All right, wanted to welcome everyone to this meeting of
the Denton City Council, the first
one of the new year, Tuesday, January 3rd, 2017.
I trust everybody had a good and profitable and relaxing
break.
I know I sure did.
It's a 10.03.
We've only got two items.
For individual consideration, we do have a quorum.
We do have a couple of absences, Mayor Pro Tem and Council
Member Hawkins.
First item on the agenda is received certification of a
petition regarding a tax freeze for seniors
and the disabled in the City of Denton from the City
Secretary and give staff direction.
I do have a couple of cards who wanted to speak on that.
We'll have those speak after I guess the City Secretary is
going to come up.
Okay.
Yes.
Yes, ma'am.
Thank you, Mayor and Council.
Today I will be certifying a petition that was turned in
regarding a tax freeze for people
65 and older and the disabled.
But I wanted to give you a little bit of background
information on the petition and the procedure
for all of you here and my vast viewing audience at home.
Just so that you kind of have an idea, I think in the past
couple times that we had to do
this, I wasn't available.
So now I want to just give you a little bit of background
on what it all involves.
On November 30th, a petition was submitted with a committee
of petitioners.
And the committee of electors included Shirley Johnson,
Shirley Martin, Bruce Reber, Terry
Mathers, and Larry Wilson.
Those were the committee of electors who were responsible
for the petition.
The petition consisted of 513 pages.
And there were certain elements on the petition that the
charter requires that need to be
certified.
Those include the committee of petitioners had to be on
each page of the petition.
The full version of the proposed ordinance needed to be on
the petition.
It was on the back side of each of the pages.
The name, address, date of birth, or voter registration
number of the person signing
the petition and that person's signature.
No signatures could be older than 180 days.
And an affidavit of circulator.
The affidavit of circulator had very specific requirements
also.
It needed to say that the person circulating the petition,
that only that person had done
that page.
That the person signing the petition was who the circulator
believed to be that person.
And that there was a blank number of signatures on that
page.
And then it had to be notarized.
And I said there were 513 pages submitted.
I needed to certify 5% of the registered voters as of the
day the petition was submitted.
That's per the tax code.
That required me to certify 3,862 names.
Still gets me all choked up.
Only 183 pages of the 513 pages that were submitted were
set aside in my initial review
due to irregularities with the affidavit of circulator.
There are also some pages that did not have any dates
listed for the date that the person
signed the petition.
There were incorrect number of signatures noted on the aff
idavit.
And the affidavits were, many of them were incorrectly not
arized.
So those 183 pages were set aside temporarily to see the
remaining pages if I could meet
the requirements to get that magic number.
Certifying the signatures involves looking up the names on
the Denton County elections
website which is a godsave.
I would put in the first name, last name, and date of birth
.
Or you could put in the voter registration number, but in
this case the petition had
date of birth.
So I would put in that and then check for if the person
pulled up.
If I found that person, then I would go the extra step to
go to the next screen to make
sure that they were registered in the city of Denton.
Because the first time you look, they could say, well, yes,
this person is a registered
voter.
But there were some people who were registered in Corinth,
the colony, Highland Village.
So some of the people who signed the petition weren't
necessarily, they were registered
voters all right, but just not in the city of Denton.
Certifying the names at times was challenging.
You're supposed to print your name.
Sometimes the printing was difficult to read at least, but
nevertheless I persevered, got
through it, and on December 20th, letters, both regular
mail and certified mail, were
sent to the committee of electors.
I also called one of the committee persons and asked that
she pass on to the other people
that the petition had met all the requirements of the
charter.
In keeping with the charter requirements, a public hearing
is going to be held on, unless
it's changed.
Now, I've been gone, but the last I heard it would be
January 10th.
There is no council action needed at this meeting.
And the state tax code states that following a petition
that's submitted by 5% of the voters,
the governing body shall call the election.
So while we'll be having a public hearing, it's more or
less a courtesy, so to speak,
public hearing.
The council really has no option on whether or not to call
the election.
And on the January 10th meeting, there will also be an item
, as far as I understand, for
consideration to call the election at that time.
So if you have any questions, I'd be happy to try to answer
them.
>> Madam Member Gregory.
>> Thank you.
How do you ensure that you're not counting the same name
twice?
>> I'm so glad you asked me that, because I missed that
part on my sheet.
I found about 26 duplicate names.
There, let me qualify that, 26 duplicate names that I
certified.
After a while, you start looking at them, so I swear I've
seen that name before.
But to ensure that, I had my staff develop a database, a
spreadsheet.
And we just listed by page the person's name, first name,
last name, and what page they
were on.
And then we sorted that by last name.
And then if I found duplicate names, I would check on the
pages to see, did they have the
same date of birth, and were they at the same address?
Now some people might have the same name, Bill Smith, might
be senior, junior, or whatever.
And so that's how we, I'm 99.59% sure that there were no
other duplicates.
>> Yes.
>> I want to thank you for working so hard.
This was time consuming.
And you have a lot of other responsibilities as our city
secretary, so I know this was
a huge time commitment on your part.
Democracy is hard work.
>> Yes.
>> And I just appreciate you, and thank you, Jennifer.
>> Thank you.
This is probably the hardest petition I had to certify, the
most amount of names in 20
days.
So yes, it was, but we got it done.
So with that, I will tell you that I am certifying that
petition, and it met all the requirements
of the charter, and we'll be proceeding from there.
>> Thank you.
Any other questions?
We do have a couple of cards.
Thank you, Jennifer.
Appreciate that.
The first one to speak is Deb Armator.
If you'll come state your name and address, your time will
begin as soon as Jennifer can
get there to set the timer.
If you'll just give her a couple seconds there, Ms. Armator
.
>> Hi.
I just wanted to take this opportunity to speak against the
proposed tax-
>> Name and address.
>> I'm sorry.
Deb Armator.
2003, Mistywood Lane, here in Denton.
I wanted to take this opportunity to speak against the
proposed tax freeze, although I
do support the process by which it has appeared on the
ballot, and I thank Jennifer for all
her hard work in certifying those signatures, and I think,
although respectfully disagree
with my fellow citizens who signed the petition.
I believe that the proposed tax freeze would only give
relief to seniors who happen to
be homeowners, while passing an additional tax burden onto
their children, grandchildren,
and other working families and Denton taxpayers of all ages
and income levels.
I also wanted to add that my own parents, who are in their
70s, their names are Wanda
and Alan Needleman, and they own a home in Denton, they are
against this as well, this
tax freeze, because they don't want to pass the burden onto
me and my children and others
in the community.
So again, while I strongly support the democratic process
by which it has appeared on the ballot,
I equally strongly am against this proposed tax freeze, and
I would encourage my fellow
citizens to vote against it, because I believe that's the f
iscally responsible thing to do.
That's all.
Thank you.
One more speaker on this agenda item, Mr. Willie Hutspeth.
If you'll come state your name and address, your time will
begin.
Mayor and Council, my name is Willie Hutspeth, I live at 6
23 Newton.
I want to talk about this tax freeze as well, but first I
want to talk about Ms. Walters.
She welcomed me to the New Year, Mayor, by hitting me in
the head with a little old notebook
and said, "I want to begin where we ended, Netso."
And then Brandon, who's armed and has handcuffs, instead of
taking her in custody and escorting
her out, he just laughed and sat down.
So I just want to make that note.
Anyway, I'm trying to get them in trouble real quick.
How big was the notebook?
Anyway, I would benefit from this tax freeze, I'm 71, so it
would be good for me.
I always want to save money.
But there are some problems, and this is what I'm finding
with being in office.
Now, you have to make this decision, one that has good and
bad in it.
And there are good things in this for both sides.
But you got to make a decision.
And it's going to not be good for the person that you
decide, it's not you that's doing
it.
The voters decide one way or the other.
So I just want to make a comment about that.
Now, my children will have to take, will shoulder more of
the burden.
I think Ms. Armator said also, what about the seniors, and
there are a lot of them in
the neighborhood that I know who don't own their homes.
So now, instead of reducing their tax burden, now you've
got, you've put in play something
that's going to cost them a lot more.
And there's going to be a lot of them.
In my situation, I can afford to pay the taxes.
I don't want to pay the taxes, but I do have enough income
that I could pay them and still
be able to live like I'm accustomed to living.
But I could name you street by street by street in
Southeast Denton, where there are elderly
people who can't even pay the taxes that they have now.
They do not own their homes.
So now that burden is going to be very, very difficult to
overcome.
So that just needs to be considered and put into play as
one of the options that voters
have in deciding what they're going to do in this situation
.
Thank you.
>> Thank you.
Seeing no more cards.
Any questions or comments from staff on this, I mean, from
counsel on this issue?
Seeing none.
All right.
We'll move on to our second item, agenda item 1B, which is
reconsider the adoption
of an ordinance accepting competitive proposals and award
ing a public works contract for the
construction of Fire Station 4 to be located at the corner
of Sherman Drive and Kings Road.
>> Thank you, Mayor.
We have staff here available to answer questions, but we
really have not prepared a presentation
for this particular item.
>> Sure.
I'm the one that asked for this to be put on the agenda.
And part of the reason was, well, the primary reason was
when we had the meeting originally
on the consent agenda and the cost was communicated to us,
I approved that.
But then I had a meeting with the staff out at Fire Station
2, which is supposed to be
identical to Fire Station 4, Save 1, Fire Station Bay.
And as I listened to the construction design elements, the
engineering of it, and realized
that council never, we never saw different design criteria
with different costs associated
with this construction.
And this construction is probably the highest level of
commercial construction.
I personally believe that we can provide the same level of
comfort, safety, efficiency,
and public response to our fire personnel in our community
with a substantially reduced
construction cost and still provide the same kind of
amenities.
In fact, one thing I did learn was that in Fire Station 2,
one side of the roll-up doors
have these new bifolding doors that apparently are supposed
to allow for faster response
time.
They're supposed to provide for a greater or less
maintenance, therefore sort of a greater
rate of return.
But they were only on one side of the bay.
In other words, this is a drive-through bay.
And so I just simply asked, why is it not on the other side
?
And the answer was because the fire personnel, in other
words, apparently, and this is another
problem I have.
I don't know how this design came to be.
Apparently, there's a committee there.
And so this isn't about being critical of anyone.
It's saying, if I'm going to agree to spend $400 a square
foot when there's other construction
techniques that can provide the same level of security,
maintenance, and lifetime of
the asset that are considerably less, I would like to at
least see that process.
We did not see that process.
So I just received an email that the difference in the bif
old doors-- Assistant Chief Hedges,
do you have that off the top of your head?
Yes, I do.
Let me-- I've got it right here.
OK.
The difference is a total of $76,000.
So our fire personnel, for whatever reason, thought that
this station-- they didn't say
this.
They didn't say this interpretation.
So I don't want to put any words in anybody's mouth.
In other words, instead of providing those doors, we've got
construction engineering
techniques that I believe can be mitigated to provide a
greater use of our tax dollars.
And I know Councilman Wiesman, you and I sort of talked
beforehand, and your comment was
referred too far down the road on this one.
And you're going to get a chance to comment, obviously.
But I don't agree with that.
And I believe-- I think we could save probably close to a
million dollars by looking at this
again, even with absorbing some of the costs of redesign.
I've asked the Fire Chief on several occasions, does this
hurt public safety in the community?
And the answer has been a resounding no.
And so I would like to have a conversation about it.
It may come out to be the same.
It may come out to be the same as it was before.
But to have a conversation of what other options are out
there that we could design this building
and save money and pass some of those savings on to better
firefighting equipment, high
fold doors at $76,000, I mean, I almost fell on the floor
when I heard that.
So this isn't a criticism of any staff.
It's more of a criticism of the process of the Council not
being involved in, well, do
we want a suspended slab with 30 foot piers 24 inches wide?
Or will something else suffice?
This is going next door to a fire station that's been
around for 40 years.
And my understanding, it's not literally falling on the
ground.
So this isn't a criticism of our fire personnel.
It's not a criticism of purchasing.
It's not a criticism of staff.
It's saying we've got to change the process to be able to
allow Council to make those
policy decisions on what kind of money do we want to spend
instead of being brought
with something that says here's what it's going to cost,
number one, that's over budget,
over budget for fire station number four and fire station
number three.
So the first order of measure before we even get started is
I would ask the Council, I've
been instructed by the City Attorney that the Chair cannot
make a motion according to
Robert's Rules of Order.
She's very adamant about that, and if I tried to do it, she
'd put me in a headlock or instruct
the police officer here to handcuff me.
And she's got her book right here.
So two ways to handle that.
One is I would ask this Council for some accommodation in
this one specific instance to suspend that
rule so that I can make a motion and if nobody seconds it,
it will die.
Otherwise, if that's not the case, then I would ask Council
to make a motion and second
it so we can at least have the conversation.
So I will first ask, is there any desire to allow a
suspension of the rules so that the
Chair can make a motion for reconsideration?
Yes, Council Member.
I don't want to suspend the rules, but I mean I'll make
your motion if that's...
Okay.
All right.
All right.
Well, I just wanted to make that commentary.
I'm going to take comment now before we go through that.
So I'm going to open it up for questions.
Yes, I'm sorry.
Yeah, this is sort of discussion to see if there even wants
to be, if there's to be a
vote to reconsider.
Is that...
So if we get off posting talking about the substantive
issue, be sure and let me know.
You made your argument about why you would consider it.
Yes, yes.
Absolutely.
So any discussion on the motion?
Yes.
Council Member Wasney.
A question for our Fire Chief or Chief Hedges.
The design cost for Station 4, if this goes back out for
another design, how much money
would we lose in terms of...
And that was my comment in terms of being so far down the
process because sometimes
you can save a dollar here and lose a dollar there and when
you're all said and done, there
isn't much savings at the end because I know we spend a lot
of money on design costs because
if we go back to square one to redesign, because I don't
think you could just take an architectural
plan and do a little change here and a little change there.
This just has to go back out to design.
So I'd like that cost, if I could, on what the city has
already spent in design costs.
Mayor and Council, Fire Chief Robin Palsgrove.
I think this is something that we'd have to determine
certainly with facilities management
with Mr. Nielsen.
The cost of the architectural design of Station 4 design
costs with LEED certification were
just under $400,000.
So what's unknown is whether you'd be doing that in a
complete redesign and whether you
would recoup that savings through a redesign or whether
there would be some elements of
the existing design that you would be able to still use and
then work with the architect
at a lower cost.
So there isn't a detailed specific response to your
question at this point.
But there is.
In that, the city has already spent $400,000 on design
costs.
So that's my point in terms of is there enough savings in
the redesign to get up to the $400,000
savings and then beyond that, in order to recoup.
So I believe the problem is in the process and moving
forward, I think we could modify
the process so that we don't wind up in the same situation
again.
What we're dealing with right now are today's dollars that
we've already spent, $400,000
on design costs.
And I will emphasize that again.
Do we have, and I understand the $76,000, but we're talking
about trying to recoup
the $400,000 plus in addition to that.
And you say you think it's there.
Yes.
Okay.
But I'm going to, there's some other council members that
want to comment, but I think
so based upon, because I don't think that, I'm not talking
about a redesign.
I'm saying you get the same floor plan.
You get, but instead of maybe concrete walls, you get metal
framed walls instead of six.
It's not a matter of changing the design in the sense of
the floor plan.
It's how some of those components, the construction side of
those components really value engineering.
So I don't think it, we're not talking about totally
redesign.
It's saying, okay, here's the floor plan.
Here's the design.
Now, if we want to go to some different level of criteria
for the construction elements,
so that's not having to go back and, you might have to redo
your mechanical engineering possibly,
your structural engineering, but your point is a good one.
And the chief's response is a good one.
We don't know.
And that's really my whole concern is we don't know what it
is.
And I for one am not willing to say, well, I'm going to let
this one go.
We'll catch it on the other end.
Not knowing that what if it was $800,000?
What if it was a million dollars we could save?
Because if we have the conversation and we don't save it,
we're not at anything.
If we don't have the conversation and there's a possibility
we could have saved it, we've
just left a certain amount of money on the table.
And to me, talk is the cheapest aspect of that.
So that's really my reasoning for even calling for this
motion to reconsider.
And one comment, for example, on the concrete versus the
metal frame.
It also has to do with structural wind load, for example,
that we live in tornado country.
And if you're going to build public safety buildings, and
so those are questions that
are worthy of a discussion.
Yes.
So that-
They are.
But as a council member, I'm not willing to sacrifice when
we do get to that discussion
the integrity of that building in the event of some
horrific weather event that does hit
Denton.
So as an example, I'm just saying, yes, it's easy to sit
and look at the difference between
concrete versus metal framing.
But there was a reason concrete was put into that.
And I believe it's wind load in the event of-
So-
They do have a safe room in there.
There is a structure that is provided specifically for a
storm event such as that to provide
safety to the personnel that are remaining in the building.
Absolutely.
But I'm talking about integrity of the whole building.
It is also housing, expensive equipment, not just people,
but expensive equipment.
So I will second Councilwoman Baguerre's motion so that we
can move forward.
You can have a discussion.
And have a discussion.
Absolutely.
But I would ask facilities and I would ask Fire Department
that when this comes forward,
let's really get into the nuts and the bolts as to why we
have some of these design standards
for a fire station.
But it's very different construction than building a
different city facility for use
because their use is different.
And ultimately, public safety, when there is some kind of
weather event, you've got
to have integrity in that building where every single piece
of equipment in there is damaged
in that storm and is useless in the recovery efforts that
will follow that storm.
So again, when this comes forward, let's have that
discussion in terms of the whys
and the wherefores of these construction standards for
these fire stations.
Councilmember Gregory.
Well, is there another alternative side simply?
Do we need to have the motion first?
Okay.
All right.
I'll hold off.
Okay.
I'm sorry.
I'm going to move to reconsider this particular bid or this
contract that was brought before
Council.
Councilmember Wasney.
And I'll second that.
Okay.
But I would also caution that we do it prompt promptly.
Yeah.
So that I know the Fire Department is on a timeline and so
that we can help them.
I think it's next week.
Thank you.
Okay.
We have a motion to second.
All in favor.
So I don't know.
Go ahead.
I didn't know that we couldn't discuss before motion anyway
.
But we always do.
Okay.
So yeah.
So yeah.
So the question is, we've already voted on this, right?
What was the vote?
That vote was unanimous.
So the vote was unanimous.
So now if we were missing two of our Councilmembers, so a
vote to reconsider is one thing and
then a vote to redo that motion.
Explain the parliamentary issues involved here.
Right.
What is before the Council right now is the reconsideration
of the action which was taken
at the last meeting.
It passed, as you noted, unanimously.
So the item now before the Council is simply whether or not
you want to reconsider what
you did at the last meeting.
Your rules require that that reconsideration motion come
forward at the next official meeting
of the City Council.
This would be the next official meeting.
So it is a timely motion to come before the Council.
The motion to reconsider will require four affirmative
votes of the body as currently
sitting in order to pass.
And should it pass, then it will come forward for
consideration on the action, the underlying
action, which is the award of the contract at the next City
Council meeting.
And I would also add that I did provide some information to
the Councilmembers in my last
status report on Friday.
As it relates to this item.
Then given that the vote that was taken last time, the
unanimous vote to move forward,
does that preclude the opportunity for the staff to work
with the contractor or with
the architect and do some value engineering?
I don't know.
Do we have someone from purchasing here to answer some of
that?
Council Mayor, certainly it's all a negotiation at the end
of the day.
The contract that the City ends up with, with the
contractor that's been selected through
the review process, the evaluation procedure, it still is
in negotiation today.
It's not in result, the contract has not been signed by the
City.
So there is time that we could, there's another path
forward, which would be simply to direct
the staff to work with the architect to do some value
engineering and hit some type of
a goal.
Is that an option?
That would not require complete redesign?
I would say where we are in the process right now is the
Council has made the award.
The contract has not been signed, which is really
essentially since the Council has spoken
on the matter, it's really only a ministerial act.
But it has not yet been signed, but I don't think that that
would be dispositive.
I think the Council's vote was really the issue.
Certainly as on all contracts, there is, once one is
awarded, sometimes there are change
orders to change some things, to add additional things to
the contract.
The Council recently saw within the last couple of months,
and I don't recall what the specific
matter concerned, but we did in fact decrease the contract
award.
So there is a mechanism by which changes can be made to
contracts.
So that's a possibility.
My only concern about I have been through a process of
being a chair of a building committee
where we did some value engineering.
And it ended up saving us some money and costing us money
at the same time.
Because when we changed one thing, then we compromised the
structural integrity of the
building.
We had to add engineering in another area, and the savings
were not nearly what we had
hoped that they would be.
So I'm a little bit nervous about doing -- I'm all for
value engineering, and we can do that,
we can save some money.
I don't know the story behind the doors, you know, why we
need this door rather than that
door.
I don't know the idea.
I'm not sure that that's a policy decision.
But while I'm okay with value engineering, I'm a little bit
nervous about the whole issue
of a complete redesign and losing that much money that's
been involved.
>> As much as Anita said earlier, the contractor is aware
of the Council's actions earlier,
and the bonds have been ordered, and the bonds are on my
desk today.
So the city's incurred some expense with that, and I don't
know what their mobilization or
anything like that would be.
I would have to inquire.
So yes, working with them to value an engineering project
at this stage is probably the best
solution.
>> Well, I want the motion to reconsider because I want to
vote against it.
After looking at having a meeting with staff and having a
meeting -- because I don't think
it's -- I mean, you talk about your experience on a
building committee.
You were involved in the day-to-day operation.
I'm saying Council voted on a project on a consent agenda
for $400 a square foot with
no say in what kind of policy decision do we have on
construction kind of processes
and practices.
Well, that's got to stop.
I mean, and for me, it stops right here.
It doesn't impede public safety, and it's okay if everybody
wants to vote the same as
they did last time, but I certainly am very strongly
opposed to moving it based upon the
process where we are in that regard.
So I don't know if we're going to save money.
That's my whole point.
We don't know.
We're making decisions on things that -- I mean, if we had
approved that as it was without
knowing that, number one, they're having to rob from
another kind of pot of money to pay
for the overage and that Fire Station 3 is going to be over
, I cannot continue to make
those kind of decisions without having a little bit clearer
idea of how we're getting to this
place.
That's my reason for calling for this.
Yes.
Can I ask for clarification of the timeline?
So that the city attorney said that next Tuesday, if you
could repeat what happens next Tuesday
and then if you could clarify what are we looking at in
terms of timeline before today
and when the new Fire Station 4 -- I just don't want this
to drag on for another six
months.
Right.
The motion for reconsideration is timely.
It had to be on today's council meeting agenda pursuant to
your rules.
The plan would be if the motion for reconsideration does
pass, then the underlying item would
be back on the agenda on the 10th of January for the
council to consider the award on the
contract.
Now, I think as your purchasing manager has pointed out,
there are some provisions in
the contract which I won't go into detail about, but just
to make the council aware,
there are some provisions that could have impact as far as
termination for convenience
of the existing contract.
And I would refer you to your status report for some
additional analysis on that particular
point.
But in response to your question, it would be the staff's
plan to have that back on
the agenda next week on the 10th.
Mayor, I believe Mr. Nelson had some remarks that he would
like to add to the conversation.
Thank you, Howard.
Mayor, members of council, just in terms of the
conversation with respect to the schedule,
if we would go back and do any type of redesign, then
obviously depending on the extent of
the redesign, there's a good chance that we would have to
go out to bid, so we would
have to follow that bid process.
Just understand that as part of the schedule involved.
Okay.
All right.
Thank you.
Any other comments?
Yes, Council Member Briggs.
Because we do have a card also.
I stand the same as I stood last meeting regarding this
issue.
I believe that we should do, as you say, for the next
station coming up.
We need to be more involved in the process.
And I think we have the opportunity with station two.
As far as this station, I still stand that we move forward.
But I will vote for reconsideration because I know it's
important to you to change your
vote.
Appreciate that.
Thank you.
I also appreciate the fact that we have two Council Members
who are out today.
And so what this does is from their standpoint is put them
back in the mix for next Tuesday
so that they can be part of the discussion and part of the
vote as well.
And so I respect their vote.
I respect their input.
And so we'll bring this back up next Tuesday.
Okay.
Yes, Council Member Geary.
The last time we considered this, I had requested that we
get some staff input on comparable
costs of building because the information that I found was
that we're essentially paying
San Diego type construction prices.
And being very cognizant of the public safety aspect of
this, what I have found is that
places like Haltem City have metal structure buildings.
They built for around $350 a square foot and they completed
just a couple months ago.
So I think it's worth our time to actually have the
information that we can compare what
these other cities are doing with their fire stations.
That will help us in the future as well as we talk about
what is kind of the process
we're going to undertake with these new construction
projects.
So for next week, if we could please have some type of comp
s for the past two years
or so and maybe longer just so that we can see the ramp up
in pricing because it does
appear to have been a ramp up in construction costs.
And also to ensure that we have sort of comparing because I
got an email about some different
construction of a fire station but it's not some of them
are concrete blocks, some of
them are only metal framing so need to make sure we're
comparing apples to apples because
anyway, so I appreciate it.
Thank you all for indulging me in this and we do have a
speaker, Councilmember Hudspeth.
Holy cow.
Wow.
Mr. Hudspeth, state your name and address and your time
will begin.
Happy New Year.
All right.
My name is Councilmember Hudspeth.
I live in 623 Newton.
Thank you Mayor and Council.
A couple of things that I noticed here.
Now let me tell you from the perspective of a citizen.
We want you to save money.
I'm sorry.
All of this talking about time and all of this.
If they're safe, they're operable and they're cheaper.
From a citizen's perspective, we want you to do cheaper.
These taxes are killing us.
Tired of paying these taxes.
Tired of paying that light bill.
I don't know how I got off on that.
I just got to go pay it in a few minutes.
It bugs me.
I admire the chief.
He's just saying, "Get me a building."
Maybe.
If you don't get me a building.
I heard him last meeting.
We're still going to fight the fires.
We're going to go.
But boy, he's got to sit here and listen to us go back and
forth.
And I'm just reading his mind because I have that ability.
He's just saying, "Get me a building.
I just want a building.
Let me go."
We're just talking about.
Now, citizen, save the money.
Don't spend the money if you can help it.
So we all want the same thing.
I just want to voice the part of the citizens that for some
citizens that I think is important.
Now the other thing I want to say is the listing on the
agenda is that you're supposed to
be, you're here to look at a warden or contract for the
building of the fire station.
The subject matter is the fire station.
So I'm speaking to that.
I am the elephant in the room.
There are no African Americans where there is one.
Since I've been here in 1970 to this point, in fact before
that, there were none.
I would like to see some African Americans at that fire
station.
I started this in 1985, I think it was.
I said, "There are no women.
There are no Hispanics.
There are no African Americans."
I asked the question, "Why aren't they?"
Now what I was thinking is because you're racist.
That's why.
God since told me, "No, don't say it's racist.
Stop that.
Just ask the question.
Why don't you have African Americans in this department?
What's wrong with the system?
Is it us?
We don't know how to fight fires.
Why don't we have African Americans?"
So I put the question to the chief and bless his heart, he
's a good man.
I mean he and his fire marshal, they're just good people.
I mean he definition good people.
They look at me as an individual, they consider what I'm
saying and they tell me the truth
as painful as it might be after I made my comments.
So in conclusion, build a darn fire station somewhere, make
it safe, and save us some
money.
Thank you.
Thank you.
Any other comments from council?
We have no more cards?
All right.
We have a motion and a second for a motion to reconsider.
All in favor signify by raising your right hand.
All opposed by signifying your right hand.
We have it passes four to one.
Is that right?
Am I right?
Yes.
We have no more agenda items and we have no more concluding
items.
So that means we will -- oh, yes, I'm sorry, Councilmember
Garey.
Are we not posted for new business?
I don't think we are, no.
Mayor?
Yes.
Just a moment.
You've spoken to this, but I feel a professional
responsibility to repeat each time this subject
comes up to assure our citizens based on your
responsibility and mine that absolutely,
that regardless of this discussion, that we're in a
position to adequately serve and respond,
we will continue to operate out of the existing station.
This is a replacement station, which is a very important
step forward that our citizens
voted for in the bond election.
But it will not affect our capacity to serve during the
interim and during this discussion.
Okay.
Yes.
My only concern is that this replacement station is also a
larger station, correct?
That is correct, sir.
And it will be able to accommodate an ambulance unit,
correct?
Yes, sir.
Because currently we don't have an ambulance unit there.
We do not.
And it is a response time issue in that area, and it is our
intention that it would be part
of a budget proposal next year to coincide with the opening
of station for what we would
be considering.
Right, which is my only reason for voting no to the
reconsideration.
Because any delay is a possible delay to getting an
ambulance to serve that area of town, which
is long overdue.
We have other stations that don't have anywhere near as
many ambulance calls as that one does.
So, my concern is those kinds of things.
Fair enough.
Yep.
Okay.
Thank you, Chief.
Thank you, Mayor.