Apr 18, 2017 City Council on 2017-04-18 2:00 PM
April 18, 2017 City Council
Full Transcript
Good afternoon. I wanted to welcome everyone to this
meeting of the Denton City Council
on Tuesday, April the 18th, 2017. We do have a quorum. It
is 2 p.m. in the afternoon. First
item on the agenda is citizen comments on consent agenda
items. We have one card. Mr.
Willie Hutsbuth, if you'll come state your name and address
, your time will begin. Is it three?
Yes, sir. Mayor and council, my name is Willie Hutsbuth. I
live at 623 Newton. Very quickly,
agenda item A on the consent agenda. I think that there the
citizens need to know a little bit about
what's happening there, so I would ask you to remove that
from the consent agenda and discuss
it. Agenda C, that's having to do with hiring or getting
issued a contract. I want to make sure
you have minorities considered. I believe that's right. D,
I was at the meeting where we talked
about closing the street. I think it needs to be discussed
orally or now so that the citizens can
see what you've decided on that instead of putting on the
consent agenda. And G, that's hiring again,
I believe. I'm not sure. I have to go fast for three
minutes. I think that's hiring. And then L, I don't
think alcohol. I just don't like alcohol. I have a bad
experience. Not me. My dad was an alcoholic
and he really abused us and my mother and I don't like
alcohol of any kind being sold to anyone.
It's my preference, so I would say don't. Let's discuss L.
And lastly, one of you council members,
or maybe more than one, but I think just one, told Brandon,
the officer, two things. One, to arrest me
on the spot and drag me out of here. He didn't do that. He
just laughed. Thank goodness. But secondly,
you told him to stop filling out the cards and assisting us
for that, for in that process. What
on earth could be wrong with that? He was helping us to
figure out how to do that and one of you
stopped him. You said don't do that. Because if you do it
for one, you should do it for all. Well,
he was doing it for everybody that I saw him do it. That's
just petty. And if you want us to talk in
these areas, if you want us to say anything at all, then
you should allow him to do that. But that's
okay. You don't have to lie. I just want to make sure it's
on the record that one of you told him
to stop doing that. Shame on you. Secondly, thirdly, that,
that, that. Turn this one more thing.
Oh yes. City manager, you're doing an excellent job in many
, many areas. The closed session for sure
that there's one thing that I have a problem with the
closed session. I'll talk about that tonight,
that I'm, I have a concern about. But I need to just give
you your props. You, since you've come
on board, things are going a whole lot better. So is the
city, the attorney is doing well
and the auditor. Here's what I mean by doing well. You
allow citizens input. You try to steer things
to where citizens can have input and you seem to, to allow
us to say things and to question things
and you're not threatened by that. So I think that's good
and I wanted to tell you that my son
told me, he said you got to quit complaining about stuff
and you ought to say something that's good
sometimes. So now I'm saying it. Make, mark that down. It
won't happen again. All right. Thank you, sir.
Okay. Request for clarification of agenda items for this
agenda, April the 18th, 2017 from council
members. Council member Hawkins. Thank you, mayor. On
consent agenda item H, the noise ordinance
exception, they applied for it from Sunday from noon to
nine and staff is recommending from noon
to six. So if this stays on the consent agenda and is
passed, what are we passing? Is it the one that
staff recommended then? Okay. I just wanted to be clear on
that. Okay. I didn't see the, is that,
what's that answer to that question? Dalton shook his head
at me because he's my mentor. Go ahead.
It would be the staff's recommendation. Okay. So we're
going to be voting on noon to six.
Yes, sir. All, all further questions, I'll point towards
Dalton for the rest of the day. Okay.
But thank you. Anyone? Yes, council member Gregory. Thank
you. Maybe Joey can answer this question.
On consent agenda item F, the cost for the police
motorcycles. Is that fully equipped with all of
the necessary additional items that would be required for
the police to do their job?
I couldn't tell from the backup if it was or if it was not.
Yes, sir. In this particular quote,
that includes all the auxiliary equipment. Okay. Thank you.
Council member Wasney.
Since we've had a citizen request on item A, if we could
just have a brief explanation
on what this ordinance and agreement is on TMPA, staff can
do it now if they're here. Thank you.
Good afternoon. Yes, this is a interconnection agreement
with Texas Municipal Power Agency.
Since 1975, I believe we've had a power sales agreement
with Texas Municipal Power Agency.
Within that power sales agreement, it addressed all issues
not only related to providing power from
the power plant, but also covered areas of interconnection
on the transmission. As we look
forward to TMPA, we look at possibly separating those
businesses, those functions of generation
and transmission, and we identified the need to have an
agreement for interconnection that would
cover the transmission part by itself. In other words, if
the power sales agreement goes away,
this agreement steps into its place to address the
transmission issues.
Any others? I've got you. Mayor Pro Tem. Thank you, Mayor.
Can I request that item U be removed
from consent agenda for individual consideration? No staff
presentations needed. Item U. Okay.
And also, I've got a couple. Anybody else? Now, it's my
understanding there's going to be a
recusal on agenda item S. Is that right? So do we need to
pull that? Yes, sir. Okay.
And also, on agenda item, I'd like to pull agenda item C,
which is the parking issue that we talked
about in work session, because I know that staff was going
to bring back sort of what that looked
like once we did all those measurements coming in from the
side. So that will give us a chance to at
least view that data. I don't expect it to be a long
presentation, but just so we'll have an
understanding of what it looks like on the ground as far as
what we talked about last time. And then
on agenda item-- okay, so we're pulling so far C, S, and U.
Is that correct? Okay.
C, S. And then on agenda-- on items for individual
consideration, this is just sort of some questions
I'm going to have in advance. So just if we could have
staff that maybe will have some answers on
that. But this is the Enterprise Pipeline Texas LLC, I
believe. I think we probably all got an email
just sort of with some links to different types of data for
this company and some of the
monies that have been paid out based upon whether you
categorize them as accidents,
spills, or whatever. So I'd like to sort of get some
information on that. And if that type of data
for a company is part of the RFQ or RFP process-- I don't
know how this was actually solicited--
but just where does that factor in into that whole process?
That would be helpful to have an
understanding of that if it does at all. And if-- because I
'm not sure-- Phil, if you don't mind,
was this one that was bid out so we had other people
respond? We only have two pipelines we
have access to in that area. Okay. So we dealt with one
that was more favorable to deal with
in that area. The other one's going through it being bought
out at that time. Okay. So we have
done some research and would have that available now or
tonight? No, tonight will be fine, I think.
Because yeah, this is different. I mean, if it's a pipeline
that's there and we either connect with
them or someone else, then it's not-- that's good. That's
good information. No, it's a 36 inch pipeline
that runs through all across Denton County. Okay. It was
there before, it'll be there afterwards.
And we'll have some data on that. Okay, thank you. All
right, any other
clarifications of agenda items? All right, then we will
move on to agenda item three of our work
session, which are work session reports. 3A, receive report
, hold discussion, give staff
direction regarding downtown reinvestment grants for 112
West Oak and 421 East Oak.
Good afternoon. He told me it was at the lower bottom.
There he is.
All right, we're gonna get started here. My name is Julie
Glover. I'm with the Economic Development
Department. Our objective today, bringing this forward, is
to just give you the information and
get some direction on two pending downtown reinvestment
grant applications. I will tell you
that one of the applicants is present today. So earlier
this year, this fiscal year, we were
given authority to spend $100,000 during fiscal year '16-'
17. Our commitments to date are $20,000
to JT Clothiers, which has been paid, $25,000 to Armadillo
Ale, which is approved, and we're just
waiting on their completion of the project so we can get
all the documentation that they did what
they said they were going to do, and $25,000 on Denton
County Brewing across the street, which is
hopefully going to open next weekend before Arts and Jazz.
That too is just waiting on the completion.
So that gives us a balance of $30,000 right now. 112 West
Oak, which is kind of dead center on Oak
Street, straight across from the courthouse, is applied for
a grant. This is what it looked like
pretty recently. If you've been by there lately, you've
seen that some of these panels are coming
down and they're exposing the historic brick that's behind
there. They're trying to get back to how
this looked in the 1943 tax record photo. So what they want
to do is remove the existing facade and
restore that exposed original brick, open the upstairs and
the transom windows that are covered
up right now in this area, replace the awning with the
historically correct awning, reroute the
electrical and plumbing, which is now in between the
existing drop ceiling and the original tin
ceiling. They want to expose that tin ceiling, add fire
suppression. They do not have a current
tenant, but they have talked to several people for this use
, and Mr. Withers is here. So they
submitted that application on January 10th of this year.
The task force reviewed it on March the 9th
and Economic Development Partnership Board looked at it
last week. Their eligible expenses total
$98,445. The total cost of the project I still think is a
little low because once they get a
tenant, that number is probably going to go up and they
have asked for a grant of $25,000.
421 East Oak you may know is the Monroe Pearson building.
Real quick question on that. If we could
go back to the timelines of okay so we it was in our last
budget where we talked about the $100,000
or that we froze the $100,000 I believe. So if we could go
back to the probably one of your first or
second slides. Okay right there. So the remaining so these
were in the hopper, the 20, the 25, and
the 25 when we did the $100,000 or they got in the hopper
when we did the $100,000? Technically they
should have come out of the previous fiscal year, but
because the projects were not finished in that
fiscal year, they rolled over because the way I understand
it we can't take money out of a previous
year. We have to keep it stay in the year we're in. Okay so
that's good information. So then let me
make sure I understand that right. So when we gave
direction to just spend $100,000 these were sort of
in the queue, but they extended past the fiscal year
timeline which means we couldn't reach back
and take it out of where exactly do we know what what that
lag was was it when did they get in right
at the end? Well JT Clothiers was pretty close. I want to
say they they were just right after
October 1. Okay. Now Armadillo Ale has obviously been going
on for a while since they're still
not open yet. Okay okay and then so then we've got this
remaining balance which was as of
what what was that balance I mean the 30,000 are the the
total balances no it says 30,000 was the
remaining balance was was all this was that did this 100,
000 or this what is that 70,000
because what I'm trying to find out is when these other two
grants came in
at what point were we in the disbursement of these three
grants that you're talking about in other
words were they already basically all fully dispersed so we
got a 30,000 balance and then
these two grants came in and people just decided well we're
going to go ahead and prove for the
50,000 or whatever it is and even though we've got 30,000
left. So the the JT Clothiers and Armadillo
Ale were approved in the previous fiscal year but because
the work was not completed
that money wasn't taken out of that year. Okay. These were
the two that you guys looked at
specifically and at that point you said we're going to free
up 20,000 look at the grant you have right
now both the task force and the EDP board looked at these
and said they're both really great projects
so if the grant becomes available again we would like to
give them the full amount that they're
entitled to so this is how they bumped from 10,000 each to
these two numbers. Okay. But they did
happen in the previous year. So it helped. Councilmember
Gregory. Thank you, Mayor. Refresh my memory because it
seems to me that while we
authorized 100,000 that there was actually a balance of
more than 100,000. Yes sir.
They're right at this moment there's 204,573 that's
technically in that line item. Okay thank you. Fund
balance is that what we would call a fund balance? Yes sir.
Okay. Yes, Councilmember Gary. I guess I'm confused
the backup said it was 300 something from the fund balance.
And I'm sorry I did check some of that
that money has come out it was 224 I think and then we had
24 come out and Chuck's going to answer that.
Chuck is standing in the wings anxiously, passionately. We
had at the end of the fiscal year the 224,000
and some change fund balance. We just budgeted 100,000 in
the current fiscal year. The council had
some discussions about whether or not to budget that full
amount of fund balance or just budget the
100,000 and they decided to budget the 100,000. We also
have not transferred that fund is set up as a
special revenue fund where we transfer 100,000 of revenues
that come in from the alcoholic beverage
tax over to this fund. We have not made that transfer yet
and we'll hold some budget discussions
on that. Okay. And in terms of the questions when the
council approves those those fundings
it's not until they complete the work that we're actually
authorized to pay them so that's why that
money couldn't be we couldn't accrue it toward the previous
fiscal year. We had to meet certain
requirements of the agreement so really for accounting
reasons that's why it's paid out in
the current fiscal year. Yes, Councilmember Waske. And if
my memory serves the discussion also
included do we just spend this on downtown or do we also
take a broader look at other areas of the
city and other businesses in the city and so I believe that
's why we agreed to the 100,000
and the 100,000 only. Thank you. Okay all right thank you
so much for that clarification.
So 421 East Oak as I said is at the dead end of Oak and the
railroad. You might know it as the
Monroe Pearson building. It's a very old building. They
submitted their application on February 28th.
Task force looked at this on March the 9th and EDP looked
at it last week.
So what they are going to do with this building is renovate
the dock on the west side, repair and
renovate the south dock, enhance with ADA ramps and stairs
to the front door, replace the overhead
doors and all original openings with new windows, clean and
preserve this original brick, put onings
in all the original locations on the east and south side.
The new use is going to be an event
center which is expected to have a lot of weddings, a lot
of weekend business there.
They will accommodate approximately 1200 occupants. They
also think that they're going to have a lot
of weekend people coming for the entire weekend using
hotels, restaurants, etc. And the parking
which is currently shared by Twice as Nice Resale and Zara
Coffee which are kind of over to the back
and side and two apartments are going to be improved and
they're going to bring that up to
239 total spaces for this project. So their eligible
expenses come to $736.396. The total cost of the
project is about $1.2 million and they are asking for a $25
,000 grant. So both of these projects
scored really high. They scored in the 25 to 30 point range
out of a possible 30 which gives them
the opportunity for the most amount of money. This
information was presented to the downtown task force
and the EDP saying here's the money, here's what we spent,
here's what's left and both of them asked
that we come to you and ask if you could adopt a budget
amendment for that additional $20,000.
So the options for these two particular projects today are
just to accept that recommendation of
those two bodies or to divide that balance of funds evenly
or to award the maximum amount to
the higher scoring project. In this case was 421 East Oak
or award the maximum to the project
with the application with that was submitted first which is
112 West Oak or any combination
you can think of thereof. Councilmember Wasney and then
Mayor Prodean. I'm sorry, I'm sorry.
Sorry, Councilmember Begay. I have a question about the
Monroe project. That's in the TIF
district or the TURS district isn't it? It is. So I'm
curious why they applied to the downtown
reinvestment grant fund as opposed to the TURS board.
Probably because that's a more well-known
funding mechanism especially on the TIF things when it's a
private property it gets a little,
I think a little more complicated. The TIF is primarily set
up to do things like public
improvements, streets, sidewalks, etc. and when we start
getting into the private sector it's just a
little more complicated as far as the incentive process
goes. Thank you. Councilmember Wasney.
I have questions on the Monroe project as well with parking
. If it's an event center for 1,200
people parking is just such an issue and I know you talked
about the how does planning weigh in
with all of the parking requirements and all of that?
Nobody for planning here. Okay so I'm
not positive this may be in the central business district
if it is it is exempt from parking but
I don't know that without checking the zoning on it. I know
there will be requirements for parking
they also have access to another lot that Mr. Beatty owns
that is on that's kind of to the side and
south of of this project that he owns that the property all
the way up to East Hickory behind
greater Denton Arts Council building so if you include that
where he has access and it's easily
walkable between those two buildings. And Roman may know
the answer he's no. Sure.
I just want to add one thing that the facility is pretty
close to the terminus of the rail line
and I remember when they presented it was one of the
meetings that they've already
have a lot of bookings already so it's looks like it's
going to be a really successful enterprise but
I think you know Denton is is uh here at that terminus is
such a critical great place to be
and so you could imagine people from town south of here
wanting to come and have their event up
here and a lot of people could just take that rail up here
and avoid the parking all together
and stroll over to the business so that's just one added
thing on the parking I want to make.
Yeah if there is parking required I'm sure that they have
already submitted their plans to planning
so I'm sure that's been brought to their attention if there
's extra parking required.
I'm hesitant to approve funding until that question is is
totally solid. Thank you.
A question as to how this would normally go out if this
wasn't a year in which we've given a pretty
strict expenditure relating to this and and specifically
said don't spend other previous
year's funds just spend a hundred thousand dollars would we
have counted something that was approved
in a previous calendar year like the armadillo project as
part of that next year's expenditures
and wouldn't have allowed this to go because it would have
come gone over that hundred thousand
or would we have how would we have approached that in
another year I guess is the question.
How would we approach this? In the past we have not because
we haven't had that hundred thousand limit
the money if the money was there we could just go ahead and
move forward with it and and let it go
through the budget process. So if we so when we approve the
hundred thousand dollars cap we either
consciously or unconsciously or however we had whatever we
had in our mind armadillo was on the
books as a pre-approved project already so the third was it
thirty thousand dollars or twenty five
and then JT Clothier's also was already a pre-approved
prior to that hundred thousand dollars so
to me this is a bit of a kind of an accounting shell game
concept if we're talking about staying
true to the to the direction we gave which was don't spend
over a hundred thousand dollars.
The fact that we're attributing those to this year because
technically the projects aren't completed
in the previous year it seems like if we were to go ahead
and grant this we're still technically
under that hundred thousand dollar limit that we gave them
understanding that those two were already
there prior to that so to me these two projects are kind of
the quintessential reason for this
I mean you've got one which had an old facade it's I think
there's only one more left that has a
facade it's the McNeil building right it's it's remarkable
the change that that creates on the
downtown area and there's we really don't have any other
tools to encourage that. This one has
been one everyone for years has been saying how do we
create this into something finally we've
got an investor who's willing to spend upwards of a million
dollars plus to do something it seems
like a great way to really spark some more continued
interest east of Bell so I'm certainly in favor
of giving the leeway to be able to fund both these projects
I guess one I got another technical
question you list out the business names but from what I
understand this grant specifically
ties to the building correct? You're right. Not to the
business. I did that because most that's the
way most people think of it. If I just say the address you
might not immediately know what they are.
Which is why we're able to say it's not really a small
business loan per se it's a place it's
it's a preservation it's really a preservation grant. And
on the one that's the one facing the
square I'm sorry I forget the address. How did this come to
be a request was there conversations
with the owner were there other possible conceptions of
what they might do with that facade
that this conversation kind of came about talk to me about
how it works. So when they first came to me
about this and we talked about the grant and I'm sorry I
don't know what happened to my
my current picture it's just kind of gone away. So we did I
did some research I called the courthouse
we found this picture from 1943. Roman accompanied the
owners and the contractor we literally went
upstairs and took a crowbar and tore things off the wall to
see what was behind there where the
windows were looked up in the under the acoustic tile
ceiling to see the tin ceiling is up there
and pretty intact. What the shape of these windows were and
then Roman went home and got a saw and
came back and climbed up on the awning and he cut a little
square I don't know if you didn't notice
it from the street but he cut a little square about like
this and they pulled that out and we
could see the brick was behind it the brick was still there
it wasn't really sometimes with these
slip covers they're they're really pretty stickily attached
to the old brick and it damages the brick.
We saw that on 102 locust where the foot clinic is now they
ended up having to do a veneer. So that
was the first test to see is the brick back there can it be
saved and or do they have to do a veneer
over it which would lessen the historic impact in my mind.
The brick looks to be in pretty good
shape there are some places where it's a little rough there
is a technique where they can flip
those bricks over and put the shiny side out and if they're
they're really damaged so they're they're
really they were very excited when we came up with this
picture because what they intended to do is
really put another slip cover over it and so the fact that
we can go back to how this was in the
40s is pretty significant. So I guess my point in asking
that is it seems like we have limited
tools in our toolbox in terms of kind of preservation
downtown it's not a historic district so save for
them being an actual historic building there are some cases
in which somebody could come in and
tear down a building and we would have no tools to
encourage otherwise and it sounds like what
happened here was an iterative process going back and forth
with the property owner saying
what if what if we did this oh by the way we have this very
small grant in the big scheme of things
to help encourage and I'm aware of another project in the
downtown area that potentially could be bad
and we don't have much tools to incentivize people to do
otherwise so that's why I continue
to be in favor of this grant and thinks it's done wonders
so anyways I've made my case for this.
Council Member Briggs and then we'll go down the line. On
that building the Moreau did you say that
they're going to be doing new sidewalks? I'm sure they will
be required to do some sidewalks.
Does that count as public improvement? Maybe from that part
of it. Maybe it's on private property so
I would have to check about that. I know they have to bring
it up to the American Disabilities Act
the current standards on that so I'm sure some sidewalks
and ramps and things will be included.
So let me and my next question is with with all of the
preservation grants that we're giving which
which are great once those grants are accepted and the
renovations are done are there is there
any restrictions on the on that property that would prohib
it say if that building sold another
person coming in and just wiping out all of that
preservation that we had granted and that the
previous owner had been done? I believe they sign if they
if there's any changes if they
undo the changes they made within three years they have to
pay the grant back to the city.
Okay thank you. We haven't had that happen. Council Member
Hawkins. Thank you Mayor. I sit on the
EDP board and so I'm one of the people who voted what my
hope was is that council reconsider what
we had decided back then just JT Clothiers was so close to
that deadline with council freezing that
fund the there being plenty of money in the fund balance
and both of these projects scoring so
highly and especially that 421 project I think that that
could really spur some development in
that area and they are putting over a million dollars into
that project. I didn't want the
other project though to not get as much because of the
timing of it or just because of the other
project too and it scored so high. So I just really hope
that this council does reconsider
just I don't know just amending it or I don't know what to
do about the dating of those other
funding of those other projects but when somebody's willing
to go into these old
buildings and they just need a little bit of help I applied
for five grand myself and it was a great
help at one of the restaurants so that was my hope of
recommending or trying to encourage EDP to
recommend this this way to council so anyway. Could you go
back to the photo of the building up on the square?
I remember no the one with photo there you go I remember
that that in that building you know
it's a hardware and seed downstairs and because of the
lawyer's office upstairs this was a great
synergy because they had a chute that went straight from
the lawyer's office down to the manure
fertilizer area. It's great synergy. There's no parking
that those folks are providing up there
is there? No sir they are in the CBD which is exempt. And
yet at the other site Mr. Beatty has
over 200 spots available so I'm not I'm not really
concerned about the parking because
people figure out a way to park to go to the events that
they want to go to and use those facilities.
I think that we ought to follow the EDP board
recommendations of supplying the full $50,000
there's there's money in the fund balance to do that and I
think that what we ought to do is schedule
a work session as soon as any council members or citizens
come to us having identified some other
area of town some other neighborhood some other district
that that they feel like is worthy of us
targeting grant money for renovations like we've done
downtown that's clearly worked it's clearly
continuing to work and I think that that you know we've
been kind of we didn't give directions to a
particular place because we haven't we don't know of any
other place that that that calls for the
attention that downtown does. There may be one I've tried
to go through my mind but I but I
would invite citizens to come up with ideas also maybe we
could even put something out through
social media asking for folks to give input because there
will be money left to do that from
this fund balance and and more money coming in according to
what we do in next year's budget so
I would recommend that we go with the full recommendation
of the economic development
partnership board. Any other I've got a couple comments
anybody else have any comments?
The reason I can support this is because of the timing
element otherwise I wouldn't support it
because we decided on the hundred thousand dollars and that
is what we budgeted what what we were
deciding in the last budget cycle was to not dip into the
fund balance we were saying no if we're
budgeting a hundred thousand then that's what we should
stick with but because of the timing issue
on them I'm okay with that because I can see that you don't
necessarily want to penalize people in
a fiscal year who have good projects because another
project in the previous fiscal year
overshot its completion date if it were more than just a de
minimis amount of whatever it is what
is it 20 000 then I'd be more concerned but I think the
parking issue is a good question
I don't know if I necessarily predicate my position on that
but it is a very good question
because there are a couple hundred spots around there but
there's also other businesses there that
who use those spots and if you've got a thousand people and
you got 250 spots let's just say you
need 600 spots somebody's going to need 400 more spots and
we've heard from DCTA that there's not
enough parking at the downtown terminus and so that that
that is a question I'd like some
clarification on and I don't think this is an action is
this an action item tonight I don't
believe it is just to give us advice about how to okay okay
should we proceed with these or do you
want to reallocate that 30 000 between the two just I need
some direction so that when we write
up the agreements and the the policies between the property
owners and the city that the numbers are
accurate sure and maybe so correct me if I'm wrong but I
hear I certainly hear your your concern with
approving that moving forward without those questions being
answered from I'm sorry you're
okay with with moving forward okay it seems like the
consensus is to move forward in the preparation
of the grants but when we present them for approval I want
to have some more clarification
on the parking issue and some of those developmental
questions as far as what of any of the four is it
21 for 21 is is any of it categorized as public
improvements or is it all categorized as as private
improvements so that that will help us have a little bit
better understanding of the data yes
councilmember Gary that's a really important question for
me because I do want to know if this
project is going to be eligible for other economic
incentive monies because I think that's relevant
to the money that they get from the downtown group so right
do you have your direction yes sir thank
you okay thank you any other questions on this no all right
thank you we'll move on then to
agenda item 3b receive report hold discussion and give
staff direction regarding why I cannot
talk today fire sprinkler tap fees and now I'm not going to
be able to talk at all now that I've said something about
it
good afternoon mayor members of the council I'm here to
talk about everyone's favorite subject
fire sprinkler tap fees this afternoon can't think of any
what better way to spend a Tuesday afternoon
want to go over kind of what a fire sprinkler tap actually
is there was a request for work session
item on this topic made on February 14 2017 and a fire
sprinkler tap is a form of a water line tap fee
so if we have to connect to our water system we do so by
making a tap into that system that can be
either a tap for domestic supply it can be a tap to supply
a fire sprinkler system there are fees
associated with making that tap and those depend on the
size of the tap that is actually made into
the line and then whether that tap is made in a situation
where paving has to be removed and
replaced or whether it's in a situation where we do not
have to remove paving the fees themselves
are set in the rate schedule each year and they're based on
a average installation cost so when we're
doing this work we actually calculate the cost associated
with it for equipment personnel all
aspects of cost needed to install this tap and then we base
our fee on the average cost assorting
according to that tap size so each year they're adopted
these tap fees are adopted in the utility
fee schedule that you see as a part of the adoption of the
budget and that is adopted by ordinance and
if site conditions differ substantially from average
conditions or if there are specific
requirements requested by fire for the installation of
these items then the charges are based on those
actual cost of installation so there's a lot of history
particularly with denton with regards to
the fire sprinkler tap fees we charged fees prior to 1991
and then there was a new fire sprinkler
system ordinance that was actually adopted in 91 during the
adoption of that ordinance because of
the perception of the council of the hardship associated
with these new requirements and new
systems that were going into place as a result of the
adoption of the fire code there was a
desire to waive the fees for the taps for a period of time
unfortunately that period of time was not
specified and so at the time the sprinkler tap fees were
more stringent than other metroplex cities
back in 91 they exceeded the uniform building code and the
uniform fire code when adopted
and language was added as a part of that ordinance that
basically stated upon written request to the
superintendent of the utilities department or written
request to the superintendent the utilities
department shall waive the installation charges for water
taps exclusively dedicated to fire
sprinkler taps the superintendent shall have the sole
discretion in the application of this subsection
that language has remained in our utility code of ordin
ances and it is there to this day and
similar language has been included in the utility rate and
fee schedules since the adoption of the
fee schedule following that time frame in 1992 and has
remained in every fee schedule to the current one
in 2000 there were some conversations between the fire
department and and water staff indicating
that the fire sprinkler ordinance that had been adopted in
1991 in Denton was consistent with
other metroplex cities in other words during that time
period other metroplex cities had
had caught up to the Denton fire sprinkler ordinance in
2001 the water department surveyed
41 cities 21 of these were from the state of Texas nine
were in the metroplex and the remaining 20
were around the United States all of these required the
developer or the building owner to actually
pay the fire tap and connection fees and using this
information an item was brought forward to
the public utility board in March of 2001 with a
recommendation from staff to charge for fire
sprinkler taps based on the direction that staff got at the
time of the 2001 meeting
staff began assessing those fire tap fees for all fire tap
installations however that code of
ordinance language and the language that remained in the
rate schedule was never changed and so that
language is still there to today because this information
in 2001 was was fairly dated we took
it upon ourselves to conduct a new survey we used 19 area
cities here in the DFW metroplex during
March 18 of these charge fire tap fees as a part of their
regular tap fees they make no distinction
between the two one charges a separate fee for each element
of the connection so the connector box
installation the tap fee itself and they also have layered
on top of that a one-time demand charge
that's based on the tap size yes sir what is the connector
box installation what is that that is
just simply the the box in which the connection is made to
the the facility itself the building
that's correct and the spring cord sort of system okay all
right that's correct
so in terms of recommendations staff does recommend to
continue to collect the fire tap fees as we've
been doing since 2001 however for consistency sake staff
does recommend removing the 1991
language about waiving fire tap fees from what is now
currently section 26-126 one of the code of
ordinances and removing that similar language that occurs
in the the rate schedules there's a lot of
information back behind these slides be glad to answer any
questions on this issue
related to the fire sprinkler taps mayor protein a couple
questions about costs and I saw in the
the backup it specifically says the last couple years how
much fees were collected
I'm not sure how many projects that's associated with in
2015 which was included in your backup
that was the that's the year that we have a complete set
and that cost of 35,000 yeah
that that cost was associated with 11 projects okay so I'm
trying to that's what I'm trying to get
a sense is average cost yeah and I can address that it may
be easier to address it just with
this particular slide this will give you a sense of what
you're looking at in terms of a paved or
unpaved this is actually right out of the rate schedule and
you can see the installation charge
waiving language that I talked about earlier as a part of
that yes has anyone taken advantage of
that the weight fees request to my knowledge not since
about the 2001 time frame go ahead councilman
washington seeing that we're in line with the majority of
cities because she stated 18 of 19
cities surveyed charge for the sprinkler tap fees so we're
in line with other cities in collecting
that fee I see this as a housekeeping issue and we continue
over the course of time to see these
things come up and so kudos to staff when these things do
come to the forefront so that we can
you know kind of clean clean things up and so I support
staff's recommendation and thank you thank
yeah yeah well and I support staff's recommendation as well
but the genesis of this discussion
was a specific project the denton brewery denton brew house
or denton brewery
didn't brew the one across the street here and that they
well let me get into the specific
so I just couple questions on this slide since you have it
up just for clarification these are the so
these tap fees are for I know that they're for your
domestic water supply right that if you have a
domestic water supply this is what you're going to pay for
two inch tap you can pay $2,400 and they
will hook that up to your meter on your property but if
they have to go across the street is there
an additional charge for that is that included in that if
you're dealing with a situation where
you're talking about a domestic supply of water right
basically the city owns as a part of the
public infrastructure from the tap at the line until it
actually connects at the meter at the
at the facility fire lines are not metered and so the city
the public infrastructure component of
that system stops at the tap sure and that's an important
that's an important distinction based
upon the facts I'm going to share so if you just give me a
little indulgence for a couple minutes
so they were doing the project over there and so they were
required based upon their
original configuration of the building to have a sprinkler
system because of their
size open space use and the like and if I say something
that is not necessarily totally accurate
somebody please correct me and so there were they met with
the city departments and long story short
there were it was very difficult because the line that had
enough capacity to meet the fire
suppression element of water requirement was across McKin
ney street on this side of McKinney street
so there were some options go get a private easement from
other owners to access the line
on oak street yeah come across private property that's very
seldom going to work I mean private
property owners aren't usually going to do that the other
options were well we have to bore under
east McKinney street or we have to do an open trench all
right now and I'm trying to verify
with the owners what they thought the costs were going to
be for a trench so if they needed let's
say a six inch fire tap they'd be charged 3800 right and
then they would be responsible from
getting that water however it needs to get there over to
their particular connection that box
connector that's correct okay so here and long story short
basically I'd heard that they had thought
that the cost was going to be considerable now there's been
some informal quotes nothing you know
firm that were much less than what I had heard originally
which I think if they would have known
that it might have been a different story but they changed
their whole configuration of their building
so that they would not have to sprinkle it because it was
too difficult and then they still have had
to really work hard to meet fire code requirements for
other types of access things such as that so I
wanted to have this conversation about to make sure that
first of all do we have a written policy
somewhere which we do not have a written policy that says
fire taps you're paying for the tap at
the line all other routing costs access costs for the for
the piping is born at the cost of the
developer because here underwater line taps typically those
are born by the city for just
regular domestic water so I think we need to clean that up
as well if that's going to be the policy
of the council and secondly I just want to make sure when
we're talking to people about projects
that we're giving that we're giving them very accurate
information and that we're trying to be
as accommodating and helpful and if so and if it was if
they were going to have to trench it I mean
if they were going to have to open trench it sounds like it
would have been a far more expensive
and just disruptive process than than boring so I don't
know if they ever really got a quote on
boring but that's not really a policy except to say when we
have people come to us who want to
develop things like that in our city let's make sure that
we help them as much as possible because
I don't know what the actual boring cost was but from what
you showed me right and what I've heard
very very different and if if if it was even more accurate
even higher than what you show but more
accurate towards that I think it would have made a huge
difference in their building configure they
would have probably kept it the way it was because it just
was more of what their environment they
were trying to create I don't know that haven't even
discussed that with them this is the first
time they're here in this discussion because I haven't been
able to reach it so that was my
reason for bringing this is because the downtown areas are
going to be especially challenging
but if we're requiring a sprinkled building we need to
ensure that they have very clear policies
on who's paying for what and how do we get them how do we
get their needs met as economically as
as they can and that doesn't mean we're paying for it but
we can certainly help them do that as
far as you know consulting or you know brainstorming
problem solving because this issue in the downtown
area is not going away based upon what I've heard you say
that and and the fire marshal that
the way it's built and you have buildings back up to each
other you don't have access and these kind
of things so I really want to staff recommendations I agree
with but if we need to continue to make
other policy create other policy that's that's very
definitive on that I think we need to really
start considering that because we don't want to get people
who are coming into our city trying
to develop these things stuck in a vicious cycle of not
really knowing what to do and where they
eventually have to redo their whole building if they don't
have to and I just don't know if we
got to that point so that's Council Member Gregory. Thank
you so according to the 2017 surveyed
that staff did of the 19 area cities of the 1918 charged
the tap fee and are the tap fees fairly
consistent with what we're charging? Yes they are of course
there are variations based on
cities I can I did not run averages for all of the tap fees
I picked a one inch tap fee as an example
and our one inch tap fee is almost identical to the average
of the 19 that we surveyed so that
I believe that the our tap fee was $1,300 and the average
of those 19 was $1,315 so very close.
I'm curious if waterline tap fees for a fire suppression
system is an eligible expense from
our downtown reinvestment grants. Somebody can check and
maybe do a follow-up. It seems like on
the oak the oak street one on the square they she included
that as an eligible project water
tie into water tap yeah it wasn't a fire I don't think it
was a sprinkler issue but it was just
water lines. Well and again I think that's more of what I'm
talking about is you know sort of an
holistic I think sometimes we get very siloed in our
approach to development you know we've got
solid waste looking at solid waste we've got water looking
at water we got fire looking at fire we've
got grants looking at grant when there might have been a
solution here but this is really the
genesis of this conversation is what I just described to
you because it was a very long
drawn-out process and I don't know whether the best outcome
was had based upon you know some
conversation but I hope it was but I think we can really
work on so question that I have is
would staff be in support of a policy that that really
clearly states if this is the council's
direction that because water tap fee water taps and fire
taps are distinctly different in what is
included in that cost from what I heard you say in other
words right the right of way for going to
the meter that's city's expense right we're going to charge
you this we're going to get it over to
your meter right if it means born under a road it means
born under a road or cut open trench with
fire it's different you pay for the tap that's the extent
of our costs and our duty it's your duty to
get it over so that's not memorialized anywhere to my
understanding is that correct that's correct
all right so council needs to number one is that is that
one thing we want to do is memorialize that
and number two memorialize if we have well I guess that was
the main one yes well that that makes me
want to see a side by side if you have this or if you know
this off the top of your head the cost of
service for a fire sprinkler tap versus just a regular
water line tap are they about the same
in in terms of the
that would be a difficult question to answer off the top of
my head tim do you have something you
want to add on that yeah tim if you could just help me
understand your questions I'm not sure
in other words if as you just elucidated if when I'm paying
for the tap fee as it relates to the
fire sprinkler all I'm doing is getting access to something
tapped on the line wherever it is
and there's no cost I'm bearing the rest of the cost if a
normal tap just tapping into the water
line is includes that are we overcharging for the tap fee
relating to the fire sprinkler got you if
it's similar to the water line because we're doing more
work that's my yeah and I think my
clarification response would be the the taps are really
more for extensions we don't really
install four inch service taps for those things very often
those are usually the standardized
connections and a lot of times that means developers
extending the line and has to tie to it and that's
the physical connection to it and so that's very analogous
to what we do for a fire line tap and
that's how we collect those costs they're based on those
average costs and they represent just
that physical connection not necessarily some portion of an
extension we have another rate
code system that involves a tap in a meter set and so that
's a different schedule and that would
tend to relay more to the smaller diameter meters so when
Kenny was trying to do the survey most
cities do not standardize these larger diameter connections
and so you don't find that information
directly online in in fact 15 years ago we used to do
individual price quotes for airy physical
connection that became kind of tedious and expensive and
when we adopted impact fees back
in 99 impact fees were kind of up in this level and tap
fees were down here so we simply standardized
our tap fees and streamlined that process and made it much
easier for someone to know exactly what
they were going to pay for for those connections. Well let
me try let me try and rephrase my question
okay it seems like for other sorts of things where we're
charging fees for one obvious example is
when we're looking at the gas bill ordinance and we're
trying to get very clear on what was our
cost of service versus what we're charging are we confident
based on history or whatever that the
the amount we're charging at each of those levels for paved
or unpaved is a is it covering our costs
and b is it is it over covering our costs and how confident
are we on that do we need to
re-look at? We're reasonably confident on that we look at
it every year keep in mind we may only do
two or three of a given size so we don't have tons of data
recent data so what we do is we take a look
at the data that we do have look at our existing fees and
then we also try to be sensitive to
whether we increase them so to the best of our ability we
feel we're generally recovering our
costs but more importantly we're standardizing our costs so
it's a lot easier for people to know what
what to charge and how to pay for it. Gotcha thanks. So
question of clarification so I want to
make sure I understand this if you could go back to the tap
fee slide so now if I've if I've got this
if I don't understand this just correct me so I'm going to
say a six inch tap I'm a business
and I need a six inch tap for a in a meter set I'm assuming
these things include I mean it doesn't
say and meter set here but it that's hooking up to a meter
is what I'm no these are just the physical
connections so we have a separate schedule that deals with
a tap in a meter set so which and this
is not that schedule this is simply connections okay so of
that so I've got a six inch tap for
$3,800 I brought you a check for $3,800 give it to you and
you put it in and I need a meter set over
on my property because I've got a six I need a six inch
water supply for domestic water used in some
manufacturing so I got a six inch meter so where in either
this fee or in the meter fee do what's
the cost of a six inch meter yeah we do not have a fee set
schedules for four six and eight inch
meters those are very unusual they're very specific to a
commercial application it's usually a fire
rated master meter for an apartment and they build that
according to our standard okay so
my question is to go from the tap to a six inch meter which
is built to whatever your specs
who bears that cost if it's just domestic water going from
a six inch tap to a six inch meter
built to city specs based upon its uniqueness we don't have
a standard fee there we would charge
for the tapped and then would require the developer to
build the meter according to our standard
and who pays for the connection between the two depends on
the situation it usually is going to be
if it's a very short distance we'll clear the curve okay
this this is exactly what I want to avoid
is this kind of subjective approach because I don't see any
difference between somebody asking
for a six inch fire because there's not a meter on the
other end of it I mean it is going into
the building but there's no meter and we're not getting
necessarily sales off of so I want us to
clear up this kind of ambiguity or kind of gray area I mean
we can have some flexibility it can't
be but so the question really is the answer to my question
was it depends on how the negotiations go
and what their specific facts on the ground are is what it
sounds like every situation is a little
bit different and we have to use some judgment as to
whether it's appropriate to charge the
standardized fee and what it was based on from a standpoint
of similar events or whether this is
something that really needs to go over to the end user as
their responsibility and that's again the
very thing I'm trying to address is we I would like to see
some fairly clear criteria okay in
making those decisions if it be linear footage if it be
paid unpaid what I mean we've got it here
we've got some criteria here so we can do something like
that okay Councilman Wasney we're not a
sleepy little town anymore where staff takes a look and
says well yes on this case and no on this
case and so I support the mayor on a real standardization
of policy on this it keeps it
transparent and fair for whoever is coming in and looking
at what's it going to cost to develop
makes it easy for staff because it's clear cut there is no
subjective decision to be made my
opinion there shouldn't be a subjective decision to be made
it should be absolutely open up a chart
open up a book here's the here's the rhythm and flow of how
it works so I would ask staff to go
back and work on this and bring it back with exactly that
plan of standardization for the tap
fees and the meter with development but also the fire tap
fees so that we don't just remove a little
old language because I think we fixed some of the problem
but not all the problem if we're if we've
opened it up let's really fix it and so that would be my
recommendation sure well and I think that
will tremendously reduce we're already going to have enough
questions in a development process
especially a very complicated one one in our old part of
our city but the closer we can get to some
kind of defining parameters it really cuts back on having
meetings and people misinterpret what it is
or show me in the code where I have to do that and we can't
and then and it just really creates a
situation that becomes that can spiral out of control very
quickly and so I think it would just
and we have these kind of examples in a lot of other areas
of our code but we're just dealing
with this one at least at this particular yeah the tool
that we've been using is a non-standard tap
where we're saying this is a unique situation and we will
price it specific to that and give them
that price okay so so we do we do that it's I think what
you're looking for is some better clarity of
when we would make the decision to go to and how we make
those decisions and part of this again was
is before we used to price everything and the attempt was
to try to streamline things by
standardization yeah okay any other questions comments did
you have any oh I'm sorry go ahead
council member Briggs no I'm good with the the
recommendation and the clearing of the language
but when you're a small business owner you have a certain
amount of money to work with so
the more clear you are and what you have to spend going in
I think the better I agree definitely I
mean people want to upfront know what they're getting into
and I think that's I haven't heard
it a ton but one of the complaints I have heard being on
councils they get into a project and they
just wanted to know upfront what they were getting into and
then there was a cost or something so I
would have grew the recommendation also well we'll take a
take a stab at that okay thank you
mayor yes I'm sorry it's connected to a lot of this
conversation about understanding costs and I
I don't know whether it's being used or used effectively or
not I know about a year or two ago
economic development adopted a tool where you could go in
kind of put an address say you're
interested in starting a new business and the goal that I
've seen it used in other cities
was that you could put a lot of these specifics on there so
you can almost just from your your house
get a sense of oh I'm going to need that I'm going to need
that I'm going to need that I'm
going to need that and it's just kind of you know it's not
no one's tied to it no but if we
can look into that are we still using that tool could that
help out with things like that so
people can get more assurance great all right thank you is
that thank you is that presentation
yes um I saw a picture there I want to see that yeah yeah
that's just a fire tap okay
just so we know what we were looking at so and just as long
as I've got it up to address
councilman rodent's question this is the the number of of
meters last year in 2015 that 11
number that I spoke about earlier the total bill was 35.5
actual cost for us to do that installation
was 33.586 so we're about a five percent so pretty close
staff is seeking a recommendation
from the council to make these changes as have been stated
so if that's the recommendation for
the council we will bring that information back in terms of
ordinance language and rate schedules
and then together with council members wasney's summary of
sort of some different policy objectives
and memorializing those yes yes we can we can do that
through the rate schedule would probably be
the easiest way to do it and adopt that by ordinance okay
great all right thank you very
much I appreciate you you bet all right we'll go on to
agenda item 3c which is receive report
and hold discussion regarding update from the capital
projects department on the status of key
projects and overall program update thank you mayor I gotta
I gotta do this first when you watch
on tv or the internet you see these pins behind somebody
you can't tell what they are so I'm gonna
be the first one to make a presentation without very good
pins behind you my name is Galen Gillum
I'm the interim director of capital projects for the city
of Denton now did you emphasize that
because uh anyway go ahead I'm sorry I do appreciate a
little bit of your time you know I asked the city
manager for four hours to do this he said no Galen you can
have about 30 minutes you're just
gonna have to get in there and tell them how the cow eat
the cabbage and get on with it and he's
he's pretty folksy like that sometimes anyway so
introduction I've introduced myself I've got a
couple of more points to make during the introduction we'll
talk about selected specific projects and
let me let me begin my disclaimer here I do not have
information in here about every project
that's recently completed I do not have information in here
about every project that's currently
ongoing right now it is it is selected information if you
have a favorite project or a pet project
or a particular one you're interested in by all means ask
but I've been doing this job for 50
days as of today and I'm certainly not an expert on every
single project that we have I've been
trying to take a little bit more programmatic look at what
we're doing then get try to get smart
enough about the specific projects to to give you a little
bit of information about them I'll do my
best to answer answer your questions okay so we'll talk
about some specific projects what their status
is and talk a little bit about the methodology again I said
I've been taking kind of a programmatic
view or an overview of what we're doing to get capital
projects done we'll talk about that and
then what some of our next steps are there are two other
updates that have been asked of my
department recently they're about what some of the
engineers do and I wanted to try to jam it into
this but I didn't quite get it jammed into this
presentation so I will try to get you that information
later this week and another request about what do we expect
when we repair a street how long should
that last we do maintenance or repair work on a street what
does that mean is it good for six
years is good for 50 years whatever and so I'm going to try
to give you that information very
soon as well apologize it's not into this presentation here
okay so why do we do capital projects
well we got a growing city in fact if you look around the
city if you look around all of north
texas you see a lot of growth a lot of activity a lot of
projects are going on things are going on
in the freeways buildings are being built houses businesses
all kinds of growth and we've got aging
infrastructure we've got streets that have been around for
a long time and so some of them need
need work so there's a reason to do a capital project there
the the departments and divisions
that I'm working with have a duty to respond if you're the
water department the wastewater
department the streets department the drainage department
you've got a duty to respond that's
your mission that's your whole reason for being in
existence is to fix those problems those challenges
for aging infrastructure and growth so projects and
solutions are developed by numerous different
ways uh citizens participate in bond uh selection staff
comes up with ideas consultants you know
and they come through the governance process we get budget
ed for projects we get bonds approved
etc that that ensures that the projects are reasonable that
they're the right projects that
the city wants that city management wants that need to be
done to meet the needs of the city
for growth and aging infrastructure and we do listen to
public input as mentioned on bullet
three above citizens get input on what types of projects we
're working on and we also take
take direct input through meetings and emails phone calls
discussions interviews things like
that we want to know what's important to the citizens okay
a couple of specific projects
bell avenue project north through the tw campus this is one
of the ones that i've gotten to
to know pretty well and spend a lot of time on we've had
some meetings with some folks at tw
university they're very excited about this project uh it's
it's actually got a little bit of an
earlier start date than that that's the start date for the
actual streets work the repaving of the
streets there's some wastewater work that's going to begin
probably before the end of this month to
replace some of the wastewater lines underneath the road so
it will start a little bit actually
before that so that's that's a date that the street rep
aving would start uh we think we're
going to be finished by the end of july this year and
obviously that's is our effort to try to meet
the schedule during the summer session we know there's
there's students there we know there's
faculty and staff there year-round but we there's less
people there during the summer than there
are during the spring or fall semesters there's an
estimated cost the source of the funds and
then a description of what will be done a five inch mill
and overlay from texas street up north
to u.s 380 replacement of 4200 feet of curb and gutter and
then i mentioned some of these concerns
obviously there's a lot of pedestrian traffic around there
so we want to take that into account
and try to have the work done as safely as possible we don
't want folks jumping over trenches or
walking into equipment etc so we'll use concepts like
safety fencing to to try to control where
the pedestrians walk we are doing it during the summer when
the the foot traffic should be a
little bit lighter utilities are now a risk or a concern
with this project is that we're not doing
an entire redesign and reconstruct of all the utilities
underneath the road we're doing the
road on top so we're taking a little bit of a risk
realizing that we're going to invest this money
and then do that redesign down down the road a little bit
later tw graduation is coming up in may
i think 11th and 12th right about that time so whatever
condition our work is at that time we'll
put it in a safe condition and then obviously there's long-
term planning as i talked about
earlier about about redoing the utilities under that road
sometime in the long term
but if you do if you've driven down this road you see it it
's going to be a very good improvement
to get this road a little bit smoother i had a question
council member i think you answered it
as far as long-term planning because when chancellor fain
was here her her vision of
that area was a little bit redesigned in the street and so
i think this is probably what you're saying
is something to bro to keep it from looking like i think
her quote was third world country
road when she was here is that correct and then in the
future i didn't hear that actual quote but
that is your assertion is correct and that this is a this
is a solution to get us a much smoother
road through this campus for a period of time to allow some
long-range planning to happen okay
that's good thank you exactly what's intended to do that's
my regary can you do you know when this
road was last completed because i feel like it was kind of
recently but maybe i'm blurring my
decades together i do not know unless someone's here that
has that historical fact may approach
him well i know south i live right around the corner south
of bell from texas street on down
was just kind of read some i don't know what all they did
but it ended up in resurfacing i was done
last summer uh which caused some work on that but i will
say that i noticed yesterday there's a sign
out there which is great communicating works about to begin
uh but i i'm almost 100 sure that it said
it would be done june 6th um so we might check on that so
expectations are tempered and that yeah
that may be for the wastewater portion only not for the
pavement but yeah citizen if i'm reading
they don't know the difference it's all construction
absolutely we'll check on that that's my gary
follow up okay so what i'm thinking of was back when they
installed that median on that northern
the part that's north from bell going up to university i
thought the university installed
that and then they put landscaping and all that so i guess
i'm confused about who did the median
and the landscaping and all that stuff on bell i'll have to
look into that unless someone in
here knows i don't know i don't okay this is probably 15
years ago now now that i'm looking
around it was a while back i thought it was a couple years
ago yeah you were probably in high
school or something so in the pool whoever had how long
will it take them to stump gail and first
question you got it okay here's a real quick question back
on the the text slide that you had
you have a combination of o and m and bond funds help me
understand because i know o and m can't be
used for street reconstruction bond funds can't own him can
't be used for street reconstruction
and bond funds can't be used for maintenance help me how
this works sort of as a hybrid help me
understand that one one thing i've learned is that for a
lot for projects where we have bond funds
then obviously that part of the project that was intended
with the bond funds can be paid for by
the bond funds sometimes when we go to do a project there's
other pieces that can be done or should be
done or it's really a good idea to do those at that time
with that project then we can have we
can take money from o and m and do that piece of the
project the the portion of the the block that
was going to be done by wastewater is is bond funds the
street portion is is not this is not in
the bond program right now except for one block is it
because it's an overlay that's really more of a
maintenance an overlay is more of a maintenance activity
even though it's a it's a relatively
deep overlay it's it is more of a maintenance activity that
's helpful thank you the map shows
the uh oops the extent of the project north is laid down
towards your right but it begins on the
south at texas street and goes up through the campus to to
380 that's the extent of this current
project that we're talking about doing this summer okay
yeah roll along we'll interrupt if you if
they've got questions we'll just the bell avenue sidewalk
over here just a little bit from where
we are right now the sidewalk that runs next to the civic
center we began working on that in march
that project was uh i would say close to shovel ready when
i came over obviously if i came over
50 days ago uh just needed a little nudge a little push a
little direction to keep it going
our intent is to complete it by tuesday april 25th if that
's not feasible we're going to put it in a
safe condition and resume that construction after arts and
jazz fest and i was i was down there i
was by there yesterday during the rain and it was the the
word they had dug out for the new sidewalk
was all full of water but today it's dry and they're
working away so they've done a very good job of
keeping the pace you know they got set back by a rain day
hopefully we don't have too many more
rain days and they can keep that construction pace going
cost source of money bond funds so we're
adding a sidewalk to the existing piece that ended a little
bit south of the senior center
add a pedestrian rail across the bridge i think by the time
of jazz fest this permanent rail will
not will not be in place but there will be a temporary rail
to provide safety as folks walk
across that bridge and then the permanent rail will be
fitted back fitted later restriping some
of the parking spaces at the civic center was a big concern
you know one wants to lose parking but
kind of fortunate timing as the county building's being
taken down we've gained some of that parking
on a more permanent basis from where that building was so
you know trading off a little bit of parking
so we'll be restriping the spaces and adding street
lighting you know one of the one of the
main goals here was to preserve the trees well it's very
dark under those trees at night so we need
some lights in the area to try to make it a safe place to
to walk at night i had a question council
member riggs do you know what took this project so so long
because i remember you know two years ago
when i was elected that we were talking about it they were
talking about in mobility and it had been
in mobility um for a while and i remember council or mayor
pritton wrote and you were talking about
it as well so i'm just curious because it seems like it got
started and it's you guys are doing a
great job moving right along and it's going to really
improve that area there for pedestrians
so i don't know if i can speak to all the reasons why it
took a while i know there was
you know concerns about taking up these parking spaces and
then the initial plan
did not account for leaving the trees in place so we had to
do a little bit of redesign to kind of
meander the path around the trees it is a busy area with a
lot of things in it that would that
the project needed to go through so i don't know if it got
put on a back burner so we could keep
working on some other things because we made some sticking
points on this project but but once i got
started and heard about it and heard about some of the
concerns i said hey let's just hit these
straightforward and address these concerns with different
departments and get this thing moving
and that's that what that's what we've been able to do okay
follow up well i appreciate that and
thank you for saving the trees you're welcome i love trees
too councilman wasney thank you
mr. taut heilman who has placed as a priority working on
our roads our sidewalks and specifically
using the bond funds that have already been approved and to
create the system in place
it's going to get the job done so i just want to publicly
thank our new city manager the reason
these projects are moving to the front of the burner is
that it is a priority for our new city
manager so thank you and he has he's made that very clear
to me he is oh yes council member
bighair two things one the sidewalk bond funds is that the
2010 or 2012 do we know i do not know
okay the second thing i since you think manager howman i
have to let everybody know that somebody
who wishes to remain anonymous but is in a position to know
was set was both speaking very very highly
of galen and his capacity as interim oh thank you so i just
want to let everybody know that the
word's getting around that you're good at that job thank
you i'll entertain any other compliments
i learned that from brian daskops yes i like your tie thank
you
just a quick map of the project you can see it it connects
up to an existing sidewalk again north is
to that side and it comes all the way down to mckinney it
'll it'll actually complete a path that
allows you to walk from from that area of town back down to
here toward other amenities and
things that are that are down here so it is a great project
and i've been i'm happy to have
participated in getting it going hickory street project a
relatively large project that we want
to keep our eye on obviously work has already begun on this
work work began with some some
wastewater line sanitary sewer line replacements back in
january of this year we estimate will be
complete with the entire project in february of 2019 it's
it's a relatively large project compared
to some of those others we looked at 3.8 million again it
is a combination of funds so much like we
answered the question before a lot of this work when we do
it we've got bond funds for certain
pieces and we use some o and m funds that were set aside
and budgeted for for doing the other
little pieces of the project sanitary sewer line
replacement water line replacement and then
repave the street lastly to make a smooth ride down through
there obviously on a large well
traveled street like that we've got traffic and vehicle and
pedestrian issues that we want to
try to be sensitive to we might have to do some detours and
getting folks off the street on during
particular work sessions and things like that there could
be a problem in this area you know
it's kind of an older area of town with abandoned lines and
when we come across those during
construction it's a little bit of a hey wait we need to
figure out what's in this line and we
don't have any other record of it none of the utilities in
this area have a record of it you
don't just cut it open and see what's in it you know it's a
you take a little bit of a cautious
approach but abandoned or unknown lines can can cause a
little bit of a slowdown it's a little bit
of a risk and then the dme substation that's going in on on
bonnie bray at hickory and oak
we want to be sure we coordinate with that that's another
special concern and risk
a map of this project with north to the top now it shows it
extends from bonnie bray on the west
side all the way over to carol boulevard on the east
bonnie bray bonnie bray road widening say that fast three
times uh we're getting some bid
responses in we put out an invitation for bid or an ifb
those responses will be in in may
the estimated completion date june 2023 didn't think we'd
ever be saying numbers that high
for dates of when things will be done a very large project
if you if you trust my math it
had a lot of different components and i did use the
calculator and i added the numbers up
and i got to that total a little over 75 million uh
regional toll revenue bond funds county
contribution have all come together to to set aside the
money for this project conversion of a
mostly two-lane road into a four-lane divided secondary
road from us 377 on the south end
up to windsor road on the north end their concerns with
text dot permitting railroad permitting
fema comes into play we want to be sure we coordinate with
with unt and we have at a meeting
with them uh last week to talk to them about this project
and schedule and the different things we'd
be doing so they'd know what was going on they shared with
us their graduation ceremonies that
they're holding at their facility for example so we want to
know when those are happening to try
to arrange construction activities to allow flow of traffic
into those graduation ceremonies and
back out uh and in land rights it can always be a you know
a concern or risk a challenge for any
project thank you council member gary do you have a
question do you have a map for this one i do
okay and north is to the right so it's like it's laid over
on the side because this is north south
can you talk a little bit about how this project is going
to relate to the airport road widening
because my understanding was that these two projects are
very interrelated i do not have
details about that right now so i'm sorry i can i can look
into that and give you some information
so a specific question of how this interrelates to the
airport road widening okay absolutely
and this is if i'm not mistaken this is phased i mean it's
you're starting at one end working
towards because of just some infrastructure get some gas
lines and things like that that still need
to be relocated is that correct it will be phased like a
lot of linear road projects you don't just
take the whole road out and work on it you work on it in
pieces as you go along do you know what
the phasing is on this i don't have that don't worry about
it now i find that out somewhere
well i find that somewhere i can get that detail to you if
you want to see it that's fine don't
yeah it's it's not that critical just curious okay
mayhill road widening and another another road project kind
of similar in scope and
size a bit to the bonnie bray road widening this on the
east side of town same same bid response
state there in early may we'll be getting those bid
responses in from companies to construct this
road a little bit short of a project completion date is
estimated to be june of 2020 56 and a half
million dollar project same relative source of funds
regional toll revenue bond funds county
made a contribution conversion of mostly two lane road from
us 380 on the north end down near i-35
on the south end and i think in the in the backup i had cut
and paste got me a little bit i didn't
it didn't say coordinate complex utility relocate that said
coordinate with unt obviously this is on
the far east side of town and so i made that correction on
this presentation but it's not in
your backup it says i think it says coordinate with unt
there council member bridge you had a
question is this road only or do you know will there be
some sort of pedestrian improvement
it does it does have pedestrian pedestrian improvements as
well thank you
there's the map showing the extent of the project from down
near i-35 again north is
is laid down toward the right up to 380 up to university
mckinney street project this one has a little bit more
complicated of a of a of a bid process
and i'll try to explain it as best i can it's we're doing a
contract with a design some someone
called a design criteria consultant and we get them on
board and we should have that back to you
within your next couple of meetings we should have the
results from that and bring that back
to you to help make that choice they will help us create
what's called a 30 plan and we'll take that
30 plan and they're a consultant working with our input on
how the road needs to be designed
we'll put that 30 plan forward and we'll have design
construction companies bid on finishing
the design and actually constructing and so sometimes you
get one company that's got the
capacity to do that sometimes you get a couple of companies
that come together to do that it's it's
called the design build process and it's an example of how
we're trying to do some different things
different methodologies to get things done in a different
way hopefully faster hopefully cheaper
estimated completion date june 2020 about a 20 million
dollar project and we're going to talk
about sources of money on this we've gotten the huge vast
money for this from tech stop
obviously this is about safe pedestrian walks and about
widening the road making a better road
from wood road lane to grissom road if we have available
funding that's why that notes there
that parenthetical note is right there about available
funding so we're working on an east
west road here we're working on mayhill and north south
road we obviously need to coordinate those
projects together and it may be much like what you're
asking about with airport i'm sorry i
don't have that information we want to coordinate with
existing traffic and pedestrian uses especially
toward the high school then there's an issue about funding
to complete the project west of 288 so
let me show you the map and i'll show you a little bit
easier about what that means we have the money
from text dot to do the blue part so from the loop 288 loop
over east toward the high school down to
grissom road we have that money and it may be enough money
to do partially or do part of the
road back to the to the west that's the green on the map
but we don't necessarily feel confident
right now we have all of the money to make it a four lane
road all the way back but we are going
to go ahead and start with the project that we do have the
money for and then we'll check under the
couch cushions or whatever we have to do to come up with
some other money yes i want to express
my gratitude on this project this is extremely important
and close to me in my district and have
had a lot of people reach out and on concerns of safety for
the kids getting to school
so i just want to say thank you and i'm glad to see that
this is on the fast track even though it
is still several years away it's still the best that that
we can do it and we need to get started
now yeah so we are thank you working hard oh council member
gary so with the text dot funds
those are i mean correct me if i'm wrong but we have a
timeline on when those have to be the
project has to be started and when it has to be finished
correct do we have any money people that
might know that i don't know that we'll find out okay well
i'm pretty sure we do have a timeline
based on um how monies are distributed from text dot so
just want to be sure that as we're talking
about different capital projects if we have like deadlines
for some monies let's bump those up in
our absolutely our list it'll be a milestone in our in our
project schedule can't say wasn't
yeah i think there is uh use it or lose it because if a if
a municipality doesn't do it
those funds go away and it goes to a city uh that that can
trigger sooner so um i'm i'm almost
certain those funds have a have a timeline yes ma'am i
would i would consider council member
gravey and then council member brief from mobility when
when the road was a state highway on the state
highway system the money was connected with that when it
was transferred to the city the funds were
transferred to the city and uh we got them i think this
past month and and according to the timeline
we're gonna i don't think there is any deadline on it from
what i've heard from mobility committee
but if there is it i mean that money's been sitting there
for like seven years with the
state funds and they hadn't done a thing with it and we're
going to be spending it in the next two
or three years to to do the work so i don't i don't think
there will be an issue
uh let's see who else anybody else i was i was just going
to mention the same thing
okay all right so some recent completions again as i
mentioned earlier this is not a comprehensive
list but the mckinney street crossing uh project the
flashing lights that you can push to get to the
parking lot across the street or just if you need to trans
verse across the street mid-block
windsor crossing at north lakes eagle drive is recently
reconstructed with some bicycle
accommodations but utility relocations for some different
tech stop projects that we've been
involved in uh ranch estates out in that neighborhood the
streets and drainage are complete
and then several other streets and lanes in in the city uh
have been completed recently i've got a
longer list of ongoing things so boliver street is ongoing
more street extension for rudel uh
again i don't want to just read the list to you just there
it is in addition to this list some
others that came in kind of late and didn't didn't make the
list mingo road there's a there's we did
a temporary fix to get uh the the bridge back to the
standards that it was at before that the
flooding event some time back uh then there's a longer
range project to perhaps uh do some more
rebuilding on the road and definitely to to upgrade the
bridge uh magnolia drainage project it's tied
to work on on hinkle drive and windsor so if we can just
figure out how to make water run uphill
over that area will be good to go but we are working on
that drainage project we've got that
out to a consultant right now to create a plan for us are
we using any bond money or sidewalk funds
on um us 77 elm street out there in front of discovery park
uh that that side path has been
widened to about 12 feet 13 feet also on the other side on
the north side of north lakes park
or was that all money connected to the extension of the
grant money that we got from tax dot for
the extension of the cooper creek hike and bike trail yes i
'm getting a lot of head nods yes that's
what it was that money for the for the sidewalks in front
of the connected to that okay thanks
because that's coming along great okay but it's not in your
report because it's not a cip program
it's not it's not a cip and some of these are some some of
these are cip and some are sometimes
doesn't matter to us you fix the street fix the street is
it a big o and m thing or is it cip
and so sometimes this this update is a kind of a
combination of the two uh two more that didn't
didn't make the list that came in very very late cindy lane
and i think you might have seen a press
release on that the the traffic traffic signal at sydney
lane at us 380 we've worked with tex dot
in the county to fund that project that should be done by
the end of may that traffic signal put in
into service middle of june so that was an important
project and then downtown storm sewer
improvements have begun uh i'm sorry are scheduled to begin
in march of next year they're being
designed right now so there is a a project in progress
right now for downtown storm sewer
improvements and i want to just take a moment to thank uh
city staff thank county especially
commissioner edes also text out because that 380 light
unfortunately the genesis of that was a
couple very tragic accidents one fatality and one major
injury in fact that i think that i can't
remember if there were two fatalities but it was a really
bad bad accident bad situation and with
all the truck traffic coming from western boulevard really
do appreciate everybody pulling together to
do to do the right thing together with the county and text
out so again thank you guys for that and
fast tracking that as well because those things take a
little time when you're working with text
dot so thank you sure yes mayor pro tem um this is a great
update i think something that
tying it to a couple of things if you remember when we had
the what works city project and we
had citizens pitch some ideas one of the ideas was kind of
combining all the data we have associated
with bond programs and other sorts of projects going on in
town put that in a very user-friendly
way where somebody can go online and find out what's going
on here i've thought for years since
we've invested millions in street reconstruction in 2012
starting with that program and then 2014
bond program that there ought to be a way a citizen could
very easily go in and type in any street in
town we have all the oci data we can find out all the
conditions of it whether or not it's scheduled
as one of those bond programs and what the status of that
is even if it's you know pending and i
think that the concern has been over the years as i've made
this request was people don't want to get
too uh clear with some of the projections that are out
several years for fear of it's but then
citizens have no insight one of the number one questions i
get at the neighborhood meetings that
i've been involved in over the last six years is street
questions and it's very hard is it just
even a council member with inside track knowledge to go in
and sort that stuff find that get that
information out what's the latest stuff so all that to say
as we're doing all this great work
two things one i think checklists for people are incredibly
motivating being able to that
hormonal response i think when you check off a checkbox and
get this sense of uh done something
i think for folks to be able to see here's our 2012 here's
our 2014 bond programs nice here's
the checklist here's what's been done and here's what's
been going on i know we have a pdf of an
update that's out online that's a quarterly report it's not
the most user-friendly way of getting
that information i think this is due for a tech upgrade and
then relating to the streets too for
people to just be able to go and search i think as we're
selling future bond programs and before
you know it you're going to be here in 2020 perhaps with
another one to be able to go back and say
we're celebrating the the money that you've authorized us
to spend and here's all the great
work that's been done around the city so that's one thing
the other thing is relating to what we
feel like we've learned as it relates to especially the
street projects from i know the issue
and joey's neck in the woods earlier this year with a lot
of projects going on at once and tying
some folks up and you even had to call some neighborhood
meetings just to kind of get some
information out have we learned anything from that i know
that was before you sat in the seat
that we're now applying in terms of public communication as
it relates to these projects
i do have a slide we'll get we'll get into some oh i'm
sorry no that's okay we'll get into some of
the communications things that we've done i think john cab
rales is going to come talk a little bit
about some of those things so hopefully if we don't address
your point at that time please
please re-ask. Councilmember Briggs had a question. Well
just more of a comment to piggyback off
something you said is it is it possible or is there a way
to do like an interactive map where
you can hover over a street and something would pop up like
completed or in completion just an idea
so one of the things i was asked to do was to come and look
at some the methodology how do we get
capital projects done and so one of the things that was
underway a little bit before i got there
was it was a process review we had a an rfq out on the
streets or ready to go out on the streets
to get a consultant in to do some some process review for
us map map how things are look look for
pinch points look for wasted time look for problems and
things with the processes obviously we want to
lead to process improvement we want to do the best job we
can at getting things done one thing that
you began to ask about councilman councilman rodin was
about improving communication so that's we've
taken some early look at that we've tried to make some
improvements already we'll address that in a
little bit more detail one thing i've done is i've
established some project management minimum
standards if you're the manager of a project here's what i
expect from you for your project and a lot
of that has to do with communication and creating creating
documents and creating things that help
people know about the project and keep track of the status
of the project give timely updates to
city management and city council about the project things
like that so i'm rolling out those standards
now in fact i just sent them out yesterday and i'm getting
some good feedback from them and from staff on that
so somehow i got this reputation as a guy i can get stuff
done right so i was i tried to think
well what does it take to get stuff done well it takes it
kind of takes a formula and the number of
people you have the amount of money you have the amount of
time you have is proportional to how
much stuff you can get done so i wanted i'm a simple guy so
i wanted to put it in a simple formula
and if something's if something's not going right what do
we not have that we need do we not have
the people that we should have or are we short of money or
time time is a real interesting concept
right is it is how much how soon do you expect it to be
done is that a reasonable expectation
some of the projects are multi-year projects and they take
a long time okay so people money and
time come together in some proportion and help get stuff
done well there's a little bit more to it
than that because you could have a lot of those things and
not really get that much done it's an
overlay of processes what processes are put in place what
processes do those people have to get
things done and so that's really the overlay that's the
that's the focus we have sure we're going to
look and see do we have enough money to do the things that
we want to do we're going to spend
some time talking about time are we setting reasonable
expectations are we constantly throwing
in smaller projects and pushing things down on the priority
list that has to do with time how much
time it'll take to get something done you know do we have
the right people in place to do certain
things and you know i've worked on i've worked on multi-b
illion dollar nuclear plants i've worked
on power plants in texas uh california nevada arizona and i
've worked with a lot of good people
on projects and the folks i've met in these 50 days they're
tremendous the dedication to the city
and wanting to do a very very very good job is is just
amazing in the staff that i've worked with so
far their knowledge the how much they know about how things
affect the city and how things go on
their desire to want to do a good job is tremendous i just
really can't say enough good things about
the people i've been learned to work with over the last
couple of weeks just tremendous so those
that's why i wanted to know about this and know that's what
we're focused on a lot of our effort
is what are the processes and how are we getting things
done uh specifically some specific things
we've done process wise part of our process is before we
can begin work on a certain area
certain street is utilities have to clear the area in other
words they have to go through and check
and see where where their utilities are we had some some
struggles some some challenges with
with atmosphere gas for example they're a franchise utility
they've worked with us in a tremendous way
to do more clearing of these streets so we can move forward
with our projects they've brought some
other folks to to to bear on this effort they've got
another truck going we've worked hard with
them to be sure they get the water they need to to go out
and do these these wet suckback things
where they they they draw the dirt and the mud out of the
the ground to see where the utilities are
and then they've got a way to get rid of the mud very
easily so we work with them to streamline
that process and make it as easy for them we're not just
telling them to do more we're trying to
help them do more and they've they've responded very very
well it's a tremendous success story
an early change that i was able to try to help implement
there to get things done at a faster
rate again i mentioned earlier some some project management
standards i want to empower the project
managers to feel like they're in charge and they are in
charge of the whole project we're not
piecemealing it this this person is in charge of this part
this person's in charge of that part
i want a project manager over the whole thing we've held a
capital project workshop i i got
john whitmore alone over from hr to come over and lead us
through this effort and trying to find out
what are what are the processes that we're doing and what
are the opportunities and challenges
there and it was very good discussion to get folks thinking
along those lines of how we do things
we've reviewed the submittals for the process review
project again to get an outside consultant
in to help us map things out the way that way we can make
sure it's not just our ideas of how
things should be but someone that's an expert in the field
can help us hey here's how these
processes should be done so some of the next steps we're
going to continue on that process
an organizational structure review project obviously with
the goal of identifying areas
for improvement and we want to work hard on scheduling okay
scheduling is one of the challenges
that i've learned over there we want to ensure resources
are available to work on projects when
we need them we want to try to be able to show the impact
of special requests i'm not here to tell
you don't make special requests of us sure that's fine you
need to know something to answer a
citizen's request we understand that's part of the job but
at times when those pile up on an
individual working on projects he's not available to work
on projects so we need to manage that
process better that's what i'm saying internally we need to
manage that process better of how we
deal with special requests and we want to be able to
establish realistic expectations for how long
things should take the big one then communications continue
to increase and improve communications
tremendous amount of data there's a tremendous amount of
project information budgetary information
schedules and things like that how do we package it up so
that the people that want to know and
need that information have it available when they need it
so that that's one of our challenges
how do we let the public know what we're doing i'm going to
turn over to john cabrales for a
moment or two to talk about some of the communications
bullet points here
is that moment doesn't that mean minute yes sir i can do it
in one minute if you like
good evening mayor council members i just want to take a
few minutes to
just give you a little bit of an update on the
communications improvements that we've been working
on with the capital projects and public communications and
a few other departments
we have started to put some effort into refining the
internal communications process that galen
alluded to so that we are communicating better between
departments as well as getting the
information that is critical that we need to know about
projects so that we can turn around and
disseminate that information appropriately one of the ways
that we're refining the process is we're
developing a public works information sheet which is going
to have all pertinent data when does the
project start when the project's supposed to stand what
does that involve where does the funding come
from things of that nature in this information sheet which
will help eliminate a lot of duplicative
efforts as well as various forms that are currently being
used there are advisories there are memos
there are different ways that we're communicating we're
trying to get everything standardized onto
one sheet so that we know we've got everything that we need
there and we can easily find it
we've also started to work on some guidelines that we will
help us better determine the level of
community outreach that needs to take place with a project
for example if you have a million of
a street of a neighborhood street that's maybe only one or
two blocks it's going to impact a
lot less people than if you are in a major feeder street uh
curl boulevard an eagle drive uh bell
avenue is going to impact a lot more traffic so there are
different ways that we probably are going
to need to react to getting information out there on those
two different projects so the guidelines
will help us categorize the different types of projects as
far as the impacts to businesses to
major centers in our community as well as traffic and and
then that'll give us some guidelines as
to how we should go and and do the outreach the good news
is we do have a lot of communication
methods that are currently being used our public
communications office so everything from very
robust social media to our website to press releases to
brochures the information that goes
inside the bill stuffers that get mailed out there are a
lot of good good ways that we can currently
are using to communicate and so we're going to make sure we
're availing ourselves of those
forms of communication we're also working on a public works
construction report remember
I mentioned this public works information sheet so what we
're trying to do is get that information
get a map combine it all into a public works report that
will be somewhat interactive in
that you'll be able to click on any particular project that
you see on the cover page and I'll
take you directly to that information sheet and then the
map will be right behind us you'll be
able to see just whatever project you're interested in we
plan to start providing that information to
you on your friday reading files as well as put that up on
the website so we'll have a little bit
more of interactive features to that report okay we got
council member Briggs and then councilman
wasmack just another idea something I don't see on there is
the district D I S D like for instance
Coronado drive is about to be closed and we have a lot of
kids from Strickland walking to school
using that pathway so maybe a suggestion maybe to contact
the district and they can inform the
schools in that way and then the parents can be notified to
send their kids a different
route or safer route to walk to school that's a good
suggestion we do currently have a list of
entities that we copy in on projects like DCTA D ISD
transportation obviously public safety
is notified if we're near TWU UNT we send information to
them I'm not sure that we send
it to the individual school campuses but that is a good
idea that we can reach out to them as well
because they'll be the ones impacted and a suggestion when
we reach out to the public
we can call it public works and we know what that means but
when we're talking to our citizens
talk about roads and sidewalks that's what they're going to
come and look for you know public works
it's just again if you're in government or you work for
government you understand that
if you're a citizen you're not sure what public works means
but they know what roads and sidewalks
means and so whether that's the headline with public works
in parentheses make it crystal clear
so when they come to the website when they look at a flyer
when they look at something
roads and sidewalks that is crystal clear that's what
people want to know thanks John
yes ma'am and you're right we we do we are going to try and
make sure we make it very clear for
example the bell one's a little more complex and that's
what we're trying to distill down so it's
very clear people understand it's a milling it's also some
wastewater work as well as curb and
gutter work the reason I think public works are selected is
because we also have for example
traffic control device projects that will impact we also
have drainage projects that will be impacted
so we have bike lanes sometimes that are just something
being done on a road related to
alternative transportation mode so we try to make it very
clear when we use the heading public works
but we make it very clear at the very top whether it's a
road milling a road reconstruction a
traffic signal replacement whatever the case might be so
that it's plain language english people will
know what it is that's going on I have one heading roads
and sidewalks and then under that talk about
millings or whatever it is that you want but have something
so uniform and so recognizable
that it doesn't matter whether they see it on the website
they see it as part of their utility bill
they they see it roads and sidewalks update so they they
will look for that don't get caught up
in the in the detail you know roads and sidewalks that's
what people want to know and then under that
have all of your other explanation and details and what's
going on but you know that's what people
will hone in on and make that so clear and so easy to find
because on the website sometimes you really
have to dig I'd have something just so easy and so clear
roads and sidewalks update so people can get
in there and really find out you know what it is that that
they because it impacts their business
it impacts where they live it impacts getting their kids to
and from school it impacts their
commute it's just so important and I think we all hear from
citizens but keep it crystal clear or
it's just going to get lost in the shuffle.
Will do thank you.
So the the public works construction report we're hoping
that we will be able to get start putting
that on the friday reading file as well as put it up on the
website we're also working with the
public communications office and tech services on revising
the capital projects web page
where we want to put the information of these different
various projects that are going on
including one of the things that we are looking at Mayor
Pro Temeroden is an interactive map feature
like you talked about we also think that it would be good
to have something there where somebody
could click on whatever that link is we know we've already
got the information it's just a matter of
linking that now from that map to whatever the information
sheet and any more detail that can
be provided so that is one of the one of the features that
we're trying to look at adding and
enhancing the capital projects web page that we currently
have right now so whether it's a
a traffic signal whether it's a a road million or whether
it's a alternative mode bike lane project
you should be able to quickly if you know what what's going
on the street or you see orange cones or
you just see some sort of activity and you're curious you
should be able to just go to the map
click on it and it'll send you directly to whatever the
project entails yes Mayor Pro Temeroden thanks
and I saw one in fact I just sent an email to Council
Member Briggs because she was the one who
suggested the map which is it seems like there's a
prototype there's a concept that just needs to be
flushed out I will say this is this is an opportunity I
think to get fun with this
and to get city tech up to speed with what normal people
expect with every other tech experience they
have in their life on Amazon on Google and stuff like that
you know if you go up to a house that's
for sale the savvy real estate folks now will have
something like text this number to this number
and you get immediately on your phone from sitting in your
car pictures costs who to contact they now
have your phone number so they can reach out to you and all
this kind of stuff I mean we're putting
signs up everywhere with these things and I think the
typical government approach is go to this website
search for this which no one's gonna remember to do and won
't remember the website it's just
maybe we can explore texting options where you can get this
kind of not that you're doing it from
your when you're driving your car maybe the passenger can
do it or maybe you're walking on
all that to say I think there's an opportunity to get
really kind of savvy and and I say fun
but that maybe that's not the right adjective to describe
anyways just some thoughts moving forward
maybe the committee on citizen engagement and the future
can kind of help explore some of those things
all right the other the last item that we're working on
right now is we have a community
contact master list that we've been working on for the last
year or so that has contacts for
the various neighborhood groups for hoa's for apartment
groups faith-based organizations and we
are revising that revamping that making sure we've got
current contact information because that's
another way that we want to use to be able to communicate
projects particularly if it's
located in a certain section of town or an area or a
neighborhood just another way that we can
actually push information out to them in a way that they
currently communicate as opposed to
making them come to us so any questions regarding the
communications any question on this part of
the presentation okay I'll turn back over to gabe that is
it that that's all I had for slides I
wanted to just give you kind of a summary statement and one
of the things that I'm trying to become
known for is a guy doesn't take no for an answer I want to
hear I don't want to hear no we can't do
that I want to hear yes we can and here's how so that we
can make policy decisions at this level so
we can we can make management decisions at my level I just
want to become known known as that
kind of person it doesn't take no for an answer and let you
know that I'm very excited about
working on these projects and pushing them as hard as I can
to get done and it's it's it's been a great
experience great any other questions yes just a comment it
just feels really organized and I
really like that you know I feel trying to remember some
other presentations that we've had like this
where this is what's going on this is what we're going to
do this is how we're going to move forward
and I just I appreciate that so thanks thank you okay with
no more questions that concludes our
open work session reports the council will now convene the
closed session at 357 we will consider
the following items consultation with attorneys under Texas
government code section 551.071
and deliberations regarding real property under Texas
government code section 551.072
and welcome everyone to this meeting of the
Denton City Council will now call it to order we do have a
quorum it is Tuesday what's the date
April 18th 2017 at 6 30 if you would stand with me to
pledge allegiance to the US and Texas flag if
you're able
to stand by I pledge allegiance to the Texas,
Vermont state, under God, one, and indivisible.
We don't have any proclamations or presentations on this
agenda item so we'll move to agenda item
three which is presentation from the members of the public
if you could roll the rules of procedure
please. The Denton City Council has adopted rules of
procedure including a code of conduct
which applies to citizens as well as council members these
rules were enacted to promote an
orderly process and to preserve decorum here is a brief
review of the rules that apply to citizens
reports citizens will have four minutes to give a report
there will be an electronic beep when time
has expired if the remarks are not concluded by that time
the citizen will be asked to stop speaking
if the citizen does not cease and a second request is made
the mayor will request to have the citizen
removed from the council chambers citizens are asked to not
approach the dais if a citizen has
papers or other materials to hand out to the council please
let the city secretary know and
she will have a staff member distribute the materials to
the council the attorney general
has ruled that council members may listen to citizens speak
and may ask questions of citizens
for clarification of the issue council members will not
engage citizens in discussion of a topic
because to do so could potentially be a violation of the
open meetings act when speaking to the
council citizens are to direct all remarks and questions to
the council as a whole and not to
any individual member please refrain from making abusive
personal impertinent profane or slanderous
remarks anyone who violates this rule will immediately be
removed from the council chambers
citizens adherence to these rules will help make an
effective presentation and will preserve the
order and decorum of our proceedings copies of the rules of
procedure are available from the city
secretary
item three which is presentation for members of the public
agenda item
b we do not have any scheduled citizen reports but for
agenda item 3c additional citizen reports
which we sort of commonly refer to as open mic where the
citizens can come talk about
what they desire within the first within their time frame
that's that's not addressed on the
current agenda the council members are prohibited from
interacting with them due to potential open
meetings violations so we do have two cards first one is mr
willy hutsmith if you'll come down
state your name and address your time will begin
mayor and city council members mayors will ask for a little
bit 623 newton i want to state what i
said in the the uh work session today about the the city
manager um i think that's haddle men
had a little bit hillman how do you say it i don't know i
think you're doing an excellent job in
in many many areas that from that's that you are
responsible for and and i want to commend you for
doing that and i said also that the seat attorney and the
or acting seat i'm not sure if we've
chosen him to be the permanent one or not it would be my
vote and the uh auditor i think they're
doing an excellent job i wanted to as i commented in the
work session i want to talk about the
closed session and one of the things that i'm still
concerned about the number of closed sessions have
have decreased and that's good but i just have a question
and observation and and i'm going by what
what we had to operate from when i was on the school board
two terms and as it would explain
to me and as i got clarification for it so i want to make
that same point here with the rest of you
the closed session is for items that you just it wouldn't
be good for you to devose or let people
know about them in the public meeting because it would h
inder what you're trying to do and it might
embarrass someone and things like that so it was explained
to me that it was there are specific
things that you need to consider as you're having these
sessions second thing and this is the one
that concerns me the most it seems like the subject matter
is where it's supposed to be it is there are
things that you really need to talk about in the private
but the number of people that you have in
the room is what differs so much from what i was taught
when i was on the on the school board i
don't think those rules have changed much since then but
there are people in that room that are
left in there that for instance today there were eight to
talk about the this is excluding the
council members and the city manager and the attorney to
talk about something to do with
the elect electricity situation and i assume there's
something of that you need to talk about in
private so i i get that but the assistant managers that
were in there what does that have to do with
that issue the uh and there's one thing that you do every
time that
when what you're doing is legally challenged that's going
to be one that i think you should have
you should have taken care of that one before we got to
this so it's the number of people that you
have in there and how does how does that tie in and then
you had several people from the electric
company what it was playing to me is that you need someone
there to to bring clarification to a
question that you have and that person's only brought in
when you have a question you don't
just have them in there just in case you have a question
that's what was explained to me so that's
the only thing that i see the number of of closed sessions
have been reduced and the seems like the
items that you're covering seem to fit within the rules of
the closed session but it's the number
and the people and the individuals that you have in there
with you that gives me some concern
thank you sir next speaker is ginger cain say your name and
address your time will begin
ginger cain 1600 churchill drive and first of all i would
like to thank the council for the
crosswalk light that you put in at north lakes gym to cross
over to the park that has made it much
more safe for uh for the blind to cross there but i also
wanted to find out when the walk is going
to be extended from uh in front of the church uh just past
where the model airplanes are on that
side so that you don't have to unsafely cross with no cross
walk and no light to get on the walk on
the other side which is still quite dangerous for someone
who can't see so i know that i've contacted
and talked to some people i know that that's in the works
but i'd kind of like to know when a
timeline is for that and also to keep in mind when uh
construction is being done on the sidewalks
once that's finished if workers could move those things
rather than leave them set there because
i don't mind moving them and i've been doing that to to
make safe passage but
sometimes they sit there for months once the work's
complete so if that could be kind of looked into
i'd appreciate it thank you thank you
okay that's all the cards we have for that agenda item
three we'll move on to the consent agenda
council member hawkins thank you mayor i move approval of
consent agenda items a through
you but we are going to be pulling item c s and u for
individual consideration okay council member
gregory second all right we have a motion and a second for
approval of the consent agenda
items a through u save agenda items c s and u which we will
take up as items for individual
consideration uh we have a motion to second let's vote on
the board please
motion carries seven zero we will now take up those items
under individual consideration agenda
item c which is considered option of an ordinance of the
city of denton texas prohibiting parking
on the south side of texas street from 150 feet east of
vine street to 150 feet west of frame street
we have uh yes
good evening council members my name is pretem dashmukh i'm
the uh traffic engineer for the city
and we have discussed this item and i'll quickly go over
the background just to uh let everyone
know what's uh what we're doing i'll pull up a graphic so
everyone looks at it we're talking
about a section of texas street between vine street and
frame street this is just north of
bell avenue uh and that's the border of twu uh the issue
started when an apartment building one of
this apartment building was hit by lightning and a
developer came back and he had to redo the whole
building reconstruct the building from ground up and the
height of the building currently or before
the lightning was 34 feet and they're constructing it back
to 34 feet but due to the change in fire
code between when this building was built and now the
height restriction of 30 feet requires anything
above 30 feet requires enough space to deploy an aerial
equipment and the aerial equipment requires
more that uh close to 26 feet of space for you know all the
stabilizers and everything to be
deployed we looked at several places where we could use the
space on the back side in the parking lot
area on this on this side along vine as well as on the
front side along texas and based on the review
we we came up to we came up with a conclusion that only tex
as street was a viable option for
equipment that size to be deployed we during the work
session discussed different alternatives and
between fire and engineering we came to a consensus that we
have to come
midways as to because parking is a big issue in this
situation in this location and we had to come
to compromise where we have to see that we don't impact
parking to a greater extent but still
achieve the safety requirements for fire equipment to be
launched so based on that we've come back
with an alternative which looks at 150 feet from vine
street and 150 feet from frame street leaves
a really small section technically if you measure 150 feet
from frame street and somewhere in the
middle of this driveway and because of this driveway where
parking is not allowed this segment
that actually we're going to restrict parking is down to
100 feet now so we're talking about four
cars at the most okay and that's the alternative that we
have tonight okay got a couple questions
councilman brig's and that is in front directly in front of
the building that it is allotted for
okay thank you i have a question um just sort of hypoth
etically speaking if for some reason
i don't know how the boat goes but let's say this plan isn
't accepted what's plan is there a plan b
i mean or is it is it oh i see the fire marshal moving this
is is there is there a plan b that if
and you said it's down to four cars it's down to four cars
okay all right good well that's
that's great that's appreciate you on the apartment side of
the street only so yeah if somehow
what's what's the alternative in this particular case we've
looked at all of our options that are
available and this seems to be the one that can accommodate
not only our needs but also you know
keep the needs of the community intact as well or that
neighborhood again you know we responded
there once before and we in took care of took care of the
incident great so this is just to
put things in place if we have any future incidents there
that apply with the code good okay thank you
councilmember gregory i appreciate the work that staff did
to respond to the concerns brought by
council during work session to bring back a plan that's
more acceptable i move approval
uh and we do have public comment we'll take that after
councilmember hawkins i second all right
we have public comment uh mr will hudson if you'll come
down state your name and address your time
and begin if you could maybe you want the map back up yes
yes that was okay we need to yeah if
we could get the map back up on the screen thank you get uh
mayor and council members my name is
willy haspeth i live at 623 newton i don't think you could
do this there so
i was at the work session and of course we're not allowed
to talk there i wanted to bring up
some points there but so i'll just bring them up here if
this building right here is the main
concern that you can't get the and for the public to know
what what's being talked about is that
fire engine with the long extending boom to put water on a
large structure they're talking about
where do they where do you park it so that that you can do
that and there's no room here so we
are told you can't park here because as you can see their
car is there so you can't get in there
all right that's understandable but this is the structure
that that is a concern is of concern
so you can't this one's not okay either you can't get the
same problem for this structure is the same
that you have for this one as well all of them have the
same problem why would you inconvenience
the people on the street and their parking right now for
just this one structure
if and the fire marshal has already said and they and and
their department said they're going to get
in there and fight this fire no matter what so my point is
then why would you inconvenience all of
these people over here and here that park here to take care
of this structure which can be
fought in the with the with the existing situation that you
have now i think that that's probably
not it's not a good thing to do to inconvenience all of
these people for the long period of time
for what if and this structure is the one you're talking
about fighting when you have the rest of
them to fight that's my point i believe those are the only
cards we have so we have a motion and a
second let's vote on the board please
agenda item 4c passes unanimously go on to agenda item 4s
as in sam
i'll read that caption
considered option of ordinance of the city council of the
city of denton texas authorizing the city
manager to execute a professional services agreement for
architectural design services
in support of the design of the new city of denton fire
station do we have a presentation
or was that just pulled just that was just pulled okay
and council member briggs has filed appropriate papers of
recusal with the city attorney's office
thank you mr city attorney okay we have no presentation we
do have a card wishing to speak
mr william hudspeth if you'll come down state your no okay
all right um council member hawkins
i move approval council member gregory we have a motion and
a second let's vote on the board please
4s passes six zero we'll move on to agenda item 4u which is
consider approval of a resolution of
the city of denton texas amending resolution by expanding
the scope of review of the ad hoc city
council committee to include all employee benefits and to
advise the city council with regard to
these matters we have a card wishing to speak mr what mr
husbeth would you
we having a presentation on this i don't think mr roe may
report to me to national
uh no sir i don't believe we are
again at the work session this was discussed and discussed
and we didn't get a chance as citizens
don't get a chance to say much there uh what i did want to
say is that one of the council one of you
council members and if you want to know who that is
citizens look at the tape seem to indicate that
why would you need this was their concern why would you
need a committee looking at
this issue of employee benefits when during budget time you
're going to look at it anyway
had i had an opportunity to speak when this was being
discussed and what i would have said to the
person is during budget times and you watch and see if that
's not the case these items will be
discussed in general very general in fact when they're
presented it will be presented in a way
where it says this is what we think is there this is what
was there before do you see any problems
with it but what was presented at the work session was just
good questions about maybe we ought to
look at some of these items and a little bit more in detail
one in particular was the time of leave
the time you're off for an emergency or something that that
you need to be off for is that what kind
of compensation would compensation should need to be
provided there and retirement issues some other
things that came about in that discussion can't remember
what one of the other specifics were but
these were things that one of the council members said why
don't we do this because it'll be more
in depth i thought that was a good idea and again when you
look at it like the council person was
saying we need to look at it you will discover things that
will probably benefit the the whole
community of or the operating workforce in the city and the
city as well one of the one of the
things that was compared was how much is going to cost us
what's being paid in the other areas
other surrounding areas thought that was good too those
things don't come up during budget time so i
think uh i think that what the council person said was not
a good thing you do need to evaluate this
i'm glad it was it was voted on i hope you passed it
tonight and you look at these let that committee
look at these more specifically like they had requested
that they be able to do thank you sir
council member oh council member hawkins sure i'll be
voting for this tonight but i do feel like i am
struggling with that vote a little bit i just wanted to
publicly say that i think that the original
intent of this ad hoc committee changed a little bit but
since it is dissolving in on may 16th
i'll be voting for it so all right thank you council member
wasney a little history and a
little background we did a salary study last year and
compared the salaries of employees with
several north texas cities but at the same time we did not
study the benefit packages
and so staff worked very hard to create a comprehensive
overview comparing the benefit packages
that are here at the city with nine other north texas
cities and so the committee initially only
looked at vacation and sick time and we were limited to
that and the committee wants to open
the scope just to include what staff has already worked on
already prepared they worked hard
to take a look and then any recommendations or comments
will come back to the full council
and with that i move approval of this item we have motion
council member briggs i will second
we have a motion and a second for agenda item for you let's
vote on the vote on the board please
okay
agenda item four you passes six to one moving on to agenda
either there are no agenda items under
general heading five moving on to general agenda item six
which is items for individual
consideration six a is considered option of an ordinance of
the city council the city of dent texas
providing for authorization improving the execution this is
by the city manager
an interconnect agreement between the city of dent and
enterprise pipeline texas llc
thank you mayor and council my name is phil williams
general manager dent municipal electric
i want to talk about this item tonight for approval the
topics would be the fuel supplier for the
dent energy center major fuel components the budget items
and cost and their pb and staff
recommendations the fuel supplier is texas enterprise
pipeline llc their domain transmission line is
located on the project site they were the uh although there
's two transmission lines on the site
they are more familiar with serving power plant situations
like this some slides that weren't in
your backup before that we put in to respond to questions
we got last night to explore a little
more information about enterprise enterprise texas pipeline
llc is a parent company is enterprise
products operating llc they're the largest u.s pipeline
partnership they own approximately 49
thousand miles of pipeline so they are large operating like
27 states
we did look back at their incidents that they've had over
the last 10 years
they did have one fatality i remember this fatality because
it's close to my hometown
in johnson county it was between cleaver and glenrose where
a backhoe operator contractor
not not a enterprise employee but a contractor dug into
their pipeline and exploded the pipeline and
and was killed and injured others co-workers on that site
they did put in a sherman extension
between fort worth to sherman went through denton during
that extension and saw that line
there were no incidents reported in that installation that
construction activity
we did look at their safety performance as reported their
instance while they will certainly
because of their size you would see them having a larger
number of incidents but if you look at a
per ratio side their size comparing to other companies they
are below the industry average
and have been now for several several years so they have
shown improvement
from their lost time injuries and in their incident rate
this is a budget item that was presented to council before
in in that listing i've highlighted here
what was shown before in march i believe march 7th to the
council as far as the
budgeted estimated costs for the project good news is that
the proposal we got from the pipeline
company for the air connection is less and we'll have some
under budget savings here on the project
project does include a 15 percent contingency in the in the
project it is time materials based
the major supply components this is the engineering permits
the transmission line tap
this is a 10 inch lateral pipeline to the plant all this
pipeline to 1050 feet keep in mind this
company is reported earlier has 49 000 miles of line this
is going to be 1050 feet so less than
one fifth of a mile of line that will be all be on our site
anything that's above ground will be
inside a 10 foot high concrete wall around our plant site
the equipment is located in the concrete
fenced area meters separators the skater equipment and then
of course the measuring devices
the public utility board and the staff recommended approval
to the city council
for an air connection agreement for an amount of 1.1
million 386 thousand dollars for the fuel
supply infrastructure staff stands for any questions
council member breaks um on the um
there's a there's a website that has the incidents reported
in the amount of money for the property
damage and from 2006 to 2017 there's two separate one is
the gas transmission systems which is um
accounted for 7.2 million in property damage and then the
gas gathering system which was 70 million
um in property damage do you have any idea what that what
kind of property damage that that may
be or when we're talking about that type of thing yes uh
after your question earlier i did look back
at the 70 million in the gas gathering system and that was
in like i said this company is very large
and has a lot of different operations several limited
liability corporations operates under
their umbrella and this was in the offshore operation was
where the majority i think 67
million dollars in the year 2008 where that was uncovered
was the in the offshore operation they
had the listing i saw the number of incidents there was
like four or five incidents they were 17 to
25 million dollars added up to the 67 million dollars for
that year okay okay
so would this be classified under a gathering system or
transmission line
the gathering system was in the offshore uh the operation
we're connecting with is under the the
gas transmission side so there's already that one has not
incurred the 70 million that one didn't
that has incurred millions of dollars but not but we
consider the whole industry uh over the past
years has incurred 7.7 billion dollars worth of damages uh
for their size operations okay there
as i said the sector report looked at their below industry
uh standards on the incident rate do they
have a is it because there's one of their pipelines in
close proximity to this location or is this just
a separate segment of pipeline that they're installing no
the reason uh we chose this site
was because it is a cross section between a gas pipeline
that already existed in denton county so
the only amount of additional pipe to tap into this 36 inch
transmission line that's already on
the site and already existed before and would exist
regardless of whether we put a plant there or not
is the thousand feet of 10-inch pipe we're tapping into
this that will be all in our site
the the one of the prominent issues that the gas
transmission systems have is people digging into
and so by having all this on our site we would be have more
control of that uh certainly won't have
any more exposure than what we would have already from this
gas transmission line being there but
the reason the site was chosen because the gas transmission
line was already there and the
electrical infrastructure was there so it minimized the
construction of both to interconnect so then
most of that thousand feet will be within the footprint of
the energy center or how much or is
it a thousand feet to get it from their pipeline to the
property line it's a thousand feet but all
that's located on the property we purchased that's okay
that was my question all right thank you
can't remember actually yeah no okay all right any other
questions for staff we do have people
wishing to speak any other questions for staff thank you
all right our first speaker will be
carol soph if you'll oh oh sorry it's sorry i'm not reading
uh in opposition carol soph is in
opposition there we do have a white card wishing not to
speak michael henn and 724 thomas street
is in opposition as well uh so then we have two cards mr ed
soph
good evening my name is ed soph 1620 victoria drive in dent
on
i just put together an overview of possible real cost
categories
of this pipeline and what it represents versus the costs of
more renewables
so i'm gonna jennifer i'm gonna put a real fancy thing up
here for you
yeah have the overhead yeah is it on yeah they'll they'll
pop it up here in a second there you go
okay rate payers of denton shoulder the debt of this one
million three hundred and eighty six
thousand dollar cost of a gas supply pipeline and meeting
metering infrastructure in addition to this
cost there are possible unknown costs the cost of the
natural gas to run the denton energy center's
engines the cost of safety inspections the cost of
maintenance the costs of environmental impacts on
the air and land and private property the cost of impacts
on the public health and safety the cost
for emergency responders equipment and facilities the costs
of supporting and prolonging the use of
a fossil fuel in the aircott grid rather than greening the
grid the costs of climate change
disruptions and mitigation the costs of precautions given
the troubling safety record of the proposed
builder of this pipeline as for renewables
first of all obviously there's no cost the one million
three hundred and eighty six thousand
dollars for a gas supply pipeline and metering metering
infrastructure there are no costs incurred
by environmental or public health and safety risks there
are no costs for regulatory inspections
no costs for air and water monitoring there are minimal
maintenance costs there are no costs
associated with exacerbating climate change and there are
no costs due to explosions fires spills
or toxic emissions in closing i simply would like to refer
you back to something which was sent to
council i believe it was before mr heilman took over so if
you don't have a copy i'll send you one
a paper that was put together by cyrus reed at the lone
star chapter on some next steps that
can be taken by denton municipal electric city council and
future city councils to make denton
a leader on clean energy i trust that you all receive this
it was sent to you and if you haven't
read it i would robustly request that you go back and look
at it because there are some great ideas
that would help denton's future remarkably thank you very
much thank you
next speaker is mr william hudspeth come down state your
name and address your time will begin
and council members my name is william hudspeth the letter
623 newton
mr salford makes a a lot of sense he's not an employee of
the city he's a citizen
but you can examine the things that he's done at his place
his house his location the things that
he's telling you about and you'll see that he's trying to
save us money lots of money did you
just hear the figures maybe they're not true but they sure
are impressive our electric bill and
i've told you mayor several times and bless your heart you
don't have much to do about it
you're just a man and thank you for at least listening you
do listen and i mean you really
do try to figure things out i keep saying my electric bill
keeps going up what is going on
why is it so high and you said you didn't know you were
going to check it out and you've tried
you've tried to figure it out well let's just say for just
funsies some of what mr salford
saying is true now i know the the part about having
regulatory agencies to have to regulate
what is happening is that's true we don't have to do that
with with the proposal he's talking
about we should do and there's no emergency anything that
we have to plan for the difference
is will it in fact save money and can we as citizens
benefit from it and you're sitting here
elevated so that you can see us i guess i'm not sure why
you're elevated or maybe so we can see
you've got to listen to us citizens now i don't know i don
't know what is the truth
but you know it might warrant if you can put this vote off
and do some checking check and see if
what he's seeing is true heck what are those million dollar
expenditures just part of a million
surely if we got some of that back maybe we can reduce my
light bill maybe a dollar or 50 cents
well that's something but i think we ought to listen to
what he's saying he's talked about this
for years these things that he's he's told us to do uh to
that we should look into i would say
maybe you ought to look into some of them maybe there's
something to it thank you thank you sir
those are all the cards that we have to speak councilmember
hawkins oh okay councilmember
hawkins i move approval of item 6a councilmember briggs i
had a question for staff
one more question
was there another option um for the for company besides
this one
the did we do like a what was did we do the traditional way
like an rfp so we have two we
really we had three options of gas pipeline companies two
are on site one would require
additional pipeline to build two i believe of like 10 miles
so because of having to build
additional pipeline we excluded that one the the second
choice uh the pipeline system is not as
robust we were worried about them uh being able to have
adequate pressure maintain adequate pressure
for this service and this pipeline company uh is has had a
past history of being able to supply
power plants and so they had a history to do it plus to
have the pipeline system installed
this pipeline was put in i believe seven or eight years ago
and so it's more current and uh just
seemed like the best option from based on the uh adequacy
of the history of the company and the
facilities they had so i guess this might be a question for
legal since there were three
companies doing the same thing is it okay that we didn't
issue any kind of rfp or under the
scenario the staff has identified that they used one of the
exemptions to avoid doing the rfp
certainly if that that option is always available okay but
the staff proceeded under one of the
exceptions okay thank you i would say that staff intends to
uh we don't tend to operate this whole
this plant for the entire length of time that's available
with just one pipeline serving it our
intention is we will uh eventually build a pipeline to the
other to the other service so we can
bid those two against each other in the future it's just
not needed for initial operation
okay councilmember gary
that was kind of my same question about the procurement
aspect so typically when we have
an exemption to purchasing it's placed in the description
of the item i was just wondering why
that wasn't in the description that i couldn't answer i
know it's it's identified in the eis
and but but not in the actual caption usually we'll put
that when it um we usually see it with the
sole source um but in this case i i can't answer that
question i guess the follow-up to that
question is that that doesn't does that make the posting
defective
in my opinion it does not okay all right thank you okay uh
we councilmember hawkins i've
recognized you and i believe you made a motion for approval
is that correct
mayor pro tem rodin we have a motion and a second for
agenda item 6a let's vote on the board please
uh motion carries five to two we'll move on to agenda item
6b considered option of ordinance
considering all matters incident and related to the issu
ance sale and delivery of up to
102 million dollars in principal amount of city of denton
certificates of obligation
thank you mayor
i will just summarize this item for the council and be
available for questions
we're proposing an ordinance allowing the issuance of up to
102 million city of denton
certificates of obligation this will fund really three city
functions 18.9 million for general
government i'll give a little bit of detail on that 17.6
million for solid waste and 65.46 for
the electric utility i do want to point out that this is
less than what we budgeted for in the
capital budget we're putting off the issuance based on
current cash balances of water and
wastewater debt and we've also reduced the issuance for the
solid waste by about seven
million from what was advertised and what was in the
capital budget in terms of the major projects
in the 18.8 million for general government for police and
fire radio upgrades and upgrades to
the computer aided dispatch system of about five million
and the matching funds for the bonnie bray
and mayhill road improvements the council heard about that
today in terms of the capital program
this is our matching funds for the rtr grant also for solid
waste projects i mentioned 17.45
million a couple of the larger are for materials management
equipment for the mining diversion
program and cell development of an additional cell and
lastly the 65 million for electric projects
i want to break down that about 69 percent of that sale is
eligible for the transmission cost
of service recovery that we recover from other utilities
within the state
i do want to highlight that we issue debt based on the life
of the asset so some of this debt will
be five ten twenty years and for the electric utility 30
years the ordinance in front of you
sets the parameters of the sale the maximum principal
amount 102 million a final stated
maturity of february 15 2047 maximum net effective interest
rate of four percent and this delegation
would end in october of 2017 we plan to sell these co's
competitively in may with that summary the
staff recommends approval of this ordinance councilmember
briggs i have a question in the
the electric list there it says denton energy center subst
ation and when we had our our update
on everything that phil said that that was scheduled to be
regular updated as a substation
but with the gas plants it needed to become a bigger better
i guess transmission kind of station
since it's next to the gas plant instead so my question
about that and also the arco so that's
the 1.7 million for the denton energy center substation and
the 1.3 million for the arco
which are two that he mentioned are going to be different
than the regular transmission projects
that we had originally looked in were those included in the
bonds the 225 million bonds or
is this something separate i think this is just some
improvements to the substation separate from
that project but i'll let phil clarify that
so the uh denton energy center substation is a new gem
crystal substation and that substation
was scheduled to be rebuilt we moved that up because of
denton energy center and expanded
it because of that this is uh part of that expansion that
we would have done we're just
doing it earlier the arco substation the the line it was a
transmission line that had to be upgraded
sooner and was dent north to arco but not the arco subst
ation that's an entry question okay yeah
well i just was going back to that conversation and was
trying to place the the money in the
issuance so thanks councilman bagari i have a question
about solid waste so if memory serves
we just rolled some debt on solid waste and that released a
lot of funds that we placed into reserve
for the various utility funds we did a refunding of debt
but that was um of outstanding revenue
bonds and we released some reserve funds for the um
electric utility water utility and wastewater
but um solid waste issues um debt that's tax supported they
did not issue any revenue old
revenue bonds so none of that kind of released reserve
savings went to um the solid waste fund
that was my question okay thank you all right we've got a
card wishing to speak
mr willy husbeth agenda item 6b is in baker
american my name is willy husbeth and council members i
live at 623 newton
i cannot imagine what one just one of these items 102
million dollars
i just can't imagine how much i don't even think i've made
that much in a lifetime
i guess yeah i have made that much but man after talking to
mr soph
someone's got to listen to that man or at least check out
what he's saying
i'm going to start saving some money on this electricity
mayor i'm going i have to my law
place which is 14 by yes 14 by 30 my electric bill only in
june and july is 500 dollars
14 by 30 500 dollars
when i install my solar panels which i'm going to do i'm
going to tell you how much money i save
we have got to stop spending this kind of money we're not
checking out some things to
make sure we're not wasting our money i remember the
question that uh one of you asked to the uh
the person that's in charge of the electric here and i'm
pretty smart about contractual stuff i
didn't even understand what he was talking about that's got
to stop you all have got to well the
next council i hope they do their work and check out some
things i think the auditor is going to
show us show some things and perhaps we'll get some of this
stuff turned around well so that's
my point thank you council member wasney i move approval of
item 6b council member gregory
we have a motion and a second for agenda item 6b let's vote
on the board please
okay
motion carries six to one we'll go on to agenda item 6c
consider adoption of an ordinance
considering all matters incident and related to the issu
ance sale and delivery of up to
30 million 700 thousand dollars in principal amount of city
of denton a general obligation refunding
thank you mayor this item is also a parameters ordinance it
includes refunding some outstanding
city debt as well as new money issuance the refunding would
be about 13 million dollars
of a portion of the city's 2007 a general obligation refund
ing bonds that are callable
we would refund those for savings to reduce our total
principal and interest payments on that
outstanding debt also includes about 17.1 million of
general obligation bonds from voter approved
debt about six million the largest portion would be for
street improvements and street repairs
also for fire station number three remodel rebuilds about 6
.4 million for a total of 17.16
in terms of the parameters ordinance it sets a maximum
sales amount of 30.7 million
a final stated maturity of february 15 2037 maximum net
effective interest rate of three and a half
percent the refunding must produce present value savings of
at least three percent from the refunded
debt and the delegation authority ends october 18th again
with with these bonds we plan to sell in may
be a competitive sale staff recommends approval of the
ordinance available for any questions you may
have councilman grigory thank you mayor well it's april and
it's another election year in denton
and so that means that during the candidate forums there's
lots of discussion about debt
and a certain amount of misinformation that happens and so
when people see on a on a
agenda item that we're refinancing they think of that
sometimes the way that they think about
you know maybe refinancing a car or refinancing a house
where they're having trouble making the
payments we're not having trouble making the payments army
are we no the refinancing is
strictly to lower our costs for savings we can issue the
refunding bonds at a lower interest
rate than the existing bonds so we save that delta so it's
like a lot of people that at times
refinance their house they're not extending the maturity
date of the of the loan they're just
fine refinancing at a lower interest rate and according to
the backup we're going to be saving
about seven hundred thousand dollars just from this refin
ancing that's our current estimate okay
also one of the comments that that is people raise concern
about you know being righteously
indignant is that we're so far behind on on spending the
money like the 2012 bond issue
we're going to we're we're authorizing you're asking us to
authorize here the last fourth
million dollars of a 20.4 million dollar authorization why
did we not authorize
the whole 20.4 million dollars back there in 2012 after the
voters approved it why why are we doing
this in smaller segments can you explain that we're
basically trying to issue the debt based on how
quickly we can get the capital program out you don't you
don't just like with your own mortgage
you don't want to enter enter into debt until you need the
funds so with this we try to issue the
debt as we need the funds this was really planned as a five
-year program when it was sold to the
voters just like the 2014 election was planned for a six-
year program so we try to issue the debt
as we can complete the project so we're minimizing our debt
service based on that if we'd issued all
20 million upfront it would have taken several years to
complete those projects we'd be paying
debt service before we had completed the project there's
also that staggered issuance of debt have
to do with retirement of other debt so that we are sort of
replacing some debt that's retired
with new debt and we're not having to raise interest rates
that we're just using that money
to some of that and it's kind of planned to keep the debt
service tax rate to try to keep that level
and not increasing so you really look at what's your
existing debt what's your plan over the next
several years for issuance what's going to be the impact on
your taxpayers trying to keep that
rate relatively level to your total tax rate well i
certainly appreciate the staff being diligent
in refinancing when we can save our taxpayers money thank
you thank you that's member riggs
i'm really glad to see the the work in the city getting
done and uh thank you mr helman and with
that i would like to make a motion to approve council
member wasney we do have also a public
comment we shouldn't speak after we take this motion i
second the motion all right any questions
for staff seeing none mr willy hudspeth any you're up okay
all right we have a motion and a second
for agenda item 6c let's vote on the board please motion
carries seven zero moving on to six
d conduct the first two readings of an ordinance to annex
approximately 16 acres generally located
on north side of barthol road approximately 350 feet west
of i-35 southbound service road
do we have a presentation on this just an aerial of the
landing question okay just an aerial okay
and am i supposed to read this yes sir all right you tell
me when i'm supposed to read it
after after a few seconds after everybody can see the area
of the property
okay we're ready we're ready okay item 6d an ordinance of
the city of denton annexing
approximately 16 acres generally located on the north side
of barthol road approximately 350 feet
west of the i-35 southbound service road more specifically
described in exhibit a and illustrated
in exhibit b which are which area buds and is adjacent to
the city limits so as to include the
property within the city limits granting to all the
inhabitants of the property all the rights and
privileges of other citizens and binding the inhabitants to
all the ordinances resolutions
acts and regulations of the city providing for a correction
to the city map to include the annex
lands providing for a separability clause and providing an
effective date we do have a card
wishing to speak mr william hudspeth all right chair would
entertain a motion on this item is
there any more presentation from staff is there any action
required no actions required actual
next rating okay all right well we'll sorry about that
council members all right so no action is
required on agenda item 6d we have closed that agenda item
we now move on to public hearings
public hearing agenda item 7a is hold a public hearing and
consider adoption of an ordinance of
the city of denton texas adopting standards of care for
youth teen programs administered by denton
parks and recreation department pursuant to hexes texas
human resources code section 42.041
good evening mayor and council members my name is dilly
williams and i work in the parks and
recreation department the standards of care are the
guidelines that we follow for our recreational
care programs such as the summer camp program and the after
school program the standards of care
cover such items as staff qualifications and training
discipline procedures staff to student
ratio training uh transportation fire and safety drills
programming etc the standards of care
require a public hearing each year and have to be adopted
by the city council annually we made two
changes to the standards of care since their approval last
year by council the first change
was as part of the city's compensation study we had some
position titles and descriptions change
and so we reflected those changes in the standards of care
and then the second item that we changed
in the standards of care was we listed the specific names
of programs that operate under
the standards of care those were the only two items that we
changed this year i can answer any
questions any questions for staff before we open the public
hearing seeing none thank you we will
now open the public hearing this is a public hearing
anybody wishing to speak please come
down state your name and address and your time will begin
anybody wishing to speak
okay state your name and address and your time will begin
my name is willy hesworth i live at 623 newton
what i really want you to consider is that certain
percentage of the youth that this program is
supposed to assist is is not helping the kids that it
really should help now this is i guess
this is staffing and trying to further program itself but
it's an opportunity to say we've got
to quit putting band-aids on what's the the situation that
's before us on my way over here
in the neighborhood that i live in those kids it's the 16
to 22 year old black male
who is not being addressed and he is the one that really
should have the attention given to him
by these programs and you're talking about staffing and and
i guess personnel to run the
program and it's sponsored by the parts department
something's got to be done for these young men now
the women are getting into it african americans the ones i
see i'm sure that they're more than just
my race has to be these are just the ones i see in my
neighborhood and to get an example of what
i'm talking about i want us to have come with me on a field
trip i want you to go with me on a field
trip you won't go but i'm just going to see it just so you
can think about it what maybe you might
be an eye-opener for you uh come go with me on a field trip
it'll start at the park fredmore park now you can't bring
anybody guards with you
it'll be at night it'll be it'll start at seven o'clock you
'll just go with me
and we're going to leave the park and go up hill street and
right down hill street toward the end
we're going to stop at a neighborhood over there and you'll
see what i'm talking about
you sit there and you look at these programs you think you
're doing something
well if that's not bad enough or not bad enough if that's
not enough difference
for you then we will go to there's a a apartment on mingo a
big large apartment complex on mingo
we'll go there about eight o'clock and we'll just walk we
'll just walk in that neighborhood and in
the big parking lot that they have out there and you'll
finally see what i'm talking about this
program only helps those as far as i can tell that a parent
gets them there and they're the ones who
are just kind of somewhat having a problem now you're going
to you're talking about funding the
staff for that group and i'm over there in my neighborhood
on ru dail and the in the areas in
that area by fred moore park and an mlk center something's
going to have to be done
should something pop off there which means happens and we
have got a crisis here like we've had in
other places i will be right back here if i survive it and
say to you i told you we need to do
something about that i think we ought to do something about
it before we get there thank you
sir this is a public hearing anybody else wishing to speak
please come down state your name
address and your time will begin anybody else wishing to
speak seeing none we will now close
the public hearing uh counselor any questions for staff or
chair would entertain a motion
councilmember gregory thank you mayor i move that we
approve uh the ordinance that adopts the
standards of care for youth and team programs councilmember
wasney i second the motion
we have a motion and a second for agenda item 7a let's vote
on the board please
okay
motion carries seven zero moving on to agenda item number
eight concluding items
concluding items items of new business councilmembers
anybody councilmember briggs
i i would like for um with all the historic preservation we
're talking about downtown and
all the updates that that's going on i would like for
council to consider um discussing an overlay
in that area um as soon as as soon as we can to protect our
downtown historic um area and also
we we talked about recording closed sessions once before
but that whole discussion um got away from
us so i would like to to bring that up again at some point
okay councilmember gary
uh probably two months or three months back i had requested
an update on um you know we had our wage
study and then we had people whose salaries went up and
then there were some it wasn't uniform so
i'd like some type of report i don't know if it's going to
be in our little small ad hoc group or
if it should be at the large group but just re-bring that
up because i don't think we've had that
discussion maybe at the small group and then up to the
large group what do you what are you exactly
remember we had the wage study wages were adjusted yes i
had requested a follow-up on that specific
point of what was the change in wages from the follow-up so
i'm sorry from one year over the
next because typically we would do like a percentage like
three percent everybody gets three
and we would know what the cost of that is but for last
year i don't think we actually have a cost
of what the change was so the net incremental change of
that decision to adjust wages yes please
that's that's exactly what i was trying to say in 1 000
words 500 any other concluding items
seeing none we will then adjourn this meeting the dent city
council at 7 37 p.m.