Feb 13, 2018 City Council on 2018-02-13 12:00 PM
February 13, 2018 City Council
Full Transcript
I wanted to welcome everybody to this meeting of the Denton
City Council on Tuesday, February
13, 2018.
It is 12 o'clock noon.
And we do have a quorum.
We will move forward through our work session reports
starting with agenda item 1A.
We report whole discussion to give staff direction
regarding request for resolution of support
from a developer applying for a 9% housing tax credit with
the state.
Good afternoon, mayor and council members.
I'm here today to present a 9% housing tax credit request
for support.
By way of quick background, just as a reminder, I know we
've been going through this recently
through the last few months, but the Texas Department of
Housing and Community Affairs
administers the federal housing tax credit program in Texas
, and they receive applications
from developers for these housing tax credits and rank them
based on a number of factors.
One of those factors is if they have support from their
prospective community where the
project will be located.
So as mentioned over the past few months, city council and
staff have been working on
a draft policy and application for a housing tax credit
request of support.
And while we've been working on this, in December, TDHCA
released their 2018 timeline for the
9% requests with an application deadline of March 1st, 2018
.
Due to the quick turnaround in timeframe, we decided, staff
decided to use the draft
application and provide that to interested developers in
order to give us information
on their projects and streamline the review process for
council.
Just as a reminder also, the 9% requests are once per year
and they're on a short timeframe
window from January to March, but the 4% requests can be
considered year round.
The 9% programs are also very competitive.
At the end of January, there were over 109 million in
credits requested with only 13.2
million available to allocate.
So just gives you some perspective for how competitive it
is to get these 9% housing
tax credits.
So as mentioned, we use the application process.
We received two applications.
The first was from Palladium USA for a multifamily
development on Teasley Lane.
The second project was from Sagebrook Development for a
multifamily development on the southeast
corner of McKinney and Mayhill.
We met with both those developers on January 19th to review
their information with the
staff team from CMO, planning and community development.
However, on February 5th, we received notice from Sagebrook
Development that they were
requesting to withdraw their request for support.
They had reviewed TDHCA's list of everyone that had applied
for the housing tax credits
and just felt like their application wasn't going to be
competitive enough and wanted
to withdraw that request for support.
Therefore, there's only one request before you today and
that is from Palladium USA for
the development on Teasley Lane.
Real quick, when you say there's only one request before us
, but the resolution of support
will be on a subsequent agenda if that's the direction, is
that right?
Correct.
Yeah.
The purpose here today is staff wanted to present some
information about the proposed
project, see what questions you have.
The developer Ryan Combs is also here to answer any
questions.
If Council so directs, we'll bring back a resolution of
support at either one of the
next council meetings in order to meet their March 1st
deadline.
Okay.
Yes, Council Member Briggs.
So I have a question for you and Mr. Combs may need to
answer it.
With the Palladium, I know that we did another project with
them and they were very good
about reaching out to the neighborhood and the community.
And I just want to make sure that community meetings are
planned for the future for this
area.
And also a question, in either the last unit, I think some
units were set aside for homelessness
or for other work with nonprofits.
And I'm curious if the same number of units are going to be
planned for this development
as well.
And also if as far as credit or rental history, if there's
any forgiveness on any of that
for the affordable units that they have marked out.
Okay.
I will ask him to address that maybe towards the end of the
presentation.
I think I'll address some of your questions as we go
through in terms of community meeting
and outreach.
Okay.
Thank you.
So just by quick way of background, these maps were
provided in your backup.
It just shows the multifamily developments that are within
the City of Denton as well
as the second map showing the tax credit developments are
within the City of Denton currently.
So, Palladium Teasley Lane is the name of the development.
It's a multifamily development located on a parcel just
north of the Sprouts grocery
store at Teasley and Hickory Creek Road.
It would be new construction multifamily.
So it is on a 6.84 acre site.
It is currently zoned CMG district.
So multifamily is permitted.
However, with the limitation four, they would need a
specific use permit since it will be
all residential development.
It would not have the mixed use development component.
So they would have to proceed through planning and zoning
to go through the further site
plan review and apply for that specific use permit.
It also has a L6 limitation for commercial use on the
ground along any Avenue Collector
or arterial street.
However, our planning staff will be coming back to City
Council at the next meeting recommending
removal of that L6 limitation for the CMG district.
So that restriction would go away if Council approves that
recommendation in the future.
Otherwise they would need to proceed through zoning review
as well.
So this is a preliminary site plan.
And again, it's very preliminary.
The developer is still working on how the buildings would
be configured, the intersection
alignment, the drive connection, some of the tree
preservation and landscaping.
But it's to provide an idea of how many there'd be four
buildings, three stories each.
There would be a clubhouse and a pool and there would be
surface parking.
And the current preliminary site plan has adequate surface
parking per our current code requirements.
Oh yes, I'm sorry.
Is that a single family home directly on the property line
right there?
There is a single family home in the back right here.
Okay.
And what is that a little bit right there?
I am not sure.
I think that might be shed.
Oh, it's part of that property.
It's part of the property, same property.
Okay, thank you.
Did you have a question?
Yes.
Yeah.
I think you did mention the driveway connection because I
remember when the property to the
south was being, came before council, the driveway that was
extended up, that there
was talk that it would be required when that property was
developed, that there would be
connection to the community pharmacy driveway as well.
Is that part of what they're still working on is trying to
develop that or?
I'll ask the developer to address that, but yes, they're
still looking at can they make
those drive connections and it would be part of the
planning and zoning review as well.
Okay.
So for clarification, this is the property that's next to
the community pharmacy?
Yeah.
On the south side?
Yeah.
Okay.
All right.
And this home that's down here, obviously that looks like a
fairly large home.
Where does the entrance for that come off of?
It's on Hickory Creek Road.
Okay, so on the other side?
Yes.
Okay.
All right, thanks.
Okay.
So there is a total of 120 units proposed.
75% of those units would be affordable and 25% of those
would be market rate.
And so there's a breakdown and a chart shown here of how
many would be one bedroom, two
bedroom and three bedroom and then also what they're trying
to target for the area median
income levels.
The developer would provide services at this development.
They would partner with nonprofits and churches to
accomplish this and listed on the slide
as some of the examples of programs and services that would
be provided.
The developer also takes an approach to community building
within their apartment developments.
So what they do is they hire resident retention specialists
, they call them, and they actually
provide an apartment for free and then they are in charge
of trying to foster more community
building as well as hosting programs and events within the
actual development.
And they call those CARES teams.
Question on this chart.
So when I see the estimated rent range there, we'll just
take any of them.
Let's just say the two bedroom.
423 to 1037, I'm assuming that the 1037 would be the rents
at the market rate.
I can say that for the end if we have questions for the
developer.
I'll do that.
I'll say the questions for the end.
Yes.
I did not understand one thing that you were saying about
the retention specialist and one
free apartment.
What does that mean, one free apartment?
So they hire resident retention specialists and their
compensation is in the terms of
provided a free apartment to live in to provide those
services to the community.
Thank you.
Sorry if I misstated that.
Does that free apartment come from the market rate unit or
the affordable unit?
I'm going to ask Ryan to come up here since there's some
questions that he can help address.
I think you just keep writing them down.
Yeah, yeah.
Somebody, yeah.
Okay.
Yeah.
If we could do that and we'll address them all at the end.
That'd be great.
Thank you.
Thank you.
Also wanted to note this development would pay property
taxes.
The developer included a sample Performa in the application
and that was from their Palladium
Denton development that was recently approved in December
up at Sherman Drive.
It was about $150,000 per year in property taxes.
So Neighborhood on their TDHCA self score, they rank
themselves high as being close to
a large number of community assets.
They're also very close to major thoroughfares and roadways
for transportation.
They are limited on the public transit options that are
directly nearby adjacent to the property,
but within close proximity to those available in downtown
Denton.
It's also important to note that this is within a census
tract with very little poverty, 2.5%.
And there's no HTC projects within this census tract or
within two miles and the limited
multifamily developments in the area as well.
So the developer is Palladium USA, which I know City
Council is familiar with.
They've been a developer of rental housing for over 140
years.
Their model is to be developer, owner, and manager, meaning
they keep the properties
and they manage them themselves with an in-house management
company.
And below is some projects that are listed that have
recently been accomplished, including
the Palladium Denton that was just approved and is
scheduled to begin construction in
early summer of 2018.
So that's the project overview and staff is looking to
receive direction if a resolution
of support should be brought back for February 20th or
February 27th.
And I'll ask the developer to come up at this time and
address any questions that you have.
Any more questions for staff?
Okay.
>> All right.
Thank you.
I'm Ryan Combs with Palladium.
Good to see you all again.
I appreciate you allowing me to be here again and take a
little bit of your time.
Palladium Denton, as she said, on the north side of town,
that was a great process that
you allowed us to go through and we do plan to begin
construction on that early summer
and very excited about it.
So we've entered into this process again.
It's the same process as last year.
There were a few questions that I wrote down.
Community meeting is certainly something we're happy to do
with the neighbors.
We are, as I can tell, and I've driven all over the
property and looked at it all over
Google Earth, the one home behind it really is the only
neighbor.
We've got the community pharmacy to the north, the sprouts
to the south, and then there's
a big kind of -- I guess it's a detention pond/lake for a
single-family neighborhood
that's on the other side of the lake over there.
But we're happy to meet with neighbors and just like we did
this past time.
Our unit mix is very similar to what we did up north.
We've got -- can I go back to that slide?
Oh, there we go.
There's the arrow.
Yeah.
>> This one?
>> That one right there.
Perfect.
Yes, our unit mix is very similar to what we did last time,
and this is the 9% tax credit
program.
There's two programs, as she said, that you can use tax
credits on.
There's the 4% program and there's the 9% program.
The 4% program is noncompetitive, however, it's half as
good.
You get half the equity, which means that usually there's a
funding gap that you've
got to make up, which means we've got to go to the city and
ask for tax exemptions or
soft money or, you know, if you have other home funds or
other things that we can use
to try to make things work.
And that's the 4% program.
That's not what we're asking for here.
The 9% program, the good thing about it is it's -- they can
stand on their own.
We don't have to ask for tax exemptions or any money from
the city, any substantial money
from the city to make those work.
And so that's the benefit.
The challenge is they're very, very difficult to get.
This year, the governor in December signed into the tax
credit law this year that counties
that within the past two years got a disaster declaration
get 10 extra points, unfortunately.
Well, fortunately, Denton County has not had a disaster in
the past two years.
Unfortunately for us, we're down 10 points from Collin
County, Dallas County, Ellis County,
some of these counties that were hit by a tornado a couple
years ago.
And so we're not as competitive as we were last year.
You know, we like Denton and we had a great experience that
we just went through.
We want to build and be more a part of this community, and
so we're trying it.
Quite honestly, we would need some things to fall out for
this application to get funded,
but I want to be transparent about that.
But we do want to try it.
Our unit mix is very similar to what we did on the north
side.
So we will have about 25% market rate units.
And Mayor, your question about the rents.
So that range that the we'll just take the one bedrooms 351
.
That would be for the 30% AMI.
And we've only got, you know, three units at that low end
price.
And then the 944 is what we are anticipating market rents
for the one bedroom to be.
And so that's kind of the range.
So, Ryan, it looks like that 50% of AMI and 60% is so let's
just take the one bedroom,
for instance.
Right.
So the 351 is at the 30%.
What would be approximate costs at the 50 and 60% range on
one bedroom?
So it's usually usually the 60% rents are about $200 below
market.
So we call that, you know, 750.
It's usually around $800 for the 60% rents, the 50% rents
are usually 50 to $100 below
that.
So, you know, $700 to $800 for the 50 to 60%.
And then 940, 950 for the full market rate.
Entry drive.
Let me go to that was one of the next questions.
Is that the site plan?
Here we go.
So the site plan, the very first thing that has jumped out
at us as we were we were in
a tight time frame to get this to the city.
We know that we have some blood playing up on the northwest
corner that we cannot build
on.
So we're trying to stay away from that.
We do want to try to create as much as a buffer from this
one single family lot as we can.
And this also tends to be the low side of the property.
Oh, you need to get behind the mic.
Sorry.
I'm sorry.
So that's why the detention pond is right here.
Now this entry drive, the developer has already created a
little stub out right here.
So what we will do is we'll back all this up.
And if we need to connect this drive up to the community
pharmacy, I think it's also
a community health center right there, then we can do that.
That's the type of thing that we'll go through as we're
going going through the full development
process with the city once we feel like we do, we can get
the funding in place.
And there are also the challenges on this site is that
there's a lot of topography,
there's a big hill in the middle of the site.
The other challenge on the site is there are a lot of
beautiful beautiful trees.
And so there's opportunities with that.
But it's something we're really gonna have to study, we're
going to need to do a tree
survey and really study how to really maximize keeping as
many the nice trees as we can.
So, so this is a very preliminary site plan at this point.
Our cares team.
What we do with our cares teams I'm on, I am on the
advisory board of it's a it's a
nonprofit called apartment life and they're not us they're
they're a separate nonprofit
that was born out of First Baptist ULIS about 15 years ago.
And what we do, they're a faith based nonprofit.
And so what we do, we're doing it in in our property up
north as we go to local churches,
one of the big church here in Denton that's that supports
apartment life is Denton Bible
Church.
And what we'll do is recruit recruit a married couple out
of the church, give them an apartment
unit, and then they become kind of live in that we call
them cares teams because that's
the name of the program.
But what they do is they live out their faith on site.
So they are out they'll do new resident move in visits, hey
, you just moved in, can we
help you find a grocery store place to work out where your
kids go to school, you know
what, all of these types of things.
And so they're they're just caring about their we call them
professional neighbors, and they
do a number of social events on site, but then they also do
a lot of things just making
helping build a helping build a sense of community, which
is what what churches really are trying
to do anyway.
And the other the other benefit to that is it helps people
start building relationships
into local churches, local nonprofits, they'll build
relationships with YMCA and other other
just local nonprofits.
And so it's a way for us to really help our residents build
roots into the community.
Did I address all the questions?
Go ahead.
Do you do they live in a one of the units that were set
aside for the lower income or
do they live in a market rate?
What both it depends if if if we find a couple sometimes
young couples from churches that
are not ready to buy a home this is a benefit for them.
You know, a lot of times we'll get youth pastors or people
that are, you know, they're
not ready to afford a home and people that work at churches
are typically not wealthy.
And so if they can, the benefit of having market rate units
and affordable units is
we can put them anywhere.
And so sometimes they're in market rate units.
Sometimes they're in some of the affordable units, it just
depends.
So question I have is more of an operational one, just so
that I have an understanding.
You've got market and affordable apartments, right market
rate and affordable housing.
So someone comes in, let's say that is a family need a
three bedroom, they would fit into
30 or 40% or 50% AMI.
Right.
As far as what income that can be verified.
As far as it, are you able to provide or let's just say I
mean some some apartment owners
I know they, they have a policy that if someone has an ev
iction, they're automatically, you
know, denied because they've got an eviction in their past.
I said this is just this is just anecdotally sure.
But if someone so is there a criteria that you're able to
apply to people who are under
the affordable housing track that provides a little bit
more accommodation or deep because
of the fair housing laws you have to say, doesn't matter.
Here's our policy.
Here's our application criteria.
And what we can and cannot do and notwithstanding where you
fit in, in, in this affordable or
market model.
Right.
This is our criteria.
Is that is that my understanding on on on we do have to
abide by fair housing laws.
And so what that means is, you know, we do we do background
checks on everybody.
And we also do credit checks on everybody that comes in to
be able to prove that they
can pay rent.
And so you know if somebody has a a violent crime in their
background, or that shows up
on shows up on a credit check or not a credit check a
background check, then if we're going
to deny that person fair housing my understanding of fair
housing is then we have to deny everybody
that has some type of felony in their background we can get
and I'm not I'm not asking you
to maybe go into specifics because I know that's probably
not your purview.
But what I'm hearing you the answer to my question is, I
think what I'm hearing is we
have a criteria that we apply to every tenant, notwith
standing whether they are market driven,
right, or whether they're affordable housing driven.
And that's right now.
Now on the credit side, because it is affordable, there is
a little bit more leeway there.
And so for example, if a family comes in and says, Okay, we
want a two bedroom unit, you
know, we've proven that we can pay for it.
However, we do show that we had an eviction, right, you
know, two, three years ago, we
can look at that and we can look at the the the criteria
under which that eviction happened
and have they gone back and made that hole, we will not
lease to them until they go back
and pay what they owe type of thing.
And so we've got a process to make that to make that work.
But because we're, we're providing housing to an affordable
component, there's a little
bit more leeway on the financial side of it.
So my last question for me is if, if you if you had a
partnership or an arrangement with
a group of nonprofits that said, Hey, you know, or if the
city asked, is there a number
of units that you can set aside not to have free rent, but
where, you know, different
organizations who do help people that are either homeless
or really struggling to find
a place that also provides some other type of services
available that generate income.
Is that something you might be open to discuss and not I
mean, obviously, I'm not saying
asking you to reduce your income stream.
But if you've got, let's say five apartments that, okay, we
'll contract with XYZ.
And you guys will, you know, with our approval place
tenants, but y'all will either be paying
for the rent or somehow like the either the housing
authority didn't affordable housing
or sure giving hope or any of these other kinds of various
organizations.
Because I think that's, that's the the the need that we're
seeing.
I mean, we certainly have a need for affordable housing.
There's no question about that.
But what we're also seeing is a need that people sometimes
who need housing are at 20%
right am I and they may have some things in their
backgrounds that, you know, are generally
problematic.
And so we're just trying to find ways that we can create
partnerships with apartment
owners that not to ask them to reduce their income stream,
but to partner with community
organizations to help at least begin to continue to meet
that need as best as we can.
Sure.
And that's the type of thing we would we would certainly be
open to doing that.
There are some guidelines.
In other words, we can't lease units to organizations, they
have to be that's tax credits, they have
to be leased to individuals.
However, you know, you mentioned the housing authority, if
some if the housing authority
has rad units that can travel, then that's the kind of
thing that we can take because
that goes with a with a potential renter.
What is that?
What's that rental rental assistance demonstration rad
units.
And I don't know exactly what the housing authority here
has.
But those are the types of things we'd be that's good for
us to research.
Okay, good.
All right.
Great.
Any other questions?
And I guess I do have a question for staff.
And I want to give Danny Shaw an opportunity if there's any
questions, because obviously
this is her purview of affordable housing and human.
So is there any question that burning question you might
have that would help us?
And if not, that's okay, too.
I just wanted to give you an opportunity.
Yes.
We had the opportunity to sit down with Ryan prior to this
application process in the presentation.
So he was able to address many of the questions that you
guys have already asked around what
were the different unit rates and those kinds of things.
So I think we're good there, appreciate your question about
set asides and hopefully we
can have some broader conversations with all of our
developers about that opportunity later.
Okay.
Great.
Thanks.
Fantastic.
All right.
Oh, I'm sorry.
Councilmember Hussbuss.
So not it's down the road the question, but I guess a
comment on the map, the layout there.
Sorry?
Yeah.
No, no worries.
I just think whenever it gets, assuming we get there, I don
't know how I feel about the
parking spots directly in the turn in.
I understand there's a right turn only lane, but I can just
imagine if someone is pulling
into one spots and backing up, then it kind of backs up
every, that road is onerous as
is.
And so I'd love, again, once we get there, I think I'm
going to push for something offset,
not directly where they turn in so that at least they can
get on the property, get off
Teasley and then kind of navigate wherever they need to go.
But I just fear if someone's backing up or backing in, that
then backs everything up
on Teasley, which we don't need any extra cars on Teasley.
So that would be my concern.
All right.
Thank you.
When we get there.
And I think Councilmember Hussbuss, and that's a great
point, I think if they move all that
back to be able to provide ingress, egress to that
development that's north there, it
might be pushing all that back far enough that would really
address some of your concerns.
But we'll wait and see how they, but that's a very good
observation.
Thank you for that.
Any other questions for staff on this?
I guess you're, are you looking for direction as far as
putting a resolution of support
on the?
February 20th.
Okay.
All right.
Council's pleasure on that.
Did you have a question, Councilmember?
Just with the set aside conversations taking place and the
community meeting being held,
I'm in favor.
Okay.
I'm seeing nods, nods, nods, nods.
Okay.
Yeah, we're good.
Thank you.
Thank you very much.
Thank you all.
Thank you, Ryan.
All right.
We're going to sort of deviate from our agenda just a
little bit.
We're going to move agenda item F up to the next work
session because we have a guest
here from the county who's going to help us understand some
of the questions and things
that we're going to be looking at here on this particular
agenda issue.
F is received and hold a discussion giving staff direction
regarding potential polling
locations for May 5th, 2018 city council election.
Who's handling that?
Oh, there you are.
Sorry.
I'm just not used to you coming up, so I'm always looking
over here.
I'm here.
I'm right eye dominated at least I guess in some part.
I don't see Frank here yet, but we mentioned maybe about 1
o'clock so we could start this
portion of it.
Yeah, we'll probably be through by then.
Go ahead.
One never knows.
No, don't drag it out.
Not a problem.
Mayor and council at your meeting last week, you were
considering the ordinance calling
the election and during that time you asked for some
information regarding adding additional
polling locations to the city council districts.
In your backup, I have provided a general map of all of the
districts and some proposed
sites along with the current sites, some basic information
on a breakdown of where those
polling locations would be and the precincts that would be
associated with them and some
information on options.
I do have several maps that I can show you, four for each
of the single member districts
so you can look at in depth where the current location is
and the proposed location and
I also have that list that was in your backup that noted
proposed voting locations, precincts
for each of the voting locations.
So would you like to start with district one and look and
see how it is or you have questions
you want to start with?
Is that okay?
Okay.
Yeah, I think district one is fantastic and there's a
reason it's number one.
Okay, yeah.
All righty then.
Here we go.
I can't even comment on that.
Okay, I can zoom in a little bit.
All right, here's district.
Here's kind of an overview of district one.
Currently your voting location is here at the Martin Luther
King Junior Recreation Center
and Council Member Hudspeth had mentioned perhaps a
downtown location which would be here we
have the Senior Center, Civic Center, Emily Fowler Library
and also Central Fire Station
is right here.
The consideration for a downtown location on May 5th is
that it's Cinco de Mayo on
that Saturday.
While the facilities might not be rented, for example, the
Civic Center, the community
room is available.
We may have difficulties with parking.
A consideration would be to have maybe an off-duty officer
hired to maintain some parking
spaces at the front of the lot for people who are coming in
to vote.
Trying to look at any kind of city facility down in this
area, down in your southern portion,
there's really nothing here that's in the district.
So I've centered on the request for something in the
downtown area which was up further
here in this area.
Okay, we got questions all the way around the horn.
My thought is District 1 and District 2 split at Pecan
Creek down south there, elementary.
As a matter of fact, it's literally the dividing between
the two.
Is there an opportunity to partner with the school district
to potentially service that
area that way?
Yes, I think last year when you were considering this item,
Pecan Creek Elementary School was
an option.
I'd have to contact the school district to see if they'd be
willing to do that.
Another consideration for using a school would be if the
district even has to hold an election,
would they be willing to open up the building in order to
let the city use the facility?
So I'd have to check on that.
Yeah, and if I could just real quick, another option there,
they have a community room because
the neighborhood has a community room that may be an option
as well, depending on what
the HOA...
Oh, in that, in Pecan Creek?
Yeah, yeah, they have their own HOA which then they have a
community room which may,
if the school's not a good option, that may be a good plan
B to service that area.
Okay.
Thank you.
I suspect that even if there are no contested races on the
school board, the city, my understanding
is the city is planning, the school district is planning to
hold a bond election.
Oh, in May?
To have a bond election presented on May the 5th.
Okay.
So I would think that that would probably be a pretty good
option.
And for me, that would be more important than MLK Center
and the Civic Center because MLK
Center and the Civic Center are pretty close to one another
.
But having a location down around Concrete Elementary
School...
Down here?
...Milky serves some folks.
Now my concern also is, and it may be that our county
representative needs to talk to
us about this, if a person comes in that lives in District
2, can they vote in the same place
as the people that are... if it's at Pecan Creek that's
located in District 1, can we
have two different districts voting in the same area or
multiple precincts voting?
So anyhow, that's a question pending.
Currently you would have to designate specific county prec
incts at the locations.
In other words, you couldn't have two locations in District
1 and you could go here or you
could go here.
They would be assigned by your county precinct.
Now I did ask a question of Mr. Phillips if one location
could have the computer programmed
where two of our city districts could have those precincts
in there.
He was checking on whether or not that could be programmed
that way, so I don't know the
answer and maybe he'll have that answer when he comes.
But you couldn't just say, "Okay, I live in District 1 and
I'm going to be down by Pecan
Creek doing some stuff, so I'm going to run down there and
vote on election day."
Now this is just for election day.
You'd have to look at what your county precinct is and then
you'd have to go to that polling
location.
Now I want to throw out a consideration is early voting.
Last year in the May election, the November election, there
was approximately 27 early
voting locations.
And a resident voter in Denton County can vote at any
polling location early voting.
So if you live in Denton and you work Ponder, Argyle, Lewis
ville, any of those locations,
you can vote in that location.
So that's a real plus for voting that for early voting you
can go to any polling location
in Denton County.
So yeah, hopefully I'll have the answer to that when he
comes.
Thank you, Mayor.
I think the questions I mainly had have already been
answered, but I think what we really
have to be looking at is where we've had growth in a
population center that is a long distance
from the polling place or strategically it's difficult to
get there.
I mean, you cannot get to Deena in District 4 without going
across Thompson or leaving
the district.
So those are the things that I'm looking at when I'm
looking at new locations is what
areas have difficulty making it to the location or where
can we help those people the most?
Sure.
Okay, Councilmember Briggs.
So I would be in favor of putting a location down near Pe
can Creek as well.
If we could share those districts, you have mine and my
district's District 2 voting
in a District 1 polling location and that might be a little
confusing.
Fire Station 2 is Gerard's district.
I think it's just on the other side, but I may.
When I type it in in our thing, find your Councilmember and
it keeps pulling up Gerard.
So I don't know with the new station being moved, maybe it
moved just two.
Just enough.
District.
This still sounds like we need to settle this.
Yeah, but I don't know.
I mean, that would be, that's my, because that would mean
District 1 would have three
locations.
Yeah, no, no, no.
My perception was that I think this is Mockingbird right
here and that the Fire Station,
if you're looking at it, the Fire Station is on the right
hand side.
Yes, or right.
East.
Unless you're driving south.
If you're looking at it, I don't do east and west very well
.
So it's on that side of the street.
And so I believe it's there, but we can double check that
for sure.
I put the address in and it said Gerard.
I put the old address in and McKinney and it said, but just
to make sure.
Yeah, we wouldn't want to do that.
Right, right.
And so, but really when I look at District 2, Pecan Creek,
they had issues.
They were asking for something closer to them.
I'm okay with the North Branch Library.
My concern was just having the three locations in one if
that was the issue.
Although it's very close to District 2, if it could be
further down, that would be.
So you're suggesting that if we can use Pecan Creek for 1
and 2 or find another location
further down in this area for 2?
Move the second location.
If one, I mean, I know that Council Member Hatsbeth also
wanted something lower.
If we could share the one location for the two different
districts, I think that would
be best.
So that way the people in that area aren't confused,
especially if they're across the
street neighbors.
They're not going to just two different areas across town.
And so I also have had a request to put a location near UNT
.
Can we take this district by district?
Because I know we're still on District 1 right now.
Is that okay?
Yeah, because we'll get confused.
I'll get confused.
I don't want to project that onto you all.
So as far as on District 1, Council Member Briggs, are you
okay then with one further
down south at Pecan Creek and either by itself with
District 1 or also if it could be shared
with District 2?
Are you okay with that?
I believe so.
I believe that way it would pull in a little bit more from
District 2 in that area.
Okay.
So it sounds like for District 1, so let me ask you,
Council Member Hatsbeth, if we were
to put one down there, if we could do that, and leave the
one currently at MLK, the one
downtown we can sort of substitute the one at Pecan Creek
for the one downtown.
Is that okay?
Yes.
Yeah.
So just as a transition to two, I think Council Member Br
iggs makes a good point.
So if I'm, because the neighborhood's split by only a
school, if I go to, if there's
any way we could do it both there, because if I show up at
the elementary school and
I'm just by chance on the wrong side of the street, then I
have to go to an entirely different
place versus, okay, well you're in this building, you just
got to go down this different hallway
or something like that.
So we can kind of manage that issue.
And then also with the close proximity of the fire place, I
mean, a fire station, if
there's another one to kind of make it more clear.
But either way, I think she raised a good point that if
there's confusion, you don't
have to jump back in your car.
Right.
So from, yes, just District 1 comment.
Yes.
Could you slide the map over to the right, because it's,
you don't want to say east.
I don't want to what?
So, so I think what we're saying is, is that that if it's,
if the way it works, we could
say that in Pecan Creek Elementary, if the district wants
to work with us, that that
could be a voting site for precincts 4 0 12, 4 0 4 1 and 1
0 3 8 and 1 0 3 9.
That probably would be all that we would need as far as,
you know, those four precincts
voting in that location.
Do you do y'all think that's?
I mean, yeah, that's fine.
I mean, I don't know if we, I mean, do we need to start
talking about precinct numbers
at this point?
Is that or when?
Well, I'm just the only reason I'm concerned is because if
you have to do it by precincts,
look at 4, 4 0 1 2.
Part of it is in that concrete subdivision.
Right.
Part of it is directly across the street from Ryan High
School.
So they would have a little ways to go, but I don't think
it's any further than those
folks driving all the way up to North Lakes.
So for district one, what I'm hearing is we keep the
current site and then see if we can't
work with the school district concrete for 1 and 2 and then
the precincts that Councilmember
McGregory had sort of enumerated as those that are there.
40 12 40 41 10 38 and 10 39.
Okay.
All right.
So I just wanted to also just throw in real quick because
the election in May is an at-large
election.
There's not the requirement that the polling location be in
an additional polling location
be in the specific district.
Like so if we're going to combine 1 and 2.
However next year it will be single member district and
those polling locations would
have to be, if I understand it correctly, in the district.
So you may want to think about creating more voter
confusion if you combine 1 and 2 this
year and then next year you're not able to.
And we can confirm that with Frank when he comes to make
sure that I have that correct
but I believe that's a consideration also.
So we're probably coming back to that.
Okay so then district 2 and that's an outstanding question
that you just mentioned.
Oh, we just lost the map.
And so Councilmember Briggs you were talking about some
polling locations.
Let me zoom in a little bit here.
So currently you're at North Branch Library.
And of course my suggestion which may be incorrect now was
Fire Station 2 which is here which
I was hoping to catch all these locations further south
here.
But like I said we can confirm but if you're okay with
combining it with Concrete Elementary
School I can work on that for you.
But then again if I'm sorry.
If Fire Station 2 is not in district 1 and we consider the
confusion like next time that
may be something that it's just remove Pecan Creek and move
it up to that so that way there's
not.
Okay.
I mean I don't.
I can confirm that for you and let you know where exactly
it is.
I apologize for that.
I was almost 100% sure it was there but.
Can I ask a question?
Not necessarily specifically about a district but when we
are looking at polling locations
are we looking at DCTA bus stops like are we figuring if
there is a close stop nearby
for those who take public transit?
I did not.
Okay.
I was looking specifically for a city facility.
Okay.
That we would be able to use and then as a secondary site
perhaps a school.
So no I did not look at that.
Okay so we're okay with two.
You had a question about North Texas.
Yes.
I had a request about North Texas and we were talking about
the downtown location.
I was thinking one when the Civic Center was mentioned
earlier I thought that would be
really great because that would be close but that's not
necessarily in three.
So have we ever had a polling location on UNT campus?
No.
No.
Well not since I've been here which is like you know a
little bit after dirt was new so
no.
Would that would they have to how would that work with
would they have to get in contact
with us and talks and agree to use one of their facilities
kind of like the district
and ISD?
Exactly.
Okay.
Moving on to district three.
Okay.
Currently district three votes at North Lakes Recreation
Center right here and proposed
location.
Yay.
Here's the master that knows everything.
I proposed fire station seven which is here.
Let me pull this out just a little bit so you can there we
go.
Get a little better.
So I chose fire station seven to help the ropes and ranch
people although a lot of ropes
and ranch if I remember correctly like to vote early
because they can go over to Argyle
City Hall which I think is just a hop skip and a jump
somewhere down here.
So anyway we have ropes and ranch.
We have these neighborhood here and we have this
neighborhood here which would be accessible
to the fire station.
The fire station does have a community room and adequate
parking.
Going to go to Councilmember Duff and then I have a comment
.
Go ahead.
Okay.
Okay.
I'm good with fire station seven and as a matter of fact
you know if we only had one
polling location I think that is probably central to
everybody in the third district.
So I'm good with that and you know if you put one up in the
north section I'm good with
that too.
Yes well I'm just looking at that that little well yeah
never mind.
I'm just looking at how that little jut out there is for
district four up there along
I-35 between the two splits.
Yeah I know why that's that way.
Okay district three fire station seven as an additional one
do we hear we have any objections
on that or comments?
Yes Councilmember Gregory.
I don't have any objections to adding seven.
I remember that the last time we had a discussion about
this there was a question as to whether
or not the Denia Recreation Center or the South Branch
Library was more oh that's in
four.
That's in four.
Never mind.
Yeah that's where we're heading next.
So fire station seven I think would be a good additional
one.
Yeah I'm good with that and you know if you want to go
where majority of people are voting
we could put one in the clubhouse at Robeson Ranch but I'm
not gonna I'm not gonna push
that.
Thank you.
I'm just kidding.
Hey there Robeson Ranch is gonna vote if you if you put it
in McKinney.
Yeah so well and the thing that we're losing that I don't
want us to lose track of and
I and I appreciate trying to make voting as accessible as
possible and but what we're
talking about is during the day of the election whereas it
's historically been true and I
think it will continue to be so that is it 60 to 70 percent
of the people vote in a in
early voting of course we'll get that statistic a little
bit more but so all right so we're
moving on to district four.
And currently the voting is at can you see that?
Deena.
Okay there currently you're voting at Deena Recreation
Center so then you have all these
people down here and here which have a distance to go so I
was recommending using South Branch
Library which is right here.
Councilmember Ryan.
Let me pull this out just a little bit so you can see a
little bit better.
Whoops.
Wrong way.
There.
So.
Okay.
So here's Deena and here is South Branch Library.
Councilmember Ryan.
Kind of in the middle.
Yes sir.
If we can work something out with the school district I
think it's LA Nelson Elementary
at the end of Ryan where Ryan dead ends in Atteaseley.
At least there you've got a stoplight to get people in and
out.
South Branch Library tends to get a little congested.
It's a little tough for people especially anybody that's
going to try and turn left
to go back north out of there that at least gives you a
traffic device to help the flow
and it centralizes it more with the population on that part
of the district.
Where is it on this map?
Where Ryan Road dead ends in Atteaseley.
Right by the wall.
Caddy Corner from the Walmart across from the Walmart.
Oh no I see I'm trying to see where it is in relation on
this map I'm looking at.
Where's Ryan?
Don't get me lying.
Ryan Road is the red line right below the four if you slide
back up a little bit.
Yep.
Okay that one going across east to west.
Yeah that's Ryan Road.
So you see that little loop on the end down there that's
where LA Nelson Elementary is.
Right here?
Other end.
Other end of that red line right there.
On the east.
On the east side yes.
On the right side yeah.
But as far as centralizing it with the population and
having a safety concern.
It pulls it down more.
Councilmember Gregory.
Well I get your point I think in the long run if we wanted
to have two polling locations
on voting day for district four that South Branch would end
up being better.
People get used to going to a particular place and the
likelihood of next year for example
the school district having an election is really much more
questionable because they
have not had a lot of contested races for school board.
We know that there's going to be an election this year that
they're involved in.
But they may not always be wanting to work on it with us on
that.
Councilmember Briggs.
It's my understanding that there is a proposed light to go
at that location at South Branch
of Management.
Can weigh in on that?
You're correct.
My guess is we're probably two to three years from that
happening now.
Okay.
But that is one of the proposed locations.
So Mr. Phillips is here.
I can have him come up and you can grill him to your heart
's content on questions and he'll
be able to answer some of those questions that we were.
That's sort of a little bit clear direction on the district
four.
So one alternative is to have it at the elementary school.
The other one is at the South Branch Library.
I certainly understand your concerns as well, given that
there may be a light there and
it is on a weekend.
I mean, you're right.
During the weekdays, it's almost impossible.
Well, the library is busier on a Saturday as well.
The elementary school is vacant on Saturday.
Well, I was talking about just getting in and out.
I'm not necessarily talking about the foot traffic coming
in.
So what's council's pleasure on that?
We got I mean, it's probably best if we could keep it to a
city facility if we can.
But I mean, obviously, concrete or not.
But we just want to leave that sort of undecided until we
hear from the elections administrator.
Maybe we should build a fire station down here.
Yes, that would be good.
Or rec center down there.
Rec center.
Okay, well,
I'm just trying to get some council members to give me some
direction.
I mean, all of a sudden, everybody's tongues tied.
I'm going to remember that next time we have a really
controversial discussion.
Yes, Councilmember does.
I'm going to follow John Ryan.
I mean, it's his district and I'll go with what he wants to
do.
Okay.
All right.
Yes.
So this year, there's a school bond election, which more
than likely the district will be
able to to help us out and hold the election there.
By the next one, there may or may not be a light.
So it would be the safety there and there will probably not
be a bond.
So it would be better to hold it at a city facility for
that election.
So just if you're okay with the confusion of moving it,
then I'm okay with asking the
district.
I think I'd rather take the chance that the school board is
going to have an election.
Just I mean, I know several of the last ones that have
canceled out, but there have been
more.
Well, we may be able to work out an agreement.
The election isn't determined if it's not dispositive,
whether we can use their facility
or not.
I mean, we are in a local agreements all the time with
people.
So that could be something we could work on.
So I'm okay with it.
Yeah.
Okay.
All right.
Now would you like to hear from Frank?
Sure.
Come on up.
Come on down.
This is Frank Phillips, the Denton County Elections
Administrator.
And Frank, one of the, we're going to use the microphone.
One of the questions they were asking and that you were
going to check, I don't know
if you have the answer yet, is if we could combine say
district one and two and one polling
location and set out specific precincts that would vote,
but have one location for two
districts.
As long as you carry an entire voting precinct to the same
district, you're fine.
Where we'll get in trouble is you're not going to have any
issues this year.
I believe everyone is at large this year.
Is that correct?
That's right.
The only issue is when you're voting by district because
your districts don't follow our voter
precincts and we can't split out a voter precinct to
separate locations.
So what you plan this year may not work for you next year.
I just want you to keep that in mind.
And also, if I may, one remark about the school is we use
schools all the time, except they're
very hesitant to let us use elementary schools.
Matter of fact, we don't use any.
They're all either middle schools or high schools.
So that's for security reasons.
That's good information.
Thank you for that.
So we may want to, that's going to be critical.
And I think though, your information on at large we're okay
by combining a voting location,
but it's when we, and of course we have those every other
year.
So it just almost be impossible to try to tell people you
go here for an at large, you
go here for a single member district.
That would create a lot of chaos.
Yes.
So is it a state rule that says that for early voting you
have all of this flexibility, but
on election day you don't?
It is, yes sir.
There are counties in Texas that are vote center counties.
We're not one of those counties.
Vote center county, Collins a vote center county.
On election day in Collin county, a voter can vote at any
site, not just their prescribed
site.
And to be a vote center county, there are certain
requirements.
And one of those that you have to be all electronic, which
we're not in Denton county.
I almost made it through the legislature last time that
paper was allowed at vote center.
I'm hopeful it will pass on the next one because I know
Denton county does want to be a vote
center county.
So if we get there, that will eliminate all of these issues
.
So that's something, if I may, that we might need to put on
our legislative agenda for
the next time around.
Please do.
To work with the county.
Solve a lot of headaches.
Yes, council member Husspeth.
So can you give me the target goal or kind of some
highlights for what makes a what's
required to qualify as a polling location?
I mean, I understand in a perfect world, it's a city
facility, but kind of if we expand
that a bit and look at it, because obviously for my
district, it's number one in a number
of ways, but district number one, that southern part, so
that's James Wood kind of area.
I mean, it really is the neighborhood has grown quite a bit
there.
The only thing that kind of fits the current prerequisites,
as I understand it, is the
elementary school.
And so I'm trying to think what other things are in that
area that would serve or qualify
to serve.
They do, like I said, they do have a I'm getting the
address for their community center.
But what kind of when you what makes up a polling location,
what are the prerequisites?
The first one is that they'll let us use it.
You'd be surprised how many places won't let you use their
facility, especially private
facilities.
Even though we can use private facilities, you know, needs
to have adequate parking,
of course, it needs to have sufficient electricity, if it's
early voting site, it needs to have
Internet capabilities.
And it has to be ADA compliant.
But beyond that, it's really open to anybody's imagination.
There are counties that use Kroger's grocery stores to vote
in.
Gives me a little bit of a pause to think about it.
But just because of everybody that has access to where you
're standing, but really any facility
that has adequate parking, ADA compliant will do.
Okay, thank you.
Yes, Councilmember Gregory.
I think I remember you talking about using schools.
Since it's a Saturday election.
I don't think it would be a problem.
I may make an elementary school.
And I believe that I saw in the primary elections that are
coming up, that there are some elementary
schools that are being used for that.
The parties picked those sites.
So yeah, it's very possible that they did get some.
And Saturday may help your cause there.
You know, Tuesdays there are a little reluctant.
Yes, Councilmember Briggs.
So could you help us right now?
We're trying to, the question about using the two districts
would be for one and two
down near the Concrete area.
It's kind of split in half, but the elementary is in
District 1.
And so there's a lot of District 2 that if, I don't know if
we would want two separate
areas if the community center is in District 2, would that
get confusing?
We are actually checking on Fire Station 2 right now just
to get confirmation.
So I don't want to make any other.
The district's not.
If we could move it up.
My only, my concern is with that neighborhood having two
locations or one location and then
two locations next year will get kind of confusing.
So, but.
Yeah, I mean, in all honesty, it stays confusing.
And the reason is, is because cities have different needs
than parties do.
And both of them have different needs than the county does
in November.
So that's why, you know, we get complaints all the time
from voters.
Well, in May I voted here.
Well, yes, because you live in a city and they picked your
polling location.
And in November we have a different one.
But as best you can, it'll never be perfect.
In 10 years, I don't know that I've ever kept them totally
the same.
You'll never find places because you're going to get.
Well, if you use your own facility, they're not going to
kick you out of your facility.
But, you know, we get kicked out of facilities all the time
.
Some that will be used for years.
And so, but the more stable you can keep it, the better for
the voters.
That's my only concern about doubling up this year and then
not being able to next year.
OK, so it sounds like we've got district three sort of
nailed down.
We've got district four with the school, you know, district
one in the sense of the polling
location would be at the concrete if the school allows it.
So district two really is the one we've got to think about
trying to find a more permanent
second location.
And what I'm hearing you say is that if the fire station is
in district two, fire station
number two, is that number two?
Then you're OK with that, that one or no, or you want to
find something further south?
Well, I don't know that there would be anything further
south.
My concern is that that would be one neighborhood going to
two different locations.
How would we explain that to me?
Help me follow that.
What would give me one neighborhood going to two different
locations?
What do you mean?
Well, split down the middle.
If people are in all the concrete neighborhood area, they
would assume that they would go
to the same voting location.
OK, you're talking.
Well, you're talking about neighborhood.
They're breaking it down by precinct, I believe.
Is that right?
Yeah.
So do we will we notify individuals their their precinct
location and where they will
go vote?
How do we get that information to our citizens?
We'd have to do an ad campaign blitz probably on the
website, social media and so on.
Get the newspaper to publish the locations and so on so
that there's a media blitz on
where you're going to go.
And it's on our website, a voter.
Any given election that's coming up, they can put in their
information and it'll tell
them where they're going to vote this time.
It is.
It would be on our website also.
We do have confirmation that the fire station is in
district two.
The new one is in district two.
OK, so we're going to go to Councilmember Ryan and Council
member Gregory.
As far as the permanency, one thing to think about is in
three years, all these will be
redrawn.
We will have new borders for our precincts, new borders for
districts.
OK, Councilmember Gregory.
Talk a moment about mail in ballots, are those eligible for
everyone or is that age restricted?
There's several criteria, 65 or older, if you're disabled
or if you're going to be out
of the county on election day.
Those are.
Do you have any stats on how many people, what percentage
of voters, for example, in
district and precinct 4003 use mail ballots?
Not off the top of my head, but I certainly have that
statistic at the office I can find.
I think knowing how many use mail in ballots and how many
are doing early voting will be
helpful.
Get a lot of mail ballots from ropes and wrench, which you
were talking about earlier.
And the reason I was asking is I was just wondering if mail
in ballots would really
be a good option for folks that live in the Pecan Creek
neighborhood that are so far out
from the majority of the rest of their districts.
Mail ballots done nothing but increase over the years.
So it's a very popular way of voting if you're eligible.
What was the voting percentage between early voting, in
other words, either by mail or
early voting?
It's about 60/40, about 60 on early voting, 40% election
day, roughly.
So we're trying to make this decision for this upcoming May
5 election.
Am I correct on that?
And that all has to be decided by when?
Frank would like the information by February 26th.
Because they're going to have to do programming, then they
have to do testing, public tests
to make sure it's programmed correctly.
We have to mail out our mail ballots 45 days prior to
election day.
So you can really back up about two or three weeks from
that.
So again, it sounds like District 3 and 4 were okay on with
the locations.
District 1 were okay as far as with the MLK and then Pecan
Creek Elementary if we can
use it.
So District 2 is still I don't know if up in the air is
correct.
So are we still okay with what?
Council Member Brie?
Can I have three?
No.
No?
Okay.
You really want to get confusing.
Yeah, that would be very confusing.
And the default is if somebody obviously if they get
confused and they want it, you can
always well, maybe I'm not correct.
You cannot always go to the one you always went to.
In other words, once we change this by precinct, you're
going to change where you vote.
All right?
Okay.
For example, if you live in 1012 and you say, oh, I'd
rather go to the fire station just
because it's closer.
But we've designated 1012 for the public library, you know,
for North Branch Library.
And you go over to the fire station on Election Day and it
's quarter to seven.
And they go, whoa, no, you can't vote here.
You have to go over to North Branch.
You know, you may not make it over there in time.
Should have early voted.
Yeah.
Well, I mean, personally, I think we're starting this too
late if we're going to do it on the
May 5th to make sure everybody understands.
But I'm sure we can get it done.
I mean, we can get the information.
I'm talking about get the information out to the voters in
time to say, here's what
you need to do.
So we've got to really make a commitment to that.
So I'm going to come back to District 2 because we need to
give direction.
Councilmember Briggs, what are you thinking?
Is there no other place in District 2 down south that we
can maybe take a look at?
There's no more schools there.
There's no libraries.
There's no -- Fire Station 2.
Is there anything at the landfill?
I'm looking.
I don't see anything.
We'll throw out -- I think I mentioned in the beginning of
my presentation that Fire
Station 2 does not have a community room.
So -- They'll have to vote where?
They would vote in maybe the Firefighter's Day room or one
of the bays.
I mean, we've done that before.
Fire Station on Kings Row, we used to -- Sherman Drive.
Sherman Drive.
We used to vote in the bay.
I'm not very comfortable with that.
Let me recognize Councilmember Hussbett.
I really do think, again, as an option, looking at per
Google Maps.
So that's not exact science by any stretch of imagination.
But if I'm guessing right based on what I'm seeing, I think
their HOA, the community room
is absolutely in District 2.
Is that in the school?
When you say community room, is it a separate building?
It's a separate building.
Yeah, it's -- HOA has a community room that you can rent
out.
That's what it is.
Okay.
They have like a -- Community center, something like that.
It has a swimming pool there.
Clubhouse.
Oh, clubhouse.
Clubhouse.
Thank you.
And so it's -- Oh, okay.
The nearest major street on your map is Sweet Gate and Lake
view Boulevard.
Am I in the right area?
Yeah, yes.
So I have my -- Sweet -- Oh, here's Sweet Gate.
Yes.
Da-da-da-da-da.
Sweet Gate, right there.
Yeah, so right there.
Bishop Pine Road, right here?
Yes.
So it's in there.
It's like a little south of here.
So I don't know what your pain threshold for that is, but
--
So if you want to look at the whole district, then --
So what you're saying is that -- You're really south.
Well, I think you said -- What you're saying is next time
when it's
a divided district and we have to be in district two, there
is still a location that we could
possibly use if this year we do the precincts in one
location at the elementary school.
Is that what you're saying?
No, I'm saying in lieu of combining them at the elementary
school, because that's probably
a few blocks down the road, and it gives you the
consistency you're looking for that each
this election and the next election, they'll go to the same
location.
And so if that's certainly plausible -- If that's available
, that's something we could
look at.
But I guess my question becomes, which precincts are you
going to send there?
I know you'll send 4012.
Are you going to send 1013?
Yes.
1013 is all of this area.
Right.
And 4012, probably 1039.
Yeah, I didn't see that one down there.
If we can -- Something else higher a little bit, because I
wasn't including 1013.
But is there another location or city facility somewhere we
could use that is not necessarily
the fire station?
Not a city facility in this area.
You got Run and High over there.
Waterworks Park is way out of the range this way up here.
But in here, it'd have to be another school, I guess, over
in this area.
Okay.
Well, could we -- I mean, yeah.
If we could maybe take some time offline to take a look at
that and see and consult with
you to see what would work best.
And you saying we need the information to you by February
the 26th.
Yes.
And if Jennifer wants to contact me, I have an Arc map that
basically shows any -- it's
an internal map that basically shows any sites we've ever
used.
Okay.
And if she tells me I need a place in 1013, I may be able
to make some suggestions.
Okay.
Good.
That would be great.
Fantastic.
All right.
So bringing this back, do you want it back on next week's
agenda for final approval?
I believe someone mentioned confirming it with an ordinance
, but that might be limiting
ourselves too much if for some reason we don't have all the
details worked out, say, with
the HOA or whatever, because we can include it in the
contract that we're going to be
signing with the county for the conduction of the election.
So it would be ratified through the contract that we have
with the county if that's all
right instead of some ordinance.
Is that okay?
Yes.
That sounds me.
Okay.
Yes.
Council Member Duff.
If we have a runoff, are we talking about having the same
location that we're having
on May the 5th?
That's a good question.
Do you want to have the two polling locations in each
district for, well, depends on where,
well, no, it's a large, so you would have to have those
same polling locations for any
potential, we don't like to use the R word, but.
I'm not sure what the.
The runoff.
Oh.
Well, and I think, Council Member Duff, I think you bring
that up historically because
of I think last year, but I think that question was also
more of an early voting location,
if I remember correctly.
It wasn't just the day of the election.
It was that there was one early voting location.
I think it was out at the Kimberly site.
Yeah.
And that's what really the question was last time was the
early voting location.
So are you talking about the early voting location in a run
off or are you talking about
also the day of election polling places?
Well, I really wasn't bringing up that one.
This is for this election.
Well, no, but I think that's what brought, I think you're
asking what about a runoff.
Yeah.
Because that was sort of how that came to the forefront was
.
Yeah.
We had one place on a runoff that was in the far eastern
part of the city.
Got me elected too.
Yeah.
You got more votes than the other people.
That's what got you elected.
Yeah.
You made my voters mad.
So what are we, so are we asking for a day of election or
early voting or both?
What would be Frank, what would be your suggestion, Frank?
Well, if you're working on it, I'd do them both at the same
time, but honestly that,
I mean, I tend to look at things maybe a little different.
I look at it in a fiscal nature too.
In a runoff, you're not going to have a whole lot of
turnout, even lower than your regular
election.
We typically scale back on polling sites for a runoff.
Yes.
Well, obviously we can't have all the early voting
locations that we have, but I guess
if that comes up, then we need to make some kind of
decision on where we're going to put
those early voting and probably use the same thing as we
use on the May 5th for the actual
polling day.
Okay.
Your choice.
Council Member Riggs.
I would like to see if we could use Ryan High School as the
second location, if possible.
For District 2?
Yeah.
Okay.
I'm looking at my, it might fit there and then we could
just keep it there if possible.
But I'm also going to put a message out to the district to
see what they think and what
they say.
But I just want to give a shout out to other District 3
voters because I do know that they
show up to the polls as well, not just Robeson.
Okay.
Well, we're about here at the end of this agenda item.
So what was the decision?
I just want to make sure I have clarification on your
direction for the runoff locations.
I think, you know, what I'm concerned about is getting Mr.
Phillips the information he
needs for the May 5th election.
That's by the 26th.
I think we can have a further conversation about the run
offs.
Or do you need all of that information by the 26th?
No, it can wait.
It can wait.
Okay.
Okay.
Fantastic.
All right.
So I have District 1 will be at, if available, the Concrete
Elementary School, the additional
location.
District 2 will be at Ryan High School, if available, if
they'll let us in.
District 3, Fire Station 7, and District 4, the L.A. Nelson
Elementary School, if available.
Okay.
Council Member Gregory?
And just one follow-up question.
Did we hear that adding those sites, it was about $4,500
per site?
Frank estimated.
Go ahead.
And this is always a guess, but a rough good estimate's
about $3,500 a site on election
day for an additional polling site.
And would the cost go down if we pair with the district or?
Yeah, if Denton ISD has an election, right off the bat, you
're sharing the cost with
them.
So you can cut that in half.
Okay.
Okay.
Now, then one other question regarding, for example, Ryan
High School.
Because if we do Ryan High School for an alternative site
at District 2, that means that there's
going to be some sets of voters that have to go there on
election day.
Are we going to need to get the school district's buy-in to
that?
Oh, yeah.
Aren't they going to have to agree to let us use the
facility?
Well, and also, they're going to have to agree, I would
imagine, since they're helping to
pay for the election, if they're having a bond election,
then it's going to impact where
the voters that are voting for those bond elections go also
.
Will they need to sign off on this?
They're going to want to weigh in because, I mean, they're
going to have an election
at the same time.
They'll be part of the same joint contract.
And whatever the sites are, you're going to share it.
Because what could happen is you're going to determine the
site you want to use today.
And I'm not picking on Denton ISD, but this is where we're
at.
Denton ISD said, "Hey, I love those two sites, but I'm also
using this school."
You're going to bite off a piece of that one, too.
Okay, so.
So, yeah, we need to have a conversation with them.
Yes.
Yeah, have a conversation with them and make sure we're all
on the same page, and if not,
what the differences are.
Right.
Okay.
Yes.
Council Member Hays.
No, I was just trying to process that because everything
they do is at large.
So I don't, it would just be adding another location.
But am I wrong?
Their voters can vote citywide all the time.
Yeah.
Right.
So.
Well, but even in that election, we still assign voters to
precincts and precincts to
locations.
Day of?
Yes.
Okay.
So they still will have a specific site they have to go to.
Okay.
Sorry, I misunderstood.
Whatever.
Whatever cities, if you say these precincts have to vote at
this location, it'll affect
both city election and the school district election.
Yeah, it just doesn't mean the same thing to the city, the
school as it does to the
city.
Got it.
So they are more at large.
Okay.
Thank you.
Okay.
Any other questions?
Do you have adequate direction?
I'm ready to go.
Okay, good.
Thank you so much for being here to answer our questions.
I appreciate you taking your time out of your day to be
here.
Thank you, Frank.
Thank you so much.
All right.
We're going to go ahead and it sounds like staff has
direction on agenda item F. So let's
take about a five or 10 minute break and we'll proceed on
through our work session with
agenda item 1B when we return.
[PAUSE]
All right.
Welcome back, everyone, to this meeting of the Denton City
Council on Tuesday, February
13th, 2018.
It is 1 34 p.m.
We're now heading back into the normal sequence of our work
session agenda.
Work session report 1B.
We've already done 1A and 1F.
So 1B is Receive Report, Hold Discussion, Give Staff Dire
ction regarding current city
of Denton facilities and how to proceed with planning for
future space needs.
Yes.
Mayor, members of the council, Mario Kenizar, assistant
city manager, wanted to have a conversation
with you all about some facility needs that the city has,
city operations have.
So you can have an understanding kind of where we are.
Some options that have been looked at over the last number
of months to hopefully meet
some of their operational needs, which in turn will provide
better services for our
residents.
I do have a number of slides I want to show, but majority
of those are pictures, so hopefully
it will somewhat keep your attention.
But the information that's being covered over the next
number of slides really conveys this
information.
Again, some history of these facilities.
And again, I'm not going to read these off to you all the
way through, but just some
of the assumptions that we used through some of the
analysis.
And I'll cover a little bit through the history because
some of this information has been
brought to previous councils in the past.
And so, but also wanted to convey that we have been able to
go back, review the assumptions,
make some tweaks and changes, and hopefully come back to
you with a better answer, some
better information.
So hopefully you'll agree and you'll give us direction here
in the next few minutes.
And then at the end, how will it improve operations,
customer service, and finally the timeline
if you agree with the direction which we're hoping for.
The areas that we're going to be covering this afternoon is
the service center operations.
This is the entire campus there off of Mingo Road.
It's approximately 46 acres in size.
It's industrial, as I mentioned just a minute ago.
It houses all of our field operations with the exception of
DME, their office Spencer.
But the remainder of all of our field ops, and I'll show
you this slide here, some of
the operations that function out of there, also houses our
procurement, our purchasing
and materials management where we distribute supplies and
small tools to our staff through
their day-to-day operations.
Our fleet services is housed there as well.
So all the repairs of our vehicles are conducted there
along in the service center campus area.
And then finally, we also have our materials area.
So dirt, flex space, any time that we need that kind of
material for some of our streets
and parks operations.
Yes, sir.
Yes, go ahead.
Before you go on, and I hate to interrupt you on this one.
No worries, go ahead.
But it is a picture.
It is a picture.
And I love pictures.
I love, glad you do.
Are we still planning to affect that outline that 46 acres
by extending Roodale and having
that be the railroad crossing and closing down?
I can't see the name of that other street.
Yes, sir.
That's part of the grand plan is to do that.
I did not necessarily see that in the rest of the slides.
And I was just wanting to make sure that that was still on
that.
Yes, sir.
This is just kind of existing conditions.
So the alignment that you're describing certainly should
help that our operations there in the
future.
But that is not included in the slide deck at this point.
Okay, thank you.
Yes, sir.
Okay.
So again, just to give you some history on the two areas
that we're going to be discussing
this afternoon.
One of those is the actual service center.
Again, as I mentioned, this is where all of our field
operations are housed, streets,
drainage parks, engineering, our procurement and
distribution center, as I just mentioned
a little bit before.
That's a large facility.
It was built in 1980.
So it's been in existence nearly 40 years.
It houses approximately 253 of our employees.
And the other facility that we're going to be focusing on
too is in the small arrow here
off to I guess your right my left is the traffic operations
building.
And actually this facility was incorporated into the 2014
bond program.
So again, just to kind of give you a progression of where
we are today through this last number
of months that we've been discussing these locations.
A couple little deal points here about this about these
locations.
The service center was built in the 1980s.
Traffic operations actually was built in the 1960s.
It actually served as I guess two generations ago our
animal shelter.
And since then, our traffic operations are housed there.
So any of the things that our traffic folks do when it
comes to making signs for sample
stop signs, they work on our traffic signals, all that is
conducted in that traffic operations
building.
And again, other little tidbits from Denton, just as you
can see the growth, we were a
much smaller community certainly 1980 look at you know
where we are today.
And we've grown not only in size and population, but we've
grown also square miles as far
as what we're responsible for.
So the first things first is the service center.
As I mentioned, it's built in 1980.
It's approximately seven little over 70,000 square feet.
It's been updated over the years.
It's a home base for 250 plus employees for the
organization.
Some of the issues that we've had at the service center
over the years, it's cramped.
There is really no room for growth with the existing
footprint based on how it's configured
at this moment.
You'll see some pictures here in a moment how it's
configured.
Hopefully it can come across in the pictures and also in
the site plan of the interior
of the facility.
And quite honestly, it's really not that user friendly when
it comes to interacting with
the public.
And it's not that it is a public facility.
We don't have a lot of interaction with the general public.
But when it comes to working with contractors or vendors
that come in to do business with
our engineering folks, parks, any of our operations, it's
just not the most inviting building to
walk into.
So hopefully you'll be able to see a little bit some of
that in the slides.
The thing that we've done over the last number of years is,
again, the issues that we've
had are we continue to grow as a staff.
But we also did, we had contracted with Nelson Morgan,
which is a local architect, a few
years ago to do basically an entire space needs analysis,
not only for the service center,
but for City Hall, for City Hall West, for City Hall East.
So they've been able to do a lot of analysis.
Some of the focus and parts of the focus of their scope of
their engagement was for the
service center, knowing that we're going to be projected
out as far as staff growth.
One of the options that they presented, and I believe it
was presented back in November
of 2016, was to build a service center annex to offset some
of the growth that our organization
is experiencing.
That location was identified off of Vintage Boulevard, I
think west of Fire Station number
7.
What it contemplated for was about 40,000 square feet of
space, but the cost at the
time was the neighborhood of $21 million.
So the city at the time had not identified funding.
It would have required bonds or some other methodology of
funding.
So at the time there was just no funding set aside for that
project.
So since then, over the last number of months, we changed
the assumptions.
We felt that we needed to move on this project quicker, be
able to find a way in which we
can find the existing space within the confines of the
service center itself.
Again, the staff continues to grow, and we need to better
utilize the space in which
we have.
And then really when it was all said and done, some of the
space that we were looking for
was hiding in Plainside.
And I'll show you what we were thinking when it comes to
how we can work with the existing
facility.
These are the first and second floor.
So first floor is over here, and then to your right, the
second floor is over here.
And again, I'm not going to read you off all these
locations, but just in the different
shades of color, as you look at the second floor, you see
these various shades of light
blue as it shows up on my screen, and more of an orange
color.
And these are just the smatterings of how the space is set
out, and that it's not the
most efficient use of space.
Our operations are just scattered about, and so we're
trying to find ways in which we can
consolidate some of that space and kind of better utilize
it.
On the bottom floor, we have again, parks, drainage, water
distribution, our electric
communications where we have our radio operations.
It's no longer under DME, it's now been transferred over to
technical services, but they're the
ones that are responsible for distributing radios
throughout our public safety and non-public
safety vehicles, also the hand-helds that are used by our
staff, whether it's for public
safety events or activities to our special events and
activities, and all of our field
crews use radios as well.
But the big space that we were concentrating on and where
the space was hiding in plain
sight was literally materials management.
And one of the things that we thought of is if there is a
way to relocate this approximate
30,000 square feet plus a small portion of the
administrative office space for materials
management on the second floor, we believe that we could
expand and relocate a lot of
these operations into the existing footprint of the service
center if we can find and relocate
materials management.
So that's kind of where we've been focusing our attention
on this last number of months.
So, to give you some pictures again, some council members
like pictures, this is the
existing conditions of our service center.
And just to show you here, this is one of our bays for, I
believe it's a water metering.
And as you can see, we have a picnic bench or a bench area
there for folks to eat their
lunch or snacks or during their break time.
And it is in the way of whenever vehicles can pull in.
So, it's basically there on a more permanent basis.
Here while it does look a little, I should say a little un
kempt, this is one of our park
services bay.
And it's difficult to see in the picture, but if you're in
person, a lot of their supplies
are housed in that location.
They just don't have the space.
So they're utilizing one of the bays to maintain some of
the supplies and equipment that they
use in their field operations.
Here and to my right, your left is also the park's,
actually this is the park's break
room.
But as you can see, this is a workstation for some of the
crew leaders and supervisors
along here with these workstations.
And it's kind of hard to tell after the distance, but this
is also the kitchen area too.
So you've got a stove, you've got a refrigerator, you've
got sink along with the workspace.
So it just makes it challenging to be able to use that
space.
And they've been very creative in the way they've used
space, but it has been a challenge.
And the spaces below here is, here's a locker room that
also serves as a lunch room, that
also serves as a crew meeting room area.
So it's just, again, the space is being used very
efficiently, but it's not necessarily
the best use of space.
The lobby area as you walk in, there's not a whole lot of
wasted space, but what you
don't have is anybody greeting you.
So anytime someone walks in that needs directions as to
where to go, they either have to know
where they're going, find someone in the hall, or just look
around and find the space.
And then last and not least is this is the downstairs rest
rooms.
And if you walk into the lobby, again, behind this wall
here, you walk into the restrooms,
and the public restrooms also have shower facilities.
So again, it's just one of those environments where do you
really want to have shower facilities
facing where the public may use the restroom.
So just to kind of give you some visual understanding of
the conditions of the service center.
So what we were contemplating is, as I mentioned, is if we
could move purchasing materials management
to 651 Mayhill.
Many of you are familiar with that space.
It's a space that's owned by Solid Waste.
It's a former Department of Defense warehouse.
It's approximately 81,000 square feet of space.
It's mostly vacant.
There are some trash and recycling bins that Solid Waste
has located there to keep them
out of the elements.
DME also has some of their equipment located inside.
But we believe that if we can move 30,000 square feet of
office space, or excuse me,
30,000 square feet of space into 651 Mayhill, because it's
basically open shell space.
It's a blank canvas.
It really allows a lot of opportunities at the service
center.
So I'm going to show you, again, a visual of what it might
look like.
And again, that visual is just kind of an overview.
So what we were thinking is this space here, if we could
expand materials management in
61,000 of that square foot of that square footage into that
space, and you ask, well,
why are they doubling in space?
Part of the reason is doing so is we would like to be able
to move some of the equipment
and materials, whether it's through DME, spools of cable,
other type of equipment that's currently
covered by an awning, it would be preferred to move it
indoors.
And so hence the need for the expanded space that we're
looking for.
So that would assume 61,000 square feet, also add some
additional parking spaces needed
for that operation, and a lay down yard where we would
still have some equipment and materials
outside on a paved or graveled environment, but it allows
that space to be available for
materials outdoors.
Could you orient us where Mayhill Road is?
Mayhill Road is, I'm going to go back because it's Mayhill
Road is right here.
Okay, so it's on the west side.
Yes, sir.
West side, to the left.
My left, your right.
No, that's our left.
My left.
So yes, Mayhill Road is on the west side.
Inside joke for those watching.
Move on?
Yeah, sure.
So cost to do that gives you some of our breakdown costs.
These are all estimated costs.
These are again planning level estimates provided by Nelson
Morgan, approximately 1,600,000
to convert the 651 Mayhill into that warehouse space.
It would require some additional concrete work with the lay
down yard and parking as
I described earlier for those spaces.
It would require some additional fixtures and furniture.
More than likely the majority of that could be the racks
that are needed, the shelf space
that's needed for materials management.
I've incorporated the design fees there, approximately 10.5
% of the hard cost and development fees
that would be incurred through the process.
In total, just a little over $3.3 million is what's
contemplated there for that move
to materials management.
And then to your left is some potential funding sources
that have been identified working
with the finance department to make that happen.
Quick question.
Yes, sir.
Okay, so I'm probably looking at this wrong.
So I see estimated costs for materials management and this
is moving from the space over here
off Mingo to this space over here on Mayhill.
That's the slide we're looking at.
So when it says moving the materials...
I'm just operations themselves.
Okay, so it says move materials management to this is $1.6
million.
And then it says site improvements.
So the site improvements are above and beyond the $1.6
million.
Correct.
So the estimated cost for materials management, I'm seeing
$3.3 million, but that's not including
the $1.6 million, is that correct?
It is.
I mean, the way it is, and my mouse is working here, is $1.
6 million for the actual interior
renovation retrofit.
There's some concrete work.
Oh, never mind.
The $2.5 million is a subtotal.
Never mind.
Okay, got you.
All right.
Yep.
Okay.
Councilman Gregory, do you have a question?
Okay.
And so again, those are the funding sources that have been
identified for this transaction
to occur.
So if we do that, what does that get us at the service
center?
You know, I've shown you earlier a slide that had the first
and second floor.
This is a slide that shows the first floor with materials
management out of the equation
and then with the expansion of these operations into that
space that's been left.
So again, as you can see, and that's why I provided a table
here to show the current
conditions, current meaning the existing amount of square
footage that these operations are
in right now versus what would be proposed with the
expansion into this space that was
just under 30 and allow this additional space to be used
for these operations and allow
just over 18,000 on the first floor, 18,000 square feet on
the first floor for future
expansion.
Do you have a question?
Yes, ma'am.
I may have been out of the room when you talked about it,
but the electric communications
and utility safety training, is that something that's
currently being done on Spencer?
I mean, DMV has their own compound out there, their own
building.
Yes, ma'am.
They do.
In this slide, and the reason it's labeled this, this is
the picture that was used from
well over a year ago, but electric communications, it's
really, it's been transferred, that
operation has been transferred with tech services.
So electric communications is no longer the title.
It's just, it's our radio communications function.
So it's the handhelds, the radios that are in the police
vehicles that are in some of
our field operations that we use at all of our different
special events and city operations.
So that is where all of those handheld radios, batteries,
support for that, it's functioned
out of there.
It's just what's titled electric communication.
This is an old title.
And then as far as utility safety and training, it's a
training room.
That's just the name of the conference room in which it's
being used for.
Okay.
Thank you.
If you could go back one slide.
Sure.
We're using some solid waste funds for this.
You're blinking or something.
No, I'm looking at my finance arm.
Okay.
And so I'm assuming that if we're using solid waste funds,
that this new location on Mayhill
Road is going to be serving solid waste in some way?
Well, this new facility at no, it would be serving the
entire city of Denton, but Tony
Puente can explain the use of the funds and-
I need the justification for why we would take solid waste
funds.
Sure.
Or a purpose other than solid waste.
Council Member Tony Puente, Director of Finance.
These COs are going to be used to renovate this facility
that is a solid waste facility.
And what's going to happen, what we're going to propose to
do is materials management and
traffic, the general fund, would pay back to solid waste
and offsetting revenue to offset
that debt service.
But again, because that is a solid waste asset, that's the
way we're going to propose to handle
this.
I mean, we could easily transfer the asset, but I think
that makes it a little too, from
an accounting standpoint, makes it a little more difficult.
Okay.
Thank you.
Yeah.
Any questions on the proposed, as far as for floor one?
Floor two, again, a little bit smaller footprint, but as
you can see, in very similar fashion,
the current conditions that the operations are in versus
the proposed, and it still allows
for a little bit of future expansion, a little over 2,700
square feet for future expansion
on the second level, if needed, down the road.
So service center, to get that, the cost of the service
center to make this happen, just
for the renovation expansion of the existing service center
, a little over $5.8 million.
And then as described earlier, there's some lay down,
excuse me, lay down yard side improvements,
a little over 300,000, it's being estimated, for a total
hard cost of $6.7 million.
And then you have the other costs associated with furniture
fixtures and equipment of $1.3
million, some design fees that need to be factored in, and
development fees for a total
of just, right at $8.9 million for that process, for that
program.
And then the other portion of the slide is to show the
funding mechanisms and how to
make that happen.
Go ahead.
Okay, again, a question on the funding sources, where it
says use of fund balance for electric,
I'm assuming that's DME.
Correct.
So is DME using any of the service center?
That's a good question.
They are not.
Okay.
Then just go back to the funding.
I'm just concerned that, of course, as we do any of this,
that we're certain that funding,
that there's a connection between the fund balance.
And I think transferring the fund balance from electric,
from DME to the other, and
that might be justified, but there was also an assumption
that some of that fund balance
would either be used to pay down the debt quicker on the
energy center or to reduce
rates.
So I'm not sure.
Well, just go back to your question on the electric piece.
Electric communication, while that's somewhat of a misnomer
, they're still providing services
to the electric department.
And so in the service they provide to the electric
department, that's the pro rata
share that they would potentially pay, DME would pay into
this particular project.
Again, these are still planning level estimates, so we'll
have to continue to refine it to
make sure that we understand what that group of folks is
actually doing for DME.
But DME will have a share of the pro rata cost to this
improvement of the service center.
And then if you could explain, you know, folks are thinking
that when they're paying their
charge for drainage, that it's going to clean out the cree
ks and stuff so that the water
flows.
So is the drainage offices or their support going to be at
the service center?
Yes.
And in the wastewater fund where that drainage operation is
housed, we do have a reserve
that's meant for drainage and we could potentially draw
down on that.
Again, still planning level estimates, got to make sure
that we understand what's set
up the reserve so that we can understand if that's an
appropriate use for that money.
But theoretically now, that's what we would probably draw
down for the drainage component.
Because there is the drainage operation that works on
keeping the stormwater areas clean
is going to be located in the service center?
Yes, correct.
Okay, thank you.
And in a bigger space, but yes.
Okay.
All right.
Okay.
So to recap, at least for the service center building and
renovation and expansion, again,
the whole premise is that purchasing materials management
moves out of that location, out
of the space off of Mingo over to 651, allows us to utilize
the vacated space at the service
center to move some of these operations into that space.
We believe that just from the standpoint of, you know, we
're short on space allows us to
utilize existing space.
It is a blank canvas over at 651 is scalable allows us to
grow into it meets our future
needs as a city continues to grow.
It would meet code requirements when it comes to over at
the service center because of just
a number of restrooms will be added along the way to
accommodate the growth that we've
had because the number of restrooms we've had today, still
have been maintained over
the last number of years.
So we do need to add some additional restrooms to
accommodate our staff.
And quite honestly, it just provides a better a better
experience and only for our staff
but also for the for the for the visiting public that does
come into the service center.
So before I move into the next slide, kind of the next
steps really we're not looking
at spending all that construct those construction dollars
at the moment, we still have a lot
of work to do and really, we need to design these elements
and get a little bit further
into to design and if there's any engineer required into
these facilities.
So what we're looking at what we're asking here today is
your permission to work with
the architectural firm or firms to begin to refine the 651
project for the service for
the materials management move and then also initiated a
request for for qualifications
for architectural services to work on the actual service
center space.
So again, just wanted to kind of lay that out as as as part
of the effort with with
this this portion of the presentation.
And if if if everything goes according to plan, we should
be able to initiate construction
over at the Mayhill site later later later this year.
So just procedural question.
I see up there next steps timeline work with architect
singular on final layout for purchasing
material management and term and timeline initial
construction.
Then I see develop RFQ for architectural services to begin
planning designing explanation for
service center.
So did we already have a did we already select the current
architect on that that we've been
talking about here with in an RFQ process which says work
with an architect.
Have we already gotten one chosen?
No, sir, we have not.
Okay, so that's part of that RFQ process.
Well, let me back up.
We have not chosen an architect.
We do have a recommendation to bring forward if we want to
do it a pretty aggressive timeline.
We would want to be able to go and seek out an architect to
go ahead and help us with
the service center, excuse me, with the Mayhill project
because it's it's and again, the slides
aren't shown yet but the transportation building and
materials management are going into the
same space at 651.
So it'd be great it'd be not ideal to be able to work with
one architect to be able to do
both of these functions in the same space.
So we're not so we're coordinated through the whole process
.
So an architect has not been chosen, but we would like to
be able to work quickly with
an architect to get this project off off the ground.
Okay, so it's in my understanding that what you're asking
is, in that particular phase
of this project or this move that you want to select an
architect.
I don't want to say outside of the RFQ because that makes
it sounds like we're doing something
we shouldn't but in other words not go through an RFQ for
that particular part of this and
go for it to through an RFQ for the service center
reservation.
Is that what?
Yes, sir, we would and only if we again if we want to keep
with an aggressive timeline
of getting that that that 651 completed and open up for
operation by middle of next year.
So my understanding is this all came out of a conversation
and you may if you're going
to address this and subsequent slides just let me know.
Because under a bond program we had the voters had approved
or something to that effect a
new service center or some kind of new construction of a
facility on different location or at
the southern end of this this campus.
So is is this sort of taking the place of that because it's
more efficient, it's less
expensive.
All right.
And so the timeline for the bond issue that we're substit
uting this for.
In other words, we're taking the bond issue of a new new
facility and we're trying to
say we can do better if we do what we're doing here.
Is that well, we don't have bond authority because it hasn
't gone to the voters.
But in essence, we were able to forego the need to
authority already did know.
So the only thing that's been approved so far is just
attract the transportation building
at a million and a half dollars.
Okay, that's what I'm thinking about.
Okay.
All right.
So next all that then.
All right, go ahead.
I'm just going to go back to the beginning of the
conversation.
So I'll move on.
So the next one is a track to transportation operations
building.
That's again, I don't want to go back to the various slide,
but that's that small building
there on in the service center campus that houses all of
our traffic and operations function
there where all of our signs and signals.
That's the location as you drive up into the approach of
the service center.
It's the first building you see on the left when you when
you pull in to that site.
Again it was built in the 1960s.
It was the original animal shelter facility.
Two generations ago, it's been used by traffic since the
mid 80s.
Again some other numbers and other metrics about the size
of Denton back in 1980 to the
present and the size of square miles as far as to the now
to the present, but about just
under 10 employees work there.
And as you know, we've made some operational changes here
recently with moving track the
transportation function under the traffic engineer.
So that is not inclusive of the traffic engineer and the
other traffic engineer that we're
in the process of recruiting for.
So in essence, that operation is more like 11 or 10, 11
folks that could potentially
working out of here.
It's very cramped.
There is no it's not really designed for technology.
The way it's configured because of the size and the
limitations in which it has.
So it just really limits the options that we have as our
community continues to grow
as we continue to make large investments in updating all
our traffic signals throughout
the community.
So again, some visuals of the traffic ops facility.
There's the bay, which not really a bay.
It's more of a garage area where there's way stored some of
the equipment.
This is the work area here.
And this is an essence of some other traffic operations
area.
But again, the space is so limited that you really just can
't have a full blown traffic
operations center.
And to be able to visualize what that might mean, if you
think of more of an emergency
operations center where you have multiple panels and be
able to see different intersections
throughout the community and be able to work remotely, so
you're not having to go on site
to the traffic signal.
If there's ever an issue, you can work directly from the
location in a central place and be
able to manipulate and change the traffic patterns as you
see fit based on the need
at the time.
As you mentioned earlier, Mayor, about the previous bond
program, the voters back in
2014 approved a million and a half dollars to actually
build a traffic operations facility
there on the service center campus.
And Councilmember Gregor, you'd mentioned about the Roodale
realignment that contemplated
that whole program coming to fruition.
And as you mentioned, it has not happened.
So as we progress further down the road back then, as far
as implementing this program,
that million and a half dollars is contemplated between 7,
500 and 10,000 square foot facility.
Back in 2016, some estimates were conducted through
preliminary design.
It came in at $2.2 million.
We had 1.5 million authorized, but it did not include any
furniture fixtures or equipment
or the lay down yard.
It just incorporated the building itself and the parking
lot.
In addition, we had not realigned Roodale.
We had not done any of the other interior side improvements
as far as streets for Pertain
and Latimore to the existing service center location.
So if this facility would have been built back then at $2.2
million, it would have been
where it is or where it was planned.
But as far as the circulation for our staff would have been
limited because, again, we
have not -- we're in the process of designing Roodale, but
we haven't constructed it yet.
So anyway, in essence, the project was put on hold.
And that's where we are today.
>> Okay.
So I guess a question, and it may be in a subsequent slide.
So if we're not going to do this, and I know that Roodale
wasn't just for this, but because
Roodale was -- I think it was what?
Three or four or five million dollars, I think.
I can't remember.
It was pretty expensive.
And that was one of the ones I really struggled with.
So I really want to understand the implication of if we don
't do this, why that's still needed
and why we're spending that money.
>> While Roodale was needed.
>> We don't have to do that right now.
>> Okay.
>> We don't have to do that right now.
>> Okay.
>> But I still want to hear -- I do want to hear some of
that.
>> Okay.
We'll follow up for that for sure.
>> Okay.
Yeah.
>> So again, so as in essence, because the project came in
over budget or over anticipated
project costs, it was placed on hold.
And so, again, fast forward to the present.
That's why we're working through these issues and trying to
find a space where we can actually
place our employees in adequate facilities.
So again, going back to this alternative option is moving
that operation over into 651.
Again, if you incorporate the space that I just mentioned
about materials management,
there's plenty of space left over to be able to move those
traffic operations into this
facility and be able to function.
As I mentioned, you're able to incorporate that million
five retrofit, the interior of
651 Mayhill.
This information was just not the information about the
service center, but the information
specific to the traffic operations facility was covered
with the bond oversight committee
back at the end of January and explained the history behind
it and they recommended approval
50.
So again, if we were to do so, it would look like this.
So again, materials management occupying the 61,000 square
feet.
We have a little bit of room for a future expansion for
another operation that may be
needed and then traffic ops or traffic control would, or
transportation operations would function
in this 10,000 square feet.
And we would have to add some additional parking for
vehicles and vendors and folks that come
in and out of that function.
So again, to make this happen, the cost, we would be able
to incorporate the million five
from bonds and also includes the cost of that includes
installation and some additional
parking that's needed.
We would incorporate some additional costs for furniture
and fixtures.
So in essence, all the way through that whole project's
estimated at just under $2.2 million
to make that happen.
So again, very similar to the cost before, but based on our
estimation, you get everything
within the site for the money that you had that was for the
project costs that came in
before without all the side improvements that was not
included previously.
Question just in general, undesigned fees, 10 and a half
percent of costs.
Is that just a budgetary estimate or is that what we get
charged for architectural services
and things such as that?
It's a range mayor.
Okay.
So it's a placeholder.
So just depending on the complexity of the project, maybe
more and maybe less.
Okay.
And again, on the right or my right, your left are the
funding sources in which we believe
we can make this happen.
So again, it fulfills a bond commitment made to the
community, get the project off that
center so we can move our staff into that facility and they
can begin operating more
effectively and efficiently.
It allows us to utilize existing space.
Again, it could be scalable because you're not making any
type of improvements as foundation.
So depending on what bids may come in, if it's something
that is too expensive based
on construction or interior innovation, the facility could
expand a little bit or it could
reduce a little bit.
It just depends on what kind of buy in power we have if we
can incorporate some economies
of scale.
Again, from the benefits perspective, it gets us a state of
the art facility with all the
interior improvements that are needed to operate our
traffic signal.
Traffic signals, it centralizes operations and we believe
that we can incorporate some
efficiencies through this investment.
As I mentioned before, it was approved 5-0 by the Bond O
versight Committee.
Again, if we can work with an architect to go ahead and
begin that process and start
incorporating not only this operation here but also the
relocation of materials management
into one project, again, we believe we can get economies of
scale and plus just a better
coordination between two different projects.
It's basically one project over a large span of a facility.
In summary, we're asking do you believe that this is a good
use of space that we have already
to relocate these operations and if so, allow us to move
forward?
Then I guess the second piece is do you believe that
expanding and renovating the service
center makes sense based on what was covered on these
previous slides?
In essence, what we're looking for is some direction to
allow staff to begin negotiating
with an architect to do the 651 Mayhill component to move
in traffic operations and materials
management into that location and begin through that
process pretty quickly and then doing
an RFQ, request for qualifications for the service center
renovations.
Total design costs for that based on our estimation is $1,
150,000.
Okay, some questions Council Member Gregory, then Council
Member Briggs.
Well, I think you have presented some very good ideas.
I'm really pleased that you've taken this to the Bond Overs
ight Committee.
I think it makes sense but I can only say I think because
it's hard to make a final
decision about if this makes sense without putting it in
the context of the full facilities
master plan that we've been talking about.
So I'm somewhat reluctant to give a green light to spending
$14.4 million on this right
now especially because when I agreed to approve the
contract for rental space to move planning
and development over to the old Dattco administration
building on West Hickory Street, we were paying
I think $400,000 a year rent.
I said I want to pledge that within a year we start
planning, we get a plan in place
for moving them to a better location where we're not
spending that rent.
And I know a lot has happened since we made that deal.
But I'm really quite anxious that we would be approving
this money before we know that
we have an exit plan for getting planning and development
out of that space downtown
and out of that expensive rent.
So I'm not saying I'm against this, but I'm kind of
reluctant until I know if we have
a plan in place and if we're going to be hearing about that
in a week or two, then that's going
to be good.
I think I can answer a couple of questions.
I would sort of reframe this last slide here.
We're really asking permission to get moving on traffic
operations and purchasing really
the use of 651 Mayhill and bringing an architect on board
to give us some decent planning estimates.
One of the things that I'm concerned about the 2014 bond
package is there's been so little
planning and implementation, the purchasing power continues
to erode.
And so really what drove 651 Mayhill was really the traffic
operations building, moving that
over, trying to leverage as much of the $1.5 million as
possible.
And then that led to the discussion of materials management
.
I'm concerned about the budget planning estimates and
really that's where we're wanting to head
with the architect is making sure that we can refine those
numbers.
They're right now so high level.
I think the service center can wait and we can have that
discussion in concert with the
city hall, potential aggregation of city departments.
That will be to you probably in about a month where we can
talk about eliminating, hopefully
getting out of that rental situation that we're in and
providing you a revised space
needs analysis.
The building space needs have changed a little bit so we
wanted to be sure that we felt comfortable
with where the departments would be housed before we
brought that to you.
But I don't really see a need to get moving right away on
the service center.
I think there's more of a need on the 651 building and
getting our planning refined.
I totally hear you in terms of the service center and how
the dollars are used.
But that's kind of where we are at this point.
And I guess the only other correction I would make is there
would be no intention to go
out and just hire an architect.
We would definitely put the traffic operations and
materials management, bundle that together
and bring one architect into a process in order to help us
with that.
But that really is the main priority today, service center
and then the eventual being
out of the former DATCU facilities is the next set of
discussions over the next month
or so.
Yes.
All right.
That was helpful because your point that the 2014 bond
money, the buying power continues
to erode is a very good point.
And so moving traffic operations to the Mayhill site and
maybe preparing the Mayhill site
for the materials.
I think gives me a little bit, I'm not as reluctant to move
forward and authorize that.
I just want to make sure that it's a top shelf planning
issue to come back and share with
us the longer range plans for the rest of the facilities
and particularly us moving
on from the West Hickory location.
That will be in March.
Councilmember Briggs, I think you had a comment.
That answered several of my questions.
I appreciate that.
I was trying to go through and think about the master plan
conversation that we had and
see how that aligned with this discussion.
So when we looked at our city council complex, that's going
to come back to us.
That was really large and where some of these departments
that we're planning on putting
into the service center, not going to go into the council
complex now allowing that to be
a much smaller scale doable project.
It has been the city hall based on our, based on direction
that we've received from city
manager's office has been scaled down based on just the
staff is not going to grow as
was contemplated in the previous study.
Secondly, it is very possible that some of the facilities,
some of the employees at the
service center, for example, engineering, some of the
engineering staff may be coming
over to the city hall complex because what we're trying to
do is create a one stop shop.
So any type of development type function, whether it's
reviewing of plans and things
of that nature, what we're trying to do is when the
developer or the community comes
in, needing to have that kind of level of review, they're
not having to send them to
two different locations.
We want to be able to keep them at one location, whether it
's on the single campus, the same
floor, two different floors, but at least on the same
location to be able to do their
business and not be sending them all over the community.
So it's very possible that some of the engineering staff
may be coming over to city hall, which
would then allow again, additional expansions, not
expansion, but just reallocation of existing
office space for the streets function over at the service
center.
The divisions that were contemplated to move to 651, though
, were not at all contemplated
in the complex.
Okay.
Thank you.
In general, I'm good with the first two for sure.
I do have a couple of questions that you may have the
answer to and you may have to get
back with us on it, but on both of them, they say use of
available CIP funds.
And whenever you're using CIP funds, it means you're taking
away from another project or
another project's been canceled out.
So I'd like to kind of know what that is.
The amount for traffic of use of fund balance, general fund
, doesn't bother me too bad, but
I want to know how much of a drawdown that's going to
actually happen on the service center,
because that's a pretty large portion of that to kind of
know the effect and what that does
to our overall percentage of fund balance.
Council members, over the last few months, we've been
working with the city manager's
office going through the entire city's CIP.
We've been closing out projects, looking for savings,
looking for projects that haven't
been closed out, that should be closed out.
As we've been doing that, we've been aggregating those
dollars.
Generally speaking, those dollars have been revenue funded
capital cash that has come
over from the general fund into a CIP project that either
never got done or it was closed
out.
And so any savings that came from that, we've aggregated
them.
And so we have this pot of money now that we're suggesting
to utilize in this particular
fashion.
In order to do that, we would come back to you to amend
that CIP budget to make sure
that we have the authority to do that.
And so we would clarify that at that point.
Okay.
I mean, if we're talking about savings, I'm fine with that.
That's correct.
If we're talking about a project that never got done, what
was the reason it didn't get
done and because...
No, in some cases there were dollars that were supposed to
go to a project and that
project was funded a different way.
And so that just wasn't cleaned up.
So we've been cleaning that up.
Okay.
Any other comments?
I've got a couple.
Go ahead, Council Member.
So I want to take a look at, or I ask you to speak to what
this project does to Mayhill,
how you see those two kind of coexisting.
I don't know what kind of traffic comes in and out of those
buildings, but now we're
adding those two.
Is that more trucks?
Is that more cars?
Mayhill does it have that capacity?
Obviously we're widening it.
What is that timing?
Will the road be finished?
It's a year out or so.
So will the road be finished by the time we're there and
then what kind of additional traffic?
Have you looked into that?
Well, this engineer can speak to the timing of the Mayhill
project, but yes, it will add
more traffic to Mayhill because of the operations there.
There will be deliveries that are made at materials
management like they are today.
So there should be fewer deliveries.
There won't be any deliveries, much of any deliveries made
over at the service center
to be pushed over to 651 Mayhill.
So there will be some additional deliveries made there.
There will be some additional truck traffic because of just
the operations that are happening
at 651.
As far as the timing, I believe Todd, they should run an
almost, depending on when we
get started at 651, we're looking at 651 being completed by
middle of next year, maybe
towards the middle to end of next year, 2019.
So Mayhill Road construction will be going on for the next
realistically two years.
I mean, it's about a year and a half out before
construction is completed.
The ultimate configuration of Mayhill, absolutely this
doesn't compromise what we're doing
with Mayhill.
Mayhill has been designed in such a way that it has
capacity for the next 30 years to 40
years before we really have to do anything.
And should we need to, there's a wider median in the middle
that we could come back and
add two lanes when traffic volumes increase to that point.
This won't push it to that point.
It will be a much better scenario once we get the DCTA
bridge crossing put in place
where we extend Mayhill from 35 up to this connection.
When that gets in place, then the truck traffic makes a lot
more sense because it's not impacting
that little piece of Edwards Road in Mayhill that's the 90
off of Colorado.
This makes way more sense.
It's a lot more flexible, easier for trucks and vehicles to
make deliveries and then they
get right back to the highway and go where they need to go.
So they can go to university, take 380 back out east of
town or they can get down to 35
very quickly.
Okay, thank you.
And if I may?
Sure.
So, I think overall I'm comfortable-ish exploring and
looking and nailing down details.
I think the miss for me, if I had to ask that wasn't
touched on, I'd really like to see
some sort of community space.
I know you have the training center there, but I think it
just opens the door for someone
like me that doesn't understand those departments and/or
doesn't interact with those departments
or you have your specific training facility but there's a
board, a committee meeting,
something like that.
I just think we need to start folding those in.
I mean, you see the advantages that the police stations
community room has and so I think
incrementally if we begin to build those in and open, I
understand the sensitivity to
those areas and I don't know how those two coincide, but I
just think we need to focus
on those because when I look at the presentation, even if
you, I mean I understand you're saying
1980-ish or so, some of those buildings, this, that and the
other, but it's been that long
since we've built a recreation center as well.
So that, there's a lot to be said for, a lot got done.
There's a lot that has not been done to keep up, but I
think overarching thing is some
sort of space that is open to the community that can
utilize it or just come in and learn
what our departments are doing and it could serve as a
breakout space if someone's doing
business there.
I just think it kind of is a need so that our citizens can
understand what department
does what, how that interacts with their daily lives and is
welcoming, not saying, hey, wait
out here.
You're welcome to this space when it's not being utilized
otherwise.
Okay, thank you.
Thanks.
Okay, a couple of questions.
On this slide, I'm assuming the $1.15 million in design
fees is for the entire three projects
that are listed there.
Yes, sir.
Which means some of that will be with a single architect
outside of an RFQ process and the
remaining would be whatever is the amount at least as
proposed under the service center.
So what I really want to understand and I want to use these
and maybe some of the ones
we've got coming up, because I know architectural firms
charge either percentage or I want to
know how this all breaks down because I want to know how
many hours people are working
on this in an architectural firm.
I want to know if that's how they figure it and it just
comes out to be that way normally
and naturally.
That's okay.
I just don't understand how you've got $1.2 million worth
of design fees.
So if somebody's spending $200, $250 an hour, whatever that
is, the number of hours, I want
to understand this process because if we're contracting
with these firms outside of it,
RFQs are not bid processes, but we need to start talking
about that.
Not bidding necessarily, but what are we getting charged
for fees, how do they break down,
and to have an understanding of that because that's just a
lot of money and it's very
well probably worth it.
I just don't understand how we get to those numbers and I'd
like to have a better understanding
of that.
Of course.
As far as I want to make sure I understood what you said,
Mr. Hollman, I'll call you
Mr. Hollman since we're in a meeting.
The movements that we're doing here were not necessarily
contemplated as people who would
be moved into the new municipal facility, at least per our
current study.
Now you said things have scaled down a little bit because
we don't anticipate the employee
growth, but given if we still had the same plan, these
particular employees for these
divisions were not contemplated to be in, let's say, this
large city complex next door
or wherever we decide to put it.
Am I understanding that correctly?
That's correct.
Okay.
So that's really outside.
Right.
I mean, the master plan, yes, we want to understand that
and I think Council Member Gregory brought
it up because of the development staff being over at $400,
000 a year rent rental space.
And I believe our lease over there is...
2023.
So seven years.
All right.
So there's 2.8 million bucks right there at least.
So on this, I don't have an issue with the concept here
because what I'm understanding
is you're trying to take space that right now is going un
utilized for the City of Denton.
And how do we create more space that are requiring
expansion now and in the future?
And how do we do that?
Well, this is a creative way to do it.
I just have a couple of questions on some of the specific
details.
Okay.
Or observations and comments.
So on the service centers, primarily because it looks like
on purchasing material management,
use of fund balances from material management, use of
excess COs, solid waste.
I'm assuming that's what we just talked about, about
projects that for some reason got funded
somewhere else or we deemed were not viable or we killed
projects that we thought were
viable that weren't viable.
And so we have the funding there.
And available CIP funds is that same kind of concept just
with other projects.
So that funding is pretty much self-contained.
On the service center, the big one there that I have a
comment about or observation is general
fund slash use of available cash or future certificates of
obligation.
I cannot support grabbing $4.4 million of cash out of the
fund balance because that's
going to -- I think we can find a way to -- if this is an
expansion, this is a capital expansion,
this is capital improvement per se.
And so typically we've -- I mean, if we're going to start
funding capital improvements
out of cash from the general fund, I think that's a policy
discussion that we certainly
can have.
That's a lot of money to pull out of there.
So if we can find a way, especially right now, interest
rates are still low.
They're not going to be in the near future for bond
financing.
It's already started going up.
So that's my only question there is that $4.4 million, as
Councilmember Ryan I think had
said, is if we can, you know, find a way to finance that
with the favorable rate structure
that we have right now, because I think that would take us
way below or get us real close
to our policy and our fund balance.
And then on traffic operations, use of GEO bonds.
Okay, so we have the $1.5 million.
And then -- so we're saying we're going to use the general
fund there for $331,000.
I'm okay with that, but we've spent that much for the wr
ought iron fences around the two
cemeteries.
So I mean, that's a more manageable kind of expense to say,
okay, we're short a little
bit.
I think we did it with the Vela project, soccer fields.
I'm just hoping that we can -- because this was my thought.
We're spending $2.178 million on that.
And I think you said if we built the traffic operations
building as was originally designed
in the 2014 bond program, it's $2.2 million.
Unless I'm -- okay, it did not include FFE and lay down
yard.
So we've got a little bit of difference there.
So we're almost at the -- I mean, we're almost at the same
-- I mean, so I know we were a
little short there, but we could have made it up just like
we're making it up here.
It's just -- it's in staff's opinion that it's better
served instead of building a new
facility there, preserving that site possibly for future
expansion, moving it over to the
651 that seemed to be more consistent with having groups
together that sort of share
either the same kind of functions or things such as that.
So I'm okay with this.
My fear is that like most other things it seems like
recently -- well, not recently,
over many years -- what we think is going to cost us to
build it is not what it costs
us to build it.
That's how we've sort of gotten into this place, this
situation in the first place about
not finishing bond programs, construction costs are going
up.
So when will we know -- because even with architectural --
they make an estimate, but
that doesn't necessarily mean that's what it's going to be.
When will we know a more definitive, hard estimate?
Is that only when we set it out to bid and get back our b
ids?
We will -- as we move forward, I want to reiterate one
other thing.
We are going to be going through an RFP process or an RFQ
process.
I wouldn't feel comfortable just hiring an architect even
though we own the building.
I mean, we really need to put a process behind it.
One of the things that we're doing to address your point is
trying to ensure that we hire
our own external cost estimators.
So not only do you have the architect's estimate, but you
've also got a cost estimator who specializes
in that industry and works for us.
So we're hoping that they tend to be a little bit more
knowledgeable about the market, what's
going on out there, having worked in recent projects.
So we're going to be going down both those paths, trying to
get as solid of an estimate
as possible.
And so I just wanted to clear up the process.
My guess is probably April or May we'll be able to get back
with you with an update on
where we are with all of this.
And in terms of the budget processes, it's very difficult
to have the conversations with
council without at least providing some kind of a funding
plan to put you at ease.
So if you want to change any of this or alter, that's fine.
My main concern in just kind of assessing the city
facilities around here is we tended
to, you know, had a tendency to underestimate some of these
costs and rather than come and
talk to the council about it, they got shelved.
And that just means you're making up even more of a cost
deficit down the road.
So it's really important to get these things moving if we
possibly can, because we've got
so many needs right now, both in our own bond program, CIP,
as well as the city facilities
that we've got to start making some decisions or the hole
gets bigger.
So that's kind of where we are at this point.
And we'll be back to you in a month on the city hall.
And I would think the service center, Councilman Gregory
brought up a good point.
And in terms of the engineering function in particular, we
are still kicking around the
reason we didn't have that today is because I knew you
couldn't look at 50 slides, but
we didn't know if we could handle what we were going to be
doing with the with the engineering
department and how that affects these other buildings.
So we need another month or so to keep refining that so we
can give you a better answer.
Is the engineering department in these particular
facilities?
Yes, they're at the service center.
And there's a real discussion whether that should be
located with the planning department
as well versus what there so we need to work our way
through that.
And let's assume that and to go with your your assumption.
But how many people are we talking about?
As far as engineers?
Yeah, that's right.
Then in other words, if we're saying if we're saying we
were hesitant to sort of move forward
on the service center concept, because we think that some
of those people are going
to be considered to be relocating to the more larger
municipal complex.
Yes.
How much are we how many people are we talking about?
How much space are we talking about?
Currently from an engineering standpoint, we're talking
about 20 current with potential
expansion to five more to expand our ability to do and
serve the city and future CIPs as
well as everything else that we're doing.
Okay, my point.
So you're 25 folks.
And the space for those people is what?
A couple thousand square feet, three, four, five thousand
square feet.
Yeah, Mark, we're looking at 160 square foot per person or
was it more than that?
Yeah, so if yeah, I don't need a specific point being that
I think I'm okay with moving
forward with it because the amount of Delta that we're
talking about, I mean, if we make
that shift, we're still going to want to have that space
for the expansion of something
else.
So if we're going to get moved out, that's a very minor
part of the service center.
If I'm understanding that correctly, if I'm wrong, somebody
just tell me because I know
there's understanding Councilmember Gregory's point, I
agree with it.
There's always there's already spatial problems with that
whole second floor, just we're running
out of space.
And we have people coming in to help us continue to improve
our efficiency delivering projects,
meet the needs of the public in general and what their
questions and putting projects
through on the development side.
So it's already an issue.
Worst case, if we go with this plan, they stay there and it
's built like this.
Worst other case scenario is we build this, they get moved
out to a new facility somewhere
down the road.
I mean, that's gonna be a long way down the road.
And that space is already configured.
It's already built out.
Then you can actually expand into that with some other
either department or expand the
departments that are existing.
Right.
Okay, I'm okay with moving forward with that.
Yes, Councilmember.
Could you go to the last slide, Mr. Cunard?
Yes.
That one?
Yeah.
Mayor, I'm okay with green lighting, the traffic operations
at 2.1 and the purchasing material
management at 3.3.
But putting a yellow light, let's hold, on the service
center at 8.8.
Actually, it looks more like 8.9 to me.
Until we hear back in a month about the rest of the master
plan.
And I can agree to that.
I think what I'm saying is even if we green lighted it, by
the time the month comes, I
mean, in a month, the service center aspect, we won't even
have the architect probably
picked by then.
That's correct.
So I think whichever path we go, we wind up at the same
point.
So I'm okay with that.
The only thing I would say, though, is if we're not going
to go out for an RFQ except for
service center, if that delays us a month, I don't care
about delay in a month.
To me, it's just --
We are going out to an RFQ for everything.
So what we'd like your permission to do today based on what
we've gotten back is go out
for an RFQ for an architect for the traffic operations and
purchasing materials management
facility.
We're perfectly okay holding off on the service center
until we get your feedback on --
I don't think you should exclude that from the RFQ.
Because by the time it gets out, we're going to have this
discussion in a month.
And then if we have to send out another one, and if there's
an architectural firm looking
at all three of these, I mean, from a timing perspective,
that's why I understand.
But even if we weren't going to hear the conversation in
six months, I'm okay with moving forward
because it's not going to make that much difference if we
move 20 people out of that building.
So we just differ in that regard.
Well, my only question is if we do a request, is it an RFQ
or RFP?
RFQ.
All right.
If we do an RFQ for all three and in a month, we decide
that we want to hold on the service
center, then are we stuck with that?
Now what we would do is basically put it out to the market
that we're moving forward with
the first two buildings for sure, and then we want an
optional price.
If we include the service center, what does that do to the
pricing?
And then we will also get the mayor's questions answered in
terms of justifying their fees,
how they come up with those.
So where are the rest of the council members on?
The green light or the yellow light for the service center?
I'm a green light, so I don't mind moving forward.
I mean, Dalton and I are talking about this, but I want to
hear what everybody else is
thinking.
Yeah, I'm definitely a green light on it.
I think we're a little behind in our facilities and we need
to catch up.
Okay.
I'm a green light as an alternate.
As the city manager stated, I think that's the best route
to take.
Okay.
I'm not sure I understand that.
We'll include that as an add-on.
As an add-on?
Scope of work.
Okay.
Who else?
You're okay with which one, Kate?
Council Member Riggs?
Yes, I'm okay with the first two.
And the service center, I would like to see it as well with
the larger facility plan,
but I'm okay going ahead and adding it because I think the
timing is going to work out.
And eventually we're going to do it because we're not going
to do the one we discussed
doing out further.
Right.
Council Member Hussie?
Yeah, I'm good with all three.
Going out.
Okay.
We'll just go with the added as an add-on.
Okay.
Yeah.
All right.
Okay.
Thank you.
That direction?
Yes, sir.
All right.
You bet.
Thanks.
Okay.
I tell you what.
The next one we've got is probably going to be a little bit
of a presentation in time,
so let's just take a little quick five or 10 minutes so
that, you know, we're not taking
breaks right in the middle of it.
All right.
Going back to this meeting of the Denton City Council on
Tuesday, February 13th, 2018.
It is now 2.52 p.m.
We're moving on to our work session report, item 1C,
receive report, hold discussion.
You have staff direction regarding an overview of
homelessness initiatives and research on
tent encampments.
Good afternoon, Mayor and Council Members.
In November, staff was asked by council to conduct research
on tent cities.
We have conducted some preliminary research, and that paper
was included as part of your
backup.
We are going to touch on that today during this
presentation, but before we kind of pull
that one piece of the puzzle out and address tent encamp
ments and emergency housing, we
really wanted to provide you with a comprehensive overall
update on homeless initiatives and
the progress that has been made throughout the last year.
As you can see from this graphic, and I'm not going to go
through it, homelessness is
a very complex problem that requires very complex solutions
and a lot of collaboration
amongst many entities.
I'd really like to turn it over to Gary Henderson at this
point.
He's the executive director of the United Way.
The United Way has led an effort over the last two years to
really take a collective
impact approach to addressing homelessness and bringing
forth a coordinated entry system,
which Denton County and our community did not have before.
So I'll turn it over to Gary, and he'll start by giving
some brief history of that
initiative and overview, and then it will turn it over to
Danny Shaw, who is our human
services coordinator, to take us through a little bit more
about what the city's contribution
has been and also address some of the highlights of the
research that we found.
Thank you, Mayor and Council.
First, I just want to give some credit where credit is due.
Perhaps your leadership dating back to 2015 and launching
the Mayor's Homelessness and
Housing Task Force, really, you took the lead as a
community.
You jumped in front of the Commissioner's Corps, Denton
County, other municipalities,
and you said in our community, even though this is a
regional issue, we're going to take
the leadership role, and if it were not for Mayor Watt's
personal leadership in that task
force, we would not be at the place we are today able to
talk in very specific level
about needs and data.
So Mayor Watt, thank you from all of us at United Way of
Denton County and the community
at large.
Really the approach to collective impact for a problem as
complex as this is the only way
to approach this issue, this issue.
So when we talk about a homelessness leadership team, with
your help as a funding partner,
United Way has joined in the City of Denton to fund the
Denton County Homelessness Leadership
Team.
You enabled us to bring the following bodies into one room
on a regular basis.
Commissioner's Court, City of Denton, City of Lewisville,
Christian Community Action in
Lewisville, City of Sanger, Sanger ISD, Serve Denton,
Giving Hope, Denton County Friends
of the Family, Monsignor King Outreach Center, Salvation
Army Denton and Lewisville, Denton
Regional Medical Center, Denton Community Health Clinic was
at the table originally, Denton
County Health Department, Texas Health Presbyterian
Hospital of Denton, Health Services of North
Texas, North Central Texas College, the Denton Chamber of
Commerce, the Lewisville Chamber
of Commerce, and then representatives from United Way of
Denton County.
Among you, you have Councilperson Briggs, Mayor Watts, and
then from the United Way
Board Chief Lee Howe serving on this leadership team.
So you can feel from the breadth of the organizations
represented in that room every time they meet,
we're attempting to attack this regional issue in just the
way it should be attacked.
This is not only a City of Denton issue.
So when that group began to meet in 2016, in addition to
charter and bylaws, they began
to work on the mission purpose vision, and this is the way
they articulated their vision.
Every person in Denton County has a place to call home that
is safe, affordable, accessible,
and supported by community resources.
That's supported by community resources is just as
important as the brick and mortar
that we endeavor to put people into.
The needs are so profound among some of these citizens that
we're endeavoring to help to
simply house them without services wrapped around them
would be completely inadequate
and we would be setting our members, our clients, and our
community up to fail.
Then the mission that this broad set of leaders articulated
was fostering an effective and
coordinated system, underscore that word, of homelessness
prevention and intervention,
both resulting in homelessness that is rare, brief, and non
recurring.
But through these four important points, and I think it
will drive home as you're talking
about a single aspect of this homelessness issue, community
awareness and connection,
data-driven, evidence-based, fiscally responsible
recommendations, innovative solutions around
affordable housing, access to primary and behavioral health
care services, adequate
income levels and coordinated services, and then finally
mobilizing, advocating, and empowering
public-private community-wide collaboration.
So that group as it began to meet, the first accomplishment
was an unanticipated accomplishment.
Our communities, and I say Denton County as a whole, faced
the loss of our Emergency
Solutions Grant, which was an annual $600,000 grant award
from the feds through the state
to this community to four service providers in Denton
County that was a critical foundation
for homelessness intervention and prevention, funding and
services in Denton County.
As a review, those four organizations that that grant?
Christian Community Action on the Prevention Space, Sal
vation Army Denton, Friends of the
Family, and Giving Hope.
Thank you Mayor Watts.
So those four organizations with the help of the city,
Danny Shaw, as well as the Denton
County Homelessness Leadership Team, those appointees that
you heard before, they began
very quick and hurried work around how can we strengthen as
a community our proposal
to the state for these funds.
And their work over months not only resulted in securing
that fund on an annual basis,
they re-secured that funding over a two year period so we
have not $600,000 for only one
year but $1.2 million for two years.
So that really, if you will, rallied the leadership team
around the strength of communities working
together in collaboration.
Again, a very complex social problem but when those folks
walk into that room they drop
all of their missional agendas at the door and they're
focused on one thing, making homelessness
rare, brief, and non-recurring for our citizens of Denton
County.
So the next major endeavor, and I'm credited with giving
the most amazing pep talk in the
world, I said this could not happen, that group began to
attack a coordinated entry
system or process or workflow so that when we discover
people at risk of homelessness
or experiencing homelessness we would capture them into the
Homeless Management Information
System, HMIS, and that we would assess their needs knowing
from the person most close to
death in Denton County today to the person who frankly with
a little bit of resources,
maybe some elimination of barriers, maybe redirecting them
back into a family member's
home but with some small resources to help offset costs.
We knew from top to bottom what our homelessness population
and situation looked like.
And to underscore how dramatically different that was for
this county, never before did
we have a working system where the folks on the ground
could tell us person by person,
not in the hundreds as identified by an annual homeless
census count, the point in time count,
but in the over a thousand households who the people were
in need and how they scored
and how they ranked.
That was groundbreaking and just a few months ago we were
recognized by the state of Texas
as a community for having achieved that coordinated entry
process status which only strengthens
our ability to retain funding sources like the ESG $1.2
million grant.
So as you look at this one aspect of the problem today,
what you need to know is you have a
leadership team behind you ready to take direction from you
, a leadership team that wouldn't
exist were it not for this council, this body, the mayor's
task force in 2015, your financial
support, United Way of Denton County's financial support
and those organizations that appointed
leaders to be in that room on a regular basis to make this
a priority.
I can tell you that United Way organizations across the
state and across the country do
not enjoy the level of support this community has given us
as a social service community
but also citizens who really desire to make homelessness
rare, brief and non-recurring.
So Danny will step up here in a second and talk to you
about the data but really this
coordinated entry system has given us the ability for her
to tell you the people experiencing
or at risk of experiencing homelessness, prevention of
homelessness wherever possible, immediate
access to coordinated entry.
There's no wrong front door.
We want to capture people where they are and assess them
and then quickly connecting people
who are experiencing homelessness to housing assistance and
or services.
So I want to continue them in that spaghetti diagram that
Sarah laid out for you.
It really is just that complicated but it really is as
simple as meeting people one
at a time, getting them housed but providing case
management, supportive services and some
of the individuals we're housing and we're serving have
some very profound and complex
needs.
It's not as simple and it's not a cheap solution.
So with that, Danny.
So I get to talk about the data a lot because I find it
very, very important and what Gary
didn't convey to you though, he did a very good job of
explaining what coordinated entry
is, is telling you how important this data is for us
understanding the complexity of
the problem, really taking this information and saying
before we had ten different databases
tracking information about the same group of people and now
we have one where we're
able to see all of that information together, that those
organizations are aligned and working
towards common goals, that a really, really important part
of this data is answering those
questions that we need to answer now and this is where we
are in our next steps.
So as a result, we have the exact numbers for what is the
demand in our system right
now.
So as Gary mentioned, we had the point time count that was
sort of giving us a nice snapshot
of what was happening on any given day but now we can truly
see the demand and we can
compare that to the resources we have and see what those
gaps are in our system so that
we can answer some important questions about what we need
to add to the system now.
And then we have a really better understanding of what
barriers people are facing.
We knew that it was hard to get people housed but until we
were implementing this coordinated
process and our agencies were communicating with each other
, did we fully understand what
types of barriers those were and then looking at strategies
for how we can attach those
with new programs.
So for me, data is only as good as what you do with it and
so we're at the next phase
of what we decide how we're going to use it.
And so let's show you a little bit about what coordinated
entry looks like right now.
We have assessed over 600 and almost 700 people currently
in our coordinated entry system.
When we do this assessment, it tells us their vulnerability
, their risk, how high their
risk is for dying on the street.
Now you can score low on that and that puts us in a
situation where we understand that
you just need a little bit of assistance and that we call
that diversion.
That's just a small cost effective solution that we can
divert you from homelessness very
quickly, keep you housed.
It's a very cost effective solution for us.
So right now we have 156 people who are scoring low enough
to just be eligible for diversion,
small, cheap intervention.
Now we have another 380 people who are scoring in the mid-
range of our coordinated assessment
system.
That's just some short-term assistance, rental assistance,
three to six months to provide
some stability to help people stay housed after they've
been homeless.
And then we have another 155 folks who have long-term
assistance needs.
These are folks who probably will never be able to live
independently.
So anything that is expended here would be an annual cost
for these folks.
Real quick question.
Go ahead.
I've got one.
So in the rapid rehousing, the 380, you said it's short-
term rental assistance that they've
already become homeless.
Right.
To be eligible for rapid rehousing, you have to qualify as
literally homeless.
So currently there's somewhat, and that could take over two
months or three months.
It's rapid rehousing, but that doesn't necessarily mean-
It's rapid.
It's rapid.
That's correct.
Because there's clients that we're working with that have
been homeless waiting for this
for over three months.
So when you say short-term and long-term, do you have more
specific time periods for
that?
Well, the short-term assistance is really directed to
specific the rental assistance.
So it's three to six months of rental assistance.
It doesn't really qualify how long it might take someone to
get into a housing solution.
What we're talking about here is when they're in the
housing solution, how long of that
assistance will occur.
And again, with the long-term, we're talking about probably
the lifetime of the individual
with the permanent support of housing.
So let's give you an example.
So you were actually talking about something really
specific about the length of time it's
taking us to get people in housing.
Well, Council Member Gregory had a question.
Oh, I'm sorry.
Let her finish that explanation because I have a question
about it different.
Okay.
Yeah, great.
So we have 380 people on the rapid rehousing list in our
housing priority list that say
that's the intervention they need.
Right now, the ESG grant will only cover 84 units.
So right there, we have the gap of 296 units that we have
to fill that we don't have either
housing units for or the money to pay for housing units for
.
So this is why the data is so much, so important.
And we can also estimate some figures on what that might
look like.
So to make sure we cover that gap, that's probably between
$1.1 and $2.1 million, depending
on how long the assistance happens.
It's also another almost $600,000 in case management, we'd
have to add in order to support
those folks because in every one of these situations, there
's going to need to be some
sort of wraparound services, supportive services happening
here.
Did you stop your question?
Did you have a follow up on that?
Can she let her go and ask a follow up?
Yeah, go ahead.
Okay.
And so on that, just to follow up, so on the 380, with the
ESG grant 80, you said 290 something,
people who need the rapid rehousing, can we just assume
that they're in shelters or on
the street?
Well, I think that's where we're talking about the rest of
our presentation is that is actually
the two different choices.
If they're in shelter, if there's enough beds, or are they
resulting in living in the streets
or in shelter because of that gap.
Okay.
Yes, go ahead, Council Member.
Thank you, Mayor.
What is, describe more of what you mean by diversion.
Sure.
I know it's a confusing term.
Some cities would call it a bus ticket, but we don't.
We actually, we talk about a more intentional intervention,
which means someone's house
may be their couchsurfing.
They're not necessarily stably housed.
They might be living on a friend's couch or living with
their parents, and they're
about to be evicted in that situation.
We might be coming in and doing some sort of small
financial assistance or mediation
with that family to try to keep that person housed.
Again, it's not a permanent solution, but it's better than
letting those folks become
homeless.
But it might be reuniting them with other family members
somewhere else.
There's a lot of opportunity within diversion.
The goal there is to just make sure people stay housed
rather than become homeless.
So when you say it's not just a bus ticket, it may be a bus
ticket to Aunt Mabel over
in Oklahoma who has a spare bedroom.
Yes, it would be intentional.
It would be case managed and to make sure that there's
truly a housing solution on
the other end of that.
It happens a lot with domestic violence victims.
I was assuming, so help me out if you have a different
number for those that are extremely
vulnerable.
That's the 155.
The number of people in permanent supportive housing, that
number there, those are the
people who are scoring the highest on the acuity, which
means they're most at risk.
They have some sort of, well, a combination of chronic
homelessness as well as a chronic
illness or some sort of substance abuse issue that is
chronic, that is preventing them from
being able to live, and they'll live with that long term.
So it just limits their ability to work or to gain the
income that they need in order
to be stably housed or their physical ailment just makes it
impossible for them to be able
to live independently.
Do we have any notion among our population of how many
people are just one health crisis
or transportation crisis away from being homeless?
Do we have any notion?
Yeah, the census data gives us a little bit of information.
I don't have to know the exact numbers, but we can look at
those that are what we call
cost burden, their living cost burden.
So any crisis could move them into homelessness because
they have to make the choice between
their housing and some other item for their family.
So yeah, the numbers are in the census data, at least to
give us that notion.
Overall, in the city, sorry, Gary.
Across Denton County, there are roughly 42,000 households
that are at or below the poverty
level.
So that was going to be my question.
These figures, this is this countywide?
Yes.
Okay, so this isn't just the city of Denton.
This is no, but we can break with with the database, we can
break that information out
much more easily than we could have ever before.
And also on the just we glossed over it a little bit
because we talked about it in two
different ways.
And I want to make sure that we hear exactly what you said.
Okay.
The first is on the rapid rehousing of 380.
You put a cost to that of what it would take theoretically
to try to solve that at this
time period doesn't mean that then we might have another 3
80 next year, but just just
in this immediate time presence, that ESG and all of the
fundings that you can identify
to help with rapid rehousing
provides funding for up to 86 of those of that number 86 of
those
Yeah, about 84, about seven a month.
But you said it's got the funding for 84.
But that's also if you have the units, that's correct, to
put it in.
So in some cases, we have the money.
What we don't have is is where to locate them.
No, and I appreciate that point, because even the 84 that
we can fund, you're exactly right.
That doesn't necessarily mean there's a housing unit.
That's right.
And so I think a little bit more commentary on that.
Okay, fantastic.
Yeah.
But if you have other questions.
We'll go to Councilmember Duff.
Those were my questions.
Do you also track how many veterans there are in this?
Yes, sir.
Absolutely.
That's very important.
In fact, we're prioritizing veterans and chronically
homeless in our system right now because we
know we can't address all of those.
And is it the opportunity to look at those veteran numbers?
So what is it about 60?
65 in the list right now?
Yeah, just around 65 right now that are currently in the
list.
Now looking at these numbers, we still have some data
cleaning up to do.
But we're at a really good point here.
Thank you.
Yes, sir.
And again, because I know this is an important presentation
.
The emergency services grant of $600,000, which we were def
unded or didn't receive allocation
2016, I guess.
Yeah, not defunded.
We just didn't score high enough to get it.
We didn't score high enough.
We didn't do anything wrong.
Okay, yes, I agree.
Yeah, that's why I changed it.
But the point being, they're operating under a certain
model of housing first and these
kind of things that the federal government has sort of
mandated.
And a lot of those parameters are what's used to score
grant applications to determine funding.
And so is that --
Can I correct one thing?
Yes.
Really only permanent supportive housing right now is
forced to utilize the housing first
model.
The emergency solutions grant does have parameters to make
sure that we're actually putting people
in permanent solutions, which is why we weren't successful
in obtaining the grant.
Because that was the component that they were missing.
Right.
We just weren't transitioning enough people from emergency
situations to permanent.
We're still in that.
We're still in that for the reasons that you laid out as
well as the funding issues.
But more importantly, the four organizations who received
that funding worked together
collaboratively to see how they could change or modify some
of the procedures in order to
increase the possibility and opportunity to meet that
component.
And according to the application grant, we were able to get
that funding reestablished
for two years and not just one year.
Correct.
Well, we didn't do anything to get the two years.
They just changed the grant cycle to two years.
Great.
Well, we can take that.
I'd love to take credit for that.
But that's good.
So we've got it for two years and now we have to make sure
that we have the metrics available
to show that, yes, the changes we put in place have met
those particular components that we
were lacking in the last grant application.
Right.
And you, again, to make that point home, we're still in a
place where we may not meet those
metrics that we proposed because of the housing shortage.
Right.
Okay.
All right.
So any other questions around just the data itself?
Because really, this is the gap conversation is an
important part of what's moving us forward
and what's moving us next in the next case.
So when we're looking at innovative solutions to try to
address this situation, of course,
we started with coordinated entry because that created this
foundational support.
But now we're looking at how do we increase the housing
stock and how do we make sure
that the funding is overcoming some of the issues that we
're learning.
And so one of those we've introduced is the Barriers Fund.
We looked at some of our neighboring communities and said,
"How are you guys addressing barriers
in your housing systems that typical funding doesn't cover
?"
And so we saw a lot of great opportunities to model some of
the things they're doing.
So we're introducing the Barriers Fund.
It's a new project.
It's gonna give us three tools at our disposal.
The first is client assistance, much like the diversion
that we talked about.
But it's that little bit of funding that federal dollars
typically won't pay for or restricted.
This will give us unrestricted dollars to help overcome
just some small issue, whether
it's somebody needs a little bit of an extra deposit to
encourage them to open the door
to this person who's experiencing homelessness or some
small thing like they need an ID because
they don't have it because they're on the street and they
've lost it.
Those small dollar amounts will help us just overcome a
small barrier and get people into
housing.
So that's one piece of it.
The second piece of it, which is the biggest one, some of
the we're calling doors for Denton
County, is actually looking to encourage landlords to open
more doors.
So we're utilizing that fund or want to utilize that fund
to do two things, which is encourage
landlords by just giving them opportunities to ask for a
little bit more money to lower
some of those barriers, some of the questions you asked the
developer earlier, those types
of things.
But also risk mitigation because the other thing that
landlords care about is making
sure to protect their asset.
So by giving them an opportunity to access a larger pool of
funds if there's damages
that happen to the unit because they lowered barriers, that
's a tool that we can use to
negotiate with them to say, "Hey, here's a little bit of
money for you.
We'll pay you double deposits.
We'll pay you something just to help us get someone who's
really in need in and we'll
protect your asset on the back end."
I said asset, excuse me.
I heard that.
I like, wait, I did say it, right?
Excuse me.
Made myself flush.
Yeah.
And then the third piece is really some of our outreach
that we haven't been able to
do.
For those of you don't know, the Denton County Homeless
Coalition is not a 501(c)(3).
So it doesn't have the ability to raise funds for things
like the point in time count to
help us sort of give some extra resources.
And there's some other outreach efforts that the community
needs to do through that mechanism.
So a third part of that is some of that funding just help
us to do better outreach.
And then of course, the other moving forward pieces that
are really important is the homeless
leadership team has now established an ad hoc committee
that's really looking at what
are the next steps in housing solutions.
That group has just started meeting, but we're really
looking at what are the policies and
what are the housing development needs communities have,
and not just Denton, but our surrounding
communities because we have to have partners at the table.
We can't be the only solution.
And then one of the other creative solutions that we've
actually brought forward to Council
and talked about before is the housing navigator.
So case managements are very specialized in what they do.
They have a very intentional focus at helping people
navigate a system for assistance, but
they don't always have the time for the housing navigation
that's needed.
So if we need to communicate with those landlords and build
those relationships like programs
with the doors for Denton County, a housing navigator is
going to be that tool.
Courtney talks about it like the unicorn, which is someone
who isn't necessarily just
a case manager, but is also a real estate professional or
has that knowledge to really
talk to landlords on that level and have a better
understanding, but then also work with
the case managers to keep people housed.
I want to talk about something just real briefly.
I'm talking about the Barriers Fund.
Because it's new.
And that's a result of United Way staff, myself, and others
visiting different communities
to try to get an understanding of what's working for them.
So I want to give you a specific real life example,
obviously no names or anything like
that, about what the problems are that we're facing.
Because if you're not involved in this on a day to day
basis and you don't understand
all the data and all the information, it's real easy to
look at it from the outside and
have a lot of questions and raise some eyebrows and all
that.
So here we go.
So you've got a family, let's say, of six people.
Two adults and four children.
And they're homeless.
They're living in a car.
They're living in a shelter.
And so they've got to find housing.
So you may find housing out there.
You may find a landlord with a house.
But for the emergency services grant, if I misstate
anything, please correct me.
Because I'm not sure on all these formulas, but I've become
very educated in the last
week.
So let's say you've got somebody that's asking $1,250 a
month for a three bedroom, two bath
house that's probably market rent here in the city of Dent
on.
And so this family goes to one of our organizations says we
need some help.
That organization says we got some ESG funding.
We can help you.
However, because of the tables with the federal government
and the parameters, they state
that the fair market value or fair market rental value for
a house of this type and
this zip code is I'm going to just say it's $1,250.
But that includes utility.
So what happens is they go and they figure out, well, the
utilities are going to cost
you $200.
So we've got to subtract that from the fair market rental
value of $1,250.
That means the rent can only be $1,050.
Well, how many landlords are going to take $200 off?
Not very many.
So I think what we're seeing is that things such as the
barrier fund can come in and some
implement temporarily that delta and make the landlord
whole per se.
Am I correct on this?
You have been trained well, sir.
Yes.
And so.
Yeah, absolutely.
The federal funds cannot be used on any kind of rent that
is above the FMR or doesn't meet
rent reasonableness, which means you have to do this weird
comparing it to three units
nearby to make sure they're all comparable.
And you can't use any other federal money to make up that
delta.
But you can use sort of private party, whether it be a for
profit or an individual or a nonprofit
to say, hey, you're not you're not restricted in that.
Right.
As long as the lease is lower than FMR, the time that
person is placed in there, we can
use the federal funds.
So this to the mayor's point.
Yes.
And the mayor is very well the situation we are to a
private donor has come forward.
They're not willing to be named at this point, but they've
created a match challenge of $7,500
to the barriers fund.
If the community will match that $7,500, he'll release
those funds to the barriers fund.
That's really our first early opportunity to start to see
the barriers fund with some
real money.
Well, and the reason I say this is because that's and you
're going to show it in the
data.
The problem we've got organizations for the wraparound sort
.
We've got people willing to do it.
We don't have the units.
The reasons we don't have the units is we're in a very high
market, which the government
look at the Housing Authority vouchers.
They barely can come up to what the market is.
So now you've got this fund that's available to help in all
kinds of situations that will
actually start putting people in housing units that are
most likely in the hands of private
investors, private individuals, because they, you know,
they get the economic return they
want.
You also can assure them that, hey, they're helping someone
out.
They're not necessarily taking a risk economically.
And then you've got some other parts of the barrier fund
that if somebody, you know, destroys
a unit, then there may be some assistance on a case by case
basis there.
So this is one of the this is one of the innovations that
has come out of this team that I think
can have a direct immediate impact on this particular
situation.
As some of us have experienced in trying to help certain
people that are in this exact
situation.
So I don't want to gloss over this.
And y'all might have wanted to cover it later on.
But this is I mean, there's a lot behind what I'm trying to
say is we see a slide up here.
We see barriers fund, we see housing solutions, we see
dashboard, the amount of data and the
amount of time and energy and creativity that's gone in.
There's so much behind.
That's the tip of the iceberg.
What you're seeing on these slides is the tip of the
iceberg.
So if you have any questions outside of this presentation,
please seek somebody out because
there's so much more that we're that that is there than
what we have to we could spend
a whole afternoon.
Right.
Yes, Councilmember.
Well, the question on the barriers fund.
If somebody if somebody may be watching this on on TV, or
live streaming or they may be
viewing this later, and they may say, hmm, $7500.
I think I can get a couple of people and we can match that
and get that money out there.
Who do they talk to?
Who do they give it to?
And are they giving it to an organization that is a 501 c
three?
Right.
So the donations are going to go to the United Way of Dent
on County.
And that's right up on their website under the homeless.
And I think the United Way is probably those donations are
tax deductible.
Yes.
Maybe they are they aren't I don't know about the new tax
code.
Good answer, Councilman Gary at United Way Denton dot org.
If you have that $7500 donor, they can email me right now.
Yeah.
And to your point, the questions you were asking earlier
when the developer was doing
their presentation as well.
We learned from our presentation from the palm tree group
and from from hearing from that
developer, I think you're hearing that consistent message
that if we can lower the debt or lower
the risk for the folks who might be eligible to house folks
, and those are really positive
solutions and this various fund is the first way we can do
that.
Yeah.
And the third thing is to make sure that we have a
dashboard available so that people
it's public facing so people can actually see over time how
we're doing to improve the
situations around homelessness in the community.
So in addition to our own internal city goal of reducing
homelessness by 20 percent by
2020, we actually had adopted through the homeless
leadership team, just seven core
of system performance measures that we're working towards
that I think just just so
you understand what they look like.
So it's not just reducing the number of homelessness, but a
couple of important best practices like
reducing the length of time people are experiencing
homelessness because the longer people stay
homeless, the more barriers they get and it's harder to
house them.
Also reducing the number of people who are first time
homeless.
I'll talk a little bit about that in a minute.
But getting that number down, keeping people houses and
much more cost effective solution
than it is letting them get homeless.
Councilmember has no question.
So using Mayor Watts example, I'm, I'm very linear in my
thoughts.
So I need help using his example, can, because I think it's
important to speak to and those
that are watching, I think it's important to speak to
almost the business side of the
business.
So using his example, if I'm a, if I'm a property owner and
I can get market rates
or I can partner with the group and get below market rates
to help out, is it, is it incumbent
upon us to find owners that are apartment property owners
that are willing to help out
or is there a financial incentive that I'm missing?
So there's two options.
So yes, part of the work of the housing navigator will be
to identify landlords who are willing
to do something that is public service oriented.
That's going to help this particular population.
But the second part of that is the barriers fund or funds
like that, which will allow
us to come to them with a financial incentive to lower
those barriers and help people get
housed.
So we have two tools, I think.
If I may.
Sure.
I agree.
But if they're not, if they don't have a heart for that,
right, if they're, if they're
not passionate about being civic minded, the, the
assumption is that could be a higher risk
rental, right?
I mean, if I'm, if I'm looking, if I'm putting on my black
hat, there's, there's a, there's
a chance there's a higher, that's a higher risk rental.
So as an owner, is there another incentive other than,
because if I have a moderate risk
and a high risk, what makes me lean towards the high risk
if I'm not civically minded?
And that's the second part of the fund that we talked about
, the landlord or the risk
mitigation.
So the outreach would be actually things like buy down.
So you'd still get market rate.
We would just buy down, we would pay you a one time advance
fee to reduce that.
So in the mayor's scenario where he was saying it was, we
needed to get that rent down to
$1,100, we might give you that $200 difference over a 12
month period.
So you're actually getting market rate.
But then when we sign the lease for that individual and
that individual is in that home, that
rate is below fair market and we can utilize the federal
funds for it.
So that's one example of how you're still getting market
rate.
And then you have access to the risk mitigation fund on the
back end that says if there's
damages, it's not going to come out of your pocket.
Someone's protecting your asset.
Okay.
And the case managers also.
Oh yeah.
And the other incentive for this is that with all of these
subsidized or supported housing
programs, there's case management support.
So the landlord isn't having to deal with the additional
issues that might come up with
a client with higher needs.
Okay.
So you're getting the additional help of having someone
communicate with that tenant for you.
Got it.
I'm tracking with you.
One more.
Yes.
Okay.
And so then my other question would be take the financial
aspect and set that aside.
I'm with you.
But there's also a social aspect and a concern there that
will all my tenants play well together?
Right.
And so how do you, what is your, how do you address that?
I mean, again, I just, I'm trying to look at the other side
of the equation.
I understand the helpful side of it.
I'm trying to say if someone speaks to me about, I don't
know if there's, if my community
would welcome, you know, or be want to enter that risk or
neighbors are upset or just,
I mean, it's no different than, you know, an apartment
complex next to the jail or something.
You know, it's like there's a concern there generally.
And how do you address that?
How do you speak to those that would say the family care
specialist can only be around
at certain times?
Right.
And so there may be a concern and how do you speak to those
in the neighborhood that may
have a concern about that?
So I think that's just part of the relationship building
with the landlords and trying to
overcome some of that thought process by things like case
management support, being around
that person, the understanding that not everyone's coming
to you with the issues that you're
making assumptions about.
So I think it's just educating those folks to the clientele
, making sure there's a better
understanding of who they might be helping.
So there's a difference between someone who's in a longterm
need of permanent supportive
housing versus someone in a rapid rehousing program.
So it's easy enough to say for the housing navigator, if
that position were available,
for that person to come in and say, I've got a family of
three who just lost his job, she's
not working right now, and we just need to get them housed
so they can get stable and
with three months of support and then they'll be your good
tenant beyond that.
So it's a difference in looking at the different clientele
and there might be a different appetite
between different landlords for the different service needs
as well.
So those are all pieces of which we can navigate through
the doors for Denton County program.
Okay.
Yeah.
And then Gary and then Councilmember Briggs has a question.
I just want to underscore what Danny is saying, Councilman
Hussbett, you're absolutely on track.
That is the key role of the housing navigator who really
understands the landlords and the
property managers as well as the case manager knows the
clients and making sure that when
a case manager is reaching out for housing, the housing
navigator understands the needs
and the expectations of the property owner in such a way
that they create a good fit
on that side.
I mean, that's critically important.
Yeah, no, I really like-
Matching is really important, right?
I really like what you said towards the end because I think
it's one thing, if I'm coming
into the mindset, if I have a negative mindset, just mere,
"Hey, it's going to be okay," may
not patch it up.
But what you said there towards the end is, "Here's the
scenario I'm bringing to you.
Here's the end goal."
And so now if I'm concerned, I'm put at ease because you're
not just plugging people in.
And you've taken the time to assess and then find a good
fit.
And now I'm plugging in someone that fits.
I think it's encouraging.
It's an encouraging message to say, "Okay, well, you
understand the family that's getting
our individual that's being placed and here's what we're
trying to do."
And so it shows more of a buy-in and I think that communic
ates well.
Yeah.
And the two other points of being able to navigate with
each individual landlord is that
you may lower one or two barriers and there might be a
landlord that'll lower five or
six of them.
Right?
So and then as the pilots go through, then you'll also have
other advocates.
So the mayor could be an advocate for us.
He's had folks like that who he's accepted in housing to
talk to other landlords and
landlords can speak to each other and sort of help us with
that as well.
Yes, ma'am.
So a couple of comments.
I'm really glad we're having this conversation because if
we have those two things in place,
like a list of friendly landlords, the barriers fund there,
that could definitely cut down
on the amount of time that these families or individuals
are waiting on rapid rehousing.
Absolutely.
Currently family discussion has been homeless for about
three months waiting on this and
you're right, Council Member Hutsbeth.
There are landlords out there who don't have to rent to
high risk because they can rent
to other people.
They're waiting at the door because our housing stock is so
low.
But this family, hypothetically, has everything.
They've done everything right.
They have all the information.
One of them is working.
They have the funds available, but the landlords just aren
't willing to take that risk.
So that is happening.
And so we need to do all that we can to cut down on that
time.
Which is probably why the housing navigator piece, which we
don't have yet, is going to
be equally important to add to just to have someone.
We saw the success of having a homeless coordinator.
We've seen the success of having someone to really be that
ringleader to support these
services.
And so I think there's proof that there's value in having
that coordination.
I was speaking just finally to the data dashboard to just
make sure you understood the different
things that we're working on.
It's not just reducing the number, but also those reducing
the barriers and increasing
income and those kinds of things.
So those are all things that we'll be measuring in the data
dashboard as well that will be
public facing.
And then we'll also look at communicating with you on a
more frequent basis as we move
forward so that you have more of this data on an ongoing
basis as well.
This is really just to show what the current commitment is
from the city towards some of
these initiatives, either through direct funding or pass
through funding with the federal government.
Wasn't really going to go into in depth in this, but if you
had some specific questions
about any of those.
The FY7, last year, this is this year, but last year, the
200,000 that we committed to
the ESG, this is just what we normally budget.
I mean, I say normally.
General fund.
Right.
You're seeing a reflection of both.
So you can see the 200,000 under the emergencies.
Okay.
Is this right here?
That was what's contributed.
That was in 1617.
This is 1718.
Now we're over here.
It's the 925.
Right, which is the 600,000 here.
Yeah.
Okay.
Council Member Briggs.
So I just want to take this moment because it is listed
here.
The Employee to Empower program from Serp Denton, they are
no longer carrying that program.
Right.
So it wasn't necessarily Serp Denton's program.
Serp Denton provided the fiscal agency for that program,
but yes, Serp Denton was the
contracted entity and they did ask, and we sent it out in
the last Friday report, they
requested that our contract be terminated for this program.
It wasn't working efficiently at the time that they asked
for that request.
They wanted to go back to the drawing board and figure out
how they might reorganize and
restructure to see if there's something new they could
bring forward.
Did you have some specific questions about?
Well, yeah.
I just wanted to bring that to the attention to the public
because that was in the staff
report and it wasn't well known.
And I know that there was a lot of community support for
that.
And I just want to draw attention to it, that it doesn't go
away and that it comes back
in some form or another, but also because it's on the
budget, the $21,000 there, and
does that mean that's going to come back into?
So we only gave them the 21,000 for fiscal year '16-'17.
We hadn't actually written the check for '17-'18, and they
did just submit the return of the
remaining amount balance of the 21,000.
So we got a check back for '14-'49, just today, in fact,
from them for the balance.
They only expended about $6,500 of the first initial 21,000
of the allocation.
For '17-'18?
For '16-'17, actually.
So the timing, unfortunately, it took them a while to get
off the ground.
So it didn't actually kick off until the end of September
of '16-'17.
So we wrote them the check in August in the last fiscal
year.
They started operating in September and then operated
through truly the end of December,
and there was one employee through January.
So less than six months, and they wanted to cancel it?
Right.
There was a real difficulty.
I don't know if you saw the report, but just to give you
kind of a scale of it, they took
in 50 applications of people interested in the program, but
by the time it got to the
interview process, there were down to 17 applicants.
And then they made 15 offers out of the 17, and only nine
completed the drug test, and
then it dropped down to four who actually showed up for
work.
So there was a real disconnect with the incentives to the
program and trying to get people interested
in doing it.
It could have been the short-term nature.
It could have been --
Well, and I understand that's important, and if we need to
have a more in-depth workshop
on that, because I think my understanding is they're going
back and trying to figure
out how we can -- they can rework the program.
And with some of the data we're getting now and some of the
ideas, that's certainly a
conversation we can go more in-depth.
And I'm not trying to cut you off.
I just know we could talk about this for a long time, but I
think what -- I appreciate
you bringing it up in this public forum so that the public
knows about it.
I think what happened was they just -- they didn't get the
turnout and the commitment
to the program from the clientele that they had anticipated
, and so they're trying to
figure out how to rework that in order to increase that.
So if we need to come back again to talk about that in more
depth, be glad to do that.
Is there anything more pressing that -- yeah, go ahead.
Well, no, just when we do, we need to set goals, because I
do know out of those four,
two actually have jobs now.
They're functioning.
They have jobs.
They're back in.
So we just need to set what goals and what we consider
success, because to me that's
--
Yeah, that's a good point.
I appreciate you bringing that up, and it is.
I mean, it's two people that might not otherwise be in that
situation, but for that program.
Absolutely.
Any other questions on how the funding is allocated
currently?
I know we have a few different sources of funding that's
coming in.
So let me look here.
So Christian Community -- the 925, does that include the
Christian Community Action of
145?
It does, because we're a pass-through for that grant.
We actually do fund Christian Community Action.
Some of it may serve people --
The majority does.
Right.
So it's Christian Community Action.
You can see they have $145,000 of that funding for homeless
prevention and rapid rehousing
in Louisville.
And again, it's not our funding.
It's passed through to us so we can support programs
outside of this.
Now one thing I don't see up there, because it's an in-kind
, is the lease for the Monsignor
King.
Right.
We actually saw it on the next slide.
Oh, you do?
Okay.
I'm sorry.
Go ahead.
Yeah, no, it's okay.
Thank you for moving us forward.
Fine.
Let's go.
Let's fly right through.
Okay.
So some of the other city contributions that we have is
providing for that shelter for
Monsignor King, which ultimately now has added 90 beds.
And that was really an immediate result of the Mayor's Task
Force.
One of the first things that the Council took action on was
to increase the number of emergency
shelter beds in the community.
And so by offering up this lease until 2025, there are now
additional shelter beds that
we didn't have before.
And then of course, there's human resources that are
dedicated to this, including the
Mayor and Councilmember Briggs, who are serving on the Hom
eless Leadership Team, to staff
in public affairs and community development helping out
with these initiatives.
And then our public safety are also involved on this on a
day-to-day basis through police
and fire responses to.
So I want to emphasize this again.
So not well, the Mayor's Homelessness Task Force, they had
several recommendations.
Three or four.
Three.
Right.
Which was homeless coordinator, increased shelter beds.
Right.
What was the third one?
I can't remember.
The third was actually to look at affordable housing.
One of the projects on the table at the time was the
project by Denton Affordable Housing
Corp on Hinkle.
That project has since not made.
Okay.
But that was the third recommendation.
But so.
The priorities were three very specific ones though, is to
increase funding and resources,
to increase affordable housing, and to look at systems
change.
So those were the priorities that were set by that group,
which resulted in those three
recommendations.
And so we, we, the City Council took that task force
recommendation.
Correct.
To heart and executed the lease with Monsignor King to
provide, and they spent three or $400,000,
$300,000 I think in renovations.
Yes.
And then where we had zero additional capacity for
emergency shelter, because they lost or
they were moved or whatever, they didn't have the available
space that they had before.
Correct.
We now have, you know, they served up to 90 people during
inclement weather just recently.
So we went from zero to 90 within a span of about a year,
or however it took them.
A year and two months, yeah.
So it started out with 40 beds, and then they were able to
expand to just at the end of
16 to the 90 beds.
And it's, they're open actually Monday, Tuesday and
Wednesday, as well as inclement weather.
So every Monday, Tuesday and Wednesday they're also open.
It's not full time.
It's not 24 hours, but it is.
It's certainly more than what we had.
Absolutely.
Okay.
So the question is with all of this investment, why are
people still experiencing homelessness?
And it's an important question to ask every time.
Gratefully you've made the case for a lot of that.
So let's talk about what this is.
We have.
Yeah, right.
I'm just teasing.
We have a housing crisis response system that looks as
complicated as the first graphic.
So I simplified it to kind of help give you a visual of
what's happening.
So on the left hand side, you're seeing how people are
experiencing homelessness commonly
in our community.
They're in a shelter, they're staying in their car, they're
sleeping in tents, or they're
staying in something that might have a roof, but is really
considered uninhabitable.
And every person we're doing outreach to, to make sure they
get into our coordinated
entry system, the triage, so that we are counting every
single person who's experiencing homelessness.
That's the goal.
So, and the goal is then to move them into a permanent
solution.
However, when you move to the right, you can see there's a
number of barriers to those
permanent solutions that we've already covered pretty well
today.
But just to highlight it, there's not enough subsidy for
enough rehousing based on the
numbers that we have.
We don't have enough permanent supportive housing beds.
They're currently all full.
We don't have any kind of affordable housing available on
the scale that it's necessary
to get people housed.
And then, of course, the housing choice vouchers are what
you know as Section 8.
They don't have any, there's a wait list.
So all of those represent barriers to getting people
permanently housed.
So on the top section, you'll see we still then have people
who are in temporary shelters
or who are living unsheltered.
I think Council Member Huffman had a question or
observation.
I have a question regarding, because it cuts both ways,
right?
Affordable housing, is there, I mean, I think I like the
term lower barrier housing.
I don't know, there's got to be a better word for that,
right?
Because affordable housing, I think, it cuts both ways.
So people are shocked at what a new house costs and didn't
just because the market is
what it is.
And I think instantly that gives people an impression,
right?
So if you say affordable housing and the current rate, let
's say it's $240,000, $250,000 for
a new home and didn't.
That shocks people that have lived here for a while to
understand that it costs that much.
But that is the entry level, right?
And so then it becomes a matter of, so I think it's just,
that's a challenge for me is I
think when you start a conversation talking about
affordable housing and you start plus
200,000, I mean, it sets everybody in different mindsets if
you're not plugged into it.
If you're not watching it, it's shocking.
You drive by the cupboard and I don't see $1 million
property, but that property on
the tax rolls is $1 million.
And so I think people just don't, if you're not tracking
with it, you don't understand
how the markets transitioned.
And so now if I'm having a conversation with someone, I'm
automatically almost affecting
how it's going to go due to my vernacular.
So I don't know if there's a better word or I would just
kind of leave you with that thought.
And maybe it's me, maybe I need to be educated.
But I'm trying to tell you when I'm telling someone, no, no
, no, 240,000, that's where
you start.
That's your world.
I've heard that off a neighbor that's been saying
affordable housing.
Yeah, now I get it.
Some people use terminology like workforce housing.
I like to utilize kind of a broader based terminology that
's accessible, available and
affordable, sort of just kind of putting it all together to
say there are different ways
in which people are facing this issue.
But the truth is, if you have someone on Social Security
who's making $773 a month and your
rent is supposed to only be 30% of your income, that's a $
200 unit.
That's what we're talking about is affordable.
How does that person live independently and be able to
afford something that doesn't put
them at cost burden, which is 30% or 50%.
So that's just, and it's how we talk about it, but you're
absolutely right.
Finding a better word would be excellent.
No, no, if I may.
So that what you, because you cranked that out like it was,
I mean, you have it, right?
Yes, sir.
And so that's what I'm soliciting from you, right?
Yes.
If I have a one page that does that math that you just
touched on, right?
And so I think that then frames it for people, right?
If I had a one pager that explains that here's how much
someone, if they're working for this
wage, here's how much they make, here's how much they can
afford.
If I had like a sample budget or something like that, it
just helps frame it for me because
I don't deal with it every day as far as an understanding,
right?
And when I'm trying to communicate a point or just myself
understand it better, that
would help me a ton because now I'm absolutely tracking
with you.
Where are you going to find an apartment for $200?
So it helps me, it really helps me a lot to kind of have
those tools that get past the
buzzwords, right?
Let's get down to, because most of the people I would
encounter, I think, even if they're
assuming, because if they're willing to help, then I don't
have to present a lot of information
to them.
But if they're not willing to help, those are the ones I'm
trying to turn and those
are the ones that just merely saying, no, no, it's a need
may not flip the switch.
But if I go with tangible data with information of one p
ager that kind of lays that out, now
they're saying, okay, now I get it, hopefully.
Yeah.
I mean, there's a lot of great resources that are already
existing, like the National Low-Income
Housing Tax Initiative has a ton of great information even
on the county level.
So we don't have to recreate that.
So if that's something you're interested in, we can put
some context.
Yeah, get him some information.
It's like a chart and one page, right?
So, I mean, you can cut out the, just pictures.
I can talk about it.
I know, I thought, I obviously didn't have enough pictures
in here.
Mario, set the standard, I think.
But I did draw my own, so there you go.
Okay, thank you.
So, I'm going to go ahead and put that in the chat.
So, I'm going to go ahead and put that in the chat.
So, I'm going to go ahead and put that in the chat.
So, I'm going to go ahead and put that in the chat.
Any other questions?
Any questions, at least up to this point?
I know you got a couple more slides left.
Right.
I did want to make the case, too, at the bottom of this
particular image.
There's also, and Gary gave you those numbers, 42,000
people in Denton County who are, you
know, at the poverty level.
So, we have a lot of people living at risk and our job
equally has to be preventing those
people from becoming homeless.
And I know I mentioned it earlier, but it is so much
cheaper to give someone three months
of housing subsidy to keep them in their house than it is
to try to work with them once they
become homeless.
So, it's much more cost-effective solution.
So, we have to find ways to invest in this more as well.
So, all this being said, it just means that people are
still living in shelter while they're
waiting or they're living on the streets while they're
waiting for a permanent housing
solution.
We just don't have the stock.
So, the question before us now, I think, is how do we
balance that need for the safe and
secure shelter relief to meet the needs of the current
homeless population while still
focusing our limited resources on long-term permanent
solutions like those that are being
worked on with the Homeless Leadership Team and the Denton
County Homeless Coalition and
a number of other great agencies who are looking at trying
to combat this issue.
For me, it comes down to that there are three major issues
that we still have to deal with
and that's we still have to address this emergency issue,
some way or some form.
We have to prevent people from becoming homeless in the
first place and we have to expand our
housing capacity.
And so, the way that we're looking at this now is to say
how can we use this data to
start making some informed decisions about where to best
allocate our existing resources
to make sure we're using it in the best way, but also to
look at where we need additional
investment.
And what, from you, are the priority areas that you want to
see that investment made
in and then decide where we want to increase funding and
assets to meet the current need.
But as the Mayor said earlier, we're going to grow and with
a growth in population, there's
going to be a growth in homelessness.
So, we have to be able to match that future need as well.
So this brings us to the conversation about TIT and CAM and
so the research that you asked
us to do.
We did a lot of research and analysis.
Some of it happened prior to your questions because we did
actually visit four different
communities over the course of the last year or so.
And so, we learned a lot from the villages of Hickory Creek
in Dallas about how they're
addressing permanent supportive housing for, in tiny homes.
A contingent of us went to Austin and talked with their
Mayor and their staff about how
they're coordinating together to work on this issue.
They have about $14 million to do it, but that's, you know,
a little jealous.
And then a group went to Boulder to also look at what they
were doing.
And then after this conversation, we also went down to San
Antonio and visited Haven
for Hope, which is a comprehensive look at how they saw
homelessness and sort of sheltering
in a unique way.
It's actually a really large operation.
>> Councilmember Briggs had a question.
>> Did you visit any current tent cities in any of the
places that you went to?
>> I did not, no.
We have a street outreach team of our nonprofits as well as
our public safety and a couple
of other groups who come, like the veterans groups that go
out with those to visit the
tent cities and build those relationships.
But directly, as far as this research, we did not.
>> Oh, yeah.
Yeah, I didn't mean in Denton.
I meant in the other cities when you went to talk to their,
if they had --
>> I can't speak to Boulder.
I don't know if that was a part of the conversation there.
Okay.
Okay.
So when we were at Haven for Hope, we were actually looking
at a system that showed us
how they were addressing that really low barrier.
I mean, it's a gate with a canvas cover and people can come
in and sleep whenever they
want to.
Or if you're willing to then work on some initial services,
then you get moved into
really what is shelter in a different way.
So they had a lot of different varieties of shelter options
too, which is another thing
that we don't have.
So they had shelter for men, shelter for women, shelter for
families, shelter for single moms.
So there was a lot of different ways in which they were
providing shelter there too.
So it was all sort of a step process.
Here if you don't want to do anything but you just need a
place to sleep that's safe,
there's the courtyard.
Here if you want sheltering, there's this option for
sheltering.
If you want to move and you've gone through the process,
you've done some work, you're
improved, you're ready to live independently, then there's
even affordable housing complex
with about 100 units there.
So it was a pretty interesting operation to visit.
>> Can I have a follow-up?
>> Sure.
>> In the first level, where if they just wanted to place
to sleep, was there a time
limit?
Like okay, well you can come here and you can be --
>> No.
They could be there 24/7 if they wanted.
>> Oh, I --
>> And it's long-term.
They could stay --
>> Long-term, I guess, is the time limit.
>> No, there was no time limitations on when they could
stay and it was open during the
day, which was I think a big piece of --
>> Okay.
Councilmember Gregory.
>> I visited there also.
>> Oh.
>> One of the things that I was concerned about and I think
that we're all concerned about
is even in those areas, are they taking care of basic
health and basic safety?
And one of the things that I noted in terms of safety was
there was a police officer on
duty --
>> Correct.
>> All the time.
So there was --
>> Multiple hits, right.
Yeah.
>> And they had access to restrooms, to showers, and to
places to wash their clothes.
>> Right.
And food.
>> And folks that were not willing to commit to any kind of
programs to earn their way
into higher quality housing, IE a bed and maybe heating and
air conditioning, they still
had a place to stay where there was some thing to address
safety and security.
>> Right.
Exactly.
>> And health.
>> Yeah.
>> And then there was also a lot of other things that we
were concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> Yeah.
>> And then there was a lot of other things that we were
concerned about.
>> No, I would ask, not today, but again, just kind of food
for thought.
In our backup at Tuts Dawn, and I heard about it in
Charlotte when we were there for a conference.
And so I'd be interested to understand kind of the group's
take on the, I think it was the ACLU's lawsuit for clearing
out a camp,
because I'll tell you, that to me is more, my question is,
would the group be willing to, the homeless coordination
group,
would they be willing to speak against that behavior?
Because to me, that is not helpful.
I understand the rights side of it.
I understand that argument.
But the other side of that is to protect the city, then I'm
almost like, let's not allow them to congregate, because it
's a lawsuit if we do.
And so I think when you're talking about coexisting, I'm
curious where the group stands on the city getting sued for
clearing out encampments.
And so I think that's just something to kick around,
because specifically the site you cleared out, when you're
talking propane tanks and a child's nursery right in front
of that,
that to me is difficult, right?
Well, it's not difficult, but it's a difficult decision to
make.
But I think when you're talking about working together, I'm
curious where, kind of just down the road, where if you can
process that.
The homeless leadership team specifically, or just any
other groups?
Yes, because I'll tell you, that's going to be an important
issue for me.
So if the homeless leadership team is like, we think the
ACLU is right and we think there should be rights
associated with that clearing out, then I need help
understanding that.
And when I put on my city hat, then to protect the city, I
need to start clearing them out early before I get into
legal issues.
And so it's one of those things where it has to work
together.
And so one group has to be sensitive to the other so that
we can all coexist.
But if we're supporting lawsuits, then I need to know that.
Sure.
I don't want to get too sidetracked on this specific issue,
but it's something we need to talk about both in the
leadership team and its conversation.
We need to have. I mean, the council with the input from
our public service and so I think that's a great point that
requires a lot of research and data gathering.
So I appreciate you bringing that up.
And so let's make sure we get that on the agenda.
I was going to say, we'll make sure we vote the agenda of
the homeless leadership team and this agenda, because it's
good point.
And I'm not really familiar with what you're talking about
as far as Charlotte or a lawsuit and all that.
So I can't really speak to that, but I certainly can do
some research.
Sure. Yeah, that National Law Center on Homeless and Pover
ty report is has significant information about the legal
information and trade provided us some guidance to just
about what things we might consider.
One of the things I mentioned earlier was the shelter.
People aren't choosing shelter.
The shelter beds aren't meeting their needs.
And there's a couple of reasons for that.
The biggest one, of course, that we've already mentioned is
there's just not enough supply for the demand.
But just thinking about why people don't choose shelter, it
's really not always the most appropriate option.
So when I talked about it earlier, our homeless shelters
currently, one serves domestic violent victims only and the
other one, the other one serve folks who are single.
So if there is a family who's experiencing homelessness,
there's not really an option for them without some
accommodations.
And so you can imagine you and your family experiencing and
being under stress and then being forced to split up if you
go into a shelter or not being able to stay together and
how much additional stress that is.
There's always a length of stay restrictions right now in
our particular shelter, so you can't stay long enough to
really obtain stability.
And we have to work on that.
There's long wait time.
So if you're working, because we found out in our point in
time count, more than half of our folks are actually
employed.
So if you're working, you can't take off of your job to go
stand in line and hope you get a bed in the shelter that
night.
And then the bigger one, too, for us is they can't bring in
their personal belongings.
So you have to choose between a bed and keeping the things
that are most important to you.
You're probably going to choose those things that are most
important to you.
Who is the "us" when you said the bigger one for us when
you're talking about, are you talking about the homeless?
In our community, what we learned from our mayor's task
force.
You're talking about the challenges.
I just want to make sure I understand the context.
None of our shelters are open for the day.
There's no place to store things.
And so oftentimes that's why people choose encampments for
the simple reason of just being able to keep their stuff
together.
And then the rules themselves make it hard to get a job.
So if you have to come in at a certain time, you have to
leave at a certain time.
You can't have some flexibility in that.
That really creates a detriment.
So it's not all the reasons why you think people choose
homelessness.
There is a small group of people who probably that's true
for.
For the majority of folks, they're just facing a choice
that is just untenable for them.
Do you have a question?
Well, yeah, I mean, that I hear all of those things and I
saw in the backup that the there's only 22 percent need for
emergency shelter being met.
If we take the full list of six hundred ninety one people,
really, those beds only mean about 20 percent.
Changes on a given day.
And, you know, that number is not a perfect number, but it
's just giving an idea of how limited.
We have the shelters. They're only open certain days and
certain times.
And so my question and one of the reasons I called for this
is this work session.
What do we do?
I mean, we've got to do something.
Right.
But that's that's the next slide, I think, is the what role
does the city take?
I'm sure the question you're asking.
I mean, this is I mean, you say, what do we do?
There's several components to that.
There's a community.
What does the city do as a bureaucracy, as an
administration?
So, of course, this body only can make the decision on that
particular one.
So that's what I'm understanding that you're asking.
Is that what I'd probably say?
Maybe there's two.
But the first is really determining what the city wants to
do as far as policy and procedure with this particular
issue and understanding what those best practices are.
The other is sort of advocating for a dramatic increase in
housing, whatever that looks like, if it's emergency or if
it's permanent.
We are in a position to advocate for that for everyone in
the community to benefit from.
And then there's a third component of just educating the
public about the issue so that we can overcome some of
those things that council member has sort of alluded to
that there is resistance in the community for this
population because of stereotypes or because of
misconceptions.
So understanding how to advocate for that and to share that
information with our community so that they are more
supportive when we are coming forward with policies or
initiatives is important.
There's a lot that's unknown.
So if we're considering what we might do in this space, we
don't know what the current cost is specifically well
enough to be able to say, is there a cost benefit?
Would it save us money under an organized environment or
not?
We don't really understand what the level of community
acceptance is overall.
What there might be in far as legal and regulatory issues,
if you came forward with any sort of policy recommendations
, we'd have to get those reviewed to make sure it would
address any of those issues that council member has brought
forward.
We don't understand what the insurance cost might be
depending on who's operating it, whether it's us or someone
else.
What those basic services might need to be within that
space if we were to offer something.
What would be included? Who would pay for it?
Who are the right partners at the table?
This is a really important question.
It can't just be the city initiative.
So who are the right people to talk to?
What capital assets are even available?
Are there city properties available?
Are there private property available that would address
this issue?
And then what would the ownership really look like of this
type of project?
Would it be -- and do we even have an organization that's
capable of sustaining it, has the capacity to do something
like this?
And there's some cons to what we learned from the research
that I don't want to kind of address.
I want to address everything that was in the research tool,
but I do want to kind of talk about those.
Not many communities are sanctioning it of their research.
In one of them, they surveyed 187 cities, and only 10 have
some explicit -- or have explicitly permitted that activity
.
Only 10 out of 187 cities.
It's pretty small.
And then it really focuses really vital resources on
temporary rather than permanent solutions.
And the goal to getting people out of homelessness is to
get them housed.
We have to be looking at those permanent solutions.
And of course, there will be new issues that will emerge.
I mean, who's going to want a tent city in their
neighborhood?
The attractive nuisance of it.
Some of our citizens feel like if we build it, they will
come, meaning we'll increase our homeless population just
because there's something available to us.
And we don't really understand the risk and liability that
could happen.
We've seen it in at least one instance, but those are kind
of the biggest ones.
The overall community resistance.
Yes, sir?
I don't know. Did you have a question?
No, I'm going to wait until she's --
Oh, okay.
And then there's just, again, the resource limitations that
I spoke to earlier.
Who has the capacity to really do something like this?
And then of course, there's some pros, too.
What is already happening will be regulated, a little bit
more controlled.
It will increase immediately the access to the number of
safe places to sleep.
There is some detail in the research that says that it can
lead to empowerment of folks who are experiencing
homelessness to provide solutions for themselves so that
they can be a partner in that process.
There are currently unopened city properties that might be
available.
And then I spoke to this earlier in a different context,
but building that trust, so having police and fire in those
spaces to make sure there's opportunities to build those
relationships is one tool to help us look at permanent
solutions.
One of the other options that we wanted to make sure that
you heard that while this temporary solution is out there
is that there's a way in which the homeless leadership team
can be a tool to help advocate with shelters to change how
they're operating.
But I think it needs to be explored to give those folks
different options that are lowering barriers even more.
The USICH has a great paper on how to strategically end
homelessness using shelter.
I think it has a lot of great recommendations in it that
could be vital here.
Just making sure shelter rules are more inclusive, maybe
being open more.
And then some of the other things in the research that we
learned about were some other ideas like LA was providing
trailers.
We, of course, visited San Antonio and saw their courtyard
as an option.
But those day shelters and those places to store belongings
come up time and time again as possible solutions to help
increase people's willingness to access shelter beds that
are available when they're available.
So we're at kind of our final slide, which is what are our
next steps and recommendations for you today is to continue
to participate with the homeless leadership team.
We're going to be working with the state and the state ad
hoc and the data and housing work groups that are really
looking to advance permanent options and solutions.
We are about to launch a city homeless leadership team,
which is our homeless team with our, you know, city
departments to make sure we're communicating better across
departments for all the different agencies in this
organization that are dealing with this issue.
And then we're going to be working with the public safety
piece of and collect a little bit more data so that we have
a little bit more information about what the direct impact
is to the city's resources.
And then to help do some development of some communication
tools so we can sort of make the case to the public.
Why we need to be doing more.
So,
I think a couple of other next steps.
That I don't think that we have the information for yet is,
if you look countywide and it can.
How much are we spending right now.
When you talk about all the social service agencies that
are spending money for temporary shelters.
The, the ancillary services that we're also providing for
how much money the county is ending up paying for folks
that are that are because they're homeless because they're
so social funds are using the ER is their primary source
for medical services.
I think it would be important to know just exactly county
wide.
Because it might be that if we took all of that money and
put it in one pot together we would, we would be able to do
a whole lot more than, than we are currently doing.
I know that they've done that in some other cities.
They've spent all that money and they put it into to homes
first program.
And they gave all those folks stability because they had a
place to go every night and they have a place to keep their
things every night.
And then they were able to to better care of themselves,
medically, they were able to.
Another thing to know is, are there some cities in the area
or counties in the area that they're doing some things that
that would be appropriate for us to copy to emulate.
And I, and I, when I went down to San Antonio to see that
program.
Haven for hope.
It was, it was eye opening and I got a big long tour I
spent over four hours there, going through all different
aspects of it.
And, but people had to earn their way into more stable
permanent housing.
And that may be that may be the best model but it may be
you know using a Salt Lake City model of housing first is a
better model.
But, but that takes a lot of funding to make that happen.
And cooperation. So anyway, if we could get that kind of
information but I think one of the important things for
everybody in the community to know is when somebody makes a
comment that the city of Denton is not doing anything for
the homeless, that that's just a plain and accurate
statement.
We may not be doing enough.
But, but there are a lot of things that we're doing to
address those needs, including diversion.
For some people are in some crisis situations and we're, we
're supporting some of those agencies that help them out of
those crisis, so that they don't become homeless and as you
said, keeping them in a home is a whole lot cheaper,
cheaper than putting them back in one.
Absolutely. Thank you for those recommendations will
certainly the two of them will take to the homeless
leadership team to see how we can get some more detail on
that.
So I think what you were talking about or discussing was
the housing first versus housing readiness, which I think
the temp encampments do they prepare or can prepare if you
have the certain programs in there for housing readiness to
advance out into a different.
So I would like to see because status quo isn't working and
we have to do something and some of these things are going
to take a lot longer than others.
Personally, I would really like to see us focus on a
shelter for families because I know that is something we
don't have in our community, but I know that it's not
something immediate.
Funding a housing navigator. That's something that we can
do.
Working with the shelters that we have to make sure they're
open more frequently all day.
I assumed and I thought that the Monsignor King was going
to go open longer than three days, but that was the plan
for the future.
But I haven't ever gotten that confirmed I think maybe I
just I thought that but that would be really great if we
could work with them to extend their hours and days.
And I would also I would also like to not give up on the
tent village.
Because I, sorry.
Someone brought the land behind the Monsignor King, because
I think that is still city owned property.
Actually sure of that. It's in the flight plan for sure but
I don't as an
option to start like a pilot and only allow a certain
number of people in there and you can you can set a max and
it answers the question where are you going to go today.
When we don't have that answer right now for anybody when
they ask.
You can provide tent searches, you can have boundaries, and
what I would really like to hear from is either officer Pad
gett or the chief on what they think of tent villages, or
the ones that we currently have in our city, if the council
doesn't mind.
Go ahead.
There's a lot of different aspects of a tent city.
And mostly from a public safety standpoint it's what
happens outside the density in the surrounding neighborhood
.
Okay, if you look at Monsignor King Center now.
Its neighbors aren't very happy that it's there.
So that's what you have to deal with wherever you put us
any, you know, not in my backyard, as Danny said, so no
matter what we do or where we do it, that's kind of what
you're going to have to deal with.
Maybe these people have a place to go.
And that's great. But what do they do when they're not
there.
You know,
also, we've got people in town that are not homeless that
exhibit the same behaviors as somebody that is homeless
that create that that not my backyard feeling.
So, does that answer your question at all.
I don't think that's the answer she was looking for.
You asked what kind of what I thought but right yeah yeah
no I understand that.
So an area though that is there all day. So, my question is
so if there are tent cities around currently, or there are
encampments I guess because they're smaller currently in
Denton.
And so they don't stay there all day leave their encamp
ments and come and come out into.
Okay, to access services.
So, if there were an encampment with services nearby. Do
you think that would eliminate any issues that we currently
have.
I don't know that it would eliminate the issues.
If we had a place that had the, you know, giving hope was
nearby and food was nearby, you know, it might confine it
to a smaller area or a different area.
You know, most of our services are in the downtown area.
You know, that's six square blocks or so, so that's where
most of the activity happens and, and, you know, they can
access those services.
But then when they're not accessing those services when we
get the issues of, hey this guy's asking me for change on
the square, and that sort of thing.
So, that's what we have to address from, from a public
safety standpoint is what happens around wherever the
campus.
Okay, you're right, whether we sanction camps or not we're
going to have camps.
So, from my standpoint, whether they're sanctioned or not,
I still have to deal with those issues around wherever the
campus.
Do you feel like if we had shelters open during the day,
and more frequently that that would that would help some of
the issues that we see around town.
I think it would would help in that somebody would have a
place to go.
You know now it's here at the library or the park. During
the day, they'd have a place to store their property.
So they could go look for a job or go look, you know, do
whatever they needed to do to better themselves.
They have a place to put that property and be safe because
even at Monsignor King they don't they can't leave it there
when they leave.
Okay, thank you.
I'm good. I'll have questions for you per se. Just a couple
of comments.
Councilmember Riggs I have to respectfully disagree. I don
't believe we're in the status quo.
I think what's the most frustrating thing about this
conversation for me is three or four years ago, nobody was
having this conversation.
We didn't have Monsignor King. We didn't have a
homelessness coordinator. We didn't have a homelessness
leadership team.
Now is it time for us to start doing something that
continues to move us forward?
Yes, I don't think tent cities are the answer.
That doesn't mean that we can't monitor them while they're
here because they're going to they're going to come up.
But I think as the officer said, we've got we've got to
find a more comprehensive approach.
But this city has done a tremendous amount of work in the
last three years.
When I look at a million dollars a year that we that we now
if we want to reallocate those funds somehow.
I don't know how it's some of its through committees and
recommendations and all that.
Can we do more? Absolutely.
Are we the only ones that I think should be doing it?
Absolutely not.
This is a county problem and this is an issue that is not
necessarily the in the total purview of the city of Denton.
And I think the city of Denton has taken a very strong lead
in doing something about this.
So it's not anything about your comment, but I get very
concerned when I hear that people say we're not doing
anything.
When I look up on this screen. Two years ago, we weren't
sheltering 90 people.
They were out on the street. They were sleeping under
people's hedgerows.
They were sleeping on park benches. They were doing all
that.
As far as Monsignor King and how they run their shelter, it
's all volunteer.
I'll be glad to chat with them. And if the city wants to do
something or some nonprofits wants to do something helps
with funding or some additional services, we can see if
they're open to that.
But I do not want to discount what we've done up to this
point.
That doesn't mean we can't do more. But to say that somehow
the status quo, I don't even know what that means.
I agree with you that our biggest need in this community is
housing for families, homeless families.
If you're a single person, you can go to the shelter. If
you don't have much, you can leave it there. You can leave
it outside.
I'm not saying that's ideal, but it's something for
families.
We literally have nothing except to put them up in a hotel.
And to me, if I were to say the status quo, if I were to
label anything the status quo, that that has not been
addressed over the last two or three years, I would say
that would be the issue because you've been dealing with it
for a few months.
I've been dealing with it in the last couple of weeks.
And it's a tragedy that we don't. But six months ago, we
would not have had the Barriers Fund to potentially provide
some financial support to people to make up the delta in
the fair market rent and try to mitigate some of those
risks in landlords.
I'm going to come back to what I've said from day one.
We can sit here and talk till we're blue in the face. We
can throw all the money we want to in the world at it.
But until we find places where we can put people, the
solution isn't to put them in a tent.
It's how can we find a place where people can actually have
a roof over their head, can have shelter from the elements,
and have some sense of self-confidence and to begin to
build that self-confidence to re-merge into society to be
able to be self-sustaining.
So we've got to get more units. Building them? I mean, you
didn't show the data.
You didn't show the data about how much money, if we were
to find housing for all these people, it was like $3 or $4
million, I think, or something like that.
Yeah, it's a little more than that when you combine.
Okay. So how much was it?
3.4. 3.4.
3.4. That's yearly.
Right.
Okay.
If we weren't making an impact. We would expect some of
that to go down over time.
It's not going to go down to zero.
Right. Well, we hope so. At some point to get to functional
zero.
But my point is, and to your point, yes, can we increase
our goals?
Absolutely. Can we do something?
Can we continue to move forward to do something that we're
not doing now?
I don't believe that it necessarily falls on the city
administration to figure out this. If we're going this road
alone, we're going to be very, very ineffective because we
haven't been going it alone. And I look at what we've been
able to do.
So I'm all for trying to figure out how we increase the
ability to house people, especially families, especially
single mothers with children, especially, you know, intact
families, husband and wife, wife, wife, husband. It doesn't
matter if they've got kids.
Where do we find a place for them if they're temporarily
homeless or if they're chronically homeless?
So I'm glad we're having this conversation.
I get I'm to the point where we've got to start doing
something as far as getting they used to call it boots on
the ground for a different concept where we start putting
heads in beds, not from a hotel motel tax consideration.
We've got to start putting people and we're not going to be
able to put them all.
And that's the most frustrating thing about this whole
conversation.
We would love to. I don't think there's one person in this
room that wouldn't love to do that.
But we've got to have some help. We got to have help from
the county. We've got to have help from some of the other
cities in the county.
And so I'm all for doing it. But as far as that the status
quo isn't working.
I just disagree with that statement and that concept
because I think a lot of what we're doing is working and a
lot of what we're doing is laying the foundation for it to
work really well. I think in the really near future and
preceding preceding months.
Yes. So I agree.
And by status quo, I mean, if we don't start changing and
doing things, we are going to be able to keep walking out
here in the park and seeing people going to downtown seeing
people going to the library seeing people.
That's what I mean. It's not going to be okay to do nothing
. We have to start doing something or status quo is going to
maintain.
And my point is, I think we are doing something.
I think I think we are doing something. And, and so we are,
but we have a lot of things that we still need to do. Of
course, absolutely.
It's going to persist. I mean, we're still going to have
people sleeping in our parks if we don't have some place
for them to go.
And I don't disagree with that. I think we could have a
place like giving and let me say something else.
We visited a lot of big cities.
We visited Austin. We visited San Antonio, great
communities are doing a lot of good work.
We've got to figure out how to make it scalable, because we
just don't have the resources that they do.
And in some ways we probably have on a percentage basis, a
bigger problem as far as homeless per capita, and maybe
people who are what is it 42,000 families in the county
that are at poverty level or below.
We might have a bigger problem per capita than some of
these other organizations, but we don't have near the
resources.
The iceberg. Yes. So no, I'm all for moving people from the
parks and the libraries and all that.
I just think, though, in the end, we can't force people to
go to where we're providing them services.
But I really do think we're moving in that direction. I
think we can make headway.
There's some options that we can talk about, I think, in a
different context that would really provide some immediate
opportunities.
But I'm going to hawk the barriers fund. I'm going to hawk
it, because that's a place right now, if it were funded
well, you can find even if you just put them in a hotel
room or something, just something that temporarily before
they can move into a place, because that's the biggest
problem.
People just can't if the market rents in this town are high
. And there are landlords who are very altruistic, very
caring and compassionate hearted people, and they're going
to do what they can.
But it's going to take a lot of people doing this because
you know we need 100 150 units for permanent supportive
housing.
So, I'm certainly open to the recommendations and if we
need to talk with shelters to see how can we help to.
But we also have to understand these are autonomous
organizations that have their own have their own vision.
Yes. So to that point, Mayor, you, you have the support of
the Denton County homelessness leadership team to engage
the board members governing board members of those social
service
organizations who built these solutions that look very
patchwork quilt wise over the decades in this community and
to engage them in a way that recognizes their autonomous
authority to govern their social service 501 c three
organizations, but we know their
support and their mission and their desire is to serve
people we can engage them in a way to relocate or to move
services in a way that helps people more efficiently. I
love the passion dialogue in this council about this issue.
There have to be other city councils coming alongside with
you, commissioners court has to come with you. And it's not
just the beds I want to encourage you to remember that
putting people in beds alone without the professionals that
case managers that will guide them
through this moment of fragility to a time 1824 months down
the road of self sufficiency. It's going to take personnel
budget, as well as the brick and mortar budget, or will
simply be other communities like a San Antonio that moved a
problem from one
institution to another in the interest of a greater
pressing need whether that's tourism or economic
development. If your desire is to really improve and
restore lives to repair lives to restore lives, you have to
see the personnel side of the case management work that
takes years to actually get our families are individuals
back up on their feet through this time of crisis to this
moment of moment of self sufficiency, and it is expensive.
So I'm just curious, was that would that come through
United Way or is that something that has been asked of the
city was that in the last budget, I can't know we can we
came forward in a previous presentation that coordinated in
July, just
for information about how that might happen and housing
navigator was an option. But when asked to prioritize
coordinated entry was our priority we needed the foundation
, so that we can have this data so now we have, I'm
confident in the data enough to say we can make some
decisions
now about that and so housing navigators still something
that is relevant to this, this issue, I remember hearing it
before I just I think we'd want to put some better budget
numbers around it.
And let me let me, and that's a good question, because I
had a conversation with United Way about this in depth
conversation to understand more of the detailed process of
this so my understanding is what's happening is the case
workers that are currently in the different
organizations, let's say giving hope for example, their
case workers, they have client base and they do all kinds
of case management services but one of them is trying to
find them housing.
And it's my understanding that the case managers may spend
up to 40 to 50% of their time.
As you understand, turned down, we're trying to find places
for people to live. So when we talk about that we need case
management services sort of part of the problem of pilot
program that we were trying to work on didn't hasn't gotten
off the ground yet was
because we didn't have case management services, but if you
take the housing navigator component out of the currently
existing case managers, then you automatically free up case
management capacity, that's sort of how I see it so what I
would like to see
and I asked for this in the private meeting is, if there's
if there's an ask from the city, together with some of the
other cities in the community in the county on a housing
navigator.
What, you know, obviously what's it going to cost but what
will it free up as far as case management capacity with
these organizations, because if we're, if we can't tell
landlords we've got people that will help, help them.
If there's a situation.
I can tell you what the answer is going to be.
So we can almost create an immediate capacity for case
management, maybe with just a housing navigator instead of
going out and hiring additional case managers which you
know I don't know how much that is but to me that's more
efficient.
So I agree with Councilmember Briggs, let's have a
conversation about what is the cost of that. What is the
benefit in increasing the case management capacity of who
we currently have doing case management, what are they
doing now, how many clients do they have, you plop off that
housing navigator duty.
How many people does that allow them to add to their case
management roster.
Because that's how you sell that position. I mean, instead
of hiring for case managers, you hire one navigator and
that might equal two or three case managers as far as
increased capacity.
So, but again, let's go back.
We're hiring a housing, what do we call housing navigator
navigator, because we got to start finding housing.
I mean I can't say that enough.
And, you know, I'm trying to do it personally I know some
other people trying to but we can't. It's got to be a
coordinated effort yes Councilmember Duff.
Yeah, you. In fact, just, just what you were talking about
kind of hit what I'm sitting here thinking about is, you
know, we need we need. We need the housing for these people
.
Okay.
But we also need to solve the underlying problem.
And the case managers can help do that.
We need to get the people on their own self sufficient. I
think that's what our ultimate goal should be here.
You know, initially our goal is got it we got to get a bed
for him to put their head down.
But ultimately, we need to solve the underlying problem.
And there's a lot of them we're not going to be able to do
that.
Right. That's that permanent supportive housing.
Just, just a reminder, back to one of our earlier items,
the affordable housing from palladium. We did request
setting aside certain units and that's how we start a few
at a time.
So, you know, we agree, we, we do have the ability to start
working on it.
Yeah, you would have tools at your disposal for lots of
solutions with developers should we look at that as well as
an option in the future, not just our housing tax credits
but all developers to ask them to do some, some things like
that.
Well, and I strongly believe that we have enough people in
this community who own housing units, who would be willing
to take a risk, you know with some, you know, with some,
some padding with some could you know just to understand
hey I'm not, you know, help me I'm, you know, I don't know,
I have these stereotypes I have these things and, you know,
trust me as somebody who's been in that business for 25
years.
It doesn't matter. Anybody can destroy your property,
anybody can cause an issue I mean it's it's yeah it's quite
interesting to be educated.
But just one of the biggest things that we can get
landlords to advocate for that it's not just people who are
who have higher barriers that destroy property. It's just a
stereotype that we've really got so on the next steps,
these look good but we also want to get have a work session
we want to have the homelessness
leadership team talk about the housing navigator issue. How
do we draw in some other communities to help with that and
you want that in a work session at the homelessness
leadership team and then we can have it here to.
Yeah, we can have it here too.
Because I know that's how we did the homeless coordinator
the city, I think paid half and the United Way paid half.
So, I would like to begin to encourage some of the other
communities in the county for some funding help as Louis
ville did in the county did with the ESG grant.
Yeah.
And then some follow up some specific. Yes. Okay, yes.
Councilmember husband and then we'll go with Councilmember
Gregory. Yeah.
I would like to hear.
Again, pragmatic approach, right, because I don't believe.
Well, better said, how do we go forward right because I
think when you're talking about
people to a certain area so that they can get services in
the in the confiner whatever that is right I think all of
the discussion I've heard, and maybe it's just, I've not
heard the, the realistic approach right it's like the
realistic approach is everything to Gary's
point is downtown, right.
That's a key
area for sales and and and and commerce is downtown. Those
two worlds don't.
They mesh, but I can tell you right now when I sit down
with a business owner downtown and they say, business is
slow, because that becomes a concern, is it valid, I don't
I mean I'm not crunching numbers it could be a myriad of
things right but, but I know that comes up
right. And so I think, for me the challenge is, I want to
speak to, to that and have a direct conversation without
the fear of repercussions that all urine sensitive you.
I tell people all the time I told Alice at the, at the
community health clinic, I don't get it.
You know I helped me educate me you know and I'll be the
first to admit that and she was she's been very helpful in
that regard.
So my, I would like to see as next steps, a.
What's, what are the steps, what's the first phase, right,
I mean is it, is it to, I think it's to embrace the fact
that the two communities don't get along.
You know they may not work well together. And here's a plan
forward to kind of, hey, those that are leaving monsignor
King, if you'll work with us to go this path and show
improvement that way, maybe we can get these unaffected
business owners now to show to buy into the
business owners that they have some control because I'll
tell you that's that's a realistic concern is, I don't know
that I'm certain, any, they, there's a, there's a mechanism
by which people can work together but but for example, I
got I spoke about this during my campaign so the gentleman,
and he passed away out there by, by LA fitness, and it was
very cold that night, and his friend is that he was near,
you know they had a relationship that report, ask him to
come in and he did not he just he would not right.
So I think there's going to be those instances where you
can't to Mary Watts point, you can't regulate someone's
activity of even in dire circumstance just won't work out
that way we're all free thinking individuals.
So at that point that that's the concern. Can you produce
right can you're saying if we build this will be able to
help regulate. I would like to see that impacted first
right if I'm drawing the steps it's, hey let's, let's
transition, how people leave money on monsignor Kings,
and how they travel downtown let's set a path. Let's, let's
, hey let's negotiate a way that works well with others. And
then I go to those business owners and I say, look, buy in,
because I'm demonstrating what we can do so that's phase
one right and then you're
talking about the library talking to parks we can start
influencing those travel patterns are showing results that
then get business owners to buy in the sale okay I get it
you you're, you're, you're helping me, you're taking one
step then I'm going to, I'm going to meet you with that
step,
and so that you can continue to produce good results
because that to me, and I just want to have more
conversations about those legitimate concerns because there
's nothing here that I see that jumps out and and and and
acknowledges the fact that
the downtown businesses, and those that are are
experiencing homelessness.
How do we bring those together, how, what what path works
for you is it Austin Street because you know whatever,
whatever those paths are let's let's have those
conversations and and get less calls to the police because
there's less confrontation, because I'm not trying
to be best buddies, we're just trying to coexist right. And
so I think once we start having those conversations and
start demonstrating an ability to to be sensitive to those
needs.
Because I think that's a very different conversation than
to say, I'm going to sell someone on the fact that it's
important if they do this because at the end of the day
that business owner that that landlords got to believe that
they're doing the right thing because
they're not going to do. And so that that to me is, is, I'd
like to see that some sort of, can I address a couple of
those.
Sure, okay, you just said, so I would say it's probably not
a phased approach I'd say we're already targeting sort of
multiple things happening at the same time so in the
conversation we're having here is taking the homeless
leadership team and saying, we're
going to negotiate with service providers to see what we
can do around changing how they operate so that that may
change behaviors, and certainly can't impede people's
movement or how they choose to move but we could say that
there's a way that we can negotiate where service providers
are, or where they're located which is something I think
Gary was alluding to. But then there's the other prong
approach which is how do we increase housing and that's
where we're talking about, you know, developing the
barriers fund and getting it fully funded, so that we can
negotiate the
housing need as well. And then we're just working on the
other baseline supports of just how are we creating more
supportive services around so I think those things are
happening. So, figuring out how to clearly show that to you
I think is what I'm hearing from you.
But I would hopefully give you some confidence that those
things are happening. For example, the barriers fun.
Actually we already had this conversation with the Main
Street Association, and that was something that they were
interested in, because they have issues around panhandling
or other things that are impeding their businesses. So we
've already engaged in those conversations with them, and we
feel like we're going to be jointly collaborating with the
communication about that various fund to sort of impact and
help improve what's happening in their
businesses. So it's just one example of stuff that's
already in place. Yeah, so I mean, I'm tracking with you
but I don't understand what that means practically. Okay,
so when you say you talk to downtown Main Street
Association practically that means creating a campaign that
give to the
barriers fun and that will decrease panhandling and help
people get housed.
So, do you then get a buy in from the from. So for example,
do you go to the police and say, who are you getting
complaints about obviously because the fire department's
tracking who gets picked up right so I'm assuming, and you
have we have names with so is it.
So you say, Bob's regularly panhandling, and we know Bob do
does the, does the. Do you go approach Bob and say hey,
that's our I need you to not do that. And what is the
source of the, what's the need right, right, so let's meet
that so that you can stop panhandling
is it. Yeah, I mean it could be because that's the, that's
then another prong of the service provision which is
outreach making sure we're connecting with every person
experiencing homelessness and connecting them to services
so you got outreach happening you got housing,
happening you've got campaigns to help fund programs so
these are all happening at the same time so they're not,
they're not phases but they are happening it's just
figuring out how to communicate that to you in a better way
so you can see it.
I think that's key from just for me I may not be speaking
for anyone else is so many small things that are happening
there that are addressing those well but and I think the
concern is that it's again, very naive thinking and very
shallow.
It could be, hey, you're panhandling, but you have a cell
phone. Now a cell phone may be easy to come by. I mean, I'm
just saying, looking at it from a again from a negative
standpoint. I think it's important to address those issues,
and I think it's, I don't know how easy it is to get a cell
phone, I don't know how easy it is
to get a cell phone. Yeah, and so I don't know that and so
I think those are those are conversations that need to be
had right because I don't, I don't know that you know I don
't, I think it's a phone cost, you know, whatever, 50 bucks,
30 bucks.
And so I think when you're, I think it needs to be, how do
you get a job without a phone.
Yeah, I think that's that's the conversation it's at a
level. I think we're, and I'm not trying to, I'm just
saying what you're wanting is I need practical steps that
result in practical solution, not at all.
I think what I'm saying is that nothing on here, all these
are positive, and they're great. But there's a negative
side that exists in our community that none of these
address.
None of those speak to the clash between downtown and the
homeless, I disagree, and let me tell you why disagree.
Because what we're trying to do, if you house people. If
you get people who are currently homeless, and you house
them. They're not going to be at Monsignor King walking
from Monsignor King through the downtown area to, and then
hanging out on the square if you
want to try to get them a job. We've already talked to DCTA
to try to figure out how we can get bus service from Mons
ignor King to some to our daily bread, instead of at eight o
'clock in the morning, everybody leaves there and where they
track across downtown, which
is they're free to go where they want to go. Absolutely. So
, what what you and I understand what you're saying, but I
think that you're sort of at that macro that micro level
which is, I understand how do we address is this addressing
the problems that
you're saying exist in downtown, how are we doing that how
are these suggestions, and this whole conversation going to
address the clash between economic development and a part
of our city that is the, you know, one of the major
attractions to our city.
How do we address that with the amount of homeless
population that we have there that create issues that
sometimes make people not want to either shop there or go
down there or feel safe there.
How are we trying to help resolve that in all of this stuff
. We're talking about is what I'm is what I, how are what we
talking about going to impact at that micro level. The
issue between tourist attraction and homelessness presence.
Well, no, but I think it's, it's not that succinct, it's
more more. What are the detractors going to say, and how do
we address those to educate the detractors, maybe that's
maybe that's my point.
How do we educate those that would be detractors to buy in.
I think I think what we're, we're trying to establish a
program that, and I'm going to tell you, some people, you
can't educate them. That's right. Some people are going to
be detractors no matter what they're going to be detractors
to be detractors to be detractors and so I'll be perfectly
honest with you.
I feel very confident in the process that as we move
forward and as we begin to take certain steps to move
forward, and to start housing people. The success of it
will speak for itself, and so a detractor is going to be a
detractor they're either here she's going to say well, this
is great
thank you I'm going to get on board, or they're going to
say, I really don't really care about these people. And I
just care about me and my business and what I believe and
all the education in the world is not going to make a hell
of a means to those people who think that way.
So, what I hear you asking to is, let's make sure that we
are developing some kind of program or tool like you said
you want the one pager. You want the one pager, where the
person comes up off the street he says, why should I do
this.
Here's why you should do it.
That's right. That's what you're one. That's right. Yep.
And I think that's what we're working on and I think that's
, they certainly heard you before when you asked for that
and I think we can incorporate that into what you're asking
for right now.
Because that you're absolutely right. I mean, how do you do
it, I tell you, I think it is an education thing I think
there's those that are detractors but I think there's.
I think oftentimes that that's steeped in ignorance lacking
knowledge, right, because I don't know how much the phone
costs, you know, and I don't know you can get it for free.
And so I think there's the education part that maybe it's
maybe it's just a class for people that, you know, I don't
know what it is but I'm saying there is an education
component of information that they have that they've
probably forgotten about that I don't understand at all.
Yeah, no I understand. I mean, yeah, I've been talking
about this for three years and I don't understand. Sure, a
lot of it so we're just I'm just trying to find a way to
put put people in, in, in housing and I do believe I truly
believe that.
And you know what not everybody you do that with is going
to get it. That's right. I mean the people you can help
that it may not.
It may not help them, but it's going to help some. Yes, and
you just have to, you just have to move. So we got a couple
other people that is that okay to. Yes, I'm done. I want to
close with this though because I think you and I had a
great conversation about housing is not.
It may be one room in an entire family. And I mean, you
know, there's there's.
It's, it's, it's temporary, or it's moving to a better
permanency but it's not, you know, I think efficiencies can
can hold more than one per I mean, to me, I think that's
important to kind of lay that groundwork.
And I think that's what we're going to go forward that it's
not, you know, three bedroom apartment for, you know, one
adult two kids, it's if we have to we're gonna we're gonna
have to be really close for a little while as we grow out
of this, I get that.
Yeah, absolutely. Yeah. Okay, cool.
No.
Bring up on future steps and what we want to look at from
my perspective, and I'm looking at the ladder to self su
fficiency that has food clothing, housing, or the beginning.
And above that we have healthcare is which we talked about
our emergency rooms being overrun by that that's something
organizations like HSNT handle, but right above that is
mental health and substance abuse and Denton County is the
lowest per capita funded
MHMR. Right. And that's what we need to lobby for. That's
where we can make a difference. And we already have to so I
think that's a great point we've had some successes in the
legislature and the last session.
So, and I hope that you embrace that equally because it's
just not enough.
Absolutely. Thank you.
Okay.
Go ahead.
Oh, well, we have these next steps but I think we also have
Councilmember Husper that which I think would be good for
all of us whatever you develop for him, as far as just a
really good bullet point.
I don't want to call it a cheat sheet but something that's
very concise and, and has some very good facts and figures
that can help, you know, educate people I think that'd be
great.
Just, not just for him but for us and for the community at
large. So the first thing we talked about was more of kind
of a housing analysis looking at what what cost burden
means and what that might be, but also some additional, how
do we communicate some of those more important
messages I think I heard a couple of different things there
specific since you want yeah y'all get together and figure
out what would be most helpful to you.
That's that's important we want to make sure we get you the
information you need. And then I making sure we do some
additional cost analysis I think was the other takeaway
that I heard specifically but we have a lot of work to do
to try to get that information,
it's difficult for hospitals to allow us to even access
what their costs are so we have some struggles with getting
that kind of data but we definitely know that we need to
understand what's the true cost and how we can do cost
savings.
And part of that you could probably get from the county
when they asked the county for reimbursements. Oh, that's
good. Thank you.
So, so, and Councilmember Gregory brought it up which I
think was very good very in the beginning. So if people
wanted number one to get additional information, they can
contact who Courtney Courtney Courtney crossing United Way.
Okay, all right. So if anyone any more information, and
then if you want about our programs and such and if you
want to contribute to the barriers fund, you get a hold of
who the same.
Yep. Okay, Gary Henderson or Courtney cross of the United
Way. Okay, and there's also a website so if you go to
United Way, denton.org slash dch lt.
There's more information on the barriers fund and you can
donate through that that website.
And, and we'll be helping to promote that campaign as well
and rolling that out to the larger public. Yes, great.
Councilmember and I did ask our lawyer question.
If money from Council members campaign funds could be
legally and appropriately directed towards that so we could
write checks from our campaign from to.
Now some of us don't have to worry about finding any more
campaigns.
It's easier but but the rest of you.
So in closing I just want to thank everybody who's involved
number one in the conversation, but more importantly
involved in helping to try to find a solution, be it, you
know, the people on the didn't county homelessness
leadership team didn't city council,
our public safety personnel who go out and make sure that,
you know, even those small encampments that they're, they
're, they're operating in a way that is safe for those
people there and trying to keep safety in the neighborhood
and.
And I'll close with this and I've said this several times
when we were in a homelessness leadership team after we
received news that we received the grant for two years.
There was a board member who said, raise your hand and said
, I really appreciate it because it seems like for the first
time in a long time.
We need to collaborate together in order to receive this
grant again. And as far as I'm concerned, that was my whole
point of this whole endeavor was to get people to start
working together.
Not because they weren't working, but to work together to
increase the efficiencies to brainstorm. We spent a lot of
time talking about this and now it's just come down to
where the rubber meets the road, we've laid the foundation.
We start building and you know what in six months, if
nothing's happened, if we, your statement is absolutely on
point. I mean we have no excuse now.
We've got what we need. We've got the data. We've got the,
what's the entry system the coordinated entry system. That
's right.
We've got the barriers fund.
We've got the tools that we need to try to make a bigger
difference in this issue. So I really want to thank
everybody who's worked so hard up to this point and who
continues to work hard on it because it's a dauntless.
It's a very difficult task, and it's a never ending task.
So the more we can find efficient ways to do it to help
more people. That's what we have to keep striving for.
So thank you so much for your support. Thank you United Way
for your support. And again, Barriers Fund Courtney Cross
or United Way.
Gary Henderson. So, any other final comments.
Okay, all right. Thank you very much. We'll take a break
before we go on to our next agenda item. Did we order
dinner.
He received a report hold discussion of staff direction
regarding the formation of a community focus group to
review and provide recommended updates to the parks and Rec
reation Department integrated pest management program.
Thank you very much. Good evening Mayor council members my
name is Laura Barons and I'm with the city of Denton Parks
and Recreation Department, and several weeks ago, staff
brought forward to you a recommendation to review the
current IPM program, which council
supported. And today I want to go over a proposal for
moving forward with that review, and what that process
would look like.
I want to start off with just a little bit of history. The
current IPM program was adopted in 2001. Several components
that were included in the creation of that document was
citizen input through focus group meetings pilot program
that included
five sites by park sites within the city testing several
alternative methods. And then we also had some immediate
city wide changes that took effect during this process. And
there was a big focus on continued education and evaluation
.
The current IPM program is designed to achieve long term
control of pest with minimal impact on non target organisms
and the environment. This includes cultural methods that
are mowing heights, natural nutrients, overseeding, and it
does establish no mo natural
species. So these are components that are included in the
current IPM program. It also includes product use their
specific, specific process on the selection of products,
the use of those specific products or outline, and it even
calls them out by name.
There is a schedule for the use, and it includes an outline
of turf maintenance by classification. There are procedures
for minimal exposure, and there's also a notification
process for that for spring and the product use.
It also includes design and maintenance standards and
education.
So I'm sorry, go ahead. So I assume since 2001 you have you
had acquired more land or more parkland more property. Yes,
we have. And so this applies to that new new areas and no
mo areas are gone in and they're established in that new,
new properties
that is correct. Yes. Okay.
So moving forward with the review, we're recommend, we're
recommending a very similar process to the original one
done back in 2001, and that is to form a community focus
group with a maximum of 15 members.
We've identified 11 members from the feedback that we
received from you a couple of weeks ago. This includes a
breakdown of two community representatives to
representatives from our athletic associations, our partner
agencies, we're including a representative from each one of
the following
UNT, TWU, and DISD. And then we're also including some
field specialists to representative from the master garden
ers to from the master naturalist group.
And then as advisors will have representatives from the
Texas A&M AgriLife extension, and also from our internal
environmental service departments.
Councilmember Griggs. I do know that we have one that we
partner with DISD on the water park, but what do we partner
with UNT and TWU on in our parks.
Well what we're looking at and one of the things that was
brought up.
The question was, what are some of the other agencies in
our areas doing in their IPM program, just in terms of
exposure from their population people that are also outside
that have outdoor or park areas.
How do we compare to not only our agencies here but also
other cities. So benchmarking is a component but also
learning from their processes.
Okay. And so the advisors make up part of the 15 members.
No, they do not. So why why wouldn't the college agencies
be more advisors than they would actually take up the
decision making part on the, on the focus group.
And that's something that we can definitely adjust. Okay,
this is just a proposal and some of the initial
stakeholders that were mentioned in our previous discussion
.
Okay, thank you.
Okay, it looked like you're about to say something.
So along with the focus group will also analyze our current
IPM program, establish pilot sites, and that will give us
an opportunity to evaluate and test any new methods or
alternative methods that may be presented during the review
will also be conducting our research and benchmarking
at that time, will come back with a draft document for our
focus group to review, make some additional revisions
recommendations will also do our evaluation of our pilot
sites include those evaluation results into those
recommendations, perform a final review, bring that back to
council work
through council on input, and then ultimately have adoption
of a new IPM program.
I do have a question.
Because I know this is sort of how we do it sometimes when
we're working with committees we meeting staff or
consultants or whoever will provide sort of a draft or an
outline of something, and then the committee will kind of
work off that I guess what I'd like to see is at least
maybe the first meeting
so try to get some ideas and input that will, in other
words, if you just hand them a draft and say hey what do
you all think about this. We've sort of set the boundaries,
instead of, okay, give them maybe the current one we have
some of the conversation
that the council has had about certain types of product
that we're using and just and get the ideas of how they're
doing it because, and that's not a criticism it's just more
of a process change that I think would be helpful.
Absolutely, I completely agree and we've actually already
started that benchmarking.
We have already started that process of collecting some
other IPM programs from other cities. Okay, good.
Or one one more. Okay.
So we're looking at a timeline for this project. So what we
're looking for is in March a formation of the focus group.
And then I have our hold our first meeting during that
month, and then over the next 60 days what we're looking at
is reviewing the current
document, conducting our research, and then following along
with the benchmarking site selection for pilot parks and
began our testing testing techniques for any alternative
methods that are desired to be explored at that time.
Once we'll after that 60 day period passes in July, will
evaluate the initial results of our pilot sites and you'll
see this as a theme and this is really one of the things
that's driving the timeline is that evaluation of pilot
sites because we're looking at starting
this in the spring and capturing as many of our seasons as
we can during this process.
So back in July to the group of first draft of a document,
get input, gather feedback over the next 30 days,
incorporate that preliminary pilot site information into
the draft do a final review of the draft document, and then
by September what we'd like to do is come back to council
with a preliminary proposal on a new and revised IPM
program.
From that we'd give ourselves an additional 30 days to
continue evaluation of our pilot sites, follow up with any
council input at that time, incorporate it into the IPM,
and then in November, looking at actually, I'm sorry in
October, looking for adoption, but from November through
December we want to continue to evaluate those pilot sites,
document our results, and report our findings so we will
continue to report back to council on what the findings are
even after adoption.
So that you'll be able to see again that evaluation of
whatever alternative methods we may be exploring at that
time.
All right.
Timeline looks good any questions, observation or comments.
Yes, Councilmember Briggs.
I would like for council to consider moving the two
advisors from two people from the college from UNT and TW
over to the advisor section and free up two spaces for
community reps so it would be for community members instead
of two on the 15 board makeup.
Could I see the list again.
Thank you.
Okay, what about DSP leave DSP, we are actually a partner
with them at the water park and the other two we don't have
any physical partnerships with I mean, and that was a
question I had, how are we picking these people.
Well, a couple of different things were taken into
consideration number one some of the feedback that we
received several weeks ago when we brought initially the IP
M product contract, some of these organizations were
mentioned and then just identifying stakeholders.
It's a good way that two of our community representatives
that have been identified have been Mr. And Miss. So, and
Carol so who I've already met with and they actually also
recommended a couple of individuals that they thought would
be some good stakeholders
in this and so the natural guard started the master garden
ers and the natural master naturalist recommendations made
by them.
We have already spoken with our regional representative
from Texas and AgriLife extension, Janet Hurley and she
also thought that that would be, they would be appropriate
stakeholders through this process.
So it's just been a combination of some of the community
input that we've already received some of the feedback that
we got from you a couple of weeks ago, and then just
identifying some additional stakeholders that would be able
to give us a meaning, meaningful feedback during
this process. This is going to sound odd and it's not
because this is how I feel about it.
But I think what's important when we have a group like this
is that we make sure we have
different type of thought processes, and not necessarily
all like minded people.
So my point being that some people would look at some of
the concerns that were expressed, I'm not saying I am
saying this but some people say well, these are over infl
ated or this isn't as big a concern so when I said how are
we selecting these specific people.
That was really the thrust of my question is how do we make
it balanced. We are also looking for a very balanced
approach to this. Yes, sir.
And that. No, go ahead. I'm sorry, I was just about to say
that's why also we've got representatives from the athletic
associations they have a different perspective on park use.
And then also, even between the master gardeners and the
master naturalist they both take different approaches to.
Okay, good. I appreciate that. Thank you. That's very
helpful. Yes, just in order to make sure that it happens. I
mean, I would assume that the master gardeners and the two
representatives from the master gardeners and the two
representatives from the master naturalist are going to be
the same person in residence. That's what we're looking for
. Yes, we already have them six community representatives. I
think what we were looking for also in that perspective was
just that field specialist, people that have a little more
knowledge and knowledge and expertise in that more effort
getting trained. We're trying to balance park usage with
somebody that also had a little bit more again knowledge
expertise in the area, along with identifying some partners
in the community other agencies that are also, you know,
subject to IPM programs and how
they're learning from their experience in their
implementation process. Well, if those four are actually
residents of the city, then that that's okay. I didn't know
if they were coming in from, from other areas or not.
So, the goal is to find those that are specific, yes to our
area. And we can definitely come back when we finish
identifying and you know, get commitment from the actual
individuals bring that list back to you.
Yeah, when we first recommended doing this board or this
panel.
We had before us, a contract to purchase chemicals for the
year. Yes, sir. And it looks like this is going to take us
through most of the year. Do we need to bring that back to
us so that we can get that done.
Well, at the time one of the things that we discussed will
continue to monitor and work through purchasing with is
that we do have a threshold, a monetary threshold that will
will be able to continue to purchase our products.
We believe that will last us through the end of the year
but again we'll monitor that very closely. And we are our
current practices will continue to follow the IPM program.
Okay, any other questions comments.
Yes, don't.
Councilmember death.
Just one brief thing.
Since it's a past, are you including wild hogs in there.
I hope you don't have to know and I don't know that
anything that we purchase on that product list would be
effective against wild hogs but if that becomes an issue,
definitely.
Anything of that nature that's usable. I understand. Yes,
sir.
Questions comments.
Thank you.
We'll go to our last work session item side of one he
received a porthole discussion give staff direction
regarding a proposed expedited competitive process for
professional engineering services for the city's public
works infrastructure.
The word expedited so that means this, this presentation is
expedited is that absolutely okay.
Good evening mayor council, Todd as the city engineer, we
just wanted to bring to you the process we've been going
through to find a much more expedited pathway to both
achieve the selection of consultants to deliver our capital
projects and any other design engineering
related projects that we potentially have coming up.
But also, not have to come do this because repetitively,
because it does take time from a staff standpoint, the
consultants themselves put a lot of effort and energy and
money into an RFQ process.
So one of the things we were looking at was how do we cut
some time out of the design process, so that we also don't
lose out on some of the losses that we're seeing in our
buying dollar when it comes to construction.
We kind of found out with an RFQ last fall, which means we
basically put the whole advertisement together in regard to
seven different categories those categories were project
management help putting together a package for review of
private development projects,
that would help our current staff to fill some of the gaps
when the workload gets too extensive or too cumbersome for
the personnel that we currently have. And then design of
professional services and five categories, the
transportation piece which is roadways bridges
intersections also rolls in sidewalks and some of those
other items. You've got a traffic signals and streetlights
component traffic signals also incorporates railroad quiet
zones. They are signalized so that rolls into that same
piece, and you've got a stormwater design, a wastewater
design and water design component.
So the biggest reason we lumped all this together into one
overall package is to reduce the time it takes to get to
construction. Currently, and for the last five or six years
the construction market is seeing inflation in construction
, 1% compounded per month.
So, net that means every month that we delay in going to
construction we're losing 1% on the construction amount of
the project, but the overall project amount, the
construction amount which is by and large 75% of total cost
of a project.
If not more depends on the size of the project the larger
the scope of the project. The design costs the admin costs
they all come down and the construction costs becomes a
bigger piece of that pie.
So, one of the ways that we look to reduce that overall
effect, both from a scope standpoint the scope creep
standpoint which tends to happen as we go through the
design process and everything gets elongated past, say six
months to a year and it goes into two, three, four or five
years there are these great ideas
that come up and we add to the project was adds to the cost
of the project. And it just keeps on rolling to get to the
point where we are today. You have a lot of projects that
are somewhat more fat than what they were when they were
initially set up and intended, not all of them.
There were other reasons for other products. There's some
reasons for the other pieces there. One of those is in
house design for the sheer amount of workload that we have
the capital projects that we need to get out the door.
We're not staffed like a small engineering or medium sized
engineering firm would. So, trying to do all that in house
design work. You would need 35 to 40 engineers, EITs,
personnel just dedicated to design.
That doesn't leave them dedicated to project management
when it goes to construction. So, where we sit today, at
least coming into this revamp of what capital projects
looks like, we have five engineers on staff doing design
work when we needed 35.
So, the solution that we're proposing and that we've
already gone on the path of is our internal engineers are
being repurposed and they're learning to be effective
project managers. They have come a long way.
But they need the tools to be able to deliver those
projects. One of those tools is having this professional
services help to help them get through the design process
and if we need to fill the gap in some of these project
management roles.
On average, your RFQ process per project will take about
three months. It takes about a month to put together that
package, get it out on the streets and advertise another
month to let it kind of marinate.
And then you get another month where you got staff that's
tied up and reviewing it. And then you select them. Then
you go to council with your recommendation after you've
negotiated contracts. There's another couple of months
there that's in that mainstream.
So, I've lost five months in the project delivery process
that also equates to real dollars lost going to
construction.
So, those opportunity costs are what we're trying to close
the gap on.
Oh, my go back one key point here is the other RF other
piece of the RFQ processes, we got to make sure that there
is a fair selection process in place. So, across the board,
when you're selected, everybody knows what the criteria is
that we're going to evaluate on.
This process allows for a streamlined delivery process when
we go through the project process if we say we want to go
build 1000 foot of water line.
I don't have to go through an RFQ process for that $300,000
project, which ties up all that time that effort that money
, I can shrink that down to where I come into you with a
council recommendation, saying, here's the contract we'd
like to put in place, go do this design work go to
construction,
and we're three months out of that minimum.
Yes, sir. Could you help me understand what you mean when
you say our engineers would be involved in project
management.
What, what kinds of things are they doing as project
managers, so project managers.
So, they're in the general overview is making sure the
scope doesn't creep on the project that this project is
delivered on time and on budget now that's incorporated
into that is making sure that we get the best possible
product for the citizens of Denton, that we can possibly
get.
If I go and engage a consultant to design a project.
They can large, take that information and go work on what
they think that needs to be done without the city engineer
being involved in that piece, whether they're a project
manager wherever the role is the likelihood that when the
engineer gets this project, and
they come back to us and say hey I got something I want you
to look at.
They may be on this side of the spectrum and we may have
intended for this and I've lost that time and effort. So
project manager is paving the way to remove roadblocks that
from a right away standpoint they're engaged in the
community, laying the groundwork for what this project is
going to be getting
feedback from them to make sure that we didn't miss
something in the evaluation of what is this project going
to be when we set it up.
Making sure that the project budget doesn't appear to escal
ate every month of the project, you know as that scope has a
an inclination you know the engineer comes back to the city
and says, we uncovered this wonderful item that would be a
great add your project
somebody hears that and says, that would be great.
So we added to the project I've added another $125,000 to
the project. Can the budget handle that.
Managing, if I may, the design of the project. It does it
also manage does the engineer go out when the contractor is
actually laying that pipeline. Yes, or building that road.
Yes, make sure that it's being done according to
specification they go where they cover it up.
We don't know if it really. So we have an inspector that
goes out on a daily basis. And an engineer inspector. No.
There's two roles here. There's the public works inspector
who is responsible and knowledgeable in all the methods and
methodology that goes into actually putting that pipe in
the ground.
So anytime say a water line goes in the ground. They put
all the components in that have to be in there. There's an
inspector they're watching that being done making sure it
gets done properly.
The project manager who was involved in the design piece
helps to make sure that we don't lose time through
arguments over contractors will do this thing you know I
think we should go lay it that lay the pipe over here
because that makes more sense.
Well that may present another problem that the inspector
and the contract we're never aware of because we're never
in the design process so the project manager has that
knowledge and they stay engaged in that process, all the
way to the end of the project.
Question. Okay. There's a lot more to it but I don't want
any further than you want me to.
So going down this path with the RFQ also gives us the
maximum flexibility and resources so what we've done with
this process is our thought was, instead of selecting one
consultant to do transportation design we said you know if
you would like to be considered for transportation
design, here's the minimum qualifications you must have. We
'll rank everybody from who we think is the most qualified
to the least qualified.
And at the end of this process I have, say 26 companies
that want to do that I got 26 companies I could go select
off of.
Now we would start with the most qualified and work our way
down the list until we have the contract that fits.
The other big component to this is it meets the funding
requirements that we have depending on the funding source.
In other words, if we get federal or state dollars, however
it comes to us through grants through funding agreements.
If the state is overseeing that part of the project.
The requirements on the paperwork are much greater,
including how we select the consultant to do the design
work.
The first step into this process when we put this together
with purchasing was to make sure there was a way that we
could use this over the life of the RFQ that we could
select for those contracts as well.
Some cities don't do that and what you end up with is is
great I got the stable of contracts that I could go to at
any time.
But I can't use it for federal dollars. I can't use it for
state dollars and I got to go do a separate RFQ process and
insert that three month period back into it.
So it was set up to take care of that issue. It was also
set up so that other departments in the city could utilize
the same RFQ process.
Use the same consultants office.
So where we are today.
We are currently reviewing all of the submittals that we
got we had 59 people from 59 or we had more than 59 people
but we had 59 consulting firms represented at the pre subm
ittal meeting which was you guys come ask us questions so
that we can resolve any issues you have with this
RFQ process then we sent out to addendums based on those
questions and some follow up questions so that it was as
clear as it could be.
When they submitted that back to us then we established
seven review panels to go through all 41 submittals that
came in there to some of them are 200 pages long some of
them are 25 pages long so each of those groups has gone
through and reviewed, or at least is in the process of
reviewing each one of those.
As they apply to those separate structures so here's where
we are today.
So we have completed four of the categories of the seven
categories that were in the RFQ.
We have when I say complete we've reviewed all of those
components so five firms and project management and
development review then 27 firms and roadways and so on
across the board we have not started the water
infrastructure review we had some folks in and out and
coordinating those schedules
has been difficult wastewater and stormwater we should have
wrapped up here in the next two to three weeks.
So next steps, we are coming back to you here as quickly as
we can.
Our anticipated date is March 6 with all the pre
qualifications for as at least four of those seven
categories if not five of them.
So you know who those firms are why we select them where
they ranked in that process and get your recommendation
that for approval that that's a good pathway for us go now
and you'd like who we put in place, and we can go from
there that allows us to assign contracts
very quickly and come back to you effectively.
Councilmember great question. It might be more for the city
manager but do we currently have a public works inspector
that goes out on every project, like even like a sidewalk
or a street fill or, or anything like that.
We do the public works inspection division reports to
stress this all by him kind of talk to you about the
difference between the engineering.
I don't know it doesn't have to be long I just wanted to
yes or no. We do.
You want you want to look anything.
We currently have six.
We currently have six public works inspectors. We have one
for right away now the differentiation between that is is
say somebody just wants to put a driveway in the right away
, like a homeowner is that person would submit for a permit
through the right away
inspector, we only have one, we have almost 1000 permits
through the city active today. So that's an area where we
're having to have that whole team try to work together to
pick up some of that area.
There's another subsequent RFQ that you'll see come in with
some other packages from us, which is how do we supplement
that group, the six public works inspectors, they go out.
Their requirement is to get out to each job site on daily
basis at least one hour. Now the reality of that is there
are 90 active projects throughout the city that they must
touch.
And there are only six inspectors so them getting to each
site on a daily basis is tough, they prioritize that based
on the work so if the contractor is going to do a concrete
pour they make sure they're there.
If they're just out there moving some dirt they make sure
things are set up and then they go move to where the next
highest priority is. It's another thing that we are looking
at how do we close that gap to get the best quality control
for the city.
Thank you.
So, it could be you had 23 contractors applied for for one
of those areas and let's say 10 qualified. Yes, sir.
And you said that there's a list from the most qualified to
the least qualified. Yes, which makes me think about that
joke about the. What do you call the person who graduated
last from medical school, doctor.
You know they're still a doctor, they're still a qualified
firm. That's right. So my question is, I would be a little
bit concerned that that if we have this list of 10 that
that y'all keep going to the three top most qualified, and
then the other seven wonder why did I bother.
Or there's some favoritism going on here. Do you anticipate
a process where, where maybe if you're maybe not quite as
confident in one of those even though they qualified that
they would still get a project.
Yes, or ever so often and they may be less intense projects
or less rigorous projects. Yes. So, there are several
things that we're doing as we go through this evaluation
process there were five areas we evaluated all of them on
equally they knew what it was.
We were up front when all that information went out. And as
we go through this with a group can can attest to this, we
are trying to moderate everybody to the point we see and
evaluate them all equally you can't bring in some other
knowledge from somewhere else without having a good
explanation
for it.
We've done a pretty good job of saying, we gave someone so
this score over here for taking this off we got to make
sure that we do that across the board.
And I think that's part of all that is, yes, we have
different amounts of.
As we go through this we're looking at the company and what
they put into that RFQ and saying you know you would be a
good fit for this type of work.
And we note that in the process so that as we come back to
a legal you know, I don't know that I want to give redoing
Carol Boulevard from I 35 to university to this person, but
certainly sidewalk seems to be something well within their
wheelhouse they put the ball out of that information
and we're not sure what it's about or all kinds of things
that may be out there that are very specific to that firm
that would lead us to say that would be a better project
for them. Well my, if I may, my guess is is that somewhere
along the line, somebody who didn't score as high on paper.
After you start working with him you suddenly discovered,
wait a minute.
There's more quality here than than appeared on paper.
So, let's be good for. We're anticipating this would be a
three year rotating basis so every three years we would go
back and do this process again just because of how much
involvement there is trying to get this process.
Do you think that that every contractor that qualifies will
end up getting a job.
I don't know if they if absolutely all 27 of the roadway
firms will get one don't know that for sure because we may
not have 27 projects. Okay.
Okay.
What we just answered the last question on the slides.
The next slide.
Next question so.
So, this would be the RFQ that we would refer to.
I'm not sure about it's for three it's for a pool, yes,
trying to create a pool, and it's going to last over three
years. Yes, again, I really and I don't know where it comes
in and the legal part of it because I know you can't ask
for pricing on an RFQ but I would think after you select
the firms.
You could begin to inquire about pricing is that correct.
Yes, after you selected them then you can start discussing
the actual price. Okay.
That's actually part of what goes into the way we set this
up for the state and federal funding piece.
They require that you take the top firm that you rank, you
negotiate with them if you cannot come to terms with them
you move to the next one.
I just I just would really encourage us to be a little more
bearish on some of these design costs and engineering
because I mean, again, I don't know how it all works I mean
, if it works with, we're just going to charge you a
percentage of the project.
I mean, it's got to be well this how many hours it's going
to take we figure we're paying these people as much per
hour this what it is. So yeah informal staff report on that
.
We can do that. Yeah.
Any other questions.
Okay.
Any other comments or questions. So you've got direction is
we're just, we're going to wait for you to bring the
evaluation to us and we get an up or down. Is that right.
That's it. Yes, sir. Great. Fantastic. Thank you.
Okay, I think that concludes our work session we will now
convene the closed session at 539.
6 PM on February 13 2018. We will consider the following
items consultation with attorneys under Texas government
code, Texas government code section 551 point oh seven one.
Thank you.
We're back in open session for this meeting of the Denton
City Council on Tuesday, February 13 2018 it is 557.
We are now convenient to a special college session for
agenda item one a considered option of ordinance author
izing the amendment amended engagement of the law firm of
Lynn Ross and Ganaway, and the BKD LLP accounting firm.
Mayor members of the city council. I'm Jerry Drake. I've
got this item on your agenda here to complete an audit that
was initiated by the city's own internal auditor.
After his departure. Last year, the city attorney's office
engaged the law firm of Lynn Ross and Ganaway and the
finance department engaged BKD to do some exploratory work
to see if there was anything that would warrant conducting
a continuation of the audit.
In November, the council approved an ordinance for
professional fees, not to exceed $50,000 for the completion
of the audit.
This would include expenses associated with the audit, and
in addressing the need to fund the expenses out of it and
to cover an increased scope of services that came about
once we started getting into the audit.
We, we determine the need to come forward to you and ask
for this additional funding. The, the new ordinance that's
in front of you is in a total, not to exceed amount of $142
,000 that's all inclusive that includes all professional
fees and expenses and embraces all of the fees and expenses
that have been built today.
So at this time, I'd like to turn the matter over to Julia
Ganaway to give a presentation to you.
Is the presentation just to go over just the detail of this
is that if you would like yes it's it's three slides.
And I guess that does this does this anticipate or does
this have built in the fees that may be incurred for a
public presentation in the future. This includes all of it
fees expenses costs through the public presentation.
Okay, go.
As we as Mr Drake referenced, based on the received tips
from the anonymous hotline fraud waste abuse committee
began an investigation city auditor resigned on October 16
2017 on phase one.
LRG was retained by the city attorney's office to provide
initial legal analysis October 20 BKD was retained by Mr
Springer, the former finance director to provide an initial
assessment of the auditors work and provide feedback.
And that that was the 18,000 for phase one.
BKD recommended additional investigation and worked with LR
G to prepare to prepare a scope of investigation and
recommended and the recommended procedures and assumed
complete cooperation with the process and and stated
initially not to exceed amount of $50,000 for phase two,
and that amount included only professional fees not
expenses or costs.
And the city council approved that recommended initial
scope on November 14 2017.
On phase two the council determined that this would be a
council at initiative, the city auditor worked internal
auditor works reports directly to the city council as well.
BKD and LRG conducted interviews of city employees
identified certain parks board personnel and employees
requested and received documentation for a five year period
, as the scope was defined by council.
I was part of the investigative team with three other
members of BKD we follow the facts as they let us where
they let us the.
There was lots of detail and covered and at least 250,000
lines of data analyzed on this.
We did receive some resistance as from parks foundation
persons, as they retained council, one person declined to
engage in that face to face interview and one retained
council and that interview had to be conducted at a
separate later date and fortunately incurring more expenses
and costs because we had to come back and do separate
rounds of interviews.
So at an initial overview we were asked to provide
additional information at a later time and public
presentation of the report and what we did find.
Additionally, the unanticipated events necessitated an
increased in the budgeted amount city council will receive
a written report from both LRG and from BKD collectively
together, we will provide a public presentation of the
investigation at a date and time specified by the city
council.
The engagement amount again is a will not exceed as opposed
to an assumed not to exceed it is a will not to exceed and
that's 142,000 for everything both before we met with y'all
during this time, all of this work, and up to the public
presentation when you when you show desire.
Yes, customer.
So last week on our agenda. There was an item to approve
this will not to exceed at 115,000. Yes, sir. And clean
last week and this week. It jumped by 27,000.
What happened between last week and this week to cause that
change in amount. Well, there was additional work that
needed to be done in conjunction with the meeting that we
had and so there was additional work to follow up on.
Then there was an additional meeting set.
And then, then the final presentation. So, that's, that was
the reason for the increase was the additional meeting and
the additional revision so some of that is for for time and
some of that is for expenses.
Yes, sir, some of that is for the time and the time for. I
'm pretty local, but for, you know, for BKD folks to get
here as well. And they came from San Antonio San Antonio
and then another member of the team came from Kansas City.
Okay, thank you.
Any other questions comments.
Okay, this is a individual consideration.
Chair asking, there's any action on this item.
That's my right.
We have a motion.
We have a motion and second.
All in favor please signify by raising your right hand.
All opposed by like sign motion carries, let me do the math
.
All right, thank you. We will move on to our next agenda
item which is public hearing.
Item two a is hold the public hold the second of two public
hearings for a voluntary annexation of approximately point
three acres of land generally located on the east side of
old Alton road, south of the intersection of old Alton road
and TZ lane.
Okay.
You're good.
This is the second of two public hearings for a voluntary
annexation of approximately point three zero acres of land
generally located on the.
Sorry, I ran east side of old Alton road, south of the
intersection of old Alton road and TZ lane.
The applicant is proposing a commercial development.
The subject site and the adjacent parcel to the north,
which you can see right here, are all part of one lot. And
once this side becomes gets annexed and zoned, it will
become part of this automotive repair facility.
Just take a big deep breath. No, no, no, we're not in that
big. I understand I know when I try to talk after running
or something it's just so yeah just take a couple of
seconds.
No, no problem. Just take a couple seconds to just. Yeah,
it's all good.
The schedule, as we're following it.
So, just to be sure, during this first public.
We have actually the schedule that we've got here. Our next
meeting will be March six, that will be the first reading
of the ordinance, and you will take action on the fourth
meeting which is April 10.
And that concludes my presentation. Thank you.
Public hearing, and I have opened the public hearing
anybody wishing to speak, please come down and state your
name and address or come to the podium. Let me put my
glasses on to see if anybody's moving out here in the
gallery.
Anybody wishing to speak for the public hearing.
Okay.
All right. Well I'll just do it one more time to make it
official anybody else wishing to speak.
Seeing none, we will now close the public hearing and move
on to our next agenda. And that is concluding items.
Yes, Councilmember breaks one, and it's more of a concern
so I'd like staff to give us a report and research it a
little bit.
I believe we may have a serious issue and didn't for our
families I was on social media and have recently learned
that we do not have a pediatric unit at either of our
hospitals.
So that when there is a sick child in our community of 130,
000, they're transported to Louisville, or Dallas cooks
children. Now in our update it said we were getting a cooks
children's hospital, but I've got confirmation that it's
not necessarily a hospital it's just pediatric offices.
So, there was, there's a need in our community and we have
two really nice facilities and I'm just surprised that we
don't have even some of them they are treating children
with adult needles instead of children needles so I'm was
shocked about that.
And also I have also heard that Presbyterian may also stop
delivering babies which means that medical city stop
delivering and now if Presbyterian stops delivering we will
not have a labor and delivery unit in our city.
So I don't know how much of this is completely fact and I'd
like a report on this as soon as possible.
Thank you.
I'm going to go over here to john Ryan and then customer
and then customer.
I just wanted to make it make a statement that on the 19th
on Monday I have my town hall meeting at South Branch
Library at 630 so encourage people to come out and attend.
We'll go to cast member Dustin customer Gregory.
I brought up the PEDs. I think last time, and you know I'm
looking south of us and flower mound and North Lake and our
goal and they all have very large housing developments
going in, and I met, I ran into the mayor of our goal.
And when I chatted with him he indicated to me that our
goal and he believed all of the others had some form of
pits.
And, you know, I think we need to bring that back up again
I think it's, you know, I can't really. I won't comment any
further.
I think it's on I think it's on upcoming agenda.
It's on okay.
Yes, that's the staff's done the research that you've asked
.
Yes, and we will address your question at the next workshop
on that.
Okay, Councilmember Gregory and then we'll go to Council
member husband.
Mr. Hats off and go next. Okay.
I'm perplexed by that comment because I stood alone in
support of PEDs and, and Don mentioned how Roberson ranch
put their own in and everyone else can put their own in so
maybe I'll just reviewed a minute maybe, maybe I'm wrong.
Well, well, yeah. And then, well we're not going this I'm
sure we're not posted for this so yeah, you have a conclud
ing item.
Well, well, I want to I want to direct the staff on keyless
concern there's a pediatric office across the street from
the mall that's fantastic we have to take out there.
No, a liar there for her for flu thing. So I would direct
you there they're great, called us the next day to follow
up outstanding organization, I don't know if it meets, you
know you can you can kind of use it as a kind of silo the
capabilities but it's, it's fabulous.
Great. Okay. Councilmember.
Thanks. Couple of weeks ago I'd send an email to our city
manager, wanting to get a status report on the enforcement
of the ordinance that we passed a couple of years ago on
credit access businesses.
And I got a great response back they didn't have all the
information yet but they're going to be gathering some and
I would ask that, as you complete the process, Mr manager
of gathering that information that you either provide a
staff report to all of the council members
a written report, or maybe if there's time in the agenda to
schedule a short workshop work session on that. Okay, I don
't have a real strong preference either way but I think that
it would be important for all of the council members to be
aware of the information.
Sure, absolutely.
Yeah, I just have one. I'd like to get and I know we're
working on it but I'd probably like to get it sooner than
later. I know understand that the deck will soon be
energized sometime this summer, or late this fall for
commercial use.
Yes, I'd like to see a budgeted performer of the fixed
costs I mean energy plants power plants are divided into
two types of costs fixed costs and variable costs variable
costs primarily being the fuel costs the energy cost and
then transportation if you have any.
We should be able to figure out what our fixed costs are we
know the debt service we know who we've hired, and those
kind of things so I'd like to see that and then also like
to see together with that maybe a projection or just a
couple of tables on our variable costs
it's operating for so long fuel costs you know natural gas
is this high, just, I don't want to get it necessarily
after the fact I want to see what we think it's going to do
so that we can begin to take a look at it from an economic
basis.
We're working on that and should be ready in within 3060
days. Okay, all right.
So it's going to take that long I guess we're working on
the format I'm getting lots of questions already about
projections on whether it'll cash flow what those mean the
assumptions behind it so it's a simple question you're
asking.
Yeah, no, mine's not about that. Yeah, yeah, yeah, mine's
not that it's it's more, you know, we've obviously budgeted
for personnel, right, we know what the debt service is and
we know what some of the, the chemicals or whatever so that
's all I'm looking for as far as
energy. That's not what I'm looking for I'm just, what are
our costs on the ground.
Fixed costs that we have to pay. If the thing never is on
at any point. Okay, yep. No problem. All right.
Any other questions concluding items.
All right, we will stand adjourned at 615.