Apr 11, 2017 City Council on 2017-04-11 2:00 PM
April 11, 2017 City Council
Full Transcript
Good afternoon.
Wanted to welcome everybody to this meeting of the Dent
City Council.
Tuesday April 11, 2017.
It is 2 p.m. and we do have a quorum.
We'll move through our work session reports and this is a
special, I'm sorry, this is
a second Tuesday work session.
And we will go into a special call meeting, I believe, at
the end of this work session
and the closed meeting.
Work session report A is receive report, hold discussion,
provide direction on the design
schedule for the proposed reconstruction of fire station
number three.
All right, good afternoon.
Brian Langley, Deputy City Manager.
Excuse me, I almost went back to Assistant City Manager.
I want to spend a few minutes with you today talking about
fire station number three and
the design and construction of that facility.
Just in terms of background on this particular station,
this station is basically located
at the intersection McCormick and I-35.
If you can see on the map here, this is McCormick Street,
becomes Avenue A as you go to this
direction.
This is the current station three and this is the site of
new station three, which is
really just adjacent to that facility.
This land has already been purchased, so we're talking
about the design and construction
of that facility at this point.
So as you may recall, when we brought forward the design
and construction of station four,
we were over budget on station four.
We ran into some cost overruns on that particular station.
I think through that process, we determined that the
council really wanted some more options
to be presented to them through that process.
And so what we'd like today to do is to talk about how we
can bring forward a different
design process to get the council on the front end of that
process to understand the options
that are available and the cost elements that are
associated with each of those options.
And we'd like to bring it forward to you in three specific
phases.
The first of these is called the schematic design.
We would have this available about four weeks after a
design contract was awarded.
This would be about 15% of the construction documents and
this would really give you options
at this point for different types of roof options,
different types of foundations, and
for each one of those, we would be able to provide you with
the cost associated with
each of those areas.
So you could have some options and try to understand for
the options that are presented,
what are the costs that are related to it.
And then in eight weeks, excuse me, we would also have some
exterior facade and masonry
options that we'd show you at that point, too, at 15%.
And then at 45% of drawings for the design development
phase, about eight weeks later,
we'd lay out all the mechanical, electrical, structural
elements and give you a detailed
construction estimate of what we think that facility would
cost and then provide any kind
of direction or changes that the council wanted to have
through that.
And then later on in the process, about 14 weeks through
the design process, 95% of the
design drawings would be completed, we'd finalize the
drawings, and provide an updated
construction cost for you.
Yes, go ahead.
So my assumption from this is that we're not going to use
the basic design that we did
for the station on McKinney Street and the station on
Sherman Drive.
I think it would have some of the same design elements, but
because of this station, the
layout is different.
It won't be exactly the same.
So some of those elements would be brought forward and we'd
have some options to give
to you to consider.
We do have David Robinson here with Kirkpatrick and he
could discuss that with more detail
with you, but that's kind of the process at that point.
You'd be able to see some of those options.
So we still have a set of programming needs for that
station in terms of number of bays,
number of people, projected growth that we would be working
from.
Yes, sir.
On the station.
But we're talking about designing basically a new design
because of the footprint of the
property and not being able to accommodate the same type of
footprint that we did on
the other two stations.
Yes, sir.
That's my understanding.
Okay.
Thank you.
Okay.
So here is a proposed project schedule for you.
What we'd like to do is bring back a design contract on
April 18th, so at your next meeting,
to start the design.
We'd be working in the month of May to complete the
schematic design that I mentioned to you.
That's the 15% of drawings.
Come back and present that to the council on June 6th.
And then assuming that that was satisfactory to the council
, we would start proceeding
through the other parts of the process.
We'd come back to present the design development to the
council in August, August 8th, and
hopefully conclude all the construction documents in
November and present the final construction
materials to the council in December.
And then we'd initiate the construction of the actual
facility.
So that's kind of the process that we've outlined.
And the intent behind this is to keep the council in tune
with what's happening through
the design, give you options to consider for construction
so you can kind of know what
those different elements are through the process so that we
don't get to the end and anyone
is surprised with the cost.
Now, is this schedule similar to the other schedules?
I mean, even though it's coming to council with the dates,
does this kind of mirror the
same timeline?
For station two and four, as an example.
It's close.
It's a little bit longer.
We think the design schedule on this is slightly longer,
but it's similar.
Construction is also going to be a little longer.
I think it was 13 months on the other facilities.
About 18 months is what we're estimating for this one.
So council, with that, that is my presentation.
I'll be happy to answer any questions.
If there's any revisions to that process or changes that
you'd like us to make, we're
happy to do so.
That's my presentation.
So if you could, Brian, go back to your slide where it
talked about the three phases or
the three 15%, 45%, and 95%.
So let's say 95%.
We get down to this third, these construction documents.
And all along the way, we've been giving direction based
upon the costs associated with certain
design criteria on the station, like roofs or whatever.
So by the time we get to construction documents, we'll have
a pretty good idea, at least from
our estimators.
I mean, obviously, it hadn't been put out to bid by that
time.
But we'll feel confident, hopefully, in the numbers that,
and then as it gets constructed,
if there's some wide variance, there's going to be some
extraordinary reason for that instead
of, well, we'll know what we're getting as far as from a
design perspective.
Yes, sir.
That's the intent is that as early as 45% of the design,
you'd have a construction
estimate.
We would update that in the phase three of the process for
you to refine that even further.
And then shortly right after that, bid that.
And that's the intent is to try to have the very best
estimate that we can for you going
into construction.
Based upon if you want this component or this component,
you can--
Right.
And so obviously, as we go through these decisions, as we
look at those options, if the budget's
not there for some of those and we want to look at how do
we reduce some of the costs,
we can have some of those discussions.
Or we can make a decision that it's worth it to us to
pursue those.
And we want to find the dollar.
OK.
Great.
We know that one of the big cost is what type of foundation
we need to have.
So I'm guessing that we do soil testing on that property in
that schematic design phase.
Or when do we do that so that we have a good notion as to
what type of foundation?
I believe the geotechnical is going to be done in that
first part of the process.
That's correct.
I'm hearing that.
So we'll know in that time period if it's going to be a
structural slab or a slab on
the ground.
Yes, sir.
And that's-- we'd hope to have that for you in the
schematic design, that first part of
the process have at least two options for you to consider.
And there may need to be others, too.
Yeah.
And that's where you'll have the costs associated with each
one and--
Yes, sir.
--estimated length of life and pros and cons and those kind
of things.
Yes, sir.
I think that was one of the ones we had for station four is
the depth of the piers and
types of costs that are associated with those.
If we can bring you back at that information early in the
process, hopefully that'll alleviate
a lot of the concerns at the end.
Great.
Any other questions?
OK.
Fantastic.
We'll proceed in that direction.
Thank you.
Thank you for your time.
Work session report 1B is receive report and hold
discussion regarding activities of council
committees and council liaisons.
Who's handling that?
Yeah, you're on.
OK.
Thank you, council.
This item is on your agenda today as a request from the
council to be able to give an update
from your chairs of your committees and your council
liaison assignments.
And so in your backup, staff has provided a brief summary
of the major discussions and
tasks that the council committees have reviewed in the past
month or so.
Staff contacts for those committees are here to give
additional information if you'd like
it or the chairs of those committees can provide additional
reports.
OK.
Questions, comments from council?
Yes, Council Member McGarry.
Yeah, this was my request.
What I thought would happen was just at the beginning of
our meetings when we do clarifications,
we would just go around and whoever is on the committees
could give an update about
what's happening on the committee.
That was kind of what I was going for as opposed to taking
up staff time.
OK.
So, all right.
So we can discuss if that's a procedure that--so what you
're saying is not--this isn't
what you were really looking for.
It's like if this were the beginning of a meeting with clar
ifications on agenda items,
if I were chair of, let's say, the TMPA board, I'd say, "
Well, I have a report or really
don't have anything different."
Just give an opportunity.
You're saying take a time where if people want to share an
update, they can?
Or are you saying they should share an update?
I mean, I don't know how else anybody would know.
For instance, I'm on the RTC.
How anybody would know what happens on the regional
transportation council if I don't
give a report?
Sure.
So-- OK.
All right.
So, council is far--yes.
Does the agenda posting allow for you to give a report on R
TC today?
We would have to modify the clarification posting to
incorporate an update on council
subcommittee reports.
He said today.
Today.
If she were to give one today as a posting, allow her to do
it today.
I'm sorry.
Can you repeat that question again, Mayor?
Go ahead.
We have an agenda item on the work session today.
Say, "Receive a report and hold a discussion regarding
activities of council committees
and council liaisons."
So council member Begarry is our liaison for the RTC.
Correct.
So, based on the posting today, can she give us an update
on what's going on at the RTC?
Yes, she can.
Does council member Begarry wish to do that?
I'm happy to do it.
I guess what I'm trying to get at is that this was more of
a procedural request that
I made as opposed to a one item on this work session.
Sure.
I was making a request about how we do our procedure.
But if you want a RTC report, I'm happy to get it.
What I'm suggesting is we could try that right now and see
if we need to do it on a monthly
basis or every meeting basis.
So-- Sure.
RTC.
There's a VW settlement.
It's going to be a bunch of money.
We can get a lot of money from it.
It's about $60 million.
The Volkswagen settlement from the emissions.
So we should be coming up with projects right now to submit
for the Volkswagen settlement
monies.
So when you say we-- The city staff and council--
No, no, but when you say there's a 60-- did you say $60
million?
Oh, no.
It's more than that.
Hold on.
I'll get the exact amount for you.
I didn't realize we were going to do reports.
I thought we were going to decide to do reports today.
There's a little bit more matter.
And I agree with that.
So let's talk about that.
So what-- if I'm incorrect in sort of summarizing what you
're requesting, feel free to correct
me.
What I'm hearing her say is she wants an agenda item.
Like if we had this agenda, we could have an agenda that
says council committee and
council liaison reports.
And it's either on a-- every agenda, it's on every third
agenda or some kind of regularly
scheduled interval where if someone has an update on some
committee that they're on,
whether it be a city council committee or another committee
outside extra jurisdictional
committee, that they have an opportunity to give their
report.
Is that what my understanding is on that, council member?
That's correct.
It can be during work session or regular session.
It really doesn't matter when.
I just thought-- and it doesn't even have to be an item.
I think it could just be a little bit more clarifying
language to allow the reports.
Oh, OK.
Yeah.
I think that we're-- I mean, I don't have any-- I
personally don't have an issue with
it being an agenda.
I'd rather have it in work session than out in the council
session because that's valuable
real estate out there.
Sure.
And we can adjust the times accordingly in the work session
.
I don't have an issue with it being an agenda.
We have that in our TNPA board.
We have personnel and finance committees that we pass those
reports.
Yes.
I think we should shy away from first and third Tuesdays
because they're already really
long.
So second or fourth-- and occasionally we don't meet on the
fourth.
So maybe the second Tuesday, once a month, would be a
logical time for city council committee
updates and/or liaison reports and just do it once a month
so that each council meeting
were not--
Sure.
So that might be a recommendation.
OK.
And most of the outside committees that people are on,
council members are on, like RTC,
COG, they only meet really once a month.
So that sort of makes sense there.
I'm OK with that.
I mean, I like the idea of-- yes, council member-- or Mayor
Pro Tem.
Sure.
I don't have any issue with it.
A couple thoughts would be I think we'd want to clarify
what-- do we get into discussions
then on the basis of somebody brings up an issue like that
and the question's asked,
how much money?
OK, what are we able to spend it on?
It seems like it would end up becoming a work session item
that we might not want to-- we
want to be clear about what the scope of that is.
And maybe also to clarify the other means of getting
information out to council.
I know when I was on RTC or even times as chair of various
committees, we've tasked
staff with saying put a report together and get it out in
the next week's packet for council
to brief them on this issue so that they're aware of this
particular thing.
So just to make clear that there's other means too of
getting that stuff out into the council's
consciousness.
Yes.
Council member Gregory and council member Briggs.
I've already spoken.
OK.
Council member Briggs.
Well, I would also say to that point, though, there's also
people who listen in public that
listens to work session items and they're recorded.
And so if it's in a staff report, they may not see the
update.
So this is-- I agree that it's a good way to get committee
information out to the public
once a month if there's an item-- if someone has something.
You're not necessarily always going to have something.
Council member Hawkins.
Yeah, I think I'd be OK with this if it's an important big
item.
If it's kind of more just smaller stuff, informal staff
report, I still think would be better.
So yeah.
I guess my thought is what I would not want to do is by--
do this in a way that it does
not make those committees not necessary.
The whole point of having those various council committees
is to go much deeper into the weeds
and deal with the details of things.
And if each month we have a detailed report from every
committee and then we all have
a discussion on it, then there's no point in having the
committees because then we're
becoming a committee of the whole.
And I know we had a mobility committee meeting today and we
had updates on reports that we
have monthly on progress on system projects and our
quarterly update from DCTA and things
like that.
And occasionally at meetings like that we say this is
particularly important.
As Mr. Roden said, please send that out to all of the
council members or we think that
we need to get some time for the whole council to hear this
particular thing, this particular
item.
But what I would not want is for us to end up doing the
business of the committees.
Otherwise we don't need the committees.
We will need to schedule some more meetings during our
month in order to get all of the
business done.
Just my copy of that.
Yes.
Council Member Wasno.
And just in terms of time management and the wise use of
time, not just for council but
also for citizens who watch these meetings, I wouldn't want
to see a whole hour go by
with council committee reports that just bogs down the
whole process.
Maybe consider putting a time limit on it that if you're
going to give a report, three
minutes in and out done and anything that requires longer
than that put it in writing,
put it in a Friday packet.
But it at least touches whatever it is that a council
member deems important to share
with council, three minutes done.
And if a citizen wants more information, they can email the
council member as well.
And then again, if it's like mobility and there's a report
that is lengthy, that can
go in a Friday packet.
But I think just to really be heads up on the time
management so we don't get bogged
down.
Sure.
Yes.
I really don't see this specifically for, I mean, I guess a
council committee could
use it to give an update.
I think that the things that need to come to the full
council out of a committee typically
come when it's time for them to come.
I see this more as for those outside committees like RTC,
COG, TNPA, some of these other things
that there's only one council member there that's
representing the city.
And so, and there's really not any kind of information
conduit between staff.
So I think we can try it.
And certainly it's, I don't think we're going to get into
big discussion.
If we do, we'll just call it for a work session because no,
that's not going to be my point
is to say, hey, I can ask some questions that can later be
distributed in an informal staff
report the answers.
But I agree.
It's an update only.
And then if something comes out of that, then we can.
It's probably primarily going to be used for those outside
committees is what I would think.
Unless the committee itself, I would really encourage, if
we need to memorialize it in
the rules, is that if a committee chair, and I would say
the chairs of those committees
are the ones to give those updates, I don't think that, you
know, just a standing member,
I think the chair is the chair.
And so if they're going to give an update that needs to
come through the chair, and
I would hope to think that the chair and the rest of the
committee would be on board with
that update being given, that it's decided upon that
somebody's not doing it unilaterally
without the rest of the committee being informed and giving
approval of that as well.
So it'll be something that evolves, but I think on the
agenda committee, we'll take
a look at that and start putting that on the second Tuesday
s.
I think that's a good place to put it.
Thank you, Councilmember Wasney.
And we can just put a time limit on it.
And if there's some things that seem to take a little bit
longer, we'll schedule something
else for it.
All right.
Councilmember Gary, anything else you would like to add to
that?
I think that's it.
Okay.
Thank you very much.
Agenda item, moving on to agenda item 1D, which is receive,
report, and hold discussion,
give staff direction regarding prohibiting...
Oh, see, have I missed something?
Yes.
Oh, yes.
I saw committees, council committees, and I'm sorry about
that.
1C, I thought I missed one.
Receive, report, and hold discussion, give staff direction
on potential changes to the
scope of the City Council Employee Leave Ad Hoc Committee.
I was just real anxious to just get through the work
session.
Sorry, guys.
Thank you.
Carla?
Good afternoon, Mayor, members of the City Council.
Carla Romine, Director of Human Resources.
March 7th of this year, the council approved a resolution
that created an Ad Hoc Council
Committee to review policies related to employee sick leave
and vacation benefits and advise
the City Council with regard to these matters.
The committee first met on March 24th.
During that meeting, they had some discussions about it
could be beneficial to expand the
scope of this committee to be able to talk about other
benefits aside from sick and vacation.
That's the purpose of this specific item today.
And Council Member Wasney was elected as chair of that
committee, so I didn't know if she
had anything she wanted to add.
You want to give us an update, Council Member Wasney?
You've got three minutes.
Oh, three minutes.
You know, if it's good enough for our citizens, it's good
enough for a council member.
That's right.
So I want to thank staff for putting together this just
excellent summary.
A lot of work, a lot of time, a lot of effort went into
this.
And it's really all-encompassing.
And so we had a productive meeting and then kind of ran up
against a brick wall because
our scope was limited to a certain lane, which was vacation
time and sick leave.
And all we'd like to ask, and the reason we have the ask
before you today, is to broaden
the scope a little bit so that we can take a look at
everything that's in the book if
we want to.
But we couldn't because the scope was so limited.
And again, I'll emphasize that it's an ad hoc committee, so
it's not long-term.
It was productive.
It was informative.
And I thank staff who was there.
We were in.
We were out.
But we were finished because we couldn't take a look at
what staff had worked on.
We just had to set it aside.
So that's our request today.
Okay.
And who else on that committee?
I think it's Councilmember Gary yourself and Councilmember
Briggs.
We had our city manager, head of human resources, Brian
Langley.
And there's manager Scott Payne.
Scott Payne.
Okay.
All right.
Okay.
Open.
Yes, Councilmember Gregory.
Well, I was looking at the resolution that authorized this
ad hoc committee and it lists
the three council members who had volunteered to serve.
I'm guessing that by the time we get a new resolution with
a revised scope for what they're
to hear and the committee has time to meet, one of those
council members will no longer
be on the council or maybe in the city.
So we probably need to think about revising the committee
membership at the same time
that we do this.
And I would request that if the committee can meet sometime
in the next five weeks,
then there's some continuity from the first meeting to the
second meeting at which point
then I think council can do-- and we may be done after one
more meeting.
So, you know, but we needed to get permission today to be
able to schedule because we have
another five weeks when I'm still here.
So that would be my request that we just continue, have one
more meeting and then decide if we
even need that ad hoc committee after that next meeting.
Okay.
All right.
Anybody else?
Comments?
I think the only question and a comment.
So I know the original scope was to-- and so correct me if
I'm wrong-- to look at vacation
time and sick leave under the current benefit definitions
or benefits.
And was there a desire to make any changes to that?
There had been some that had talked about, do we need to do
something different with
vacation time or sick leave?
So in y'all's meeting, did you talk about it to the point
where there was any decision
or direction on at least the original scope of the
resolution, which was do you see any
changes that you're either recommending or that you're-- or
not?
So let me back up.
When we did the salary comparison, we compared it to nine
other cities across North Texas.
And so that's where this report came from because we
extended looking at the scope of
employee benefits also with nine other North Texas cities
so that we could kind of take
a look because we looked at salaries with the nine cities
but we didn't look at benefits.
This report then looked at the nine cities.
So there were some recommendations, ideas, but there were
about three different paths.
And what I would ask is that we finish looking at this and
then Carla will come and present,
here are some options and ideas for the whole council.
I think it would be premature right now to just chop it in
half, take a look at part
of it because I think we need to take a look at it as a
whole.
Okay.
All right.
As far as-- and my only observation on that is-- well, let
me just say, I don't have an
issue with the expansion of the scope.
My observation is if you're saying we want to look at the
entire benefits package and
maybe make recommendations to change whatever benefits that
we're offering to city employees,
is that what I'm understanding you're asking?
No.
We're looking at comparing the city of Denton with nine
other cities.
One of the questions was on the health insurance,
specifically deductibles and that kind of
thing because it was-- if you read the book, it was a
disparity from the other North Texas
cities.
But we couldn't really have an in-depth discussion on the
balance of all of these because you
can't just zoom in and look at one item because your salary
and your benefits, it's a whole
package.
Right.
So in answer to your question, no, we're not zeroing in and
looking to change at all of
these.
It's just interesting to look at comparisons with the other
nine cities.
Some of them were right in line with the other nine cities
so it's not even worth kind of
taking a look at because it's part of the rhythm and flow.
But the health insurance deductible and that was something
that I think we could because
it hasn't been looked at in a long time.
And again, there isn't anything that this committee can do
by itself.
I understand.
But it lets us really have an in-depth discussion with the
people who look at the books, look
at the numbers and are involved before it comes back to
council to say it's worth the
discussion.
What do you think?
Right.
Okay.
So maybe I'm a little confused because I thought that the
ad hoc committee originally was to
look at the request was because there was a request made
when we were talking about
the benefits that should we not have as many rollover hours
available either in sick time
or vacation time.
Or some cities do use it or lose it.
And so then the direction of the council was okay, you all
form this committee, go look
at the data and form a recommendation which is fine.
Don't have an issue with that.
So if we're increasing that scope of looking at some of the
benefits may not be something
that you all are coming back with some recommendation.
My whole point in saying this is if we're going to look at
a comprehensive, if we're
going to take a comprehensive review of employee benefits,
not just sick leave and vacation,
deductibles, I would hope to think that somewhere in that
process we have an employee group
that is also part of that discussion.
And so that's why I'm asking if it's this overall kind of
we're going to look at this
and compare it to other cities and do we need to maybe
bring some recommendations back to
council.
If that's the objective, which I don't have a problem with
that, so let me just say that
upfront, I think we might need to include some other people
in the conversation from
staff perspective to help try to provide that voice of the
employee.
Because if we're going to be making those decisions it's
going to be impacting the
employees.
And somewhere down the line we're going to have to take
into consideration some of their
questions, concerns, observations.
And so I'm just trying to figure out how that works into
the process.
So on its face, no problem with giving you extra time.
I just don't think it could be done in one meeting unless
there's really just, well,
we don't see any changes that need to be made, but if there
's substantial changes, I would
want to think that we have some conversation with whoever,
staff.
I don't know how this works, but you probably understand
what I'm trying to say.
So yeah, no problem with your request.
So if I could, let the ad hoc committee meet one more time
and take a look at this.
And at that point, turn it over to human resources and our
city manager and let them, you know,
because yes, there were some ideas that came forward on the
rolling hours and all of that
with two or three different options.
And so I still say I think to have kind of one report from
human resources, here are
some things to think about.
And then at that point in time, you know, if there are some
changes that we want to
get employees involved in, I just embrace that completely.
Sure.
Sure.
Okay.
Mayor Pro Tem, did you have a question?
I thought, okay, no.
All right.
So Carla, any input or?
No, okay.
You're just getting up.
Okay.
All right.
Any other questions on the proposed resolution?
Yes, I'm sorry, Councilman.
So just to be clear, we're okay in one more meeting to just
kind of broaden what you all
talked about.
I'd be okay with that.
So the red, yes, Mayor Pro Tem.
Is it, and just to get more clarity as to, again, I had, I
voted against this and I had
an issue with I didn't get a sense of what the goal was.
We hadn't defined the goal or even defined the problem.
So I'm always concerned with efficiency of our time and
staff time when we're looking
at goal-less issues, I guess, or problem-less issues.
So in this case, are you saying when you identified a disc
repancy in our employees' health insurance,
what did you, what were you pointing out, the discrepancy?
It's the deductible.
Oh, the deductibles.
Are they two, are they higher or lower?
They're actually much lower and they haven't been changed
for a long time.
So I would look at that and say in the current health
environment, that's a really good
thing.
But again, my question would be, I guess I'd want to know
from the ad hoc committee, what
is your goal?
Is your goal to increase deductibles of our staff
healthcare by looking into this?
As a steward of the taxpayer dollar, if you look at the tot
als in this book, and I would
defer to human resources, I think it's 18 million for
healthcare last year and it goes
up 6% a year each year.
So hearing that at budget time, 6% a year, 6% a year, 6% a
year, 6% a year, that's when
you stop and say, maybe we need to take a look at something
.
So staff, like I said, did an excellent job at compiling
all the statistics, comparing
it to nine other North Texas cities because we looked at
salaries and adjusted those accordingly,
but we didn't take a look at this side of the equation.
Doesn't these sorts of things, sorry, is it okay if I ask
you?
No, it's not.
Don't these sorts of things, it's probably a good idea.
Don't these sorts of things get ferreted out as part of a
normal course of budget inquiry
every year?
In other words, I feel like we hear from risk management
every year around budget time for
an update on what's the state of our health insurance, what
are we doing to tweak things,
what's the staff recommendation of this as part of that.
Is that normal annual review of these sorts of issues that
the full council is part of
that discussion, is that not a sufficient approach to this
or is there something else
you guys are angling to try and solve with this ad hoc
committee?
Not trying to solve anything except government's job is to
be a steward of the taxpayer dollars.
I understand.
I have never seen a comprehensive report like this one in
my two years on council.
This was excellent.
So again, out of respect for staff, to be able to open this
up and have a meaningful
discussion, no decisions or policy established, it comes to
council for council to review.
That's what committees do.
So that's the scope.
You Mayor Pro Tem, and I understand what you're saying.
I think though the genesis of this report was when we did
our salary survey and we did
our salary survey, our compensation study, and so we
compared it to other municipalities.
As we got into some discussions with new hires and things
such as that, I think what sort
of became not clear but sort of bubbled to the surface is
that were we just comparing
salaries, or were we comparing total compensation, all the
benefits package, which does go into
people's decision making process on what salary they will
accept.
We don't go into that level at budget time.
We just go into here's what we're looking at, here's what
it's going to cost the budget.
So I think this report sort of was born out of that
discussion of how do our total benefits
compare to our peer cities and the salaries that we pay,
not just looking at the salaries
singularly.
And so I think to review that and to see if there's things
that whether or not you raise
deductibles or lower, and that's a policy decision that the
whole council will make,
but to review it and to make sure that if we are making
decisions on salaries, on vacation
pay, on pension, on health insurance, that we have at least
as much knowledge as we have
as what's the marketplace.
I mean that was really the whole genesis of this is where
are we in the marketplace with
salaries and I think what I'm understanding is why don't we
look at this from the perspective
of where are we from a total compensation package, benefits
package, in the marketplace.
It's more of just sort of a review and observation than I
would say there's a problem we're trying
to solve.
It's just sort of a back check, which we do that quite
often I think to make sure that
we're in line with other municipalities.
So I think that was really the genesis of this and I think
the spirit of what the committee
is asking for in that regard.
Understanding you may still disagree, but that's okay.
That's democracy.
But that's the point is you may disagree with what you
think is the goal, but yet that doesn't
mean that that is the goal.
It means there may be some other things that...
Well I think it's pretty clear there's been no stated goal
and no one wants to give one.
So that's my point.
No I just did.
I just did state a goal.
No I heard it.
Okay.
And I think again the entire council had the discussion
when we reviewed salaries as it
related to the marketplace.
And again I wasn't clear why we were diving into this
specific issue of it looked like
rollover, vacation time, sick time and that sort of thing.
Now we're wanting to broaden that.
The whole council is going to be in budgets within a month
on these issues and at any
point can say we want to have an entire two hour discussion
on these sorts of things.
So again I'm just looking at efficiency of the process and
so anyways.
So I would much rather a subcommittee maybe do that than
budget real estate time is pretty
limited.
But I understand it.
I think I'm not hearing that you're opposed to the analysis
.
It just may be the timing of the analysis or the process of
the analysis is what I'm
hearing maybe is what you're talking about.
So I'm okay with...
Do we have an action item on this?
Is this resolution an action item?
No, what we'd have to do is work with legal and bring back
a revised resolution.
You just need direction?
Yes.
Okay.
Yes.
All right.
So what I'm understanding at least from your summary
Council Member Hawkins is that so
if I'm not right Madam Chairman let me know that the
committee is asking for just an expansion
of the resolution to include the benefits as outlined in
this report that the committee
received so that you can discuss it at the committee
meeting and that you're asking for
one more meeting prior to Council terms expiring or the new
elections to have a meeting and
bring back any recommendations or observations.
It may just be observations that the committee deems
appropriate for Council.
Is that it?
That's correct and again it'll be human resources that
brings back kind of a summary and discussion
and it'll be Council that decides you know if they do
anything and if they do what.
So just want to emphasize that.
So to my Council committee members I'll be sending out an
email to try to look for a
date because it gets so hard to find a window of time
sometimes.
So thank you.
I think we...
Council Member Briggs did you have a question or comment?
I thought I saw you.
Council Member Gary you're on the committee any comments?
Any?
I just want to be sure that we're not in the new resolution
.
We don't say that there's one more meeting because then we
'll have to come back for another
resolution if there have to be two meetings.
I mean the resolution will say one more meeting in the next
five weeks but then beyond that
it's not limited is it?
Because that's not...
When we have the committee meeting what I took away wasn't
that we need one more meeting.
It's that we needed an expanded scope because all of the
benefits fit together like a little
puzzle piece.
All right.
Okay any comments on that?
Observations on Council Member Gary's observations?
Yes, Mayor Pro Tem.
This is just a legal question.
Does the resolution specifically include the names of those
on the committee?
In other words are we going to have to come back for
another resolution anyways in the
event they want to go beyond that one meeting because they
've got you're going to have to
put another person on it?
Is that correct Mr. City Attorney?
That's correct, we will have to come back and actually
change the name if more meetings
are required and we go into May and June.
Yes.
And I think that's appropriate in a sense because we'll
have three new council members
and then we can sort of revisit this policy discussion of
whether this committee even
moves forward.
I mean that's sort of you have a whole different discussion
about that.
Yeah.
And we may be finished after one meeting.
So let's just do a simple resolution in and out done and
cross the next bridge when we
come to it if we need that bridge.
Okay.
So it sounds like that it will be limited to it doesn't
even have to be if you all
can get two meetings in May.
So I would just say that maybe the committee resolution
either expires or something by
date certain.
I mean because we don't want to if you can have two
meetings within that amount of time
I'd say go for it.
So whatever the date is for the council elections and or
the swearing in of new members I think
that would be I think that'd be probably a better use of
that.
We'll put something on your next agenda.
Okay great.
Fantastic.
All right.
Thank you.
Appreciate it.
Now we'll go to item D. Receive report and hold discussion
give staff direction regarding
prohibiting parking on Denton Street from Oak Street to H
ickory Street and Texas Street
from Vine Street to Frame Street.
Who's handling that.
Oh there he is.
I was hiding down here.
There he is.
It pops up.
Gosh.
Yeah that's great.
All right.
I'm almost there.
I'm just pulling a couple of things.
So good afternoon.
My name is Preetan Deshmukh.
I'm the traffic engineer for the city.
Great.
And this item originally came in for the last council
meeting but it was actually two streets
segments that we had within the city.
One they were coincidentally one close to TW and the other
one close to UNT and both
are kind of combined in this report.
We're asking for no prohibition along these two street
segments.
There are one block segments.
One on Texas Street and the other on Denton Street.
I'll pull up a little graphic.
This is the first one.
And the reason they were separate items the first one was
came in from the fire department.
They had some specific concerns and requirements to get
their fire equipment and I'll briefly
I'll leave this allows me.
I'll briefly touch on why they requested that.
And then the second one was request from several residents
and concerns from people living
in the neighborhood around Denton Street between Oak and H
ickory.
So the first one is a result of I think it all began with a
lightning strike in this
middle apartment building and that building completely
burned down well it burned down
40 percent but it was destroyed to a point they had to
reconstruct.
And when they came back city started looking at the new
fire code, started looking at the
height requirements.
Basically our code allows us anything under 30 feet is okay
but anything about 30 feet
we need aerial apparatus emergency equipment to be you know
access that part of the building.
So this building is planned to go 34 feet and for the
aerial apparatus to be deployed
it requires 26 feet clear width on any street or driveway
or area around the building.
See you can see there is an area in the backside.
If you leave the parking area fire department looked at
this particular drive aisle and
they found it was only 24 feet it does not fit 26 feet so
they can't really deploy the
equipment here.
The other issue was turnaround of the equipment in this
area they can provide a turnaround
it's more than 150 feet long it's about 245 feet.
The other location they looked at was this street and I
think they had some similar issues
I think Laura can talk to that Fire Marshal Laura is here
and she can talk to that.
Then finally they settled on the only option they had was
to get access off of Texas Street.
They required 26 feet the current width of this street from
curb to curb is about 30
feet.
So if you allow parking even on one side then you according
to fire code the parking requirement
is 6 feet so you go down to 24 feet you still don't have 26
feet.
So that's why parking restriction on both sides was
recommended by staff and we've
taken this to Traffic Safety Commission this item and the
next item but both those were
approved by Traffic Safety Commission.
I can talk to and questions about this particular segment
or I can explain the other one and
then we can talk about both.
I got a question for the Fire Marshal.
Good afternoon.
Good afternoon.
So explain to me help me because I'm struggling with this I
'll be honest with you because
of just it's really a code issue at least it's that's sort
of what how it surfaced.
So you've got your I guess it's the aerial apparatus
correct which I think I actually
saw it deployed today on a EMT call or something paramedic
called it.
So how wide are those they can still go down city streets I
presume.
Correct yes.
How wide are they?
So our new truck is actually 8 feet wide.
And it deploys its outriggers it's a little over 17 feet
wide.
And the outriggers are the things that sort of brace it.
They are the stabilizers to deploy the aerial apparatus yes
sir to deploy the ladder.
So you've got the 8 feet width and if it's let's say it
pulls up on Texas Street let's
say there's no cars there.
Correct.
All right well let's put let's just make the cars the way
they are configured in the
picture so it pulls up there and it's so it's taking up 8
feet and then it's got
to set its outriggers out and when it sets its outriggers
then from outrigger to outrigger
on the other side is 17 feet.
Correct just a little over 17 feet yes.
So help me there's help me understand the 26 foot
requirement.
Okay absolutely.
So a standard fire code you know fire lane fire apparatus
access requires 20 feet and
then we have the additional 26 foot requirement for aerial
apparatus which again not only
takes into consideration the deployment of the stabilizers
but that additional space
that additional footage also gives us a couple of other
things.
It gives us the space that we need to deploy our resources.
It also gives us the space that we need for operations for
actual you know operations
of at the fire scene and the third thing that it does is it
allows two emergency vehicles
to be able to pass each other because not only is access
coming in an issue but also
the ability to exit is also an issue for us in public
safety so it's not just about the
width of the apparatus itself sure but it also allows us to
deploy resources perform
operations on the scene and also allows two emergency
vehicles to pass each other getting
in or out of an active scene.
I thought the regular fire lane was 24 feet.
It's 20 regular fire lane is 20 foot aerial apparatus is 26
.
Okay that's interesting.
So if you're if the top of your ridge cap is less than 30
feet or less then your fire
lane like I say this parking lot here correct then that
only has to be 20 feet.
Any structure so it doesn't necessarily just have to be the
building according to fire
code.
Yeah so if you've got a 25 foot structure but you've you
also have let's say a mechanical
room or you have HVAC systems that take it above 30 feet so
anything above a 30 foot
structure it not just including the building itself but
anything above that then we do
require a fire aerial access.
Why did I think it was 24 feet?
I sure I mean I'm not well I think I'm building a project
and I think it was required of 24
feet so that's the only reason I asked.
So I'll get some verification.
It's always been either 20 or 26.
Based upon the height.
Based upon the height yes.
Now this right here is 24 feet.
We did I have had many conversations with the project
manager on this and we looked
at the possibility of trying to widen this but yeah that's
gonna be impossible.
Yeah it is.
They're completely landlocked here and it's actually this
building here that was struck
by lightning.
Right.
The only thing that we have with this particular fire lane
is as Preetam mentioned it exceeds
150 foot required.
Yeah almost by 100 feet.
So they can't okay.
Dalton if you just allow me.
So this is part of my question as well because I know under
current fire code when these
were built it was not required.
Correct.
Everything's got to be sprinkled.
Correct.
Anything above two units I believe has to be sprinkled.
And so we certainly need to make sure that fire personnel
can get in there and do their
job but we also have so many other code requirements that
are meant to really suppress a fire so
that we don't have to call I don't even know how they
measure it call two or three or four
alarms or however they do that.
So that's just an observation.
That's why I think I struggle with this is we do have a lot
of codes that are attempting
to knock these things down so we don't have this kind of
issue with something burning
you know 40 percent.
And that is correct.
Anytime we have some additional fire suppression
protections in place code does allow flexibility
in certain areas.
Now in this particular case though we still have these two
buildings here that are unprotected.
They do not have fire suppression systems.
This is the only one that because of the percentage of
construction the rebuild that they had to
do it did require it to come up to not only fire code
current fire code requirements but
all code requirement.
Yes.
Yes sir.
So at the time it was not.
So really then the so the two buildings that are remaining.
Yes.
They're not really subject to quote unquote the fire code
we're talking about because they
they didn't have to be modified.
It's just this building.
So we're almost saying we're trying to knock off parking on
either side to help for this
one building that got destroyed.
This now got to be up to code.
Well it actually will help the other two buildings because
again these two are not protected
by a sprinkler system.
So it would be even more important for us to access these
two buildings.
Well no I get that but if this building hadn't been burned
we wouldn't be having this conversation.
That is correct.
I mean so the the access issue is still there when this
before it was in this destroyed
state.
Correct.
Councilmember Gregory.
I'm sorry.
Let me ask it a different way to make sure I'm
understanding because I think I discovered
new information.
You need a wider area for your fire apparatus if a building
is over a certain height.
Correct.
And the height is what?
30 feet.
30 feet.
So if it's less than 30 feet for example a 26 foot wide
roadway is sufficient because
there's still room for six feet of parking and 20 feet for
fire apparatus access.
Yes sir.
Thank you.
So if the code does allow some flexibility.
Would the fire department not feel comfortable with just
having no parking on one side of
the road?
I don't know which how you pick the side.
That's a whole nother issue and I get that.
But I think what I'm struggling with is just saying all of
a sudden there's no parking
at all allowed on that road.
So the equipment needed to get to the top the above 30 feet
would 24 feet be sufficient
to do that or you need the extra two feet?
The flexibility that the code allows us is really about
being able to reach points of
a building.
So another kind of common 150 foot standard is that we have
to be able to reach all points
of an exterior, all of the exterior of the building within
150 feet.
When we have a protected building like fire sprinklers we
can look at that project and
determine whether or not we can exceed that 150 foot rule.
So those are some of the flexibilities.
In this particular case again we did the one block simply
because that was the easiest
to say from this street to this street.
I mean we can certainly look at bringing that in.
But with all three buildings exceed 30 feet and at this
point only one of them is protected
by sprinkler system.
We have additional access to this particular building, you
could get to it from Vine, but
these two are the ones that we're concerned about.
And so the buildings on the other side of the road, what
height are those?
Those are single family residential.
See that's kind of what I'm struggling with.
Just because somebody built something across the street
from them now they can't have people
over and have them park on the road and entertain.
So that's why I'm just trying to figure this out.
I feel like the most practical thing to do is just not
allow parking on that side of
the road if the fire department is okay with that, if the
code is flexible enough for that.
We do have some additional challenges here because of some
overhead utility lines.
We can definitely revisit it to look at access.
Again, it's these two buildings, this one's protected, this
one's on a corner, we can
still access.
This one's an issue, this one's a concern, but also these
two not being protected.
These types of issues, even in District 4, I'm not even
going to say the neighborhood,
this is a big deal doing this to some people.
It's a huge deal.
It is something that we're facing more and more because we
're having multifamily units
development coming into areas that are traditionally single
family residential.
Now in this particular case, this one has been there since
2002 and the requirements
were less restrictive at that time, but we do have more
recent developments that this
is the same challenge is something that we're having to
address.
We'll go to Mayor Pro Tem and then Councilmember Washington
.
You also have the compounded problem that this is a block
away from a university, so
anytime you restrict parking in a very parked place during
the day, it's just pushing it
off to other parts of the neighborhood as well, which is
already pretty congested.
I didn't notice in the backup, we usually do have a
communication plan associated with
these sorts of either staff or citizen initiated requests.
Did we notice the property owners surrounding and what was
the response on that?
Because I imagine most, if not all of those on the north
side of the street, I guess are
rental, so what was our procedure for that?
We went through the standard notification procedure on any
parking restriction and I
believe we received just one in opposition and it was a
resident of the apartment complex.
The apartment complex right now is currently being used as
student housing by TWU.
Let's see, Councilmember Wasney?
So would you explain, I heard part of the discussion and
explanation that the reason
you want both sides of the street and need both sides is
the width of the street.
By the time you put the fire truck with the extenders, you
need room to get around that
by another emergency vehicle and not just an automobile.
And so that explains the need across the street because it
gives you the adequate footage
to have the big fire truck with the extenders and get
another emergency vehicle around it.
I just see this, our number one responsibility is public
safety.
I will just hone in on that every single time.
I get it that yes, there's parking, yes, there's student
parking, but I would ask this Council,
are you going to look yourself in the mirror if there's a
fire in one of these multi-story
apartment buildings?
And our fire department is unable to service that fire and
service those fire victims adequately
because we weren't willing to give up some parking spaces.
The answer is, it's a tough trade-off, but if our fire
department comes to us and says,
based upon fighting a fire in this location, we had some
real issues on fighting the fire,
because of those issues, we are asking for a public safety
decision here.
So if and when another fire hits, we have the adequate
space to position our fire equipment
and we can fight a fire and save lives if that's what we're
called upon to do.
So that's my question.
I think it's a tough one and it's always a tough one, but I
support the fire department's
recommendation and request.
Council Member Gordy.
Get back to what Mr. Hawkins was saying.
So imagine somebody across the street, the house was built
in the 40s or 50s, some elderly
lady, imagine maybe 65 years old, lives across the street
and she has a Wednesday Bible study
at her house every week and her 65-year-old friends come
over there.
And now, because the apartment owner across the street
wants to build a tall apartment
building, she really can't have that anymore or she can't
have friends over because they
can't park in front of her house and there's not room in
her driveway.
So that's what we're saying, right?
It is a unique situation and again, this has been there
since 2002 and they are rebuilding,
just to give you a little bit more, they are rebuilding the
exact same building that they
had before.
So we're allowing them to rebuild the same height even
though it's under a new code.
That is what they've chosen to do.
Now that's not something I would allow them to do.
That's the development plan, that's the structure that has
already been redeveloped there.
They have essentially rebuilt what they had before and we
've given them the requirements
needed for that.
Do you have a building permit now to build there even
though there's not the apparatus
to -- I mean, I'm not trying to argue, I'm just trying to
understand.
We've already given them the building permit.
They have a building permit for that project.
So do we have a choice of buying an apparatus that gets the
same height that doesn't require
17-foot stabilizers?
I mean, are there other apparatuses that we could have
bought that would have provided
the same safety for the people up there in the buckets that
required less physical room
for stabilizing?
Well, certainly there are other apparatuses that are
smaller that all have different capabilities.
So their size will determine the capability of that
apparatus.
We do have another ladder truck, it's called a quint, that
has a smaller ladder height
on it.
It's a 75-foot ladder, but it's also 16 feet 9 inches.
So it's still right at that -- Not much less.
Correct.
So there's not a lot of -- We're still looking at about 17
feet in width with the outriggers.
And again, as we would change specifications for a smaller
vehicle or smaller fire apparatus,
we would also be looking at possibly reducing the capacity
of that engine.
Reducing its capabilities.
Okay, so it could go up as high -- We could be as -- We're
reducing capabilities at that
point as well.
Okay.
Thank you.
I think -- Do you have a question?
Yes, go ahead.
So we're looking at this because the two buildings do not
have fire sprinkler systems or fire
suppression equipment.
Is that what -- This issue came up specifically because of
the building that is being rebuilt.
At 34 feet, it triggered the aerial apparatus requirement
for a 26-foot fire access lane.
Okay, so it doesn't have anything to do with the two other
buildings that are there?
No, it's the new development that spurred the requirement.
Okay.
Council Member Gary.
I have a process question.
So when, for instance, the applicant came forward with this
application for a 34-foot
building, was PNZ or fire -- I'm sorry.
Was the fire effects or the effects on the streetscape and
the needs for fire control,
was that a part of the discussion that was had when their
permit was issued?
They were told of the requirements at that time.
I'm sorry.
Who is they?
The applicant?
The applicant, yes, the developer.
Okay, but were the surrounding -- you know, was PNZ
informed or were the neighborhoods
informed?
Because it kind of seems like knowing what the effect on
the streetscape is of a building
height would be very helpful early in the process.
This project would have gone through our normal DRC process
.
I do not believe that there is any notification to PNZ or
to residents of what would be in
our case, you know, a standard DRC process and requirements
that are being communicated
to a developer.
Okay.
Thank you.
I think globally speaking, we're going to have to figure
something out.
I mean, our downtown core is filled with all sorts of
streets that are much less wide than
this.
And we're going to get more and more dense.
It's going to happen.
And somehow there's big cities all over the country that
have very thin streets that figure
this out.
I don't know if they have different codes.
If we're adopting like a suburban code and there's an urban
code or how we -- I mean,
this hypothetically could have been a 24-foot wide street.
In that case, what would we have done?
We would have had to take property in order to widen the
street in order to fulfill this.
I mean, that would have been an absurd conclusion to this.
So I don't know that this answer to this problem can be
universalized in a way that I would
feel comfortable with across our city.
And so if it's causing a lot of other problems in a heavily
parked area, it seems like maybe
there's a compromise solution that you're still able to fit
the truck there on that
side of the street.
You get the width you need to put the side rigors up.
And somehow this cop fire -- and I'm assuming the fire
department dealt with it with the
current situation on the ground.
Correct.
Did they have to move cars?
Did they -- I mean, how did they tackle the fire?
So some of these are more kind of -- somehow I wonder if --
I get that there are global
kind of recommendations to what would be the best case
scenario.
Unfortunately, our city is not built to those standards.
And as we're encouraging infill -- so that's my concern.
I'd encourage some sort of compromise that allowed parking
on one side of the street.
I'm just going to be straightforward.
I don't pose the question as you did.
I don't think opposing this is going to be putting people's
lives or saying I don't care
about fire safety or that I'm not concerned about people's
lives.
I mean, that's -- and it's certainly not saying that I'm
not in support of the fire department.
But this is what I read in the backup.
It says the code allows for the -- the problem is -- and
Mayor Pro Tem, you brought up a
good point -- they fought this fire with the facts on the
ground.
This is really a code -- I know it's about -- but this is a
code-driven issue.
I mean, the code is if you have this height -- well, what
version of the fire code is
this?
What year adopted did this new code come about?
We're under international fire code 2012.
Okay.
So we're under 2012.
And that's where this came -- I don't know.
It might have been earlier than that.
But that's the version we're under.
So what the backup says is that currently the current
configuration has a 24-foot wide
fire lane within the property.
I really think it's 24 feet.
I need a very -- but you've got to have some fire lane,
whether it's 20 or 24 feet.
If you've got a parking lot, you have to have a fire lane
for the very things you're describing.
A 20-foot fire lane for anything less than 30 feet.
Yes, sir.
And that's -- but that requirement came in 2012?
Or when did the -- anything under 30 feet, you have to have
a 20-foot fire lane?
Do we know when that -- never mind.
We'll figure that out.
Okay.
Yeah, because I have done some research on that.
We adopted the -- we changed from a uniform fire code to
the international fire code in
2000.
So there were some significant changes at that time.
Sure.
Okay.
So they've got a 24-foot fire lane.
At the time they built this was adequate.
That's what the code was in 2002.
Or it wouldn't have been built.
So whatever they needed, they got.
So then it says now they've run into this problem.
Now they're rebuilding it.
It's over 30 feet.
The code allows for the use of a public street as a fire
lane if the street remains unobstructed.
Texas Street between Vine Street and Frame Street runs the
length of the apartment complex
on the north side.
Measuring it at 30-foot width, Texas Street meets the width
-- 30-foot width.
So Texas Street is 30 feet wide?
Yes.
Okay.
So Texas meets the width requirement of 26 feet to serve as
the development's aerial
access road.
In other words -- so correct me if I'm wrong -- we're
saying we're going to give the developer
-- and, of course, I think this is under new ownership from
who built it originally and
when the fire even started.
I think maybe.
So we're saying, well, they can't meet the code within
their development.
So what we're going to do is the code allows for you to
take a public street and make it
your fire lane and therefore unobstructed.
So we've got to tell people who are living there now that
have been living there for
who knows how long that you can't park because it's got to
be for the benefit of this development,
which we have this situation all throughout our city.
So this isn't about opposing public safety.
It's not about opposing the fire department.
It's about saying sometimes we get codes and the facts on
the ground, they don't always
fit.
And I feel 100% certain whatever the configuration is here
now in the future somewhere else in
the city that our fire department will find a way to
provide the best public safety, the
best preservation of property and human life that they can
because you've always done that.
But I really struggle with saying we're going to deny
parking on a segment that includes
more than this front -- because the two buildings, they've
been there.
So this conversation isn't even about them.
But we're going to take this whole segment and say it's not
parking because the developer
chose to build up the height and now we've got this code
issue that's popped up.
Probably somebody didn't even know about it.
I mean, it probably was something that -- have they started
construction yet?
Yes.
Okay.
So they've already started construction.
And I'm just going to be very reluctant when we have this
same situation all around the
city to say because the developer is now building over 30
feet, our code that we passed back
in 2012 requires a 26-foot fire lane and now we're going to
basically -- what's the word
I'm looking for?
It's a fancy word so I don't know fancy words.
We're going to take over the street for fire protection
because of this developer and tell
people who they are -- you can't park there anymore on the
side of the street.
Now, my fallback position would be which -- I don't really
have a fallback position but
if we just took the parking off the side where the
development is, we're saying, okay, if
you guys are parking there to go into your apartments, you
're not going to be able to
-- that would at least have more of an impact on the
specific development than it would
everybody else who's going to be affected by this because
of the code structure.
So this isn't about anything about fire, you know, safe --
public safety or the loss of
life.
I'm very confident you guys did it before.
I mean, you all fought that fire, I guess, when it was not
sprinkled and probably preserved
it to where it didn't burn at least 100% down and kept it
from burning down the other buildings,
most likely.
So I'm sorry that in some ways you guys are put in this
position because of this old city
because that's really what it is.
And I just struggle with this.
So those are my comments.
Anything about the fire department in that regard?
Because it's really -- this is code driven based upon a guy
deciding or a gal or a development
trying to build above 30 feet.
We got Councilmember Gregory and then I think we're going
to go -- okay, we're going to
go over here and Councilmember Wasney.
Yes, go ahead.
>> And I think the thing that I'm trying to -- what's the
takeaway?
What can we learn from this?
And it would seem to me that maybe one of the things that
we would learn is if a developer
wants to come in and develop apartments that are too tall
for what the street can handle
with the street's current configuration, that maybe the
developer is not allowed to do that.
And I mean -- and if the developer has to rebuild, they
have to build to the new code.
When my hot water heater went out, we had to reconfigure
the closet.
It had to be built to the new code.
So why in the world we're saying, yes, you can rebuild that
building back just the way
it was at the same height it was, even though it's not
allowed now, seems like maybe that's
where we could have addressed the problem rather than
create a problem for other folks
by saying, yes, you can build it just the way it was even
though it doesn't meet the
code and we're going to solve this problem by inconvenien
cing the folks across the street.
And it may be no more than an inconvenience, but for some
folks, it may impact their entire
lifestyle if they've been needing and depending on parking
on the street in order to accommodate
themselves or their guests or their caretakers or whoever.
So I think that this could have been avoided had the
developer not been allowed to build
back the same way it was.
And I'm puzzled as to why that was allowed to happen and
maybe somebody, some staff person
can tell me offline why we did that.
>> Councilmember Wasner.
>> Two things.
Our development code is 30 years old and this council has
funded and as we speak, a new
development code is being written.
And it won't be finished until 2018, but if the city
manager could make sure that this
discussion moves forward to have it addressed in the new
development code, would it compromise
be to only remove parking along the apartment side and
still allow it in front of the single
family homes across the street?
If the apparatus is up, granted, another emergency vehicle
can't get around it, but that might
be a compromise situation to at least meet some of the fire
department's requirement
and request.
>> Yes.
And I think that we can do that.
That certainly and you're correct, Mayor.
We'll definitely in any situation, and let me be clear, any
situation, we will respond.
We will adapt to the environment on the ground.
We will overcome any obstacles and we're going to get the
job done.
Fire code, though, helps us out in ensuring that there aren
't any obstacles up front,
that we don't have to maybe utilize any additional
resources or spend any time in overcoming
those challenges and get right to work.
But just restricting parking on one side will definitely
give us some space to operate efficiently
and effectively in this particular area.
>> As I'm looking at this, and I struggle with that, but I
'm looking at this and I'm
looking at this building and I'm looking at this lot layout
.
What you're saying is, first of all, and this might be for
a bigger discussion, Mr. City
Manager, but when I look at the building permitting process
, you submit your plans and it goes
out to all the departments and it comes back reviewed for
code compliance.
So when this reconstruction came up, a very vital question
is, how did this get, because
this got past something.
I mean, this should have stopped this whole permitting
process until a solution was found.
So we're trying to go back and now back.
So honestly, and I build stuff, so I understand.
You look at the parking lot, you got about a three or four
foot sidewalk in front of
the parked cars there on that side where the street is.
You've probably got about 10 or 12 feet from the roof line
to the sidewalk.
I don't know what the, you only need two feet.
Am I right?
In that fire lane, you got 24 feet on the fire lane and you
want 26 in the parking lot.
In the actual parking lot.
And I know you want your 150 foot, but if you had your 26
foot backing out, I know it's
difficult.
I know it is.
But I don't know why we can't say, well, you know what,
guys, you got two feet in your
parking lot if you go a little closer to the building,
unless there's some offset that
the sidewalk can't be a certain distance to the building.
We did look at that.
We looked at every-
What was the result of pushing that parking line two feet
forward?
We have, we have, now on this side, it actually goes to the
property line.
So we had no space on this side.
On this side, we have utilities here and utilities here.
You can't see it very well.
Is that an underground transformer box?
I believe so here.
And that's a dumpster?
Yes.
And that's the only location for those utilities.
We had to accommodate for that.
So one of the things that we were looking at is possibly
doing inserts or inlets here
to give us those additional, that additional space on the
backside.
But that's part of the problem that we were running into in
addition to the length of
it.
We, if we tried to accommodate for the utilities on the
ground, that would push us further
in and way past that 150-foot dead end.
How far is that?
254 feet, I believe.
And when you say 150-
245.
You're saying 150 feet, what's the significance?
So you're saying you don't want to drive in more than 150
feet.
Correct.
And the reason is?
For backing up.
For safety reasons in being able to give us the appropriate
exit strategy of any site,
of any emergency operating site.
Okay.
So-
So if we have 150-foot-
Right.
They have to give us some sort of turnaround.
And there's different ways to achieve that.
According to this code.
So when this was built, that wasn't part of the code?
Correct.
Yep.
Okay.
Yeah.
Yeah.
This is-
We looked at all the options on this one.
No, no.
I understand.
Well-
And again, in trying to work with the developer in the
development in moving this particular
project forward.
Unfortunately, and what do they say?
Hindsight is 20/20.
Now, the requirement with the review of the plans, here's
the building height.
It's over 30 feet.
Okay.
Somehow that got- somehow, I don't know how to define it,
but we're here now because that
really wasn't discovered at the front end.
And so we've got to find a way to do this.
And if this is the solution, it's the solution.
If it's not, then we got to- but as you said, y'all will-
so anyway.
Okay.
I just want to make sure I understood what the obstacles
were because the transformer
blocks can be moved.
Now, it's not cheap.
But I mean, and this is my point.
We're going to take a whole city block for the benefit- to
adhere to the benefit of the
developer, of course, so it can allow per code fire access,
which will allow the developer
to avoid expending certain monies to move the utilities.
We can probably get- we can probably do something with that
dumpster.
I know we can do- I mean, if we even move it up or
something.
So that's my only thought is they're getting- I don't want
to say the easy- everybody else
is having to pay for what they- the circumstances that they
're experiencing by not- by them
not understanding the code.
And now they're trying to backtrack.
And I'm not saying they did it intentionally.
I don't know how it got there, but I just- it's very
difficult for me to do that.
I mean, I understand if I were building this, of course I'd
be asking for that.
Of course I would.
And I understand why the fire department is because, hey,
this is the code and this is
the only way we can meet it.
But in essence, at least if the backup's correct, we're
saying that we're going to use this
public street to satisfy their Fire Lane Code if it's unob
structed.
Correct.
All right.
And again, the code does allow for that.
We've got developments that come in and that is sometimes
the only option to advance that
development and we try to work with them as much as we can
in giving them those different
options.
Sometimes they work, sometimes they don't.
But if they're coming in on the front end, I don't think I
've ever seen, since I've
been on council, a request to take parking off of a street
because the developer needs
the street as a fire lane on the front end.
And so those streets are either wide enough or there's some
accommodation made in that
regard.
Okay, good.
Anybody else?
Is this an action item?
I believe it's an action item next week.
Next week, yes.
Okay.
Well, yeah.
Just for clarification and direction, limiting to one side
is something that would provide
another option that would still give us.
Council direction.
I would suggest that you be prepared with an alternative
ordinance to limit it to one
side so that we didn't have three, you know, if it's yes or
no, that may not be the only
choice.
It might be good to have another choice.
No parking on one side.
Council Member Geary.
So then my question is, you've got the whole block from
what are those two side streets?
Vine and Frame.
Okay, so you've got that whole block kind of highlighted,
at least on this presentation
for no parking.
But if somehow, if we were to say there's no parking on, is
that the east side of Texas?
What is that?
This is Vine and this is Frame.
But on the side where Texas is, we're saying on just only
one side, is that the east side
or the west side of Texas?
It's the north side.
North side.
There you go.
I don't know one direction.
But could we also limit it to no parking?
Because you do have that Vine Street.
Is that Vine?
This is Vine.
This is Vine.
Yeah, where you could back up and if you needed to turn in
the street.
Because I just don't want to take the whole street segment
from block to block.
And something that we did, if you'll recall, about a year
and a half ago on I believe it
was Mulberry maybe, we had again a multifamily residential
building come in on a street that
was much narrower.
We had some adequate fire hydrant placement that allowed
for us to give ourselves 150
foot inlets on each side of the street.
And then what we did was we only restricted the middle.
I mean if I were going to vote to take parking away, which
I would say okay, on the north
side of the street, from Vine Street to the edge of the
property line where that new building
is being built so that it's very restricted.
Most likely the people parking there are going to be people
in the apartment building.
Some may be across the street, but it seems like that more
impacts truly the development
that is requesting it.
Right.
If we could do this or again we could do 150 feet on each
side because at least on Vine
we'll still have access to the building here on the corner.
We can still access the building on the corner.
We can go 150 feet in from Vine, 150 feet in from Frame,
give ourselves that middle
that is only restricted to one side.
Okay, I thought you said to both sides.
No.
No, only one side.
Yes, that so that little highlighted part he's got up there
.
One side, which is that north side on the south side of the
apartments right there in
front of the apartments.
You know what I'm saying, Pre-Tim is go in 150 feet here,
150 feet here.
And then restrict this.
Yes.
Okay, got you.
So you're coming in from both sides.
150 feet in.
So it'd be less.
In the middle, restrict it to one side.
Okay.
All right.
Yes.
I'd ask for council direction to move forward with that
next week so that it's clear from
staff and see if we have council consensus.
It sounds like we do.
Well, we'll go.
You all are conversing.
So are we all on the same page?
Yes, yes.
We've done this before on another street.
That was Wainwright.
Wainwright, that's what it was.
Between Sycamore and Prairie.
Okay, so you're coming in 150 from there, 150 from the
property line.
And in the middle, restricting it to one side.
Yes.
So that's the south side that's in front of the apartments,
that side that's right
there.
I think for us, we'll probably do the north side.
I believe the hydrants are on the south side.
Are you saying?
But I will double check that.
Are you saying in front of the houses?
Yes.
Yeah.
I understand, but they would still have one side to park on
.
What I'm trying to do is get as close to the hydrants.
So if the hydrants are on the, if the hydrants are on this
side of the street, I'll restrict
parking on this side of the street.
Do you see what I'm saying?
Yeah.
What I'm trying to do is restrict parking on this side
because that's going to allow
us to get to these buildings without cars being parked in
front of us.
Right.
But I do want to double check hydrant placement, but we'll
allow parking, leave parking on
the north side of Texas.
They're on the south side.
Yeah.
The hydrants are?
Okay.
That's where I thought they were.
Okay, good.
Good.
All right.
Yes, sir.
One more thing I do want to point out is enforcement wise,
it's better to start at one location
so if we start at Vine and say we have, we have signage
that says 300 feet from here
or 400 feet or end so we can place it properly.
If we start in the middle, 150, 150, that gives us some
error.
People don't understand sometimes where the signage should
start or end.
So if we start at the Vine street and go here and say this
is where it ends and this is
all parking restricted, then we're better off doing that.
Okay.
So now you've got me confused.
So now are you asking for no parking on from Vine street
all the way to the over to the
edge right there when what you're talking about before was
coming 150 feet in.
We need to do 150 feet on both sides.
Oh signage, you're not talking about enforcement?
So you don't need no parking on this side either.
Yes.
So it's the entire segment.
No, it's just in the middle.
I'll show you.
I'll show you how it is because we've done it before.
150 feet.
Can y'all sort of work that out behind the scenes and just
bring bring to us a couple
of alternatives one that Councilmember Wasney has asked for
and if y'all need to do something
else we'll consider it.
Correct.
Okay.
Did you have a final question?
Well, that was a clarification on the signage because I've
seen somewhere it has an arrow
and it says from this spot no parking and then from this
spot no parking.
So you have a complete zone.
So the allowing parking here and allowing parking here
wouldn't seem to be an issue
if the signage was appropriate.
I believe that's what we have on Wainwright.
Okay.
Yes.
Thank you.
Any other questions?
Question.
Talk loud so you can hear.
We can hear.
I'm going to point to the two spots because there's so much
confusion and if you would
say yes or no.
Okay.
From point A to point B.
Here to here.
No, no.
What we're looking at what we're looking at is something
similar to what we've done on
another street.
We'll restrict parking in the middle.
So we're going to go 150 feet in from Vine.
We're going to come in 150 feet in from Frame and then in
the middle restrict parking on
the south side of Texas.
Okay.
So.
Yes, ma'am.
In the center.
Yes, ma'am.
Got it.
So we'll have just no parking in the center.
You can still park on both sides on the end.
We can access this building from the corner.
We'll have access to the building in the middle which is un
protected.
We'll have access to the new building which is protected.
And we'll be able to have unobstructed access to all of the
buildings with restriction on
the south side of Texas Street.
Okay.
What will be interesting is when you measure 100 and this
isn't to scale so.
Correct.
There's 24 parking spaces along there and parking spaces I
believe are 9 to 10 feet
in width.
So that whole lot width is close to probably a couple
hundred feet.
So it'll be interesting.
Okay.
So that's the direction.
Correct.
And then we'll look at it and see how it lays out on the
street and if there's an issue
we'll deal with it.
Okay.
Thank you all very much.
Oh yes, sir.
There's one more section.
Yes.
The other segment.
And Laura needs to get back here.
Okay.
So now the next one is Denton Street between Oak and Hick
ory.
And this is a really small section of Denton Street which
is less wider.
It's really narrower than the rest of Denton Street north
of Oak Street.
So currently the street is 24 feet wide from curb to curb
and there's parking allowed on
either side of the street.
And we've received in the past six to eight months we've
received multiple complaints
about being very difficult to pass especially if traffic is
coming one direction the other
one has to back into a driveway that is for one of these
apartments or one of these houses
for someone to clear and then clear a path.
I can pull up an aerial that can give you a better option.
But again going back to the fire code there are a couple
things that we already discussed
for a long time.
The city requires a 20 foot fire lane.
In this case we're not looking at any aerial apparatus and
so we don't need the 26 feet
but we need a minimum of 20 feet.
The street is 24 feet wide and according to fire code we
can allow six feet parking but
we still do need 20 feet clear.
If we allow parking on one side along this segment that
will be a variance from the fire
code.
And I mean that's an option and we can look into it.
It's just that it would be similar to the variance that we
'll be applying for this
segment of Texas Street is let me go to that location.
So if you look at it if you're a car or a vehicle
approaching there's barely any space
in between these two cars let alone a fire or emergency
vehicle to approach.
So based on this and we've received multiple complaints
people have to back into this driveway
when they're driving and this is an ongoing issue.
I know we all know that this is the old city with narrow
streets.
So there were two this was also an item on the April 4th
agenda and there were two options
as to restrict parking on both sides.
We did receive some concerns from citizens or residents
next door.
They wanted to only have restriction of parking on one side
and that would be a variance from
the code.
We're open to looking at alternatives.
I mean it'd be a similar discussion.
Councilmember Riggs.
So that's a lot of cars parking on that street.
Do we know is it UNT parking or is it residential parking?
It is what I've understood from residents as well as local
businesses I think there's
a business building back there is primarily it's used by UN
T students and a lot of them
actually use their bikes right to UNT campus but it's
primarily used by UNT students and
some of these residents do use this parking as well as the
one in front of Oak but yeah
it's completely packed during school time and once school
is out this parking goes down.
It looks like not even I mean a large size vehicle could
not get through there you know
or mid-size.
That is true I mean they have to do extremely slow in the
segment.
I've spoken with one of the property owner one of the
neighbors that lives in those houses
with their family.
What I'm hearing is that they understand this is impassable
especially with two lane traffic
but that the interest is can we can we kind of again
similar to them can we compromise
because they utilize that for parking for themselves and
for guests given the short
length of the driveway there so I guess my concern is again
one another approach is just
taking everything away.
It's pretty disruptive for everyone there.
I think Councilmember Wasney and Councilmember Begay.
I had asked the police chief for an accident report in this
area too and it's been a while
I think there were seven accidents just because of
restricted visibility because you're trying
to weave your way through the cars trying to get to the
stop sign and then trying to
get visibility to be able to see before you pull out on one
of the one ways either Oak
or Hickory.
So if Council doesn't want to restrict it on both sides we
could restrict it on one
side only but something to consider would be to enforce isn
't it 30 feet before a stop
sign that you're not supposed to park?
That's right and currently we are in this pilot program
especially around certain streets
in UNT area north of UNT that we've started installing and
I think this was our first
location this is where we install the sign that says do not
park within 30 feet of the
stop sign.
Of the stop sign so that.
So going southbound on Denton this stop sign currently has
that plaque that says within
30 feet parking is not allowed and we have five more
locations I think there's one on
normal street and multiple locations around that area.
And do you also paint the curb?
We do not we just sign it so that people when they look at
the stop sign they understand
that you're not supposed to park within 30 feet.
So maybe with the signage in the 30 feet 30 feet and remove
parking on one side that would
I think alleviate some of the issues.
Okay.
I have just kind of a broad suggestion I'm okay with
removing parking on one side but
I think the broader issue that we're going to have with all
the core part of town is
that I think we're going to have to go to neighborhood
permit parking on some of the
core areas.
I don't really see any way around it other than every
meeting will have to address one
of these streets so if we could kind of do what we need to
do to head in that direction
as opposed to having people do it piecemeal I think it
would be more effective.
To that end I would like to respond there is currently a RF
Q out for hiring a consultant
and we're looking at the south neighborhood small area plan
and within that plan we have
an implementation strategy it's going to look at land use,
zoning, everything that's associated
with the issues that are you know this area is plagued with
as well as access, street
widths and parking.
So it's going to do a parking supply study, parking demand
study in this whole neighborhood
as to what is the actual parking demand and that study will
look at the bigger picture
kind of address everything in one because this is not just
a problem associated with
you know how much is parking or what can we can do on these
streets that are not wide
enough there are narrower streets but this will look at
what our circulation system can
handle and what streets are major street that we need to
keep clear, what streets would
be good for parking, the whole big study.
So I think we are moving forward in that direction and it
will be a process that won't happen
overnight but we are looking at the big picture and
addressing that issue.
Let's see did you have a question?
You had mentioned I think in the mobility committee meeting
last month about adding those
some signs to the stop signs.
Correct.
Since enforcement didn't seem to be working in putting
those signs up to try to educate
people.
I guess my question is why are we opting not to also do
some yellow paint along the curb
for that is it 20 feet or 30 feet?
30 feet.
30 feet because my guess is a lot of people would have a
hard time judging 30 feet or
they would they would if they got a ticket anyway they'd
say oh but that wasn't but
yet if their car was parking inside the yellow it would be
pretty clear to everybody concerned.
So are we not doing the yellow paint on the curb because of
cost, because of the maintenance
and upkeep?
All of the above yes.
The amount of labor force required, the amount of people
that are required to upkeep it,
the total cost of having you know all the curbs being
painted yellow and red because
what happens if we start at one intersection it slowly
would percolate and translate to
all driveways because citizens will come out and say now I
need five feet for each side
of my driveway to be painted because people are now parking
too close to my driveway.
And we've been in that I've been in that situation in my
previous place and it gets to a point
where how much paint are you going to maintain.
It's more of an education process as opposed to signage and
more signages people are going
to keep on ignoring all the signs.
So that's that's where we're coming in from.
Let's see Joe, let's see did you have Joey and then yes.
Just direction I'd be okay with restricting parking on one
side and definitely doing the
30 back 30 feet back from the stop sign you know staff
direction on which side that is
I prefer so.
I'm okay with the one side as well.
Mayor Pro Tem, one side.
Yeah.
You know I'm going to agree reluctantly only because I
think we need to look at this comprehensively
because we're going to we're just going to be continuing to
do this and there's going
to be some point where we just say enough is enough and
then we've got some people who
have you know we've decided you can't park over there and
it's just we're going to start
trying to figure out how to do this on a case by case basis
and and think about the and
the parking neighborhood parking is a good plan thing there
is especially in this neighborhood
you start pushing people if the students can't park there
you start pushing them out and
so it's that's we've got to have a comprehensive approach
in cooperation with the two universities
because it's that's really the crux of when schools out we
won't be having this conversation
at all.
Yes, Councilmember.
And part of the comprehensive approach is what Councilman
McGarry said about about
looking at neighborhood permits.
Right.
Okay, staff had direction on that?
We have the direction.
Yeah.
Okay.
We'll put in the extra alternative of one side parking.
So Mayor Pro Tem, your contacts didn't express a preference
either side.
I mean, I guess staff will look at it and see which has the
most residential on that
side and figure out which is the best.
I think there are big driveways on this side so most likely
we'll restrict parking and
lose fewer spaces.
Okay, great.
Fantastic.
Thank you.
Appreciate it.
Thank you.
All right, we'll go on to our next.
Y'all need a break.
We've been going for about an hour and a half.
Y'all want to know?
No.
Okay, good.
Jennifer, you need a break?
Okay, just making sure.
No.
Well, I probably do.
But we'll go on.
I'll get up if I need one.
Do you need a snicker, boy?
What are y'all trying to say?
Do I seem hangry or something?
Or is that it?
No, no.
Agenda item one E is receive report hold discussion provide
direction regarding the
design and project schedule for the proposed parallel
runway at the Denton Enterprise Airport.
Mr. Nelson.
Good afternoon.
Mark Nelson, Director of Transportation.
I appreciate the opportunity to visit with you this
afternoon on an important infrastructure
project for our community.
We've been at an airport.
And we have a we've been working with TechStop for a number
of years to establish a West
parallel runway.
In fact, it's been in multiple master plans going back for
at least 20 years.
And so again, what we have here is just a conversation this
afternoon as we advance
some design options with respect to some funding
commitments that have been made by TechStop.
So quick overview.
I'll demonstrate a site plan of where the runway is or
where the proposed runway will
go operations overview there at the airfield why it's
important for this West side runway,
parallel runway, look at the design options, some of the
benefits associated with that,
and then confirm commitment to fund the proposed parallel
runway and to what extent in terms
of a local match and then outline that estimated project
schedule.
So quickly here you see the primary runway here.
North would be to your left.
So the terminal building, air traffic control tower here at
midfield, existing runway, which
is in place now.
We've had a recent extension there to the north.
This is the proposed parallel runway here in this blue,
darker blue.
The lighter blue demonstrates the proposed extension or a
proposed extension of the scope
as provided by TechStop.
Then you see the hashed areas here on the north and south,
which is property that was
recently acquired for this proposed runway.
So the Denton airport is designated as a reliever airport.
What does that mean?
Well, long or the short is it receives a little additional
funding from FAA and TechStop.
Its name essentially does supports both DFW and Love Field
in terms of relieving recreational,
private aircraft operations to include corporate as well as
cargo operations from commercial
service airfields.
There's about 11 of those around the north Texas area and
Denton airport is one of those.
Runway 1835 is a 7,000 foot by 150 foot runway.
It's got fairly heavy or substantial capability in terms of
weight bearing capacity, single
wheel, pretty simple.
On the dual wheel you might see that on 737s, DC9s, some
larger corporate jets as well.
In this past FY we had about 137,000 operations.
That still put us in the top 10 throughout the state in
terms of overall operations.
In 2015 we had over 165,000 operations that had us pegged
at about the 7th busiest airport
in the state.
That's including DFW Intercontinental, some of the larger
commercial service airports
in our community and our state.
In 2015 due to these high operations, understandably quite
a few of these are light training aircraft
utilized in our single runway configuration.
The 2015 master plan did justify the parallel runway and
primary purpose was to separate
the lighter aircraft operations from the heavier, faster
aircraft that utilize our airfield.
So I'll go through a couple of the different design options
.
Next Hot has funded or committed essentially 90/10, in this
case 85/15 funding for 45/75
design scope, 4,500 feet long by 75 feet wide with a 12,000
pound weight bearing capacity.
As we move down the master plan, the approved master plan
indicated a 5,000 by 100 foot
wide with a 12,500 pound weight bearing capacity.
Again that provides that additional 500 feet, so a longer
takeoff run available provides
heavier aircraft, faster aircraft, the ability to take off
and/or land.
And as part of that master plan scope it was suggested that
the city or the local sponsor
would cover 100% of the costs associated with that
additional 500 feet as well as the 25
foot additional width.
As we went through the design process we looked at and
cross referenced the benefits associated
with that additional 100 feet versus a heavier weight
bearing capacity.
So at 30,000 pounds and the 75 foot wide and 5,000 feet
long it provides a little more
variability in terms of type of aircraft that can utilize
the runway at our airfield.
So again the TxDOT scope at 4,500 by 75 and 12,500 pounds
pretty much allows itself only
for the lighter aircraft, training aircraft.
Again does the purpose as requested by TxDOT which is
separating the train traffic from
the heavier.
Again limited capacity due to the length of the pavement
and the pavement strength.
Right now we've got an estimated cost of roughly about 7.5
million on that.
TxDOT would be about 5.9 and the city share would be
approximately 1.6.
So the master plan scope again a little bit more robust
design in terms of both length
and width.
However, same 12,500 pound capacity.
Again it's pretty much relegated to the lighter aircraft
use.
It does separate similar to the 4500 foot runway.
It does have some increased capacity for some heavier
aircraft because of the length.
However the weight bearing capacity doesn't play out for
that.
So estimated cost on that is roughly about 8.4 million.
TxDOT is 5.9 share on that and the city would be 2.5
million.
And again this is essentially what was approved and laid
out in our airport master plan.
So the recommended scope is something that we've taken a
look at now that we've got
about 75% plans back from KSA, the consultant of record
there at the airport who's been
working with TxDOT aviation to facilitate design on this
particular project.
At 5000 feet with 75 foot wide width and the 30,000 pound
capacity allows the light aircraft
and heavier aircraft, turbine aircraft, you start getting
into some turbo props, King
Air type aircraft and some of your lighter jets.
King Air is kind of like a suburban.
It's the or an SUV on the road out there.
It's kind of the general purpose private corporate type
aircraft entry level if you
will.
Again increased capacity due to the length of pavement.
And in terms of the weight bearing capacity, just because
it's at 30,000 pounds doesn't
mean that you can only land or operate a 30,000 pound
aircraft on said facility.
That's essentially life cycle of the pavement.
So at 30,000 pounds that's designed to last roughly 20 year
life cycle.
On occasion you can utilize heavier aircraft, use that
runway for heavier aircraft should
your primary runway be down whether it's for maintenance.
If there's an accident on that runway.
And it just provides essentially a secondary landing
surface for about 70% of the traffic
that we experience out at the airport.
You could probably get into the 50 to 60,000 pound weight
bearing or pound aircraft on that
runway.
You might not want to do that in the middle of August.
It's going to be an asphalt runway or at least that's what
the design is.
Due to just the pavement strength in mid summer.
But nonetheless prior permission required, written approval
, you can utilize a heavier
aircraft on that runway.
So that project design is estimated again with 75% plans in
to date at 8.5 million.
5.9 million is the cap with which TechStat is willing to
fund.
And then the dent in shares about 2.6 million.
Roughly about 100,000 more than the master plan scope at 2.
5 million in local.
So in terms of the financial, we had 3.56 million set up in
our FY 2017 18 CIP budget.
TechStat is requesting or wanting this project to move a
little bit quicker.
We've been fighting for this runway to make this happen for
a number of years.
And quite frankly parallel runways or new runways just don
't come into play very often.
So we would like to capitalize on that and move forward
with this accelerator schedule.
So basically what we would look at doing if the recommended
scope is approved, we would
look at our reimbursement ordinance and then bring back the
city's portion project in terms
of certificate of obligations in 2017-18.
TechStat if that takes place, TechStat would essentially
move forward with this notice
to proceed.
Looks like we've got about eight weeks until we get final
design.
So sometime the early/mid part of June we would have that
design into TechStat.
They would review it and then they would publish that or
advertise the project in mid to late
July timeframe requesting that we would have funding in
place prior to advertising.
This is a slide that outlines a little bit of some of the
financials we talked about.
In 2017-18 the West Runway Construction we had a 2016
estimated cost of $8.853 million
with a TechStat share of about $5.87 and then the city
share right at $2.9, almost $3 million.
Now with the 75% plans in, again we're looking at about an
$8.5 million, $5.9 million from
TechStat and then the $2.6 million local share.
We have here is just an excerpt from last year's budget
demonstrating that we had these
funds set up in the 27 or at least to be sold as part of
the 2017-18 bond sale and then
again this $435,000 is actually for another project on the
primary runway which makes
the parallel runway a little bit more important in terms of
a reconstruction component of
that primary runway in the 2018 to 2020 timeframe.
But that $435,000 is demonstrating a 90/10 match so it
would be about a $4.3 million
project.
So I wanted to walk through each of those components with
you.
That's the end of my presentation.
What I was looking for was direction on the option that
staff recommendation is to move
forward with the 75 foot wide by 5,000 foot, 30,000 pound
weight bearing capacity runway.
Council Member Gregory?
Do you have a question?
I think we ought to proceed.
Anybody have a question?
Council Member Wasney.
So belated thank you to Quentin Hex.
Who worked so hard as our airport director to help secure
that TexDOT funding.
A lot of airports, a lot of cities are fighting for that
money and so I hope this gets back
to you Quentin.
And I know he fought hard for that $5.9 million.
And so just to clarify, if we don't build the second runway
with the added weight capacity,
if runway one is down, then all of the other larger
aircraft cannot land out there because
it's going to be light aircraft only if it's limited to the
12.5.
It needs to have the 30 in order to hold the heavier
aircraft.
That's correct.
The heavier weight bearing capacity provides more
flexibility in terms of the users at
the airfield.
You'd be restricted to the lighter aircraft.
So as North Texas grows and this airport continues to have
demands on it, I think we'd be foolish
to try to build to a lesser capacity, i.e., light aircraft
only, and make that our new
runway.
The new runway needs to have the capability to hold these
bigger aircraft that are coming
in currently and with the growth in North Texas, I think we
're going to see more of
it.
So I support staff's position as well.
Any other questions, comments?
And we'll get a sort of analysis, I guess, in the airport
committee about this being
paid because I think if I remember correctly, the city was
going to start paying for the
debt service of the airport.
So we just want to get an understanding of that, make sure
that that's part of the budget
process because the airport is an enterprise fund.
So I just want to make sure that we get some clarity on
that.
Okay, direction to move forward on this?
I'm seeing -- yep, okay, you bet.
Thank you.
With Council's indulgence, with sort of a request by the
city manager, just an observation,
instead of going into closed session right now and having
everybody who's not in here
leave, we're just going to go ahead and have the item for
individual consideration.
So I'm going to call that meeting to order.
Following the completion of this work session, we will now
go into -- convene in a special
call session, which the following items will be considered.
It is 4 o'clock straight up on April the 11th, 2017.
So we will now move on to our still public meeting on
agenda item one, which is items
for individual consideration.
Item 1A.
Thank you, Mayor, members of council, members of staff.
I don't have a presentation.
I can pull it up of one that we've had before.
This is the first reading of the annexation for the Andrus
property.
Part of the presentation is for the mayor to read the
ordinance, and I believe --
I got to read it?
Okay.
I got to read it, I guess.
At the conclusion of your presentation, the mayor, I have
prepared for you the caption
of the ordinance, which you'll read into the record and
then close the item.
Okay.
All right.
So that's the only action we take today?
That is correct.
Okay.
Am I ready to read now?
Yes.
Just tell me what I'm supposed to read.
This side right here.
Okay.
This is for agenda item 1A.
An ordinance of the City of Denton annexing approximately 4
.7 acres of land generally
located north of Ryan Road, west of Farm to Market Road 21
81, Teasley Lane, and Lake Forest,
Good Samaritan Village, and east of Country Club Road, more
specifically described in
Exhibit A and illustrated in Exhibit B, providing for a
correction to the city map to include
the annex lands, providing for a savings clause and
effective date.
And that is the ordinance, I believe, is what I just read.
Is that correct?
Yes.
The substantive part of the ordinance.
Yes, sir.
Okay.
All right.
So there's more action to be taken on this agenda item, so
we will now just sort of close
this agenda item and it will come forward for other
consideration at some other meeting.
The second meeting is scheduled for May 16th.
Okay.
All right.
Thank you.
Okay.
Now we will -- well, we've got concluding items.
We'll go ahead and go through concluding items.
Any concluding items?
Yes.
I have a question and follow-up to one of my original
requests.
We got a staff report in our backup about the gas well
inspectors.
I asked how many that we had, and so we just currently have
one, but we have room for four.
My question follow-up to that is do we have plans to hire
more in the future?
Yes.
I'm currently meeting with our development services
director on moving forward on that
plan with the level of service needs to be.
And I know that's also been a question, is should we expand
the scope, keep it as it
currently is?
And so we will have a plan back to you very shortly.
Thank you.
But there's no intention to reduce the four.
Okay.
Anybody else?
I've got one so -- anybody else?
Joey, you got a concluding item?
Councilmember Hawkins?
I do not.
Okay.
All right.
The only one -- I drove this because of a call from a
constituent.
The intersection of Granada and Ryan Road, there's -- and I
don't know what our ordinances
are as far as the trimming of hedges that may sort of prove
to be a sort of a site issue.
In other words, as you're trying to look around to see if
someone's coming.
So if somebody could just check out the intersection of
Granada and Ryan Road.
I think it says you're on Granada trying to turn -- there's
a hill there, and it's just
-- if there's something that can be done, great.
If not, understand that.
I just wanted to get that checked out because of a public
safety issue.
Any other questions on our concluding items?
Seeing none, then we will -- I guess we can adjourn our
open meeting.
And then we will convene in closed session pursuant to
Texas Government Code Section
551.071.
It is now 4.05 on Tuesday, April the 11th, 2017.
So as we --