Jan 05, 2016 City Council on 2016-01-05 2:00 PM
January 05, 2016 City Council
Full Transcript
I wanted to welcome everyone to the Denton City Council
meeting, Tuesday January 5th, 2016.
I trust everybody had a relaxful and enjoyable holiday and
a happy new year.
This is our second council meeting for the year.
It is now 2.02 and we do have a quorum.
We'll go through our first agenda item.
Is my mic on?
I can't tell if it's on.
Okay, first agenda item is citizen comment on consent
agenda items.
Are there any citizen comment on consent agenda items?
Second is request for clarification of agenda items listed
on agenda for January 5th, 2016.
Any clarifications?
You know?
Yes, go ahead, Mr. City Manager.
>> Well, I've just got a couple that I wanted to mention.
One is you have two items on the agenda.
One in closed session to talk about discuss some lease
property and
then there's an action item on your agenda item 4B
associated with that closed session discussion.
We want to go ahead and have the closed session discussion
about it.
But I would ask that you delete for today, action item 4B
regarding that,
because we don't have the contracts ready for your review
yet.
We also have item 4C, which is a contingency fund issue.
And we have provided to you at your seat a revised
agreement,
service agreement with the Denton African American Scholars
hip Foundation.
That increases the amount with another donation from a
council member.
So when that's approved, you need to approve it hopefully
with the new ordinance rather than the one that was in your
backup or
the new agreement rather than the one that was in your
original backup.
And then we sent out to you yesterday regarding item 5C,
which has to do with property for an airport runway
extension project.
We sent out the wrong backup material and we have now
provided you with the accurate backup material for that
item.
So I just point out that you have new information on that
one item as well.
Other than that, Mayor, thank you.
>> Okay, any other questions?
I think I noted one and but for some reason the notes didn
't show up on there.
But if I find it, I'll.
Any other questions for clarification?
Dalton, did you?
>> He covered it before she.
>> Okay, all right.
Seeing none, all right.
We'll move on to agenda item 3A, receive report and hold
discussion, give staff direction regarding policies related
to economic development investment fund and the downtown
reinvestment grant.
>> Thank you, Mr. Mayor.
I want to ask Amy Bissett, our director of development
services, if she would present this work session item for
your consideration.
Thank you, Ms. Bissett.
>> Thank you, Mayor and council members.
What we are discussing today is looking at two separate
economic development funds that exist in the city of Denton
today.
Our agenda today is, I'll give you an overview of why we're
talking about this right now.
And we will discuss the history of these two economic
development funds.
We will talk about policies for administering both of the
funds moving forward.
After direction from you, then we will take that policy
direction back into
future discussions where we'll be looking at our overall
incentive policy,
which is a policy that speaks to more than just what we're
talking about today.
But every incentive tool that we have in Denton is under an
umbrella policy that is updated every two years.
And we will be updating that in spring of this year,
starting in March and April.
And so the conversation that we have today will inform
draft policies that will be integrated into that umbrella
policy moving forward.
So we will talk about two separate funds, the Downtown Re
investment Grant Fund, which was established in 2007.
And the Economic Development Investment Fund, which as you
know, it was established in 2015.
I'm going to start with the Economic Development Investment
Fund.
And we'll walk through the history of that, we'll post some
questions to you for discussion.
And then I will hand it over to Caroline Booth, who will
walk you through the Downtown Reinvestment Grant Fund
history, and we'll have a similar discussion there.
So where does our authority come from to have economic
development and funds in the city of Denton?
It comes from the Texas Local Government Code, Chapter 380
states that a municipality may establish and
provide for the administration of one or more programs for
making loans and grants of public money.
To promote state and local economic development and to
stimulate business activity.
And in order to meet a criteria for public funds for
use in economic development it has to constitute a public
purpose.
And several of these are listed here from diversification
of the economy to
eliminating unemployment, attraction of major investment,
and several others.
The Economic Development Investment Fund will be the first
one that we talk about today.
Its purpose is to create a cash grant program to increase
the city's ability to compete for large economic
development projects.
The reason that we need this fund is because we operate in
a competitive environment.
Many cities in Texas have a 4A or 4B sales tax corporation,
which is essentially a mechanism by which they set aside a
percentage of their local sales tax revenue every year for
economic development purposes.
So they have a fund available to them in order to help
incentivize and recruit businesses to their communities.
And we're in a position where we're often competing against
other Texas and
North Texas communities without a similar mechanism in
place.
>> Real quick question on just very quick historical
context for that.
When we had an election on, first of all, which one was the
election on?
Was it the 4A?
>> 4B.
>> And because I never have got this straight.
It's 4B, the one where the, because the difference is who
appoints those members is my understanding.
But anyway, do we know when the election was for that?
Anybody recall historically?
>> I think it was in the mid 90s.
>> Okay, all right.
Okay, sorry, go ahead.
>> So that election failed in Denton, and so we do not have
that sales tax corporation as a mechanism for economic
development.
Additionally, we also compete with other states and
specifically statewide incentive programs.
Many states are in a competitive disadvantage to Texas, and
they know that.
And have therefore created incentive programs to help
directly compete with Texas and
other major markets in the US that are doing well
economically.
Those incentive programs often offer one or more million
dollars in cash grants
up front in order for a company to base in the state, and
it's typically based on the creation of a number of new
jobs.
So I want to talk about a couple of case studies, real life
examples of projects that we've seen or
contemplated here in Denton, because they are the two
probably that we've most seriously considered giving a cash
grant for.
And they didn't come to fruition for one reason or another.
And so I want to talk about these case studies because then
when we talk about potential policies in a few minutes,
we'll be able to look back at the case studies and see how
they apply to those.
So Project Adams, many of you may remember this specific
project because we did award an incentive to them.
It was an aviation aerospace manufacturer.
They made airplane seats essentially, and their major
customers were
aircraft manufacturers and airlines all over the world.
Their German based company is 150 years old.
They had 25 manufacturing facilities worldwide.
It came down to Denton, Texas or Asheville, North Carolina.
North Carolina immediately, right out of the box, offered a
million dollars cash up front for them to locate there.
The reason that it came down to Denton or Asheville was
because they were being driven by where their customer base
was.
Two of their three largest customers were near Denton, and
the third of their largest customers was near Asheville, so
they wanted to locate near one of their major customers.
That was their single decision for location up until the
point that it came time to discuss incentives.
North Carolina offered a million dollars up front.
We did something that we'd never done before, which was
first we applied for a Texas Enterprise Fund grant and got
it,
which would have been $750,000 over three years.
It was job based, so they had to provide a certain number
of jobs per year in order for them to receive that cash
grant.
We had our local incentive, which we set here and contempl
ated a way to turn at least some of that into a cash grant
up front and
came up with a way to do that that was also job based, and
then we worked with the state on a skills development grant
.
Putting all those puzzle pieces together, we got to about a
million dollars, but it took us about nine months to do it.
And the reason that this particular project hung with us
through that was because they really did want to be in Dent
on for
quality of life reasons for the fact that two of their
customers were here.
But in many other instances, the amount of time that it
took us to get through that process,
to be able to come close to matching it, and it would still
be spread out over several years,
put us at a significant competitive disadvantage.
And just to close the loop on that story in case you have
question marks over your head,
they actually operate in Denton today, and were operating
in Denton at the time, a very small office.
They essentially had to put all of their relocation plans
on hold for a certain amount of time.
They're still based in Germany.
I still keep in touch with them.
They still want to expand in Denton at some point in the
future.
But they didn't go anywhere.
Essentially, something happened operationally that slowed
down their process.
Project Aspen is a project that we submitted a proposal on
several months ago.
And it's a really unique project.
We don't see them like this very often.
It was a $10 billion capital investment.
To put that in a little bit of perspective, that would have
been $68 million of ad valorem revenue to the city of Dent
on,
if that was the value of that project at completion.
By far the biggest project.
It would have been the biggest project in the country for
that given year.
And if they build it, it will be.
They haven't built yet.
It was starting out at 1,500 high tech, high wage jobs in
the first year and building up to 4,000 jobs over the next
few years.
We looked at the RFP and we were it.
It was where they belonged.
We were recruiting tech based companies.
We have a young agile workforce.
We have two universities, plenty of educated workforce for
them to pull from.
We had the research park at UNT where they could partner
with them.
Everything that they had on their list for the ideal
community, we had it.
And that almost never happens.
But when you look at the level of capital investment, it is
certain
that every major metropolitan area in the country that
could qualify was competing for that.
It is a massive project.
And the only way, when it all comes down to it, they're
going to look at all their criteria and
they're going to narrow it down to the communities that
meet all those criteria.
And then it's going to come down to the bottom line.
Who's going to get my bottom line down the most?
Who's going to offer the most in terms of an incentive,
whatever that looks like?
And we had some intense conversations here about how do we,
it is inevitable that if we could, we would offer a cash
grant here.
If we knew we could get them, we knew they were going to do
that type of capital investment,
it would be worth multiple millions of dollars in order to
recruit them to Denton.
But we had no ability to do that, essentially.
We put together a proposal that included a cash grant offer
based on the fact that we knew that
if this project came to fruition, we would come to the city
council and say,
we've made this proposal to them, here's why we think we
should do it.
We're going to have to find some funding sources to make it
happen.
This project came to us earlier in 2015.
I don't know if they've made a final site selection or not.
I know we didn't make it into the final rounds.
So a little bit, going into a little bit more detail about
chapter 380 incentives specifically.
Chapter 380 is the part of the Texas local government code
that gives us the most broad opportunity for incentive
tools in the state of Texas.
There are several other tools that we have.
We have tax abatements.
We have TIFFs and TURs.
Those aren't what we're really contemplating today.
But these chapter 380 incentives, we've been utilizing them
for several years.
But we've always used them in a performance based manner,
which means it is reimbursement for
revenue that we've already received, a property tax
reimbursement or a sales tax reimbursement.
A cash grant would fall under chapter 380 as well.
It would be the same kind of grant agreement.
But it would obviously be based on a different set of
criteria.
For example, the state of Texas uses number of jobs created
at a certain wage.
And they pay a dollar amount per job per year for a certain
number of years.
And it's a very simple mathematical formula to figure out
what they're willing to offer in terms of a cash grant.
And it is our job in economic development to show a good
return on investment for any economic development dollars.
So we're contemplating a policy for administering cash
grants.
Cash grants are going to be the incentive tool that we'll
want to be the most diligent with and
the most scrutinizing of because there's an opportunity
there to provide a cash grant and
not get back in return what you would expect to get back in
return or what you were promised.
And so that's why it's important that we develop a good
policy here that has clawbacks and
has a lot of due diligence.
One of the things that the state of Texas does is they do a
full financial analysis.
They have to have three years of financials and they have
audited financial statements.
They do a full forensic analysis of the company to make
sure that they are who they say they are.
That they have the financial backing to deliver on the
project that they intend to deliver on.
And they really are very scrutinizing before they're
willing to give a cash grant like that.
And that's one of the protections and then there are also
clawbacks written into the agreement.
So you're given a little bit each year, but you have to
prove that you've accomplished
what you said you were going to before you would get the
next amount the following year.
So our policy, the way it's written today means that we do
have a mechanism in place.
We have a policy that says we can give cash grants.
So when the two previous cases came up, Project Adams and
Project Aspen, we were able to at least have a conversation
about how could we possibly fund a cash grant if we wanted
to.
But it would be a situation where we'd have to go try to
find a source of funding on the fly, if you will.
So with this fiscal year budget allocation, you all have
allocated $150,000 annually from mixed beverage taxes to go
into that fund.
So we have the seed, if you will, of a revenue source.
So in 2014, the Economic Development Partnership Board
created a strategic action agenda.
They worked with the city council and with other
stakeholders in the community.
And we created a two to three year plan.
At the time, we felt like the economy was in a really
strong and growing place.
And we didn't have 18 months to create a 100 page strategic
plan.
We needed to be active three months later in accomplishing
some specific objectives.
So we did create that plan, and in the beginning of 2015,
just right out a year ago,
we created five action teams to help implement that plan.
They're interdisciplinary stakeholders that are on each of
those teams.
One of the teams is called the Investment Action Team.
And that team is in charge of finding investment for
economic development and
creating opportunities for investment in economic
development.
And they made the recommendation over the summer for the
city council to create a fund.
And then more recently, they have made recommendations for
a policy framework for
what criteria we might create for eligibility.
Their recommendation is that a company must meet two of the
following three criteria to be eligible for a cash grant.
Number one, they have to be producing high wage or
knowledge based jobs.
Two, substantial capital investment.
And three, that they address a specific recruitment target
or supplier target.
And there's a lot of room for interpretation here, and
there may be some
more clear definitions that we would like to put on these
specific criteria.
But one of the things that I want to share is that
the way that our policy is written today gives us the
flexibility to provide a cash grant.
It doesn't tell us how we can do it or what criteria
specifically someone would have to meet.
In some ways, that's a positive thing because every
incentive comes through
EDP and through this city council and is considered on a
case by case basis.
And so you make the policy every time you approve an
incentive.
And so to put some very specific criteria on this incentive
could potentially put us in a position where we would want
to be able to make a cash grant and couldn't.
And so I would just share that as we look back on the case
studies that we just discussed.
So- >> In that light, I'm guessing that the answer to my
question is we don't have that.
But I was wondering, because there had been discussion in
the past about what we considered a high wage job.
And I'm guessing the comment that you just made prior to my
butting in says we didn't want to be specific because we
wanted to have more flexibility.
>> Well, we have not been specific at this point in time.
We look at it and we bring it to EDP and bring it to the
council and say, here's their average wage.
Here's Denton's average wage.
It's improving that.
I believe our policy says that it has to increase the
average wage in Denton in order to be eligible or be
considered high wage.
>> Okay, thank you.
>> So looking back at our two case studies, Project Adams
would have met number one and number three.
But they were not making a substantial capital investment.
They were coming into the market slowly.
They were going to lease space.
They were going to add a few employees at a time.
But they were high wages.
And they addressed a very specific recruitment target,
which is the aviation and aerospace industry.
If you look at Project Aspen, the larger high tech company,
they would have qualified under all three of these criteria
.
So additional policy considerations for you to contemplate.
What other eligibility requirements would we need to have?
How clearly do we need to define high wage jobs or
significant capital investment?
I do think there needs to be some definition on there.
What about expansion projects if they're competitive for
relocation?
Should the fund have geographic targets or restrictions?
Should the fund accumulate to a certain amount before it
can be used?
That is what I have on the economic development investment
fund.
We can go through the downtown fund and then talk about
both of them together or we can contemplate them separately
.
>> Can you email us that?
>> Yes, absolutely.
>> And are you wanting the feedback to all these questions
now or is that something we could give some thought to and
email you?
>> You can definitely give some thought.
I think, I assumed we would have some discussion today but
not necessarily come to decisions today.
>> Okay.
>> Any discussion?
>> Well, I mean, on the eligibility, on the one hand, you
want to leave it a little bit vague in terms of,
in my opinion, on the wage because you want to be able to
modify that wage as time goes on.
What you define as a high paying job, because what we'd
hope would happen is our average wage continues to increase
over time.
So you don't have to go back and modify your ordinance.
I'm wondering if we could tie it to some percentage over
the median or something like that where you don't put an
amount.
But we definitely tie it to something because otherwise
each time there's an application,
you're going to have somebody selling on why this is good
and somebody saying, I don't consider that to be high
paying.
So that would be a thought is find something to tie it to
that we could all agree is a good benchmark.
But it wouldn't be a specific number on the wage.
>> I mean, I would agree that, I mean, if I remember
correctly in the discussions of this particular fund,
it was a fund that was meant to be able to go above and
beyond what our normal incentive package could offer.
And it was intended to really try to attract and be sort of
the,
hopefully the missing tool that we needed to really get
some, like Plano.
I mean, Plano, I think their check was for $6 million to
get Toyota.
Of course, they don't have an economic 4A or 4B either.
I think they have a dedicated, I think it's a cent.
It's either a penny or something of their property tax that
goes to the economic development fund.
So I think there are, we probably need to have even a
dedicated work session either through this strategy team or
I don't know if EDP does this kind of thing, but to where
we do try to hash out some policies.
Because there's nothing in there now really of any
consequence that is going to be used to attract the kinds
of things this needs to attract.
But there will be.
And it will be good, we will, I think, need some guidelines
to differentiate it, if that's what the policy makers
desire.
To between this and the other incentive packages that we
have.
But so yeah, I agree that if it's above and beyond, then we
're not there to remain the status quo, I guess.
>> Well, I'll just offer up this, to me, this might be a
good session on the retreat, right?
Where it's not, we don't feel like we got a bunch of agenda
items behind it.
And the brainstorming kind of things, we're doing a retreat
where you're getting up and you're writing on the boards.
And I felt like when we did that last year, a lot of good
came out of that.
And this is one where you got one shot to define it.
Kind of the best you can out of the gate.
So just a thought.
>> Yes, Councilman Hawkins.
>> That's a good point.
And two, I'd be curious how tax abatements kind of worked
prior to 1989.
And how did we encourage business in our city?
Just, I know that I'm not asking you to tell me that right
now.
Just curious about that before we kind of got real
aggressive about trying to get business.
So.
>> I can find out.
>> I have a question on this particular portion of the
presentation.
>> Just so to be clear then, you're gonna email us this.
And you're good if we email directly to Amy our thoughts.
And then you're gonna come back to us and tell us how we're
gonna talk about it again?
>> Yes, sure.
>> Is that?
>> Yeah. >> Okay.
>> All right, I'll have Caroline Booth come up and present
the other piece of this work session.
>> Good afternoon.
I'm gonna be speaking with y'all about the downtown rein
vestment grant program.
The purpose of this program is to provide cash reimburse
ment grants for
capital improvements to buildings in the downtown area.
These grants can range from $5,000 to $25,000 and
they're made in the form of a single payment reimbursement
after the project is completed.
I think it's important to reiterate that these grants are
strictly for capital improvements, not for operating costs.
Some of the types of projects that are eligible under the
program are facade rehabilitations,
new awnings and signs, impact fee reimbursements, and
utility upgrades.
Just so you have a visual of the area in which businesses
are eligible to apply under this grant program.
You can see the boundaries here, they follow roughly Park
way and McKinney in the north.
Sycamore Street along the south, Carroll to the west, and
Exposition in the east.
In 2002 and 2003, the city of Denton along with community
stakeholders and
a consulting firm developed a strategic plan that
identified the downtown area as a key focus area.
For strategic efforts going forward, there was a task force
that was developed as part of that effort to do strategic
planning.
And it recommended a grant program to assist building
owners with project costs and
also to offer some control over the design of rehabil
itations and
new construction because there aren't regulations around
that in the downtown area.
In 2007, the council adopted the downtown incentive
reimbursement grant program and
allocated $50,000 for each fiscal year through 2011, 2012
to the program.
In 2012, there were some changes made to the program
including renaming it to its current name and
lowering the maximum grant amount from $50,000 to $25,000.
And the review and approval process was also updated and it
was changed to grants under $10,000 are reviewed by the
downtown task force and approved by the city manager.
If they're over $10,000, the downtown task force reviews
them,
then the EDP board and they're brought to council for
approval.
In 2013, the fund was increased from 50,000 to 100,000 per
year.
To kind of summarize what the grant program has done to
date,
there have been 41 grants awarded since October 1st, 2007.
Seven of those expired without payments due to issues with
the project.
In total, the city has spent $361,695 under the grant
program.
But program projects have actually invested about $18.5
million over the life of the program.
I want to call out a couple of specific examples that were
in your backup.
The Hickory Street Lofts project converted an empty lot to
mixed use development that includes wine burgers and the
campus barbershop.
They received a $15,000 grant in fiscal year 2008, 2009.
And the increase in the property value from 2005 to 2015,
it was an increase of 2,361% in that property value.
Mellow Mushroom took a warehouse and converted it to a
restaurant.
They received a $7,235 grant in fiscal year 2010, 11.
And that led to a 406% increase in their property value
from 2005 to 2015.
So we've noticed some changes recently in the number of
applications that we've been receiving for downtown rein
vestment fund grants.
They've slowed a little bit, though we still have two that
were submitted before the end of the fiscal year that are
pending.
And as you recall, you asked us to put a moratorium on
accepting new grant applications until we had a chance to
have this discussion.
Another thing that has shifted on the square in terms of
economic activity is we're seeing
the activity spread out from the face of the square.
When the grant fund was first implemented, it was a lot of
facade rehabilitation on the face of the square, but we're
seeing it move outward.
We're seeing more transit oriented redevelopment and
we're seeing more entrepreneurship and innovation based
businesses locating downtown.
At this time, the staff recommends that we continue the
downtown reinvestment grant program.
But we'd like to get some direction from you on if we
should continue it as is or
if we could broaden the purpose of it to incentivize rede
velopment of the industrial area.
Or incentivize entrepreneurial and startup businesses.
So at this point, if you guys have questions or want to
have some discussion,
we could do that before we review what the next steps are.
>> Yes, Councilmember.
>> Thank you, Mayor.
You had said that the applications had slowed down.
>> Mm-hm.
>> And that was prior to our putting a moratorium on that.
>> Yes, sir.
>> Could you give us a little more data about the slow down
?
>> Sure, I'd like to ask Julie Glover, our downtown guru,
to come up and
join me at the podium, help out with that question.
>> She had called her up cute up already.
She just loved passing that on.
>> You were?
>> That's why I was on the front row.
>> Do you need a stool?
>> In the last year, there for a while, I might need a
stool.
>> In the last year, there for a while, we were using like
every dime and
towards the end of the year we were going how many more
projects are coming up.
When we lowered the amount to 25,000, the reason for that
was we only had 50,000 a year.
Everybody that applied was asking for 50,000.
So the grants were really falling in that 7 to $10,000
range,
which for some of these big projects is just kind of a
little pat on the head.
So about when we lowered it, we also got more money, so it
was kind of,
I wish we'd known that before.
I think in the last year, we've seen bigger and bigger
projects, some multimillion dollar projects,
to where $25,000 is not a lot of money to them.
And some of the smaller projects that we've been seeing,
normally the downtown task force likes to see a bigger
return on investment than 50/50.
So if you're going to put in a new awning for $10,000 and
you ask for 5,000 of that,
they're going to say, well, are you creating jobs?
Are you creating more traffic downtown?
So I think some of those kind of fell by the wayside,
some of the smaller ones because we were trying to focus
more on the big ones.
We do have two right now that came in mid-September.
One is for a brewery that's been looking for a downtown
location for a while and
has found it, a local beer brewery.
The other one is still kind of in the planning stages and
have asked us not to share who they are yet.
But those both came in mid-September.
They will be big projects, they'll probably both ask for 25
,000.
And I think they both probably would qualify for that
amount.
I think everything kind of goes up and down.
I think 2010 and 11 were really big years for investment.
I think properties are harder to come by now.
Greg might be able to attest to that, that there's fewer
and
far opportunities coming along.
>> So in 2014, 2015, we had 100,000 in the,
>> Fund. >> Yes, sir.
>> We spent how much?
>> I knew he was gonna ask me that.
I wanna say that we spent 20.
>> Really?
>> If I remember right.
Now there were some things from the previous year that
rolled into that year
because they didn't finish the project until after October
the 1st.
>> And that was 20,000 and that doesn't count the two $25,
000 applications.
>> That does not count them because they have not completed
their applications yet.
What they do is they get just the basic form in to us and
then we give them some time.
They can go ahead and start the work because we don't wanna
slow anything down.
If they're gonna do the work anyway, go ahead and start.
But they still haven't gotten other budget numbers to me
yet.
>> Thank you.
>> So I'm looking at the grant report and I'm just curious,
there's sometimes the amount requested and the amount
granted are equal.
And sometimes it's less and sometimes it's significantly
less.
How is that determined, the final amount?
>> They have a scoring system that they go by.
One is like, does it increase traffic downtown, either
daytime, nighttime, or
around the clock if it's a housing, does it improve?
I should have brought it with me, shouldn't I?
It's based on proximity to the courthouse square or
to the transit oriented development down at the transit
station.
If you're closer to one of those things, that gives you
more points.
If you're increasing walkability and pedestrian activity,
that gives you some points.
If you're improving the water and sewer, and
that doesn't mean you're putting in extra bathrooms.
That means you're going from a one inch pipe to a four inch
pipe.
You're replacing a phase one electric with a three phase
electric.
So you're improving the entire area's ability to grow.
The other one, they have like an other category where they
can just give points
that they think it's a good project.
If it's something that is on our wish list, if it's a
grocery store,
if it's a transit oriented development, those sorts of
things,
they also get points for that.
>> Okay, thank you.
>> Yeah, I was just going to add, and you just brought it
up, Julie.
I think I was on that task for a long time, and I think
part of what you're seeing is
the convergence or the timing of two things happening.
So you had a lot of activity, because there really wasn't
much activity before 2008, 2009.
Excuse me.
And then we went from a subjective system to a points based
scoring system.
Sorry.
And so then those smaller projects weren't scoring, because
they weren't creating jobs,
and they weren't bringing new people downtown.
So you saw less and less people qualify based on the point
system.
>> Sorry I checked you out.
>> You always do.
>> That is true.
So if somebody, and before we started the point system, if
somebody was redoing their awning,
and everybody felt good about it and thought, they're right
on the face of the square,
that's going to make it look good.
They would just say, let's give them the money.
And then we had some people that weren't happy with the way
it was being done,
that it was too subjective.
So we came up with the point system, which really did, I
think, hurt the smaller projects.
Like if they were just painting or doing an awning or doing
some signage,
they couldn't meet some of that criteria about where they
weren't increasing employees,
they weren't increasing their business, etc.
>> Go ahead.
>> The one thing that I would, if we decide to move ahead
with continuing this or
if we modify it in some way, it would seem to me that the
idea of
added points if you're closer to the courthouse or you're
closer to the transit center,
as opposed to fewer points if you're further away, is just
the opposite of what it needs to be.
If we want to really expand the definition of downtown,
because having had some close personal contact with folks
who had businesses off the square,
they felt like that they were already at a disadvantage in
terms of traffic and in terms of publicity.
And even in terms of events happening, so that I've heard
several of them feel like that they had to work even harder
for
marketing and for attention on big event nights to get
folks to leave the proximity of the courthouse.
>> I think this is a great example of a program that was
put in place as has been with the square over its life
cycle of the last 20 or 25 years.
Where people started out with a vision and that vision was
stuck with,
it was persistence and we have what we have today.
I think this did its job in the beginning.
We changed the name of it because we weren't really
incentivizing anybody to do the projects because they were
such a minute portion of the project cost.
It was just sort of a, hey, we want you to do this.
Personally, I would be in favor of expanding this either
throughout the whole city or moving some of this into the
economic development fund.
I think the downtown has, it's arriving to a different
level, a different stage.
And we're now giving incentives out of the TIF.
We're giving incentives from the general fund for these
major projects that are two, three, four million dollars.
Not saying that smaller projects don't need some help.
I'm just simply saying that I think for it to be just now
localized and isolated to the downtown area,
I think it's time to think bigger and to look at other
parts of our city that could benefit from this
small amount of investment that may be something that would
be helpful to people.
So I would struggle to support this continuing as it is
today and
staying localized to just the downtown area.
I think it's either time to expand it to other parts of the
city or if we really want to use it for
economic development, help us increase that economic
development fund balance so
that when we have big projects that come in that really can
provide a really powerful punch above and
beyond what we already can provide for, that we have the
opportunity to do that.
In no way is it taking away from the downtown.
In no way, as some have characterized me in the past, as
being anti-downtown.
On the contrary, I mean, look at it.
I mean, all you have to do is do the analysis of it.
Even as the TIF, which is in place, which is a $24 million
over 20 years quote unquote incentive,
it has developed in spite of there not being much money in
that and
we've not used much money out of the TIF except for the
rail yard and some other things.
So it's an organic creation.
It's happening because it's the market.
People want to be down there.
Prices are the highest probably anywhere in the city and I
just think it's time to see if we can maybe
maximize those funds somewhere else to provide the same
bang for the buck,
either around the city or in a different fund.
So that's where I am and I don't think that's any secret.
But again, when you look at the early stages with the Mell
or Rush Moon, the Weisberg Deli,
those were the catalysts and industrial, those were the
ones that started out first that took the risk.
And we've seen how that's grown and evolved.
So I think it's worked and it may just be time for, I think
somebody said,
actually I think it's you, Mayor Pro Tem, a couple years
back.
My memory is not very good in some ways, but you know, well
, when it's time to take the training wheels off,
it's time to take and by golly, I think the downtown is not
just doesn't have training wheels.
It's doing, you know, the Tour de France, so to speak.
So the power of metaphor.
Yes.
In helping a memory.
Yes.
That's exactly right.
Anyway, that's very good.
I just learned.
So that's where I am on it.
Not in a, you know, against staff or anything.
I just think we can use that money if we're really wanting
to rehab some areas in town or provide some incentive on
some other strip centers.
The one I remember as an example is the one at the corner
of Carroll and University Drive where the Starbucks is and
the Radio Shack.
That used to just look horrific and they went in and they
redid that entire facade and good heavens,
you can't find a parking spot in there because everybody's
at the coffee shop.
But those are my thoughts on it.
I mean, if it stays the way it is, am I going to?
But I would like to see it expanded and help us maybe
maximize its use because we all know that money's tight
these days and we want to make sure we use it as
efficiently as possible.
Those are my thoughts.
Yes.
I thank you for that, but I want it to be more focused on
some certain areas, maybe not just citywide.
I don't know if we'll get a bigger bang for our buck.
I mean, if we just open it up to the city limits, is that
possibly what you're saying?
Well, I mean, if we can identify areas, if we want to say,
well, we targeted this area for many years.
So is there another area?
Is there an area outside of the D tip area, maybe in the
southeast portion of Denton or somewhere on the outskirts
or somewhere north?
Just I mean, that's certainly some good input.
I agree.
That'd be interesting to see.
For five years, we picked a section.
What would happen there?
Because it's obviously been very effective here in helping
some of the small businesses and startups.
But as we've heard, number one, because of the lack of
property, number two, because of the price, number three,
most of the projects now are large.
I mean, they're large projects.
And you're right.
I mean, 25,000, I mean, it's 25,000, nobody's going to turn
down $25,000.
I mean, come on.
But I think it may be an opportunity to find some other
areas that could use that.
So yes.
Along those lines, what you all have been saying, the
question that occurs to me is, and there may be somebody
from your office that could answer this.
We have some areas in town that are maybe underserved in
terms of groceries.
And I'm wondering if 50,000 or 100,000 would make a
difference in moving a grocery chain forward and locating
if we set boundaries for it.
Would you all have any notion as to what that is, or would
you need to take some time to at least--
I think we need to take some time.
OK.
We can definitely do that.
It seems like most of them have some kind of formula for--
Right.
And they have their own people that go out and look for
spots.
That's what I was--
Yeah.
I was aware of that, but I was just wondering if this might
be a tipping point in some situations.
And I might just add that the way this downtown grant is
structured, it's tied specifically to saving historic
buildings.
So if we expand it, it's probably going to have to be
completely rewritten, because the historic value of the
buildings downtown are what we're really trying to save
with this program.
Yeah, so that's really where I was going to go with this.
I think-- I don't disagree with anything you said.
I think we have to decide what is it that we're trying to
accomplish, right?
So this was kind of a hybrid model.
This was promote economic development downtown to bring
more pedestrian friendly businesses downtown, because it's
walkable, et cetera.
But it was also to-- because vacant buildings deteriorate
much faster than occupied buildings.
So it was part and parcel to how do we save these old
buildings?
Well, you get them occupied with a business, and renovating
an old building is a whole lot more expensive, as Joey can
tell you,
than if you just went into a brand new strip center to open
your coffee shop or your retail shop or whatever.
So I do think that it's done its job for sure.
And I don't think that $10,000 or $20,000 makes one of
these big projects happen or not.
So the question you have to ask yourself is really, what
are you trying to accomplish with it?
I don't think it's going to be impactful at all to say,
well, let's take this $100,000 and let's open it up to the
whole city.
Because if that project that you mentioned on university, $
10,000, $20,000 doesn't make that rehab happen or not.
But I do think what you're saying makes a ton of sense,
which is if there's a specific area of town that we say we
want to revitalize
for economic development reasons, for a lack of services
reasons, for aesthetic reasons, what are they?
I think first you have to define what are you trying to
accomplish before you can just say how we set the criteria
on the money.
I don't think that -- I think right now you could take this
$100,000, put it in the economic development fund,
and say downtown projects are available out of the economic
development fund.
But you're just going to have to wrap criteria around it.
Maybe you put the money in it and say if it's a project
within the DTIP, these same criteria apply instead of
having two different funds.
But I think unless you start with what are you trying to
accomplish to say we're just going to open up this $100,000
for the whole city,
you're just going to get a bunch of applications.
Somebody wants to paint their building or put it on.
And how impactful is that really going to be?
But I think what we did prove is that it worked.
A concerted effort with a focus and a task force.
Because honestly, I think the energy created by the
downtown task force and the attention given and all the
work did more than the money.
It was all those people working under Julie's leadership
and getting people to come in and talk about their projects
and sharing ideas amongst the group.
That's what made this happen.
It wasn't the 10 grand or the 20 grand.
Now, I will tell you though, I think it's also a mistake to
say $25,000 doesn't make a difference in a $2 million
project.
It does.
That can be as a part of their net income that makes it
their go, no go.
So it can be impactful.
Even though it seems small, it can be impactful to where
somebody says I'm going to do the project or not.
If it's that tight, they're probably not your guy anyway.
So I would support that, Mayor.
I wouldn't support eliminating it and having the money go
off into the abyss.
But I think putting the money into the larger fund and
allowing downtown projects to be able to tap into that
economic development fund would make sense.
>> Well, just to add to that, that five grand isn't going
to make or break a business, you're right.
But when you are trying to rehab an old building, the
chances of hidden costs are so much higher.
And I know, even personally when I did hoochies, being able
to put the awnings up at the end when we went way over
budget.
So just kind of adding to what you said there, it didn't
make or break us, but definitely gave us more curb appeal
at the end.
So. >> Well, I tell you, based upon what you just shared,
which I appreciate that about its original goal or its
intent was to help with the preservation of a historic
building.
And if you need to rattle your paper, rattle your paper at
me, okay?
Because if it was up to me, because we will be considering
later on in another couple weeks or next week, I guess,
or the next time we meet on what do we do with people in
City Hall West?
What do we do?
If it empties out, what do we do with it?
And I think that if we wanted to do something really
creative with that building,
historically, because it has represented many different
facets in the life of our city.
It's been very, sort of very different functions.
This could be an opportunity with the grant money to,
>> Hold them here.
>> Based upon the economic development grant money.
So anyway, but I'm open to it being put in the fund.
If, again, we have to decide what that fund is really used
for, as we discussed earlier that first presentation.
So I guess we have to give you direction.
So, I'm sorry, go ahead, Mayor Pro Tem.
>> One of the questions that I would have as far as
direction is,
if the staff has been approached, or
if any council members have been approached about an area
to target.
I think this has been a great conversation because Julie
was talking about a different area.
So if we know of an area that we might need to address for
the reasons that you talked about, Mr. Johnson, of blight
or lack of services.
Let's get some information on that, if there's some of
those out there.
>> Mayor, can I?
>> Yes, go ahead. >> So I was just going to tell you guys
that, so on the scoring system, just so everybody
understands.
Because I think what we might be able to do, if everybody
was in agreement, if it goes into the larger economic
development fund.
If it's in the D tip, these same criteria could be in place
.
The scoring system, you had the categories, economic impact
, historical accuracy of the building,
utility upgrades and impact fees, increases population and
location.
It's proximity to the courthouse.
So it's hitting all those different categories.
So to me, the D tip area is a much larger area than what we
historically kind of looked at the downtown reinvestment
grant for.
There's, as we work on our drainage projects south of the
square, is prime for redevelopment.
And it's certainly blighted.
There's going to be needs and opportunities for redevelop
ment south of the square.
So might we consider as we, however we're going to address
this overall fund.
What if we said we're going to, as a part of that work
session,
address how the downtown funding rolls in, if it's going to
roll in.
Meaning, if you're going to take that 100 grand and put it
in here, do you want downtown projects to be able to apply?
And if so, what will the criteria be?
Because I don't think we want to lose historical accuracy
as a part of this.
Because you want to incent people to respect the historical
accuracy of the buildings, even if they don't have a
historical marker on them.
So I'm just saying, if we're going to roll it in and not
let the money float away,
do we want to treat downtown projects a little bit
differently than we would just a general economic
development incentive application?
>> Well, and these are all good questions.
And I think it's indicative that there's another work
session for this that needs to be scheduled with
incorporating the ideas of the DTIP areas, some other areas
in town.
If it's in the one big fund, how do we segregate it?
If we do, do we want it to have two different functions?
So it'll be good, because we can sort of make those a
combination.
Because if it's going to be in that one fund, then that's
sort of the conversation about that fund would hit, I think
, all the topics we've been talking about.
>> Can I ask for some guidance on one particular thing that
's more time sensitive?
>> Sure.
>> That is the two pending grants that are there today.
When and if they're ready to proceed, can we consider those
?
>> I don't have an issue with that.
I mean, they're-
>> You have excess funding sitting there.
That wasn't spent.
>> Yeah, so no, I mean, obviously, sure.
I mean, is that the direction council's, okay.
>> I think I heard enough ideas and direction for us to
come back with some ideas for a future work session.
>> Great.
Thank you.
Thank you.
Everybody, do you have enough to take a break?
What do you take?
That's only been an hour.
No, we don't need to.
>> Okay.
All right, we're going to go on to the, I think my hand's
broken from the city attorney trying to get me to get back
in compliance.
We're going to go on to work session 3B, which is receive
report, hold a discussion, and
give staff direction on the DENT renewable plan and
activities related to the future, excuse me.
The future power supply plans to meet the city's growth and
needs.
>> Thank you, Mayor.
I'm going to call Phil Williams, our general manager for D
MA, to present this item.
>> Thank you, Mr. Williams.
Good afternoon.
>> Good afternoon.
>> So I wanted to come back today and respond to some of
the questions that have been raised by council
past meetings on renewable DENT plan.
But also, well, I'll go through some of this.
Council direction, as we've said before, is renewable rates
for liability.
We've proposed a 70% renewable energy, give us options to
be able to replace the coal generation that we existing
have.
Also provides rate decreases beginning in 2020 and provides
a 74% emission reduction.
Today I'm going to talk about utility scale batteries.
The size of the units that we're having, the size of the
facilities, the emissions impact.
And in answering other questions that council may have, we
'll say that during the holidays
that staff has met with two or three different individual
groups.
And have entertained questions from these groups and
hopefully answered them to their satisfaction.
We're finding ourselves now that as we have different
citizens
entering into the discussion that some of those citizens
are asking some of the questions that were asked by other
citizens early on.
And so we look to expand our question and answers that we
have on our website.
And we'll be doing that later this week with some of those
commonly asked questions that we're getting.
That information as well as these presentations on our
website.
Also in response to council direction we received yesterday
, we went ahead and
arranged for question and answer meeting that we'd have
with the public on Saturday,
January 23rd at 930 in the morning to follow the same
format or
similar format to what was done for the gas well discussion
that happened last year.
So to make that aware of them.
>> What's the location?
>> Council chambers.
>> Okay.
>> Like the past one was done with the gas wells.
>> Will that be videotaped?
>> Yes, sir. >> Okay, great.
>> But if I could, Phil, we need to, we'll probably poll
council members.
If you attend that meeting, we need to affect whether or
not we post it, sir.
>> Okay.
Very good.
So going into the discussion, first item we have here is on
utility scale batteries.
So far, the battery cost of the installations have been out
there.
The capital cost is three to four times higher than what
these plants are.
>> There's a question.
>> Can you clarify utility scale?
When you're talking about that, what exactly do you mean?
>> So by utility scale, I would mean the sizes of the units
that were quick start units,
we're talking about turning 20 megawatts.
And so we're talking about that size of battery technology.
>> Divided up or just complete, because each one is 110 meg
awatts.
But you're talking total utility scale, okay.
>> Okay.
>> The life span has been half a salon or less than what
these plants are.
More of the life span of certain types of batteries is more
determined by the number of cycles that you're putting that
battery through.
The way we're talking about operating these plants with
cycling them on and
off many times during the day sometimes, each one of those
cycles will count against
the battery technology and would shorten the life of the
batteries.
The technology hasn't been in place or proven over a number
of years.
So far, the uses that we've seen from people utilizing the
batteries has been for
what I would call ancillary services, for voltage support,
for
regulation up and down for governing the renewable energy
like solar and wind.
Not to meet long term load requirements.
For our operation here, we're talking about a source of
energy that would come on in the summertime in August,
come on at 9 o'clock in the morning and go until 10 o'clock
at night.
So you're talking about 16 hour days, 8 hours to recharge,
and
the battery technology doesn't seem to be there yet to be
able to perform in that way.
>> Phil, well, Mary can I ask a question?
>> Yeah, go ahead.
I can barely hear you, so.
>> Okay, sorry.
>> So, Phil, our total megawatt load, annual estimated load
is what?
>> So our total load for right now is peak that we set this
past summer was 347 megawatts.
Deanticipated load in 2019.
I have a graph here that shows that.
It'd be, I mean, we're going to be growing up, growing past
that, going up to 370, 380.
>> Is there any city, any municipal owned utility, any
utility,
anywhere in the United States that's using battery storage
to the level that we would have to have?
>> No, sir.
>> Is there anybody?
>> There's some people that are talking about coming out
with like 200 megawatts of batteries, but I don't think
there's anybody using on that size.
>> Okay, thank you.
>> What is the highest battery storage right now?
>> Texas right now, I believe Duke Energy has a battery
technology that's used in connection with their wind
project out in No Trees, Texas, which is appropriately
named.
I believe it's 37 megawatts, is that right, Jim?
37 megawatts that they use to provide ancillary services,
not to provide generation, but to provide support for their
wind project.
>> Phil, got a question.
>> I don't know, if I ask a question that you think is more
appropriate for a closed session than just, and then we can
talk about it.
Because you stated that the peak for at least megawatt is
347 is what we had.
Do you know what the, maybe a range would be helpful.
From total megawatt hour usage, from January to December,
do you have an idea of what that, just a range?
I mean, are we at- >> The total number of megawatt hour
sales that we have?
>> Yes, of our load, our load.
Total medical, when we look at what our load was over the
365 days is, I mean, I think-
>> About one and a half, from where you're making, one and
a half million megawatt hours.
>> Okay.
>> So the megawatts is a measure of in one hour.
>> Right.
>> And then one megawatt hours is over a period of time.
So then in, when we talk about the peak times of 347, as we
got up to needing 347 megawatts.
But that's, how many hours in a range, I mean, are we
talking,
you need that capacity for 16 hours out of the day during
June and July or-
>> If I could have two more slides.
>> You got it.
>> I'll get to your- >> Okay, fantastic.
>> I think I have a picture that answers that question more
significantly.
>> Fantastic, thank you.
>> Okay.
And so the other issue of ERCOT with batteries is,
is ERCOT has not really set up their rules yet to deal with
this.
This was an issue that Encore had.
Encore tried to introduce battery technology into their
grid.
And it was one of the questions that ERCOT had, or one of
the issues they have of,
this kind of crosses a line between somebody that's a
transmission service provider, like ERCOT is.
And it was protested by some of the generation companies
because it could,
battery technology could also be used as a generator, as a
supply, a power supply.
And so you're kind of crossing lines between somebody that
has an asset that can be used in the transmission business,
but also has an asset that can be used in the generation
business.
And so the ERCOT rules aren't yet clarified as far as how
that will be treated in the future.
I think it will be, I think a lot of these issues will be
addressed.
It's just issues that are open right now.
We're not, we don't have a timeframe of when they will be
addressed.
And then lastly, the Citibank financial analyst
issued a statement that they expect battery storage to
start to be cost-effective around the year 2030.
And so they see this, and this is a statement I've made
before the council, is to me battery technology is where
solar was in the past.
I think battery technology will evolve.
It will be a resource.
It will be something that's usable within the market.
But it will evolve and come in to play as solar has over
time.
>> So when you say capital cost is three to four times
higher than the quick start plans.
So let's say for instance, I mean I think we've floated, I
think there's been floated a cost for the proposed plan.
>> 220 million.
>> And if it's 220 megawatt, then you're looking at a
million dollars a megawatt hour of capacity.
So are you saying that then sort of battery storage then is
what you're saying.
>> Three to four times that.
>> Is three to four million.
>> Plus I still gotta buy the energy to put in there in the
first place.
>> Okay.
>> And so that becomes the other issue, especially in Texas
is,
if you're doing this to be more emissions reduction,
then you gotta look at where's the power gonna come from to
put in those in the place.
And if you're talking about in Texas, you're gonna be using
all the solar power you can get during the day to repeat
your load.
And if you, during summer months, and so
it doesn't leave any power at night to put in these
batteries except wind power, it's unpredictable.
>> All right, I've done some high quality internet research
on No Trees Texas.
It's in Nectar County.
Near the- >> Squared off from New Mexico.
>> Yeah, thank you.
It's an unincorporated town.
The battery storage, it's a lead acid battery capable of
36 megawatts, capable of delivering full effect for 40
minutes.
So now this is Wikipedia.
Would you guys give us a little bit more research on that
and verify if that's accurate or not?
>> From our research, it is accurate.
>> We're not going to the same Wikipedia page, are we?
>> No.
>> Okay.
>> We talked to actual battery vendors.
>> Okay. >> People who had invested interest in wanting to
promote and sell batteries and come tell us, hey, I've got
the solution to all your problems.
And one of those entities we talked to from California was
saying, no,
my batteries aren't the answer to your problems.
His batteries are the answer for the ancillary service
problems.
If you need a short term fix for sagging voltage,
these can fire up and provide you 30 minutes, 40 minutes of
power to help until you get another generator on.
But as far as being a long term provider of energy over
several hours during the day,
they're not there yet to do that.
They provide the ancillary services that you need for
voltage support and regulation up and down.
But at the companies we've talked to of, like I said,
California vendor and other battery vendors of where are
you guys going and
how far are you away from having a solution to these issues
.
Where the market seems to be going is focusing on using
these to provide these ancillary services.
>> Thank you.
>> Okay.
So, do you have one more question?
>> Yes, I'm sorry.
Go ahead.
>> So I have an email from someone saying that Southern
California Edison procured 250 megawatts of storage.
>> Southern California Edison, so-
>> Is that not utility scale or?
>> Yes, that is utility scale.
And so what they're using that for is for these ancillary
services.
>> Okay.
>> And so it's for a short term need.
California many years ago really became prohibitive to
building a new generation projects within California.
And so they import a tremendous amount of power.
And in importing that power, they have a problem with
voltage support because they don't have the generation
local.
They're having to bring it over long transmission lines.
And so they're finding these batteries as an answer for
that to provide voltage support.
I'm going to look at my staff.
I mean, they looked at that provider.
>> Right.
Now instead of building two new gas peakers, they procured
the, okay, so that's just kind of what they chose to do?
>> Yes.
>> Okay, thank you.
>> So why do we come up with turning 20 megawatts?
Why this size?
And in round numbers, part of it is to give us an option to
replace the 100 megawatts we have presently out of Gibbons
Creek.
Gibbons Creek, whether it goes away in 2018, 2019, 2020,
2024, somewhere it's going away in some period of time.
And so we need to replace those megawatt hours we're
getting presently out of Gibbons Creek.
If we go to the market, there it is, there's my cursor.
So if we go to the market, the market megawatts have higher
emissions and they have more volatile pricing.
And so we're looking for somewhere to short this up that
would give us also more flexible generation than what we're
getting right now at Gibbons Creek.
Gibbons Creek was built as a base load unit.
It wasn't built to go up and down countering against wind
renewable generation.
And so it wasn't built to do this.
And so these plants would be.
The other 100 megawatts would be to back up wind energy.
Again, wind energy, this mitigates the risk for when the
wind doesn't blow.
It allows more favorable contract terms.
In other words, we can go buy this wind energy at the best
contract terms and
also have backup for that that's less volatile to pricing
than market energy.
And then the other 20 megawatts is to back up our solar
contracts.
Again, same thing as the wind to mitigate risk, but also
what we see is is solar will come into play more as we grow
.
We anticipate meeting our future growth with future solar
contracts.
We think solar pricing is still has some possibility to go
down.
And this allows us to meet that and again, buy the solar
energy at the most favorable pricing.
>> Couple questions.
I'm just going to take a sort of bullet point at a time.
On the 100 megawatts to replace Gibbons Creek.
And I was going to try to get these because I know we get
weekly updates on Gibbons Creek, its output.
Well right now, Gibbons Creek, I can't speak for the summer
.
Sure, Gibbons Creek was up and running more in the summer.
But we're not getting near 100 megawatts.
I mean, if we did that times 8,760, we're not getting 900,
000 megawatt hours from Gibbons Creek.
In fact, I think the last report I saw was 80.
>> What's the, is it 150 or when it's just running just to
stay on?
>> 150.
>> 150.
>> They, depending on the plan, they're either 180 minimum
or 150.
>> Okay.
So I understand that and I want to go more into some of the
specific numbers on some of the, but we'll do that in close
session.
Because I know that I think if I'm understanding the
increased renewables are meant to absorb
some of that generation as well, in other words, if we're
going to go from 40 to 70.
>> It'd be virtuous.
>> Some of that will be.
Okay, so let's go to the second one, the 100 megawatt
backup wind energy.
When we're talking about renewable contracts under the new
paradigm,
the proposed plan or just the way we're trying to buy renew
ables now from what I understand.
The current wind contract we have is, and I'm just going to
, what is it, is it 80 megawatts, 60?
What is it?
>> That may be conflict to our price.
>> Okay, sorry, sorry, that's fine.
Yeah, but anyway, let's just say 50.
I don't know what it is, but let's say 50.
But it doesn't, wind contracts, what is it, about a 40%
capacity or 50% capacity?
So what their capacity is, you're probably actually going
to get close to half of what the actual, of that in actual
generation.
So, and this may be for closed session, so if I get too
specific, just, and that's cool, I don't have a problem
with it.
But it's my understanding, the reason why we want these,
some type of backup generation is so
that when we go out and talk to renewables, they don't have
to back it up.
I think we've talked about that.
We can just say, hey, we'll just buy what you generate.
You don't have to worry about it.
If it's down, we're going to take care of that on our end.
You're not going to have to take care of that.
So when we see projections of renewable energy moving
forward with the proposed plan,
that's really what I'm saying is the assumption is if we
have the proposed plan moving forward are the things that I
've seen.
Those megawatt hours represent the actual generation,
represent what we're anticipating actually purchasing,
which is actual energy.
So my question is, how does, when I see 100 megawatts for
backup wind energy,
if we're buying just as an example, and I'm going to use a
number and I don't know what the projection,
but let's say it's 500,000 megawatt hours of renewable
energy.
That we're thinking we're going to be able to purchase
actual energy, not backup, not,
when it's not going, they back it up, but that's what we're
going to get.
So how are we calculating how much we're going to need to
back that up if we're already got into the equation?
This is what we think we will actually be purchasing.
We're not going to have to back, by some unforeseen thing,
if a storm comes through and knocks down some turbines or
you lose a transmission line or something that's sort of, I
don't want to say out of the ordinary,
but not really associated with the wind not blowing because
we've already sort of factored in.
If we execute this number of contracts for this amount of
megawatt hours,
we believe we're going to be able to get actual this
generation and that's what's already forecasted in.
And I'll be able to go more in detail on that in the closed
session.
>> So.
>> How are we calculating that we need 100 megawatts to
back it up if we're backing up what we think we're already
going to be purchasing?
>> So as we've discussed, we talk about our wind and solar.
We're talking about multiple contracts from multiple
sources.
>> Sure.
>> We're trying to bank on that somewhere the wind will be
blowing.
>> Right. >> That the wind will stop blowing everywhere.
But as you noted, different wind farms have different
profiles.
Some will blow as much as 50 and have 50% capacity factor.
Some will be as low as 30.
The ones with 30 blow more on peak.
But so they have different levels of production.
So we can't predict which day exactly they're going to blow
.
But over a year, you can get pretty close on prediction of
how many megawatt hours you're going to get out of each
wind farm.
What you can't predict is which hours they're not going to
produce.
And so to meet that demand for those hours that they don't
produce to back that up.
So we don't need megawatt for megawatt.
In other words, if I go buy 200 megawatts of wind, I don't
have to have 200 megawatts of backup.
Because the wind will blow somewhere.
But I have to have some backup for the amount of wind I'm
buying.
>> And I guess that's my question.
And again, I'll have to rely on you on the confidential
proprietary information.
You mentioned if I go out and buy 200 megawatts of wind.
That was sort of your example.
I don't have to have 100 megawatts backed up.
So let's say if I'm going to go out and buy 200 megawatts
of wind and I ask for an RFP and I say, you back it up,
wind contractor.
I'm going to be paying for 200 megawatts of capacity.
The wind's either going to provide it or their backup
source is going to provide it.
But let's say I want to say, well, I want to buy 200 meg
awatts, but we're going to buy what you produce.
Which may be 100 megawatts in actuality.
We may only get 100 megawatts.
So if we shift to a different paradigm or if we have a
different paradigm, because when I look at 100.
And the reason I'm asking these questions, you and I have
talked about this.
My thought is, do we need the 220?
And I know you've got another slide on that.
And so that's why I'm asking.
Yeah, two more.
But what I'm trying to get to is how are we calculating,
because 100 megawatt capacity
of backup is 876,000 megawatt hours, if it's running all
the time.
Which is, that's a lot.
I mean, so those are some of my questions that will
probably be a little bit more refined in closed session.
But those are my thoughts, because when I saw those two in
your slide, I thought, well, we're not really getting 100
megawatt.
I mean, when we rolled this out, it was presented as
backing up renewables and things such as that.
This is the first time, at least in a public setting that I
've seen where we have to replace Gibbons Creek generation
capacity.
Whereas I thought the increase in renewables was part of
that equation.
Because when you look at our current usage, I mean, we're
not getting, I mean, Gibbons Creek is, I mean, you know.
>> And it's because the market's cheaper.
>> Yeah, the market's cheaper.
Exactly, the market's cheaper.
And it's been that way for two or three years.
>> And we've been that way for two or three more at least.
>> So then I guess, so then go down to the next bullet
point, the 20 megawatt is sort of a similar question to the
second bullet point.
That is, if we're buying it with them already backing it up
, or if we're buying it with us backing it up, there's going
to be a cost difference.
And so if we're just purchasing what they make, it's like
an inputs contract or an outputs contract.
We'll just buy what you generate, and we'll be responsible
for when a cloud comes over or something like that.
Those are sort of the questions I have, how do we factor
that?
And you go ahead, I'm sorry.
>> So kind of multiple questions there.
But let me come back and respond to one of those.
And that is, for one thing, the market has evolved from
when we did our original wind contract.
>> Right.
>> As far as the bidders on a renewable energy contract on
wind or solar,
as far as the number of entities that have, in addition to
their portfolio, their own fossil fuel generation to back
it up, those have become fewer.
More entities are out there that specialize in their wind
energy contractor or their solar contractor.
And so as far as the number of people they could bid to
provide us the renewable energy with their own backup,
those have gotten much fewer.
So the number of people who sell energy in this way, as far
as you're going to buy whatever I produce, whenever I
produce it.
Then that's become the most economical way to buy the power
, and the market's adjusted to that.
And just to the point that most purchasers recognize that,
hey, I've got to provide the backup on my side.
That the cheaper way for me to buy that renewable energy is
to me take care of buying that renewable.
I can take care of buying that renewable backup through
another contract from another entity to back that up,
a lot of what Georgetown has done, or I can procure it,
have my own generation, such as what Austin's proposing.
>> But it sounds like that, if that's the way the paradigm
is now, in other words, they say, look,
we're not guaranteeing a generation amount, we're just
saying you take what we generate.
Because of where it would be located, it sounds like there
's a pretty good predictability with,
like you've talked about, West Texas wind, coastal wind,
all these kind of things.
There's a predictability to that that I guess gives some
confidence in, well, we think if we execute this contract,
we'll get X number of megawatt hours out of it, and that's
factoring in that it's only a 40 or 50% capacity, or the
wind, or something like that.
>> Right. >> Okay, all right.
>> So it gives you a low profile that you-
>> Can depend on-
>> There's enough history now in these projects that they
can feel more confident in their low profile.
>> Okay, that's the term, low profile, okay.
I'm sorry, what?
>> What is the total megawatt hours of the 70% renewables
is going to make up?
Do we know that?
Like the-
>> Now let me look at my staff and see if I can pull out
that number.
>> Is that on the sheet?
>> It'd be 70% of the one and a half million.
>> Yeah, so one and a half million.
>> Yeah, it's about 1.1 million or something.
>> Yes.
>> Okay.
>> Can I ask a question?
>> Yes, I'm sorry, go ahead.
>> So Phil, I'm going to try to be real simple with my
question, because this is what seems pretty simple to me.
The ideal situation would be that you build this and you
never turn it on.
That means that you were able to, because what I see is
leverage, right?
So if I'm negotiating wind or solar, and the people selling
to me know that I have the ability to produce my own,
and they want the business, then they're going to go.
In other words, if I'm just in the market, I don't make
anything, I just buy.
Well, now I'm limited to whatever the best deal I can
negotiate versus everybody else that's out there buying in
the market that has no ability to produce it themselves.
If you can produce it for less, you have leverage.
>> Right, so.
>> It gives you a back stop.
>> Right, so, because what I see here is I'm thinking about
, when I think about wind and solar,
and I understand there's a lot of different wind sources,
types of wind and hours of the day and all that stuff.
And for solar, of course, you're limited.
It seems like, If you say I'm going to go 100% renewable,
which means I'm only going to buy on the market unless I
own my own wind and solar farms.
We're competing with everybody else in the market that's
buying wind and solar at any given time.
And if supply is down and demand is high, prices are going
to go up.
So it seems like to me, I mean, the math would have to work
, obviously,
but I can see a situation where, and I don't know that we
need two of them, maybe one of them.
You're going to get to that.
But to where the greatest investment we could make would be
to build it and never use it.
Because that would mean that the contracts that we were
able to leverage were more beneficial.
It allowed us to accomplish the reliability, the rate
control, and the renewables, all three.
All right, so I guess that's my, I get where you're going
with the previous slide,
which is I've got 100 here and I've got 100 here and 20
here.
I may not be using all of that in any one time.
>> Correct.
>> That gives me the capacity to meet my peak load.
But ideally, if I could buy all of that, cheaper than what
I could make it for, then I'd buy it.
But I knew I had the leverage that I could make it if the
demand was higher, the supply was down.
Sun wasn't shining in West Texas or whatever.
Is that really where you're going with all that, is I've
got the backup ability?
I've got the backup ability and that puts me in the most
favorable position to buy
the renewable contracts is with that backup capability that
I can just buy the raw power at the cheapest price possible
.
>> Right, because it seems to me like if I'm selling you
something and I know you don't have many options, I'm going
to be a lot less aggressive.
>> Or if you know my options are limited, my option is to
market.
>> Correct.
>> Okay, all right, thanks.
>> Councilmember Wasney.
>> And I'm losing my voice, so I'll just speak.
>> I can identify with that.
>> Speak as little as I can.
To Councilman Johnson's point, the plants are not just for
backup.
We're at the mercy of ERCOT, and when they say turn your
plants on, those plants get turned on.
So I think that is the huge shift there in the purpose of
these plants.
It'd be a great thing if these were just backup, but that's
not the purpose of these plants.
That is a small part of these plants.
These plants are going to be turned on when ERCOT says we
need power.
These plants are going to be turned on when we want to sell
power.
So that's when those plants are going to run.
So to shift gears, I have a real problem with the whole
math and
the timing for the power plants.
If we pulled the trigger today and said yes, we're going to
build these plants,
what year would they be up and running?
Is that 2019?
>> By at least 2019.
>> So 2019.
This council, as a group, has agreed that we will be 100%
renewable by 2030.
So instead of looking at a 20 to 30 year energy plan,
we really need to be looking at an 11 year power plan that
bridges the gap from 2019 to 2030.
How do we do that?
How do we get there?
I'm not sure that I want to jump off the cliff and incur a
20 year debt of 220 million
to build two power plants when we're really only looking at
a decade of generation to back up renewables.
So I don't have an answer for that, and I haven't heard an
answer for that.
>> If I could respectfully disagree, Council Member Wasney,
these plants do have value even if you're at 100% renewable
.
Because even at 100% renewable, as I've stated, as in
Georgetown,
there are instances where even if you're purchasing all the
renewable megawatt hours
that you need to be renewable, you can't look at what the
time is you're going to get those megawatt hours.
Sometimes you'll be getting those megawatt hours when you
don't need them, and you'll be selling them into the market
.
And for those hours where the sun didn't shine, the wind
didn't blow,
you would still need some kind of backup generation.
So these units would have value and would be productive in
those period of times,
even at a point where we're 100% renewable, where we are
purchasing enough renewable energy
that we would be 100%, we'd be, as Georgetown is, saying we
're 100% renewable.
But even Georgetown, at 100% renewable, is also purchasing,
has a contract with a third party entity that has gas power
generation
that will provide the backup for when the sun doesn't shine
and the wind doesn't blow.
>> So to be clear, even if we're 100% renewable,
we'll need power generation to back up that 100%.
>> Correct.
>> Councilmember Hawkins.
>> Phil just answered it all.
Thank you, Councilmember.
>> Well, even in 2030 when you said battery technology
would be where it needs to be, and that's when our goal is.
>> Yes, even in 2030.
When battery technology starts, and when it gets to that
point, it will start to become into the market.
But it will not be there to replace all the generating
capacity in ERCOT,
68,000 megawatts of capability at one time.
>> We were just looking for our city, Denton, not
everything ERCOT serves, just for our city, not-
>> So even serving the city of Denton, battery technology
will be a start, but
it won't be the place where it can replace all the
generation.
I guess the point is, is will these units have value in ERC
OT, even if we're 100% renewable?
The answer to that is yes, they'll still have value because
all of ERCOT will not have replaced all their generation.
And this would be our way to support the rest of the market
to get to more renewable,
is to have this kind of quick start generation to back up
wind and solar.
>> So you're talking about selling to ERCOT?
>> Talking about backing up Denton's need and the market
needs.
>> And that's a question I have, and I don't need you to go
back to the last slide,
but you'd sort of parsed out three, the 100, the 100, and
the 20.
because I know there's some, because there's that question
if ERCOT can
ask us to turn on the engines to run if there's a critical
need, if there's a shortfall.
So within those three figures, there has to be some
accounting for generation to ERCOT.
Generation, because I know that in the projections of
serving load and
then ERCOT, there's different types of generation hours.
So in those three, are they just embedded in there
somewhere?
Or if ERCOT says you gotta turn those on, well then we're
not getting 100 megawatt,
100 or 20 for our benefit because ERCOT is sort of either,
I don't want to say hijacked, but has forced us to turn
those on.
>> So if I could, let me use this graph and explain how the
units will be dispatched.
And so this is an average of the load in Denton in 2019.
Average summer load day.
And so- >> Phil, what do you define as a summer day from-
>> Well, this graph is for August.
>> August, okay, I'm sorry, I missed that.
>> This is for August.
>> So for the 24 hour day, average day in August, here's
the usual load shape, right?
You get one o'clock in the morning, goes down to a minimum
load about five,
six o'clock in the morning, and then starts rising during
the day and
reaches a peak around six, seven o'clock in the evening.
And as the sun goes down, the load goes back down, comes
back down again and
start over.
So during that day, during the summer, you'd have the
average wind production,
which during the summer day, that wind production usually
goes down during the peak hours.
During that time, the average market prices in the early
morning hours are low and
we'd buy off the market.
We'd have the solar contracts, our solar production would
pick up during the day,
during the daylight hours and run, but our load would
exceed those needs.
And during this time, you see a crossover going from market
to these units.
What's happening is the whole thing, this whole load ship's
happening all across Texas.
Demand's going up, the market prices go up.
When the market prices go up, our first choice will always
be to serve our load,
we'll be to use renewable energy first.
Market, if it's cheaper, the market prices will go up
during the day.
During that time, these units will be dispatched as market
prices go up past our
dispatch rate, our dispatch cost.
And it would run that many hours of the day for that much
generation.
And this is about 220 megawatts.
And so, during the evening hours, sun goes down, we pick it
up at the market,
it picks up in the evening hours out in West Texas and
picks up some.
But we'd replace that with market where we could.
So, when we talk about turning 20 megawatts, this is where
we get that number.
What happens if you have less than 20 megawatts is, is I'm
having to fill that
in with market energy.
And that's higher price market energy during the highest
prices of the year,
is during the August time frame.
And so, that's why we're looking at being not only an
average day, but
then drawn in the peak day also.
And so, to meet that additional market, we'd have to buy in
the market,
which we're doing for our energy management organization.
But also use these units to offset the highest price.
>> So, are you saying every day in August, basically,
the gas plants will be running from like 10 in the morning
till 8 at night?
>> Yes. >> Constant?
>> Yes.
So, we look at running these units on the average,
we've said these units will run around 38% over a year.
And so, that depends on the weather.
If you have a 2011 heat wave summer, it's going to run even
more.
If you have a mild summer, it'll run less.
But during the summer months, you expect them to run most
of the daylight hours.
>> Well, so it's also been said that 69% of the rice energy
will go to aircott,
that these are going to run for that.
Does that account for this?
>> Yes.
>> And is that just on assumption that it's an emergency,
or
is that on the assumption that we're just going to sell it?
>> That's based on the assumption that we'll participate in
aircott according to the aircott
protocols and according to the aircott generation rules,
which says you have to
bid in your units, you cannot withhold your units from the
market.
So, we would determine the price to bid those in, and they
would get struck.
If you look at a bid curve of all the units in aircott,
these units would be ones that would be dispatched early on
because of their efficiency.
>> Okay, so now I'm just a little confused because I
thought that they would tell us
only in an emergency, but now you're saying that if we have
them, we have to participate and run them.
>> Yes. >> Okay, so that's new information to me.
>> Okay.
>> Mayor.
>> I'm trying to look up the aircott generation mix.
Is there anything similar to what we're proposing already
existing anywhere?
>> By other utilities?
>> By other utilities.
>> Different utilities have a different portfolio mix.
You take Austin and San Antonio, they have nuclear power in
their mix,
nuclear coal, gas generation, and renewable.
>> But any like quick start gas generation?
>> So the South Texas Electric Co-op, is golden spread in
aircott?
>> Well, just if there is, is there data?
>> No.
>> Is it showing kind of how often those are turned on or
is it different, totally different situation?
>> I guess the run time of those units would be competitive
information.
It's not something that would be posted somewhere as far as
what they run.
We can see, and through our energy management organization,
when they're running after they've run.
>> So question then, Phil.
So I'm assuming then if ERCOT says I need you to turn it on
,
it's because that is the most economical power available at
that time?
>> Yes.
>> So then if we didn't have them, if we don't have these,
assuming the demand is going to be the same and we don't
build these plants.
ERCOT couldn't then tell us to turn ours on, we wouldn't
have them.
They would have to generate that power from somewhere else.
>> They would generate that power from another unit and
from what ERCOT does post as far as the emissions of the
market.
It would be a unit that would have more emissions to it.
>> Right, so.
>> A less efficient, more emissions unit.
>> Because I guess what I'm trying to get at is I want to
make sure, obviously we need to be good stewards of our own
backyard as best we can, right?
So, because I think one could say, well, the coal plant
generates emissions somewhere else, so that's not our
problem.
Well, it's our plant, right?
But secondly, the air that we're breathing here is,
whatever we're breathing here is coming from a couple days
south of here.
Right, based on what Dr. Banks showed us.
So whatever we're generating here, somebody's breathing
north of us.
What we're breathing here has been generated south of us.
So I want to just make sure that I'm understanding it right
.
Because I think we have three different conversations at
play, right?
One is fossil fuels.
Philosophically, form against them in between, whatever.
And one is a cost.
Should we spend the money to do this or should we just go
in the market?
And the third is if we don't, then what?
So I guess for me, I don't think, I don't want to engage in
a debate by the way,
but I don't think the purpose of building these is so we
can sell power to ERCOT.
I think our stated purpose has always been to back up.
If we're going to go 70% renewables, we have to have
control of our backup.
Now, if we build them, do we have to participate in ERCOT?
Yes.
But the purpose of building these would not be so that we
could sell power to ERCOT.
Correct.
You have to.
If you build them and you're part of ERCOT, you don't have
a choice.
You have to be willing to sell it.
Am I right?
Correct.
And the majority of savings, when we talk about that over
the 20-year time frame,
that we'll spend $2 billion, if business as usual, on
purchase power.
With these units, including paying the principal interest
on these units,
we're talking about spending $1.5 billion.
So $500 million of savings.
The majority of those savings are as a result of us serving
our load,
meeting Friday night our ancillary services and serving our
load.
It's not the majority of those savings are not from selling
to ERCOT.
The majority of the savings are results from serving our
load.
Correct.
This is also interesting to learn.
We have these discussions about the environmental impact.
We talk about the economic impacts.
And we're learning all of the technology of how ERCOT works
and how generation happens.
So let's say that it's 1,700 hours.
No, let's say 1,900 hours.
I think that's 7 PM.
We're at the highest area.
We're generating the most electricity we can generate to
back up our needs.
ERCOT, I don't know how they do it.
They call Mike Grimm.
>> Call the back line.
>> And they say, we need you to turn on your quick start
plants.
And Mike says, sorry, they're already on.
What happens then?
>> So each entity is responsible for providing the power
supply for
their anticipated load, and usually plan that the day ahead
.
And you plan that months ahead, but you get down to it for
the difference in weather.
You're planning a day ahead in real time, you're planning
to meet your load.
If you don't plan enough generation to meet your load, our
lights aren't going to go out.
ERCOT's going to meet that load and
will be settled at wherever the market price is to meet our
generation.
Vice versa, if we're generating more than our load, then we
just sold to ERCOT at whatever the market price is.
And so second by second, every four seconds, ERCOT is
monitoring what's the load compared to the generation.
They have a fleet of generators, and this would be another
plant site located within that fleet of generators.
And they go through that stacking order of determining
which generators they want to own
to meet the total generation for that day, and they're
looking at ERCOT as total.
As far as the financial security, to make sure you're
meeting your load requirements in the most economical
fashion,
that's each load's responsibility to do that.
What these units do is provide us a way to do that that's
more fixed and not variable.
Doesn't leave us to the market prices.
That can be very volatile.
>> Question on this graph.
And that's a good question.
So, and this is a general question based upon the
spreadsheet.
It's not actual.
All right.
Because we've sort of busted up into serving dent and load
and the other.
ERCOT, they're forcing us to turn it on, those kind of
things.
So what I heard you just say is, let's say this is August
the 1st, this graph we're looking at.
So on July the 31st, if there's 31 days in July, I guess
there are.
The group's going to be sitting around thinking, okay, how
do we meet our load for tomorrow?
How do we do it?
And you've got all these things, and so one of them is we
're going to start the plants at 9 o'clock.
We're going to have them run a full board.
That's going to be accounted to our load, okay?
Sort of similar to what he asked, but you're making that
decision the day before is sort of what my question is.
So we've got this happening.
This is what's happening.
But we had decided earlier the day before that we don't
have enough.
In fact, from what I'm hearing you say, every day in August
, and an average day,
this is an average day in August, that we will need this
proposed,
these 12 units or these gas plants to meet just our load is
what I'm seeing here.
Is that-
>> Correct, I mean, months ahead.
>> Okay, well- >> Months ahead we'll be looking at what we
anticipate our load to be.
That can be plus or minus what the weather's going to be.
>> Sure, sure.
>> And so you get within a certain percentage of it.
But then as you get to week ahead, day ahead, look at the
weather forecast-
>> Sure, you get to refine it and you get to-
>> You get to refine it and say, okay, I now have, it looks
like it's going to be cloudy and rainy, so I'm not going to
have the load I thought it was.
So I've already bought enough, I don't need to buy anymore.
Man, it's a heat wave of the century, it's going to be 110
degrees.
>> So the question goes to sort of the crux of Mayor Pro
Tem's question, that is, so we've got all these contracts
in place, average wind, average solar, average market
purchase.
We know what those are.
And we know we're going to have a gap.
So we know that we're anticipating, we're saying we're
building these things to help with this gap.
Part of it's to back up, part of it's to meet this
differential so that we don't have to go out to the market.
So these things are fired up and they're running because we
know we've needed them, we're going to need them to meet
our load.
So the phone does ring.
They're already running.
And they are, I guess the crux of my question is, how do we
fix our plants running,
representative of this graph, that says, Urquhart, you can
give us a call.
We've already elected that we're generating this much from
our power plants to meet our load.
So unlike the contracts, we have contracts that everybody
knows, okay, DME has, you know.
So how do they know that this load is for Denton?
Because if it's already on and it's meeting our load, then
Urquhart sales will not occur in here unless somehow there
's that four second spike where our load doesn't need that
much.
And so that's, to me, how do we differentiate between when
these are running, they're to our credit or somebody else's
credit?
>> I'm going to let you take a shot at this while you drink
.
>> Did you say take a shot?
Never mind, I want some.
Why he's drinking, is that what you said?
>> It's kind of a hammer problem.
>> Okay.
>> We, Mr. Mayor and Council, we offer into Urquhart with a
price.
We give them an offer curve.
So if it's in DME's best interest, going back to Council
Johnson's question,
if it's in the city's best interest to purchase off of the
market,
we naturally have that capability because we own the
generation.
If it's cheaper to generate it ourselves because market
prices are higher, then we generate it ourselves.
So we have kind of a free option because we own this
physical capacity.
You don't have that option if you don't have the capacity.
And that's what's going on in this graph right here.
There's on average this much when, maybe on 1900, this much
solar and
the rest of it's being met by generation.
That is presuming that the market price is higher than the
generation.
If for that particular day the market price is not higher,
if the market price is lower than our generation, then we
'll just buy it off the market.
>> Okay. >> Because that's our profitability.
>> No, and I understand that.
And so it's probably, I'm making it more difficult than
what the question really is.
So then that leads to one question.
Let's say the market's cheaper.
>> Okay. >> Market's cheaper.
Will those still be running if we're buying off the market?
>> No, sir.
>> Okay. >> If the market is cheaper, they will not be
running.
>> Unless our COD calls and says, you gotta run them.
>> That would only happen in an emergency condition.
>> Okay. >> And what would generally go along with that
emergency condition would be a high price period.
>> Okay.
>> Which would mean that, again, it would be profitable for
, we've made the investment.
If I have an investment sitting on the ground that I've
already made, why would I not run and
make more money if I'm getting more than what it cost me to
produce?
>> So then if we're purchasing from the market in this
particular scenario,
then that light blue would be the dark blue.
In other words, some portion of that.
Not all of it, but some portion.
>> Yes, sir. That is correct.
>> So my question goes back to when we are running it.
When let's say the market is not cheaper.
>> Okay. >> And we are generating to meet our delta.
>> Yes, sir. >> From what our contract energy is and what
our peak is.
>> Yes, sir.
>> That those hours generated accrue to the credit, I say
credit.
I don't mean from a monetary perspective.
They accrue to the credit for our load.
In other words, if we need 200 megawatts of power, it's
1900 hours.
And those things are running.
ERCOT's not coming back and saying, well, that really, you
're selling that into the market.
Even though we've elected it, this is how we're meeting our
load.
Because ERCOT's saying, you're short 200 megawatts.
No, we're not.
We've got it.
We're running right now.
And so they don't say you're generating money for ERCOT.
This is your load.
They move on.
Is that?
>> That is correct.
It's all done financially.
It's all done electronically as well.
There was a question earlier, what happens if ERCOT calls?
We said they're already on.
It's all done electronically.
It's all electronically hooked up.
ERCOT sends you a signal, and that unit moves.
>> That's good, because Grim doesn't answer his phone in
four seconds.
>> So when you say it's financial, because I think where
some of the questions are is
in the end that we're buying it, we're using these to back
up.
Now you did say if you got an investment on the ground and
prices are outrageous and
we don't need it, we're going to run it to help offset some
of the cost for, to help the rate payers.
I get that. >> Yes sir.
>> But when it comes to the point of actually, and that
probably is a little,
probably not as often when you have that kind of emergency
situation.
It seems like there's a question on, well, outside of
emergency situations, why would we be,
if we're generating more power to accrue to the benefit of
the market,
instead of to meet our load, why would we have a capacity
of a plant that would do that?
And I can go more into that in close, because you've got
generation for load, generation for ERCOT.
There's a difference.
And so that's going to be the crux of my question, but I
just wanted to make sure that when this light blue is on,
that that's accruing, when I'm looking at my chart.
>> Yes sir.
>> These megawatt hours are accruing to the top part that
says to meet load.
Instead of down here at the bottom, you don't have to, we
'll go into that probably in a little bit more detail.
But that's where I'm really confused, is when I see there's
a projection of
what it is we need these for to meet our load only, and
what we need these to meet other situations.
Then what numbers does that blue accrue to if they're
running for our benefit?
I'm assuming it's to meet our load, because that's what I
've heard.
This is to meet our load.
>> That is correct.
This graph is accurate for us to meet our load.
What you're not seeing is what the price is at each hour.
So it's presumed in the darker blue area that the ERCOT
market price is cheaper.
>> Sure.
>> Than what we would generate for.
In the light blue area, the ERCOT price is above what we
would generate for.
>> Okay, well, I hear that.
We'll talk about it in more detail, because I don't want
there to be kind of, because what I'm understanding is what
you're saying is, hey,
it doesn't, really doesn't matter who this is running for
the benefit of, we're selling it at this price.
I mean, it's costing us this much.
Do we put in an offer curve, this offer number?
>> Yes, sir. >> They say run it.
We get paid this amount.
It's costing us this amount.
Whether it's theirs or ours, we still get credit for it.
So that's where I'm getting confused, especially when we
parse out what it takes to meet our load.
>> Right. >> And then other words.
So I'll go more into that, because I don't want to be
confusing.
That's very cryptic.
>> Mayor. >> Yes.
>> But doesn't it stand to reason though, so if we're
buying in the market,
if we're buying in the market at any given moment, because
it's cheaper for us to buy than make.
>> Yeah, no.
>> And it's unlikely, because we get to say what we're
offering the power for that we generate here, right?
>> Correct.
>> So if we can buy in the market for cheaper than we can
make it,
then I would think it'd be unlikely that ERCOT was going to
call and say crank it up.
Because we want you to sell it to us, to sell to somebody
else,
because those same people are buying off the open market
just like we are, right?
>> Then I want to ask you a question.
If I go into specific megawatt hour generations on the
spreadsheet, you have a problem with that?
>> I'm really going to close this.
>> Okay.
I think this will become more clear.
>> Yeah.
>> In. >> Because it's just, what I'm saying,
I guess I'm getting back to what Council Member Wasney said
.
If ERCOT calls and says turn it on.
>> Right. >> We have to, and we have to sell into the
market,
and we're going to sell in the market and make money.
Well, if we're not generating because we can buy in the
market cheaper.
>> Well, yes.
>> Why would anybody be buying our power for more?
It's going to stay off.
Unless there's a situation where the load is so high that
they have to be turned on because the load can't be met at
those lower prices.
In which case, wouldn't we stop buying and produce our own?
Because the market prices are going to go up if the load
goes up.
>> I get that.
That's not the thrust of my question.
I can do it in general terms.
Council Member Briggs said that she asked you,
is 69% of the generation from these plans going to be going
to ERCOT the market?
And I think you said yes.
>> I don't know if it's 69%.
>> That was the last number that you guys gave us.
>> Okay. >> Is that of the total capacity?
>> No, no, it's just of the generation that is being
proposed.
So none of that 69% that we're saying is going to ERCOT is
in this blue number if it's running.
Because it's cheaper for us to run it than it is for them
to.
>> Correct.
>> Okay, so, all right, good.
So keep in mind, the ERCOT market is built for a dereg
ulated market.
70% of the market is deregulated.
And 15% of the municipalities and utilities, 15% are co-ops
.
The ERCOT market is built around a deregulated market that
separates out
the generation function from a transmission function from a
distribution function.
So to them, it's a separate market, it's a separate world
of I have generation to match load.
And that's all they're looking to do.
And so ERCOT is looking at a generation stack that says,
here's what everybody said
they're going to provide generation for at this price to
meet this total load.
And then the settlement function as far as the didn't
contractually arrange for
all that in the most economical way is a market function
they do.
The operation function, they're looking at as far as what's
the total ERCOT generation
capacity and what's the total load.
And here's most economical stacking order of what people
have bid in their price for
to run their unit at, and they just go up that stack chart
until they meet all the load requirements.
>> Yeah, this will become clear, I think, as I can get into
details.
>> Well, and to be clear in terms of generation, when we're
talking about
these two quick start plans generating X% for
our needs and X% for the market's needs, we're still not
talking about those
plants running 24 hours a day, seven days a week, are we?
>> No, sir.
>> Because that's been a real source of confusion for folks
.
And where some folks have generated some numbers, I think
very honestly,
that ended up not being accurate numbers because the
assumption was 24/7.
And what we're really talking about is over the course of a
year that these
plants are going to be running 36 to 42% of the time,
something like that?
>> Correct.
>> Okay, thank you.
>> I raise and then Council Member Hawkins.
>> So, but, okay, so that just really confused me.
So we're going to run them 30% of the time, but 60% is
going to be sold to ERCOT.
So 60% of that 30%?
>> Correct.
>> Okay.
>> Council Member Hawkins.
>> Sure, you touched a little bit on the stacking order on
how ERCOT will call in
people to turn on or find, can you speak a little bit more
to that?
I mean, I'm just trying to think of it simply,
can Denton say that we're going to sell the most expensive
power and
they never want us to turn it on?
Am I understanding that correctly?
>> So ERCOT has an independent market monitor that audits
those prices.
And according to the protocol, you have to defend what you
're bidding in.
>> Okay. >> So you can't,
what they're looking for is in the competitive market, they
're looking for
is somebody purposely withholding generation back from the
market to drive up prices.
So then they can get a higher profit at a later point in
the day.
And so, while you have some range of pricing you can have
as far as where you're
bidding in those units, you have to have a reasonable test
to-
>> That makes sense. >> What you're pricing in.
And so you look at the list of units and where in that
stacking order,
you can go back and look.
I think someone asked before how do these compare to like
units running in
the marketplace.
You look at where those units are parasol Texas.
And you look at where those units are today in the stacking
order.
And they're very low in the stacking orders when they get
dispatched as
compared to the rest of the market.
>> Okay.
>> Okay.
So continuing on looking at the economics of what if we
built only six units versus 12?
You get some economy of scale from building 12 units as
opposed to six.
So just because you cut the number of units in half doesn't
mean you cut the capital cost in half.
It's more like 65%.
And so you would still, the cost per unit would be several
million dollars more per
unit to build fewer units.
Also, the emissions reductions would be much less.
Because if you go back to that previous graph, if I don't
have enough capacity on this day,
if I have half of that capacity available to meet that, I'm
having to meet the rest of it with market power.
And as we discussed before, the market, our kind of market
has much higher emissions per unit
than what we're looking at with these units.
The savings are reduced, as we talked about from 526 to 320
.
The market risk is more because we're going to the market
more often on a daily basis to meet our needs.
And the rate decreases that we projected would be delayed
because we wouldn't have the savings that we're projecting
with building this number of units.
And it gives us, we just feel like it gives us less option
ality as far as replacing given screen.
>> Phil, on the first one, the cost, do we have hard
numbers on that or is that just sort of y'all's estimate?
>> I believe that's indicative pricing that we've gotten
from the vendors.
>> [INAUDIBLE]
>> Well, I'm probably gonna wanna see a little more detail
on that cuz I find that difficult to, I mean-
>> So where that comes in is, if I'm gonna do the design
build for putting in six units.
>> Sure.
>> So now I'm gonna use that design again at another site.
Well, I get to use that design once again.
>> So the- >> Second site.
>> Okay, and yeah, that's fine.
Again, I'll just need to see a little bit more shoring up
of that.
Cuz I understand there'll be some difference because of
economies of scale.
But if you were to put the 150 times 2, that's 300.
You got a $75 million difference, which-
>> So that's pricing again from the vendor.
>> Yeah, okay.
>> Okay.
>> Yes.
>> So I have a few questions there.
It says Gibbons Creek retiring.
So I have a question.
If it does not retire and we buy and run these engines as
frequently as we say we're going to,
what would the net emissions increase be?
>> I don't know.
>> Can we find that out?
>> So the emissions from, and one of the things we'll put
out on the question and answer is,
we've never looked at the emissions of Gibbons Creek as
compared to other
Lignite coal units in the state.
And I was amazed at the difference between the emissions
between,
I knew we've done a lot and made some investments at Gib
bons Creek to clean up the emissions from it.
But it's substantially different by thousands of tons of
emissions a year.
And so Gibbons Creek is compared to other units.
What I would think would happen is if we, as we look at the
future of Gibbons Creek and
what will happen to that unit, I think you'll be looking at
someone else replacing a older,
even more higher emissions unit and keep Gibbons Creek on,
rather than completely taking Gibbons Creek off.
I think the market will, as we trade in our Gibbons Creek
plant for the new model we're putting in,
someone else will buy that plant and possibly operate it as
opposed to older units they have in their fleet.
So this is a summary of projected emissions and gas usage.
We're looking at a 74% reduction in greenhouse gas.
We're looking at the pollutants from there, the criteria
pollutants decreasing 74% and
natural gas decreasing 38%.
I have detail worksheets here that go into more detail.
I want to thank Dr. Banks and Jim Maynard for working on
putting this together.
This was a facilitated discussion we had with citizens last
week.
We will be taking these worksheets and posting on the
website later this week.
In summary, what it shows is a percentage reduction or
emissions as usual of overall of the megawatt of the MMBTUs
of 38%.
And you can see the bottom line, the reduction in the
different types of emissions that we'll be talking about
from this as usual.
The second page is showing, since there's been much
discussion about what would the emissions be
if you include the units running for ERCOT.
So the second page of this shows if you compare to what
these units will be offsetting in ERCOT,
you'll be offsetting non-CC gas average, that is non-comb
ined cycles.
That means other picker units.
And so when you look at that reduction, it means that these
units run as opposed to what would run in their place.
It'd be a 27% reduction in gas usage because these units
are more efficient than what the average is of what we're
running.
Instead.
>> Yes, Councilmember Briggs.
>> So can we separate the 70% renewables from the gas
plants for a minute?
And I want to ask you a question.
How much less gas would the 70% renewables portion of the
plan create compared to our business as usual?
And then how much gas does the rice engines add?
>> So I don't have it with me.
But we have run the scenario before of if you try to do 70%
renewable without the quick start units.
And you do it by buying the backup energy from the market.
It actually uses more gas and have higher emissions.
So it's the backup coming from the market as opposed to
these units which are more efficient.
I don't have the exact numbers, but we've run that before.
We'll post that on the website and furnish that.
Okay.
That is all the presentation to answer the questions.
As I said before, we'll have a question and answer meeting
with the public on Saturday, January 23rd.
Does that meet with the council's request of what you
wanted as far as that kind of format?
>> Thanks.
Just a couple of things to follow up on some questions that
I have received from citizens.
And I don't know if we need these in another presentation.
You might be prepared if you want to do them in an informal
staff report.
I would be curious regarding the storage capacity that
Councilmember Briggs mentioned in Southern California.
I'd like to know a little bit more about that, the 240 meg
awatts in place of the peaker plants.
And again, the thing I would like to know about is like
what I read in the thing about no trees.
What is the full delivery, I guess the full delivery
capacity is 240 megawatts, but for how long?
So I would be curious to get that information.
>> So for the no trees is 37 megawatts and it's to back up
just that, just the weight generation there.
>> Yeah, so if you all could get that.
The other two questions that I've had a lot of questions
that have already been answered.
And I'm glad that you're going to be putting a lot of the
answers up on the website.
Do you already have or will you be putting the white paper
up on the website?
That's already up, isn't it?
>> Well, probably do is use the white paper as a source to
answer.
It'll be in the format of answering its reply to those
questions.
>> All right, I continue to hear some questions about
demand side management,
which I think is a conservation practice.
So if you could make sure that we are addressing that and
telling us what that would be capable of doing for us.
In terms of reducing peak loads, peak demands.
And the other question that I have that came up is
regarding the proposed location on the west side of town.
I'd like to get some information from either our airport
staff or
the FAA regarding the possibility of the, what do they call
it?
Hang on.
Thermal pollution creating turbulence or problems for
airport operations.
So if you could just, I think we've spent enough time today
.
I don't need the answer today.
>> Well, Councilmember Riggs had asked a question about the
airport and
we did get a letter from the FAA that I'll forward to the
rest of the council.
>> Okay, thank you.
>> One follow up, and if you don't have it now, that's fine
, if we could get that.
It seems like based on what I've heard that the airport
permits their emissions restrictions are sort of what
controls
what kind of generation we can have at certain places like
whether it's at the airport.
In other words, once you reach that threshold of generation
that hits that maximum capacity of emissions,
I mean you're in violation is what I understand.
>> You're limited to a certain number of tons per year.
>> Right, which could translate into megawatt hours per
year.
>> We're trying to find out what that number is.
In other words, per those permits, what is that number?
At least as the proposed plan, if there were six on one
side, six on the other, per the air permit,
what is the restriction of megawatt hours for each one of
those sites, at least as proposed?
>> Okay. >> Yeah.
Yes, Councilmember Hawkins.
>> Yeah, I was going back through all the presentations you
'd done on the December 1st one.
We talked a little bit about funding, and you could just
send me an email.
I was curious if we went a general obligation bond route,
is that a special called election?
And two, if we do that, what are the estimates in that
difference between revenue bonds and
GOs that would go to that street maintenance fund?
I know that's a little off topic today, but just maybe in
an email or something.
>> I'll turn to finance and get that.
>> Cool, thanks Phil.
>> Yes, Councilmember Briggs.
>> I have a few more things, just for your next
presentation or maybe now.
You had said in one of your presentations that it would be
$14 million more a year
to back up with market renewables, to back up the market.
I would like to see some- >> Basis for that?
>> Something for that, because there's a lot of numbers
that are just up in the air.
And there's not really any data that I've seen to go with
those.
>> Also, it has also been said in one of the last meetings
that you guys had that
this plan has already gone up 10 million, so it's now
around 240 million.
And I would like to know what that number is coming from,
and
is it because of the export ban that was lifted?
Are you including for that volatility in gas?
>> So the part of the increase or decrease in savings is
from the interest rate rise.
That would be over time.
It would increase the immediate capital costs.
The immediate capital costs would be affected by the
exchange rate if we buy
engines from the vendor that deals in Euros.
So the exchange rate would affect that.
As far as impacting what the gas export would have on the
gas futures,
yes, that has been considered for us in the gas forward
market.
[BLANK_AUDIO]
>> Yes, Council Member Wiseman.
>> Thank you for having the meeting on the 23rd with the
public.
Do we have a time?
>> 930 in the morning.
>> So 930, September 23rd in council chambers.
>> January.
>> I'm sorry. >> January 23rd.
>> I'm on cold meds.
>> So yes, I mean, I took, as council's direction was,
followed a format that was done for the Guess Well Q&A for
that.
And that's the format they did, so I just followed the same
thing.
>> Any other- >> So on that due,
are presentations allowed to be presented?
Questions asked, how does that?
I wasn't at the first format, so I'm just curious.
How does the public get involved on that 930?
Do they spill out cards to- >> No, if it was the same
format,
I thought you read the Guess Well Safety thing.
>> I thought there was one before that I missed, like
around 10.
>> So yeah, it would be the same.
I wouldn't anticipate, so I'm taking a little license here.
I wouldn't anticipate staff presentations being as long as
they were, not that they were too long, but they needed to
get a lot of information out.
We've already had a lot of information.
Some of it may just be some of these frequently asked
questions.
And then yeah, they went around with a microphone.
Do you have a question?
I mean, so it's, and I didn't want, the council meeting
format was,
didn't really allow that kind of dialogue, question, answer
, response type.
And that's really what I think the goal was.
So yeah.
>> Can I ask Phil one more question?
>> Well, can I ask for one more clarification in the
meeting?
So one of the issues that was brought up from the last
meeting was, was pass the mic around for different
questions.
But once somebody had made a statement or asked a question,
we had to make sure that all the rest of the audience get a
chance to ask their questions before you come back around.
In other words, once you've asked your question, before you
get to ask the second one or a follow up question of what
somebody else asked,
then we make sure that everybody else in the audience had a
chance to ask their question first.
>> Yeah, I think that whoever's moderating that meeting can
help facilitate that.
So I don't know if that necessarily needs to be decided now
, but I'm not sure who's going to be facilitating that moder
ating it.
I think that's something that can be discussed either
before or even at the outset of the meeting.
>> Okay. >> Yeah.
>> Joe was a great MC.
>> Yes.
>> So last thing, have you been approached by any storage
vendors?
>> Yes. >> Regarding this plan?
>> Okay. >> I'm sorry, I asked the second part again.
>> So you have that regarding the renewables and this plan?
>> Well, yes, we've been approached by storage vendors
before we came out with this plan and since then also.
>> But specifically.
Can you give us a quick update on Austin Energy's RFP for
storage?
That they issue?
>> RFI.
>> RFI.
>> Jim, you want to speak to that?
>> If you could come to the microphone and introduce
yourself.
Thank you, Jim.
>> Jim Maynard's the development manager for us, working on
this project.
We spent many hours putting this all together, thank you.
>> So as Phil stated earlier, it's an RFI.
It's a request for information, not an RFP.
It is based on me reading it.
It's based on their desire to have ancillary services
provided by storage.
That RFI is asking for about 5% of their total load in
storage.
Do you know what that number would be, Jim?
>> I believe the range was 10 to 170 megawatts.
>> It's 5% of their-
>> 170 megawatts is about 5%.
>> Okay.
>> Thanks.
>> Thank you, thank you, Jim.
Any other questions?
Thank you, Phil, appreciate it.
Good information.
Thank you, Council, for your questions.
That concludes our work session reports.
We will now, what we'll do is go ahead and go into closed
session, then we'll take a break.
We will now, where's my cheat sheet?
I will now convene the closed session at 4.15 PM.
We will consider the following items.
Consultation with attorneys under Texas Government Code
section 551.071.
Deliberations regarding real property under Texas
Government Code section 551.072.
And deliberations regarding certain public power utilities
competitive matters under Texas Government Code section 551
.086.
[BLANK_AUDIO]
>> We wanted to welcome you to the Denton City Council
meeting for January the 5th, 2016.
It is 634, if you would stand with us if you're able to
pledge allegiance to the US and the Texas flag.
[BLANK_AUDIO]
>> Honor the Texas flag.
I pledge allegiance to thee, Texas, one state, under God,
one and indivisible.
[BLANK_AUDIO]
>> Before we get into our regular agenda, I just wanted to
ask for
a moment of silence to honor Sarah Mutschlickner.
As we all know, she lost her life over New Year's Eve.
And I just wanted to take some time, a moment of silence to
honor her.
So if you would join me, please, thank you.
[BLANK_AUDIO]
Thank you all very much for that.
And also, just want to send out a great sense of gratitude
to our police department and
police chief for their yeoman's work and really helping to
move this tragedy forward.
And they've at least found someone that alleged is in that
sense.
So I just really wanna thank the police force and Chief How
ell for their due diligence in this.
And just their commitment to making sure that they really
tried to resolve this in as
expeditious manner as possible.
So we have a great police department.
I really thank them for that and thank you all for that.
[BLANK_AUDIO]
I'm gonna come down, we've got a proclamation.
So I'll come down and read that.
[BLANK_AUDIO]
And anyone here on behalf of that proclamation, please feel
free to join me.
[BLANK_AUDIO]
Hello, okay, it's on.
All right, we're gonna read a proclamation, Irma P Hall Day
.
And so if you would not mind introducing yourselves and
tell us what this proclamation is about.
>> Sure.
My name is Harry Eady and I'm the festival director for the
Denton Black Film Festival.
It is sponsored by the Denton African American Scholarship
Foundation.
And we're a 31 year old organization, been around Denton
for a long time.
And Irma P Hall, some of you may or may not know,
is an actress who's been performing for 40 years.
If you've ever seen the movie Soul Food, she played Big
Mama.
If you've ever seen Lady Killers with Tom Hanks,
she was the primary person that he was trying to kill in
the movie.
So we are giving her a lifetime achievement award.
She's been in film over 40 years.
And she lives in Dallas, which we didn't know.
But she's going to be here to join us.
And so those of you who would like to attend, we would love
to have you for
the festival, which is the 29th through the 31st of January
.
>> Okay, and when will she be here?
When will you be giving her that award?
>> The award will be the 29th of January, 8 o'clock.
>> Okay, and where?
>> At the campus theater.
>> Great, great.
Thank you very much, and you are?
>> I'm Linda Eady.
His better half.
And also a very active volunteer in the organization.
>> Fantastic, well thank you all very much for bringing
this to our attention.
And it's my pleasure to read this proclamation by the mayor
of the city of
Denton, Texas.
Whereas Irma P Hall is our esteemed sister born in Beaumont
, Texas.
And known for her performances in film, stage, and
television,
through which she has sought to educate, entertain, and
inspire others.
Whereas Irma P Hall has educated and entertained the world
through her
inspired performances in films that have reached across the
globe and
touched and influenced the lives of millions.
And whereas Irma P Hall as a multi-talented and passionate
individual
has served as an inspiration to the black community through
her film and
stage performances, poetry, paintings, activism, and
advocacy.
And whereas Irma P Hall dedicated her life to educating
young minds in urban
communities with 27 years service as a teacher of languages
in the Denton,
I'm sorry, Dallas Independent School District.
Illuminating a path for countless children to realize their
God given talents and
potential.
And whereas Irma P Hall has continued her commitment to
education on a broader
scale through her performances in film and stage.
Along with her artistic expression through poetry, writings
, and paintings.
And whereas Irma P Hall has used her talents and
indomitable spirit and wisdom to enrich and elevate the
profile of the invisible.
The underprivileged, the forgotten, and the disregarded.
So that they aspire to live lives of optimism and greater
possibilities.
Now therefore, I, Chris Watts, Mayor of the City of Denton,
Texas,
do hereby proclaim January 29th, 2016 as Irma P Hall Day in
the City of Denton.
And urge all citizens to recognize and honor the many
contributions of Irma P Hall.
And again, January the 29th at 8 o'clock at the campus
theater.
Thank you very much.
Thank you all for coming.
>> Thank you, sir.
>> [APPLAUSE]
>> Thank you very much.
>> Thank you.
>> Thank you very much.
>> Thank you.
>> The Denton City Council has adopted rules of procedure,
including a code of
conduct, which applies to citizens as well as council
members.
These rules were enacted to promote an orderly process and
to preserve decorum.
Here is a brief review of the rules that apply to citizens'
reports.
Citizens will have four minutes to give a report.
There will be an electronic beep when time has expired.
If the remarks are not concluded by that time,
the citizen will be asked to stop speaking.
If the citizen does not cease and a second request is made,
the mayor will request to have the citizen removed from the
council chambers.
Citizens are asked to not approach the dais.
If a citizen has papers or other materials to hand out to
the council,
please let the city secretary know, and
she will have a staff member distribute the materials to
the council.
The attorney general has ruled that council members may
listen to citizens
speak and may ask questions of citizens for clarification
of the issue.
Council members will not engage citizens in discussion of a
topic,
because to do so could potentially be a violation of the
Open Meetings Act.
When speaking to the council, citizens are to direct all
remarks and
questions to the council as a whole and not to any
individual member.
Please refrain from making abusive, personal, impertinent,
profane, or
slanderous remarks.
Anyone who violates this rule will immediately be removed
from the council chambers.
Citizens' adherence to these rules will help make an
effective presentation and
will preserve the order and decorum of our proceedings.
Copies of the rules of procedure are available from the
city secretary.
>> To our next agenda item, which is agenda item three,
presentation from members of the public.
We don't have any for agenda items A, B, and C, but
we do have some for additional citizens' reports.
And that's sort of an open mic, and we have four cards.
And so if you would, when I call your name, come up and
state your name and address and your time will begin and
you have four minutes.
The first speaker is Jennifer Lane.
So if you could come down and state your name and address
and your time will begin.
>> Last to fill out the card first called.
Hi, I'm Jennifer Lane and my address is 1526 Willowwood
Street in Denton.
And I have sent this in email to the council, but
I'm going to reiterate it now so that the public can hear
it as well.
I was fortunate enough to have had as a student about ten
years ago,
a woman who was one of the negotiators in Paris.
Her name is Anya Colmus.
She was taking voice lessons from me.
And I reached out to her to ask about how we could find the
right sources of
independent analysis, particularly on the renewable side
for Denton, for the renewable plan.
And she recommended that I contact someone who is in
Seattle working with the Stockholm
Environmental Institute and I was able to reach him and he
got back to me.
His name is Pete Erickson and I have sent his response.
He was also a negotiator at COP 21 and he's co-authored a
paper and
writes others about the problem of carbon lock in.
How investment trying to save money on the front end
actually locks you into
carbon producing problems for a longer period of time and
which will be costly down the road.
And the questions that he suggested and that I brought
forward that we worked out
together for all of you are, is it really possible to meet
our 70% renewable goal and
still build these plants, if so, exactly how?
Question two, also if we are only buying solar and
wind and not building solar and wind infrastructure,
are we taking it from that which exists rather than adding
to the sum?
In other words, how is this not green washing?
If we're planning, this is question three, if we're
planning to be 100% renewable by 2030,
are these plants that we're considering building going to
be stranded assets?
What will happen to them?
Question four, why choose these specific projects?
Why not lock in the purchase of 70% renewables or more for
now and
get going on building our own renewable infrastructure
right away.
Seattle, where he's working, where there's a Stockholm
Environment Institute,
divested from a coal plant, divested from coal in general.
And Seattle also has a municipal utility.
Seattle is huge compared to Denton.
But he suggests that you all call Corrine Grand at Seattle
City Lights.
Seattle City Lights is Seattle's municipal utility company.
They use Stockholm Environmental Institute to help them
with analysis and consulting.
Any decisions like this should be based on an analysis by
an outside body.
Any public utility should be held accountable and have a
publicly available resource plan.
Please feel free to share this with anyone that you're
talking with, anyone on DME,
anyone in the staff, anyone amongst yourselves, anyone who
's out there that you trust,
who is helping you to get Denton where we want it to be.
And please vote at least for the present time to hold off
until you can
bring this kind of expertise into the fold.
Thank you.
>> Thank you.
Our next speaker will be Zach Youngblood.
If you'll state your name and address, your time will begin
.
>> Zach Youngblood, 836 Hawes Drive, Copper Canyon, 75077.
Mr. Mayor, members of the council, I understand that during
today's working session,
you all received a report from DME management regarding
some of the things that were discussed
in the public hearing of the 15th of December of last year.
And reading through that presentation, which I believe you
all received today,
I saw that DME referenced a report by City Group that
suggested that battery storage was not where it needs to be
.
And will not be any time in the near future.
Now, I'm curious which city report that was, if it was
Energy Darwinism 1 released in the fall of 2013,
or if it was Energy Darwinism 2 released in August of 2015,
which suggests that for
outside investors, batteries will, excuse me,
batteries will reach a break even point as of 2020 and
a positive return on investment, that is for outside
investors by 2030.
I would also like to note that as of right now,
the price for battery storage remains at $500 to $700 per
kilowatt hour of installed storage.
Although projections are for that to drop to 350 within the
next few years.
And from a report that was commissioned by Encore Utilities
a couple of years ago, it found that at a price point of $
350 per kilowatt hour installed,
that the on the grid storage would become more, wow.
That on the grid storage would become cost effective.
I would also like to point out a request for offers that
Southern California Edison placed in the fall of 2013,
which was extremely open ended, anything goes.
Which I know Council Member Briggs questioned the
possibility of that during the public hearing.
And they received everything from standard combined cycle
plants, energy efficiency bids.
They took it all, they're really looking forward.
And they are a larger producer than DME, so of course they
can leverage that in certain ways that DME can't.
But I feel that DME's plan, they just keep going back to
the well and coming up renewable debt over and over again,
regardless of any discussion, any things that have been
discovered by other parties previous at no cost to the city
,
which are available publicly.
Additionally, there is also...
I've heard it reported that because of the Fed rate hike
and the city's delays in implementing these plants,
that it has cost the city $10 million because of the 0.1%
rate hike that occurred on December 16th.
And I find that to be extremely ridiculous, the notion that
the project would have moved ahead into
requesting bids on any sort of financing for 20 years,
and that the city would have to pay $10 million for that.
And that the project would have moved ahead into requesting
bids on any sort of financing for $200 million
would exist in any form between December 15th, the day of
the public hearing, and the next day when rates were raised
.
I would like to say one more thing, and that is I think
that like many other people here,
DME has not given you all the full picture.
I know how reliant you are on staff reports, and you're rel
iant on staff to be neutral observers, neutral parties,
and to give the best information they can to give the best
result for the citizens of the city.
And I just don't feel that's what's happening here.
Thank you.
We have a question. Council Member Briggs.
Yes, ma'am.
Can you tell me the name of that article again, the 2015...
what did you say?
Energy Darwinism 2.
Darwinism 2.
Okay. Thank you.
Thank you very much. Appreciate it.
The next speaker is Deborah Armentor.
Please state your name and address, and your time will
begin.
Hi. I'm Deborah Armentor at 2003 Mistywood Lane.
And I, too, am going to speak about the gas plants that DME
is proposing.
About a week ago, my friend Adam Briggle asked on a
discussion group, "Do people live there?"
We were talking about the gas plants.
Do people live around there?
And so a few of us decided we would go and check that out.
Yesterday, several of us went to 2153 right off Shepherd,
where the plant...
roughly where the plant is going to be.
I get one of them, the one on the other side of town.
It's on... I'm sorry, off of... yeah, Shepherd Spencer, and
it's off of Spencer and 2153.
So you've got Shepherd here, 2153 over here.
Anyway, that property, obviously, is in Denton, where the
gas plant is going to be.
But what I didn't realize until I had actually got to the
area is that the people who live closest to that area are
technically in Aubrey.
And I realized this, because we had printed up these flyers
, you know, citizens of Denton.
Do you know that DME is proposing a gas plant right across
the street from you?
And as soon as we started talking to people, they said, "
This is Aubrey."
On the other side of the plant is Denton.
Everybody we spoke to... I mention this because everybody
we spoke to was in shock that they had no idea.
They weren't following our little gas well saga in Denton.
And they were upset that a gas plant was going to be right
across the street from them that they weren't even going to
receive any energy from.
They get their energy from another provider.
They were very upset by this.
And not necessarily for environmental reasons.
In fact, we didn't even really talk about the environment.
These were people who were talking about property values.
They were talking about... They were concerned about noise.
They were concerned about the light and traffic.
They wanted to know why did these random citizens notify
them instead of DME.
So I wanted to give you guys, and also DME, I hope this
gets back to them, the heads up on that.
I also wanted to tell you that after that, I called Aubrey.
In fact, I didn't even know what kind of government
structure Aubrey had.
But I looked up Aubrey City Council.
I called the mayor.
I haven't heard back from her yet.
And I called several members of Aubrey City Council.
Just at the very end of the work session, I received a call
on my phone.
And it was from Calvin Tillman, whose name you probably
know.
And he's on Aubrey City Council.
He was also the former mayor of Dish.
He was in the "Gasland" movie.
He's spoken here in the past.
So I know him, but he didn't know me from Adam.
And I asked him if he knew that Denton was going to put a
gas well right across the street from an Aubrey
neighborhood.
There's a lovely little-- I forget what it's called-- Green
view, something little churchless, lovely little old
fashioned white church and a little cemetery right next to
it.
And he said no.
He had no idea.
And he was, he too, just like the citizens, he was in shock
.
And he was upset to hear about it.
So anyway, you guys are going to be hearing from him.
We're going to be going to over by the airport, the
location by the airport, over in District 4,
just letting people know.
I just wanted to let you guys know that.
And if you guys wanted to help us out and notify people,
that would be wonderful.
That was all.
We have a question.
Councilmember Briggs.
About how many residents or how many homeowners did you
speak to?
Do you have an idea?
I'm just curious.
I should have been counting.
Quite a few.
40 or 50.
OK.
Yeah.
And none of them knew?
None of them knew.
None of them.
And those were the ones--
I was surprised there were so many people home.
We would have started over the weekend, but we all had out
of town family or plans over
the weekend.
So we just-- on a Monday morning, there were a bunch of
people home.
This is a pretty well-to-do area.
It's big houses.
And anyway, yeah.
I trust him.
I'm not good with numbers.
Thank you.
Thank you.
Any other questions?
Seeing none, thank you.
Appreciate it.
Next speaker is Jodi Ismert.
Ismert, I'm sorry.
I mess that up every time.
I'm sorry, Jodi.
And we've been playing telephone tag or email tags.
I apologize for that as well.
No worries at all.
Jodi Ismert, 819 Anna Street.
And I just wanted to let you guys know that I had met with
Phil at DME.
I believe Gillen-- I'm going to probably butcher his name.
But I believe that we met with him as well.
And Phil got to show us the PowerPoint slides,
and I got to ask a lot of questions.
That was very nice.
One thing I kind of gathered--
and I just wanted to say it for public record--
I gathered-- I'm a data person, by the way.
So I love data.
I love looking at it.
I love analyzing it.
I was able to find out more information about energy data,
which I didn't really know very much about going into the
meeting.
I still have lots to learn.
I'm not an expert on energy, obviously.
But one thing that kind of disturbed me as a data person--
and I'm looking at the graphs specifically--
is that you see one graph, which is on one of the
PowerPoint slides.
I think it was like slide three or something,
but I can't remember exactly.
And it's to the right of the page, and it was the original
graph--
the same graph that was shown in their public meeting.
And then they posted a new graph to the left of that one,
which was done at a later time, I guess,
after they got many questions.
Well, anyhow, the graph on the left starts at 2016.
The graph on the right starts at 2019.
As a data person, the one thing that you know,
if you're doing modeling, especially if you're
doing any kind of modeling at all, number one rule
is that if you are creating data, you always
rerun the entire model, because the data shifts
as you progress through time.
So that wasn't done.
It was just a data slide that was added on.
And so that bothered me initially, and I asked about it.
Phil kind of explained some of the details,
but I don't want to say anything about Phil,
because he's extremely smart and obviously he
has a wealth of knowledge.
But I'm not sure that he put this together.
So that's something they really need to correct.
They need to rerun that whole thing.
They can't just add a graph without running
the entire model again.
It doesn't work like that.
So that kind of bothered me.
But anyways, so we continued on through the conversation.
It was really lovely.
I learned some things.
One thing I definitely learned is
that they're specifically looking at cost benefit analysis
only, not emissions.
Public is concerned about emissions,
as well as cost benefit analysis.
But they are strictly looking at cost benefit analysis.
And it was a very circular presentation,
since there was nothing else to compare it to except VAU,
compared to what they believe the numbers might be.
Secondarily, I also spoke with somebody
who had a meeting with somebody at DME,
which I'm not going to say who.
And it was a citizen who specifically
said that they heard from this person at DME
that the one thing DME knows is that these numbers are not
correct, but we need to make a decision and just go with it
.
And I believe that's true after seeing the information.
And so I don't understand the numbers necessarily.
And I'm not an energy expert.
But the more and more I hear, and the more and more
I see in the graphs, and the fact that they didn't rerun
the entire model, it's quite clear,
I think, that the data is not quite accurate.
And to hear that somebody on DME actually said,
we know the numbers are wrong, but we've
got to make a decision and go with it,
I would really like to put that on public record for
everyone
to hear.
And that's all I have to say.
Thank you.
All right, any questions?
All right, thank you.
OK, those are our cards.
And I believe that's also our limit.
I think we limited to four speakers, yes.
So now we'll go on to our next agenda item, which
is the consent agenda.
Council Member Johnson.
Thank you, Mayor.
I would move approval of consent agenda items 4A through I,
eliminating item 4B, and amending the agreement used
for item 4C.
OK, and 4B is-- we're just not considering it.
So you're not pulling it as an item
for individual consideration.
We're just removing it from the consent agenda altogether.
Right, that was removed altogether.
Yes, OK.
All right, Council Member Hawkins.
Second.
OK, so we have a motion on approval of consent agenda
item from 4A through 4I, excluding 4B,
with an amendment to item 4C as presented.
Any questions?
Let's vote on the board, please.
[SIDE CONVERSATION]
Motion carries.
We'll go on to agenda-- oh, I skipped the page.
I'm sorry.
Agenda item 5A, which is--
agenda item 5 in general is captioned,
items for individual consideration,
consideration of the use of eminent domain
to condemn real property interests.
Agenda item 5A is considered option
of an ordinance of the city of Denton determining
the public use, need, and necessity
for the acquisition of fee simple title
to the surface of state.
You have a card.
Billy has a card on every item including this one.
OK, we'll do the staff presentation first.
Yeah.
Mayor, if you're ready, I'll ask Paul Williamson
to make the presentation on item 5A.
And I know you do have at least one card.
Thank you, Paul.
Mayor, city council members, before you tonight
is an ordinance making findings of public use and necessity
,
authorizing staff to make offers to purchase,
and if necessary, to use eminent domain
to acquire the subject property tract for the fire station
number three rebuild project.
Upon a favorable motion, I will proceed
to display the affected property tract on the overhead
screens.
Council member Johnson.
So moved.
Well, we got to--
You got to read it.
I've got to read it.
You got to read the--
Never mind, I'll let Joey do it.
There is a recommended motion in your back.
All right, so I'll then recognize council member Hawkins.
I got it.
I move that the city of Denton, after having made the
offers
required by state law, authorize the use
of the power of eminent domain to acquire fee simple
to the surface estate, including waiver of surface
used to the mineral estate of a tract of land
generally located in the 1200 block of North Interstate
Highway 35 East and being a portion of lot one, block one,
royal in addition.
In addition to the city of Denton,
Denton County, Texas, according to the plat recorded in
cabinet
D, page 329, plat records Denton County, Texas,
and more particularly described on exhibit A,
to the ordinance now under consideration
and on the overhead screen being now displayed to the
audience,
all of which is for a valid public use necessary to provide
fire and emergency medical services to serve
the public and the citizens of the city of Denton, Texas.
OK, we do have a speaker that we'll
take after we have a second before the vote.
But is there a--
Chair would entertain a second.
Mayor Pro Tem.
Well, I'll second.
There's no way to do it.
We have on the board mover and second by Hawkins.
All right, so we have a motion to second.
But before we take a vote, we have a card.
And does that conclude staff presentation?
For this item.
OK, all right, thank you.
Mr. Willie Hutsmith, if you would come up
and state your name and address and your time will begin.
Mayor and council members, Willie Hutsmith,
I live at 623 Newton.
I want to speak to the portion about the eminent domain
issue.
I have property that soon will be in this situation, where
I'm hoping to make a certain return on my investment.
And I've had an investment in this property on Bonnie Bray
for 20--
almost 30 years I've had this property.
I know exactly what it's worth.
I've already heard rumblings that this eminent domain
that you're planning to do in this situation,
or possibly do in this situation,
is what's going to happen to me.
And I just want to state for the record
that I don't agree with you doing that.
Let the market determine what a person
can get for their property.
Now, I'm not saying that if we need it for the fire station
,
I know it does fall within the preview of what you,
the representative of the city, would want to do.
And it's good for the whole city.
I understand that.
It's just-- I guess I don't have any rights.
I don't have any way of making you do one thing or the
other.
I know that.
I guess I'm just stating my frustration
about the eminent domain situation.
And I think part of it hinges on the fact
that this ethics discussion that's
what's supposed to take place, which I haven't heard much
about, to help make sure that you are responding and doing
what you're behaving like you're supposed to behave as
citizen--
as representatives of us, that discussion
needs to take place about--
I think that area needs to be covered, the area of ethics,
so that I can be comfortable with you making a decision
for me in this area of eminent domain.
Again, my objection is not necessarily
about the fire station.
It's that policy of choosing to use--
let me just put it the way it comes to me in my mind--
taking my property at a price you told me that--
or you think is good for me, but it's not good for me.
And that's my disagreement.
I don't think that that should be used in situations
like this at all.
Now, unless the person is just not wanting to sell,
then maybe in that situation it should be.
Again, I think if we deal with the ethics of what
the council is going to operate, the ethics rules,
if we'll talk about some of those,
I'd feel more comfortable with you
using that form of purchase of property
for those individuals.
Couple of questions.
Council Member Briggs.
OK.
Question.
Did you know that on these items of use of eminent domain,
one of the issues I have is that they're lumped in
with a final offer.
And if that doesn't work, then to use eminent domain.
And for me, I have an issue with that.
I would prefer to have final offers
and then to know that the vote that I'm taking
is for the eminent domain.
I think it makes--
it holds us more accountable for the use of it.
And so that is something I've mentioned to DME specifically
,
but not necessarily to the city.
So let me understand what you're saying.
This is just a general rule that is just--
this is what we might do in these situations.
It's not for a particular property,
as they've mentioned, the fire station.
Well, yeah.
When we vote on these, it's for a final offer.
And if that final offer isn't accepted,
it's for the use of eminent domain.
It's not necessarily that it's going to be used.
It's that it is allowed to happen if so be it.
It's not a separate vote.
I think that's even worse.
What happened with the negotiation?
How do you negotiate?
Now, you're going to-- there's a potential for me to lose
30
plus years in my property.
Just lose it, because the majority of you
said it should go away.
Now I'm hearing that it means you're voting on that
as an option.
You get to do it.
And if you don't accept what we've given you,
then this takes place.
And you voted on that before you even get the final offer.
Yeah, I don't agree with that.
We do have a couple other questions.
Councilmember Wasney.
You didn't hug me.
Because I have a cold.
We have to ask a question, so I'll put this in question
form.
Were you aware that on January 12th, one week from today,
the ethics question and ethics ordinance discussion
will be back at council one week from today at the work
session?
Oh, work session.
I'm speaking about that work session.
And if you can't be there, it is televised and recorded.
So you can watch that even after the fact.
But one week from today.
That is very encouraging.
Very encouraging.
I will be there.
I will just take off work to make sure I'm there.
12, thank you.
We have one other question.
OK, Councilmember.
Councilmember Johnson.
Well, first question is, am I talking to nighttime Willie
or daytime Willie?
Night.
Nighttime Willie.
I like nighttime Willie.
So have you ever sold property to a municipality,
and state, or a city, or you've been through that process?
No.
So you might want to know.
And I think Paul should maybe hang around and talk with you
.
The eminent domain--
I'm not going to get into the legality of it.
But ultimately, this group here would not determine
what your property is worth.
So there's a process.
There's going to be a negotiation any time
that they're buying something.
Because the last thing that anybody really wants to do
is use eminent domain.
But ultimately, if you can't reach resolution,
then that doesn't get decided by us.
It doesn't even get decided in the city.
And that would ultimately-- eminent domain authority
lies with a judge somewhere.
But you will decide if you use that method of negotiation,
despite a will.
I think ultimately, what we would prefer to happen
would be that you could reach an amicable agreement
to purchase the property.
Very seldom, in my experience in the real estate business,
does it ever get to the eminent domain part.
Because frankly, everybody's going
to spend a lot of money on attorneys that could just
be changed hands for the property.
So I just think it'd be good if you talk to Paul afterwards
and let him explain to you what that process is.
What's Paul's last name?
Williamson.
Williamson, OK.
Because I think it's not what you think.
Well, I've heard-- and I read in the paper
what our own mayor went through.
He deserved it, though.
Oh, I thought my mic was off.
I'm sorry.
Oh, I'm sorry.
And I've heard rumblings about what
I'm going to be offered for my property.
There's nowhere near what my property's worth to me.
So rumblings is rumors.
For the record, I wouldn't want to buy anything from you
or sell anything to you, because you'd
be tough to negotiate with.
Thank you, sir.
Any other questions?
I used to like him, but I don't now.
All right.
Thank you, Mr. Espinosa.
Thank you.
OK, we have a motion and a second on the board.
Let's vote, please.
Oh, do we need to do something different?
I think we read the whole motion in the survey.
Yeah, OK.
All right, yes, we're ready to vote.
Motion carries, 6-0.
Move on to agenda item 5B.
Consider adoption of an ordinance of the city of Dent,
Texas, determining the public use need
and necessity for the acquisition of fee simple title
to the surface of state.
Thank you, Mayor.
Mr. Williamson will also present this item.
Thank you, Paul.
Mayor, members of the city council,
this involves a tract out for the Denton Enterprise Airport
,
the West Parallel Runway Project.
And before you tonight is an ordinance
making findings of public use and necessity,
authorizing staff to make offers to purchase,
and if necessary, to use eminent domain
to acquire the subject property tract for the Denton
Enterprise
Airport West Parallel Runway Project.
Upon a favorable motion, I will proceed
to display the effective property
tract on the overhead screens.
And we do have a speaker card on this,
and we will take those comments after we have the motion
in the second.
Mayor Pro Tem.
Thank you, Mayor.
I move that the city of Denton, after having made the
offers
required by state law, use of the power of eminent domain,
if needed, to acquire fee simple to the surface estate,
including waivers of surface use to the mineral estate
of a 29.444 acre tract generally located--
I think, Mayor Pro Tem, I'm getting some indication.
Are we on the right one?
Actually, that motion, the recommended motion,
is in the digital backup.
Oh, I'm sorry.
You're reading the motion for the next item.
You're reading, I think, the next item.
I'm sorry.
I'll start over.
You're handing me the same number.
You're handing me the same number.
OK.
It's technology.
All right.
I move that the city of Denton, after having made the
offers
required by state law, use the power of eminent domain,
if needed, to acquire fee simple to the surface estate,
including waiver of surface use to the mineral estate
of a 25.63 acre tract generally located on the north side
of Tom
Cole Road and being west of and adjacent to the city of
Denton
Enterprise Airport property and being situated in the
William
Wilborn Estate, abstract 1519--
1419, excuse me--
Denton, Texas, Denton County, Texas,
and more particularly described on exhibit A
to the ordinance now under consideration
and on the overhead screen being now displayed to the
audience,
all of which is for a valid public use necessary to provide
the expansion of aviation infrastructure and facilities
to serve the public and the citizens
of the city of Denton, Texas.
Council Member Hawkins?
Second.
Thank you.
Is that the complete staff presentation?
All right.
We have a motion and a second.
Now will Mr. Willie Hussbett has filled out a card?
OK.
All right.
He has indicated his desire not to speak.
Council Member Briggs?
Is this just open land?
There's no homes or anything on the property?
It's just open land?
That's correct.
Yes, it's farmland right now.
It's prop land.
Any other questions?
Seeing none, we have a motion and a second.
Let's vote, please.
Motion carries 6-0.
Move on to agenda 5C.
Consider adoption of an ordinance of the seat of Denton,
Texas,
determining the public use, need, and necessity
for the acquisition of fee simple title
to the surface state, including a waiver of surface
use to the mineral states of a 29.44 acre tract.
Yes, Mayor, city council members.
Tonight, before you, is an ordinance
to make findings of public use and necessity,
authorizing staff to make offers to purchase,
and if necessary, to use eminent domain
to acquire the subject property tract for the Denton
Enterprise
Airport West Parallel Runway Project.
Upon a favorable motion, I will proceed
to display the affected property tract on the overhead
screens.
Council Member Johnson.
Thank you, Mayor.
I move that the city of Denton, after having made the
offers
required by state law, use of the power of eminent domain,
if needed, to acquire fee simple to the surface of state,
including waiver of surface use to the mineral state of a
29.44
four acre tract generally located and adjacent
to the southwest boundaries of the city of Denton
Enterprise
Airport property, and being situated in the J. McDonald
Survey abstract 873 Denton County, Texas,
and more particularly described on exhibit A,
to the ordinance now under consideration
on the overhead screen being now displayed to the audience,
all
of which is for a valid public use
necessary to provide the expansion of aviation
infrastructure and facilities to serve the public
and the citizens of the city of Denton, Texas.
And well, OK, once it's been displayed.
Council Member-- or Mayor Pro Tem Gregory.
Second.
You know, seconding these motions
is a lot easier than making them.
We have a motion to second.
Does that conclude staff's presentation?
That's complete.
We do have a card of Mr. Willie Hudspeth.
Would you like to-- all right.
Thank you, sir.
He waves his desire to speak at this time.
We have a motion and a second.
Let's vote, please.
Motion carries 6-0.
Now moving on to agenda items for agenda item 6,
items for individual consideration.
We have agenda item 6A, which is received certification
of recall petition from the city secretary
and gives staff direction.
Thank you, Mayor and Council.
On December 14, 2015, Ms. Alita Thomas,
representing a committee of electors,
submitted a petition for the recall
of Council Member Hawkins.
I have reviewed the elements of the petition required
by the city charter, found the petition to be sufficient,
and hereby certified that the petition is in compliance
with the provisions of the city charter.
The charter provides for a seven-day period
for Council Member Hawkins to resign
after being notified of the sufficiency of the petition.
That time period is passed with Council Member Hawkins not
resigning.
Per the charter, Council is now required
to order and fix the date for holding a recall election.
An ordinance will be placed on the February 2, 2016
city council agenda for council's consideration
to order a recall election for Council Member Hawkins
on May 7, 2016.
And I'll stand for questions.
Any questions?
Seeing none, Council Member Johnson.
I don't really have a question.
Can we comment?
Sure.
Sure, the item is appropriate posted.
Mr. Mayor, I might make a comment as well.
Yes.
If I could.
There is a provision in our city charter
with regard to a timeframe to call this election.
And the city secretary and I this afternoon spoke
with the elections division of the secretary of state
to confirm what we already believe to be the case,
which is that state law does in fact preempt our charter
and that the election will be held on regular election
dates.
The next regular election date, of course, is in May.
So this recall will be had in May.
All right.
Thank you.
Well, I just wanted to say, Council Member Hawkins,
you're a first class individual and you don't deserve this.
And I think it's a joke that less than 20 people registered
to vote in your district who actually voted,
signed your recall petition.
And one of the main stated reason on your recall petition
was that you didn't vote to uphold the fracking ban,
in which case six of the seven of us should be recalled.
I think it's making a mockery of the democratic process.
And I look forward to campaigning alongside you.
And it's just a shame that you have to spend time away
from your family and your businesses to go through
what you just went through again last year, campaigning,
unopposed.
So I apologize on behalf of all the voters in district four
,
of which I'm one, that you're having to go through this
because it's a cooked up reason,
three reasons to recall you.
And that's, I'm quite confident not what the recall
petition
was designed for.
And you've been a fine, upstanding member
of this community and this council.
You do a ton of stuff for our city
and you serve my district well.
Thank you.
Any other comments?
And my understanding is there's really no action here today
.
No, this is no action is required by the council.
It's a certification from the city secretary.
All right.
Any other comments?
All right, thank you.
Moving on to agenda item seven, public hearings.
Seven A is hold a public hearing and consider approval
of updates to the city of Denton's mobility plan
and travel demand modal of the Denton Roadways.
Oh, I'm sorry.
I'm sorry.
Sorry about that, Mr. Husspeth.
I will back up.
Now it's my turn to make a mistake.
Mr. Husspeth, I'm sorry.
You got an agenda item.
I guess because we didn't have an action item.
You know, Mayor, you're just--
I'm sick.
I've taken some cold medicine.
You didn't give me a hug either.
I apologize, sir.
I too, in 1981, I think it was, see there,
our first term or the second term
was faced with a recall of sorts.
The vote was very close and the challenger
decided to have the votes recounted.
Mr. Hawkins, I know exactly how you feel as far as the
agony
you must be going through, the questions you have.
Why and what about-- and all of those things.
So I'm not going to speak to that.
I know what that's like.
And I want to speak to the fact that when you do citizens,
you council members, the way you've done citizens,
this is what you get.
Now, what did you do?
You took the vote that the citizens cast to ban fracking
and changed it.
They voted.
We voted in that election.
And you, on your own, took that vote away.
Well, that's what you get when you do people like that.
County commissioners, they're going through that with me.
Don't try to silence Americans by saying, I am the law.
And you had better do what I say or you're going
to get what for if you don't.
When you do that in America, I'm telling you,
we've been free for a long time.
That's just not going to be acceptable.
You can't do people like that.
You should honor what the vote has stated.
You can't come up with rules that satisfy you
and just ignore people.
You're going to get this all the time.
I know, Mr. Hawkins, I like him.
But I understand the voters.
You had better stop doing that.
And I can tell you something else.
If you don't do something to fix that IOOF cemetery
and let African-Americans be buried there,
then by golly, you need to get rid of that darn cemetery.
Give it back to whomever that it came from.
And that's the same issue--
not same-- similar to this issue.
I want IOOF removed or let blacks be buried there.
You have not spoken to that.
You've got to get the same thing in that situation as well.
Thank you.
Mayor Pro Tem.
Question for you, Mr. Henson, but a couple of them.
You're aware that the council only revoked the ban
on fracking after state law was passed.
It's referred to as House Bill 40
for three different specific times.
It said that cities could not enact or enforce
a ban on fracking within the city limits.
Are you aware of that?
No.
It was after House Bill 40 passed.
Are you aware that our mayor actually
went down to Austin to speak against passing House Bill 40
and that most of the council members lobbied
our representatives in Austin to not pass House Bill 40,
to not tie the voters' hands, the citizens' hands,
on a fracking ban within the city limits.
Are you aware of that?
No.
Well, that happened also.
Are you aware that several of the leaders of the vote
to ban fracking and the lawyer that they had hired to be--
what was the term that we used?
Intervener.
An intervener on our behalf.
Several of those leaders and their lawyer
recommended that the city revoke that ordinance,
that because of the way that House Bill 40 was stated,
that it was going to be a losing cause
and that they would rather have a fight against House Bill
40
on a battleground that was more favorable to winning.
Are you aware that that happened also?
No.
OK, well, I think that that might
help you understand the predicament
that the council was in at the time that we made that vote.
Let me get some clarification on what I do understand.
Did you vote?
Did you raise your hand or push that button and say,
I agree to the motion that we do not ban fracking?
Did you answer that question before you
give me some more rhetoric?
Well, let me say this.
So you're not going to answer that question.
I contributed money to the--
You answered that one question.
Did you vote?
I did vote.
To reverse what the voters had--
I voted to revoke the ban.
To what?
To revoke the ban.
That's what the citizens read, as I read.
That's what you're getting.
And I was asking you questions to help you understand
the context of that vote.
You still could have voted against it.
I mean--
Sure could have.
You could have done that, right?
You bet.
But I think what you're communicating to me
is had you done that--
well, I'm not sure what you're--
had you done that, then what would have happened?
Had you voted against the ban?
Well, I'm supposed to ask you questions.
OK.
And I can't predict all of the possibilities,
but there were a number of different possibilities.
OK.
Yes.
That's it.
Any other questions?
Don't see anything, sir.
I do-- now that I've got an opportunity.
Again, I apologize, Mr. Hussbuss, for overlooking
your card on that.
I'll try to correct that mistake on the ones moving forward
.
I do want to say I did, as well, vote to repeal that ban.
And I am a firm believer in the rule of law.
That doesn't mean that I agree with everything
that the law allows, but I do believe in the rule of law.
And I've served with you, Councilmember Hawkins,
for several-- or a year.
You took my spot.
So in February, or whenever that vote is taken,
because I believe in the rule of law,
my vote will reflect that.
But in no way does that vote reflect a lack of support
for you as a council member or as a person.
But it does support our charter, and it
supports the laws of this city and the laws of this state.
So I wanted to make sure that I clarified that with you.
Any other questions or comments?
OK.
We'll move on to agenda item number seven.
And we do have a speaker, for sure, Mr. Huspice.
So I want to make sure that I don't overlook that.
Again, I apologize for that.
Public hearing number seven A is hold a public hearing,
consider approval of the updates to the city of Denton's
mobility
plan and the travel demand modal of the Denton Roadway
system.
And I will-- I think our process has
been to open the public hearing prior to staff presentation
.
So I will now open the public hearing,
and we will take staff presentation and then
entertain speakers after that.
Thank you, Mr. Mayor.
I'm going to ask Mr. PS Arora of our utilities division
to present this public hearing for your consideration.
Thank you, PS.
Thank you, sir.
Mayor, members of council, we'll be
talking about the update to the existing mobility plan.
We do have an existing plan that depicts
on a master planning level the road network in the city.
All of the collector's streets, the secondary arterials,
and primary arterials are included in the mobility plan.
Why do we need to update it at this time?
We have some very large developments
that have gotten a master plan community zoning designation
,
MPC, one of them being Hills of Denton, which
is north of Loop 288 and generally in this area,
Coal Ranch and Hunter Ranch.
Between three of them, they comprise about 9,000 acres.
And the street layout for those developments
was approved by the Planning and Zoning Commission
and the city council.
That is not included in the current mobility plan.
Also, the city had annexed close to 10,000 acres
in the city limits.
There is no current street layout
for all those annexed areas.
So they had to be master planned.
So that was also added to the--
had to be added to the mobility plan to update it.
Beside that, as you are aware, we
are working on the road impact fees.
So we wanted to know what is the current capacity
of the existing streets that is already used up
based on the current number of lanes they got,
what is the current capacity, and what is used up.
We also wanted to know, based on the future traffic
generation,
do we need to upgrade some roads or downgrade some roads
based
on the projected traffic volumes.
We also gave a task to the consultant
to realign some existing streets so it
would improve the traffic movement
and reduce possible future construction conflicts,
et cetera.
To do that, a computer model were
used-- so I will go through quickly what process we
used to update the mobility plan.
The first thing we did was we prepared a computer model
for the existing road network.
And to do that, we went out and in about 111 locations
in the city--
as you can see all the dots right here--
they represent a particular segment of the road
where traffic was counted.
And that traffic count was done for the entire city.
That way, we had a basis to calibrate the existing
condition model.
So the model was run, and we made
sure that the results of the model
matched what we were seeing in the streets out there
based on the actual traffic counts.
And you can see, based on the numbers right here,
if it says 0 to 2,000, that's so many vehicles per day
in a green designation, and up to 40,000 plus, which is red
,
which will be some of the roads 35 and Dallas Drive
and part of the 380.
So those are the highly traveled streets in the city.
So we calibrated the existing condition model,
which was tied to the actual traffic counts we had done.
Then we had to project what will be the future traffic
generated
for the built out condition.
To do that, we used the WRT, our consultant for planning
department, which did the comprehensive plan update.
So they came up with this future land use plan,
which you see right here.
This future land use plan was used
to generate traffic through the entire city
for the built out condition.
And that data was then used to run the built out condition
computer model and determine what roads needed
to be secondary arterials, needed to be primary arterials,
or needed to be collective streets.
So we see right here is the proposed additions
we did to the existing mobility plan, which
is the master plan community.
And you can see right here in this color right here,
these are the roads that were added in the hills of Denton
and Coal Ranch and Hunter Ranch.
So all those roads were added to the existing mobility plan
.
Beside that, we had all of the annexed areas.
So in the annexed areas, we added the new roads,
as you can see all along here.
And we added some roads for connectivity,
for the north-south connectivity on both sides of the city.
So these are the new roads.
So these new roads and the MPC designation roads,
they were all added.
And we ran the model.
Once we ran the model, as I had discussed earlier,
we were looking at what the upgrades are needed, which
will be going from a secondary arterial
to say a primary arterial, which is the airport road
between Marsh Branch and 35W.
So the traffic generation shows it
to be between 25,000 to 40,000 vehicle trips
in the built-out condition, which means that it
needs to be a primary arterial.
So it was upgraded from a secondary to a primary.
And then we went through the whole--
all of the roads to look at the traffic.
We looked at the need for connectivity.
And there are 21 upgrades in the entire city.
This is the table that you see right here.
You have in your packet the actual map
that shows all of the roads that have been upgraded.
And there were some downgrades, because what we saw
was that the future traffic generation did not
justify a particular current designation for the street.
So Bobcat Road has a secondary arterial designation.
The traffic generation only shows it
to be 2,000 trips at the most, which then we
were looked at the current designation
and downgraded to Collector Street.
So we went through the entire city.
And there are eight downgrades in the entire city
from the current designation to a lower designation.
The task that consultant had was to realign some of the
roads,
as I discussed earlier.
This was to improve the traffic flow that we have currently
.
And it does not change the designation
of the street from secondary to primary or primary
to secondary.
The designation is still the same.
It is just a change in alignment,
slight change in alignment based on floodplain.
Or there may be some buildings out there
that we need to stay away from or look
at existing lot lines to see what
is the least amount of disturbance we can create.
So those are the things that we looked at realignment.
So once we compiled all of that, the MPCs, the realignments
,
the newly annexed area streets, this
is the proposed mobility plan that we have got right now.
So it shows the existing roads as primary arterials, which
are, as you can see right here, existing.
The future primary arterial roads
are shown with a dash yellow and red,
which you can see right here.
Along here, Post Oak Road, Mayhill Road, part of that.
And secondary arterials are the future
are the green with the small yellow in between them.
And you will see those along here and in this area.
Excuse me.
So this was then the basis to run the future condition
model.
We had the floodplain, which was the WRT, future land use
plan.
So we determined all the traffic generation.
And this road network was used to run the model.
What we see here then is that in the green,
if you see the green color, it shows
that it has a level of service A or B, which is pretty much
in the entire city.
So the future traffic generation that we have,
and with the road layout that we got,
it meets our A or B condition for most of the city.
There is some tolerable, because there's substantial
traffic.
We don't really need a primary arterial, say in this case,
or it may be a Loop 288, which is a textile road.
Same thing for University Drive.
So several of those are textile roads,
which whenever textile improves those roads,
we may have a better traffic condition, which will be for
35W,
and so on.
This plan had, we had gone through a public hearing process
at Planning and Zoning Commission.
It was presented to the Mobility Committee
and to the Traffic Safety Commission.
In the public hearing at P&G, it was recommended
for approval 620, and staff recommends approval.
I stand for any questions.
>> Okay, we have some questions
for staff before we take public comment.
Council Member Hawkins.
>> Thank you, PS, for this.
I know we're pretty much trying to just clean up.
It seemed like the mobility plan include Hills of Denton,
Coal Ranch, Hunter Ranch, but I just wanted to make sure,
there's no significance, like with future repairs of a
street
or anything when a street gets downgraded.
I mean, that has nothing to do with this.
>> No, sir.
All it is, if it is a secondary arterial and it went
down to Collector Street, all that means is in the future,
whenever that street is done, then it will be having right
of way of a Collector Street
and the pavement width of a Collector Street.
>> Gotcha.
Thank you.
Council Member Briggs.
>> Hi. I was at this P&Z meeting,
and there were a few issues or things that came
up during the meeting, and I just kind of want to see
if they've been corrected, and this is what we're voting on
or kind of ask you.
>> Yes, ma'am.
>> Do you know what I'm talking about?
>> Yes.
>> About the road going through the nature area.
>> The post-hoc alignment was redone.
>> That was redone, so that is not in this.
And also, the right of way that was taken, there was a
gentleman
that lived in the area and said that we have given
up our right of way.
Has that been solved?
Do you know?
>> I'm talking about the intersection of Bonnie Bray
and the 380 in that area.
>> I think it's in the same area in the Clear Creek.
>> I'm sorry?
>> In the Clear Creek.
It's in the same area.
>> Oh, yeah, yeah.
We actually realigned.
Let me go back to that.
>> Okay.
>> Okay. So in this area, and you will see that we did not
go
towards this area right here.
We moved the road away.
>> Okay.
>> So it's not coming straight through,
and it's not impacting any of these properties.
>> Okay, good.
And another thing that there were a lot of bikers concerned
and that this plan did not include bike lanes or sidewalks.
And I'm not, and it was brought
up that that could be addressed later.
Is there a way to do that or?
>> Yeah, as we go through the impact free process,
we will be presenting actual cross sections that we are
using.
And, you know, there is already a bike plan approved
by the council.
>> Okay.
>> And that will be preserved,
so those bike lanes will be done as part of the plan.
>> Okay, so they'll go together.
>> And also the right of way that we have for collector
streets
or primary or secondary arterials, if there is a desire
to add a bike lane or actually to have bike facility,
it can be done on the side path which can be expanded
from a five foot to a eight foot or a ten foot, like it's
being done
on Bonnie Bray or Mehill Road,
where the sidewalk is actually much wider
than a five foot sidewalk.
So the bikes, people riding a bike can actually use that.
And there's enough right of way that would allow us to do
that,
whether it is a collector street or an arterial street.
Any of those will have the real estate, if you will,
that would allow us to do what we want to do.
>> And last question, did I hear you say
that you had a consultant on this project?
>> I'm sorry?
>> You had a consultant?
>> Yes, we used Kimneyhorn.
We had initially hired Kimneyhorn to do the road impact
fees
and we determined that our current mobility plan was
woefully inadequate, so we added the computer model to be
done
as part of the project.
>> Thank you.
>> To update the mobility plan.
>> Thanks.
>> Councilmember Wozni.
>> I just want to go on the record on behalf of my
constituents
in a neighborhood called The Vintage,
which is down by Fire Station 7.
And the current plan calls for Vintage Boulevard
to be a six-lane expansion.
Now that goes in between four lanes of 35W
and two lanes of 377.
So you've got six lanes connecting an interstate highway
with four lanes and a county road with two lanes.
But the neighborhood has objected to this in the past.
I just want to carry their objections forward.
And if there's something that the city can look
at as we move forward, I know that this project is
partially
funded, but I know that those neighborhoods are not happy
about a six-lane road coming right through the middle.
>> Okay. And Vintage Boulevard, you know,
is currently shown exactly as what is
in the current mobility plan, which is a primary arterial.
You do realize, Councilmember Wozni, that Fort Worth Drive,
TextDOT is ready to expand that road.
And we actually have a project already starting very soon
to work on the utilities on Fort Worth Drive.
And then TextDOT will go and upgrade that road
to a six-lane highway.
>> Well, I'm just saying the people who live
in The Vintage are not happy about a six-lane road.
And I just want to carry their voices forward.
And make that as part of the record tonight.
>> Okay.
>> Councilmember Briggs.
>> I just have one last question that I thought of.
We were trying to do the McKinney Street with TextDOT.
And I just wanted to make sure that anything
in this plan was not going to hold that project up if we're
--
or is it -- does it include that or is it --
>> This will not hold any projects.
>> Hold anything -- okay.
>> No, it will not.
>> Just checking.
Thank you.
>> Councilmember Johnson.
>> Yes, just for clarification for the citizens.
A lot of the new streets that you're showing as a part
of those master plan communities,
if my understanding is correct, those will be built in many
cases
by the developer and not by the city.
>> Yes, sir.
>> Okay. Thank you.
>> Any other questions for staff before we take public
comment?
Seeing none.
Thank you.
Thank you, PS.
We have a card.
Mr. Willie Hussbuth, if you'll come down
and state your name and address, your time will begin.
Thank you, sir.
>> My name is Willie Hussbuth.
I live at 623 Newton.
Councilmember Wasney, I noticed you didn't get an answer,
which the answer that you were seeking for is I thought,
yes, we're going to change that and give the citizens what
they
need there or no, we're not going to change it.
And it's tough.
They can just make do.
I think you should have said, yes, we could change that.
I think. Look at this master plan
that you're planning to do in our city.
All of this stuff, well, I hope you guys can understand
what he
was talking about.
I don't have a clue.
Let me just give you some of my plans.
Put something on the ground for the students at Ryan to be
safe.
Put dirt down there.
Put gravel.
Put something.
You keep giving us excuses about how much time it's going
to take to get the right sidewalks.
Kids are being hurt.
The next student that gets hurt on that road,
you can bet I'll be down here.
I promise you, I will be right here at this podium saying,
what is wrong with you?
Put something out there so that they can walk on in this
master
plan.
I just thought about that as I saw all these lines going
all over the place.
Something else.
You got planning and zoning looking at this.
You got this impact study.
You got all these plans that he's talking about.
How about just somebody like me who drives
these streets all day long?
How about some of us talk to us about some things that we
see?
That would help you, I think.
Maybe not.
For example, how much time do I have?
Two minutes.
For example, you own Eagan going to bail,
and you have to turn left going on bail.
And you have, Lord help me, a white line.
Say, do not cross the white line.
And you want to go into Southeast Denton.
Remember, Eagan, bail, white line, Dallas drivers,
they're coming, and they're coming fast all the time.
And you want to exit to go into Southeast Denton.
There is no way.
You're going to get a horn blown at you
every time you try to do that.
Put me on that study.
I can tell you some other things that impact study
so that I can tell you some other things.
Jago.
You're at Jago and Oak.
Oak running into Jago.
Drive it tomorrow, please.
How do you know that if you're in the far right lane
that you're supposed to go to the left lane?
How do you know?
How does the car in the left lane
know it's supposed to go to the far left?
There's no lines.
Put that in impact study.
Another one.
Teasley Lane.
You're on Teasley Lane, and you want to go--
you're trying to go on Dallas Drive.
You get on Dallas Drive, and you go under the trestle.
There is a white line that tells you, now, I'm one of the
weirdos.
I don't cross the white line.
It's insane.
You don't cross-- they won't let you over
if you go the distance that that white line shows.
And the last one--
I know you're not following this.
I don't care.
I just want to say it.
I've been wanting to say it forever.
Bail that one.
Darn.
Time's up.
Well, those are my concerns.
Put some citizens on that panel, and let
them help you figure out that panel,
but in this discussion, figure out what the city needs.
We have a question.
Councilmember Briggs.
Do you know Mr. Davis?
Davis.
Wait.
Davis.
Yeah.
He might be--
What is Davis, Mr. Davis?
He's an engineer.
He's very helpful.
You may want to talk to him about your ideas
sometimes.
Good.
I'm Willie Hadsbe.
[LAUGHTER]
As if you didn't know.
Anything else?
Any other questions?
Seeing none, thank you, sir.
Good.
You got my number.
This is a public hearing.
We have no more cards.
But if anybody else is wishing to speak,
please come down, state your name and address,
and your time will begin.
Talking about agenda item 7A.
Zach Youngblood, 836 Hawes Drive, Copper Canyon, 75077.
Mr. Mayor, council members, it's a well-established fact
in traffic engineering that if you build capacity,
it will fill.
And I think that as the plans stand right now,
there is poor integration between the mobility plan,
which focuses on single passenger vehicular traffic,
both for commercial--
all vehicular traffic, various transit options through DCTA
,
the bike plan, and any pedestrian issues.
So I think that some of the best master plans I've seen
for mobility do a great job of integrating
all modes of transit, and not necessarily just saying,
you know, it is Texas.
We love our cars.
We love our oil.
But you do know that things like carbon pricing is on the
way.
Gas prices are going to go up.
And these roads, I know this is a 2030 or 2050 plan.
We're looking at 10, 20 years down the line,
where the situation in Denton will change.
Even now, it's moving from many plots
that were single-family use are moving to multi-family
units.
And density in the city center is increasing.
So the city's character is changing,
but in a good way, I would think.
Additionally, I would like to say
that I think the downgrading of EGLE from a secondary arter
ial
to a collector is in major error.
As a UNT student, I've driven that route many times
in the last year.
And I know that the counters were out during the same time
that the resurfacing and utility work was going on.
And myself and many other students
who would normally go down EGLE all the way to North Texas
Boulevard or further--
yeah, all the way to North Texas Boulevard from Carroll
or Fort Worth Drive would instead get off at Bernard
Welch in order to avoid the extensive construction which
has been going on along that stretch of EGLE.
I have a couple of questions for you.
Councilmember Briggs.
You're saying an integrated plan might be a better way
to go to make sure it all gets incorporated into one?
Yes, ma'am.
I think that's a good idea.
Mayor Pro Tem.
So you're advocating for a road design
that does more to accommodate pedestrians and bicyclists?
Absolutely.
That's exactly what the change in status of EGLE
is designed to do.
Now, what I heard was that there was a possibility of a
lane
diet in order to move to adding the bicycle infrastructure.
That's the plan.
Is that the end goal of the resurfacing project?
I beg your pardon?
Is the adding of bicycle lanes part
of the end goal of that resurfacing project?
The mobility plan calls for a road diet on EGLE Drive
for it to go to one lane in each direction,
a continuous center lane, and a bicycle lane in each
direction.
See, that's what I'm thinking is that your counts that you
're
reading right now are from the period of construction,
and I don't think that's an accurate read.
Well, there had been counts before that.
So what I'm trying to tell you is
we're trying to accommodate what I think I hear you asking
for.
Well, that's one street.
I'm talking system-wide.
OK.
I understand.
Councilmember Johnson.
Yes, sir.
Thank you.
I was just going to say you might get John Davis, if you
could get with him afterwards.
And so we have invested in a bicycle and pedestrian
coordinator at the city.
On our mobility committee, every month that we meet,
we're talking about roads, cars, bicycles, pedestrians,
dealing with-- part of the challenge we have in the city
is many of our roads are textile roads.
But I think we could certainly get you hooked up
with those folks so that you can understand,
let them share with you, and they
could answer your questions.
But let them share with you the coordinated plan.
I will agree with you that some years ago,
I don't think it was well coordinated,
but we have spent quite a bit of time, effort, and money
to get that all coordinated, and invested in a person
specifically to do that.
I definitely understand what you're saying,
but I would have to agree with Mr. Hudspeth regarding
the lack of sidewalks over on Eath McKinney.
That demonstrates that you're just not talking to Tex.dot
in a loud enough voice.
I was just trying to help you out.
I understand.
There's probably some good resources for you.
Thanks.
OK, any other questions?
Thank you.
Appreciate it.
Thank you.
This is a public hearing.
Anybody else wishing to speak, please come down and state
your name and address, and your time
in for agenda item 7A.
This is a public hearing.
Anybody else wishing to speak?
Seeing no movement, we will close the public hearing.
Council Member Hawkins.
Thank you, Mayor.
I move approval of item 7A.
Council Member Johnson.
Second.
OK, we got a second.
Before we take a vote, Council Member Briggs.
I just wanted to confirm that the other plans, the bike
plan
and the other, are all going to be integrated together,
even though we're not seeing it visually.
Question for staff?
I think I just wanted to make sure that that's still all--
Yeah, the bike plan stands on its own.
So that will be integrated with all the road work
that will be done.
Any rehab is done or any expansion
is done of a road where there's a bike lane to be built.
That will be part of it.
There's no way to show that on this map here.
Thank you.
OK, we have a motion.
I believe we recognize the second.
So let's vote on the board, please.
Seeing no more questions.
Motion carries 6-0.
We'll now move on to agenda item 7B, which is public
hearing.
Hold a public hearing and consider a specific use
permit to allow basic utility, a Denton Municipal Electric
substation on approximately 6.2 acres
within a downtown commercial general DCG district.
And we will now open the public hearing
to hear staff presentation and then subsequent public
comments.
Thank you, Mr. Mayor.
I'm going to ask Amy Bissett, our Director of Development
Services, to present his public hearing.
Thank you, Amy.
Thank you, Mayor and council members.
The first public hearing that I'll be presenting tonight
is a consideration of a specific use permit for a subst
ation.
This project is a part of an overall transmission
and distribution upgrade plan that's
a part of Denton Municipal Electric's CIP program
from 2013 to 2017.
It includes one of 43 improvements
to the CIP program.
And it's a project that's been in the public hearing
for a long time.
It includes one of 43 improvement projects--
or this is one of 43 improvement projects,
including multiple new substations, upgrades
to existing substations, and other upgrades to lines
as well.
And this specific project is intended
to replace an existing substation on Locust Street.
You're considering tonight the approval of a specific use
permit for a substation on approximately 6.2 acres.
This is located on the southwest corner of South Locust
Street
and West Collins Street.
Here's an aerial view of the property.
You can notice I'm running north to south.
On the east side is Locust.
And then on the north, running east to west, is Collins.
There are four tracts of land in this property.
One of them has a body shop on it.
One is partially developed with a small commercial building
.
And the other two are undeveloped today.
Here are some site photos of the property.
Here are some photos of nearby small neighborhood
of single-family homes across Collins Street.
This is an aerial of the zoning district.
This is zone DCG, which is Downtown Commercial General.
Basic utilities are allowed by right or by SUP
in all zoning districts in the city of Denton.
They're allowed by SUP and DCG.
Here is a site plan.
And this includes two access points on Collins and two
access
points on Locust Street.
The applicant is designing a 10-foot masonry wall
to screen the substation from the surrounding area.
And they're providing for enhanced landscaping
along Collins to provide a buffer between the substation
and the residential homes.
Here is an example of what the screening wall would look
like.
It screens the equipment itself.
And 10-foot tall covers most of that that sits on the
ground.
Here's a rendering of what the area will
look like along Collins Street.
You'll notice on the left-hand side of the screen,
the masonry wall.
And then there is a three-foot landscaping buffer,
followed by an eight-foot sidewalk,
and then an 11 and 1/2-foot parkway with street trees
that will all provide an enhanced buffer to the neighbors
across the street.
Considerations that we looked at--
substations are essential.
We cannot provide the electric infrastructure
we need to provide to the community without them.
When it is necessary to put them in an urban area,
it should be designed to create the least impact possible
on surrounding properties.
DME has worked with the neighborhood,
held neighborhood meetings to provide opportunities
for feedback so that they can create a design that
minimized the impact.
A 10-foot masonry wall will screen the interior components
of the substation.
And the enhanced landscaping that I
showed in the previous depiction will
be across from the existing single-family homes.
Public notifications went out on November 18.
29 public notices were sent, and 79 courtesy notices were
sent.
To date, we've received zero in opposition, three in favor,
and zero neutral.
Staff recommends approval of S15-0011,
subject to the following conditions--
one, that the substation be screened by a minimum 10-foot
masonry wall, and two, that the substation comply
with the attached site plan.
The Planning and Zoning Commission
recommends approval as well, subject to the conditions
above.
The applicant is here if you have questions.
Council Member Hawkins.
Sure, it might be for the applicant or Amy,
but I think this has come up before, even with the King's
Row SUP.
And we had talked about trying to collapse
the timeline a little bit.
And I just wondered if we have had any further conversation
with that.
I mean, the first meeting DME had was October of 2013.
Then city council approves the site in August of 2014.
And then we are deciding on the SUP now.
And I just think that could create some problems,
you know, if there's a different renter or somebody
sells a home or something like that.
We do recognize that long timeline.
And Development Services has been working with DME
and with the legal department to streamline some processes.
And part of that's related to DDC requirements
so that when we're going through the public hearing process
,
it is within an acceptable time frame,
and conditions don't change.
Glad we're working on it.
Thank you.
Any more questions from staff before we take public comment
?
Seeing none, thank you.
I want to give the applicant an opportunity
to speak if they so desire.
Is the applicant present?
And do they wish to speak?
All right, no.
Then we'll move on to our cards.
Mr. Willie Hespeth, you'll come down,
state your name and address.
Your time will begin.
Mayor and council members, my name is Willie Hespeth.
I live at 623 Newton.
Would you put the slide up just before the rendering?
OK.
And then I'm going to ask that you move to the rendering
after I make a couple of comments.
If you look at the wall, 10 feet,
notice that you can see right over it
and see all the electrical wiring.
So my question to you is, what good is the wall?
You see all the work, all the stuff that's there.
What good is the wall?
If it's 10 feet tall and all of the--
much of the workings behind it can be seen.
Now, go to the rendering right after that.
This is the elephant in the room.
OK, you got the site there.
This thing is in Collins.
As I can remember where that is, it's right by--
it's right in a neighborhood.
I guess we need these things.
I'm sure we do.
But look at that drawing.
Two people walking along holding hands as though it's a
good
thing that that thing is there.
It's not.
Now, this is the elephant in the room.
It's unsightly.
But I guess you're saying we need it.
Couldn't we have done something better than that, that wall
that's not really covering very much?
That's my only concern.
OK, any questions?
Thank you.
Thank you, Mr. Esmeth.
I have no more cards, at least, on this agenda item.
But this is a public hearing.
Anybody wishing to speak?
Please come down, state your name and address,
and your time will begin.
Anybody wishing to speak?
Zach Youngblood, 836 Hawes Drive, Copper Canyon, 75077.
Mr. Mayor, members of the council,
I am going to have to agree with Mr. Hudspeth in his
assessment that having driven past the station that's on
the
south side of University of Nibani-Bray, that 10-foot
stone wall is ugly.
It doesn't really abate anything.
And it seems like DME and development are going towards
this really cookie cutter thing that is not exactly
screening or adding any sort of character to what could be
an area for public art.
Instead, you have the rough surface to bricks, which I
understand it's because it doesn't take paint well.
But I personally am of the opinion that instead of
anti-graffiti things like spikes and surfaces, this is a
great place for public art, things of that nature.
I would much rather see things like that mural that is set
at
the corner of Scripps and Bonnie Bray for, I don't know,
as long as I've been alive.
I don't know how many years before that.
Something along those lines, beautifying the streets of
Denton instead of just another 10-foot tall brick wall.
That's all.
Thank you.
Any questions?
Seeing none, thank you.
Appreciate that.
Since it's a public hearing, anybody else wishing to speak?
Anybody else wishing to speak?
We will close the public hearing for agenda item 7B.
Any Councilmember Briggs?
I just wanted to go on record as Councilman Hawkins said
that
this was done a long time ago, and there's two Councilmem
bers
here that didn't take part in the site selection or
approval
of the site or anything, so I just kind of wanted to go in
on
record and say that.
This was not something I saw from beginning to now.
Okay.
Thank you.
Any other questions or comments?
Chair would entertain a motion if colleagues are so
inclined.
Councilmember Hawkins?
Thank you, Mayor.
I move approval of item 7B.
Mayor Pro Tem?
Second.
We have a motion to second for agenda item 7B.
Let's vote on the board, please.
Motion passes 5 to 1.
Moving on to agenda item 7C, is hold a public hearing and
enable
-- excuse me -- hold a public hearing and consider a
specific
use permit for multifamily dwellings on two properties on
neighborhood residential mixed use 12 in our MU 12.
The subject properties are approximately .24 and .33 acres.
We will now open the public hearing and staff make the
presentation and then we'll take public comments.
Thank you, Mayor.
Amy Bissett, our Director of Development Services, will
also
present this public hearing.
Thank you, Mayor and Councilmembers.
This public hearing is to consider a specific use permit
for a multifamily project.
Meadowview lofts is located at 609 and 612 Meadowview Court
in an
NRMU 12 designation.
Here's an aerial view of the property.
It is zoned NRMU 12.
The background on this site is that it was originally a
planned
development that was approved in 1970 for apartments on the
entire
property that you see here.
In 1972, Meadowview Court platted it into its current
configuration.
In 1984, PD 8, the planned development, amended -- was
amended to permit four plexes on seven of the eight lots
along
Meadowview Court, including the two that we're contempl
ating
today.
In 1985, five of the seven duplexes were constructed.
In 2002, citywide rezoning initiative rezoned PD 8 into NRM
U 12 in the rezoning, and four
plexes, which are considered multifamily, require an SUP
approval in NRMU 12.
Site photos.
The site plan shows existing four plexes on the remainder
of this property.
The development was intended to be multifamily four plexes
from the beginning when the PD
was created in 1970.
Here's some elevations.
The property has been intended for multifamily since 1970.
The proposal is consistent in scale and density of the
surrounding properties, and it does
comply with the criteria for approval.
Public notifications were mailed out on November 18th.
Twenty-two were sent.
Site mail and 65 courtesy notices were sent.
To date, we've received one in opposition and one neutral.
During the public engagement process, there was a neighbor,
the neighbor to the west of
this piece right here, as a single-family residence.
He came out during the planning and zoning commission
meeting and asked for a screening
wall to be added as a condition.
And so I'm going to share a little bit more detail about
that.
Staff does recommend approval of this with a maximum
density of each lot being four units,
and that each building shall be no greater than two stories
in height, and that the development
substantially comply with the attached site plan.
The planning and zoning commission recommends approval as
well with the same three conditions
that staff had, but they've added additional condition,
which was that the applicant construct
a privacy fence along the western property line of 612 Me
adowview Court.
During the conversation with the planning and zoning
commission, the applicant was not
there.
The applicant's representative was there, and the applicant
's representative indicated
that they were uncomfortable committing at that time to
constructing the privacy fence
without the applicant knowing that that was going to be a
condition that was placed.
So at the time, the planning and zoning commission asked
that we facilitate a conversation with
the applicant to determine their willingness to construct a
privacy fence.
Planning and zoning commission said they'd also be willing
to consider a landscape buffer
instead.
The applicant, however, has said that they are happy to
construct a privacy fence.
We would ask you all to provide a little more direction on
what that would look like.
The conversation that we have had with them is that it
would be an eight-foot tall privacy
fence, board-on-board construction, and the applicant is
fine with that.
I do believe they're here if you have any questions, and
with that, I'm finished with
the staff presentation.
>> Let me go back to the chart.
Okay.
Staff has completed the presentation.
Do we have any questions for staff prior to public comment?
This is a public hearing.
Seeing none, thank you.
Is the applicant here, and would they like to speak?
>> I'll answer this question.
>> On answer this question, at least at this point, does
council have any questions for
applicants?
There may be some that come up during the discussion, but
any questions for applicants?
Seeing none, thank you.
We do have a card.
Mr. Willie Hutsbeth, he desires not to speak at this time.
Any other questions?
Well, this is a public hearing, so anyone wishing to
comment on this agenda item 7C,
please come down and feel free to state your name, address,
and your time will begin.
>> Zach Youngblood, 836 Hawes Drive, Copper Canyon, 75077.
Mr. Mayor, councilmembers, I would just like to say, as I
mentioned earlier in the mobility
plan discussion, the city is increasing in density.
We have right here two lots moving from single family
permit to the special use permit for
the multifamily dwelling, even if it is just a fourplex
instead of a oneplex or a twoplex.
I think that's wonderful.
I think that's -- I love density.
I will admit, I lived in Austin for a few years, and that
wasn't dense enough, but I
think that this is a great thing.
And that's a beautiful neighborhood up there, and I think
fourplexes will be a good addition,
and that will be eight happy families in that neighborhood.
>> Any questions?
All right.
Thank you very much.
>> Thank you.
>> All right.
This is a public hearing.
Anybody else wishing to speak, please come down and state
your name, address, and your
time will begin.
Anybody else wishing to speak?
If not, we will close the public hearing.
Councilmember Johnson?
>> Thank you, Mayor.
I would move approval with the added condition that the
applicant build an eight-foot board-on-board
privacy fence bordering the back of the 612 property.
>> Okay.
Councilmember Hawkins?
>> I second.
>> We have a motion and a second.
Let's vote, please.
>> It didn't show up on my screen.
Sorry.
Motion carries 6-0.
Yeah, it didn't show up.
So, I apologize for that delay.
We'll move on to agenda item 7D, which is hold a public
hearing, consider adoption, adopting
a resolution regarding the proposed site for construction,
expansion, and use of an electric
power transmission distribution substation located along
both the east and west side
of South Mayhill Road between Spencer Road to the north and
Parker's Page Road to the
south.
And prior to staff presentation, I will now open the public
hearing.
>> Thank you, Mr. Mayor, and I would like to ask Mr. Brett
Smith, I'm sorry, Mr. Brett
Heath, sorry, Brett, the DMA.
It's been a long day, Brett, to make this public hearing
presentation.
Thank you, Brett.
>> Mayor, Council, good evening.
We're here tonight to talk about the new Mayhill substation
and the transmission line that's
going to run south from Mayhill substation to our existing
Parker substation.
The executive summary is that DMA does have a problem.
We have great growth and agent infrastructure as the
problem that we're trying to resolve.
We have a responsibility to respond to that problem, both
as an electric provider here
in the city of Denton and also a regulatory responsibility
from the filings that we have
to do at the federal government.
We have a public involvement process to allow for citizen
input, and we do consider all
of the practical options and would desire to move forward
with the most sensible approach
that has the least impact and the most support.
DMA continues to perform analysis on our submitted FERC 715
studies.
In April this past year, we submitted the fifth one.
That's an annual requirement.
We'll be doing the sixth FERC 715 study, which is
mathematical modeling of our entire system
and how it integrates with the state of Texas electrical
grid.
And so that's a NERC compliance requirement.
We are looking at rebuilding the transmission line that
exists along an electrical route,
and rebuilding on the existing route is a feasible option.
We also looked at some alternative options, and the
original line is a Brazos electric
power cooperative line that was built at 69 kV.
This easement, which I'll show here in a moment, was
actually dedicated by easements in the
1947-48 timeframe, and when Brazos left the city of Denton
area, that was deeded over
the city of Denton back in 1987.
So rebuilding this transmission line to operate at 138 kV
will address the two key factors
that we have, which is system growth and agent
infrastructure.
The Mayhill substation project is a budgeted CIP project
for the DME.
It's shown as item number 12.
It's part of the -- located in the east-southeast side of
Denton right here for a new Mayhill
substation to kind of give you a general graphical idea of
where this is at.
Besides the substation, rebuilding the transmission line is
also an approved budgeted CIP project,
and it's identified as budget project number three in this
area.
We used an engineering consultant named Power Engineers to
look at a constraints map and
put this together of what type of obstructions exist
presently between the POCR substation
down here in the bottom section.
This is I-35 POCR substation along the existing
transmission easement that we own that a line
is not presently built on, and then the old Brazos line
goes right through the Pecan Creek
Mobile Home Park and goes across several properties here,
the Nems Greb property, Haggard, and
Jodoy.
It then goes around the backside of the Rosa Cafe and comes
back over to the Spencer Complex,
the campus here.
And so the orange areas that are shown here are the
residential areas.
This purple square down here is a small family cemetery.
We held a open house on September 30th, 2013.
We held this in the lobby of the Denton Regional Medical
Center Professional Building.
We sent out 610 notifications, and the public hearing did
what it was intended to do.
We had citizens that showed up, people that owned land out
here.
They got off to the side.
They talked among themselves to see what would impact them
the least, knowing that we needed
to build this substation and transmission line.
So that was good.
The group actually did ask why are we showing possibly
putting substations on the west side
of Mayhill Road and south side of Spencer?
We only needed to pick one of the sites, so only one was
needed.
And they said, "Why don't you move it over east of Mayhill?
Put it on the city of Denton-owned property, the landfill,
and why don't you give that
a try?"
So we thought, "That's a really good suggestion.
Let's investigate that option."
One of the other things that they also asked is instead of
moving the substations here
to the east side of the landfill, is at the same time, we
might also want to look further
south as we go through the Pecan Creek Mobile Home Park.
Instead of cutting diagonally through the mobile home park
or going down the drainage
channel to go up Mayhill, why don't we investigate coming
along the backside, along the golf
course and stay on the city of Denton property?
Once again, another great suggestion.
So this map right here, this red line, this clouded area
will show you the only areas
that we're really talking about tonight from Parker subst
ation along the existing easements
that we own, going along the backside of the trailer park
on city of Denton property landfill
coming up Mayhill to the substation on the city of Denton
property.
This is the only area that we're talking about during this
public hearing tonight.
After we had these items to look at, we went ahead and met
with Vance Kimmler, the director
of solid waste and landfill, and we asked him, "Is this
something that we could consider?"
He said, "Actually, here by Foster Road, this is really a
good place to build one because
it does not impact any of the city of Denton landfill cells
that are permitted."
So he said that would be something that could be considered
.
We also had heard as we were talking with him that the city
fire department was considering
a fire station possibly here.
They're investigating several sites and this was just one
of the sites.
So we wanted to see if we both went in this area, could
that fit and co-locate?
And the answer was yes.
In further south, instead of going diagonally through the
mobile home park or going down
the drainage ditch to go up Mayhill, to go up the existing
route, would this also work
back here?
And since this is a city of Denton property, Vance Kimmler
said yes, that would also work
as well.
And then go along the backside of the trailer park along
the golf course here, outside of
the trailer park fence.
So the public involvement steps that we've done today is
September 30th, 2013.
We did meet, as I mentioned, the professional building.
After we had these suggestions, looked at them, we met with
Mr. Donley on the property
since that was his suggestion to go around the backside of
the trailer park, told him
that was something that we could actually do.
He seemed very pleased about that.
We also met and conversed with several of the affected land
owners, the Nams Grubb family,
the Haggard's family, and Mr. Joe Doy with RTS and M.
And we then talked about the Mayhill Road Project, knowing
it was going through there,
would this also be a compatible use with that?
So we met with the City Engineering, Real Estate, and Legal
Departments at the City
of Denton.
And we also wanted to see if there's any other municipal
area needs with the Fire Department,
City Engineering, Solid Waste, and Legal and Real Estate.
We then discovered by going on this yellow route on the
backside of the trailer park
that there were about a dozen homes that were not
previously notified through the mail out
because it exceeded and they were outside of the 500 foot
courtesy boundary notice that
we sent out.
So we held a second open house May 28th, 2015, this year at
the Center of the Visual Arts.
At that second open house, we mailed out 405 notifications.
12 people attended and one comment card was turned in.
And it did support, that one comment card did support the
yellow route along the backside
of the mobile home park.
So the recommendation based on the citizen comments
received from both open houses, September
30th, 2013, May 28th, 2015, and the Public Utilities Board
December 14th public hearing,
which was a unanimous 7-0 vote.
Staff recommends moving forward with the yellow
transmission line route and utilizing the
city of Denton landfill property for the substation.
With that, I'd be happy to answer any questions now or
after we hear from the public.
Any questions for staff before public comment?
Seeing none, thank you.
Okay.
We've got some cards that we'll process through and then it
is a public hearing, so anybody
wishing to come down can speak.
Mr. Willie Hudspeth, please state your name and address and
your time will begin.
Mayor, Councilman, my name is Willie Hudspeth, I live at 6
23 Newton.
Point of order, if I decide not to speak and then someone
comes up and says something,
can I come back and speak after that?
If I hadn't spoken before.
Madam City Attorney, I think there's some discretion with
the Chair as far as allowing
it.
I don't have an issue with that.
No, sir.
I just wondered because after my new friend spoke, I had
something to say.
But I just want to know.
Yes, sir.
What is the general's name?
What is your name?
Ray.
Now, he did it the way I think you should do it.
He put forth the effort to ask the citizens what they
thought, researched what they thought,
realized he made a mistake, came back and said, well, we're
going to resend it again
because I sent out the notification again and that's the
way it should be done.
Used city property.
I'm not saying used city property all the time.
What he did in his group is what I keep advocating to you
or saying to you, you do that sometime.
I must say the City Council of all the other municipalities
that I speak for, school district,
county commissioner's court, you're very good at
interacting and asking questions of
me and I really do respect that.
You're not supposed to be there just to do what I say or
anyone else.
There should be some give and take, some discussion about
things that we're talking about.
I think that's the way it's supposed to be.
I shouldn't just be here and hate people like I do Mr.
Johnson.
That is not what I'm sorry.
I'm just kidding.
So this I'm just saying now mark this down because I'm not
going to do this often.
This is the way it was.
This was done the way it should be done.
The way that this young man did this time.
That's all I was.
Thank you.
And the young man at that.
Questions?
Yes.
I have a question.
I'm sorry, Mr. Eskimos.
We had a couple of questions.
It's this interaction that you're desirous of.
Mayor Pro Tem.
Do you know how much I appreciate it when you balance those
criticisms with praise?
I appreciate it.
And I think maybe we ought to do all of these sessions
after eight o'clock.
Late night.
You're great.
Late night willies wonderful man.
Actually, I visited with you in the middle of the day and
you and your pleasant.
Yeah.
Councilmember Johnson.
Did you know that I'm really glad that nighttime Willie is
here again passing out comments.
See you used to hand out comments like they were manhole
covers.
Compliments.
Not comments.
Comments are plentiful.
But the compliments.
I just really want to thank you for doing that.
And people are going to start to think you really hate me
if you keep saying that.
Oh, I.
So we're going to do a public hug after this since these
two would not.
I know.
But when you wave to me today, I didn't know how many
fingers you were holding up.
I heard the comment, but I couldn't see.
OK.
All right.
Thank you.
The next speaker will be Joe Doyle.
Please come down.
State your name and address and your time will begin.
So you're wishing not to speak.
OK.
All right.
Do you want your card read into the record as far as your
position on this or are you
just pulling your card altogether?
OK.
Joe Doyle, address 5956 Sherry, number 1000 Dallas is in
opposition.
And the next speaker on the card will be Bill Vaughn.
If you come down, state your name and address.
Your time will begin.
My name is Bill Vaughn.
I live at 401 Marshall Road in South Lake, Texas.
And I'm actually speaking on behalf of the Spencer family.
And Joe Doyle is a member of that family.
That's affected by the Mayhill station.
The Spencer family, as it was referenced earlier, dates
back to the 1930s in the Denton area.
So it's safe to say they were settlers of this community.
There's a funny ad on television right now where there's a
guy plowing his front yard
and his son walks up and says, you know, he's unhappy with
the cable service they have or
something.
He says, Dad, you know, what's up with this?
Why do we do this kind of stuff?
And he says, son, because we're settlers.
We settle for stuff.
And anyway, he laughed.
He thought it was funny.
The Spencer family settled for the dump going in across the
street from their family farm.
And you can imagine over the generations how difficult that
has been to literally live
across the street from the city dump.
And we have had numerous meetings with the -- with the
municipal -- Denton municipal
electric.
And we believe that a lot of our comments have really
fallen on deaf ears.
And I don't know the best way -- I don't know what
procedure is, but I have a few exhibits
I'd like to give.
And I --
Well, you can either put them there and the overhead camera
will project them onto the
television screen or if you have copies for the city
council members, you can hand them
to the city secretary.
Does that --
Yeah, the overhead will kick in here soon.
Yes, sir.
Okay.
If you'll notice the lower -- the southernmost of these is
the proposed station.
And those topographic lines on there are not all that leg
ible.
But within this map, that particular location that they
have proposed right here is the
highest elevation on this entire map.
So essentially what you will have is the Mayhill station
sitting up there.
And then beyond that it's going to go very, very, very high
.
The other problem that we believe this plan is a little bit
half-baked is that they're
planning on coming up here, so they've got heavy power
lines coming in here.
Then they're going to turn around and reverse their course
and come back here, cut across
the Spencer property.
Now there is an existing right-of-way there, but it's for a
much lower voltage power line.
This is a massive power line that's going in there.
We've been advised by legal counsel that that would
constitute a different type of right-of-way
taking in order to cut back across this property.
So we tend to believe that that is in fact accurate because
it's much, much different
than the power lines that are there on that property.
And the bigger, heavier lines require a wider path as well.
But it's our understanding and all the conversations that
we've heard where city council has reported
on this and based upon some of the things they've done in
other parts of the city that
aesthetics truly are important in the way that this project
goes in.
Our proposal would be slightly different, which would be to
move this Mayhill station
about 1,000 feet north.
This is the proposed station.
It would be to move it up here 1,000 feet north.
It's still on the dump side of the property.
It keeps these heavy power lines off of what is going to be
one of the more developable
pieces of property in Denton.
And I can speak with some authority on that.
I'm the immediate past president of the North Texas Land
Council, past three-term president,
which is the top 50 land brokers and developers in the
Metroplex.
And if, in fact, this were allowed to go further up north
here, then the property on this side
of the road is also owned by the city.
Then it would cut across an existing Atmos gas line as well
as the back of the FEMA site
across an existing self-storage facility and then across
the Lowe's parking lot to reconnect
with that.
We've been in contact with the Lowe's people.
We've also been in contact with the owners of the FEMA
facility.
And they seem to be in agreement with that.
So we feel like that's a much, much, much better path for
this to take.
And we don't feel as if it's been fully explored.
We've had numerous meetings with DME, but not very
productive.
We have a couple questions.
Okay.
Mayor Pro Tem.
He answered my question in his last comment.
Okay.
Councilmember Briggs.
Well, yeah, I was just curious if you had presented this
exact plan or talked about
this thing that we are seeing right now with DME.
Over the course of numerous meetings, yes, we have.
Okay.
Did they have a reason for you?
Why not?
Or?
Well, their belief is that the existing right-of-way across
the Spencer property gives them permission
to go across that property without acquiring additional
right-of-way.
Our contention is that, and we've asked for copies of that
easement agreement and have
not been given that, but our contention is that that was
for a much smaller right-of-way.
Once again, not with the massive power lines overhead.
And this proposal right here, once again, I didn't show you
this picture, but, you
know, that's just power lines going in one direction.
What's going to happen, what we believe is probably going
to happen here is that the
power lines are going to come in here to the Mayhill
station, once again, double back,
reverse their course back down here, then cut up back
across that property.
So it's going to be, this area right in here is going to be
a real mess just in terms of
power lines going in every direction.
Okay.
I see what you're saying.
Whereas this could be eliminated if they were to come up to
here and there would just be
one row of power lines up here, once again, going down a
gas easement, a city property
over here as well, and cutting back up into here to get to
their location rather than
coming up through what we hope someday will be a very nice
real estate development for
the city.
Any other questions for the speaker?
Seeing none, thank you.
Thank you.
Well, he got a question for staff.
You want to wait until the completion of the public comment
or do you ask it now?
Okay.
We're going to close the public hearing.
We have another card.
Marilyn Haggard, if you'll come state your name and address
and your time will begin.
Hello.
Marilyn Haggard.
I live at 5300 Whiting Way.
Our family land borders the Spencer land.
There's this right here and there's the Spencer land.
The existing line, again, is not the same voltage as what
is going or wattage, whatever,
not the same power line.
We would like to see this line removed.
If you're going to move a substation up here, go on up.
Go on up to the north and across.
Don't leave us trying to sell land where we've got a power
line coming right here and then
right here.
That's a pretty adverse effect on your land when you've got
two power lines going through
it.
We have been through the deal with the landfill and the
fact that that's been and pipeline
and all of that.
We want a break.
We want you to cut us some slack, please.
Move it on up here, move it down and across and take out
this weaker line.
You said it's outdated.
If it's outdated, get rid of it and get the lines that you
need and take them on up and
across.
But don't leave us with major power lines in the front of
our property and right through
the middle of it.
Please don't do that.
Thank you.
I have a question.
Help me understand where your property is.
There's a little white label there towards the corner.
If you could ... This one?
Yeah.
Where's your property in relation to that?
Property is right here.
Okay.
All right.
See, it comes at the front of it and it comes right through
the middle of it too.
Okay.
All right.
I just don't think as property owners we should have to
have any effect that much of our land.
Okay.
Thank you.
I appreciate you paying for that.
We do have the land on the market and it affects what
people are willing to do to pay and what
they're willing to build when they're dealing with major
power lines of this nature.
Okay.
Any questions or any further comments from you, ma'am?
I just want you to think about it, if it were your land.
Okay.
All right.
Thank you.
Those are all the cards that I have, but this is a public
hearing.
Anybody wishing to speak, come on down and state your name
and address and your time
will begin.
Hi.
My name is Donna Sincere.
I live at 3500 Oceanview Drive.
We did receive something in the mail that we were sent and
it is supposed to let us
know.
We're a little confused.
We came tonight to really find out where this line was
going through.
Our home is the black dot that I kind of filled in and then
they have these red lines that
go around and kind of show the path of the power lines in
the blue.
Then it talked about they had to notify everybody within
500 feet, which obviously I'm not quite
sure how big from one red line to the other red line.
Is that a thousand feet?
Obviously we're within the 500 feet and I tried to look up
what were all the bad effects
of having a power line other than it's unsightly going
through.
Some people worried about the electric voltage danger of
lightning strikes because you're
living within a close proximity to this.
Are there thoughts that yes, it could be cancer causing?
Other different things.
I was reading and nothing is really proven.
I'm just here I guess to state the opposition and wondering
what would ... I understand
this is necessary.
I'm understanding that, but I kind of came to learn where
am I really in relation to
this line?
How close is this line?
We kind of live opposite of where the Flowers Baking
Company is.
I can see it out the back and it's on Edwards Road.
So we talked to a number of our neighbors and some of them
were not aware of this.
We did not move in to this property.
It's a whole area of history maker homes in the villages of
Carmel until June of 2014.
So this meeting in '13, none of those people that lived
there were ever aware of that.
I think a number of the people said they never even got
this notice or maybe we all get so
much junk mail.
I'm sure all of you can attest to it.
I almost hate to go to the mailbox.
You've got to sort everything, shred everything.
Could have just overlooked it.
A number of them aren't here tonight, but certainly were
either unaware and even the
salesman for history maker homes said he hadn't even heard
there was this meeting or wasn't
even aware of all of this that was going on.
So we bought our home looking to have a place where we
thought we could retire, enjoy, and
I'm not really looking forward to any buzzing lines
overhead.
So my question is I would like to know how closely are
thinking this line is going to
come through to the backs of our properties.
Okay.
>> Okay.
Any questions?
And we'll try to get some clarification on that when staff
comes back up.
Yes, ma'am.
Oh, Council Member Briggs.
Is this what you received in the mail?
>> Yes.
>> This right here.
>> And I really had to look at it very, very closely to try
and figure out where my property
was and then I penciled it in.
I colored it in, the little dot there.
And it's like, well, if that is that blue line is supposed
to be the power line, how
close am I really going to be to it?
>> Was there another explanation sheet that goes with it?
>> Oh, on the back.
Okay.
>> Not much of an explanation, just that there was going to
be this meeting.
>> Okay.
Yeah.
Okay.
>> So I came to be informed.
>> Right.
>> So I'm an interested citizen.
>> Right.
>> All right.
>> Thank you.
>> Thank you.
>> Yes, thank you.
>> Thank you.
>> Any other questions?
Okay.
Thank you.
This is a public hearing.
Anybody wishing to speak, please come down and state your
name and address and your time
will begin.
Anybody wishing to speak?
I see requests to speak from council members.
Do you all want to wait until after the public hearing is
closed or you want to wait?
>> Yeah, for staff.
>> Okay.
For staff.
Okay.
All right.
One more time.
Anybody wishing to speak?
This is a public hearing.
Please come down and state your name and address and your
time will begin.
Okay.
We'll now close the public hearing.
Council Member Hawkins.
>> Yeah.
I had a question for staff, please.
You had shown the landfill site and there was cell permits
or something.
Can you speak on that?
Is this can possibly go there?
>> The cell permits is for the landfill cells.
When we were asked by the citizen group if we could
consider moving off of the private
property that Mr. Jodoy and Bill Vaughn referenced earlier
in this location, could we move the
substation from this private property that they own and
represent?
Would it be possible to move it over to the city of Denton
landfill property that the
city of Denton presently owns?
And it was a great suggestion.
And it definitely does allow DME not to build a new subst
ation on property that doesn't
have a substation.
The transmission line that Mr. Vaughn was discussing is not
actually part of the public
hearing tonight because we're not looking at doing anything
at this area, but we can
discuss that here in a moment.
Moving the substation to the landfill property, after
talking to Vance Kimmler, we wanted
to make sure from the permits that he has to request and
receive, can a landfill be
fully developed?
We didn't want to impact that and decrease the amount of
landfill space in the city of
Denton.
And he said this would not affect those permits, that they
were not planning to put a landfill
at that particular spot.
They are to the south, of course, that's where it presently
is, and they do have some
ability to move northward on property further back to the
northeast here.
Okay.
So just to be clear, the transmission line that is going
across the property, the diagonal
one?
This is not part of the public hearing tonight.
And what does that mean?
That we're not talking about should we rebuild in that
location or not.
There are still options that we're looking at.
We've been talking about this since the September 2013 open
house.
We have had numerous conversations and we've met numerous
times with affected people.
So I understand that.
If we did decide on the yellow route there, I mean, I'm
trying to figure out what are
we deciding on then tonight.
Does that make that transmission line that route decided on
tonight?
Right.
The previous person that spoke about the neighborhood here,
the villages of Carmel, the Razis electric
power transmission easement used to go diagonally through
this entire property many, many years
ago, a decade or so.
We had met with the developer, I believe his name was Mr.
Halligan, and he asked would
it be possible to relocate that transmission line because
he wanted to develop there.
Once again, we worked with the developer and we said as a
matter of fact, we have no plans
now or ever to rebuild that line and use it in that
capacity.
However, we do need to get to this POCR substation and
would he be willing to have us release
this easement so he could then develop his property, build
the homes that these good
people have bought, and then allow us to be granted some
easement also on the edge of
his property so we could then get over here.
So we worked with him and we worked with Flowers and we
came to a mutual understanding before
any of the subdivision was built and we do have an easement
to get back through here.
And it allows us to release these so the homes could be
built.
Okay.
Thanks, Brent.
Councilmember Johnson.
Thank you, Mayor.
Okay.
So Brent, if you can stay with that slide for a second.
Yes, sir.
Because Mr. Vaughn.
Vaughn?
No, I just want to make sure I have it right.
He made a suggestion about move the substation about 1,100
feet further to the north and
get up closer to Spencer and then come across.
So am I to understand the transmission line that's in
existence today, ultimately we will
have to rebuild the transmission line to update it, right?
So does the location of the Mayhill substation that you're
proposing today preclude us from
having a different route for that transmission line that's
going across that property on
a diagonal?
It does not.
I mean, as far as if the transmission line is going to be
rebuilt and reused in its existing
location, the substation site as we've presented it tonight
would allow us to do that.
Moving the substation potentially further north, as was
asked, we could still come back
down, but that would increase the distance to get back down
to an easement that the City
of Denton presently owns without affecting new and other
landowners.
But we have not decided the best route to go from the subst
ation site.
We have options by utilizing and picking and selecting this
site tonight during this public
hearing.
So next question then is the site that Mr. Vaughn had
mentioned, 1,100 feet or so to
the north that's still on the landfill side of the road,
landfill property.
Has that, I guess that's been brought up to us, to staff in
meetings, have we investigated
the concept of that?
Would that be a viable location?
From my recollection, the majority of it was about the
transmission line going north, not
about the substation being positioned there.
We have not run that by Vance-Kindler to see if that would
be one of the impacted cells
that you're talking about.
It very well may be because I've seen some drawings that
they're looking at expanding
northward there.
This one place, Vance, seemed like, "Wow, this is a really
pretty good place to have
it if you're going to have one."
And so that's why we presented this, recommended this.
Okay.
So to be clear then, if this site is chosen, the location
of the transmission line is still
yet to be determined if and when that transmission line is
going to get rebuilt?
From the substation, Mayhill substation, back north and to
the west to get to Spencer.
But it defines the area of the transmission line from the
substation south along the east
side of the old Mayhill Road and going around the backside
of the Pecan Creek Mobile Home
Park.
Correct.
So we would rectify that issue now as a part of this
project?
That is correct.
Would that all get built before the decision was made on
the future transmission line location?
It could be, but it wouldn't have to be.
One of the things that I would like to address to Ms. Hag
gard, she came up and was talking
about her property here in this area.
If the substation site is picked as it's shown, we could
come back down all the way to intersect
the line and go back up, but that would not be our
preference.
We could do that.
We would prefer not to.
At the very least, if we had to reutilize this line, we
would suggest working with Nelms,
Grubb and Haggard that we try to then square this off to re
intersect it so it would be
less of a distance.
This is 26 poles it would require to go up this direction.
One of the solutions possibly we've suggested is to go with
10 poles just straight across
here, which seems very viable.
We hadn't had a lot of success in trying to work through
that.
We're still investigating options, but that is one option
that we can cut the number of
steel transmission poles by a third, or actually by two
thirds.
I bring it up because I'm very sensitive to impact to
private property and private property
rights.
This is necessary.
We have to do it.
I just want to make sure that if this is the location that
's chosen that it would not preclude
us because obviously the most logical thing to me would be
go just north of the site and
come straight across on Spencer.
That's what we've been trying to get the landowner to work
with us on to cut the number of poles
down by two thirds from 26 poles down to 10.
Again, I hear that.
I'm not so worried about what we're going to spend as it is
on impact.
So if we could go straight across Spencer, now we're not
impacting three people's property.
That would be our preference as well.
But that is not part of the public hearing for the subst
ation site in the transmission
line south tonight.
That's for further discussion.
Thank you.
Council Member Briggs.
I have just one follow-up about the poles.
There was a question about easements.
So I'm curious, is there or has there been a bigger eas
ement needed or designated for
these larger poles when you upgrade the poles from the
regular smaller ones?
One of the things with the 69KV transmission system, we had
used typically a 60-foot wide
transmission easement on the 138KV.
We've been recommending moving forward with 75-foot wide
because it does require a little
additional easements.
And so if we do need to go back and reutilize the
transmission line in its existing location,
we would be more than willing to work with the landowner to
try to rectify any additional
width that's required.
Of course, that may not be desirable from their perspective
.
It's not desirable from our perspective, but we would do
that.
I have one more question.
The gentleman showed the topographical map and that this is
on an incline, a hill.
Is it possible to dig down into the earth to flatten that a
little to make the substation
lower or does it have to go on the hill?
The great elevation of where we're proposing to put this is
not that much elevated from
the existing Mayhill Road.
The landfill site and the cells of the landfill are much
taller than that.
Okay.
All right.
Thank you.
You're welcome.
My questions tonight are on the process that if this all
started in 2013 and this is 2016,
that we need to be more efficient in our timeline when we
begin a project and talk to citizens
and then bring it forward.
So my encouragement to staff would be to shrink that
timeline so that things are, citizens
get busy and things happen, they move in, they move out.
So that's number one.
Number two, it emphasizes what I brought up at the last
council meeting to council, that
our public notification system is lacking in terms and it's
something I know planning
which will spill into DME.
We've used the same notification systems for years and I
just honestly believe we can do
a better job in notifying the public on events that are
going to happen that will impact
their property and their property values.
So it emphasizes what we talked about at the last work
session.
So thank you.
Okay.
Thank you.
Thank you.
Mayor Pro Tem.
Thank you.
So on the map, one of the persons speaking said that their
understanding was that there
was going to be actually two transmission lines going on
Mayhill, one running up from
old Edwards Road toward the Mayhill substation and another
one running back down.
Is that accurate?
In the end, that could be accurate.
That's not what we would recommend doing, but that could be
done to utilize existing
easements that are presently in place.
We would much prefer to work with the landowner, have us
absorb the cost, relocate the line
into place, into a location that would be most appealing to
them.
So that might only be accurate if we were not able to, for
example, go down Spencer
Road?
That's correct.
Okay.
Thanks.
Councilmember Hawkins.
Thank you.
And Brent, so just to be clear, if we do decide on this
station, on this substation, the transmission
route, that will also be a public hearing process that we
could decide on.
Is that correct?
We would come back to you on a recommendation, how do we
move forward from this substation,
what would be the best option?
Okay.
But I think there's many more discussions to have before we
come back to you on that
because we do want to solicit citizen input and we do want
to try to speed up that process,
but we want to make sure we have an option to investigate
all options.
Okay.
Thank you.
Councilmember Wasney.
One of the citizens brought a map and showed an alternative
site that was north of the
site that DME has selected.
What was DME's objection to the property owner's second
location?
I'd mentioned previously, I don't recall the substation
site.
We very well may have talked about that.
We've had a lot of discussions.
I do remember the transmission line going up north through
there and over across the
Lowe's and the FEMA property.
I don't recall the substation.
And I have not talked with Vance Kimmler about is that,
would that affect the city landfill,
permitted landfill cells as far as where can they bury the
trash for the city of Denton
because I don't want to decrease that.
I have not had that conversation.
So I think based on your comment, I'm more comfortable
postponing this decision and this
vote tonight until we get specifically that answer because
that is an alternative site.
I've heard a lot of maybe what ifs, possibles with all the
transmission lines.
We do know that it's a marriage between the substations and
the transmission lines.
So I'm more comfortable waiting until we have a little bit
more information.
I know it's been going on since 2013, but it's certainly
new for Councilman Briggs and
myself and I'd be more comfortable with some more
information on this.
Appreciate that.
Councilmember Johnson.
I think you said earlier when I asked about it would seem
more logical to me if you're
going to be here just to come up and go straight across
Spencer.
I think I picked up on what you're trying to say in your
answer, but I want to maybe
get more specific.
Okay.
Because what I think we've heard from the property owners
is this diagonal transmission
line is a real problem.
We believe it is too.
And so if this is a substation location, going straight
across Spencer Road to the Spencer
station would be the direct shot.
It would seem to be.
And Mr. Vaughn when he was up talking about the site higher
up 1100 feet to the north,
come across, go behind FEMA, go through the self storage,
across Lowe's, etc., obviously
that doesn't touch their property anywhere.
So I get it, right, if I can get you to put it on somebody
else's property instead of
mine.
But my question for you is a very direct one.
Have we attempted to have any conversations about with the
Spencer family and their representatives
about coming straight down Spencer and eliminating the
entire diagonal line?
We have.
And is there openness to that?
Resistance to that?
What would your stance be, Brent?
As I mentioned earlier, that really wasn't something we're
ready to move forward with
tonight, but I did have a copy of something we have shown
them.
If you'd like for me to show that, I'd be happy to.
This is a copy of one of the options.
Go ahead.
Well, I'm asking the question specifically because Council
Member Wasney, I appreciate
where you're coming from, which is here's something that's
been brought up.
We need to wait more time.
But we've also said, hey, we're letting too much time pass
between us, so we can't say
to staff, in my opinion, you all need to pick up the pace.
And then we keep saying, let's wait a while.
So I think on this one, I'm just trying to get a very
specific answer to help me decide.
We have shown this coming down Spencer.
We have not had a lot of acceptance to this possibility.
Even though it does cut the number of poles down and then
removes the line diagonally
off of their property and their neighbor's property.
Okay.
Thank you.
I have one more.
Brent is correct that we've looked at multiple different
options for this project.
Thank you.
Brent Heath is correct that we've looked at multiple
options at the property owner's suggestion
of different ones.
We did look at a site to the north.
We believe that the sites to the north get into the
landfill's permitted area.
And so that wouldn't be an area we could develop in.
The reason this site was allowable for landfill because it
's not in a permitted area for the
landfill.
The sites to the north are.
So that would preclude it.
It's bought for landfill area and it would preclude them
from using it for the landfill
for their purpose that they got the land for in the first
place.
Gotcha.
Thank you.
I think you cleared it up for me.
Okay.
I just had a couple questions.
One of the speakers had a map showing her home on the sort
of in relation to the proposed
line.
Right.
And she asked how wide or how far would that be from the
line.
That was the 500 foot boundary from the center line of the
blue line of where the transmission
line would sit.
So it would be 500 foot.
From the edge of the property line or from the house, from
that property line, correct?
Right.
From the notification zone that was drawn in the red line
on either side of the blue
line is 500 foot either side of that center line.
So make sure I understand because it's really not that late
actually.
You think it was but it's only nine o'clock comparatively.
So from it say this transmission line goes in as proposed,
at least this particular one
on this subject of this public meeting.
When the pole gets built, from the pole to the closest
adjacent property line of the
home that was sort of drawn in, you're saying that's 500
feet.
As I saw it tonight, it's 37 and a half foot from the
center line of the transmission pole
to the edge of the easement.
From the edge of the easement to this home would be an
additional whatever it is under
500 foot, 450 something feet.
Okay.
That's good.
So I guess and I know that the diagonal is not a part of
this public hearing but I just
have a couple questions.
If you could put your proposal with the substation and the
proposed route, at least that's the
subject of this public hearing, if we could pull that up on
the screen.
It's back up.
Oh, okay.
We need to get, okay.
There we go.
So with the proposed site, which is up there at the top of
the photo, and then the line
coming down the green, the yellow going across, coming down
the, that's what's the subject
of this public hearing.
And what I'm understanding, the reason why this diagonal
has sort of come into play,
at least as part of the conversation, is because to move
from that substation to the, I guess
it's the Spencer Road substation?
Over the Spencer complex.
How do you get from that substation over, I guess, west?
And so part of what you said was the easiest way to do that
would be to go up, cut across
Spencer Road and up that way.
If that option were taken, I'm trying to understand this so
I can understand what's going on.
If that option were decided in the future to be the more
desirable option, would that
then be the impetus to remove that diagonal line?
In other words, if you put that thing going across Spencer,
is that in lieu of us needing
to go up through that diagonal easement?
That would be very sounding, yes.
Okay.
Well, then I'm going to tell you that I'm going to support
this plan.
I'm going to tell you why, because number one, this is what
's on the board tonight and
what's the proposal.
But also, if - let me make one more clarifying question.
Going across Spencer Road, is that on the Spencer family
land?
Would that be one of the options that we'd have to consider
?
That's what we have approached them with to date.
Okay.
Well, then I've got to tell you, I don't have any problem
with the substation where it is.
I understand the bifurcation of the easement.
The easement is already there with a line that is not what
you eventually will need.
But if we're going to remove that whole transmission eas
ement and abandon it, the reverse is true.
And that is the value of that property is going to
dramatically increase from both the
people who have spoken tonight.
So I don't have any problem with, you know what, this is
for a later conversation of
saying, okay, y'all want that gone?
Well, then we need some help as well.
So I'm okay with your plan as proposed, at least for what's
the subject of tonight's
public hearing.
Okay.
Council Member Wasney.
Yeah.
Phil Williams brought up a very important piece of
information, and that's that the
property proposed by one of the landowners a thousand feet
north is on permitted landfill
property.
And for people to understand what permitted landfill
property means, it's controlled by
statutes coming from the federal government, the state
government, and anything that falls
within that, because I know they're working on some new
permits right now.
It's expensive and complicated.
And so that automatically rolls out that site if it's going
to fall.
So that answers my question.
Excuse me.
That is --
Sir.
I'm sorry.
Sir, you're out of order.
I'm sorry.
I'm sorry.
Thank you.
But you're out of order.
Thank you.
So that's my understanding, Mr. Williams, that that is
permitted landfill property.
Correct.
So item two, I agree with the mayor that if we can in the
future remove that diagonal
and go down Spencer, I think that's the solution right
there.
So if we're only voting on tonight the actual land --
landfill, the substation, then I can
support this.
Do you have the transmission line south?
Yes.
I want to ask for a clarification item, because one of the
items that's been confusing at
times was the proper representation of the property on
Spencer Road.
And so I want to confirm tonight that Mr. Vaughn is the
representative for that property.
Yes.
May I speak again?
Not unless -- let us get through this, and then I'll ask
the council if they would allow
that and let me get through the rest of the questions.
Yes.
I just want to clarify that.
Mayor Pro Tem.
Thank you, Mayor.
So the question before us tonight is actually in the
resolution is two things.
One of them is the approval of the Mayhill substation as
indicated on the map and approval
of the yellow option, the yellow line that basically goes
around to the east and to the
north of what appears to be old Edwards Road.
Is that correct?
If we could get the picture back on the screen, that would
be great.
That is correct.
The yellow line is the option that extends from the
existing green line that would remain
in existing easements and the green line that would go up
to the Mayhill substation.
So yes, the yellow line is the option of versus diagonal or
the purple line.
And so that would be correct.
Right.
So the question is the yellow route and the Mayhill subst
ation, and we don't have any
question before us tonight about the line bisecting.
That's the old Brazos?
Yes.
Brazos what?
Brazos electric power cooperative easement.
Are there currently poles and lines on there?
There are.
Some of those are some wood pole, two pole, H frame
structures.
Some of them have been replaced because of the age they've
been replaced with a single
-- In my understanding, the approval of this tonight
would not necessarily affect that one way or the other.
That is correct.
But indeed it might impact and make it easier for us to
move ahead and abandon that in some
time future.
If we abandon something like that, it's an easement that we
own that somebody paid for
at one point or another.
Would we ask for payment back or do we just -- you know, I
think there's some statutes
about public property not being -- we cannot give it away.
How does that work?
Or is that legal counsel?
There might be some mutual working out as far as the actual
settlement of any land that
might be needed at Spencer or some of the location on their
property.
That could be a value for that, a value that you'd be
giving up and you'd net out the difference.
There'd be some of those discussions.
Maybe legal counsel could address that further.
I think there's -- it appears to me from listening to this,
there's a little bit of work to be
done with regard to where this future transmission line is
going and it appears that there is
some ownership issues with regard to the existing line.
So I think we've got some work to do.
Okay.
Any other questions for staff?
Sir, I'm sorry.
The public hearing is closed.
I'm going to have to -- the public hearing is closed, so I
apologize for that.
Any staff would -- Councilmember Gregory, Mayor Pro Tem
Gregory?
Well, I would move approval of the recommendation as
presented by staff.
Councilmember Johnson.
I will second that with a strong recommendation to staff
that we work very hard to eliminate
the diagonal existing transmission line so as to affect the
multiple property owners
in the least way possible.
And I would echo that sentiment by Councilmember Johnson.
Obviously some of our best alternative routes involve some
of the same property owners, so
I would encourage them to get together and continue to talk
about this issue and I think
we can come up with something that will be a win-win for
everybody.
Councilmember Hawkins?
Before I vote, I'm going to vote yes for this, but I too
want that diagonal line gone and
I want City Council to see that again.
It sounds like that's what's going to happen, so that's why
I'm voting for it.
Councilmember Briggs?
I just wanted to say that I'm glad that we are putting the
substation on our city property.
I think that was a great compromise.
And I echo the sentiments of the lines.
Yeah, I also want to point out that we did move the subst
ation off of some of the private
property at their suggestion.
So I certainly and I think it provides an opportunity.
If the City needs something that's going to be helpful and
it will be helpful to the private
property owners, I think there's impetus and there's some
ability there to collaborate
to find a situation that meets everybody's interests.
So we have a motion and a second.
Let's vote on the board, please.
Motion carries 6-0.
That brings us to agenda item 8, which is presentation from
members of the public.
We have 8A.
Mr. Hussbett, do you want us to take a break or do you want
to just plow through?
Y'all need a break?
No, no, okay.
Let's plow through.
Motion to 8A.
Mr. Hussbett, just state your name and address, please.
Mayor and council members, my name is Willie Hussbett.
I live at 623 Newton.
I'm here saying again that I would like for that rule that
you have of putting people
at the end of the agenda that speak quite a bit, I'd like
for that to be removed.
Until so, my protest, which is, like I protest so much
about everything, I can't keep up.
But I'm here until that changes, probably won't change, so
I'll just be here every night
until it won't change.
So I'll be here.
Secondly, not being buried at IAOF and I cannot be buried
there.
And I'm paying for it as an African American.
And it singles out everybody that you can't be buried there
if you're not white.
I'd like to know what is the definition of white?
Do you measure it to know how white you have to be?
What about my interracial grandchildren that, heck, I don't
even know what color they are.
Do you put something up to them and say, okay, you're not
white enough, you don't walk a
certain way?
That's insane.
Give them the property back.
The deed says, or the restriction says, if an African
American or non-white person is
buried there, then the deed goes back to the owner.
Give it back to them.
That's my suggestion.
I'm not paying for a legal attorney to go and be permitted
to bury there.
I'll tell you what, give me my money back over the years
that you've had me to pay for
that thing, and then we'll be, I'll call it quits, but
until then I will be talking about
it.
The emissions vote, I thought that should have became up in
this setting and not wherever
you did it.
If you meet in the daytime, let me tell you what you
eliminate.
People who work for a living.
And that, doing that at the lunchtime is not a good thing.
You shouldn't be having these kind of important discussions
at lunchtime.
I don't understand the emissions thing.
I just know that if you're not doing what you're supposed
to do, council members, then
you're poisoning my great grandchildren with these
decisions that you're making.
And if that's the case, shame on you.
Ethics.
I don't see how in the world you can put up a, I was going
to say porkies.
Is that the name of that thing?
That dates you, my friend, in the movies that you like.
Whatever it is.
And you're a real estate person.
Don't tell me your company is not going to make money off
of that deal.
And I'm just telling you, council members, we should have
let that one go.
You didn't.
Now, we and my team, which I told you now is at three, we
'll be looking into that for
years.
We're going to see if you're making money off of that.
And if you do, we're going to call you.
And first you got to prove it.
So if you don't ever find out, then that's okay.
Put some sidewalks out there for Geyer and Ryan.
What is the problem?
Well, again, if one other person gets hurt, I will be right
here saying, I told you and
I'll keep talking about that.
Shame on you again.
And the last one is, let's see, in something.
Oh yeah, sorry.
Okay.
Good.
All right.
The last one is, I hate seeing this and doing it because it
hurts my throat right here to
say you've done a good job tonight.
It makes me, I just can't, because I'm not used to that.
School board, I don't.
The county commissioners, I don't.
I haven't yet because they're just, they don't want to act
right.
But you guys, I tell you, I'm just really impressed.
And Hawkins, do you, you just got to hang in there, buddy.
I think you're going, I think you're doing it.
You're just hanging up, hanging there and the process will
work itself out.
But that's all you can do is just hang in there.
Thank you.
All right.
Any questions?
Mayor, can we get a group photo?
Group hug and group photo.
Nighttime Willie tonight.
Mayor Pro Tem.
It's like an alternate.
Okay.
We, we will now move on to concluding items.
Council member Hawkins, did you have a comment?
I saw your request to speak.
Okay.
Count concluding.
Yes.
Concluding items.
Mayor Pro Tem.
Well, council member Briggs, let's go.
I got bumped.
Yeah, you got bumped.
I don't know what happened.
Yeah.
So I have a few in regards to, to, to Woody.
Willie, I, Mayor Pro Tem called for a staff report on the
cemetery a while ago when I
was looking in our backup from the reading file and I didn
't see it on there listed.
And so I just kind of wanted to see where that was on there
and if that was coming.
I'm not sure.
We've talked about it and I'm just not sure what the status
is, but we're working on some
research on it.
Okay.
And next on the notifications, I'm wondering, because the,
the lady said something about
junk mail and so I'm wondering, is there a possibility for
us as we're going through
the notification process to put color, a color envelope,
like a something that signifies
this is from the city and it's really important when, when
people are going through their
mail and they see it just as an option maybe.
And then another thing brought up tonight by this gentleman
was that maybe to use public
art or to see what else we can do besides a stone fence
around the substation.
Maybe just put it out there and see what other cities have
done.
If there's any creative, more pleasing visual things to see
.
And and last, I'm going to take this time to ask my fellow
council members to keep in
consideration for a third party independent consultant for
the renewable plan.
Okay, thank you.
Mayor pro tem.
Thank you, Mayor.
A couple of months ago, I believe it was in early December,
so that would be one month
ago.
I've gotten a couple of emails from citizens who live in a
neighborhood.
Pass this on.
I haven't heard from it.
I, when we heard, had a public hearing earlier, it was
right next door to this neighborhood.
So I want to bring it up tonight to ask for some staff to
follow up on.
It's a neighborhood off of North Elm Street or Highway 77.
It's directly east of the UNT Discovery Park.
The street that runs along the east side of it, the
collector street is called Nicosia.
N-I-C-O-S-I-A.
There's over 100, there's over 350 homes in this
neighborhood at this time.
And there's only one way in and one way out.
And it's on Nicosia.
There, it appears that at some point, West Hercules Drive
will connect to Locust Street,
but it doesn't connect now.
And I guess my concern is about this is twofold.
Number one, we don't generally allow developments of that
size to be constructed where there's
only one way in and one way out.
But we have, and so I guess I need some reassurance that my
understanding is correct, that that
would happen today.
But I'd like to know what the solution is.
This is a, this could be a serious situation if Nicosia was
blocked off and emergency vehicles
could not get in there to that neighborhood for some reason
.
It looks like an easy solution, probably not an inexpensive
solution, to extend Hercules
to connect it up to give a second egress and access route.
So if y'all would look into that and give an informal staff
report back answering the
question, do we allow this today?
And what are the some viable options to get this fixed?
- Council Member Hawkins.
- Thank you, Mayor.
Next week it looks like we're gonna be talking about fiber
access in Denton, and I wanted
to invite Good Samaritan Lake Forest to definitely tune in.
Hopefully that ends up being on there, 'cause that's been
an issue out there for a long
time.
And two, I wanted to applaud Community Improvement Services
.
I brought up last December that those best in Denton b
anners had been put up and people
were possibly getting warnings or citations, and we kind of
fixed that right away, and
I'm just yay team, that was awesome.
So anyway, happy new year.
Yes.
- Just to comment, Mr. Mayor, and Joey, if I could, we've
talked today and may have a
need to move that fiber access discussion to the 26th, so
we'll give you a note.
- Okay, thank you.
- Council Member Wasney.
- See, two things.
I want to be the second person on this council to bring up
the independent energy analyst.
Council had talked about that after the public hearing that
we would address that.
Well, we've had the public hearing, and so I'd like council
to come back to that and
have a meaningful discussion.
Item two, staff had promised me, and I still don't have it,
for Mr. Heath from DME, and
it is a cost summary on the transmission line substation
project, and we're at 403 million
now, and I wanted to see the projected budget and the cost
to date so that we can take a
look at where we are with that project.
He said he had seen it, so I believe it's there.
I think it got lost over the holidays.
So if we could redirect back to that and get that to me,
that'd be great.
Thank you.
- Council Member Johnson.
- Thank you, Mayor.
Well, my apologies that I will not be here for the meeting
next Tuesday.
I'm not quite going on a trip to Alaska like our mayor did
a while back.
I can't afford those kind, but I am going to spend a week
at Willie's house just hanging
out roasting marshmallows.
I will be out of the country.
I'll be in Argentina, so I don't think there's the ability
to Skype in because I won't have
phone service or anything.
So I won't be here next week.
You kids have fun.
- Great.
I've got a few.
I've got about 10.
I didn't hear anybody fall on the ground.
The first one is I would like to have a work session.
We've talked about revising or rewriting the DENT
development code, and I had a citizen's
give me an idea, sort of a suggestion that we're trying to
figure out what works for
the code right now and what doesn't, and it's very
difficult to figure that out.
I would really like for us to have a work session on how do
we or can we give either
the planning director or someone or some form of a
committee or something some very wide
latitude to make some decisions on some of the codes that
seem to be pretty cut and dry
that might be a little antiquated or outdated because I
think in doing that, what will rise
to the surface are the problem pieces of the code that seem
to be the most prevalent.
So I'd just like to be able to talk about are there some
things we can do now prior
to rewriting the code that might provide some flexibility,
you know, with some checks and
balances that it may not have right now, and in that way we
might be able to also determine
what are some of the major problems with that.
Second, I had a conversation with Don Smith who's part of
the Ditton Airshow Committee
and based upon several circumstances they were a little
short with their budget.
They had some donations that didn't necessarily come
through so I wanted to sort of, when
I say short, about $6,000, $7,000 is what they're looking
at as a deficit based upon
some donations that didn't come through.
So I wanted to just sort of encourage the city manager to
see if there's some options.
I mean, we've got hot funds or, you know, I don't know if
there's some discretionary
funds in the airport, but for council to think about that I
'll probably be sending a few
of my contingency funds that way.
But that's a good event.
They bring in a lot of people.
It's well attended.
They bring in some class acts.
So just wanted to try to see if we can encourage to find a
way to help with that, being that
it's pretty small and we've certainly done some things on a
much larger scale to help
meet some of those needs of the some of the shows and the
events and festivals that have
really made dent in what it is today.
We talked about this in earlier work session.
I do want to reiterate a work session on City Hall West and
our vision for City Hall West
and what we think we can do for that, what are our goals
for funding it, and in concert
with that either in the same discussion or one close
thereafter revisiting our master
plan and what are we planning to do with municipal
facilities and things such as that.
I've had several, several citizens comment both recently
and in the past and probably
I would suspect some of you have gotten some emails as well
.
Wind River, you know, and we've heard that wanting traffic
calming, some type of traffic
calming devices that the speed limits on Wind River are
very often exceeded.
In fact, recently one somebody ran into somebody's, of
course they have those brick fences back
there and didn't make the corner, didn't make the stop.
So really want to explore that and I understand about war
rants and I understand about all those
kind of things but there's really a groundswell beginning
to surface of people really concerned
about their safety and their children's safety on that
stretch of Wind River from Lillian
Miller on out to the service road.
So if we could take a look at that, let's see, is that, oh,
this is going to maybe sound
like an odd request and this is more for DME but Mr. C.
Manager if you could pass it along.
You know, one of the things that we're all concerned about
are our utility rates.
How do they compare to others in the area?
We are a municipally owned utility so that provides some
type of regulatory attention
statewide.
So I would just be curious because we've heard that our
rates are higher because of the debt
for TMPA and I would just like to see if it's possible and
I know it would be proprietary
because it would be competitive matters but a mock budget
of if we didn't have that debt,
if that debt was gone, you know, how would that impact even
under the business as usual?
I know we're considering the debt plan.
We got rates on that that are proposed but I'm just saying
if that debt were gone, how
would our rates look or what would that do to the DME
budget?
Because I'm really just trying to get a handle on what is
really impacting this and this
was brought up in a meeting with a citizen yesterday who
said that he calculated his
per kilowatt hour rate at 12 cents or 10 cents but when you
look at something else that,
you know, you multiply that times, I think it's a thousand
to convert it into a megawatt
price, it was Ben who was in that meeting.
And of course that covers all of our costs of operations so
I'm just really trying to
see what is impacting our rates, whether it be TMPA debt or
the transmission, the transmission
that we talked about, the transmission debt because we saw
that we're netting $5 million
right now but we also have a lot of debt, all right, and
how does that translate into
cash flow?
So really just trying to see some different scenarios of
how different decisions that are
made impact those rates in a more specific way.
So we'd like to see if we can develop something like that.
And again, I want to say one more time that I really
applaud the Denton Police Department
and their work for the City of Denton in making sure that,
you know, we're safe and that if
something happens as tragically as it did this last weekend
that they are on it because
that really, I have to say a lot has happened since I've
been on council but that really
disturbed me and I really appreciate the dedication and the
commitment to try to make sure that
we do the right thing on that to ensure that all of us are
safe and that if something were
to happen where we're not that we can make sure that we try
to find out the source of
that.
So I really do appreciate that.
Mayor Pro Tem.
Just to let you know, I got a text after I made my comment
that concern about that neighborhood
is on the agenda for the Mobility Committee next week.
George, you work fast, man.
Way to go.
Okay, any other concluding items?
Council Member Briggs.
I don't really have a concluding item.
You just brought up Don Smith and I wanted to let you guys
know that he's volunteered
and I'm going to go on a flight with him this week to see
the City of Denton from above.
It'll be my first time on a small airplane so there's that.
Bring a big purse.
He's a good guy.
Any other questions?
Observations?
Okay, thank you.
We will stand adjourned.