Good afternoon or good noon everyone.
Wanted to welcome you to this meeting of the Denton City
Council on Tuesday, March 27,
2018.
It is straight up noon.
We do have a quorum, so I'll call this meeting to order.
Our first item on the agenda is citizen comments on consent
agenda items.
I do not see any blue cards for consent agenda items.
We'll go on then to our agenda work session reports.
Our first work session report is 2A, receive a report, and
hold a discussion regarding
signal timing at intersections with red light cameras
within the city.
Good afternoon everyone.
My name is Preetam Deshmukh.
I'm the traffic engineer for the city and let me get this
pulled up.
All right.
Thank you for the opportunity to be here this afternoon and
talk about traffic signal timing,
one of my favorite topics.
I'm also joined here by Deputy Chief Fletcher who will be
jumping in towards the end of
the slide to talk about red light camera intersections.
This is a lot of technical information, equations and stuff
that I've tried to simplify, so
if there's any questions you have in the middle, you can
just stop me and ask questions.
So start with the terminology.
What is signal timing?
What do you mean when you talk about signals and timings at
intersections?
One of the first thing that people say a lot and talk a lot
is cycle length, which pretty
much means starting from when you're at an intersection, it
starts from green to the
next green, so it goes through the whole cycle of different
indications.
So the time between required to complete a whole sequence
is the cycle length.
So moving on, there are some other technical terms here,
green time, what does that mean?
It's the amount of time the indication is green, so if you
're in an approach, you get
there at the intersection, you see green, that's pretty
much the green time, the interval.
Yellow time, which is what we're going to really focus on
in this presentation and this
particular item at the work session is the amount of time
that any approach receives
yellow.
It's just a few seconds, but that's the time that's
required to safely clear the intersection.
Any vehicle approaching at a particular speed, they need to
be cleared out of the intersection
and that's time given.
And the red time, that's the amount of time that a movement
, so once the red kicks in,
you're sitting there until the green kicks in again.
So that's the amount of red time.
So together all these three times comprise the cycle length
.
Now actually getting into signal cycle, I have a quick
chart here, it looks like a pie
chart, but signal timing works in a cyclic fashion.
So if you start at zero, it goes around this entire cycle
in here.
So if you start anywhere, it goes through the whole cycle.
So I want to get back to this particular one and explain a
little bit more how that impacts
if you increase any of these timings, how does it impact
the cycle length and how does
it impact the signal as a whole.
So this is just a typical signal.
Our city signals typically cycle lengths range from 65
seconds to 130 seconds.
People start getting nervous and frustrated at 130 seconds,
but I've sat through ones
that are 180 seconds.
So there are intersections in the rest of the country.
Now focus on yellow time interval.
The way it's calculated is this equation and it's fairly
straightforward once you try and
understand it, the T is the perception and reaction time,
typically one second, and then
the rest of the equation focuses on the speed at which the
vehicle is approaching the intersection.
So if the speed limit is 30 miles an hour, typically that's
the V and then the rest
of the equation has deceleration equation and then grade.
So based on this equation, traffic engineers calculate the
yellow time at particular intersections.
So you have an intersection where the approach speed is 30
on one approach and 40 on the
other.
Typically we use the conservative and apply the yellow time
for that particular approach
based on a conservative higher speed.
So it typically, these are the calculated yellow times and
then I'll get to the all
red in a little bit, but these are the calculated yellow
times for these speeds at an intersection.
And as I mentioned earlier, yellow time is to clear the
intersection, but what here we
do in Denton also is add a lot of red time to red time will
actually help more to hold
all the phases red so anyone that's trapped in the
intersection can still have a few more
seconds to get out anywhere between 1.5 to 2.5 depending on
the speed.
They have a second or two more to get out of the
intersection.
That's an added safety that's implemented in the system.
So if you see the total amount of time is consistently six
or more seconds that's given
to anyone that approaches that intersection.
And getting --
I have a question on that.
Sure.
If you go back to the last slide.
So just to follow the logic here on the all red, so the
reason why it's less at 1.5 seconds
at 60 miles an hour is because the car's moving through the
intersection faster?
Correct.
Which I can see how you don't need to hold it as long, but
if there is someone else in
that intersection, a 60 mile an hour crash is going to be
much more -- greater opportunity
for serious injury or possible death.
So if you had a longer red time at a higher speed, what's
the disadvantage of that?
In other words, is it just a waste of time?
Is it a waste of -- does it cause more potential problems
than it might save as far as collision
is concerned?
So the yellow time and red time play off of each other a
little bit.
So if you look at the speed, the higher the speed, the
higher the yellow time.
So the amount of yellow time given will most probably clear
the intersection.
So you don't have to necessarily get to all red.
And then in the pros and cons, I'll explain why you don't
want to increase either of them.
Okay.
We'll go Councilmember Gregory and then Councilmember Ryan.
Thank you.
You mentioned with yellow that some people perceive that as
clear the intersection.
Now, some people, when they see yellow, they think it means
speed up to achieve that, to
clear the intersection.
And for other people, they see yellow and they say, oh, it
's time for me to slow down
and stop.
Have there been studies -- surely there have been
engineering traffic studies done to calculate
what percentage of the population reacts one way to a
yellow and what percentage of the
population reacts a different way to the yellow?
That's a very good question.
I'm not sure if the psychology or the behavior part was
studied that much, but definitely
there has been studies on a technical level as to -- there
is something called a dilemma
or trap zone.
So if you're approaching an intersection, if you're in that
particular area, just before
you hit the intersection, then you are caught in whether
should I press the gas pedal or
should I break down.
And that particular dilemma zone, engineers have worked to
match the yellow and all red
time to counter for that particular area.
So behavioral-wise, I'm not sure if there have been studies
done.
And maybe Scott can talk to that, but it's human behavior.
There are days when people behave differently than they
would normally behave.
So that's the issue is it's hard to predict the same person
behaving differently in different
ways.
Yeah.
I was just thinking in terms of percentages of drivers in
general, you know, what percentage
of cars in an intersection react one way to the yellow or a
different way to the yellow?
And I agree, it could be different for the same person on a
different day, different
circumstance.
Correct.
And, you know, younger the person, driver, it tends to be
the faster way than the slowing
down way.
It could even be gender-based also.
Could be.
Councilman Wright.
Thank you, Mayor.
Follow that one.
I will try my best not to.
Meaning that men would respond more stupidly.
You mentioned a moment ago that if you had an intersection
that had 35 miles an hour
and 45 miles an hour, you went with the more conservative.
Does that mean that if it's 35 going this way and 45 going
this way, both are having
the same?
Yellow time.
They're both having the same yellow time.
Correct.
Yes.
And it's a matter of a few seconds.
30 and 35, you have .5 seconds.
And between 35 and 40, both are almost the same yellow time
.
So if two streets intersect, one is 35, one is 40, they'll
still get the four.
So there is not that much difference, but we go with the
more conservative yellow.
And I think in particular, one spot we have a camera is
there at Mayhill.
And so you've got 55 going on one road, and I'm not sure
what Mayhill is currently, probably
35.
Currently, yeah.
I think it's 35 or 40.
Yeah, so you've got a pretty big difference in the speeds
on those two.
Yes, I mean, I'm not sure if I have that particular yellow
time, but I can check into that.
So pros and cons.
Pros, yeah, it provides additional timing, and it may help
reduce accidents to a point
where it starts diminishing returns.
So it can go up to a certain level, but after that, you don
't see the benefit of extending.
Those are the pros of extending the yellow chain interval.
But the cons, there are several cons.
It uses part of the green time.
Now if you consider this as a whole dial, if you start
taking more time or giving more
time to certain yellow, then you have to give more time to
all the yellows in there, and
that reduces time from your green.
And if you try and increase the green time again, that
increases the cycle length.
So that means you're not really doing a service.
It's a disservice by keeping on adding more yellow time,
because then it creates an intersection
delay in congestion.
That's another con in here.
And then the most important part for me is the inconsist
ency with the rest of the signals.
If we're doing changes in yellow, they should be applied
all over for all intersections
in a uniform manner, just to be legally defensible and give
a fair opportunity for everyone at
all intersections, as opposed to really focusing on the red
light camera intersection and changing
them or those particular locations.
- I believe Council Member Briggs had a question.
- So does the changing the yellow change, does that affect
the crosswalk timing at all?
Do any of these affect the safety of the crosswalk timing
for people to get?
- No.
- No.
- The pedestrian trimmings are separate, but yes, they do
impact the overall congestion,
because now you have to provide more time for yellow, less
time for green, and at the
same time, provide time for pedestrians on the opposite
side.
So it becomes a balancing act, and you don't want to
increase the overall cycle length,
which means by the time someone waiting at an intersection
comes back again with a green,
it takes a lot longer.
So it doesn't affect the pedestrian safety.
- Sure.
- And so to your last comment on changing all the
intersections, so I was just curious,
when we did install the red light cameras, did we change
the yellow light timing on those
intersections?
- No, we did not, because the way we calculated those
yellow times...
- Let's see.
There has been conflicting information back when some of
the methods of developing yellow
time were not standardized.
There were industry leaders that were trying to come up
with different ways of implementing
yellow time, and that's when the red light cameras at
certain cities went in, and they
were short of the amount of time actually required to clear
the intersection.
So that's where all these studies and issues came out, that
we need to bump out yellow
time.
So at intersections that we have, we've never reduced or
changed the yellow time.
They're consistently...
Overall, throughout the city, they're consistently applied,
and we use the same equation that
is federally required, or it's a guideline, federal
guideline for us.
- Thank you.
- Mayor Pro Tem?
- I have two questions.
One, when the speed limit's changed on US 380 recently, I
think they went up to 50 miles
per hour.
Were the lights also changed commensurate with the...
- They were re-timed by text-off.
That's correct.
- Okay.
And so what is the interval then after...
I guess is it pursuant to the chart that you provided?
- It's consistent with this chart, yes.
- Okay.
And then the other question, you mentioned that in order to
be consistent, we should have
all of the signals at every intersection change, but isn't
the amount of the interval dependent
on the speed limit?
- Correct.
- So you're saying all 30 mile per hour speed limits should
change, all 40 mile per hour
speed limits should change?
- If the council chooses to move in that direction to add
more yellow time at red light locations,
then there has to be consistent change to increase, and
there are serious cons to that
particular.
So we don't recommend doing that, but yeah, if we are
changing something at one location,
it should be consistent.
- Okay.
Thank you.
And then moving on, I think next slide is where the chief
is gonna jump in and he'll
talk about red light cameras.
- Council member Husspeth has a question.
- Yeah, before you go, I'm sorry.
So I guess when you talk about consistency, that's where it
's troublesome for me a little
bit, right?
Because not, do all intersections have red light cameras?
- No.
- So in and of itself, how are those locations selected?
- Those locations, probably deputy chief can answer that
question, how they were selected.
- But for me, just then before he comes up, that's my thing
.
They're inconsistently applied because consistent would be
there'd be in every intersection
in my estimation.
When I say consistent, then every intersection has one.
But whatever the process is where we individually selected
these particular intersections, it
depends on where you go.
If you're affected, that to me is the definition of
inconsistent.
And then the other thing is if you could summarize, and it
may be in the data sheet, but just
to hear you, what are the purpose of the cameras?
If you had to give a mission statement for the cameras,
what's the goal?
What are we trying to accomplish?
- That's also a good answer for him, but I can summarize it
.
The accomplishment is to make the intersection safer.
- Select intersection safer.
So we're not concerned about, and that's a loaded question.
- Exactly, exactly.
- Okay, thank you.
- Thank you.
- Okay, all right, thank you.
So Chief?
- Do you want me to start with answering the questions or
move through this?
- Sure, ask my husband.
- Yes, please.
- The chart here shows the locations of our current cameras
.
We have 13 cameras monitoring 11 intersections.
Very briefly, I can't have to go back in history a little
bit on how we selected intersections.
In 2006, well 2005 when we first took this up with council
about doing red light cameras,
we were under the home rules set up.
There wasn't a state law process that didn't come until
2007.
So we could only put red light cameras at intersections
that didn't involve a tech start
roadway.
We were prohibited from those.
So that limited a lot of the intersections that we could
choose.
The process at that time was to look through historically
where we as law enforcement went
out and worked red light violations where we intuitively
knew we have wrecks, we have
a lot of violations here because we put a lot of personnel
there.
Those intersections are, and I said it in the backup, most
red light intersections are
very difficult to work in terms of law enforcement to do so
safely.
Because you have to be in, unless you do it with multiple
people, you have to be in a
position to see the light, see the car, and then safely
pull out and get through the rest
of the oncoming traffic that has a green light now to get
behind the car and stop them and
address the issue.
So typically what we have done historically is we put out
packs of officers.
You have to have someone watching the lot and calling out
the violation on a radio and
then officers stationed downstream for any place that car
can go.
So we went at it from the idea of violations which equal
accidents, which equal injuries
and top traffic.
After 2007 legislative changes, the state put in some
criteria in there in terms of
selecting intersections and what has to be done.
We followed those procedures, taking those through traffic
safety, but in the end it
really comes back to where are the problems.
In terms of the mission statement, what we're looking to do
is try to find a way to enforce
the traffic law.
Really it comes down to predictability.
We all drive.
I've taught two kids to drive.
We try to teach them how to drive defensively and that's
based on predictability.
You want to know that when something happens on the roadway
, I can predict this is what
should happen and therefore that's what I should do.
So with red lights, you'd really like to know that when the
light turns yellow, cars will
slow down and try to stop or they'll have enough time to
clear the intersection and
they're not just going to go on through.
I said this way back in 2004 in this room, how many of us
when the light turns green
for us at an intersection just punch the gas pedal and take
off versus we stop and we delay
and we look the other way for oncoming cars because we all
know it's a good chance someone's
coming through the other way and I'd rather be delayed than
be hit.
So that's kind of what walks you through how we've come to
these particular intersections.
If you'll notice as we went along in the backup, I'll point
out the ones that came in 2014,
we could do text on intersections and you'll see most of
those are large intersections.
They're ones that take even more officers to work.
They're ones that are somewhat higher speeds, a lot more
traffic and that's what we're really
trying to do is get people to change their driving behavior
.
We're not going to eliminate all accidents because driving
behavior is independent every
day and based on the choice that you make at that point in
time.
So someone's always going to make the wrong choice and hit
somebody.
We're always going to have violations but we're trying to
do an enforcement piece to
add on to that if that answers your question.
Yeah and then we have Councilmember Gregory on deck.
So, yes it does and I guess I'll be listening because
ultimately we arrived at these locations
because we couldn't put them at every location or because
so you there's a ranking system
there and so for me it becomes a question of how do you
rank the punitive nature of
these intersections to the inconvenience of the time being
longer or whatever becomes
problematic if we stretch that time, right?
So how do we measure that because for me listening to you
and we've all experienced, so if I'm
behind an 18 wheeler and I'm driving I can't see the light
so I've either got, even at
two seconds back I don't know that I can see the light over
the top of the truck so then
do I drop back further or do I end up in the intersection
unbeknownst to me and now it
becomes punitive if I'm in one of these intersections.
So if I'm two seconds back and I can't see the light in a
normal intersection I clear
it maybe I'm late getting in there and it's okay.
In one of these intersections I'm getting something in the
mail or whoever's driving
my car and so for me that's where it becomes, so it may be
inconvenient to stretch the time
but if we make sure we catch those that are definitively
running it on red then, because
there's a lot of components to that, right?
Because my understanding of the law is if you enter the
intersection legally you can
leave it legally, right?
Yes sir.
So if I'm turning left and it's not green, there's a lot of
traffic, I can get in the
middle intersection when it's yellow and I can leave and be
okay when it's red.
Absolutely.
And so there's some nuances there and so that's my thing.
I just want to scale the risk of it being longer versus got
chaing some people that may
be doing the right things and just get caught up in a bad
situation.
Well I think it's fair at this point to add in, you know,
the concept of the cameras is
it's an enforcement tool.
From the red light camera perspective I don't really have
an opinion on the amber or the
yellow time cycle or you know, we just get a feed from the
signal that says it's red
and so whatever the signal timing is, it's calculated the
way it should be calculated.
It is a dilemma with driving along and I know because I
paid one of these in another city
where there was a truck in front of me and I did just what
you talked about and by the
time I could see it, you know, I thought I could make it
and you know, $79 and some odd
cents later I paid that I didn't make it.
I watched the video and I ran it.
It is a driving choice but I would put to you that it's the
same dilemma that you face
if an officer is sitting there in a squad car and you're
driving along and you're behind
the truck.
That officer, technically you've run the light if the light
's red before you enter the intersection
you go on through even if there's a truck in front of you
and so the officer then would
have that discretion to decide should you have been driving
further back was there something
you know and so you're still subject to the punitive nature
of the violation.
The difference is the camera is always there and always on
and that's both the pro and
the con and they catch everything that goes through.
Now I know from reviewing violations we tend to try to
watch some of those and there are
those that we apply the same discretion that I can see that
the car stuck in behind the
truck you didn't see it could they have been off you know
could they have slowed down those
are those are discretion you know discretionary choices we
make just like we would if we were
out there on the street.
Councilmember Gregory has a question.
It is an argument for maintaining safer distances behind
trucks.
So regarding consistency and where we where we place red
light cameras do you use the
same kind of decision making when you decide where you're
going to be monitoring and when
you're going to be monitoring for speeding violations how
do you all how do you all make
those decisions because we don't we're certainly not
consistent in when and where we do that.
Well a lot of that with what.
I'm getting a city attorney wants to understand the
different consistency of applying the
law we're talking about consistency and where we place red
light cameras and his decision
making them where to place red light cameras do the same
lot does the same logic apply
when we're applying other traffic laws is that is that out
of the.
I just want to just caution the council.
I mean the question can go forward or you know what but the
this this caption is posted
to talk about signal timing and intersections with red
light cameras.
It's I know that there's red light enforcement camera
program that we have in the ordinance
that's starting to go beyond the bounds.
So with this one I think it's a fair question to ask but I
just want the council to to keep
that in mind that this is you know the red light
enforcement program is a topic that's
beyond the scope of what's posted for today.
So as far as the consistent question consistency question
goes the consistency original discussion
was about consistency on the timing for every every
intersection instead of just thinking
about the question of where we place red light.
Well and I think that's okay.
Nevermind.
The next slide here just to give you a historical
perspective and I try to cover it in detail
in the agenda information sheet the violation notices that
were issued.
This is all cameras.
Keep in mind that in the earlier years we had six cameras
then we added three more in
2011.
I pointed out the bump in 2010 where we go up to 7000
violations there.
We upgraded equipment we had different detection devices
and then in 2014 we added six cameras
at some very large intersections and hence the jump in
violations.
Councilmember Briggs had a did you have a question or
comment or?
I had a question for the city attorney.
Okay sure.
Because a few of my questions do revolve around the red
light cameras and this is just
specifically for timing.
My questions involve tickets for violations since that's in
the presentation can I ask
the a violation ticket question for intersections or?
If it's related in how the tickets may have been issued as
a result of the signal timing
posting that we have today that's yes but the other only
suggestion I could offer this
council that if this council really wants to discuss the
red light camera enforcement
program the city staff can come back with a future work
session to discuss all the issues,
the numbers over the years, how much revenue has been
received, etc. but I know that what
we have here is that we're getting very dangerously close
to going beyond the caption.
And I would do that under new business today?
And then the last slide I have here is simply showing
related to the timing and the issues
in terms of safety and accidents we do track we report
every year to text dot crash data
from our red light cameras and you can see we've so we're
never going to eliminate all
accidents but we have had I think you know totals of five
at 11 intersections that are
pretty large in our city which we think you know is getting
towards the goal of what we're
trying to do.
However we do it whether by camera or by officer or you
know any other way to change behavior
the fewer actions we have the better off we all are in the
process.
I will note and again I said in the agenda information
sheet that I thought of note one
of the concerns and it struck me earlier one of the
questions was asked earlier about you
know safety and timing and those things.
One of the indications to me about driver behavior and
choosing to go forward on yellow
or stop always revolved around the issue of rear end
crashes and we first started this
that was one of the big rallying cries was what rear end
crashes go up with cameras but
dating back certainly through 2014 we've had zero rear end
crashes at any of our red light
cameras which to me is at least indicative that people are
adjusting their behavior to
what to do when they see a yellow light.
Councilmember Gregor has a question.
Okay let me try this question.
Not blaming you.
When you're collecting data about violations I know that
you because people maybe didn't
time it right.
Am I getting here?
Didn't time it right getting through the intersection.
Do you look at like how many of these citations or notices
that go out because somebody entered
the intersection within a second of it turning red or
within you know more than three seconds
of it turning red or that violate because they're turning
right on red without stopping.
Do we gather any of that kind of data?
We have the data we've not pulled that and collated it in
terms of you know how many
at what intersection you know we're within so many seconds
of red or any of those kind
of things.
We did get some some general data on vehicle speeds and
that for me certainly in viewing
them that that plays a role.
But the numbers tend to be you know it varies at each
intersection you know what a tenth
of a second at that intersection at that speed looks a
whole lot different than a tenth of
a second at another intersection at higher speed.
We certainly could probably go back and look at each
individual intersection and try to
take a look at that but it would be a little difficult to
go and try to make a cross-section
across-the-board comparison with the varying speeds and the
size of the intersections
as to what the violations are because again I try to
emphasize that in terms of an enforcement
tool this is just a much more effective and efficient and
from the law enforcement side
safer way to enforce a violation that can easily be
enforced the exact same way by an
officer who's out there at the scene.
It's just not as cost-effective.
Councilmember Ryan.
Thank you Mayor.
I first had asked for this to to come forward to council it
came out first as a informal
staff report dating back some time in there it talked about
the fact that adding one second
to the yellow reduced red light running by I believe it was
30 some percent 36 ish and
that the red light cameras more in the in the 90 percent is
there any data on having
both in the same?
I would increase in the yellow and engineer friend.
Could you could you restate the question?
I didn't quite.
The data that was presented to us included adding time to
the yellow light interval and
what reduction in red light running that created and what
the red light camera creates as far
as a reduction in the number is there any data that when
you do both if there is what
the reduction in red light running is?
Both being the both the one second adding the one second
that reduces by about 36 percent
and having the camera there.
Okay gotcha.
So I can talk to the yellow light reduct increase by one
second that goes to back to my initial
explanation when cities started implementing this earlier
the way the yellow time was calculated
and put in the system there were different ways to get
there and they were trying different
times so when they started installing red light cameras at
those particular intersections
they had not timed the yellow right the yellow was short
and part of the reason was they
were trying to this was in larger cities where they were
trying to manage congestion at the
same time they were trying to manage pedestrians crossing
so too many people working at the
intersection and too little time for all these movements so
the yellow time was lower and
in those particular cases when they bumped it one second
they reached the optimal and
what we have in our city is has worked through all that and
had we have we have the optimum
time that's needed so technically that 36 percent we
already have data on but as far
as red light I think these numbers can tell that the number
of violations in the previous
one does that part of answer part of the question no but
let's say any intersection out there
it's not necessarily whether it's got a camera or not but
if from what I read if you
increase the yellow by one second above the the standard
from the manual that you had
had a 36 percent reduction in the number of people running
the red light which obviously
would relate to a reduction in accidents at that
intersection yeah as I said it's a diminishing
return so let me go back to the numbers here you see the
six seconds specifically in the
guidelines that said that the yellow time should be
anywhere between three and six seconds
if it's more than six seconds then you have to be really
cautious of the amount of time
you're providing at this intersection because then you're
creeping into people using that
particular time to as a green time so the people use it as
an extended green so that's
why adding one second to some of these locations which
already have five point five and six
second yellow at this time is well it's not recommended let
's so if I think the study
was based on data there was that had short yellows to begin
with that's why they saw
that increase okay well in the way I thought I read it was
that when you increase it to
one second above you added if you're at the the industry
standard for the manual and you
went one second above that's what created that 36 percent
reduction is that did I miss
read that I think they the way I read the study and there
was the the staff report points
each and every aspect of it the way it read was the data
that was said was time differently
not based on these equations it was not an industry
standard equation that was run I
think it was a report from King Mr. Mr. Reed King I we can
we can yeah I guess for future
reference at some point I don't know if I need to wait on
concluding items on this but
additional data that I'd like to see would be of the stop
lights in town signals in town
how many are at what speed because I don't know that many
that would be at that upper
that would be at that 60 mile an hour that already had the
second so just and and we
I think it's evident and clear that it's hard to talk about
because the caption is signal
timing with intersections at red light cameras and so it
may be that because I think that
was the that was the request was you know about increasing
yellow signal time and so
I think that's why the caption was was worded that narrowly
so certainly want to get to
y'all's questions but I think in the end what we're going
to find out is we're going to
either make a decision today about do we want to increase
any type of interval timing for
either yellow or red but it's clear that as councilmember
Briggs had mentioned that there's
there's certainly an appetite for discussion on the red
light program in general so I don't
want to try to get those two convoluted here because we
could speak we could talk for a
couple hours on just in general general terms so I'm going
to recognize councilmember Briggs
and then councilmember Hudspeth.
So I do have a specific question about the yellow light
changing I know you mentioned
that if we did it for one we'd have to do it for all the
intersections but is there
a specific intersection maybe that's not at the maximum of
six that would you'd feel uncomfortable
going over but one that we could do a pilot program in and
increasing that like councilmember
Ryan said one second just to see if the violations at that
intersection decreased from before
or after.
Yes we can.
Is that something maybe that that we could do just to see
if it if it works or not but
I wouldn't want to make you uncomfortable by going over the
the one but it if there's
an intersection that's listed here with a red light camera
that you think that we could
do some sort of pilot program on I would be in favor of at
least trying it so that we
can have data for our next conversation.
Yes we can try we'll pick an intersection I'm not sure if
you have anything in mind
but the only concern I would have is the minute the cycle
goes up people start noticing congestion
immediately so that's one of the drawbacks of we start
getting complaints.
So maybe not near the loop.
I would stay away from the loop.
Thank you.
Councilmember Hudspeth.
Yeah as a I mean that's that to me is a I think that's the
issue right.
I think if you're not if you've not been victimized by
these things then I don't think you you
you're as a cute because I'll tell you I have an answer to
you right now just heard
the question and the answer is absolutely shady.
What is it Shady Oaks and and what Colorado.
Yeah Woodrow because you're going to have a brand new right
turn lane and they're used
to suffering in traffic anyway so it's going to go faster.
And if you do it so I mean it's instantaneous.
That's a simple answer.
If you if you if you pay attention right to me I I don't
need a conversation later I know
where I fall and I know how long the contract is but
specifically to this.
How can you can you educate me on how malfunctions if that
so it's all automated right.
So with the degree of 100 percent certainty I have an
answer as to what happens but the
do you do you agree with that to a hundred hundred percent
that if it malfunctions somehow
it goes all red every time correct.
So question yeah it's an inbuilt conflict monitor it's a
matter of safety.
So if it goes wrong and it fails there is a fail safe that
the conflict monitor kicks
in and we make sure that we we service each and every
intersection conflict monitor every
year just to make sure that we're on top of things.
Okay and then so there's and then I'll pair two questions
together kind of you you've
mentioned studies a few different times and so I want to
know what study that is you rely
on and forgive me if I missed it in the backup and and kind
of one that's one a one B would
be is there a study that captures the fact that people have
slower reaction times now
because you have you know before you didn't have Bluetooth
you didn't have this you didn't
have that so I think there's more distractions in vehicles
and I'm assuming driving patterns
habits have changed.
So is there so what study are you relying on initially and
then is there a study out
there that you would point to that captures newish drivers
or new driving tendencies because
I'm assuming there's been a change.
So the first one is it's based on the traffic engineering
handbook that's from the IT Institute
of Transportation Engineers and there's all the formulas
all the calculations they are
in there the way they have come up with the the numbers as
far as you know reaction and
perception time it's based on studies that they've received
and conducted and over time
they've averaged it out every new addition that comes up
goes through the series and
sequence of other studies that they receive data from and
they keep on updating some of
the numbers or the equations and add and remove certain
things so it's constantly updated
based on research and data that they have received
throughout the nation.
Thank you.
Thank you.
I agree.
Thanks.
The first line in the backup information says that the
primary objective of signal timing
is to move people through an intersection safely and
efficiently.
So if we do a test by increasing the length of the yellow
and we're I guess we're checking
to see if that increases violations.
I would also be interested if what impact it has on safety
and efficiency.
In other words does that yellow light being left on longer
does that does that mean that
we have cars stacking up for a longer period of time.
I think that we need that kind of information so that we
see the whole picture as we're
as we're gathering information and not not focusing on one
thing and ignoring the rest
of the data that we need to have.
So that's an excellent point and one of the things that we
are doing across cities we're
doing capital projects is historically as we have engineers
traffic engineers especially
have looked at intersections we've looked at this isolated
intersection and then we
make decisions based on timing.
Over the last 10 to 15 years there's been a an
understanding that this is more of a
system wide approach and if you look at one intersection
you may change one yellow light
here and it may impact four other lights and the ability to
move through the intersection.
So what we're doing with capital projects today is looking
at from a complete corridor
analysis plus going further to make sure that whatever we
do now doesn't have an unintended
consequence beyond that limit.
One of the things that always gets a little hard to
understand with these traffic signals
is that anytime I make an adjustment you brought it up to
say I may have more parking space
in between signal lights which means I got to build more
roadway.
So there's a much bigger infrastructure cost if I'm not
doing a good job of balancing how
many lights I have in between one intersection to another
or this destination or another
plus what is that timing set at and the more frustrated a
driver gets with more time delayed
at an intersection the more likely they are to run another
intersection.
And we are talking about intersections with red light
cameras.
I hear you but it all impacts all of it together because
the original question is if we broaden
it to an additional second it plays into a bigger picture.
Well I guess unless there's some burning questions to
address the issue at hand I mean we've
got a proposal on the table because this we really are sk
irting close to just the general
conversation.
I don't mind the general conversation I just I'm not sure
that the posting is broad enough
in order to have that and that's nobody's fault that's just
sort of how it came up and
it's obviously there's a desire to have that so I think
staff has been alerted that and
the agenda committee certainly has as well.
There was a proposal or a suggestion by Councilmember Br
iggs of hey can we instead of doing this
across the board can we pick a pilot intersection with a
red light camera that won't cause necessarily
this stacking kind of dilemma that you've just described
and is council okay with trying
that to gather some data.
Obviously it's you know going to be isolated but it'll
still be data to see how it falls
out.
Yes Councilmember Ryan.
Yes I would you know I appreciate Councilmember Husspah's
thought in which one to use but
you are now changing the flow of traffic through there once
you have that extra lane so to
me that wouldn't be the ideal one to to do the test on it
needs to be something that
nothing else has changed except for the time of that line.
Well I think we can I don't think we need to decide exactly
which intersection that
is I think the traffic engineers will know which one best
would fit that and isolate
it to that to that problem or to that particular testing
environment.
So are we everybody okay with that moving forward I mean I
'm just yeah yeah I mean
and if you're not that's okay too I'm just trying to get an
idea we've got to give them
some direction I'm seeing sort of half-hearted nods I'm not
seeing anybody standing up and
down on the table that may happen at our next general
conversation but yes Councilmember
Mayor Pro Tem I'm sorry.
To clarify it would be one signal that's going to have one
second more do we do we know the
speed there?
Unless we fix the intersection we don't know the speed so
here's the list of intersections
that already have red light cameras and between me and
Deputy Chief we pick Oak and Carroll
as in as the beta test as the beta test just because it's
not that congested it's not a
text-off facility so we have better control over all the
elements.
Okay so that's a 30 35 miles per hour?
I think it's in that range.
Carroll slightly higher Carroll might be 40.
That's a discussion.
How long would it last for the test?
The question on the floor is what is the time duration of
the beta test?
I mean from it from I mean I don't think we can make that
what do you think is necessary
in order to gather the data that is being requested?
Yeah I think it definitely depends on the season but right
now if we deploy it a month
right before summer hits.
Thirty days while there's still the student traffic in town
?
Correct.
Okay.
Well I'm okay with it I just I don't really like sessions
like this because the issue
is that people don't like red light cameras so I hate to
put I hated second-guess traffic
engineering because there was a formula that I would have
failed to answer to.
Yes.
And I don't like I don't like questioning somebody's math
when I'm not even close
to the ability to do that so I feel like we should have a
discussion about red light cameras
rather than try to do these workarounds.
So what's your?
I'm not opposed to gathering data I just I don't really see
the point of it because
I think the real issue is the red light cameras.
Okay all right given those comments do we still have the
same direction from council?
Yes councilmember Gregory?
I think that's right I think gathering the data is
important but I have a feeling that
whatever the data comes out people that have their views
that we should have them or we
shouldn't have them I doubt that it's going to change
because sometimes people feel so
strongly about views that facts don't ever get in the way
of that and I'm including myself
in that by the way.
Okay so it looks like you have direction to pick an
intersection you've identified one
certainly if you feel that upon further discussion that
needs to be different than just ask that
you alert council or just send out an email or something
and we'll wait till you come
back and in the meantime we'll get on the agenda yeah
general discussion on red light
cameras.
Okay.
All right any other questions comments on timing of signal
lights at red light cameras?
Seeing none thank you very much appreciate it.
Thank you.
Thank you for the presentation.
All right we'll move on to agenda item 2B which is receive
a report hold discussion
give staff direction regarding the reallocation of project
bond funds and other funds in conjunction
with the city's capital improvement program.
Mayor city council.
My name is Tony Puente I'm the director of finance thank
you for your time this afternoon
to go over some recommendations some thoughts here on the
geo bond program.
First of all before I begin just let me say that we have
met with both the 2014 bond oversight
committee we actually met with them back in January and
also in March and so many of the
recommendations that are here are coming from them.
I will also or have been approved by them I'll recommend it
for approval.
Last night we also were able to meet with the public
utility board and they unanimously
approved the recommendations that we've made in regards to
the funding shortfalls for the
drainage projects and where the source of funds is coming
from for those and I'll touch
a little bit on that as well so if you have questions we'll
go to go through that.
So just quickly the objectives for today we are wanting to
go through a number of projects
with you and some of these projects date back to the 2005
bond program so there's some specific
projects from that bond program that are still out there we
wanted to go ahead and bring
that to you today we've just because there is no bond
oversight committee from the 2005
bond program and there wasn't enough of a quorum to meet
with the 2012 bond oversight
committee we did take all those recommendations through the
2014 bond oversight committee
and we did have some members of that committee that have
been part of the 2005 and 2012 as
well so we thought that was the prudent thing for us to do.
So we'll discuss with you the recommendations from the bond
oversight committee and then
ask you for direction on the recommendations for each one
of these projects and just so
council member Hudbett knows I do have a spreadsheet and so
we can go through that if we need to
so I'll have that available.
So again we had five projects that are remaining we have
bonds that are still out that we still
have on the books that have not been spent these are geo
bonds they're voter approved
general obligation bonds for five projects two of the two
of the projects which are the
larger projects are related to FM 1830 and US 377 both of
those projects are actually
fully funded and are on the way in the in process FM 1830
was funded by the county with
a minor amount of city match and then US 377 is funded by
text dot with also a minor city
match and so there's bonds that are remaining to the amount
of 2.7 million those bonds did
and the reallocation of those bonds to the Bonnie Bray
project did go to the 2005 bond
oversight committee unfortunately we were unable to confirm
that but again that staff recollection
but what we did is we went ahead and still discussed that
with the 2014 bond oversight
committee and now would like to go ahead and bring that to
you for formal approval or thoughts
on that particular project.
Just as a note because when we look somebody looks at 2005
bond program projects that have
gone uncompleted that's 13 years but when you look at that
at least that specific project
those are both text dot projects I mean those weren't fully
within the control of the city
or fully funded by the city so it's not that the city has
delayed is that text dot wasn't
able to fund those and therefore our match wasn't required
until it got funded which
has been just recently.
Yes sir that's correct.
Thank you.
Yes Mayor Pro Tem.
Can I ask about specific items on the 2005 bond program at
this point?
Yes ma'am.
Okay the IOF cemetery fencing that came to us maybe last
summer I think and we allocated
$180,000.
Correct.
So on your spreadsheet it says that the revised project
cost is $555,000 so I was under the
impression that we were allocating the $180,000 out of
general fund revenue and then that
was the total cost of the project not that the project had
been demarcated as a $555,000
project.
Correct it was actually $375,000 that was allocated to that
fencing project in fiscal
year 17 to complete that project.
Was it general fund?
It was general fund dollars yes ma'am and so part of the
proposal today is specific
to that particular project is that we've been able to
identify restricted funds which are
from fund 916 it's the park development fund and we found
that this particular cemetery
is eligible for those funds there's $288,000 in that fund
that could be allocated to this
particular project and so one of the recommendations today
is to simply switch out that funding
so give the $288,000 to that project and then take the $288
,000 in general fund dollars
and reallocate that to the VALA project that's the
recommendation.
Okay well I guess my question was more I don't remember
anything about a $555,000 project
and maybe somebody else that was here could clarify I
remember that project being a $180,000
project.
You mean the wrought iron fences?
Yeah the fencing yes.
No I think because I do remember that we were I think that
was only either the repairs for
the cemetery for the headstones because I remember what
part of the question was is
do we go ahead and do it all at once because we had a short
fall do we do all the monument
repair and the fencing and there was some hesitation and I
'll be honest I just said
hey just take the difference out of the general fund if we
're short and that was that $375,000.
Okay well I obviously didn't understand that whole
conversation but just to be clear the
larger amount that was presented to us was for headstones
as well but this on our spreadsheet
is just the fencing.
Correct I believe that's correct Laura do you have any
thoughts on that?
So just the fencing for this project is $555,000?
Yeah Laura.
And that's only for the IOF correct it's not also for the.
Let me ask Laura Barron's to come up here.
Good afternoon Mayor Councilmembers Laura Barron's
Assistant Director for Parks and
Recreation that total amount is a combination of the f
encing and the headstone repair both
are currently in progress and I can go back and look to see
what the total amounts for
each one were but we have two two cemetery projects going
simultaneously the repairs
of the headstones and also the fencing for that total
amount.
Yeah it was the it was the.
It was.
It was the.
It was the.
Right.
Oakwood both Oakwood and I00F fencing repairs are in
progress as well as the monuments and
we actually just gave an update on the monument project and
this past Friday's report and
that has been complete.
I just want to clarify that the I00F cemetery fencing that
's under the program description
of the funded projects and geo funded projects is actually
Oakwood cemetery IOF cemetery
fencing and the major headstone repairs.
Yes it includes both cemeteries.
Okay I00F and Oakwood cemetery.
All right just to clarify thank you.
Thank you Mayor Pro Tem.
Mayor Councilmember Gregory.
So could somebody clarify what was the 2005 bond money for
the I00F cemetery for?
As best we can tell it was just probably for fencing.
There's not a lot of clear documentation in that particular
pamphlet for that.
And maybe if and I'm just guessing that the reason that
that got delayed was because when
the original proposal for the fencing came up it was
delayed because there were some
people who felt like that the fencing that was going to be
built was not appropriate
for a historical cemetery.
I think that's right but I don't think that there's anybody
in this room that has the
institutional memory right now.
I don't think I have that memory either but we did have a
pretty lengthy discussion.
I think the discussion we had was how much money was in the
bond package and was left
and what the cost of that fencing was going to be for both
the cemeteries and I think
that's the mayor's corrective going back and saying well
let's make up the difference with
the funds out of the general fund and the council approved
a budget amendment to take
$375,000 I believe out of the general fund matching that
with the other project dollars
that we have for the bond program to complete the entire
project.
So we have all those details and we can certainly bring
that back to you and or send that to
you in informal staff reports so you can see all the
components of in the history of that
issue.
And also to wrap into it also not only I00F but Oakwood.
Yes sir that's correct.
So we'll do that I'll get that to you.
And so the recommendation here is just we found that we had
some unspent money in the
2005 bond program for I00F and we're taking that restricted
funding and we're using that
to do what we're doing and that is to do fencing and
monument repair to both I00F and Oakwood
therefore not having to pull that money out of the general
fund.
It's simply it's exchanging the monies out of the 916 fund
which is the park development
fund with general fund dollars.
Sure that's the only purpose of bringing this up is to let
you know that the general fund
is unrestricted and so we could use that to allocate it
somewhere else whereas before
if we didn't do this we're just going to take it from that
apply it to the cemeteries
and then we've got to figure out how to do that's right the
rest of the funding for the
development.
Okay.
Yes sir.
All right.
Who's on first second or third or you know.
So the other projects that were in the 2005 was the Clear
Creek Heritage that several
pieces of that project are underway they're in process and
then the last one was the way
finding signage that project actually started off as the
entry corridor improvements those
were subsequently not done and so then there was a
recommendation to move that funding
to this way finding signage and if you recall some of those
signs are already up in the
downtown area there's phases one two and three that were
approved and those are underway
so in process.
So in the 2012 bond program of course the majority of that
was 20 million dollars for
street reconstruction I just want to say that to date we've
completed about 123 street segments
of the 208 segments that were communicated that's about 35
lane miles out of the 60.8
miles that were there the other piece to a smaller extent
was up to 400,000 for public
art you you you're aware that the medallions at the North
Texas Boulevard Alpha 35 have
been completed the other project that was contemplated was
additional medallions on
Brinker Road and Loop 288 those are still not been done and
certainly the public art committee
will be having conversations about those particular pieces
and and what to recommend and bring
back for approval use of that those funds.
So the 2014 bond program again we had a large amount for
street reconstruction 52 street
segments have been completed representing about 19.38 lane
miles there's no no reallocation
or any shortage of funding in any of the 2012 street money
or the 2014 street money what
we've discussed with the bond oversight committee is that
we're going to complete as many segments
as we possibly can with the funds that we have in relation
to street reconstruction.
Councilmember Hussbett. Yeah thanks Tony. So 52 of 195 is
that completely separate from
128 of 208 is that right on that last slide? Yes sir. Yes
sir. Two separate numbers? Two
separate numbers. So it's what does that mean 195 and 208
fourish? Yeah. Okay thank you.
So the first project. Councilmember Briggs had a question.
I can wait till the end it's
about Ruedale. Oh okay. And just let me say that there's a
number of staff people here
that from from the the departments that can answer any
specific questions on on some of
these projects if I'm not able to communicate that. So the
transportation division facility
if you recall we've discussed with that particular facility
with you and relocating that facility
from what was originally contemplated to 651 Mayhill. We
originally came to you with a
proposal to utilize funding of 678 from the general fund
and also from some capital savings
and capital programs. What we are recommending now is to
utilize that particular initial
funding for some of the other projects that we have and
after this discussion we're going
to have discussion about solid waste and and also there's
some some excess CEOs that have
resulted in solid waste that we are now proposing to
utilize for this particular facility instead
of what we originally had come to the council and just
briefly talk to you about as far
as funding. So that's 678,000 that we would use in excess
solid waste CEOs. Bonnie Bray
phase four that particular project that has a revised
project cost now 13 million dollars.
There's a 3.5 million dollar gap in that funding. We are
proposing to allocate some of the savings
or some of the money that we had from the 2005 bomb program
from FF 1830 and US 377
2.1 million to this particular project. In addition the
other recommendation is to take
1.3 million dollars from Bonnie Bray phase six and
allocated reallocated to phase four
to get that project completed. Now what will happen is
phase six is now going to be underfunded
but what we'll have about four million dollars from that
was approved in the Geobomb program.
Our plan is to utilize those funds to design and do right
away acquisition for phase five
and phase six of Bonnie Bray to get that completed and then
either look for external funding
sources to get those two projects completed or to roll
those into a future bomb program
recommendation. Councilmember Gregory. We've answered the
question about how we plan to
deal with the shorting the money from phase six of Bonnie
Bray but how do we accommodate
or account for the shortage of funds from FM 1830 and US 37
7 projects? Again those projects
are fully funded they've been fully funded by the county
and or by the state. So the
money that we had designated from our bond election 2014 we
don't need for that project?
Correct we do not need those for those two projects correct
. Okay that was not clear
to me when I was going through this presentation and it was
sort of like I was getting very
concerned about taking money from this project and then
there's no money to do that project.
Mayor Pro Tem and then Councilmember Hesk. So for instance
with the FM 1830 and 377 improvements
if the money is no longer needed that means that we have an
overage or we have extra funds
of two million dollars is that an early repayment on the
bond or how is that money allocated
then the bond money? So the bonds that were issued from
that particular election are likely
still outstanding they're likely beyond their call date and
so the only thing that you can
do with those bonds you can either use them to pay down pay
down debt or to reallocate
them to another eligible project. Since the proposition in
which those dollars were approved
was for transportation projects again reallocating them now
to Bonnie Bray is an allowable use.
Okay so I guess I'm assuming that you have done the math
and you know the interest rate
on the 2005 bond projects or bond monies is favorable as
opposed to leveraging a new bond
or using 2014 monies. Yes ma'am and I think too again we've
been paying debt service on
these bonds for all these years as well and so I think at
this point utilizing was probably
the better approach. So when you say it's past the callable
time that means that we
can't repay it early? That's correct. When was the 2005
bond callable? They were callable
likely it was 20-year bonds probably 2015. Again if they
were issued in 2015 I'd have
to go back and determine exactly when that was issued. So
we're certain that none of
them can be none of that money can be used to repay any of
the bonds? I'm not a hundred
percent sure but so I can go back and double check that.
Okay. And I just wanted to weigh
in a little bit here our main mission with the bond program
as a whole has been trying
to follow through on as many of these promised programs as
we possibly can. I mean obviously
so many of these projects are years several years behind we
've got obviously some that
were 13 behind you're gonna be dealing with a question on V
ela later which is 13 years
later and the cost escalation has been significant. So what
you're seeing is several months worth
of work kind of reallocating savings and different dollars
to try to make projects whole that
really time and inflation have eaten away those bond
estimates from the 2014 and 2012
areas. So we're trying to get the bond packages whole as we
possibly can and get that delivered.
I think the major lesson learned moving forward is to try
to get as many of these plans on
the shelf especially for the larger projects before you go
to the bond committee that way
you don't lose that year or two of just engineering time
that sort of thing. But right now we
are many millions short on the on those two bond projects
because time and things just
flat not getting implemented. So we're trying to save as
many of these projects and make
them whole as we can. Councilmember Patsbeth. Thank you sir
. First
is a request Tony could I get a some sort of one pager that
captures the phased projects
if you will and kind of where we are. So for example using
your example Bonnie Bray six
phases four are done and so if I can have that on one sheet
and then like for example
the drainage where we're working on that downtown is kind
of here's a phase here's where we
are so I just have all that in one sheet that would be
helpful me to kind of track and flow
with if you'd be so kind and then my question is and I don
't know if it's specific for you
but generally the question is what is the duty kind of when
you have a voter approved
bond what what is the duty to fulfill that vote request how
does that work.
Generally there'll be language in there that the projects
that the projects that are voted
for will receive the funding and typically there's a there
's some language at the end
that should shortfalls occur should something else happen
that the money will still be spent
on getting as many of these things done as possible but by
no means are you promising
that everything will be delivered and there is the ability
to move dollars around as priorities
change but these main staple projects you know is really
what we're trying to safeguard
as much as possible and that's and keep the integrity there
and that would be Mayhill
for sure there's a lot more wiggle room with the local
street segments the 403 we're not
taking that as an excuse though not to get those done so we
're trying Todd's got a plan
in place right now to try to at least double or triple our
output over the next couple
years and get those local street segments largely done so
that's really what's driving
our approach is trying to come through and do what we said
we were going to do back then.
Okay thank you.
So which Bonnie Bray phase is it the one that is kind of
encroaches on the neighborhood
and buys those single family homes and goes near razor
ranch.
Let me ask the city engineer.
So the very northern end of phase four and most all of
phase five up to about the last
thousand feet of it is right on the borderline of the
neighborhood right around McKenna Park.
Okay and so that phase that will be funded with phase four
will be funded with this.
Phase four is intended to include the intersection of
scripture and Bonnie Bray and we go just
beyond that so right to the edge of McKenna Park with that
particular project that's part
of the increase in cost is the original limit came right to
scripture.
We're trying to get past the intersection so that you don't
end up with just half an
intersection built and then we're gonna left with another
half so we expanded the limits
to be a little bit more inclusive of a complete project.
Thank you.
Member Hudspeth asked a question that was really had to do
with accountability and obligations
regarding these bonds.
Part of that seems to be the responsibility of the
oversight committees and one of the
things I couldn't find in the backup was when we see these
recommendations from the oversight
committee I don't know who's on it and I don't know if it's
the 2014 oversight committee
or the 2012 committee or the 2005 committee or if it's a
combination of those folks and
I'd like to get that information for sure.
I'd also like to find out if we have any sort of regular
like a quarterly meeting of these
oversight committees mostly the practice has been to use
folks that were part of the citizens
bond committee that recommended those because they're
familiar with the projects and familiar
with the decision making to be part of the oversight
committee so I'm curious about that
and if they have quarterly meetings or biannual meetings to
and by biannual I don't know if
I'm using the right word I mean twice a year meetings to
keep up with what's going on and
to make recommendations so if you all could get that
information back to us.
I can certainly answer at least the bond committee that's
been weighing in lately has been 2014
and there are some of those members that were on both the
2012 and 2014 committees and they've
been very helpful actually in bouncing some ideas off
particularly as it related to the
parks projects so that's definitely the way we move forward
.
I will tell you that my understanding is that we've been
meeting annually my first meeting
was about three weeks after I started last year and they
were not happy with the progress
Tony and his staff and our new city engineer and really all
of our directors at FCIP projects
began an initiative late last summer pulling all the
budgets off the engineering books
that the CIP was heavily decentralized and the finances
Tony now oversees all those funds
and is accounting for all those funds and we meet on a
monthly basis making sure for
progress status updates we have also just recently spoken
with the oversight committee
about getting them together on a quarterly basis to get
their input a little bit more
regularly but there really wasn't an opportunity to do that
until we actually could discuss
their own data so I will give him give Tony and our team
just huge credit for being able
to put this in an organized fashion we know where we stand
now we're trying to make the
best with what we've got left.
And Councilmember will say Miss McGarry if you'll permit me
that committee is made up
of individuals that were on the blue ribbon 50 member
committee it was the the chair and
then the co-chairs of the subcommittees that comprise the
bond oversight committee.
Well I think that's actually a really good point in terms
of you know the oversight and
accountability aspect I have a question for legal I'm
assuming that the blue ribbon
committee and then the oversight committee were created by
an ordinance of some kind
or resolution.
Most likely resolution.
And I guess I'd like to see the resolution just to see if
perhaps they could be modified
because I think you can build some things in there that
just automatically require quarterly
meetings for instance that way you're not reliant on you
know particularly go get her
chair to drive the oversight function of the committee not
that there that couldn't happen
but I don't have a lot of confidence in it given the
history so perhaps we could just
build that into the resolution.
So the next project down here I've just touched briefly on
that a little bit which is phase
six again we're playing we're requesting to reallocate
about 1.4 million from that project
to body for body brave phase four to get that project
completed and then the plan would
be that the remaining funds about 4.7 that would be
utilized for design of phase five
and phase six and also to acquire as much right away as
possible with those funds have
that have those two projects ready to go for the next bond
over for the next bond committee.
So the next project is the more Street expansion project.
This is if you're familiar with this project this project
is right next to Sally beauty
and also the Denton Central Appraisal District that project
has a revised estimate of 3.15
million we are recommending to take 250,000 of that money
that was for us 377 and reallocate
to this project to get this project completed.
That's my Ryan.
Thank you mayor when you talk about purchasing the right of
ways especially in phase six
we already own most of that and if we do will are we
because it's in a different department.
I know anytime we want to sell parkland we have to put that
on a bottom or put that on
an election is that something that will have to be done if
we're using any North Lake Park
property if we if we need to yes that would be the pathway
I think where Tony is going
with that is we're doing two things with phase six one we
're looking to expand the limits
of that project all the way to 77 there's some funding
opportunities we're exploring
right now that would make that a reality but it's in the
very early stages of trying to
figure out if that's even something we can do when we say
right away a lot of times what
we're actually meaning is property acquisition which could
be a lot of things it could be
easements needed for sidewalks pedestrians it could be
temporary construction easements
it's just a generic term sometimes that we use when it's
not just right away it's also
all real properties that would be involved in the project.
And I guess the second half of my question is if we need to
use any of the parkland will
that need to go for an elect and go to an election from the
voters since we're changing
from one department to another.
As I understand it because it would be a parkland
conversion that would be the pathway forward
but our intent would be to try to avoid that as much as
possible.
So the next project and Mr. Briggs I know you have a
question on this project we have
a new estimate for this project seven million dollars there
's a one point three million
dollars shortfall the proposal here is to utilize you know
371,000 from those from that
US 377 project and there's some additional CIP dollars from
water and wastewater that
are already included in the 1718 adopted CIP that are there
to complete this particular
project.
And so it says extension but it's the realignment correct.
Yes ma'am.
And so I recall I guess a year or so ago when we were
talking about realignment we were
also talking about the service area there in the trucks and
there was going to be a
change there which was kind of brought to us as a deal like
we need to do this because
of this and I know that we're not going to do the same the
same thing at the service
area and so I remember in our conversation the mayor
mentioned well do we even need to
do this realignment now and I guess that's my first
question and the second one is to
have we reached out to that neighborhood and had any kind
of neighborhood meetings there
with the homeowners that are going to be directly affected
with the pertain being closed off.
Let me ask the city engineer come here.
Anthony you're running away from the podium.
So the short answer to the public involvement piece is no
we have not yet but the plans
are so early in our development as we went through the
process of trying to bring projects
back into either the right size of the original scope one
of the things we looked at was a
project like Riddell where there are several things trying
to be accomplished all at one
time.
So Riddell does need to be realigned with the current Ridd
ell for a lot of reasons there's
the future expansion of TWA there's development in the area
it also would make a safer crossing
because we would remove a couple of the railroad crossings
that are potential hazards to safety
and condense them into one.
We would also get a better alignment of just the roadway in
general you right now you have
two offset intersections and by bringing them together you
reduce the number of potential
accidents collisions for even pedestrians and cyclists in
that area is that corridor
continues to expand along Mingo.
So bringing it into one spot has a lot of advantages one of
the things that was originally
proposed was that would be a four lane roadway through
there that's still the long term
goal what we've reduced the scope to now is that we've
built two lanes of the four lanes
with a median in the middle so that you could add in the
other two lanes somewhere down the
road when the traffic volume is really warranted.
Does that answer your question?
Yeah it did and I asked earlier for a map so that I could
see and I was sent but it
looks like it would be really difficult for all those homes
in the development over there
in that area to get easily to their homes and so I just
wanted to bring that up now
in the initial discussions.
So part of the path forward when we're delivering the
project would be to engage the public
and where the current alignment proposed would be once we
've ironed out some of the other
details we need to get to roughly a 20% or 30% stage on the
design address the public
show them what we're looking at and get some feedback on
those types of issues.
The majority of the original scope of the project had more
to do with like you said
where the service center was located how we provide
connectivity and the future traffic
management center would have also been in that area and
tying all that in and not allowing
so much of the city work crew traffic and the potential
support of that going through
the neighborhood to get to that center and come right off
of Roudel to get there.
So as the need for that traffic management center has
shifted to another location the
need for that building has gone away and the access there
has also gone away.
So we would certainly address those issues with the public
as they came up but it does
have impacts to the overall capability to deliver the
project with the amount of money
we have available today.
Okay thank you.
Councilmember Gregory.
My guess is if we did the Roudel extension.
Yes sir.
Across the train tracks that we could build that in a way
that it would be a quiet zone.
That's the intent as we build it today would be building it
as a quiet zone.
And then if we did away with the pertain or and another
crossing that that would eliminate
the need for the train conductor or the train engineer or
whoever lays on the horn to be
doing that and there was a guy the other night that just he
was just on it constantly.
I thought he must be going as slow as possible to get
through that intersection because it
felt like it went on for five minutes.
Yes the current project takes into account a full automated
cryotone which means that
we would have the crossing arms come down and wouldn't need
the wayside horns that
you hear in downtown which are quieter than the train but
it would eliminate that need.
Thanks.
Well I mean I think I want a little bit more detail on this
because this this project was
originally meant to accomplish primarily one goal and that
was to get people in and out
of the service center in different locations and driving
down through I think it was Texas
Street one of those streets not Texas Street on the
backside.
And so I really want to have a little bit more detail on
this one because we've basically
changed the whole need and you've identified some but I'd
still like to see more formal
presentation as far as quiet zones.
We've been talking about quiet zones for years and for some
reason those have escaped us
we haven't had that many quiet zones so I just want to see
because if this is really
a total revision of this project and what it's supposed to
do I want to look at it and
say is this one we still want to do at this time or do we
is this money better allocated
or do we just put it in another bond.
I just want to see the timing of it because the scope of it
and the rationale for it has
totally changed and I just would like to see the detail on
that.
Absolutely.
Yep okay thank you.
Yes Councilmember Hussbett.
I'm going to piggyback that but I'd ask for a phased
approach so everything or just to
make that curve less deadly and add some barriers to keep
you know because right now it just
drops off when you go in this.
So I'd like maybe during that presentation I'll just give
you a heads up I'd like to
see something that just makes it look normal and then
versus just leaving it as is and
then something that does everything if you will.
We can absolutely bring the project back.
We have not gone away from that specific concern exactly.
If we're going to cross the railroad tracks we're going to
make sure it's an easily traversable
it's a safely traversable crossing.
Today yes you have a very steep vertical alignment so it's
real steep coming up and real steep
coming down which is the way a lot of these crossings have
been addressed throughout the
state on what used to be a very small two lane road that
really had very little traffic
so the intent of the design even revised is to make sure
that city service crews can get
in and out of the service center quickly more effectively
safely but so does the rest of
the motoring public in and around that area knowing that
there's some expansion some other
facilities in that area.
Great.
Thank you.
So that kind of concluded the transportation related
projects.
Can I ask one question on that?
Because by the numbers you know people are looking at 403
segments total of 180 segments
done so far.
So obviously we've got sort of a conundrum here of okay
what is the latest?
Are we where our bond programs a little over robust?
Did we not staff up enough?
Are we not hiring enough contractors?
You know there's going to be and we don't have to go into
all of it.
I'd like to get some kind of information on what your
analysis is of where we are, how
are we going to make it up, how did we get to this place
because some of it's just you
know you got a hundred four hundred something segments
between 2012 and now you've got eight
what is that six years.
I know they extend a little bit more from the 2014 but I
think the public is going to
want some explanation of okay help me understand how this
happens and sometimes our cost maybe
our estimates in the beginning weren't that great.
Of course we've hit a time when construction costs have
been increasing quite rapidly.
Nobody can time that or determine that.
You can give some explanation now if you want I don't
necessarily mean to prolong it it's
just I think those questions eventually are going to have
to be answered or some data
provided on that.
Absolutely and we can do that in an expanded setting.
The short answer is we've tried to do a lot of things in
house to save a good bit of money
but the reality is is that we lose some opportunity costs
when it comes to that our crews are
both trying to construct new roadways as well as maintain
existing roadways and there's
just a lot of dominoes that have to fall to keep moving
forward and effect in an efficient
manner.
So what we're putting in place now is what you see a lot of
communities going to which
is I'm bundle a lot of projects together a lot of these
road segments together put them
in one construction set and bid those out.
So we'll do some in house help offset some of that cost and
then put some out on the streets
to allow a contractor to take it forward faster and a
little bit more effectively in can just
because they're focused.
They can stay focused on the job that's the job they're
working on and they move on because
the alternative is we staff up.
Yes city staff you say well instead of going out and hiring
a contractor crew we got see
170 about 230 something segments still left to go.
So we have to decide is it better to contract this out can
it get done faster do we just
go ahead and hire dedicated staff our street reconstruction
or bond construction division
to go out and do that.
Have we done that analysis on the difference between that
approach and then this bundling
that you're talking about.
We have not done that in depth.
Okay.
That is something that as we bring out a new deputy
director who will be over that streets
and drainage department that's one of the things they're
going to be looking at is what's
the right size department.
We can staff up for the next two or three years of
construction but how much longer
does construction go on.
Is it maintainable indefinitely and there is a point at
which we have so much materials
and manpower on staff that we don't get the same value out
of that and we're maintaining
a fleet of vehicles that diminish quicker than what we can
get.
And that's a good and that's a good response and so that's
all part of that analysis that
cost benefit analysis.
Because I know we we did hire specifically I remember the
presentation where there was
a an entire sewer water and sewer crew replacement crew
hired because we were getting behind
on the street segments because we couldn't get the
utilities done.
Yes.
I mean you're not going to tear a street up just to tear it
up again to put the utility.
So we hired a whole new crew to begin to replace sewer
lines if I remember correctly.
And so it's more along that same approach.
Absolutely.
Okay.
I appreciate that.
And I'm looking forward to seeing more detail greater
detail coming.
Thank you.
So the next project we want to talk with you about today is
Fire Station 3.
You may recall that we had previously come to the council
and reallocate some monies
from this particular project to complete Fire Station 4 and
also the burn tower.
Those projects are ongoing.
The burn tower I believe is actually complete.
And so we had previously talked to the council as part of
the budget process that we redeemed
about one point two million dollars in additional CEOs to
complete that project based on the
engineering estimates at that time.
There was a number of discussions with the council
regarding the design of Fire Station
3.
I think all that has finally been the council's finally
given staff direction based on the
most current engineer's estimate we believe that that
amount needs to be about one point
six million and not one point two.
So we do plan to go to the audit finance committee on April
10 to discuss the next bond sale.
And so the proposal here would be to again issue those CEOs
one point six million for
Fire Station 3 to get that project completed.
So the one point two seven five estimate was provided when?
I think it was late last year Mayor.
Late in 2017?
Yes.
Okay.
So we're three months into 2018.
It may have been earlier than that.
And we were still at the schematic design phase.
So as they continue to get the construction documents ready
to go they're going to by
definition have better pricing estimates for you as well.
So I would like this is going to sound really odd.
This comes from my investment days.
On some of these shortfalls, I mean we've got a we've got a
fund balance.
We're paying three or four percent.
I don't know what kind of interest rates we're paying.
But on some of these we need to make some decisions on do
we need to maybe cash fund
some of the shortfalls.
And that's a financial analysis based upon our policy for
our fund balance based upon
what the current rates are because I know rates have gone
up.
I mean they've probably gone up 25 to 50 basis points in
the last two or three months at
least.
And I'm sure that for our fund balances we're getting
probably next to nothing and they're
not there to achieve a rate of return.
They're there more for safety and insurance.
So I understand that.
So I hope that that's part of the equation at some point
like we did.
I mean you can't do large projects of two or three or four
million dollars.
I understand that.
But I do know we have had some budget amendments here
recently where we've had additional savings
in the last budget cycle where we've done two or three
million dollars worth of signal
improvements or we've we've done some other items such as
that.
So I just want to make sure we're looking at comprehensive
ly because this is a this
is first of all great information.
Good presentation really giving us a real clear picture of
the landscape on the bond
program which will allow us to move forward with a little
bit more clarity and certainty.
But I think that given that combined with some of the
budgetary savings we're having
I mean I think if we'd have known this back then there
might have been some different
allocations of funding for for that.
So if some of those projects still have not been done that
we made some budget amendments
for I think it's worth taking a look at to see what's the
highest what is the highest
priority.
So more of a comprehensive approach to sort of our
financial management with some of those
I don't want to say excessive excess funds but sort of
funds that were due because of
savings on expenses and increased revenue.
What was just inside budget.
I'm always accusing him of hiding money from us.
But the but we're exactly taking that approach.
In fact the you know the quick win street projects the Vela
Park you know there was
about three million dollars that we added it suggested that
we use fund balance to pay
for those will be taking exactly that same approach over
the summers we're putting together
our budget for you and refining our estimates.
So we're completely on board that if there's one time shots
of money in particular that
they should be going to help offset these bond projects.
Okay.
So Mayor Pro Tem had a question.
Well I just want to second what you said about when we were
presented with options for instance
for I don't know if it was fire station three or four when
we actually kind of went into
the details of the project.
I certainly didn't have any understanding that the project
would go four hundred thousand
dollars over what the recommendations for the various
elements were.
So I guess for the audit finance committee meeting on the
10th if the idea is that you're
just going to bring forth a four hundred thousand dollar
overage on fire station three and six
hundred thousand dollars shortfall for the firing range and
we're just supposed to say
okay we'll send it to council and see if they'll find some
money for it.
I don't think that's sufficient.
I mean I think you have to also bring us options for
cutting the shortfall with really good
details for how that could happen and not necessarily from
getting general fund revenues
but how does this project change because now we don't have
the money.
Because I'm sorry you can't just add five hundred thousand
dollars to every project.
It's not a fiscally prudent way to operate.
I know all of these items are important but that's just you
just can't add five hundred
thousand dollars every six months to every project.
It's not a thing.
We will definitely do that and I guess one other change
kind of in philosophy I want
to mention to council is we're working our way through
these projects is you're also
going to see more projects brought before you to where we
see building projects heading
our way to do to fund the preliminary and up through
construction design to where we're
ready to put something on the street to give you even
better project estimates.
You're going to see that approach coming forward most
likely on station eight as we're
planning for that and we've got a couple of other projects
that you just authorized
us to head down that path with 651 Mayhill and the service
center as well.
So we see that and the better that we the further along we
can get construction drawings
the better budgets we can give you.
Yes mayor council member Hussman.
Thank you.
One question is what is what is the time frame so you've
like laid out a number of projects.
Have you attributed a timeline to these.
What are your thoughts on how.
So we vote yes.
What's the timeline to achieve all that you've laid out.
Well I think I think what we've talked about with the bond
oversight committee is that
our goal is for for the majority if not all these projects
to get them completed or at
least substantially completed within that six year window
that we had communicated to the
to the council and to to the bond committee.
So if I may so you the the numbers you're giving hold for
six years you for it for example
in a perfect world I'm not holding you to unforeseen
instances but so this maneuvering
says we're good for the next six years.
Well we have three years left in that program and so so the
goal will be again to get most
these projects substantially completed within the next
three years.
He's not going to make that guarantee to you.
You know on the and I'll answer your question two phases I
think on the on the capital projects
involving drainage roads that sort of thing Todd staff has
built in inflationary estimates
to try to get you as solid with the budget as possible on
the building costs firing ranges
that sort of thing.
It's all going to depend on those costs right now are
jumping all over the place it's better
for us to get into construction drawings get the most
recent per square foot costs of what
was happening and not delay those projects every time we're
if we were starting to experience
out in the market the the time delay with these these
projects can add up to several
hundred thousand or millions of dollars so road drainage
water sewer projects we feel
pretty comfortable with the revised estimates the building
projects we can't make that commitment
to you until we get those until we see what the market says
.
Okay and then so my follow up to that last point is the
help me understand if you know
the scope of work for the range in my understanding that
there are other not municipalities but
law enforcement agencies that utilize that range am I wrong
I mean I've slept since
I've been out there but no you are right.
I believe there's other agencies that utilize that facility
are they contributing to the
cost or I mean I don't know how that I mean I don't know
what the agreement is but that
seems like a big number to me so I'd like to understand
what's going into it because
I know the federal government put that that kind of that
covered area out there if I'm
thinking about the right place and and and so I'm wondering
what goes into six hundred
thousand dollars.
Let me ask Chief White to come up here.
Okay thank you.
The building you're talking about was the cover was
actually put out by I think the
Citizens Police Academy and the 100 club.
Okay yes.
So there are other agencies that use it they do contribute
financially to an extent probably
not a lot.
A lot of this a lot of the costs are to the building so
there was some proper there are
properties being donated that has kind of held us this this
project up.
We're waiting on all that property get donated it's from
the razors and it borders Western
Boulevard will increase our footprint will allow us to move
our building out of the flood
plane.
As good as this property is for for our range it is
substantially inhibited by the flood
plane so in the past the buildings we've had because of
that have been portable buildings
so there's going to have to be a quite a bit of buildup if
we stayed inside our normal
footprint by we are hoping by getting this extra property
that it will allow us to move
that a little bit to the east and ever so incrementally
getting you know more out of
the flood plane.
Okay and then the gate is that there was an did they redo
the gate there.
We've done a lot of work already we've done we've done the
the berm has been heightened
there's been drainage improvement to the whole range the
the gate along Airport Road is finished.
We anticipate that we're still going to use that gate even
if we move the building out
along Western we've we've had some discussions with with
planning with trying to look at
different designs and how can we maximize our potential for
parking using that that
existing gate that we already have so there's been quite a
bit of work done already the
main the main hold up now is the building itself and the
building itself along with
fencing along Western that will increase our security of
the overall property.
Okay and then lastly I guess my I don't know the answer to
this because I know there's
a there's obviously a sensitivity to who goes out there but
if there's any avenues to recoup
some of that money if it's I don't know if there's if there
's an enhancement where we
go $100,000 further but it allows us to collect rents or do
something like that I'd like to
know what those are just before you know if if it's
manageable and it then increases revenue
back to us.
Well I know there is some revenue that comes in and I know
like the DEA is also DEA or
that they've been property you know mowers some some
machinery that we've used out there
so they have target systems so they have contributed but it
's still primarily our facilities.
Thank you.
So my question is about the Magnolia Street drainage you
may have gone over that but I
think I was in the back so I know that that we approved
something not too long ago council
did regarding the drainage project and I thought that was
currently going on I know that that's
really significant for the Hinkle to get redone and that
has to be done first or in connection
with so if this revision or the shortfall is that going to
affect when Hinkle can be
redone?
Is that going to delay the project?
The short answer is no it won't delay the project it's
still moving as quickly as we
can it the biggest issue is just wrapping up the very last
little tidbits of what we
need to have in the way of I believe it's temporary
construction easement so that we
can just start moving and then of course getting it into
the schedule for our crews.
Okay thank you.
Yes ma'am.
I've got a question on Hinkle Drive drainage real quick.
Refresh my memory what is that?
Hinkle Drive drainage?
Yes.
So there was a missing component of drainage council
recently saw a property acquisition
piece that had to be acquired that was the last piece we
needed to go to construction
this is a drainage piece just north of Hinkle Drive goes
under Elm that in the area where
Hinkle and Bonnie Bray flooded significantly in the I think
it was the 07-08 floods this
was a project that came out of that this is the last piece
that connects all that and
takes it underground.
So help me understand it says the shortfall of $180,000 is
already included in the street
improvement fund this is drainage why are we I know for
street improvement fund was
a fund created to bulk up our street maintenance.
Yes.
So why are we taking money out of I never understood that
the street improvement fund
also was for quote-unquote drainage projects.
That's not but there's a street portion to this project and
part of what happened is
as we're going under Eagle and putting in this new culvert
this box over it that goes
under the roadway run a significant piece of that last
little bit of Eagle that has
not been redone.
So streets is going to do that in conjunction with the
drainage piece so it could have been
worded better it's $180,000 that goes to $180,000 worth of
streets improvement.
Got you okay all right so there's so the drainage component
is is already funded somewhere else.
Yes.
Okay perfect thank you very much I appreciate that.
Okay so not to go backwards but so for the police fire
range the recommendation is to
utilize general fund resources you know mayor one of the
questions you brought up was you
know we ended fiscal year 1617 with about 3.6 million
dollars you know to the good in
the general fund we did come to you with a proposal for
some traffic improvements and
also part of that proposal at the time was $575,000 that
went to Vela and so there was
some additional capacity there that came from 1617 this 620
,000 is proposed to come out
of the general fund from that you know surplus of revenue
that we had in 1617.
So okay so let me make sure I'm clear on what you just said
so you came back with a staff
amendment because of some revenue over expenses in 1617
over the budget and that was 3.
At the time it was about 3 million dollars.
And we created a budget amendment to allocate all of that.
Yes correct.
So what I'm hearing you say is that now that all the books
are getting finalized and things
are settling the dust is settling that now there's an
additional however much money that
we're taking out of so it's really an increase of 3.6
million or something like that.
That's correct.
Revenue over expenses for 1617.
Correct.
Okay all right okay.
And just based on if I could based on the both yours and
mayor pro tem's questions mayor
we will bring back potential value engineering options on
station three and fire range if
you want to allocate that 620,000 dollars differently or
not at all.
We'll bring that back to finance and audit for you to have
that discussion.
Okay.
Yes mayor pro tem.
So I'm guessing that for the firing range we need to make
to have some type of direction
today or no is that going to go to audit finance as well?
Well the planned issuance was going to go to the audit
finance committee on the 10th
for the CEOs.
Well here's where I'm kind of having some pause because if
there's a 620,000 dollar
shortfall so the project doubled in price I don't know what
the time period was for
the doubling but when is the project going to start if
there's an additional 620,000
dollars allocated and then are we going to be I won't be
here thank goodness but is
the next council going to be here and they're going to have
500,000 dollars of additional
expenses added on in six months to this project so it
becomes a 1.7 million dollar project.
So I mean I need to know when these projects are going to
actually start before we're
allocating money for them.
We'll get that for you.
Station three is a little easier we're in design for that
right now and should be on
the street I would say in the next month or two.
So we'll have something to the council this summer on
station three.
Firing range can't be that specific we will get that for
you.
It sounds like maybe there's a property issue so perhaps I
don't know if the time is right
for the modification is what I'm saying.
No you're bringing up a very good point and we'll get you
some information I will also
ask chief you know to get us a little bit more information
if there's a place if there's
options to scale back to have that conversation with you
but your points a good one that the
longer this goes on the more the price rises so we'll have
that discussion with you.
So the next couple projects and we've already talked a
little bit about both the downtown
drainage projects what we're calling the downtown drainage
projects that are made up of the
Hickory Street and the South Bell projects that were
included in the 2014 bomb program
with this commingling or not commingling but this aggreg
ating or bundling of projects we've
now added also Oak Street drainage project to that and so
the combined shortfall for
those three projects is 470,000 for the Magnolia project we
've already spoke a little bit about
that that shortfall and so combined a little bit over 2
million dollars we're proposing
to utilize funds that have aggregated or accumulated in
what we call the channel rehab funds and
so those channel rehab funds are associated with the
drainage fee that is that's part
of the wastewater bill bills to to our customers throughout
the city that was implemented that
drainage fee was implemented back in 2002 there's been no
changes to that drainage
fee that drainage fee was intended to cover O&M expenses of
both the drainage operation
and also the watershed in addition to the O&M expenses
there was also debt service expenses
from from previous CEOs and also then revenue bonds that
have been sold both of those are
nearing the the maturity date and so we have almost
completed payoff on on that debt that
has contributed to some of the additional pro funds that
are going into this channel
rehab in addition some of the watershed functions you know
the largest one that I can think
of is the mosquito abatement program that is now covered by
the general fund so the
revenues from the drainage fee are not covering those
expenses that again have added to monies
that were transferring to channel rehab those channel rehab
dollars that are going into
the CIP program have been utilized to revenue fund some
channel rehab or drainage projects
currently we have about four million dollars that has that
has accumulated in that particular
account and we're proposing to utilize two million from
that particular account to get
these projects these drainage projects fully funded.
Councilmember Gregory.
This may have already been addressed by Councilmember Greg
's question but on the Magnolia Street
drainage that's a significant shortfall for a project that
was done in 2014.
Is there an explanation for why why it's so so much
different from what anticipated.
So a good bit of that reasoning is just the length of time
it's taken actually get here
and the original budgeting.
Locally we are seeing in the Dallas Fort Worth area
construction inflation is accruing at
roughly 1% per month compounded so if you put that over a
year we're seeing a growth
in rate or in the cost of any construction project from
almost 13%.
If you bring that back to what the original cost was plus
there was a an oversight on
the original budgeting in that we didn't take into account
all project costs on each project
which includes design fees right away any staff times is
tied to it so you didn't get
an accurate picture of the overall project cost that's been
corrected over the last nine
months and every budget that you see from a capital
improvement side in regards to streets
and drainage has taken that into account.
So you're saying that that the 2014 bond program there was
no anticipation of inflation in
construction cost.
No but not that I've seen but that's not an uncommon
picture for a lot of cities to
have been in in the past.
I've not seen many cities that have until over the last
five or six years really started
taking into account construction inflation.
Some of that is just potentially not having the knowledge
to base that on capital projects
some of it is just construction inflation in the past was
not near to the extent what
it is now especially locally.
Nationally the construction inflation rates sitting around
four and a half percent.
So here is annually.
Yes sir.
Okay.
And here we just have so much construction going on in the
Metroplex we have almost an
artificial bubble that's been created here in the area the
market's just a little bit
different.
Thank you.
Yes sir.
One question you've talked about using money from the
drainage fund to make up for capital
project shortfalls.
Is that was that my understanding and I understand about
that the drainage fee was originally
implemented to cover O&M and some pre-existing debt.
I think we need to revisit the drainage fee.
That wasn't very popular back then and so I know that it
was not anticipated that it
would be used for capital programs for capital funding and
if we're getting to the point
we're paying off debt and things such as that this reminds
me when we almost wanted to put
a street improvement fee onto the utility bill.
That was brought I guess it was before your time.
So I just need a better understanding of I mean I know we
're doing it we can do it but
that wasn't the original intent of that funding and I'm not
trying to be picky or sort of
hard-headed it's just I think the cleaner we keep things
the better off number one I'll
understand it and better off I think the public will
understand it and so if there's some
things we need to clean up as far as procedures or fees or
you know the purpose of those fees
we need to have the conversation.
So you're saying we're going to take $470,000 out of the
street drainage fund drainage fee
fund to make up that shortfall.
Plus an additional 1.7 that will go to Magnolia Street.
Right.
Oh out of the street drainage fund.
No the 1.7 is also coming from the drainage channel rehab
account.
But that's not associated with the drainage fee that's
collected on the utility.
Yeah gotcha okay because I'm talking about the part that's
coming from unless I misunderstood
that there's some monies coming from the drainage fee
account that's assessed on a utility bill
every month.
The amount that's going to come from that for both of these
projects it's a little bit over
two million dollars.
Okay yeah I mean okay that seems way out of the scope of
what that was originally intended
for my understanding.
So if we could have a little bit more detail on that I mean
to see I mean if we're going
to use that if we're going to use that for this then we
need to definitely have a conversation
because if we've got two million dollars saved up in a fund
balance it is just a monthly
fee that is used to cover O&M.
That needs to we need to think about how do we reduce rates
potentially and that with
that fee as well.
So just would like to have a more comprehensive discussion
about that.
Yeah and I would I guess I would sort of I don't know if
temper is the right word but
one of the things that we're working on right now with the
streets drainage just our overall
approach is making sure that we're putting plans in place
for measuring those plans on
annual basis.
The organization and the formality of you know managing
these plans is a huge priority
for us at this point and one of the one of the positions
that Todd is recently hiring
his assistant director will be specifically putting in
place those types of plans to make
sure that as the dollars are coming in there if they're
flowing out for those exact projects
if there's an opportunity to reduce fees like we're doing
in solid waste or rethink philosophies
will bring into but right now there is there is a shortage
of drainage and I'm sorry a
shortage of data for you on those types of things we can
certainly talk to you philosophically
I think we need a little bit of time to put these plans in
place and we're continuing
to sort of assess what should have been done what hasn't
been done and where do we need
to alter the way that we're doing business.
And I can appreciate that so I guess the thrust of what I'm
saying is is that I understand
we have a shortfall I understand we got to find the revenue
to to to cover that shortfall
for me it's also a philosophical discussion of when we've
had the drainage fee that's
assessed if I'm wrong in my understanding of this I will
certainly stand down and be
corrected.
But my understanding of it was that it was never intended
to fund drainage capital projects
that it was intended to cover you know cleaning out of the
culverts those kinds of things
that are associated with O&M for drainage maintenance.
So that's so when you talk about plans and capital projects
to me capital projects and
drainage fee those were never meant to sort of go together
at least the original intent
of the drainage fee so I don't want the drainage fee to be
an assessment of a fee to fund
capital projects because that's that wasn't the intent of
it when it was originally so
it's nothing about what you're saying it's about revisiting
how that because y'all you
weren't here obviously that was many years ago but that was
really how it was presented
to the public and so that's I would I would like to
continue to have that conversation
as I personally don't want the drainage fee to be covering
capital program projects because
it's a different it's a utility bill it's not something
that is going to be paid for
by tax revenue you know tax supported bonds.
We had similar concerns voiced by the by the bond committee
as well and folks who remember
that that fee going into place I think that the challenge
has been is this a management
issue or is or is this you know where there's not been
plans put in place and allowing allowing
these funds to pull up or not but I think you're we totally
agree with you it's just
a matter of how we formalize this and how we put that plan
in place through the budget
process but in the meantime the discussion was we know Magn
olia's got to get done and
sure you know no understanding you're asking us for a
drainage type project yeah you're
asking us to make a modification to a policy decision right
and the intent of that policy
decision I'm saying I get that I appreciate that coming
forward I'm saying though in the
future that that is a policy decision of this council to
continue to determine if capital
projects are funded from the street drain from the drainage
fee that's collected on
the utility bill and I would want to have that discussion
before we have plans allocating
those funds for capital projects understood yep.
So the last project here and obviously there's other
projects in the in the Chia bomb program
that we're not presenting today but this is the Vela
complex project we do have a separate
presentation that we sent to you regarding three current
options that we have kind of
on the table what we've utilized here is the the high end
of that of those options it's
six million dollars we believe that that will complete what
was originally proposed for
this particular project there's a number of funding sources
that we've identified to get
this project fully funded so what we're proposing is that
about 1.9 million dollars is has already
been allocated to this project from a number of funding
sources we are recommending a budget
amendment of 1.5 million dollars to to to allocate interest
money and so this is where
where things get a little complex and so let me so bear
with me so we have the bonnie bray
project that was funded partially by rtr regional toll
revenue that money is earning interest
every month that interest has to be maintained unallocated
and then we must request permission
from through the cog to utilize those funds we have about 1
.5 million dollars currently
of unallocated interest on that rtr money that we would
propose to request the cog to
allow us to allocate that money to the bonnie bray project
we will then swap or do a switch
we had previously issued 8.5 million dollars in co's for
matching funds for bonnie bray
those dollars can be utilized on any traffic type or
transportation project what the proposal
would be is when we swap that money with co's we would then
in turn use the co money to
complete traffic projects that were brought forward to the
council as a budget amendment
to use general fund dollars that frees up the general fund
dollars that can then be
allocated to to the vela project again what we're doing
here is we're identifying dollars
that are restricted and swapping them out with unrestricted
dollars and so rtr money
can only be used on that bonnie bray project the co money
can be used on any transportation
project including those projects that came forward to you
we lovingly call them the freedom
projects right and so those are the quick win projects that
were funded with general
fund dollars that are unrestricted dollars to then reall
ocate those dollars to the vela
project so i know that that was kind of complex there's a
lot of things moving around so before
i go to the next piece if you have any questions on that we
have a couple questions council
breaks so my question we discussed this beforehand i was
not in favor of spending that much money
on i just couldn't wrap my head around a soccer complex
costing six million dollars but seeing
this it originally was voted on and approved for 1.3 by the
the citizens right for the
bond so i'm just kind of trying to figure out how it
increased by almost five million
dollars for a soccer complex well let me let me run away
again let me ask laura barons
to come up here and she can walk you through through that
project and the genesis of that
project and i understand the importance of it to our
community and i'm all in favor of
parks but this just seems really expensive so it's my
understanding in researching the
history of this this is going back to 2005 where the just
over a million dollars was
allocated for a athletic complex that was originally
proposed to be part of the ch collins
complex it was a three field athletic complex lighted and a
playground i believe structure
at some point it was determined that that site was unsuit
able because of the layout
where the complex was originally proposed to go was
actually part of either drainage
or easement to that property so then they began to explore
other sites other potential
sites the next site that was looked at had to do with the
purchase of about 20 acres
where the animal adoption center currently sits during that
time we actually went through
a formal process of design the design concepts were brought
to council in the community at
that time and they had some concerns with taking some of
the property from north lakes
that is designated as natural preserve area and turning
that into an athletic complex
so that particular site was then abandoned fast forward
then a couple more years and
now we are at the purchase of the site that we currently
have which was 26 acres purchased
from the razor development from the razor family in trying
to keep with as much of the
original concept and design from the 2005 bond package we
've pretty much retained the
same major facilities we've expanded to four fields instead
of three we now have a restroom
and concession stand facility we have the playground there
have been some pavilions
added but some of the additional first of all of course
everything that we've talked
about here today in terms of the timeline inflation of
costs that has all played a major
role there's also some indication that that original cost
estimate may have been low something
again that we're seeing with several of the projects that
we're discussing today about
the only really upgrade that I could say that would be
considered in this in addition to
going from three to four fields is going to be we are
recommending in the project and
what we have scoped out for this particular complex is the
addition of LED lighting we
feel that it's just it's it's not going to be physically
responsible to put in some
of the older styled lights that we have now when our goal
is to turn everything over to
LED so that's really one of the only upgrades again in
addition to the addition of one field
and so the land has already been purchased and is that
included in this or is that do
you know how much that was the land was purchased for a
million dollars and that was part of
the original funding this this was used for the purchase of
that land so the six million
will be on top of the one yes for land okay I have a
question about veila and then also
a question about the RTR swap so with veila can this be a
phased project or does it all
need to happen at one time yes and that's part of the
exhibit that you have in a presentation
that I can give I don't know if you wanted me to go ahead
and go into that now hang hang
on for just a second because let me let me figure out the
RTR swap and then so typically
I thought when RTR funds are allocated they're supposed to
you have a match in order to get
the RTR funds so did we have a match and is that match
changing by the general fund allocation
being moved so part of that match was going to come from
the 8.5 million CEOs that that
were issued I'm not sure what the exact match is on that
particular project okay I'm not
comfortable with the interest swap without knowing what the
RTR terms are the RTR money
is clean money and it's not easy to get is the thing so we
're not making any of these
moves that confirm is with both cog and the RTC that's a
conversation that's ongoing
as Tony had mentioned making sure that every we've got John
pollster working on this our
consultant with ITS so that we understand exactly what we
can and can't do and I believe
you've already gotten some commitment from cog in this
particular set of funding that
we can move on the 1.5 yes interest swap yes that's the
first I've heard of it I've been
sitting on the board for 20 months well okay so we're
assuming that whatever matching has
to happen will happen through the source through other CEO
funds is what you're saying we'll
get clarification on that status for you okay did you want
to on the Bella phasing did you
want I just wanted that because she brought that up did you
want to hear that now or do
you want to hear that later I mean I would like to know if
there's phasing on Villa because
I'm really not comfortable allocating any type of RTR funds
for parks to be honest like
most of the projects that are behind our parks projects I
know that's not the fault of anybody
here but if if we want to prioritize parks we should and we
should use general funds
and we can have a difficult discussion about you know do we
get a two million dollar fire
station or do we have better parks or do we have an
additional five hundred thousand on
the firing range those are that's why we're elected so I'm
okay with having that conversation
I'm not okay with taking RTR funds that I mean they're hard
fought funds I don't think
anybody understands how difficult it is to get money you
know that are that people are
competing for and I don't think it really sets a good
precedent either well and let
me clarify Mayor Pro Tem the recommendation here is to
allocate that interest money to
the Bonnie Bray project I understand that I totally get
that part I'm more concerned
about the matching portion of it because by allocating the
interest then we're going to
free up 1.5 or whatever and the allocated funds that we've
committed so that's that's
my concern the second concern is that a lot of our projects
that go through cog funding
are behind as you guys know again not really the faults of
anybody here but that impedes
our ability to get money for roads in the future as well so
I feel like you probably
just got triggered by the RTR fund transfer on a parks
project so okay and I'm gonna
let me record let me come back to the phasing because
council member Husbeth has a question
I think is it related to sort of this slide that's on the
screen generally yes okay okay
yeah because well it's a statement more than a question
okay I just I want to revisit ask
the council to revisit or at least state my position
clearly I'm not willing to support
anything until we have some regarding Vela until we come to
some kind of agreement on
those two piece of property that I want to sell you know I
just think we can't to this
point we can't continue to kick the can down the road and
hang on to this property for
to plant cherry blossoms you know that is a great it needs
great idea we've got to move
and so that's my point is I don't want to move forward with
conversations about shifting
I'm gonna I'm gonna vote no for everything until we have to
to Mayor Pro Tempest point
some tough discussions about what are we saving it for you
know we're saving it for what to
then borrow money from something else and pay interest on
it I mean to me it's we've
got to have that conversation or it at least it's a
holistic approach to that area what
do we want that to look like and that'll help me form my
opinion as to what I can stomach
because then it may eat some of that cost you're talking if
it if the number is truly
six million and if the initial budget was low balls and I
don't hold that against this
group right so I understand hey it looks like a huge gap
but let's say it's two million
dollars difference but the first the front end was was low
ball so whatever that is but
but I just need a complete picture before I can support
anything and we do we do have
a work session scheduled April the 10th April the 10th to
answer your question on the on
the property and then Laura's got a few options here for
you to to Mayor Pro Tempest question
about how does you know what options are there can it be ph
ased and what are the budget implications
so we could go a long way towards you know this my main
concern and urging of the council
is you know we've got we've got an ongoing bid that's on
this project finally so we give
you some certainty for a while for a little bit of time I'm
not sure how long that bids
good for but you know my main concern was not getting this
done and having the project
escalate yet again but I think we can address all of your
questions through her presentation
okay I tell you what we've been going for about two and a
half hours that's two hours
let's just take a break before we go into this presentation
for about five or ten minutes
and then we'll pick up at the presentation thank you uh
2018 at 227 so before you go
into the presentation I guess Councilmember Husspeth you
had indicated that before you
have some information on the sale of properties that you
didn't want to move forward on anything
or just this well I don't want to move forward on anything
but I do I am sensitive to the
city manager's point that I don't want to compound the
problem sure if we have a bit
so it depending on when that bid kind of I know the
presentation is pending in a couple
of weeks but if that bid terminates before if we need to
move faster I'll make a decision
okay my preference is that we have that conversation before
we move forward I guess my and I appreciate
that thank you for that clarification for me with just the
specific I mean I understand
all the other ones and I asked enough questions to have
some good clarity on what I need to
do on that at least to this point this is one it seems to
be a lot more complicated
there seems to be some outstanding questions of RTR funds
you know what can they be used
for swaps the history I mean we can go through this
presentation but I would like for this
particular project to come back in a standalone work
session with more with some written detail
on the history what was it originally because I heard that
we added restrooms pavilions
were those in the rich because this is quite an increase so
we can go through the phased
approach if we think we're going to make a decision on this
particular scenario today
and I guess I'd ask the city manager to weigh in on my
comment before we move forward if
the council like us to another week won't hurt we can
certainly put something together
that takes you through the iterations that this this
particular project's gone through
we've got budget options I believe there's six or eight
hundred thousand dollars spread
Laura is that right so obviously that additional dollars
those additional dollars we were talking
about can be dealt with on top of and we'll be back on the
10th to answer councilmember
HUD's question I think Mayor pro tem but Gary had also
asked the same thing about could
some of that parcel be sold off and those funds in theory
used to offset this project
so we can certainly come back with the with the iterations
of this give you some options
next week I don't think there's a financing issue it's
really more of a matter of where
the dollars are coming from we can we can fund any
iteration of this project that you
want but if you want to split together the history of it
and and make sure that you have
plenty of time to talk and about the the options we are
happy to be back here at week with
you councilmember during that presentation if we could have
an itemized list of each
thing and how much it cost instead of just pictures we've
got pictures would be good
but you know an itemized list to just for me I just want to
know I'm asking myself
originally 1.3 million was approved and going back in I
guess it's a total seven million
dollar project would they approve that today is is my
question I'm fine with another week
or two the the history that that was given to us I think
was a very accurate history
I haven't right but but but it but it really is reflective
of how the project has changed
over time the the I think we have already discussed and
answered our question about
about selling off part of that land around that area but we
can you know have that discussion
again if we need to my concern is this is a project that
has been on the books for a
long time and and we have now the the best iteration of
that project that we've ever
had and significant delays means significant cost increases
as we've seen and and so so
let's not delay this a significant period of time hopefully
we could get answers maybe
some answers to the RTR qualifications for body break maybe
we could also check and see
if there are any matching funds from the state for park
development that would go along with
the money that we've already spent to purchase the land to
be our match on that so if we
could do a little check into that also so with that did you
have a comment yes yes go
ahead yes please so I think I do fall in line with with the
week kind of to regather I would
add add a caveat if we could maybe it's I don't know who's
played it falls on economic
development whomever but if there's a marketing opportunity
so if there's an exclusive naming
whatever that is that ties to help fund it I'd like to know
what that would be what that
would look like I understand that it's named but there
there there's property around it
tons of it and if there's someone if it's if it's a con
cession stand that then is has
a business attributed to it if it's whatever that is I just
want to get outside the box
a bit and because then you'd have an exclusivity that so
there's a tournament in town and you
you're the sole concessions provider for that tournament
that has a number associated with
it and it may be a way to to can't kind of get some more
community by it okay yeah and
the request for writing wasn't and not believing your it's
having that historical record so
that I can sit down and look at it and go okay because I I
'm still trying to understand
when you say the citizens approved 1.3 million you're
saying that was in the 2014 bond program
is that what you're saying five two thousand five okay so
that was I mean that's yeah I
don't know the answer to that one obviously that it might
have covered it then but it's
not covering it now so you had a question I do have a
question because item B on the
consent agenda is for approval of all of these projects
that we have just seen and I have
issues with a few of them and questions and I don't know
about approving them all together
so my question is about that item and do we just talk about
the item when it comes up
yeah or we can we can pull it we can pull it back a week as
well oh the consented item
sure well then if you could get your questions or we can
answer them now that you would that
you need to to help you with making the decisions on the
one that you that you have some questions
on and yes it's I'm sorry were you did you have any more
questions or well yeah I mean
just with each individual like the the police the thing the
Bella complex the Roodale all
of those are in this one approval and so I don't know if
they need to be the ones that
we had issues with that we need more information on
separated or or how we want to do that
okay I think we have two critical paths and I'll just throw
this out there for council
to chew on we really need to get the feedback on bail in
next week I think we've got a little
bit of time where they're holding their bid I think the
other one is just the adjustment
on the the drainage for Magnolia because we've got to get H
inkle going so those are the two
most critical ones we can certainly pull everything back
and have a further discussion after audit
and finance gets an opportunity to weigh in on these
projects so it would be helpful to
to me and the staff to understand we've got Roodale we've
got the police department firing
range and we had station three I think that you wanted more
information on if there's
any other projects that we can we got a vet through audit
and finance and then bring back
to council we're happy to do that my I've been pushing
staff pretty hard to get these
these packages funded and at least give you something to
respond to so we can start getting
these out on the street this summer so if there's any more
than those three projects
that you'd like more update on I'm sorry Roodale I missed
that as well if so if there's any
of those we're happy to kind of do a workshop and call
those out more specifically.
Yeah I was on the same along the same lines but I thought
perhaps we could approve all
of them I would be okay with approving all of them except
for essentially the prop to
2014 bond packages because that represents the greatest
increase as a percentage it's
almost a 33 percent increase over the course of four years
so that would be my and I think
most of the stuff that we've talked about has fallen under
prop two with the exception
of the drainage and Vela and with Vela I'm okay going
forward on conceptually that it's
a six million project I can I can accept that because I
just have to the bond was approved
by the public the project has to be completed but I think
we can have a discussion about
where the money comes from because obviously I'm not okay
with the RTR funds being used
until we have a discussion about that and there may be
other sources of funding that
we haven't discussed yet like the sale of the property etc
so that's where I'm at.
All right well it sounds like probably what would be best
for just efficiency is to put
it on the schedule for when does audit finance meets on the
10th? What's the next council
meeting after that is it the 17th? And if council members
could get to staff as specific
questions as you can on the projects that we've talked
about so that number one we can
have it for the audit finance committee meeting on the 10th
and then number two when it comes
before us on the 17th we're ready to take action on it. So
if you can and does it mean
we're gonna force you to it just means really wanted as the
city manager has really requested
that we get these things moving so that we aren't going to
wind up in this situation
you know another six months down the road as construction
costs continue to go up so
first of all we'll appreciate when so what we don't need
the the phased presentation
most likely we can do that next week or on the 17th and
then for audit finance on the
10th and then okay so you've got the next couple of slides
were just just to recap what
the bond oversight committee had recommended and then you
know the actions that we were
proposing for the council's consideration again that would
feed into the item for action
later on tonight but it sounds like we're gonna just go
ahead and wait on on all this
and come back to the audit finance committee and then back
to the council. Yeah and I want
to say first of all thank staff thank you Mr. City Manager
for the hard work to put
this all together because you know we've asked you to think
outside of the box and I think
this reflects that and I really do appreciate that because
I think it shows an efficient
use of taxpayer dollars and and sometimes we might bite off
more than we can chew in
the past and it's left to those in the future to try to
figure out how to clean it up if
there's errors made on estimates if if there's you know
sort of our eyes are bigger than
our ability to consume so thank you for that and and I look
forward to the 10th and the
17th meetings that will sort of get this all wrapped up and
see you know about getting
it moving forward so thank you so much for your hard work
in that. All right we'll move
on to agenda item 2c which is receive report hold
discussion give staff direction regarding
proposed rate reduction for residential solid waste
customers. So Mayor Tony point to Director
of Finance if you'll give me a quick second so I can pull
this item up. So just really
quickly this item I first wanted to acknowledge all the
work that our staff at the solid waste
department has made over the last 10 to 12 months looking
at that operation many of the
changes in the capital program and also in the operation
itself I think you you have
been made aware the PAB has been made aware as well and so
this is really a culmination
of a lot of those efforts certainly Ethan Cox our Director
of Finance Director of Solid
Waste sorry I spoke on that and Dr. Kinney Banks as well
have been very instrumental
in and really taking a hard look at that operation and
making a lot of hard decisions and recommendations
that have come back to you. So this item just you know kind
of right off off off the bat
right here you know where we are proposing a rate a rate
decrease of 12 percent for residential
collection that would impact customers with with standard
refuge and recycling carts you
have up there what the monthly fee is and what we're
proposing that it would be with
this 12 percent decrease for a customer with a large cart a
large refuge and recycling
cart again those rates are up there what that equates to is
that that's about a three dollar
and thirty four three dollars and thirty four cents savings
on a standard cart per month
and three dollars ninety nine cents on a large cart service
I will tell you too that these
services are also subject to sales tax so they are taxable
services and so there's
a little bit of additional savings that will come from that
as well the full eight and
a quarter percent of sales tax is applied to this
particular service again not a whole
lot of services municipal services that are taxable but
this this particular one is taxable
so in on an annual basis we're estimating that that would
be about a forty dollars and
eight cent savings on a standard cart service and on a
large cart service it's about forty
seven dollars and eighty eight cents again there'll be some
additional savings attributable
to the deferred sales tax that it's not going to be paid.
Councilmember Briggs did you have a question?
Just a couple of clarifying questions and also a thank you
for this this is really great
anytime you see a reduction in rates for our citizens you
have to apply that so commercial
is staying the same this isn't affecting commercial.
Let me clarify to councilmember that that we are couching
this as a first step there's
our first step in what we anticipate would be a full review
of all the rates we anticipate
that there may be additional rate reductions in other areas
we are engaged in both in a
management study that will really give us a better picture
of what the operation is and
also a rate review to make sure that if there's additional
fees that need to be rebalanced
based on the cost of service that we're able to do that we
anticipate bringing that back
to you in the next few months as part of the proposed
budget.
Okay but this is just residential what we're hearing?
This is only residential yes ma'am.
Okay and it's only for the green cart it doesn't it's not
we're not talking about recycling.
Well that is a that is a combined fee.
Oh okay.
Yes.
So it's not included.
Yes correct.
Okay thank you.
Councilmember Gregory.
Thank you mayor.
Does this in any way impact our ability to serve our debt
that we have connected with
a solid waste operation?
No and part of the discussion today in a later slide is
that we have been able to reduce
the the projected future debt that was planned that will
now be planned now.
The current debt that's on the books will continue to be
serviced though there are about
4.2 million dollars in excess COs we've been talking a
little bit about using some of those
dollars for 651 Mayhill.
Those those excess COs that have that have come out of this
whole review process will
be offset with rental a rental fee that's going to come
back into solid waste from the
materials management fund the general fund to offset that
debt service cost.
Well the reason I'm asking is because I I'm glad that you
're coming back with with this
notion that we have this extra money but I was wondering if
we would be better served
and if the ratepayers would be better served by
accelerating our service of the debt because
I know that you know when you pay it off early you're
getting a savings on the interest that
you're not having to pay.
So so have you calculated that.
The the 4.2 million dollars in excess CEOs was actually
issued in 2016.
We would we probably you know could go back we would we
could go back and look and see
what other eligible refundings might be available to us.
I will tell you that based on recent federal legislation
the opportunity to advance refund
bonds is just not available to us any longer and so we
would have to look to see if there's
any bonds that are still outstanding that that are nearing
a current callable time frame.
Okay I'm not exactly understanding your answer but it's
because I don't exactly understand
all of the intricacies of this.
I think I think what he's saying is it's too early to call
the debt and given the new federal
legislation that went in it largely erodes the benefit of
refinancing because it are
treated as taxable issues now.
To your to your point though the second phase we are
expecting a second significant rate
decrease probably this summer through the budget process.
Part of what we're doing though is working on the the
commercial side there's a rate
book that needs to be updated there's fees that have not
been charged uniformly so we're
working through that.
We're also continuing to take costs out associated with
material mining associated with the CNG
and some of the other contracts that we have out there so
there's several hundred thousand
dollars of additional expenses being removed while we're
going through the efficiency
study.
We just felt very comfortable if this was a good first step
.
We're happy to take a look at your question the next phase
of it though I think it makes
a lot of sense.
Okay thanks.
So through this presentation I'm going to go ahead and
cover some of the staff efforts
that have gone on also we'll cover the capital plan and
just in a little bit further just
what they what the impact of this particular rate decreases
and then finally the the next
steps in this process.
So some of the staff efforts that have gone on over in in
in this operation is really
a realignment of some our business units.
The goal there is to ensure that we understand each aspect
of that operation and we really
have done that in preparation for this management review
and also this rate study to make sure
that we understand what the cost the true cost of the
services are so that we can better
match them with with the rates that need to be applied for
our customers.
We've also revised our capital planning and budgeting
processes.
I will tell you that the finance folks that have
traditionally been housed and reporting
to that operation now report to the city's finance
department.
That is a change that that was made in the last several
months and also there's just
been a culture change in that operation to make sure there
's good business vetting of
programs and projects as they come forward to allow staff
members they may have different
opinions that they can voice those that they have avenues
and again that was part of the
strategy and not just allowing the finance staff to
continue to be housed there to be
aware of what's going on in the operation but then to have
a different avenue to voice
any issues that may come up in evaluating any any other
operation.
Again we want to make sure that we're having a better you
know business case analysis financial
analysis of projects and programs that are going on in that
in that operation as as you're
well aware you know some of those projects that you've have
come to you for discontinuation
really the economics have not we're not proven to be there
and so so through that process
we hope to continue to have a better review and business
case analysis of of those projects
and programs as they come forward in the future.
So part of the changes that we've made in the capital
program is that we've reduced
over the five-year period the CIP program for a total of
you know 12.5 million dollars
we are currently projecting that we will not need to issue
any additional debt in both
the current year and the following year we'll continue to
evaluate that five-year program
as we go forward but currently there is no plans to issue
any additional debt for that
operation.
As a result the projected debt service on that 12.2 million
dollars that was included
in in that financial forecast has now been stripped out and
is no longer there and so
that has contributed to the savings that you have up here
of approximately 13.4 million
dollars over that six-year period so that's operating costs
that are no longer included
in that revised performance and we'll continue to to look
at that performance as we go forward
and and when we bring that back to you if additional
changes are needed in that area
we'll certainly be able to to communicate that to you in
the next coming months.
Question by councilmember Ryan.
Thank you mayor.
When you say additional debt in SCIP mainly up there does
that also include that we would
now be cash financing vehicle replacements and other things
that are for solid waste
but might go through a different city department like fleet
?
This particular fund does cash fund some vehicles they tend
to not be the larger trucks those
tend to be debt financed but again in in in the review of
the operation is some of the
scaling back you know some of the vehicles that were
projected to be purchased with debt
just aren't aren't there anymore.
Okay yeah that's that's been one of my big things is we
should be big enough to pay cash
for our vehicles and as opposed to using debt financing for
them as much as possible.
So again this is this is just to quickly just visually show
you what what the impact is
on reserves and working capital again you know this is an
immediate rate decrease this
if approved tonight would go affect that would be effective
starting tomorrow we anticipate
that customers that are on they have bills due on April 19
th will be the first customers
that will will see this immediate decrease obviously we
have a number of cycles in which
we bill our customers and so as those cycles come up you
know those reductions will be
seen by those those additional customers we have a total of
21 billion cycles that we
do again this particular change still keeps our reserves
well above what the minimum for
that reserve which was 14 percent and even well above the
18 percent reserve for this
particular fund that equates to about about 60 days of
reserve in that particular fund
so again in looking at this at these reserves and working
capital we think there's a lot
of health in that fund and we think that there's might be
some opportunities here as we go
forward looking at at our rates and the revenue that's
coming in to support these operations
so just quickly this is just a high level comparison for
you of what the adopted budget
was in 1718 and what we project that it would be after this
particular change now I will
mention to you that as a result of some of the operations
that we are no longer engaging
in particular the mining operation there was also revenue
that was assumed that would come
in for that operation so that revenue has also been pulled
out of that of that out of
that budget and so that 4.374 million is is attributable to
some of those types of changes
that have made revenue assumptions that were made for
operations that have now been discontinued
so just quickly you know one of the reasons that we're
recommending this is a first step
on a 12% decrease we certainly believe that that is the pr
udent thing to do we think that
you know there needs to be certainly considered
consideration and not only maintaining our
fund balance targets that have been established but also to
safeguard this fund we do have
some volatility associated with wholesale revenue you know
that volatility we need to
make sure that we have a better understanding a better
handle of what any potential impacts
might be when we start looking at cost of service to make
sure that we're applying
them and that we make sure that we stay within what the
market forces would allow for that
particular service in particular in addition we've not made
any recommendations at this
point for any of our commercial rate revenue commercial
rate revenue is very complex there's
a number of sizes of containers that are out there that may
be behavior that may that may
change from you know within our commercial customers we
need to get a better handle of
that we believe that the rate analysis that we're working
on today will help us get a
better handle on what the impacts might be to be able to
come back to you with a with
a better recommendation as it relates to commercial rates.
Finally just the next steps that we're proposing is again
we are engaged in a management review
of that operation we anticipate that to be completed
sometime in June cost of service
and market study is also underway and we anticipate that to
be completed between June and July
we anticipate that all this would coincide with the
discussion on the proposed budget
not just for this fund but certainly citywide.
Finally you know we do believe that there might be
opportunities for some additional
rate decreases again we're describing this as a first step
for you we also did discuss
this particular rate decrease last night with the PUB and
they unanimously approved the
12% decrease.
Council without you know I don't have any other slides
certainly we'll entertain any
questions you have and again you know Mr. Ethan Cox is here
as well so if there's some
questions about the operation of that you know he's
certainly available to to respond
to any questions you may have.
Any further questions thank you so much appreciate your
diligence in this and it's great news
and sounds like that there may be some availability for
future decreases depending on how the
budget discussions go.
Thank you all right appreciate that.
Moving on to agenda item 2D receive a porthole discussion
provide direction to staff on the
Denton Development Code update specifically regarding
administration and procedures module
2.
Good afternoon I'm Scott McDonald I'm the director of
development services and for this
presentation I'm honored to present Claring and Associates
and they're going to provide
an overview of where we're at and where we're going and
Matt Goble will do that and introduce
his team certainly he's got a lot of material to go over
and happy to answer any questions
in the end of the presentation if there are any.
You had me until a lot of material to go over it's okay.
We'll make it we'll make it.
No I'm teasing you.
We'll make it happen.
This is important this is very important to our community.
All right Mayor Council members good to see you all again
thank you for the opportunity
so happy to be here again Matt Goble I'm with Claring and
Associates joined by my colleagues
Jim Spong and Tarek Wafai over there.
We have a presentation today to do several things.
Mainly we're going to we're going to mainly cover the new
set of material that we're rolling
out for the public over these next couple of days which
deals with administration and
procedures how we how we make decisions regarding land use
development applications in Denton.
First of all before I get there I'm going to remind you a
little bit about the scope
of the project just to the the steps of the project that we
've been through and where
we're going after this.
We have several slides to talk about next steps.
We have a lot of public meetings coming up and we want to
make sure that you understand
kind of our strategy for rolling this material out to the
public and then we should have
plenty of time for discussions in Q&A.
If I could request I'll try to just go through my slides
fast and then we'll come back and
have questions at the end but if you do see something you
want to you want to flag me
down and just stop.
Yeah so if we could just maybe hold unless it's just a
really really burning question
just hold until the end of the presentation thank you.
Thank you sir.
Just a reminder about Claring we have been working with you
all for a while now we work
on codes around the country and around Texas and so we
bring a lot of knowledge of best
practices from the Texas the Metroplex and around the state
and then also around the
Rocky Mountain West in the country.
I'm not going to go too much into our our our quals you've
seen all that before you've
seen this material before as well the project overview but
I just wanted to remind you this
is the the same slideshow that we're going to be giving the
public at a public open house
tomorrow night also to the P&Z tomorrow so I wanted you all
to just have a sense of the
materials that we are going to be presenting to the public.
We're going to be reminding them all about the importance
of the Denton Development Code
and what it is and how it regulates you know where
development can go how big the buildings
can be etc.
It's very important to address some really important
questions about the quality of development
over the next generation.
So you have good staff and good regulations in place but
there's a real opportunity with
this project to take everything to the next level so we're
excited to take the DDC forward.
The real foundation of this project is the Denton Plan
which you adopted in the last
couple of years and consistency with the Denton Plan is a
really important goal for the project.
Making sure also that the new regulations are user friendly
, clear and concise, as efficient
as possible, streamlined, aligned with state law.
We have a lot of big objectives that we are trying to
achieve with this project.
I've got some animation here.
The timeline is on this slide.
I'm not going to go through specific dates for you.
Suffice it to say we've had some fits and starts with this
project and we are committed
now to maintaining momentum and to getting it done as
quickly as possible.
We are in the drafting stage of the DDC which has been
going on for a while.
We're going to be finishing it up in early summer and
getting into the adoption process
very quickly right after that.
So we're already having good conversations with staff about
how to turn all this feedback
that we're getting around as quickly as possible into a
consolidated draft of a new code.
Just a quick refresher, we are drafting the code in a
series of modules that address different
topics.
We started off with the zoning districts and the use
regulations.
Right now we're with the administration and procedures
piece.
This is what we're rolling out to you all and the public
today and tomorrow.
And then we'll come back with the final piece which is
development standards.
This gets at the quality issues, landscaping and parking
and building design, things like
that.
That's actually a little bit more interesting material
honestly than the procedures that
we'll talk about today.
But procedures is interesting too.
And we'll try to hit the high points for you with this
presentation.
I wanted to remind you about process.
We are going through an internal staff draft with each of
these modules where we kind of
do an internal vetting of all the material with staff and
then we make edits and we turn
around everything for public review.
We are now doing the public review presentations for module
two, the administration piece.
We have already turned in the staff draft of module three,
all that building quality
stuff that I mentioned.
So while we are doing the presentations of module two,
staff is already deep in the process
of developing all their comments on modules three.
So we're actually going to be back in just a few weeks in
mid-April and you're going
to see the public presentations of module three.
So the train is moving quickly.
We are trying to get this done as quickly and expeditiously
as possible.
What you're going to see after we present that module three
is very quickly, in early
summer, you're going to see a consolidated draft that puts
all the pieces together.
And it's going to reflect all the different feedback that
we've gotten from the public
on the use regulations and on the procedures and on the
quality standards.
So that's a really important milestone stage for the
project.
And we'll come back and talk about that later at the end of
the presentation.
But I just want to highlight that we are actually getting
pretty close to that exciting milestone.
This is the overall annotated outline of the code.
This shows you the sequence of the drafting.
We started with the districts and the use regulations.
We're now in subchapters one and two, which is what I'll
spend the bulk of my time today
talking about.
And then we'll come back with development standards at the
final meetings in April.
So with that very quick whirlwind overview of the
procedures, let's talk about the procedures
module and what's in module two.
First of all, what are our goals?
What are we trying to achieve?
And let me just step back real quickly.
When we kicked off this project, we talked with a lot of
folks that do development in
Denton, folks that have experienced the process firsthand
as customers, and some of the most
frequent critiques we had of the DDC related to the
procedures piece.
It was considered to be a process that was kind of
inconsistent, opaque.
People didn't really know, didn't trust that they were
being treated consistently by different
staff or through different procedures.
And so one of the things that we were trying to do was just
get back to basics with this
material.
So first of all, align procedures with state law.
Texas Local Government Code sets some minimum requirements
for what you need to do in terms
of regulating zoning and land use.
And we wanted to make sure that we were kind of stripping
away all of the extra requirements
that may be unnecessary that Denton had developed over time
and really focusing on the basics
and assuring that we were aligned with state law.
Streamline the process by delegating more decision-making
authority to staff.
Where possible, can we make the process more efficient by
not requiring expensive public
hearings and letting the small stuff be handled at a
professional staff level?
Relocate administrative and technical information outside
the DDC.
You all have a large amount of really technical information
, some of which is outdated, that's
embedded within your DDC that doesn't need to be there.
And so concurrent with the writing of the new code, your
staffs are updating their technical
criteria manuals and a lot of the stuff can be pulled out
and updated from the DDC and
put in those new manuals.
And then clarify concurrent review procedures, making sure
that we know which procedures
can move forward simultaneously.
So that'll get through the process faster if people realize
they don't have to wait
for one process to finish before moving to the next one.
So I'm gonna quickly now walk you through the content and
some of the key changes.
Subchapter one is a brief chapter, but it's important.
It's the introduction to the material, really sets the
legal foundation.
This is the one that the lawyers are most focused on.
But this sets the overall purpose of the code.
This sets the statement of applicability.
Where does the zoning jurisdiction for Denton apply?
What is the authority to regulate land use in Texas?
All these types of things.
Even conforming situations is covered here.
These are lots or structures or uses or site features that
might have been legal at the
time that they were originally improved, but no longer
comply with the standards of the
new code.
So those are important and I'll come back to those in a
minute.
Enforcement is here as well.
The clarification of who's responsible for enforcing the
zoning regulations.
What are the procedures to follow when a violation is
alleged?
What are examples of different types of violations?
What are the penalties and the remedies that are available
for violations?
All that stuff is covered here.
And then also transition from prior regulations.
This sounds dry.
It's very important.
These are the sets of rules that cover how you transition
from your current DDC to the
new regulations.
So clarifying, for example, that prior violations continue
to be a violation under the new code
unless they comply with the new standards.
Knowing that if you submitted a complete application under
the prior code, you will still be judged
and evaluated based on the standards in place when you
submitted that complete application.
That's always an important rule.
So this is an important chapter that really lays the
foundation.
I just wanted to highlight a few things that we are
continuing to think about and talk
about with your staff.
First of all, how will the new DDC fit into the existing
framework?
By this we mean kind of your ordinance framework that you
have.
Denton has a more complex ordinance structure for land use
than we see often.
And part of that is because in past years when you have
updated the DDC, you haven't
consistently gone in and repealed other sections of
municipal law that cover the same issues
and potentially should have been repealed.
They overlap.
And so there is a regulatory knot that needs to be unt
angled here, to put it mildly.
And we're working with staff to make sure that the
appropriate other sections of the
municipal code are identified and they'll be repealed as
the new DDC goes forward.
So that's a thorny issue with a simple bullet to describe
it.
Consider a formal process for determining nonconforming
status.
We are working through with your staff thinking about the
rules that apply to nonconformities
and trying to clarify exactly when someone can prove that
they are a legal nonconformity
and then what the rules are that apply to them.
And you see there at the bottom of the slide, we are
reorganizing all your nonconforming
rules.
We're distinguishing rules for nonconforming uses and
structures and lots and site features.
Right now it's a bit of a tangled mess and we're trying to
make it more clear kind of
which sets of discrete rules apply to which types of noncon
formities.
So those are all important parts of this subchapter.
And I'm just going to zip right on to the next subchapter,
administration and procedures.
This is the bulk of the material that we're presenting on
this trip.
This is where we describe the roles and responsibilities
for the city council, for the planning
commission, for the staff and how you get particular
permits, how you get a preliminary
plat, et cetera.
So this slide simply shows you the organization of the
material.
And I'm not going to spend much time here except to say it
is a clean organization that
makes a lot more sense when you spend time with the
document than your current code does.
Your current code is pretty scattered and fragmented in
terms of where all this stuff is laid out.
We start right up front with a table.
And I've got the table blown up on a couple of slides here.
Just to show you that this is an example of a tool that
gives a lot more clarity as to
who does what.
One of the things we heard about in the current system is
that it's not clear to the public
who makes what decisions and how you go about getting
different types of approvals.
So here you can walk down the left-hand side of this table
and you can see, okay, there's
a category of development permits that includes things like
site plan reviews, specific use
permits, et cetera, subdivision procedures, et cetera.
And then for each one of those, as you travel right across
the table, you've got a cross-reference
to the section in the code where that's described.
You've got a note about whether or not public notice is
required, either published or mailed
or online.
Is a pre-application conference required?
And then finally, which bodies are responsible for review
and decision-making?
R is a review and recommendation.
D is a decision.
A is an appeal.
We haven't changed a lot of the substantive cells here, but
we have added things that
are done currently in practice that you don't have in your
current code.
For example, site plan review isn't clearly described in
your current DDC, and we have
clearly included it right up front.
That's an important tool that the city has, and we have
included that along with the other
procedures to make it very clear and explicit how that
procedure follows.
We have introduced some new procedures that you don't have
now, like temporary use permit.
We have carried forward some unchanged.
You see Gaswell Development Site Plan is up there.
We are not touching the Gaswell piece at all.
The substance is going to get carried forward unchanged,
but it's getting carried forward
as part of this new framework, so we're integrating it into
this new framework.
I'm going to highlight a few of the more important
procedures on my next few slides.
This is just the bottom half of the table.
We saw permits.
We saw subdivision.
Here we have plan and DDC amendments.
If we're going to amend the zoning map, that's a rezoning
that's on here, a rezone to a plan
development annexation.
Then finally, flexibility and relief.
If I am not happy with something, if I feel like I need a
escape valve from the regulations
through a variance, or if I want to challenge a decision
through an appeal, that is covered
in this section of the code.
Minor modifications is an important new tool that I'll
cover in just a few slides.
That's the table that introduces this subchapter.
A few other things.
We have highlighted the responsibilities and the
composition of all the different decision-making
bodies here and review bodies.
So the Historic Landmark Commission, the Zoning Board of
Adjustment, the City Council, what
role do they have in administering the code?
All that is clarified in this section 2.3.
One thing I would highlight here is that we're carrying
forward, we're calling it the Development
Advisory Committee.
And we're going to come back and ask you about that in a
few minutes.
But right now, you have a Development Review Committee
under your current code, which is
the source of a lot of confusion from a lot of stakeholders
.
Mr. Mayor?
No, is this the Development Review Committee that, is that
the Council Committee?
No?
No.
Okay.
It's not the one that you, okay.
Never mind.
No, go ahead.
The Development, no.
Yeah, staff, okay.
That's right.
That's right.
DRC.
Never mind.
I know it is DRC.
We're going to try to move away from the acronym DRC, and
because it's been the source of a
lot of confusion and criticism under the current system.
And we'll come back and ask you about that.
But the proposal right now is to move to a Development
Advisory Committee that is not
quite as tightly defined and codified in the DDC, and gives
you more internal flexibility
to adjust moving forward.
We'll come back to that.
So after the table at the front of this subchapter, and
after we lay out the bodies, we establish
what are called common review procedures.
And this is basically just a simple kind of six-part
framework that applies to most types
of decision making.
You start at the left and you move to the right.
And we've got a simple graphic here that we tailor for each
one of the procedural types
in this subchapter.
We start off with pre-application activities.
Do I have to come in and meet with staff before I submit an
application?
All that is covered right up front.
Then we submit the application, and it's processed by staff
.
It's determined whether or not it's complete.
And if so, it moves forward into the review process.
Staff then reviews that based on criteria and takes action,
which could be a decision
if it's a staff-approved decision, or it could be a
recommendation up to another body.
Step four would then be notice and scheduling of public
meetings or hearings if it goes
on up to the council or it goes on up to Planning
Commission.
Step five is the review and the decision by that body, by
the commission or the council.
And then six would be anything that happens after the
decision is made.
Does the approval lapse?
Or can I come back in and modify a permit that I got?
It's not rocket science, but it's a clean, simple framework
that gives a lot of clarity
and predictability to staff and to the decision makers and
to the public so that you understand,
yeah, there's a method to the madness here in Denton.
Yeah, we understand that everything is generally proceeding
according to plan.
What we do in this material is we set this framework.
We just have to say it once.
We don't have to repeat it multiple times.
And then all the subsequent procedures just refer back to
this framework and it becomes
a much shorter document than you have now.
And it's much more well-organized.
So this is the framework that we have.
And each one of these procedures later in the subchapter
refers back and builds on that
framework.
So 2.5, again, is the development permit procedures, site
plan review, specific use permit, temporary
use permit.
The Gasswell development site plan is getting carried
forward unchanged.
I wanted to highlight just a couple of these for you.
First of all, site plan review.
Codify and simplify site plan procedures.
Again, Denton is doing site plan review, but it's not in
your DDC right now.
And so you've got it in separate manuals.
And so we are pulling it forward and codifying it along
with the other types of review procedures.
This is just where the city evaluates compliance with the
site and building design requirements
in the code.
Does it physically comply?
It's a really important tool.
This shows you an example of how we have a tailored version
of each one of these charts
for each of the procedures.
So we say at the bottom, you know, who's the decision maker
and does this step apply?
And you can see in this particular case for site plan
review, these are all handled at
the staff level.
So we just go through steps one through three, steps four
and five don't apply because we
don't have any public hearings for these.
And so this is just a decision made in step three.
But step six does apply because, you know, a site plan
could expire.
There are things that happen post approval in site plan.
I do have a couple of questions and one may be in this if
this is too much detail and
it's it's what our council committee will review as far as
the actual draft.
Because I know some of the comments that I've received on
the site plan review have been
the specific things that are required within that site plan
review.
In other words, either whether it's engineering or I mean,
fairly extensive.
Now that may have changed recently.
I think there was some desire to maybe change that.
Are those the kinds of things that what you guys are doing
is trying to rewrite or retool,
so to speak those types of procedures?
And then I have one other question.
That's a great question.
So that's actually a related issue.
It's the administrative manual.
You might have heard me talk about in prior meetings, but
we are stripping out all the
detailed things like submittal requirements and fee
schedules, things like that from the
code itself.
They need to go in a separate manual where they can be
updated over time without going
through a full code amendment.
Scott and his team are working to update all that material
right now.
It's in process.
So that's sort of outside the scope.
We're not rewriting those kind of procedures.
Okay.
So then the next question I have is I guess this would
probably fall under the same category
as far as permitting rules.
In other words, we have right now to get a permit, it's
sort of two stages.
You get your soil erosion permit and then you get just your
regular permit.
And I've been asked several times why are they not just the
erosion requirement is just
part of one single permit.
In other words, if you don't get that, you're not moving
forward on any more of your construction.
Why does it have to be?
That's not what you guys are charged with.
That's more than that administrative policies and
procedures and those kind of things that
you're saying are stripped out?
Yes, generally speaking.
Okay.
They're separate.
But we are trying to structure this site plan tool as an
umbrella that would capture a lot
of those different types of requirements.
That is the way it should be used.
Okay.
And so that's why I mentioned earlier we're trying to
stress these concurrent reviews
because all this stuff should be done at the same time.
Okay.
All right.
Thank you.
Those are great questions.
So site plan review is here.
We have clarified the thresholds for when site plan is
required and I'm not going to
go through all these bullets, but it's new stuff.
It's new projects or it's big new additions to projects,
you know, mixed use expansion
by more than 2,000 square feet, et cetera.
I'll just pause here and say we are meeting with the
advisory committee tomorrow morning
for the project, which has a few of you on there and then
also a few folks from the P&Z.
And this is a good example of how we're going to try to get
a little bit more in the weeds
with them on some of the specifics of where the code should
land in terms of things like
site plan requirements.
I mentioned this change of use permit.
This is in the draft as a new tool and this is basically it
's kind of a -- it's a working
idea, but this is a tool for staff to evaluate whether
changes of use comply with the zoning
standards.
A lot of communities have something like this.
You might need something that's kind of short of site plan,
but, you know, some things might
not be required to go through a site plan process, but they
still need some kind of
check for the staff to ensure that the project complies
with the zoning ordinance.
And that's when this type of thing would be used.
We might call it something different.
It might be broader than change of use.
It could be certificate of zoning compliance, something
like that, but that's why this is
here.
Subdivision procedures, these are very important for Denton
.
These are all listed here on this slide.
Administratively approved plats, you know, we call these
minor subdivisions in a lot
of communities, you know, just a creation of a few lots.
And then the other types of plats are listed here.
Plan and DDC amendments are important.
What are the procedures and the criteria for making
amendments to the Denton Plan 2030?
And then also zoning amendments, map amendments, that's a
rezoning.
Rezoning to a plan development is a specialized type of rez
oning, and then a text amendment
actually changes the text of the DDC.
Those are all really important.
I want to highlight the rezone to PD really quickly.
This would replace your master plan community tool that you
've got now.
Basically MPC has been used in the past.
What we're proposing is a simpler process that basically
just says you've got a plan
development tool, it allows for a negotiated approval for
large unusual developments.
This would be a simple process that's just a special flavor
of a rezoning where you've
got an applicant that comes in and lays out their concept,
and they get that concept evaluated
and approved and documented as part of a plan development
plan that is approved and applies
to that site in the future as part of the rezoning.
The last bullet here is important.
Demonstrate public benefit to justify the increased
flexibility.
You shouldn't be able to do a PD just because you don't
feel like complying with the code.
The City of Denton is extending a great opportunity by
allowing someone to apply for a plan development.
You should be getting something in exchange for that
flexibility.
And the code is designed to require that.
I know you want questions held until the end.
I just don't know what it's I mean, I'm not sure how long
the presentation is.
I just have a few more.
Okay, then I'll hold it.
Yeah.
Okay.
I just have one more category of procedures and then I've
got a little bit on process
and then I'll be done.
Hopefully in relief again if I want to step outside the
straight rules of the code.
Minor modifications.
I told you I'd come back to this one.
Right now you've got ADPs, alternative development plans,
which we heard from everyone frankly
was overused and led to a lot of inconsistency and some
people like it because it lets them
you know, you know, have a lot of flexibility.
When you say you heard from people overused was it staff
that felt they were overused
or was it the development community?
Both.
Okay.
So the development community, you know, you think they
might like them because they do
provide a lot of flexibility but oftentimes they said they
recognized that it was becoming
too ingrained.
It was too much of the process.
It was hard to know what was expected of them if they felt
like the ADPs were just always
going to be so easily granted.
Minor modifications would replace the ADPs.
A lot of communities have adopted something like this.
It allows staff to approve a minor modification or a
deviation from a dimensional or a numeric
standard based on a set of qualifying criteria.
You can't do certain things with minor modifications.
Increase density, change use, deviate from use specific
standards, etc.
But you can do a lot of things and there's a table here of
standards that you can deviate
from.
So, you know, setbacks can be, you know, modified up to 10%
say of the underlying standard.
Building height by up to 10%.
These are all 10s right now.
That's a little bit of a placeholder.
We're going to go back and review each of these thresholds
with staff as we work through
Module 3, the development quality standards.
But we're trying to provide a little bit more of a tight
system when you can consider
flexibility and there's criteria that apply here.
So, you can't just have this for free.
You've got to be meeting the intent of the underlying
standard better than the existing
code would.
So, there's more predictability with this tool.
That's the intent.
That's my last substantive slide.
I just have a few here on process.
We are rolling this out now for the public.
You're actually our first meeting here.
We're going to be doing this for the next couple of days.
Tomorrow morning with the advisory committee where we get
into more detail.
We've got a series of stakeholder meetings tomorrow
including with the Developers Alliance.
P&Z work session tomorrow afternoon and then public open
house tomorrow night at 6 o'clock.
So, if you're all able to attend, that would be great.
I mentioned Module 3.
That is coming up very quickly.
You'll see us back here on April 17th for a work session on
that.
Then we'll be doing a similar set of meetings on that
material.
This is new.
The zoning map is going to be rolled out as well.
If you recall from some earlier meetings that we had, we
laid out a new set of updated zone
districts.
Those need to be applied to an updated zoning map.
The staff has been working on that in the background and
they're going to start rolling
out that map at a parallel set of meetings that you see up
here on these slides starting
in late April.
The goal ultimately is going to be to get a first draft of
that map out there for feedback.
Then we can make revisions to that map and then the full D
DC and the clean map can start
going forward into the adoption process at the same time.
So, that is a lot.
We are trying to reach out and talk with as many folks as
we can about this and we have
a schedule with you all and with the P&Z to get feedback
and that's just all summarized
here on this slide.
I think that's my last substantive slide.
Where can you find more information?
Everything is going on the website.
The city staff has done a great job of keeping that current
and keeping all the information
up on the site.
We've been getting a lot of hits on that I think.
We have a couple of things we wanted to ask you about
specifically but let me go ahead
and just stop there because I know I've talked a lot at you
.
Let's just take your questions.
So, Mayor, thank you.
Go ahead, Councilmember Gregory.
Thank you, Mayor.
I know I'll let you ask the questions on the plan
development because I have some too,
but my question is about the new zoning map.
Are you saying that part of updating the DDC is updating
the entire zoning for the city?
Yes.
Can you go into a little more detail of that?
I can, yeah.
So every community that updates its zoning code needs to
think about this issue and they've
got some choices about how aggressive they want to be in
changing the zoning map at the
same time.
So some communities are fairly conservative and they try to
update their code in ways
that don't require a lot of changes to the zoning map.
Other communities are pretty aggressive and they adopt a
whole new slate of zone districts
that are brand new.
They don't have really existing good parallels and then
they go through a big process to
methodically look at specific sites and think about where
those new zones should be.
Denver is an example of a city that did that.
It took about four or five years to do their whole process
and they comprehensively looked
at every site and updated the zoning map.
Most communities are somewhere in the middle.
When they update their code, some of the changes are just
simple name changes for districts.
Some of the districts get carried forward unchanged and
maybe there's a couple of districts
where they do need to do some additional thought and think
about where those new districts
go.
I think Denton is in that middle category where there's
some simple things that are
being converted and some stuff that might require some
additional thought and outreach.
The staff is in charge of this piece, but they're actually
doing that work right now.
They have developed a methodology for taking the new
districts that have been developed
and thinking through whether or not those require simple
name conversions or something
that requires more public input.
When they go into this series of meetings starting in April
, one of the things they're
going to be doing is presenting that methodology to the
public just so people understand this
is a rational process that we've gone through and then
putting that first map out there
and getting feedback on whether or not they've gotten it
right.
Oftentimes you need to make tweaks to that first map.
Then the map gets updated and like I said, it then goes
forward with the new code.
The reason I ask is because shortly before I got on council
in 2009, there had been a
citywide rezoning.
Everything was renamed and things.
It seemed like for the next five or six years, we spent a
lot of time having zoning cases
coming before us because I don't know, maybe towards the
end of the rezoning process, they
wore out and there were a whole bunch of things that just
got default zoned.
As a result of that, there were years of cleaning up some
of the issues that came from that.
Is that typical?
Nobody gets everything right the first time when they're
updating a zoning bill.
I think it's not atypical at all.
I have to go back in and clean it up.
Recently it came to light that several of us on council got
concerned when we realized
that for example, in the NR6 zoning, that the side yard set
backs was four feet, which
meant it could be eight feet between houses, which the fire
department seems to frown upon.
Is that where issues like that would be most likely to be
corrected as we're doing this
updating process?
One of the things that you should look at in updating the
map is conditions on the ground.
You certainly don't want to create any situations that are
inconsistent with fire regulations.
You don't want to create new nonconformities if you can
help it.
All those things should be looked at.
I think those have been baked into that methodology that I
talked about that staff is developing
as they prepare the map.
You should be looking at conditions on the ground.
You shouldn't be creating problems like that.
It's a whole big category of issues just by itself.
I think I would just add to Councilmember Gregory's
question that as I understand it, part of this
is to simplify the zoning districts.
I think we're cutting them almost in half.
That's part of the issue.
If you've noticed over the last, I've certainly noticed
since I've been here, you're ending
up with a lot of, for lack of a better word, backdoor PUDs
where people are coming in,
don't necessarily fit into a zoning category, so they go to
the next one and then negotiate
down.
Right.
That's part of what they're trying to address as well.
When he talks about plan development being a privilege, why
do you need to do this?
What's the methodology for not fitting in a zoning district
?
That sort of thing.
There's a lot of those types of issues that they're trying
to clean up.
The other thing I'd add is you're seeing what I still think
is a pretty aggressive schedule.
This is up there as an idea right now.
If we continue to get feedback and the staff's doing the
best they can right now to reach
out to the communities and the development community to get
their feedback, but if this
has to go on for a few more months to make sure that we can
kind of deal with some of
those issues on the front end and save you a lot of
complaining on the back end, that's
exactly the point.
We want to talk to you about the role of our council
committee and vetting that out a little
bit even more.
We're not going to be able to deal with all that.
I'm sure we can't anticipate everything, but that's
definitely in the front of our mind.
It's not creating a huge avalanche for you on the back end.
Well, and along those lines, if I may, Mayor, you pointed
out a very specific issue of going
to the next zoning category and then negotiating back.
I'm wondering if in some of those cases that 10% rule for
minor modifications would solve
that where we were going from NR4 to NR6 and we were really
only going to NR4.23.
No?
Well, I think that's something that's a great example.
It's something we really want our council committee to
think through that a little bit
and get a comfort level because what has happened is some
of our residents have been trained
that we're negotiating one or two, three houses now over.
There's really a lot of thought that needs to go into how
far do we go, how comfortable
are you with those types of decisions being made.
I think there's a lot of work in each one of these modules
for those specific questions.
But we've been, you're all aware of very specific concerns
that you have.
We certainly hear it and that's really the point is working
with that committee from
our council making sure that you've got a comfort level on
what in the end product we
bring back to council.
In terms of the community, we're really hoping this
outreach, if we need to expand the outreach
and try to cut off some of those concerns up front that
will do it.
You typically, my guess is that no matter how good of a job
we do for the next year
or two, you're going to be hearing concerns about, "Well, I
didn't really get what I
wanted or I've changed my mind now and we're just going to
have to work our way through
that."
It's going to be simple but we're trying to do as much up
front as we can.
Then the final thing, for zoning changes that have already
happened where we have put conditions
on these zoning changes that we've approved, they still
stand even if we change it.
Did I understand that?
They are carried forward.
One of my earlier slides was transition from prior
regulations and that's one of the things
that we clarified in that part of the code.
If you've got an existing entitlement, that carries forward
.
I'm sorry.
It was one more thing and a half.
Because you said if you can prove that you're-
Nonconformity.
Nonconforming.
That could end up being ... How do you prove that you're
nonconforming?
How do you show that, "Oh, this was built in 1964 and this
is what the rules were back
then."
That's a fairly standard practice in communities around the
country that you put the burden
of establishing a legal nonconformity on the property owner
.
You need to produce materials that show, "Yes, this is when
we did the addition to the house
or this is when the original construction took place."
The staff is going to have a record of the regulations that
were in place at that time.
That analysis is technically, it's on the back of the
property owner to show that they
were legal when they were established.
It's fairly common.
The other choice would be to make the city responsible for
maintaining a library of nonconformities
over time, which is you just don't have the resources to do
that.
The word for a property owner is to, if you did a remodel
in 1995, you better keep that
CO or that building permit from then.
Very much so.
That's an important part of educating people about the code
generally.
When the new code comes out, that's something that should
be in the education materials.
I've got a couple of questions.
You're saying we're doing away with NPCs and going to PDs,
which I remember when we went
from PDs to NPCs.
NPCs were primarily for large scale, I mean large scale
developments, hundreds if not
thousands of acres.
Is there a floor to a PD development or is it, I mean, is
it just, if you can justify
it, if you can show the benefit, the additional benefit, it
doesn't matter whether it's
an acre, five acres, it's more, it's not based upon the
size, it's just based upon
the need.
I can read you the language.
So we draft this different ways in different places.
Sometimes there is no floor.
It's just whenever you need that flexibility.
Other communities say 10 acres or more.
You know, there is some threshold.
We say in this draft right now, maybe submitted for any
contiguous area of five acres or more
within any combination of districts.
Or you can do down to one acre in the central business
district.
So that's a kind of a tailored approach.
So you've got, you can do a smaller site in the CBD.
Okay, so can I pass along a comment to the group that's
meeting tomorrow?
When's the council, the council committee meeting?
Nine o'clock.
That you know, I want to make sure that that doesn't
necessarily impede our desire to have
infill.
I know infill, if infill is, I remember there's an acreage
requirement on infill, if it's
less than an acreage.
I just, if we have an infill project that's less than five
acres, I don't, I guess I would
like to have more flexibility with that.
That's just my comment.
Doesn't mean it has to happen.
That's just my comment.
And on the ADP, this is going away and then to have these
minor modifications, what level
of staff approves those minor modifications as per the
draft?
So just to clarify, it might actually be council.
It might not always be staff.
The way a minor modification is structured is it kind of
tags along with another application.
So it could tag along with the site plan, could tag along
with the temporary use permit
or preliminary plan.
And so whoever hears that associated application type is
responsible for making the decision.
So if it's a staff level decision, then ultimately it is
the director of community development
who's, but they can delegate that down as they can any
decision assigned to them.
Okay, so maybe I'm not understanding the minor modification
.
Could you go back to that slide, minor modification slide?
And we need to fix this slide.
I apologize for that.
But this allows staff to approve.
But really it should say allows the decision maker for the
associated application.
Well, but my question is, because if you're, if you're, so
there's some things that, and
I don't know enough of a specific example, so somebody
might have one, where somebody
might want to deviate from something, either it's a setback
or they don't want this fence
to be here, something that before would have to go to
council or P and Z for approval.
But we really think that sometimes staff needs to have the
flexibility and authority to make
some of these minor changes.
So I get a little confused when you say if it's in the pur
view of whoever the deciding
body is like, okay, let's say a permit, building permit.
You're getting a permit.
Yeah, council doesn't brew permits.
If you want to deviate from something in the code, minor
something, then whoever's reviewing
that permit can do that.
If it's a set of construction drawings, and you want to dev
iate from, let's say parking
requirement.
All right.
Is that a, according to this, would that be, let's see,
changes in uses increases in density,
deviations from use specific standards.
Okay.
All right.
So this is the table right here.
Okay.
All right.
Okay.
That's helpful.
I appreciate that.
Go ahead.
And then I have one more question.
So how does that, are we just changing the name from ADP to
minor modifications?
You were carrying forward a similar idea, but you're trying
to put some more specific
guideposts around it.
So you're putting some criteria in place that you don't
have now, that it's got to meet
or exceed the underlying intent of the code.
And you're also limiting the number of places where that
can be done.
And also you're potentially allowing this to be done at a
staff level versus having
it to go up to a city council or a public hearing.
So you're changing it in some important ways.
You're trying to grease the wheels for the small projects,
but you're also not trying
to allow this unfettered flexibility that we heard was a
problem.
They're close, but we're trying to be nuanced about how we
improve it.
Okay.
So these are the specific areas for minor modification.
Is this the exclusive list?
No.
No.
This is a starting point.
And as I said, we're going to go through and we're going to
work with staff to fine tune
these things.
Okay.
There are a few other ways that you can use this tool
specifically for federal legal compliance.
If you need to do reasonable accommodations for Fair
Housing Act, you can also use minor
modifications for that.
If you need to do something to affect a religious assembly
for RLUPA compliance, you can use
you can make adjustments for that.
Okay then.
So the question that comes for me is, so there will be a
page or two document that says these
are this is the exhaustive list, which we can modify.
This is the exhaustive list of what can qualify for a minor
modification.
Nobody's going to have to guess.
They can look at the table and say it's here, it's not if
it's not here, can't do it.
If it's here, I can try.
Yes very much.
And when staff works on their application requirements,
they need to be adding a box
that says so when somebody submits an application, they're
going to say, are you applying for
a minor modification as part of this process?
If so, which one?
Tell us the justification why you deserve to have this.
So that that'll be that'll be baked into the application
process.
Zoning map.
I know when we changed the zoning map, gosh, when was it?
Was it 2000?
And anybody remember that?
2002?
Two is sticking in my head for some reason.
The council or the city gave an opportunity.
Now it was we went from one thing to totally something.
I mean, really changed it, putting new classifications.
But if you wanted a rezoning in a particular area, why they
were changing the map, they
literally would allow citizens who desired that to submit
their projects to staff and
staff would make a decision on is this something that would
fit into this new zoning criteria
instead of going through the whole rezoning process and
then it would come to council
and council you can make a presentation council approve it
in essence, bypassing PNZ, which
was very effective.
I mean, you had several people, including myself, who had
been trying to do that.
And it was effective.
Is that something that's going to be afforded in this or
are we just changing it in a way
to where we're not really changing the zoning or, you know,
increasing the zoning opportunities
we're just trying to consolidate and does that make sense?
The process you described where someone could come in and
propose that as part of that process
is very wise and makes a lot of sense.
I think that's the best practice.
That said, you know, this piece of the work is not
specifically under our control.
And so I don't want to get out in front of the methodology
for the map.
Oh, who's that under?
It's Scott and Scott and his team.
So they're working on that now.
And so one of the things we're going to be talking about
later today and tomorrow is their
methodology and we're going to wear that.
Then I throw that in the hat.
I think that's a great idea.
I throw that piece of information in the hat.
All right.
The overall goal is simplicity and trying to eliminate
confusion.
And right now you've got these two codes out there and we
're trying to make the whole system
simpler and the map simpler as well.
Okay.
And so as far as the uses within a zoning category, that's
also staff's construct.
Is that staff constructing?
Is that y'all?
That's part of the DDC.
That's us.
Because I think, you know, we have different conversations
about and a great example of
it was people wanting to go in our six, but they we put
enough conditions on it to where
it effectively makes it an NR four and, you know, the set
backs and things such as that.
So I think this is, I guess, going to provide the council
an opportunity that if we want
to change some criteria in a zoning classification, we can
do that.
For instance, you got in our six, do we want or lot sizes?
I mean, I think our minimum lot size is 4000 square feet or
something like that for an
NR six or in other words, this allows us to look at some of
those to make sure that it's
still working for us.
In other words, are we creating I'm just using this as an
example, because we saw it up here
where people could park in their driveway and their truck
if they have a big, you know,
half ton or ton or ton and a half dually, it's sticking out
in the sidewalk because
the setback is are we afforded the opportunity to have
input into that during this process?
Yeah, I think the map and the code need to start building
off each other.
So as the code gets farther along now, and then as you
start to get public feedback on
the map, those are going to start to inform each other.
So I'm working in another community now where, you know,
after the first draft of the map
was rolled out, we went back and we we fine tuned to the
use table.
And because we heard some feedback about the types of small
scale commercial that were
appropriate in some of the mixed use districts.
And so we fine tuned that based on that feedback.
And so I think the same thing could apply to developments,
dimensional standards as
we go forward.
So I think, you know, one of the things that we're going to
be talking with staff about
building into this process is is circling back after you
get this feedback to determine
if any edits are necessary to the draft standards.
Because one thing I thought of is we've done a tremendous
amount of annexations and we
have a default zoning of RD five.
So if people if we're going to be changing the zoning map,
if people have an opportunity
to say, hey, we know what we want.
Can we talk about it and go through that process that best
practice process that you talked
about?
You know, some of the ones on the interior and something
that doesn't.
But you know, already five just isn't it already five?
Yeah, it's a default.
Is it already five or already five?
Already five X.
Yeah.
What is already five?
Everybody's yours.
It's technically unzoned until they come forward with
initial zoning.
Yeah, I already five regulations, but it's not zoned
already five.
Okay.
Oh, okay.
All right.
So then that's it makes my point even more.
So they're basically unzoned.
And so we're going to create a zoning map.
I would think that if they can have an opportunity to come
in and and ask for some of those things
because it's still it's not just staff approval.
It is council approval just helps streamline the process.
Okay, good.
All right.
Any other questions from the council to our presenters?
Any more comments from Oh, I'm sorry, John, I guess one is
from from your standpoint,
as other cities have done this, you know, we've got the
advisory committee, how much
time do other cities generally spend on a with a sub
committee on on this type of situation
because I'm anticipating that it's going to be quite a bit
of work in quite a bit of
hours put in.
This one here.
This one.
So the committee that's meeting tomorrow morning.
Yes.
I think the the goal is we need to talk with staff this
afternoon about kind of exactly
the plan.
But I think there is a lot of work.
I mean, there is a lot of detailed review that's going to
need to be done by the committee
members to to come up to speed on the stuff that we
presented last summer on module one,
but also this module two and module three.
You all will be responsible for really kind of getting into
the weeds with us a little
bit.
But that said, it's not going to be a terrible assignment.
I mean, I think it's very interesting.
I will appreciate your feedback.
But it differs by community, I would say.
Some of our committees are fairly high level, honestly, and
they come and they listen to
presentations and they make a couple of comments and then
they go off back to their jobs.
Okay.
And some I think it's better if you're really involved.
That's that means the community is taking ownership, which
is great.
And just for public clarity, I use the description that it
's kind of like Star Wars.
Module one is actually the second part of this module is
the first part of it.
So it's it's out of order.
And that's the reason we that's the reason we haven't gone
over module one.
Okay.
Yeah.
Okay.
Any other questions or just to clarify, sir, we did go over
module one back in the summer.
Well, not with your committee.
Right.
Yeah.
So willing to talk with Scott about the way to to come back
up to speed on that with you.
And I guess for me, it'd be nice to get a little bit of
clarity on the direction that
we're going.
So we've got council direction and staff, staff truly needs
to understand where it is
you'd like us to go.
So we have an advisory committee and the role or the
structure of that advisory committee
was was all done prior to me, you know, coming on board.
So today, as we meet to talk about these things and as we
move forward, the expectation is
we're going to we're going to do as much public outreach as
possible.
So what we have is a schedule of outreach meetings, which
will not preclude us from
having meetings in our office, one on ones, any any civic
organization, industry, whoever
it may be, we're going to we're going to try to get in
front of and talk about this.
Most importantly, I think, is the is the advisory group
that was established and really understanding
what what the catalyst for that was.
So so we have three members from council and three members
from PNZ.
Ultimately, council is appointing PNZ members and now PNZ
members are part of this.
And is that really the structure that council would like to
retain and who those members
are kind of that commitment to getting into how far into
this and the frequency and that
we can talk with the committee members.
But really, I just as staff, I need some direction on where
it is the council would like for
me to go.
Sure.
Councilmember Ryan.
Of the overall DDC, how much actually is directly related
to planning and zoning?
Isn't it?
It's probably only about a fourth of it.
Is it not?
No, this is a this is a component of the overall municipal
code.
And a lot of the municipal code doesn't relate to planning
and zoning.
But all of the DDC relates to planning and zoning.
Right.
So it all relates to something the council would do.
But a very small portion of it actually relates to what
planning and zoning does.
I think it's the opposite.
Opposite.
Yes, the opposite.
You're saying the DDC relates to planning and zoning more.
Whereas if I understand it, exclusively.
Yeah.
Okay.
Yeah.
And I guess maybe some of the exceptions in that might be
as far as how it is that we
look at it, whether it's some of the engineering components
, water, wastewater, as we look
at some of the ESA or some of the other components that are
within the DDC that may skew some
of that word is that would come directly to council.
It may go to PUB versus P and Z. And so there are some
differences in that that everything
within the DDC will come before council and perhaps not all
items that are referenced
in the DDC are a P and Z matter.
So an appeals process may not result in going to a P and Z.
Who's on the committee?
Somebody refresh my memory.
Who on P and Z?
Do we know?
I've never met with P and Z.
This will be the first time?
Yes.
Okay.
All right.
Well, and I don't know that the I don't know what the
committee's I don't know how many
times the committee's ever met if the committee's ever met.
So are you so is your question, do we still want it to
consist of three council members
and three P and Z members?
Absolutely.
I'm looking for that structure in that direction.
That's what I'm needing.
I'm good with it.
Okay.
All right.
I mean, when did we form that?
I was not on council at the time.
Yeah, I guess if I could jump back in and maybe just
provide some background.
Now I understand your question a little bit more.
So this was set up under prior staffs and prior discussions
as a as a just a stakeholder
sounding board, you know, just folks that can provide
feedback.
It's not a voting body.
It's not any kind of official group.
In other communities where we have a group like this.
It's not just officials.
Oftentimes we might have a couple of local consultants and
some neighborhood folks and
maybe just one person from P and Z and maybe one person
from council.
So you know, it's 10 or 12 people that just kind of
regularly meet and provide feedback
and guidance as we move forward.
I think there was a real focus from some earlier folks in
Denton that you had real good expertise
on the council and the P and Z and those two groups could
suffice and we didn't need to
make it a larger thing.
And I think there was an also also a thought that that
would just be more efficient and
it could move faster that way.
But whoever serves on it, I still think the goal should be
an informal sounding board
just to help us move along quickly.
I know that part of that comes from council.
We actually do already have by ordinance a development
committee and that's we only met
once since I've been on council for three years and we
talked briefly about one thing.
And I think that's where the original three member of
council came from because that's
already established.
And then adding the P and Z to come into it would just be
for more I guess, more opinions.
And I guess maybe this is for Erin from a quorum standpoint
when we talk about six members
versus five, what does that do to us and should we consider
that?
And I guess and maybe one more editorial is that if in fact
whenever this was created
and it's only met one time, I just question when it was
created and the purpose in it
and I just really want to make sure that I'm doing what it
is that you'd like for staff
to do.
>> You had a question for me.
>> I guess I'd have to look closely at the whole history of
this.
I'm not familiar with it and whether there was some type of
an ordinance or resolution
that created it as far as membership.
I just don't know.
I would be happy to talk to you more further after this
meeting to refine that.
>> Okay.
So go ahead.
>> So okay.
So my thought is strip away to three council members
because we'd hear it anyway and just
my thought and add more stakeholders, builders, historic,
people from the historic district
that type component especially, you know, the Allison's of
the world.
I think that component adds more, has more stakeholder
approach to it than, I mean that's
just outside looking in my, I mean maybe it's me running
from another committee but I just
think we're going to see it anyway, right?
And I think we can always access that information.
We can always, nothing precludes us from sitting in.
It's not like you're locked out.
It's not mandatory and it opens a door for someone that
deals with it every day from
a different perspective versus kind of a governing body
look at it.
>> Okay.
Mr. Mayor, do you have a comment?
>> Yeah.
We've been actively working with CDAC and some of the other
local consultants and getting
a lot of feedback.
I would really urge you not to do that.
Sort of I think part of the beauty of the process is to
sort of bring together planning
and zoning and council's expectations of one another.
You're both seeing different things.
If a developer doesn't like necessarily that they're seeing
a P&Z, you tend to get maybe
different arguments at council and I just think it's
helpful to have you two working
together.
We will continue working out, working with the Allison's of
the world and those folks
and in fact we reach out to them virtually every time that
we have a module.
But there have been disconnects in certain policies between
P&Z and council.
I think that my advice to you would be if you're going to
keep that committee, go ahead
and keep that joint like that so there's some continuity of
understanding what a code is
supposed to accomplish.
>> Well, but see, maybe I'm looking at that wrong and I'm
fresh off an argument with the
person I appointed to P&Z, but I think that's right.
You're almost forcing a meeting of the minds and I may be
absolutely wrong, but that's
how I see it.
You're trying to find some cohesiveness and I think that
should be disjointed.
I think it should be this group functions autonomous and
has a fresh look at it.
This group functions autonomous and has a fresh look at it
and I look at it as in practice
the conversation is going to be had.
Either I'm going to have it on Tuesday during the three
minutes segment on open session in
the council meeting, that group that's going to have to
deal with it is going to come talk
to me and tell me, hey, I don't think this is a good idea
or I can have them talk in
advance and save the three minutes on Tuesday nights.
But either way it's coming if they disagree.
Really, above all that, I just see if I'm looking at it
wrong, I'm looking at it wrong.
When I hear you say P&Z working with council, cohesive,
that's not appealing to me.
I really like that they have one look at it and they may
see it different.
I look at their notes.
I can watch the meetings.
I can gather information that way.
I can always call my representative.
I can call any representative on there and say, hey, how
did you get there?
I do it all the time.
Why did you vote that way?
What did you see?
What am I missing?
I'm free to do that in a different area and then come back
and research the data we get
and form my own opinion and look at it separately that way.
I get it.
I hear what you're saying.
I want to be clear that when I say cohesive, I'm just
talking about the purpose in a rule
or guideline, a thought process.
I'm not talking about conformity.
I think that's important because I think if we're trying to
get through this process relatively
efficiently and that will be defined by all of you, it's
not going to be helpful to have
planned commission members being whipsawed with city
council.
That is what happens on a frequent basis with cases and
rules and administrative guidelines.
I think it would be helpful.
We're talking about building methodology and rationale and
kind of leaving it at that.
We're not talking about making decisions on specific cases.
So I think we can hit everybody, but it's going to be
easier to kind of work through
process frustrations.
The people that are willing to serve on these committees
are the ones that are very passionate
about this subject and it would be helpful to have people
kind of working through those
together.
Otherwise, we're going to be recreating the wheel of the
council.
Yes, Councilmember Ryan and then Councilmember Rates.
I see it that we're the ultimate decision makers in the
process and we're the ones whose
phones ring and get the emails if something's not put in
place right.
When we signed up for this job and ran for this job, we
committed to the number of hours.
The P&Z members, quite often when you're trying to talk
somebody into getting in on P&Z, you
say it's about three hours a month is what you're going to
spend on P&Z.
This process, as I see it, is probably you're looking at
somewhere between 30 and 60 hours
worth of meeting time during the course of it to go through
the three modules and are
those P&Z members willing to put that much extra time
forward?
If there are certain parts of this that they don't need to,
that it has nothing to do with
something that would come before P&Z, they may not need to
be there.
At most, I think having two P&Z members on there allows you
to still have a quorum with
three council members as opposed to if you have three P&Z
and three council, you've got
to have four people there.
You've always got to have at least one P&Z at that meeting
in order to create the quorum.
Council Member Briggs.
I just want to clarify the three member council committee
is just like any other committee
that we have, like mobility, ethics, environmental.
It's already something that we have had and when I was
elected three years ago, I chose
to be on this committee so that I could get into the weeds
and hear issues.
I think that's what this is for.
This is one of our options, one of the committees that we
can choose.
It's a three member committee that meets.
We just haven't met because there wasn't anything to
discuss until now.
The P&Z members, I think, were added or invited to come
into our committee to help us so that
we could get experience, different opinions.
So I think the developers have had plenty of time and are
going to have extensive meetings
with these guys and this is our chance to get in and really
dig into it.
And so I'm completely okay with this.
That's what I signed up for.
Well I would recommend that the council members stay on it
because I think it will facilitate
movement.
I've been hearing about updating the DDC since I got on
council in 2009.
And I suspect that if there's no council members involved
in this, it could very easily come
back to the full council without the sensitivity of people
who have been sitting through so
many of these meetings and experiencing so many of these
problems that we've had.
And then it comes back to council for full consideration.
And we, because there's not been that input in the process,
it just gets completely undone
and it goes back to the drawing board again.
I think that having council members on it will provide
important input and possibly
make the process more streamlined.
Okay.
So let me make a suggestion.
Committee's slated to meet tomorrow.
Go meet tomorrow and unless we put it on the agenda and
discuss it further as far as what
the makeup is and things such as that, we'll move forward
with this plan unless there's
a consensus that says don't do that.
Mayor Pro Tem.
I'm okay with what we have going forward.
I just have a question about the makeup.
So tomorrow's meeting is six people.
Is that right?
Correct.
Okay.
And the three PNZ were appointed when and by whom?
Do we know who the three PNZ members are?
Ron, you know those offhand?
If you do, could you come?
Yes.
Thanks.
If I may.
Yeah, let me hear the answer first and then yeah.
Yes.
Andrew Rozelle, Larry Beck and Margie Ellis.
Okay.
Okay.
Oh, I'm sorry.
Go ahead.
I didn't I thought you were.
Well, I just want to make sure that there's going to be a
quorum because I have a hearing
at 830.
We didn't get enough notice for me to change my hearing
date.
So I want to make sure that if there's four people, that's
quorum even if it's only one
council person.
Again, with the actual document, technically three members
don't constitute a quorum even
but if this is a valid committee that's created by
resolution and this would be the makeup,
then under that analysis, yes, that would be correct.
But again, I have not seen a document that actually created
this committee.
I know it's existed but I haven't seen the document.
So this would be my running request.
I mean, I think it will be helpful in the future.
If there's some discussion that we're supposed to be having
about a policy directive, we
really need to see the underlying resolution before we have
the discussion.
I mean, it's not just this, it's like always and preferably
the history as well.
I think we can have a better discussion.
But just FYI, I probably won't be here till 930.
Councilmember Hesbitt.
Yeah.
So that's kind of my point, right?
So I don't even know which three council members are on
there?
Okay.
And then we have legal that's got to get refreshed on this
impassioned group.
So to me that just seems, it sends red flags to me that we
maybe need to, I'm all for speed,
but I just want it clear that we're not even succinct on
the structure of this group and
we're going to meet tomorrow.
I just want that clear and articulated.
Thank you.
And I've had some of those same concerns, plus the posting
that came out does not even
ask for electing a chair.
So we don't really have a way to run the meeting right from
the start.
All it says is to receive a report on this.
So it's a little bit of a mishmash at this point that...
And if I might, I mean, absolutely valid points and what I
want to do is certainly is get
council's input feedback, provide that.
Clarion wants to be able to have that more intimate setting
to get into greater detail
rather than scheduling a series of work sessions.
So look, I mean, it's obvious that you're not prepared to
meet tomorrow.
I mean, there's a problem with the posting, who's going to
lead it.
We need to have some resolution verification.
So I think we need to...
Are the council members okay with us having a discussion
about this before you have your
first meeting?
I mean, yes.
I mean, from a legal standpoint, question, if you've posted
the meeting, can you cancel
the meeting within the posting period?
Yes, you can.
Just making sure.
Council Member Briggs and then Council Member Pratt.
And the last time the three council committee met, I
believe we did, we had a chair, it
was Kathleen, right?
Or was it...
So if we could just look at, find those minutes and see
that discussion as well.
And if these...
And if...
I just assumed that this was the council committee and that
these PNZ members were invited to
come in and...
Yeah, they're not members of the committee, they're
official members of the committee.
Right, so the committee has been created.
It's just a specific meeting and so we would just need to,
if Kathleen was the chair, reelect
the chair.
Okay.
But it's not posted to do that.
Okay.
I don't think, I mean, I haven't seen the posting.
But I think Sarah was the vice chair.
Yeah, it's posted to go right into the code tomorrow and
quite frankly, both Scott and
they're trying to get up to speed on the committee itself.
So assuming the city attorney is okay with how this is set
up, we can still move forward
tomorrow.
If we have concerns about, from Erin's perspective, we'll
reschedule it, reformat it and move
on.
But Scott and I are trying to get up to speed on what the
intention of the council was and
how this was to move forward.
I think we're fine.
We're ready to start working through this.
And this is new to me today about the planning commissions
being sort of volunteers and not
necessarily...
So it's a good discussion if that's in fact how it's
structured.
Yes, and absolutely.
Just staff just needs direction.
I personally look in for direction.
I just want to make sure it's the right makeup and how it
is we got to where we're at and
how to move forward.
Absolutely.
We can have the meeting tomorrow as scheduled.
And if Erin doesn't wish for us to meet for some legal
reason, we will not and we'll follow
the agenda and I'll get direction from the subcommittee as
we move forward.
Again, just looking whether it's the appropriate people are
on there still and again without
any meetings have taken place.
If possible, could legal provide if we...
We might be here till dinner time anyway.
Could you go ahead and maybe look up that resolution and
just pass it?
I know it won't be posted or unless we were able to come
back and I guess this whole discussion
to this committee is still within the posting of talking
about this module.
Because it's trying to figure.
So if we could just get the resolution issue resolved, who
's the makeup, when was it created?
We can do that today.
And are we able to reopen this discussion if we needed to
at a later date?
If we just if we close this agenda item, are we able to
come back into it?
Yes, you can as long as the meeting is still being held in
progress today.
Okay.
All right.
Okay.
All right.
Well, let's do that.
We'll flush that out.
We'll move on for tomorrow pending this information that we
'll be getting with Aaron from the
legal department.
Because that's what I'm hearing everybody wants to do
except for Council Member Hudsbeth.
So I'm not sure if I do.
Yes, I'm sorry.
I'm sorry.
So when when we're looking at the information, we're going
to find out when the resolution
creating this particular makeup was enacted.
And we're also going to figure out when our last meetings
were, if I understand it correctly,
like if there's minutes available, because I'm assuming
there have to be some minutes
somewhere.
That's what you're requesting as well.
I thought that's I'm trying to clarify that that's what we
're going to get out of this
little break.
I will seek for anything that that I can find that relates
to.
The believe it was December 1 Friday report from last year
had a short description in
that and I think that's where the confusion is coming about
because the way it it was
worded it sounded like the PNZ were members of this
committee as well as the council members.
So that's that's a starting point.
Okay, December 1.
All right.
Okay, we're going to find out some more information.
So we may read comments or questions from Clarion.
Any comments or questions from the council at this time, we
're going to have more once
we get the paperwork, I'm sure.
Okay, thank you very much.
Seeing none, we will we will
adjourn this particular work session.
And we also now believe have completed our public work
session reports, if I'm not mistaken.
So we will now convene in the closed session at 410 on
Tuesday, March the 27th 2018, we
will consider the following items consultation with
attorneys under Texas Government Code
section 551.071 and deliberations regarding certain public
power utilities competitive
matters under Texas Government Code section 551.086.
Council now convene in special call meeting on March the 27
th 2018.
It is 628 we do have a quorum and order.
I believe we're pulling for non consideration at this time.
Sorry, let me restart that over my mic was off.
We will now move into special call meeting of the Denton
City Council, March 27 2018.
The time is 629.
We do have a quorum call this meeting to order considering
the consent agenda items we have
A and B that are noted but I believe we are pulling agenda
item B for future consideration
is that correct?
Some understanding?
Okay.
All right.
Okay.
So, Chair would entertain a motion on the one consent
agenda item which is agenda item
one a move for approval.
We have a motion and a second.
All in favor please signify by raising your right hand.
Motion carries.
I'm sorry.
Yes, Councilmember Gregory.
Gregory seconded.
I'm sorry.
Motion carries unanimously.
We move on to our items for individual consideration to a
consider approval of a resolution of
the City Council of the City of Denton Texas supporting
action by the Regional Transportation
Council related to local control and the advancement of the
I635 LBJ East project.
Do we have a very brief presentation on that?
Is that right?
Okay.
I think the computer is fixing to go down.
Good evening, Mayor, members of Council, Mark Nelson,
Director of Transportation.
Yes, I can make this as brief as possible.
Less than 20 minutes anyway.
Really what we have in front of you this evening is a
discussion on managed lanes that really
boils down to local control, local planning control really
at the regional level.
So this is an issue that has been taken up or has been
discussed at the Regional Transportation
Council.
And with that I'll move on into the presentation.
Just a quick overview of particular components.
We'll talk a little bit about the project at hand, where
the state is aligned in itself,
where the Regional Transportation Council is aligned in
itself, a little bit of discussion
on the impact of some of the decisions, and then support of
the managed lanes.
Maybe that bullet point should read local control or local
planning authority.
And then really the next steps, which the next step is
really decision or discussion
of resolution to support that position.
Excuse me.
So this is the particular project.
At the end of the day it's a project that's going to
enhance capacity along 635 East.
You may be well aware of the LBJ 635 project essentially
from 35 down to 75 where they've
added the cantilever and additional capacity.
Those are managed lanes down below and then general purpose
lanes above grade.
And essentially what that provides is additional choice for
those folks who are utilizing that
corridor.
This particular project is east of 75 down to I-30 and
provides a similar managed lane
component.
Pretty much what you see, just a larger version of it, what
you see on I-35 south of here
from Corinth down into 635 into Dallas.
So essentially what has happened is the governor and
lieutenant governor and a couple of senators
have basically submitted letters to the RTC requesting that
they do not advance additional
transportation projects with the toll component.
They have worked with the Texas Transportation Commission,
which is appointed by the governor,
and has oversight of the unified transportation plan and
asked them to pull any projects that
are out there that do have a toll component involved in
that.
So what does that directive do?
It essentially creates about a $770 million, maybe a little
bit more.
They're still polishing and sharpening their pencil as to
what that number is, but roughly
$770 to a million dollar gap in terms of trying to fund
that particular project.
So the RTC came up with a plan that would shift funding
from other projects to backstop
that and move that project along simply because this
project, 635, is ready to go.
It's got its environmental cleared.
It's got schematic plans in place.
So long and short, it's ready to move forward.
They did not want to delay it, so they looked to take other
projects, funding off of the
other upcoming projects to advance that.
And so one of those projects is I-35 West, roughly in the
Fort Worth corridor up to 114,
also has a toll component to it.
So in summary, what this directive does is it really pulls
local control from the planning
perspective from the regional transportation council by
shifting the planning process.
I'm sorry, Council Member Ryan.
You said I-35W has a toll component.
Is that in the funding of it?
It's in the planning stages at this point in time.
I-35W, they've actually pulled it off because of what the
governor said, but essentially
the planning directive would have managed lanes down the
center, similar to what 35E
has.
Okay, because in the 2045 plan put out by RTC, it's not
showing to be any managed lanes
on that side at all.
Right, and what they have is because of that, they've left
a wider median in the middle
so that they could add those at a later date, but that's
the direction they're moving forward
with the I-35W.
So the regional position or paradigm, if you will,
Metropolitan Planning Organization,
as stated here, is federally required and recognized.
It advances a transportation plan that is voted on and
approved by members of the RTC,
which are generally elected officials throughout the region
.
And essentially they have voted in favor and advanced a
plan that does include a managed
lane component to fund a portion of that 635 project.
And so as stated earlier, this project is, you know, the
region's ready to move forward
with this.
It's ready to be let, or I'm sorry, ready to be bid.
So at RTC, Dallas has actually emphatically stated that
they would not support a project
that does not include the managed lane.
And so representatives from Garland and Mesquite have also
voiced their strong opinion as far
as including the managed lane component, and Denton County
has also expressed their desire
to include that because pulling that funding component or
that tool, revenue tool, for
regional transportation infrastructure would impact some
advancements, some capacity enhancements
to I-35 from 635 up to the Rayburn, Tollway, Bush, and 121
in that area there on the south
side of Lewisville and Denton County.
As stated here, communities and the drivers are embracing
the managed lanes, seeing a
drastic increase in the use from the projected volumes on
the managed lanes, and then essentially
using the managed lane revenue in part, the region has been
very creative in how they've
advanced funding.
As stated here, seven billion has been able to leverage
upwards to 21 billion in new transportation
infrastructure throughout the region.
So as stated, the managed lanes offset funding deficits,
and so these managed lanes actually
provide alternatives to drivers, even if you're not
planning to use those managed lanes, by
pulling folks who do choose to use the managed lanes, it
creates additional capacity in the
general purpose lanes.
So a couple bullet points here towards the end, kind of
expressing a little bit about
how well those managed lanes are working.
So what does that do?
35 miles per hour in peak, now it's an average of 50 miles
per hour, reduces a lot of stop
and go traffic along those congested corridors, improving
the air quality.
So that's one of the key elements that the RTC is trying to
address in the non-attainment
area here in the North Texas region.
Another comment there with reduction, 72% reduction in
congestion out of the MT North
Terran Express.
So where are we at this point in time?
RTC is scheduled to take action on this particular issue.
They are working through a series of upwards to 11
different funding mechanisms that would
include anything from shifting funding from current
projects, in other words delay in
those other critical projects, to a do nothing at all
approach.
And so the item before you this evening, the resolution in
front of you this evening is
really taking a position with local control, local planning
, the efforts that the RTC has
advanced over the past year to 18 months to advance the I-
35 project and really at the
last minute having Tex.Austin, the Governor's Office,
change the planning direction and
how best the regional folks can plan for their regional
infrastructure.
So with that I would take any questions and help clarify if
I've left anything uncertain.
Any questions?
Councilmember Gregory?
There's not so much question as we're just being put into
this situation.
In the mobility committee meeting, it was an interesting
discussion because we were
talking about first we were saying free lanes versus
managed lanes.
But what it really is is tax supported lanes versus toll
supported lanes and that actually
the toll supported lanes helps us fund some of the rebuild
of tax supported lanes.
And we're put in this position of needing to rely on some
toll supported lanes because
the state's unwilling to increase revenue by increasing to
pay for infrastructure improvements
because they're unwilling to pay request a increase in the
fuel tax.
So we're just put into this situation of a growing area and
needing some way to pay
for the construction of those roads.
So it's not really that we're being asked to support toll
lanes.
It's just we're being asked to find a way to fund the
construction of lanes that we
must have that the state's unwilling to fund.
Right.
And there's a significant concern with the some say prol
iferation of the toll lane or
toll lanes in the state of Texas.
The state legislature has approved essentially five
projects to allow for a toll component
or a managed lane component in this case and one of them is
I-635.
There was a couple one out of Houston and one out of the
Austin area that was also put
on ice based on the directive.
Did you have a question?
So then I would move approval of the resolution.
We Councilman Gregory made a motion to approve.
Do I have a second?
Second.
Mayor Pro Tem second.
Let's vote on the board.
Vote on the board.
Everybody.
We're voting on agenda item 2A.
Everybody in approval please signify by raising your right
hand.
Passes unanimously.
Move on to agenda item 2B.
Consider adoption of an ordinance of the City of Denton
Texas Home Review Municipal Corporation
amending ordinance number 2017 to reduce solid waste
residential rates.
Mayor, my name is Tony Puente, Director of Finance.
As we discussed earlier in our work session, the
recommendation before you is to reduce
rates for solid waste residential collection services by 12
%.
Those rates as we've outlined previously to you translate
to about a $40 per year reduction
to the customers with a standard cart, refuge and recycling
or about $47 per year for customers
with a large refuge and recycling cart service.
There's additional reduction for those individuals that
have additional large cart.
But again, we have very few customers that have those
additional carts.
I don't have a presentation for you.
I can certainly put the presentation that we discussed
earlier in work session if you'd
like or I can just stand for any questions.
Council Member Briggs.
I move approval.
We have a motion.
Mayor Pro Tem.
Second.
We have a motion and a second for agenda item 2B.
All who approve signify by raising your right hand.
Motion carries unanimously.
Agenda item 2C.
Consider adoption of an ordinance authorizing the City
Manager to sign a notice of extension
of the TNPA power sales contract for seasonal operation
from September 1, 2018 to September
30, 2018.
George Morrow, General Manager of DME.
So before you tonight is an extension agreement for a one-
month period from September 1st
to the end of September for the Gibbons Creek power plant.
Obviously our contract expires September 1st and staff has
evaluated and determined that
the value of that plant exceeds the cost for that one-month
period.
We can still get pretty good hot conditions in North Texas
at that time.
This election is made pursuant to this part of the contract
so I'm just showing you that
provision says basically we have the right, the three
participants that are left in that
project, Garland, Brian and Denton have the right to extend
for this one-month period.
So there's a one-page extension letter in your packet that
we're being asked to execute
to confirm our desires for that month period and we'll be
picking up Greenville's old
piece.
They have 10%.
They're leaving.
We're really going to increase our entitlement 11 megawatts
for that one-month period.
I would point out there's no obligation beyond the
September 30th period.
There's some discussion of operating the plant seasonally
again for next year.
That's an open item that there's no commitments made by
anybody, something we'd come forward
as we have better information and talk to the City Council
about going forward.
Some of the key aspects there is how does the plant run
this summer?
What does the market look like for that power?
Anything else that would make that decision for you.
So we're asking approval of an ordinance which would author
ize execution by the City
Manager or his designee of the extension letter to keep Gib
bons Creek running for that extra
month which I think had always been anticipated.
It's just contractually there was this gap there that we're
trying to take care of.
So any questions?
Council Member Briggs.
Was the PUB updated on this?
Yes.
Did they see it last night?
Yes.
Yesterday?
Okay.
So the PUB came forward and endorsed this item by a vote of
five to one.
Okay.
Mayor, I move approval of item 2C.
We have a motion by Council Member Gregory, Council Member
Ryan.
I'll second.
Do we have a motion and a second?
Oh, I'm sorry.
Yes.
Discussion for a moment.
Yes.
I'll be voting in favor of this.
I just wanted to clarify though the reason I'm voting in
favor of it is because it presents
the possibility that the DEC will probably maybe hopefully
run for slightly less time
if we have Gibbons Creek online.
Okay.
All right.
Any other questions, comments?
Council Member Briggs, did you have a question or comment?
All right.
We have a motion and a second.
All in favor, please signify by raising your right hand.
Council Member Duff, is that a -- oh, okay.
Yes.
All right.
I'm sorry.
Didn't you -- yes.
Yes, you were.
Okay.
The motion carries unanimously.
We did have -- we're going to need to go back into one of
our work session reports to get
an update on the -- let's see.
Which one was that?
Item 2D as far as regarding the update for the Denton
Development Code Module 2, but
more over the Council committee and the resolution and just
sort of update from legal on matters
that we discussed in that work session.
So I'll go ahead and reopen, I guess, the agenda item work
session report 2D, receive
report and hold discussion, provide direction to staff on
the Denton Development Code update.
Thank you, Mayor, Council.
So on -- our department was able to look into the -- how
the development review advisory
committee was actually formed.
It seems originally it was formed without a resolution in
2006 by a previous council
that at that time they contemplated having three members of
council as well as three
members of the P&Z be members of that committee.
In addition, there's language in the AIS from that meeting
that their meeting or they were
formed to look at some specific amendments that were being
discussed by council and P&Z
at the time and that they would only last between 12 and 18
months for that committee.
And so that's how that was formed.
We don't know if there was anything else beyond that that
extended it other than what appears
in a resolution in 2015 in which this council amended its
board's commissions and committee's
handbook.
And in that handbook, there is a -- this committee is
actually recognized as an ad hoc city council
committee.
So there is some support in a resolution that you've all
passed that this is an active committee.
I think there was some information provided by Council
member Ryan that this is -- that
they've had an actual meeting not too long ago.
Was it Councilmember Briggs?
I apologize.
And so it seems that it has been living up to its duty.
Based on that, I would recommend that tomorrow's meeting do
continue going forward.
Since there are only two council members on that committee
--
There's three.
But the third one was Councilmember Wasney who's no longer
here.
Did somebody replace her?
John.
Yeah.
You replaced her, Councilmember Ryan.
So if at least two members show up at nine, that's what you
need to have a quorum to
start off.
I'm not suggesting at this time that the members of the P&Z
be considered as part of that committee.
I do recommend for quorum purposes.
They can be at the meeting, provide any questions, ask
questions, input.
But I also highly encourage this council to consider
adopting a resolution setting forth
the parameters of this ad hoc committee so that not just
for ourselves but in the future
our later councils and P&Z commissions will know what the
makeup of this committee is.
So I highly encourage that.
Yes, Mayor Proctor.
So when were Commissioners Rosell, Ellis, and Beck
appointed to this committee?
Because I don't remember that as an action of the committee
.
Yes.
I don't remember that either.
The only thing I can speculate since our line use attorney
isn't here is that they were
nominated by the P&Z commission as their representatives to
this committee.
Oh, I see.
Okay.
So there wasn't any formal action that would establish
parameters for the nomination process
or composition even of a committee including P&Z?
That is correct.
The council in 2006 just had an agenda item and they had an
AIS and just approved it without
a resolution.
Okay.
That provides a lot more clarity.
Thank you.
Council Member Hesbitt.
And then to your point, I mean, so John says he joined.
Are there minutes to support that?
Or do you have to go back and?
That's in one of your earlier meetings involving
appointments to boards and commissions.
At that point, Council Member Ryan was replaced, nominated
to replace Council Member Wasse.
Got it.
Okay.
Okay.
All right.
Any questions on that?
So the meeting moves forward?
That is my recommendation.
Yes.
Okay.
All right.
Any other questions or comments on that work session report
?
We will move from that work session report and go back to
our special call meeting, reconvene
for our last agenda item, which is concluding items.
Anybody have concluding items?
I'm going to start over here.
Mayor Pro Tem.
In our Friday report, we got a memo about a partnership
between the PD and Denton ISD.
So I was wondering if, A, we would be getting a
presentation on that during our joint meeting
with Denton ISD on May 7th.
And if not, if we could get that.
And then to the extent that there's a policy discussion in
there, I'd like to have it because
I think it's probably more than just managerial type
decision.
So I'd like to have that discussion at the time with Denton
ISD as well.
Or individually as our own group.
It's really, I just thought that day might be helpful.
Okay.
Council Member Deff.
Yeah, I've got about 49 letters here that I got from people
mainly, I think, in apartments.
They're really concerned about the recycling.
It's very obvious that we have a lot of people that want to
participate that can't right
now.
And I understand there's cost and logistic, I mean, the
logistics of it and all that.
I think for my house, about 80% plus goes into recycle.
Very little goes into the trash itself.
And I think this is something that we need to seriously
look at.
And it helps our landfill.
Second thing.
Yes, go ahead.
I'm sorry.
I tell you, the parking down in the downtown area is pretty
brutal if you come at the wrong
time.
One of my observations though was is there was a credit
union that's down on Mulberry
that's shutting down and moving out.
And I'm wondering whether that might not be some land that
we could acquire.
Because if we got that, it's a pretty good area.
We could initially just turn that into a parking lot and in
the future put a parking garage
there.
I know my wife told me that the parking garages are all
ugly, but I'm sorry.
I don't see any reason they had to be ugly.
As a matter of fact, if you put one there, I mean, you
could put restaurants on top of
the thing.
And it doesn't have to be ugly.
But I'm just wondering if that is a possibility because I
have no idea what they're planning
on that property.
Council Member Hussby.
I just wanted to give everyone a heads up.
So April 24th, I'll be late getting here for that.
It's just a work session day.
So I won't be here.
I'll be here.
I know you're still up and running four ish five ish six is
h in there someplace, but I
have a prior commitment.
So just a heads up.
Okay.
Appreciate that.
Thank you.
Council Member Gregory.
I hope that our posting for our luncheon with the school
board is done in a way that's broad
enough so that we can have some dialogue with the school
board members, especially about
issues regarding their plans for future construction,
report on the bonds, any land purchases that
they've made and what they might be doing with that.
Also, I hope that it's broad enough that there's an
opportunity for us to discuss school safety
and the deployment of school resource officers, things of
that nature.
Just want to have that broad enough.
I wish we had had that meeting scheduled prior to the bond
election.
I think it should have been, and I'm disappointed that we
weren't able to do it in a way that
we were able to get that information prior to the bond
election.
I think we've pretty much covered this in our work session,
but just to bring clarity
to that, I want to request a work session that is broadly
posted to discuss red light
cameras, traffic signals, and intersection safety, just
something with a much broader
posting than what we had today.
- Okay, Council Member Briggs.
- I remember in our discussions for McKinney, and also
Mayor Pro Tempig-Garry brought it
up, there were text dot funds that were allocated that had
to be used by a certain day or time.
I just want to make sure that we're still on schedule with
that project for those funds
to make sure that that's all coordinated so we don't lose
that.
I'd also like an update if possible for us if we've hired
or the hiring process for the
bike and pedestrian coordinator.
I've been seeing a lot of confusion still in our community
because that position is
vacant and I know that it's important for our community to
have someone there.
I was going to ask about a non-restrictive discussion on
red light cameras that Council
Member Ryan just brought up.
I'd like to see or have a request a wastewater drainage fee
ordinance in our Friday packet
so we can review that before our next discussion.
I had a report that the timing at Carroll and Hickory cross
walk is short.
I don't know if it's shorter than normal or if we could
just have somebody look at that.
Also in our Friday packet, a printed copy of the new
proposed zoning map.
We may see that tomorrow at our meeting, but if we could
just have it to look at ahead
of time.
And then last, with the DDC, there's a lot going on and
there's some really specific
to neighborhoods that don't really involve developers.
And I want to make sure that planning creates collaboration
with the residents that are
directly affected.
For instance, in my district, the historic district, there
is a new national register
district being created.
I don't know if staff is aware of that, but I'd like to
make sure that this group is included
with city staff as the historic preservation plan of the D
DC is updated.
Sorry, I forgot my other item.
Apologize.
And I just wanted to clarify the red light discussion would
include the contract as well.
So the entire scope of what could be discussed in a red
light camera discussion.
Council Member Duff brought up a good point, which I also
got the many letters regarding
recycling and I know that our environment subcommittee is
working on that.
However, I wanted an informal staff report or some type of
report indicating what percentage
of our recyclables are sent to China, if any, because I
know that China has banned all foreign
recyclables at this point.
So they did accept 50% of the world's recycling material
and it's being backed up at various
locations now.
So I wanted to make sure that we still have buyers for our
recycling and if we don't have
buyers, what percentage of that is not being purchased by
China anymore.
I've just got a couple wanted to give a shout out to DME as
I was driving into the city
on Bonnie Bray.
Apparently the straight line winds that came through about
7 a.m.
There was one snapped power line and two or three of them
that were about hanging on the
ground.
So they were on the spot and I'm sure they've been working
all through the day to get those
repaired.
So shout out to them.
I want to also just thank Julie Anderson for her work with
Keep Dentin' Beautiful and the
Great American Cleanup.
She did an excellent job and all her volunteers and all
those that worked at that event.
This last Saturday as you drove around town Saturday
morning until about noon, you saw
various people all over the city picking up trash and
litter and I certainly want to thank
her for that and just for everybody in the community that
came out to help keep our,
to help Keep Dentin' Beautiful to pick up the litter.
And one thing I did learn and I think that we need to think
about this as a city.
I know we use a lot of things that are recyclable but what
I did not know is from one of the
booths there, very educational, is styrofoam never degrades
.
It never degrades.
So I would like for staff to just take a look at, you know,
our styrofoam use and to see
exactly where we use it and how we use it and, because I
was quite frankly stunned at
that.
Yes, Council Member Briggs.
This is a new, this is a concluding item.
This isn't a discussion, it's a concluding item.
It's to add to the concluding items because of what you
just said with the styrofoam and
during our DASD meeting because they are a very extremely
high use of styrofoam trays
for every school.
And so they could, we could just include that in their
discussion on what they use and that.
Okay.
Great.
Thank you.
You bet.
All right, any other conclu- Mayor Pro Tem, you're giving
me the stink eye.
No.
Okay.
Well, plastic never degrades either.
Every item of plastic that has ever been made is still in
existence.
Well, that's true.
I guess that the, in the concluding item and the
educational component of that concluding
item, it showed that it degraded at some point.
But so we can look at that as well.
We will add that to that as well.
All right.
We will now conclude this very long, what do we call this?
Just work session and special call meeting.
We will adjourn at 702.
[ Silence ]