WEBVTT

00:00:00.000 --> 00:00:07.000
 good morning it's nine o'clock on June 14th so we'll call to order the city of

00:00:07.000 --> 00:00:12.560
 Denton public utilities board meeting the first item is public comments at

00:00:12.560 --> 00:00:22.640
 this point are there anybody on the line or here that wishes to speak okay all

00:00:22.640 --> 00:00:28.780
 right then we'll move into the regular meeting first item is agenda oh I'm

00:00:28.780 --> 00:00:35.040
 sorry I can't hear you can't hear me Lee can you hear well enough to

00:00:35.040 --> 00:00:45.520
 understand what you're saying can you hear me now no no really can you hear me

00:00:45.520 --> 00:01:04.080
 you guys yeah okay Lee can you hear me obviously not okay what do we do okay

00:01:15.520 --> 00:01:25.760
 Rachel this is Tony can you hear me I can hear you very well Tony but we had a

00:01:25.760 --> 00:01:34.880
 lot of trouble hearing the people in chambers so maybe now can you hear can

00:01:34.880 --> 00:01:39.920
 you hear Susan Barbara no it's it just sounds like she's very far away Tony

00:01:39.920 --> 00:01:46.160
 you're very close but it sounds like she's very far away okay let's give us a

00:01:46.160 --> 00:01:48.560
 second we're gonna see there might be some technique can you hear me this has

00:01:48.560 --> 00:01:54.880
 been jumper we are standing by for technical difficulties

00:02:07.200 --> 00:02:17.080
 okay can you hear me now no ma'am it's not any better yet can you hear me am I

00:02:17.080 --> 00:02:26.400
 we could switch mics yes yes okay maybe it's this mic you sound far away but it

00:02:26.400 --> 00:02:49.120
 is legible or audible Tony that was clear as a bell just fine that one must

00:02:49.120 --> 00:02:57.520
 have been worn out it's perfect much better thank you

00:02:57.520 --> 00:03:17.040
 I yes Lee ma'am I wish to pull agenda item G from the consent agenda okay any

00:03:17.040 --> 00:03:28.000
 other items I had a quick question on a okay pull a any others all right do we

00:03:28.000 --> 00:03:40.560
 have a motion to approve items B C D E F H and I so moved Karen moves I second

00:03:40.560 --> 00:03:47.960
 and seconds I'll become very faint again I'm sorry to report oh same I'm sorry

00:03:47.960 --> 00:03:56.960
 Lee he says you're very soft again very vague okay so we have a motion and a

00:03:56.960 --> 00:04:06.800
 second on approving the items all in favor say aye aye opposed okay Liam

00:04:06.800 --> 00:04:14.320
 Barbara can you hear me no I'm almost on top of the microphone I don't know what

00:04:14.320 --> 00:04:28.760
 to do you can't hear me it's got to be audio zoom related issue right Rachel can

00:04:28.760 --> 00:04:45.880
 you hear me it's very faint again ma'am okay can you hear me now no and we got a

00:04:45.880 --> 00:04:57.720
 very a very intense feedback from virtual host when that happened okay can

00:04:57.720 --> 00:05:00.240
 you hear me now

00:05:00.240 --> 00:05:08.120
 Rachel can you hear me no still very faint

00:05:26.800 --> 00:05:31.360
 they're saying that you're not going to be able to hear me very loudly we're the

00:05:31.360 --> 00:05:39.040
 first ones doing this so we're going to have to just bear with it so Barbara and

00:05:39.040 --> 00:05:43.160
 Lee do you vote yes or no on the proving those other items just raise your hand if

00:05:43.160 --> 00:05:54.800
 you can you hear me at all okay so can you hear do you want to prove those

00:05:54.800 --> 00:05:57.800
 items or not

00:05:57.800 --> 00:06:08.720
 sorry ma'am could not hear you Lee can you hear me once again I can hear you

00:06:08.720 --> 00:06:14.880
 okay so we don't we don't know what's going on so so so the chairs asked if if

00:06:14.880 --> 00:06:21.840
 you are approving the consent agenda items except for a and was it G a and G

00:06:21.840 --> 00:06:32.880
 a and G are you in favor yes Barbara yes okay okay thank you all right

00:06:32.880 --> 00:06:40.280
 item a I just had a quick question I have a vague memory of this happening

00:06:40.280 --> 00:06:49.360
 before of a vendor bidding and then changing their their bid can somebody

00:06:49.360 --> 00:06:57.400
 remind me if this is a recurring problem with wind energy or am I just imagining

00:06:57.400 --> 00:07:05.240
 things can you hear me yes okay Terry Nolte assistant general manager DME so

00:07:05.240 --> 00:07:17.880
 this was a an RFP that was issued in actually late 2019 and so due to COVID

00:07:17.880 --> 00:07:25.480
 in early 2020 bids were delayed and our decisions were delayed by the time we

00:07:25.480 --> 00:07:33.120
 got to negotiations with this particular contractor or this supplier he decided

00:07:33.120 --> 00:07:37.760
 so much time had expired that he was going to change his price and when he

00:07:37.760 --> 00:07:43.360
 changed the price the contract no longer became cost-effective relative to other

00:07:43.360 --> 00:07:48.160
 bids we received and we'd already moved moved away from those other bids so

00:07:48.160 --> 00:07:51.360
 that's why we're asking you reject this yeah thanks that that makes sense I just

00:07:51.360 --> 00:07:53.600
 wanted to make sure this wasn't something we were gonna have to go

00:07:53.600 --> 00:08:01.680
 through repeatedly thank you okay do we have a motion to approve item a so

00:08:01.680 --> 00:08:11.720
 moved in a second second okay we have a motion in a second all in favor say aye

00:08:11.720 --> 00:08:25.000
 aye aye okay motion carries item G is there someone here to speak to item G

00:08:25.000 --> 00:08:35.720
 so we should have either pre-tem or Steven on the phone yes go ahead Lee

00:08:35.720 --> 00:08:40.760
 madam chairman my reason for requesting pulling this item was so we could get a

00:08:40.760 --> 00:08:46.600
 little better explanation of it and the impact it might hold for the future

00:08:46.600 --> 00:08:50.720
 since it appears to be a long-term consulting contract for wastewater

00:08:50.720 --> 00:08:53.000
 management

00:08:53.000 --> 00:09:07.200
 can you hear me Lee someone should be on the line to answer your question this is

00:09:07.200 --> 00:09:11.160
 a this is Chris Campbell water and wastewater capital project superintendent

00:09:11.160 --> 00:09:15.120
 I can answer any questions on this item hey Chris this is Tony if you could

00:09:15.120 --> 00:09:19.800
 speak up a little louder please so we can all hear you thank you is that is

00:09:19.800 --> 00:09:25.400
 that better Tony yes did you hear the question for mr. Ryback if I do

00:09:25.400 --> 00:09:28.320
 understand correctly he was just wanting some more detail because this is going

00:09:28.320 --> 00:09:32.040
 to be an extensive contract is that correct yes sir that is correct it

00:09:32.040 --> 00:09:36.320
 appears to be a long-term consulting contract and I thought it might be good

00:09:36.320 --> 00:09:40.160
 for us to get a little further explanation exposition of it thank you

00:09:40.160 --> 00:09:47.920
 yes sir mr. Ryback no problem so this this is a the the utilities group did an

00:09:47.920 --> 00:09:52.800
 RFP here recently and scored multiple criteria for the water and wastewater

00:09:52.800 --> 00:09:58.120
 group one of the criteria was was for planning and permitting right now the

00:09:58.120 --> 00:10:02.240
 current or currently the the water and wastewater group we do have a water

00:10:02.240 --> 00:10:07.560
 master plan however we do not have a wastewater master plan so this was this

00:10:07.560 --> 00:10:12.960
 was top of our priority list to get this consultant on board to to evaluate

00:10:12.960 --> 00:10:17.360
 currently what we're doing within our model and within our basins and then

00:10:17.360 --> 00:10:22.640
 also look at what do we need to do for the next 25 to 50 years with water and

00:10:22.640 --> 00:10:27.760
 weight or with wastewater infrastructure so yes this will there is an extensive

00:10:27.760 --> 00:10:32.560
 amount of effort that's going to be put forth for surveying and looking at our

00:10:32.560 --> 00:10:38.400
 existing system and as well as our basins and then and then they will break

00:10:38.400 --> 00:10:43.480
 down each basin and then come together with a holistic plan of how we should

00:10:43.480 --> 00:10:50.240
 proceed forward with our wastewater infrastructure alrighty then so this is

00:10:50.240 --> 00:10:55.320
 the result of a screening process that has already occurred that is correct yes

00:10:55.320 --> 00:11:01.760
 sir okay have we done business with this firm in the past yes sir Kim Lee Hornan

00:11:01.760 --> 00:11:05.600
 Associates have done quite a bit of business with the with the city of

00:11:05.600 --> 00:11:10.160
 Denton they've actually just recently helped write our standard standard

00:11:10.160 --> 00:11:14.880
 specs for the for the city of Denton as well very well thank you I appreciate

00:11:14.880 --> 00:11:19.360
 that I just want to get a better flavor for this particular contract because of

00:11:19.360 --> 00:11:26.880
 the time frame and money thank you absolutely anytime okay do we have a

00:11:26.880 --> 00:11:35.960
 motion to approve item G okay Lee's motioning second do we have a second

00:11:35.960 --> 00:11:44.320
 I'll second thank you Karen all in favor say aye aye aye can you hear me better

00:11:44.320 --> 00:11:52.040
 now yes a little bit a little bit okay because the alternative is to move into

00:11:52.040 --> 00:12:04.160
 the work session and I'll be via zoom can you hear me yes yes you can hear me

00:12:04.160 --> 00:12:11.120
 okay so we can hear you okay so the next item is items for individual

00:12:11.120 --> 00:12:18.080
 consideration item consider the approval of the May 24th 2021 minutes

00:12:18.080 --> 00:12:25.400
 were there any changes or corrections okay do we have a motion to approve the

00:12:25.400 --> 00:12:31.760
 minutes so moved okay been moved do we have a second Lee's seconds all in

00:12:31.760 --> 00:12:39.000
 favor say aye aye I'm abstaining I was absent okay thank you Karen I did that

00:12:39.000 --> 00:12:41.480
 last time

00:12:41.480 --> 00:12:53.320
 me too everybody okay so leaving leaving green

00:13:05.080 --> 00:13:12.960
 okay okay the next item is item B consider recommending adoption of an

00:13:12.960 --> 00:13:17.080
 ordinance for the city of Denton a Texas Home Rule municipal corporation

00:13:17.080 --> 00:13:21.320
 authorizing the city manager or their designee to execute a contract with

00:13:21.320 --> 00:13:28.080
 Hammett extra excavation incorporated for the construction of the perimeter

00:13:28.080 --> 00:13:32.240
 landfill gas header perimeter road and waterline extension for the solid waste

00:13:32.240 --> 00:13:36.080
 and recycling department providing for the expenditure funds therefore and

00:13:36.080 --> 00:13:41.000
 providing an effective date awarded to hammock excavation Inc and the not to

00:13:41.000 --> 00:13:44.400
 exceed amount of three million six forty one nine hundred and forty dollars and

00:13:44.400 --> 00:13:51.840
 six cents six cents six cents good morning members of the board my name is

00:13:51.840 --> 00:13:54.920
 Brian burner I am the solid waste director for the city of Denton it's

00:13:54.920 --> 00:13:59.920
 nice to see everybody in three dimensions for a change so I am here

00:13:59.920 --> 00:14:06.960
 today to talk about the project with Hammett to award a contract to extend

00:14:06.960 --> 00:14:14.120
 our landfill road perimeter road gas well header and waterline what I do want

00:14:14.120 --> 00:14:24.040
 to talk about today is why we need that this work done talk a little bit about

00:14:24.040 --> 00:14:27.560
 the process to identify the contractors and the cost to provide our

00:14:27.560 --> 00:14:31.960
 recommendations and then answer any questions that you might have a city of

00:14:31.960 --> 00:14:36.800
 Denton landfill in the exist under our existing permit we actually started our

00:14:36.800 --> 00:14:41.640
 fill pattern on the south and the west side currently we are now moving into

00:14:41.640 --> 00:14:45.600
 the east side and we need to install the infrastructure to support this service so

00:14:45.600 --> 00:14:51.720
 again access road on the east side as well as waterline and gas line header to

00:14:51.720 --> 00:14:55.720
 manage the landfill gas that that is located or that will be produced in this

00:14:55.720 --> 00:14:59.880
 area when we talk about the work to be completed again from landfill gas system

00:14:59.880 --> 00:15:04.680
 we're going to stall about 4,600 feet of 18 inch header control and collection

00:15:04.680 --> 00:15:13.280
 system a 950 foot leachate force main a non potable effluent waterline to help

00:15:13.280 --> 00:15:19.160
 with not only cleaning and watering the roads but also a desk control and then

00:15:19.160 --> 00:15:25.600
 again an all-purpose 10 inch reinforced concrete pavement road to make sure that

00:15:25.600 --> 00:15:30.200
 we can get in and out of the landfill on the east side we had construction

00:15:30.200 --> 00:15:36.160
 specifications prepared by SES consulting engineers that were released

00:15:36.160 --> 00:15:42.120
 for review on March 16th of this year we sent the request to 463 companies with

00:15:42.120 --> 00:15:48.200
 two active responses on April 22nd based on a review of the event of the RFP and

00:15:48.200 --> 00:15:51.720
 the evaluation the lowest responsive company that was identified was Hammett

00:15:51.720 --> 00:15:56.560
 Construction and with the 205 day proposed for construction we do

00:15:56.560 --> 00:16:01.160
 recommend awarding the landfill gas header waterline and concrete road

00:16:01.160 --> 00:16:06.960
 construction to Hammett Excavation I'd be glad to answer any questions that you

00:16:06.960 --> 00:16:14.840
 might have at this time questions yes mr. Rebek go ahead

00:16:15.440 --> 00:16:23.000
 Lee go ahead mr. madam chairman my question is regarding the landfill gas

00:16:23.000 --> 00:16:28.600
 collection system it's probably a dumb question but I'm gonna ask it anyway so

00:16:28.600 --> 00:16:34.160
 what do you do with the methane gas that you collect currently we are flaring

00:16:34.160 --> 00:16:38.840
 that gas however as we speak we have at least nine contractors out at the

00:16:38.840 --> 00:16:45.080
 landfill who are reviewing the system to install what we call a high BTU plant

00:16:45.080 --> 00:16:49.040
 what we want to be able to do is take this material actually clean it up to

00:16:49.040 --> 00:16:54.240
 pipeline grade quality and put it into the at most landfill or excuse me the

00:16:54.240 --> 00:16:58.560
 at most natural gas pipeline that runs along the north end of our property to

00:16:58.560 --> 00:17:04.240
 create a beneficial and usable product as a result of this so it's a it's a

00:17:04.240 --> 00:17:09.640
 beneficial reuse of that material well that is excellent so this is an

00:17:09.640 --> 00:17:14.160
 extension to an already existing landfill gas collection system that I

00:17:14.160 --> 00:17:16.600
 understand that correctly that is correct we currently have the header

00:17:16.600 --> 00:17:20.840
 that runs on the south and west side of facility what we want to do is create is

00:17:20.840 --> 00:17:25.960
 complete the ring by running it along the east side mm-hmm all right well very

00:17:25.960 --> 00:17:30.920
 good thank you thank you Karen did you have a question to Lee's question took

00:17:30.920 --> 00:17:36.680
 care of it thank you thank you all right any other questions do we have a motion

00:17:36.680 --> 00:17:46.000
 to approve this item motion to approve a motion okay it's been okay we have a

00:17:46.000 --> 00:17:54.080
 motion and a second all in favor say aye aye okay that one carries the next item

00:17:54.080 --> 00:17:59.080
 consider recommending the adoption of an ordinance of the city of Denton a Texas

00:17:59.080 --> 00:18:02.520
 Home Rule Municipal Corporation authorizing the city manager or their

00:18:02.520 --> 00:18:07.400
 designee to execute a contract with Hammett Excavation incorporated for the

00:18:07.400 --> 00:18:10.680
 construction of the public disposal facility for the solid waste and

00:18:10.680 --> 00:18:15.040
 recycling department providing for the expenditure of funds therefore and

00:18:15.040 --> 00:18:20.600
 providing an effective date CSP 7568 awarded to Hammett Excavation

00:18:20.600 --> 00:18:28.520
 incorporated in the not to exceed mount of 2 million 526 832 and 34 cents good

00:18:28.520 --> 00:18:31.760
 morning again now Brian Bernhardt of solid waste director with city of Denton

00:18:31.760 --> 00:18:37.840
 before you this morning to talk about our public disposal facility and award

00:18:37.840 --> 00:18:41.680
 of a contract to Hammett construction company again what I want to try to do

00:18:41.680 --> 00:18:46.080
 this morning is to define the need for the what we're going to call the PDF

00:18:46.080 --> 00:18:52.320
 again the process to identify the contractor the recommendations for

00:18:52.320 --> 00:18:56.240
 approval and answer any questions that you might have city of Dent public

00:18:56.240 --> 00:19:00.560
 disposal PDF facility is located on and within the permitted boundaries of the

00:19:00.560 --> 00:19:04.840
 city of Denton landfill purpose really is to provide a safe place and

00:19:04.840 --> 00:19:08.320
 environment for residents to dispose of materials at the landfill what we try to

00:19:08.320 --> 00:19:12.200
 do is it's actually separate from the working face so residents who don't have

00:19:12.200 --> 00:19:17.560
 dump trailers don't have the big landfill equipment basically drop it on

00:19:17.560 --> 00:19:22.680
 on a concrete pad the materials picked up and actually transferred to the

00:19:22.680 --> 00:19:28.640
 working face keeps him separate from the landfill equipment and reason we need

00:19:28.640 --> 00:19:33.620
 this facility built is because our current PDF is located within the

00:19:33.620 --> 00:19:37.040
 footprint of the next landfill cell which is currently under construction so

00:19:37.040 --> 00:19:41.840
 that facility will be removed I have to have a place to go so what we want to

00:19:41.840 --> 00:19:46.000
 try to do is to go ahead and build a what we're going to consider a 30-year

00:19:46.000 --> 00:19:51.200
 facility so that it increases our reliability and the safety that's going

00:19:51.200 --> 00:19:56.040
 to be concerned with the construction we hope this facility will be complete by

00:19:56.040 --> 00:20:00.320
 the end of the year so we can start using it again the work will be

00:20:00.320 --> 00:20:04.440
 completed we've got about quarter million square feet in this facility it

00:20:04.440 --> 00:20:10.560
 will include earthwork concrete road ramps pads pillars effluent water

00:20:10.560 --> 00:20:14.800
 supply line for for water monitors electric litter control fences just

00:20:14.800 --> 00:20:20.120
 everything that we need to make sure that this works and does not impact the

00:20:20.120 --> 00:20:24.840
 environmental integrity of the facility with the request for proposal we had

00:20:24.840 --> 00:20:29.480
 Biggs and Matthews environmental prepare our bid specs and documents it was

00:20:29.480 --> 00:20:36.440
 released on March 12th we sent it to 461 companies we had four responses that were

00:20:36.440 --> 00:20:43.560
 received on April 22nd of 2021 the results of the proposal evaluation is

00:20:43.560 --> 00:20:47.720
 that Hammett again Hammett can excavation had the best overall and

00:20:47.720 --> 00:20:54.080
 final offer with a 230 day construction time period we would recommend awarding

00:20:54.080 --> 00:20:58.920
 the PDF contract to Hammett ex excavation would be glad to answer any

00:20:58.920 --> 00:21:06.960
 questions that you might have regarding this questions yes go ahead Barbara is

00:21:06.960 --> 00:21:12.720
 this the company we're working with here or proposing to could you repeat your

00:21:12.720 --> 00:21:20.280
 question please no Hammett excavation is actually located in bottom Texas but

00:21:20.280 --> 00:21:23.360
 they are the company that's currently doing the landfill cell expansion and

00:21:23.360 --> 00:21:27.320
 and this is what they do they are their experts in the installation of these

00:21:27.320 --> 00:21:32.200
 types of facilities so we're extremely comfortable in them having and building

00:21:32.200 --> 00:21:36.640
 that the facilities as well as doing it on time and under budget so there's some

00:21:36.640 --> 00:21:42.920
 synergy with our synergies quick all right other questions go ahead now you

00:21:42.920 --> 00:21:46.920
 said it's a we're looking at a 30-year facility for this new one correct how

00:21:46.920 --> 00:21:50.200
 old is the existing facility the existing facility was there for about

00:21:50.200 --> 00:21:53.520
 ten years but again it was very rudimentary was basically just a pad

00:21:53.520 --> 00:21:59.240
 with some some a frame type concrete barriers you dumped it on the pad they

00:21:59.240 --> 00:22:04.440
 scooped it up this is more in line with a I'm gonna call it a pseudo transfer

00:22:04.440 --> 00:22:09.320
 station so we drop it on a pad it goes down into a truck a lot less moving parts

00:22:09.320 --> 00:22:14.240
 but again cleaner safer for our residents and in you know in the off

00:22:14.240 --> 00:22:19.880
 chance that we have an extreme rate event it allows us to really keep that

00:22:19.880 --> 00:22:26.360
 the landfill running at that at optimal speed okay okay thank you any other

00:22:26.360 --> 00:22:33.560
 questions okay do we have a motion to approve this item go move the moves and

00:22:33.560 --> 00:22:44.280
 second I guess we'll give that one to Barbara all in favor say aye aye motion

00:22:44.280 --> 00:22:49.200
 carries thank you thank you very much next item is management reports so thank

00:22:49.200 --> 00:22:53.800
 you madam chair and members of the PB in your management the reports this time

00:22:53.800 --> 00:22:58.680
 around we did send you a memo on the budget process I think mr. Ryback had

00:22:58.680 --> 00:23:03.400
 previously kind of asked for just some detail on that and Cassie Ogden our

00:23:03.400 --> 00:23:08.160
 director finances here if if there's any questions regarding the content of that

00:23:08.160 --> 00:23:19.160
 memo or just any general questions about the budget process any questions I would

00:23:19.160 --> 00:23:21.840
 love to ask some questions but unfortunately I had not yet had a

00:23:21.840 --> 00:23:25.920
 chance to read the memo having been out of town over the weekend if you could

00:23:25.920 --> 00:23:31.480
 give me a few minutes and come back to this I would appreciate it that's that's

00:23:31.480 --> 00:23:36.080
 fine mr. Ryback that no issues with that the other alternative too is if if you'd

00:23:36.080 --> 00:23:40.120
 like to set something up or reach out to miss Ogden she'll be happy to to meet

00:23:40.120 --> 00:23:44.360
 with you individually or have a call with you and and answer any questions so

00:23:44.360 --> 00:23:52.880
 but again if it's up to you so to the next item that we have go ahead no I'm

00:23:52.880 --> 00:23:55.520
 just gonna say I would appreciate it if we could give me a couple minutes and

00:23:55.520 --> 00:23:59.360
 then I'll I can get back to it and ask any questions yes sir if that's all right

00:23:59.360 --> 00:24:03.920
 with you madam chairman sure that's fine go ahead so to the next item that we

00:24:03.920 --> 00:24:09.720
 have is just the calendar for future agenda items we did have an item

00:24:09.720 --> 00:24:14.240
 scheduled for for today that was you know slipped back and so that I'll probably

00:24:14.240 --> 00:24:17.920
 come back to you on the 28th but I think that generally speaking the budget items

00:24:17.920 --> 00:24:22.360
 that are listed on here with the dates are in order and consistent I think with

00:24:22.360 --> 00:24:27.640
 what's been provided to you in that in that budget memo as well and then finally

00:24:27.640 --> 00:24:32.160
 the the last item that we have for you is just a new business action matrix

00:24:32.160 --> 00:24:36.360
 again these are the same items that we've had the turn of the first two and

00:24:36.360 --> 00:24:41.160
 we're planning to come back to the PB and do time to address those and then the

00:24:41.160 --> 00:24:45.640
 last time that was added was just a legislative update as you know the

00:24:45.640 --> 00:24:49.520
 legislative session has concluded there's a number of bills still kind of

00:24:49.520 --> 00:24:54.200
 waiting for the governor to to potentially veto or sign or just let

00:24:54.200 --> 00:25:00.320
 pass there's there's also the possibility of a special session that

00:25:00.320 --> 00:25:03.840
 might be called by the by the by the governor but we are working with our

00:25:03.840 --> 00:25:09.440
 legislative consultants and and do plan to come back to you probably sometime in

00:25:09.440 --> 00:25:16.000
 July with with an update of of all all matters related to legislative activity

00:25:16.000 --> 00:25:20.840
 impacting any of our utilities so again that that's on the schedule and be happy

00:25:20.840 --> 00:25:25.360
 to answer any questions that I mean you ever might have on any of that any

00:25:25.360 --> 00:25:33.080
 questions all right have you had a chance to read it Lee or you need a few

00:25:33.080 --> 00:25:37.600
 more minutes yes ma'am I have thank you very much and I do have a couple of

00:25:37.600 --> 00:25:43.640
 questions okay she's coming up to the podium already well I was wondering it

00:25:43.640 --> 00:25:48.880
 seems that we use the departments are using baseline budgeting so that means

00:25:48.880 --> 00:25:52.840
 last year's budget is always the start of next year's but I understand that

00:25:52.840 --> 00:25:59.320
 correctly from the memo yes that is correct okay next item is I was

00:25:59.320 --> 00:26:03.040
 wondering does the if we're starting with the baseline each year may I assume

00:26:03.040 --> 00:26:10.000
 that budgets never go below the baseline but always above not necessarily if

00:26:10.000 --> 00:26:18.000
 there were one-time expenses we do back those out before we roll it forward and

00:26:18.000 --> 00:26:24.280
 if we always look at a three-year history of the expenses so if the

00:26:24.280 --> 00:26:29.800
 department historically has been spending less than their baseline we

00:26:29.800 --> 00:26:34.920
 will work with them and they could possibly reduce their budget their new

00:26:34.920 --> 00:26:43.080
 baseline okay so the baseline is in the hard bottom it's still flexible enough

00:26:43.080 --> 00:26:49.680
 based on actual expenditures possibly one time and also ongoing correct okay

00:26:49.680 --> 00:26:54.480
 the other item I noticed is that there is a quarterly review by the budget

00:26:54.480 --> 00:27:02.600
 manager yes the quarterly review takes place before our quarterly report is

00:27:02.600 --> 00:27:08.280
 published and so we do provide that quarterly report to PB and council but

00:27:08.280 --> 00:27:14.280
 we go through and look at any all of the expenditures ensure that we are where we

00:27:14.280 --> 00:27:22.240
 think we were forecasting and do kind of a deeper dive of the budgets very good

00:27:22.240 --> 00:27:26.900
 this quarterly budget report is that something that we typically see as a

00:27:26.900 --> 00:27:35.200
 utility board yes we do provide that to the pub and to the council okay and it's

00:27:35.200 --> 00:27:39.400
 very much those are my questions and madam chairman I appreciate you giving me

00:27:39.400 --> 00:27:43.920
 a little flexibility here and mr. Ryback those quarterly reports are also on the

00:27:43.920 --> 00:27:47.880
 city's website under under the finance department and there's a history there

00:27:47.880 --> 00:27:54.560
 of those reports along with annual financial reports as well okay well very

00:27:54.560 --> 00:28:01.680
 good thank you okay the next item is concluding items does any board member

00:28:01.680 --> 00:28:06.400
 have any items they'd like added to a future agenda or any congratulations or

00:28:06.400 --> 00:28:14.680
 whatever no okay and we will move into our work session receive a report and

00:28:14.680 --> 00:28:18.480
 hold a discussion and give staff direction regarding a proposed high

00:28:18.480 --> 00:28:22.520
 performance computing operation on leased property at the Denton Energy

00:28:22.520 --> 00:28:27.000
 Center under development by Tanasca

00:28:27.000 --> 00:28:34.800
 well good morning pub members it was actually 2017 I was thinking when the

00:28:34.800 --> 00:28:39.160
 last time that I presented to pub was so I believe miss Parker you were here

00:28:39.160 --> 00:28:43.080
 miss Russell was on the board at the time but everyone else is new but I'm

00:28:43.080 --> 00:28:46.160
 Jessica Rogers I'm the director of economic development for the city of

00:28:46.160 --> 00:28:50.900
 Denton I previously was with DME so they did get to see me a little bit more in

00:28:50.900 --> 00:28:55.840
 the past but I'm going to be leading the presentation today of course Terry

00:28:55.840 --> 00:29:00.440
 Nolte is here with DME and as well as we have representatives from Tanasca on the

00:29:00.440 --> 00:29:04.560
 line with us and so in the event that I can't answer a very technical question I

00:29:04.560 --> 00:29:14.440
 have a lot of help so let me sort through these thing go

00:29:14.440 --> 00:29:28.360
 all right so for you today I'm going to be presenting on and the development of

00:29:28.360 --> 00:29:33.640
 a modular data mining prospect and so this project came to us through Tanasca

00:29:33.640 --> 00:29:37.900
 Tanasca is a large private energy company that specializes in power plant

00:29:37.900 --> 00:29:44.080
 development natural gas and electric power marketing and a number of things

00:29:44.080 --> 00:29:49.420
 so DME and economic development have been working with Tanasca with a

00:29:49.420 --> 00:29:53.840
 specific data center client on the development of a high density computing

00:29:53.840 --> 00:29:57.720
 operation and I have pictures to kind of show what that looks like here in a few

00:29:57.720 --> 00:30:02.200
 slides this project is going to be unique because it has an extraordinarily

00:30:02.200 --> 00:30:06.920
 high electric demand and to sort of put that in perspective is this specific

00:30:06.920 --> 00:30:11.840
 projects demand is going to be larger than the entire city of Denton demand at

00:30:11.840 --> 00:30:16.080
 build out and this project is also unique because they're looking to

00:30:16.080 --> 00:30:20.440
 construct this project at the Denton Energy Center and that's because that

00:30:20.440 --> 00:30:25.180
 site has adequate transmission and substation capacity really with minimal

00:30:25.180 --> 00:30:29.160
 build out for this particular project so it's really a unique project and Denton

00:30:29.160 --> 00:30:32.080
 has a unique location that can meet their needs and we're gonna go through

00:30:32.080 --> 00:30:37.320
 all of sort of the details of the introductory comments over the next few

00:30:37.320 --> 00:30:43.520
 slides so what does this look like in terms of a project so the modular data

00:30:43.520 --> 00:30:47.600
 mining campus where they're going to be performing those high density and high

00:30:47.600 --> 00:30:51.920
 performance competing applications really looks exactly exactly like a

00:30:51.920 --> 00:30:56.280
 modular data mining campus would look like in your mind they're sort of the

00:30:56.280 --> 00:31:01.080
 size of a semi truck sort of can shipping container and they'd be located

00:31:01.080 --> 00:31:06.480
 there on the site so this is the deck schematic so this is the south side of

00:31:06.480 --> 00:31:11.160
 the deck right here sort of kind of on the airport side of the deck for those

00:31:11.160 --> 00:31:14.880
 like me who are directionally challenged and then this is what it would look like

00:31:14.880 --> 00:31:18.200
 on the ground here and this is where they would perform things like

00:31:18.200 --> 00:31:23.040
 cryptocurrency mining doing competing operations for artificial intelligence

00:31:23.040 --> 00:31:28.440
 DNA mapping and machine learning and those sorts of things so here's a good

00:31:28.440 --> 00:31:33.360
 aerial of the deck site so here's the Denton Energy Center the Jim Crystal

00:31:33.360 --> 00:31:38.280
 substation so this project is being proposed to be developed in three phases

00:31:38.280 --> 00:31:43.280
 so phase one is the south side of the Denton Energy Center phases one and two

00:31:43.280 --> 00:31:48.320
 which is about 19 acres and the goal would be to have that operation up and

00:31:48.320 --> 00:31:53.160
 running September to November this year in phases one and two and then phase

00:31:53.160 --> 00:31:57.320
 three is 11 acres on the north side of the Denton Energy Center with target

00:31:57.320 --> 00:32:03.440
 operation date of March 2022 no surprise but electric will be supplied from the

00:32:03.440 --> 00:32:08.480
 Jim Crystal substation and because of the extraordinarily high demand of the

00:32:08.480 --> 00:32:12.560
 project it's a little bit different than projects that I usually get so we're not

00:32:12.560 --> 00:32:16.560
 negotiating an economic development incentive but we are looking at a

00:32:16.560 --> 00:32:20.440
 purchase power agreement and that's sort of again extraordinarily unique

00:32:20.440 --> 00:32:24.360
 situation where we have such a high demand and high user that we'd be

00:32:24.360 --> 00:32:28.760
 looking at a purchase power agreement they'll the company will also be leasing

00:32:28.760 --> 00:32:34.280
 the land from the city of Denton and that will be market-based a market-based

00:32:34.280 --> 00:32:39.920
 lease rate so the property because the city owns it is currently zoned public

00:32:39.920 --> 00:32:44.360
 facility so we do have to initiate a rezoning process to allow for a private

00:32:44.360 --> 00:32:49.200
 use and so we are in the process of doing that right now I believe the PNZ

00:32:49.200 --> 00:32:53.320
 meeting is upcoming later this month we'll be rezoning that those sections of

00:32:53.320 --> 00:32:58.920
 the property from public facility to light industrial to allow for this use

00:32:58.920 --> 00:33:04.320
 so speaking to why this particular project is pursued here in Denton and

00:33:04.320 --> 00:33:09.040
 sort of a quick list of what did the customer need they needed transmission

00:33:09.040 --> 00:33:14.280
 level voltage they needed really high reliability but able to contain curtail it

00:33:14.280 --> 00:33:18.800
 when the system conditions called for it they needed rates pursuant to a PPA

00:33:18.800 --> 00:33:24.920
 access to the workforce to operate the computing center and one thing that's

00:33:24.920 --> 00:33:28.640
 really particular to Denton is access to renewable energy was extraordinarily

00:33:28.640 --> 00:33:32.120
 important for this client and they wanted to be somewhere where they had a

00:33:32.120 --> 00:33:36.320
 good community and environmental partner for their goals and of course there on

00:33:36.320 --> 00:33:40.160
 the right you'll see that didn't was able to meet and really exceed all of

00:33:40.160 --> 00:33:44.880
 the expectations of this client so this really was a great partnership and a way

00:33:44.880 --> 00:33:49.880
 to utilize property at the Denton Energy Center and that has a lot of benefits

00:33:49.880 --> 00:33:55.560
 for both the company and the city so getting into direct benefits for the

00:33:55.560 --> 00:33:59.480
 city of Denton so this particular project is in alignment with our economic

00:33:59.480 --> 00:34:03.720
 development strategic plan this board I don't know how involved you were in that

00:34:03.720 --> 00:34:07.360
 process throughout the pandemic but we just finished our economic development

00:34:07.360 --> 00:34:11.880
 strategic plan it was adopted in February of this year and in that plan

00:34:11.880 --> 00:34:16.040
 it specifically calls out strategic growth areas and identifies what we

00:34:16.040 --> 00:34:21.280
 would consider high value development areas data centers like this operation

00:34:21.280 --> 00:34:24.720
 were one of the few industries that were specifically called out as having

00:34:24.720 --> 00:34:29.000
 extreme benefit here in the city of Denton in terms of our economic value a

00:34:29.000 --> 00:34:34.120
 lot of that has to do with having our own electric utility so we certainly are

00:34:34.120 --> 00:34:40.200
 pursuing data centers as an economic development strategy the second point

00:34:40.200 --> 00:34:43.280
 would be that the full build out of the project so all three phases it would

00:34:43.280 --> 00:34:46.720
 more than double all of DME is current retail energy sales and create

00:34:46.720 --> 00:34:52.200
 additional revenues for our general fund in terms of franchise

00:34:52.200 --> 00:34:58.560
 fees ROI energy sales revenues on sales taxes as well as property taxes

00:34:58.560 --> 00:35:04.320
 related to the business personal property of the client and then lastly

00:35:04.320 --> 00:35:09.760
 this does have the potential to increase DME system load profile by reduce doing

00:35:09.760 --> 00:35:15.840
 that could reduce costs to serve the existing customers so we always like to

00:35:15.840 --> 00:35:19.640
 examine what are the risks and the rewards of any project as no project is

00:35:19.640 --> 00:35:24.560
 without a risk right so we looked at the commercial risks of the project so for

00:35:24.560 --> 00:35:28.360
 this particular project of course it's such a large-scale project that the

00:35:28.360 --> 00:35:33.200
 customers credit is something that we look into so we will work to mitigate

00:35:33.200 --> 00:35:37.840
 that through the actual purchase power agreement we also looked at what's the

00:35:37.840 --> 00:35:43.640
 lifecycle of the business plan how long can this modular operation continue and

00:35:43.640 --> 00:35:47.320
 what happens when it's over and so in our discussions and research really

00:35:47.320 --> 00:35:51.520
 knowing that there are other potential computing operations going forward to

00:35:51.520 --> 00:35:55.720
 expect coming online in the future and so we certainly can continue to explore

00:35:55.720 --> 00:35:58.640
 what those opportunities are as we're going through the first few years of

00:35:58.640 --> 00:36:03.040
 this operation and lastly is that this does consume a significant portion of

00:36:03.040 --> 00:36:07.640
 available transmission capacity in our industrial area that's not a huge risk

00:36:07.640 --> 00:36:12.160
 all that means is that if someone needed the power kind of soon thereafter we

00:36:12.160 --> 00:36:15.240
 might have to go through a little bit of a longer process to get the

00:36:15.240 --> 00:36:19.720
 infrastructure there to serve them it's not a huge delay not a significance

00:36:19.720 --> 00:36:23.880
 concern for our staff but something that we want to acknowledge in terms of

00:36:23.880 --> 00:36:28.040
 benefits to the city again significant revenues increasing based on the sales

00:36:28.040 --> 00:36:34.880
 of the energy seeing some general fund relief which is always positive and then

00:36:34.880 --> 00:36:40.440
 some electric rate relief possible and then lastly is again a little bit on our

00:36:40.440 --> 00:36:46.240
 economic development strategic plan but a possible funding source for what we're

00:36:46.240 --> 00:36:49.280
 calling our economic development catalyst fund so this is the fund with

00:36:49.280 --> 00:36:54.520
 which we would fund economic development programming and then lastly that this

00:36:54.520 --> 00:36:59.760
 does utilize right now that we have transmission capacity surplus so this is

00:36:59.760 --> 00:37:07.440
 able to take advantage of our current situation so jumping into timeline and

00:37:07.440 --> 00:37:11.840
 that's next step so this project because it's a modular installation is going to

00:37:11.840 --> 00:37:16.600
 really have an aggressive timeline and in terms of how quickly it can be

00:37:16.600 --> 00:37:21.360
 installed so we're gonna start there we've started the rezoning process it

00:37:21.360 --> 00:37:26.320
 goes to public hearing at the Planning and Zoning Commission on June 23rd and

00:37:26.320 --> 00:37:31.720
 that's to rezone the property again to light industrial as soon as the zoning

00:37:31.720 --> 00:37:35.760
 is in place then we can begin permitting the project and they can move really

00:37:35.760 --> 00:37:42.760
 quickly the project will come back to pub and to City Council in terms of both

00:37:42.760 --> 00:37:47.200
 the PPA and the reason sorry PPA will come back to pub and council the

00:37:47.200 --> 00:37:51.600
 rezoning process will go through City Council but the real goal is to get this

00:37:51.600 --> 00:38:00.280
 project online really late fall 2021 as soon as we possibly can so continuing on

00:38:00.280 --> 00:38:05.200
 those next steps so what we're kind of doing on the staff side now one working

00:38:05.200 --> 00:38:09.120
 the rezoning process but two working on negotiating that comprehensive purchase

00:38:09.120 --> 00:38:13.020
 power agreement and that's going to include what the costs of the power are

00:38:13.020 --> 00:38:18.080
 the terms of the lease any type of that credit credit or collateral requirement

00:38:18.080 --> 00:38:23.520
 and then also getting the final details about the interconnection and any type

00:38:23.520 --> 00:38:27.320
 of operational requirements that would be needed to operate that facility and

00:38:27.320 --> 00:38:31.520
 lastly I'll just make a point that we do have the economic growth writer that's

00:38:31.520 --> 00:38:36.360
 in your rate structure this project is so large it would not qualify for that

00:38:36.360 --> 00:38:43.280
 that's one of the reasons we're moving to a PPA so our direction today and that

00:38:43.280 --> 00:38:49.000
 we're seeking is to provide 120 day exclusivity exclusivity period on the

00:38:49.000 --> 00:38:52.920
 deck site so simply allow us the time to negotiate the terms of the PPA with this

00:38:52.920 --> 00:38:59.720
 project and then move the PPA through its approval processes and so with that I

00:38:59.720 --> 00:39:04.360
 will stop talking and I'm sure there are lots of questions on this project but

00:39:04.360 --> 00:39:10.460
 no I've got I've got some assistance here as needed okay thank you Jessica any

00:39:10.460 --> 00:39:16.440
 questions and madam chair and PB members we also have a couple of folks with the

00:39:16.440 --> 00:39:20.020
 company too so if there are questions for them they'll be happy to answer any

00:39:20.020 --> 00:39:26.400
 questions you might have okay all right questions all right we'll start with

00:39:26.400 --> 00:39:39.080
 Karen sorry Ben I was curious about what since this is placing such a high demand

00:39:39.080 --> 00:39:43.880
 on our electric generation or electric transmission I guess what will happen

00:39:43.880 --> 00:39:49.480
 when there's another tropical storm or winter storm URI and we need that

00:39:49.480 --> 00:40:01.800
 electricity for the ratepayers of denton come on come on down Terry Nolte

00:40:01.800 --> 00:40:06.400
 assistant general manager DME again the way that this transaction is being

00:40:06.400 --> 00:40:12.040
 structured this is a fully interruptible load so we would have the ability to

00:40:12.040 --> 00:40:17.280
 interrupt this load for a number of for any reason and certainly if we had a

00:40:17.280 --> 00:40:23.360
 situation like URI again it would be the first to go okay are they able I mean I

00:40:23.360 --> 00:40:26.480
 know that the target distribution center has its own generators that can kind of

00:40:26.480 --> 00:40:31.680
 get off the grid would it is this just a project that is too big for them to be

00:40:31.680 --> 00:40:38.400
 able to generate any of their own there are they are not planning to generate

00:40:38.400 --> 00:40:44.280
 and I think it's a it's a cost issue yeah having a backup generator of this

00:40:44.280 --> 00:40:50.200
 size would be they'd be a small utility right effectively so they're relying on

00:40:50.200 --> 00:40:55.400
 that intermittency I'm sorry the interrupt ability in order to make the

00:40:55.400 --> 00:41:01.160
 economics work effectively I did also just want to commend utility staff in

00:41:01.160 --> 00:41:04.920
 general for your willingness and eagerness to think outside the box

00:41:04.920 --> 00:41:09.560
 because this is a very creative seems like a very creative project that not

00:41:09.560 --> 00:41:14.200
 everybody would have would have considered so I'll just give some accolades

00:41:14.200 --> 00:41:18.840
 to ten ask me to ask is one of the largest players in the in the power

00:41:18.840 --> 00:41:28.280
 business in Texas and so the innovation is really theirs well yours too so thank

00:41:28.280 --> 00:41:36.560
 you it's true all right Ben so I guess I'm curious about the land what why do

00:41:36.560 --> 00:41:39.440
 we have so much land that we're not using and then did we have a purpose for

00:41:39.440 --> 00:41:46.360
 it in the future or otherwise my understanding and I was not here at the

00:41:46.360 --> 00:41:49.760
 time that the deck property was Tony might be able to answer the question

00:41:49.760 --> 00:41:54.160
 better but you know typically when you build a power plant you want to have a

00:41:54.160 --> 00:41:59.760
 buffer area around it in order to control access and and as with other

00:41:59.760 --> 00:42:04.280
 property purchases that the city does for utilities you kind of have to buy

00:42:04.280 --> 00:42:10.160
 what the parcel is so the acreage is really determined by what what the

00:42:10.160 --> 00:42:17.000
 parcel is okay Terry's exactly right I mean it was really a kind of all or

00:42:17.000 --> 00:42:23.880
 nothing on that particular land deal but I will tell you that even then and now

00:42:23.880 --> 00:42:30.520
 there is the potential future use of that property for a service center annex

00:42:30.520 --> 00:42:36.560
 for the city as you know especially with hunter coal ranch coming in you know the

00:42:36.560 --> 00:42:41.680
 the likelihood that we're gonna be able to serve much of that you know southwest

00:42:41.680 --> 00:42:45.920
 kind of side of the community becomes a real challenge out of our current

00:42:45.920 --> 00:42:49.680
 campuses and the current service center over here at Texas Street and so that's

00:42:49.680 --> 00:42:53.920
 something we that we've been working on obviously if if this project comes into

00:42:53.920 --> 00:42:58.480
 play we'll need to kind of reevaluate that but I think the I think the

00:42:58.480 --> 00:43:04.040
 benefits of this project certainly outweigh the potential drawbacks and

00:43:04.040 --> 00:43:09.340
 those having to rethink kind of a service center annex property so is is

00:43:09.340 --> 00:43:16.520
 to ask a recording in progress are they effectively going to use all remaining

00:43:16.520 --> 00:43:22.080
 available land or like could we continue like do that service center annex as

00:43:22.080 --> 00:43:28.460
 well what I think there's still gonna be additional land you know one of the one

00:43:28.460 --> 00:43:31.320
 of the projects that will be coming through there will be the loot 288

00:43:31.320 --> 00:43:36.840
 project that's gonna bisect some of the property that DME owns and so I'm trying

00:43:36.840 --> 00:43:41.120
 to remember I think it's property on the south side of that that would still be

00:43:41.120 --> 00:43:46.200
 available to us and it'll just have to be a much you know smaller scale kind of

00:43:46.200 --> 00:43:48.600
 annex than what we've been talking about but that's something that we'll be

00:43:48.600 --> 00:43:52.120
 working through with the with the architects on that so yeah much of much

00:43:52.120 --> 00:43:57.920
 of the land at the deck is actually impeded by easements for the gas lines

00:43:57.920 --> 00:44:03.840
 and the transmission lines out there so really this these two areas are areas

00:44:03.840 --> 00:44:10.400
 that could be developed and you know just an innovative use of property okay

00:44:10.400 --> 00:44:17.880
 thank you okay Lee did you have questions Lee can you hear me yes ma'am

00:44:17.880 --> 00:44:23.400
 chairman I can't hear you my question is has to do with the

00:44:23.400 --> 00:44:29.120
 interrupt ability of power that's very unusual for a data center operation a

00:44:29.120 --> 00:44:33.400
 little unclear about it and I've had a little trouble hearing from the meeting

00:44:33.400 --> 00:44:37.800
 room so you may have covered this but I wasn't able to make it out very well so

00:44:37.800 --> 00:44:42.440
 could you tell us a little bit more either Terry or the folks from to ask

00:44:42.440 --> 00:44:49.000
 about the interrupt ability of power in this data center operation I think I'll

00:44:49.000 --> 00:44:55.640
 defer to mr. Hemshot with with to ask on that one

00:44:55.640 --> 00:45:00.120
 hey good morning how's my volume can everybody hear me okay

00:45:00.120 --> 00:45:06.240
 yeah wow real good okay thanks good morning thank you very much for for the

00:45:06.240 --> 00:45:11.200
 for taking the time and answering for asking these questions I also want to

00:45:11.200 --> 00:45:15.920
 compliment the you know the city Terry staff everyone has been just excellent

00:45:15.920 --> 00:45:21.760
 responsive and Terry very innovative as well the city has been just just just a

00:45:21.760 --> 00:45:27.680
 pleasure to work with I want to I want to start to say in terms of your direct

00:45:27.680 --> 00:45:31.540
 question on the ability yes this is different this this is called

00:45:31.540 --> 00:45:37.120
 effectively tier zero data center tier four would be think of all the

00:45:37.120 --> 00:45:41.480
 applications on the internet where response time is in milliseconds to a

00:45:41.480 --> 00:45:46.280
 given to a given poll on the system and that it has to have multiple layers of

00:45:46.280 --> 00:45:52.040
 redundancies in order to actually fill that to fill that need those layers of

00:45:52.040 --> 00:45:56.000
 redundancies are you know important in that application but they do layer on a

00:45:56.000 --> 00:45:59.920
 lot of inefficiencies such that you know they have to have multiple backup

00:45:59.920 --> 00:46:03.200
 systems they have to have multiple cooling systems multiple of everything

00:46:03.200 --> 00:46:08.040
 to have that redundancy in this example because these applications are more

00:46:08.040 --> 00:46:12.900
 computing process intensive where they occur over a period of time and they can

00:46:12.900 --> 00:46:16.600
 be scheduled you know I go back in time and think about you know some of the you

00:46:16.600 --> 00:46:19.600
 know initial classes that I had in computer science where you're actually

00:46:19.600 --> 00:46:24.800
 scheduling time on a given piece of computing equipment you know back way

00:46:24.800 --> 00:46:29.720
 back when it's a similar thing in this case here where they're scheduling over

00:46:29.720 --> 00:46:33.360
 a period of time so an interruption is more of just a delay of the process and

00:46:33.360 --> 00:46:42.960
 it's not you know so as critical as it is for a tier 4 data center. So the time that's

00:46:42.960 --> 00:46:49.360
 being used in your modular systems are either scheduled or are they like flow

00:46:49.360 --> 00:46:57.440
 through historical data gathering from different organizations? I'm sorry the

00:46:57.440 --> 00:47:03.820
 interrupt ability when it occurs or I'm sorry that's okay we have structured the

00:47:03.820 --> 00:47:09.280
 question a little awkwardly what I've asked of asking is first to clarify that

00:47:09.280 --> 00:47:14.240
 you're talking about the time in your modular systems is actually mostly

00:47:14.240 --> 00:47:20.840
 scheduled rather than flow through and if it is flow through is it just staging

00:47:20.840 --> 00:47:27.480
 for keeping historical data over time? Okay so the a lot of the a lot of the

00:47:27.480 --> 00:47:31.640
 activity will be on mining which is flow through or just a continuous process and

00:47:31.640 --> 00:47:35.480
 that process can be interrupted virtually at any point in time. Oh the

00:47:35.480 --> 00:47:40.440
 data mining I got you thank you. Right in terms of the any of the artificial

00:47:40.440 --> 00:47:43.440
 intelligence video rendering applications like that those are more

00:47:43.440 --> 00:47:48.320
 scheduled applications. Okay thank you that makes a little more clear I

00:47:48.320 --> 00:47:55.840
 appreciate it. Sure okay and Barbara go ahead if you can hear me. Yes I was just

00:47:55.840 --> 00:48:00.440
 going to say that the presentation answered a lot of questions and I

00:48:00.440 --> 00:48:08.360
 appreciate the information that was presented to us thank you very much. Okay

00:48:08.360 --> 00:48:14.760
 and and I want to echo what Karen said that this is very creative and it's

00:48:14.760 --> 00:48:19.380
 going to benefit the city greatly so I'm certainly in favor I guess what you're

00:48:19.380 --> 00:48:24.480
 looking for is some kind of consensus direction? We're looking for

00:48:24.480 --> 00:48:28.920
 recommendation from this board to council which will be discussing tomorrow

00:48:28.920 --> 00:48:35.520
 on the 120 day exclusivity period for continuing negotiations. Before I forget

00:48:35.520 --> 00:48:40.920
 I do have one question we have no issues with our bonds on this arrangement. No

00:48:40.920 --> 00:48:45.440
 ma'am we've sought out an opinion from from bond council and we're good to

00:48:45.440 --> 00:48:51.120
 proceed with with the project. Okay excellent thank you. All right so do we

00:48:51.120 --> 00:48:56.560
 have a consensus to move forward to recommend moving forward with this

00:48:56.560 --> 00:49:06.400
 project? Sure. Okay yes all right is that what you need? Okay all right our final

00:49:06.400 --> 00:49:10.240
 item and we'll be adjourning into a closed session so I do need to read the

00:49:10.240 --> 00:49:14.320
 entire thing and it's a long e but it will take us approximately five minutes

00:49:14.320 --> 00:49:19.240
 or so from the time we close to go into we we're moving into the work session

00:49:19.240 --> 00:49:25.440
 room so that we can have a zoom. So yeah so so Barbara and Lee if you guys will

00:49:25.440 --> 00:49:29.040
 hold on we're we're all gonna jump on zoom and so I think it'll be a little bit

00:49:29.040 --> 00:49:33.160
 easier for us to hear everyone. But here is what the closed meeting is about

00:49:33.160 --> 00:49:37.560
 deliberations regarding certain public power utilities competitive matters

00:49:37.560 --> 00:49:42.160
 under Texas Government Code section five five one point zero eight six

00:49:42.160 --> 00:49:46.560
 consultation with attorneys under Texas Government Code section five five one

00:49:46.560 --> 00:49:51.840
 point zero seven one receive a presentation from staff regarding

00:49:51.840 --> 00:49:55.960
 public power competitive and financial matters regarding the provision of

00:49:55.960 --> 00:50:00.320
 electric power to a perspective large electric demand customer discuss

00:50:00.320 --> 00:50:04.920
 deliberate and provide direction to staff regarding the same consultation

00:50:04.920 --> 00:50:09.480
 with city's attorneys regarding the legal issues associated with the matter

00:50:09.480 --> 00:50:13.560
 where the public discussion of these legal matters would conflict with the

00:50:13.560 --> 00:50:17.400
 duty of the city attorneys to the city of Denton and the Denton City Council

00:50:17.400 --> 00:50:21.680
 under Texas disciplinary rules of the professional conduct at the state bar of

00:50:21.680 --> 00:50:30.280
 Texas or would jeopardize the city's legal position in any administrative

00:50:30.280 --> 00:50:34.680
 proceeding or potential litigation any final action decision or vote on the

00:50:34.680 --> 00:50:38.720
 matter deliberated in the closed meeting will only be taken in an open meeting

00:50:38.720 --> 00:50:42.720
 that is held in compliance with Texas Government Code chapter five five one

00:50:42.720 --> 00:50:47.320
 except to the extent such final action decision or vote is taken in the closed

00:50:47.320 --> 00:50:51.520
 meeting in accordance with the provisions of section five five one point zero eight

00:50:51.520 --> 00:50:56.720
 six of the Texas Governmental Code the public power exception the public

00:50:56.720 --> 00:51:00.760
 utilities board serves reserves the right to adjourn into a closed meeting or

00:51:00.760 --> 00:51:05.400
 executive session as authorized by Texas Government Code section five five one

00:51:05.400 --> 00:51:12.560
 point zero zero one the Texas Open Meetings Act on any item on its open

00:51:12.560 --> 00:51:16.560
 meeting agenda or to reconvene in the continuation of the closed meeting on the

00:51:16.560 --> 00:51:20.520
 closed meeting items noted above in accordance with the Texas Open Meetings

00:51:20.520 --> 00:51:25.280
 Act including without limitation section five five one point zero seven one through

00:51:25.280 --> 00:51:32.800
 five five one point zero eight six of the Texas Open Meetings Act thanks

00:51:32.800 --> 00:51:38.720
 Catherine going into closed session thank you