Aug 11, 2015 City Council on 2015-08-11 3:00 PM

August 11, 2015 City Council

Full Transcript
31246 words Download SRT Download VTT
Good afternoon. I wanted to convene this Tuesday, August 11 , 2015 Denton City Council meeting. This is the second Tuesday work session. And we'll now, we do have a quorum. We'll move through our agenda items. Agenda item 1A is receive report, hold discussion, provide direction regarding current city of Denton facilities and how to proceed with planning for future needs. Thank you, Mayor. Now this item is only agenda because we've had several discussions, council and staff about some of our facility needs we met at one time over in City Hall West. Some of our particular issues have to do with planning and some of the staffing in that building. And we've gotten some direction from council to continue to look at options. So I'm going to ask Brian Langley to present the information that we have today that has been provided to you in your packets and hopefully open that discussion for more discussion. We also have in the closed session some additional information on specific site that we've talked about before if the council were to provide us with direction to move forward with some space for some of the needs that we have. So that discussion will take place in closed session. Now just as a matter of point also we are maybe being optimistic that this agenda will be relatively short for you today and so we've not planned dinner for you tonight but I assume we could get through before 6 o'clock if you 'll just say yes to everything that we've presented to you. Or no. No, get you there just as fast. That'll work too. So with that I'm going to ask if you don't have any questions ask Brian if he'd talk through his presentation. Okay thank you George, Mayor and Council, good afternoon. As George mentioned I did want to spend some time with you talking about City Hall facilities and George gave us a great segue into this slide. So just to recap for you back on June 30th we did have a tour of the City Hall West facility. I think the consensus of the council that time was pretty clear that facility in your eyes and in our eyes too was inadequate. It's inadequate for the current operations that we have there and it's inadequate for what we need in the future. So as a result of that council asked us to come back with some options and so today looking at those options we really wanted to give a bigger picture more holistic view of what's out there in terms of facilities and we wanted to tell you about some of our key facilities, describe some of the key issues that we have at each of those locations and finally provide you with a recommendation on how to proceed and we're going to give you both short term and long term recommendations on how to proceed. I think there are some things we can do short term to kind of get things going and then there's some long term things that we'll need to look at as well. But regardless of the direction that we take one of the things I did want to try to emphasize to the council is that all of these have costs. Short term recommendations, long term recommendations and regardless of whether we decide to build a new facility or not there will be substantial costs in the future for growth of the city and really the question in our mind is how best to manage that cost, how best to get the best return on our investment. Some of these things that we'll be talking about as George mentioned is potentially leasing space for the planning and development department. If we do want to have that group relocated to a different facility there's costs involved in that and we'll need to talk about that. There's also been some items for City Hall West that we call deferred maintenance items. These are things that we have held off on making substantial repairs to that facility because there's been a lot of discussion about City Hall West in terms of what's the future of that building, is it going to be sold or repurposed and we needed to get some direction on that before we really made some of these high capital investment expenditures. Most of that's roof ing, HVAC improvements, those are very high cost items. We may have to look at acquiring or building other facilities and those are as you know very expensive items. Long and short of this is because of all these items and the substantial costs is we're recommending a very careful and deliberate approach to look at these and come back with a recommendation that meets all of these objectives. Some of the items that I'll have in the presentation today is one of the things I thought would be helpful is to briefly describe some of the cost and footprint requirements of recent City Hall administration buildings that have been built around the state just to give you an idea of if we're looking at building a City Hall what are we really talking about in terms of cost, what are some of the principal areas that are housed in these buildings, what's the square footage that some other communities have built that are similar to us. I want to review some current issues with our city facilities as I mentioned to you and there's a number of those that we need to talk about. Then we're going to provide you with a staff version of a facility vision and then provide you with a key overview of some design and construction elements that we think are appropriate and again this is meant to be a discussion to see what the council's reaction is to that and if you have a different vision of what we're looking at. Now it all comes down to some kind of financial capacity and options too so we'll look at that with you and talk about what are our options of how we could build such a facility and how it might work and then finally give you the recommendation. So here are the facilities I wanted to mention to you. Some of you may be familiar with some of these but not all. The first one that we wanted to show you is Sugarland Texas is down in the Houston Texas area. They built a new City Hall in 2005 so about 10 years ago. The population of Sugarland is about 87 ,000 so close to Denton but smaller. $17.8 million was the cost of that facility, 82,000 square feet and about $218 a square foot 10 years ago. These are some of the departments that are listed here that are housed in this building. I think you're going to see some of these kind of common types of departments throughout the various facilities that I'll show you. Planning is there, economic development, development services, the city council chambers, the work session rooms for council discussions, those kinds of rooms are pretty common in all the City Hall s that you'll see. Brian, real quick question. Yes sir. As we go move forward on these different buildings, when we look at population, is that the population at the time it was built or is this the population that's current? This is the most current population that we have. Okay. Great Vine, just down to the south of us, population 48,520. This was built in 1996 so about 20 years ago almost. $12.5 million, only 37,000 square feet and a much higher cost per square foot, $337 per square foot. I don't know what issues were involved with that facility. There may have been some specific site plan issues that caused the cost to be higher than the sugar land facility that we looked at. But again, if you're looking at some of the operations that are housed there, economic development, city manager's office, planning, permitting, development services, engineering, kinds of similar things that we've been talking about with our structure. Louisville, I think everybody's familiar with this facility . Population's about 99,000 there. This was built in 2003. It's kind of hard to believe that was that long ago, but about 12 years ago that facility was built. They did build a 68, 000 square foot facility and one of the points I wanted to reference to you is that they have a basement part of that facility which is 16,000 square feet and they're in the process of renovating that or actually finishing that space out to add more space. So the 68,000 feet that they constructed back in 2003 are already running out of that space there. The cost per square foot there was $211 per square foot. Again, same kind of departments. You see some variations of these as you look through the facilities, but a lot of similarities as you go. Grand Prairie built a public safety building. This is off of Highway 161. Some of you may have seen this traveling around the Metroplex. They have a much larger population than we do, 182,000. This was built in 2010. The cost was $53 million for that facility. That works out to about $353 per square foot on 150,000 square feet. Again, I don't know all the site issues that may have been involved with that building, but just to kind of give you a reference point of these are very sizable investments, something that 's going to be around for some time in each of these communities. This, however, is just for police and fire administration, so a little bit different than the other city halls. Frisco population estimate is 145,000 and that's certainly different than what it was in 2006 when this was built. $29.7 million was the cost of that facility, 150,000 square feet. Something more in line, I think we've seen with the other facilities, about $198 per square foot, 300 employees there. They're also looking at having to, part of this facility is library , about half of it is library. Facilities are looking at building a library now so they can move those folks out and add more space for their city facilities that they need. South Lake is another city hall that was constructed in the area in 2001. Much smaller city, 27,000 in population. The cost was 18.5 million. Square footage, about 76,000. The cost per square foot is $ 243 per square foot. So just kind of giving you a flavor of, they're all kind of in that ballpark that you're looking at. I think everyone's familiar with the Denton County Administration Building. They're this was built just a few years ago, 2012. $16 million was the cost of that facility. 66,000 square feet, $241 per square foot. And then you can see some of the different services here. This is not so much an administration office building, it's more of a service type facility, but hopefully gives you an idea of what kind of costs that we're looking at for these. It's a very substantial investment, very costly. Any questions on that before I move? Yes, Kevin. What I don't see is cost per employee in that building. So example, Grapevine, beautiful building. There are only 62 employees working in that building. And you compare to Grand Prairie, 400 people. Frisco, 300 people. So for me it's about does the cost justify efficiency in city government? So that I think is a cost parameter that I certainly would like to see because I think it will help balance out the rest of the figures that were seen for each city. We can certainly look at that . I think for each of these buildings to they probably have other facilities in their city that for the Grapevine example, I don't know this to be true, but that could be their primary meeting space. So maybe the council chambers and some of the work session rooms and those kind of meeting spaces, they may be the predominant spaces there and it's not meant to be so much of a city office building is more of a meeting space. But we can look at that and try to get down to some of those metrics is that's a good point. Each of these are very different on if you look at on a per employee cost. Okay, I'm going to keep going. I wanted to try to give you some updates on some of the current issues with City Hall facilities and we're unique because we have three City Hall building. So it's not just City Hall West and one that we looked at in June but all of the ones that we have. I think it's important to look at those kind of together and try to understand that whole picture. So I want to start first with with City Hall. This building that we're in today. This was constructed in 1968. Its last major renovation was in 1999. It's a 35,000 square foot facility. It primarily houses as you know, the city manager's office, economic development, finance, legal utility administration. It's all also has the City Council chambers, this room, the City Council work session room. So it has a lot of different meeting rooms as well. The finance conference room, the meeting room downstairs, lots of different activity takes place during this this building during the week. Brian? Yes, sir. I'm sorry. On the other City Hall, as you said, how many employees are housed in those particular facilities? Do you know with those departments in here about how many employees that equate? I think we've got that somewhere. I don't know if we have it handy. We can present it later on. I don't know if we have it handy but we can certainly get it for you. Yeah, we can look at that and maybe come back to that presentation. So some of the challenges that we see with this building, and you're going to see some of these across all of our buildings, but this is a little bit unique for this one. It's the main location for public meetings. So our council chambers and other meeting rooms are, in our view, offer inadequate space for a lot of the meetings that we have. And it's frequent that we've had we've had some very hot topic issues over the past year or two with the City Council and so you've had some very large meetings but just on a routine basis the council chambers is at capacity or near at capacity. We have work session meetings where we don't have enough room for the staff and members of the public to be there. We've had to simulcast meetings from the council chambers into this room, into the room downstairs. One large public hearing that we had, we actually had to do that also to the Civic Center. I think that's the unusual case but there's been many times where we've had to take some additional steps just to get everybody here and have an appropriate professional meeting. There are space limitations in this building. It's currently at or near capacity for city offices so there's no room for additional growth really in any meaningful way of additional city staff. As we grow as a city we know that will happen going forward. We've got to have a place where those folks can office and they can work in a professional environment. There are parking limitations here in this building so anytime any of you've come to a large public meeting or event here it's very difficult to find public parking. There's only 116 spaces I believe for this facility so that 's difficult. There are flood plain restrictions for this building. Expanding this building, parts of the building are in the flood plain. This something we would always characterize as we're ADA compliant but we're not ADA friendly so if you think about this building as an example there's really not one key entrance here. There's lots of ways to get into the building. It's not clear what's the main entrance. There are handicap accessible entrances here in the front in this courtyard area but a lot of our folks come down this hallway on the side over here. They're looking to come up and if they are disabled persons they can't get up the stairs. They have to come back around and go back in. Likewise for the council chambers itself you're able to get in but it's not friendly, ADA friendly. The last point is something I think we've also spent some time talking to you about. There's a high cost to operate and renovate this building due to some of the architectural, the valid architectural concerns that folks have about this building and the significance of it. So that's something that anytime we're looking at a major renovation or doing something different how you handle that in the appropriate way is something that we have to manage through. And this building will be eligible to be designated as a historic structure in 2018. So just three years. Thank you. Is this building very efficient with its utilities or what's your opinion? Well we've made some we've made a lot of adjustments to try to to make it more efficient. The windows here that you see we had a project about three three years three to four years ago where we replaced all those that's made it better. There are areas around the doorways which are frankly not efficient. You can see some of the gaps there. The doorways are very beautiful. They're hand carved doorways. They look great but they're they're not the most energy efficient in some cases. We've tried to make improvements though where we could to keep the integrity of the structure intact. The hallways there's a lot of hall ways which look very nice add to the architecture of the building but may not be the best use of space for having to heat and cool the entire facility without really having that be usable space so much. Okay I'm gonna keep going. Okay City Hall West so this is the structure we went to in June with you. It was constructed in 1927. Almost a 90 year old facility. The last major renovation was done in 2001. 24,700 square feet primarily houses planning and development as you know and as a as a side note one of the things that we pointed out to you from the discussion the other day as you went wondered through the various hallways and corridors and staircases and so forth is about half of the building is not really usable for operations so the 24,000 square feet is a little bit misleading because a lot of that can't really be used for offices that's there. So challenges include the building is not designed for current operations and it does not properly align workspaces to enhance productivity. I think you've seen that firsthand where some folks are put in that building and how we're trying to have them operate. There's also space limitations there in the proposed budget for next year we're looking at adding several positions related to planning and development. There's a concern about where do those folks go? How are we going to make that work? So there's really no additional growth for currently what we have on the books for next year as not to mention what we would have in the next five, ten, fifteen years in that area. We also think customer service for the public is impaired due to the layout of this building and the absence of other key departments. So if you're here to get a building inspection or an CO and get your utilities turned on you have to go to that facility then you have to go over to City Hall East where you may not know where that is and tend to your customer service issues. If there's some problem that you didn't get addressed then you've got to go back over to building inspections and get that handled. That's again one of the ways that we think one facility would improve our customer service just by the access to those core services. When you say one facility what do you mean? If we we're going to get to this but one of the things we're going to recommend is a City Hall facility, a new City Hall facility to house key departments which would improve customer service. You're talking about the long-term solution not the short-term. That's correct. It's a long-term issue. You know having engineering in a separate part some parts of development review engineering as I understand are over in City Hall West but there are other parts that are over in another building the service center. Having those all in one area would probably aid in that discussion. Sorry. Yes ma'am. When you own a home your decision is do you stay where you are and renovate or do you sell it and move on to a different spot. Has it ever been explored to use this facility and pop it up which would add additional office space which seems to be one of the most important issues. ADA compliance we could modify what we have in terms of stairs and access and solve that problem. My question has that been talked about in terms and what was the discussion result? For this City Hall facility yes it has been looked at in fact when it was originally designed there was a thought that it could have a second floor on top of it. I believe that adds about 15,000 square feet if we did that so we don't feel like that's enough to really meet a long term solution for the city. There's also the issues involved still with parking how you make that work and how you make that a lot some of the square footage I understand would be staircases and those kinds of things for access for emergency access and so forth. We own the property across the street correct? Two acres yes. Couldn't that be additional parking? It could. I've got some recommendations related to that property a little bit later in the presentation that certainly could be yes. I think what we're trying to look at here and this is again all good discussion we're trying to look at what do we need over the next 20, 30 years what are the needs for the city and what's the best investment to do that and so that's all part of that discussion. So going back to City Hall West there are difficulties with the split levels again you're looking at that building how it's been put together and renovated over the different years. It is an operational issue to heat and cool that efficiently. There are parking limitations over in that building I know no one 's surprised to hear that there are some issues. Same thing ADA compliant not ADA friendly there's a way to get access to that building for persons with disabilities on the back area of that there's a button I believe that you have to check in on to get access we did have an incident where someone wasn't able to get access for a period of time just because someone had stepped away from their office and it's hard for those people to get in so again those are things that potentially could be solved with resources that we look at putting into the building but what's the return on that investment long term is kind of the question. Again high cost to operate and renovate due to the same architectural integrity concerns the facade of that building I know is very important to the community and we've looked at not wanting to change that so how do you amend that building or how do you increase that building's footprint if you can't change that and it is designated as a historic building. Okay City Hall East which is over off of Hickory Street and Industrial this building was originally constructed in 1946 it was a manufacturing facility originally it was expanded in 1964 it's the largest of the facilities that we have it's 153,000 square feet and it houses several different areas lots of different pieces of the organization police the jail public safety training facility or the training center which is recently added two years ago two or so two years ago or so municipal court our customer service operation where you go to pay your utility bills the people that manage the call center there human resources technology services our parks administration operations all there so a lot of different folks in that building so some of the challenges for this one are it separates our key functions from other city departments and again back to our concept of it impairs customer service if you've got different pieces of the organization in different parts of our complexes it's hard to know where you need to go for different things I can't tell you how many times people come to this facility looking to pay their water bill or their or their utility bill and we have to tell them to go to City Hall East where is City Hall East and how do you find that and where to go it happens on a daily basis at this building parking limitations is also an issue there we're next to the downtown transit center they have a lot of activity there we've got the public safety training center which has been constructed all of the city departments that are there as well as customers who come in to take care of their business at that facility at times if you've been over there at certain times of the day or a lot of times of the day it's hard to find a spot it's hard to find a place that's convenient the railroad and exposition parking lots need substantial redesign and construction whether or not we do anything with a city hall at some point in the future these lots need to be looked at the railroad lot has really just needs to be reconstructed it's got some slopes to it which are dangerous at certain times with certain weather needs to be looked at there is some expansion possible I think there's about 15 to 16 thousand square feet that's still available for that facility but it's really only meaningful for the police department and courts where it's positioned in the building and those facilities will need to grow over time same same issue it's ADA compliant but not necessarily ADA friendly so some of this some of the issues are the same across all these organis facilities that we have when did we when did the city purchase that building do you recall do you know mark when do we purchase city hall east 91 91 it was given to us it sounds like it was donated correct okay for business for me okay and the expansion for the police training facility refreshment was that 20,000 what how much was it I don't know this way yeah about 20 20,000 okay chief that was done two years ago is that right okay okay thank you okay another building and it's probably a little bit lesser known but it's still an important facility for you to know about is the service center this is over off of texas street next to the rail line it was originally constructed in 1978 it was last renovated in 2006 it's 69,000 square feet it houses engineering real estate operations water wastewater and purchasing group it also houses the park street water wastewater operations our communications group in the warehouse we store a lot of materials that are being used for different projects around the city it's also the location for our public utilities board meetings and we have those twice monthly there we had a large public hearing there just this past Monday yesterday I should say it seems like it was longer than that yesterday it separates some of the challenges that are there is it separates key functions from some of the other city departments that we've talked about again the recurring theme here is we think because of all these different operations in different buildings that it impairs customer service and most notably engineering is separated from planning and development with this structure we have an engineering group over in the service center and a planning and development group in another facility there's poor accessibility in our in our view for the public and there are parking limitations so again for this public hearing that I was referencing before parking is already limited there and you pull into a facility like that and there are backhoes and large pieces of equipment and and heavy industrial looking pieces of equipment you're not really sure where to park we're safe and it's it's difficult for the public to know where that is and to find a spot for that we did look at some space limitations here we're looking at capacity we wanted it's part of the budget process for next year site plan study was requested it was not recommended but to be funded but it was requested in the budget and the expansion of the location really doesn't seem compatible with the surrounding neighborhood a lot of the other buildings that we have are in the downtown area they're more in an office type or development this is in a neighborhood and the question would be is if we wanted to really meaningfully expand that building how would that work in a neighborhood finally the purchasing function is another key administrative function and it's all over there at that facility separated from all of the other functions that we have in the city couple questions on this and so I may be I may mistaken as far as what I'm recalling but if I recall correctly on the bond program wasn't there a request or somewhere that we're going to build a new space for is it signal lights or transportation the transportation facility is that at this site it's close to it it's it's a separate facility trying to remember the direction I think it's east east of me okay is this the one where we're also saying the five million dollar reconfiguration of Rue Dell Street yep so different but that would not change this facility it just realigns to make that a lot better on my point being is that if we're saying that this you're right what we're doing is we're sort of adding city facilities next to this we're sort of augmenting it but if we're saying that this facility is something that we need to do something different with and that's part of the proposal long term is how do we combine and all this I mean we're slated to spend six or seven million dollars over there so I mean how does that you don't have to answer it now but I just raised that question of how does that work in to these longer term plans and I think that's going to be the challenge is this has come along sort of after this the major budget process that we that y'all have gone through for this year and we 're going to talk about cost later on but with these new things coming in I mean if I would have known that or the public would have known maybe that in five or seven years they're going to be asked to look at another major city facility that will do a lot of combining which is more efficient including some of this but then we're spending that kind of money in that same facility I just raise that yeah I think it's a good point the what we're planning to do for the transportation facility is make that a separate facility to house all those operations and then eventually connect that through fiber optics to all of the signals around the city so they can control the traffic patterns better so I don't think that change we 're not what we're talking about we're not change that use this facility though I think with a plan that we'll show you in a moment for the long term plan of what we'd want to do for building a new city hall it could take some of the operations out of the service center facility and allow other operations to grow into that over time so you don't have to change it. Good answer. I hope that makes sense. Thank you. Okay so let me just kind of summarize all the issues for the various facilities the four facilities that I talked about they are aging structures no doubt about it's 281,000 square feet in those four structures that I mentioned to you here's the approximate age of the buildings city halls 50 years old city hall East 70 years old city hall West 90 years old and the service center is 40 years old so long term we're going to have to look at how we're going to deal with those facilities they are these buildings require substantial ongoing maintenance expenses they're expensive and difficult to renovate depending on the facility that you're talking about as I mentioned to you throughout this presentation you know our view is that customer service for citizens is impaired by the lack of one key facility the limited and or inefficient office space that we have in some of these and the decentralized service model what I mean by that is lots of different pieces and lots of different areas of the city not in one key area that are related. And I remember looking at the presentation back of I don't recall do you have slides that address so let's say hypothetically we get some kind of direction to do something different because what we still do with I mean this is a big building it's obviously put a lot of money into it's still very functional in the sense of you know still house people it'll still so do we have or is that for a different discussion? I think I have some information a little bit later I mean basically the point is going to be that some of these existing facilities that we have we look at how we want to repurpose them maybe some of them do we want to sell maybe City Hall West is one of those candidates do we want to sell do we want to lease that facility but retain the integrity of the building those are the conversations that we can certainly have I think this building is certainly one I think that would we want to continue to try to operate in some way the question is how much do we want to operate here? It used to be a lot different. So the demands for the public meeting space do strain these facilities and we've seen this over the years with various different meetings the council chambers itself this room the council work session room our municipal courts also have issues from time to time where they can't get enough of the seats in there for all the folks that they need for court and other meeting spaces in this building every week there's lots of different meetings in the different meeting rooms that we have and sometimes it's difficult to find enough space. Parking at all facilities is limited and the current facilities really don't have an adequate room to expand as the city goes. I was gonna wait till the end. I didn't see anything that addressed the Civic Center or there wasn't anything in here as part of that and what that so is there a particular reason for that or? Well you mean of doing something different with the Civic Center? Well I mean that is a city facility that's a certain age that has been a certain function has a certain amount of parking spaces has a footprint and I mean if we're looking at all primarily major city facilities I was just curious why that one sort of has been taken out of the mix. Well I was really looking at primarily the office type structures but we can there's about 35 or so maybe more than 35 different structures that we own throughout the city and we can come back with something more comprehensive but we're trying to focus on just the office related and the service related. I see that more as a community amenity type building but we can look at it however the city wants. Okay last point on this slide so due to the all the concerns that I've talked about I mean the point I'm trying to get to here is rather than looking at just one facility we think we need to come back and look at this holistically again I think there's some short term things that we can do and then some long term things but all of these things need to be looked at with one lens of how we want to manage it hol istically. So I want to transition now if there's no additional questions on that into what staff has as a vision for a facility and then try to give you some ideas of some key design and construction elements. So as I mentioned earlier to you we are proposing that we look at building a new City Hall facility. Number one on this list this was in our mind it would enhance customer service to the public and promote a positive image for the community. If we do this in downtown which is what we would propose this is also equally important that this would be a catalyst for more pedestrian oriented high quality and professional employment focused development in the downtown area. So this is not just about city offices it's not just about having something that looks really nice it's about trying to serve as a catalyst and really kick start some additional development. We've already got a lot of great development going on in the downtown but it's trying to get it even more so. We also want to look at developing additional parking options for the downtown area so one of those options could be in concert with this building constructing a parking garage and as we've talked about at the staff level what we've looked at is this parking garage could be used by for city business during the day but on weekends and after hours this could be a free parking garage to the downtown area which I think accomplishes another goal that we've had for all of our discussions about parking in downtown. Where you put this to maximize that is really important maybe it's not a parking garage maybe it's additional surface lots we could talk about how to do that but just as a concept we think we try to try to have this facility do lots of things for us meet all of our facility needs but also meet some of the parking needs and the development needs in the downtown area. We also want to connect the existing Denton campus the city of Denton campus and we consider this the Civic Center this building the library facility over here Quaker Town Park we consider that our part of our campus connect that to the rest of downtown so that means connecting I'm sorry sir. Oh no I'm sorry yes she just had a question I didn't mean to interrupt you go ahead. I was just on that note isn't that already connecting this side to downtown isn't that already in the plan? That's something that we want to do yes of trying to look at how we do that it could be a simple crosswalk it could be looking at even something bigger than that closing McKinney Street in certain areas they're trying to make this a very pedestrian oriented area there's things that we could do that could be very dramatic to affect how this area I think the concern I've heard is this area feels cut off from the rest of downtown how do you make it more inclusive so that's there's lots of things we could look at some are more expensive than others. I think leadership didn't have a slide on that. To connect to some of the parking and so forth here correct . So that really was one of the points I wanted to make and improve the entryway into Quaker Town Park so this building right over here next to us it's owned by the county if we acquired that building and demolish that building because frankly we don't think that's something that would really be able to be used for offices but if you were able to demolish that building and improve the Quaker Town Park entryway over here and connect to a city hall facility if it was across the street that could be great for the park be great for the facilities over here and improve this whole area. And one of the other concepts of the staff level that we've we've talked about is looking at some type of in conjunction with this facility the parking garage all the improvements that we would make is some type of outdoor public gathering and or performance area and so I don't know exactly what this might look like I mean there's a lot of steps to kind of go through a visioning process with the council and the community about this but it could be some type of plaza area out in front of the city hall some water features it could be something that's kind of a park area during the day but in the evenings there could be performances there lots of different ways to kind of manage that but making that part of the downtown experience part of the city hall experience part of the parking options trying to combine all those elements together to get something that's really impactful and meaningful for the downtown area that's kind of the vision for all these things coming together and I think that's consistent with some of the things that we've talked to the council about over the last few years in our strategic planning retreats and so forth trying to take all those things and meld them together. Good question so when I when I read this list about city hall vision and you say a new building a new city hall facility okay I get that here's a building then it talks about a parking garage pedestrian friendly but then when you get down into connecting existing city of Denton campuses to downtown when you get into purchasing the building next door knocking it down it's it seems like is this predicated upon a specific general geographic location of where this new new city hall would be because if it's somewhere else over in this vicinity then some of these things necessarily won't be met by that so are we talking this general vicinity that our thought is is to try to leverage the space that we already own across the street but it could be anywhere and if it was if it was in a different location sure some of these elements might change but our division is is that it would be connected okay so this general area right certainly if council and the community decided we don't want it over here we wanted another part of down we don't even want it in downtown at all you know there's there's that's a different different animal okay all right thank you good question okay so moving ahead so after a preliminary review of looking at our operations and I do want to stress this is preliminary this is us trying to put together something that we think kind of has a basic framework to it going forward here are the things that we would propose to include in a new city hall planning and development engineering again we've talked about the connection there what we want to try to do with that the city manager's office the mayor and council offices currently there's only one office for the council one office for the mayor looking at how we might augment that to make that better maybe a conference room some additional spaces for the bigger office for the mayor yes definitely a bigger office for the mayor I'll make sure we get that customer service is also it's a key department that we have they are running out of they 're out of space in that facility as we grow in the city how we how are we going to make that work the finance department city council chambers we're looking at upsizing the city council chambers you know somewhere in the range of having 250 or so type seats for the council chambers maybe more we need to look at that a little bit the work session room itself also will need to be larger to accommodate larger public meetings and we've got to think about not in Denton as a large city now it's 125,000 but what do we need when we're a city of 200,000 in just a few years what's that need to look like and and try to think about that long term is that you see the age of the facilities that we have when we build something we're going to have it for a long long long time and so it's got to serve that need for a long time human resources economic development parks administration community improvement services transportation illegal those are all kinds of the things initial blush of kind of looking at all of our services things that we would want to do based on our calculations roughly 125 to 150,000 square feet would be necessary for to be reassigned to that building we'd also need to think about going forward again when we're a city of 200,000 or 250,000 years in the future how are we going to accommodate that growth do you want to have unfinished floors that are constructed so that you can grow into that do we want to add space next to the city hall so that you can construct a new building 10 20 years in the future how we want to plan for that growth so that all of this is kind of master planned out with our our facilities going forward so those are the kinds of things that that we've been talking about so so in in this when we so when we talk about these facilities that we're we're discussing that are we're sort of outgrowing and and are aging which is this one city hall east and city hall west they are not considered any in any way to be part of that potential expansion you're saying any expansion that the sort of the the vision is the the the idea is any expansion would occur within that one particular facility it could be i think what we're looking at for those particular departments to keep them contiguous in that building that we'd want to have that expansion there doesn 't mean that other facilities couldn't have expansions for other departments i think we will need that for the other operations but at some point we don't want to look at five or ten or fifteen years after we built this facility and realize hey well guess what we're going to have to move half of planning out to another building because that's what we're trying to avoid so trying to think about those core operations and keeping them contiguous and together could be at some point you can't do that and you'd have to move some of that but from a planning perspective in the foreseeable future we want to look at it that way does that answer your question mayor absolutely okay so some of the key design and construction elements cost stuff is very expensive assuming 125 000 square feet at 280 dollars a square foot a new facility is about 35 million dollars these are big ticket items again why we want to have a very deliberate and careful approach to how we look at them because these are significant investments 150 000 square feet 42 million 200 000 56 very large numbers land acquisition for five acres roughly two and a half million dollars for downtown area that's a rough guess but probably pretty close based on what we we recently purchased some land for we do as i mentioned to you we already own two acres of land across the street so we could leverage that already if if that was the location that the council and the community wanted if it's something different that's a whole different look that we would have just to do some pre-design work on this and what do we mean by pre-design kind of looking at some site plan options renderings of the building how many parking spaces that you need those kinds of things it's probably about a hundred thousand dollars depending on the level of detail that you need the actual design fees for a structure like this probably seven to ten percent of the costs are going to be designed so you multiply that out on the 35 million dollar facility you're looking at two and a half million to three and a half million dollars just for the design something you have to do to build it obviously but they're very expensive cost okay you haven't stopped me yet so i'm gonna keep going and once falling out of her chair yeah so that's good maybe it's a little bit kind of going back to the mayor's question if you could go back one or two slides where you list the departments this one okay so that uh that encompasses everyone who's in this building correct plus plus everyone in city hall west yes and some in city hall east and some in the service center and some in the service center so as we're talking about a new building it does your recommendation also say that we're keeping city hall east but vacating these two i mean does your recommendation get that specific on what not what do these buildings become but at least these are vacated completely i think that's a great question at this point we're looking at vacating city hall west and repurposing that building either through the sale of the building leasing the building or doing something totally different with it city hall east on the other hand would still have municipal court the jail the police facility the training facility so we look at repurposing that into more of a justice center long term so the growth of those operations long term would then be housed there there are some departments like technology services perhaps they could go ahead and stay in city hall east and they are frankly going to need some expansion space there too so some of that you're probably going to have some room for expansion in those facilities but trying to repurpose them around a central theme that makes sense so we think city hall east is a justice center makes a lot of sense we've already invested a lot of money in for those operations and we could use it city hall west is a little bit different what about this building this building is a good question i think you could have some administration offices here you could have we own some other buildings in the city and you could look at trying to push some of those operations here you could try to push some functions here the greater denton arts council building that we own over here off of bell avenue would that be would this be a better location for some of those operations could that be transit oriented development those are questions that we can begin start thinking about with the community of what would be the future use of this building and what's the best way to do it we haven't figured all that out obviously these are just really more concept at this point and i think what i'm looking for today is to get some consensus that we're heading in the right direction and i have a few specific recommendations for you to go go through with but if we're heading in that right direction then we can start working through all those details there's a lot of detail work to do to talk about where we want to be i hope that answers your question that's me i think council member briggs you have a question oh i was just doesn't the city have another a newer building over on across from the old animal shelter over in the area the facilities management building we do have that it's currently has a few offices that are vacant there but we typically use that when we're renovating other structures we move we temporarily relocate folks over there to use those offices until they need to go back to the current location building it wasn't a new building but it was an old building that we bought and refurbished and that one's fine that one's great yeah that one's that building is working well we have our facility crews that run out of that building okay sorry i think this conversation was triggered from our meeting at the planning department when we realized sitting in that basement that planning did not have enough space over there to work efficiently i that was just so apparent with that meeting so when i left that meeting it was uh planning needs help right now and what can we do to find help for planning right now just personally i mean i'd love to build everything new and nice and big and grand we're almost a billion dollar budget right now we've just struggled through a budget meeting wondering how we're going to find enough money to work on our streets so to jump off the cliff and say wow let's go let's go build big and new i think it's something we want to think about but gosh i sure don't want to go spend one or two million dollars on consultants or design fees or i sure want to get our citizens of denton involved as well because this is their money this isn't our money this is our citizen money and while we talk about oh let's do this downtown maybe they don't want us downtown so that's just my initial blush um i want to be very cognizant of what planning needs right now because everything comes through planning for this city do i recognize that we have some issues and shortfalls in some of our buildings i do when i get that my question is how are we going to pay for it i think that's a good segue into my next slide financial options and recommendations and i think i'll address many of your points in the next few slides um councilmember wisening so what are the options these are obviously very expensive and how do we want to look at paying for these um there are bond program options that we have uh so but with the current tax rate that we have in the bond program that was approved by the voters in 2014 we don't have the we don't have the capacity to issue any additional debt to build a new city hall facility the next expected bond program is in 2020 and that's assuming no tax rate increase however we could advance that by one to two years if the full three cent tax increase that was recommended by the bond committee uh was was levied so right now we've been talking to you in the budget that we would have an increase this year an increase next year related to the bond program the total increase would be 1.4 cents that's assuming that we're going to sell the debt over a six-year period if you decided that we wanted to advance that because we want to get to this date quicker and we want to sell it over a four-year period we could do that but you're going to have to have a higher tax rate increase than one more closely to the three cents that we've been talking about with the public and the bond committee it's one option additional bonds could be sold if if you have a tax rate increase for something like this so for every penny of an increase 11 to 13 million dollars in bonds could be sold over a 20-year period alternatively you could delay the sale of the 2012 and the 2004 bond packages and say instead of those being sold over a six-year period we 're going to sell them over a 10-year period those are options again just trying to paint some pictures maybe not pretty pictures but pictures and i'm getting there stay with me i'm getting to the to the recommendation so some other options so it's not just bonds there are other ways that we can finance some of this stuff we could utilize the downtown tax increment reinvest ment zone for some or all the costs so we've talked about the parking garage that's a great example of we could debt fund that out of the turrs we could use that to help augment this facility to look at how we could finance that so in addition to the normal bond program that we have we could sell repurpose or lease existing buildings to help offset some of the construction costs and again the devil's in the details there about what we're willing to do and what's acceptable to us as a community but that's one of those options we could look at depending on how we used how we built a performance space potentially we could use hot funds for that if it was built in concert with a new city hall no pun no pun intended a performance center built in concert with the city hall but we could we could do that i still have it right but that's a possibility we could use parkland dedication trust funds to improve the quaker town park area with this building next door if that's the area that we decided to do and another final option is we could consider exploring some regional transportation resources to improve mckinney street don't know what that might look like but working with the regional transportation council are there ways that we can make this more pedestrian oriented are there ways that we can improve mobility in this area are there some regional funds that could help us with that all these things together we're looking at options for how to make it work brian on that top one i've never heard turrs bonds before is that just backed by the balance that's in that turrs so it won't be backed by the residents they would be they would be general obligation bonds and they would be backed by the turrs revenues coming in so there's about 270 000 or so on an annual i'm looking around make sure it's about 270 or so annually that's going in to that uh fund on an annual basis and so that would be the debt service that would service the debt but if it's a general obligation bond it still has to be voted on by the people at turrs bond um no i i think this could be issued by the council or it could or it could be something that we would take the voters okay i think if we're looking one of the recommendations i'm going to have talking about the citizen engagement piece of this is we are recommending that we take this to a vote right for the bonds uh that'd be issued for the public and that probably would make sense to probably do it all at one time okay anyone else oh sorry you're the mayor right now oh yeah unfortunately you guys okay so recommendations let's talk what we what are we recommending that we do on a short-term basis so going back to the point earlier on um what we're proposing for planning and developments we're looking at finding a location that we can lease on a short-term basis and i say short-term basis that's a five to seven year commitment is kind of what we're looking at in order for us to have time to work through these issues and then build a facility that can work here's a rough estimate of what that cost might be 350 000 on an annual basis would be needed at least a facility of 24 000 square feet rough numbers that is not i want to be clear that's not in the budget for next year that's proposed so if that's something that we want to do that's something we'll have to find the resources to make that happen it does save us though about a million dollars in deferred costs needed for city hall west so if we decided that we wanted to go ahead and move that operation out of city hall west and and no longer house that these operations there then we wouldn't need to make about a million dollars of investments there so like i said at the beginning all these things have cost it's just a question of where do we think is the best return on our investment why couldn't we rent city hall west which means we keep it close to the city's heart i mean it's part of part of our dentin but lease it generate income that would help offset the cost of that 350 000 lease cost for planning yes okay do we have an idea cost per square foot on going right downtown right now take that cost per square foot of lease space times the square footage of city hall i'd like to see some cost estimates on leasing that out with the caveat that we would have some control over whoever leases it we we have some control over what improvements they make to the building so it doesn't damage the historical nature of the building yeah this is the the 1458 per square foot that i've listed here that's our best guess on the market rate in the downtown area i don't think city hall west would probably command that at least in the condition that it's in with some of the renovation so we can certainly look a bit more detailed but that's kind of our best guess of what that market rate is great a couple things to think about um number one yes that's actually i think a great option other than the reason city hall west doesn't work for our needs probably makes it not work for other office needs either because it's just really not designed for that but i think one thing for us to think about or remember is maintaining control over a structure what it looks like um what it's used for you can accomplish all kinds of things with deed restrictions so you know there was some conversation a few years ago about selling city hall west and the old fire station for some kind of a redevelopment project and a lot of there was a lot of stuff in the paper and people concerned about well you can't sell it because it's got all that history and architecture and all that you can you can do anything you want to do pretty much in a deed restriction so for example you could say i'm going to sell this property but i'm going to put a deed restriction on it says the roof must always be clay tile and a red color you can't change the windows you can't change the brick you can't change the front door you can accomplish all those things so one thing i think we should explore is well i would just tell you leasing city hall west will be a challenge in terms of getting any sort of a return because all the issues were that million bucks that we need to spend to make it functional in terms of hvac and roof you're going to have to spend that for anybody meaning you know for a tenant to be able to function in it right now it would be an office tenant but it's really not conducive for an office use because of all the different levels and stuff so i think that that one thing for us to keep in mind is if if maintaining the historical integrity and look of a building is what is our most important concern it doesn't mean we have to continue to own it i'm not saying we don't continue to own city hall west but i think that's the conclusion that most people would jump to for obvious reasons that if i sell it to somebody it can't control what it looks like or what it gets used for and that's not the case you can control that with with by other means specifically with deed restrictions i don't think we're going to be able to get a whole lot of rent would be my professional opinion on on that space as it sits today without spending a lot of money on it i don't think we want to go spend a lot of money on it to be able to lease it so just something to think about i'm sorry what you do with this slide no sir no go ahead i 'll just want comments for them i think we mentioned the lease term five to ten years somewhere is kind of what we're looking at and that goes into the long-term recommendations that i'll show you in just a moment of kind of what we're proposing and how to how to do that we've already talked about potential repurposing of city hall leasing perhaps of how we do that selling it with deed restriction those are options that we can talk about another time the old central fire station is another facility which is close to that do we want to sell that facility do we want to rep urpose it how do we want to do that but i think again all these things are kind of interrelated in our view of looking at this comprehensively and bringing back a package that makes sense over time for all of them and then we've talked about the denton county building but we would pursue if if the vision is to build this across the mckinney street as we've talked about is to pursue the purchase of this building next door yeah a couple of observations on this particular slide as i look through this and a couple questions first so the primary reason for a lot the long-term goal at least from staff's perspective is to bring together departments that are that are not together to write a little bit better synergy this particular one is saying we don't have enough room for the planning development department which is a lot of it's a lot of divisions it's inspections it's i think health card i mean there's a lot of different when i think of planning and development i think of what manal does that that group but it's more than that there's a lot of things underneath that and so a couple of things that i would be very it would have to take a lot of convincing to get me to spend 350 thousand dollars a year for a five or ten year lease to save a million dollars and i understand that there that the structure of that is i mean you'd almost have to gut it literally keep the shell take everything out and just redesign it which i don't advocate for that so my thought is in the in the short because i certainly would be opposed to moving everybody out and leaving that space vacant and paying 350 thousand dollars a year in lease payments i mean there's got to be a way that i mean that would be that i look at it in the reverse let's look at it in the reverse we're paying 350 thousand dollars for a group to be somewhere but we have a building sitting vacant that some of those people or most of those people are maybe certain groups of those people so i guess when i hear this i hear this all or nothing kind of approach like we got to move them all because they're all sort of interrelated and they all sort of work together and i guess i'm not been convinced that that's really the final solution i mean i've heard that's the situation but i would be concerned with spending that kind of money over that kind of lease term and leaving that building vacant just like i would be vac ating city hall west just like i would be vacating this particular building because they still i've always said i'd like to see government operate more as a business and and but in this respect it's sort of it's the same but it's not the same if we can have some people there as we're determining this long-term solution i'm just trying to get that 350 thousand dollar cost down because five years is what is that 1.75 million 1.75 and 10 is 3.5 million it's a lot um i'm not saying that it's not worthy to look at at some iteration but it just seems like we're on an all or nothing kind of approach instead of exploring and there may not be anything in between i just haven't heard too many options of the in between well i i apologize if i if i presented it as all or nothing i think what we're trying to do is is is hopefully outline a vision of where we want to go and i think if the direction is we want to look at trying to find a lease but at the same time we want you to try to find what would we be doing with city hall west and central fire station the old central fire station to offset some of those costs and come up with a better financial plan we can certainly do that and come back i think the direction though that we're looking for is that something you want to do is that something you want to do we can certainly come back and run the numbers look at those and come back with a plan that accomplishes that and offsets as much of that as we can i don't think we can offset all that 350 000 a year but maybe we can offset some but i guess that's my question is the direction you're looking for this all or nothing approach moving all of planning out and and leaving city hall either to be repurposed or or is there some other interim so i just need to understand if i say this is my direction that i understand what you're seeking as direction okay maybe i misunderstood your question yes i think the direction and the recommendation is to move the entire planning and development group out and the reason is to keep them all together and to have a space that allows them to absorb some of the new positions and i think we have maybe i'm trying to remember 10 positions i believe it is that's going to be coming as part of this budget and the next budget over into planning and development adding them up there's a lot we've got to have room for those folks to make sure and we got to have them in an environment that's conducive to them doing the job that we're asking them to do so that's kind of that's the recommendation from staff just to get them into one area there's so many contingencies involved in this plan because it's holistic it's comprehensive and there are certain piece pieces of this that i think are absolutely crucial that we decide what our direction is before we can give them more comprehensive direction and one of those is our tolerance level of divesting ourselves as a city of some of these buildings if that's not is that an option that would mean city hall west that would mean things like perhaps you had mentioned the center for visual arts yes as a potential option which is a valuable building in a valuable location there to be able to put some of those on the table to say what are we willing to do because if we are willing to sell that opens up a lot of options i think for us and some revenue and solve some of these problems and so part of me thinks that's a pretty ripe discussion we all know it was controversial last time and different people had different opinions but at some point i think we're gonna have to cross that bridge we're not going to be able to go very much further down this track of giving you more direction so i don't know when we have that conversation but it needs to take place yeah it's almost like you want you want to break the conversation now it's hard to have a holistic conversation but also get it's hard to stay out of the details right because all the details matter i would just say in terms of the short term what i want us to remember is the conversation we were at watching how planning and development and building inspections and fire inspections and how all those people function or don't function in the space that they're in so to me saying well let's i'm not saying this is what you're saying but i'm just kind of thinking through what the potential options would be and say well now now let's go take 20 of those 60 people and put them in another building one of the things that we continue to hear about and talk about is inefficiency and lack of customer service so to me i think we have to say well we absolutely need to address those and we and we have the growth that's going to put additional positions in there so can you imagine trying to put 10 more people in that building no can't put one more person but then you go well who do i take out what departments do i take out where can i put them well there's no space here and there's no space to say so then you start looking around and then you you're back to the inefficiency issue so i think the way to look at is to say okay if we need to do this then how do we fund it how do we fund it well you could say i'm going to sell the the old fire station in city hall west what do we think that that's worth if we sell them what's the downside can we still have the parking we want over there if we sold it you know i think we have to go through a step process but if we don't start with we need to do this i mean we all agreed we need to do we need to get planning and development all the people in that building in a functioning space wherever that is whatever that is george mentioned the adjacency issues how important is that so i don't think you can ever get to your answer if you don't go through a stepped process that starts with i need to do this for sure so if this then what are my options and if i take that option then what are those options because if you look at the amount of money you know you look at you go man 350 grand that's a lot of money you also have to look at what does it cost us if we don't do it in terms of just the impact of time about the all or nothing you're talking about this particular approach well i'm saying i'm just saying an all or nothing sounds like you're saying they all have to stay there or we have to lease that exact whatever we've got to move them all somewhere right that's that's what i mean right so so i think i think moving people out of city facilities and continuing to own the facilities that are vacant makes zero sense at all i don't think that would make any sense at all so i think kevin is on it which is what i mean in your business you would never do that you don't need a building you sell it and i think we need to operate we need to look at this like we would in the business so to me i think we have to start with do we need to move them yes and then and then how do we fund it because there's probably a lot of different options for that that's my opinion well i was just gonna say i think this is all incredibly good conversation that helps identify and frame the issues that we've been debating and discussing for a long time but some of what we're talking about here i think will become a little bit more clear as we talk about some specific space options and what it'll do for us when we get into closed session just so we don't make a decision before you hear the whole story so i think it's a mistake to break up the planning department um it's a mistake and i know when we when you say planning see that's what i'm saying is so make sure i understand what i'm hearing so inspection what all's what's all under planning we have any any visit i'll have her come up and yeah and go let me let me let me rephrase moving everyone in city hall west right to a new location yes i don't want to cut that in half and leave a few people there and then move a few people someplace else city hall west either stays open or city hall west is closed you know for me that 's the question and that's the option on the table it was evident when we met there that we we've got to get the city hall west people out and moved where they can work efficiently because everything in this city comes through planning everything large small in between and everybody that you talk to knows we have a lot of problems and a lot of those problems it's just flat out lack of space for our people over there we have a huge employee attrition or we did last year we lost 17 employees i think just that the location of that building i'm sure was was part of that it was a miserable place to come and work every day so planners are in demand across the country i don't care what city what county what state planners are in demand so we need them we need good planners we need an efficient planning department that means closing city hall west so a question is and we come back to if you own a business you look at your asset list so that's what i would like to see from the financial land and i don't need all 35 buildings because i don't think we 're really looking at that scope i think initially it's going to be an asset list of immediate concerns which are city hall west and the adjacent fire department because that's all one big you know chunk of land in terms of do we do we sell it and if we do sell it what deed restrictions i would like to hear that cost and then i i'd also like to hear at a later work session what kind of deed restrictions we could place on it not to kill the sale but to give the city just a little bit of control over maintaining the historical aspects of those buildings but it's all about money in and money out i know the bond committee said oh let's raise taxes you know what they're not elected and they're not accountable to the citizens of this city i am and what i'm hearing is that our taxes are high enough right now so i'm not ready to pull the trigger and raise taxes to to build bigger and newer and nicer my issue today right now is how do we help planning do a better job which means give these people the space they need in the space they deserve and and i i hear what you're saying i don't necessarily have the same opinion i don't think because i think when we when when you're talking about planners you're talking about people who sit and do plan review and the planning department is made up of many many different departments i believe if that's correct the planning department itself is made up of the planning division which are the planners that you're referring to it's made up of building inspections which includes plans examiners and inspectors building inspectors and health inspectors and it also houses gas well administration now in addition to that when you look at development review as an activity in the city some other departments that play key roles in that are engineering and fire specifically and we have engineers development review engineers and fire inspectors and a fire plans examiner if you will all housed in city hall west as well and those all function as a core part of our team and we have worked hard over the last few years to get fire inspections and to get development review engineering inside that building so that we can become more efficient and be working better as a team and cut out some of those inefficiencies that happen from everybody being separated today we have 59 people that are housed at city hall west it includes everybody that i just described if you take the new fte's that are currently being contemplated in the upcoming budget for those core functions that's an additional up to 13 fte's and today in city hall west we have offices as small as 72 square feet and so we've pretty much chopped that building up just about as tiny as we can get it and we are going to have an immediate need for more space in the in the coming months so my question to you is so what you're saying is everyone that's there all right they all need to go to the same place because they all work in or they're inextricably linked that those functions are i'm not saying you can bifurcate them but they're engineering and planners and fire inspectors i get that so i guess if that's the case if that's the case then help me understand before this recommendation can or before these recommendations have come to us the budget recommendation which has been formulated over many months and is presented to us last week had the planning department adding 15 new people or 10 new people or however many you said so where what was the plan where were you going to put them if somehow this doesn 't come to fruition well the the request for those fte's has been at the direction and from my understanding of the city council where you've said tell me what you need in terms of resources to deliver the business friendly product that we're looking to offer to our citizens and so first we looked at staffing and secondly we're looking at facilities and i do i want you all to be aware that i have a presentation prepared in closed session that does address a lot of these questions in further detail and so i would hope that you would have allow me an opportunity to bring that to you before making a recommendation and and and i agree about because kathleen on the when you talk about it's the people's money you're absolutely right and it's been coming upon us to make sure that we use that in the wisest way that's reflective of community values and to me to spend 350 000 on leasing space for five or ten years especially if we don't know where we're going long term like let's say we decide we can't afford to do a a combined city hall well i'm i can tell you right now then we have to make a decision now we've got 350 000 dollars of spending now do we buy it and i'll i'll just say on on the surface i will be very hesitant i think city hall west is an integral part of denton's history and i know we can sell it and put deed restriction on it like that that thing has been almost every department in the city has been touched by that building and my goal for that building if anything would be to somehow restore to something that was like it was many years ago and to provide it an actual opportunity for the community so to me i don't really see selling it and taking those proceeds because we're going to take a beating on it if the problems exist for selling it i mean leasing it with the the and then you pile deed restrictions on top of that you will provide all these kind of restrictions your price is going to be so nominal i'd say i'd rather own it for that price and do something else with it so the only thing i'm trying to figure out is to make sure that this is the only option in order to meet those needs to maximize the taxpayers you know return on what they pay for the city and i need to understand that we can't say well you know this department really yeah we'd like for them to be here but they don't have to be here we can we can do they don't meet but once a week or once ever two or three weeks and and we could turn it into we could have additional meeting space i'm just simply saying for three which especially again is not budgeted this 350 000 is not in the budget and i'm going to be very i mean if this comes out of anything for me if it's in the budget we'll have to look at the supplemental package i mean to try to come up with 350 000 right now you think i mean and we're talking about decreasing taxes we're talking about we've talked about do we want to have a tax decrease this is about a half cent tax increase if i'm not close to it is that not 350 000 it's the equivalent of the equivalent of what's what's a what's a penny 800 000 850 000 so about about a yeah about a third a little more than a third there is the 959 000 that we talked about with council i know chuck's going to go through that in a moment that's an option there's options for there's ways to look at that there's a lot of different ways to look at it but going back and look at the supplemental packages it sounds like there's a lot yeah i was looking i haven't been looking over at this side of the room i'm sorry is that okay yeah sorry go ahead well first i wanted to say i'm glad to hear you say that about the city homeless because i think i think holding it in the city is is a good is a good option and a good thing to do but also my question was has have we been approached by a developer that wants to buy that and the fire station because that seems to be like a package deal all of a sudden like talked about so i didn't know if that was already if we've been approached and we know what would amy address that if we've had interest in both facilities but that would be a conversation that would be more appropriate in closed session if you want more specific details on that okay okay but we do we there's absolutely interest in both okay thank you i'm just worried that we're sending mixed signals to planning i feel like we we tell them we uh we're gonna shake things up we're gonna move things around you know we want your some uh supplemental package here um you need this position but then we maybe aren't willing to do that we want to change the cultures dentin's coming we got to get co's open and then when it comes down to like moving them and you know they need a new locker room get them a new locker room like we got to start we have to spend some money sometime i'm just we're talking about a lot of different things and you know you it's hard to nail down like the plan and i want to make sure that we're just really consistent about our vision of dentin tons of businesses are coming here wanting to get open small businesses it's a nightmare to get a permit still because you just don't know where to go which paper do i fill out i'm just building a fence i mean i'm just talking from personal experience i want to make sure that i know it sounds like a lot of money to spend but this to me is more just an investment we're just we just want uh things to start running more efficiently and properly and we're we keep telling you know we'll go to our retreat and say we got to change the culture and we are we have momentum then starting to change and i want our that to continue so i just want us to make sure we're thinking about that i don't know what to do about city hall west i'm torn i don't know we we fix it up and then what do we do with it after that or you know i know we're just talking but is it a music hall is it you know even when i first got on council i said well maybe it's a museum and then even kevin pulled me aside he's like you sure you want a museum and i was like i don't want another museum you know i i don't know so i'm you know i'm not putting we're just just thinking i'm torn what to do with that building i love that building and you see the christmas lights on the old postcards and i wasn't around back then i don't want you know that means that building means a lot to a lot of people here so maybe just as a question and maybe this a good segue into the next topic what all is kind of involved with this city-wide space study will some of these things be answered in that study i still have a couple of slides left is that one of them that's one of them i just go ahead and work on recommendations but let me go let me go with greg and then kathleen and did you yeah okay well you know i i just want to say to build on what joey said you know you can't say you got to do more with less it doesn't jive right it doesn't work and so when we say you know with all due respect mayor and we say i can't see supporting spending three hundred fifty thousand dollars a year in rent okay well what's the solution we don't own anything where we can go put them i didn't say i can't see doing that i said i can't see doing it without understanding what the understanding is and so and so and so the the what we do know right now is we got a problem with city hall west right so we set in the room where all of our perspective new customers to the city big manufacturers big employers that's the room where they have their first experience with us right going through a drc or a pre -application meeting or whatever it is so first of all what you know what are you willing to spend on your brand but then secondly how do we recruit the best in class staff people and walk them into a place and say here's your new digs i know it looks like a closet but mr engineer this is where you work now so i mean i think we kind of have to put our money where our mouth is and i don't think it's a good idea for us to dismiss something out of hand before we understand how we could pay for it right so because i i'll just tell you this my stance on city hall west it probably makes sense to keep it because it's such a weird jacked up building with all these different levels and concrete and all it's not unless somebody really really loves it and is going to do something with it that everybody would just stand up and clap for you're not going to get a lot for it because it's weird weird weird it's been renovated so many times it's hard to do anything with it i also think we we don't need to just stand on the desk and say we're not selling it unless we say what we're going to do with it because sitting vacant that building will degrade and fall apart so fast you see it over and over so just like this comment we need to have a plan for what we're going to do with it and we need to be willing to fund it or you'd be better off selling it to somebody who would take care of it and and let it live right because all the jumping up and down about the fire station up by unt well we sold it to somebody that did nothing with it but if we would have done nothing with it the same tree would have grown right up through the middle of it so just because you say i want to keep it you got to be willing to fund it sure and preserve it otherwise you'd be better off selling it to the to respect the history of it but you know i just feel like we can't we we keep talking over and over about culture about customer service about customer experience about getting people through the permit process getting people co's all the things that we've been talking about for the last year we've identified one of the major issues and i think we owe it to ourselves to say well hold on let's don't get scared of the number because maybe that's not the number we don't even know where the number came from but whatever it is let's don't get scared of the number and then say hey y'all figure out how to do more with less because we know that that's not going to get you the answer that you want so sometimes we gotta we gotta face it so again i emphasize that we have a billion dollar budget we're just starting to get into it we 're looking at 350 000 that isn't in this current budget i want to remind everybody this budget is not concrete this is a fluid budget that's what this council was elected to do and that's make good decisions tough decisions so we get into this billion dollar budget and let's just let's just do some line item study and see if we can't find some money to help pay for this in response to you chris in terms of a five to ten year lease but what if that makes the most sense to solve the problem as we grow and as we look towards a 2020 or 2025 plan for something big i know that we are paying some pretty major debt off to uh you know pay for the the dme debt that's going to be behind us at some point in time so i'm willing to risk a five to ten year lease to create an efficient planning department because we are right on the edge of of everything planning in this city and we we have to have that space and i think we owe it to our planning department to do everything we can and that includes an interim plan while we plan for possibly something bigger but i say let's find that money and and and i don't disagree with that i don't disagree with any of the sentiments that have been shared locker room and you know city hall west and i really don't all i'm simply saying is i will say that i don't know if i fully will agree to that somehow that the location is going to solve all the issues that we have thought we've identified with and when we let's make sure we understand the planning planning when we talk about planning typically we're talking about the drc the development review process the planning of these projects all right when when i hear the word planning so if y'all are meaning something else please be sure and sort of help under help me understand that when you talk about planning i'm thinking of the planning process that we've said we have difficulty with will location help yes but i don't if that's really the sense if that's one of the major reasons we're going to do this is that because we need to it's going to change the culture it's going to improve permitting time it 's going to improve the process it's going to because i don't think we if we if we're just worried about people coming and meeting in denton and having a brand we can find a place to do that for less money than that but what you're saying is we just if they're coming to the planning department this is where the meetings take place then let's figure out a way we can do it and make an impression so if we're saying that the location is going to be one of the major developments or solutions to the problems that we think we're trying to address i want to make sure we have some matrixes then that are in place to help help determine that because i trust that those people over there and planning are doing their very best whether they're sitting in the closet whether they're sitting that doesn't mean that they wouldn't like other offices absolutely absolutely i totally agree with that but i really i if we're going to move them because we need to move them because we 're outgrowing it so be it absolutely have no problem with that but i don't want us to justify it on something that to me as far as the location means that it's going to solve our problems or most of our problems how many times have we seen sports facilities who build new new arenas that doesn't necessarily improve their winning stats so i i just want to i just want to say that i can be convinced of this and i'm not that far off i think you guys have been hearing that i'm sort of resistant to this i'm just simply saying i want to make sure i have enough information to commit because if we don't have a long-term plan kathleen to move all these people somewhere else and i 'm going to say we got to figure out how to make that lease short term and instead of renting we need to find something that we can purchase even if it's what we're because that that would be silly i mean there's no way i'm going to rent if i can buy if i know that i have that need but that 's the concern for me is we're saying this is the short-term need but a five and ten year lease is not what i would consider a short-term solution that i mean when you're talking about a five or ten year lease that's a long-term solution so if the direction is to build the new city hall and then we may give that direction but then you also it's going to go before the bond committee which then is voted on by the voters and then we don't know whether they're going to prove it or not so i'm just simply saying yeah 350 and you're right this is if we've got a budget coming up we can find a way to fund that as a real estate owner i just have a great aversion to leasing when you know you 're going to own something and hold it for a long period of time especially when we've got buildings that are 50 and 60 years old 90 years old that that's my only thought about this is to make sure so yes this conversation is bringing up the information and soliciting the information from you guys from staff that helps say this is why we need to do this not just because we went over there and sat in a meeting and saw somebody sitting in a little room okay that's fine but i think we owe it to make sure we understand fully the rationale and the fiscal implications and how this fits into a long- term plan that's my only objection to this how does this fit into a long-term plan and i have no problem if it's an integral part of a long because five or ten year lease is not a short-term solution to the issue it's it's a it's an interim stamp but it's by no means short-term yes and in answer to your question the matrix for me is very simple they have outgrown that building yes period yeah so it's an immediate need and we owe it to them to address that immediate need okay yes joey i was going to similar comment i think planning is doing a great job and i agree with pretty much everything you said but it seemed like the conversation kind of got somewhere over in the ditch there yeah just in principle that's what sure i was trying to say sure i agree that's a big number are you saying i'm in the ditch yes oh yes yes yes yes kevin yeah i agree this needs to be part of a comprehensive strategy and going the price tag is huge and part of the reason is the this is you floated this to us ever since i've been on council and i don't know how long before that it's so easy to kick the can down the road on this because politically speaking you go out to the public and say do you want roads to new parts i mean people aren't coming to me saying we need a new city hall and they never will i mean it'll be something that we'll just have to take leadership on and saying while i understand that this doesn't feel like it's going to serve you as a citizen it actually does because of the efficiencies you're able to create because of the space you 're able to create the customer service needs but no one sees that firsthand so at some point i think we're going to have to bite the bullet and make some difficult decisions that are going to have difficult financial consequences as a result on a lot of things and this is one of them so i'm in favor of continuing to look at this subject but i kind of feel like this immediate discussion has been placed out of context a bit because in your recommendation you don't you 're not really understanding this planning issue as a standalone issue but more part of a comprehensive strategy is that correct i mean while there is a problem to be solved there your recommendation doesn't include let's just kind of fix this planning department issue no i think i think it's bigger than that i think even if you move if the decision of the council was to we 're going to move planning and development and buy a new facility just for that department or we're going to move them to a place that we lease it doesn't solve all the issues and that's that's what we're trying to talk about is some of the adjacencies with the other departments the other areas that need to be connected to them that that's what we need to have some kind of resolution to long term well i was just i don't want to say that when brian started this presentation i understand there's so many moving parts here part of it is a short-term solution to the plan immediate problem Kathleen that you talk about the planning department we know we've got a problem we need to resolve it i understand the mayor's concern that we have a long-term plan if we're going to do something that we need to know what our general direction is that takes longer to get to the answer that is going to take longer to get the the answer for than solving the short-term solution for just the planning department we've got to pull the trigger on something if we're going to solve either one of those problems and so what brian's trying to present is a short-term solution for the planning issue and a longer-term problem to try to analyze all of these issues together well i completely disagree with your notation that people shouldn't lease things because i think leasing is a wonderful thing a big proponent of it but on a serious note though yeah don't wax over that yeah but on a serious note i mean so why do you why do you lease something when i'm not exactly sure what my long-term need is so i don't want to go i mean it's kind of funny i recall although i wasn't in the conversation i kind of uh get a feel for how it went with the conversation about a year ago or so maybe we should buy this it may not fit our long-term need but if we can use it for a while and then we can sell it if we don 't need it i think the conclusion was that's not a bad idea we shouldn't be in the real estate investment business as a city so you know i think what what we've identified here is okay we got to do something for planning is what how does it fit into the long-term goal long-term plan well long-term we want to build something that will house them we don't have that today we don't know where that's going to be what it's going to be but they need to function so how does it fit in the long term we need to go get them in a place they can function and maybe you know there 's all kinds of ways to structure your deal right so maybe you do a five-year lease or a seven- year lease but i got the option to terminate it after the third year or maybe i have an option to buy it or you know so all those things can be made a part of i don't want to lose i just don't want to lose the sight of the fact that the this planning and development department which is a lot more than just the planning as we heard it is a problem for them to function today and there's more people coming and there's more customers coming to use their services so i don't know that everything has to be perfectly connected but i think you can certainly anytime you're doing a deal a lease deal you can structure it to fit what your needs are right so it could be i want an option to buy it i want an option to terminate when i'm ready or whatever those are what i don't want to do is for us to not do what we need to do so that those departments can function well because we're worried about eating the entire elephant because we're not going to have a fully baked long-term plan in a month does that make sense absolutely absolutely don't disagree with that okay thanks okay i'm going to leave this slide so the lease term of five to ten years that we talked about in the short term that's directly connected to the long-term plan which is on the next slide at least the long-term recommendation that we have so we've talked about this the plan is to work on a city hall plan to be funded the next bond program i want to be clear too the reason it would be the next bond program is because we're not proposing a tax rate increase associated with this what i was trying to give you earlier some of those options if you wanted to do it earlier if you wanted to try to advance that there are tax rate impacts associated with that or delay of projects that have already been approved so i just want to be clear about that we'd also propose that we utilize some type of community task force to examine options and develop recommendations to be considered by the voters in 2020 not sure exactly what the structure of that would be but some kind of community interested folks who could help us with the planning of this helping us look at the vision of what we want what are the things that are important for us and then that would likely form the basis of the bond committee that you would then appoint at some point or a council would appoint and for the next bond program 2020 now we start that process typically about a year before the vote actually occurs so you're talking about by the end of 2019 understanding what 's going to be presented as a recommendation for a bond committee to take a look at you have to have some details for them to understand this is a priority for us this is why we want you to look at it here's some basics so that's kind of the plan is how you bring it forward so due to the size of this investment again you're talking about millions of dollars there are all kinds of issues that we've already talked about at length here of different facilities how we want to connect different buildings what we want to do for downtown we're proposing that we complete a city hall facility needs assessment so council member hawkins this is to your point earlier is we really feel like we need some help working through these there's a complicated issues of how you look at all these different pieces and to make sure that the dollars that we spend the taxpayer dollars that we spend are spent in the most effective and efficient way that's really what we're trying to get here so we would utilize an internal steering committee this is part this is funded in the budget or has been recommended to be funded in the budget we would utilize an internal steering committee of staff key staff around the city or facilities areas and some of the key departments that we've been talking about to determine what are the appropriate department appropriate departments to be included in this new facility again i've given you a preliminary sketch of what we think makes sense but there's some more detail work that needs to be done of what are all the all the pieces that need to be there we need to validate what are our current and future needs again these are rough sketches that we've given you of 125,000 square feet even it's not going to be like that it's got to be a more detailed analysis to figure out exactly what you need and why we need to know what our parking requirements are for a facility like this and the downtown area if we're looking at just the facility itself how many departments you have how many citizens are going to be attending those meetings what do you need just for the facility well what do you need for the downtown area too how much do we want to augment that by we got to figure out that and we need to know with precision why we need it because they're going to be very expensive options and we need to have some initial site planning options where would you locate a facility like this how big is the footprint how many acres do you need for this would that require a parking garage would it require surface lots do you have that in the downtown area how would that work we need help with that so that work will assist us with identifying some elements which we which we can then include in a preliminary design remember that's the hundred thousand dollar piece i talked about some sketches some site plans some drawings of what the facility might look like that's the information that you then take back to the bond committee and then to the voters themselves to authorize but you have to have that information to go forward once the preliminary design work is done you can get some basic cost information schematics to kind of start looking at that the design itself i'm sorry yes so that would be staff and the 100 000 is already in the budget i just the 100 000 isn't in the budget no ma'am that that the 200 000 we've included for the needs assessment for the facility needs assessment that is in the proposed budget for next year the 100 000 for preliminary design and i'll get to the next slide in a moment talking about next steps kind of the sequencing of these things that's in a future year well 100 000 is already one third of the way through the first lease payment for our planning department so i would be in favor of keeping it in-house staff work and not bring in consultants and consultant fees to have staff do that initial preliminary footprint that can come back to council and we chew on that before we step out of the box and spend one or two hundred thousand dollars on outside help let me make sure i understand so brian first of all to make sure i understand that you are talking about the same thing so we you've talked about the site study that was in the but but this this last bullet point is that the one that talks about the the site the the last one once preliminary design elements are you saying that that hundred thousand dollars it was in your previous slide was for i'm going to say was that for like an architect or somebody to draw up some preliminary kind of elevations actual sort of construction drawings if you will very not detailed but rudimentary as far as like some of like what we saw on the convention center i think is sort of similar to something that's correct all of these kind of build on themselves so the needs assessment is trying to validate what do you need to have in the facility what square footages do you need what's kind of some basic site planning options we need some help in identifying what that is we've budgeted 200,000 for that purpose and again i know that's a lot of money it's it's a it is a lot but in the context of the entire project it's we're trying to make sure that we we spend the right dollars to make sure we get the right return on that investment the next piece of that after you do the needs assessment and you know what you need then the preliminary design would be completed after that to figure out here's what it might look like here's what how you would have things configured and that would be used to help us spur the discussion with the bond committee and and the voters themselves yeah she she but do you know but do you have a follow-up to sort of uh okay go ahead i just want to go on the record that i think at this early stage i would like to see staff work on the needs assessment first before we draw pictures which for me is just way preliminary and i know we had drawings for the convention center that that didn't happen so you know for me it's needs assessment let's hear department by department what are you going to need on a five ten fifteen twenty year buildout projected in in terms of where do you see your department growing so we get a square foot need department by department before we jump off the cliff again one or two hundred thousand dollars pays for almost the first lease payment to get planning moved it's about efficient use of cost of of dollars right now councilmember breaks well my comment was again about the convention center and you brought it up we did invest and spend a lot of money on the project that didn't ever come to fruition so i just want to kind of look at our past and and try to prevent that from happening again if the if we spend all this money and then the public isn't for it how much have we have we invested and wasted so just kind of wanted to make that note okay i'm on a power ahead last slide power oh i'm sorry hold on joey's got something i'm torn on that because my only thing is we just had all the departments give us these supplement als and they're requesting new fte's so they got their new fte's to do what they need to do better and to anticipate what's going to happen this year and then we're saying oh and by the way do a study that would externally cost 200 grand which sounds like four full-time positions that's my only i'm torn am i get are you torn about the the the budget item of 200 what are you torn i guess i'm not understanding what you're asking everybody to on top of their work also do the study of something that we're confused about what they actually need because we need to study for space wise is that what you're asking am i i don't want to spend two hundred thousand dollars on a consultant to tell me how much space we need in the city of denton every department head who plans on being here for a while is going to be able to say here's my projected growth over the next five ten fifteen years we have four assistant city managers who can help with this project because they oversee those different sectors of the city let's use in-house resources i don't want to i just am going on the record i don't want to spend consult money on this right now what if in order to do that do we need more employees to do that or is that something that well i think the the question is do we have the right disciplines here to know how to do that effectively we can certainly take a look at how we might be able to do it i just want to make sure that what we spend the dollars on or what we really need and that's if there's a different way to do that we can certainly get with our facilities group and try to come back with a suggestion of that but the idea is is to make sure we've really validate what we need so that when we spend if the the intent is to build a city hall if we spend 25 to 35 million dollars that that we get there and it meets what we need that we don't have to come back 10 years later and realize that wasn't the right facility it is so important for us to be responsible with their money but i just want it maybe this is the most efficient way to get us to what we need i'm just saying that i agree we do a lot of studies around here that cost a lot of money but i so councilman rhodes yeah i mean it's difficult it's easy to pile up on consultants in city government i've done it myself um and what i've learned uh throughout the four years here sometimes sometimes consultants save you money uh as a city because you have folks who either aren't properly equipped uh to do it or it takes folks from doing their regular job and there's a cost to that and that could easily go up well above 200 000 and then we 're actually going backwards on that so i mean this is something where i'm not an expert in space studies i i could probably tell you something within my sphere of work how much space i need but to be able to do that in a large organization how you put all the pieces together probably involves an expert um so i'm comfortable with that and and given the large scale of investment we're talking about at the end of the day some of those price tags 200 000 is is is a pretty small uh investment to make to get us to the point of even saying where do we need to go and if so what are our options so i'm comfortable with it well kevin just made my point if we look at this at these costs he's outlining relative to the total potential cost of the project in the end it's probably a very good investment to do that and not try to use people who aren't equipped to do it and you know i can imagine the police chief and the fire chief and the plane director all getting together but they're going to be looking at their interest maybe having somebody who does that as a profession can look at those in relation to each other more objectively and more professionally then if i may offer compromise that we include this in all of our budget discussions as we look at money in and money out money in and money out instead of deciding today yes you're authorized to to go spend this this amount of money because this is very preliminary right now that in terms of all of this let's put it into the context of our budget discussions because in those budget discussions we'll see what's there what's a priority and where that money needs to be spent yeah and i will say i do appreciate the city manager on his this estimate for this space study was considerably higher so i appreciate that you that there's at least an attempt to make it i don't want to say seem more reasonable because reasonableness is just simply an eye to be holders except for the texas legislature i'm sorry i couldn't i couldn't resist that um no so so i do you're taking me out of the category of yes absolutely yes absolutely absolutely so i do i do appreciate that i do i do appreciate that yes yeah yeah yeah yeah okay yeah and to that point this first sub bullet point i've listed here is we wanted to utilize an internal steering committee of these key stakeholders to help us keep the cost down as much as we could but at the same time try to utilize that expertise okay moment you've all wanted to work who said we weren't gonna need lunch who said we weren't gonna need dinner i told you last last slide that i had here and again this is just some timing elements to this of you're talking about the short term and long term they're talking about years of how this would work out so if you agree with these recommendations or we want i know we'll probably have some additional conversations about this in the future but this is kind of the planning level steps that we were proposed so in fall of this year we'd start that city hall facility needs assessment that we've been talking about we'd start that process we'd look at trying to um lease begin and lease of a new space for planning and development sometime in spring or summer of 2016 summer of 2016 also we would begin you know work with that internal steering committee and community task force to finalize the vision of the city hall and again that's something that we need to have more conversation about just a concept at this point but how do we bring some other stakeholders into that process and make sure that we're all thinking about it the same way we would try to complete the preliminary design again this is building upon the needs assessment that we would have done but complete the preliminary design in spring of 2017 and in fall of 2019 begin the the actual deliberation process with the bond advisory committee if that's the direction of the council we would then have a bond election in 2020 nove mber 2020 it sounds like a long time off but it'll be here before you know it begin the design this is the actual designs the the two and a half to three and a half million dollars that you'd have to spend all this has to be kind of sequenced out begin designing the city hall facility and then begin construction of 2022 now the construction i understand is somewhere between 18 and 24 months depending on kind of what kind of facility if it goes properly maybe it's 24 to 36 months i don't know but i don't really know exactly how long these would be and so that's why when i said the short term for the lease is five to ten years if we're wanting to move these folks out and get a short-term fix it's really several years before we'd be open and operational again without a tax rate increase is what we've we've looked at proposing so that's my presentation i know there's a lot of discussion on this and i hope i've given you a lot of information we we do appreciate the discussion i know there's a lot of different points of view here and we're trying to see where we need to go here on this issue one comment do you have you all been able to or i think it would be helpful for me at least because part of the reason for doing this is a couple reasons one is branding i think in some sense it's trying to you know we've got some old facilities and how do we want this to reflect sort of the continuing brand that we want to project but also a major factor in this is efficiency and to me efficiency when it comes to this operation can doesn't necessarily always but it can be synonymous with you know what kind of financial impact has there been any analysis of if we had these departments in more close proximity to each other and the communication capabilities and and the the you know sort of on-the-fly meeting capabilities or driving to and back that has there been some kind of analysis of what we're spending time wise number one in some and with these kind of bifurcated facilities and what kind of financial impact it may have and if not if there's a way to do that just sort of basically it'd be interesting to see and that i would hope to think that if we did have somebody that did a space study that there's probably some kind of formula out there that that provides some kind of financial component because i'm sure corporations do this all the time you know they consolidate facilities they do these types of things and surely they've done some type of financial analysis as well on on that as far as what it might save them in either productivity or or employee time and the like the answer is no we haven't done anything like that but certainly we can look at doing that and bringing something back as part of this process to see how we could estimate it yeah i think that's a good idea yes i'm sorry i think what you'd also want to include is operational expense so your maintenance costs on 50-year- old buildings and your utility expense is dramatically different dramatic as compared to a newer building so i think you'd want to make sure you included that and then and then i also think what would be beneficial is your usable square feet so you got total square footage of this of the buildings but your actual what's usable for your people so as you think about 20 years from now i had to go through this in another life and kathleen i think the the way to do this and i think where the compromising number came from which is your people are involved but they've got a professional who's leading them through the process and they're providing the data and the professional is putting all that data together in a way that they can give it back and help them make some decisions on deciding what what exactly do we need so your usable square footage that you have today and then and then looking at it as kathleen said per employee because there's metric there's kind of good information out there in the world about how many square feet per employee do you need in this sort of a work environment to maximize productivity and all these other things so i'm sure that whoever we hire hopefully would do all those things but i'll bet you'll be shocked at what your maintenance and operational costs are of these old buildings for the amount of electricity and electricity we use and the repair expenses any other questions comments yes council member rodin a couple times it's been mentioned that we have a closed session item on this and so my suggestion would be that we forego making any recommendations prior to having that i don't know if it's more efficient to break now and have that and come back and have more discussion and give direction in public or if we just kind of go to the next work session item and i mean it sounds like at some point we probably should reconvene publicly and give direction so i leave it to anyone else's suggestion and that and i guess and that's the question is because if we don't give direction now then we will need to be in open session would we not to be able to do that or i would prefer that even if we could do it in closed session well i guess a question for our city manager i think this is an ongoing issue on the budget for consideration so it would be a proper topic of discussion of discussion in association with the budget and upcoming budget meeting so depending on how you want to proceed today that's still a possibility i think it might be a good idea to go ahead while this is discussions all fresh on our mind to go into the closed session discussion and have that and then when we come out and talk about budget you as anita was saying you could continue to give us some direction on how to proceed and whether to follow this and maybe do that before we get into the actual budget discussion so it would be proper to give direction on this particular agenda item even though it would be in the budget posting because this this is related to the budget posting right this is related to the budget i think there's specifically some recommendations made by the city manager with regard to some cost and some numbers associated with this topic so i would say then it probably would be efficient to go ahead and move into closed session to discuss this item and when we come back then we can welcome back we will now reconvene our open session of this tuesday august 11 2015 denton city council second tuesday work session agenda item 1b which is receive a report and hold discussion give staff direction regarding the 2015-16 proposed budget capital improvement program and five-year financial forecast thank you mayor blase chuck springer director of finance if he'd open this discussion and in this item i don't have any formal new presentation i'm here to facilitate council if you need me to pull up some items from prior presentation i've got that on a thumb drive and we've also got one other item just to begin the public hearing process that's on the regular agenda today so i'll open it up we did have a lot of questions on the sixth we're going to try to get as many answers as we can by the 18th and then follow up after that so the item on the 18th attached to that agenda item will have follow-up answers to the questions from the sixth but i'll open it up for council how you want to handle their discussions do you have a question can i did i in the interest of i think what we signaled at the end of our last open session and before going in the closed session that we were going to provide some sort of direction on that last conversation in public and as we've been advised we can do so in the context of this budget discussion precisely because it has budget implications to it so i just throw that out as maybe this is a good time to just kick it off with that so it kind of ties it off so i would like to suggest that we direct the staff to look into possible le asing options to be able to take care of the staff from city hall west and to come back to city council with some contractual options that we can explore that further all right that's uh is that the direction that the rest of my colleagues agree with i see it yes all right good deal all right so that's the direction on on that particular component of the budget any questions for chuck i have a couple but any question yes i i brought this up at the end of a meeting and that was we had that discussion with the chamber about our contract relating to the cvb and my suggestion was maybe we have a similar conversation about the economic development portion of that and because that has budget implications i didn't know if the timing of that was was able to get some sort of presentation to us in the context of our talks so that we could kind of have a fuller conversation at the council level about that well we are having discussions about that you asked for that and we're talking about bringing back i'm either asking me we do have i guess a contract that we need to renew on an annual basis with the chamber but i don't know that that couldn't be accommodated between now the time you adopt the budget or immediately following that but amy any comments that you'd like to make sure we um in addition to a budget implication we have an annual contract with the chamber that renews on october 1 of each year and so um in fact in in the within this month the economic development partnership board will be contemplating the renewal of that contract and making a recommendation to the city council and that we can certainly put together a work session to discuss the the contract the history of the partnership and anything else that that you wish during this during these budget discussions and we it might be that that discussion takes a little bit of time and if so we might go ahead and pursue the contract renewal with an understanding that we would come back within x amount of time and 30 days 60 days 90 days with further discussion about that and i believe the way the contract is written would give us some flexibility with that well and if it didn't i think we could adjust the contract so that it did allow us to accommodate that discussion down the road if that's the consensus council would be bringing it back thanks any other yes just kind of over the budget we can sure ask anything right now probably more for chuck than any thank you though i just had somebody approach me this past week and i think they were a little confused the general fund budget was developed on that six percent growth and it actually came in at 8.54 so there was an additional 959 000 and where their confusion was was that already in the budget and i was even i needed a little bit of clarity on that and so it was actually in the budget but where the confusion was is well then how are you spending that and i think that that's what we were trying to decide ultimately maybe you could go a little into that please do you want me to pull up my presentation go into three options or just summarize just summarize okay yeah in terms of that what we had to do is put it somewhere as a placeholder so we included it the proposed tax rate included those revenues so we just put it as an expense in non-departmental just the full amount and then i kind of went over the three options were were to spend it for a recurring expense like increased street maintenance or something that would continue on for a one-time type of expense a capital expenditure or to reduce the tax rate if you reduce the tax rate it would actually lower the revenues that are proposed in in the budget to offset that 959 so it's just kind of basically plugged in there so it can show up in terms of non-departmental but it's it's set for the council to determine what to do with that potential funding either on the expenditure side or on the revenue side thanks jack does that help yeah that does help okay and this is anything on the budget sure yes we have a three percent staff pay raise across the board and correct me if i'm wrong we had three percent three percent and now this year it's three percent i understand that staff um races were frozen during the recession so i understand the three in the three um i'm questioning another three which would take us almost up to 10 percent in three years time since the rate of inflation is 1.7 percent um i'd like to see the difference in the budget between 1.7 percent in staff increase versus the three percent across the board and i'm wondering is there an option to allow for merit pay raises up to three so that um you know there are people in your office who work really hard and maybe they deserve a pay raise and there are other people who maybe don't work quite as hard and maybe they're there because everybody gets a review so um i would like to some direction on tying those reviews to the three percent versus just an across the board three percent and let me clarify the compensation package is not an across the board let me break it into two areas for non-p ublic safety non-police and fire it's a merit-based increase so it's an average three percent merit -based increase so it is merit-based it's merit-based for all those employees it's based on their review and it's anywhere from zero to four percent we budget it as an average three percent merit increase the public was under the assumption that it was an across the board three percent okay no and and all three the last three years it's been a merit-based compensation program has it been across the board for sworn personnel and police and fire they're under the meet and confer agreements so we look at their group of survey cities and it's the compensation is set at 105 percent of those average the average of those survey cities so their increases will be based on that it will be the same for all the personnel but for example you know police officers it may be 2.4 percent where sergeants it may be a little bit different but what we're estimating is their compensation package overall based on the meet and confer is also right about that three percent level or very close to it i'm i'm not questioning police fire okay this is this is um outside of those meet and confer agreements but could i see the difference in the 1.7 which is the inflation rate and the three percent if that's possible just in in in raw numbers yeah we can do that a couple questions to clarify are you just talking about those people subject to merit so are you excluding the police and fire correct excluding excluding police and fire we can get that number yeah i'd just like to see that that number thank you and let me also mention for all the other non-general fund personnel and the utilities and and the other funds they're also on the merit -based system so it's their compensation package would be the same as what's adopted for the general fund employees whatever's decided by council but they're also on a merit-based system so they get a review and then the average compensation is about a three percent merit but they have that range for all the other non-general fund employees so i wanted to clarify that council member yeah i have a question the resolution coming up for the adopting the tax rate of 0.6938 per 100 is that the the tax rate increase that the public voted on yeah what's proposed in the budget last year's tax rate was 0.68975 so the increase in that's proposed is 0.663 that's related to debt service so that relates directly to the first issuance of the 2014 bond election and that was when the public voted on it and we had estimated in the documents we sent out and with the bond committee that the implementation of that would be a three cent tax increase over the six- year program right now we're estimating about one and a half cents for the full implementation of that program over the same time period the six-year program so it's less than yes and and i'll get into this when we go into this item that we're looking at the notice but that just sets a proposed tax rate so that kind of sets up a maximum for the advertisement you can't go above what you advertise but you can go below so it doesn't yeah the city council still sets the tax rate this is just putting the notice out there what's going to be considered okay thank you yes ke vin um couple a couple more questions one relates to we had a lot of discussion with leadership denton on downtown parking and so i want to get a sense of what can be abstracted out of this budget if anything that that helps us pursue additional parking options on understanding a lot of those were kind of creative ideas so that can be given in a report but one of those that we discussed that they suggested was a way to kind of cross um and uh mckinney street to connect to these two large public parking spaces in the evening do we know if there's been a any movement on that and b if there's funding identified in this particular budget for that i'll let mark talk on the movement and i'll try to touch on the budgetary part thanks yes sir there um we've had some discussions with engineering we've seen some a couple preliminary cuts at at a design that would create a mid-block crossing that would include um essentially a six foot wide safe harbor pedestrian safe harbor um but we not we're not at a point yet to bring it back for final uh permitting process what's can you give a sense of what where it is in the process or what you're waiting on or or well i understand uh engineering was uh continuing to tweak that and that is something that we could bring back to mobility committee or that would be great back in terms of a uh informal staff report but there's no so there's no just to clarify there's no funding identified because no prices have been set yet so there's nothing there's nothing included in this budget not at this point okay i mean i would just if there's a way to me that's probably a small investment to open up two very large parking lots that are hard to access at night and it and it helps us just kind of move that needle in the right direction so if there's a way to get some estimate that we can at least consider as part of this budget discussion uh i think that would be helpful yes yes greg well so we just had mobility committee today and i and i often wonder if we talked earlier about do you have to eat the whole elephant at a time i mean i would just like to throw out is there a simple short-term solution which is we're going to put on either side of the street some big lights that light up one section of the street really brightly at night and paint a cross walk i mean i don't know meaning i understand that from an engineering standpoint you think about long- term solutions and i don't pretend to understand all the implications of whether you do that but i would just like to throw out rather than thinking we have to find the total engineered long-term solution especially given that we've been talking about long-term facility needs and some of these things you know do we do we do something versus waiting for the long-term solution and say let's put if you light up one part really brightly and paint a crosswalk in it does that do it do drivers slow down because they see the bright lights and just throwing it out there is maybe we can do something inexpensive to to get those parking lots opened up to people now just an idea i think the biggest concern or the with this in terms of establishing that crosswalk is getting a a requisite safe harbor in the middle because the traffic there's quite a volume of traffic in both directions and so trying to push that existing neck down of the of of mckinney was the concern so we'd like to get the six foot wide in the middle to allow for folks to cross two lanes and allow for traffic to pass into the next but i think there's a couple of i've seen two versions out there in terms of options but to get it quickly i'll work with engineering to see where we can expedite that we'll let you be the first one to cross during that during that night yes councilmember riggs i think what he's saying is that there's people crossing right now is there anything that we can do just to make it safer in the meantime for for the people that are crossing to keep crossing that right i would defer that to our traffic engineer okay um i know that i can i can cross quickly and easily as a here the question is there a safe easy short-term solution that'll get what you're trying to achieve accomplished sooner than engineering a capital project and getting it built so we'll take a look at that yes well one last thing and this is just to add to the report we discussed this in mobility committee as well as you guys might have seen the little d bike parking facilities that were kind of put in it was actually part of a neighborhood empowerment grant a couple years back or a year ago i guess now and we've identified spots and a certain number of needed ones i think that was around 80 or something like that but that the funding there's a funding gap from what we can fund in available funds to what we actually need so to be able to put what that funding gap is if we were to say hey we've got places identified we've got these ready to go we can get these all put together at once what is that funding what's that number to be able to place all of those in the next fiscal year all right i think i think we're working on great working with both parks and engineering to drill into that number and hopefully we can get that within pretty short order thanks i've got a couple questions this refers back to council member wasney's question about the three percent in the merit it's a merit i believe so i guess my question becomes uh you don't have to answer this today but if it could be part of that april the 18th sort of question and answer kind of you know report uh maybe august august i mean what am i man i can't i don't know if it's next year's budget process starting you know yeah geez i'm i'm hangry um so i i'd like to see um what we've budgeted maybe over the last two years preceding for that and did we allocate all that or was there in other words we say it's merit but does it all get allocated or was there some left over because i know one time we had a report and somebody maybe can refresh my memory that on what was happening i think it was maybe even a leap report or something where it talked about that a lot of people quite a few weren't getting reviews on a regular basis and that that was one of the things that was the cultural issue was that the performance reviews so my question is okay if these are merit based upon reviews but people aren't receiving their reviews then how do you determine what that amount is and so that doesn't have to be answered now but just maybe just some some clarification on how that whole merit review sort of works together that if somehow there is a review that hasn't occurred for 15 or 18 months or gosh i've talked to people who've maybe only had one review in the you know some years that just an understanding of how more accurately are we giving reviews on time and if we're not how does a merit increase relate to the lack of review i guess we can give you some okay and i noticed i think i got an email where i understand that in our at our adoption center there were two new positions that were being filled i think maybe this month and i know that they were i think mid-budget allocations where are those in the budget moving forward i mean we have to allocate for them in that department i didn't see in the in the proposed budget fiscal budget where are those allocated for as we're moving forward yeah those would be within the police department in the animal control division okay so were they part of the supplemental package i didn't see them in the supplemental package they were just built in they were built in there were two positions in animal control and the two building inspectors were mid-year we kind of mentioned that on a slide and i think george had mentioned it before that george had approved those kind of mid-year so we built those in for 15 16 as as full-time approved positions so once they were approved in the current year and we got those in the budget then they show up as part of next year's base budget ongoing and they're not supplemental programs the next year so when we move that when we carry that forward like we have in our budget document or you know we've got our proposed our approved budget for the last fiscal year then estimated budget what you're saying is if you looked in that particular budget item for estimated for 2014 to 15 it would show an increase because the estimate is it's going to be more than what we originally budgeted for yeah but realize we're just kind of in the in the midst of hiring those positions now so in terms of true dollars out of 14 15 there's not many true dollars associated with those positions because once george approved them then we have to go through the hiring process so there's you wouldn't see a full year impact in 14 15 you just see a small amount in terms of when we estimated those positions were going to come on board well i guess does so that doesn't require budget amendment or anything like that for the last for the 2014 no and actually depending and i don't know how exactly the numbers worked out but those approvals and the cost of those may be made up with savings in that same department so the actual budget number might not have increased gotcha okay good fact it still could be lower than was the original budget okay and been accommodated within that money fantastic okay great uh and chuck if you could and i looked for it it wasn't in our our uh a powerpoint presentation it might have been in hard backup which i didn't see but you had a couple of slides which you don't need to show them but if maybe you could just send a copy of them to me and if the other council i just need to be reminded of you said you have a summary of the three options for that additional council and also i think you had a slide that were one-time expenses like the ambulance was one and you had several on there that that accumulated a certain amount of money if you could just forward those on i just need to see refresh my memory what those were okay i can attach those i guess or they're they're in the presentation for the sixth would you like me just to point out which slides they are are they in the are they in our electronic i didn't well i didn't i didn't attach it to the sick or today but it was attached to the six yeah if you could just tell me because i pulled up it's like 110 slides and i was running through them i couldn't so if you just tell me which slides they are that 110 it wasn't brian's presentation well no well it's 110 pages when i look when i put the budget on the budget the actual budget so there's a separate attachment yeah if you could if you could do that that'd be fine um it was 110 pages there's 110 slides the other thing is um i still was trying to understand what it if if i could just get a summary and brian you can send this and i could probably look back and pass budgets but so the gen the the fund balance increased from what we projected when we approved the budget last year to this year what are we saying is going to be the increase and i'd just like to get a summary of what that fund what the fund balance was like two or three years ago and what it is now just to get an idea of if it's grown if it's shrunk and and things such as that maybe even the last five years that'd be fine uh let's see what else and i'd mention to the city manager and check you're going to have it for the the uh august the 18th not april uh when i was looking at i'll just give my my colleague sort of a sort of a brief synopsis the the economic development incentive 380 agreements are within the economic development budget in other words those expenses are in that budget and i was just asking if there's a way we can have a a line item in the budget either line item or a different category that somebody was looking at the budget okay these are what we're spending on our economic development 380 agreements because to find them they're sort of intertwined within the economic development budget i just that to me those those sort of departments are more for here's your revenue here's what your expenses are and and i don't know if i would consider 380 agreements either the revenue or the expenses associated there of necessarily part of the department but that's just something that i was thinking 18th we've got that at least yes we'll break it out yeah i just wanted to give them sort of a preview of that for accounting purposes we have to count it as an expense okay no right i'm just saying it something that can be more easily identified um that's all i have for for now at least uh as we keep perusing through this and moving down the line yes council member johnson yes yes yes yeah yeah yeah i don't know if he's getting me asking a bunch of questions or not but i'm gonna take that as a dig over here but no no he's in the ditch again i just want to make sure send them directly oh yes yes yes and i'll try to put them in a response to the full council yes cast member brief yes we did receive an informal staff report on the damage to quaker town park from the jazz fest and all the rain and everything and i was wondering is that amount in our budget to fund that or is that something different or in relation to the the numbers that we're giving to the informal staff report that's being absorbed within the current year's budget for the parks and recreation department we were just letting you know what that cost was because you had asked for that we wanted you to be aware of it but we've gone ahead and moved forward and actually i don't know if you've been aware of there's actually been heavy equipment out at uh quaker town park because they're out there now cutting the new grades and trying to do the repair in preparation for the blues festival i'll be coming up here i think next month so so the the costs for that are being paid out of the current year's budget taken out of parks and recreation okay okay thank you so i guess that's similar to what we talked about on the animal adoption center that somehow if there's savings that that might be absorbed but if there's additional monies that are required then that's somehow paid for out of the fund balance or something like that i mean is it are you talking about the additional personnel you know the parks and the parks and rec uh repairs to the quaker i mean i mean they have money budgeted for repairs and improvements during the year within their operating funds and i think what they probably did is once they knew that damage was there they held on to those funds in order to be able to spend it on that versus other programs so it's really just kind of a prioritization where are we going to spend our maintenance dollars and i think their prioritization was we know we're going to need to take care of this so let's hold on to those funds for this project or a certain amount based on what they had and probably my guess is they probably had to put off some other things to be able to do that but they just felt it was a higher priority to get it taken care of great all right any other questions for this agenda item all right i believe that concludes our work session for this special call meeting so uh we will now convene uh in an open meeting do i need to give the time or date or we just do are we are we convening out there we staying in here no we're staying okay yes this one yeah okay yeah we 're just going to convene into the regular portion of the meeting we have two agenda items we 're actually three but the second the third one's concluding items items for individual consideration items 1a is considered approval of a resolution of the city of denton uh placing a proposal on the september 15 2015 city council public meeting agenda to adopt a 2015 tax rate that will exceed the lower of the rollback rate or the effective tax rate mayor and council on this item under state law we're required to hold two public hearings on the tax rate if we exceed as it stated the lower of the effective or rollback rate the effective rate is 0.656271 the proposed rate is 0. 69638 so we're above the effective rate we're below the rollback rate the rollback rate's a little over 72 cents this item also calls a public hearing on the budget which is required by state law and the city's charter so the public hearing on the budget will be on september 1st the public hearings on the tax rate will be on august 18th and september 1st there's a couple notices attached here that go in the newspaper they also go on the city's website they go on dtv and we'll also issue a press release and kind of attach those notices and let the public know of when the public hearings on the tax rate and the budget will be and do you know if those notifications or on our website are these things these other additional publications that we put out because i think it's it's it's we want to make it really clear that number one this is mandated by state law and that this is the maximum if we pass this resolution i guess today or whenever we do it that that's the maximum rate that that will be levied doesn't mean that that is the rate that it could be lower but it will not be higher is that okay i just want to make sure that because i think people will see that and think we've already adopted a tax rate and we haven't even really talked about it very much so okay i'll appreciate the language of the notices is set by state law and oh okay so and changes every couple of years okay so we don't have any we don't have any option there's no flexibility the notice is what the notice is you know we've clarified that and we'll continue to clarify it to the to the watching public all right anything yes council member hawkins this is just a resolution right now we don't need a motion on this one we do i move approval of item 1a chair has a motion uh we have a second yes council member we have a motion and a second to adopt a resolution pursuant to agenda item 1a all in favor please signify by raising your right hand okay uh the the uh resolution passes unanimously she's trying to throw me off there raising both hands um all right we'll go on to agenda item 1b which is considered option of an ordinance authorizing city manager to execute an interlocal agreement with the denton county texas under section 791.01 the state of texas government code to author ize denton county to install the downtown square camera system yes sir good evening so uh what this interlocal agreement will do it's going to enable us to install four cameras right at the downtown square at each of the corners currently where we have our wi-fi access so we're actually going to leverage the same technology we're using to provide free downtown wi-fi to connect those cameras onto our camera system and then what we'll do we'll extend the camera system to our 911 dispatch center and also provide that same connectivity to the denton county sheriffs so it's a collaborative effort to provide uh the public health and safety and provide better service to our residents any other any any questions for staff i've got a couple but any questions yes council member rodent so i i got the impression what can you talk about the budget implications if any i mean who's i have getting used for you who's paying for the cameras who's paying for installation so as far as the pain for the cameras that i think denton county already had some in stock but they're going to be providing the cameras and then we're going to be providing the network connectivity and electrical to it it's going to be using the same infrastructure we're using already so as far from the city standpoint there's not really an additional cost to that so does it impact the bandwidth of the wi-fi for the public to use no because the way the cameras are set up they're going to be uh they're going to have a cable connected to the camera so it's physically connected yes and and i guess the elephant in the room i mean is this all kind of a result of the vandalism on the courthouse actually is that what motivated or was this conversation going on prior to that this was actually a conversation we actually initially proposed back in march of 2013 because we knew the capabilities of the wi-fi in long term we actually proposed that as part of two different phases so this would have been the second phase of that but it's just pointing at the courthouse it's pointing away from the courthouse i can actually show you a couple of pictures okay let's see if i can kind of give you more of a visual i like pictures so so here you can kind of see where it's uh pointing so each of the corners you kind of see the instance for one camera on how it's pointing towards the street and as far as uh visibility you know it depends how you set it up but you can potentially see license plates or get facial recognition so is that kevin up there so is this a traffic i mean it's point it looks like it's cat what what's being protected by the video it's just pointing at general traffic i don't think it's there to identify you know if someone's putting you know things in their car or anything like that it's more for the general safety and the good thing with this you can depends how you set it up you can have it set up to move simultaneous every 30 seconds i'm going to change my view it really depends on how it's set it up motion okay it can be set that way too council member bricks so why are they going i mean i i'm really not for more cameras i mean is it like a red light thing is it a traffic thing why is it because when i first heard camera i thought you know protection for the square but this just seems kind of like just there to be there so it's it's going to be faced towards uh trying to prevent potentially vandalism in the buildings or if you see a lot of high density areas let's say you know dispatch notices hey there's a big group coming in and they're protesting you know can potentially get them to react a little quicker or hey there 's something else going on there you know quicker response it depends on the need you know and as far as the city of denton we have around 350 cameras so it'd be in addition to some of our public facilities like we have it aimed towards parking spots we use it at our solid waste to make sure no one digs in into the waste you know we have it in the libraries and all types of different facilities council member was i have a quick story to tell and then i do have a request yes my daughter lives in charlottesville virginia in this past year a woman was abducted in downtown charlottesville which is the walking street because of the cameras on that walking street at 1 30 in the morning they ended up with facial recognition of who was the last person with this young college student he left charlottesville and was caught in galveston texas and who knows where he was headed but because of that facial recognition they caught him through dna testing now they have associated him as a serial killer in the state of virginia and other states with young women who met horrible fates without that camera on the walking street in charlottesville virginia he would still be on the loose so it's a balance between public safety and personal privacy i vote for public safety our police chief is here i would like him to weigh in on that topic just generally about the cameras the value of the cameras yeah um yeah the surveillance cameras especially in very populated areas like downtown going to be very beneficial for a number of reasons um just as you described there's there's a lot of potential for solving or preventing crime um you know it's not going to be used as a general monitoring of the public in terms of identifying people just you know spying on them or anything actually i mean we don't have the time or the reason to do that but it would only be used to go back and and see if a crime had committed we could go back and play back video see if there was anything captured on it that could be identified to use as a lead in solving some kind of an offense member what's that okay council member johnson thank you mayor that's a very extreme example and so i'm all for it in fact i'm not doing anything wrong i don't care about anybody watching me but on a more daily practical you know we have as the property owners downtown have a huge challenge with vandalism you know there's folks who consider themselves public artists who like to climb up on buildings and paint things on buildings and um just generally damage things which is probably never going to change um but in terms of a deterrent to that you know these cameras especially if they can move back and forth and i'll tell you from a safety issue at the texas building we got lucky and somebody happened to look up because they heard sound and there was people that had climbed up on top of the building and they were throwing beer bottles trying to land them on top of the opera house and you think about somebody walking down on the street below gets hit with one of those you know that could kill somebody um we luckily our fantastic police force was able to catch them just because of the way they had gotten up there and anyway long story but if you had these sort of cameras on those corners and and you know vandals you know kids just looking to make trouble it doesn't take long before a few of them get caught and maybe that gets deterred so i mean property damage um the we've had people get on top of buildings and vandalize the ac units on top of the buildings spray paint all over ac units and those sort of things so just that general practical you know if they know that there might be captured on camera walking into the door of a building or walking up on the back entrance of a building and that part of it went away i think that would go a long way too so i i totally understand the balance of personal privacy but to me if i'm walking on a public street i'm really not in my personal private area anyway so i'm totally good with it yes joey thank you mayor i would agree with that greg i own a business on the square and vandalism is an issue and i think that this will definitely curb that and eventually probably stop it i also think about events like holiday lighting on the square where there are thousands of people showing up and i want to keep the square family friendly while letting certain businesses in the free market you know do its thing on the square so i i have no problem with this if you're not doing anything wrong i don't mind anybody recording my family or me on the square so yes councilmember are these like really big cameras and do they make a lot of noise i guess my my thing is um i just don't want people visiting the square to see these big giant cameras following them around like you know we have a big issue with crime and vandalism and like that's our um the first impression you know like we have to and we can get you pictures with it it's probably going to be closer to like what you're seeing there but it's going to have like a dome on top of it i don't think i have pictures here just to show you the different views that we can potentially get but it's in the street it's not can will it go like in front of the businesses as well we can have it face wherever it needs to it's a 360 view it'll be a 360 view so it'll turn yes and we can have it turn every 30 seconds if you like just so it's it's rotating around okay uh you know my one comment is i mean you know i don't have an issue with this i guess if we're going to have them i want to make sure that we can use them because i know that the the shot that was used to try to identify what happened at the uh monument there on the square i'm not making comment about the issue of that but it really it was very difficult to see because of its placement in the light and and so i guess if we're going to do it and we want to use it effectively to make sure that we actually because typically these will come into play at night i mean during the day you got a lot of other people so it's at night so to ensure that we have adequate lighting number one better lighting reduces crime uh and that if you have to use them and there's better lighting at least you can see what you're looking at so i just want to make sure that placing them we also make sure that the other tangential services and and assets that we have there maximize their efficiency absolutely sir and you can see right here this is what it looks like at no at night this is assimilation of course it would be dependent on where the streets light are at and what they're pointing to so we would definitely take that in consideration okay all right great so the one over here the further picture this one yes that's at day daytime so and that's at night so you can see what's going on at night if there were the vandalism or the facial recognition you're not going to get that this is assuming there's that absolute no no light at that area so as we're mounting them of course we're going to test to see you know what does it look like during the day what does it look like at night and if it's not you know how do we ensure adequate lighting for that area where's the extra lighting going to go and come from so that would be part of you know this is uh we actually use a program to kind of simulate what it looks like we would actually have to have our guys and DME kind of mounted on the poles to really get a true of what this looks like any other questions comments all right we have uh that's our agenda oh i'm sorry did you have a question yes it is an action item yes yes council member rodent i move approval b of agenda item one b we have a motion and a second for agenda approval of agenda item one b all in favor signify by raising your right hand all the signal all opposed signal by like sign all right resolution or i'm sorry ordinance passes let me do my math five to one and that brings us to our concluding items new business yes kath uh council member wasme i actually have four things the first one i would ask legal to pursue the creation of an ethics ordinance using the san antonio ordinance as a model to coordinate with the ethics committee on this council which is councilman briggs councilman rodin and councilman wasney i'd like to also then revisit our impact fee map that we looked at those five different zones and i've spent a lot of time doing some research and talking to planning and i'd like to uh bring them back here to examine um how some of those zones could be changed so that each zone meets in downtown and kind of becomes a pie shape rather than just separate separate zones and to confirm are we limited to five can we have more than five and uh just take take the time that we need to really because i think the strength of that program or the failure is going to be on how those zones are um designed also on the impact fees to see if specifically if council has the legal power to either increase or decrease the impact fees for specific projects in an attempt to either encourage or discourage development in a certain area because we've had that conversation several times how can we either encourage development or discourage development in a certain area and how legally can we go about achieving that goal and our impact fees a legal tool to get to that goal and then number four um i'd like to ask council to revisit the rules of procedure for city council regarding a citizen's ability to speak at council work sessions we touched on it but we never came to a solution or an agreement so if staff could give us some direction on what the procedure is if legal could give us some direction on how we bring that up and revisit to try to give structure to a change if there is indeed a change on having citizens have more of an open voice at work session and kind of explore that further because we kind of ran out of time okay good all right that's my quick announcement this uh saturday 10 to 1 is the annual southeast dentin back-to-school fair at the mlk center so anyone family kids in need of back-to-school supplies can come out uh give what they need so it's one of a number of events that'll be coming up soon so if you need that come on out council member and i have a question i saw that frisco city council voted last night and i was just curious do we need to do do we need to vote in the state law that makes truancy a civil rather than a criminal offense are we going to do that for the city of denton or is that since the state passed that do we need to do that or talk about it or discuss it or see okay so you're like wanting either an informal staff report a work session or something that addresses that issue right yes okay great yeah and no go ahead can i just go back to the the previous vote for a second i don't know if that's allowed or not i just wanted to my vote the reason i voted or no okay all right i'll just make a statement later thank you i've just got a couple items we touched on this i think in our in our work session as it relates to the street impact fees i don't know that we ever really requested any specific work session or action item but um i'd like for us as a council to have a discussion on um priority placing priority on street replacements so i don't know if we ever requested to actually have a work session but yeah as we as we looked we talked about it mobility today but you know the the it's kind of been peanut buttered out over the whole city and we might want to as a council decide that we want to place more of a priority on certain high impact streets and then the the second thing is i'd like for us to at least have a policy discussion on um council member briggs brought up for example the the damage that was done to quaker town park at jazz fest um and that kind of just that expense just falls on parks and nothing was in the budget for that and so i'd like for us to have a policy discussion about you know if if you're renting or signing an agreement with an event to use a city facility and then you have a mitigating issue happen like torrential downpour to be able to have a conversation with them of okay because they're trying to decide whether they go forward or don't go forward then i don't think it's really right for the the the city to necessarily have to bear whatever brunt is caused by the event going on so for example you know to have someone from park sitting with whoever's making the decision to carry on with the event okay we're estimating this is the type of damage that's going to be done it's probably going to cost somewhere in this neighborhood to repair it all if you want to go forward you need to know you're probably going to be responsible for an expense of this or this right because otherwise we have to start building into our fees assuming those and so it could be a policy where you're just saying hey if you want to go forward or not right we may decide as a city no we're not going to do that we'll just bear the brunt of whatever it is but you could have you know that was like 30 something thousand dollars you can have a hundred thousand dollars worth of damage who knows to something so i think it's a good policy discussion to have you know along that line under new business i will echo that sentiment and austin you know had to make some tough decisions on some of those things because some of the festivals were really messing up some of their parks so any other concluding items everybody's just itching to get out of here man i could just oh man they're just wanting to hurry up watts okay well we'll stand adjourned at uh 658 p.m.
Back to Meeting