments this year just to try to give them one-on-one
training on things not to
click now I won't look at who I'm looking at now but he did
a really good job of reporting
things that were suspicious yeah after I never mind yeah
which is great because historically
that's not been the case so we're seeing an increase
increase in that can I get so
it's almost like a black hat like a third party that tries
to point out vulnerabilities
and we also do do some of it in-house on a monthly basis as
well too do you have a report
of where we stand that I could see some of it would be
considered I guess confidential
so if you'd like to come to my office maybe we'll
definitely show you okay very good and
then lastly so where do we fall projecting planning forward
paperless is that by department
or is that something your department can lead on and inch
that way I heard you talk about
microfilm that sort of things is that is that is that
something you can drive or is that
a local department that has to make that decision and then
reach out to you so I think it's
a combination of both so for instance we just ramped up
since we just upgraded our ERP system
we in June we're starting to later this this month we're
starting an ERP governance committee
to try to prioritize our projects and key initiatives and
some of that will involve
some of the automation and less paperwork process so I
think it's more of combination
okay very good thank you anything else I've just got a
comment I want to thank you and
your staff because your department really operates behind
the scenes it's not high
profile like streets utilities and all that but we I mean
we rely upon you and your staff
for number one to maintain the integrity of our customer
data from hacking to keep us
online because I have no idea what I'm doing on my phone or
on my computer so I just think
you guys do a great job and I just don't know if you get
the kind of recognition you should
because you really are the heart of what keeps this data
flowing in our just like we had
a water main break in the streets department was out there
fixing it you know they do a
great job I can't think of too many times where we've gone
down and thank you we appreciate
that we've not that 99.6 absolutely so I just want to
really give you kudos for that
to you and your staff thank you anybody else fantastic all
right thank you very much good
report sorry my for my inability to see the budget and
understand all the nuances of it
learn something new every day all right we'll go on then to
agenda item F which is receive
report hold discussion give staff direction concerning
water supply planning to meet the
city of didn't futures needs well you can come up if you
want I mean you're gonna talk
to us about water I'm sure dr. banks will take your your
spot y'all can just switch
we have enough water that's good thank you very much yeah I
've only got 35 slides
good afternoon council Kenny banks I'm general manager of
utilities I just saw slide one
of 50 so I'm sorry yeah yeah that I have a bunch of slides
at the end of it it's not
really I'm just cheating yeah I'm sorry yeah no worries
well good afternoon I want to talk
with you a little bit today about didn't water utilities
and specifically about our water
supply planning this is a topic that's been discussed a
couple of times within the the
context of the budget and so it seemed appropriate to bring
it forward to you I do want to start
with a little bit of history because I believe that it's
important to kind of understand
how this planning is done on a statewide basis and wanted
to go through a little bit of that
information with you so I also wanted to talk about the
current state of the utility kind
of where we're out in space and time give you a very brief
overview of our forecasting
when this got scheduled I didn't we didn't have the
departmental presentations lined
up and so I'm going to skim over some of that because some
of the forecasting that we use
in the departmental presentations that you saw yesterday
for water and that you'll see
today for wastewater are what I'm going to be referencing
so I want to be cognizant of
time and the fact that y'all have seen some of that
information before and then I'll talk
a little bit about our future needs planning so a little
bit of a history lesson I promise
I'll keep it brief Texas water planning has been in place
for quite some time in 1913
we had a legislatively created board of water engineers
that was responsible for a variety
of water related planning activities mainly appropriations
but what really changed things
for the state of Texas was our 1950s drought of record that
occurred generally around 1950
to 1957 and at the end of that drought which was just
economically devastating for the
the region the Texas Water Development Board was created
both legislatively and actually
via an amendment to the Texas State Constitution so that
can kind of give you a sense of the
magnitude of the of the concern there were a lot of changes
that happened that happened
between the 1960s and 1980s with regards to
responsibilities for the Texas Water Development
Board and a few other state agencies like the Board of
Water Engineers and then in 1997
Senate Bill 1 was enacted and mandated a system of regional
and statewide water supply planning
groups that was actually managed by the Texas Water
Development Board and that was really
put in place to talk about the idea of increasing awareness
and vulnerability of the state to
drought and then also in recognition of the increase in
population and in the state and
the associated water needs that came along with that
population increase. So the regional
and statewide planning that is done as a part of SB 1
divided the state into those 16 regional
planning areas each of those areas has a regional water
planning group that's responsible for
going through the regional plan they're required to be
updated every 50 year or I'm sorry every
five years and they're required under each of those five
year increments to consider
a 50 year planning horizon. Denton is in Regency and we are
a voting member of the Regency
regional water planning group. The regional plans are
created a year before the date that
the statewide plan is to be adopted and then they are
incorporated into that statewide
plan. The last regional plan for Regency was adopted in
2016 and the state plan was recently
adopted in 2017. The task of these regional water planning
groups are set by policy and
I've included some of the those tasks in your agenda
information sheet just so you'll have
them. They're tasked with looking at projected uses,
current and possible future water supplies,
the economic decisions associated with the use of various
water supplies, etc. So it's
a very comprehensive look at water use. So I'll give you a
real brief overview of the
Regency summary. Basically, not surprisingly, the Regency
area is highly urbanized and while
we contain 25% of the state's population in Regency, we
only use about 8.3% of the state's
water. That's because we have most of our water usage being
done by municipalities and
for people in lawns versus heavy agricultural uses that you
see in other areas. So the population
in this area, not surprising, is growing pretty rapidly,
about 6.5 million in 2010, estimated
to be 9.9 million in 2040 and about 14.4 million in 2070.
Most of our water is from surface
water sources and right now our existing supply is about 1.
65 million acre feet per year.
So put a little conversion down there when we talk about
big water volumes, we have a
tendency to talk about them in acre feet. So one acre foot,
let me do that for the camera,
is equal to 325,851 gallons. So like I said, the demand is
mainly municipal, so you can
see in the growth trends that are occurring through 2070
that that is almost exclusively
municipal demand on this scale. And basically, our 2070
demand is anticipated to be about
2.94 million acre feet, so we've got approximately a 1.36
million acre foot per year shortfall
that has to be managed for. Again, the demand is mainly
municipal and it's interesting some
of the economic analyses that are done. The demand, not
meaning the demand by 2070 according
to the Regency estimates, is going to be about a 34.6
billion annual combined loss in terms
of 2070 dollars and about 373,000 jobs.
Councilmember Riggs had a question.
So we learned yesterday that we sell our excess water to
the other cities around. And so
if there's a shortfall, at when and what point will we stop
selling, do we know we need to
stop selling water to others and reserve it for our
population?
I've got a slide later that I think will address that issue
that we can talk from because I
think it's important to understand kind of where, what we
're planning for future supply
within that context. So if it's okay, can we discuss that
when I get to that slide?
Any other? Okay. So real quickly, Regency suppliers are
basically, we have around 41
regional water providers and about 360 water user groups.
The big players in the region
are Dallas Water Utility, Fort Worth Water Utility, North
Texas Municipal Water District,
Tarrant Regional, Trinity River Authority, and then the
Upper Trinity Regional Water
District. You can kind of see this graphic here is just
essentially another look at the
projected demands and kind of where we're at in terms of
expectations. We'll go over
this in a little bit more detail for us in a couple of
slides. We are in Denton County,
part of Dallas Water Utility's service area. Right now
Dallas Water Utility serves about
2.4 million people. 1.2 million is actually within the
Dallas system and then 1.2 million
are through 27 wholesale customer cities. We'll give a
little bit broader look at kind
of where we're at in space and time with regards to the
major water providers in the region.
So you've got Denton here. We actually are part of the
Dallas system, but there's also
a supply in our area through Upper Trinity Regional Water
District. And you can kind
of see here how the major players are arranged here within
the DFW Metroplex. So real quick,
past and current state of Denton Water Utility. So on Lake
Lewis, we have two supplies, two
plants, one on Lake Lewisville, one on Lake Ray Roberts.
The water rights for Lake Lewisville
is about 5% of the volume of the lake. Plant capacity for
Lake Lewisville is right around
28 MGD. And that's about where we're going to stay at that
particular plant because of
the size of the raw water lines that take water from Lewis
ville Lake to the plant on
Spencer Road.
Councilmember, I'm sorry, Councilmember has a question.
Yes sir.
Thank you, Mayor. You're showing 5% water rights. So when
you add up all of the different
municipalities or et cetera that have water rights, it adds
up to 100%. Would that be
correct?
That's correct.
Okay. And yet we were told yesterday that our part on the
dam would be 15 million over
a period of time and the total project was only 60. So that
doesn't seem like we're
paying a percentage of that dam based on our rights.
I think, and Tim can help me if I misstate this, I'll look
for a thumbs up over here.
I think that that's based in part due to the system that is
comprised of Lake Ray Roberts
and Lake Lewisville because they're interconnected. So is
that generally correct?
The reasons for that difference is the Ray Roberts project
included new storage up in
Ray Roberts but expanded storage in Lake Lewisville. So
when they raised the pool level in Lewisville
seven foot for the Ray Roberts project, our water rights in
Lewisville from a standpoint
of permitting are 5%, Dallas has 95%, but the cost
allocation for the dam expenses are
based on a portion of the Lake Ray Roberts storage
physically residing in Lewisville.
They move the flood storage in Lewisville upstream.
So that's why there's that difference. It ends up being
about 9% of project cost as
opposed to the 5% water rights in the original Lewisville.
I guess I thought I heard the number 60 million put out
yesterday for the total on the dam
project and that we were 15 million which is 25%.
It's actually about 150 million.
That makes more sense.
And I recall stating that, but that was a guess on my part.
I actually have those numbers
and Tim is correct. It's right now that the overall
estimate is $149,999,000.
Yesterday when we were shown a comparison to water costs in
other cities, we saw that Dallas
was a lot less and New Braunfels which I may or may not
compare.
But Mr. City Manager, I recall you explaining that it's in
part because we are burdened
with so much plant.
But I don't fully understand that, how that works, and I
wonder if this is an opportunity
to get clear on that.
Is there a way that we could be getting water and costing
less if we weren't participating
in these plants?
No, many of our fellow cities out there will own regional
treatment plants, that sort of
thing.
We happen to have two of our own.
So that just increases our costs.
And really I don't think there's any other choice obviously
because of the geography
around Denton.
But when you're part of these more regional plants, you can
share the costs as you're
adding cells or whatever.
There's efficiencies in that, efficiencies O&M, that sort
of thing.
So the fact that we're operating two separate plants right
now and we're having to expand
one of the two, just really you're not going to find many
other cities in our situation
like that up in the DFW area.
Many of them are going to be more regional based and
sharing costs.
So it's the fact that we don't have more partners to share
the costs with?
Is that kind of...
Yeah, in theory.
We're footing the bill ourselves and there may be much
greater efficiency building 100
MGD plant and expanding from 20 to 50.
But all those financing costs, operational costs, those
sorts of things can be spread
over many partners.
And we lose that efficiency having two separate water
sources with two different kinds of
plants, things.
And you just wouldn't see that dynamic in many other
communities.
But the geography around Denton makes that a fact of life.
Thank you.
Real quickly, in terms of the history of Lake Louisville's
plant, it started at a 4 MGD
plant in 1958.
We still had wells in our system at that point.
It went to 4 to 8 MGD in '65, 8 to 16 in '75, 16 to 24 in '
89, and the last expansion was
done in '94.
So that took us to 28 million.
On Ray Roberts, as we've mentioned, we have 26% of the
water rights there.
Dallas has the remaining.
The plant capacity on Ray Roberts right now is 20 MGD, but
that plant was designed to
be ultimately expanded and we have the physical space and
infrastructure necessary to go to
100 million gallon per day.
Thank you, Mayor.
How does 28 MGD translate into 5% of the water rights?
I've got a slide later on that I think will help address
that.
Okay.
I'll wait.
So that is actually a bit of a complicated question, but I
think if I can talk from that
slide I can make it clear.
All right.
So the water demand forecasting, just a real brief overview
, and this is the part that
we've talked about a little bit within the budget.
The forecasting that we do, of course, on a year-by-year
basis and looking at our capital
programs is designed to help us to put together our budget,
but it also helps us to understand
what our water needs are.
And so I wanted to touch on that just a little bit for the
benefit of those watching and
I'll try to keep it brief because I know that we've gone
over this before.
The projections are done by the City of Denton.
We actually use the Council of Governments.
We also use -- we take a look at the Regency numbers.
We do multiple-year projections to guide our capital, our
regulatory programs.
One key issue with this entire exercise, when you're
talking about planning, both from a
capacity standpoint and from a water rights standpoint, you
've got to understand that
we have to plan for the peak demand.
So we have to have the capacity in the system to be able to
move the water around in the
city and provide that -- the water needs for the city plus
some cushion for that hot August
day where we have a very large amount of water usage.
So we do this by looking at water customers by class,
calculating the usage of that class,
projecting how many of the -- projecting the number of
those accounts, how much we anticipate
them to grow on a year-by-year basis, and then translate
that back into volumes in a
simple sense.
That allows us to look at historical and projected water
production in terms of million gallons
of water per day is typically what we'll be looking at.
This is the average graph, and I think it's important for
you to understand that because
I'll show you the peak and the difference here.
So about -- for '19, under dry conditions, we're looking at
about 22.9 million gallon
per day on a yearly average.
But if you look at '19 for our peak day demand, it's almost
double that number.
So that's what I'm conveying when we -- when I say we have
to plan for that peak demand.
We've got to have capacity in the system to be able to meet
this demand even though it's
quite a bit less than our average yearly usage.
So we turn this information into projections.
You've seen graphs like this before.
This is the average annual graph.
One of the things that we talked about yesterday was the
idea of the declining per capita per
day consumption and kind of what that trend has been
looking like lately.
We've had some unusual years with regards to rainfall
patterns, and so that's -- we
suspect that that's partially driving this, but we also
suspect that the declining per
capita per day is also related to efficiencies in
appliances, greater efficiencies in irrigation
systems.
And we also, as was mentioned yesterday, have a pretty
large proportional number of multifamily.
So all of those things are likely having influence as well.
So we use this information to start projecting our capacity
.
This happens to be a peak day finished water production
estimate, and so you can see the
plant expansion that we talked about here.
And we're generally trying to have that capacity in place
when we get close to this dry year
usage pattern mark.
But as we talked about yesterday, the ability for us to
push this planning horizon out certainly
exists, and if our per capita continues to go down, we'll
likely see this entire wedge
here slide to the right.
So every year we take a look at this.
Every year we do the projections, and every year we perform
this analysis so we can be
sure we're timing our capital correctly and also to be sure
that we're budgeting correctly.
>> Question, Councilmember.
>> Yes.
>> Does incremental capacity come in sort of minimum size
chunks?
In other words, is there a reason you're talking about
adding 30MGD, which it looks like -- I
can't see how far that goes out to the right.
Are there different sort of steps, size steps that you
could do without losing efficiency?
>> That's something that we're taking a look at right now
and plan to bring the results
back to the Council.
It's not as easy as just saying, well, let's do 10MGD, 10MG
D, 10MGD, because there are
plant processes that just simply don't lend themselves to
meshing up with that type of
a treatment train all the way through the treatment process
of the plant.
And so we're looking at that to see if there's an
opportunity to maybe size it a little bit
smaller.
The first one was a 20MGD, so we've at least got the
potential of taking a look at that
since we have an existing capacity right now.
The question is, can we slice it smaller than that?
And that's what we're trying to look at right now.
Okay.
So water supply needs, water rights, and firm yield.
This is where we get into the actual water rights of the
lakes.
So to get back to some of the questions that were asked
earlier, we've got to have an understanding
of what firm yield actually means.
Firm yield is basically saying that it's a model-based
approach where we're modeling
the maximum annual supply that's available on demand, and
then we're basically ensuring
that that amount will be in place to be able to accommodate
a seven-year drought of record,
a drought that was identical in terms of the rainfall
patterns that existed in the 1950
to 1957 drought.
So that's kind of the planning tool that is used for the
water rights component of the
system.
And so when we look at how much we draw out of the lake on
a day-to-day basis, if we're
above conservation pool, we've got the ability to pull out
more than our water right.
It's what we're planning for is that seven-year drought of
record.
That's why it gets a little bit complicated when you talk
about water rights without qualifying
it to the idea of this is planning for the worst-case
scenario.
So under the firm yield concept, our available supply out
of Lake Louisville and Ray Roberts
combined is about 25 million gallons per day.
Our future needs by 2050 in terms of water rights is 45
million gallons per day.
Basically that's going to give us a 20-MGD deficit.
So I did notice it, and I want to point it out on your AIS,
I think there was an error.
I believe this value actually says 25 in your AIS.
So just for those watching this, this is the correct math.
Based on firm yield, and again, this is the worst-case
scenario that we have data for
in terms of that seven-year drought of record.
So this is actually our water rights contrasted against our
usage pattern from 1992 projected
forward to, in this case, 2035.
So I'll try to be brief in explaining this graph.
This is when the water rights for Ray Roberts came online.
The lake was impounded in 1987, and we began to receive
those water rights in 1988.
We had prior to that a small raw water contract with the
city of Dallas that allowed us to
purchase a small amount of water, and we're able to work
into that agreement a potential
or an effluent credit due to what we were discharging into
Lake Louisville.
And so you can see at the time that that was put in place,
we were actually had quite a
bit larger GPCD.
I think we were well in excess of 180 gallon per capita per
day in this timeframe, and
we got close to the need for that before the capacity for
Lake Ray Roberts came online.
We retained that contract when the Ray Roberts system came
online because at the time that
trend was indicating that we would probably need that water
right much, or we would accommodate
the capacity of the water that we were getting from Lake
Ray Roberts in a much shorter timeframe.
So this is why it's important to plan for this every year
because every year we do these
projections we saw that the gallon per capita per day was
going down and that that time
horizon was moving out.
So in 2015 that contract actually expired and we chose not
to renew it at that time.
So now we've been going forward for the last several years
with that contract not in place,
and we are in need of securing additional water rights to
in effect make us drought
proof.
So we're not this line does not in any way shape or form
indicate that we're running
out of water that we don't have the capacity to provide the
water needs of the city, but
it does indicate to us that we need to take a look at
getting some additional water rights
to ensure that we're meeting that planning horizon issue
for the seven year drought of
record.
So, yes.
Yeah, is there anything in our weather pattern history that
would indicate whether we're
more likely than we might have thought in the past to
experience a record drought or
less likely you know we're inclining toward greater or
lighter rainfall or it's just total
unpredictable.
Right.
Right now the planning tool that's been chosen to be used
by the state is the 50 to 57 drought
of record.
The the certainly weather pattern changes are occurring.
And that that is one thing that is being looked at very
strongly.
Those projections going forward are likely at least they've
got the possibility of changing
that 50 to 57 drought of record.
I just don't think we have enough information on that at
this point.
So right now this is the the planning horizon or the the
planning tool that's that's used.
If you ask me if that's going to be the same planning tool
even within the the 50 year
period that this this actual plan looks like let's say we
roll forward to you know 2070
approximately, we very well could have another measurement
in place.
So we may have more data at that point and better ability
to to model what weather patterns
are likely to to do.
Councilmember Riggs.
So when you hear that there's going to be a deficit in our
water supply even in the
future it's kind of scary.
Correct.
Right.
And so I'm we need water to live.
So what do we do to get more water rights?
Do we just go back to Dallas or like Louisville?
Do we do we get a higher percentage or I mean this is a new
process so I'm just curious
how right right.
What do we do?
Well and and I'll I'll I'll talk from this graph to to
answer that question.
So the the first thing that we're trying is to secure what
is referred to as an indirect
reuse permit.
All right.
Basically what indirect reuse means is that we have a
ability to claim as a water right
with T.C.Q.'s permission and through a permit we have the
ability to claim as a water right
half of our effluent discharge on a one pass through system
if that if that makes sense.
So right now we have our our effluent discharge is around
12 million gallons per day on average.
So on average what that means is that our water right that
we could claim if we're successful
in getting that indirect reuse permit is about six million
gallons per day.
So that's what this green section of the of the graph
indicates right here.
That's our first option because once we get the permit that
's a no cost option to the
city and allows us to keep our rate payers from having to
pay for water additional one.
Does that reuse does it affect the water quality.
It's a one pass system.
So the the short answer on that at 6MGD for Lake Louisville
I would say the answer to
that would be no.
One of the things that may come up and we're a very small
player in this system there are
there are a lot of entities out there that are pursuing
indirect reuse by the way.
Region C has indirect reuse as one of their big strategies
for the entire region that
creates a situation where we've got to make sure that we
are retaining enough water in
that system to maintain environmental flows.
So from from my standpoint I wouldn't I wouldn't
characterize it as a water quality issue per
se I would say that we've got to be sure that we do not
overuse indirect reuse as a
strategy regionally because that means less water is going
to be in the in the streams
and that also means that there's a possibility of having
less water through that entire system
all the way down to the coast.
Now before that that becomes a scary issue you also have to
keep in mind that we are
impounding a lot more water in the region than we ever had
and so you've got to contrast
the the system as it existed prior to all those impound
ments versus the system as it
exists today.
So that that it's it's a it's an interesting thing to
consider when you're talking about
a situation where you've got hundreds of millions of
gallons per day by multiple users coming
out of that system that that's quite a different scenario
than 6MGD one pass.
Keep in mind if you if you do that it essentially almost
catches up because we take that water
in we use it and then it gets discharged back again.
So when you're talking about that the fluid is the
wastewater that's coming out of our
water treatment plant.
Out of our wastewater treatment plant.
Wastewater treatment plant.
Correct.
And right now it's going into Lake Louisville.
That's correct.
And are you saying that that we just get credit for that
out of Lake Louisville or are you
saying that we directly pull it back in and reuse it?
No, we get credit for it.
That's the difference between what's referred to as a
direct reuse and an indirect reuse.
Indirect reuse just means you get to claim the credit.
The direct reuse means that you're essentially taking that
water as wastewater treating it
and putting it right back into the system for potable use.
And there are some entities that do that.
That's not what we're proposing here.
There are also just for to explain all the terms there's a
nuance issue there with direct
reuse too because you've got to differentiate between
direct potable reuse and direct non-potable
reuse.
Right now we have a small direct non-potable use with our
reuse program where we provide
that water for irrigation purposes.
So it's not much.
It has a tendency to be less than a million gallon per day.
So that's our first strategy is to pursue that system.
There's two things that are nice about that.
Once we get through the permitting aspect of it and that
permit is down at TCEQ currently
under review, once we get past that component the cost for
this water right is essentially
the cost it took to get the permit.
The other thing that's nice about it is it tends to grow
with the city because as our
water needs increase our wastewater effluence will increase
and the water right will increase
accordingly.
The next option is a simpler option but it's going to cost
some money.
Basically we would go to the city of Dallas and just simply
secure a purchase agreement
similar to what we had before.
So now this is raw water purchase.
This is not treated water.
So question.
So we no longer have a contract with Dallas for Ray Roberts
?
We no longer have a contract with Dallas to purchase raw
water from them.
But we're pumping water out of it now because of our water
rights?
That's correct.
Got you.
Okay.
Do you have a question?
On the assumption that if we didn't kind of create our own
capacity that we could buy
from elsewhere, do we know that Dallas has excess capacity
or is projected to have excess
capacity so that would even be possible to do?
Well Dallas is certainly planning to meet the needs of its
customer base and one of
the things that I think it's important to point out as a
component of this discussion
is that Dallas is a member and is involved with the
planning of Region C as much as you
know or more than we are.
So if you look in the Region C plan, it actually has both
of these concepts in that plan currently.
The concept of indirect reuse and the concept of purchased
water from Dallas.
So that's a roundabout way of saying they're planning on
doing that as a part of their
membership of Region C. So the amount that we're talking
about is very small and keep
in mind that it's only going to be a situation where we're
dealing with raw water, not treated,
and keep in mind that this discussion really is not a day-
to-day discussion.
It's within the context of the firm yield idea, meaning
that this is what we would need
to have to be able to survive the seven-year drought of
record.
I would also say that that's a very conservative means of
looking at it because effectively
what we end up, I think it would be very unlikely that we
're going to go through a seven-year
drought of record and get about three years into it and not
have some kind of diminishment
of water usage that goes beyond what we typically see and
would then pull down the usage and
the dry year scenario.
So in other words, I think that's a very conservative way
of looking at it.
So basically those are the two options that we are looking
at right now.
We are in process with both of these.
The TCQ is currently reviewing our indirect reuse permit
application and then we also
have fairly regular talks with the City of Dallas.
In fact, we talked with them just about a month and a half
ago concerning this idea
of water purchase as well as a lake operational agreement
that they would like to take a look
at.
So again, we've talked about this a lot already.
Indirect reuse is the first option.
Dallas Raw Water Purchase is the second option.
Because we have both areas, we have two entities that serve
this area.
There might be a possibility, we haven't explored it at
this time, of purchasing water from
the Upper Trinity system as well.
That is kind of just another option that's on the table.
So projecting this all out, this is generally what we would
expect the situation to look
like.
If we are successful in getting our indirect reuse permit,
that would probably put us through
kind of difficult to predict, but I'd say at least through
2032.
And then we would be looking at that point of entertaining
the idea of purchasing that
water from Dallas or from another entity.
So treatment capacity-wise, we should be in good shape.
Again, I want to stress to everybody that what we're
talking about here is planning
for a seven-year drought of record.
We're not talking about day-to-day water usage.
So that translates into what I put together to compare
where Region C thinks will be in
space and time.
I chose to use 2050 as a base model year because that's our
current projection window.
The Region C estimate and our estimate are very similar.
You can see dry year estimates, we're anticipating a little
bit less demand, about 44 MGD, compared
to Region C estimates of 48 million gallons per day.
I would say that our estimates are based on actual water
use, and we forecast every year.
And so I'd like to think that our numbers are a little
tighter and a little bit more
defensible, no knock against Region C. And then really in
terms of makeup, the main difference
is purchased water.
Yes, I'm sorry.
I know we're dealing in unlikely scenarios, but does it
make sense that we would be experiencing
a seven-year drought, but it wouldn't affect Dallas?
The likelihood is that that would be very regional in
nature.
It would not just affect us.
So it would be affecting others as well.
And so that's the nice part about the Region C planning
because everybody's planning for
that firm yield.
So it's not just us, it's Dallas, it's every other water
supplier and provider.
So one thing that I will say is that it's very important
for Dallas to maintain the
volume in Lake Ray Roberts.
It's the only, that system is the only gravity feed system
that they have.
They have a tendency to, in times of short droughts, to
overdraft on the eastern side
and move that water in to the system of their chain of
lakes.
And then as things get drier and drier, they move over to
the western side.
So the eastern side has a tendency to get more rainfall.
And basically, I'm looking over at Tim, did I get that
right?
It's reversed.
Yeah.
The western reservoirs don't get as much rainfall as the
eastern reservoirs.
So the eastern reservoirs tend to be more prolific.
Geographically, the western reservoirs are closer to where
the demand is.
So they get overdrafted.
And when it rains, just like it did the last year or so and
fills everything back up, it's
a non-issue.
They tend to overdraft the western reservoirs and have the
eastern reservoir system as a
under-drafted system that they'd have to import that water
in to sustain the later
years in a drought record.
The other comment that came up about drought record and
planning, many of the entities
within Region C are planning on what's called safe yield
versus firm yield.
So what that means is that you'd go through a seven-year
drought record and your supplies
aren't gone.
So you have a safety factor.
So Dallas is one of the entities that is planning on the
basis of a safe yield.
So they're actually planning on something beyond the seven-
year drought.
But to Kenny's comment on Ray Roberts, because they operate
the system as a reservoir system,
they tend to preserve the water in Ray Roberts more so than
Louisville, because when it rains
and rains hard, they want to have the larger catchment area
have the bucket downstream.
So they tend to keep the lake levels in Louisville higher,
which certainly benefits us.
And so in the 2011 drought, which was a pretty hard short-d
uration drought, one of the lakes
with the biggest inventory was Ray Roberts.
That's pretty much it.
There's more questions.
The board just lit up.
Council Member Gregory.
OK, I want to go back because I didn't hear the answer.
What we are able to produce, pull out and convert into pot
able water out of Lake Louisville,
that MGD number of 28, 25, whatever it is.
Yeah, it was 28.
28.
How does that compare with what our actual water rights are
of 5% of the water that's
available in Lake Louisville?
Right.
So 28 MGD is the plant capacity.
The available supply by both reservoirs together because
they're connected is 25 MGD in terms
of firm yield water right.
Does that answer your question?
So we can pull out all that we have the right to pull out.
That's correct, but keep in mind that we're talking about
the firm yield scenario where
if you're talking about a situation where we're not into a
drought of record, we can
actually pull out more water than that and do that on a
routine basis.
Then another question.
There's a new lake that has been approved starting
construction in northeast Texas around
the bottom, right?
Who has the water rights to that?
I know that at one point I heard a couple of years ago I
read in the news that I think
it's Flower Mound backed out of its financial commitment to
that.
Who's got the water rights?
Are there any available that we should try to secure over
there?
Right.
Are you talking about the lower boat arc?
I don't know.
There's several lakes.
Several lakes planned.
Ralph Hall, lower boat arc, Marvin Nichols.
Lower boat arc is one I believe that is starting to break
ground.
That's a project that I'm going to look for 10 for
confirmation.
It's North Texas Municipal Water District, right?
So they have all of the water rights to that one?
To my knowledge, that's correct.
Okay.
What about those others?
They're a supplier though.
Keep that in mind.
Okay.
So they're regional suppliers.
So that they're technically the water rights are theirs but
others will be making use of
that through their regional supply agreements with North
Texas Municipal.
Is there, is it even possible at this particular point to
look out to 2050 and create a contract
with Dallas or with that other agency for some water rights
in 2050?
I'm sure that it is.
The question is going to be one of timing and cost.
So the idea is going to be do we want to, we need to plan
for that at the time when
we're nearing that water right and need because that would,
if we don't, they're basically
going to enter into a contract but they're going to want to
enter into a contract now.
So we would effectively be in the same situation if I'm
understanding what you're saying correctly
that we were in back in this area of the graph, I'm sorry,
this area of the graph where we're
basically paying for that water right but we're not using
it.
And the final question, if we ever get to the point, I have
a friend who lives on an
island, they get their water from a well.
Okay.
But everybody in this community, because of the capacity
that the well has, they have
a set number of water taps.
And that's all that they have.
And that really controls any future growth, any future
construction of residences or businesses
because it's hard to have a house if you don't have any
water.
Is there, do we look at in region C, a scenario where at
some point down the road, if you
look at all of the reservoirs that are available and the
fact that it's not likely that we
can purchase water from out of state, Oklahoma has never
shown any interest in selling any
of those kinds of things.
Is there ever people, you long term smart guys that plan of
saying we have a capacity
and we can't grow past this, there's going to be no more
water taps available?
And you have a slide for that.
The short answer to that is yes.
Basically, this is a quick series.
I promise I'll be fast on those.
This is 1910 to 1920.
Basically you can see how lakes are added through that
system.
There's well systems that were around.
We had the Garza to Louisville Lake added, Lake Grapevine,
Lake Tawakene with a transmission
pipeline.
We go out larger regionally and start to add dual systems
on our transmission lines, new
lakes, continue to add lakes into that system, change our
service areas and basically what
is going on now is there's a lot of lake construction that
's going on in this area with a huge pipeline
project that will actually transfer that water in to where
Dallas can use it.
So the part of the design of Region C and really the
overall statewide water plan is
to get all of these entities together so these things can
be planned.
Obviously these lakes take a very long time to permit and
construct.
And basically now we're looking at systems that are going
in new up in this area and
over here that will be transferred into the system.
So every five years that's looked at again.
Every five years it's adjusted.
Thank you.
Council Member Briggs.
So we have focused on planning our future energy needs for
a while and to me water is
more important so I appreciate the conversation and the
presentation today.
I would like to ask for kind of, Council Member Gregory
said, maybe a list of pros and cons
on the options including money and environmental issues on
indirect reuse versus purchase and
how that would look if we decided to do one and not the
other or less indirect use and
more purchase when you mentioned draining the creeks out of
the natural.
It kind of was a little scary as well so just kind of
balance those.
Right.
Well and keep in mind we're required to, the environmental
flow issue is looked at.
That's a requirement.
And so it isn't like we're going to just pull all the water
out of that system.
It gets a little more complicated on water rights issues
for downstream, etc.
But again all of that is looked at as a system.
I'd be glad to bring that back.
Are you looking for qualitative, you know, just a general
description or are you looking
for more quantitative in terms of cost benefit?
Well when we had, when we were talking about our energy
needs we had like the pie graph
that was here and we, you know, what we purchased, what we,
you know, have, that kind of thing.
And so I'm looking at this and I'm thinking well if we have
this existing what if we purchase
more water from Dallas and instead of this plant to the
indirect use and how much that
would cost us just the balance between the two.
Right, right, right.
And just again so I can be sure I'm addressing the question
correctly.
The indirect reuse is not going to cost us anything other
than the permit securing cost.
After that, after that it is, it is free and clear.
In terms of the purchased water for Dallas, I think when we
had that contract with them,
I'd have to, I'd have to go back and look.
Tim and I were talking about it earlier and the number of
about a hundred thousand a year
it sticks in my mind which probably would translate into
being about a hundred and forty
thousand a year to get a comparable purchase at this date.
But keep in mind that that's a small amount and so you, you
know, you start to contrast
that against the six million gallons that grows with your
city and that's going to
be quite a bit more expensive.
So we're probably looking at current price half million
dollars a year or more.
So and that would be at a fixed value versus one that
changes over time.
So does that help or would you still want me to bring that?
That helps, that helps.
Maybe, yeah.
I'll get offline with you on more environmental issues.
Okay, absolutely.
I'd be glad to.
Thanks.
Councilmember Hutsworth.
Thank you.
So one, one thing that you hadn't touched on, I just want
to get a general look at it
from your perspective and that's the Desalination.
So I had an opportunity to tour the plant in San Antonio
and I think they report 13,441
acre feet per year that they get from that and it's also,
it's, matter of fact, the
water's more pure.
They have to go back and add chemicals to get it, you know,
get the taste right and
avoid the scaling, that sort of thing.
So what is your, what is your look on that going forward?
Do you think that pursues or, I know the cost issue becomes
huge.
Yeah, it's a big cost issue and we've also got to consider
it from a source standpoint.
I believe the, most if not all the desal for San Antonio is
actually coastal accessed water
and so up in this region we're really only looking at the
ability to do desal with brackish
groundwater and so the capacity of a system like that is, I
think, undetermined although
those resources do exist, but that's going to be extremely
expensive on a per gallon
basis.
So we're going to have to pump it from a deep, deep system.
It's going to be highly salty, almost certainly, and then
we're going to have to desalinate
it.
So it's possible, it's just, it's probably going to be one
of our most expensive, if
not the most expensive option available to us.
Okay.
And then if we could go back to the graph, major water,
Texas, major North Texas water
providers.
Get back to it.
This one?
Yes.
My ask, can you give me something, and so it doesn't have
to be, it doesn't have to
be any more drilled down than this, but what I'd like to
know is the source, how much we
get and how we get it.
Is it pumped?
Is it, you know, and just a little call out, right?
So if we get water from- Her provider?
I'm sorry?
Did you want that, the sources and for each of these
individual providers, is that what
you're asking?
No, for us specifically, yes.
Okay.
But more, so for example, Ray Roberts, we get, you know,
whatever, three gallons, and
it's pumped, you know, through this water line, right?
So it leaves me with the water line, our max that we get
from it, and how?
Is it pumped, gravity, you know, I don't know those, and
they all may be pumped, I don't
know.
Right.
That kind of component, that's kind of what I'm hitting at.
I'd like to know where it came from, how much is our max,
and then what the name of the
water line that it travels to get to us.
Okay.
And you're asking that for Denton or for all of these
regional providers?
Just for Denton, yes.
Okay.
I can probably address that.
The, we've got the two plants, Ray Roberts, Lake Louisville
.
Lake Louisville plant is on Spencer Road.
It draws water in from the intake structure that's right by
the I-35 bridge on Lake Louisville,
where the old party cove is.
Well, no, no, I just want, I want, if you just, someone
creates it.
Could you get that to him off?
Yes.
You want it offline?
Yeah, yeah, yeah.
No worries.
I'll just create that for me.
Okay, please.
Council Member Ryan, I think had some questions.
Yeah, I had a question when we look at the firm yield slide
versus the slide before it
was, which is peak day.
We've got current year projection on peak day of, in the 35
, 36 range, this slide 15.
Right, yeah, yeah, you may be able to see the actual number
easier on this one.
Yeah, and I'm just looking at, so we've, how much do we
actually produce?
I mean, we've got the ability to do, we've got a 28 MGD and
a 20, so total of 48.
Right.
How much are we actually running through there?
Because when you look at what our rights are, our rights
only allow us 25 if we ended up
in a drought situation.
So would we be in a huge problem just from the water rights
, even though we can clean
up the water for a pot?
Right, right.
The available supply is 25 million gallons per day.
Think about that in terms of an annualized basis.
All right.
So in the summertime, we're going to pull much more water
than that.
Probably we'll be upper 30s or so to be able to meet those
in a dry year scenario.
So we've got the ability, even under this situation, to be
able to draw more water than
that on a daily basis.
This is 25 million gallons per day annualized average.
Does that help?
Yeah, so it's 25 million times 365 per year.
Correct, yeah.
And in some days you'll have way less than 25 million and
in some days you'll have more,
depending on the time of the year and the overall usage
patterns.
And then I guess my other question is on the region map is
are we only allowed to purchase
or to have rights within our region or are we able to, if
there was a new lake going
in that's just in region B or East Texas that we would be
able to?
We can secure water rights from other areas.
The trick is going to be getting them here.
Okay.
So, but yes, that we could conceivably get water rights
from outside of our area here.
Now region C itself also has some areas along its periphery
where water is anticipated to
be moved into region C as well.
So we can do that both on a small scale, you know, Denton
County, or we can do that on
a larger scale region C.
Okay.
And is there such a thing as a trade or a swap that as
Dallas starts to buy up rights
over in East Texas and we do some, where they can get the
water into their lakes on the
eastern side and make use of it that we could be involved
in helping them get that that
we would get a larger percentage of ownership or water
rights on Ray Roberts?
I suppose any deal is possible, but the question is going
to be what water rights do we need
to get and would one, would they give those water rights up
in one lake for capacity in
another?
I think that's unlikely.
The second is what would the cost of that look like in
comparison to just purchasing
the water from them as raw water?
So I mean, any kind of a deal is possible.
I think that that scenario would likely end up costing us
more than what we've looked
at here.
Keep in mind that these suggestions that were done by
region C have also been subjected
to economic analysis by the consultant that was hired to
put the plan together.
And so these are supposed to be our best and most
economical approaches to doing this.
But anything's possible.
We could secure outside of the region.
We could cut any kind of a deal with the city of Dallas in
theory.
Okay.
Thank you.
Councilmember Meltzer.
Okay.
Probably last question I imagine.
In a water shortage drought scenario, I have no idea if the
scale is meaningful.
Would hydraulic fracturing potentially be a competitor, a
significant competitor for
water supply versus municipal use?
Not according to region C. The mineral interest are a
component of what they analyze.
I can tell you for us back in the heyday when most of the
drilling was going on, we were
looking at a small percentage.
It was somewhere around 3 to 5% maximum.
And I don't think that we'll see that kind of drilling
again.
Now in fairness, some of the wells that went in, they
actually were able to drill a water
well in and use that.
But we had a lot of water purchased for doing that at the
time.
That gives me order of magnitude.
Thank you.
Okay.
Sure.
Okay.
I'm going to have the last question.
All right.
If you could go back to your need, you should call it the
fair, the firm.
Okay.
Yes.
So we've spent the last hour talking about a seven-year
drought situation in essence.
That's correct.
Okay.
So that's the worst case scenario in the sense of what
people think would be a worst case
scenario for planning purposes.
Correct.
So when I look at this, you're saying that the water rights
that we have between Lake
Ray Roberts and Lake Louisville is about 25 million gallons
per day.
Annual average, correct.
Annual average.
Which that comes out to about 9.1 billion gallons is when I
multiply 25 times 365.
Right.
All right.
So that's all of our water rights pursuant to whatever the
contracts, the agreements
were back then.
Correct.
All right.
So if you go to the what we use, that one, or it was the
table, it was that right there.
This is the peak day.
Do you want the average day?
I want the average day, yes.
Yes.
Okay.
Where's the average day on here?
It's not on there.
Yeah, this is water production in terms of billion gallon
per day.
This is annual average.
Okay.
This one's the average, this one's the peak.
All right.
So then, okay, you just switched slides.
Okay.
So this is the average right here.
Right.
So when you're down to 2027.
Right.
We're sort of at our quote unquote maximum for our water
rights just in a normal sense.
Right.
Yeah.
I would argue that we're probably around in this range
because we've got to plan for
a drought.
Right.
So then you've been talking about for a seven year drought.
Right.
But yet if you're not in a seven year drought, we're still
going to have a water capacity
need.
Absolutely.
We're going to still, this permit that you've been talking
about, this indirect.
So I guess my question is, if we're talking about expanding
our Ray Roberts plant to 100,
is it 100, what was it?
How many, to 50 million?
Yeah.
It is capable of being expanded to that amount.
But what we proposed and talked about yesterday was a 50 MG
D plant, the existing 20 and 30
million gallon per day additional capacity.
So this is where I get confused about that.
Okay.
So our water rights between both lakes is 25 MGD.
Correct.
Now, I guess if we purchase water from Dallas that we're
pulling out of Lake Ray Roberts,
that's why you're saying, because why would we want to
spend $90 million to increase our
plant capacity unless we believe that that's where we're
going to be able to get some of
that additional water source from in the future?
Two answers to that.
That 25 MGD that you're talking about is under the firm
yield scenario only.
We can draw much more out of the lake if we're not in that
scenario.
Okay.
Let's put the firm yield on the shelf.
What I'm trying to figure out is what are our water rights
outside of this sort of worst
case scenario?
So what you're saying is in a drought, we can't pull more
than that because we need
to conserve water.
Correct.
But normal situation, wet, dry, annual, whatever.
What is the MGD that we have available between the two
lakes?
If we chose to, if we were not hindered by capacity at all,
is that what you're asking?
Yes, and we don't have this firm yield, we don't have this
seven year drought thing we've
got to do.
So if we just, what are our rights to pull out of there,
regardless of our capacity?
250?
Yeah, it's about 230.
230 million gallons per day.
Okay, so.
Not drought per day.
All right.
So that's what you're saying is from a planning perspective
outside of a drought situation,
we're only hindered in our capacity from a mechanical
perspective of drawing it out.
Right.
Treating it and transmitting it.
We've been talking seven years, we've been talking about a
seven year drought and it's
like, oh, are we going to run out of water?
And yeah, if we're in a seven year drought, we've got a
plan to address that.
At least we're working on a plan.
Correct.
But outside of that, we're tenfold below the capacity.
I mean, our capacity right now on that particular one is
tenfold less than what we are, not
Ray Roberts is different.
Right.
We've got a tremendous amount of more water that we could
draw out than what our capacity
has.
That's correct.
Okay.
And keep in mind too, we always have to plan for that peak
day.
No, I understand.
Yes.
Yes.
But that's not a water shortage issue.
No, it's a capacity issue.
That's a capacity issue to be able to pump it out.
Right.
That's where that comes in.
Right.
Okay.
Fantastic.
Good information.
Thank you very much.
I appreciate that.
Thorough as always.
Any other comments, questions?
So we've covered, if we have worst case scenario, we've
also covered just the normal circumstances
that sounds like we've got a good plan moving forward to
secure and to make sure that our
city has available water rights for many years to come,
except if we don't build the capacity.
Correct.
All right.
Thank you, Dr. Banks.
Appreciate it.
You bet.
Appreciate it.
Hey, I think dinner is ready.
So let's take a quick break and grab some dinner.
Welcome, everybody back to this meeting of the Dent City
Council on Tuesday, June 5th,
2018.
It is now 534 and we've got one more work session item to
go over.
It's work session item 3G.
Receive report, hold discussion, give staff direction
regarding the wastewater and drainage
FY 2018-19 operating capital improvement program budgets.
Mayor of City Council Tony Puente, Director of Finance,
thank you for having me today.
This is a very similar presentation as you saw yesterday
for the water utilities.
The only difference here is that there's another component
that we'll be talking with you as
a separate presentation.
There's actually two presentations, is the drainage
component.
What I'll tell you is that about 20 of those slides are
mine and the rest are probably
Kenny Banks.
So he'll be coming back up here.
Just fair warning.
So just really quickly, I'm going to try to go through some
of this information that you've
already had in your backup.
But this is our volume forecast on what we've seen in
customer growth, residential, commercial,
and wholesale.
I just want to point out that we're budgeting at about a 2%
growth in customer growth over
the planning horizon for this forecast.
So again, this is a very similar chart to what you've seen
both yesterday and also today
on the water side.
And what I wanted to point out to you is that one of the
projects that is out there that
we've identified as a risk is a treatment capacity
expansion.
So we are now at our 21 MGD capacity for our current plant.
We'll be looking at an expanded capacity in a new plant out
in the future.
That particular plant is actually out kind of on the fring
es of our 10-year planning
horizon.
We do plan to begin potentially, if all things stay equal,
an $8 million design in around
2024.
And that's actually part of our current CIP.
The other component of that will be the expansion that's
out in 2028.
That particular project in total is about an $80 million
project.
So again, based on some of the feedback that we heard
yesterday on the water side, we'll
also be looking at this particular project and within kind
of the context of some of
the feedback that we got from the council yesterday.
So some of the assumptions, again, very similar to what you
've seen on the wastewater side
is again, all our rates are based on cost of service, same
kind of debt coverage ratios,
very similar type of revenue funding versus debt funding.
We have a reserve that's about 28 to 39% budgeted expenses.
One of the things that we did here was very similar that we
did on the water side by removing
the customer service component into a separate enterprise,
separate internal service fund.
We've not done that here with drainage, but we have
separated it out and not included
that as part of that calculation.
And so when we get to that particular discussion on the
forecast for the drainage component,
you'll be able to see that.
That's about a million dollar, so there is a million dollar
drainage reserve that's been
a component of the wastewater fund for quite some time.
To our knowledge, that has never been used.
And so we've actually carried that over and we'll show it
as a reserve in the drainage
component and kind of dedicate it to that particular
function.
And we'll have some more conversations about that.
So some of the cost containment strategies, of course, is
similar to some of the other
utilities and general government.
We've been doing a lot of work on the CIP side, taking a
closer look.
In this particular forecast, we've tried to levelize the
revenue funding contribution
over into our CIP to try to better coordinate that and time
that with the schedule of when
we actually think that those projects are going to happen.
So some of the risk, obviously what I mentioned to you is
there is an $80 million AMJD expansion
or additional capacity through a new facility that will be
planned.
Out there, yes ma'am.
So on that $80 million, I think I heard you say the
beginning of the presentation, just
to clarify, just for the design is $8 million?
Yes.
Okay.
Just wanted to clarify that that's, and that's part of the
$80 million?
Correct.
Okay.
Thank you.
So in addition to that, some of the other risk is certainly
, and we're seeing this
across all our CIP projects is just increasing cost for
construction and getting some of
these projects done.
We have utilized more of our internal crews to try to
mitigate some of those costs.
Certainly looking at our O&M costs is something that we
look at on a yearly basis.
And also being cognizant of some of the regulatory
requirements that may be out there that may
be coming our way.
So two very similar options as we did on the water side.
And so option one, we can go through the forecast for that.
We're recommending in that particular option a 5% rate
decrease that reduces the reserves
over that five year window, about $8 million.
Option two scenario is a 2% rate decrease.
The difference there is that we do a little bit more
revenue funding of some of our capital,
but it reduces the planned debt issuances in the future to
again potentially build some
capacity for a project like the one that we have here that
's out there kind of on the
fringes of that 10 year window.
So what we have here is the option one, which is the 5%
rate decrease.
Certainly we want to be cognizant of where our projected
fund balances are and certainly
we'll come back and show you a wider picture of more of a
10 year basis.
But again, so we were looking at where we thought that our
reserves, working capital
and operating reserves were over that five year period in
relation to where our current
policy is for those reserve targets.
And certainly while there's a little bit of a dip in 2022,
there is a projection, we projected
that that fund balance will come back up well within the
range of our current fund balance
policy.
Yes, sir.
Real quick question.
This may be too specific.
But I recall a few years back, we used, I think it was some
wastewater and water economic
development fund to for I think it was either WANCO or
someone and we were going to, I think,
pay replenish that fund.
Is that in here somewhere?
Yes, sir.
So you have the development plan lines right here and you
see that we're contributing
and getting back to a million dollars over that time
horizon.
So that shows up as a separate reservation within that
particular fund.
Appreciate it.
Thank you.
In addition to the other measure that we're cognizant of
and looking at is our debt coverage
ratio.
Again, these are just two metrics, two targets that we look
at to kind of judge the financial
health of these funds, not just this fund, but we have
similar measures on the other
funds.
So again, we feel that this 5% reduction certainly keeps us
well within a good financial picture
within that five year horizon.
For option two, option two certainly is a little bit
healthier option than option one.
Again, if you're looking out in 2023, we're projecting a
little bit over $10 million in
reserve and that's certainly actually nearing kind of the
maximum in our current target
for that particular fund.
Again, cognizant of our debt coverage ratios and this
actually puts us in a slightly better
position than what I showed you in option one.
Again, this is a five year kind of planning horizon and
just like we do with the water
fund and all our funds is we come back to you on an annual
basis and relook at kind
of a rolling five year.
So there'll be opportunities to continue to evaluate where
we are in point in time and
if there are needs for us to look at slightly different
rate structures, we can certainly
do that with you in the subsequent years as we get closer
to some of those major projects.
So these are just some of the budget highlights for you,
some of the detail again, very similar
to what you saw yesterday, three year history of our
wastewater revenue and just want to
be very clear here that this excludes any drainage revenue.
So that's not included here, both on the revenue side and
on the expense side.
We've completely stripped those out and showed them to you
separately.
Certainly on the expense side, again, this is a three year
history and where our current
proposed expenditures would be based and all this is based
on option one.
So I want to be very clear with the council on that.
So again, very similar to what we showed you yesterday, 6,
000 gallon residential customer
where our current rates stand today, where option two would
put those rates and where
option one would put us.
Certainly as these other entities go into their budget
cycles, if there are increases
in their rates, certainly our rates will continue to push
further to the low side of this particular
graph.
And this is the commercial customer at 50 gallons and then
a commercial customer at
200,000 gallons.
So that wraps up my piece of this.
Yes sir.
Yes, go ahead.
I'm sorry.
So the $80 million project, similar to the discussion we
had yesterday, I assume that
when that arrives is subject to some variables, so there's
some range around when that might
occur.
Do you have a rough idea, like yesterday we said, kind of
plus or minus two years?
Yeah, I think, yeah, can you say about plus or minus two
years on that?
Yeah, and that's kind of like we're forecasting it like in
the middle of the range of probabilities.
And if we're talking about doing that 75% debt and 25%
revenue, so what would the debt
service be?
And just to take it a couple of steps further, what rate
increases will we be looking at
in say potentially eight years?
If we're off of, you know, whatever, off the 5% reduced
base or off the 2% reduced base,
how much will we have to jump in order to cover the debt
service when that project hits?
So again, I think since we're going to be looking at this
particular project, very similar
to what we're going to be doing on the water side, I think
it might be best for us to kind
of bring that back to you and kind of show you some
different scenarios on what that
might look like.
We have very similar type questions on this particular
project as well.
Yes, go ahead.
Yeah, so, you know, might a scenario include, you know, for
the reflection, well, both playing
the increment of the capital, like, you know, does it have
to be that big?
Or could that be spread?
And then, you know, might we make a less shocking jump to
customers by, say, either staying
flat or staying well below the inflation rate?
You know, is there any benefit to that worth looking at so
that we don't, you know, just
kind of break the rate payers back, you know, in eight
years?
Correct.
Council Member Gregory.
Thanks.
We have not, as we've talked about wastewater, we have not
had a discussion in a while about
the issues that we had a while back regarding overflows,
spillage, and I know that we, the
last time we had a presentation, it was about some smarter
ways of going in and checking
those sanitary sewer lines to make sure that they're
repaired.
But before I want to know how much, whether to reduce it by
2% or 5%, I want to be really
comfortable that we are doing, that we have as much money
as we could possibly need to
make sure that we don't have some more issues like we had a
few years ago with this spillage
because of the issues with compliance with EPA, but more
importantly, the issues with
environmental integrity to our water system are, because we
live in our, the water system
where we're getting our water from.
So how are we doing there, and can you show me on those
slides what kind of money we're
putting into constant repair and upgrades of those systems?
And I think Katie can probably speak to that, and certainly
when we go into this department
presentation, one of those components will be the capital
improvement program, and they
can actually point out some of those projects.
Okay.
Yeah, are you talking about when, you know, we had that
potential consent decree, but
we got out from under that because we were doing such a
good program, we had such a good
program and system in place.
I just want to make sure that our program is still good.
Okay, so you're just wanting to make sure that we're still
on track there.
And that we're not running into a situation where we have
overflows, especially down close
to the plant because of the water and the effects.
Is this where you're wanting direction on at least this
component of the 2% or 5%?
We can wait until the end.
Well, if you want to make the correction now.
If you could, because I want to look at the graphs from the
one, not the graphs, the projections,
the numbers on the 1 and 2% like we did last time to see.
So under the 1% and 5% in 2019, our revenue funded capital
is $8.4 million.
Is that right?
2019?
Yeah, 8.4 million.
Yes, correct.
And our reserve fund, 12, but at the end of that, it's
basically 9.5 million.
Correct.
All right, if we could go to maybe option two then.
So the funded capital is 10.4.
So about 2 million.
So that's where you're that's where that rate difference
because I think the other ones
are gonna be the same.
And the reserve million dollar projected reserve.
So about $700,000 difference.
Okay.
All right.
I mean, I don't know when you're gonna decide.
I'm gonna leave here in a second to go greet the students.
But I would be okay with again, as I sort of reasoned last
time with option one, because
it's, it's, we're only $700,000 less and but that's just me
.
Okay, do y'all want to give direction on this particular
right now or okay?
Wow, it's still so fresh in our minds.
Yes, Councilmember Briggs.
I'm okay with option one as well.
I think that if it was going to put us in a lot of trouble,
it wouldn't even be an option
for us to consider.
So I'm okay with that.
And the wastewater charge is always the one that's the most
difficult to defend and justify
when someone is asking me about that charge.
So yeah, I'm good with this.
And I feel like next year, we can we can keep evaluating
and see where we are.
I will tell you, you know, Councilmember, one of the items
that relates to this is the
newcomer rate that you know, I've had a couple of customers
that have called about that we
are taking a look at that I would think there's a
possibility to, to come up with some recommendations
on potentially lowering that based on our 10 and five year
averages on that.
So that is something that we do plan to address when we
come back to you with the rate ordinance.
Thank you.
Anybody else want to comment on Councilmember Gregory?
Option one.
Oh, you're holding a finger.
Okay.
Councilmember Ryan.
Well, I would prefer option two because I'm much rather do
more revenue funded capital
projects.
Sure.
Okay.
As opposed to strapping us with future debt.
Okay.
Councilmember Dove.
Okay.
I'm leaning to but I'm not opposed to one so I mean, so my
preference to but one doesn't
give me heartburn.
So right now we have.
Oh, you don't turn your mic on.
I'm leaning to but one is okay as well.
I think same issue.
I mean, more for me just again, the cash option to pay it
pay down.
So, well, I need the information that I've requested and I
think we're irresponsible
to make a choice between two options without knowing what
the impact is of something that's
been presented, you know, very plainly right in front of us
, but without the implications
for the rate payers.
So I think we need to, you know, we need to take into
account kind of what the arc is
for them.
And, you know, without that, you know, I'd say we don't
have enough information to, to
opine.
All right.
So right now we're standing three, three, three for a
preference.
Anybody want to change?
I'm still is what he's asking for something y'all can get
back with us pretty easily.
What's what's it is.
I'm not sure.
I'm not sure.
I still understanding exactly what you're what you're
wanting.
But okay, well, well, there's no reason to, you know, be in
the dark.
Got an $80 million thing right out there.
It's not being 80 million 80 80 million.
Yeah.
So we've been expressed as something that we would aim to
do 75% through debt, 25% through
cash.
We're told that it might be as soon as eight years from now
.
And that's going to have implications for rates.
So just like to understand what that is.
And we might ultimately say, you know, rather than save,
you know, rather than take credit,
yeah, we took a buck and a half off your bill.
You know, we might be better off being able to say we kept
rates flat for 15 years.
You know, or we're going to make a decision now that is
going to lead a future council
to be in a position where they can I'm going to make up a
number here, you know, where
they're going to give people 10% rate increases on every
utility they got, because this council
wouldn't look down the road.
That's what I don't want to do.
So so right now, I want to see the projection for what the
implications for the rate payer,
and then look at look at the whole curve.
Right.
So what you're saying is you're you're okay with the status
quo until you get other information
to just keep the rate the same.
I didn't say that actually.
I said, we don't have enough information to say to give to
we don't have enough information
in my opinion, to give direction with only direction they
're asking for is option one
is a 5% rate decrease, or option two, which is a 2% rate
decrease, neither option.
It might be right to do one or the other might be right to
do something different.
We need to see the full set of the full set of data in
order to to give direction.
That's my opinion.
I would I would I would tell you that unless unless you're
within five or six years, the
integrity and these utility funds the integrity of the data
we're going to give you over a
10 year projection is not something you can rely on in not
something we would recommend
planning on.
We can certainly show you when the expenses will be layered
in.
But there are especially with water, there's so many moving
parts here that it's it's a
mathematical exercise that my my broader concern is we're
sitting on such huge fund balance
in this fund right now.
You can't justify it.
And you know, when we're looking eight and 10 years out,
unless the council wants to
make it up, you know, make a policy decision that we're
going to start a sinking fund which
most ratepayers will view as two contingencies.
I think it's very, very difficult, but we can we can go
through the exercise.
I will tell you we're not going to have much confidence
level when we get started getting
out in years six through 10 on the integrity of the numbers
.
So I get where you're going.
But we won't recommend anything other than you're saying
for that reason.
What you're telling me means it could be much better than
we're seeing because it's it's
out years.
It could be much worse than we're seeing.
So when I have uncertainty, it doesn't lead me to do, you
know, the least conservative
thing.
Right.
So I'm not afraid of seeing the math.
In fact, I require seeing the math.
And I understand that there's there's a range of variation
around it.
No one's saying that we're afraid of showing the math.
I'm just telling you that once we get out in year six, we
're not going to be able to
defend the math.
So I don't I'm not sure how helpful it is, as your experts
on staff, where we've got
a pretty good planning horizon the next couple of years.
And even then, these numbers move wildly based on where b
ids come in, whether projects get
actually put into the queue and what happens with the
weather patterns.
I mean, you could have a situation next year where this
significantly changes if this kind
of weather that we've been experiencing over the last
couple of weeks holds up.
So I get where you're going.
I'm not sure how helpful it's going to be to you other than
identifying an expense down
the road.
Councilmember Hussbett.
Yeah, I'll switch to one that'll give us for.
Okay, all right.
Still provide that information to us if you would.
Because I think that the challenge is going to be council
member that I understand what
you're saying.
And I've had the same thought about with the but we could
say that about every I mean,
we could say that at 10 years down the road, we're going to
need three or four or five
fire stations, you know, so I mean, so there's going to be
things out there that may or may
not come true.
So if we can't if the five year forecast is one that we
hear from staff that and if you
go back and look at the five year forecast and look at how
were they lined up with what
actually happened, you're going to see you know, when you
look at it historically, which
we have done, we find that it's pretty much more
conservative in the in the actuals.
In other words, the the we've saved more money than what we
thought we were going to spend.
So I get it.
And so I certainly respect your your your values.
And that's what you need to make a decision.
That's what you need.
And we've got seven people here who get get to decide how
they want to do that.
So appreciate that.
But if you could provide that just a you know, what would
that and just and just give us
some assumptions.
If we did it in year 10, this is what the rate would need
to be based upon everything,
you know, because you got 2% growth or whatever all those
assumptions going out.
It's basically just do a five year forecast for 10 years,
which we know that that's that
was the whole I'm going to the deck.
Okay, I'm going to step out.
So it sounds like the direction was option one.
So I'm going to step out and let Councilmember Gregory have
the chair and I'll probably I'll
be back.
But if so, I'll you'll see me.
Don't rush.
Don't rush.
We can handle it.
So dark.
Unless there's any other questions, Dr. Banks is going to
come up here and kind of go through
the departmental presentation.
He'll cover not just the wastewater operating side, but
also cover some of the environmental
services that's kind of part of this fund.
Good evening, Council.
I am I reckoning I've got less than or approximately 30
minutes.
So I'm going to try to make this as quick as possible.
Give us give us room for a bathroom break.
Yeah, yeah, yeah.
20 minutes 20 minutes.
Okay.
All right.
And don't talk about trying.
So thanks.
So real real quickly want to talk about some
accomplishments and for the for the wastewater
fund.
A few things here.
We've completed design of the Hickory Creek lift station
replacement project.
If you recall, that's the the lift station that we actually
had some damage occur a couple
of of I guess about two months ago, where we had a piece of
concrete get in it and actually
had the lift station go down.
So we've got that in the queue for a replacement of
rehabilitation project.
Concrete Interceptor Phase four project was completed.
Basically the Cooper Creek Interceptor.
We did do our wastewater master plan computer model that
was that's an important component
that leads into the the next item we're currently trying to
be as optimistic as we can with
regards to the wastewater and water impact fees.
Those are required to be done on a five year period.
We need that water and wastewater master plan in order to
be able to put the impact the
capital program together and we really want to get that
accomplished before we start the
new budget cycle.
So that's why we have it in our upcoming, if you will,
accomplishments.
And we continue just like on the water side to ensure that
our in house construction and
preventative maintenance costs are lower than what we could
get on the by contracting that
service out.
We track a number of metrics, including equipment and and
staff time, and then benchmark against
what we can get from from outside services.
So goals are to begin construction of the Hickory Creek and
West Peak Flow detention
facility.
Basically those are two facilities that are designed to
take in peak flows and store them
during periods of high flow.
We still do have a infiltration and inflow that happens
into our system and so our volumes
go up when we get heavy rainfall.
We like to build storage capacity within the system to be
able to hold that waste material
until after the event has has passed and then feed it back
into the system that prevents
us from having to do a plant capacity increase before we
need to.
So we want to begin the pump station, of course, meet all
the administrative order requirements
that were mentioned earlier by Councilman Gregory, just to
address that question real
real briefly.
That's baked into the operating cost.
PS and and his staff have done a great job in keeping up
with that.
Our sanitary sewer overflows continue to go down and are at
very low levels.
We've been able to use the asset management program to
basically right size our capital
replacements and and are have been able to keep our budgets
down accordingly.
And we're meeting all the requirements of the of the AO.
So basically we want to continue our in house construction
benchmarking.
And then we really need to complete a design and
construction of a sludge handling project.
I mentioned this a little bit last last session about the
water side for solids handling at
the at the Louisville treatment plant.
We have had to undergo a design change in the Pecan Creek
plant to deal with our new
phosphorus effluent limitations.
And basically that is designed to do ferric chloride
injections and that creates some
additional solids and solids handling challenges.
So we're going to a more modern approach to solids handling
that is more mechanical
in nature to help us deal with those issues.
Do we you're talking about bio solids.
That's correct.
And do we use take all of those and mix them with compost.
That's correct.
Yes.
Yeah.
The only thing that is disposed of at the treatment plant
is the that doesn't go into
the composting operation is whatever is caught on the
initial bar screen and then what's
separated out prior to all of the settling basins by the
essentially it's the grit removal
section of it.
All the rest of it goes into the composting operation.
And do we are we selling enough compost or are we are we
getting an over supply of inventory.
I don't believe that we're getting an oversupply of
inventory.
We have a tendency to to build that inventory up in
anticipation of sales times because it's
only used during certain times of the year.
But in terms of building up an excess inventory I don't I
don't believe that's the case.
We have a question here.
So when you say grit day are you speaking of the famous
corn.
That's correct.
You've been out there.
Yes.
Okay.
Yeah.
That's absolutely.
So that is not where does that go.
That that actually gets disposed of at the landfill along
with the bar screen.
Okay.
Yeah.
That that material will not break down very effectively in
the in the compost operation.
So it also gets really bad at Thanksgiving and Christmas.
Not to get too detailed.
Anyway basically our budget emphasis is always to deliver
cost effective solutions.
We want to really analyze our asset lifecycle to be sure
that we're replacing everything
when it needs to be replaced.
Continue to leverage technology again.
Wastewater Group is has is is very well known for asset
management and the use of technology
to to make our system last longer.
And then translating all of that information I really feel
that that leads us to improving
our customer service because by doing all of those
activities we're reducing our mainline
service calls our sewer chokes and our sanitary sewer over
flows.
So in the asset management plan I've talked about a little
bit already.
We continue to use that to drive efficiencies and reduce
our costs for O&M.
We want to really work this upcoming year in getting our
solids handling sludge dewatering
equipment in place and get it operational to handle all of
that material that we need
to manage at the plant.
Real briefly on the position summary I mentioned to you all
yesterday in the water presentation
that we were moving to positions to wastewater out of the
Field Service Technical Group and
that the budget transfer would be able to was going to
occur from water to wastewater
to pay for those positions.
So we're adding to two positions but it's budget neutral.
Five-year capital plan again as as yesterday we wanted to
give you a high pass overview
of our of our capital planning kind of give you a sense of
what that looks like and and
again I want to point out for the council's benefit and
those watching the group assignment
numbers because that gives you the the category of the type
of capital plan that's going on
so when you get the full budget information you'll be able
to see those categories know
what type of category the expense belongs to and then they
'll be detailed capital improvement
sheets in the budget book that will tell you about each of
the individual projects cost
and a brief description.
So the major projects that we're looking at are
predominantly those detention facilities
the the lift station upgrade got those by fiscal year in
this particular slide solids
handling the the in system storage that we had talked about
a little bit earlier and
then we've got a large system of replacements that are our
large system of interceptor work
that is going on for up sizing our infrastructure on the H
ickory Creek and then adding some
additional connections and so essentially these are coming
in they're labeled one through
four and you can see the the individual fiscal years the
collective amount of feet being
sold or upgraded in that particular series of four are is
roughly about 30,500 feet of
lines so that's a pretty substantial amount of capacity
that's being added there.
Could you go back one slide please?
Yes.
Do you show anywhere in there or do you show somewhere else
?
I'm looking at oversized lines and I'm assuming that this
has to do with with preparing for
new developments that come in and and then they have impact
fees so do we see anywhere
in this plan where there's revenue coming in from those
impact fees to offset some of
these costs?
Yes, actually when when Tony showed you the the budget pro
forma earlier on the revenue
side you will actually see impact fee revenues as one of
the revenue lines.
Okay thank you.
Yeah and just so you know the the oversized lines we we
basically hold funding in in there
and and replenish it each year so that we can have the
ability to have capital to bring
to bear on on a a line oversized for new development so if
a new development goes in and they're
required to put a certain capacity in and we deem it to be
in the interest of the city
to increase that capacity the developer only pays for the
capacity of their system and
then we basically oversize the line for that additional
capacity need that we've identified.
Mr. Ray.
You can go back that slide thank you.
On replacement lines does that include when we're redoing a
street and we replace the
lines underneath it beforehand?
That's correct yeah our our field service replacements are
are basically designed we
we're always looking at that system on both the water and
wastewater side anytime there's
a street project that's been proposed to determine whether
the life cycle of that asset would
indicate that it needs to be replaced at the same time so
we tear it up only one time and
that's the most cost efficient way to do it.
It takes a little bit longer but it will you know hopefully
inconvenience the the residents
less.
Well I guess where my concern is is as you look at 2021 and
out you've only got 25,000
listed in there as opposed to 977 on in 2019 it's.
We are we are front loaded on that because of all the
activity that's going on so it
is ramping down I couldn't I couldn't tell you the
specifics without going into detail
but if you would like to see that information I'm sure we
can get it for you.
Okay thank you.
Sure.
Last slide here is to just show you the the overall CIP map
for those projects that we've
just talked about it's color coded by each of the
individual fiscal years and you can
see here is that large section of Hickory Creek intercept
ors that I mentioned a little
bit earlier.
So that's it for wastewater.
I also wanted to go through environmental services really
quickly and give their departmental
presentation.
This this is a department that exists within departments if
you will it's funded by a variety
of different sources so wanted to give an opportunity to
kind of see where where things
are at.
Basically the this is FDs by functional area you can see
that there's there's not been
a whole lot of change in between we are we are proposing a
aside from the footnotes we
are proposing a one FTE increase in watershed protection
due to some of the new regulatory
requirements that we have for stormwater inspections.
So we're we're getting at capacity for being able to keep
up with all the development inspections
and then the state has blessed us with some additional
regulatory requirements in that
regard.
Real quickly this is what environmental services looks like
there's kind of two major elements
to it the assistant director of environmental services is
Deborah Vieira.
She has the landfill regulatory laboratory manager
environmental compliance coordinator
in the watershed protection and industrial pretreatment
group and then we've got the
sustainability side of the organization that's managed by
Katherine Barnett which includes
keep it beautiful and then also sustainability recycling
marketing and outreach.
So just a few accomplishments we were actually looked at as
a test case for the star communities
group which is a a sustainability rating group for for
predominantly large cities.
Typically you won't see a city of our size in that group
but they wanted to take a look
at us and see kind of how we would rank out.
So we got a three star system which was an interesting
exercise to go to that's that's
by the way a very good score especially considering our
size and it gave us some things to think
about that we're talking about bringing into the
sustainability plan update discussions
that are ongoing right now.
We did complete the review and approval of sub chapter 17
matter exceeded all requirements
for tcq designation of a high performing pretreatment
program.
The landfill received a zero compliance history score never
liked that scoring system because
the zeros the best you can get but that's that's the
highest rating possible.
We implemented the inner star energy star portfolio manager
to track our municipal building
energy use and then we've been working with the state
energy conservation office Seco
to do energy audits of our 10 highest using municipal
buildings.
Real quickly goals we want to continue to build out our air
quality action plan.
Oftentimes you see this as the greenhouse gas inventory
that we that we bring to you.
So we want to kind of add some additional elements as we
continue to make that plan
of all we need to look at a stormwater ordinance for
industrial sites.
So we've got that on the radar to meet our municipal
separate storm sewer system requirements
draft the technical criteria manual that we discussed
during the sub chapter 17 revisions
complete our update to the sustainability plan adopt and
implement.
Basically the the others are related to sustainability
education series including the roots and shoots
program for sustainable schools.
That's a program that's really about environmental
volunteerism is kind of the next level after
our recycling and community garden education that we've
been doing.
We want to complete the gas well inspection contract
evaluate and make a recommendation
to city council and one of the things that we've really
been working on that I'll share
with you later when we do the gas well departmental
presentation is continue to approve the public
information for gas well inspection so that people can
understand how what the inspections
look like what activities we're doing what things look like
in their neighborhood.
You have a question yes. So it may be more of a question
when that gas well presentation
comes to us but when you're looking at the contract and
evaluating are you also looking
at what we used to do and comparing that or yes yes yeah
absolutely and and I think we
can you know we certainly go into detail on that when we
have the departmental presentation.
Yeah thank you. Real quickly just wanted to go over our
performance measures. You can
you can see them up here. They're basically in their
designed to try to help us understand
our workload measures participation rates. Some of them are
compliance related and like
our elicit discharge reported per number resolved as a
metric that we have to report to the
state. So I won't spend the time to read through all of
these. If you see one that you are
interested in or would like some more details on I'd be
happy to provide that to you.
Departmental cost containment strategies basically we
reviewed our water sample collection and
analyses we like to do that about every five years and just
identify any redundancies or
ways that we can do things differently. We were able to
save about $19,000 in cost savings
by doing that effort and then we also had a reduction of
two FTEs under the landfill
regulatory compliance division due to the fact that that
program is is no longer going
to move forward. That's about a $90,000 savings. Completed
projects we finally finished the
TCK voluntary cleanup program for the old Denton County
annex and got that clean bill
of health. We restructured our private waste haulers to
provide some equity with other
municipalities and the way the fee structure was set up it
was really more punitive to
those smaller haulers and so we worked on that to make sure
that they were kind of pushed
out of the business by the fee structure. We consolidated
recycling education and outreach
and keep Denton beautiful under the sustainability group.
Renovated a building at wastewater
treatment plants into a field laboratory which has been
very nice for doing certain kinds
of analyses out there and then we installed a permanent
odor control vapor system. We
had a little discussion about that in consent agenda
earlier today. Future projects we continue
to look at our mosquito surveillance and response plan.
That's one of the responsibilities of
environmental services and always on the lookout for new
disease concerns and treatment methodologies.
Want to deal with our laboratory information management
system and continue to make that
produce information from data efficiently and then we are
going to have some new monitoring
and reporting requirements for the landfill permit
amendment and we of course are going
to work through those to make sure we're compliant there.
So that is pretty much it for the department.
So I will step aside unless there's any questions. Is there
any direction? I missed the first
part of the presentation. That was the departmental
presentation mayor. The next presentation
we have for you is on drainage. Okay. So we've got about 10
minutes before our regular schedule.
Do you think we can get through it? I think we can manage
that. So one of the things that
was requested of us when we came back and talked a little
bit about the capital improvement
programs on the geo funded side was that we had some gaps
and so we had identified what
we call channel rehab money. That was really money that
came from this drainage fee that
we had transferred over capital project and sat there for
some time and so what we did
at the time we recommended to utilize a little bit over $2
million from that particular account
to bridge the gap on some of these geo funded projects that
needed the extra funding. So
as a result of that the council had asked that we come back
and specifically talk about
the drainage component and the drainage fee. So just real
quick history here. Prior to
1999 the drainage program was funded out of the general
fund. It subsequently was moved
in 1999 into the wastewater fund and it was funded 70% from
water, 30% from wastewater
revenues. In 2000 there was a discussion that initiated
with the council at the time to
implement a drainage fee under some state statutory
provisions that allowed us to charge
a drainage fee and dedicate it to the specific function. So
in 2002 that drainage fee was
adopted by the council, was put in place. It was to cover
drainage O&M, the storm water
program, street sweeping program and about $1 to $2 million
of limited capital program.
That program and I say limited, it's mainly maintenance and
some minor improvements to
our existing drainage system but because of the nature of
the program we do consider them
capital, we do capitalize those in our accounting system
and so that's why they're identified
as capital. Within the O&M component is also debt service.
So there was a debt service
component at the time that was also being paid. We are ne
aring the end of that particular,
those particular issuances. So some of the cost containment
strategies here, again budgeted
salaries, reducing revenue funding, small capital projects,
utilizing mapping to reduce
personal time. One of the things that I'll mention to you
is that we really want to take
certainly the next year and really take a look at this
particular operation, continue
to have conversations with the council about this operation
. We do agree that this operation
while it has been part of the wastewater fund has not
really been discussed in much detail
with the council over the years and so we certainly wanted
to separate this out and
have more discussions with the council. In the five-year
forecast for this particular
fund, for this particular operation we are not recommending
any changes to the current
fee schedule. Again that's been in place since 2002. The
drainage fee is calculated
on a square footage impervious surface. There is that
million dollar reserve that was previously
shown and dedicated in wastewater but it's really for
drainage and so we do show that
over here on this drainage and I'll kind of walk through
the perform of that for you.
So some of the risk, again we have aging infrastructure,
there's public safety considerations, contractor
costs are certainly things that we're cognizant of that are
impacting our projects. So real
simple five-year forecast here for you. So for '19 we're
projecting about $4.7 million
in rate revenue. This is the drainage fee. There is non-
rate revenue, $357,000 that's
coming primarily from the general fund to fund some of
these programs that aren't covered
under the drainage fee like, and I told Katie I wouldn't
say the word, but I'm going to
say the Mosquito Program is one that's funded out of here.
So there's a number of programs
that are in this particular function that are funded by
transfers primarily from the
general fund into this particular operation. O&M components
certainly here, revenue funded
capital you'll see that that continues to grow as our debt
service continues to decrease
and so we will be continuing to do projects and Danny will
come up here in a minute and
talk to you a little bit about some of those capital
projects that they'll be engaging
in. Again no rate increases being proposed for the drainage
fee, no change and there's
a million dollars that we're showing in a drainage reserve
for any emergency type of
situation to come up. Councilmember Gregory has a question.
Thank you. Regarding the expenses,
the O&M expenses, I'm assuming that that's money that's
available to go in and take some
of the drainage ditches and clean them out so that the
water flows more smoothly. Correct.
Those are the types of projects that were contemplated here
. Do we do that on a as needed
basis? Do we do that? Do we have a regular monitoring
program? There's a drainage ditch
on the east side of Nottingham, right where Nottingham
turns into Audra next to Shiloh
Gardens that has some pretty sizable trees now that keep
getting beautiful. We'd love
to be able to plant in people's yards and I think the
larger they get the more expensive
it's going to be to clean them out. So I'm concerned about
those kinds of things. Let
me ask Dan to come up here, Councilmember. Okay. Yes, to
answer your question, those
aren't on the concrete line channels we do make regular
checks of and everything else
and we do look around on the natural ones and do make
checks. A lot of them we do get
phone calls on when we have issues, we'll go out there, we
'll verify and then we'll
go out there and see what needs to be done, what kind of
cleaning and all that. Just like
I said in the streets program before, we need to dive into
this department. I'm looking
at trying to get more stuff into our system so we can go
back over and actually get them
on a routine pass every year so we can go by and verify
everything. Thanks. I don't
know if we're going to get the presentation done by 630. So
a couple options, we can do
it and be late at going out there, we can just push it to
because we're at sort of
a stopping point here, is push it to the next work session.
I just we've got seven proclamations,
six or seven proclamations and I just would hate to keep
people waiting out there. So
if we could maybe move this to the next the first one of
the budget presentations next
week if that's okay. Nothing against you guys. It's just
okay. Then at we will stand adjourned
at 626 and then reconvene up in the city council on the
mics now working June 5 2018. It is
634. If you would join me in standing if you're able to
pledge allegiance to the US and Texas
flag.
Honored the Texas flag. I pledge allegiance to the Texas
one state under God one indivisible.
Okay, we've got several proclamations to read tonight. The
first one is women's veteran
day. So anybody who's here to accept that proclamation or
participate, please come on
down and we'll get you introduce yourselves and tell us a
little bit about the proclamation.
Hi I'm Camilla Zimbal. I'm the commander of the women
veterans of America Denton and
we're chapter 48 and the proclamation is about the
integration services act. 70 years ago
women were integrated into the service and recognized as
women of the service even though
they served long before that they just were not recognized
and so President Truman signed
an act 70 years ago and this is a celebration of that act
and so we're going to have an
event at Lil Elm Park on June the 9th for our women
veterans to celebrate to educate
people concerning women veterans and to continue to grow
this chapter that we now have 62 members
of.
Hi I'm Gina Smith and I am a retired Marine and I am the
sergeant at arms for our chapter
48 color guard and honor guard.
Hi I'm Diane Frazier. I'm an Air Force veteran and I'm also
a member of the color guard.
My name is Sandra Miller US Army law enforcement.
My name is Cecilia Barr. I served in the US Navy and I'm a
proud member of the women's
veterans 48.
I'm Sharon Boalsley. I'm a retired Army nurse anesthetist
and enjoyed serving.
Well before I read this I want to thank you all for your
service to our country and all
those that have served and I'd like for us to just give you
a warm round of applause.
It's an honor that I will read this proclamation.
It's a proclamation by the mayor of the city of Denton
Texas whereas Texas salutes and remembers
the many American female veterans who have courageously and
honorably served in the military
on behalf of our nation.
And whereas women have formally been a part of the United
States Armed Forces since the
inception of Army nurse excuse me Army nurse corps in 1901
but have proudly served alongside
and supported our nation's military since the American
Revolution.
And whereas the women's veterans community is the fastest
growing subset of American
veterans in Texas women comprise over 13 percent of the
veteran population a percentage which
is higher than the national average and increasing yearly.
Whereas women veterans of America chapter 48 and the Denton
County Military Veterans
Peer Network network advocate for cultural transformation
to raise awareness about the
service and sacrifice of women veterans.
And whereas on June the 9th 2017 Greg Abbott governor of
Texas signed Senate bill 805 declaring
that June 12th be celebrated as women's veteran day and
order that all Texans recognize the
role of women in the military forces and to commemorate the
sacrifices of and valor displayed
by Texas women veterans.
And whereas we honor our female veterans and their families
for their remarkable sacrifices
and outstanding contributions to our nation.
Now therefore I Chris Watts mayor of the city of Denton
Texas do hereby declare and proclaim
June the 12th 2018 as women's veterans day here in the city
of Denton and encourage all
Denton residents to recognize the courage and contributions
of generations of American
service women and their families who have proudly served
our great state and nation
doing their part to protect our land people freedoms and
legacy.
Thank you ladies so much.
I have a confession to make.
I made a mistake.
Y'all were supposed to help us with the pledges of
allegiance so I totally forgot about it
so I'm going to own that and be accountable so thank you
ladies so much thank you thank
you very much thank you.
Our next proclamation is men's health week.
Is there anybody here for men's this is this is very
embarrassing.
There's nobody here from I'll stand in for men's health
week.
Yes that's right.
This is a proclamation by the mayor of the city of Denton
whereas despite advances in
medical technology and research men continue to live an
average of five years less than
women with Native American and African American men having
the lowest life expectancy and
whereas educating the public and health care providers
about the importance of a healthy
lifestyle and early detection of male health problems will
result in reducing rates of
mortality from disease and whereas men who are educated
about the value of preventative
health care play in prolonging their lifespan and their
role as productive family members
will be more likely to participate in health screenings and
whereas the men's health network
works with Congress to develop a nation a national men's
health week awareness period
as a specific campaign to help educate men boys and their
families about the importance
of positive health attitudes and preventative health
practices and whereas the men's health
month website has been established at men's health month
dot org and features resources
proclamations and information about awareness events and
activities including wear blue
for men's health and whereas Denton men's health month will
focus on a broad range of
men's health issues including heart disease diabetes mental
health prostate testicular
excuse me and colon cancer and whereas the citizens of this
city are encouraged to increase
awareness of the importance of a healthy lifestyle regular
exercise and medical checkups now
therefore I Chris Watts mayor the city of Denton Texas to
hereby declare and proclaim
June 2018 as men's health month here in the city of Denton
and encourage all citizens
to pursue preventative health practices and early detection
efforts so thank you all.
National pollinator week who's accepting the national poll
inator because you're going
to have to yeah yeah so tell us a little bit introduce
yourselves and tell us a little
bit about national pollinator week.
Hi everyone my name is Sarah Luxton and I work with the the
Bee City USA program here
at the city of Denton and we're hoping to celebrate poll
inator week it's June 18th through
the 24th we have several fun events planned for the
community partnering with groups like
the libraries here scrap Denton we also are partnering with
the Texas master naturalist
and today I'm joined with by one of the Texas master
naturalist from the Elm Fork and we
also have our wonderful Denton County beekeepers
association who is quite the leader when it
comes to educating and helping all the beekeepers bee
keepers in the community so I'm going to
pass it off to them.
Hello I'm Candy Pardue I'm the president of the Denton
County beekeepers association
and our mission is to support the beekeepers within our
county help them be better at their
jobs but we also encourage citizens to come out learn about
the pollinators there's things
you can do every day in your own yard that will help the
pollinators within the city
of Denton and Denton County and we would love to help you
learn what those things are.
And I'm Clay Thurman I'm with Elm Fork chapter Texas master
naturalist we have a pollinator
garden out at Clear Creek we also have one at Leela
learning center and I would like
to encourage everybody to get into planting pollinator
friendly plants and challenge the
city of Denton to become a monarch watch city we cannot let
Louisville show us up can we?
Thank you thank you all this is a proclamation by the mayor
of the city of Denton whereas
pollinator species such as thousands of species of bees are
an essential partners in producing
much of our food supply I'm going to read that one more
time because it sounds so simple
but it's so important I mean it's so important whereas poll
inator species such as thousands
of species of bees are essential partners in producing much
of our food supply and whereas
pollinator species provide significant environmental
benefits that are necessary necessary for
maintaining healthy diverse urban and suburban ecosystems
whereas pollination plays a vital
role for the trees and plants of our community enhancing
our quality of life and creating
recreational and economic development opportunities whereas
for decades the city of Denton has
managed urban landscapes and public lands that include many
municipal parks and green
ways as well as wildlife habitats and whereas the city of
Denton provides recommendations
to developers and residents regarding landscaping to
promote wise conservation stewardship including
the protection of pollinators and maintenance of their
habitats in urban and suburban environments
now therefore I Chris Watts mayor of the city of Denton
Texas do hereby declare and proclaim
June the 18th through the 24th of 2018 as national poll
inator week here in the city
of Denton as an affiliate of Bee City USA and encourage all
citizens to recognize and
join this observance of our community thank you all so much
for bringing this to our awareness
Juneteenth who's here for Juneteenth oh is it oh yes I
really oh yeah Juneteenth
I think he did that on purpose to get that grand entrance I
understand that okay yeah
all right okay introduce yourself and tell us about Junete
enth Willie Hutzmith and Juneteenth
is those who don't know the blacks in Texas didn't find out
that they were free until
two years later someone said they come did they come by
boat did the boat get lost we
don't know we didn't find out we were free until two years
after the the actual freedom
took place and so we are celebrating that time hi my name
is Yolanda Glover I've been
a part of Juneteenth for 23 years right now I'm inactive so
I'm just here to support the
Juneteenth celebration it is not a black festival why don't
some of y'all come out and and and
cheer with us I hope you like barbecue and fixings and
things like that come on out if
you can't dance we'll teach you how to dance all right okay
this is a proclamation by the
mayor of the city of Denton whereas the city of Denton
recognizes the vast contribution
that the African-American people have made to this
community and where it is it is this
population that helped laid a strong foundation for the
city of Denton and whereas the 19th
of June is the day recognized as freedom day and immense
and patient day to celebrate the
anniversary of the abolition of slavery excuse me in Texas
on June 19th 1865 the day the
slaves in Texas were freed and whereas all people of all
races are now protected from
slavery by law now therefore I Chris Watts mayor of the
city of Denton Texas in recognition
of the spirit of freedom do hereby declare and proclaim
June the 16th 2018 as Juneteenth
day to be celebrated at Fred Moore Park in the city of Dent
on and urge all citizens to
join in the spirit of the celebration and friendship for
the good of the citizens of
our community thank you so much
okay LGBTQ pride month who's here to represent that come on
down
we're gonna get you to introduce yourselves come on down
it's okay no
hi my name is George fairy I'm the president of the Stone
wall Democrats of Denton County
we have our monthly our pride celebration on the 30th of
this month and the goal of
pride Denton is to shed light on intersectionality and
giving people of color voice and visibility
so on behalf of Stonewall I'd like to have miss Leslie Gut
ierrez speak
hi I'm my name is Leslie I'm the treasurer of Stonewall and
we wanted to first think
our allies on City Council for having a proclamation for
pride month there's a lot of safe spaces
that we have in Denton from glitter bomb and Andes or the
former Mables or crossroads that
we know we can go and be who we are and love who we love
and we think it's a really visible
step forward for City Council to make a proper proclamation
and we're really excited because
it means that we're gonna ask for more the human rights
campaign gave us 33 out of a
possible 100 points for LGBTQ friendly cities today which
means we're gonna be here knocking
on doors asking for an equal rights ordinance because
housing discrimination is not okay
we are who we are we love who we love and we deserve
dignity and respect which means
you're gonna see a lot of us
I'm CC bar now and it's Cecilia but I'm very proud of this
organization in the way we've
tried to communicate with parents and community and grow
with our inner relationships knock
down the questions and educate don't ever hesitate to walk
up to us let us know who's
in your family or how you're doing dealing with it or ask
questions on how to talk to
him God bless you and thank you for the proclamation my
name is Jordan Villarreal and I'm the vice
president of Stonewall my name is Paige Dixon and I'm the
vice president of the young Democrats
of Denton County and very proud to be here today with my
friends Sandy Swan I'm the secretary
for Stonewall Democrats Denton County and just here to
support our all of our allies
and LGBTQ communities in Denton hi I'm Jacqueline Ulysses
and I'm not sure if I'm really supposed
to be up here okay okay because I'm not part of the Stone
wall thing I saw this event via
Facebook I want to be a part of it okay okay cool all right
yeah for sure I am the secretary
of pride at Texas Women's University and I recently came
out on Facebook as asexual
my name is Camion Connor I am the current chair for
outreach Denton we provide a safe
space and LGBT youth group here for Denton teens and I'm
just so excited to see so many
people here and thanks for repping us too my name is Tamsen
Price I am the current president
of the college Dems of UNT and I am here to support our
LGBT community and allies so hey
my name is Agatha Bynes and I am a teacher at Texas Women's
University my name is Deb
Armentar and I'm really proud to teach in the LGBT studies
program at UNT and George
asked me to come here I'm really proud to stand up here
with my friends Clay Thurmond
and I am a proud ally of my LGBTQ brothers and sisters I'm
Russell Lytle I'm the former
president of Stonewall Democrats current president of Dent
on Progressives and most importantly
member of the community for over 15 years here in Denton
and one of your neighbors
my name is Max and I'm a black belt in Taekwondo yeah my
name is Amber my pronouns are she
her and hers these are my kids Max who is 10 and Lulu who
is 6 and Lulu and I are very
proud straight cisgender allies hi my name is Lindsay Jones
and I'm a member of the LGBTQ
community hi my name is Kelly Jakes I'm a member of GLAAD
at UNT and I'm here to support
all my brothers and sisters and allies my name is Ened Eli
as Josea I'm a citizen of
Denton County and I'm one of the committee members for
Pride Denton hi my name is Ashley
I'm just happy to be here okay this is a proclamation by
the mayor of the city Denton whereas we
recognize the June anniversary of the Stonewall uprising in
New York as the beginning of the
modern lesbian gay bisexual transgender queer equality
movement and whereas we recognize
the tireless efforts of LGBTQ and allied groups who have
pursued equality for all citizens
and in Texas abroad where we recognize that on June 27th
2015 the Supreme Court of the
United States in the case of Obergefell is that correct how
you say that Obergefell Obergefell
sorry versus Hodges director Ohio Department of Health
ruled that constitution ruled that
the constitution grants same-sex couples the same right to
marry that heterosexual couple
has and whereas we recognize former President Barack Obama
's declaration on June 24th 2016
of the 7.7 acres surrounding the Stonewall Inn as a
national monument this is the first
National Park Service unit dedicated to the gay rights
movement and includes the Tavern
Christopher Park and several other streets where protests
were held in 1969 now therefore
I Chris Watts mayor the city of Denton Texas to hereby
declare and proclaim the month of
June 2018 as Denton LGBTQ Pride Month in the city of Denton
and ask for all citizens to
celebrate the work of the LGBTQ in promoting diversity and
tolerance in our community and
throughout our country thank you all thank you all for
being here.
Okay our next proclamation is the longest day now I see
some some shirts out there that
I think are going to be coming down.
Good evening how are y'all?
Come on in.
Would you introduce yourself and tell us a little bit about
the longest day and then
we'll have everybody introduce themselves.
Thank you so much my name is Erin Caston and I am the
advisory board chair for the greater
Dallas Alzheimer's Association representing Denton County
so we keep Denton County represented
and for all things Alzheimer's our goal and my task my
passion is to help Denton County
be aware of what support services are out there what we're
about leading research for
the complications and the disease of Alzheimer's the
longest day is a signature day of action
for the Alzheimer's Association during June which is
Alzheimer's and brain awareness month
held annually on the summer solstice it advocates across
the world will honor these are people
excuse me facing Alzheimer's disease and their caregivers
by participating in activities
that they love worldwide there's an estimated 47 million
people living with Alzheimer's
and other dementias participants will do what they love
biking hiking playing bridge
swimming here in Denton a couple of our communities play
poker they play bingo and this affects
all walks in of industry this is not just senior health and
I'm a nurse it's not just
health care but this is everyone in our citizens here in
Denton County whether it's choosing
your favorite activity hosting an event or joining a team
participants will raise funds
and awareness to the advanced critical to advance our
critical needs for the Alzheimer's
Association in care support research and programs and I
like to introduce Jerry.
I'm Jerry Sam's and have been involved with the Denton
Alzheimer's Association for many
years and also any of you are interested we have support
groups for caregivers and we
would welcome you to join us thank you.
Good evening I'm Tanya Blix I am on the walk committee with
Aaron and I also work for Good
Samaritan Society Denton Village we're celebrating the
longest day by opening a dog park this
year so I'd like to invite everybody out to our dog park on
June 21st in the morning while
it's cool bring your dog and we're going to run around and
chase dogs for our longest
day.
Hi I'm Ashley Lascore I am the president of Silver Lining
Home Care Solutions and we
are a home care agency in Denton and I'm here supporting
the Alzheimer's Association we
can all fight together to end Alzheimer's we are
celebrating the longest day by shining
bright and being a silver lining to somebody by spreading a
random act of kindness on the
longest day and I'm here standing for my grandmother.
Hi my name is Veronica Elliott and I am with Brookdale
Senior Living we're part of the
Alzheimer's Committee or yeah sorry and we just believe in
what we do and thank you.
Hi my name is Allison Helms I'm a participant in the
longest day this year and last year
I'm a wedding and portrait photographer here in Denton and
so I'm offering many sessions
on June 18th and 19th and all the proceeds are going to the
longest day fundraiser.
I'm Eileen Short and I assist Jerry with different support
groups along with serving on the advisory
committee.
Hello my name is Kimberly Engle and I work with Veronica as
well at Brookdale Senior Living.
Hi my name is Lisa Schader I work in the financial services
industry this is my second year participating
in the longest day and to honor my husband's grandmother
will be donating clothing and
other items to the women's shelter and in honor of my
grandmother will be eating a lot
of Mexican food.
Thank you wonderful thank you all so much for sharing that.
This is a proclamation by the mayor of the city of Denton
whereas Alzheimer's disease
is the most common form of dementia that affects memory
thinking and behavior.
Alzheimer's disease is a global health crisis worldwide
there are an estimated 47 million
people living with Alzheimer's and other dementia including
5.4 million in the United States.
There is a 29 percent increase in the number of Texas Tex
ans age 65 or older with Alzheimer's
by 2025 the greatest risk factor for this disease is age
over 65 and women are at the
epicenter of the Alzheimer's epidemic accounting for two
out of the three cases and whereas
the disease is the sixth leading cause of death and the
cause of death among the top
ten in the United States that cannot be prevented cured or
even slowed.
Alzheimer's disease is the most expensive disease in
America and has become a national
crisis and whereas since 1980 the Alzheimer's Association
has worked to enhance care and
support advanced research and advocate for people with
Alzheimer's and their families
and caregivers.
The Alzheimer's Association vision is to reduce the risk of
dementia through the promotion
of brain health.
The Alzheimer's Association the leading voluntary health
organization envisions a world without
Alzheimer's and has an impact on the global national and
local level and whereas the longest
day is a sunrise to sunset team event to raise funds and
awareness for an awareness excuse
me for the Alzheimer's Association this event is held
annually on the summer solstice and
symbolizes the challenging journey of those living with the
disease and their caregivers
and those lost to the disease.
On this day teams around the world will come together to
honor the strength passion and
endurance of those facing Alzheimer's.
Now therefore I Chris Watts mayor of the city of Denton
Texas do hereby proclaim June the
21st 2018 as the Alzheimer's Association the longest day in
the city of Denton and encourage
all Denton residents to recognize and to support this
organization.
Thank you for bringing this to our awareness.
Thank you so much.
Okay if you could our next agenda item will be agenda item
three presentation from members
of the public if you could roll the introductory remarks
please.
The Denton City Council has adopted rules of procedure
including a code of conduct that
applies to citizens as well as council members these rules
were enacted to promote an orderly
process and to preserve decorum here is a brief review of
the rules that apply to citizen
reports citizens will have four minutes to give a scheduled
citizen report and four minutes
to give an open mic report there will be an electronic bell
when time has expired if the
remarks are not concluded by that time the citizen will be
asked to stop speaking if
the citizen does not cease and a second request is made the
mayor will request to have the
citizen removed from the council chamber citizens are asked
not to approach the dais if a citizen
has papers or other materials to hand out to the council
please let the city secretary
know in advance for scheduled citizen reports the council
may initiate discussion or questions
following each citizen report for non scheduled open mic
citizen reports the council may listen
to citizens speak however because no notice of the subject
of the open mic report has
been provided to the public in advance the Texas open
meetings act limits any deliberation
or decision by the council to a proposal to place the item
on a future agenda a statement
of factual policy or a recitation of existing policy
citizens are asked to direct all remarks
and questions to the council as a whole and not to any
individual member please refrain
from making abusive personal impertinent profane or slander
ous remarks anyone who violates
this council rule of procedure may be immediately removed
from the council chamber thank you
in advance copies of the rules of procedure are available
from the city secretary
okay we don't have any scheduled speakers but so we'll go
on to the other public speaking
portion of the agenda which is the open mic we have a
speaker Mr. Willie Hutzpeth if you'll
come down state your name and address your time will begin.
Mayor and council members my name is Willie Hutzpeth I live
at 623 Newton and I wish you
all would tell my wife any of you that I have Alzheimer's
disease not old timers disease
speak to her about that she has a lot of Alzheimer's let me
just say let me start off with saying
something's wrong with a city that only has two
firefighters in the history something's
wrong I know I've given lots of excuses as to why that is
let me just say to you it doesn't
look good and something's wrong with that secondly I notice
there's only one female
on this council thank you it's not good either so we need
to kind of even up things so we
can do better I think here's an example of doing better the
back to school event has
been put on for years and grown to a point at which many
kids are being helped and what
they do is give out things that the kids will need when
school begins why this year did
you move it from MLK to maybe it's a better location I don
't know it's a better location
okay at the church that it's going to now how are the
people in southeastern the ones
who need the the the material the most who's being raised
by their grandparents are no
parents trying to get these items how are they going to get
all the way over to Denton
Bible Church and why didn't someone contact the people who
've been doing this for years
and already have it set up they were eliminated from the
whole thought process and in this
whole procedure that you're doing what that's what I mean
by having somebody on this council
that's a little bit better than what you all are presenting
yourself as representatives
no representation no one was notified that all of these
things are going to take place
no one from the committees from years past who've done this
and had this organized and
had something in fact in place that whatever is taking
place is taking place no flyers
have been distributed you have not notified anybody as to
where the thing is going I don't
know I don't know what you advertise it if you did
something's wrong with that the kids
who needed the most are not informed it is moved in a place
where they can't get to and
there are some supporters of the organization and they were
they had vendors vendors who
came out and who showed what they were trying to produce
many of them were just volunteer
even the fire department I even mentioned them in good
light but the fire department
was there they weren't now you have to pay to be an a
sponsor that's backwards we are
going backwards and for the mayor to have his name affixed
to it that's not good because
I know Mayor Watson and he doesn't he would not purposely I
don't think do this so I'd
say someone needs to look at this the two major issues let
the people know who's been
doing this for years what you're doing they should be a
part of the decision making process
rethink taking that thing over to Denton Bible and thirdly
you need to talk to some people
who've done it who've already they've already done it for
years they're in fact ready to
do it we're ready to do it this year probably need to
contact them and make sure that they
know what's going on and that they have a part in this the
kids are going to really
be hurt that need this to most and I was suggesting you
that you look into it and and make some
some very much needed changes thank you thank you all right
move on to an extra agenda item
which is the consent agenda Councilmember Ryan consent
agenda item with the exceptions
of items J and R all right Councilmember Gregory second so
we have a motion to approve in a
second to approve the consent agenda items all of them
except for items J and R which
will be considered as items for individual consideration
let's vote on the board please
motion carries seven zero we'll now take up item J which is
agenda item for J consider
adoption of an ordinance of the city of Dentex the home
rule city authorizing the approval
of change order number four to the contract between the
city of Denton and Zachary construction
corporation for the mayhole road widening and improvements
project I believe it was
there did we have a staff presentation requested for that
or I know we wanted it to be pulled
just so you know we've got a very high level overview of
you a few slides okay all right
you bet
he's wonderful okay mayor council Todd Esther city engineer
we're here to present tonight
the change order number four for the mayhill project this
is the total negative net change
order of a little over six hundred sixty seven thousand
dollars it was a construction decision
during the time of construction knowing that there is a
bridge project to be encountered
in the next phase of this construction so when we took into
account multiple items we
were starting to look at how are we building this thing and
what is the what is the best
value to the city as we continue this project forward just
to give you a brief overview
mayhill and I apologize the map is turned to the right so
north is to your your left
side and as you look north mayhill road the project extends
from University Drive all
the way down to where Edwards and mayhill begin to split or
just about right at Blue
J lane so in light of the council's decision last fall to
explore more avenues to make
this a more and less complete project by including the
bridge project over the DCA DCTA bridge
and provide a much more straight route to mayhill in
general we pursued funding through
north central north central Texas Council of Governments
and had that funding approved
to where we have an eighteen million dollar almost nineteen
million dollar extension to
the project to make this the complete project it was
originally intended to be when it was
originally considered as a part of that funding agreement
the city also has to maintain a
match of approximately 20 percent of that eighteen and a
half million dollars puts us
in there for about four million dollars as construction has
proceeded there have been
multiple items out on the job site that we've had under
runs on quantities where we estimate
as best we can during the design phase exactly how much is
going to be required of certain
items and then during the process of construction you find
out that we don't have that exact
amount that we're normally using so we either sometimes
overrun or under run those items
usually we're very close but there are times when you're
out in the field that that does
present a change so some of those items come from that
there was also an agreement with
the county Denton County to get some of the right away that
we needed and temporary construction
easements that we needed to make this roadway of reality so
in lieu or in kind for that
transfer we're also doing improvements where we're
providing a left turn median into the
Denton County facility as well as an eight inch water reuse
line that they'll use for
landscaping irrigation some other things it comes directly
out of the wastewater treatment
plant we also had a lift station that needed to be modified
along Providence Parkway and
with some additional taps as we get in the near properties
and real estate that are right
off of Mayhill Road itself you find out that some of the
taps and fire hydrant locations
weren't as conducive to the construction operation as we
had initially thought so some of those
things got moved as well and what we would call a field
change and then you wrap it up
in a change order such as this so this is a very all-in-
compassing change order for
a multitude of items the chief of which there are a couple
of items on here this shows a
couple of the representations of the Mayhill Road alignment
so Mayhill coming south I-35
is down this way Colorado Boulevard is over here and the DC
TA railroad is here the alignment
that was originally considered looked at multiple phases it
was a southern alignment and a little
bit further north and then one that came through the middle
here there were decisions that
led to prior to my being here there was a decision led to
lining this roadway this way
then we've also had some interest through conversations
with council members and staff
to look at some alternative routes so you see that on this
map here the biggest change
in the cost is the roadway was originally going to be
constructed to about this driveway
in this phase now as we are relocating utility lines
specifically DME's electric lines there
are poles and posts that were set and settled in a certain
location that worked for the
original alignment they also will work in the future
alignment but there is some it's
a difficult way to explain this we're having to move poles
to make room for new poles it
just becomes a convoluted mess to try to work around so one
of the things that we looked
at was how do we take this piece of the roadway and utilize
it for a DME to do what they need
to do in the temporary sense for today knowing that
eventually when we do get this alignment
along the bridge alignment for Mayhill Road when that phase
of construction comes in we'll
have to make some additional shifting to that utility work
as well so we were working through
existing and proposed poles by putting in this temporary
access that kicked us over
on Mayhill Road just a little bit sooner and we're
basically delaying this piece of construction
for the next phase of operations it was more of an
operational decision that led to this
change order the roadway still goes where it's going to go
we just opted to make this
a much cleaner conversion back to the asphalt roadway a
little bit earlier and that's what
you see in this change order.
As a rundown of the change orders we've had four this would
be the fourth three of those
have been additive change orders they've been items that
were run into in the field or they
were due to delays that were incurred by franchise utility
relocations that incurred us some
made us think about this project and how we would deliver
it in a different way so that
brought some additional cost there and now we have a deduct
ive change order to continue
to prosecute this project as effectively and efficiently as
we can.
At this time staff recommends the change order for 667,847
dollars and 97 cents in the negative.
Any questions for staff?
Seeing none councilmember Gregory.
I move approval of item J. Councilmember Ryan.
I'll second.
Councilmember Briggs.
So I just wanted to say that originally I voted no on this
item because of uncertainty
of the complete project so that I will still be voting no
because the uncertainty is still
there for this item.
Okay any other comments?
Seeing none let's vote on the board please.
Motion carries six to one.
Moving on to agenda item four R which is considered the
adoption of an ordinance of the City of
Denton approving an interlocal agreement between the City
of Denton and the University of North
Texas for a bike share pilot program owned and administered
by the University of North
Texas and providing an effective date.
Good evening mayor members of council my name is Mark
Nelson director of transportation
and bringing forward the item that was discussed earlier
this afternoon in the work session.
As stated in the work session this is a bike share pilot
program essentially what is before
you this evening is an ordinance approving an interlocal
agreement with the University
of North Texas who wishes to advance this bike share
program and essentially requesting
some variances to an existing bike share ordinance that we
have.
So with that quick overview I'll outline some of the goals
as to how we got to where we
are key elements of how that interlocal agreement was
drafted.
Talk a little bit about some draft policy revisions based
on the work session earlier
this afternoon and then direction or vote on the proposed
ordinance.
So I won't read through each of these individually but long
or the short is the interest is from
the University of North Texas to partner with you with the
City of Denton to establish a
bike share program to ensure that we're operating within a
good neighbor program or policy cleaning
up and clearing up safety issues clutters on campus for the
University of North Texas
as well as within the community at large.
And so you know the underlying issue here is the last
bullet point is meet the intent
of the existing ordinance 2018-277 which was effectuated
earlier this year.
So with that again University of North Texas wishes to
follow the existing regulations.
Two primary variances associated with that would be the
fact that the current ordinance
is due to sunset in the September timeframe and University
of North Texas wishes to extend
that out through the fall and spring semester so that we
could gather data that will help
craft a longer term program.
And then also part of the variance request would be
requesting that more than 100 bikes
would be allowed or be deployed.
In this case the University of North Texas has indicated
that they will initiate with
100 bikes to be deployed and then maybe move up into the
number of 200 total bikes to be
deployed current ordinance limits that in city limits to
100 bikes.
So other key elements certainly have accountability of the
operator and how do we do that.
Again the University of North Texas is working through SPIN
as their logistics arm.
They're contracting with SPIN to handle the logistics, do
all the rebalancing.
They do intend to submit for and pay for a license and
permit.
They have a, in fact their rebalancing program is more
robust than what we have in the current
ordinance and then providing additional data so that again
we can move forward with a more
robust and refined policy in the future.
And then again insurance and escrow is also going to be
included as part of the existing
interlocal agreement.
So with that council as part of the work session requested
a few revisions so as part of section
3B we removed the white paper exhibit.
I've got a typo here it says section 9 it should be section
11.
It was also removed out of that component and then section
D referenced that or highlighted
that previously that we had as part of that or as amended.
That was in reference to the existing ordinance.
And then section 3 the metrics there was a request to maybe
look at how we identify the
information or how we identify the users and this is the
language that was placed in there
added this item 6.
And then there was a request for how many students are on
campus and the approximate
numbers is roughly 6,300 students on campus.
One other question that we understood was how was or how
would bikes outside of campus
or those bikes that weren't specifically branded the UNT
spin would they be available for general
public and yes they would be available for that.
Again it's essentially a nominal programming component to
the device on the bicycles.
So options this evening would be approve the ordinance that
implements the interlocal agreement,
provide staff with additional direction if this is not to
your agreement and then take
no action at this time.
You should have at the dais at each of your places the city
attorney's office place that
revised interlocal agreement for your review.
I'll stand for any questions if you have.
>> I have a couple of questions.
Councilmember Melser.
>> Not a question really just a statement that I believe
that some form of bike sharing is
likely to be in Denton's future.
I think that at this time there's more we don't know than
we know and I want to express
appreciation to UNT for the willingness to work closely
with the city in tracking the
results and sharing the information and especially in a
first phase that's strictly in accordance
with the previous ordinance and I believe that through that
learning you will eventually
be able to craft a better policy going forward.
So I'll be voting yes on this.
>> Councilmember Briggs.
>> I just want to clarify because the citizens can use the
bike which is great.
Would Spence still be in charge of getting that bike
wherever it is if a private citizen
used it and putting it back on campus?
>> That is correct.
>> All right.
Thank you.
>> Councilmember Ryan.
>> Thank you, Mayor.
First off, I'm very happy that this is coming forward
before us.
I did have a question regarding private property if a bike
-- if they're doing rebalancing
every morning by 7 a.m. and someone takes that bike and
goes to an apartment complex
that's private property, are there going to be any issues
with them going on there to
pick that bike up?
Or I guess on a second note, if you've only got 6,300
students out of -- what are we at,
38,000 students there total?
If you've got that many, have they looked at doing
agreements especially with camp or
apartment complexes that have a very high student
concentration to allow those bikes
to be left on their property so the student doesn't get to
ride the bike home but then
it gets picked up before they get a chance to go to class
in the morning?
>> If I may, let me answer the first question and we do
have Dr. Clark here who may be able
to answer the second question.
My understanding is that they would be allowed to retrieve
their property that may have migrated
onto their private property.
And again, the intent of the program and the assurances in
place in terms of managing that
through the University of North Texas Transportation
Department, their intent is to get those bikes
back on campus to those pooled locations so that they can
use them to provide that alternative
transportation options from those high activity locations
whether it's the library, parking
garages or surface parking lots on the periphery of the
campus.
>> Mayor Watson.
>> Councilmember Ryan, thank you for the opportunity to be
here.
I'm a little embarrassed.
I wish I would have thought of that myself.
We do run a series of buses that go to each of the high
capacity housing areas but I think
this is something we need to go look at.
Can I check it out for the day or for 24 hours and then it
comes back and how do we go do
that and can we have it registered differently that this is
not just for short term riding
on the campus.
So I know that we have the ability, speaking with Spinn
today, to set geo offenses to establish
where we can have multiple riders throughout the day that
may not be UNT community.
And so I think it's just a third phase we need to go look
at.
Can we establish a secondary geo offense associated with
those apartment complexes and then what
is the rebalancing.
So I think this is part of the discovery phase for this
summer.
Let's get those hundred out there and let's find out if
there is a need and work with
the Student Government Association to find out is there
that need to have that bike through
the night and you know what I'm coming back from campus.
So thank you for the question.
I think this is a prime example of the partnerships and the
collaboration between the University
and the city that has really been a hallmark of just our
partnership over the years.
So this is going to be I think an opportunity as Council
Member Metzler said to grab some
data, analyze some data that will help us craft, you know,
or continue to craft an ordinance
that is workable for the city and also our partners.
So thank you all so much for participating in that with us
and bringing this opportunity
to the city.
I see no more requests to speak.
Council Member Gregory.
Thank you, Mayor.
Thank you, Dr. Clark and to the staff at UNT for your work
on this.
Thank you, Mark Nelson, for always figuring out how to deal
with the bureaucracy and promote
and move forward issues with bicycles.
We appreciate I appreciate that.
I move approval for the revised ordinance that was
presented to us.
Council Member Hutzpeth.
I too appreciate the collaborative atmosphere.
It's really helpful.
I really look forward to the data.
It's going to be it'll help the city.
It'll help other vendors.
You know, we mentioned TWU earlier.
So I really think this data is going to be really open a
lot of doors.
So I'm grateful.
And so I'll second.
All right.
We have a motion and a second for agenda item 4R.
Let's vote on the board, please.
Motion carries 7-0.
Thank you very much.
Thank you all.
Next item is items for individual consideration, which is
agenda item 5.
We have one agenda item 5A.
We do have a card wishing to speak on that.
So do we have a staff presentation on that?
DENCO 911.
Mayor and Council Tony Pueynton, Director of Finance.
I don't have a presentation.
I just wanted to let the let the council know that we did
receive one nomination from the
council for consideration to the slate of candidates.
In August, DENCO 911 will send back to the council what the
all the candidates submissions
from all the 33 participating cities and the council will
then vote on one of those candidates.
And the candidate gets the most votes as the candidate that
will serve a two year term
on the DENCO 911 board.
Okay.
Councilman Gregory, do you have a question for staff?
Former mayor of Denton, Jack Miller has been serving as the
chairman of DENCO 911.
Is his term up or is it?
The the the actual member that's whose term is up is Jim
Carter.
He is the the current city representative, one of two.
He this he has served two terms.
He is eligible to serve another two years term.
But again, he was not submitted as a nominee.
We just had one.
And who was that?
So do you know what the status of the mayor, former mayor
Miller is?
My understanding is that he's still on on the board.
Thank you.
Councilmember Briggs.
And then the nominee is the application that we had in our
backup.
Yes, you have your her bio and her short resume.
Yes.
Thank you.
All right, we have a speaker.
Mr. Willey-Huspits, come down and state your name and
address.
Your time will begin.
Mayor and council.
My name is Willey-Huspits.
I live at 623 Newton.
One of the things that I would like for two things, if we
make if you make the public
aware of who these who does nominate the nominee is, that
would be good so we can then think
and maybe make our suggestions or comment on that if if
allowed.
Secondly, one of the things with the 911 operators that I
would like to see taking place are
would like to have added to what they do.
First you call 911 and they immediately want to know what's
your name?
What's the problem?
And then a series of other questions before you can get out
what it is you're calling
for.
And once they get that information sometimes, well,
especially with me, then you'd see that
there's no need to ask those other questions.
So I would think you say this is my suggestion.
911 operator operator, can I help you?
And then give them a second to tell you what it is that
they want.
Because one time mine was just my horses got out and I
wanted to know what to do.
And they went through this series.
What's the emergency?
What's the location?
The horses are in a place where there's no way for you to
know what the street is and
where it is.
I have to start describing it.
There's a tree at the far end, it's 50 feet, it's to the
right.
Just ask what is your problem first?
Not all the other questions.
Where you live and all of that.
Thirdly, I need to find out how to make a request for items
that are pulled from the
consent agenda.
I didn't get the comment on the street.
I wanted to talk about that too.
And had some questions that I wanted to ask.
Didn't get to talk about mail because you didn't have it on
there so that I didn't
get to sign up for a comment about that.
Secondly, the bike sharing.
Let me think about this.
If you take the bikes home and you are allowed to leave it
there, where are you going to
put it?
I think you're creating a problem where those bikes will be
, there will be some that's not
planning to use them anymore and there they are on the
ground, laying there all day.
They could use them but they decide not to.
That needs to be considered.
I think that we have too many consent agenda items.
There's ways that you're talking about something somewhere
and I've got to figure out where
you're talking about that.
Because I go to the work sessions, you don't talk about
them there, they're just on the
sheet that you're going to vote on them.
But some of you, you've read this whatever you read and I
'll find out what that is so
I can do better with that situation.
You pull them.
But when they're pulled, I think that we shouldn't have a
consent agenda but we'd be all night
if we didn't do that.
Council Member Briggs.
My name is Linda R. Hatman, H-A-P-E-M-A-N and she is a
local Denton resident.
Okay, thank you.
Any other questions?
Council Member Meltzer.
Yes, I entered Ms. Hatman's name into nomination.
She eats, breathes and sleeps emergency preparedness.
Linda Hatman for 11 years has been the DCTA safety training
manager.
She's a responsible, seasoned and articulate professional
who trains DCTA employees in
emergency preparedness including how to properly interact
with 911.
So she's sort of a professional customer of 911 you might
say.
She's responsible enough to serve as the liaison to the FBI
Joint Task Force on Terrorism for
DCTA.
She's highly qualified and I'm happy to move that we put
her name forward in nomination.
Council Member Briggs.
I will second that.
All right, we have a motion and a second for agenda item 5A
.
Let's vote on the board please.
Motion carries, 7-0.
It's my understanding, our next agenda items are public
hearings but we only have one and
it's my understanding that that has been withdrawn.
Is that correct?
All right.
So we do not have any items under public hearings for
agenda items 6.
So we'll move on to agenda item 7 which are concluding
items.
Council Member Briggs.
Okay, so our reuse store, it's a really great asset and I
would like to find more ways to
advertise it.
And I know we also resell paint and I don't think a lot of
people realize that and it's
much better than throwing it in the landfill.
I've heard that other cities have like a giant paint mixer
so that the paint can go further
and they can remix colors.
And I'm not sure if we have one and if we don't, can we
look to get one possibly for
our reuse store out there.
A couple of years ago we received a staff report on a
sidewalk ordinance and I have
not been able to find that and I'm wondering if we could
get that back out.
It was about having tables and chairs out in the right of
way and it was some sort of
ordinance that we either passed or did not.
Also during our joint DASD discussion the idea was
mentioned for maybe a discount for
the Denton ISD teachers and their families at the water
park.
I would like to see if maybe we could do a pilot program
one week this summer to see
how that turns out and about maybe implementing something
like that next summer if it is successful.
And earlier I heard something about a Monarch Watch City
and I'm wondering what that is
and what do we need to do to be one.
And last thing I'd like to know who is in charge of the
back to school event in an informal
staff report.
What changes were made and why and that's it.
Councilmember Hussbett.
Thank you.
Just one thing.
I was thinking today I'm wondering if staff can carve out
the proclamations when they
post the videos.
I think those groups may want those or be able to utilize
those and so I'm not sure
if there's a way to do that but kind of break those out as
separate videos so then they
could go grab that video segment or re-record it or
download it for them to utilize their
social medias or whatever that is and that probably could
be good branding for the city.
Thank you.
Councilmember Duff.
Yeah, I think we've gone through kind of a long election
and I was talking with one
of the people, one of the judges and you know I wonder if
it would be possible for us to
combine the primary with the Denton City election and have
them at the same time.
It'd probably be two ballots but have them at the same time
.
I think that would save a certain amount of money also.
I mean we go through a primary and then we have a primary
runoff and then we have a Denton
runoff and people are just getting fatigue.
Another problem with that is with mail-in ballots.
People mail that in and they've got all the information on
the outside and they put the
ballot in there.
Well because they want to be secrecy they take it out of
there and the ballot goes over
here and all of a sudden it is in the wrong election.
So there were a number of them that were actually, they
weren't counted because they don't know
who they belong to.
I want to be careful that we don't get into deliberations.
It is concluding so you've asked for research.
I'd like to see us take a look at that and see if we can.
I have one, I've said it last time, I'll say it again.
I want to thank Nicole Lopez who is an animal control
officer here with City of Denton for
putting on the fashion show at the adoption center.
I don't know if you're able to see some of the pictures and
photographs on YouTube and
the website but to see the fashion show with the animals
was quite remarkable.
So she did a stellar job and I just want to give a shout
out to her and all those involved
with that organization to try to, number one, allow some
students from the universities
to show their talent and also provide an avenue so that
animals can find adoptive families.
So I really want to give a shout out to them.
Councilmember Briggs.
I was there and it was a lovely, lovely event and I'm
wondering if you saw the wonderful
picture of the lady in the beautiful gown with the dog poop
ing.
Did you see it?
I did.
Yeah, it was great.
Yes, I did.
It's reality.
It is.
Reality TV.
All right, seeing no more requests to speak, we will now
adjourn the meeting at 743.
Thank you.