1 00:00:00,000 --> 00:00:03,840 Good afternoon. I'm Pat Smith, 2 00:00:03,840 --> 00:00:07,360 the chair of the city of dead bond oversight committee. 3 00:00:07,360 --> 00:00:09,360 This afternoon, we are having 4 00:00:09,360 --> 00:00:11,640 a regularly scheduled meeting for 5 00:00:11,640 --> 00:00:15,640 the bond oversight committee via zoom. 6 00:00:15,640 --> 00:00:19,640 The first agenda item will be consideration 7 00:00:19,640 --> 00:00:25,160 of the meeting minutes for February 4th, 2021. 8 00:00:25,160 --> 00:00:28,560 Is everyone had an opportunity to review the minutes? 9 00:00:28,560 --> 00:00:34,680 Can I get a motion for approval? 10 00:00:34,680 --> 00:00:37,320 I'll move. 11 00:00:37,320 --> 00:00:40,680 Thank you. Randy Robinson. 12 00:00:40,680 --> 00:00:42,800 Can I get a second? 13 00:00:42,800 --> 00:00:44,800 I'll second. 14 00:00:44,800 --> 00:00:47,440 Thank you, Eric. Any discussion, 15 00:00:47,440 --> 00:00:52,200 comments or amendments to the meeting minutes? 16 00:00:52,200 --> 00:00:54,440 All right. Seeing none, 17 00:00:54,440 --> 00:00:58,000 all in favor of approving the meeting minutes as presented, 18 00:00:58,000 --> 00:01:01,560 please signify by raising 19 00:01:01,560 --> 00:01:04,560 your hand or saying I for the phone or zoom. 20 00:01:04,560 --> 00:01:12,320 I. Janet, are you able to vote? 21 00:01:12,320 --> 00:01:26,360 Did you hear anything from Janet, Cassie? 22 00:01:26,360 --> 00:01:29,840 No, it looks like she's joined via phone, 23 00:01:29,840 --> 00:01:32,560 but it looks like she's still muted. 24 00:01:32,560 --> 00:01:36,840 Okay. Do we have enough votes? 25 00:01:36,840 --> 00:01:39,880 I thought we had quorum, 26 00:01:39,880 --> 00:01:42,800 but if she doesn't vote, I don't know if we have quorum. 27 00:01:42,800 --> 00:01:47,760 I think we're okay, Mac. 28 00:01:47,760 --> 00:01:49,600 It's very well. 29 00:01:49,600 --> 00:01:53,760 Just counting answers are four numbers. 30 00:01:53,760 --> 00:01:55,480 Yeah. Eric, myself, 31 00:01:55,480 --> 00:01:58,760 Randy, and Brandon. 32 00:01:58,760 --> 00:02:01,480 There's seven total on the board? 33 00:02:01,480 --> 00:02:02,520 Yes. 34 00:02:02,520 --> 00:02:04,120 Yes. We still have a quorum. 35 00:02:04,120 --> 00:02:05,800 Okay. All right. 36 00:02:05,800 --> 00:02:07,720 That motion is approved. 37 00:02:07,720 --> 00:02:11,040 Moving on to the next agenda item. 38 00:02:11,040 --> 00:02:14,560 BOC 21-006. 39 00:02:14,560 --> 00:02:16,720 Receive a report, hold a discussion, 40 00:02:16,720 --> 00:02:19,160 give staff direction regarding 2012, 41 00:02:19,160 --> 00:02:24,160 2014, and 2019 general obligation funded capital projects. 42 00:02:24,160 --> 00:02:26,040 I'll turn it over to you, Cassie. 43 00:02:26,040 --> 00:02:30,120 Thank you. We have three presentations for you today, 44 00:02:30,120 --> 00:02:33,120 similar to last time. 45 00:02:33,120 --> 00:02:37,080 Gary Packen is going to present the parks projects, 46 00:02:37,080 --> 00:02:38,960 and then we'll have Rachel Wood from 47 00:02:38,960 --> 00:02:43,800 Capital Projects present and then Scott Gray from facilities. 48 00:02:43,800 --> 00:02:48,480 You'll have an opportunity to ask questions with each presenter. 49 00:02:48,480 --> 00:02:51,040 With that, I'll turn it over to Gary. 50 00:02:51,720 --> 00:02:56,120 Good afternoon, Gary Packen, Director of Parks and Recreation. 51 00:02:56,120 --> 00:03:01,160 I'm going to go through the 2014 bond election proposition number 4, 52 00:03:01,160 --> 00:03:03,840 and our projects associated with that. 53 00:03:03,840 --> 00:03:06,840 We've completed all of the playground replacements. 54 00:03:06,840 --> 00:03:10,560 In fact, we completed an extra one at Joe Skiles Park, 55 00:03:10,560 --> 00:03:13,760 and we had money left over that was relocated and approved 56 00:03:13,760 --> 00:03:16,480 by the Bond Oversight Committee last meeting. 57 00:03:16,480 --> 00:03:18,360 That's been moved to the tennis court, 58 00:03:18,360 --> 00:03:20,640 North Lakes Tennis Center project. 59 00:03:20,640 --> 00:03:24,240 That is pending construction, 60 00:03:24,240 --> 00:03:27,120 and I'll talk about that here in a future slide. 61 00:03:27,120 --> 00:03:33,680 This is the park improvements phase 1 at Lake Forest Park in Milan. 62 00:03:33,680 --> 00:03:35,240 We completed a playground, 63 00:03:35,240 --> 00:03:38,040 a pavilion, and a basketball court. 64 00:03:38,040 --> 00:03:44,200 Phase 2, park improvements at South Lakes Park. 65 00:03:44,200 --> 00:03:46,080 We are in the bidding process. 66 00:03:46,080 --> 00:03:50,960 We're going to our solicitation review committee next Wednesday 67 00:03:50,960 --> 00:03:56,080 to get that out to bid, so that should be out very soon. 68 00:03:56,080 --> 00:03:57,960 We're excited to get that project moving. 69 00:03:57,960 --> 00:04:00,840 That's two additional courts with lights, 70 00:04:00,840 --> 00:04:04,080 and then an option to put lights on the other courts as well. 71 00:04:04,080 --> 00:04:13,400 Property acquisition, we had a little over $1 million in the bond program, 72 00:04:13,400 --> 00:04:17,080 and we have an additional $5 million for 2019. 73 00:04:17,080 --> 00:04:22,920 We have submitted an offer on one property down in South Denton, 74 00:04:22,920 --> 00:04:29,600 and Real Estate is working on another offer in the same general area, 75 00:04:29,600 --> 00:04:31,160 and then we're working with a developer 76 00:04:31,160 --> 00:04:33,720 to potentially buy some land off of them as well. 77 00:04:33,720 --> 00:04:37,960 So there's three properties that we're specifically talking to. 78 00:04:37,960 --> 00:04:42,680 There is a fourth one that's close to Lake Forest Park 79 00:04:42,680 --> 00:04:44,680 that's owned by an energy company, 80 00:04:44,680 --> 00:04:47,280 and they haven't been real responsive, 81 00:04:47,280 --> 00:04:50,720 so we keep trying to move forward on that. 82 00:04:50,720 --> 00:04:53,640 So we're trying to work with them as we move forward. 83 00:04:53,640 --> 00:04:59,120 Southwest Park Master Plan design. 84 00:04:59,120 --> 00:05:02,560 We have a focus group that's been walking through us 85 00:05:02,560 --> 00:05:06,120 this process since July of 2020. 86 00:05:06,120 --> 00:05:08,920 It's about 20, 25 people. 87 00:05:08,920 --> 00:05:11,640 We take it at the park board and brief them 88 00:05:11,640 --> 00:05:13,200 and gain some feedback, 89 00:05:13,200 --> 00:05:17,320 and then we plan on taking it to city council in the near future. 90 00:05:17,320 --> 00:05:19,880 And once we get feedback from them, then we'll go back, 91 00:05:19,880 --> 00:05:23,520 make some updates, and then put it back through the process again 92 00:05:23,520 --> 00:05:29,600 with park board and city council for eventual approval to the master plan. 93 00:05:29,600 --> 00:05:34,040 The master plan itself right now is three sections. 94 00:05:34,040 --> 00:05:37,280 The northern section is open space and park. 95 00:05:37,280 --> 00:05:39,960 The bottom left, which you see a footprint of a building, 96 00:05:39,960 --> 00:05:42,360 that could be anything at this point in time. 97 00:05:42,360 --> 00:05:47,200 It just kind of really articulate what size of a building could go there. 98 00:05:47,200 --> 00:05:51,560 Over the course of the next 20 years, we may decide that it's, you know, 99 00:05:51,560 --> 00:05:56,000 an ice rink, a field house, whatever, a library, a rec center, 100 00:05:56,000 --> 00:05:57,320 could be any one of those. 101 00:05:57,320 --> 00:06:00,760 So we're just going to leave it as general footprint space 102 00:06:00,760 --> 00:06:04,240 with its capabilities based on its parking options 103 00:06:04,240 --> 00:06:08,400 and the building space overall with the square footage. 104 00:06:08,400 --> 00:06:11,440 And then the bottom right side is what could be put there 105 00:06:11,440 --> 00:06:14,000 in regards to athletic fields. 106 00:06:14,000 --> 00:06:15,920 None of this needs to be built at one time. 107 00:06:15,920 --> 00:06:18,160 It could be built in three different phases 108 00:06:18,160 --> 00:06:21,080 with the park open space, the indoor building, 109 00:06:21,080 --> 00:06:23,280 and then the field space in the bottom right. 110 00:06:23,280 --> 00:06:27,840 And each one of those phases could be rolled out at a slower pace as well. 111 00:06:27,840 --> 00:06:33,200 So this entire property could be phaseable. 112 00:06:33,200 --> 00:06:35,080 And currently, there's no funding for this. 113 00:06:35,080 --> 00:06:41,880 So this is just to kind of get a master plan in line for future opportunities. 114 00:06:41,880 --> 00:06:43,840 Spray ground, this was completed. 115 00:06:43,840 --> 00:06:46,080 We're going to be opening it up on May 15th. 116 00:06:46,080 --> 00:06:49,200 It did not open last year because of COVID. 117 00:06:49,200 --> 00:06:54,240 But we're excited to get it back open and provide that service to the community. 118 00:06:54,240 --> 00:06:55,720 And this is in Carl Young Park. 119 00:06:55,720 --> 00:07:03,360 Our trail system, this is a component that has been done that basically starts 120 00:07:03,360 --> 00:07:09,720 at North Lakes Park and goes up to North Point Park and then points east. 121 00:07:09,720 --> 00:07:13,320 This is a component of our entire trails plan. 122 00:07:13,320 --> 00:07:17,080 We've been working on our parks recreation and trail system master plan 123 00:07:17,080 --> 00:07:19,640 since January of 2019. 124 00:07:19,640 --> 00:07:24,240 We've been very focused on our trail section of that plan. 125 00:07:24,240 --> 00:07:28,280 We have currently over 200 miles of trails that are planned in parks, 126 00:07:28,280 --> 00:07:33,240 along major roadways, along major greenways or creeks. 127 00:07:33,240 --> 00:07:38,400 And then connections between under or over text dot roads. 128 00:07:38,400 --> 00:07:42,920 And then we're also planning paddling trails as well, both along our creeks 129 00:07:42,920 --> 00:07:47,560 and around the entire perimeter of Lewisville Lake in partnership 130 00:07:47,560 --> 00:07:52,640 with the Army Corps, Texas Parks and Wildlife, and neighboring cities. 131 00:07:52,640 --> 00:07:58,960 The tennis center, the Pro Shop has been completed. 132 00:07:58,960 --> 00:08:02,680 It was actually done about three months ahead of time. 133 00:08:02,680 --> 00:08:04,200 So that's ready to go. 134 00:08:04,200 --> 00:08:09,080 We are not yet ready for our flat work. 135 00:08:09,080 --> 00:08:10,200 We're getting close. 136 00:08:10,200 --> 00:08:14,360 We've been working through permitting and design on that. 137 00:08:14,360 --> 00:08:18,600 So we're just about at the point where we can get it out on the street 138 00:08:18,600 --> 00:08:23,320 and get a meeting set up with finance and purchasing for the SRC 139 00:08:23,320 --> 00:08:25,880 to get that approved and out to bid. 140 00:08:25,880 --> 00:08:30,560 We did get $40,000 in grants from the USTA for that project. 141 00:08:30,560 --> 00:08:33,640 Our goal is to put 12 courts out there. 142 00:08:33,640 --> 00:08:35,960 We are going to provide some alternates. 143 00:08:35,960 --> 00:08:40,400 So the base bid is 10 courts with two courts as an alternate. 144 00:08:40,400 --> 00:08:44,880 And then the pickleball courts will be alternates as well. 145 00:08:44,880 --> 00:08:47,880 That gives us an opportunity to accept or decline 146 00:08:47,880 --> 00:08:50,760 that based on what the cost comes in and what the budget allows. 147 00:08:54,600 --> 00:09:00,960 Waterpark additions with the wave pool and the concessions, 148 00:09:00,960 --> 00:09:03,160 we're getting ready to reopen our pools. 149 00:09:03,160 --> 00:09:05,160 They were not open last year. 150 00:09:05,160 --> 00:09:10,000 We have been challenged with getting enough people to return, 151 00:09:10,000 --> 00:09:12,520 to operate at full capacity. 152 00:09:12,520 --> 00:09:16,120 Since we were closed, we are shorthanded this year. 153 00:09:16,120 --> 00:09:19,200 We lost a lot of our reoccurring staff to other jobs. 154 00:09:19,200 --> 00:09:22,600 Since we were not open, they went and sought other employment. 155 00:09:22,600 --> 00:09:26,480 We did talk to a community last week-- 156 00:09:26,480 --> 00:09:30,000 actually, this week-- that did open their pools last year. 157 00:09:30,000 --> 00:09:31,920 And they are not having a hiring challenge. 158 00:09:31,920 --> 00:09:35,560 So it definitely impacted us by closing the pools. 159 00:09:35,560 --> 00:09:38,440 And that staff went and found other employment 160 00:09:38,440 --> 00:09:39,600 during that time frame. 161 00:09:39,600 --> 00:09:43,560 So we have to rebuild our staffing and our aquatics team. 162 00:09:43,560 --> 00:09:50,080 Vela Athletic Complex, this project is completed. 163 00:09:50,080 --> 00:09:54,560 The only thing that we're working on is finalizing two signs, 164 00:09:54,560 --> 00:09:57,440 two plaques that are going to go in the property. 165 00:09:57,440 --> 00:10:00,760 And we received one, and there was a misprint on it. 166 00:10:00,760 --> 00:10:02,960 So the company has to redo it. 167 00:10:02,960 --> 00:10:05,720 When they printed the logo, it didn't come out correctly. 168 00:10:05,720 --> 00:10:07,800 So they're redoing that right now 169 00:10:07,800 --> 00:10:11,800 and going to be sending that back to us. 170 00:10:11,800 --> 00:10:15,480 And the sculpture that is going towards the entrance 171 00:10:15,480 --> 00:10:17,600 of the park, it's called the Trophy. 172 00:10:17,600 --> 00:10:20,520 That is under fabrication right now 173 00:10:20,520 --> 00:10:23,440 and looking for installation in August of this summer. 174 00:10:23,440 --> 00:10:30,640 There's a rendering with the footprint. 175 00:10:30,640 --> 00:10:33,960 We are going to be putting some landscaping around the perimeter 176 00:10:33,960 --> 00:10:35,960 of this just to kind of soften that up a little bit. 177 00:10:35,960 --> 00:10:39,840 And there's another angle. 178 00:10:39,840 --> 00:10:46,240 Lake Forest Park, Drew's been working on this 179 00:10:46,240 --> 00:10:48,120 with our public works team. 180 00:10:48,120 --> 00:10:50,400 The fish have been relocated. 181 00:10:50,400 --> 00:10:52,040 The water was drained out. 182 00:10:52,040 --> 00:10:54,920 I think we may have some more water in there now 183 00:10:54,920 --> 00:10:56,160 since the recent rains. 184 00:10:56,160 --> 00:10:59,280 But you can see in the picture that the dam 185 00:10:59,280 --> 00:11:02,640 is being reconstructed and refortified. 186 00:11:02,640 --> 00:11:06,560 They removed some trees out of the base of the dam itself. 187 00:11:06,560 --> 00:11:08,880 And then we'll start dredging in the near future. 188 00:11:15,160 --> 00:11:17,480 Public art transportation. 189 00:11:17,480 --> 00:11:19,840 So if you remember a few years ago, 190 00:11:19,840 --> 00:11:24,000 we were going to put some medallions on I-35. 191 00:11:24,000 --> 00:11:28,440 There are currently medallions right there by UNT that exist. 192 00:11:28,440 --> 00:11:33,880 But there were ones to be placed at Brinker and Lillian Miller. 193 00:11:33,880 --> 00:11:36,000 It was determined that that could not occur. 194 00:11:36,000 --> 00:11:37,720 So we have the funding available. 195 00:11:37,720 --> 00:11:41,280 There was discussion of putting them on the ground more 196 00:11:41,280 --> 00:11:43,120 as a monument. 197 00:11:43,120 --> 00:11:47,080 And the Public Art Committee didn't like that idea. 198 00:11:47,080 --> 00:11:50,320 And there was some discussion to use the funding for gateway 199 00:11:50,320 --> 00:11:51,680 signs. 200 00:11:51,680 --> 00:11:53,600 And the Public Art Committee felt 201 00:11:53,600 --> 00:11:58,640 that that's not signages and sculptures as an art 202 00:11:58,640 --> 00:12:00,080 from that perspective. 203 00:12:00,080 --> 00:12:02,960 So we've been sitting on the money 204 00:12:02,960 --> 00:12:05,280 looking for what to do with that. 205 00:12:05,280 --> 00:12:07,920 Currently, we have been talking with TxDOT 206 00:12:07,920 --> 00:12:13,280 in regards to the continuation of I-35 basically from UNT 207 00:12:13,280 --> 00:12:15,840 to US-77. 208 00:12:15,840 --> 00:12:18,600 So the thought process there is we 209 00:12:18,600 --> 00:12:24,720 could continue those medallions moving north along 35 210 00:12:24,720 --> 00:12:28,400 at those interchanges where it could be at the Merge, 211 00:12:28,400 --> 00:12:34,480 at Oak, at 380, and some areas along that corridor 212 00:12:34,480 --> 00:12:39,120 where the medallions are embossed into the walls 213 00:12:39,120 --> 00:12:43,360 as opposed to freestanding structures attached 214 00:12:43,360 --> 00:12:45,680 to the wall with illumination. 215 00:12:45,680 --> 00:12:48,040 That would be a little cheaper, a little more affordable. 216 00:12:48,040 --> 00:12:52,080 So between the $311,000 that we have currently 217 00:12:52,080 --> 00:12:56,040 in the bond project and then additional $290,000 218 00:12:56,040 --> 00:12:59,120 that we just received from the Governor's Community Achievement 219 00:12:59,120 --> 00:13:02,080 Award, Denton received and Keep Denton Beautiful received 220 00:13:02,080 --> 00:13:03,360 first place. 221 00:13:03,360 --> 00:13:07,400 So we will be receiving a grant of $290,000 222 00:13:07,400 --> 00:13:10,200 to go towards TxDOT right-of-ways for beautification 223 00:13:10,200 --> 00:13:11,720 and enhancement. 224 00:13:11,720 --> 00:13:14,240 So we have almost $600,000 that we 225 00:13:14,240 --> 00:13:17,720 could utilize for future projects. 226 00:13:17,720 --> 00:13:20,880 So option one basically says funding for sculptures 227 00:13:20,880 --> 00:13:23,960 on Carroll Dallas Bonnie Bray Roundabout. 228 00:13:23,960 --> 00:13:25,400 I think it was last meeting that it 229 00:13:25,400 --> 00:13:27,840 was mentioned about putting a sculpture in the roundabout 230 00:13:27,840 --> 00:13:29,640 on Bonnie Bray. 231 00:13:29,640 --> 00:13:34,520 If we decided to reallocate that $311,000 towards sculptures 232 00:13:34,520 --> 00:13:37,800 that were put in the city along major roadways, 233 00:13:37,800 --> 00:13:41,680 we could use that money in the very near future. 234 00:13:41,680 --> 00:13:44,400 With it being bond money, I know we've 235 00:13:44,400 --> 00:13:47,040 been trying to utilize the bond money quickly 236 00:13:47,040 --> 00:13:49,680 and get it back into the community. 237 00:13:49,680 --> 00:13:52,560 This is the fastest way to do that. 238 00:13:52,560 --> 00:13:55,840 Option two does cause some delays. 239 00:13:55,840 --> 00:13:57,760 They're in the process of planning, 240 00:13:57,760 --> 00:14:00,000 so it's going to be a number of years before they 241 00:14:00,000 --> 00:14:03,000 were able to start that project. 242 00:14:03,000 --> 00:14:08,800 I think it's 2025 is the date in regards to that construction. 243 00:14:08,800 --> 00:14:10,880 So that would delay the spending and utilize 244 00:14:10,880 --> 00:14:15,200 that for the aesthetics on I-35 for the embossment 245 00:14:15,200 --> 00:14:18,040 of the medallions and beautification. 246 00:14:18,040 --> 00:14:22,160 So we'd be sitting on that for four or five years. 247 00:14:22,160 --> 00:14:24,800 So that's the downside of that. 248 00:14:24,800 --> 00:14:29,960 So we do have $600,000, but don't have the $290,000 yet. 249 00:14:29,960 --> 00:14:35,560 We have a meeting next week with GCA regarding the grant. 250 00:14:35,560 --> 00:14:39,600 And so those are the two options that we're 251 00:14:39,600 --> 00:14:41,000 thinking about right now and wanted 252 00:14:41,000 --> 00:14:43,800 to get some feedback from the Bond Oversight Committee 253 00:14:43,800 --> 00:14:46,840 in what your preferred direction would be. 254 00:14:46,840 --> 00:14:54,240 Thanks, Gary. 255 00:14:54,240 --> 00:14:55,040 So thoughts? 256 00:14:55,040 --> 00:14:59,840 Janet, are you on? 257 00:14:59,840 --> 00:15:01,840 Yeah. 258 00:15:01,840 --> 00:15:02,840 Are you on? 259 00:15:02,840 --> 00:15:04,480 OK, good. 260 00:15:04,480 --> 00:15:05,680 Can you hear me? 261 00:15:05,680 --> 00:15:06,600 Yeah. 262 00:15:06,600 --> 00:15:08,640 OK, good. 263 00:15:08,640 --> 00:15:12,040 Gary, this is Brain. 264 00:15:12,040 --> 00:15:12,680 Oh, go ahead. 265 00:15:12,680 --> 00:15:18,960 Did traffic have any thoughts about putting a sculpture 266 00:15:18,960 --> 00:15:19,880 in that roundabout? 267 00:15:25,240 --> 00:15:27,200 Hang on a second. 268 00:15:27,200 --> 00:15:29,680 She's getting over to the computer. 269 00:15:29,680 --> 00:15:30,160 OK. 270 00:15:30,160 --> 00:15:38,680 Hello. 271 00:15:38,680 --> 00:15:41,480 Becky Devaney, City Engineer. 272 00:15:41,480 --> 00:15:45,040 This traffic department is happy to coordinate with the Parks 273 00:15:45,040 --> 00:15:46,720 Department and a sculpture. 274 00:15:46,720 --> 00:15:49,560 This is a typical type situation that 275 00:15:49,560 --> 00:15:51,040 has been used in other cities. 276 00:15:51,040 --> 00:15:52,680 So if that's something that the committee 277 00:15:52,680 --> 00:15:58,160 would like to consider, we would absolutely look into it. 278 00:15:58,160 --> 00:16:01,480 I was just curious if that was-- 279 00:16:01,480 --> 00:16:06,080 having participated in the event of driving around 280 00:16:06,080 --> 00:16:08,920 the roundabout on numerous occasions, 281 00:16:08,920 --> 00:16:11,800 I was just curious if that was any kind of a safety 282 00:16:11,800 --> 00:16:16,000 concern of having a monument or a sculpture 283 00:16:16,000 --> 00:16:18,880 in the middle of that. 284 00:16:18,880 --> 00:16:22,280 The roundabout at Bonnie Bray is larger in nature 285 00:16:22,280 --> 00:16:26,000 than maybe the other roundabout that's located at Hinkle. 286 00:16:26,000 --> 00:16:28,080 And so it does have the ability to have 287 00:16:28,080 --> 00:16:29,360 a structure in that area. 288 00:16:29,360 --> 00:16:34,960 But obviously, sight distance and the considerations 289 00:16:34,960 --> 00:16:37,600 would be put into play for safety concerns. 290 00:16:37,600 --> 00:16:39,520 We would want to make sure that everyone still 291 00:16:39,520 --> 00:16:41,360 has the appropriate sight distance all the way 292 00:16:41,360 --> 00:16:46,200 around the roundabout from not only the vehicular movements, 293 00:16:46,200 --> 00:16:50,840 but then also the pedestrian traffic or bicycle traffic 294 00:16:50,840 --> 00:16:51,680 is in that area. 295 00:16:51,680 --> 00:16:53,200 So those would be all things that 296 00:16:53,200 --> 00:16:55,640 would be put into consideration. 297 00:16:55,640 --> 00:16:57,600 If we decided to go that route of putting 298 00:16:57,600 --> 00:16:59,240 a monument in that location, we would 299 00:16:59,240 --> 00:17:03,320 look into all those things from a safety perspective also. 300 00:17:03,320 --> 00:17:04,480 Thank you. 301 00:17:04,480 --> 00:17:07,520 Absolutely. 302 00:17:07,520 --> 00:17:12,600 Gary, what were the committee's thoughts on-- 303 00:17:12,600 --> 00:17:16,240 what's an example of Carroll Boulevard and Dallas Drive? 304 00:17:21,600 --> 00:17:23,400 Are you asking me? 305 00:17:23,400 --> 00:17:23,920 Yes. 306 00:17:23,920 --> 00:17:25,640 OK, sorry, I missed that. 307 00:17:25,640 --> 00:17:29,520 So the thought process, we'd put two or three-- 308 00:17:29,520 --> 00:17:31,440 actually, probably three or four-- 309 00:17:31,440 --> 00:17:36,320 pads along that roadway on Carroll on the east side. 310 00:17:36,320 --> 00:17:38,840 And we could actually put temporary art there 311 00:17:38,840 --> 00:17:39,480 if we wanted to. 312 00:17:39,480 --> 00:17:41,880 And we could rotate it out every couple of years 313 00:17:41,880 --> 00:17:45,880 and basically lease artwork from artists 314 00:17:45,880 --> 00:17:47,880 that could display their artwork. 315 00:17:47,880 --> 00:17:50,680 And then we'd have a constant changeover. 316 00:17:50,680 --> 00:17:53,280 Or we could go out and actually purchase it 317 00:17:53,280 --> 00:17:57,720 and put those three or four sprinkled along that right away. 318 00:17:57,720 --> 00:17:59,800 And there's a trail that follows that as well 319 00:17:59,800 --> 00:18:03,320 to provide that experience for both the people walking 320 00:18:03,320 --> 00:18:05,760 and driving that corridor. 321 00:18:05,760 --> 00:18:08,400 So we're talking, like, between south of University 322 00:18:08,400 --> 00:18:11,800 down to Congress Street, that area? 323 00:18:11,800 --> 00:18:13,360 Yes, approximately, yes. 324 00:18:13,360 --> 00:18:18,520 And Brandon also asked about Dallas Drive. 325 00:18:18,520 --> 00:18:19,680 What are your thoughts there? 326 00:18:19,680 --> 00:18:21,520 Dallas and Teasley, if you remember, 327 00:18:21,520 --> 00:18:24,480 there is an old right of way that used to be there. 328 00:18:24,480 --> 00:18:26,800 About a year and a half ago, we wanted to remove that 329 00:18:26,800 --> 00:18:29,000 and put some landscaping in there, 330 00:18:29,000 --> 00:18:31,440 put some benches and some seating in there. 331 00:18:31,440 --> 00:18:33,920 And the thought process is we would put a pad out there 332 00:18:33,920 --> 00:18:38,640 and put a structure in that park to help beautify that, 333 00:18:38,640 --> 00:18:40,880 something that probably a little bit on the brighter side 334 00:18:40,880 --> 00:18:42,640 so you could see it. 335 00:18:42,640 --> 00:18:46,840 But that was the thought process of putting a pad or a foundation 336 00:18:46,840 --> 00:18:49,920 there that we could put a sculpture. 337 00:18:49,920 --> 00:18:52,400 OK, anyone? 338 00:18:52,400 --> 00:18:53,880 Eric? 339 00:18:53,880 --> 00:18:58,080 I guess, to me, it sort of looks like a decision 340 00:18:58,080 --> 00:19:03,040 between some investments that would be where local residents 341 00:19:03,040 --> 00:19:07,520 would be often versus something that is more of a-- 342 00:19:07,520 --> 00:19:12,040 call it marketing slash general beautification 343 00:19:12,040 --> 00:19:14,600 to let people know who are driving through Denton, 344 00:19:14,600 --> 00:19:19,720 that this is our city and we're proud of it, right? 345 00:19:19,720 --> 00:19:23,560 My preference would be for the first, 346 00:19:23,560 --> 00:19:26,800 for putting it where our residents are. 347 00:19:26,800 --> 00:19:30,200 But I would certainly defer to the Public Art Committee 348 00:19:30,200 --> 00:19:33,800 because I think they deal with those questions a lot. 349 00:19:33,800 --> 00:19:36,120 Just out of curiosity, is the match 350 00:19:36,120 --> 00:19:41,800 for the potential funding along 35, 351 00:19:41,800 --> 00:19:44,080 does that require a local match? 352 00:19:44,080 --> 00:19:46,720 Would it require the entire amount 353 00:19:46,720 --> 00:19:49,000 that we have available and that sort of thing? 354 00:19:49,000 --> 00:19:51,240 So we're going to be meeting with TxDOT. 355 00:19:51,240 --> 00:19:53,520 So basically, there is no match. 356 00:19:53,520 --> 00:19:58,560 But if there's things above and beyond what their base options 357 00:19:58,560 --> 00:20:00,280 are that they will provide and fund, 358 00:20:00,280 --> 00:20:02,760 we would have to find above and beyond that. 359 00:20:02,760 --> 00:20:03,720 OK. 360 00:20:03,720 --> 00:20:07,960 Yeah, I just-- especially when you think of the Bonnebray 361 00:20:07,960 --> 00:20:14,560 roundabout, and well, that could be sort of a way to really 362 00:20:14,560 --> 00:20:19,000 activate that space with Razor Ranch South coming in, 363 00:20:19,000 --> 00:20:21,360 drawing people over through that area 364 00:20:21,360 --> 00:20:24,720 and being something to remember and enjoy 365 00:20:24,720 --> 00:20:26,400 as we're going through our town. 366 00:20:26,400 --> 00:20:30,440 And also, I don't know if this is the specific parcel you're 367 00:20:30,440 --> 00:20:33,520 referring to on the Eagle and Elm area, 368 00:20:33,520 --> 00:20:38,040 but it's kind of an older triangle 369 00:20:38,040 --> 00:20:41,960 that was recently changed for the sidewalk and the drainage. 370 00:20:41,960 --> 00:20:43,560 Is that what we're talking about there 371 00:20:43,560 --> 00:20:45,320 on that northeast corner? 372 00:20:45,320 --> 00:20:48,040 Yeah, there's two right-of-ways that we've improved. 373 00:20:48,040 --> 00:20:50,400 Dallas and Teasley has been completed, 374 00:20:50,400 --> 00:20:52,920 and they both had old abandoned right-of-ways. 375 00:20:52,920 --> 00:20:58,840 And then Eagle and Elm is just right there at 377. 376 00:20:58,840 --> 00:21:00,520 They had an old right-of-way as well, 377 00:21:00,520 --> 00:21:05,520 and we're actually currently moving dirt on that property 378 00:21:05,520 --> 00:21:07,480 for improvement and beautification. 379 00:21:07,480 --> 00:21:08,120 OK. 380 00:21:08,120 --> 00:21:09,600 Yeah, when I think of that, I think 381 00:21:09,600 --> 00:21:13,920 that has a big opportunity to kind of be an entrance 382 00:21:13,920 --> 00:21:17,200 to downtown, if you will, as people are coming in 383 00:21:17,200 --> 00:21:22,000 from the south and be sort of a gathering place potentially 384 00:21:22,000 --> 00:21:23,760 for some of those apartments and things that 385 00:21:23,760 --> 00:21:25,680 have been built down there. 386 00:21:25,680 --> 00:21:28,400 So those are just my thoughts. 387 00:21:28,400 --> 00:21:29,400 Thanks, Eric. 388 00:21:29,400 --> 00:21:32,560 Randy, Janet, any thoughts? 389 00:21:32,560 --> 00:21:36,240 Yeah, I mean, personally, I think the-- 390 00:21:36,240 --> 00:21:38,760 I look at it more-- 391 00:21:38,760 --> 00:21:42,600 the highway medallions are great. 392 00:21:42,600 --> 00:21:47,760 But if it's going to be unknown time and unknown, 393 00:21:47,760 --> 00:21:50,600 what the cost is actually going to be, 394 00:21:50,600 --> 00:21:54,040 I think we probably ought to just take the burden to hand 395 00:21:54,040 --> 00:21:58,320 and say, hey, we have a place to use it. 396 00:21:58,320 --> 00:22:00,720 The bond funds are authorized. 397 00:22:00,720 --> 00:22:03,000 I don't want to hang on to them for another five years. 398 00:22:03,000 --> 00:22:06,600 Janet, how about you? 399 00:22:06,600 --> 00:22:16,440 She may not be hearing us. 400 00:22:16,440 --> 00:22:21,160 So with that, sounds like there's kind of a sense here. 401 00:22:21,160 --> 00:22:23,800 Could I get a motion for one of those two options? 402 00:22:29,320 --> 00:22:31,040 For a vote or just for direction? 403 00:22:31,040 --> 00:22:33,040 Well, let me ask, Cassie, you wanting a vote 404 00:22:33,040 --> 00:22:34,920 or you just wanting feedback? 405 00:22:34,920 --> 00:22:36,520 We just need direction. 406 00:22:36,520 --> 00:22:38,920 I think that sense is option one. 407 00:22:38,920 --> 00:22:45,080 We can move forward with planning that. 408 00:22:45,080 --> 00:22:47,800 We'll run back through the public art committee. 409 00:22:47,800 --> 00:22:51,280 And then the $290,000 we get from the GCA, 410 00:22:51,280 --> 00:22:54,360 we'll continue to work with TXOT to see if that's an option. 411 00:22:54,360 --> 00:22:56,640 We definitely need to figure out what the time frame is 412 00:22:56,640 --> 00:22:58,160 on that when we meet with them. 413 00:22:58,160 --> 00:22:59,600 In regards to how quickly they want 414 00:22:59,600 --> 00:23:02,640 that to be utilized as well. 415 00:23:02,640 --> 00:23:04,760 And if we needed to do something down the road 416 00:23:04,760 --> 00:23:08,080 for the complement, the GCAA, we could always 417 00:23:08,080 --> 00:23:10,480 put that in the next bond package. 418 00:23:10,480 --> 00:23:12,720 It's going to be years before that's done. 419 00:23:12,720 --> 00:23:19,640 OK, is that what you needed, Gary? 420 00:23:19,640 --> 00:23:22,720 Yes, and make sure I didn't have another slide down. 421 00:23:22,720 --> 00:23:23,720 I had one other slide. 422 00:23:23,720 --> 00:23:25,280 Just let me bring that back up. 423 00:23:25,280 --> 00:23:26,600 Can you see that? 424 00:23:26,600 --> 00:23:29,280 Nope, let me re-share it. 425 00:23:29,280 --> 00:23:41,840 The last slide was the 2019 bond program. 426 00:23:41,840 --> 00:23:45,800 I mentioned this earlier on the 2014 bond program 427 00:23:45,800 --> 00:23:47,440 for land acquisition. 428 00:23:47,440 --> 00:23:50,920 We do have $5 million, and we're working with real estate 429 00:23:50,920 --> 00:23:55,640 on some due diligence and offers for potential park property 430 00:23:55,640 --> 00:23:57,040 for future park space. 431 00:23:57,040 --> 00:24:02,360 And we continue to work with local developers 432 00:24:02,360 --> 00:24:05,920 on their projects to try to acquire park space 433 00:24:05,920 --> 00:24:08,120 in their properties and their development 434 00:24:08,120 --> 00:24:10,120 and hopefully provide connectivity 435 00:24:10,120 --> 00:24:12,880 to other parcels and other city assets, 436 00:24:12,880 --> 00:24:20,240 whether it's park space, trails, neighborhoods, major roadways. 437 00:24:20,240 --> 00:24:21,160 And that's all I had. 438 00:24:25,080 --> 00:24:27,440 Thanks, Gary. 439 00:24:27,440 --> 00:24:29,480 Capital Projects. 440 00:24:29,480 --> 00:24:34,440 Next up, we have Rachel Wood from Capital Projects. 441 00:24:34,440 --> 00:24:36,320 We'll be doing a joint presentation. 442 00:24:36,320 --> 00:24:45,120 And I'm just looking for where the presentation is saved. 443 00:24:45,120 --> 00:24:52,920 Do you need me to share it? 444 00:24:52,920 --> 00:24:55,160 That might get challenging, just because I need to drive 445 00:24:55,160 --> 00:24:57,160 for the majority of the slides. 446 00:24:57,160 --> 00:25:04,600 There we go. 447 00:25:22,920 --> 00:25:26,840 So similar to the previous presentations we've given you, 448 00:25:26,840 --> 00:25:31,400 we'll go through the financial updates of each bond program 449 00:25:31,400 --> 00:25:36,040 first before we get into the detailed project updates. 450 00:25:36,040 --> 00:25:38,280 And then Rachel's going to go over some project management 451 00:25:38,280 --> 00:25:40,560 and process improvement updates as well. 452 00:25:40,560 --> 00:25:42,960 So I'm going to go through some of those first. 453 00:25:42,960 --> 00:25:45,480 And then Rachel's going to go over some project management 454 00:25:45,480 --> 00:25:48,000 and process improvement updates as well. 455 00:25:48,000 --> 00:25:50,600 And then Rachel's going to go over some project management 456 00:25:50,600 --> 00:25:52,640 and process improvement updates as well. 457 00:25:52,640 --> 00:25:54,960 And then Rachel's going to go over some project management 458 00:25:54,960 --> 00:25:56,600 updates from Capital Projects. 459 00:25:56,600 --> 00:26:05,240 You can see from the charts that we've broken out 460 00:26:05,240 --> 00:26:08,920 the 2012 bond and the 2014 bond program 461 00:26:08,920 --> 00:26:12,600 to show you really how much has been spent 462 00:26:12,600 --> 00:26:15,560 and is still remaining from each bond program. 463 00:26:15,560 --> 00:26:17,080 And I do want to remind you this is just 464 00:26:17,080 --> 00:26:21,240 for the street improvement part of the bond program. 465 00:26:21,240 --> 00:26:27,520 There's additional CO issuances that will be sold this year. 466 00:26:27,520 --> 00:26:29,440 They're included in our reimbursement ordinance 467 00:26:29,440 --> 00:26:31,720 but haven't officially been sold yet. 468 00:26:31,720 --> 00:26:41,080 And then the 2019 street bond program, we're still at 1%, 469 00:26:41,080 --> 00:26:48,520 but have future projects coming down the pipeline 470 00:26:48,520 --> 00:26:52,040 to start spending this money allocated for street projects. 471 00:26:52,040 --> 00:26:58,440 OK, thank you, Cassie. 472 00:26:58,440 --> 00:27:00,000 So good afternoon, bond committee. 473 00:27:00,000 --> 00:27:02,920 I'm Rachel Wood, Deputy Director of Capital Projects. 474 00:27:02,920 --> 00:27:05,000 And as Cassie mentioned, this is really 475 00:27:05,000 --> 00:27:08,120 going to flow similarly to previous presentations 476 00:27:08,120 --> 00:27:10,640 that Becky Devaney and myself have given to the bond 477 00:27:10,640 --> 00:27:13,680 committee, providing updates on the status of projects. 478 00:27:13,680 --> 00:27:16,320 And then at the end, we'll talk about some process improvements 479 00:27:16,320 --> 00:27:20,320 that we have going on to improve the efficiency of the projects 480 00:27:20,320 --> 00:27:22,080 that we're delivering. 481 00:27:22,080 --> 00:27:25,640 So first, we'll go through the street reconstruction bond, 482 00:27:25,640 --> 00:27:29,480 the status of how we are delivering the 434 segments 483 00:27:29,480 --> 00:27:32,760 from the 2012 and 2014 bond. 484 00:27:32,760 --> 00:27:34,960 So we're pleased to announce that when 485 00:27:34,960 --> 00:27:39,120 you saw this chart at the last meeting, 486 00:27:39,120 --> 00:27:41,840 we were projecting to complete eight segments 487 00:27:41,840 --> 00:27:44,920 during the first quarter of 2021. 488 00:27:44,920 --> 00:27:47,280 Thanks to the excellent work of our project managers 489 00:27:47,280 --> 00:27:50,680 and our contractors, we've actually completed 11 segments. 490 00:27:50,680 --> 00:27:54,040 So just to kind of keep things clear for the remainder 491 00:27:54,040 --> 00:27:56,480 of the next two years-- and we are still 492 00:27:56,480 --> 00:27:59,040 projecting to complete all of the remaining segments 493 00:27:59,040 --> 00:28:02,520 by quarter four of calendar year 2022-- 494 00:28:02,520 --> 00:28:04,520 we're just going to keep the same numbers 495 00:28:04,520 --> 00:28:08,280 and just kind of show with color differentiations what's 496 00:28:08,280 --> 00:28:10,200 been completed and what's been remaining, 497 00:28:10,200 --> 00:28:13,040 just because I know it can get confusing trying to do the math 498 00:28:13,040 --> 00:28:14,920 and look from presentation to presentation 499 00:28:14,920 --> 00:28:18,880 to compare how many segments we have remaining. 500 00:28:18,880 --> 00:28:21,640 So a lot of exciting progress has been made. 501 00:28:21,640 --> 00:28:23,900 We've actually got one of our projects. 502 00:28:23,900 --> 00:28:25,280 We had a pre-construction meeting 503 00:28:25,280 --> 00:28:27,280 for what we're calling the outsource bundle that 504 00:28:27,280 --> 00:28:30,280 consists of 47 different segments. 505 00:28:30,280 --> 00:28:32,400 We had that earlier this week and had a community 506 00:28:32,400 --> 00:28:35,320 meeting on that project two weeks ago with our project 507 00:28:35,320 --> 00:28:37,040 manager, Dustin Draper. 508 00:28:37,040 --> 00:28:38,840 And then we've got a portion of what 509 00:28:38,840 --> 00:28:41,920 we're calling our 2020 bundle that's 510 00:28:41,920 --> 00:28:46,440 going to council on June 8 for consideration of the construction 511 00:28:46,440 --> 00:28:47,480 contract. 512 00:28:47,480 --> 00:28:50,960 And it will go into construction shortly thereafter. 513 00:28:50,960 --> 00:28:53,480 So other than that, there aren't a ton 514 00:28:53,480 --> 00:28:56,880 of updates other than we've got a lot of active construction. 515 00:28:56,880 --> 00:28:59,160 2019 Street Reconstruction Project 516 00:28:59,160 --> 00:29:04,560 is on track to complete in quarter four of 2021. 517 00:29:04,560 --> 00:29:07,440 And that does include Windsor Drive. 518 00:29:07,440 --> 00:29:10,880 And we do still have the note that there 519 00:29:10,880 --> 00:29:13,760 are seven segments that are being programmed 520 00:29:13,760 --> 00:29:16,600 as parts of other projects. 521 00:29:16,600 --> 00:29:19,000 Becky and I actually had a conversation yesterday 522 00:29:19,000 --> 00:29:19,880 with TextDOT. 523 00:29:19,880 --> 00:29:21,960 We should be getting some additional information 524 00:29:21,960 --> 00:29:25,120 from them very soon on Trinity Road 525 00:29:25,120 --> 00:29:28,120 and the timing of TextDOT's Trinity Bridge project 526 00:29:28,120 --> 00:29:31,080 because we're trying to sync those projects up. 527 00:29:31,080 --> 00:29:34,200 For Mulberry Street, which includes two segments, 528 00:29:34,200 --> 00:29:36,840 that's going to be a part of the Pecan Crate Tributary 529 00:29:36,840 --> 00:29:39,440 for phases three and four projects. 530 00:29:39,440 --> 00:29:43,080 We did submit a funding request as a part of our CIP budget 531 00:29:43,080 --> 00:29:45,800 request this year for additional funding 532 00:29:45,800 --> 00:29:47,320 to fully fund that project. 533 00:29:47,320 --> 00:29:49,000 So really, that timing is going to be 534 00:29:49,000 --> 00:29:52,000 dependent on identifying those drainage funds that we 535 00:29:52,000 --> 00:29:54,920 need to complete that project. 536 00:29:54,920 --> 00:29:58,000 On Westgate, we've got a community meeting coming up 537 00:29:58,000 --> 00:30:01,560 May 13 and then a presentation to city council 538 00:30:01,560 --> 00:30:04,320 through a work session on May 18 where 539 00:30:04,320 --> 00:30:07,160 we're going to be talking about the scope and some potential 540 00:30:07,160 --> 00:30:10,680 options to improve connectivity in the Westgate area 541 00:30:10,680 --> 00:30:14,960 in the broader context of Denton High School's new location, 542 00:30:14,960 --> 00:30:17,800 a significant amount of multifamily and single family 543 00:30:17,800 --> 00:30:20,320 residential that's going on in the area, 544 00:30:20,320 --> 00:30:23,120 plus the upcoming 35 widening project. 545 00:30:23,120 --> 00:30:26,200 So we've got a lot of good traction on that. 546 00:30:26,200 --> 00:30:27,880 Once we get some direction regarding 547 00:30:27,880 --> 00:30:30,680 what the scope of that project should entail, 548 00:30:30,680 --> 00:30:32,880 we'll begin budgeting accordingly 549 00:30:32,880 --> 00:30:35,640 and then develop a final design and ultimately go 550 00:30:35,640 --> 00:30:39,840 to construction on that project as well. 551 00:30:39,840 --> 00:30:43,760 So going through our 2014 bond Proposition 1 projects, 552 00:30:43,760 --> 00:30:46,480 I'm not going to go through every single project. 553 00:30:46,480 --> 00:30:49,000 I know you've seen this slide a couple of times. 554 00:30:49,000 --> 00:30:52,600 So all I'm going to do is highlight a few updates. 555 00:30:52,600 --> 00:30:55,440 Updates include-- we actually had a really productive 556 00:30:55,440 --> 00:30:55,960 meeting. 557 00:30:55,960 --> 00:30:58,400 Our project manager, Kyle Pedigo, 558 00:30:58,400 --> 00:31:01,480 met with Union Pacific Railroad, one of their consultants, 559 00:31:01,480 --> 00:31:04,120 Vinish, and Kimley Horn this morning. 560 00:31:04,120 --> 00:31:07,000 And it seems like we are still on track 561 00:31:07,000 --> 00:31:10,440 for completion of the downtown quiet zones 562 00:31:10,440 --> 00:31:13,600 by the end of calendar year 2021. 563 00:31:13,600 --> 00:31:16,320 There is, of course, the hang up that ultimately 564 00:31:16,320 --> 00:31:18,280 the activation of the quiet zones 565 00:31:18,280 --> 00:31:20,480 is on Union Pacific Railroad. 566 00:31:20,480 --> 00:31:23,160 But we did at least get some verbal confirmation 567 00:31:23,160 --> 00:31:25,960 that we're following all the steps that we need to follow. 568 00:31:25,960 --> 00:31:28,600 And that project is being delivered in concert 569 00:31:28,600 --> 00:31:30,840 with the downtown storm sewer project 570 00:31:30,840 --> 00:31:34,480 that project manager, Kyle Pedigo, is also delivering 571 00:31:34,480 --> 00:31:37,400 currently in the downtown area. 572 00:31:37,400 --> 00:31:40,520 New to this slide is the mingo quiet zones. 573 00:31:40,520 --> 00:31:43,840 And those are the quiet zones that kind of hug mingo road 574 00:31:43,840 --> 00:31:45,760 from fish trap to frame. 575 00:31:45,760 --> 00:31:47,800 I won't name every intersection. 576 00:31:47,800 --> 00:31:51,240 But city council recently approved a design contract 577 00:31:51,240 --> 00:31:55,840 with Bridge Farmer to design those intersections. 578 00:31:55,840 --> 00:31:58,840 And so once we've got the design in a firmer opinion 579 00:31:58,840 --> 00:32:00,920 and probable construction costs, we'll 580 00:32:00,920 --> 00:32:03,200 then look at what the remaining budget we have. 581 00:32:03,200 --> 00:32:09,240 I believe we had about $930,000 from the 2014 bond earmarked 582 00:32:09,240 --> 00:32:10,280 for that project. 583 00:32:10,280 --> 00:32:12,840 And so just knowing that it's been several years 584 00:32:12,840 --> 00:32:15,040 since that original estimate was developed, 585 00:32:15,040 --> 00:32:17,600 we most likely will need to identify additional funds. 586 00:32:17,600 --> 00:32:20,680 But we'll know for sure once we've got that design completed. 587 00:32:20,680 --> 00:32:24,040 But we are excited about that project getting delivered. 588 00:32:24,040 --> 00:32:27,440 And it's being delivered as part of the overall TWU area 589 00:32:27,440 --> 00:32:31,680 program that project manager Tracy Beck is managing. 590 00:32:31,680 --> 00:32:35,400 A part of that project is also the Rudel extension at mingo. 591 00:32:35,400 --> 00:32:38,600 So the same council meeting where city council approved 592 00:32:38,600 --> 00:32:42,440 the contract with Bridge Farmer for the mingo road quiet zones, 593 00:32:42,440 --> 00:32:45,880 they also approved a contract to go to 30% design 594 00:32:45,880 --> 00:32:47,520 for that project. 595 00:32:47,520 --> 00:32:51,520 And what we plan to do is later this calendar year 596 00:32:51,520 --> 00:32:55,800 have a presentation where we get feedback from bond committee, 597 00:32:55,800 --> 00:32:58,240 also get feedback from council on what 598 00:32:58,240 --> 00:33:01,880 the scope of the TWU area program should be. 599 00:33:01,880 --> 00:33:04,480 There are several projects that are bond funded, 600 00:33:04,480 --> 00:33:06,200 several projects that are also in need 601 00:33:06,200 --> 00:33:08,680 from an infrastructure project, and some projects that 602 00:33:08,680 --> 00:33:12,120 have been requested from a pedestrian safety perspective 603 00:33:12,120 --> 00:33:14,480 by Texas Women's University. 604 00:33:14,480 --> 00:33:16,360 And so we want to get some feedback on how 605 00:33:16,360 --> 00:33:19,800 we prioritize those projects and which ones we should look 606 00:33:19,800 --> 00:33:21,720 at funding and delivering first. 607 00:33:21,720 --> 00:33:24,320 They're definitely all needed and just need to figure out 608 00:33:24,320 --> 00:33:27,280 the best way to prioritize those projects. 609 00:33:27,280 --> 00:33:29,240 The only other thing I'll note on this slide 610 00:33:29,240 --> 00:33:31,560 is Becky and I've been having some really positive 611 00:33:31,560 --> 00:33:34,640 conversations with the cog with Denton County. 612 00:33:34,640 --> 00:33:38,000 So as we look at funding needs for the different remaining 613 00:33:38,000 --> 00:33:40,200 phases of Bonnie Bray, we're hopeful 614 00:33:40,200 --> 00:33:43,320 that as Denton County is preparing a potential bond 615 00:33:43,320 --> 00:33:46,280 program and as we're looking at some additional funding 616 00:33:46,280 --> 00:33:48,440 opportunities from the cog that we 617 00:33:48,440 --> 00:33:51,280 can use those funds to augment and ultimately complete 618 00:33:51,280 --> 00:33:54,240 Bonnie Bray as that is one of our top priority projects 619 00:33:54,240 --> 00:33:54,960 to get completed. 620 00:33:54,960 --> 00:34:04,920 So next, going into some of our proposition three projects, 621 00:34:04,920 --> 00:34:08,360 most noteworthy on this is we have removed Eagle Drive 622 00:34:08,360 --> 00:34:09,600 Drainage from the list. 623 00:34:09,600 --> 00:34:11,280 That is a completed project. 624 00:34:11,280 --> 00:34:14,440 And thanks to the work of our business services team, 625 00:34:14,440 --> 00:34:16,440 as well as the finance accounting team, 626 00:34:16,440 --> 00:34:19,160 we have closed that project out and actually used that 627 00:34:19,160 --> 00:34:22,400 as a model for closing out projects. 628 00:34:22,400 --> 00:34:24,320 It is a pretty complicated process 629 00:34:24,320 --> 00:34:27,200 to close out and ultimately capitalize a project. 630 00:34:27,200 --> 00:34:29,880 And so we've got an SOP in the works. 631 00:34:29,880 --> 00:34:31,400 And I'm delighted to say that we're 632 00:34:31,400 --> 00:34:33,280 going to have several more projects coming down 633 00:34:33,280 --> 00:34:36,360 the pipeline that we're going to be ready to close out very soon. 634 00:34:36,360 --> 00:34:37,760 So it's been great that we've been 635 00:34:37,760 --> 00:34:39,680 able to get that process documented just 636 00:34:39,680 --> 00:34:41,160 so that we know all the steps that we 637 00:34:41,160 --> 00:34:45,200 need to go through in order to properly close out projects. 638 00:34:45,200 --> 00:34:48,040 So just only other thing I'll note here, 639 00:34:48,040 --> 00:34:49,760 as I mentioned, downtown storm sewer, 640 00:34:49,760 --> 00:34:51,640 we're doing a lot of coordination with that. 641 00:34:51,640 --> 00:34:54,120 And the Quiet Zone project, and it 642 00:34:54,120 --> 00:34:58,240 is on track to be completed by quarter 3 of 2021. 643 00:34:58,240 --> 00:35:00,240 They're currently looking at potentially starting 644 00:35:00,240 --> 00:35:02,680 the punch list for closing out that project 645 00:35:02,680 --> 00:35:04,320 around the September time frame. 646 00:35:04,320 --> 00:35:09,360 So trying to be more like parks. 647 00:35:09,360 --> 00:35:12,360 You will notice in upcoming bond committee presentations 648 00:35:12,360 --> 00:35:15,440 that we're going to try to have more pictures and help you 649 00:35:15,440 --> 00:35:17,440 see the status of some of these projects 650 00:35:17,440 --> 00:35:19,840 rather than just showing you the boring Gantt chart 651 00:35:19,840 --> 00:35:21,360 that you've seen on previous slides. 652 00:35:21,360 --> 00:35:23,800 So this is our first step in that direction, 653 00:35:23,800 --> 00:35:26,400 and we're going to try to have the next presentation be even 654 00:35:26,400 --> 00:35:27,160 more engaging. 655 00:35:27,160 --> 00:35:29,840 We've talked maybe about videos, no promises at this point, 656 00:35:29,840 --> 00:35:31,280 but that is a potential. 657 00:35:31,280 --> 00:35:33,400 But just wanted to highlight some of those projects 658 00:35:33,400 --> 00:35:37,040 that we are nearing completion on right now. 659 00:35:37,040 --> 00:35:38,880 One of those is West Hickory Street. 660 00:35:38,880 --> 00:35:42,600 We're currently projecting a quarter 3 calendar year 2021 661 00:35:42,600 --> 00:35:44,040 completion date. 662 00:35:44,040 --> 00:35:46,920 Recently completed is the London Dairy Sidewalk, 663 00:35:46,920 --> 00:35:50,760 which is a part of the 2018 sidewalk improvements project. 664 00:35:50,760 --> 00:35:53,720 That was actually completed in April, 665 00:35:53,720 --> 00:35:56,520 and we've had a lot of feedback from residents, particularly 666 00:35:56,520 --> 00:35:59,040 those whose students walk to McMath Middle School, 667 00:35:59,040 --> 00:36:01,320 that that's really helped the safety for those students 668 00:36:01,320 --> 00:36:03,120 walking to school. 669 00:36:03,120 --> 00:36:06,200 I've already mentioned the 2019 Street Reconstruction Project 670 00:36:06,200 --> 00:36:08,800 Windsor Drive is a part of that project, 671 00:36:08,800 --> 00:36:12,960 and we are on track for a quarter 4 2021 completion date 672 00:36:12,960 --> 00:36:13,880 there. 673 00:36:13,880 --> 00:36:15,800 Hickory Creek Road, phase one, I'm 674 00:36:15,800 --> 00:36:18,880 going to call it all but complete at this point, 675 00:36:18,880 --> 00:36:22,840 but we will complete it this quarter, quarter 2 2021. 676 00:36:22,840 --> 00:36:26,040 And then we are doing some final punch list items on West 677 00:36:26,040 --> 00:36:28,400 Hercules right now, but that project 678 00:36:28,400 --> 00:36:32,480 is set to wrap up later this month. 679 00:36:32,480 --> 00:36:34,280 So hopefully we'll be able to come back to you 680 00:36:34,280 --> 00:36:36,680 with some big completed signs like Gary 681 00:36:36,680 --> 00:36:40,840 had during our next bond committee presentation. 682 00:36:40,840 --> 00:36:44,720 Couple of exciting updates on the 2019 bond program. 683 00:36:44,720 --> 00:36:48,040 So actually at the April 27th city council meeting, 684 00:36:48,040 --> 00:36:50,600 the city council approved construction contracts 685 00:36:50,600 --> 00:36:54,520 for what we're calling the MCFC and LOFT. 686 00:36:54,520 --> 00:36:57,800 That's our first two bid packages of the 2019 bond 687 00:36:57,800 --> 00:36:58,920 program. 688 00:36:58,920 --> 00:37:03,040 That was also our first project that we selected the contractor 689 00:37:03,040 --> 00:37:05,640 using competitive sealed proposals. 690 00:37:05,640 --> 00:37:08,160 We took that approach just so that it wasn't low bid. 691 00:37:08,160 --> 00:37:11,120 We were actually able to take in other factors, 692 00:37:11,120 --> 00:37:13,880 including the qualifications of the contractors, 693 00:37:13,880 --> 00:37:16,760 into account as we were selecting the contractors. 694 00:37:16,760 --> 00:37:19,880 So we are now under contract with SEMA. 695 00:37:19,880 --> 00:37:24,560 And these are what we're calling our early out packages. 696 00:37:24,560 --> 00:37:26,080 I'm knocking on wood as I say that, 697 00:37:26,080 --> 00:37:29,520 but they're relatively simple roadway construction projects 698 00:37:29,520 --> 00:37:31,560 that do not include any utilities. 699 00:37:31,560 --> 00:37:33,440 And so we're hopeful that we're going 700 00:37:33,440 --> 00:37:35,520 to be able to complete those projects by the end 701 00:37:35,520 --> 00:37:37,080 of the calendar year. 702 00:37:37,080 --> 00:37:39,840 And then work is currently underway 703 00:37:39,840 --> 00:37:43,480 for the design of the first phase of Southeast Denton. 704 00:37:43,480 --> 00:37:46,400 And so we plan to advertise that project. 705 00:37:46,400 --> 00:37:49,440 It's 22 segments of the Southeast Denton neighborhood, 706 00:37:49,440 --> 00:37:51,280 primarily roadway construction, but there 707 00:37:51,280 --> 00:37:52,920 will be some utilities. 708 00:37:52,920 --> 00:37:55,680 We're also looking at sidewalks and streetlights 709 00:37:55,680 --> 00:37:57,400 for those first 22 segments. 710 00:37:57,400 --> 00:38:00,160 So we're hoping to advertise by the end of the calendar year 711 00:38:00,160 --> 00:38:01,640 for that project. 712 00:38:01,640 --> 00:38:03,400 And then in concert with that, we've 713 00:38:03,400 --> 00:38:07,880 got phase B, or phase two, which includes 51 segments 714 00:38:07,880 --> 00:38:09,480 of the Southeast Denton neighborhood. 715 00:38:09,480 --> 00:38:12,600 We're looking at delivering those 51 segments 716 00:38:12,600 --> 00:38:15,360 using the construction manager at risk methodology. 717 00:38:15,360 --> 00:38:19,240 So the design contractor and the construction manager 718 00:38:19,240 --> 00:38:21,360 would be selected at the same time, 719 00:38:21,360 --> 00:38:24,040 so that the construction manager can provide feedback 720 00:38:24,040 --> 00:38:27,440 on constructability and give us a little more predictability 721 00:38:27,440 --> 00:38:28,720 in terms of price. 722 00:38:28,720 --> 00:38:30,840 And so we hope to have that advertised 723 00:38:30,840 --> 00:38:32,960 by the end of the calendar year as well. 724 00:38:32,960 --> 00:38:36,280 So a lot of really exciting traction 725 00:38:36,280 --> 00:38:38,040 in the Southeast Denton neighborhood. 726 00:38:38,040 --> 00:38:40,560 We plan on having another community meeting later 727 00:38:40,560 --> 00:38:41,640 this summer. 728 00:38:41,640 --> 00:38:44,400 And so we're really excited about the opportunity 729 00:38:44,400 --> 00:38:47,080 to use the construction manager at risk methodology, 730 00:38:47,080 --> 00:38:49,560 particularly for those 51 segments, 731 00:38:49,560 --> 00:38:53,560 just because it's going to require a lot of coordination 732 00:38:53,560 --> 00:38:56,360 and in a very tight geography. 733 00:38:56,360 --> 00:38:59,880 So having one contractor, one design firm 734 00:38:59,880 --> 00:39:01,960 will be really helpful for all the coordination 735 00:39:01,960 --> 00:39:06,120 with franchise utilities and other city departments, 736 00:39:06,120 --> 00:39:09,000 just to ensure that we're minimizing the impact 737 00:39:09,000 --> 00:39:11,240 to residents and getting them the highest quality 738 00:39:11,240 --> 00:39:14,600 infrastructure in the process. 739 00:39:14,600 --> 00:39:16,520 Bonnie Bray, phase six. 740 00:39:16,520 --> 00:39:19,520 Right now we're under right of way acquisition. 741 00:39:19,520 --> 00:39:21,240 We have several properties that we're still 742 00:39:21,240 --> 00:39:23,760 in negotiations with. 743 00:39:23,760 --> 00:39:24,840 We have regular meetings. 744 00:39:24,840 --> 00:39:26,760 We actually have one later today, I believe, 745 00:39:26,760 --> 00:39:28,680 with Denton Independent School District, 746 00:39:28,680 --> 00:39:30,360 kind of talking about this project, 747 00:39:30,360 --> 00:39:34,840 talking about the scope given the Denton High School Project. 748 00:39:34,840 --> 00:39:40,840 And so we are currently tracking for a 2023 completion 749 00:39:40,840 --> 00:39:43,480 date for Bonnie Bray phase six. 750 00:39:43,480 --> 00:39:46,920 The completion date is 100% dependent on that right 751 00:39:46,920 --> 00:39:48,880 of way acquisition right now. 752 00:39:48,880 --> 00:39:50,600 We do hope to be ready to go to bid 753 00:39:50,600 --> 00:39:52,000 by the end of this calendar year, 754 00:39:52,000 --> 00:39:55,680 hopefully this fall for the construction contract. 755 00:39:55,680 --> 00:39:58,120 But just want to note that we are doing everything 756 00:39:58,120 --> 00:40:01,600 in our power to get the portions of Bonnie Bray 757 00:40:01,600 --> 00:40:03,800 immediately adjacent to the new high school 758 00:40:03,800 --> 00:40:05,520 open as quickly as possible. 759 00:40:05,520 --> 00:40:08,400 And as a part of that May 13th Westgate meeting, 760 00:40:08,400 --> 00:40:10,800 we will also be talking with residents 761 00:40:10,800 --> 00:40:13,480 about the status of the Bonnie Bray phase six project, 762 00:40:13,480 --> 00:40:17,040 just because it's in such close proximity to the Westgate 763 00:40:17,040 --> 00:40:20,360 project and all of the connectivity kind of comes 764 00:40:20,360 --> 00:40:24,040 into play, particularly around the new high school. 765 00:40:24,040 --> 00:40:25,640 The last thing I'll note on this slide 766 00:40:25,640 --> 00:40:28,280 is right now we've got some schedule uncertainty 767 00:40:28,280 --> 00:40:32,200 for Ryan Road and Hickory Creek Road phase three. 768 00:40:32,200 --> 00:40:35,080 I know Becky's mentioned in a few previous presentations 769 00:40:35,080 --> 00:40:37,920 that we were getting $10 million from the COG 770 00:40:37,920 --> 00:40:39,920 to help fully fund that project. 771 00:40:39,920 --> 00:40:41,720 And that is the case. 772 00:40:41,720 --> 00:40:44,880 We actually submitted what's called a tip modification, 773 00:40:44,880 --> 00:40:48,000 just kind of formally earmarking that $10 million 774 00:40:48,000 --> 00:40:51,240 from the COG on April 23rd. 775 00:40:51,240 --> 00:40:55,200 But because of the funding source of that $10 million, 776 00:40:55,200 --> 00:40:57,000 there are some schedule impacts. 777 00:40:57,000 --> 00:41:00,800 And so knowing that both the portion of Hickory Creek Road 778 00:41:00,800 --> 00:41:05,160 phase three touches 1830 and Ryan Road 779 00:41:05,160 --> 00:41:09,680 will connect 2181 to 1830, we want to minimize impact 780 00:41:09,680 --> 00:41:12,920 and ensure there's that connectivity from 2181 781 00:41:12,920 --> 00:41:14,040 to 1830. 782 00:41:14,040 --> 00:41:15,680 And so we don't want both projects 783 00:41:15,680 --> 00:41:18,360 to be under construction at the same time. 784 00:41:18,360 --> 00:41:21,920 So we should know by the end of this month what truly 785 00:41:21,920 --> 00:41:24,560 the schedule impact is going to be of that additional $10 786 00:41:24,560 --> 00:41:27,320 million that we've gotten from the COG. 787 00:41:27,320 --> 00:41:30,880 And after we have that confirmation on schedule impact, 788 00:41:30,880 --> 00:41:33,240 we're working with the design firm, HDR, who's 789 00:41:33,240 --> 00:41:36,800 designing the Hickory Creek Road phase three project right now. 790 00:41:36,800 --> 00:41:40,400 We'll be able to determine, is Ryan Road going to go first, 791 00:41:40,400 --> 00:41:44,000 or is Hickory Creek Road phase three going to go first? 792 00:41:44,000 --> 00:41:45,800 And so by our next bond committee meeting, 793 00:41:45,800 --> 00:41:47,600 we'll be able to share that with you. 794 00:41:47,600 --> 00:41:49,680 But just wanted to be transparent right now 795 00:41:49,680 --> 00:41:51,720 that the dates that we have listed, 796 00:41:51,720 --> 00:41:53,720 there's just some uncertainty just because we're 797 00:41:53,720 --> 00:41:56,040 wanting to make sure we're coordinating those projects, 798 00:41:56,040 --> 00:41:58,680 minimizing impact to residents, and making sure 799 00:41:58,680 --> 00:42:01,120 that we're maximizing those outside dollars that we're 800 00:42:01,120 --> 00:42:05,320 getting from the COG. 801 00:42:05,320 --> 00:42:06,840 So really quickly, I'll talk about some 802 00:42:06,840 --> 00:42:09,080 of the exciting project management and process 803 00:42:09,080 --> 00:42:11,880 improvement updates we have going on. 804 00:42:11,880 --> 00:42:14,320 I've mentioned several community meetings already. 805 00:42:14,320 --> 00:42:16,840 I think this is the only week in May 806 00:42:16,840 --> 00:42:19,800 where we don't have a community meeting on a Thursday night. 807 00:42:19,800 --> 00:42:22,040 So if you're ever bored on a Thursday night, 808 00:42:22,040 --> 00:42:23,720 I can almost guarantee you we're going 809 00:42:23,720 --> 00:42:25,720 to be having a community meeting. 810 00:42:25,720 --> 00:42:27,760 We've got a kind of renewed emphasis 811 00:42:27,760 --> 00:42:29,920 in concert with our public affairs department 812 00:42:29,920 --> 00:42:32,640 to make sure that we're not just talking to residents 813 00:42:32,640 --> 00:42:34,320 as we're ready to go to construction, 814 00:42:34,320 --> 00:42:37,480 but that we're also talking to residents early on in the design 815 00:42:37,480 --> 00:42:41,080 process so that residents have an opportunity to impact it. 816 00:42:41,080 --> 00:42:43,480 Once we've already selected the construction contractor, 817 00:42:43,480 --> 00:42:46,080 well, yes, we could make change orders in the field. 818 00:42:46,080 --> 00:42:47,800 Those changes are much more complicated, 819 00:42:47,800 --> 00:42:48,880 much more expensive. 820 00:42:48,880 --> 00:42:50,800 And so we're really wanting to hear earlier 821 00:42:50,800 --> 00:42:55,080 on from the residents as these projects are getting mobilized 822 00:42:55,080 --> 00:42:58,000 what they'd like to see, concerns they may have, 823 00:42:58,000 --> 00:43:00,640 if there is some sequencing considerations 824 00:43:00,640 --> 00:43:03,360 that we need to make as we're scheduling these projects out. 825 00:43:03,360 --> 00:43:06,160 And so as I mentioned, if you're ever 826 00:43:06,160 --> 00:43:08,920 curious on a Thursday night what you're going to be doing, 827 00:43:08,920 --> 00:43:11,680 you're always welcome to join us at one of our virtual community 828 00:43:11,680 --> 00:43:12,800 meetings. 829 00:43:12,800 --> 00:43:15,760 We're also developing tools for improved coordination 830 00:43:15,760 --> 00:43:17,680 with our franchise utilities. 831 00:43:17,680 --> 00:43:20,920 Becky and I are having regular conversations with Atmos. 832 00:43:20,920 --> 00:43:23,160 We're looking at what we can do from a city resource 833 00:43:23,160 --> 00:43:25,400 perspective to improve those coordinations 834 00:43:25,400 --> 00:43:28,480 and have somebody in-house that can help kind of serve 835 00:43:28,480 --> 00:43:31,920 as the primary point of contact just so that Atmos knows truly 836 00:43:31,920 --> 00:43:33,720 what our priorities are. 837 00:43:33,720 --> 00:43:36,680 We're working on getting Atmos an updated list of all 838 00:43:36,680 --> 00:43:38,640 of our capital projects just so that they 839 00:43:38,640 --> 00:43:42,240 know what the current sequencing is because that sequencing is 840 00:43:42,240 --> 00:43:45,400 dynamic and so that they know who they should be contacting 841 00:43:45,400 --> 00:43:48,200 should they have questions. 842 00:43:48,200 --> 00:43:50,880 I've mentioned several times the construction manager at risk 843 00:43:50,880 --> 00:43:52,880 alternative delivery method in addition 844 00:43:52,880 --> 00:43:55,080 to the Southeast Denton neighborhood being delivered 845 00:43:55,080 --> 00:43:56,600 with construction manager at risk. 846 00:43:56,600 --> 00:43:59,800 We're also looking at Ryan Road being 847 00:43:59,800 --> 00:44:02,600 delivered with construction manager at risk. 848 00:44:02,600 --> 00:44:05,400 And we've got Frisa Nichols on contracts 849 00:44:05,400 --> 00:44:08,840 kind of serving as our primary consultant helping us navigate 850 00:44:08,840 --> 00:44:11,920 the development of the contract templates 851 00:44:11,920 --> 00:44:13,800 and then also getting staff trained 852 00:44:13,800 --> 00:44:16,360 on the nuances of the construction manager at risk 853 00:44:16,360 --> 00:44:20,000 methodology both from a contracting perspective 854 00:44:20,000 --> 00:44:22,720 as well as from a project delivery perspective. 855 00:44:22,720 --> 00:44:25,880 So we had a formal kickoff on February 1st. 856 00:44:25,880 --> 00:44:28,920 We had an internal training that several cross-departmental 857 00:44:28,920 --> 00:44:32,560 representatives attended on April 21st. 858 00:44:32,560 --> 00:44:35,040 And we're hopeful that within the month or so 859 00:44:35,040 --> 00:44:37,440 we're going to have that contract template finalized. 860 00:44:37,440 --> 00:44:39,800 And then as I mentioned, our plan right now 861 00:44:39,800 --> 00:44:43,600 is to advertise by the end of the calendar year 862 00:44:43,600 --> 00:44:47,160 for construction manager for the Southeast Denton phase 2 863 00:44:47,160 --> 00:44:47,920 project. 864 00:44:47,920 --> 00:44:49,880 So we're really excited about the progress 865 00:44:49,880 --> 00:44:51,600 that we're making there. 866 00:44:51,600 --> 00:44:53,960 And then depending on what we decide with Ryan Road, 867 00:44:53,960 --> 00:44:55,800 we'd be advertising for Ryan Road 868 00:44:55,800 --> 00:44:58,600 should we decide for it to go before Hickory Creek Road phase 869 00:44:58,600 --> 00:45:00,800 3 shortly thereafter. 870 00:45:00,800 --> 00:45:02,960 The other really exciting and important effort 871 00:45:02,960 --> 00:45:05,760 that we've got going on that I wanted to mention for bond 872 00:45:05,760 --> 00:45:08,920 committee is we've got an external review of our estimates 873 00:45:08,920 --> 00:45:09,960 at completion. 874 00:45:09,960 --> 00:45:12,640 And because some of these projects 875 00:45:12,640 --> 00:45:15,040 do have some shelf life to them, because we've 876 00:45:15,040 --> 00:45:17,400 got some new team members, we're wanting 877 00:45:17,400 --> 00:45:20,280 to make sure that we have a third party look at the cost. 878 00:45:20,280 --> 00:45:22,720 We know we've got some significant increases 879 00:45:22,720 --> 00:45:26,600 in materials that are projected and escalation, 880 00:45:26,600 --> 00:45:28,240 just given the economic conditions 881 00:45:28,240 --> 00:45:29,360 that we have right now. 882 00:45:29,360 --> 00:45:31,400 And so we're wanting to make sure that we're 883 00:45:31,400 --> 00:45:34,120 factoring in that escalation appropriately. 884 00:45:34,120 --> 00:45:36,720 And so that's something that our team is working closely 885 00:45:36,720 --> 00:45:39,160 with the finance team on, making sure 886 00:45:39,160 --> 00:45:42,480 that our estimates at completion are as accurate as possible. 887 00:45:42,480 --> 00:45:45,880 The firm that we've selected is not only reviewing our projects, 888 00:45:45,880 --> 00:45:48,920 they're also training our team on cost estimation best 889 00:45:48,920 --> 00:45:52,200 practices, and they're helping us develop templates 890 00:45:52,200 --> 00:45:54,360 that we can use for future projects 891 00:45:54,360 --> 00:45:56,240 so that we've got that in-house talent. 892 00:45:56,240 --> 00:45:58,360 But we do have them on call. 893 00:45:58,360 --> 00:46:00,640 And so we're trying to prioritize those projects, 894 00:46:00,640 --> 00:46:02,680 particularly those ones that are time sensitive 895 00:46:02,680 --> 00:46:06,040 without external funding first. 896 00:46:06,040 --> 00:46:09,320 And then we're working through the list of other projects 897 00:46:09,320 --> 00:46:11,000 that have not yet gone to construction 898 00:46:11,000 --> 00:46:13,760 just to make sure that we have adequate budgets 899 00:46:13,760 --> 00:46:18,080 for the full completion of those projects. 900 00:46:18,080 --> 00:46:20,840 And not listed on the slide, but just one other note, 901 00:46:20,840 --> 00:46:23,320 we are in the process of implementing our project 902 00:46:23,320 --> 00:46:26,160 management software system and hope 903 00:46:26,160 --> 00:46:28,560 to have that rolled out by the end of the calendar year 904 00:46:28,560 --> 00:46:29,080 as well. 905 00:46:29,080 --> 00:46:31,520 We're working with the finance department, 906 00:46:31,520 --> 00:46:34,040 working with our business services department, 907 00:46:34,040 --> 00:46:37,360 and several other utilities as well has been involved in that. 908 00:46:37,360 --> 00:46:38,760 And so that's really going to help 909 00:46:38,760 --> 00:46:42,560 us have a far more sophisticated way of keeping tabs 910 00:46:42,560 --> 00:46:45,520 on the status of our projects, having the financials 911 00:46:45,520 --> 00:46:47,320 available in the same location. 912 00:46:47,320 --> 00:46:49,640 And so we're really excited about that 913 00:46:49,640 --> 00:46:52,480 and hope to be able to show off that new tool to the bond 914 00:46:52,480 --> 00:46:53,840 committee at a future meeting. 915 00:46:53,840 --> 00:46:56,800 So with that, I'll stop talking and gladly answer 916 00:46:56,800 --> 00:46:58,080 any questions that you have. 917 00:46:58,080 --> 00:47:02,920 Thanks, Rachel. 918 00:47:02,920 --> 00:47:04,080 Great presentation. 919 00:47:04,080 --> 00:47:09,960 Did you say who is the cost estimating company you're using? 920 00:47:09,960 --> 00:47:11,600 Sure, it's OCMI. 921 00:47:11,600 --> 00:47:13,360 They also go by O'Connor. 922 00:47:13,360 --> 00:47:16,080 So they do have a Dallas office, but they're actually 923 00:47:16,080 --> 00:47:19,320 the firm that does a lot of the estimation for Las Vegas, 924 00:47:19,320 --> 00:47:23,040 Nevada, several large cities in California. 925 00:47:23,040 --> 00:47:24,840 And then they also do Henderson County. 926 00:47:24,840 --> 00:47:28,240 But they are an expanding presence in Texas as well. 927 00:47:28,240 --> 00:47:31,800 And they've been using local numbers and local cost 928 00:47:31,800 --> 00:47:34,280 estimates as they're preparing the estimates that they've 929 00:47:34,280 --> 00:47:34,840 done for us. 930 00:47:34,840 --> 00:47:37,160 We've been very impressed with the work that they've done. 931 00:47:37,160 --> 00:47:39,520 And they're actually very fast in their review process. 932 00:47:39,520 --> 00:47:44,680 I'm doing some construction projects right now. 933 00:47:44,680 --> 00:47:50,160 And I had to lock in steel prices just a month ago at risk 934 00:47:50,160 --> 00:47:54,480 because if I didn't, I'd have experienced a 20% increase. 935 00:47:54,480 --> 00:47:57,320 Is that something we're going to be concerned about in this bond 936 00:47:57,320 --> 00:48:01,480 program, especially for 2019, where we based it 937 00:48:01,480 --> 00:48:04,760 on these estimates, which we already have inflated, 938 00:48:04,760 --> 00:48:08,400 but those inflation factors are pretty much-- 939 00:48:08,400 --> 00:48:12,720 Yes, that's absolutely why we've got OCMI on board right now. 940 00:48:12,720 --> 00:48:15,800 And we're having to have those tough conversations internally 941 00:48:15,800 --> 00:48:21,320 right now around how much do we want to budget additionally. 942 00:48:21,320 --> 00:48:23,880 And then also talking about the sequencing of our projects. 943 00:48:23,880 --> 00:48:25,480 That's something that we're looking at, 944 00:48:25,480 --> 00:48:28,480 particularly as we look at Hickory Creek and Ryan Road. 945 00:48:28,480 --> 00:48:31,760 What's the cost of pausing one of those projects going to be? 946 00:48:31,760 --> 00:48:36,440 And we're looking at 5 and 1/2% potentially per year. 947 00:48:36,440 --> 00:48:39,480 And that's probably a conservative estimate. 948 00:48:39,480 --> 00:48:42,480 I'd say it's very conservative. 949 00:48:42,480 --> 00:48:46,440 Any other questions or comments for Rachel? 950 00:48:46,440 --> 00:48:48,280 Eric? 951 00:48:48,280 --> 00:48:53,280 Yeah, I guess more a comment/request for the future. 952 00:48:53,280 --> 00:48:55,680 I was trying to go through and figure out 953 00:48:55,680 --> 00:48:59,760 what the funding and process status was 954 00:48:59,760 --> 00:49:02,640 for each of the individual sections of Bonnie Bray. 955 00:49:02,640 --> 00:49:08,640 And it seems like the estimates versus the funding buckets 956 00:49:08,640 --> 00:49:11,560 combine different segments of that project. 957 00:49:11,560 --> 00:49:14,200 So it's very difficult for me to follow. 958 00:49:14,200 --> 00:49:15,280 Maybe it's just me. 959 00:49:15,280 --> 00:49:18,360 But I guess in the future, if we could just 960 00:49:18,360 --> 00:49:22,280 get sort of a more per segment breakdown instead 961 00:49:22,280 --> 00:49:25,880 of these lumps of this much money for phases five, six, 962 00:49:25,880 --> 00:49:30,120 and seven, and that sort of thing, that would help me. 963 00:49:30,120 --> 00:49:31,880 Sure, we can work on that. 964 00:49:31,880 --> 00:49:34,520 And that is a various to observation, Eric. 965 00:49:34,520 --> 00:49:36,640 And so that's something that we are working on. 966 00:49:36,640 --> 00:49:38,840 They are very commingled. 967 00:49:38,840 --> 00:49:40,840 But I think that's something that we can find a way 968 00:49:40,840 --> 00:49:42,880 to maybe more graphically represent 969 00:49:42,880 --> 00:49:45,920 the different funding buckets, the status of the funding, 970 00:49:45,920 --> 00:49:47,240 the status of the project. 971 00:49:47,240 --> 00:49:48,320 That's something we can certainly 972 00:49:48,320 --> 00:49:50,120 work with the project manager and the finance 973 00:49:50,120 --> 00:49:52,040 team on for next time. 974 00:49:52,040 --> 00:49:52,520 Thanks. 975 00:49:52,520 --> 00:49:58,320 Any other questions? 976 00:49:58,320 --> 00:50:01,880 OK, Cassie, back to you, ma'am. 977 00:50:01,880 --> 00:50:02,400 Thank you. 978 00:50:02,400 --> 00:50:04,440 So next up, we have Scott Gray here 979 00:50:04,440 --> 00:50:06,400 to talk about the facility projects. 980 00:50:09,440 --> 00:50:14,040 Just give him a minute to get up and running. 981 00:50:14,040 --> 00:50:24,360 Chair, members of the committee, good afternoon. 982 00:50:24,360 --> 00:50:27,040 Scott Gray, director of airport and facilities. 983 00:50:27,040 --> 00:50:29,480 And give me just a moment to pull up the presentation. 984 00:50:39,440 --> 00:50:39,940 OK. 985 00:50:39,940 --> 00:50:58,360 OK, just a couple of projects to update you on. 986 00:50:58,360 --> 00:51:00,760 Pleased to be back again to give you 987 00:51:00,760 --> 00:51:04,240 the good news on these projects. 988 00:51:04,240 --> 00:51:07,600 The first is the 2014 bond proposition number two, 989 00:51:07,600 --> 00:51:10,040 which included fire station number 990 00:51:10,040 --> 00:51:12,640 three, the construction of the new facility. 991 00:51:12,640 --> 00:51:14,960 Plus, as you can see there on the right, 992 00:51:14,960 --> 00:51:19,280 and then plus the demolition of the older facility 993 00:51:19,280 --> 00:51:21,640 and construction of the new one, which is the artist rendering 994 00:51:21,640 --> 00:51:23,280 at the bottom. 995 00:51:23,280 --> 00:51:27,280 Happy to inform the group that that station is complete. 996 00:51:27,280 --> 00:51:30,480 The fire folks have moved into the new building, 997 00:51:30,480 --> 00:51:34,240 are very excited about its layout and usability. 998 00:51:34,240 --> 00:51:35,600 So we're pleased with that. 999 00:51:35,600 --> 00:51:41,120 We have a few final items to complete on that project 1000 00:51:41,120 --> 00:51:42,600 to close it out. 1001 00:51:42,600 --> 00:51:44,480 So probably the next time I'm with you, 1002 00:51:44,480 --> 00:51:46,840 it will be the last report on that project 1003 00:51:46,840 --> 00:51:48,720 to finish this one off. 1004 00:51:48,720 --> 00:51:56,200 And lastly is the 2019 bond project, 1005 00:51:56,200 --> 00:51:58,520 which I believe I brought to you last month-- 1006 00:51:58,520 --> 00:52:00,560 or excuse me, the last meeting. 1007 00:52:00,560 --> 00:52:04,040 This was the project for the police headquarters, 1008 00:52:04,040 --> 00:52:07,040 the substation, and the firing range. 1009 00:52:07,040 --> 00:52:09,640 Obviously the headquarters in one location and the other two 1010 00:52:09,640 --> 00:52:13,120 are co-located off Vintage Drive. 1011 00:52:13,120 --> 00:52:14,640 The notice to proceed on that project 1012 00:52:14,640 --> 00:52:18,760 was January 15 of this year. 1013 00:52:18,760 --> 00:52:21,480 It is moving along fairly well. 1014 00:52:21,480 --> 00:52:25,320 A number of challenges, as is typical with what 1015 00:52:25,320 --> 00:52:27,000 is called a messy renovation, which 1016 00:52:27,000 --> 00:52:29,400 is the headquarters building. 1017 00:52:29,400 --> 00:52:32,440 But nothing that the team hasn't worked through. 1018 00:52:32,440 --> 00:52:35,040 At this point, the projections for completion 1019 00:52:35,040 --> 00:52:37,120 is still unchanged. 1020 00:52:37,120 --> 00:52:40,440 And the budget is still intact with all three 1021 00:52:40,440 --> 00:52:43,120 of these portions of the projects. 1022 00:52:43,120 --> 00:52:45,880 To date, there's been about $47.3 million 1023 00:52:45,880 --> 00:52:49,720 of GOCOs issued from a cash flow perspective 1024 00:52:49,720 --> 00:52:52,200 to get us through the end of this fiscal year. 1025 00:52:52,200 --> 00:52:54,840 And then finance will assist us with the rest of the funding 1026 00:52:54,840 --> 00:52:58,160 to complete our construction needs for all three 1027 00:52:58,160 --> 00:52:58,960 of these projects. 1028 00:52:58,960 --> 00:53:02,560 So very short and to the point with two 1029 00:53:02,560 --> 00:53:05,360 very exciting projects that we're happy to report on. 1030 00:53:05,360 --> 00:53:07,800 And I'll be happy to answer any questions you may have. 1031 00:53:07,800 --> 00:53:14,400 Thanks, Scott. 1032 00:53:14,400 --> 00:53:18,040 Any questions for Scott? 1033 00:53:18,040 --> 00:53:20,040 All right. 1034 00:53:20,040 --> 00:53:20,520 Thank you. 1035 00:53:20,520 --> 00:53:25,880 Cassie, back to you, ma'am. 1036 00:53:25,880 --> 00:53:28,440 That is all the presentations we have on that item. 1037 00:53:28,440 --> 00:53:33,200 So we can, if you want to, move on to item C. 1038 00:53:33,200 --> 00:53:33,960 Sure. 1039 00:53:33,960 --> 00:53:39,040 So item C, BOC 21-07, receive a report, hold a discussion, 1040 00:53:39,040 --> 00:53:41,840 give staff direction regarding the reallocation 1041 00:53:41,840 --> 00:53:45,720 of funds associated with the 2014 bond election. 1042 00:53:45,720 --> 00:53:48,240 And I'm going to pass it over to our assistant director 1043 00:53:48,240 --> 00:53:49,600 of finance, Nick Vincent. 1044 00:53:49,600 --> 00:53:52,280 He's going to do a short presentation for you. 1045 00:53:52,280 --> 00:53:56,000 And we'll ask for direction on the reallocation request. 1046 00:53:56,000 --> 00:53:57,280 Good afternoon, bond committee. 1047 00:53:57,280 --> 00:53:59,480 Let me get the presentation pulled up really quickly. 1048 00:53:59,480 --> 00:54:10,040 So we are in front of you today to seek approval 1049 00:54:10,040 --> 00:54:13,480 to reallocate some project dollars that were associated 1050 00:54:13,480 --> 00:54:16,800 with the 2014 bond proposition. 1051 00:54:16,800 --> 00:54:19,600 Originally, that proposition is approved by voters, 1052 00:54:19,600 --> 00:54:22,120 included a transportation facility. 1053 00:54:22,120 --> 00:54:25,440 Originally had a budget of $1.5 million. 1054 00:54:25,440 --> 00:54:27,800 This has come forward to the bond committee 1055 00:54:27,800 --> 00:54:32,400 in 2018 for reallocation based on where that money currently 1056 00:54:32,400 --> 00:54:36,000 resides, which is the 651 South Mayhill project. 1057 00:54:36,000 --> 00:54:38,240 Staff is requesting to reallocate that money 1058 00:54:38,240 --> 00:54:41,160 to another facility owned by the city, which 1059 00:54:41,160 --> 00:54:44,640 is the service center facility off of Rootdale. 1060 00:54:44,640 --> 00:54:47,240 So currently, the money we are requesting to reallocate 1061 00:54:47,240 --> 00:54:55,400 is $1,249,612.07. 1062 00:54:55,400 --> 00:54:56,960 That's it. 1063 00:54:56,960 --> 00:54:58,960 I'll answer any questions that you may have. 1064 00:54:58,960 --> 00:55:06,200 Any questions for Vincent? 1065 00:55:06,200 --> 00:55:07,560 Pull the screen down really quick. 1066 00:55:07,560 --> 00:55:15,760 All right. 1067 00:55:15,760 --> 00:55:18,040 Cassie, do we need a motion and a second on this? 1068 00:55:18,040 --> 00:55:19,880 Yes, we do need a vote on this one. 1069 00:55:19,880 --> 00:55:25,080 So I'll take a motion to approve the reallocation. 1070 00:55:25,080 --> 00:55:26,560 So I'll move. 1071 00:55:26,560 --> 00:55:27,760 Thank you, Janet. 1072 00:55:27,760 --> 00:55:28,600 I'll second. 1073 00:55:28,600 --> 00:55:32,840 Second. 1074 00:55:32,840 --> 00:55:33,360 Excuse me. 1075 00:55:33,360 --> 00:55:34,040 Second. 1076 00:55:34,040 --> 00:55:35,360 Thank you, Randy. 1077 00:55:35,360 --> 00:55:36,360 Any discussion? 1078 00:55:36,360 --> 00:55:44,840 Seeing not, all in favor of the motion as presented, 1079 00:55:44,840 --> 00:55:47,240 please signify by saying aye or raising your hand. 1080 00:55:47,240 --> 00:55:53,320 Janet, you good with that? 1081 00:55:53,320 --> 00:55:54,200 Aye. 1082 00:55:54,200 --> 00:55:55,240 OK. 1083 00:55:55,240 --> 00:55:55,960 Motion carries. 1084 00:55:55,960 --> 00:56:04,840 Moving on to the next agenda item, right, Cassie? 1085 00:56:04,840 --> 00:56:07,120 Yes. 1086 00:56:07,120 --> 00:56:11,600 DOC 21-008, receive a report, hold discussion, 1087 00:56:11,600 --> 00:56:15,720 provide information related to 2019 on the election street 1088 00:56:15,720 --> 00:56:19,480 improvements plan issuance schedule. 1089 00:56:19,480 --> 00:56:21,680 So I am going to present this item. 1090 00:56:21,680 --> 00:56:24,000 I have a very short presentation. 1091 00:56:24,000 --> 00:56:27,280 You already heard Rachel present on kind 1092 00:56:27,280 --> 00:56:32,160 of moving the sequence of the 2019 bond program segments 1093 00:56:32,160 --> 00:56:34,520 up, which is why we are asking-- 1094 00:56:34,520 --> 00:56:37,400 or we just wanted to give you an update of the bond timeline. 1095 00:56:37,400 --> 00:56:41,040 So let me share my screen, and we will get started. 1096 00:56:41,040 --> 00:56:51,960 So as Rachel mentioned, they have 1097 00:56:51,960 --> 00:56:56,680 begun on two different segments-- 1098 00:56:56,680 --> 00:57:02,120 well, not segments, the packages of the 2019 bond program. 1099 00:57:02,120 --> 00:57:04,120 The contracts were approved April 27, 1100 00:57:04,120 --> 00:57:07,720 and so they're estimated to begin construction 1101 00:57:07,720 --> 00:57:09,160 beginning in June. 1102 00:57:09,160 --> 00:57:13,720 And so with that, they're going to need additional funding. 1103 00:57:13,720 --> 00:57:18,840 We had planned to fund those projects next year, 1104 00:57:18,840 --> 00:57:21,320 but we will be funding them this year instead. 1105 00:57:21,320 --> 00:57:24,840 And then Hickory Creek Road, phase three. 1106 00:57:24,840 --> 00:57:28,840 So you heard her talk about the connection between Hickory 1107 00:57:28,840 --> 00:57:31,840 Creek and Ryan Road. 1108 00:57:31,840 --> 00:57:35,080 We're still waiting on the final review, 1109 00:57:35,080 --> 00:57:37,160 but we want to have the money just 1110 00:57:37,160 --> 00:57:40,640 in case this project needs to get kickstarted this year. 1111 00:57:40,640 --> 00:57:43,560 And so we adjusted the bond timeline accordingly. 1112 00:57:43,560 --> 00:57:50,880 And so you can see the top part of the slide 1113 00:57:50,880 --> 00:57:54,840 shows the original bond issuance timeline, 1114 00:57:54,840 --> 00:57:58,200 and the highlighted portions on the bottom show the adjustment. 1115 00:57:58,200 --> 00:58:04,040 Basically, we've moved up some funding from next year's bond 1116 00:58:04,040 --> 00:58:07,320 issuance to this year to be able to start some of those projects 1117 00:58:07,320 --> 00:58:10,640 earlier than what we initially planned. 1118 00:58:10,640 --> 00:58:14,680 And it's a total of $4.3 million is 1119 00:58:14,680 --> 00:58:18,920 what we moved up from next year, and that's $2.3 million 1120 00:58:18,920 --> 00:58:21,720 for the street reconstruction and $2 million 1121 00:58:21,720 --> 00:58:25,640 for Hickory Creek Road. 1122 00:58:25,640 --> 00:58:30,640 If we do go back to council for our bond parameters ordinance, 1123 00:58:30,640 --> 00:58:34,440 June 8th, and if we do have the information from TxDOT 1124 00:58:34,440 --> 00:58:36,760 at that time about Hickory Creek, 1125 00:58:36,760 --> 00:58:40,480 the final determination, we will adjust the timeline accordingly. 1126 00:58:40,480 --> 00:58:43,400 But this is our tentative plan as of right now. 1127 00:58:43,400 --> 00:58:45,400 So just wanted to give the committee an update. 1128 00:58:49,000 --> 00:58:52,120 OK, thank you. 1129 00:58:52,120 --> 00:58:55,880 All right, any other questions or comments for Cassie 1130 00:58:55,880 --> 00:58:57,400 or anyone else on the call? 1131 00:58:57,400 --> 00:59:03,920 All right, seeing none, I guess we can adjourn.