WEBVTT

00:00:00.000 --> 00:00:06.440
 >> Good evening, ladies and gentlemen, and welcome to the Planning and Zoning Commission

00:00:06.440 --> 00:00:09.840
 work session meeting for Wednesday, July 14th, 2021.

00:00:09.840 --> 00:00:16.360
 Seeing that we have a quorum, I'll call the meeting to order at 433.

00:00:16.360 --> 00:00:19.880
 On the agenda this evening, there's no work session reports and there's not any comments

00:00:19.880 --> 00:00:24.320
 on the citizen or the consent agenda item, so we'll hop right into the regular meeting

00:00:24.320 --> 00:00:25.320
 agenda items.

00:00:25.320 --> 00:00:31.640
 Meeting first with item two, consider the approval of the June 23rd, 2021 minutes.

00:00:31.640 --> 00:00:37.360
 Is there any edits or talking points on the minutes this evening?

00:00:37.360 --> 00:00:38.360
 Great.

00:00:38.360 --> 00:00:41.080
 That moves us to our consent agenda.

00:00:41.080 --> 00:00:44.000
 We have two, a final plat and a preliminary plat.

00:00:44.000 --> 00:00:47.560
 Is there any questions on these that we can call up?

00:00:47.560 --> 00:00:48.560
 City planners on this.

00:00:48.560 --> 00:00:50.440
 Any questions on the consent?

00:00:50.440 --> 00:00:51.440
 Okay.

00:00:51.440 --> 00:00:52.440
 Great.

00:00:52.440 --> 00:01:00.760
 Let's hop into the items for individual consideration, starting with 4AFP20-0027C, presented by

00:01:00.760 --> 00:01:01.760
 Haley.

00:01:01.760 --> 00:01:02.760
 You're presenting this one?

00:01:02.760 --> 00:01:03.760
 >> I will.

00:01:03.760 --> 00:01:04.760
 Yeah.

00:01:04.760 --> 00:01:07.760
 Who do you mind filling up the presentation?

00:01:07.760 --> 00:01:14.840
 Yeah, while Karina gets that one pulled up, this is a final plat for the woodlands on McKinney

00:01:14.840 --> 00:01:15.840
 Street.

00:01:15.840 --> 00:01:18.040
 It's one you all have seen several times before.

00:01:18.040 --> 00:01:21.760
 A new version of the plat was sent to you just this afternoon.

00:01:21.760 --> 00:01:27.420
 So since the agenda posting, the applicant has been able to work through all of their

00:01:27.420 --> 00:01:31.120
 outstanding comments related to review of their deed restrictions and some just easement

00:01:31.120 --> 00:01:35.740
 mislabelings and cleanup type items.

00:01:35.740 --> 00:01:38.920
 So we are able to recommend approval of the plat this evening.

00:01:38.920 --> 00:01:44.080
 I'm happy to answer any questions if you all have them on this one.

00:01:44.080 --> 00:01:45.560
 Any questions for Haley?

00:01:45.560 --> 00:01:46.560
 Okay.

00:01:46.560 --> 00:01:53.680
 Seeing none, we'll move to the next item of business, item 4B, PP21-0012.

00:01:53.680 --> 00:01:55.120
 This also is Haley.

00:01:55.120 --> 00:01:56.120
 Yes.

00:01:56.120 --> 00:02:02.280
 So this next plat is a single lot industrial development for -- I'm sorry.

00:02:02.280 --> 00:02:04.440
 This is actually three lots.

00:02:04.440 --> 00:02:09.480
 This is the urban logistics facility on I-35, the frontage of the Acme property that was

00:02:09.480 --> 00:02:10.940
 recently rezoned.

00:02:10.940 --> 00:02:16.080
 So at this time, the plat is recommended for denial as they have several outstanding comments

00:02:16.080 --> 00:02:17.440
 that they have not yet worked through.

00:02:17.440 --> 00:02:20.160
 However, they have requested that extension.

00:02:20.160 --> 00:02:23.960
 We don't quite have 30 days, but August 4th would put them at approximately 20 days from

00:02:23.960 --> 00:02:24.960
 now.

00:02:24.960 --> 00:02:28.500
 So that is the date certain that they've requested that extension to and staff has no objection

00:02:28.500 --> 00:02:29.920
 to that request.

00:02:29.920 --> 00:02:32.640
 So I'm happy to answer any questions on this project as well.

00:02:32.640 --> 00:02:35.200
 Any questions for Haley?

00:02:35.200 --> 00:02:39.060
 All right.

00:02:39.060 --> 00:02:44.580
 Seeing none, we'll move to the next item, 4C, FR21-0006.

00:02:44.580 --> 00:02:45.720
 This is Ron's item.

00:02:45.720 --> 00:02:46.720
 I had a question.

00:02:46.720 --> 00:02:51.400
 I just had a quick question.

00:02:51.400 --> 00:02:52.400
 What was the date on that?

00:02:52.400 --> 00:02:54.440
 I just didn't hear.

00:02:54.440 --> 00:02:55.440
 It was August 4th.

00:02:55.440 --> 00:02:56.440
 Okay.

00:02:56.440 --> 00:02:57.440
 Thank you.

00:02:57.440 --> 00:03:09.160
 A development just south of I-35, Eagle Creek.

00:03:09.160 --> 00:03:10.520
 It is a residential development.

00:03:10.520 --> 00:03:13.160
 It is a multi-phase development.

00:03:13.160 --> 00:03:17.760
 The development or the phase that they're proposing with this final replant is phase

00:03:17.760 --> 00:03:18.760
 4.

00:03:18.760 --> 00:03:26.080
 It contains 216 residential lots and three open space lots, HOA lots.

00:03:26.080 --> 00:03:31.520
 The staff is recommending denial as the applicant has not met the requirements or the criteria

00:03:31.520 --> 00:03:41.920
 for approval per the DDC, specifically sections 832D, 835, and 836J related to notification

00:03:41.920 --> 00:03:45.280
 as well as HOA documentation.

00:03:45.280 --> 00:03:50.280
 There was an extension already on this item, so there will not be an extension.

00:03:50.280 --> 00:03:54.880
 Again, staff is recommending denial, and I'll stand for any questions.

00:03:54.880 --> 00:03:59.000
 Ron, has the other phases already been plotted, if you can remind me?

00:03:59.000 --> 00:04:00.000
 There have been approvals.

00:04:00.000 --> 00:04:05.240
 I'll double check if they've been filed with the count, but yeah, phase one and two, there

00:04:05.240 --> 00:04:07.080
 has already been approved.

00:04:07.080 --> 00:04:08.080
 Okay.

00:04:08.080 --> 00:04:09.080
 Yes.

00:04:09.080 --> 00:04:10.080
 Great.

00:04:10.080 --> 00:04:11.080
 Any other questions for Ron?

00:04:11.080 --> 00:04:12.080
 All right.

00:04:12.080 --> 00:04:14.040
 I don't see any.

00:04:14.040 --> 00:04:19.200
 Next is item 4D, PP21-0011B.

00:04:19.200 --> 00:04:20.200
 This is Corrina.

00:04:20.200 --> 00:04:21.200
 Good afternoon.

00:04:21.200 --> 00:04:24.680
 Corrina Maldonado, Associate Planner.

00:04:24.680 --> 00:04:30.600
 The preliminary plat before you today is PP21-0011B.

00:04:30.600 --> 00:04:33.960
 This was brought forth to you at the previous Planning and Zoning Commission meeting, and

00:04:33.960 --> 00:04:39.200
 you recommended an extension of this item.

00:04:39.200 --> 00:04:44.560
 Staff was previously recommending denial of this item, and is now recommending approval,

00:04:44.560 --> 00:04:51.320
 as they now have met all requirements, including preliminary tree preservation within our code,

00:04:51.320 --> 00:04:53.320
 and I can take any questions on this.

00:04:53.320 --> 00:04:54.320
 Great.

00:04:54.320 --> 00:04:57.320
 Any questions for Corrina?

00:04:57.320 --> 00:04:58.320
 I do not see any.

00:04:58.320 --> 00:04:59.320
 Thank you.

00:04:59.320 --> 00:05:10.680
 That brings us to item 4E, ZCP21-0017, and this is also Corrina.

00:05:10.680 --> 00:05:16.920
 Thank you.

00:05:16.920 --> 00:05:25.640
 This is ZCP21-0017 for Razor Ranch Multifamily at Heritage Trail.

00:05:25.640 --> 00:05:30.680
 The request today is for a consideration of approval of a site plan for a multifamily

00:05:30.680 --> 00:05:31.680
 use.

00:05:31.680 --> 00:05:40.220
 The site is approximately 5.906 acres, located on Lot 1 and Lot 2 Block E of the Razor Ranch

00:05:40.220 --> 00:05:41.840
 East addition.

00:05:41.840 --> 00:05:46.080
 They will have to replat into one lot for this site.

00:05:46.080 --> 00:05:48.760
 It is located in the Razor Ranch Overlay District.

00:05:48.760 --> 00:05:51.760
 You can see that the aerial map doesn't give it justice.

00:05:51.760 --> 00:05:55.600
 A lot of this is already starting to develop, but it is located here in yellow.

00:05:55.600 --> 00:06:01.380
 It is surrounded by four public streets, so that would be Linden Drive to the north, Heritage

00:06:01.380 --> 00:06:08.720
 Trail to the west, Panhandle Street to the south, and East Park Boulevard to the east.

00:06:08.720 --> 00:06:13.200
 As I mentioned, this is located in the Razor Ranch Overlay District, which has a base zoning

00:06:13.200 --> 00:06:20.240
 of RCCD that goes back to our 2002 Denton Development Code, and it is located in the

00:06:20.240 --> 00:06:23.560
 South Mixed Use District of the Overlay District.

00:06:23.560 --> 00:06:29.520
 The proposed use of multifamily is permitted in this area, and just wanted to point out

00:06:29.520 --> 00:06:37.240
 that the last time you saw this site in particular was with the zoning case where they were revising

00:06:37.240 --> 00:06:42.800
 or amending the concept plan to revise the southern portion, which was previously indicating

00:06:42.800 --> 00:06:49.000
 a park use, and changed that to now allow for the multifamily use.

00:06:49.000 --> 00:06:54.680
 The multifamily standards for this site, those located east of Heritage Trail, are subject

00:06:54.680 --> 00:07:00.240
 to architectural landscape standards found in Ordinance Z18-0026, and that would be

00:07:00.240 --> 00:07:03.200
 Exhibit C2A.

00:07:03.200 --> 00:07:09.120
 Like all other site plans for the Razor Ranch Overlay District, this does require approval

00:07:09.120 --> 00:07:10.800
 through the Planning and Zoning Commission.

00:07:10.800 --> 00:07:13.960
 Typically, you don't see these site plans.

00:07:13.960 --> 00:07:17.920
 They're administrative with staff, but for Razor Ranch, this is why you're seeing this

00:07:17.920 --> 00:07:18.920
 today.

00:07:18.920 --> 00:07:22.920
 So what is included in this approval today, or consideration of approval, is the site

00:07:22.920 --> 00:07:27.000
 plan, landscape plan, and elevations.

00:07:27.000 --> 00:07:31.500
 So the criteria for approval of site plans within the Overlay District are located on

00:07:31.500 --> 00:07:32.500
 the screen.

00:07:32.500 --> 00:07:38.080
 So those would be that the site plan substantially complies with the concept and schematic plan

00:07:38.080 --> 00:07:42.560
 that's approved by council for the Overlay District, second that the site plan provides

00:07:42.560 --> 00:07:47.360
 for a compatible arrangement of buildings and land uses that would not adversely affect

00:07:47.360 --> 00:07:52.280
 adjoining neighborhoods or properties, third that the site plan provides for adequate and

00:07:52.280 --> 00:07:58.000
 safe circulation of vehicular traffic, and that the plan fully complies with all other

00:07:58.000 --> 00:08:01.600
 sections of the Overlay District.

00:08:01.600 --> 00:08:04.200
 So first, I'll go through the site plan.

00:08:04.200 --> 00:08:08.120
 I've tried to highlight some areas to make it easier to identify.

00:08:08.120 --> 00:08:19.720
 Overall, it's 3,100, 500 square feet of building area, and so that's located in blue, as well

00:08:19.720 --> 00:08:22.440
 as the administrative leasing office.

00:08:22.440 --> 00:08:27.160
 So the two areas, Building A and Building B, you can see here these L-shaped buildings.

00:08:27.160 --> 00:08:33.280
 It's a total of 322 dwelling units with multiple amenities on site.

00:08:33.280 --> 00:08:39.560
 That includes a dock park located in this green area here, a sports court, pool amenity

00:08:39.560 --> 00:08:46.840
 area, the clubhouse, and a tot park playground and plaza area.

00:08:46.840 --> 00:08:50.840
 So overall, they're providing 74.9% lot coverage.

00:08:50.840 --> 00:08:54.200
 That's less than the maximum of 90%.

00:08:54.200 --> 00:09:00.000
 They're providing 9.6% open space, and I'll go over that in the next slide.

00:09:00.000 --> 00:09:04.180
 The maximum required is 8%.

00:09:04.180 --> 00:09:07.240
 The maximum allowed height in this area is 100 feet.

00:09:07.240 --> 00:09:09.680
 They're actually under with 85 feet.

00:09:09.680 --> 00:09:15.120
 This is about seven stories, and they're providing 515 parking spaces.

00:09:15.120 --> 00:09:20.840
 That's a few spaces above the minimum of 504, but within the Razor Ranch Overlay District,

00:09:20.840 --> 00:09:24.880
 they are allowed to exceed the maximum.

00:09:24.880 --> 00:09:27.280
 So this is the landscape plan for the site.

00:09:27.280 --> 00:09:30.360
 It does meet all the minimum landscape requirements.

00:09:30.360 --> 00:09:33.840
 They are providing 21% landscape area.

00:09:33.840 --> 00:09:36.240
 The minimum would be 10%.

00:09:36.240 --> 00:09:41.440
 They're also providing 42% tree canopy, and the minimum being 20%.

00:09:41.440 --> 00:09:46.840
 On this site, they are also incorporating some various alternatives.

00:09:46.840 --> 00:09:51.280
 That would be the use of green screens on the southern parking.

00:09:51.280 --> 00:09:56.040
 You can see that in these kind of these highlighted green areas along the edge, as well as some

00:09:56.040 --> 00:10:03.280
 raised planters on the southern parking, which is a split parking design.

00:10:03.280 --> 00:10:06.920
 I'm just very quickly going through the elevations.

00:10:06.920 --> 00:10:14.440
 This is both building A and building B from Linden Drive, so that's facing south on Linden,

00:10:14.440 --> 00:10:19.760
 and then these would be the outward facing elevations, facing East Park and Heritage

00:10:19.760 --> 00:10:20.760
 Trail.

00:10:20.760 --> 00:10:27.840
 There's a few elevations of the amenity building that can be viewed from Linden Drive, as

00:10:27.840 --> 00:10:33.800
 well as the split parking that's viewable from Panhandle Street.

00:10:33.800 --> 00:10:37.440
 So with that, staff is recommending approval of the request, as it does meet the established

00:10:37.440 --> 00:10:41.720
 requirements of the Razor Ranch Overlay District, with the following conditions.

00:10:41.720 --> 00:10:47.440
 First, that any public utility easements that are shown on the site plan is being abandoned

00:10:47.440 --> 00:10:52.680
 in order to accommodate the proposed building locations, must be abandoned prior to the

00:10:52.680 --> 00:10:54.880
 issuance of any building permits.

00:10:54.880 --> 00:11:00.360
 And then second, that a replat must be submitted and approved to combine lots one and two of

00:11:00.360 --> 00:11:05.880
 the Razor Ranch East addition into one lot, again, prior to any building permits.

00:11:05.880 --> 00:11:08.080
 And with that, I can take any questions.

00:11:08.080 --> 00:11:09.080
 Great.

00:11:09.080 --> 00:11:10.200
 Thank you.

00:11:10.200 --> 00:11:12.200
 Any questions for Karina?

00:11:12.200 --> 00:11:20.200
 Karina, can you go back to any of the earlier slides that show the aerial or the actual

00:11:20.200 --> 00:11:21.200
 – that's fine.

00:11:21.200 --> 00:11:22.200
 This one's – nope.

00:11:22.200 --> 00:11:23.200
 That one's perfect.

00:11:23.200 --> 00:11:24.200
 Okay.

00:11:24.200 --> 00:11:28.400
 I know in the northeast corner, the road kind of juts out there, where they have the tot

00:11:28.400 --> 00:11:29.400
 park.

00:11:29.400 --> 00:11:33.800
 Was there any conversation around putting the kids' park right at that intersection?

00:11:33.800 --> 00:11:39.480
 It seems – I know the landscape plan has some trees, and I assume a fence, but it does

00:11:39.480 --> 00:11:43.000
 seem like not the most protected spot for kids to be playing in.

00:11:43.000 --> 00:11:44.420
 Was there any conversation around that?

00:11:44.420 --> 00:11:49.640
 There was no direct conversation related to the placement adjacent on the east side where

00:11:49.640 --> 00:11:52.600
 the senior living apartment complex is.

00:11:52.600 --> 00:11:59.480
 They did a similar design where I believe it's a pool area.

00:11:59.480 --> 00:12:02.880
 That conversation was had then about the placement.

00:12:02.880 --> 00:12:08.080
 And so since it was a similar concept, we didn't want to rehash the same item out.

00:12:08.080 --> 00:12:14.400
 So there was no specific conversation had, but it is kind of mirroring what's on the

00:12:14.400 --> 00:12:17.120
 opposite side of East Park.

00:12:17.120 --> 00:12:21.320
 And for clarification, there's a pool opposite the intersection here?

00:12:21.320 --> 00:12:22.320
 I haven't heard of that either.

00:12:22.320 --> 00:12:23.680
 Haley can speak to it better than I can.

00:12:23.680 --> 00:12:25.720
 This was more when she came through with Razor.

00:12:25.720 --> 00:12:26.720
 Correct.

00:12:26.720 --> 00:12:32.500
 You can kind of see it on the kind of northeast corner of your screen there.

00:12:32.500 --> 00:12:37.120
 The amenity – outdoor amenity area and pool at the adjacent facility on the opposite side

00:12:37.120 --> 00:12:42.320
 of East Park is right there at the corner to kind of create open spaces facing the park,

00:12:42.320 --> 00:12:43.900
 Razor Ranch Park to the north.

00:12:43.900 --> 00:12:48.080
 So they were kind of mirroring that open space concept here at the corner, pulling the buildings

00:12:48.080 --> 00:12:52.040
 back a little bit, having that amenity area at the front.

00:12:52.040 --> 00:12:55.720
 And I believe it will be fenced, of course, at this location for security.

00:12:55.720 --> 00:12:56.720
 Yes.

00:12:56.720 --> 00:12:57.720
 And I apologize.

00:12:57.720 --> 00:13:02.280
 I kind of zoomed through the presentation, but it's a little bit hard to see here.

00:13:02.280 --> 00:13:07.120
 This area here is where they are fencing in around that top park.

00:13:07.120 --> 00:13:09.120
 It does extend here.

00:13:09.120 --> 00:13:12.560
 So the building would basically block any entrance.

00:13:12.560 --> 00:13:17.480
 And then for the areas that don't have any security, there's fencing here plus retaining

00:13:17.480 --> 00:13:23.720
 walls and then pedestrian entrances from East Park Heritage in the north on Linden.

00:13:23.720 --> 00:13:27.360
 But this is, as Haley mentioned, a fenced-in area.

00:13:27.360 --> 00:13:28.360
 Great.

00:13:28.360 --> 00:13:29.360
 Thanks.

00:13:29.360 --> 00:13:30.360
 Any other questions?

00:13:30.360 --> 00:13:33.200
 I don't see any.

00:13:33.200 --> 00:13:34.880
 Thank you, Corina.

00:13:34.880 --> 00:13:37.600
 The next item of business moves us into the public hearings.

00:13:37.600 --> 00:13:43.080
 We'll start with 5AZ21-0007C.

00:13:43.080 --> 00:13:46.680
 And this is yours, Corina.

00:13:46.680 --> 00:13:50.720
 All right.

00:13:50.720 --> 00:13:51.720
 Thank you again.

00:13:51.720 --> 00:13:58.960
 This is a zoning case, so Z21-007 for the Jim Crystal Road rezoning.

00:13:58.960 --> 00:14:04.600
 The request is for, again, a rezoning for approximately 30.43 acres.

00:14:04.600 --> 00:14:09.940
 This is going from public facilities to Light Industrial District.

00:14:09.940 --> 00:14:13.160
 The site can be shown here in yellow.

00:14:13.160 --> 00:14:20.360
 This is city-owned property that was acquired in 2017 to accommodate the Denton Energy Center.

00:14:20.360 --> 00:14:24.400
 You can see in green, I've kind of surrounded the area of what is shown, at least on this

00:14:24.400 --> 00:14:29.920
 aerial, of what is city-owned property, so the rezoning would just be two portions within

00:14:29.920 --> 00:14:35.560
 that area, which I'll refer to as the northern and southern portions.

00:14:35.560 --> 00:14:41.920
 So like I mentioned, this is city-owned property, and so as part of our 2019 DDC, all property

00:14:41.920 --> 00:14:48.280
 that's owned by public entities, including the city, was automatically zoned PF, and

00:14:48.280 --> 00:14:54.560
 these areas are, again, intended for provision of public and community services like fire

00:14:54.560 --> 00:14:59.400
 stations, schools, basic utilities like the Denton Energy Center.

00:14:59.400 --> 00:15:06.800
 So the rezoning is intended to support Denton Municipal Electric's proposed ground lease

00:15:06.800 --> 00:15:11.440
 to a third party as part of a modular data center warehouse development.

00:15:11.440 --> 00:15:16.600
 This was brought forth with city council in previous work session.

00:15:16.600 --> 00:15:23.840
 And again, the PF zoning is limited to community uses, and so the rezoning is to allow for

00:15:23.840 --> 00:15:31.160
 that warehouse use, which would be permitted in LI but not in the PF zoning district.

00:15:31.160 --> 00:15:37.560
 So this is just previous and current zoning for this site, and I just wanted to highlight

00:15:37.560 --> 00:15:39.820
 something.

00:15:39.820 --> 00:15:46.280
 So the 2002 zoning map on the left hand of the slide does show the previous zoning before

00:15:46.280 --> 00:15:47.280
 2019.

00:15:47.280 --> 00:15:53.720
 So you can see the area I kind of roughly drew it in was previously zoned ICG.

00:15:53.720 --> 00:15:58.760
 That was one of our previous industrial zonings.

00:15:58.760 --> 00:16:02.920
 When it transitioned to the 2019, which you can see here on the center portion of the

00:16:02.920 --> 00:16:11.160
 slide, the PF taken out, that would have transitioned to the HI zoning district.

00:16:11.160 --> 00:16:17.840
 You can see that reflected in this small area here where the Encore substation is.

00:16:17.840 --> 00:16:23.640
 So anything that's not city owned property has transitioned to the HI district, and so

00:16:23.640 --> 00:16:30.320
 the request today is actually for a lesser intensive zoning district of the LI, Light

00:16:30.320 --> 00:16:33.680
 Industrial District.

00:16:33.680 --> 00:16:36.000
 So I'll go through the general approval criteria.

00:16:36.000 --> 00:16:39.840
 I won't go through all of them, but I have highlighted the ones that I will focus on

00:16:39.840 --> 00:16:46.680
 today, including the comprehensive plan, impacts to surrounding property, and adequate public

00:16:46.680 --> 00:16:47.680
 facilities.

00:16:47.680 --> 00:16:53.560
 Again, with the zoning criteria, I'll just go over the ones highlighted that are similar

00:16:53.560 --> 00:16:56.520
 to the general criteria.

00:16:56.520 --> 00:17:01.060
 So first, the general criterion three and zoning criterion one related to the Denton

00:17:01.060 --> 00:17:02.840
 Plan 2030.

00:17:02.840 --> 00:17:06.880
 So the future land use for this area is industrial commerce.

00:17:06.880 --> 00:17:12.080
 It is predominantly intended for light and heavy industrial, so the light industrial

00:17:12.080 --> 00:17:17.960
 district is consistent with this designation, but it does offer a less intensive zoning

00:17:17.960 --> 00:17:21.880
 than a heavy industrial district would allow.

00:17:21.880 --> 00:17:27.480
 The primary uses for this industrial commerce area are for manufacturing, assembly, fabrication,

00:17:27.480 --> 00:17:32.400
 and wholesale and distribution, so the proposed warehouse use is consistent with the intended

00:17:32.400 --> 00:17:35.680
 uses in this designation.

00:17:35.680 --> 00:17:42.880
 Next, speaking about general criterion eight and zoning criterion five, and minimizing

00:17:42.880 --> 00:17:45.920
 the adverse impacts to the surrounding property.

00:17:45.920 --> 00:17:52.080
 So as you can see, the northern portion is approximately 1,000 feet east and approximately

00:17:52.080 --> 00:17:54.120
 1,000 feet south.

00:17:54.120 --> 00:17:58.760
 From the nearest residential zoning, it's difficult to see here, so I've provided some

00:17:58.760 --> 00:18:00.280
 arrows to show.

00:18:00.280 --> 00:18:04.960
 Just right here, there's an R2 zoning, and on the west side, an R2, which is actually

00:18:04.960 --> 00:18:08.800
 buffered by an HI zoning.

00:18:08.800 --> 00:18:15.080
 The closest, most adjacent uses to that northern portion is, again, the Encore substation,

00:18:15.080 --> 00:18:21.880
 and then the Denton Electric Energy Center, excuse me, to the south, as well as flood

00:18:21.880 --> 00:18:24.420
 plain on the east side.

00:18:24.420 --> 00:18:30.480
 So the southern portion is very similar in adjacent uses.

00:18:30.480 --> 00:18:35.360
 Actually to the south, it is abutted by the rural residential zoning.

00:18:35.360 --> 00:18:41.800
 That property to the south was annexed in 2010, and under the 2002 zoning was given

00:18:41.800 --> 00:18:45.120
 the placeholder zoning of RD5X.

00:18:45.120 --> 00:18:53.400
 When this transitioned in the 2019 zoning, it was given that RR as a base zoning.

00:18:53.400 --> 00:18:59.120
 Existing on the southern portion, or sorry, south of the southern portion, are some active

00:18:59.120 --> 00:19:05.360
 gas wells that you can see kind of scattered around the site, so that area would not develop

00:19:05.360 --> 00:19:11.400
 into residential in the future due to our gas well setbacks.

00:19:11.400 --> 00:19:18.240
 Next, just talking about existing facilities, so to serve the site, there is existing water

00:19:18.240 --> 00:19:22.440
 and sewer to both the northern and southern portions.

00:19:22.440 --> 00:19:28.440
 Any extension of utilities would be looked at with any platting if this were to be approved.

00:19:28.440 --> 00:19:34.360
 The subject sites do have access directly from Jim Crystal through way of private access,

00:19:34.360 --> 00:19:39.200
 and for emergency services, the site is served by Fire Station 3.

00:19:39.200 --> 00:19:43.760
 This is the new fire station at 1401 Underwood.

00:19:43.760 --> 00:19:47.880
 We did have some public outreach notices were sent out.

00:19:47.880 --> 00:19:51.960
 Due to the location of the site, there's not much that's close to it except for city-owned

00:19:51.960 --> 00:19:56.840
 property with a few exceptions, so we have not received any responses.

00:19:56.840 --> 00:20:01.360
 We did hold a virtual community meeting on June 17th.

00:20:01.360 --> 00:20:07.160
 The radius for how many people were notified, I believe, was about 1,000 feet from the subject

00:20:07.160 --> 00:20:08.160
 site.

00:20:08.160 --> 00:20:15.640
 The main questions, we did have a few people in attendance, were related to noise mitigation,

00:20:15.640 --> 00:20:20.200
 what the adjacent zoning looked like, and how they would be impacted by the supply for

00:20:20.200 --> 00:20:21.200
 electricity.

00:20:21.200 --> 00:20:27.600
 DME was in attendance to address any concerns, and the overall response from the public was

00:20:27.600 --> 00:20:28.600
 positive.

00:20:28.600 --> 00:20:33.840
 With this, staff does recommend approval of the request as it does comply with the general

00:20:33.840 --> 00:20:39.080
 criteria and zoning criteria in Section 2.4E of the Debt and Development Code in Section

00:20:39.080 --> 00:20:42.080
 272D.

00:20:42.080 --> 00:20:48.640
 The next steps after this request is that it will go to the city council on July 20th.

00:20:48.640 --> 00:20:51.960
 That's next Tuesday.

00:20:51.960 --> 00:20:57.480
 In relation to the project, on July 27th, city council will consider a lease agreement

00:20:57.480 --> 00:21:00.280
 and a power purchase agreement for the site.

00:21:00.280 --> 00:21:02.480
 With that, I can take any questions.

00:21:02.480 --> 00:21:08.920
 DME will be here to answer any questions during the regular session.

00:21:08.920 --> 00:21:09.920
 Great.

00:21:09.920 --> 00:21:10.920
 Thank you, Carina.

00:21:10.920 --> 00:21:11.920
 Any questions?

00:21:11.920 --> 00:21:16.920
 I have maybe two.

00:21:16.920 --> 00:21:23.120
 One, tangential to this conversation, you said the property to the west is buffered

00:21:23.120 --> 00:21:24.120
 by an HI.

00:21:24.120 --> 00:21:32.180
 Is HI an appropriate buffer from a LI zoning into R2?

00:21:32.180 --> 00:21:36.800
 The HI is an existing zoning.

00:21:36.800 --> 00:21:41.280
 It's kind of odd in the way that it looks right now because it's city-owned property,

00:21:41.280 --> 00:21:42.280
 so it's PF.

00:21:42.280 --> 00:21:44.560
 HI is what's already existing.

00:21:44.560 --> 00:21:49.720
 The space between the HI and the proposed site, maybe I should just pull the presentation

00:21:49.720 --> 00:21:50.720
 back up.

00:21:50.720 --> 00:21:54.440
 But there is a significant spacing in between.

00:21:54.440 --> 00:21:58.440
 If there's any development of the HI, there is mitigations when an HI development goes

00:21:58.440 --> 00:22:01.160
 into an R2.

00:22:01.160 --> 00:22:04.480
 Right now, the R2, there's an existing home there.

00:22:04.480 --> 00:22:12.340
 I would say it's unlikely that that would develop anytime soon just because it's really

00:22:12.340 --> 00:22:19.200
 all industrial in nature, even if it's city property, the existing uses are substations

00:22:19.200 --> 00:22:20.200
 and gas wells.

00:22:20.200 --> 00:22:21.200
 Gotcha.

00:22:21.200 --> 00:22:23.160
 You mentioned on the earlier slide that it's a private company.

00:22:23.160 --> 00:22:25.200
 Is that contract existing?

00:22:25.200 --> 00:22:26.800
 Is it public?

00:22:26.800 --> 00:22:29.400
 I think someone can answer that.

00:22:29.400 --> 00:22:30.680
 That is not me.

00:22:30.680 --> 00:22:36.240
 I'm just curious on who's putting a data warehouse in the city if that's public.

00:22:36.240 --> 00:22:44.360
 What I can provide is the city is working with Tanaska on the development of this site

00:22:44.360 --> 00:22:47.880
 through the power purchase agreement, and I'm not sure if maybe Haley or Matt can jump

00:22:47.880 --> 00:22:54.080
 in, but that will be going to council, and there has been a work session on it.

00:22:54.080 --> 00:22:58.800
 There is an NDA on a portion of it, so that's why I hesitate to say anything.

00:22:58.800 --> 00:23:03.280
 That's why I was wondering, is the company public?

00:23:03.280 --> 00:23:07.280
 I do not believe so, defer to Matt on that one.

00:23:07.280 --> 00:23:08.280
 Right.

00:23:08.280 --> 00:23:13.240
 My understanding at this point is it's still subject to non-disclosure agreement.

00:23:13.240 --> 00:23:17.800
 Whoever Tanaska is working with, so that's still not public information at this point.

00:23:17.800 --> 00:23:18.800
 Okay.

00:23:18.800 --> 00:23:19.800
 Great.

00:23:19.800 --> 00:23:22.480
 Any other questions for Karina?

00:23:22.480 --> 00:23:26.320
 All right.

00:23:26.320 --> 00:23:31.960
 Moving on to item 5B, Z20-0005B.

00:23:31.960 --> 00:23:34.120
 This is Julie Wyatt's item.

00:23:34.120 --> 00:23:36.040
 Good evening.

00:23:36.040 --> 00:23:40.440
 Let me pull up my presentation.

00:23:40.440 --> 00:23:44.920
 Here we go.

00:23:44.920 --> 00:23:45.920
 Good evening.

00:23:45.920 --> 00:23:51.520
 I'm Julie Wyatt, senior planner with the city of Denton, and I am presenting Z20-0005B,

00:23:51.520 --> 00:23:53.640
 Denton Commerce Center.

00:23:53.640 --> 00:23:57.560
 So the request before you is to rezone approximately 142 acres.

00:23:57.560 --> 00:23:58.560
 Julie.

00:23:58.560 --> 00:23:59.560
 Presentation.

00:23:59.560 --> 00:24:00.560
 It's not shared.

00:24:00.560 --> 00:24:08.800
 I promised I wouldn't do that, and then I did it.

00:24:08.800 --> 00:24:14.040
 I apologize.

00:24:14.040 --> 00:24:15.040
 There we go.

00:24:15.040 --> 00:24:16.040
 Okay.

00:24:16.040 --> 00:24:23.760
 So, the request is to rezone about 142 acres from mixed use regional to light industrial

00:24:23.760 --> 00:24:24.760
 district.

00:24:24.760 --> 00:24:32.120
 Light is located along the west side of I-35, where Loop 288 currently ends, but it will

00:24:32.120 --> 00:24:33.640
 eventually be extended.

00:24:33.640 --> 00:24:40.280
 It's just on the north side of that future Loop 288 alignment.

00:24:40.280 --> 00:24:45.120
 The current zoning map has the subject property as mixed use regional, that MR, and they are

00:24:45.120 --> 00:24:49.040
 proposing LI, which is in the light blue.

00:24:49.040 --> 00:24:52.880
 The criteria for approval for a zoning case is in subchapter 2 of the Denton Development

00:24:52.880 --> 00:24:56.200
 code, both the general and specific.

00:24:56.200 --> 00:25:00.160
 First thing we always look at is the future land use map, the Denton Plan 2030.

00:25:00.160 --> 00:25:04.520
 The subject property has a future land use designation of business innovation.

00:25:04.520 --> 00:25:09.600
 That's intended for those large tracts of land to support those employment type uses,

00:25:09.600 --> 00:25:15.200
 larger scale offices, employment parks, industrial type uses.

00:25:15.200 --> 00:25:20.640
 It does have supporting uses such as retail, hotels, and residential that could be potentially

00:25:20.640 --> 00:25:22.840
 be appropriate.

00:25:22.840 --> 00:25:27.000
 Currently we see two zoning districts within business innovation, LI and GO.

00:25:27.000 --> 00:25:29.640
 In this instance, LI is consistent.

00:25:29.640 --> 00:25:34.920
 It does provide those types of uses that we want to see in business innovation at that

00:25:34.920 --> 00:25:39.160
 scale that is typically found in business innovation.

00:25:39.160 --> 00:25:43.640
 One commissioner did have questions about commercial development standards.

00:25:43.640 --> 00:25:50.000
 Given that this is along one of our primary corridors, I-35 as well as Loop 288, the Denton

00:25:50.000 --> 00:25:55.240
 Development code requires that any structures within 250 feet of that ultimate right of

00:25:55.240 --> 00:25:59.360
 way would have to comply with our commercial design standards.

00:25:59.360 --> 00:26:03.200
 This property is kind of unique in that and it's really along three rights of way that

00:26:03.200 --> 00:26:04.460
 it would have to comply.

00:26:04.460 --> 00:26:10.920
 I've created a little, it's not to scale, but a little exhibit here showing all of those

00:26:10.920 --> 00:26:14.440
 areas that it would have to comply with those commercial design standards.

00:26:14.440 --> 00:26:18.880
 Then additionally, I just wanted to point out that both the Planning and Zoning Commission

00:26:18.880 --> 00:26:23.760
 and City Council have talked about a small area plan for this general area because there

00:26:23.760 --> 00:26:28.480
 is a lot of development pressure and this is one of our gateways to the city.

00:26:28.480 --> 00:26:34.280
 As indicated in those discussions about that small area plan, it's kind of indicated that

00:26:34.280 --> 00:26:39.800
 the industrial, that west side of I-35 corridor is where we want to see our industrial centers.

00:26:39.800 --> 00:26:44.160
 This is consistent with that discussion.

00:26:44.160 --> 00:26:48.480
 Another criterion for approval is significant changes in the area to warrant the zoning

00:26:48.480 --> 00:26:50.240
 change.

00:26:50.240 --> 00:26:54.840
 We had to kind of go way back to figure out how the property was zoned the way it was.

00:26:54.840 --> 00:26:58.200
 We looked at that 1999 Denton plan.

00:26:58.200 --> 00:27:05.560
 At that time, the city anticipated that this part of the city would develop with a regional

00:27:05.560 --> 00:27:12.000
 mixed use center, more commercial uses, and the zoning reflected that vision.

00:27:12.000 --> 00:27:19.160
 The zoning was one of our regional mixed use districts that was available under that 2002

00:27:19.160 --> 00:27:20.160
 code.

00:27:20.160 --> 00:27:25.880
 So that 1999 plan, that vision, and the zoning were consistent.

00:27:25.880 --> 00:27:31.360
 Denton Plan 2030 kind of looked at the area and looked at the broader Denton and determined

00:27:31.360 --> 00:27:36.520
 that we already had three other regional commercial centers and this really wasn't going to be

00:27:36.520 --> 00:27:41.360
 a regional commercial center and so the vision for this area changed to that more employment

00:27:41.360 --> 00:27:43.400
 uses, that business innovation.

00:27:43.400 --> 00:27:46.200
 However, the zoning kind of stayed in place.

00:27:46.200 --> 00:27:52.320
 So that zoning then transitioned with the 2019 plan to that MR district.

00:27:52.320 --> 00:27:55.000
 So that's really how that zoning got in place.

00:27:55.000 --> 00:27:57.320
 So you can see the subject property here.

00:27:57.320 --> 00:27:58.320
 This map is from 1999.

00:27:58.320 --> 00:28:01.800
 There wasn't a lot out there in 1999.

00:28:01.800 --> 00:28:07.880
 The subject site has that star on it and here is just a screenshot from that 1999 Denton

00:28:07.880 --> 00:28:13.840
 Plan showing that regional mixed use center along with the subject property with that

00:28:13.840 --> 00:28:14.840
 star.

00:28:14.840 --> 00:28:19.240
 So that vision of the area really has changed, but that zoning hasn't been updated to reflect

00:28:19.240 --> 00:28:21.680
 that new vision.

00:28:21.680 --> 00:28:25.840
 Another criterion minimizes adverse impacts on surrounding property.

00:28:25.840 --> 00:28:31.520
 LI district is appropriate in this area, not anticipated to create adverse impacts.

00:28:31.520 --> 00:28:36.360
 A lot of the surrounding property is either undeveloped or maybe has agricultural uses.

00:28:36.360 --> 00:28:41.720
 However, as it starts to develop, we do anticipate that it's going to develop consistent with

00:28:41.720 --> 00:28:47.560
 that future land use designation and that that zoning will continue to track with that

00:28:47.560 --> 00:28:51.040
 comprehensive plan.

00:28:51.040 --> 00:28:53.160
 Public facilities available to serve the property.

00:28:53.160 --> 00:28:59.640
 There are, there's adequate transportation currently and it will also continue to improve.

00:28:59.640 --> 00:29:06.880
 They do, the site currently has access to I-35, that corridor, as well as FM 1173.

00:29:06.880 --> 00:29:13.060
 However, as you're probably aware, there are improvements that are imminent in this corridor.

00:29:13.060 --> 00:29:19.640
 There are improvements to the, to I-35 that TexDOT is moving forward with as well as that

00:29:19.640 --> 00:29:21.320
 Loop 288.

00:29:21.320 --> 00:29:28.480
 It's currently under design and they anticipate that Loop 288 is going to start around 2026,

00:29:28.480 --> 00:29:29.480
 I believe.

00:29:29.480 --> 00:29:34.800
 It's probably a fluid date, but it is under design now, so it is moving forward, that

00:29:34.800 --> 00:29:37.040
 extension of that roadway.

00:29:37.040 --> 00:29:41.560
 And there is a concurrent comprehensive plan amendment that we're going to be talking about

00:29:41.560 --> 00:29:44.280
 regarding mobility in the area.

00:29:44.280 --> 00:29:47.680
 There is water and wastewater available to the site.

00:29:47.680 --> 00:29:52.920
 A new lift station may be required for that sewer, but that will be determined at that

00:29:52.920 --> 00:29:56.160
 platting stage.

00:29:56.160 --> 00:29:57.160
 Public outreach was done.

00:29:57.160 --> 00:30:03.080
 That says February 27th, it was actually, and I wrote down on a note, it was actually

00:30:03.080 --> 00:30:05.440
 consistent with what is required.

00:30:05.440 --> 00:30:08.760
 This was a cut and paste error.

00:30:08.760 --> 00:30:13.640
 It is consistent with our requirements for newspaper ads, as well as the property was

00:30:13.640 --> 00:30:18.080
 posted on July 2nd of this year.

00:30:18.080 --> 00:30:21.360
 So they did meet all of that notification requirements.

00:30:21.360 --> 00:30:24.840
 We haven't received any responses regarding this case.

00:30:24.840 --> 00:30:29.100
 So staff does recommend approval of the request, is that it complies with the criteria for

00:30:29.100 --> 00:30:31.640
 approval and I'll be happy to answer any questions.

00:30:31.640 --> 00:30:35.600
 And the applicant will be here with a presentation tonight.

00:30:35.600 --> 00:30:38.360
 Any questions for Julie?

00:30:38.360 --> 00:30:43.760
 I have a couple questions.

00:30:43.760 --> 00:30:46.880
 The small area plan that you mentioned, has that been approved, or is that just like there's

00:30:46.880 --> 00:30:49.360
 momentum towards that?

00:30:49.360 --> 00:30:53.960
 Haley might know more than me, but I believe there is momentum that council did want to

00:30:53.960 --> 00:30:55.720
 move forward with that small area plan.

00:30:55.720 --> 00:30:59.360
 I don't think it's gotten underway yet, but it is.

00:30:59.360 --> 00:31:00.720
 No, that's correct.

00:31:00.720 --> 00:31:05.720
 There was a work session with council following the discussion that we had with you all, and

00:31:05.720 --> 00:31:08.920
 they were in favor of staff moving forward with that, but that has not officially kicked

00:31:08.920 --> 00:31:09.920
 off today.

00:31:09.920 --> 00:31:11.960
 But we are definitely moving in that direction.

00:31:11.960 --> 00:31:19.640
 And at the risk of breaking my own rule on a zoning case, is the proposed use to warehousing?

00:31:19.640 --> 00:31:21.360
 They have talked about distribution.

00:31:21.360 --> 00:31:24.140
 They've also talked about other employment uses.

00:31:24.140 --> 00:31:29.440
 So we don't have an end user or a final reviewed site plan.

00:31:29.440 --> 00:31:34.880
 They've shared some kind of conceptual plans with us, but given that this is a straight

00:31:34.880 --> 00:31:44.160
 zoning case, really any of those uses permitted under that LI, if it's approved, could be

00:31:44.160 --> 00:31:48.440
 developed to that scale that would be permitted under LI.

00:31:48.440 --> 00:31:54.240
 And then the last question I think I have is you mentioned that under business innovation,

00:31:54.240 --> 00:31:59.960
 it's LI and GO, is that codified or is that just like a working, these typically fit?

00:31:59.960 --> 00:32:01.960
 That is a great question.

00:32:01.960 --> 00:32:09.100
 No, so we have our typical zoning districts that we often see related to certain future

00:32:09.100 --> 00:32:12.280
 land use designations, but there is flexibility within that.

00:32:12.280 --> 00:32:19.840
 I know we've seen HC within business innovation when it's been adjacent to the highway corridor.

00:32:19.840 --> 00:32:26.440
 So while there are kind of typical zoning districts that we often see and that really

00:32:26.440 --> 00:32:32.000
 slot well within those future land use designations, there is flexibility since that comp plan

00:32:32.000 --> 00:32:39.480
 is that policy document and has a lot of provisions that could inform that zoning case, but so

00:32:39.480 --> 00:32:40.480
 not codified.

00:32:40.480 --> 00:32:48.720
 Yeah, and maybe I'll bring this up in the regular meeting, but I have some concerns

00:32:48.720 --> 00:32:50.040
 in long-term planning.

00:32:50.040 --> 00:32:56.080
 I understand like there's a need or at least a market for light industrial in Denton and

00:32:56.080 --> 00:33:02.080
 they like the airport in west of 35, but I don't want Denton to become the warehousing

00:33:02.080 --> 00:33:07.840
 for Plano and Frisco as Plano and Frisco attract all the big headquarters and then Denton becomes

00:33:07.840 --> 00:33:14.720
 this warehousing center for a lot of the corporate job opportunities that are not getting to

00:33:14.720 --> 00:33:15.720
 Denton.

00:33:15.720 --> 00:33:23.360
 And so I have this tension of we have an area for business innovation and cognitively warehousing

00:33:23.360 --> 00:33:31.200
 distribution doesn't align with what I would think of business innovation and these kind

00:33:31.200 --> 00:33:35.880
 of headquarter business parks that we had talked about years ago of drawing in.

00:33:35.880 --> 00:33:40.680
 And so I'll just have to think through that, but that's where my mind is right now with

00:33:40.680 --> 00:33:41.680
 that.

00:33:41.680 --> 00:33:42.680
 Any...

00:33:42.680 --> 00:33:43.680
 Commissioner Smith?

00:33:43.680 --> 00:33:44.680
 Thank you, Chair.

00:33:44.680 --> 00:33:50.520
 I wasn't present for the work session discussion that happened around the small area plan after

00:33:50.520 --> 00:33:55.080
 that Hirschbach property went out and we started talking about the small area plan, would Margie

00:33:55.080 --> 00:33:58.560
 or Ronnie or Andrew, would you guys maybe fill me on the discussion if you guys remember

00:33:58.560 --> 00:34:05.560
 anything from that, be helpful just to see what recommendations we made as a commission

00:34:05.560 --> 00:34:10.080
 that city council I know is reviewing and they said that city staff should start looking

00:34:10.080 --> 00:34:11.080
 into it.

00:34:11.080 --> 00:34:13.200
 What were y'all's thoughts in that process?

00:34:13.200 --> 00:34:14.200
 Yeah.

00:34:14.200 --> 00:34:18.760
 Haley, do you know what was reported out to council maybe to frame what actually left PNZ

00:34:18.760 --> 00:34:19.760
 to council?

00:34:19.760 --> 00:34:20.760
 Sure.

00:34:20.760 --> 00:34:24.720
 Ron actually did that presentation and he is here tonight so he can give us a brief overview

00:34:24.720 --> 00:34:27.720
 of that if that would be helpful.

00:34:27.720 --> 00:34:28.720
 Yes.

00:34:28.720 --> 00:34:32.520
 We took the same presentation that we did to the planning zoning commission, shared your

00:34:32.520 --> 00:34:38.960
 concerns related to that area and wanting to have the small area plan for that area.

00:34:38.960 --> 00:34:44.040
 The city council was also in favor of that and again as mentioned earlier by Haley and

00:34:44.040 --> 00:34:46.640
 staff they directed us to move forward with it.

00:34:46.640 --> 00:34:51.440
 Now the issue here, not the issue, but really the timing that we're trying to do is to make

00:34:51.440 --> 00:34:57.160
 sure that the comp plan update as well as the small area plan is in concert.

00:34:57.160 --> 00:35:01.000
 So we're working towards that right now and putting together a timeline for that to happen

00:35:01.000 --> 00:35:06.880
 around the same time so we don't go into it without really having the comp plan really

00:35:06.880 --> 00:35:10.080
 inform what that small area plan is to be.

00:35:10.080 --> 00:35:11.380
 So that's where we are.

00:35:11.380 --> 00:35:15.960
 So there really wasn't any recommendations by the planning zoning commission other than

00:35:15.960 --> 00:35:19.240
 to initiate that small area plan.

00:35:19.240 --> 00:35:20.240
 And council concurred.

00:35:20.240 --> 00:35:21.240
 Yeah.

00:35:21.240 --> 00:35:26.280
 So it was all mainly logistics conversation, it wasn't typical type of use what we think

00:35:26.280 --> 00:35:28.160
 we would like to see that kind of stuff.

00:35:28.160 --> 00:35:29.160
 No.

00:35:29.160 --> 00:35:32.040
 It's too premature for that and we wanted to make sure that there was public outreach

00:35:32.040 --> 00:35:35.520
 and stakeholder interviews or stakeholder involvement.

00:35:35.520 --> 00:35:36.520
 Okay.

00:35:36.520 --> 00:35:40.240
 Yeah, I think and Commissioner Ellis and others can correct me if my memory is failing me,

00:35:40.240 --> 00:35:44.640
 but I think there was the idea that people are entering into our town right there and

00:35:44.640 --> 00:35:47.440
 how do we protect and actually plan that area.

00:35:47.440 --> 00:35:51.280
 And there was mention at the time that there's some industrial or warehousing needs that

00:35:51.280 --> 00:35:54.960
 are kind of getting cluttered by the airport and there's a market demand kind of moving

00:35:54.960 --> 00:35:56.600
 that north.

00:35:56.600 --> 00:36:00.240
 But to Ron's point, we didn't talk about what we wanted to see there.

00:36:00.240 --> 00:36:06.280
 We just want something, some planning to be done around that massive intersection as a

00:36:06.280 --> 00:36:07.760
 gateway into the city.

00:36:07.760 --> 00:36:11.360
 So as far as I understand, there's the current momentum to still continue that, but there's

00:36:11.360 --> 00:36:16.520
 not any that I've seen or you're telling me now, any direction on what is contained in

00:36:16.520 --> 00:36:17.520
 the SAP.

00:36:17.520 --> 00:36:18.520
 That's right.

00:36:18.520 --> 00:36:19.520
 Right.

00:36:19.520 --> 00:36:22.760
 And part of that effort that we would be initiating is also to set the boundary of that area too.

00:36:22.760 --> 00:36:26.040
 So a lot of work has to still be done in order to get to that point.

00:36:26.040 --> 00:36:27.040
 Got it.

00:36:27.040 --> 00:36:30.120
 I'll say the rest of my comments for public.

00:36:30.120 --> 00:36:33.560
 No, I agree with the chair on this.

00:36:33.560 --> 00:36:35.680
 I don't want to see that intersection.

00:36:35.680 --> 00:36:40.040
 That's the main throat, you know, 35 and that new loop is going to be a major intersection.

00:36:40.040 --> 00:36:43.040
 I don't want to see it become just a warehouse district.

00:36:43.040 --> 00:36:50.860
 I mean, let's put that like on the, you know, further out and have like nice commercial restaurants

00:36:50.860 --> 00:36:51.860
 and all that stuff along there.

00:36:51.860 --> 00:36:56.640
 I mean, I know that's stuff that you're going to discuss later, but I just want to kind

00:36:56.640 --> 00:37:00.040
 of reiterate what chair is saying as well, that I don't think that would look good for

00:37:00.040 --> 00:37:06.440
 a city that didn't just be in a warehouse district right there on the major thoroughfare.

00:37:06.440 --> 00:37:08.680
 Any other questions for Ron or statements?

00:37:08.680 --> 00:37:09.680
 Okay.

00:37:09.680 --> 00:37:10.680
 Great.

00:37:10.680 --> 00:37:11.680
 Thanks, Ron.

00:37:11.680 --> 00:37:15.920
 Next item of business is item 5C, CA21-0001.

00:37:15.920 --> 00:37:17.840
 And this is back to Julie.

00:37:17.840 --> 00:37:29.340
 All right, so this is a, let me get to it.

00:37:29.340 --> 00:37:36.120
 This is a companion request to the previous zoning request.

00:37:36.120 --> 00:37:42.600
 All right.

00:37:42.600 --> 00:37:50.940
 So this is a comprehensive plan amendment, CA21-0001, Denton Commerce Center.

00:37:50.940 --> 00:37:54.500
 So before we get into the specific request, I want to talk a little bit about mobility

00:37:54.500 --> 00:37:58.960
 planning in the city of Denton and how all of this ties together.

00:37:58.960 --> 00:38:04.600
 We haven't seen a mobility plan amendment at the Plating and Zoning Commission, I think,

00:38:04.600 --> 00:38:05.600
 since 2011.

00:38:05.600 --> 00:38:11.920
 So this is, this doesn't happen very often, but it is a part of the comprehensive plan.

00:38:11.920 --> 00:38:16.940
 So the mobility plan is one element to our comprehensive planning efforts.

00:38:16.940 --> 00:38:22.800
 It establishes our future roadway network, and that can include cars and pedestrian as

00:38:22.800 --> 00:38:24.560
 well as bicycle networks.

00:38:24.560 --> 00:38:27.860
 So it's, it should be looked at comprehensively.

00:38:27.860 --> 00:38:35.960
 Mobility plans are updated both intermittently as well as on a regular, ongoing basis.

00:38:35.960 --> 00:38:40.840
 And that can be in response to a specific request or as part of that comprehensive planning

00:38:40.840 --> 00:38:41.840
 effort.

00:38:41.840 --> 00:38:47.920
 So the request in 2011 was related to a specific project, as is this one tonight.

00:38:47.920 --> 00:38:53.120
 However, the city is currently updating their mobility plan, and we'll talk some about that

00:38:53.120 --> 00:38:54.120
 tonight.

00:38:54.120 --> 00:38:59.920
 The mobility plan really establishes those transportation networks, and within that,

00:38:59.920 --> 00:39:03.780
 it defines that hierarchy of roadways.

00:39:03.780 --> 00:39:09.360
 And that includes the biggest roads, which are highways, and then you've got your arterials,

00:39:09.360 --> 00:39:12.920
 and then a little smaller than that, you have your collectors, and then your neighborhood

00:39:12.920 --> 00:39:16.080
 roadways really aren't included in a mobility plan.

00:39:16.080 --> 00:39:19.600
 Those are more site-specific.

00:39:19.600 --> 00:39:28.080
 Our current plan was adopted in early 2016, and that replaced our 1998 plan, which had

00:39:28.080 --> 00:39:33.520
 been amended every so often, so it really is kind of that 2011 mobility plan.

00:39:33.520 --> 00:39:39.840
 And as I mentioned, our current update is underway.

00:39:39.840 --> 00:39:43.060
 So now I'll get to the specific request.

00:39:43.060 --> 00:39:49.040
 In 2016, when we adopted our current plan, Cindy Lane, which is a neighborhood street

00:39:49.040 --> 00:39:56.760
 within the Ranch Estates, was kind of reclassified and upgraded to a secondary arterial, and

00:39:56.760 --> 00:40:05.720
 that mobility plan took Cindy Lane from its current location, so connecting to Highway

00:40:05.720 --> 00:40:10.460
 380 with a signalized intersection, and then connecting it all the way to the north to

00:40:10.460 --> 00:40:15.200
 FM 156 as that secondary arterial.

00:40:15.200 --> 00:40:20.840
 When projects develop within the city, they have to, if a mobility plan roadway is coming

00:40:20.840 --> 00:40:27.800
 through their property, they have to dedicate that right-of-way associated with that roadway.

00:40:27.800 --> 00:40:30.680
 Sometimes they have to build it, so I know that's something that y'all look at often

00:40:30.680 --> 00:40:33.400
 with the plats.

00:40:33.400 --> 00:40:37.840
 In this case, the update to the mobility plan that engineering has been working on will

00:40:37.840 --> 00:40:44.720
 actually remove that Cindy Lane and sort of simplify that arterial network within this

00:40:44.720 --> 00:40:52.340
 area, and so they are proposing to remove that section of Cindy Lane as it's not going

00:40:52.340 --> 00:40:56.240
 to be something that our engineering staff wants to take forward with that update to

00:40:56.240 --> 00:40:58.760
 the mobility plan.

00:40:58.760 --> 00:41:02.840
 So you can see the subject property is the same one we talked about earlier, and here's

00:41:02.840 --> 00:41:09.520
 that Cindy Lane, it's kind of difficult to see, but it's that green dotted line, and

00:41:09.520 --> 00:41:13.520
 then that's where it cuts through the subject property.

00:41:13.520 --> 00:41:17.640
 So we're going to look at the current mobility map and then how that relates to the proposed

00:41:17.640 --> 00:41:21.360
 mobility map, that one that's under review with engineering.

00:41:21.360 --> 00:41:25.240
 Subject property is, again, outlined here in yellow.

00:41:25.240 --> 00:41:27.700
 Cindy Lane is that green dashed line.

00:41:27.700 --> 00:41:35.520
 You can see here's where it connects to Highway 380, that's in this location, goes through

00:41:35.520 --> 00:41:40.920
 that neighborhood, and then would, as proposed under the current mobility plan, would extend

00:41:40.920 --> 00:41:49.680
 it toward the north through these large tracts of land and then on upward.

00:41:49.680 --> 00:41:56.280
 The proposed mobility plan, Cindy Lane would actually just remain as a neighborhood street,

00:41:56.280 --> 00:42:06.080
 so it wouldn't have any expansion related to that roadway, it would just end here.

00:42:06.080 --> 00:42:11.800
 Windsor would cut across, and then we do have that Loop 288 corridor that's providing that

00:42:11.800 --> 00:42:16.760
 connectivity through this general area.

00:42:16.760 --> 00:42:20.000
 Criteria for approval for a comprehensive plan, since the mobility plan is an element

00:42:20.000 --> 00:42:26.400
 of the comprehensive plan, is in subchapter 2, and then there are specific criteria for

00:42:26.400 --> 00:42:27.640
 approval.

00:42:27.640 --> 00:42:32.280
 There's really two subsections for the specific criteria for approval.

00:42:32.280 --> 00:42:38.920
 The first subsection, it would need to meet one of that criteria, and then those additional

00:42:38.920 --> 00:42:43.160
 review standards are listed after that.

00:42:43.160 --> 00:42:46.920
 We'll touch on these as we move forward.

00:42:46.920 --> 00:42:51.960
 So I first want to talk about how this relates to the overall comprehensive plan, and before

00:42:51.960 --> 00:42:56.440
 I get into the analysis, I just want to kind of orient you toward the map.

00:42:56.440 --> 00:43:02.640
 So the subject property here has that red star, so that's sort of that area we're looking

00:43:02.640 --> 00:43:04.180
 at.

00:43:04.180 --> 00:43:08.680
 I have the mobility plan overlaid on the future land use map here.

00:43:08.680 --> 00:43:16.880
 Here's where Cindy Lane connects to Highway 380 and then cuts to the north.

00:43:16.880 --> 00:43:22.240
 Business innovation is one of those dominant future land use designations in this area.

00:43:22.240 --> 00:43:27.920
 It covers the subject site as well as that surrounding area, that's that light purple.

00:43:27.920 --> 00:43:32.160
 One place I'd like to draw your attention to, that's that low residential, that's that

00:43:32.160 --> 00:43:33.160
 ranch estates.

00:43:33.160 --> 00:43:37.320
 It's sort of an island, it's a large lot, established neighborhood, it's been there

00:43:37.320 --> 00:43:44.560
 for a long time, and that has that protection of that low residential future land use designation.

00:43:44.560 --> 00:43:47.160
 So that does sort of give it that policy protection.

00:43:47.160 --> 00:43:52.480
 And then south of that, we've got our industrial commerce, so that's our more heavier industrial

00:43:52.480 --> 00:43:57.800
 area just south, kind of hugging that airport in south of Highway 380.

00:43:57.800 --> 00:44:04.840
 So you can see that Cindy Lane really crosses those three future land use designations.

00:44:04.840 --> 00:44:12.320
 It's rural to the north, but it would essentially sort of induce those trucks to move forward

00:44:12.320 --> 00:44:18.520
 or to move toward the north through that roadway as it's proposed.

00:44:18.520 --> 00:44:22.160
 So we looked at the analysis, we looked at all parts of the comprehensive plan when we

00:44:22.160 --> 00:44:25.600
 analyzed this, because we don't just have that future land use map to rely on, we've

00:44:25.600 --> 00:44:30.640
 got to look at other goals that we have in the city.

00:44:30.640 --> 00:44:34.960
 So first, one of our mobility goals is to provide for the safe, efficient movements

00:44:34.960 --> 00:44:39.600
 of motor vehicles, bicycles, and pedestrians in a sustainable way that complements Denton's

00:44:39.600 --> 00:44:42.480
 plan growth strategy.

00:44:42.480 --> 00:44:49.120
 Given the divergent goals of these diverse future land use designations that are impacted

00:44:49.120 --> 00:44:56.360
 by Cindy Lane, that connectivity that Cindy Lane in its location could conflict with that

00:44:56.360 --> 00:44:57.360
 growth strategy.

00:44:57.360 --> 00:45:03.800
 So we really, it has, that business innovation has different goals than the low density residential,

00:45:03.800 --> 00:45:07.760
 yet we've got this roadway cutting through there that would essentially bind those two

00:45:07.760 --> 00:45:10.920
 future land use designations together.

00:45:10.920 --> 00:45:17.160
 So with that mobility plan update that engineering is moving forward with, it would remove that

00:45:17.160 --> 00:45:20.360
 Cindy Lane, as I showed you in an earlier slide.

00:45:20.360 --> 00:45:25.800
 It would focus then using Mosh Bit Branch, Lovers Lane Corridors, also the future Loop

00:45:25.800 --> 00:45:34.640
 288 and I-35 to move that truck traffic along those arterials, avoiding that expansion into

00:45:34.640 --> 00:45:41.360
 that residential, kind of leaving them alone as an island.

00:45:41.360 --> 00:45:46.000
 Other thing we did look at as related to that future land use map is business innovation

00:45:46.000 --> 00:45:48.040
 in the intent.

00:45:48.040 --> 00:45:53.640
 So that is intended for those employment uses and often they want really large acreage.

00:45:53.640 --> 00:45:59.600
 It can range anywhere from a smaller size to 20 to 30 acres all the way up to like that

00:45:59.600 --> 00:46:04.680
 hundred acre areas for those larger campuses and larger structures.

00:46:04.680 --> 00:46:11.000
 So as Cindy Lane is currently proposed, and it's a little bit difficult to see, but there

00:46:11.000 --> 00:46:18.520
 is a railroad corridor along the western side of the subject property and then it sort of

00:46:18.520 --> 00:46:24.240
 runs diagonally, getting closer to 35 as you go toward the south.

00:46:24.240 --> 00:46:30.520
 Cindy Lane sort of bisects that so that these large tracts of land that would be ideal for

00:46:30.520 --> 00:46:35.400
 that business innovation and those employment uses really are bisected and it could reduce

00:46:35.400 --> 00:46:38.720
 the developability of those lots.

00:46:38.720 --> 00:46:45.080
 Secondary arterials require anywhere from, well they often, 65 to 110 feet of right of

00:46:45.080 --> 00:46:53.080
 way so it would be a swath of land that would sort of reduce that developable area.

00:46:53.080 --> 00:46:58.160
 And then finally, when we look at the implementation of the comprehensive plan, our mobility plan

00:46:58.160 --> 00:47:02.080
 should really be updated every five years along with that comprehensive plan.

00:47:02.080 --> 00:47:03.240
 That's kind of the goal.

00:47:03.240 --> 00:47:06.500
 We don't always reach that goal, but that is the goal.

00:47:06.500 --> 00:47:11.800
 And so the city is undertaking the updating of the mobility plan.

00:47:11.800 --> 00:47:15.040
 You know, we want to make sure that we understand where our roads are going, but we also want

00:47:15.040 --> 00:47:23.740
 to provide the flexibility and the ability to change with changing circumstances.

00:47:23.740 --> 00:47:28.920
 So another criterion is the events, trends, or facts that have changed since that mobility

00:47:28.920 --> 00:47:30.520
 plan was adopted.

00:47:30.520 --> 00:47:37.720
 So in order to talk through this, I've provided an aerial of what was going on in this area

00:47:37.720 --> 00:47:42.660
 in 2015 and then how that's changed to 2019, which is our most current aerials.

00:47:42.660 --> 00:47:48.240
 So in 2015, we didn't have a lot of industrial growth in this area.

00:47:48.240 --> 00:47:57.920
 We did have some industrial clustered near the I-35 split as well as the airport, but

00:47:57.920 --> 00:48:05.240
 it really hadn't started moving north along Western Center Boulevard.

00:48:05.240 --> 00:48:10.800
 Since then, we have seen a lot of industrial development in the area.

00:48:10.800 --> 00:48:14.240
 And some of them are on the ground and some of them are still sort of in the development

00:48:14.240 --> 00:48:20.840
 stage, but all of those yellow dots represent a new industrial development or an industrial

00:48:20.840 --> 00:48:27.040
 development that's in the planning stages along that corridor, sort of, you know, really

00:48:27.040 --> 00:48:32.400
 showing what kind of truck traffic, what kind of movement is going to be going along in

00:48:32.400 --> 00:48:34.240
 this area.

00:48:34.240 --> 00:48:41.520
 This current classification of Cindy Lane really would induce those trucks to move forward

00:48:41.520 --> 00:48:48.480
 and potentially tag up to loop 288 north of the subject or near the subject property,

00:48:48.480 --> 00:48:52.680
 cutting through that neighborhood as it's currently aligned.

00:48:52.680 --> 00:48:58.160
 And that's why that draft mobility plan really has sort of changed what that road classification

00:48:58.160 --> 00:48:59.160
 would be.

00:48:59.160 --> 00:49:04.200
 You know, we've been really successful in our industrial sector, but there will be a

00:49:04.200 --> 00:49:07.600
 lot of traffic associated with it.

00:49:07.600 --> 00:49:10.160
 Additional review standards, substantial benefit to the city.

00:49:10.160 --> 00:49:13.740
 This proposal is consistent with that draft mobility plan.

00:49:13.740 --> 00:49:17.880
 It's also consistent with our future land use goals, as we've discussed.

00:49:17.880 --> 00:49:22.560
 It would not negatively alter the existing or proposed land use pattern.

00:49:22.560 --> 00:49:25.720
 It wouldn't change that.

00:49:25.720 --> 00:49:31.920
 And it would not adversely impact those existing uses because of increased traffic.

00:49:31.920 --> 00:49:38.000
 The -- those existing and those planned arterial network, those are sufficient to meet the

00:49:38.000 --> 00:49:44.320
 demand of that traffic generated by the development of this area.

00:49:44.320 --> 00:49:48.680
 And since Cindy Lane currently doesn't extend beyond Ranch Estates, there's no -- it would

00:49:48.680 --> 00:49:51.120
 not change those existing traffic patterns.

00:49:51.120 --> 00:49:53.920
 So there's -- that road isn't there yet.

00:49:53.920 --> 00:50:00.500
 So nobody's relying on that to accommodate traffic.

00:50:00.500 --> 00:50:04.560
 Public outreach was done on the request.

00:50:04.560 --> 00:50:09.280
 An opposition letter was emailed to you today, and I also have hard copies if you didn't

00:50:09.280 --> 00:50:10.400
 get your email.

00:50:10.400 --> 00:50:13.040
 I did talk with that property owner.

00:50:13.040 --> 00:50:20.320
 He said opposition on the marking, but then the text of his letter kind of sounded like

00:50:20.320 --> 00:50:22.140
 he was in favor.

00:50:22.140 --> 00:50:29.080
 And so I called him because I wanted to find out, you know, what his intent was.

00:50:29.080 --> 00:50:35.720
 And he was a gentleman that is currently -- his property is on the alignment for Cindy Lane,

00:50:35.720 --> 00:50:40.280
 and that wasn't something -- he thought we were putting the road on it instead of removing

00:50:40.280 --> 00:50:41.280
 it.

00:50:41.280 --> 00:50:42.400
 So I did talk with him about that.

00:50:42.400 --> 00:50:45.160
 So I just want to let you know that.

00:50:45.160 --> 00:50:47.160
 So staff does recommend approval of the request.

00:50:47.160 --> 00:50:52.520
 It meets the criteria for approval, and it is consistent with our current planning efforts.

00:50:52.520 --> 00:50:54.640
 And I'll be happy to answer any questions.

00:50:54.640 --> 00:51:02.880
 And engineering is also here if you have -- if you need more technical questions answered.

00:51:02.880 --> 00:51:08.360
 Commissioner Ellis.

00:51:08.360 --> 00:51:09.360
 Thank you, Chair.

00:51:09.360 --> 00:51:12.440
 Julie, back to the comment that was emailed to us.

00:51:12.440 --> 00:51:14.040
 So he just misunderstood.

00:51:14.040 --> 00:51:15.040
 Yes, ma'am.

00:51:15.040 --> 00:51:16.040
 And it's now clarified.

00:51:16.040 --> 00:51:17.040
 Yes, ma'am.

00:51:17.040 --> 00:51:22.320
 And did he change his -- I haven't received an updated letter from him, but I can certainly

00:51:22.320 --> 00:51:26.720
 call him prior to City Council and get that update.

00:51:26.720 --> 00:51:27.720
 Okay.

00:51:27.720 --> 00:51:32.120
 Second question is, does this stand alone from the zoning change?

00:51:32.120 --> 00:51:38.240
 So if the zoning change, let's say, does not get approved, is this still being considered?

00:51:38.240 --> 00:51:39.240
 Yes, ma'am.

00:51:39.240 --> 00:51:40.240
 It stands alone.

00:51:40.240 --> 00:51:41.240
 Separate on its own.

00:51:41.240 --> 00:51:42.240
 Okay.

00:51:42.240 --> 00:51:43.240
 Thank you.

00:51:43.240 --> 00:51:44.240
 You bet.

00:51:44.240 --> 00:51:45.240
 Any other questions?

00:51:45.240 --> 00:51:46.240
 Commissioner Smith.

00:51:46.240 --> 00:51:50.320
 And really, this might be a question for mobility.

00:51:50.320 --> 00:51:53.680
 Why was it ever thought that it would be a good idea to put a primary arterial through

00:51:53.680 --> 00:51:57.840
 a really low density neighborhood in the first place to connect into business innovation?

00:51:57.840 --> 00:52:03.000
 I know that's a loaded question, but more of like, are there other properties that are

00:52:03.000 --> 00:52:08.400
 -- that we may have a mobility draft that currently has things like this that are out

00:52:08.400 --> 00:52:09.400
 there?

00:52:09.400 --> 00:52:10.400
 Because, yeah.

00:52:10.400 --> 00:52:11.400
 It's -- yeah.

00:52:11.400 --> 00:52:14.480
 I'm going to let engineering answer that.

00:52:14.480 --> 00:52:15.480
 Sounds good.

00:52:15.480 --> 00:52:19.280
 Good afternoon, Chair and Commissioner.

00:52:19.280 --> 00:52:22.160
 This is Chandra with Traffic Engineering.

00:52:22.160 --> 00:52:28.440
 When drafting the mobility plan, the consultant we hired, they take into consideration of

00:52:28.440 --> 00:52:34.160
 all the traffic at the current condition and 20, 30 years into the future.

00:52:34.160 --> 00:52:39.360
 So they plug in all the models and run and see how the networks are loaded.

00:52:39.360 --> 00:52:45.440
 So they will evaluate and see where appropriate arterial or a collector is needed.

00:52:45.440 --> 00:52:51.320
 So that's how we arrived at those networks that it's in the draft.

00:52:51.320 --> 00:52:54.640
 It doesn't really answer the question, but I get it.

00:52:54.640 --> 00:52:55.640
 Yeah, that works.

00:52:55.640 --> 00:52:56.640
 All right.

00:52:56.640 --> 00:52:57.640
 Thank you.

00:52:57.640 --> 00:52:58.640
 Thank you.

00:52:58.640 --> 00:53:00.920
 Any other questions for Julie?

00:53:00.920 --> 00:53:02.520
 Commissioner Pruitt.

00:53:02.520 --> 00:53:03.520
 Yeah.

00:53:03.520 --> 00:53:12.280
 Can you -- I guess I understand the considerations with the existing portion of -- I'm sorry,

00:53:12.280 --> 00:53:18.760
 I'm terrible with names -- the roadway that we were talking about extending north to south.

00:53:18.760 --> 00:53:24.960
 I guess my question is, if we just look at the northern portion, say, from the proposed

00:53:24.960 --> 00:53:31.960
 alignment of Mosh Branch Road as it crosses the railroad tracks over to I-35 and northward

00:53:31.960 --> 00:53:40.320
 of that, can you explain why having connectivity from Mosh Branch northward crossing the future

00:53:40.320 --> 00:53:45.960
 Loop 288 is not desired?

00:53:45.960 --> 00:53:50.480
 I'm going to have engineering answer that as well.

00:53:50.480 --> 00:53:58.880
 Actually, with the proposed loop, unlike the existing loop on the eastern side, the proposed

00:53:58.880 --> 00:54:07.320
 loop will contain frontage roads and then the main lanes, and also on the other designation

00:54:07.320 --> 00:54:15.400
 of the roadway networks, they thought the northern section of Cindy could be removed.

00:54:15.400 --> 00:54:22.600
 The frontage roads also have connectivity to the collectors and the neighborhood streets,

00:54:22.600 --> 00:54:26.360
 which the eastern section, the existing loop, doesn't have it.

00:54:26.360 --> 00:54:33.160
 So those network of smaller roadways can connect with the frontage and take off a lot of traffic

00:54:33.160 --> 00:54:35.560
 from those north-south arterials.

00:54:35.560 --> 00:54:43.760
 I guess just for clarification, if the mobility plan is amended to remove the section of Cindy

00:54:43.760 --> 00:54:49.100
 Lane that we're talking about, would that change whether or not a crossing either over

00:54:49.100 --> 00:54:55.600
 or under the future Loop 288 is provided, a north-south crossing right there?

00:54:55.600 --> 00:55:04.800
 Yes, but based on the other network being proposed, this seems to be irrelevant anymore.

00:55:04.800 --> 00:55:11.360
 Back in 2015, we didn't have any plans for frontage roads on the loop, but now Techstart

00:55:11.360 --> 00:55:17.720
 has put in the frontage roads to begin with, and then later they will add the main lanes.

00:55:17.720 --> 00:55:23.760
 So it's a change in policy, and also 35 is being widened with the frontage roads being

00:55:23.760 --> 00:55:29.040
 extended, so that will also relieve some of the projected traffic.

00:55:29.040 --> 00:55:37.480
 Okay, so just trying to understand, so the concept is that a north-south route is not

00:55:37.480 --> 00:55:42.400
 required there because the main freeways are getting widened, and therefore there'd be

00:55:42.400 --> 00:55:47.320
 a longer route that somebody could take along the frontage and the interstates to get around

00:55:47.320 --> 00:55:48.320
 to their destination?

00:55:48.320 --> 00:55:49.320
 That's right.

00:55:49.320 --> 00:55:57.080
 Usually they put in arterials at approximately 1,200 feet apart, but now with these Loop

00:55:57.080 --> 00:56:04.760
 288 frontage and also the 35 widening, it seems those models doesn't seem to have those

00:56:04.760 --> 00:56:06.880
 Cindy Lane required anymore.

00:56:06.880 --> 00:56:10.680
 Okay, thank you.

00:56:10.680 --> 00:56:12.720
 Any other questions for Julie?

00:56:12.720 --> 00:56:16.320
 I've got a couple.

00:56:16.320 --> 00:56:22.160
 What's the draft mobility plan timeline for implementation?

00:56:22.160 --> 00:56:24.840
 Haley might be able to answer that, or Chandra.

00:56:24.840 --> 00:56:28.920
 I believe it's running in parallel fashion with the comprehensive plan update.

00:56:28.920 --> 00:56:36.560
 We want to make sure our mobility plan and our future land use map work together well,

00:56:36.560 --> 00:56:43.080
 and so I believe that that is sort of, the intent is to kind of keep them parallel, am

00:56:43.080 --> 00:56:46.960
 I correct?

00:56:46.960 --> 00:56:56.200
 Going to that is if we're using the rationale that the Cindy Lane northbound is going away

00:56:56.200 --> 00:57:00.800
 in the draft plan as the rationale that we can take this snippet apart now out of the

00:57:00.800 --> 00:57:08.520
 subject property, why are we not just going ahead right now and removing Cindy Lane entirely

00:57:08.520 --> 00:57:14.560
 and aligning Cindy Lane up 100% to the draft mobility plan in the interim?

00:57:14.560 --> 00:57:19.200
 I'm curious why we're just taking one section out, if we know it's all going away.

00:57:19.200 --> 00:57:25.640
 Well because it was just related to this one request, so that's why we just kept it localized,

00:57:25.640 --> 00:57:32.840
 but I thought about that when we were drafting it, and so we noticed for only that part that

00:57:32.840 --> 00:57:39.520
 the applicant is requesting having be removed, so I'm not sure if the whole thing could be

00:57:39.520 --> 00:57:49.640
 removed given the public notification piece, but yeah, it is sort of an incremental step.

00:57:49.640 --> 00:57:55.520
 Yeah, and I guess you said something that I want to clarify, the applicant is filing

00:57:55.520 --> 00:58:00.200
 for this to be removed, this isn't city initiated to align with the applicant.

00:58:00.200 --> 00:58:01.200
 Correct.

00:58:01.200 --> 00:58:10.120
 I guess going to Commissioner Ellis' question, if item B doesn't get passed for some reason,

00:58:10.120 --> 00:58:15.560
 it would be up to the applicant to still pursue item C, they could pull item C theoretically,

00:58:15.560 --> 00:58:16.560
 correct?

00:58:16.560 --> 00:58:19.400
 That's a good point, yes, theoretically.

00:58:19.400 --> 00:58:24.600
 Maybe we'll go ahead and remove it straight for us, but okay, any other questions for

00:58:24.600 --> 00:58:25.600
 Julie?

00:58:25.600 --> 00:58:33.880
 All right, let's move to the last item, 5D, Z21-0002, and I will invite Sean Jacobson

00:58:33.880 --> 00:58:34.880
 for presentation.

00:58:34.880 --> 00:58:40.360
 Good evening Chair and members of the commission.

00:58:40.360 --> 00:59:08.000
 I'm just going to pull up on here, let's see, okay, all right, and there we go.

00:59:08.000 --> 00:59:13.680
 Okay, good evening Chair and members of the commission.

00:59:13.680 --> 00:59:21.840
 My name is Sean Jacobson, Associate Planner, presenting Z21-0002, prominence.

00:59:21.840 --> 00:59:31.360
 This is a request for a rezoning of approximately 58.55 acres at the corner of loop 288 in University.

00:59:31.360 --> 00:59:36.960
 It's divided into requests for 24.93 acres from current planned development and light

00:59:36.960 --> 00:59:44.000
 industrial zoning to general office, approximately 23.47 acres from planned development to mixed

00:59:44.000 --> 00:59:48.680
 use neighborhood, and approximately 9.7 acres from planned development to light industrial

00:59:48.680 --> 00:59:49.680
 zoning.

00:59:49.680 --> 00:59:55.600
 Again, this property is bounded by loop 288, University Drive, Mayhill Road, and prominence

00:59:55.600 --> 01:00:00.840
 way with a mix of undeveloped and commercial lots and a residential lot, all of that zone

01:00:00.840 --> 01:00:06.880
 to L.I. to the northwest, and a single family neighborhood south across prominence way.

01:00:06.880 --> 01:00:11.760
 About 26 acres of floodplain covers the north and center of the property, as you can see

01:00:11.760 --> 01:00:14.360
 in those maps in the lower right-hand corner there.

01:00:14.360 --> 01:00:18.760
 One shows the current ESA map, you have the current floodplain map, significant tree canopy

01:00:18.760 --> 01:00:22.360
 in that floodplain area, as well as along prominence way.

01:00:22.360 --> 01:00:28.200
 This zoning change would replace the old existing PD with current zoning districts containing

01:00:28.200 --> 01:00:33.360
 similar mix of uses, some additional ones, under current DDC standards.

01:00:33.360 --> 01:00:39.680
 So just to give you a little background here, this planned development was approved in 2000

01:00:39.680 --> 01:00:44.800
 under an interim zoning, an interim DDC essentially.

01:00:44.800 --> 01:00:50.720
 At the time, it was a PD concept plan, subject property was divided into four areas, A, B,

01:00:50.720 --> 01:00:55.480
 C, and E. You're not wrong, there was a D, but it is unrelated to the property we're

01:00:55.480 --> 01:00:59.720
 dealing with, so we're not talking about it, but each was authorized for a different mix

01:00:59.720 --> 01:01:03.760
 of uses, including commercial, industrial, and/or residential.

01:01:03.760 --> 01:01:09.320
 And there was a remaining 18 acres, it was essentially in section C, but it was designated

01:01:09.320 --> 01:01:11.880
 for future park dedication when this developed.

01:01:11.880 --> 01:01:17.880
 This was vested in those standards under that interim DDC, so 1991 use table, 1988 landscape

01:01:17.880 --> 01:01:18.880
 code.

01:01:18.880 --> 01:01:26.480
 In 2002, the city council zoned out approximately 3.92 acres of area A to employment center

01:01:26.480 --> 01:01:27.480
 commercial.

01:01:27.480 --> 01:01:31.560
 That property that was included in this rezoning tonight, essentially, to bring that into line

01:01:31.560 --> 01:01:35.840
 with how the PD would be rezoned adjacent to it.

01:01:35.840 --> 01:01:42.080
 So in 2021, then, this proposal is taking those four areas, putting them into current

01:01:42.080 --> 01:01:46.480
 zoning districts that generally match up similar uses.

01:01:46.480 --> 01:01:52.600
 So A and B would be going into a GEO district, as well as a sum of C, the rest of C would

01:01:52.600 --> 01:01:56.880
 be going into MN, and then E, which was designated for light industrial, would be going into

01:01:56.880 --> 01:01:57.880
 light industrial.

01:01:57.880 --> 01:02:04.360
 I also just note that the Parks Department is in talks still with the current developer

01:02:04.360 --> 01:02:09.960
 to once again do a dedication of that parkland, about 18 acres, at the time of platting of

01:02:09.960 --> 01:02:11.760
 this property.

01:02:11.760 --> 01:02:15.680
 Because the property never developed, that property has never come to us as parks since

01:02:15.680 --> 01:02:18.760
 the time that it was designated.

01:02:18.760 --> 01:02:23.720
 And just give you a glance here, that's what that original PD concept plan looked like.

01:02:23.720 --> 01:02:29.960
 So here would be the proposed zoning, see that GEO area encompasses essentially A and

01:02:29.960 --> 01:02:37.280
 B, the MN in the area that was C, and then the LI, the area that was E.

01:02:37.280 --> 01:02:41.520
 As you know, we have our general criteria for approval, as well as our specific zoning

01:02:41.520 --> 01:02:44.900
 criteria for approval, and we'll touch on some key elements of that.

01:02:44.900 --> 01:02:49.320
 So first off, look at our Denton Plan 2030 comprehensive plan.

01:02:49.320 --> 01:02:54.760
 It's primarily a business innovation, future land use, but it also does have areas of moderate

01:02:54.760 --> 01:02:58.000
 density residential and some neighborhood residential mixed use.

01:02:58.000 --> 01:03:02.600
 So it's intended for large tracts of land to develop with a mix of commercial, supporting

01:03:02.600 --> 01:03:06.920
 residential and retail, and that moderate density residential is intended for a mix

01:03:06.920 --> 01:03:12.240
 of residential, particularly near retail, near parkland.

01:03:12.240 --> 01:03:17.360
 These proposed zonings that are trying to mix, fit that mix of uses allowed in business

01:03:17.360 --> 01:03:23.240
 innovation, and the residential uses would fit with that moderate density residential

01:03:23.240 --> 01:03:27.760
 in that proposed MN area.

01:03:27.760 --> 01:03:32.960
 Also note that zoning out of the current PD ensures that the property is held to all 2019

01:03:32.960 --> 01:03:39.140
 DDC standards, which of course align more fully with our comprehensive plan.

01:03:39.140 --> 01:03:45.880
 It also enables a mix of uses that would be at a key corridor at the intersection of two

01:03:45.880 --> 01:03:50.040
 major routes there, which is in line with our preferred growth concept, and it's providing

01:03:50.040 --> 01:03:54.240
 employment moderate density housing near what would be, hopefully, a potential future park

01:03:54.240 --> 01:03:55.840
 and trail area.

01:03:55.840 --> 01:04:00.040
 It also allows a broader range of uses that fit our future land use map and are currently

01:04:00.040 --> 01:04:01.640
 permitted under the PD.

01:04:01.640 --> 01:04:07.000
 I want to highlight here, particularly minimizing adverse environmental impacts.

01:04:07.000 --> 01:04:11.860
 As I noted, there's a significant amount of both trees and environmentally sensitive areas.

01:04:11.860 --> 01:04:16.240
 When this PD was put in place, our current protections essentially didn't exist.

01:04:16.240 --> 01:04:21.400
 They basically said, "ESAs are a thing, and please tell us how many trees you're planning

01:04:21.400 --> 01:04:25.320
 to take out and maybe try not to take out too many," and that was about it.

01:04:25.320 --> 01:04:29.920
 Zoning out of this PD ensures that we can apply all of our current environmentally sensitive

01:04:29.920 --> 01:04:34.320
 area and tree standard protections, which aligns with our comprehensive plan to try to protect

01:04:34.320 --> 01:04:37.960
 trees and increase tree canopy.

01:04:37.960 --> 01:04:42.120
 With that, minimizing adverse impacts, we would have higher standards coming in.

01:04:42.120 --> 01:04:46.440
 So again, it wasn't the minimum tree canopy planting requirement at that time either.

01:04:46.440 --> 01:04:50.560
 These new zoning districts would bring in our current tree canopy requirements, varying

01:04:50.560 --> 01:04:52.280
 by zoning district.

01:04:52.280 --> 01:04:55.900
 Would also bring in our current requirements for right-of-way screening, which would help

01:04:55.900 --> 01:04:58.040
 the neighborhood to the south of prominence.

01:04:58.040 --> 01:05:03.080
 We now require much greater significant right-of-way screening, and that would be required under

01:05:03.080 --> 01:05:04.080
 this.

01:05:04.080 --> 01:05:11.680
 It would also bring in heightened commercial building standards under the current DDC.

01:05:11.680 --> 01:05:16.300
 Just touching on parks, again, because of discussions with the applicant, Parks Department

01:05:16.300 --> 01:05:24.560
 is actually proposing a trail, potentially on their draft trail map, through this area.

01:05:24.560 --> 01:05:30.320
 So that would be one thing that would be a benefit as part of the planting process following

01:05:30.320 --> 01:05:35.560
 this rezoning, to be the potential for about 18 acres of parkland to come to the city next

01:05:35.560 --> 01:05:40.840
 to the proposed, well, what would develop in the future potentially.

01:05:40.840 --> 01:05:43.200
 I definitely want to touch on transportation.

01:05:43.200 --> 01:05:47.160
 This is an area that has a number of intersections around it that are difficult.

01:05:47.160 --> 01:05:51.400
 There was a very detailed TIA done, although there's no planned uses.

01:05:51.400 --> 01:05:55.120
 Estimates were done based on looking at some of the highest possible traffic generation

01:05:55.120 --> 01:05:57.400
 uses that could come in.

01:05:57.400 --> 01:06:03.880
 So that led to an estimate of 7,565 daily trips, as you can see there.

01:06:03.880 --> 01:06:08.040
 The TIA focused on ten key intersections surrounding the site.

01:06:08.040 --> 01:06:12.400
 Six out of ten of them would operate at a level of service D or better, which as you

01:06:12.400 --> 01:06:16.920
 know is kind of our baseline for really paying attention to.

01:06:16.920 --> 01:06:22.120
 Three of those ten currently, right now with no changes, operate at a level of service

01:06:22.120 --> 01:06:23.120
 E or F.

01:06:23.120 --> 01:06:29.000
 Just note, if you're looking on the map there, the circles that are not dashed are current

01:06:29.000 --> 01:06:30.000
 intersections.

01:06:30.000 --> 01:06:36.640
 The dashed circles are intersections proposed that may come about as part of this development.

01:06:36.640 --> 01:06:43.800
 The ones in yellow, those are the four that either are currently at an E or an F, or the

01:06:43.800 --> 01:06:46.560
 one that's along the loop 380 frontage road.

01:06:46.560 --> 01:06:51.680
 It's anticipated that if that was put in just as one driveway there that it would operate

01:06:51.680 --> 01:06:54.400
 at a level of service F.

01:06:54.400 --> 01:07:01.560
 So and the TIA indicates that there would be increasing delays over until out to 2029

01:07:01.560 --> 01:07:03.440
 over the period studied.

01:07:03.440 --> 01:07:08.240
 However the traffic actually generated by development of the site would be a small part

01:07:08.240 --> 01:07:10.120
 of those issues.

01:07:10.120 --> 01:07:14.560
 It's much more due to, it's loop 288 and University driver there.

01:07:14.560 --> 01:07:16.320
 That's what's driving this.

01:07:16.320 --> 01:07:21.840
 However, there were some mitigation items recommended by the TIA.

01:07:21.840 --> 01:07:27.720
 A major one would be a signal light at prominence drive, which either when it's relined with

01:07:27.720 --> 01:07:31.880
 Audra in the future, it may actually be warranted sooner, in part because of this development.

01:07:31.880 --> 01:07:35.800
 That'd be studied when civil engineering plans came in for this development.

01:07:35.800 --> 01:07:40.800
 And this site would be estimated to be responsible for about 25% of the cost of that signal.

01:07:40.800 --> 01:07:44.280
 And when that signal, if that goes in, that would raise that intersection to a level of

01:07:44.280 --> 01:07:49.960
 service C, would actually be higher than it is right now with no development.

01:07:49.960 --> 01:07:55.080
 Also recommended a right turn deceleration lane along loop 288 going north.

01:07:55.080 --> 01:07:59.560
 And that would again be looked at when civil engineering plans came in for this project.

01:07:59.560 --> 01:08:05.240
 And then it was recommended that textile in the city of Denton consider allowing two driveways

01:08:05.240 --> 01:08:12.000
 along that extended loop 288 ramp there in order that they would actually be able to

01:08:12.000 --> 01:08:14.200
 function at a good level of service.

01:08:14.200 --> 01:08:19.680
 Other long-term solutions that were noted, TextOdd is planning to extend the median at

01:08:19.680 --> 01:08:25.280
 Spring Valley across from QuickTrip, and so you would no longer have cars trying to cross

01:08:25.280 --> 01:08:27.320
 back and forth University Drive there.

01:08:27.320 --> 01:08:29.440
 They wouldn't be able to.

01:08:29.440 --> 01:08:35.680
 There's also, TextOdd is looking at a freeway bypass at 380 and 288, which would relieve

01:08:35.680 --> 01:08:39.600
 some of the traffic pressure at that intersection.

01:08:39.600 --> 01:08:46.480
 So overall, TI determined that the actual, with the mitigation and the actual traffic

01:08:46.480 --> 01:08:50.720
 generated by this site, it's not having a significant impact that wouldn't be addressed

01:08:50.720 --> 01:08:52.000
 by this mitigation.

01:08:52.000 --> 01:08:56.800
 And that would be looked at more thoroughly at the CEP stage.

01:08:56.800 --> 01:09:00.480
 Water and wastewater service is available, and the property owner is currently constructing

01:09:00.480 --> 01:09:02.560
 additional wastewater connection.

01:09:02.560 --> 01:09:04.880
 No utility capacity issues have been identified.

01:09:04.880 --> 01:09:09.680
 That's within the eight minutes or less response time boundary for Fire Station 2.

01:09:09.680 --> 01:09:13.440
 No law enforcement issues are expected to increase here.

01:09:13.440 --> 01:09:17.280
 We did do our public outreach and received one response in opposition.

01:09:17.280 --> 01:09:19.240
 It was a neighborhood meeting.

01:09:19.240 --> 01:09:24.600
 Two citizens attended, asked questions, expressed some concerns about multifamily development

01:09:24.600 --> 01:09:29.200
 causing traffic on prominence, about traffic on loop 288, and they expressed their appreciation

01:09:29.200 --> 01:09:33.040
 for the proposed GO zoning.

01:09:33.040 --> 01:09:37.960
 So with that, staff does recommend approval of the request as it complies with our criteria

01:09:37.960 --> 01:09:39.320
 for approval.

01:09:39.320 --> 01:09:42.520
 And I will stand for any questions.

01:09:42.520 --> 01:09:45.760
 Thank you, Sean.

01:09:45.760 --> 01:09:46.760
 Any questions?

01:09:46.760 --> 01:09:47.760
 Krischer Smith.

01:09:47.760 --> 01:09:48.760
 Thank you, Chair.

01:09:48.760 --> 01:09:55.600
 Sean, what was the, this PD that's existing there, was a PD that was underneath the rezone

01:09:55.600 --> 01:10:00.120
 that we did in '19, right, that became PD whenever we did the rezone in '19.

01:10:00.120 --> 01:10:04.280
 So it was probably due to a zoning change that happened with like a restriction or something

01:10:04.280 --> 01:10:05.280
 like that.

01:10:05.280 --> 01:10:09.760
 It wasn't the way that our PDs are being done now underneath our current code.

01:10:09.760 --> 01:10:12.520
 What exactly was that PD's restrictions?

01:10:12.520 --> 01:10:13.520
 What happened within there?

01:10:13.520 --> 01:10:17.520
 Give us some more information about specifically that PD that's being rezoned away.

01:10:17.520 --> 01:10:24.200
 So that PD that was put in place in 2000 wasn't actually changed in any way by the 2019.

01:10:24.200 --> 01:10:26.240
 It just moved forward as a PD.

01:10:26.240 --> 01:10:34.120
 I guess the, it's a PD and it has, and correct me if I'm wrong, but being a PD zoning, meaning

01:10:34.120 --> 01:10:38.800
 that it has obviously some sort of base zoning, I know it's from 2000, but some sort of base

01:10:38.800 --> 01:10:43.200
 zoning and then there was changes in criteria that were specific to just that site.

01:10:43.200 --> 01:10:48.000
 I guess that's my question, is what are those specific changes that were done just to that

01:10:48.000 --> 01:10:49.000
 site?

01:10:49.000 --> 01:10:55.240
 So the way that PDs were put in place in 2000 when this was done, there wasn't necessarily

01:10:55.240 --> 01:10:56.920
 a base zoning that was put in place.

01:10:56.920 --> 01:11:01.800
 They literally said, here are the uses, here's the list of uses you're allowed, here's how

01:11:01.800 --> 01:11:05.500
 you can design buildings.

01:11:05.500 --> 01:11:11.120
 It was actually kind of detailed in laying that out and so what we looked at was what

01:11:11.120 --> 01:11:16.600
 zoning districts would generally line up with how that was set up in our current list of

01:11:16.600 --> 01:11:19.320
 zoning districts we have now.

01:11:19.320 --> 01:11:24.600
 But there wasn't, there's not necessarily a simple zoning district from our, a straight

01:11:24.600 --> 01:11:28.400
 zoning district from previous time that I could refer to that to say, well, it was kind

01:11:28.400 --> 01:11:29.400
 of like that.

01:11:29.400 --> 01:11:30.400
 Okay.

01:11:30.400 --> 01:11:34.320
 I'll look, I'm going to look more at the, but you guys send the backup and I'll formulate

01:11:34.320 --> 01:11:36.360
 a better question during public comment.

01:11:36.360 --> 01:11:41.200
 Maybe just to clarify a little bit, so in 2000 we were under an interim zoning code.

01:11:41.200 --> 01:11:45.560
 It was kind of a hybrid of our '91 code and the 2002 code that came about, so it truly

01:11:45.560 --> 01:11:51.440
 was a PD in the sense of PDs that we have today that created its own development regulations.

01:11:51.440 --> 01:11:55.440
 The old code did not necessarily require that they have a base zoning for that, so it is

01:11:55.440 --> 01:12:01.800
 truly a standalone document that doesn't necessarily follow any of the codes that we have become

01:12:01.800 --> 01:12:03.240
 familiar with in the last two decades.

01:12:03.240 --> 01:12:08.540
 It was kind of an interim hybrid situation at the time, so it's a very unique animal.

01:12:08.540 --> 01:12:13.040
 So basically it was, and that's what I saw in the backup there, it was just more of like,

01:12:13.040 --> 01:12:16.320
 it was its own zoning that had its own blend of these different pieces that are all part

01:12:16.320 --> 01:12:17.320
 of it.

01:12:17.320 --> 01:12:18.320
 Correct.

01:12:18.320 --> 01:12:22.400
 So there wasn't any other criteria on like deviation on height or any of those kinds of

01:12:22.400 --> 01:12:23.400
 things.

01:12:23.400 --> 01:12:24.400
 Correct.

01:12:24.400 --> 01:12:25.400
 It's not the PD overlay that we had.

01:12:25.400 --> 01:12:28.720
 We didn't have a really good one that fit at all, and so it's just this mixed bag of

01:12:28.720 --> 01:12:30.040
 stuff that's in that section.

01:12:30.040 --> 01:12:31.040
 Correct.

01:12:31.040 --> 01:12:32.040
 So okay.

01:12:32.040 --> 01:12:33.040
 Right.

01:12:33.040 --> 01:12:34.960
 I just didn't know what, if there were some criteria that we could do exact comparisons

01:12:34.960 --> 01:12:40.920
 between like moving to geo, any differences in height versus where, basically do we have

01:12:40.920 --> 01:12:41.920
 to rezone it?

01:12:41.920 --> 01:12:45.760
 That's kind of where I was getting to on that piece, is that underneath its current zoning,

01:12:45.760 --> 01:12:48.600
 what are we really changing in the way that it really makes a big difference, but I think

01:12:48.600 --> 01:12:51.400
 I understand from Haley's answer that I understand where we're coming from now.

01:12:51.400 --> 01:12:52.400
 So okay.

01:12:52.400 --> 01:12:53.400
 Thank you.

01:12:53.400 --> 01:12:54.400
 Certainly.

01:12:54.400 --> 01:12:55.400
 Any other questions?

01:12:55.400 --> 01:12:57.400
 Commissioner Ellis.

01:12:57.400 --> 01:12:58.400
 Thank you, Chair.

01:12:58.400 --> 01:13:01.920
 Sean, I know you said we're not talking about area D, but I just, I want to talk about

01:13:01.920 --> 01:13:03.840
 it for a second, because I just want some clarification.

01:13:03.840 --> 01:13:10.440
 I assume that that's the southern part that's remaining in PD that I see on the proposed

01:13:10.440 --> 01:13:14.240
 zoning exhibit that you have in here.

01:13:14.240 --> 01:13:17.040
 Do you know what those uses are for area D?

01:13:17.040 --> 01:13:21.520
 So area D was primarily a residential use designation.

01:13:21.520 --> 01:13:25.760
 I believe there was some retail that was permitted in that area, and some of that is actually

01:13:25.760 --> 01:13:29.600
 the neighborhood to the south that you see now, that's actually used to be part of area

01:13:29.600 --> 01:13:30.600
 D.

01:13:30.600 --> 01:13:31.600
 Okay.

01:13:31.600 --> 01:13:34.480
 So that left the PD and was zoned, I believe, R6 and R4.

01:13:34.480 --> 01:13:35.480
 Okay.

01:13:35.480 --> 01:13:39.200
 And right now that's remaining as area D in the PD?

01:13:39.200 --> 01:13:42.960
 The neighborhood is not in PD, but yes, the other area, yes, it's remaining area D in

01:13:42.960 --> 01:13:43.960
 the PD.

01:13:43.960 --> 01:13:46.920
 It's a different landowner who's not part of this request.

01:13:46.920 --> 01:13:47.920
 Okay.

01:13:47.920 --> 01:13:48.920
 Understood.

01:13:48.920 --> 01:13:49.920
 Okay.

01:13:49.920 --> 01:13:53.520
 I think that's it for now.

01:13:53.520 --> 01:13:54.520
 Thanks.

01:13:54.520 --> 01:13:55.520
 Any other questions?

01:13:55.520 --> 01:14:02.640
 First, for what it's worth, this seems more like business innovation to me, which is,

01:14:02.640 --> 01:14:09.040
 makes my head a little wrap around the previous item, and B versus this one, it actually seems

01:14:09.040 --> 01:14:10.800
 innovative.

01:14:10.800 --> 01:14:18.800
 But the question I have is early on your slides, you had some FEMA designations and ESA designations.

01:14:18.800 --> 01:14:26.040
 Does staff have any hesitation on the development of the property given that half of it is in

01:14:26.040 --> 01:14:28.720
 potentially restricted development areas?

01:14:28.720 --> 01:14:32.560
 Well, I will note that that is the current FEMA map.

01:14:32.560 --> 01:14:38.480
 There will be some changes because the landowner has a previous approval for a letter of map

01:14:38.480 --> 01:14:44.800
 revision, and so some of that in the northwestern corner is being removed from the flood plain

01:14:44.800 --> 01:14:46.920
 under that previous approval.

01:14:46.920 --> 01:14:51.680
 But from staff's perspective, much of that remaining area is going to parkland that will

01:14:51.680 --> 01:14:56.120
 benefit the development in that area, so we think that actually helps create a beneficial

01:14:56.120 --> 01:14:57.120
 mix.

01:14:57.120 --> 01:14:58.120
 Great.

01:14:58.120 --> 01:14:59.120
 Thanks for that clarification.

01:14:59.120 --> 01:15:00.120
 Christopher?

01:15:00.120 --> 01:15:04.120
 Yeah, if you don't mind, can you go back to that slide with the trail corridor that you

01:15:04.120 --> 01:15:05.120
 showed?

01:15:05.120 --> 01:15:06.120
 Certainly.

01:15:06.120 --> 01:15:10.040
 Sorry, just a moment.

01:15:10.040 --> 01:15:11.040
 Sorry.

01:15:11.040 --> 01:15:38.200
 Yeah, thank you.

01:15:38.200 --> 01:15:45.360
 So I'm trying to understand the implications of the parkland dedication that was made under

01:15:45.360 --> 01:15:54.040
 the old PD versus the requirements of the 2019 DDC that would apply insofar as they

01:15:54.040 --> 01:16:00.480
 provide an easement or dedication to allow this in the future.

01:16:00.480 --> 01:16:04.800
 My understanding is that the 2019 DDC only requires an extension of a trail if it already

01:16:04.800 --> 01:16:13.480
 exists at the border, and that the ESA requirements are really more geared toward development

01:16:13.480 --> 01:16:19.760
 of the site as opposed to which portions of the ESA need to be dedicated versus doing

01:16:19.760 --> 01:16:23.280
 a funds in lieu of or other sort of arrangement, right?

01:16:23.280 --> 01:16:31.520
 So I guess my question is, what level of confidence do we have that if the zoning changes is approved

01:16:31.520 --> 01:16:39.320
 that that corridor would be available to our parks department in the future, and what guarantees

01:16:39.320 --> 01:16:40.960
 that if anything?

01:16:40.960 --> 01:16:48.200
 Well, I will clarify first that the land was never actually dedicated under the PD.

01:16:48.200 --> 01:16:52.360
 It was if this developed under the PD, then this would be provided.

01:16:52.360 --> 01:16:54.640
 And so in some ways we're in a similar situation.

01:16:54.640 --> 01:16:59.000
 The landowner has actually been the one that has, through this process, approached the

01:16:59.000 --> 01:17:04.440
 parks department saying, "I'd like to give this to the city.

01:17:04.440 --> 01:17:05.520
 Are you good with this?"

01:17:05.520 --> 01:17:09.800
 And the parks department said, they thought about it, and they said, "Yeah, okay."

01:17:09.800 --> 01:17:13.640
 So there's not a guarantee built into this, and that would certainly be something that

01:17:13.640 --> 01:17:18.560
 city council could add as a condition of approval.

01:17:18.560 --> 01:17:23.440
 But from our perspective, the landowner, the developer has expressed a strong interest

01:17:23.440 --> 01:17:28.880
 in dedicating this park, and they would actually have park dedication requirement even with

01:17:28.880 --> 01:17:31.440
 potential future development.

01:17:31.440 --> 01:17:36.280
 And so there would be that benefit in it as well, besides the fact that we're fairly familiar

01:17:36.280 --> 01:17:40.480
 with landowners preferring not to have the maintenance responsibility for land that they

01:17:40.480 --> 01:17:41.920
 can't develop.

01:17:41.920 --> 01:17:48.240
 So it's not a guarantee, but it is something that I believe we have a level of comfort

01:17:48.240 --> 01:17:50.600
 with the desire to provide that area support plan.

01:17:50.600 --> 01:17:51.600
 Okay.

01:17:51.600 --> 01:17:52.600
 Thank you.

01:17:52.600 --> 01:17:55.600
 Any other questions for Sean?

01:17:55.600 --> 01:17:56.600
 Great.

01:17:56.600 --> 01:17:58.520
 Thanks for the presentation, Sean.

01:17:58.520 --> 01:18:01.960
 Before breaking, I would want to turn it over to Haley.

01:18:01.960 --> 01:18:04.320
 She has a couple of announcements for us.

01:18:04.320 --> 01:18:05.320
 Yeah.

01:18:05.320 --> 01:18:09.040
 Just to put them on the spot, maybe embarrass them a little bit, I wanted to make an announcement

01:18:09.040 --> 01:18:13.680
 that we are very happy to announce that both Corina and Sean have been recently promoted

01:18:13.680 --> 01:18:15.720
 from assistant planners to associate planners.

01:18:15.720 --> 01:18:22.360
 So congratulations are in order for their hard work.

01:18:22.360 --> 01:18:23.800
 Congratulations.

01:18:23.800 --> 01:18:25.200
 Well deserved.

01:18:25.200 --> 01:18:31.520
 With that, I will close the work session meeting at 5.51 and we will return here at 6.30.

01:18:31.520 --> 01:18:38.520
 Thank you.

01:18:38.520 --> 01:18:41.560
 Good evening, ladies and gentlemen, and welcome to the Planning and Zoning Commission meeting

01:18:41.560 --> 01:18:45.600
 for Wednesday, July 14th, 2021.

01:18:45.600 --> 01:18:49.120
 Seeing that we have a quorum, I'll call this meeting to order at 6.32.

01:18:49.120 --> 01:18:53.160
 And please let the record show that Commissioner Cole is not with us this evening.

01:18:53.160 --> 01:18:56.560
 The first item of business is to stand and provide a pledge of allegiance to the U.S.

01:18:56.560 --> 01:18:57.560
 and Texas flag.

01:18:57.560 --> 01:19:06.560
 I pledge allegiance to the flag of the United States of America and to the Republic for

01:19:06.560 --> 01:19:16.080
 which it stands, one nation under God, indivisible with liberty and justice for all.

01:19:16.080 --> 01:19:17.080
 Honor the Texas flag.

01:19:17.080 --> 01:19:18.080
 I pledge allegiance to the United States of America, one nation under God, indivisible

01:19:18.080 --> 01:19:19.080
 with liberty and justice for all.

01:19:19.080 --> 01:19:20.080
 Honor the Texas flag.

01:19:20.080 --> 01:19:21.080
 I pledge allegiance to the United States of America, one nation under God, indivisible

01:19:21.080 --> 01:19:22.080
 with liberty and justice for all.

01:19:22.080 --> 01:19:23.080
 Honor the Texas flag.

01:19:23.080 --> 01:19:24.080
 I pledge allegiance to the United States of America, one nation under God, indivisible

01:19:24.080 --> 01:19:25.080
 with liberty and justice for all.

01:19:25.080 --> 01:19:26.080
 I pledge allegiance to the United States of America, one nation under God, indivisible

01:19:26.080 --> 01:19:27.080
 with liberty and justice for all.

01:19:27.080 --> 01:19:28.080
 I pledge allegiance to the United States of America, one nation under God, indivisible

01:19:28.080 --> 01:19:29.080
 with liberty and justice for all.

01:19:29.080 --> 01:19:32.080
 The next item of business is to consider the approval of the June 23rd, 2021 minutes.

01:19:32.080 --> 01:19:33.080
 Commissioner Smith.

01:19:33.080 --> 01:19:34.080
 Make a motion to approve.

01:19:34.080 --> 01:19:36.380
 We have a first for approval.

01:19:36.380 --> 01:19:37.380
 Commissioner Ellis.

01:19:37.380 --> 01:19:38.380
 Second.

01:19:38.380 --> 01:19:43.080
 We have a first and a second for approval of the minutes.

01:19:43.080 --> 01:19:46.080
 Any discussion?

01:19:46.080 --> 01:19:48.680
 Seeing none, I'll call for a vote via roll call.

01:19:48.680 --> 01:19:49.680
 Commissioner Pruitt.

01:19:49.680 --> 01:19:50.680
 Aye.

01:19:50.680 --> 01:19:51.680
 Commissioner Smith.

01:19:51.680 --> 01:19:52.680
 Aye.

01:19:52.680 --> 01:19:53.680
 Second.

01:19:53.680 --> 01:19:54.680
 Chair is an aye.

01:19:54.680 --> 01:19:55.680
 Commissioner Anderson.

01:19:55.680 --> 01:19:56.680
 Aye.

01:19:56.680 --> 01:19:57.680
 Commissioner Ellis.

01:19:57.680 --> 01:19:58.680
 Aye.

01:19:58.680 --> 01:19:59.680
 Motion carries 6-0.

01:19:59.680 --> 01:20:04.960
 The next item of business is to consider our consent agenda.

01:20:04.960 --> 01:20:05.960
 Commissioner Ellis.

01:20:05.960 --> 01:20:10.280
 I move approval.

01:20:10.280 --> 01:20:11.280
 We have a first for approval.

01:20:11.280 --> 01:20:12.280
 Commissioner Smith.

01:20:12.280 --> 01:20:13.280
 Make a second.

01:20:13.280 --> 01:20:16.320
 We have a first and a second for approval of the consent agenda.

01:20:16.320 --> 01:20:19.320
 Any discussion?

01:20:19.320 --> 01:20:21.280
 Seeing none, I'll call for a vote via roll call.

01:20:21.280 --> 01:20:22.280
 Commissioner Pruitt.

01:20:22.280 --> 01:20:23.280
 Aye.

01:20:23.280 --> 01:20:24.280
 Commissioner Smith.

01:20:24.280 --> 01:20:25.280
 Aye.

01:20:25.280 --> 01:20:26.280
 Commissioner McDade.

01:20:26.280 --> 01:20:27.280
 Chair is an aye.

01:20:27.280 --> 01:20:28.280
 Commissioner Ellis.

01:20:28.280 --> 01:20:29.280
 Aye.

01:20:29.280 --> 01:20:30.280
 Commissioner Anderson.

01:20:30.280 --> 01:20:31.280
 Aye.

01:20:31.280 --> 01:20:32.600
 Motion carries 6-0.

01:20:32.600 --> 01:20:40.760
 The next item of business is our individual consideration items, starting with 4A FP20-0027.

01:20:40.760 --> 01:20:44.080
 I'll invite Haley Zagorski for presentation.

01:20:44.080 --> 01:20:46.280
 All right.

01:20:46.280 --> 01:20:47.280
 Good evening.

01:20:47.280 --> 01:20:49.240
 Carina is getting the plat pulled up.

01:20:49.240 --> 01:20:53.120
 This is a final plat for the Woodlands and McKinney Street.

01:20:53.120 --> 01:20:59.000
 This is a manufactured home development with a single large lot.

01:20:59.000 --> 01:21:03.060
 Since the time of the agenda posting, a new plat has been sent to you all.

01:21:03.060 --> 01:21:09.120
 They were able to resolve all conditions that were -- or all staff comments that were outstanding

01:21:09.120 --> 01:21:13.040
 on the plat rather related to their HOA documents and some easement and labeling items on the

01:21:13.040 --> 01:21:15.560
 plat, so we are now recommending approval of this request.

01:21:15.560 --> 01:21:18.240
 I'm happy to answer any questions.

01:21:18.240 --> 01:21:19.960
 Any questions for Haley?

01:21:19.960 --> 01:21:21.920
 Commissioner Smith.

01:21:21.920 --> 01:21:23.840
 I make a motion to approve.

01:21:23.840 --> 01:21:25.360
 We have a first for approval.

01:21:25.360 --> 01:21:26.360
 Commissioner Anderson.

01:21:26.360 --> 01:21:27.360
 I second.

01:21:27.360 --> 01:21:30.160
 We have first and second for approval.

01:21:30.160 --> 01:21:31.160
 Real fast.

01:21:31.160 --> 01:21:33.920
 Rachel, is there anyone wishing to speak on this item?

01:21:33.920 --> 01:21:35.800
 Good evening, Chair.

01:21:35.800 --> 01:21:37.200
 No, there is none.

01:21:37.200 --> 01:21:38.200
 Thank you.

01:21:38.200 --> 01:21:41.440
 Any further discussion on the item?

01:21:41.440 --> 01:21:43.520
 Seeing none, I'll call for a vote via roll call.

01:21:43.520 --> 01:21:44.520
 Commissioner Pruitt.

01:21:44.520 --> 01:21:45.520
 Aye.

01:21:45.520 --> 01:21:46.520
 Commissioner Smith.

01:21:46.520 --> 01:21:47.520
 Aye.

01:21:47.520 --> 01:21:48.520
 Thank you.

01:21:48.520 --> 01:21:49.520
 Chair is an aye.

01:21:49.520 --> 01:21:50.520
 Commissioner Anderson.

01:21:50.520 --> 01:21:51.520
 Aye.

01:21:51.520 --> 01:21:52.520
 Commissioner Ellis.

01:21:52.520 --> 01:21:53.520
 Aye.

01:21:53.520 --> 01:21:54.520
 Motion carries 6-0.

01:21:54.520 --> 01:21:58.520
 The next item of business is item 4B, PP21-0012.

01:21:58.520 --> 01:22:03.000
 I'll invite Haley back for presentation.

01:22:03.000 --> 01:22:05.880
 Good evening.

01:22:05.880 --> 01:22:08.880
 This is a preliminary plat for the Urban Logistics Edition.

01:22:08.880 --> 01:22:12.000
 This property is located on the south side of I-35E.

01:22:12.000 --> 01:22:15.860
 The preliminary plat includes three lots, the largest of which would be intended for

01:22:15.860 --> 01:22:20.560
 industrial development, the other two left as commercial parcels.

01:22:20.560 --> 01:22:23.920
 At this time, there are several outstanding comments that are outlined in Exhibit 2 of

01:22:23.920 --> 01:22:26.120
 your backup, so staff is recommending denial.

01:22:26.120 --> 01:22:30.640
 However, the applicant has requested an extension, and staff has no objection, and that would

01:22:30.640 --> 01:22:33.880
 be to a date certain of August 4th.

01:22:33.880 --> 01:22:34.880
 Thank you, Haley.

01:22:34.880 --> 01:22:37.520
 Any questions for Haley?

01:22:37.520 --> 01:22:39.600
 And Rachel, is there anyone wishing to speak on this item?

01:22:39.600 --> 01:22:42.760
 No, Chair, there is none.

01:22:42.760 --> 01:22:43.760
 Thank you.

01:22:43.760 --> 01:22:44.760
 Commissioner Smith.

01:22:44.760 --> 01:22:49.000
 Make a motion to approve the extension to date certain of August 4th, 2021.

01:22:49.000 --> 01:22:52.320
 We have a first for the 30-day extension to a date certain of August 4th.

01:22:52.320 --> 01:22:53.320
 Commissioner Ellis.

01:22:53.320 --> 01:22:54.320
 Second.

01:22:54.320 --> 01:22:56.480
 We have a first and a second for the extension.

01:22:56.480 --> 01:22:59.160
 Any discussion?

01:22:59.160 --> 01:23:01.320
 Seeing none, I'll call for a vote via roll call.

01:23:01.320 --> 01:23:02.320
 Commissioner Pruitt.

01:23:02.320 --> 01:23:03.320
 Aye.

01:23:03.320 --> 01:23:04.320
 Commissioner Smith.

01:23:04.320 --> 01:23:05.320
 Aye.

01:23:05.320 --> 01:23:06.320
 Commissioner McDade.

01:23:06.320 --> 01:23:07.320
 Aye.

01:23:07.320 --> 01:23:08.320
 Chairs, an aye.

01:23:08.320 --> 01:23:09.320
 Commissioner Anderson.

01:23:09.320 --> 01:23:10.320
 Aye.

01:23:10.320 --> 01:23:11.320
 Commissioner Ellis.

01:23:11.320 --> 01:23:12.320
 Aye.

01:23:12.320 --> 01:23:13.320
 Motion carries 6-0.

01:23:13.320 --> 01:23:19.320
 Item number 4C, FR21-0006, and I'll invite Ron to present.

01:23:19.320 --> 01:23:23.360
 Thank you, Chair, members of the Commission.

01:23:23.360 --> 01:23:28.960
 This item, for your consideration, is a final replat application for a residential subdivision,

01:23:28.960 --> 01:23:30.240
 Eagle Creek.

01:23:30.240 --> 01:23:36.040
 The application did come to the Commission last time you all met for an extension, and

01:23:36.040 --> 01:23:37.760
 that was approved.

01:23:37.760 --> 01:23:43.440
 However, between then and now, the applicant has not been able to address the comments,

01:23:43.440 --> 01:23:51.200
 specifically sections 832D, 835, as well as 836J, per the development code.

01:23:51.200 --> 01:23:55.400
 So therefore, staff is recommending denial of this subject item, and I will be happy

01:23:55.400 --> 01:23:56.400
 to answer any questions.

01:23:56.400 --> 01:23:57.400
 Great.

01:23:57.400 --> 01:23:58.400
 Thanks, Ron.

01:23:58.400 --> 01:23:59.720
 Any questions for Ron?

01:23:59.720 --> 01:24:01.840
 And Rachel, is there anyone wishing to speak on this item?

01:24:01.840 --> 01:24:05.000
 No, sir, not this.

01:24:05.000 --> 01:24:06.000
 Thank you.

01:24:06.000 --> 01:24:09.320
 Commissioner Anderson, I'll make a motion to deny.

01:24:09.320 --> 01:24:12.880
 We have a first for deny.

01:24:12.880 --> 01:24:13.880
 Commissioner Smith.

01:24:13.880 --> 01:24:14.880
 Second.

01:24:14.880 --> 01:24:15.960
 We have a first and a second to deny.

01:24:15.960 --> 01:24:17.760
 Any discussion on this item?

01:24:17.760 --> 01:24:18.760
 Okay.

01:24:18.760 --> 01:24:20.640
 I'll call for a vote via roll call.

01:24:20.640 --> 01:24:24.200
 Just a reminder, a vote in the affirmative is to deny.

01:24:24.200 --> 01:24:25.200
 Commissioner Pruitt.

01:24:25.200 --> 01:24:26.200
 Aye.

01:24:26.200 --> 01:24:27.200
 Commissioner Smith.

01:24:27.200 --> 01:24:28.200
 Aye.

01:24:28.200 --> 01:24:29.200
 Commissioner McDade.

01:24:29.200 --> 01:24:30.200
 Aye.

01:24:30.200 --> 01:24:31.200
 Chair is also an aye.

01:24:31.200 --> 01:24:32.200
 Commissioner Anderson.

01:24:32.200 --> 01:24:33.200
 Aye.

01:24:33.200 --> 01:24:34.200
 Commissioner Ellis.

01:24:34.200 --> 01:24:35.200
 Aye.

01:24:35.200 --> 01:24:36.200
 Chair is also an aye.

01:24:36.200 --> 01:24:44.080
 The next item of business is item 4D, PP21-0011B, by Karina for presentation.

01:24:44.080 --> 01:24:48.760
 Good evening, Karina Maldonado, Associate Planner.

01:24:48.760 --> 01:24:53.800
 The item before you today is a preliminary plat, PP21-001B.

01:24:53.800 --> 01:25:01.160
 This is a preliminary plat for an eight-acre site for 35 residential lots and one common

01:25:01.160 --> 01:25:02.960
 area lot.

01:25:02.960 --> 01:25:09.000
 Since the posting of this agenda, the applicant has addressed all comments, so staff is now

01:25:09.000 --> 01:25:13.280
 recommending approval of this request as it does meet the established requirements in

01:25:13.280 --> 01:25:14.280
 the DDC.

01:25:14.280 --> 01:25:16.280
 With that, I can take any questions.

01:25:16.280 --> 01:25:17.280
 Great.

01:25:17.280 --> 01:25:18.280
 Any questions for Karina?

01:25:18.280 --> 01:25:21.200
 Rachel, is there anyone wishing to speak on this item?

01:25:21.200 --> 01:25:23.280
 No, not this one.

01:25:23.280 --> 01:25:26.080
 Thank you.

01:25:26.080 --> 01:25:29.080
 Any other discussion?

01:25:29.080 --> 01:25:33.200
 Chair, we'll make a motion for approval.

01:25:33.200 --> 01:25:34.200
 Commissioner Smith.

01:25:34.200 --> 01:25:35.200
 Second.

01:25:35.200 --> 01:25:37.720
 We have first and second for approval.

01:25:37.720 --> 01:25:38.720
 Any discussion?

01:25:38.720 --> 01:25:42.600
 Seeing none, I call for a vote via roll call.

01:25:42.600 --> 01:25:43.600
 Commissioner Pruitt.

01:25:43.600 --> 01:25:44.600
 Aye.

01:25:44.600 --> 01:25:45.600
 Commissioner Smith.

01:25:45.600 --> 01:25:46.600
 Aye.

01:25:46.600 --> 01:25:47.600
 Commissioner McDade.

01:25:47.600 --> 01:25:48.600
 Aye.

01:25:48.600 --> 01:25:49.600
 Chair is an aye.

01:25:49.600 --> 01:25:50.600
 Commissioner Anderson.

01:25:50.600 --> 01:25:51.600
 Aye.

01:25:51.600 --> 01:25:52.600
 Commissioner Ellis.

01:25:52.600 --> 01:25:53.600
 Aye.

01:25:53.600 --> 01:25:54.600
 Motion carries 6-0.

01:25:54.600 --> 01:26:05.860
 I call for ZCP21-0017 and I'll invite Karina for presentation.

01:26:05.860 --> 01:26:12.880
 All right.

01:26:12.880 --> 01:26:16.680
 The request today is for ZCP21-0017.

01:26:16.680 --> 01:26:20.600
 This is for Razor Ranch Multifamily at Heritage Trail.

01:26:20.600 --> 01:26:25.600
 So the request before you today is for approval of a site plan for a multifamily use.

01:26:25.600 --> 01:26:33.040
 This is approximately 5.906 acres located on lot 1 and lot 2, block E of the Razor Ranch

01:26:33.040 --> 01:26:34.040
 addition.

01:26:34.040 --> 01:26:38.940
 This site, although it's two lots currently, will need to be replatted to combine those

01:26:38.940 --> 01:26:42.800
 two lots into one for this development.

01:26:42.800 --> 01:26:48.520
 The subject site is surrounded by four public streets.

01:26:48.520 --> 01:26:50.700
 On the north is Linden Drive.

01:26:50.700 --> 01:26:52.880
 To the west, Heritage Trail.

01:26:52.880 --> 01:26:58.560
 To the south is Panhandle Street and then to the east is East Park Boulevard.

01:26:58.560 --> 01:27:02.800
 So this subject site is located within the Razor Ranch Overlay District.

01:27:02.800 --> 01:27:05.880
 It has a base zoning of RCCD.

01:27:05.880 --> 01:27:12.440
 That is because the Razor Ranch Overlay District is based on the 2002 Denton Development Code.

01:27:12.440 --> 01:27:18.760
 So the site is also located within the South Mixed Use District and the proposed use is

01:27:18.760 --> 01:27:22.520
 for multifamily, which is permitted in this area.

01:27:22.520 --> 01:27:28.320
 I did want to mention that the concept plan for the Razor Ranch Overlay District was amended

01:27:28.320 --> 01:27:36.400
 in April 2021 to permit the multifamily use on the southern portion or lot 2 of the site.

01:27:36.400 --> 01:27:41.600
 So multifamily located east of Heritage Trail are also subject to the architectural landscape

01:27:41.600 --> 01:27:49.280
 standards in ordinance number Z18-0026C and that is exhibit C2A that they would need to

01:27:49.280 --> 01:27:51.560
 comply with.

01:27:51.560 --> 01:27:57.840
 So the reason why you're seeing this today is that site plans within the Razor Ranch

01:27:57.840 --> 01:28:02.920
 Overlay District do require P&Z approval before moving forward.

01:28:02.920 --> 01:28:06.320
 Traditionally, site plans do not require P&Z approval.

01:28:06.320 --> 01:28:09.040
 They're approved at an administrative level.

01:28:09.040 --> 01:28:13.160
 So the approval today or consideration today includes the following elements.

01:28:13.160 --> 01:28:17.880
 That is the site plan, landscape plan, and elevations.

01:28:17.880 --> 01:28:25.120
 The criteria for approval for a site plan for the Razor Ranch Overlay District includes

01:28:25.120 --> 01:28:26.440
 four elements.

01:28:26.440 --> 01:28:30.480
 First being that the site plan substantially complies with the concept and schematic plan

01:28:30.480 --> 01:28:32.320
 approved by council.

01:28:32.320 --> 01:28:36.640
 Second that the site plan provides for a compatible arrangement of buildings and land uses that

01:28:36.640 --> 01:28:41.040
 would not adversely affect adjoining neighborhoods or properties.

01:28:41.040 --> 01:28:45.640
 Third that the site plan provides for adequate and safe circulation of vehicular traffic

01:28:45.640 --> 01:28:51.840
 and last that the plan fully complies with all other sections of the overlay district.

01:28:51.840 --> 01:28:53.640
 So first I'll just go over the site plan.

01:28:53.640 --> 01:28:57.320
 I did highlight some areas to make it easier to identify.

01:28:57.320 --> 01:29:06.280
 Overall, 311,500 square feet of buildings on the site or building coverage on the site.

01:29:06.280 --> 01:29:09.400
 That includes 322 dwelling units.

01:29:09.400 --> 01:29:14.200
 Those dwelling units are located in two multifamily buildings.

01:29:14.200 --> 01:29:22.480
 Those are these L-shaped buildings in blue, as well as the amenity center located here

01:29:22.480 --> 01:29:23.900
 in green.

01:29:23.900 --> 01:29:32.840
 So as well as the amenity center, there is also a dog park located here on the southwest

01:29:32.840 --> 01:29:39.280
 portion of the site, a sports court park on the opposite end, a pool amenity area, the

01:29:39.280 --> 01:29:45.600
 clubhouse, a tot park playground area and plaza that can be seen here on the north part

01:29:45.600 --> 01:29:46.600
 of the site.

01:29:46.600 --> 01:29:50.440
 Previously, that was not mentioned in work session, I do want to highlight that there

01:29:50.440 --> 01:29:57.000
 are pedestrian entrances on the north side of Linden Street where this promenade area

01:29:57.000 --> 01:30:03.600
 is on the west side along Heritage Trail and then on the east side on East Park, and these

01:30:03.600 --> 01:30:11.880
 are gated areas with entrances for the residents that would be occupying this multifamily development.

01:30:11.880 --> 01:30:17.840
 So overall, the site shows 74.9 percent lot coverage, that's within the 90 percent maximum

01:30:17.840 --> 01:30:18.840
 on the site.

01:30:18.840 --> 01:30:25.920
 They are proposing 9.6 percent open space, that's all the areas shown in green.

01:30:25.920 --> 01:30:30.060
 This will be, these multifamily buildings will be seven stories with a maximum height

01:30:30.060 --> 01:30:35.280
 of 85 feet, that's less than the allowed 100 feet.

01:30:35.280 --> 01:30:42.240
 And then parking proposed is 515 spaces, that does exceed the minimum of 504, but within

01:30:42.240 --> 01:30:46.600
 the Razor Ranch Overlay District, they are permitted to exceed that number.

01:30:46.600 --> 01:30:54.040
 And the last item I wanted to bring up is the red boxes that you see here on the site.

01:30:54.040 --> 01:31:01.640
 Those are existing easements that they intend to abandon to serve this site.

01:31:01.640 --> 01:31:06.760
 So just briefly going over the landscape plan, they are meeting the minimum requirements

01:31:06.760 --> 01:31:10.720
 and exceeding in some areas the standards.

01:31:10.720 --> 01:31:16.260
 So 21 percent landscape area is proposed, the minimum required is 10 percent.

01:31:16.260 --> 01:31:22.360
 And then 42 percent tree canopy is proposed and 20 percent is what's required, and as

01:31:22.360 --> 01:31:27.960
 you can see they have street trees along all frontages with some raised planter beds and

01:31:27.960 --> 01:31:35.880
 green screens in areas where maybe some easements are blocking the required planting locations.

01:31:35.880 --> 01:31:42.880
 So just briefly going over the elevations, the applicant is here and may provide a presentation

01:31:42.880 --> 01:31:46.380
 on additional elevations if you all would like.

01:31:46.380 --> 01:31:51.620
 So first here is the elevations of the two multifamily buildings along Linden Drive facing

01:31:51.620 --> 01:31:54.320
 south.

01:31:54.320 --> 01:31:58.840
 These are the elevations along East Park and Heritage Trail, these would be the right of

01:31:58.840 --> 01:32:01.920
 way facing elevations.

01:32:01.920 --> 01:32:07.720
 The clubhouse which is visible from Linden Street as well as a portion of their split

01:32:07.720 --> 01:32:12.360
 parking structure that you can see from Panhandle.

01:32:12.360 --> 01:32:16.080
 So staff is recommending approval of this request as it meets the established requirements

01:32:16.080 --> 01:32:20.560
 of the Razor Ranch Overlay District with the following conditions.

01:32:20.560 --> 01:32:25.280
 First that any public utility easements shown as being abandoned on the site plan in order

01:32:25.280 --> 01:32:30.160
 to accommodate the proposed building locations must be abandoned prior to issuance of any

01:32:30.160 --> 01:32:31.600
 building permits.

01:32:31.600 --> 01:32:36.560
 And second that a replat must be submitted and approved to combine lots one and two,

01:32:36.560 --> 01:32:42.000
 block E of the Razor Ranch East addition into one lot prior to issuance of any building

01:32:42.000 --> 01:32:44.040
 permits for this development.

01:32:44.040 --> 01:32:48.400
 And with that I believe the applicant is here, I'm not sure if he wants to give a presentation

01:32:48.400 --> 01:32:50.680
 but I can also take questions before that.

01:32:50.680 --> 01:32:54.800
 Sure, is there any questions for Karina?

01:32:54.800 --> 01:32:56.920
 Is the applicant Gerald Lewicki?

01:32:56.920 --> 01:32:57.920
 Yes.

01:32:57.920 --> 01:32:58.920
 Perfect.

01:32:58.920 --> 01:32:59.920
 Can we pull up your presentation?

01:32:59.920 --> 01:33:00.920
 Sure.

01:33:00.920 --> 01:33:24.800
 Okay, if it won't pop up, someone might have exited out of it.

01:33:24.800 --> 01:33:33.360
 Sorry, give me one second while I pull up the presentation.

01:33:33.360 --> 01:33:37.760
 Thank you.

01:33:37.760 --> 01:33:43.720
 Good evening, Commission.

01:33:43.720 --> 01:33:50.720
 I'm Gerald Lewicki with Hodges Architecture 13642 Omega in Dallas and we're honored to

01:33:50.720 --> 01:33:56.120
 be here to present the AHS Development and Razor Ranch to you.

01:33:56.120 --> 01:33:57.120
 Sorry.

01:33:57.120 --> 01:33:58.120
 It looks like...

01:33:58.120 --> 01:34:01.120
 There you go.

01:34:01.120 --> 01:34:19.600
 All right, I'll just briefly run through this.

01:34:19.600 --> 01:34:25.280
 As you know, overall Razor Ranch, this is a larger section of Razor Ranch but still just

01:34:25.280 --> 01:34:32.300
 a portion of that and our site is immediately south of the park as Karina has mentioned.

01:34:32.300 --> 01:34:36.440
 So the design of the site is set up so that it's on the axis of the park.

01:34:36.440 --> 01:34:50.760
 So as the park comes down and relates to street, to Linden Street, then the axis continues on.

01:34:50.760 --> 01:34:53.720
 All right.

01:34:53.720 --> 01:35:00.120
 And landscape plan that we looked at, the site is heavily landscaped or approximately

01:35:00.120 --> 01:35:08.680
 double the required landscaping and shade tree coverage for the site and also have amenity

01:35:08.680 --> 01:35:18.160
 areas as Karina brought up, the dog park, the sports court on the southern portion of

01:35:18.160 --> 01:35:24.980
 the site and then the tot lot area and plaza on the north portion as well as the entry

01:35:24.980 --> 01:35:29.520
 element as you're coming into the main clubhouse building.

01:35:29.520 --> 01:35:34.880
 And Chair, to answer your question about the tot lot, yes, that was a specific request.

01:35:34.880 --> 01:35:39.300
 We did not feel like we had the room needed in the other two amenity areas.

01:35:39.300 --> 01:35:45.960
 It is fenced, has a fence around the entire development but especially around this area

01:35:45.960 --> 01:35:51.840
 as well and the lot itself is brought in towards the building so it's easily accessible to

01:35:51.840 --> 01:35:53.440
 the buildings themselves.

01:35:53.440 --> 01:36:00.280
 So that was the reason for that location.

01:36:00.280 --> 01:36:06.480
 Just quickly looking at some views, some perspective views, this is from the northeast corner looking

01:36:06.480 --> 01:36:12.880
 back into the project and again this is the entrance off of Linden Street in between the

01:36:12.880 --> 01:36:19.240
 main buildings with the amenity area back behind in this location.

01:36:19.240 --> 01:36:31.900
 Then this is from the northwest corner viewing at the corner of Heritage and Linden.

01:36:31.900 --> 01:36:34.600
 These are just some interior shots of the amenity areas.

01:36:34.600 --> 01:36:40.120
 They have some top notch amenities within the clubhouse area.

01:36:40.120 --> 01:36:48.640
 They have a business center, they have interior gathering areas, outdoor cooking areas adjacent

01:36:48.640 --> 01:36:54.600
 to the pool, outdoor pool area and seating areas.

01:36:54.600 --> 01:37:01.840
 I just want to give you a flavor of fitness room, fitness area as well as part of the

01:37:01.840 --> 01:37:03.600
 amenity package.

01:37:03.600 --> 01:37:08.240
 I just want to give you a flavor of the development and let you know that again we're pleased

01:37:08.240 --> 01:37:12.200
 to be able to present this and bring this project to Razor Ranch and here to answer

01:37:12.200 --> 01:37:13.200
 any questions.

01:37:13.200 --> 01:37:14.560
 Thank you very much.

01:37:14.560 --> 01:37:16.360
 Any questions for the applicant?

01:37:16.360 --> 01:37:26.360
 Just out of curiosity, you showed kind of the alignment of this particular site plan

01:37:26.360 --> 01:37:30.320
 with the park across the street there and how the entrance is right in the middle between

01:37:30.320 --> 01:37:31.320
 the two buildings.

01:37:31.320 --> 01:37:32.320
 Yes.

01:37:32.320 --> 01:37:34.400
 Is there a planned mid-block crossing crosswalk there?

01:37:34.400 --> 01:37:38.360
 Initially that was contemplated but we felt that from a safety standpoint it would be

01:37:38.360 --> 01:37:44.160
 better to leave the crossings at the street intersections so it encourages pedestrian

01:37:44.160 --> 01:37:48.560
 circulation all along that north side of Linden.

01:37:48.560 --> 01:37:55.080
 Okay so if someone were to walk out the exit through the center of this grand entrance

01:37:55.080 --> 01:37:59.000
 then they have to walk all the way to the correct intersection and cross and then walk

01:37:59.000 --> 01:38:01.360
 back in order to get to the middle of the park?

01:38:01.360 --> 01:38:02.360
 Absolutely.

01:38:02.360 --> 01:38:03.360
 Okay.

01:38:03.360 --> 01:38:07.560
 Now there's kind of a curve in Linden at that point and a little bit of gray differential

01:38:07.560 --> 01:38:14.520
 still we felt that it was safer at the corners.

01:38:14.520 --> 01:38:15.520
 Okay.

01:38:15.520 --> 01:38:18.520
 Any other questions for the applicant?

01:38:18.520 --> 01:38:19.520
 I don't see any.

01:38:19.520 --> 01:38:20.520
 Thank you very much.

01:38:20.520 --> 01:38:21.520
 All right.

01:38:21.520 --> 01:38:22.520
 Thank you.

01:38:22.520 --> 01:38:25.520
 Rachel is there anyone wishing to speak on this item?

01:38:25.520 --> 01:38:27.520
 No Chair.

01:38:27.520 --> 01:38:29.080
 Perfect.

01:38:29.080 --> 01:38:32.160
 Any further discussion or questions for staff?

01:38:32.160 --> 01:38:35.840
 Commissioner Smith.

01:38:35.840 --> 01:38:37.760
 Make a motion to approve with staff recommendations.

01:38:37.760 --> 01:38:40.600
 We have a first for approval with recommendations.

01:38:40.600 --> 01:38:41.600
 Kush Ellis.

01:38:41.600 --> 01:38:42.600
 Second.

01:38:42.600 --> 01:38:44.800
 We have a first and a second.

01:38:44.800 --> 01:38:47.200
 Any discussion on the item?

01:38:47.200 --> 01:38:49.840
 See oh Kush approved.

01:38:49.840 --> 01:38:50.840
 Just a comment.

01:38:50.840 --> 01:38:57.280
 I think I don't oppose this but just a little bit of common sense.

01:38:57.280 --> 01:39:00.600
 I think if people are living there and they exit their apartment and they want to go to

01:39:00.600 --> 01:39:04.780
 the park they're going to end up walking across the middle of that street there anyway.

01:39:04.780 --> 01:39:10.760
 So I would encourage staff to at least monitor what happens as this development goes up and

01:39:10.760 --> 01:39:17.280
 flag this as a potential area for accommodating that in the future.

01:39:17.280 --> 01:39:22.800
 So the item of concern that you brought up was actually brought up by staff as well.

01:39:22.800 --> 01:39:27.360
 Unfortunately there wasn't a mechanism for us to require that of the developer.

01:39:27.360 --> 01:39:32.720
 I'm not sure if it's an option in any other means of adding that but just wanted to let

01:39:32.720 --> 01:39:37.560
 you know that staff did consider a mid-block crossing but again we couldn't, there was

01:39:37.560 --> 01:39:41.560
 no requirement that they provide that.

01:39:41.560 --> 01:39:42.560
 Okay.

01:39:42.560 --> 01:39:43.560
 Thank you.

01:39:43.560 --> 01:39:44.560
 Any other?

01:39:44.560 --> 01:39:45.560
 Commissioner Anderson.

01:39:45.560 --> 01:39:48.120
 No I'm going to vote for this as well.

01:39:48.120 --> 01:39:57.520
 I just wanted to ask, it looks very nice I will say that, but I'd like to see some different

01:39:57.520 --> 01:39:58.520
 angles and stuff.

01:39:58.520 --> 01:40:02.200
 Instead of just a flat wall with doors and windows it would be kind of nice if it had

01:40:02.200 --> 01:40:08.000
 some little setbacks and stuff like this that's just architectural stuff but instead of just

01:40:08.000 --> 01:40:12.800
 a flat front wall you know.

01:40:12.800 --> 01:40:16.040
 I don't know if you want me to pull up the elevation so within the Razor Ranch Overlay

01:40:16.040 --> 01:40:22.380
 District they are required to have a certain amount of relief in their elevations.

01:40:22.380 --> 01:40:24.920
 It might not have been pretty easy to identify.

01:40:24.920 --> 01:40:25.920
 Could you pull it up again?

01:40:25.920 --> 01:40:26.920
 Yeah.

01:40:26.920 --> 01:40:43.520
 I'm not going to hold this up but it's just.

01:40:43.520 --> 01:40:50.000
 So although it does look like just one kind of just one flat wall it's hard to see in

01:40:50.000 --> 01:40:54.960
 this depiction but some of those areas are recessed back and I'm not sure if your elevations

01:40:54.960 --> 01:40:58.400
 are actually the perspective may show it a little bit better.

01:40:58.400 --> 01:41:08.760
 We can share the applicant's presentation again and I believe it has a better viewpoint.

01:41:08.760 --> 01:41:13.480
 As it pulls up it's loading a bit slow but it is something within the Razor Ranch Overlay

01:41:13.480 --> 01:41:19.760
 District within the ordinance specific to this area it does it does have requirements

01:41:19.760 --> 01:41:20.760
 towards that.

01:41:20.760 --> 01:41:25.040
 I mean for something that looks really nice I mean it looks really nice it's just I didn't

01:41:25.040 --> 01:41:27.080
 I thought it was just going to be a flat wall.

01:41:27.080 --> 01:41:28.080
 No.

01:41:28.080 --> 01:41:29.080
 Okay.

01:41:29.080 --> 01:41:33.000
 It has insets and projections within the façade.

01:41:33.000 --> 01:41:35.920
 Yeah well thank you.

01:41:35.920 --> 01:41:36.920
 You're fine.

01:41:36.920 --> 01:41:46.280
 Okay yeah for some reason this is it's not working.

01:41:46.280 --> 01:41:47.840
 Any other questions or discussion?

01:41:47.840 --> 01:41:54.160
 We have a first and a second for approval I will call I'll call for a vote via roll

01:41:54.160 --> 01:41:55.160
 call.

01:41:55.160 --> 01:41:56.160
 Commissioner Pruitt?

01:41:56.160 --> 01:41:57.160
 Aye.

01:41:57.160 --> 01:41:58.160
 Commissioner Smith?

01:41:58.160 --> 01:41:59.160
 Aye.

01:41:59.160 --> 01:42:00.160
 Commissioner McDade?

01:42:00.160 --> 01:42:01.160
 Aye.

01:42:01.160 --> 01:42:02.160
 Chair is an aye.

01:42:02.160 --> 01:42:03.160
 Commissioner Anderson?

01:42:03.160 --> 01:42:04.160
 Aye.

01:42:04.160 --> 01:42:05.160
 Commissioner Ellis?

01:42:05.160 --> 01:42:06.160
 Aye.

01:42:06.160 --> 01:42:07.160
 Motion carries 6-0 congratulations.

01:42:07.160 --> 01:42:14.320
 Next item of business is item 5A Z21-0007C.

01:42:14.320 --> 01:42:20.720
 I'll open the public hearing and invite Carina Maldonado for presentation.

01:42:20.720 --> 01:42:39.040
 It's me again it's Carina Maldonado Associate Planner with the City of Denton.

01:42:39.040 --> 01:42:43.360
 This request is a public hearing for Z21-0007.

01:42:43.360 --> 01:42:47.040
 This is a Jim Crystal Road rezoning.

01:42:47.040 --> 01:42:54.800
 So the request today is to rezone approximately 30.43 acres from public facilities PF to light

01:42:54.800 --> 01:42:57.480
 industrial LI district zoning.

01:42:57.480 --> 01:43:03.640
 The subject site is located on or is city owned property and is located within a larger

01:43:03.640 --> 01:43:11.520
 tract of city owned property that was acquired in 2016 to accommodate the Denton Energy Center.

01:43:11.520 --> 01:43:17.160
 So just to depict it within the aerial at least within the perspective shown the area

01:43:17.160 --> 01:43:23.920
 in green is all city owned property and then the subject site is two portions of that shown

01:43:23.920 --> 01:43:24.920
 in yellow.

01:43:24.920 --> 01:43:30.320
 So I will be referring to this as the northern and southern portions.

01:43:30.320 --> 01:43:36.880
 So as I mentioned this is all city owned property and so with the 2019 Denton Development Code

01:43:36.880 --> 01:43:44.240
 many public owned facilities automatically were assigned to PF zoning district.

01:43:44.240 --> 01:43:50.520
 Within these districts it's intended for public community services such as fire station schools,

01:43:50.520 --> 01:43:55.920
 civic buildings as well as basic utilities provided by the city.

01:43:55.920 --> 01:44:00.680
 So the request today is intended to support Denton Municipal Electric's proposed ground

01:44:00.680 --> 01:44:06.800
 lease to a private company as part of a modular data center warehouse development.

01:44:06.800 --> 01:44:15.080
 This project was brought forth to city council earlier in June regarding the use.

01:44:15.080 --> 01:44:20.680
 We won't get into that too specifically today but just to let you know DME is in attendance

01:44:20.680 --> 01:44:23.640
 in case you have questions for them.

01:44:23.640 --> 01:44:29.360
 So prior to any development being established on this site the property must be rezoned

01:44:29.360 --> 01:44:34.920
 to a district that would permit the modular data center warehouse use and so the proposal

01:44:34.920 --> 01:44:38.040
 is for the LI district.

01:44:38.040 --> 01:44:41.520
 So just a little bit of zoning history on this site.

01:44:41.520 --> 01:44:49.120
 So prior to 2019 with the 2002 zoning map the subject site was previously zoned ICG.

01:44:49.120 --> 01:44:55.780
 That is one of our heavier industrial districts within the 2002 zoning.

01:44:55.780 --> 01:45:00.960
 So again when the 2019 zoning came through all city owned property transitioned to the

01:45:00.960 --> 01:45:06.280
 PF zoning however if that PF zoning was not there or if the property was not owned by

01:45:06.280 --> 01:45:10.680
 the city of Denton it would have transitioned to the heavy industrial district.

01:45:10.680 --> 01:45:15.320
 And as you can see with this kind of little square patch above the subject site that is

01:45:15.320 --> 01:45:20.720
 the Encore substation, I'm sorry not Encore, I believe it's Encore, substation.

01:45:20.720 --> 01:45:24.680
 So the zoning there of ICG did transition to HI.

01:45:24.680 --> 01:45:29.840
 So again without the PF being there or without the city owning that property it would have

01:45:29.840 --> 01:45:32.520
 likely transitioned to HI.

01:45:32.520 --> 01:45:39.800
 However the request is to rezone to a lesser intensive zoning district of light industrial.

01:45:39.800 --> 01:45:45.360
 So I will go over very briefly the general approval criteria as well as the zoning criteria

01:45:45.360 --> 01:45:50.840
 and I've highlighted the items that I'll cover in bold.

01:45:50.840 --> 01:45:55.400
 So first touching on general criterion three and zoning criterion one regarding the Denton

01:45:55.400 --> 01:45:57.180
 plan 2030.

01:45:57.180 --> 01:46:04.500
 So these subject site, the northern and southern tract both are designated for industrial commerce.

01:46:04.500 --> 01:46:10.240
 This future land use designation is predominantly for light and heavy industrial.

01:46:10.240 --> 01:46:14.680
 The light industrial district is consistent with this designation and it does provide

01:46:14.680 --> 01:46:22.280
 a less intensive zoning within the area than the heavy industrial district would.

01:46:22.280 --> 01:46:27.240
 Heavy uses within the industrial commerce area are manufacturing, assembly, fabrication

01:46:27.240 --> 01:46:29.800
 as well as wholesale and distribution.

01:46:29.800 --> 01:46:35.960
 The proposed warehouse does or is consistent with the intended uses in this designation.

01:46:35.960 --> 01:46:39.400
 Excuse me.

01:46:39.400 --> 01:46:44.400
 Next we'll talk about the general criterion eight and zoning criterion five regarding

01:46:44.400 --> 01:46:47.720
 minimizing adverse impacts on surrounding property.

01:46:47.720 --> 01:46:53.680
 So I do have a bit zoomed in version of the aerial here just to depict the northern portion

01:46:53.680 --> 01:47:01.920
 that you see here is located at least or approximately 1,000 feet east of and approximately 1,000

01:47:01.920 --> 01:47:05.000
 feet south of the nearest residential zoning.

01:47:05.000 --> 01:47:12.080
 That residential zoning would be the R2 district and so it's a little bit cut off but at the

01:47:12.080 --> 01:47:16.000
 end of this arrow is Jim Crystal Road and then on the northern side of Jim Crystal is

01:47:16.000 --> 01:47:17.240
 R2.

01:47:17.240 --> 01:47:24.600
 If we kind of head just straight north and then to the, I would say to the northwest

01:47:24.600 --> 01:47:32.940
 of the northern subject site is the HI district and then just adjacent is the R2 district.

01:47:32.940 --> 01:47:38.300
 And just to make a point of clarification that came up in work session, the HI district

01:47:38.300 --> 01:47:42.800
 is actually, it holds an existing residential use and I believe that that property owner

01:47:42.800 --> 01:47:48.400
 also owns the property within the R2 district as well.

01:47:48.400 --> 01:47:55.440
 So in relation to that northern portion, the closest adjacent uses really are the electric

01:47:55.440 --> 01:48:02.400
 substations as well as existing gas wells and flood plain around that northern portion.

01:48:02.400 --> 01:48:10.000
 The southern portion is located directly south of the Denton Energy Center and directly adjacent

01:48:10.000 --> 01:48:14.960
 to that southern portion on the south is a rural residential zoning designation.

01:48:14.960 --> 01:48:21.800
 However, that RR zoning, that property was annexed in 2010.

01:48:21.800 --> 01:48:28.320
 In the 2002 zoning was assigned an RD5X which was the placeholder zoning after annexation

01:48:28.320 --> 01:48:35.000
 and with the transition to the 2019 zoning was given that RR as a placeholder as initial

01:48:35.000 --> 01:48:36.000
 zoning.

01:48:36.000 --> 01:48:42.680
 However, I did also want to mention that that southern RR property does have significant

01:48:42.680 --> 01:48:49.320
 amount of active gas wells, those are these red dots that you'll see as well as being

01:48:49.320 --> 01:48:52.880
 adjacent to the substation and flood plain on the west side.

01:48:52.880 --> 01:48:58.520
 So any development on the south really would not end up being a residential development

01:48:58.520 --> 01:49:05.280
 due to the gas wells and the required setbacks from those gas wells.

01:49:05.280 --> 01:49:10.440
 So moving on to general criteria 11 and 12 as well as zoning criteria 6 regarding public

01:49:10.440 --> 01:49:14.440
 facilities and capacity to serve the site.

01:49:14.440 --> 01:49:18.880
 So existing water and sewer are available to the property.

01:49:18.880 --> 01:49:23.840
 Capacity in any extension of utilities would be assessed with platting and site development

01:49:23.840 --> 01:49:30.960
 of the two portions of the sites and then access is provided or is accessible through

01:49:30.960 --> 01:49:37.200
 Jim Crystal Road and if there were emergencies related to the use it would be served by Fire

01:49:37.200 --> 01:49:44.800
 Station 3 which is the new station at 1401 Underwood which would serve any industrial

01:49:44.800 --> 01:49:48.800
 developments on the west side of I-35.

01:49:48.800 --> 01:49:54.320
 So we did send out notices within the 200 foot and 500 foot area as you'll see within

01:49:54.320 --> 01:49:58.480
 the zoning boundaries that mostly hits just city owned property.

01:49:58.480 --> 01:50:03.360
 However, staff and DME did host a community meeting.

01:50:03.360 --> 01:50:06.520
 This was a virtual meeting held on June 17th.

01:50:06.520 --> 01:50:10.360
 I believe the notification radius was about a thousand feet.

01:50:10.360 --> 01:50:13.000
 We did have about five people in attendance.

01:50:13.000 --> 01:50:20.040
 They asked questions related to noise mitigation, adjacent zoning as well as any impact that

01:50:20.040 --> 01:50:25.600
 the proposed city project would have on the supply for electricity for residents.

01:50:25.600 --> 01:50:30.280
 DME was available to answer those questions for them so it was less about the zoning and

01:50:30.280 --> 01:50:34.740
 more about the use and the overall response was positive.

01:50:34.740 --> 01:50:42.760
 So we did not receive any responses to date and with that I can get to the recommendation.

01:50:42.760 --> 01:50:47.240
 Staff does recommend approval of the request as it does comply with the general approval

01:50:47.240 --> 01:50:53.680
 criteria as well as the zoning criteria and then just some final next steps for the project.

01:50:53.680 --> 01:51:01.760
 This will go to city council July 20th after PNC's recommendation and then July 27th city

01:51:01.760 --> 01:51:06.500
 council will consider a ground lease agreement as well as a power purchase agreement related

01:51:06.500 --> 01:51:08.640
 to the project.

01:51:08.640 --> 01:51:10.200
 With that I can take any questions.

01:51:10.200 --> 01:51:17.680
 DME staff is also available for questions as well as the third party to NASCA to answer

01:51:17.680 --> 01:51:19.280
 any questions as well.

01:51:19.280 --> 01:51:20.280
 Great.

01:51:20.280 --> 01:51:22.280
 Thank you so much for the presentation.

01:51:22.280 --> 01:51:26.440
 Any questions for staff?

01:51:26.440 --> 01:51:27.840
 This is a public hearing.

01:51:27.840 --> 01:51:29.920
 Anyone wishing to speak may certainly do so.

01:51:29.920 --> 01:51:32.840
 Rachel is there anyone who's called in on this item?

01:51:32.840 --> 01:51:34.960
 No callers for this one chair.

01:51:34.960 --> 01:51:35.960
 Thank you.

01:51:35.960 --> 01:51:39.920
 Anyone present wishing to speak?

01:51:39.920 --> 01:51:42.440
 Seeing none I'll go ahead and close the public hearing.

01:51:42.440 --> 01:51:43.440
 Commissioner Smith.

01:51:43.440 --> 01:51:45.240
 Make a motion to approve.

01:51:45.240 --> 01:51:46.240
 Commissioner Anderson.

01:51:46.240 --> 01:51:47.240
 Second.

01:51:47.240 --> 01:51:49.960
 We have a first and a second for approval.

01:51:49.960 --> 01:51:53.600
 Any discussion on this item?

01:51:53.600 --> 01:51:55.840
 Seeing none I'll call for a vote via roll call.

01:51:55.840 --> 01:51:56.840
 Commissioner Pruitt.

01:51:56.840 --> 01:51:57.840
 Aye.

01:51:57.840 --> 01:51:58.840
 Commissioner Smith.

01:51:58.840 --> 01:51:59.840
 Aye.

01:51:59.840 --> 01:52:00.840
 Commissioner McDade.

01:52:00.840 --> 01:52:01.840
 Aye.

01:52:01.840 --> 01:52:02.840
 Chairs an aye.

01:52:02.840 --> 01:52:03.840
 Commissioner Anderson.

01:52:03.840 --> 01:52:04.840
 Aye.

01:52:04.840 --> 01:52:05.840
 Commissioner Ellis.

01:52:05.840 --> 01:52:06.840
 Aye.

01:52:06.840 --> 01:52:09.480
 Motion carries 6-0.

01:52:09.480 --> 01:52:16.160
 Next item of business is item 5BZ20-0005B.

01:52:16.160 --> 01:52:20.280
 I'll invite Julie Wyatt for presentation and open the public hearing.

01:52:20.280 --> 01:52:23.280
 Good evening.

01:52:23.280 --> 01:52:34.080
 Let me share my presentation.

01:52:34.080 --> 01:52:42.000
 All right.

01:52:42.000 --> 01:52:45.480
 Good evening I'm Julie Wyatt senior planner with the City of Denton and I am presenting

01:52:45.480 --> 01:52:50.680
 Z20-0005B Denton Commerce Center.

01:52:50.680 --> 01:52:58.000
 So request before you is to rezone approximately 142 acres from mixed use regional MR district

01:52:58.000 --> 01:53:03.640
 to light industrial district that's LI.

01:53:03.640 --> 01:53:08.320
 I'm just a comparison of the current zoning map versus the proposed zoning map.

01:53:08.320 --> 01:53:13.160
 Currently that property has that zoning designation of MR that's that purple and they are proposing

01:53:13.160 --> 01:53:16.320
 to go to that LI.

01:53:16.320 --> 01:53:19.680
 The criteria for approval for a zoning case is in sub chapter 2 of Denton Development

01:53:19.680 --> 01:53:20.680
 Code.

01:53:20.680 --> 01:53:24.960
 It includes both the general and specific criteria.

01:53:24.960 --> 01:53:30.440
 First thing we always look at is the Denton Plan 2030 so that future land use map.

01:53:30.440 --> 01:53:35.080
 The site is designated as business innovation that's intended for large tracts of land that

01:53:35.080 --> 01:53:38.960
 are appropriate for well planned large scale office and employment parks.

01:53:38.960 --> 01:53:46.080
 It also has room for things like supporting uses like retail, hotels, and residential.

01:53:46.080 --> 01:53:50.960
 The typical districts that we see kind of fit within that business innovation future

01:53:50.960 --> 01:53:55.680
 land use designation is our LI and GO.

01:53:55.680 --> 01:54:00.040
 In this instance they are proposing LI which is consistent with the future land use map

01:54:00.040 --> 01:54:04.560
 given the permitted uses as well as development scale.

01:54:04.560 --> 01:54:13.080
 There was a question about the development of the property and those design considerations.

01:54:13.080 --> 01:54:18.040
 The Denton Development Code does require that properties within the LI district, they do

01:54:18.040 --> 01:54:24.160
 have to conform to our commercial development standards any structures within 250 feet of

01:54:24.160 --> 01:54:26.220
 the ultimate right of way.

01:54:26.220 --> 01:54:31.840
 This is kind of an interesting property because there's three rights of way which impact it.

01:54:31.840 --> 01:54:35.800
 You have the FM 1173 on the north.

01:54:35.800 --> 01:54:40.280
 You have I-35 on the east property boundary and then loop 288.

01:54:40.280 --> 01:54:45.720
 I do want to mention that loop 288 there will be a right of way dedication if this is approved

01:54:45.720 --> 01:54:47.800
 and it is developed.

01:54:47.800 --> 01:54:53.320
 When platting occurs they will have to dedicate right of way for that loop 288 extension which

01:54:53.320 --> 01:54:59.500
 will take up a significant portion of that southern portion of the property.

01:54:59.500 --> 01:55:03.960
 So all of those rights of way they would have to conform to those commercial development

01:55:03.960 --> 01:55:10.680
 standards for any structures within 250 feet of any of those rights of way.

01:55:10.680 --> 01:55:15.560
 Also we talked about at work session and we've talked about several times before that small

01:55:15.560 --> 01:55:21.000
 area plan we have had quite a few projects come forward in this general area.

01:55:21.000 --> 01:55:25.480
 There's been a lot of development toward the north side of Denton and so the planning and

01:55:25.480 --> 01:55:30.200
 zoning commission as well as city council have talked to staff and directed staff to

01:55:30.200 --> 01:55:33.000
 move forward with the small area plan.

01:55:33.000 --> 01:55:38.600
 That hasn't yet kicked off but it is something that we are moving forward with in conjunction

01:55:38.600 --> 01:55:43.640
 with our comprehensive plan amendment or I'm sorry our comprehensive plan update.

01:55:43.640 --> 01:55:47.240
 We want to make sure that we have the right design standards and the right permitted uses

01:55:47.240 --> 01:55:51.880
 in these areas.

01:55:51.880 --> 01:55:56.120
 Another criterion for approval is significant changes to warrant the zoning change.

01:55:56.120 --> 01:56:00.680
 So to determine this we had to go back a couple of decades.

01:56:00.680 --> 01:56:03.360
 We looked at the 1999 Denton plan.

01:56:03.360 --> 01:56:09.360
 At that time the thought was that this part of town would be a regional mixed use center.

01:56:09.360 --> 01:56:14.800
 So shopping and maybe higher density residential uses.

01:56:14.800 --> 01:56:20.760
 So you can see this is a snapshot of that 1999 Denton plan.

01:56:20.760 --> 01:56:25.800
 All of that purple was intended to be that regional mixed use center.

01:56:25.800 --> 01:56:28.720
 And the zoning at that time reflected that vision.

01:56:28.720 --> 01:56:32.440
 So it was that regional zoning designation.

01:56:32.440 --> 01:56:39.240
 With the update for our comprehensive plan, for the 2030 plan, we sort of looked at what

01:56:39.240 --> 01:56:44.480
 regional shopping and regional centers we had and determined that those existing ones,

01:56:44.480 --> 01:56:49.320
 the South Loop 288, we had a Denton Enterprise Airport and then at that time Razor Ranch

01:56:49.320 --> 01:56:54.760
 was moving forward, determined that this area was unlikely to develop with that regional

01:56:54.760 --> 01:56:55.760
 shopping.

01:56:55.760 --> 01:57:00.560
 So they sort of kind of came up with a new vision for this area and that was that business

01:57:00.560 --> 01:57:01.560
 innovation.

01:57:01.560 --> 01:57:08.920
 So looking at more of those employment uses, particularly along that 35 corridor.

01:57:08.920 --> 01:57:14.920
 And so that's when that future land use designation changed to that business innovation.

01:57:14.920 --> 01:57:21.120
 The current zoning of MR is sort of a vestige of that 1999 plan.

01:57:21.120 --> 01:57:27.040
 When we implemented the 2019 Denton Development Code, all of those older zoning districts

01:57:27.040 --> 01:57:32.160
 just sort of transitioned to comparable districts or compatible districts.

01:57:32.160 --> 01:57:36.400
 So it really just sort of moved that 1999 plan forward.

01:57:36.400 --> 01:57:42.960
 However, that isn't consistent with the current vision of the area.

01:57:42.960 --> 01:57:47.100
 This criterion minimizes adverse impacts on surrounding property.

01:57:47.100 --> 01:57:53.680
 The subject site, as you can see in this little inset here, is sort of kind of in the middle

01:57:53.680 --> 01:57:57.000
 of a business innovation future land use designation.

01:57:57.000 --> 01:58:00.880
 Currently, much of the surrounding property is undeveloped.

01:58:00.880 --> 01:58:05.080
 It's either agricultural uses or just undeveloped property.

01:58:05.080 --> 01:58:11.040
 However, given that future land use designation, we do anticipate that the surrounding properties

01:58:11.040 --> 01:58:17.720
 will develop in a manner consistent with our future land use map and that business innovation,

01:58:17.720 --> 01:58:21.720
 and that LI district, the permitted uses within it are consistent with that.

01:58:21.720 --> 01:58:27.360
 And so we anticipate that that will continue to develop in a like manner.

01:58:27.360 --> 01:58:35.300
 One question we had at the work session was kind of what that means and what those employment

01:58:35.300 --> 01:58:36.300
 uses mean.

01:58:36.300 --> 01:58:42.480
 So I put together this slide on the break just to kind of talk about especially those

01:58:42.480 --> 01:58:48.280
 employment uses comparing the existing zoning with those two districts that we typically

01:58:48.280 --> 01:58:51.100
 see in that business innovation.

01:58:51.100 --> 01:58:53.440
 This isn't all the uses.

01:58:53.440 --> 01:58:56.680
 There's an exhibit in your backup that has all of the uses in the Debt and Development

01:58:56.680 --> 01:58:57.680
 Code.

01:58:57.680 --> 01:59:02.240
 I just sort of pulled out some of those kind of more employment uses.

01:59:02.240 --> 01:59:09.760
 And you can see that while there are some minor differences, there are – GEO and LI

01:59:09.760 --> 01:59:14.560
 are fairly comparable, and it's somewhat comparable to that MR as well.

01:59:14.560 --> 01:59:20.160
 These are a lot of our more intense uses in more intense districts.

01:59:20.160 --> 01:59:25.120
 So they allow – all of these zoning districts allow a lot of those employment uses.

01:59:25.120 --> 01:59:30.960
 GEO and LI are a little more toward that employment, a little less commercial.

01:59:30.960 --> 01:59:33.620
 They don't have as many residential uses as the MR.

01:59:33.620 --> 01:59:39.140
 They really kind of stick to more of those employment uses.

01:59:39.140 --> 01:59:43.240
 Public facilities and services available to serve the property.

01:59:43.240 --> 01:59:46.220
 We look at transportation and water and wastewater.

01:59:46.220 --> 01:59:53.040
 There is adequate access to the site from I-35 and FM 1173 at this time.

01:59:53.040 --> 01:59:56.720
 This is kind of turned a little funny that north is this direction.

01:59:56.720 --> 01:59:58.800
 This is 1173 right here.

01:59:58.800 --> 02:00:01.300
 This is that I-35 corridor.

02:00:01.300 --> 02:00:07.320
 This is Loop 288, and this is a schematic from the – from the tech stop plans for

02:00:07.320 --> 02:00:10.740
 that I-35 corridor and the expansion.

02:00:10.740 --> 02:00:14.240
 There are future improvements planned for I-35.

02:00:14.240 --> 02:00:17.780
 Those are moving along, as well as Loop 288.

02:00:17.780 --> 02:00:20.080
 Loop 288 is moving along as well.

02:00:20.080 --> 02:00:25.960
 It's under the design phase right now, and we'll get under construction within the

02:00:25.960 --> 02:00:26.960
 decade.

02:00:26.960 --> 02:00:32.300
 So that – kind of the intent is to really push that Loop 288 forward and connect that

02:00:32.300 --> 02:00:33.480
 toward the south.

02:00:33.480 --> 02:00:37.880
 There's also a concurrent comprehensive plan amendment related to mobility that we'll

02:00:37.880 --> 02:00:39.560
 be talking about next.

02:00:39.560 --> 02:00:42.480
 There are water and wastewater available to the site.

02:00:42.480 --> 02:00:45.560
 Sewer – a new list station may be required.

02:00:45.560 --> 02:00:50.000
 That will all be determined if this is approved at that platting stage.

02:00:50.000 --> 02:00:52.800
 Public outreach was sent out.

02:00:52.800 --> 02:00:59.560
 We haven't received any in favor or opposition to this project for the zoning part.

02:00:59.560 --> 02:01:03.720
 So based upon the criteria for approval, staff does recommend approval of the request.

02:01:03.720 --> 02:01:08.080
 It's consistent with the comprehensive plan, and I'll be happy to answer any questions.

02:01:08.080 --> 02:01:11.240
 And the applicant is here, and he also has a presentation as well.

02:01:11.240 --> 02:01:12.240
 Great.

02:01:12.240 --> 02:01:13.240
 Commissioner Smith.

02:01:13.240 --> 02:01:14.240
 Thank you, Chair.

02:01:14.240 --> 02:01:18.080
 Julie, I know this is a straight zoning case, but for whatever is – whatever would be

02:01:18.080 --> 02:01:21.880
 on this site if the zoning was approved, what would be the best point of access to that

02:01:21.880 --> 02:01:22.880
 site itself?

02:01:22.880 --> 02:01:23.880
 Would it be off 1173?

02:01:23.880 --> 02:01:28.120
 Would it be entrances on a long road, I mean, out of the way of the right of way, off of

02:01:28.120 --> 02:01:33.180
 the access road of 35, off of an access road, off of the 288 expansion, all three?

02:01:33.180 --> 02:01:37.220
 The applicant has actually already started discussions with TextDOT to kind of figure

02:01:37.220 --> 02:01:41.320
 out where those access points will be, and so they might – may be able to talk further

02:01:41.320 --> 02:01:45.420
 about kind of what their – what their ideas are, but they would have access to all three

02:01:45.420 --> 02:01:46.420
 of those roads.

02:01:46.420 --> 02:01:52.840
 Of course, Loop 288 is not quite as much because there isn't – that road's not there yet.

02:01:52.840 --> 02:01:58.720
 In terms of the mobility plan, FM 1173, that road's actually going to kind of shift to

02:01:58.720 --> 02:01:59.720
 the north.

02:01:59.720 --> 02:02:04.160
 However, that current alignment is going to remain in place as a secondary arterial.

02:02:04.160 --> 02:02:08.520
 So under the current mobility plan or that draft mobility plan, they would have access

02:02:08.520 --> 02:02:13.120
 to that road as well as 35 and then at some point in the future, Loop 288 as well.

02:02:13.120 --> 02:02:14.120
 Okay.

02:02:14.120 --> 02:02:15.120
 Another question.

02:02:15.120 --> 02:02:22.000
 Talking about the right of way that's being taken up on that land, with 30 – with it

02:02:22.000 --> 02:02:27.720
 kind of being somewhat of a U-shape with that 250-foot buffer, and then 288 having essentially

02:02:27.720 --> 02:02:31.240
 probably flyovers down on the extension.

02:02:31.240 --> 02:02:37.800
 So at the very beginning, if this zoning was approved, that 250 ROW would be essentially

02:02:37.800 --> 02:02:39.280
 codified, right?

02:02:39.280 --> 02:02:44.160
 And then if their – whenever a design comes back with the 288 expansion, that right of

02:02:44.160 --> 02:02:49.160
 way would then be reset once the flyover or whatever the interchange is between 288 and

02:02:49.160 --> 02:02:50.160
 35.

02:02:50.160 --> 02:02:53.560
 How does that get reset and how does that affect the zoning and the planning and everything

02:02:53.560 --> 02:02:57.720
 else in this project, even if we were to approve it to go through and start that process?

02:02:57.720 --> 02:03:04.160
 Well, I think the I-35 corridor, that right of way dedication could be pretty easily discernible

02:03:04.160 --> 02:03:09.720
 because that design is further along and they're further along in those plans.

02:03:09.720 --> 02:03:12.740
 Loop 288, that is still under design.

02:03:12.740 --> 02:03:16.640
 Our city staff works pretty closely with TxDOT there.

02:03:16.640 --> 02:03:19.880
 They have at least a monthly meeting.

02:03:19.880 --> 02:03:23.000
 They often have more meetings than that with TxDOT.

02:03:23.000 --> 02:03:28.400
 So we would try to determine what that right – that correct right of way dedication is

02:03:28.400 --> 02:03:35.400
 at that platting stage and get that – at that time, if for some reason there were some

02:03:35.400 --> 02:03:40.180
 minor changes, an additional right of way would need to be acquired by TxDOT in order

02:03:40.180 --> 02:03:45.000
 to accommodate their final design of the road, then TxDOT would have to acquire that right

02:03:45.000 --> 02:03:46.000
 of way.

02:03:46.000 --> 02:03:47.000
 Okay.

02:03:47.000 --> 02:03:48.000
 Got it.

02:03:48.000 --> 02:03:49.000
 Thank you.

02:03:49.000 --> 02:03:50.000
 Sure.

02:03:50.000 --> 02:03:52.200
 Any other questions for Julie?

02:03:52.200 --> 02:03:54.360
 Thanks, Julie.

02:03:54.360 --> 02:04:05.480
 I'll invite the applicant to present and if you could just state your name and address

02:04:05.480 --> 02:04:06.480
 for the record.

02:04:06.480 --> 02:04:10.320
 I'm going to go ahead and share your presentation, okay?

02:04:10.320 --> 02:04:11.320
 Is that it?

02:04:11.320 --> 02:04:12.320
 I'm sorry.

02:04:12.320 --> 02:04:13.320
 Andrew?

02:04:13.320 --> 02:04:14.320
 I think you just state your name and address for the record.

02:04:14.320 --> 02:04:15.320
 Hi.

02:04:15.320 --> 02:04:16.320
 My name is Todd Finley.

02:04:16.320 --> 02:04:17.320
 I'm with CLX Ventures.

02:04:17.320 --> 02:04:19.580
 Thanks, first of all, for having me here.

02:04:19.580 --> 02:04:23.800
 My co-founder – our co-founder, Brad Copeland, is also here, so just wanted to run through

02:04:23.800 --> 02:04:28.080
 a quick little presentation and I'll answer some of your questions and whatever questions

02:04:28.080 --> 02:04:31.760
 you guys may have.

02:04:31.760 --> 02:04:38.840
 So let me make sure I don't mess this up.

02:04:38.840 --> 02:04:40.840
 We're CLX Ventures.

02:04:40.840 --> 02:04:45.000
 We are a local group.

02:04:45.000 --> 02:04:49.080
 I've been doing industrial for the last 15 years prior to this, so I was with Hillwood

02:04:49.080 --> 02:04:50.880
 Investment Properties.

02:04:50.880 --> 02:04:57.640
 Brad Copeland and Tony Long, our co-founders – Tony was with CBRE for 30 years, Trammell

02:04:57.640 --> 02:05:02.880
 Crowe as well, and Brad Copeland was also with Trammell Crowe, Crowe Holdings and Clarion

02:05:02.880 --> 02:05:05.440
 Partners.

02:05:05.440 --> 02:05:12.680
 And Eli Ellis is our VP of all our financials.

02:05:12.680 --> 02:05:18.720
 Just development activity, this is just – we only focus in the state of Texas.

02:05:18.720 --> 02:05:22.560
 We've done our share of travel over the years, so we're kind of trying to stay local.

02:05:22.560 --> 02:05:28.360
 So this is just – we do multifamily and industrial, Brad and I focus mainly on industrial,

02:05:28.360 --> 02:05:33.440
 and so this is just kind of the areas we're at in Texas, showing our pipeline and what

02:05:33.440 --> 02:05:37.600
 we've done.

02:05:37.600 --> 02:05:42.880
 This is a – Julie and I have been working on this project together for the last eight

02:05:42.880 --> 02:05:48.840
 and a half months, and she thought it would be helpful to show a rendering of something

02:05:48.840 --> 02:05:50.600
 we've done in the past.

02:05:50.600 --> 02:05:53.800
 This is at DFW Airport.

02:05:53.800 --> 02:05:58.600
 It's – the top picture on the right is the rendering, and then the picture after

02:05:58.600 --> 02:06:03.160
 it is an actual – we have, you know, tons of different photos just to show the type

02:06:03.160 --> 02:06:07.520
 of product we do, where, you know, a lot of times you get renderings and then the actual

02:06:07.520 --> 02:06:11.320
 building comes out and it's like this – this doesn't look anything like the rendering.

02:06:11.320 --> 02:06:18.240
 So typical tilt wall, everything you see from Alliance to the stuff that's going, you

02:06:18.240 --> 02:06:35.180
 know, Exeter is doing, and all throughout the DFW is what we do.

02:06:35.180 --> 02:06:36.800
 Yeah Amazon took this building.

02:06:36.800 --> 02:06:48.120
 It's a million footer, 40 foot clear, and they leased that a year ago from us.

02:06:48.120 --> 02:06:54.160
 These are just the specifications for it, just to give you kind of an idea, it's ESFR.

02:06:54.160 --> 02:06:55.640
 That building was a 40 foot clear.

02:06:55.640 --> 02:07:01.000
 What we're proposing is some 36 foot clear and then some smaller stuff, 32 foot clear,

02:07:01.000 --> 02:07:03.740
 that fronts 35.

02:07:03.740 --> 02:07:09.540
 Trailer storage.

02:07:09.540 --> 02:07:16.760
 This is just talking about nothing that anyone in this room doesn't know, just how hot

02:07:16.760 --> 02:07:23.000
 the economic environment is in the state of Texas and in DFW and Denton, I'm sure you

02:07:23.000 --> 02:07:28.540
 guys know better than us, but it's a desired place to be and so we're looking forward

02:07:28.540 --> 02:07:36.440
 to being a part of it.

02:07:36.440 --> 02:07:42.760
 This was another building we did in Dallas off of Interstate 20, just similar to the

02:07:42.760 --> 02:07:44.640
 one at DFW, a little bit different.

02:07:44.640 --> 02:07:50.480
 We use the same designer, so it just kind of gives you an idea of the storefront, the

02:07:50.480 --> 02:07:56.340
 glass, and the tilt wall.

02:07:56.340 --> 02:08:05.240
 This is a project that Brad and I did in Houston off of I-45, and so same kind of look, colors.

02:08:05.240 --> 02:08:12.440
 I can send you guys this package or any photos if you need any.

02:08:12.440 --> 02:08:18.280
 One thing I was going to answer, Tim, your question, the right-of-way, our civil engineer

02:08:18.280 --> 02:08:26.240
 is PKE and they are the civil engineer for TxDOT, so they're already working on that

02:08:26.240 --> 02:08:28.640
 right-of-way at 288.

02:08:28.640 --> 02:08:36.520
 The I-35 right-of-way has already been dedicated and purchased by TxDOT, so everything along

02:08:36.520 --> 02:08:41.840
 I-35 that borders this has already been taken by TxDOT.

02:08:41.840 --> 02:08:46.840
 The 288 right-of-way, we are working with TxDOT since we were using the same civil engineer.

02:08:46.840 --> 02:08:51.320
 We know where that right-of-way line is, so we have that worked through.

02:08:51.320 --> 02:08:54.600
 We have the future driveways from 288.

02:08:54.600 --> 02:09:01.040
 288 is a ways out, I'll just say that, as far as when it goes to let and when it will

02:09:01.040 --> 02:09:02.040
 actually get built.

02:09:02.040 --> 02:09:06.800
 I think it's in eight years from now that it potentially just the frunge rows will go

02:09:06.800 --> 02:09:10.760
 all the way through, but we've already been coordinating where those future drives will

02:09:10.760 --> 02:09:11.760
 be.

02:09:11.760 --> 02:09:18.320
 The I-35, that works coming in the next three years, and so we've been coordinating with

02:09:18.320 --> 02:09:19.320
 them as well.

02:09:19.320 --> 02:09:26.400
 So we'll have access points from 1173, and then we'll have another access point just

02:09:26.400 --> 02:09:31.680
 south of that that will tie into the new frontage road for I-35.

02:09:31.680 --> 02:09:37.560
 And then we'll have access points once the 288 frontage road is extended in the future.

02:09:37.560 --> 02:09:38.560
 So we're still working through that.

02:09:38.560 --> 02:09:44.680
 I've probably had eight calls with TXDOT and the city of Denton at the same time.

02:09:44.680 --> 02:09:50.160
 We're working on a temporary access through 288 to the southern part of our site now.

02:09:50.160 --> 02:09:55.880
 I've got another in-person meeting with TXDOT in a couple weeks.

02:09:55.880 --> 02:09:56.880
 Great.

02:09:56.880 --> 02:09:59.840
 I appreciate the presentation.

02:09:59.840 --> 02:10:00.840
 Any questions?

02:10:00.840 --> 02:10:01.840
 Oh, Commissioner Smith.

02:10:01.840 --> 02:10:02.840
 Thank you, Chair.

02:10:02.840 --> 02:10:03.840
 Brad?

02:10:03.840 --> 02:10:04.840
 Todd.

02:10:04.840 --> 02:10:05.840
 Todd, sorry.

02:10:05.840 --> 02:10:06.840
 My apologies.

02:10:06.840 --> 02:10:15.360
 So a couple things just to confirm, you said access points would be off 1173 and then obviously

02:10:15.360 --> 02:10:19.400
 off 35, once those access points are granted in about three years, once that starts.

02:10:19.400 --> 02:10:24.480
 And then probably access points off 288 as well, once that right-of-way gets cut.

02:10:24.480 --> 02:10:31.640
 We're trying to get access point off of 288 less than three years, but right-of-way we'll

02:10:31.640 --> 02:10:39.000
 have two access points, 1173 and then another piece that we will, you know, where the paper

02:10:39.000 --> 02:10:42.800
 clip, I don't know if you know the little U-turn that you go west on 288, we'll have

02:10:42.800 --> 02:10:47.320
 a north, actually where the water tower is, just north of that, we'll have a tie-in to

02:10:47.320 --> 02:10:48.320
 the future frontage.

02:10:48.320 --> 02:10:49.320
 Okay.

02:10:49.320 --> 02:10:50.320
 And so.

02:10:50.320 --> 02:10:54.880
 So yeah, I guess with it kind of coming from all three areas, all three sides, everything,

02:10:54.880 --> 02:10:59.540
 but the railroad, which you probably shouldn't have an access point there, that'd be weird.

02:10:59.540 --> 02:11:03.160
 What would, kind of where would you, I know this is a straight zoning case, so we're not

02:11:03.160 --> 02:11:07.280
 talking about exactly plotting and where the building would be located, but in your opinion

02:11:07.280 --> 02:11:12.540
 as a developer, where would the property, if this were to be zoned, where would this

02:11:12.540 --> 02:11:14.060
 property be located on that?

02:11:14.060 --> 02:11:18.240
 Would it be closer, as close to 35 as you possibly can, would it be further set back

02:11:18.240 --> 02:11:21.400
 away from 35, closer to the railroad?

02:11:21.400 --> 02:11:30.560
 It will be, where the right-of-way is, that's been dedicated, our building, our front building

02:11:30.560 --> 02:11:35.400
 will be a rear load, meaning the dock doors will be in the back, so this is something

02:11:35.400 --> 02:11:41.000
 that I've worked through with Julie and her team for a long time, and so we want to make

02:11:41.000 --> 02:11:45.840
 that to where there's no dock doors as you're coming across 35, and so we'll have also a

02:11:45.840 --> 02:11:47.920
 detention pond in front of that.

02:11:47.920 --> 02:11:54.200
 So it's gonna be pretty far, our first building is gonna be pretty far away from the frontage

02:11:54.200 --> 02:11:55.200
 road.

02:11:55.200 --> 02:11:59.200
 Yeah, I was looking at the map, I was measuring it out, and it looks like from where 35 exists

02:11:59.200 --> 02:12:04.720
 now to that railroad, it's about give or take where you are, because the railroad comes across

02:12:04.720 --> 02:12:09.360
 at an angle from west to east, and so if you're looking at it as, you know, it's about three

02:12:09.360 --> 02:12:14.720
 quarters of a mile away from 35, so you're probably talking about a quarter of a mile.

02:12:14.720 --> 02:12:19.900
 So we'll have a building up close to the frontage of our property set back from a detention,

02:12:19.900 --> 02:12:24.160
 and then we'll have other buildings behind that, but they'll be, you know, just south

02:12:24.160 --> 02:12:31.880
 of 1173, and then access points north of the future, eight years from now, 288 frontage

02:12:31.880 --> 02:12:32.880
 road.

02:12:32.880 --> 02:12:33.880
 Sure.

02:12:33.880 --> 02:12:39.280
 And I would assume that it'd probably be designed as a more industrial actual manufacturing

02:12:39.280 --> 02:12:45.400
 the backside of it, and more of whatever would be, if this development would need some sort

02:12:45.400 --> 02:12:49.080
 of office or clerical pieces, it would be up front, closer to 35.

02:12:49.080 --> 02:12:53.080
 I would assume that's what you guys, in your past projects, is that kind of the way you

02:12:53.080 --> 02:12:54.080
 approach that?

02:12:54.080 --> 02:13:01.240
 Yeah, I mean everything we do is distribution, and so this is speculative, so if an Amazon

02:13:01.240 --> 02:13:06.520
 comes and leases something, so they may need, you know, 45,000 square feet of office or

02:13:06.520 --> 02:13:07.520
 something like that.

02:13:07.520 --> 02:13:12.160
 But we always have, you know, entrances where we believe need to be, and that's where we

02:13:12.160 --> 02:13:16.540
 dress up with storefront, the glass and stuff that I was showing earlier.

02:13:16.540 --> 02:13:20.920
 And so, you know, the front building, what I'm saying, was...

02:13:20.920 --> 02:13:23.520
 Like, take that one that you talked about in Houston there.

02:13:23.520 --> 02:13:25.280
 Yeah, so right here.

02:13:25.280 --> 02:13:28.560
 There's warehousing and distribution and whatnot that's backside of it, and that's the closest

02:13:28.560 --> 02:13:32.520
 point of access, or the main facade piece that people are seeing when they're traveling down

02:13:32.520 --> 02:13:33.520
 main thoroughfares.

02:13:33.520 --> 02:13:40.520
 What we are planning on orientating, when you drive by 35, you won't see dock doors.

02:13:40.520 --> 02:13:45.760
 You'll see storefront glass, not this exact one, and then you'll also, you see where these

02:13:45.760 --> 02:13:48.360
 dock doors are, you won't see that.

02:13:48.360 --> 02:13:53.680
 There'll be probably two or three more storefront entrances, and so that's kind of where we

02:13:53.680 --> 02:13:55.560
 said, "Okay, let's try to have that."

02:13:55.560 --> 02:14:01.740
 But then buildings behind that towards the railroad will have, you know, placed.

02:14:01.740 --> 02:14:08.560
 Right now, we have the dock doors not even facing an 1173 or 288, so...

02:14:08.560 --> 02:14:09.560
 Okay.

02:14:09.560 --> 02:14:10.560
 Be facing the railroad, pretty much.

02:14:10.560 --> 02:14:11.560
 Pretty much, yeah.

02:14:11.560 --> 02:14:12.560
 Okay.

02:14:12.560 --> 02:14:13.560
 All right.

02:14:13.560 --> 02:14:14.560
 Thanks.

02:14:14.560 --> 02:14:19.480
 But we're following, you know, all the ordinances, all the guidelines, and all the...

02:14:19.480 --> 02:14:22.060
 Thank you.

02:14:22.060 --> 02:14:24.920
 Any other questions for the applicant?

02:14:24.920 --> 02:14:25.920
 Chris Anderson.

02:14:25.920 --> 02:14:26.920
 Thanks, Chair.

02:14:26.920 --> 02:14:34.800
 You all are planning on building just strictly industrial distribution centers, right there,

02:14:34.800 --> 02:14:35.800
 correct?

02:14:35.800 --> 02:14:37.760
 That's our current plan, yes, sir.

02:14:37.760 --> 02:14:38.760
 Okay.

02:14:38.760 --> 02:14:39.760
 Thanks.

02:14:39.760 --> 02:14:45.720
 I don't see any other questions at this time.

02:14:45.720 --> 02:14:50.000
 I appreciate you being here for presentation and being here to answer questions.

02:14:50.000 --> 02:14:51.000
 Thank you.

02:14:51.000 --> 02:14:52.000
 Okay.

02:14:52.000 --> 02:14:53.000
 Thank you.

02:14:53.000 --> 02:14:54.000
 Rachel, is anyone calling in for this item?

02:14:54.000 --> 02:14:55.000
 No callers, Chair.

02:14:55.000 --> 02:14:59.520
 This is a public hearing.

02:14:59.520 --> 02:15:09.100
 Anyone wishing to speak on this item can certainly do so, if you have thoughts or comments.

02:15:09.100 --> 02:15:14.440
 Seeing none, I'll go ahead and close the public hearing and then turn it to the dais for a

02:15:14.440 --> 02:15:15.960
 motion and then some discussion.

02:15:15.960 --> 02:15:16.960
 Commissioner Smith.

02:15:16.960 --> 02:15:20.520
 I'm going to make a motion to approve staff recommendations.

02:15:20.520 --> 02:15:26.320
 I think it's a...certainly we've seen this when we voted on the Hirschbach property that

02:15:26.320 --> 02:15:30.760
 was on the east side of 35 down 77.

02:15:30.760 --> 02:15:35.400
 It seems like the right of way and the way to be chiseling away that a lot of the fear

02:15:35.400 --> 02:15:39.920
 that we brought up in work session might be very mitigated by the amount of right of way

02:15:39.920 --> 02:15:44.440
 that's the front pushing most of this development further off 35.

02:15:44.440 --> 02:15:49.280
 That makes me feel a little more comfortable that this is really in that section of town

02:15:49.280 --> 02:15:51.800
 that is meant to be for that industrial piece.

02:15:51.800 --> 02:15:57.120
 So with that being said, my comments being said, I think that the motion stands.

02:15:57.120 --> 02:15:59.080
 We have a first for approval.

02:15:59.080 --> 02:16:01.080
 Commissioner Ellis.

02:16:01.080 --> 02:16:03.400
 I'll second.

02:16:03.400 --> 02:16:07.480
 We have a first and a second for approval.

02:16:07.480 --> 02:16:08.480
 Any discussion on this item?

02:16:08.480 --> 02:16:09.480
 Commissioner Ellis.

02:16:09.480 --> 02:16:10.480
 Thank you.

02:16:10.480 --> 02:16:11.480
 Yeah.

02:16:11.480 --> 02:16:14.480
 I just had a few comments.

02:16:14.480 --> 02:16:20.760
 I was a big proponent of getting the small area plan underway, and it was namely for

02:16:20.760 --> 02:16:22.920
 that other side of the freeway.

02:16:22.920 --> 02:16:27.880
 That's what, in my opinion, we need to figure out as a city and as people are entering that

02:16:27.880 --> 02:16:32.740
 more residential and that part of Denton.

02:16:32.740 --> 02:16:37.920
 This side of the freeway does seem to be headed this way into warehousing.

02:16:37.920 --> 02:16:43.280
 Warehousing does bring jobs, hopefully we can get some good leases in these buildings

02:16:43.280 --> 02:16:45.520
 and some good jobs for the city.

02:16:45.520 --> 02:16:51.640
 But I'm okay with the zoning change on that side of the freeway.

02:16:51.640 --> 02:16:52.640
 Any other discussion?

02:16:52.640 --> 02:17:01.680
 Before I call for a vote, I would probably echo Commissioner Ellis's thoughts, but also

02:17:01.680 --> 02:17:03.360
 Commissioner Smith's.

02:17:03.360 --> 02:17:10.040
 In my finite mind, I think about the business innovation area of Denton being corporate

02:17:10.040 --> 02:17:15.920
 headquarters and campuses and parks that we see down in Plano and in Southlake.

02:17:15.920 --> 02:17:21.440
 I think it'd be an inviting way into the city, but to Commissioner Ellis's point, that makes

02:17:21.440 --> 02:17:24.280
 a lot of sense on the east side.

02:17:24.280 --> 02:17:30.320
 This plot of land is kind of quirky with the right of ways and it's kind of being tucked

02:17:30.320 --> 02:17:36.040
 into a pretty, could be a big interchange in the future.

02:17:36.040 --> 02:17:42.000
 I don't know if a grandiose corporate headquarters and campus is going to be found at that spot.

02:17:42.000 --> 02:17:47.040
 That being said, if there's someone here who can employ locals and provide some jobs here

02:17:47.040 --> 02:17:50.280
 in Denton, I'm in support of the project.

02:17:50.280 --> 02:17:53.440
 With that, I'll call for a vote via roll call.

02:17:53.440 --> 02:17:54.440
 Commissioner Pruitt?

02:17:54.440 --> 02:17:55.440
 Aye.

02:17:55.440 --> 02:17:56.440
 Commissioner Smith?

02:17:56.440 --> 02:17:57.440
 Aye.

02:17:57.440 --> 02:17:58.440
 Commissioner McDade?

02:17:58.440 --> 02:17:59.440
 Aye.

02:17:59.440 --> 02:18:00.440
 Chair is an aye.

02:18:00.440 --> 02:18:01.440
 Commissioner Anderson?

02:18:01.440 --> 02:18:02.440
 Nay.

02:18:02.440 --> 02:18:03.440
 Commissioner Ellis?

02:18:03.440 --> 02:18:04.440
 Aye.

02:18:04.440 --> 02:18:06.400
 This motion carries 5-1.

02:18:06.400 --> 02:18:07.400
 Congratulations.

02:18:07.400 --> 02:18:14.320
 The next item of business is item 5C, CA21-0001.

02:18:14.320 --> 02:18:20.080
 And I'll invite Julie back out for presentation and open the public hearing.

02:18:20.080 --> 02:18:34.280
 Okay, let me ... This is CA21-0001, Denton Commerce Center.

02:18:34.280 --> 02:18:40.800
 Before we get too into the request, I just want to talk briefly about mobility planning

02:18:40.800 --> 02:18:41.800
 in Denton.

02:18:41.800 --> 02:18:46.600
 It is a component of our comprehensive plan, so it is one of the chapters of our comprehensive

02:18:46.600 --> 02:18:47.880
 plan.

02:18:47.880 --> 02:18:52.360
 The mobility plan is intended to establish the future roadway network, but that also

02:18:52.360 --> 02:18:58.120
 includes both pedestrian and bicycle networks, not just cars.

02:18:58.120 --> 02:19:06.200
 The mobility plan is intended to be modified and amended over time and updated intermittently.

02:19:06.200 --> 02:19:11.160
 And that can either be in response to a specific request, like tonight, or as part of the comprehensive

02:19:11.160 --> 02:19:12.160
 plan amendment.

02:19:12.160 --> 02:19:17.360
 And that is something that the city has undertaken and is currently updating our mobility plan,

02:19:17.360 --> 02:19:22.680
 kind of running in parallel fashion with the update of our comprehensive plan.

02:19:22.680 --> 02:19:28.700
 And the mobility plan establishes our transportation networks and that defined hierarchy of roads.

02:19:28.700 --> 02:19:34.440
 So we've got our large highways, which funnels to our smaller arterials, to then our smaller

02:19:34.440 --> 02:19:40.120
 secondary arterials, then to our eventually collectors and neighborhood streets, which

02:19:40.120 --> 02:19:42.120
 aren't always all on the plan.

02:19:42.120 --> 02:19:47.880
 It's usually those larger roads, but it does create, establish that hierarchy of roads.

02:19:47.880 --> 02:19:56.420
 Our current plan was adopted in early 2016, and that replaced our 1998 plan.

02:19:56.420 --> 02:19:59.320
 I show it as the 2011 mobility plan.

02:19:59.320 --> 02:20:05.520
 That's because it was amended over time, and the last iteration was 2011.

02:20:05.520 --> 02:20:11.360
 So those two plans, or the 2016, replaced that 1998.

02:20:11.360 --> 02:20:15.240
 And as I mentioned, the update is currently underway.

02:20:15.240 --> 02:20:18.600
 So now we'll get to the request.

02:20:18.600 --> 02:20:28.240
 With that adoption of the 2016 plan, the mobility plan reclassified what is a neighborhood street,

02:20:28.240 --> 02:20:31.240
 Cindy Lane, to a secondary arterial.

02:20:31.240 --> 02:20:39.720
 So that it would extend from its connection to US 380 at that signalized intersection,

02:20:39.720 --> 02:20:45.800
 all the way north to FM 156.

02:20:45.800 --> 02:20:52.360
 Under Denton Development Code Section 7.8.7, if a development includes a corridor that

02:20:52.360 --> 02:20:58.240
 is shown on our mobility plan, that developer has to dedicate that right of way and sometimes

02:20:58.240 --> 02:20:59.240
 build that road.

02:20:59.240 --> 02:21:03.520
 And that's something that y'all have seen in platting from time to time.

02:21:03.520 --> 02:21:08.040
 So that's pretty standard for developments.

02:21:08.040 --> 02:21:13.160
 In this instance, the applicant would like to revise the mobility plan to remove that

02:21:13.160 --> 02:21:17.600
 section of Cindy Lane, which runs north and south to the center of the site.

02:21:17.600 --> 02:21:20.720
 So here you can see the site right here outlined in yellow.

02:21:20.720 --> 02:21:29.160
 And here's that mobility plan, that Cindy Lane in that green dotted line, and they are

02:21:29.160 --> 02:21:34.880
 proposing to remove it from their site.

02:21:34.880 --> 02:21:40.620
 So I wanted to take a look at the current mobility plan versus that draft mobility plan.

02:21:40.620 --> 02:21:44.520
 Here we show that current plan, showing Cindy Lane.

02:21:44.520 --> 02:21:52.400
 Here's where it connects to US 380 and western center to the south.

02:21:52.400 --> 02:21:59.420
 Goes all the way up, crosses the railroad track, and then on to parts north.

02:21:59.420 --> 02:22:03.480
 The proposed mobility plan sort of simplifies it, kind of takes some of those collectors

02:22:03.480 --> 02:22:14.540
 out, provides a little more simplified and grid of those arterial roadways, and it does

02:22:14.540 --> 02:22:19.880
 remove Cindy Lane, kind of converts it back to what it was, that neighborhood street,

02:22:19.880 --> 02:22:29.360
 and then relies on the loop 288 and I-35 corridor and at some point in the future Windsor to

02:22:29.360 --> 02:22:33.320
 move that traffic around in the area.

02:22:33.320 --> 02:22:39.320
 And the proposal is consistent with that draft mobility plan.

02:22:39.320 --> 02:22:43.440
 Criteria for approval for all applications is in subchapter two.

02:22:43.440 --> 02:22:46.920
 And because the mobility plan is a part of the comprehensive plan, it goes through the

02:22:46.920 --> 02:22:53.760
 comprehensive plan amendment process, that specific criteria is also in subchapter two.

02:22:53.760 --> 02:22:57.840
 There's two subsections to the criteria for approval.

02:22:57.840 --> 02:23:03.520
 The first subsection, they have to meet at least one of those criterion, and then there

02:23:03.520 --> 02:23:07.560
 are additional review standards.

02:23:07.560 --> 02:23:10.660
 So first, I want to talk about didn't plan 2030.

02:23:10.660 --> 02:23:15.280
 We're not really talking about the future land use map per se, but it does, the two

02:23:15.280 --> 02:23:19.980
 things inform each other, so I want to talk a little bit about the map before the analysis.

02:23:19.980 --> 02:23:24.460
 So the subject property is shown with that red star.

02:23:24.460 --> 02:23:28.940
 This is the future land use map overlaid on the mobility plan.

02:23:28.940 --> 02:23:36.240
 You can see that that Cindy Lane kind of snaking north from 380.

02:23:36.240 --> 02:23:39.920
 And you can see there are several future land use designation colors on the map.

02:23:39.920 --> 02:23:44.280
 The subject property has that business innovation that's in that kind of lighter pink.

02:23:44.280 --> 02:23:46.340
 You've got rural to the north.

02:23:46.340 --> 02:23:50.440
 And then there is a little island here of low residential, that's that yellow piece.

02:23:50.440 --> 02:23:55.680
 And that is that ranch estates, and that low residential future land use designation is

02:23:55.680 --> 02:24:03.680
 kind of a policy protection for that neighborhood, so that it does sort of, any zoning decision

02:24:03.680 --> 02:24:10.360
 would be informed by that future land use designation, that yellow.

02:24:10.360 --> 02:24:15.840
 And then to the south of that, of the business innovation and the low residential, we've

02:24:15.840 --> 02:24:20.400
 got our industrial commerce south of 380.

02:24:20.400 --> 02:24:25.220
 So now that we've sort of oriented on the map, we're gonna talk about some of our analysis.

02:24:25.220 --> 02:24:31.640
 So we looked throughout the plan, it's sort of for guidance in this question, in the first,

02:24:31.640 --> 02:24:36.760
 in the mobility section, to provide for the safe, efficient movements of motor vehicles,

02:24:36.760 --> 02:24:43.040
 bicycles, and pedestrians in a sustainable way that complements Denton's Plan Grow Strategy.

02:24:43.040 --> 02:24:48.640
 Given that we've got these two different future land use designations with sort of divergent

02:24:48.640 --> 02:24:54.560
 goals, low residential has different goals than business innovation.

02:24:54.560 --> 02:25:01.080
 But then Cindy Lane sort of marries the two with this roadway cutting through, and especially

02:25:01.080 --> 02:25:03.640
 cutting through that neighborhood.

02:25:03.640 --> 02:25:11.560
 And that could conflict with that growth strategy, that roadway, because it doesn't really marry

02:25:11.560 --> 02:25:14.400
 those two goals together very well.

02:25:14.400 --> 02:25:24.800
 And that's why the mobility plan update and that draft plan really does just take Cindy out of the equation and moves the truck traffic and the industrial traffic to other areas.

02:25:24.800 --> 02:25:31.960
 And so this proposal is consistent with that goal, as well as the mobility plan update.

02:25:31.960 --> 02:25:38.360
 And then when we look at business innovation, as we mentioned, that's intended for large-scale,

02:25:38.360 --> 02:25:40.360
 large-employment facilities.

02:25:40.360 --> 02:25:45.200
 Their common lot sizes can range anywhere from 20 acres all the way to over 100 acres, as

02:25:45.200 --> 02:25:48.000
 you're seeing tonight.

02:25:48.000 --> 02:25:54.640
 And by splitting these parcels with Cindy Lane, you're potentially reducing the developability

02:25:54.640 --> 02:26:01.560
 of them, because you're sort of just bisecting them and reducing that overall acreage.

02:26:01.560 --> 02:26:08.080
 And then finally, in the implementation section of the Denton Plan 2030, we really should

02:26:08.080 --> 02:26:11.400
 be looking at our mobility plan on a pretty regular basis.

02:26:11.400 --> 02:26:15.720
 We do want to make sure that we know where those roads are connecting in the future.

02:26:15.720 --> 02:26:21.040
 And so I-35 probably is not going to change its alignment much, but we do want to make

02:26:21.040 --> 02:26:26.120
 sure that we are flexible and that we're looking at new conditions as we move forward, as we're

02:26:26.120 --> 02:26:28.360
 planning for these roads.

02:26:28.360 --> 02:26:35.800
 Another criterion, the events, trends, or facts that could have changed since the adoption

02:26:35.800 --> 02:26:43.200
 of that Denton Plan 2030, I've got two aerial maps on your screen, one from 2015 when the

02:26:43.200 --> 02:26:49.120
 mobility plan and the Denton Plan 2030 were adopted, and then one from now.

02:26:49.120 --> 02:26:56.160
 And then I've got that Cindy Lane shown in that sort of-that green line.

02:26:56.160 --> 02:27:01.880
 The industrial and distribution sectors have grown in this area, and that indicates that

02:27:01.880 --> 02:27:05.920
 there may be some changes to the mobility warranted.

02:27:05.920 --> 02:27:13.880
 And you can see that these yellow dots are either industrial or distribution-type facilities

02:27:13.880 --> 02:27:17.880
 that are either already on the ground or are currently planned, so-and those weren't there

02:27:17.880 --> 02:27:18.880
 in 2015.

02:27:18.880 --> 02:27:23.000
 So you can see there's been a lot of growth in the last six years in that area.

02:27:23.000 --> 02:27:27.760
 And then that-and that truck traffic and all the other trips that would be associated with

02:27:27.760 --> 02:27:37.040
 it will impact the area as it would impact the area, and as that Cindy Lane is currently

02:27:37.040 --> 02:27:43.920
 drawn, it really would induce those trucks to go north on Cindy Lane and tag up to Loop

02:27:43.920 --> 02:27:51.800
 288, which would not be appropriate for that current neighborhood to have those trucks

02:27:51.800 --> 02:27:54.600
 go north through that area.

02:27:54.600 --> 02:27:58.880
 And that's why the engineering staff has really modified this area with that mobility plan

02:27:58.880 --> 02:28:05.480
 update, simplifying the area's arterial system, removing Cindy Lane, and then pushing that

02:28:05.480 --> 02:28:09.880
 truck traffic to other roadways.

02:28:09.880 --> 02:28:14.800
 Additional review standards, the proposal is consistent with that draft mobility plan.

02:28:14.800 --> 02:28:16.960
 It's consistent with our land use goals.

02:28:16.960 --> 02:28:20.800
 It would not negatively impact that proposed land use pattern.

02:28:20.800 --> 02:28:26.520
 Those properties can still develop in accordance with that future land use designation with

02:28:26.520 --> 02:28:32.200
 the-with the draft mobility plan and those existing roadways.

02:28:32.200 --> 02:28:37.400
 And the draft mobility plan includes a network of future arterial roadways and highways that-that

02:28:37.400 --> 02:28:42.200
 are designed to accommodate the projected buildout of that area.

02:28:42.200 --> 02:28:47.640
 And additionally, Cindy Lane is not there, so cars aren't relying on it to get around

02:28:47.640 --> 02:28:48.640
 in the area.

02:28:48.640 --> 02:28:54.080
 It's not-it's not part of our traffic accommodation right now.

02:28:54.080 --> 02:28:56.160
 Public outreach was done.

02:28:56.160 --> 02:28:59.380
 We received one letter in opposition.

02:28:59.380 --> 02:29:03.980
 We talked about that at work session and talked with them about the current mobility plan

02:29:03.980 --> 02:29:07.320
 versus the draft mobility plan.

02:29:07.320 --> 02:29:11.480
 And staff does recommend the approval of the request, as it does comply with the criteria

02:29:11.480 --> 02:29:12.480
 for approval.

02:29:12.480 --> 02:29:16.800
 And I'll be happy to stand for any questions, and-and the applicant is here for questions

02:29:16.800 --> 02:29:17.800
 as well.

02:29:17.800 --> 02:29:19.000
 Thank you, Julie.

02:29:19.000 --> 02:29:21.000
 Any questions for Julie?

02:29:21.000 --> 02:29:22.000
 Christopher?

02:29:22.000 --> 02:29:25.600
 I have a question for staff.

02:29:25.600 --> 02:29:28.440
 It may be for traffic, I'm not sure.

02:29:28.440 --> 02:29:38.640
 Is-do you know what the future land use assumptions were to determine that Cindy Lane and some

02:29:38.640 --> 02:29:41.760
 other secondary arterials in that area were not necessary?

02:29:41.760 --> 02:29:45.840
 In other words, are-are they based on the future land use map of business innovation,

02:29:45.840 --> 02:29:51.800
 are they based on the current zoning of much of it being rural, what-what was that land

02:29:51.800 --> 02:29:52.800
 use assumed?

02:29:52.800 --> 02:29:58.740
 I'm not sure how they adopted the 2015 and what assumptions went in, but all I know is

02:29:58.740 --> 02:30:01.600
 the latest one with the draft mobility.

02:30:01.600 --> 02:30:06.840
 They take into account of the future as well as what's developed so far.

02:30:06.840 --> 02:30:08.560
 So sort of a hybrid between the two?

02:30:08.560 --> 02:30:09.560
 That's right.

02:30:09.560 --> 02:30:10.560
 Okay.

02:30:10.560 --> 02:30:11.560
 Thank you.

02:30:11.560 --> 02:30:17.460
 Any other questions for staff, Julie, traffic?

02:30:17.460 --> 02:30:18.840
 This is a public hearing.

02:30:18.840 --> 02:30:23.920
 Anyone wishing to speak may certainly do so.

02:30:23.920 --> 02:30:29.440
 He was actually moving first, so I'm gonna give him the-if you could just state your

02:30:29.440 --> 02:30:31.960
 name and address for the record, you have four minutes to speak.

02:30:31.960 --> 02:30:36.160
 Michael Marshall, 2892 Marshall Road.

02:30:36.160 --> 02:30:42.440
 So our property is at the very bottom from-based on the 2030 of the right of way.

02:30:42.440 --> 02:30:45.500
 It encroaches just across our property.

02:30:45.500 --> 02:30:52.000
 And our issue is that we're zoned general office and so-but the only access is through

02:30:52.000 --> 02:30:53.000
 Marshall Road.

02:30:53.000 --> 02:30:54.960
 There's no 35 access.

02:30:54.960 --> 02:31:01.520
 With Cindy Lane as it is in the 2030, there's access to get from 35 to our property.

02:31:01.520 --> 02:31:06.680
 Now, I wasn't excited originally about giving up our residential property for commercial

02:31:06.680 --> 02:31:10.560
 purposes or a lot of industrial, but we're kind of hamstrung here because we're general

02:31:10.560 --> 02:31:13.860
 office but we don't have a way to get to it because you can't bring the trucks through

02:31:13.860 --> 02:31:16.040
 Marshall Road and Ranch Estates.

02:31:16.040 --> 02:31:21.680
 So we can't build houses on it and we don't have access for the general use that it's

02:31:21.680 --> 02:31:24.920
 approved for which is general office.

02:31:24.920 --> 02:31:33.200
 Just for clarification, you own or you represent the property just south of the subject property

02:31:33.200 --> 02:31:34.200
 in question here?

02:31:34.200 --> 02:31:40.480
 Well, ours is a sliver that's 18 acres or 17 acres surrounded by about 70 acres, which

02:31:40.480 --> 02:31:42.960
 is the Turner Trust property.

02:31:42.960 --> 02:31:48.760
 So I guess the feeling is we should either be residential because we're part of Ranch

02:31:48.760 --> 02:31:56.160
 Estates or we should be general office with access from 35, because if we did a development

02:31:56.160 --> 02:32:01.260
 with general office now, Ranch Estates would hate it.

02:32:01.260 --> 02:32:08.560
 So just so I understand, you're opposed to the removal of the full Cindy...

02:32:08.560 --> 02:32:12.200
 Based on our zoning currently, yes I am.

02:32:12.200 --> 02:32:18.640
 But to be even more specific, it sounds like you're not opposing the removal of Cindy way

02:32:18.640 --> 02:32:23.640
 on their property, you're more concerned about the entirety of Cindy way being removed from

02:32:23.640 --> 02:32:24.640
 the mobility plan.

02:32:24.640 --> 02:32:25.640
 That's correct.

02:32:25.640 --> 02:32:26.640
 Gotcha.

02:32:26.640 --> 02:32:27.640
 Okay.

02:32:27.640 --> 02:32:28.640
 That makes sense.

02:32:28.640 --> 02:32:33.800
 And I would highly encourage you to talk to Julie to start with, to try to see what options

02:32:33.800 --> 02:32:34.800
 are available to you.

02:32:34.800 --> 02:32:35.800
 Sorry to be contacting you prior to the meeting.

02:32:35.800 --> 02:32:36.800
 Okay.

02:32:36.800 --> 02:32:37.800
 But I appreciate you being here.

02:32:37.800 --> 02:32:38.800
 Yeah.

02:32:38.800 --> 02:32:39.800
 Thank you.

02:32:39.800 --> 02:32:40.800
 Any questions?

02:32:40.800 --> 02:32:41.800
 Commissioner Smith.

02:32:41.800 --> 02:32:42.800
 Thank you, Chair.

02:32:42.800 --> 02:32:51.880
 The Turner property, are you right there behind like the I-35 RV Superstore and that's your

02:32:51.880 --> 02:32:53.840
 land back there?

02:32:53.840 --> 02:32:57.600
 The Turner property has a sliver that goes around our property.

02:32:57.600 --> 02:32:58.600
 Okay.

02:32:58.600 --> 02:33:02.080
 So that's between like RV World and our property.

02:33:02.080 --> 02:33:03.080
 Okay.

02:33:03.080 --> 02:33:04.080
 Gotcha.

02:33:04.080 --> 02:33:06.080
 Your zone, G.O.?

02:33:06.080 --> 02:33:07.080
 Yes.

02:33:07.080 --> 02:33:08.080
 Yep.

02:33:08.080 --> 02:33:15.200
 Any staff, Julie, not for, I know we're just getting through public comment, but at some

02:33:15.200 --> 02:33:21.160
 point in time, maybe after, can we visit and just see how he ended up as G.O. and not as

02:33:21.160 --> 02:33:22.160
 R.R. if we move over.

02:33:22.160 --> 02:33:26.720
 I don't know how, well, it should have probably been R.D. 5X or moved over to R.R. when we

02:33:26.720 --> 02:33:28.720
 did the rezone, I don't know how it ended up G.O., so.

02:33:28.720 --> 02:33:29.720
 Yep.

02:33:29.720 --> 02:33:30.720
 I can find out.

02:33:30.720 --> 02:33:31.720
 Thanks.

02:33:31.720 --> 02:33:38.400
 Sir, your next view to state your name and address for the record, you have four minutes

02:33:38.400 --> 02:33:39.400
 to speak.

02:33:39.400 --> 02:33:45.040
 Hey, my name is Arthur Smuck, I live at 5100 Barthold Road, Denton, Texas.

02:33:45.040 --> 02:33:50.000
 So we're the property on the north side of Barthold and to the extent that getting rid

02:33:50.000 --> 02:33:54.760
 of Cindy Lane no longer runs it right through the center of my house, I just want to say

02:33:54.760 --> 02:33:55.760
 we support the project.

02:33:55.760 --> 02:33:59.960
 It's either right through our house or I was going to be able to high five people out our

02:33:59.960 --> 02:34:00.960
 windows.

02:34:00.960 --> 02:34:05.000
 We're thinking you guys didn't want us here, but we're in support of it given that it gets

02:34:05.000 --> 02:34:07.200
 rid of it and doesn't run it through the middle of our property.

02:34:07.200 --> 02:34:09.560
 Well, I appreciate you being here and letting us know.

02:34:09.560 --> 02:34:11.560
 Thank you.

02:34:11.560 --> 02:34:14.480
 Anyone else wishing to speak on this item?

02:34:14.480 --> 02:34:22.160
 If you could state your name and address for the record, you'll have four minutes to speak.

02:34:22.160 --> 02:34:30.480
 My name is Ken Chambers, I live at 2099 Marshall Road, which is at the end of the private road

02:34:30.480 --> 02:34:34.120
 off of Marshall Lane going north.

02:34:34.120 --> 02:34:39.480
 As it's proposed right now, the new Cindy Road goes straight through my house.

02:34:39.480 --> 02:34:50.440
 I'm on the south side of the proposed ETJ division development and also I'm concerned

02:34:50.440 --> 02:34:57.680
 about a lot of traffic coming down through the area and dumping into the other residential

02:34:57.680 --> 02:35:02.000
 area to the south.

02:35:02.000 --> 02:35:06.720
 Just to confirm, you are in support of removing Cindy Lane from the mobility?

02:35:06.720 --> 02:35:07.720
 Yes.

02:35:07.720 --> 02:35:08.720
 Great.

02:35:08.720 --> 02:35:09.720
 Thank you.

02:35:09.720 --> 02:35:10.720
 Any questions for Sism?

02:35:10.720 --> 02:35:11.720
 Great.

02:35:11.720 --> 02:35:16.200
 Thank you for being here and letting us know your perspective.

02:35:16.200 --> 02:35:18.440
 Anyone else wishing to speak on this item?

02:35:18.440 --> 02:35:19.440
 Okay.

02:35:19.440 --> 02:35:23.360
 Rachel, is there anyone wishing to speak via phone?

02:35:23.360 --> 02:35:25.840
 No, Chair, not at this time.

02:35:25.840 --> 02:35:26.840
 Great.

02:35:26.840 --> 02:35:30.440
 I'm going to go ahead and close the public hearing.

02:35:30.440 --> 02:35:31.440
 Commissioner Anderson?

02:35:31.440 --> 02:35:33.760
 You've got to hold it down.

02:35:33.760 --> 02:35:34.760
 There you go.

02:35:34.760 --> 02:35:35.760
 I'm making motion to approve.

02:35:35.760 --> 02:35:36.760
 Great.

02:35:36.760 --> 02:35:37.760
 We have a first for approval.

02:35:37.760 --> 02:35:38.760
 Commissioner Smith?

02:35:38.760 --> 02:35:39.760
 Second.

02:35:39.760 --> 02:35:42.440
 We have a first and a second for approval.

02:35:42.440 --> 02:35:43.640
 Any discussion on this?

02:35:43.640 --> 02:35:44.640
 Commissioner Pruitt?

02:35:44.640 --> 02:35:52.320
 I have a question for the applicant or the requester of the -- are they still here?

02:35:52.320 --> 02:35:53.320
 Yes.

02:35:53.320 --> 02:35:54.320
 Sorry.

02:35:54.320 --> 02:35:59.640
 I think I understand that you're just trying to be a good citizen.

02:35:59.640 --> 02:36:06.320
 You realize that we have some evolving plans that are not yet approved, and if we're planning

02:36:06.320 --> 02:36:11.360
 on removing this roadway from the future mobility plan, why not go ahead and do that now so

02:36:11.360 --> 02:36:13.480
 that you can move forward with your development?

02:36:13.480 --> 02:36:16.480
 Is that a correct summarization?

02:36:16.480 --> 02:36:17.480
 Yeah.

02:36:17.480 --> 02:36:24.760
 And through the planning with the engineering and staff, this was discussed by maybe the

02:36:24.760 --> 02:36:30.240
 previous city engineer, and so it was always discussed that, well, the current thoroughfare

02:36:30.240 --> 02:36:35.800
 plan has it on there, but the future mobility plan, it's being removed, so as we're coming

02:36:35.800 --> 02:36:41.560
 to the point to go through zoning, I've asked the city, hey, how -- are you guys taking

02:36:41.560 --> 02:36:42.560
 care of that?

02:36:42.560 --> 02:36:43.560
 How is this being handled?

02:36:43.560 --> 02:36:47.720
 And so they recommended us to do it through this process.

02:36:47.720 --> 02:36:48.720
 Okay.

02:36:48.720 --> 02:36:53.520
 So that's -- we're just trying to clean up what the city has already decided that future

02:36:53.520 --> 02:36:54.520
 mobility plan.

02:36:54.520 --> 02:36:55.520
 Yeah.

02:36:55.520 --> 02:36:59.480
 So I really appreciate that, and I don't fault you at all.

02:36:59.480 --> 02:37:06.500
 I guess my question is, if there was some reason why the city wanted to have some through

02:37:06.500 --> 02:37:14.320
 access there, but there was not a need for a full secondary arterial roadway width, say,

02:37:14.320 --> 02:37:20.200
 something like a collector, is that something that would still allow you to move forward

02:37:20.200 --> 02:37:21.200
 with your development?

02:37:21.200 --> 02:37:22.200
 It would --

02:37:22.200 --> 02:37:23.200
 If it was a reduced right-of-way?

02:37:23.200 --> 02:37:29.140
 I mean, it would be a negative, obviously, because when we plan the speculative, I mean,

02:37:29.140 --> 02:37:34.080
 we're buying a lot of land, and we try to plan for what the market needs, but we also

02:37:34.080 --> 02:37:39.680
 want to be able to have the flexibility to land a big facility, maybe a million-footer.

02:37:39.680 --> 02:37:45.580
 So to answer your question, yeah, I mean, it could become a big problem.

02:37:45.580 --> 02:37:51.840
 And that's why when we do these developments, we like to understand the thoroughfare plans,

02:37:51.840 --> 02:37:56.360
 and if something is being removed, we need to know that before we go through with the

02:37:56.360 --> 02:38:00.960
 zoning and close on our land, because to go through all the design, spend hundreds and

02:38:00.960 --> 02:38:07.240
 thousands of dollars, and then the city say, "Hey, what about a connector street that may

02:38:07.240 --> 02:38:09.400
 not really be warranted?"

02:38:09.400 --> 02:38:11.400
 Yeah, it's significant.

02:38:11.400 --> 02:38:12.400
 Okay.

02:38:12.400 --> 02:38:17.200
 So it's not really the placement from east to west that could be shifted with the freedom

02:38:17.200 --> 02:38:20.520
 of the mobility planning process?

02:38:20.520 --> 02:38:25.080
 It's more just the sheer amount of land lost to the right-of-way dedication?

02:38:25.080 --> 02:38:32.880
 Yeah, it's the flexibility of building a larger building versus smaller building.

02:38:32.880 --> 02:38:40.280
 Say there's a huge prospect that wants to come to Denton, it would be great for Denton,

02:38:40.280 --> 02:38:44.840
 and they needed to do a large building, and when it went through all the city approvals,

02:38:44.840 --> 02:38:48.000
 that could be a potential impact not knowing what that is.

02:38:48.000 --> 02:38:49.000
 Okay.

02:38:49.000 --> 02:38:56.560
 If you could come to the microphone just so it's on record.

02:38:56.560 --> 02:39:02.680
 And just for clarification, what I was alluding to is I believe in our transportation criteria

02:39:02.680 --> 02:39:09.360
 manual or maybe it's in the mobility planning process, there's some amount of flexibility

02:39:09.360 --> 02:39:14.400
 of the particular right-of-way that is chosen for those mobility roadways within I think

02:39:14.400 --> 02:39:19.240
 1,000 feet of the shown location on the map.

02:39:19.240 --> 02:39:23.000
 So that's what I was trying to see was is the main problem the fact that it runs through

02:39:23.000 --> 02:39:27.680
 the middle, or is it just a problem because of the amount of land that you would lose

02:39:27.680 --> 02:39:29.120
 due to roadway dedication?

02:39:29.120 --> 02:39:34.640
 The flexibility, what you're referring to is it's usually 1,000 to 1,500 feet.

02:39:34.640 --> 02:39:38.440
 And so that's why you have people here like, "Hey, it's shown right going through the

02:39:38.440 --> 02:39:39.440
 middle of my house.

02:39:39.440 --> 02:39:44.320
 I wouldn't like that," because it's conceptual, but you still have to recognize it and understand

02:39:44.320 --> 02:39:45.320
 it.

02:39:45.320 --> 02:39:49.620
 And usually cities don't until developers come through and say, "Hey, I'm ready to

02:39:49.620 --> 02:39:50.620
 develop.

02:39:50.620 --> 02:39:51.620
 I'm ready to plat."

02:39:51.620 --> 02:39:55.120
 And so that's why this comes out, but you're right.

02:39:55.120 --> 02:40:02.040
 And so, I mean, I don't know where, we were told it wasn't going to be on the plan, but

02:40:02.040 --> 02:40:03.040
 it's not official.

02:40:03.040 --> 02:40:06.080
 And so I don't know where shifting it would go.

02:40:06.080 --> 02:40:11.160
 If you shifted it, if I said, "Hey, if we can shift it further to the west, closer to

02:40:11.160 --> 02:40:16.880
 the railroad, are you jumping over the railroad, then jumping over 288 with bridges, and then

02:40:16.880 --> 02:40:19.520
 jumping back over the railroad?"

02:40:19.520 --> 02:40:27.400
 Well, I was just going to say one other thing to, I mean, to your point and understand the

02:40:27.400 --> 02:40:31.640
 rationale for wanting to maybe have maximum flexibility to maybe cut through the site

02:40:31.640 --> 02:40:32.640
 somewhere there.

02:40:32.640 --> 02:40:36.940
 But I mean, we're actually working with a prospect right now at this point in time that

02:40:36.940 --> 02:40:42.960
 is a large user that could, manufacturing, and I believe staff's aware of it, but they've

02:40:42.960 --> 02:40:44.920
 been talking to economic development and so forth.

02:40:44.920 --> 02:40:50.120
 So this is not a surprise, I don't think, to anybody in Denton, but if they did that,

02:40:50.120 --> 02:40:56.160
 if the facility they're trying to build or would like to do there would basically eliminate

02:40:56.160 --> 02:41:02.360
 the possibility of going to this site because it would bisect the manufacturing facility

02:41:02.360 --> 02:41:04.440
 that they're looking at.

02:41:04.440 --> 02:41:10.560
 So again, from our perspective, it probably would be a showstopper for us.

02:41:10.560 --> 02:41:12.920
 Even if it were shifted to the left with that flexibility?

02:41:12.920 --> 02:41:16.200
 Yeah, I mean, if you took it all the way over, like Todd was saying, if you took it all the

02:41:16.200 --> 02:41:21.040
 way over to the west side of the site, then perhaps, because we're going to have interior

02:41:21.040 --> 02:41:26.400
 circulation drives, we'll have private drives that circulate traffic all through the development,

02:41:26.400 --> 02:41:32.760
 but if you took it to the very western border perhaps, I would think that you could probably

02:41:32.760 --> 02:41:38.640
 run something down, as long as it's not running through the main body of the site.

02:41:38.640 --> 02:41:39.640
 Okay.

02:41:39.640 --> 02:41:40.640
 Does that make sense?

02:41:40.640 --> 02:41:41.640
 Yeah, thank you.

02:41:41.640 --> 02:41:48.120
 The other, and you guys have seen this, the other issue with that is the future alignment

02:41:48.120 --> 02:41:53.980
 with 1173, is it starts to curve up and it'll eventually tie into 77.

02:41:53.980 --> 02:42:00.200
 So you have that working, and that's not a 90 degree deal, it's a curve right after

02:42:00.200 --> 02:42:05.680
 the railroad, and so it comes up, and so I think, I believe, I can't speak for engineering,

02:42:05.680 --> 02:42:12.600
 but I think that will be a new large artery that will take traffic from there, and then

02:42:12.600 --> 02:42:16.880
 the fastest way to get anywhere is on 35, so, but.

02:42:16.880 --> 02:42:21.640
 Yes, thank you very much.

02:42:21.640 --> 02:42:23.160
 Thank you.

02:42:23.160 --> 02:42:28.480
 Just for the edification of those listed in the dais, as a reminder, and to you, Kirsten,

02:42:28.480 --> 02:42:33.400
 to prove it, a secondary arterial on a mobility plan, they have to provide the right-of-way,

02:42:33.400 --> 02:42:36.200
 so I know you're confident in being a good neighbor, and you might, you very well could

02:42:36.200 --> 02:42:40.520
 be, but they had to do something with that and remove it from their site, or when they

02:42:40.520 --> 02:42:44.400
 came to Platting, they would have to deal with the secondary arterial if it's on the

02:42:44.400 --> 02:42:45.600
 mobility plan.

02:42:45.600 --> 02:42:54.200
 So the removal of that is a necessity, unless they dedicate the right-of-way from the beginning.

02:42:54.200 --> 02:42:57.040
 Does that make sense?

02:42:57.040 --> 02:43:00.560
 I think I lost you at the very end there, but.

02:43:00.560 --> 02:43:04.320
 Even if there wasn't a road there for another decade, if it's on the mobility plan, it's

02:43:04.320 --> 02:43:06.640
 a secondary arterial, they would have had to dedicate the right-of-way.

02:43:06.640 --> 02:43:07.640
 Yes.

02:43:07.640 --> 02:43:10.120
 And would have empty land there for a while.

02:43:10.120 --> 02:43:11.120
 Right.

02:43:11.120 --> 02:43:12.120
 Yeah.

02:43:12.120 --> 02:43:16.560
 Any other questions or discussions?

02:43:16.560 --> 02:43:19.960
 We have a first and a second for approval, is that correct?

02:43:19.960 --> 02:43:22.160
 We did get that, correct?

02:43:22.160 --> 02:43:23.160
 Okay.

02:43:23.160 --> 02:43:25.880
 Seeing no other discussion, I'll call for a vote via roll call.

02:43:25.880 --> 02:43:27.160
 Mr. Pruitt?

02:43:27.160 --> 02:43:28.520
 Sorry, discussion?

02:43:28.520 --> 02:43:30.280
 Go for it.

02:43:30.280 --> 02:43:33.360
 Okay, thank you.

02:43:33.360 --> 02:43:45.760
 So I'm really concerned about what the triangle to the south of 288, west of I-35, east of

02:43:45.760 --> 02:43:49.720
 the railroad turns into.

02:43:49.720 --> 02:43:55.940
 As we look at how the mobility plan impacts the developability of that land, the usability

02:43:55.940 --> 02:44:02.400
 of that land in the future, it sounds like the plan is to make that an isolated triangle

02:44:02.400 --> 02:44:07.780
 where the only way out is to jump on an access road and drive three or four miles in a circle

02:44:07.780 --> 02:44:10.240
 before you get to something that you can turn onto.

02:44:10.240 --> 02:44:14.240
 That's the way I see it.

02:44:14.240 --> 02:44:18.240
 If that's an incorrect impression, then please correct me.

02:44:18.240 --> 02:44:20.400
 So that concerns me.

02:44:20.400 --> 02:44:26.760
 I will point out, just because I think it's good to refer to the R-2030 plan periodically,

02:44:26.760 --> 02:44:32.160
 in the mobility chapter, it says, "Well-connected street networks result in more direct routes

02:44:32.160 --> 02:44:38.200
 and shorter travel times as opposed to a few large multi-lane arterials which create congested

02:44:38.200 --> 02:44:43.600
 intersections and longer, more circuitous routes."

02:44:43.600 --> 02:44:51.440
 I think this is an example where we are planning to create more circuitous routes.

02:44:51.440 --> 02:44:52.440
 Does that matter?

02:44:52.440 --> 02:44:55.880
 Again, it really depends on how this land develops.

02:44:55.880 --> 02:45:01.240
 If it's a lot of warehousing, truck traffic, that sort of thing, it probably doesn't matter

02:45:01.240 --> 02:45:02.900
 that much.

02:45:02.900 --> 02:45:09.780
 If there are some more general office, other things that are consistent with the business

02:45:09.780 --> 02:45:16.720
 innovation district, say we get some corporate areas, say they want a place to go to lunch

02:45:16.720 --> 02:45:26.760
 periodically, being trapped in a triangle there doesn't strike me as conducive to development

02:45:26.760 --> 02:45:33.400
 in that area.

02:45:33.400 --> 02:45:36.560
 So then the question is, okay, what would provide that?

02:45:36.560 --> 02:45:42.520
 To me, the big deal is crossing these large freeways.

02:45:42.520 --> 02:45:46.000
 When you talk about crossing a railroad, the answer is always no.

02:45:46.000 --> 02:45:50.040
 When you talk about a freeway, the answer is, "Well, if you get in 10 years ahead of

02:45:50.040 --> 02:45:53.040
 time, maybe yes."

02:45:53.040 --> 02:46:01.080
 To me, this presents an opportunity to either make sure that this area has one or two routes

02:46:01.080 --> 02:46:02.080
 out.

02:46:02.080 --> 02:46:06.960
 You have Mosh Branch, if you go all the way south, to cross east, eventually we're going

02:46:06.960 --> 02:46:14.240
 to great extents to create a crossing that aligns with Windsor there.

02:46:14.240 --> 02:46:18.560
 But north, we're basically going to shut this off.

02:46:18.560 --> 02:46:20.160
 And so that concerns me.

02:46:20.160 --> 02:46:26.360
 Now maybe there's a middle ground, maybe there's a way that we can get a crossing under the

02:46:26.360 --> 02:46:33.280
 future of Loop 288 without going up through this property.

02:46:33.280 --> 02:46:40.600
 But what I see here concerns me that maybe we're cutting off all northern access that

02:46:40.600 --> 02:46:44.440
 has some different ways to go.

02:46:44.440 --> 02:46:48.360
 Just going to see if Julie could pull up a map to help orient everyone real quick.

02:46:48.360 --> 02:46:56.120
 Yeah, and Julie, if you have the draft mobility, that might be the most helpful document.

02:46:56.120 --> 02:47:00.040
 And Chair, I will say, I don't blame the applicant in this at all.

02:47:00.040 --> 02:47:05.320
 I completely realize that this is what our draft plan shows, and I appreciate that.

02:47:05.320 --> 02:47:09.320
 I think you've gone through the process as well as possible.

02:47:09.320 --> 02:47:15.040
 Yeah, and Julie can point some of this out on the map, but I just wanted to touch on

02:47:15.040 --> 02:47:16.040
 a couple of things.

02:47:16.040 --> 02:47:20.400
 That we do still have the Windsor overpass on 35 that would cut through this area.

02:47:20.400 --> 02:47:25.400
 And there's also, a little further south of here, there are some local streets and collectors

02:47:25.400 --> 02:47:28.740
 that are already stubbed going towards the north.

02:47:28.740 --> 02:47:32.920
 So as these larger parcels continue to develop, there's certainly nothing that would prevent

02:47:32.920 --> 02:47:36.920
 and we would even require connection to some of those that are already stubbed out to provide

02:47:36.920 --> 02:47:42.640
 some collectors through this area for extra maneuverability in the future.

02:47:42.640 --> 02:47:47.800
 But I think the general need that our mobility plan study has shown is that an arterial through

02:47:47.800 --> 02:47:54.160
 that little wedge of the pie that you identified between the railroad and 35 may not be necessary.

02:47:54.160 --> 02:47:59.400
 Because local streets might be sufficient to get everyone to those major corridors.

02:47:59.400 --> 02:48:05.360
 And I would add on to that, part of that proposed mobility plan, so our current mobility plan

02:48:05.360 --> 02:48:08.560
 has a lot of collectors on it.

02:48:08.560 --> 02:48:13.800
 Our proposed mobility plan actually pulls out some of those collectors to allow and

02:48:13.800 --> 02:48:22.280
 sort of sets that arterial grid, but that would allow those collectors to be developed

02:48:22.280 --> 02:48:28.760
 within that kind of more harder grid pattern to allow for that flexibility.

02:48:28.760 --> 02:48:34.740
 So that's kind of one of the intents of that draft mobility plan is to kind of rely on

02:48:34.740 --> 02:48:38.080
 some of those collectors within that framework.

02:48:38.080 --> 02:48:39.280
 So I don't know if that helps.

02:48:39.280 --> 02:48:43.360
 And just to point out this, so this is Barcelona right here.

02:48:43.360 --> 02:48:49.120
 And once again, it's not shown as a collector on the draft mobility plan, but it stubs out

02:48:49.120 --> 02:48:55.800
 to be extended toward the north, and then Windsor will eventually cross I-35.

02:48:55.800 --> 02:48:57.080
 That's on TxDOT's radar.

02:48:57.080 --> 02:49:01.240
 So I don't know if that helps kind of organize that area.

02:49:01.240 --> 02:49:02.240
 Yeah.

02:49:02.240 --> 02:49:03.240
 It does help.

02:49:03.240 --> 02:49:04.800
 And thank you for pointing that out.

02:49:04.800 --> 02:49:13.560
 I guess my perspective on this is just that a building might last 50 or 60 years, right?

02:49:13.560 --> 02:49:20.520
 A zoning classification might be requested to change in 20 years or something for redevelopment.

02:49:20.520 --> 02:49:27.800
 A roadway right-of-way and a crossing of a TxDOT freeway is going to last 100, 200 years.

02:49:27.800 --> 02:49:34.160
 And so that's why I get concerned about this.

02:49:34.160 --> 02:49:36.680
 I guess I don't want to belabor the point.

02:49:36.680 --> 02:49:50.400
 Just a question to staff, if we were to agree to remove this alignment through this property,

02:49:50.400 --> 02:49:55.520
 in the remainder of the adoption of the 2020 mobility plan process, is there an opportunity

02:49:55.520 --> 02:50:05.160
 to say that there should still be a roadway that has a crossing so that you can get from

02:50:05.160 --> 02:50:11.320
 south of 288 to westbound 288 from that segment south of there?

02:50:11.320 --> 02:50:14.360
 I'm going to have engineering come up.

02:50:14.360 --> 02:50:16.640
 It again depends on the land development.

02:50:16.640 --> 02:50:21.360
 Say if the south of the land that they want to come and develop, their access would not

02:50:21.360 --> 02:50:22.360
 be restricted.

02:50:22.360 --> 02:50:28.240
 If they want to dedicate, say, 55 feet or 65 feet of roadway, then we would be able

02:50:28.240 --> 02:50:35.320
 to take the dedication and provide connection to 35 or the future Windsor or to the frontage

02:50:35.320 --> 02:50:41.400
 of loop 288, again, with permission from TxDOT, since we don't control their access.

02:50:41.400 --> 02:50:42.400
 Right.

02:50:42.400 --> 02:50:50.600
 So we wouldn't have any say over whether TxDOT would provide crossing of 288 to go westbound

02:50:50.600 --> 02:50:55.840
 on 288 from south of this subject property?

02:50:55.840 --> 02:51:02.480
 I have to check the final plans, but by law, they would not be restricted of access.

02:51:02.480 --> 02:51:03.480
 Okay.

02:51:03.480 --> 02:51:04.480
 Thank you.

02:51:04.480 --> 02:51:05.480
 Sure.

02:51:05.480 --> 02:51:11.740
 Yeah, and just so you know, as we go through the draft mobility plan, having been on the

02:51:11.740 --> 02:51:16.680
 last mobility plan approval process, there's going to be work sessions and a ton of input

02:51:16.680 --> 02:51:17.680
 subcommittees.

02:51:17.680 --> 02:51:21.200
 There's going to be a lot of opportunities to speak into it, and there's an opportunity

02:51:21.200 --> 02:51:25.560
 for you to highlight this area if there needs to be a deeper examination over this on the

02:51:25.560 --> 02:51:28.680
 roads that at least we control.

02:51:28.680 --> 02:51:30.440
 Is there any other discussion?

02:51:30.440 --> 02:51:31.440
 Okay.

02:51:31.440 --> 02:51:37.840
 I'm going to go ahead and call a vote via roll call.

02:51:37.840 --> 02:51:39.160
 Commissioner Pruitt?

02:51:39.160 --> 02:51:50.280
 I'm going to say nay just because I think there's sufficient flexibility to move this

02:51:50.280 --> 02:51:53.480
 alignment westward to still allow the development.

02:51:53.480 --> 02:51:55.040
 Commissioner Smith?

02:51:55.040 --> 02:51:56.040
 Aye.

02:51:56.040 --> 02:51:58.080
 Commissioner McDade?

02:51:58.080 --> 02:51:59.080
 Nay.

02:51:59.080 --> 02:52:01.320
 Chair is a aye.

02:52:01.320 --> 02:52:02.960
 Commissioner Anderson?

02:52:02.960 --> 02:52:03.960
 Aye.

02:52:03.960 --> 02:52:05.840
 Commissioner Ellis?

02:52:05.840 --> 02:52:06.840
 Aye.

02:52:06.840 --> 02:52:11.720
 Motion carries four, two.

02:52:11.720 --> 02:52:19.120
 The next item of business is item 5DZ21-0002.

02:52:19.120 --> 02:52:26.080
 I'll invite Sean Jacobson for presentation and open the public hearing.

02:52:26.080 --> 02:52:41.280
 And members of the commission, if you'll give me just a moment, go ahead and pull up the

02:52:41.280 --> 02:52:43.120
 presentation.

02:52:43.120 --> 02:52:44.640
 Okay.

02:52:44.640 --> 02:52:48.240
 Good evening.

02:52:48.240 --> 02:52:56.040
 Sean Jacobson, Associate Planner, presenting Z21-0002, prominence.

02:52:56.040 --> 02:53:00.840
 This is a request to rezone approximately 58.55 acres.

02:53:00.840 --> 02:53:06.080
 It's divided out to be 24.93 acres going from planned development and light industrial to

02:53:06.080 --> 02:53:13.120
 general office, 23.47 acres going from PD to mixed use neighborhood, and 9.7 acres going

02:53:13.120 --> 02:53:16.760
 from PD plan development to light industrial.

02:53:16.760 --> 02:53:23.440
 This property is bounded by loop 288 north, University Drive, Mayhill Road, and then prominence

02:53:23.440 --> 02:53:24.440
 way.

02:53:24.440 --> 02:53:29.320
 There's a mix of undeveloped and commercial lots, one residential lot, all zoned LI to

02:53:29.320 --> 02:53:34.320
 the northwest, single family neighborhood south across prominence way.

02:53:34.320 --> 02:53:40.000
 As you can see in the FEMA map on the lower corner there, there's about 26 acres of flood

02:53:40.000 --> 02:53:41.000
 plain.

02:53:41.000 --> 02:53:45.400
 It covers the north and center of the property, the extensive environmentally sensitive areas

02:53:45.400 --> 02:53:50.040
 in that area, and significant tree canopy in that area, as well as along prominence way.

02:53:50.040 --> 02:53:57.440
 This zoning change would be to replace this current and old PD with current zoning districts

02:53:57.440 --> 02:54:04.160
 that contain a similar mix of uses, some additional ones, and then require that it all falls, develops

02:54:04.160 --> 02:54:06.600
 under the current development code standards.

02:54:06.600 --> 02:54:12.720
 So just to give a little history, this planned development was created in 2000.

02:54:12.720 --> 02:54:18.280
 It was, there was a concept plan that divided the subject property into four areas, A, B,

02:54:18.280 --> 02:54:23.480
 C, and E. There was a D, but it's not part of this request, it's to the south and has

02:54:23.480 --> 02:54:26.000
 partly developed already.

02:54:26.000 --> 02:54:30.920
 Each of those areas authorizes a different mix of uses, including commercial, industrial,

02:54:30.920 --> 02:54:31.920
 residential.

02:54:31.920 --> 02:54:37.680
 There was a remaining 18 acres that was nominally part of area C, but was intended for future

02:54:37.680 --> 02:54:41.240
 park dedication from when the plan developed.

02:54:41.240 --> 02:54:47.800
 All of this property was vested in standards under the 2000 interim DDC, which was an odd

02:54:47.800 --> 02:54:52.320
 document that was in effect while we were trying to write the 2002 DDC, and so it essentially

02:54:52.320 --> 02:54:59.200
 applies 1991 zoning and uses, 1988 landscape code, and its own mix of processes.

02:54:59.200 --> 02:55:06.960
 In 2002, city council did approve zoning out almost four acres of area A to an employment

02:55:06.960 --> 02:55:11.280
 center commercial zoning, which became a light industrial zoning.

02:55:11.280 --> 02:55:17.080
 That property is tonight also proposed to zone to a GEO to match where the plan development

02:55:17.080 --> 02:55:22.000
 is proposed to go to GEO just for consistency's sake.

02:55:22.000 --> 02:55:29.680
 So this request again is to take those areas A through E to current zoning districts, general

02:55:29.680 --> 02:55:33.360
 office, MN, and LI, bring them under current DDC standards.

02:55:33.360 --> 02:55:39.080
 In regard to the park area, the parks department is actually in discussion with the applicant

02:55:39.080 --> 02:55:44.560
 to move forward with likely about an 18-acre park dedication at the time of platting, similar

02:55:44.560 --> 02:55:47.640
 location to where the park was proposed under the PT.

02:55:47.640 --> 02:55:53.760
 This is that concept plan, you can see the areas there, and then how it would be proposed

02:55:53.760 --> 02:55:54.760
 to be zoned.

02:55:54.760 --> 02:56:00.920
 Of course, we have our general criteria and our specific criteria for zoning approval

02:56:00.920 --> 02:56:02.840
 to consider.

02:56:02.840 --> 02:56:04.720
 First off, we look at our comprehensive plan.

02:56:04.720 --> 02:56:09.640
 The site is primarily business innovation future land use, so intended for those large

02:56:09.640 --> 02:56:14.160
 tracts of land developed with a mix of commercial supporting residential and retail.

02:56:14.160 --> 02:56:18.240
 It does also have a transitional moderate density residential area.

02:56:18.240 --> 02:56:21.360
 It's intended for a mix of denser residential areas.

02:56:21.360 --> 02:56:23.960
 It's located near retail and parks.

02:56:23.960 --> 02:56:29.760
 These proposed zonings line up with future land use, bringing in a mix of uses in the

02:56:29.760 --> 02:56:34.840
 business innovation area and a mix of residential uses, including multifamily in that moderate

02:56:34.840 --> 02:56:39.440
 density residential area.

02:56:39.440 --> 02:56:44.280
 Other ways it lines up the comprehensive plan, obviously bringing this property into compliance

02:56:44.280 --> 02:56:49.320
 with the full current debt and development code for all future approvals on the site.

02:56:49.320 --> 02:56:53.200
 The current DDC is much more in line with the comprehensive plan than whatever was in

02:56:53.200 --> 02:56:55.440
 place in 2000.

02:56:55.440 --> 02:57:00.480
 It's also ensuring development along two major corridors, which is in line with our preferred

02:57:00.480 --> 02:57:01.480
 growth concept.

02:57:01.480 --> 02:57:05.960
 And it's providing employment and moderate density housing near a potential future park

02:57:05.960 --> 02:57:11.280
 and trail and allowing for a broader range of uses that would fit in our future land

02:57:11.280 --> 02:57:15.160
 use map than is currently permitted under the PD.

02:57:15.160 --> 02:57:20.400
 One key here is particularly minimizing adverse environmental impacts because under the PD

02:57:20.400 --> 02:57:27.880
 there is minimal to no protection of environmentally sensitive areas and tree preservation, whereas

02:57:27.880 --> 02:57:31.440
 taking it out of the PD would require full compliance with all of our environmentally

02:57:31.440 --> 02:57:36.080
 sensitive area protections for future approvals as well as our tree preservation standards

02:57:36.080 --> 02:57:41.760
 for future approvals on this site, which aligns with the goals of our comprehensive plan.

02:57:41.760 --> 02:57:47.720
 There are also enhanced standards that come into play with our current DDC versus what

02:57:47.720 --> 02:57:51.360
 would be required under the PD as you can see there.

02:57:51.360 --> 02:57:55.920
 The landscape areas would be approximately the same but tree canopy, there really wasn't

02:57:55.920 --> 02:58:00.160
 a requirement for that under the PD and we would have a fairly significant tree canopy

02:58:00.160 --> 02:58:05.160
 requirement for all future development as well as street tree requirements and right

02:58:05.160 --> 02:58:08.840
 of way screening, which would be beneficial for the neighborhood to the south of this

02:58:08.840 --> 02:58:13.520
 development, providing a great amount of landscaping between them and any future development on

02:58:13.520 --> 02:58:19.320
 the site, as well as improved commercial building design standards.

02:58:19.320 --> 02:58:23.560
 Just looking at parks here, again the applicant is in discussion with the Parks Department

02:58:23.560 --> 02:58:30.120
 to donate about 18 acres of the floodplain to the city and the Parks Department is looking

02:58:30.120 --> 02:58:34.440
 at providing a trail through that area, which would of course be a benefit to the city and

02:58:34.440 --> 02:58:35.440
 to that development.

02:58:35.440 --> 02:58:42.760
 In terms of transportation, this is an area that has some current significant traffic

02:58:42.760 --> 02:58:43.960
 issues.

02:58:43.960 --> 02:58:49.120
 There was a detailed traffic impact analysis done, although there's no proposed use for

02:58:49.120 --> 02:58:54.420
 the site right now and so it was, these are estimates based on possible high traffic generation

02:58:54.420 --> 02:58:57.800
 uses that could develop on the site after the rezoning.

02:58:57.800 --> 02:59:02.080
 Be looking at about 7,565 daily trips at full development.

02:59:02.080 --> 02:59:07.920
 TI looked at about 10 adjacent intersections, 6 out of 10 of them would operate at a level

02:59:07.920 --> 02:59:13.480
 of service of D or better, going out to a horizon of 2029.

02:59:13.480 --> 02:59:18.400
 Three of 10 of those are intersections that currently without any additional development

02:59:18.400 --> 02:59:23.200
 there already operate at a level of service E or F and then there's a proposed driveway

02:59:23.200 --> 02:59:28.400
 for this site, subject detects out approval that if nothing, if that was the only driveway

02:59:28.400 --> 02:59:32.440
 along loop 288, it would operate at a level of service of F.

02:59:32.440 --> 02:59:40.880
 The TI indicates that there would be increased delays going to 2029 with the, if this site

02:59:40.880 --> 02:59:47.720
 were to develop as estimated, however, the potential site development is actually fairly

02:59:47.720 --> 02:59:53.240
 minimal in its contribution compared to the traffic that would already be occurring because

02:59:53.240 --> 02:59:56.840
 of current and future growth in the area.

02:59:56.840 --> 03:00:00.280
 This is on 288, it's on University.

03:00:00.280 --> 03:00:03.680
 Most of the delays there are being caused by growth that's going to come one way or

03:00:03.680 --> 03:00:04.680
 the other.

03:00:04.680 --> 03:00:09.800
 However, there were some mitigations recommended, a major one is a signal light at prominence

03:00:09.800 --> 03:00:15.640
 drive either when Audra is realigned south or possibly sooner that would be assessed

03:00:15.640 --> 03:00:20.160
 when civil engineering plans came in for this site and this site is estimated to be responsible

03:00:20.160 --> 03:00:24.000
 for 25% of that cost.

03:00:24.000 --> 03:00:27.480
 If that's, if when that's put in place that would raise the intersection to a level of

03:00:27.480 --> 03:00:34.120
 service C versus where it's currently operating often at an E or F at peak times right now.

03:00:34.120 --> 03:00:38.960
 There's also recommendation for a right turn deceleration lane along loop 288, again that

03:00:38.960 --> 03:00:44.440
 would be assessed when civil engineering plans came in and the TI also recommended that

03:00:44.440 --> 03:00:50.520
 techs.net consider recommending, consider approving a second driveway access point along

03:00:50.520 --> 03:00:57.920
 loop 288 to reduce the pressure of having just one off point there for this development.

03:00:57.920 --> 03:01:03.720
 And then other long term solutions that will help reduce traffic tension in the area are

03:01:03.720 --> 03:01:07.800
 the extension of the median at the intersection with Spring Valley so you won't have cars

03:01:07.800 --> 03:01:15.800
 trying to cross 380 there and then the future techs.freeway bypass of 380 at 288.

03:01:15.800 --> 03:01:22.600
 So essentially the TIA concluded that overall the development of this site won't materially

03:01:22.600 --> 03:01:27.920
 negatively impact the area but it may be able to help contribute to future improvements.

03:01:27.920 --> 03:01:32.520
 Water and waste water is available, fire response is within 8 minutes or less, law enforcement

03:01:32.520 --> 03:01:37.280
 issues are unexpected to be made worse by this development.

03:01:37.280 --> 03:01:42.080
 We did do public outreach and there was one response in opposition, there was also a neighborhood

03:01:42.080 --> 03:01:48.240
 meeting two citizens attended expressed concerns about potential traffic generation and appreciation

03:01:48.240 --> 03:01:54.360
 for proposed geo-zoning, so with that staff does recommend approval as the request complies

03:01:54.360 --> 03:01:56.520
 with our criteria for approval.

03:01:56.520 --> 03:02:00.480
 The applicant is here and I'll be happy to stand for any questions.

03:02:00.480 --> 03:02:02.680
 Great thanks Sean.

03:02:02.680 --> 03:02:06.160
 Commissioner Anderson.

03:02:06.160 --> 03:02:14.160
 Sean if we vote for this, are we voting for a traffic light at Audre and 288 as well or

03:02:14.160 --> 03:02:16.240
 is that just recommended?

03:02:16.240 --> 03:02:20.800
 It's a recommendation but when civil engineering plans come in for this site there would be

03:02:20.800 --> 03:02:26.160
 a warrant study and if it's concluded that it's needed there then there would at least

03:02:26.160 --> 03:02:31.000
 be I believe a requirement that this development help pay for that if and when it's put in

03:02:31.000 --> 03:02:32.000
 place.

03:02:32.000 --> 03:02:36.760
 I don't mind voting for the project but I just don't want another red light right there

03:02:36.760 --> 03:02:42.520
 at Audre because when you're on University of 380 and you're taking a right onto Loop

03:02:42.520 --> 03:02:45.960
 going southbound you're just going to get up to speed and you're going to have to stop

03:02:45.960 --> 03:02:51.760
 immediately because that's probably what a quarter of a mile, a little stretch and I

03:02:51.760 --> 03:02:59.440
 thought the reason we have these major thoroughfares like Loop 288 and 380 is to keep traffic moving

03:02:59.440 --> 03:03:04.440
 not putting red lights and having traffic stop.

03:03:04.440 --> 03:03:08.480
 Definitely something that engineering and tech stop would look at and I believe that's

03:03:08.480 --> 03:03:13.800
 part of the reason why it's something that may be delayed until Audre is realigned with

03:03:13.800 --> 03:03:19.140
 prominence so that you would have one intersection where there would be light rather than having

03:03:19.140 --> 03:03:22.040
 turning from Audre and then hitting that point.

03:03:22.040 --> 03:03:24.320
 Thank you sir.

03:03:24.320 --> 03:03:26.200
 Any other questions for Sean?

03:03:26.200 --> 03:03:29.840
 Okay I don't see any, thank you very much.

03:03:29.840 --> 03:03:38.320
 I do have one card, it's the applicant Mr. Lee Allison.

03:03:38.320 --> 03:03:42.680
 I think you know the drill but name and address and you'll have ten minutes.

03:03:42.680 --> 03:03:46.000
 I don't know if I remember but it's been awhile.

03:03:46.000 --> 03:03:51.120
 Lee Allison with Allison Engineering Group 2415 North Elm, Denton, Texas.

03:03:51.120 --> 03:03:54.860
 With me this evening in the audience is Henry Reif, the landowner.

03:03:54.860 --> 03:03:58.680
 I don't have this power point or a formal presentation but I would like to speak to

03:03:58.680 --> 03:04:03.480
 some of the items that came up during the work session.

03:04:03.480 --> 03:04:09.320
 One related to park dedication, I personally am excited to see a park department now that

03:04:09.320 --> 03:04:12.160
 is wants these kind of dedications.

03:04:12.160 --> 03:04:16.960
 When this project was started they didn't want them, the PD actually was more to make

03:04:16.960 --> 03:04:21.080
 sure the city would take it not to make sure the developer would give it, but these are

03:04:21.080 --> 03:04:26.080
 excellent opportunities along streams and flood plains for hiking and biking paths and

03:04:26.080 --> 03:04:32.320
 help get some of that traffic off of the roadways and avoid that conflict of traffic there.

03:04:32.320 --> 03:04:36.920
 So for no other reason than business reasons we're inclined for it to occur.

03:04:36.920 --> 03:04:41.560
 We certainly for business decisions would like for the park dedication to count towards

03:04:41.560 --> 03:04:48.800
 any required park dedication for the residential type uses as they occur and we would like

03:04:48.800 --> 03:04:54.120
 for any dedication above and beyond that because the required park land dedication is not going

03:04:54.120 --> 03:04:57.360
 to be the 18 acres, that's just something we're doing.

03:04:57.360 --> 03:05:01.800
 We want to make sure there's a notable difference obviously for tax purposes and donations and

03:05:01.800 --> 03:05:05.600
 those kind of things so that's an interest with park dedication.

03:05:05.600 --> 03:05:12.000
 When it comes to the zoning history Mr. Smith, this was started back before 2000, there was

03:05:12.000 --> 03:05:18.100
 a different set of rules in place, the developer had gone to a lot of work trying to make plans

03:05:18.100 --> 03:05:21.900
 for this and then all of a sudden there was going to be a zoning change, well those zoning

03:05:21.900 --> 03:05:25.400
 change were going to kind of undo all the plans and at the recommendation of the city

03:05:25.400 --> 03:05:30.960
 he came forward with a PD to preserve his efforts at that date and time.

03:05:30.960 --> 03:05:38.800
 With that though he was vested in times of the time, rules in the time, at the time,

03:05:38.800 --> 03:05:43.800
 which meant he didn't have a tree preservation requirement to speak of or tree mitigation,

03:05:43.800 --> 03:05:49.160
 there weren't any ESAs so those things weren't in place, in removing this zoning the PD and

03:05:49.160 --> 03:05:53.120
 going to straight zoning today now the property is going to be back under the current rules

03:05:53.120 --> 03:05:56.200
 so those things are there out of the way.

03:05:56.200 --> 03:06:02.760
 One of the differences for example was multifamily under the PD allows for 10 units per acre,

03:06:02.760 --> 03:06:08.480
 that sounds pretty low but when you figure 18 acres of floodplain there's 180 units right

03:06:08.480 --> 03:06:13.320
 there and then you pack them on the remaining five, now you're up to 20, 30 units per acre

03:06:13.320 --> 03:06:18.080
 on the actual developable land so that's not a good comparison between the two zonings

03:06:18.080 --> 03:06:23.920
 if you look at it that directly that way but this is really more compatible.

03:06:23.920 --> 03:06:29.000
 Another thing with business today marketability on a speculative development such as this

03:06:29.000 --> 03:06:34.760
 one, actually straight zoning is better to promote than a PD because a PD nobody knows

03:06:34.760 --> 03:06:38.400
 what you have and they got to go find the ordinance and see what's written in it and

03:06:38.400 --> 03:06:42.560
 study it, especially this way it's standard city zoning, you look it up, you see what

03:06:42.560 --> 03:06:46.040
 it is and you make your decisions and move forward.

03:06:46.040 --> 03:06:52.680
 Relative to the traffic impact analysis I want to point out we didn't want to do one.

03:06:52.680 --> 03:06:56.760
 The proposed zoning is essentially the same intensity as what there is today so we're

03:06:56.760 --> 03:06:59.560
 having zero impact on traffic.

03:06:59.560 --> 03:07:04.080
 What the traffic impact analysis does is it shows the issues that exist today whether

03:07:04.080 --> 03:07:08.240
 we zone or not including the potential for a red light on Audra.

03:07:08.240 --> 03:07:13.560
 If we didn't do any rezoning and came in developed today and did a traffic impact analysis that

03:07:13.560 --> 03:07:17.920
 issue would come up and those considerations would have to be made and those will be made

03:07:17.920 --> 03:07:20.520
 when the first development comes through.

03:07:20.520 --> 03:07:25.160
 This TIA that we did will probably serve as the background TIA for the future developments

03:07:25.160 --> 03:07:29.280
 and it will get refined every time a development comes through and we go from speculation to

03:07:29.280 --> 03:07:32.080
 reality.

03:07:32.080 --> 03:07:38.220
 Related to the status there was a conditional letter of map revision approved with FEMA.

03:07:38.220 --> 03:07:41.080
 The grading for all of that work has been done.

03:07:41.080 --> 03:07:46.520
 There's still two bridges to be constructed and when those are completed then we can go

03:07:46.520 --> 03:07:51.640
 follow the letter of map revision that will change the FEMA floodplain on one of our exhibits

03:07:51.640 --> 03:07:52.640
 we prepared.

03:07:52.640 --> 03:07:56.440
 We showed where it's going to be revised to and that's what will come back so that'll

03:07:56.440 --> 03:08:01.400
 be a little lesser amount but there's still going to be significant floodplain there.

03:08:01.400 --> 03:08:05.960
 There's a sanitary sewer that the design's been approved and the applicant's about to

03:08:05.960 --> 03:08:10.680
 get under construction as soon as he can get his three-way agreements out of the way and

03:08:10.680 --> 03:08:14.320
 pardon me, I believe that covers the issues I heard come up.

03:08:14.320 --> 03:08:18.680
 I'll be glad to respond to any other questions you might have at this time.

03:08:18.680 --> 03:08:20.520
 Any questions for Mr. Allison?

03:08:20.520 --> 03:08:21.520
 Commissioner Pruitt?

03:08:21.520 --> 03:08:22.520
 Just a quick one.

03:08:22.520 --> 03:08:27.640
 I really appreciate your efforts on this parcel.

03:08:27.640 --> 03:08:32.800
 Given your enthusiasm for cooperation with parks and whatnot would you be amenable to

03:08:32.800 --> 03:08:38.800
 a requirement that that corridor be preserved whether it be by dedication or easement for

03:08:38.800 --> 03:08:40.560
 a future trail corridor?

03:08:40.560 --> 03:08:41.560
 Mr. Reif's here.

03:08:41.560 --> 03:08:45.560
 We've discussed this earlier and I believe he would be amenable to anything that would

03:08:45.560 --> 03:08:46.560
 preserve that.

03:08:46.560 --> 03:08:50.440
 I mean we want to make sure the Parks Department will take it so I think we'll be good with

03:08:50.440 --> 03:08:51.440
 that.

03:08:51.440 --> 03:08:52.440
 Thank you.

03:08:52.440 --> 03:08:56.160
 I don't know if it can be done or how but we'll be good with it.

03:08:56.160 --> 03:09:01.560
 Is that a recommendation to council?

03:09:01.560 --> 03:09:10.240
 I'm going to consult Mack Reinwald and see what he says we can do here.

03:09:10.240 --> 03:09:11.480
 There's probably several options.

03:09:11.480 --> 03:09:17.160
 The most legally viable method is probably to do a park development agreement in association

03:09:17.160 --> 03:09:21.320
 with the zoning when it goes to council so that's something we could work on over the

03:09:21.320 --> 03:09:26.520
 next few weeks if it's the preference of this board to go ahead and take an agreement to

03:09:26.520 --> 03:09:31.240
 council that would memorialize how the park development and dedication would work.

03:09:31.240 --> 03:09:33.000
 Thank you.

03:09:33.000 --> 03:09:39.480
 Sorry, I didn't quite catch all of that.

03:09:39.480 --> 03:09:42.040
 Could you try again?

03:09:42.040 --> 03:09:47.560
 Right well there's a couple of options but one being somewhat unusual would be putting

03:09:47.560 --> 03:09:51.680
 a condition on a straight zoning case which I think is one idea.

03:09:51.680 --> 03:09:56.560
 The other would be actually taking a park dedication agreement to council in conjunction

03:09:56.560 --> 03:10:01.000
 with the zoning and that's something that council if they approve the zoning could also

03:10:01.000 --> 03:10:05.440
 take a second item up and approve an agreement on the same night and that'd be probably the

03:10:05.440 --> 03:10:11.600
 best way of memorializing that actual concept rather than attaching it as a condition to

03:10:11.600 --> 03:10:13.720
 a straight zoning case.

03:10:13.720 --> 03:10:17.480
 Our only concern with the park dedication agreement would be would it delay the timing

03:10:17.480 --> 03:10:19.520
 for our zoning hearing with city council?

03:10:19.520 --> 03:10:24.640
 We would really like to go with the next possible city council meeting.

03:10:24.640 --> 03:10:28.980
 Certainly and I think that's something that staff could expedite.

03:10:28.980 --> 03:10:33.720
 And just, practically speaking, when we put a motion on the table do we just put a motion

03:10:33.720 --> 03:10:38.560
 with the recommendation of a park dedication or with the condition of a park dedication

03:10:38.560 --> 03:10:40.560
 going to council?

03:10:40.560 --> 03:10:49.760
 I think the preference is B, to direct staffed.

03:10:49.760 --> 03:10:52.400
 I don't think necessarily needs to be a part of your motion this evening but if you wanted

03:10:52.400 --> 03:10:56.960
 to direct staff tonight to take an agreement as well that way it stays separate from the

03:10:56.960 --> 03:10:59.320
 actual motion on the zoning case.

03:10:59.320 --> 03:11:00.320
 Understood.

03:11:00.320 --> 03:11:01.320
 You understand?

03:11:01.320 --> 03:11:02.320
 Are we good?

03:11:02.320 --> 03:11:03.320
 Yep.

03:11:03.320 --> 03:11:04.320
 Great.

03:11:04.320 --> 03:11:08.480
 Any other questions for Mr. Allison or the applicant?

03:11:08.480 --> 03:11:10.920
 I don't see any.

03:11:10.920 --> 03:11:11.920
 All right.

03:11:11.920 --> 03:11:12.920
 Thank you.

03:11:12.920 --> 03:11:13.920
 This is a public hearing.

03:11:13.920 --> 03:11:15.520
 Anyone wishing to speak may certainly do so.

03:11:15.520 --> 03:11:17.560
 Rachel, do we have anyone calling in?

03:11:17.560 --> 03:11:18.560
 No, Chair.

03:11:18.560 --> 03:11:19.560
 I'm not on this item.

03:11:19.560 --> 03:11:22.840
 We struck out on all items.

03:11:22.840 --> 03:11:26.520
 Seeing that there's no one else here to speak I'm going to go ahead and close the public

03:11:26.520 --> 03:11:29.280
 hearing and turn it for a motion and discussion.

03:11:29.280 --> 03:11:30.280
 Commissioner Smith.

03:11:30.280 --> 03:11:35.960
 I'm going to make a motion to approve with a strong recommendation to staff to have a

03:11:35.960 --> 03:11:41.160
 park dedication agreement or discussion brought up at city council for it to be put a part

03:11:41.160 --> 03:11:42.160
 of that.

03:11:42.160 --> 03:11:44.960
 We have a first for approval, Commissioner Anderson.

03:11:44.960 --> 03:11:45.960
 Second.

03:11:45.960 --> 03:11:51.280
 We have a first and a second for approval with the recommendation for some staff work

03:11:51.280 --> 03:11:57.200
 before council having it not delay any kind of forward progress in the project.

03:11:57.200 --> 03:12:00.480
 Any discussion on the item?

03:12:00.480 --> 03:12:02.580
 Seeing none, I'll call for a vote via roll call.

03:12:02.580 --> 03:12:03.580
 Commissioner Pruitt.

03:12:03.580 --> 03:12:04.580
 Aye.

03:12:04.580 --> 03:12:05.580
 Commissioner Smith.

03:12:05.580 --> 03:12:06.580
 Aye.

03:12:06.580 --> 03:12:07.580
 Commissioner McDade.

03:12:07.580 --> 03:12:08.580
 Aye.

03:12:08.580 --> 03:12:09.580
 Chair is an aye.

03:12:09.580 --> 03:12:10.580
 Commissioner Anderson.

03:12:10.580 --> 03:12:15.240
 I would not hold that traffic light against you guys, so I vote as an aye.

03:12:15.240 --> 03:12:17.280
 You say you're in support?

03:12:17.280 --> 03:12:18.280
 Okay.

03:12:18.280 --> 03:12:19.280
 Commissioner Ellis.

03:12:19.280 --> 03:12:20.280
 Aye.

03:12:20.280 --> 03:12:21.280
 Chair is 6-0.

03:12:21.280 --> 03:12:22.280
 Congratulations.

03:12:22.280 --> 03:12:30.520
 That brings us to the last item this evening, which is to talk about the matrix.

03:12:30.520 --> 03:12:35.600
 And I will turn it to Hayley for any updates first and then to the dais for discussion.

03:12:35.600 --> 03:12:41.440
 I actually don't think I have any updates this evening.

03:12:41.440 --> 03:12:46.360
 There was kind of that summer break for council, if you will, so we haven't had any items go

03:12:46.360 --> 03:12:48.240
 before them yet.

03:12:48.240 --> 03:12:52.320
 So no updates tonight, but happy to add anything to the matrix that you all might want to see

03:12:52.320 --> 03:12:54.680
 at upcoming work sessions.

03:12:54.680 --> 03:12:55.920
 Great.

03:12:55.920 --> 03:13:03.040
 Any questions about the matrix or any items that we would like to place on the matrix?

03:13:03.040 --> 03:13:04.040
 Commissioner Smith.

03:13:04.040 --> 03:13:05.040
 Thank you, Chair.

03:13:05.040 --> 03:13:11.120
 Hayley, I know we talked about a change to the mobility plan based off of what the draft

03:13:11.120 --> 03:13:14.600
 mobility plan is there.

03:13:14.600 --> 03:13:19.000
 Regardless of the conversation that happened the night of the dais, I'm afraid if there's

03:13:19.000 --> 03:13:28.440
 other neighborhoods like Rancho States that has an arterial that's mobility planned to

03:13:28.440 --> 03:13:29.440
 go right through it.

03:13:29.440 --> 03:13:33.680
 Nothing obviously in it works for it, but in the mobility plan it's there, and so maybe

03:13:33.680 --> 03:13:37.320
 a couple other sets of eyes of folks that know neighborhoods and whatnot might be good.

03:13:37.320 --> 03:13:41.640
 If there is a draft mobility plan, you can send out to the commission, they can look

03:13:41.640 --> 03:13:43.720
 over, try to see if there's any trouble spots and bring up.

03:13:43.720 --> 03:13:47.160
 It's not necessarily a work session item, but more of just this is where it's at right

03:13:47.160 --> 03:13:48.160
 now.

03:13:48.160 --> 03:13:49.160
 Bring up any points.

03:13:49.160 --> 03:13:53.080
 I know you'll be bringing them back to the commission to review, but it might save us

03:13:53.080 --> 03:13:57.840
 some time during work session reports of having to see mobility plans, and it gives us a little

03:13:57.840 --> 03:14:01.240
 bit more time to chew on it now and throw up some red flags if we see any.

03:14:01.240 --> 03:14:02.240
 Sure, yeah.

03:14:02.240 --> 03:14:06.720
 I'll talk to our city engineer and see if we can get you all a link to that.

03:14:06.720 --> 03:14:07.720
 Okay.

03:14:07.720 --> 03:14:09.880
 I have one item.

03:14:09.880 --> 03:14:16.720
 I recently met with the individual potentially going to be taking over my seat in the short

03:14:16.720 --> 03:14:26.400
 order, and I just want to encourage or reinforce or even ask that there's a formal orientation

03:14:26.400 --> 03:14:27.520
 for new commissioners.

03:14:27.520 --> 03:14:32.280
 I don't know what was in place for Commissioner McDade, they might have had a great one.

03:14:32.280 --> 03:14:37.680
 I don't know, but I would strongly encourage some kind of structure around that.

03:14:37.680 --> 03:14:41.600
 I don't know if it's Julie's boot camp that she's been working on over the years, and

03:14:41.600 --> 03:14:46.840
 I'm happy now to volunteer my time to sit in those meetings or to help figure that out.

03:14:46.840 --> 03:14:53.120
 For the sake of continuity and continued progress as big projects are coming on, I would love

03:14:53.120 --> 03:15:01.820
 to see, and I'm volunteering any of my help to try to make commissioner transition as

03:15:01.820 --> 03:15:03.200
 easy as possible.

03:15:03.200 --> 03:15:07.040
 If staff could start thinking about that, I think it would be really helpful for all

03:15:07.040 --> 03:15:10.260
 commissioners to have that resource as they on board.

03:15:10.260 --> 03:15:11.260
 Sure.

03:15:11.260 --> 03:15:13.040
 That is very much appreciated.

03:15:13.040 --> 03:15:16.560
 Just so you all know, we are planning hopefully starting next meeting to once a month start

03:15:16.560 --> 03:15:21.440
 up the boot camp series and get a very solid set of those completed by the end of the year

03:15:21.440 --> 03:15:24.920
 so that that can become kind of a handbook for new commissioners, but in the meantime

03:15:24.920 --> 03:15:29.160
 certainly I think we'd be amenable to setting up some meetings and helping the new commissioners

03:15:29.160 --> 03:15:32.320
 get up to speed as well as your potential replacements.

03:15:32.320 --> 03:15:33.320
 Awesome.

03:15:33.320 --> 03:15:34.560
 Thank you.

03:15:34.560 --> 03:15:37.520
 Any other items for the matrix, commissioner Ellis.

03:15:37.520 --> 03:15:38.520
 Thank you, chair.

03:15:38.520 --> 03:15:41.320
 Just actually just wanted to comment a little bit on that point.

03:15:41.320 --> 03:15:46.600
 I know when I came on some five years ago, there was a one on one that I came and had.

03:15:46.600 --> 03:15:48.860
 I think we got away from that a little bit.

03:15:48.860 --> 03:15:50.420
 It absolutely needs to happen.

03:15:50.420 --> 03:15:55.040
 I mean, it was, you know, obviously we can't go through everything, but at least there is

03:15:55.040 --> 03:16:01.120
 just the high level overview of what the role is.

03:16:01.120 --> 03:16:03.960
 So yeah, we need to put that back in.

03:16:03.960 --> 03:16:07.880
 And I know we're shortstaffed and busy.

03:16:07.880 --> 03:16:09.440
 Thank you.

03:16:09.440 --> 03:16:10.440
 Okay.

03:16:10.440 --> 03:16:14.560
 Seeing no other items, I'm going to close the meeting at 829.

03:16:14.560 --> 03:16:15.800
 Thank you.