1 00:00:00,000 --> 00:00:09,760 It is nine o'clock on Monday April 26th we have a quorum so we'll call to order the Public 2 00:00:09,760 --> 00:00:17,860 Utilities Board of the City of Denton meeting to order the first item is public comments 3 00:00:17,860 --> 00:00:25,560 we did receive one public comment via email from Sherry Darby and according to our rules 4 00:00:25,560 --> 00:00:31,520 we don't actually read it but the Secretary will put it into the board minutes do we have 5 00:00:31,520 --> 00:00:38,320 anyone else waiting on the phone to make a comment this is Tyler Smith no you do not 6 00:00:38,320 --> 00:00:44,160 have any other public comments all right thank you and we'll go into the regular meeting 7 00:00:44,160 --> 00:00:51,280 which the first item is consent agenda does anybody wish to pull any items from A through 8 00:00:51,280 --> 00:01:02,400 G yes madam chairman I would like to remove item A from the consent agenda okay any other 9 00:01:02,400 --> 00:01:18,040 B anyone else all right do we have a motion to approve item C through G so moved second 10 00:01:18,040 --> 00:01:28,680 thank you all in favor say aye aye opposed item A so madam chairman members of the board 11 00:01:28,680 --> 00:01:33,200 we have Chris Campbell here from the water department Chris one of our superintendents 12 00:01:33,200 --> 00:01:37,440 he's going to walk through a short presentation and hopefully you know answer any questions 13 00:01:37,440 --> 00:01:43,440 that you have if not he'll give you time for a question answer if that Chris hey good morning 14 00:01:43,440 --> 00:01:48,600 everybody I'm gonna my name is Chris Campbell I'm the superintendent over capital projects 15 00:01:48,600 --> 00:02:06,400 for utilities and just bear with me here I'll share my screen okay I'm gonna walk us through 16 00:02:06,400 --> 00:02:14,480 a brief presentation over the Hickory Creek lift station change order number two request 17 00:02:14,480 --> 00:02:18,540 project overview and scope original scope was to construct a new wastewater lift station 18 00:02:18,540 --> 00:02:24,120 an effort to replace and decommission the existing Hickory Creek lift station we have 19 00:02:24,120 --> 00:02:29,600 had one change order for this project which was a monorail extension extension I'm sorry 20 00:02:29,600 --> 00:02:36,200 allowing more mobility when removing a pump from the lift station change order number 21 00:02:36,200 --> 00:02:41,960 two which is what we're here for today is improve a proposed bypass system by enhancing 22 00:02:41,960 --> 00:02:51,520 redundancy a few manhole upgrades as well as some what well improvements the valve adjustments 23 00:02:51,520 --> 00:02:57,240 schedule so our original schedule for this project was 270 days change order number one 24 00:02:57,240 --> 00:03:03,440 excuse me added 21 days to the contract and change order number two will add 154 days 25 00:03:03,440 --> 00:03:08,640 to the contract the new lift station is set to be online actually operating at the end 26 00:03:08,640 --> 00:03:16,360 of next month which is May here's a kind of a brief overview of our budget for the for 27 00:03:16,360 --> 00:03:21,920 the project original contract value you can see there we added change order number one 28 00:03:21,920 --> 00:03:27,360 and then change order number two is what we are bringing forth today with the project 29 00:03:27,360 --> 00:03:33,080 total is these change orders combined are less than five percent of the original contract 30 00:03:33,080 --> 00:03:40,520 value it's a recommendation consider recommending adoption of ordinance accepting the change 31 00:03:40,520 --> 00:03:44,080 order of construction for the Hickory Creek lift station with Raymar construction in the 32 00:03:44,080 --> 00:03:55,400 amount of 128 thousand 170 dollars and 68 cents and with that I'll open it up to questions 33 00:03:55,400 --> 00:04:03,040 any questions mr. Ryback go ahead yes thank you um I was curious about the scope as I 34 00:04:03,040 --> 00:04:14,640 looked at the exhibit for the information I noticed there were a number of changes valve 35 00:04:14,640 --> 00:04:23,440 reconfiguration manhole cast in place it just occurred to me that it was a little bit odd 36 00:04:23,440 --> 00:04:29,720 there were so many reconfigurations or modifications to the original design so I was wondering 37 00:04:29,720 --> 00:04:35,560 Chris if you could just tell us a little bit about how we got to the place where we are 38 00:04:35,560 --> 00:04:40,080 today where you're asking for the change order I'm not suggesting this is unreasonable I'm 39 00:04:40,080 --> 00:04:45,560 just curious how so many of these adjustments were made and we're just getting the change 40 00:04:45,560 --> 00:04:51,080 order now so if you could address that I'd be very grateful yes sir absolutely yeah and 41 00:04:51,080 --> 00:04:56,200 you're you're 100% correct there are quite a few changes with this change order including 42 00:04:56,200 --> 00:05:01,560 those valve adjustments manhole adjustments throughout conversation with the the wastewater 43 00:05:01,560 --> 00:05:06,240 superintendent the design engineer team on this project it's been brought to our attention 44 00:05:06,240 --> 00:05:13,160 that when this project was designed quite a few years ago we were not thinking holistically 45 00:05:13,160 --> 00:05:18,680 for the for the lift station site all the manholes that are involved actually the the 46 00:05:18,680 --> 00:05:24,520 actual material that we're using for the manholes the you know this one is it is actually a 47 00:05:24,520 --> 00:05:31,480 one-off fiberglass manhole or I'm sorry lift station so yes sir that quite a few things 48 00:05:31,480 --> 00:05:37,960 were put aside to try to save a few dollars that have been brought forth and we feel that 49 00:05:37,960 --> 00:05:43,640 with where we are with this project in the Hickory Creek Basin we feel it'd be imperative 50 00:05:43,640 --> 00:05:49,760 to to push forward and and provide the best product well I understand that I'm just curious 51 00:05:49,760 --> 00:05:56,080 you made the comment you were pushing said you were trying to make some value adjustments 52 00:05:56,080 --> 00:06:02,560 and yet the contract value has gone up so again just curious how we got to this place 53 00:06:02,560 --> 00:06:07,080 I see there's some other questions so I'll let you answer let some other folks get a 54 00:06:07,080 --> 00:06:15,680 word in edgewise thank you thank you okay Billy go ahead thank you madam chair that 55 00:06:15,680 --> 00:06:21,960 being said you have a hundred and twenty eight thousand dollar change order on this portion 56 00:06:21,960 --> 00:06:26,960 but you're adding a hundred and fifty four days that seems a little disproportionate 57 00:06:26,960 --> 00:06:31,440 days versus dollar amount it should I mean for 154 days if you would think you'd be a 58 00:06:31,440 --> 00:06:37,640 half a million dollars into it really easy yes sir I could speak to that briefly and 59 00:06:37,640 --> 00:06:42,360 really I think where we're gonna have add more days is the bypass for this we've we've 60 00:06:42,360 --> 00:06:47,200 asked them because of lessons learned on some other lift station projects to change their 61 00:06:47,200 --> 00:06:52,640 means and methods with the bypass this is one of the largest stations in the wastewater 62 00:06:52,640 --> 00:06:59,700 system and their initial bypass was very similar to another project on Teasley and we felt 63 00:06:59,700 --> 00:07:05,320 that it was important to change their means and methods with the bypass shifting how they're 64 00:07:05,320 --> 00:07:11,020 going to go about performing the bypass adding a few additional taps so that's a big portion 65 00:07:11,020 --> 00:07:19,360 of it along with the manhole changes you know we change one of the manholes for example 66 00:07:19,360 --> 00:07:26,800 we changed to a polymer manhole to better improve corrosion resistance of the manhole 67 00:07:26,800 --> 00:07:32,880 which will improve of course the longevity of the manhole so is this more of a float 68 00:07:32,880 --> 00:07:39,080 in the schedule than it is actual work being performed for the days extended I believe 69 00:07:39,080 --> 00:07:45,500 so like we're waiting on redesign instead of actually out there doing work is that correct 70 00:07:45,500 --> 00:07:52,600 we have added design days in there the design has been completed now and as far as the bypass 71 00:07:52,600 --> 00:07:59,080 is concerned is along with the manholes as well so all the design has been completed 72 00:07:59,080 --> 00:08:05,440 and now now we've just got to perform the actual work pretend did you have a comment 73 00:08:05,440 --> 00:08:11,380 to make or I saw you brought your hand down yeah actually Chris touched on it good morning 74 00:08:11,380 --> 00:08:18,080 this pretendation deputy director water wastewater Chris did touch on the lessons learned I think 75 00:08:18,080 --> 00:08:24,260 one of the critical things that we've learned in the past few months just dealing with some 76 00:08:24,260 --> 00:08:32,760 other bypass issues is that we in moving forward we need to include the by actual bypass in 77 00:08:32,760 --> 00:08:39,280 our design so that we can define when things happen what happens because in the past we've 78 00:08:39,280 --> 00:08:45,780 left the contractor to define it and put it in place and just learning from what we know 79 00:08:45,780 --> 00:08:53,280 with what happened at easily with text on contractor we we had several days and weeks 80 00:08:53,280 --> 00:08:59,160 of our staff trying to figure things out and remedy it at the last minute instead of that 81 00:08:59,160 --> 00:09:04,120 we went back this one we really redesigned it and that's why this additional cost is 82 00:09:04,120 --> 00:09:12,200 to make sure that we have ample amount of redundancy in the system so that the overflows 83 00:09:12,200 --> 00:09:19,520 the fails never happen okay mr. Ryback you have another question yes I was just curious 84 00:09:19,520 --> 00:09:27,000 you have mentioned redesign and the dollar amount you're asking for is for construction 85 00:09:27,000 --> 00:09:34,560 is there also a design amount is there a designer a separate consultant civil engineer involved 86 00:09:34,560 --> 00:09:40,200 so will there be another change order for them as well there is a design consultant 87 00:09:40,200 --> 00:09:44,760 Hayes and Sawyer that's part of this project and we've actually brought their change order 88 00:09:44,760 --> 00:09:48,880 forth pre term actually presented that change order I don't remember the exact date but 89 00:09:48,880 --> 00:09:54,500 we have brought that for to PB and council okay so that's already been approved yes sir 90 00:09:54,500 --> 00:10:02,600 okay very good thank you thank you any other questions do we have a motion to approve item 91 00:10:02,600 --> 00:10:13,960 A so moved thank you in a second oh Barbara's seconding all in favor say aye opposed motion 92 00:10:13,960 --> 00:10:23,680 carries item B Barbara I just have a question I understand that we're we're going to deny 93 00:10:23,680 --> 00:10:33,040 that but tell me what a utility scale what utility scale solar energy is yes ma'am we 94 00:10:33,040 --> 00:10:39,600 have a think Terry Nolte's on on the line he can he can respond to that Terry yes good 95 00:10:39,600 --> 00:10:51,560 morning chairman chair Parker and members the PUB Terry Nolte assistant GM at DME so utility 96 00:10:51,560 --> 00:10:58,260 scale solar it would be anything larger than a megawatt in size and as you're probably 97 00:10:58,260 --> 00:11:06,400 aware we have a number of contracts out there that are in excess of 75 megawatts of solar 98 00:11:06,400 --> 00:11:17,120 capacity this was actually an RFP that we issued in late 2019 with COVID we had a number 99 00:11:17,120 --> 00:11:25,520 of discussions with potential bidders we narrowed it to two bidders and we went back to with 100 00:11:25,520 --> 00:11:35,400 our with our detailed contract the selected bidder delayed the start date for another 101 00:11:35,400 --> 00:11:45,340 year and increased their price and so we are rejecting this RFP or this bid and closing 102 00:11:45,340 --> 00:11:53,040 out this procurement because it's no longer the most cost effective incremental piece 103 00:11:53,040 --> 00:12:03,040 of solar generation for our portfolio we've also miss Russell we've also kind of changed 104 00:12:03,040 --> 00:12:11,480 our strategy a little bit as a result of the winter storm and we're going to be optimizing 105 00:12:11,480 --> 00:12:17,560 several of our renewable energy contracts to try to make them more rateable and dependable 106 00:12:17,560 --> 00:12:33,880 you're on mute Susan and jumper mr. jumper go ahead yeah thank you so to kind of follow 107 00:12:33,880 --> 00:12:41,760 up that Terry's does that mean we're not like looking for other options at this point 108 00:12:41,760 --> 00:12:48,840 where instead what you just said kind of trying to leverage our current contracts yes sir 109 00:12:48,840 --> 00:12:56,280 mr. jumper we will be trying to optimize the existing contracts we will more than likely 110 00:12:56,280 --> 00:13:05,720 later this year issue a new RFP for some form of renewable whether it's coastal wind or 111 00:13:05,720 --> 00:13:11,840 additional solar at this point our portfolio is pretty full up in terms of our ability 112 00:13:11,840 --> 00:13:17,160 to meet our hundred percent renewable objectives with the contracts that we currently have 113 00:13:17,160 --> 00:13:27,900 in place so unless we see a significant uptick in in demand load growth within the system 114 00:13:27,900 --> 00:13:35,700 we should be in pretty good shape for at least another year and a half or two years other 115 00:13:35,700 --> 00:13:48,460 questions do we have a motion to approve mr. Russell proved second Karen to Vinnie all 116 00:13:48,460 --> 00:13:58,200 in favor say aye aye carried next is consider the approval of the April 12 2021 minutes 117 00:13:58,200 --> 00:14:10,560 does anyone have any changes seeing none do we have a motion to approve the minutes mr. 118 00:14:10,560 --> 00:14:19,500 cheek moved approval mr. Russell seconded all in favor say aye aye opposed okay next 119 00:14:19,500 --> 00:14:24,720 is management reports madam chair and members of the pub so we have a couple items for you 120 00:14:24,720 --> 00:14:32,480 the first item is a contract extension notification this is a change in our lock box with Wells 121 00:14:32,480 --> 00:14:37,720 Fargo I don't know if if Krista or Ryan are on the phone but if anyone has any questions 122 00:14:37,720 --> 00:14:44,640 we'll be happy to answer any questions regarding that item is the board member have a question 123 00:14:44,640 --> 00:14:53,280 all right okay the the next item is just a follow-up memo regarding the minutes I know 124 00:14:53,280 --> 00:14:57,520 we had previously sent a memo to the PB but there were still some additional questions 125 00:14:57,520 --> 00:15:03,400 and just want to see if if I'm if the memo that I sent you made made the item clear for 126 00:15:03,400 --> 00:15:07,720 you I know that recently the council adopted a new boarding commission handbook and that 127 00:15:07,720 --> 00:15:12,080 should have that should have gone to you already and if it hasn't please let me know and I'm 128 00:15:12,080 --> 00:15:16,340 happy to send that to you but I think the bottom line is that the minutes are the official 129 00:15:16,340 --> 00:15:22,660 record of of the city and and they are in in the format that's dictated by the city 130 00:15:22,660 --> 00:15:26,840 secretary's office to the city council and so it's not those minutes are not intended 131 00:15:26,840 --> 00:15:31,960 to be verbatim and so it just gives you kind of a sense of what the agenda item was what 132 00:15:31,960 --> 00:15:37,040 the vote was and then obviously then the video becomes kind of the the detailed record of 133 00:15:37,040 --> 00:15:41,520 what the discussion was but again I hope that was clear for you if not I'll be happy to 134 00:15:41,520 --> 00:15:50,520 answer any questions on that item go ahead um thanks Tony so the the letter that was 135 00:15:50,520 --> 00:15:55,620 in our item details for the agenda item didn't have the attachment which was the memo I wonder 136 00:15:55,620 --> 00:16:00,400 if you could resend that I mean it probably is redundant but I've never I haven't seen 137 00:16:00,400 --> 00:16:07,400 the actual memo yet okay yeah we we can get that back out to you okay yes ma'am thanks 138 00:16:07,400 --> 00:16:16,040 okay um the next item is on um before we move on madam chairman I have a question oh I'm 139 00:16:16,040 --> 00:16:23,600 sorry I didn't see you sorry okay uh Tony I was curious um these recordings are the 140 00:16:23,600 --> 00:16:30,880 actual verbatim um minutes if you will of our meetings how long are those retained um 141 00:16:30,880 --> 00:16:35,400 my understanding is they were they're retained indefinitely okay so there's no like in a 142 00:16:35,400 --> 00:16:41,920 year or two they expire and are deleted correct that's that's again my understanding uh Katherine 143 00:16:41,920 --> 00:16:46,760 I don't know if if you know any different um now if there's a change in the state retention 144 00:16:46,760 --> 00:16:52,880 guidelines and that may have they certainly have an impact on on the retention of those 145 00:16:52,880 --> 00:16:57,760 I'm just curious because video takes a lot of memory and if you're recording all of these 146 00:16:57,760 --> 00:17:04,680 various and sundry uh board meetings in addition to city council and so forth um I don't assume 147 00:17:04,680 --> 00:17:08,400 the IT folks will eventually want to get rid of it so I was just curious if there was a 148 00:17:08,400 --> 00:17:16,880 time frame um yeah no no time frame that I'm aware of okay thank you yes sir all right 149 00:17:16,880 --> 00:17:23,240 I think now we can move on okay so for uh future agenda items um obviously today we'll 150 00:17:23,240 --> 00:17:27,280 we'll be having discussion with you with our finance team on on budget priorities again 151 00:17:27,280 --> 00:17:32,000 that was a um a request that we had gotten in a meeting with the chair and the vice chair 152 00:17:32,000 --> 00:17:37,440 and city management team and so we hope you find that discussion um good for you and and 153 00:17:37,440 --> 00:17:41,840 certainly we're looking forward to to your thoughts on on the budget going forward and 154 00:17:41,840 --> 00:17:46,320 then um after that there'll be a number of discussions that will be coming to you related 155 00:17:46,320 --> 00:17:54,000 to the utility rates and budgets uh in conjunction with the you know 21 22 uh fiscal year um and 156 00:17:54,000 --> 00:18:00,480 just especially for those that are new um that budget is due to the council on july 31st 157 00:18:00,480 --> 00:18:06,080 right and so uh usually right after the first part of the first week in august is when the 158 00:18:06,080 --> 00:18:10,240 the proposed budget is presented to the city council and obviously that'll come with the 159 00:18:10,240 --> 00:18:15,360 recommendations from the pub so that's that's kind of the end the end game for for the pub 160 00:18:15,360 --> 00:18:20,160 as we're trying to get get to that deadline and and uh and certainly we'll be coming to you and 161 00:18:20,160 --> 00:18:27,360 and and seeking your direction on on rates and the proposed budgets uh and capital budgets um uh for 162 00:18:27,360 --> 00:18:34,800 for fiscal year 21 22 so uh with that if there's any any other item that that you want to see on the 163 00:18:34,800 --> 00:18:39,280 on the future agendas or if any questions on these items i'll be happy to answer any questions on that 164 00:18:39,280 --> 00:18:48,880 any questions um madam chairwoman i have a question sorry barbara i was just curious so 165 00:18:48,880 --> 00:18:55,920 this uh budget will we be having some kind of uh work review session to go over the budget in more 166 00:18:55,920 --> 00:19:02,960 detail yes sir um you'll you'll get you'll get um line item budgets you get very detailed um 167 00:19:03,600 --> 00:19:08,880 information on each of the utilities budgets and rates um and they'll be coming to you um here 168 00:19:08,880 --> 00:19:15,040 pretty quick okay so in the next month and a half or two months we'll be seeing those then yes sir 169 00:19:15,040 --> 00:19:21,200 so so don't plan on any vacations um you're ours for the next two months well thanks for the heads 170 00:19:21,200 --> 00:19:33,040 up thank you madam chairman um miss rascal did you have a question yes yes barbara has a question 171 00:19:33,040 --> 00:19:40,560 barbara you like barbara better i do too yes i did um you said something about a handbook or 172 00:19:40,560 --> 00:19:46,240 something we should have gotten or we got how how would that have been received i don't recall 173 00:19:46,240 --> 00:19:52,240 seeing it it should have it should have been an email to you uh barbara um it was the handbook 174 00:19:52,240 --> 00:19:56,560 on for the boards and commissions uh the council did make some updates to that and it should have 175 00:19:56,560 --> 00:20:03,600 been emailed to you uh i think on friday came from rosa rios yes from rosa rio she's the city 176 00:20:03,600 --> 00:20:10,480 secretary correct so if you didn't get that give me a call or send me an email and we'll get that 177 00:20:10,480 --> 00:20:21,440 back out to you okay okay so the the last item is the uh just the new business items um you know 178 00:20:21,440 --> 00:20:27,200 we've obviously worked through uh the listing that we had uh we still have a pending item from solid 179 00:20:27,200 --> 00:20:34,240 waste that'll be coming to you uh here pretty quick um and then um you know the uh there was a 180 00:20:34,240 --> 00:20:40,960 question um this was a question that originally came from from mr soph and uh we think that um as 181 00:20:40,960 --> 00:20:46,640 part of the budget we'll be able to to try to address that question um and then finally you know 182 00:20:46,640 --> 00:20:50,960 the the question on the minutes and that was that was resolved today and karen i'll make sure we'll 183 00:20:50,960 --> 00:20:57,120 get that memo and attachment to you um before the end of the day so if there's any other uh items 184 00:20:57,120 --> 00:21:02,400 that you'd like to add to this list we're happy to um to hear you guys out that's all i have miss 185 00:21:02,400 --> 00:21:13,200 miss parker okay i'd like to uh see what the routine is for replacing water meters and uh are 186 00:21:13,200 --> 00:21:19,520 we mostly now when we replace an electric meter we're going to the smart meters uh just i know 187 00:21:19,520 --> 00:21:27,360 there's a regular time limit that you have for replacing water meters in the city and and and 188 00:21:27,360 --> 00:21:35,600 how far are we along in replacing the electric meters with smart meters if we could know about 189 00:21:35,600 --> 00:21:41,200 that next time yeah that's that's that's a good question um yeah we can certainly uh come back 190 00:21:41,200 --> 00:21:47,280 and and provide you some more context that where we are currently um going through a study on 191 00:21:47,280 --> 00:21:52,000 looking at um automating our water meters and certainly uh their replacement schedule which is 192 00:21:52,000 --> 00:21:56,720 about a 10-year replacement schedule will be part of that analysis uh certainly there'll be a 193 00:21:56,720 --> 00:22:02,960 financial impact but we can certainly get that to you uh that study will also look um at our am 194 00:22:02,960 --> 00:22:09,920 current ami system for for electric um and um i can tell you we currently have about a dozen 195 00:22:10,800 --> 00:22:17,280 non ami meters out there on the electric side um and and those folks are just um you know folks 196 00:22:17,280 --> 00:22:22,560 that still not comfortable with as as those residents um vacate then we did we are planning 197 00:22:22,560 --> 00:22:28,320 us to convert those uh to ami uh but um but that analysis that we're doing on the water side will 198 00:22:28,320 --> 00:22:33,920 also encompass uh the electric side and so once that study um is ready we'll we'll be able to 199 00:22:33,920 --> 00:22:38,720 respond to and provide you the context that you need as barbara if that's okay with you thank you 200 00:22:38,720 --> 00:22:48,480 very much yes ma'am okay then we'll move on to the work session so the first item is to receive 201 00:22:48,480 --> 00:22:54,160 a report hold a discussion and give staff direction regarding solid waste department 202 00:22:54,160 --> 00:22:58,720 services assistance program formerly known as porch collections program 203 00:23:01,840 --> 00:23:08,480 so uh we have um eugene mckinney um he's um he's coming up right now and and get settled in the 204 00:23:08,480 --> 00:23:22,720 staff computer and and get his presentation up so morning everyone hey eugene 205 00:23:31,840 --> 00:23:34,720 mckinney 206 00:24:02,400 --> 00:24:04,720 oh 207 00:24:31,840 --> 00:24:34,720 so 208 00:24:34,720 --> 00:24:50,720 we're almost there just give us one more second eugene likes to make a grand entrance 209 00:24:50,720 --> 00:25:00,480 well you could have always given us the standby due to technical difficulties that would have 210 00:25:00,480 --> 00:25:17,520 been a good one i wish i could but no it's just eugene 211 00:25:30,480 --> 00:25:39,520 so 212 00:26:00,480 --> 00:26:09,520 so 213 00:26:30,480 --> 00:26:39,520 so 214 00:27:00,480 --> 00:27:09,520 so 215 00:27:30,480 --> 00:27:39,520 so 216 00:27:39,520 --> 00:27:53,520 we're almost there there he is 217 00:28:00,640 --> 00:28:09,520 so 218 00:28:09,520 --> 00:28:23,520 okay presentation yeah but i think you 219 00:28:29,920 --> 00:28:32,720 not sure okay sure 220 00:28:32,720 --> 00:28:40,640 i think we're ready sorry for the delays 221 00:28:40,640 --> 00:28:53,120 so good morning sorry for the delays 222 00:28:56,320 --> 00:29:04,160 madam chairwoman morning board members and everyone in attendance my name is eugene mckinney i'm the 223 00:29:04,160 --> 00:29:10,400 deputy director with solid waste and recycling department and i'm here this morning to talk about 224 00:29:10,400 --> 00:29:17,360 our porch collection program as well as some improvements where are we are suggesting 225 00:29:17,360 --> 00:29:23,760 so what is our porch collection program it's a program that allows 226 00:29:24,480 --> 00:29:33,120 our customers assistance with getting their carts to the curb on their collection day how does it work 227 00:29:33,120 --> 00:29:41,440 the customer contacts customer service requesting the service customer service 228 00:29:41,440 --> 00:29:48,080 contact solid waste typically a field service supervisor or crew leader goes out to the location 229 00:29:48,800 --> 00:29:55,840 they approve the service they locate the container and they communicate that back to the operator 230 00:29:55,840 --> 00:30:05,120 at that time a yellow lid is placed on the bin on the service day the driver operator identifies 231 00:30:05,120 --> 00:30:14,160 the bin visually at that time once it's identified the cart is serviced manually the driver typically 232 00:30:14,160 --> 00:30:18,720 gets out of the vehicle goes and gets the can brings it back to the truck tips it with an 233 00:30:18,720 --> 00:30:26,080 automated arm and that collection is complete so here's what our drivers see they see when they 234 00:30:26,080 --> 00:30:32,080 pull up they see a container with the yellow lid what we'd like to do and we'd like to rebrand 235 00:30:32,080 --> 00:30:40,400 the program and move away from porch collection to service assistance program this will do a few 236 00:30:40,400 --> 00:30:45,760 things for us it'll increase customer privacy by removing those green lids out of the community 237 00:30:45,760 --> 00:30:53,520 that way everyone will have a standard color lid it strengthens by installing an application process 238 00:30:53,520 --> 00:31:00,240 it increases our application process to ensure eligibility it allows for an auditing of records 239 00:31:00,240 --> 00:31:07,440 that way everything is stored electronically we'll run this program through our Rubicon system 240 00:31:07,440 --> 00:31:13,280 decrease in administrative time the times that we actually touch paperwork you'll see here an 241 00:31:13,280 --> 00:31:19,520 application this application will work through customer service and customer service will work 242 00:31:19,520 --> 00:31:27,120 closely with us as far as the paperwork and notifying so part a of this application is the 243 00:31:27,120 --> 00:31:33,360 customer's information part b is the doctor the physician importantly more importantly part b 244 00:31:34,160 --> 00:31:41,440 where the doctor determines if this eligibility is permanent or temporary part c is more terms and 245 00:31:41,440 --> 00:31:47,200 conditions of the program we put a lot of emphasis on the customer changing locations 246 00:31:47,200 --> 00:31:53,520 because we don't have a process in place now where if they go online and do it electronically 247 00:31:53,520 --> 00:31:57,760 the system may not notify this system may not identify that they're a porch collection 248 00:31:57,760 --> 00:32:03,600 uh customer and they may some service gaps may happen so if when the customer calls and lets 249 00:32:03,600 --> 00:32:08,640 customer service know they're moving they'll let solid waste know immediately and we'll take care 250 00:32:08,640 --> 00:32:15,680 of the change again our recommendations we want to rename the program from solids to solid waste 251 00:32:15,680 --> 00:32:21,120 services citizens program we want to update a application process to require adopters validation 252 00:32:21,120 --> 00:32:27,600 for eligibility currently our departmental leaders crew leader supervisor going out and they're just 253 00:32:27,600 --> 00:32:32,720 determining where the container should sit there's no eligibility to really determine in this process 254 00:32:32,720 --> 00:32:37,120 in the current process all the other layers will be removed so we'll have a uniform color list 255 00:32:37,120 --> 00:32:42,800 throughout the community as well the most important thing will allow our new rubicon smart city 256 00:32:42,800 --> 00:32:48,320 application to alert our operators when they come up on the stop so what you'll see is what the 257 00:32:48,320 --> 00:32:53,120 driver's operators will see on their screen when they approach one of these stops they'll see the 258 00:32:53,120 --> 00:32:59,040 customer's name and address which we have blotted out here as well there'll be an ambient alert 259 00:32:59,040 --> 00:33:04,640 100 to 150 feet away from the house so when they start approaching the house there'll be an alert 260 00:33:04,640 --> 00:33:10,080 that alert is going to stay on until that customer is serviced and is manually turned off 261 00:33:10,080 --> 00:33:16,080 so again no more yellow lives it's an ambient alarm plus the the operator is visually alerted 262 00:33:16,080 --> 00:33:17,840 when we come across one of these stops 263 00:33:17,840 --> 00:33:23,520 questions comments your feedback is welcome 264 00:33:24,880 --> 00:33:38,400 questions yes lee go ahead oh thank you ma'am uh i'm curious um the program previously had 265 00:33:38,400 --> 00:33:44,960 uh no requirement for identification that the person had an issue with getting their 266 00:33:44,960 --> 00:33:50,480 can to the curb did i understand that correctly yes yes sir you are you are correct there was 267 00:33:50,480 --> 00:33:56,000 just a phone call and the representative went out and basically determined where the container 268 00:33:56,000 --> 00:34:01,600 should sit but there was no eligibility who should who should receive and the most important one of 269 00:34:01,600 --> 00:34:06,400 the most important uh facets of this new our recommendation is we want to take that out of 270 00:34:06,400 --> 00:34:13,440 our hands determining eligibility okay well you're still determining eligibility but just based on 271 00:34:13,440 --> 00:34:18,480 some criteria from the third party correct yes it'll be their doctor their physician 272 00:34:19,040 --> 00:34:23,760 determining eligibility based on their medical conditions what if they're just 273 00:34:23,760 --> 00:34:31,600 pretty much elderly you know 90 years old can't get to the curb very easily is is that something 274 00:34:31,600 --> 00:34:39,200 that they can also have this assistance program for on the surface i'll say yes because if there's an 275 00:34:39,200 --> 00:34:44,160 opportunity for tripping fall easily slipping fall and things like that that doctor can make 276 00:34:44,160 --> 00:34:49,520 that assessment as well and there's um there's even on the application whether it's permanent 277 00:34:49,520 --> 00:34:55,680 or it's temporary okay um you know but more importantly those opportunities that create 278 00:34:55,680 --> 00:35:00,160 you know and it's confidential won't be disclosed to solid waste what that is it'll just be the 279 00:35:00,160 --> 00:35:05,840 physician saying yes or no they meet the criteria for the program well and i do like going away from 280 00:35:05,840 --> 00:35:15,120 the uh yellow lid i it can be dangerous to identify that someone and madam chair 281 00:35:15,120 --> 00:35:22,960 madam chair i don't know if if if um bg mentioned it but this did go through the committee on um 282 00:35:22,960 --> 00:35:28,000 disabilities and so so that did go there first so that's coming with their recommendations 283 00:35:28,000 --> 00:35:32,960 yes but anyways i just want to make sure that that was communicated yeah thank you thank you 284 00:35:32,960 --> 00:35:38,400 thank you tony we we did um march the 19th and they they love the fact that there's a formal 285 00:35:38,400 --> 00:35:43,680 application process now so that way it's not just being given to everyone as well as the yellow 286 00:35:43,680 --> 00:35:52,960 lids are being removed from the community to kind of reduce some threats billy go ahead so uh i 287 00:35:52,960 --> 00:35:59,520 appreciate the process change um so what the picture that you saw was just one circumstance i 288 00:35:59,520 --> 00:36:05,600 realized that but it was out in front of their home so you run into a dual or a catch 22 there 289 00:36:05,600 --> 00:36:12,800 because they're supposed to be not visible from the street until beginning in the end of trash day 290 00:36:12,800 --> 00:36:22,640 uh is there some sort of uh waiver or something for people who can't get them back and forth 291 00:36:24,480 --> 00:36:31,040 um so i heard part of it you said the container shouldn't be visible from the street right well i 292 00:36:31,040 --> 00:36:35,280 didn't say that i'm sorry i'm trying to understand what you're saying i said that but what i'm saying 293 00:36:35,280 --> 00:36:41,120 is that's the city's rules right is it except for on the beginning and the end of trash day 294 00:36:41,120 --> 00:36:47,520 they shouldn't be visible from the street right okay i'm sorry so with the new program their 295 00:36:47,520 --> 00:36:53,520 address is locked into the system so even if it's on the side of the house or somewhere else as long 296 00:36:53,520 --> 00:36:58,480 as there we have a party application process they have to allow us permission to enter the property 297 00:36:58,480 --> 00:37:05,040 on that said day so it doesn't have to be visible as long as this we have access to it that system 298 00:37:05,040 --> 00:37:11,040 is still going to alert us that this is a house that requires this this service yeah my concern 299 00:37:11,040 --> 00:37:16,480 would be like trash days tuesday and that trash cans out there on wednesday is that going to create 300 00:37:16,480 --> 00:37:23,200 some sort of code violation no sir so once we service the container if it's in the yard behind 301 00:37:23,200 --> 00:37:27,760 the fence we'll replace it we'll take it right back to where we got it from so those customers 302 00:37:27,760 --> 00:37:31,600 at least through this process you won't have to worry about a container being left out overnight 303 00:37:31,600 --> 00:37:37,680 or visible beyond the service day okay thank you yeah billy i think i think billy the only the only 304 00:37:37,680 --> 00:37:43,680 thing that may be out there and obviously that's not the city's role would be in the hoa so certain 305 00:37:43,680 --> 00:37:48,720 hoa's have certain rules and so those those that are governed separately from from the city so 306 00:37:48,720 --> 00:37:55,920 certainly yeah then go ahead thank you okay i got a couple of things um so it sounds like 307 00:37:55,920 --> 00:38:01,600 we're mostly just reorganizing an existing program rebranding maybe automating some things 308 00:38:01,600 --> 00:38:10,000 electrifying uh is that correct yes we like to call it a program enhancement okay uh so is there 309 00:38:10,000 --> 00:38:16,960 any additional costs that come along with that no additional costs okay uh so then uh from an 310 00:38:16,960 --> 00:38:22,800 operational standpoint um the uh was it the rubicon system that alerts the driver is that what you were 311 00:38:22,800 --> 00:38:31,120 saying yes so if if for example two houses next door to each other require this service uh does 312 00:38:31,120 --> 00:38:36,800 this just kind of stack the alerts or how do they manage multiple alerts in the same area if it's 313 00:38:36,800 --> 00:38:41,920 you know 100 150 feet out right we we just had this conversation this morning just fine and 314 00:38:41,920 --> 00:38:46,560 tuning because rubicon is actually is actually improving it's a process improvement every day 315 00:38:46,560 --> 00:38:53,840 for we're finding out new things so the conversation of stacked um customers so it'll stack it'll stack 316 00:38:53,840 --> 00:38:57,440 it in the system so what you'll see is you'll hear that ambient alert and there'll be a green 317 00:38:57,440 --> 00:39:03,040 dot that flashes as well as another address will come up so it's insurability that that customer 318 00:39:03,040 --> 00:39:11,520 will be serviced and the range it typically you know 150 to 200 feet and once you pass the house 319 00:39:11,520 --> 00:39:15,520 we have to manually there's a green dot that stays illuminated and we have manually turn it off once 320 00:39:15,520 --> 00:39:21,040 we pass the house so with the drivers when you know of course they're sneeze out there they know 321 00:39:21,040 --> 00:39:25,840 their routes their managers of the communities they know what they're doing so they are quick 322 00:39:25,840 --> 00:39:31,520 to turn their ambient alarm off or the light off so that doesn't happen so they don't have stack 323 00:39:31,520 --> 00:39:39,120 sort of don't create a confusion so but to answer your question yeah um we'll no customer in this 324 00:39:39,120 --> 00:39:52,320 situation will be left behind you're on mute again well they're washing my windows i'm trying 325 00:39:52,320 --> 00:40:02,320 not to have the noise in the background um and you have what you need from us Eugene yes okay all 326 00:40:02,320 --> 00:40:08,960 right thank you all you know actually i guess i can bring it up under concluding items 327 00:40:08,960 --> 00:40:15,280 it might be nice to see the Rubicon system in a work session because it's fairly new to us 328 00:40:15,280 --> 00:40:24,320 correct yeah it's fairly new and we do start we we plan to start our presentations early June 329 00:40:24,320 --> 00:40:32,320 okay we do so you will see this in its most updated version again it's a process improvement 330 00:40:32,320 --> 00:40:36,800 they are showing us new things every day with the capabilities of the system right now 331 00:40:37,360 --> 00:40:42,480 seeing are wonderful so early June we'll start rolling out our presentation processes through 332 00:40:42,480 --> 00:40:50,320 the different boarding committees so it's coming wonderful yeah so Susan I just just want to make 333 00:40:50,320 --> 00:40:55,040 sure that I didn't hear any opposition so I'm assuming that everybody's good just proceeding 334 00:40:55,040 --> 00:41:03,040 with these changes okay very good thank you thank you thank you all right next item thank you Mr. 335 00:41:03,040 --> 00:41:08,560 McKinney receive a report and hold a discussion and give staff direction on priorities for the 336 00:41:08,560 --> 00:41:14,320 fiscal year 2021 2022 electric water wastewater and solid waste budgets 337 00:41:14,320 --> 00:41:20,720 good morning pb members chair nick vinson assistant director of finance give me a 338 00:41:20,720 --> 00:41:22,160 second i'll pull the presentation out 339 00:41:26,160 --> 00:41:35,680 take my glasses off they're a little fogged up this morning 340 00:41:35,680 --> 00:41:47,680 all right 341 00:41:47,680 --> 00:41:53,920 and so as I said I'm nick vinson assistant director of finance and this is a joint 342 00:41:53,920 --> 00:41:58,640 presentation I'll run through the first six slides and then turn it over to the directors 343 00:41:58,640 --> 00:42:03,120 to cover their priorities with you for this upcoming budget cycle a couple things before 344 00:42:03,120 --> 00:42:09,200 we get started we are encouraging the pb members to ask questions give us feedback regarding the 345 00:42:09,200 --> 00:42:15,120 priorities you want to see included in this 22 budget these are staffs recommendations it doesn't 346 00:42:15,120 --> 00:42:19,360 mean these can't change based on your feedback but we definitely want to have that dialogue with you 347 00:42:19,360 --> 00:42:28,400 and discuss them so the objective of the presentation is really to look at the budget 348 00:42:28,400 --> 00:42:32,240 cycle and the current priorities that are identified by the staff members mostly the 349 00:42:32,240 --> 00:42:37,840 directors from the departments give us any feedback of what you think of those anything 350 00:42:37,840 --> 00:42:42,480 new you'd like to see in the budget we'll be happy to bring that back forward to you during 351 00:42:42,480 --> 00:42:47,280 the budget discussions so each of the utilities will present today electric water wastewater and 352 00:42:47,280 --> 00:42:55,440 solid waste and then we'll talk about those next steps so what we want to do for several of the new 353 00:42:55,440 --> 00:43:03,120 pb members is really just show you what the budget process is made up of and when it starts and when 354 00:43:03,120 --> 00:43:08,720 it goes through and so the city's fiscal year runs from october 1st to september 30th budget 355 00:43:08,720 --> 00:43:12,960 discussions really start in march you can see over here to your left we have that budget kickoff 356 00:43:13,760 --> 00:43:18,240 and then march and may is where we're currently at we're looking at that budget development and 357 00:43:18,240 --> 00:43:23,040 planning and then we get in june and july and talking about the city council budget presentations 358 00:43:23,040 --> 00:43:28,160 august we have that city council budget workshop that tony had mentioned earlier 359 00:43:28,160 --> 00:43:32,880 that's usually the first tuesday of august but then september we have our public hearings for 360 00:43:32,880 --> 00:43:37,920 the tax rate in the budget prior to city council adoption and then towards the end of september the 361 00:43:37,920 --> 00:43:43,040 city council does adopt the budget so several steps and several conversations to come forward 362 00:43:43,040 --> 00:43:50,160 to the pb in the coming months a city council priorities the city council did meet about a month 363 00:43:50,160 --> 00:43:55,200 and a half ago to talk about priorities to be included in the fiscal year 2022 budget and these 364 00:43:55,200 --> 00:44:00,640 are them you can see anything from implementing an economic development strategic plan to renovating 365 00:44:00,640 --> 00:44:07,760 the loop 28 building completing the mobility plan and then funding for city hall west improvements 366 00:44:07,760 --> 00:44:11,440 and then improving that capital improvement project communication around the city 367 00:44:12,320 --> 00:44:16,640 so several priorities that they have established with their 22 budget process 368 00:44:16,640 --> 00:44:23,440 a budget term so we just want to give some basic terms and that you will hear throughout the 369 00:44:23,440 --> 00:44:30,240 budgeting process and you may hear today so prior to today's meeting the finance department has been 370 00:44:30,240 --> 00:44:35,040 working with departments to develop a baseline budget and a baseline budget simply means the 371 00:44:35,040 --> 00:44:40,960 fiscal year 2021 budget roll forward so taking that budget that was adopted by both the pb and 372 00:44:40,960 --> 00:44:46,560 city council and rolling it forward to the next fiscal year in doing that what we do is remove 373 00:44:46,560 --> 00:44:52,400 any one-time expenses associated with supplemental packages from the prior year so those come out of 374 00:44:52,400 --> 00:45:00,000 that baseline budget we do look at lot cost that have been updated so you know transfers to the 375 00:45:00,000 --> 00:45:05,520 general fund technology services of inner fund transfers those are the ones we look at we do lock 376 00:45:05,520 --> 00:45:10,560 those now for departments and baseline adjustments what these are these are increases to the baseline 377 00:45:10,560 --> 00:45:16,880 budget and these could be example is office supplies increasing from 500 to 1500 would be 378 00:45:16,880 --> 00:45:22,480 an example of the baseline adjustment uh covid reinstatements if you do remember during the 379 00:45:22,480 --> 00:45:27,200 presentation we had last week and several department didn't make operational decreases 380 00:45:27,200 --> 00:45:32,000 in response to the covid pandemic so departments do have an opportunity this year to get those 381 00:45:32,000 --> 00:45:36,880 items reinstated and they are being submitted separately for the city management team to look 382 00:45:36,880 --> 00:45:42,960 at as part of the budgeting process um something little request um we usually consider these new 383 00:45:42,960 --> 00:45:47,440 initiatives that could be new personnel for a department it could be a new vehicle for a 384 00:45:47,440 --> 00:45:52,080 department or it could be a new software program as an example as mentioned down there below 385 00:45:52,080 --> 00:46:01,280 so some major data before you move on this is lee i have a just brief question so when you say the 386 00:46:01,280 --> 00:46:07,920 baseline budget is rolled forward so each department does not start a budget from scratch 387 00:46:07,920 --> 00:46:13,680 they take last year's budget it becomes this year's budget and then it's merely reworked 388 00:46:13,680 --> 00:46:19,200 for the current year did i understand that correctly that is correct mr rabak the previous 389 00:46:19,200 --> 00:46:24,160 budget is rolled forward um to the next year that is correct absolutely thank you 390 00:46:24,160 --> 00:46:30,560 um and one other thing about that mr rabak just to point out you know 391 00:46:30,560 --> 00:46:35,200 there's several reasons for that some of them be in detail so each department does a great job 392 00:46:35,200 --> 00:46:40,000 providing detail how that budget was developed as people continue to promote around the city or 393 00:46:40,000 --> 00:46:45,600 move to new positions the next person coming into that role can pick up and where they left off so 394 00:46:45,600 --> 00:46:51,440 and definitely benefit to be had in that but that is the reason for that um so a couple important 395 00:46:51,440 --> 00:46:57,040 dates that are coming up departments do submit the baseline adjustments um in april so we did 396 00:46:57,040 --> 00:47:02,160 recently receive those from departments the finance team is currently working with departments to go 397 00:47:02,160 --> 00:47:08,160 through them and clean them up and really get them in a presentable format for the city management 398 00:47:08,160 --> 00:47:15,200 team we start those internal budget review and discussions in may of this year so actually here 399 00:47:15,200 --> 00:47:19,680 in a few days we'll start meeting with the cmo team to talk about those budgets that were submitted 400 00:47:19,680 --> 00:47:25,920 prior to coming to pub and city council and then in june and july those are the presentations to 401 00:47:25,920 --> 00:47:31,680 both the pub and city council and then of course we'll incorporate any feedback you give us today 402 00:47:31,680 --> 00:47:36,640 for those future meetings into this budget and then of course the adoption in september 403 00:47:36,640 --> 00:47:41,920 about the city council pb adoption of the budget usually late august or early september 404 00:47:41,920 --> 00:47:48,400 of a city council usually be in mid to late september stay dick i hate to stop you again 405 00:47:48,400 --> 00:47:54,960 but what's the cmo uh the city management office city management office okay great thank you city 406 00:47:54,960 --> 00:48:04,160 manager and assistant city managers and then what i'll do i believe um tony puente is going to walk 407 00:48:04,160 --> 00:48:08,480 through the dme slide so i'll turn it over to him any questions for me 408 00:48:08,480 --> 00:48:19,600 all right so um just to cover the slide obviously some of these items are items that 409 00:48:19,600 --> 00:48:26,400 should not be new to you obviously um the first couple um you know we did discuss with you um 410 00:48:26,400 --> 00:48:30,640 when we came and talked with you about the impact of of winter storm uri 411 00:48:30,640 --> 00:48:32,640 nick can you go back one slide 412 00:48:32,640 --> 00:48:40,480 all right so uh again you know what weatherization um at at the denner energy center is something 413 00:48:40,480 --> 00:48:45,600 that that we're certainly looking at um actively along with looking at our fuel supply 414 00:48:46,400 --> 00:48:51,280 if you recall we do have currently one gas supplier but we are looking at various options 415 00:48:51,280 --> 00:48:58,880 that that could include some diversification in our fuel supply out there at the dinner center 416 00:48:58,880 --> 00:49:06,560 and then certainly the second item as you know you know there's still ongoing discussions in austin 417 00:49:06,560 --> 00:49:13,920 and we're actively engaged with our local delegation as well as various other parties 418 00:49:13,920 --> 00:49:21,440 at at the capital through our lobbyist focus advocacy and our participation in uh tppa which 419 00:49:21,440 --> 00:49:27,840 is the texas public power association comprised of over 70 municipal owned utilities and so we're 420 00:49:27,840 --> 00:49:34,320 certainly active um and participating in those and and at this point there's really not been a whole 421 00:49:34,320 --> 00:49:39,760 lot of movement uh the time is clicking on the legislature uh but um you know we're certainly 422 00:49:39,760 --> 00:49:45,760 you know keeping in tune with the with the various bills that are out there um the the next item um 423 00:49:45,760 --> 00:49:51,200 you know the then renewable resource plan was adopted a few years ago um it's it's a little 424 00:49:51,200 --> 00:49:57,360 stale it's a little dated uh there there are some you know uh definitional issues within that plan 425 00:49:57,360 --> 00:50:03,200 that we'd like to come back and do some cleanup um for you and then and then have a discussion 426 00:50:03,200 --> 00:50:10,000 discussion with you uh don't anticipate major deviations from from the plan of you know certainly 427 00:50:10,000 --> 00:50:14,880 not the hundred percent renewable goal uh but certainly we'll we'll come back to to the pub 428 00:50:14,880 --> 00:50:19,520 and have that discussion we already talked to you a little bit about you know some restructuring on 429 00:50:19,520 --> 00:50:24,880 some of our renewable uh contracts and how we take those forward so that's really trying to encompass 430 00:50:24,880 --> 00:50:31,440 all of those issues within within this bullet item another major uh project and this is this 431 00:50:31,440 --> 00:50:37,600 is very project specific that we wanted to just bring to you is uh you know we had direction from 432 00:50:37,600 --> 00:50:43,520 the council a few years back to pursue a gas insulated substation uh to replace our current 433 00:50:43,520 --> 00:50:48,640 hickory substation and so that's a pretty important project for us it's about a little bit over 20 434 00:50:48,640 --> 00:50:56,000 million dollar project uh that's already ongoing uh related to that is also uh this transmission 435 00:50:56,000 --> 00:51:01,280 line that basically cuts right through the unt campus and so very important to the university 436 00:51:01,280 --> 00:51:06,560 internally the overall uh community and so we felt that this is a major project that we felt 437 00:51:06,560 --> 00:51:13,040 uh we'd like to recommend as a priority for you uh going forward uh and as you know we've we uh did 438 00:51:13,040 --> 00:51:20,720 abandon the eagle substation project um and so uh so that was a a major change uh that then created 439 00:51:20,720 --> 00:51:26,160 um uh the need for us to do a little bit of redesign on the hickory gis substation to 440 00:51:26,160 --> 00:51:31,360 to serve unt's load from that station rather than what was originally contemplated at the 441 00:51:31,360 --> 00:51:38,320 eagle substation and just just uh for your curiosity the eagle uh substation was also 442 00:51:38,320 --> 00:51:43,760 intended to be a gas insulated substation um and that differentiates from the air insulated gas 443 00:51:43,760 --> 00:51:48,640 stations which is uh um substations which is what we normally see out there with the 444 00:51:48,640 --> 00:51:54,000 you know big walls or big uh chain lead fences um you know these are more um these are housed 445 00:51:54,000 --> 00:52:00,240 inside so these large building structures that that you would see um the next item and and this 446 00:52:00,240 --> 00:52:05,440 item really came from the council's uh priorities and it was really we were asked to do an informal 447 00:52:05,440 --> 00:52:10,160 staff report so we felt that we needed to duplicate that here and that's really just to look at uh 448 00:52:10,160 --> 00:52:16,400 undergrounding um some electric lines across the city and our jerry fildler in our engineering 449 00:52:16,400 --> 00:52:21,120 department is is looking at that he's come up with a pretty good uh you know what i feel pretty good 450 00:52:21,120 --> 00:52:26,960 solid methodology of how how he's narrowed down the various corridors and uh so once we have that 451 00:52:26,960 --> 00:52:31,280 we will our plan is to then send that informal staff report to both the the city council and 452 00:52:31,280 --> 00:52:41,040 also the pub um yes billy um i know we've been looking at that enclosed substation for years 453 00:52:42,000 --> 00:52:47,200 um did we i guess did they finalize the design is it gonna look like the beer barn or 454 00:52:47,200 --> 00:52:56,080 is it gonna look like what the beer barn no no um you know if you recall billy we we worked really 455 00:52:56,080 --> 00:53:01,840 closely with that with with that neighborhood um we went through a variety of different designs 456 00:53:01,840 --> 00:53:06,480 and so it's gonna be uh you know in keeping with the uh with the design with you know with the 457 00:53:06,480 --> 00:53:12,720 design kind of um that that fits that neighborhood uh certainly the wall was a major component and 458 00:53:12,720 --> 00:53:17,920 so we're cognizant of that as well so we've not deviated from that what we have deviated 459 00:53:17,920 --> 00:53:23,600 a little bit is that rather than piecemeal that project like we've done various other projects 460 00:53:23,600 --> 00:53:28,800 we're going to basically do a design build um on that project and so we're we are working through 461 00:53:28,800 --> 00:53:34,480 that now with our procurement and legal department but uh uh again um i i think the neighborhood will 462 00:53:34,480 --> 00:53:41,600 be pleased with with that project okay thank you go ahead Barbara hi tony is this the one on uh 463 00:53:41,600 --> 00:53:49,600 bernard and hickory um no ma'am it's it's actually um between uh hickory and oak and and bonnie bray 464 00:53:49,600 --> 00:53:57,520 um bonnie bray wasn't yeah several years ago we had a a citizens committee meet and they came up 465 00:53:57,520 --> 00:54:07,280 with some suggestions and so now you're saying that that's going to change no no ma'am the the 466 00:54:07,280 --> 00:54:14,080 the design is still unchanged um it's how we how we're going to procure and construct the facility 467 00:54:14,080 --> 00:54:20,400 rather than do separate contracts uh we're going to do a single uh design build contract where you 468 00:54:20,400 --> 00:54:25,680 have a engineering firm that comes in and they handle all you know from nuts to bolts on on that 469 00:54:25,680 --> 00:54:30,640 facility uh we think that there will be some some cost savings uh the one that you're referencing 470 00:54:30,640 --> 00:54:36,640 is actually and i believe is bernard i think it's the corner of eagle and bernard um that that 471 00:54:36,640 --> 00:54:41,440 substation there we did abandon that we that that substation is not going to be needed for probably 472 00:54:41,440 --> 00:54:48,800 another 30 years uh we have uh retained that property and um and ultimately there will be a 473 00:54:48,800 --> 00:54:55,600 substation there but that'll be very much into the future so yeah would it be helpful to bring 474 00:54:55,680 --> 00:55:02,000 the design back through a work session just to whether we've got new board members to begin with 475 00:55:02,000 --> 00:55:08,080 and then to refresh all of our memories yeah yeah well we're happy to do that or we can certainly 476 00:55:08,080 --> 00:55:13,120 do an informal staff report to you with all the details again you know the community you know we 477 00:55:13,120 --> 00:55:18,240 work very closely with the community that some of the council you know that and and so so we've we've 478 00:55:18,240 --> 00:55:22,400 had questions about you're not changing anything no we're not changing anything we're just changing 479 00:55:22,400 --> 00:55:30,960 how we procure and construct the facility go ahead karen uh i was on the citizens design committee 480 00:55:30,960 --> 00:55:37,680 and uh council member paul melcher was also on it he came up with the idea of sort of making it look 481 00:55:37,680 --> 00:55:44,960 like a building you know like like they do in brooklyn you know you could walk by it and not 482 00:55:44,960 --> 00:55:51,120 necessarily think oh goodness this is a transition station so that was the that was the big idea 483 00:55:51,840 --> 00:55:58,000 we didn't arrive at a definite design in that committee so i'm sure things have moved forward 484 00:55:58,000 --> 00:56:04,560 in the last four or five years whenever that was um so i'd be really i'm really curious about what 485 00:56:04,560 --> 00:56:11,360 has been uh you know developed since then i know that there were going to be some panels with some 486 00:56:11,360 --> 00:56:20,000 public art and um there was also going to be a little facade element from uh what is now the 487 00:56:20,000 --> 00:56:26,320 monroe pierson building which was the warehouse of the guy who built my house on oak street 488 00:56:26,320 --> 00:56:32,880 so it'd be really nice tie-in you know for the history of the neighborhood and i know that those 489 00:56:32,880 --> 00:56:37,680 ideas haven't been dropped so i'll be very curious to see how they've been developed in more detail 490 00:56:37,680 --> 00:56:41,840 well we can certainly um like i said i we can get you an informal staff report i think we already 491 00:56:41,840 --> 00:56:47,120 did one for the council we'll just brush that up say it to you and if and if there's still questions 492 00:56:47,120 --> 00:56:50,800 after that we can come back and do a work session on that we'll be happy to do that i think it'll 493 00:56:50,800 --> 00:56:58,880 be great and it'll also be serve as a nice model for other substations um you know in the city if 494 00:56:58,880 --> 00:57:04,800 it works out if the design works out and fits in with the neighborhood thanks i remember the major 495 00:57:04,800 --> 00:57:12,000 concern about that was it was one of the gateways in the denton and so they weren't uh you know that 496 00:57:12,000 --> 00:57:19,360 karen and i both served on that and they wanted it to not just look like an electrical substation 497 00:57:19,360 --> 00:57:27,040 be driving in the city from that one yeah yeah i think it's important for the pb to understand 498 00:57:27,040 --> 00:57:33,840 too that while while gis substation does take considerably less less property um than a regular 499 00:57:33,840 --> 00:57:41,520 air insulated uh substation um the cost is is considerably more uh for that type of substation 500 00:57:41,520 --> 00:57:46,880 and not only that but uh also understand that our that our folks certainly those in our substation 501 00:57:46,880 --> 00:57:54,960 um the division um don't have a lot of experience dealing with these sorts of uh substations and so 502 00:57:54,960 --> 00:58:00,400 likely what we'll be doing is is probably looking to some outsource help and obviously that that 503 00:58:00,400 --> 00:58:04,400 tends to sometimes cost you a little bit more and not only that but it did it could impact 504 00:58:04,400 --> 00:58:10,400 reliability um if those contractors have to come in from out of town to work on an issue with the 505 00:58:10,400 --> 00:58:14,720 substation that may that may that may have an impact on our reliability and so those are 506 00:58:14,720 --> 00:58:19,200 things that we're going to be looking at and and certainly talking with you certainly as we come 507 00:58:19,200 --> 00:58:23,280 back with you on on the budget and and start really looking at at operating that facility 508 00:58:23,280 --> 00:58:35,280 once it's on the ground so nick i think i had one more item um 509 00:58:39,680 --> 00:58:46,960 and so so in the last item um some of you might be aware of it but we did get called in um from 510 00:58:46,960 --> 00:58:55,040 the public utility commission to do a full rate case on our transmission cost of service um and 511 00:58:55,040 --> 00:59:02,240 so so we felt that that because of the potential financial impact um on our on our fund um we felt 512 00:59:02,240 --> 00:59:06,400 that that was important for us to have us here as a priority uh the pub and the council has already 513 00:59:06,400 --> 00:59:11,040 approved a contract with a company called new gen strategies and we're already actively working 514 00:59:11,040 --> 00:59:19,360 with them uh to get that prepared that is due back to the commission um before november um we're 515 00:59:19,360 --> 00:59:26,240 we're hopeful uh that of a good outcome but uh but again um any decrease in our rate of return 516 00:59:26,240 --> 00:59:32,960 will have a an economic impact on our on our fund and it's something that that we're cognizant of 517 00:59:32,960 --> 00:59:38,800 and we're working through that and made preparations for that already through our our multi-year 518 00:59:38,800 --> 00:59:46,480 forecasting for for this particular fund um but it's also important to know that uh we do uh want 519 00:59:46,480 --> 00:59:53,840 to uh twice a year do interim rate case filings with the commission uh but it's been about 15 520 00:59:53,840 --> 01:00:00,800 years since we last went for a full rate case and so it seemed pretty logical um for us to be called 521 01:00:00,800 --> 01:00:06,080 in for that and so um so we'll again we'll be working through that uh i are already working 522 01:00:06,080 --> 01:00:12,160 through that now um and working closely with our finance uh department and also bill shepherd in 523 01:00:12,160 --> 01:00:18,000 our um energy services area are working through that so with that i'll be happy to answer any 524 01:00:18,000 --> 01:00:22,240 questions or if there's any other items that you'd like to see on here certainly i'm happy 525 01:00:22,240 --> 01:00:30,400 to discuss that with you any questions no just comment tony i know this is a big deal and i hope 526 01:00:30,400 --> 01:00:36,960 everybody sees that the t-cost is a huge deal for the city of bitten and how we get our return 527 01:00:36,960 --> 01:00:44,960 on our investments and it can go south or it can go really really well or go south yeah the the 528 01:00:44,960 --> 01:00:49,520 other the other time that i'll mention to you it'll it'll um actually you you approved it today was a 529 01:00:49,520 --> 01:00:55,840 a contract with nugent strategies as well to do a cost of service study and so that's going to be 530 01:00:55,840 --> 01:01:01,520 part of of that discussion and consideration going forward is you know what potential rate impact 531 01:01:01,520 --> 01:01:08,880 does they have um if if our rate of return on the transmission cost of services cut in half or 532 01:01:08,880 --> 01:01:14,240 or worse you know so what is the overall impact uh because uh because that the amount of revenue 533 01:01:14,240 --> 01:01:18,800 that we've been getting has certainly been a good source of revenue that's that's been helpful 534 01:01:18,800 --> 01:01:29,120 uh to to sustain our base rates um you know in the last few years so but thanks all right thank you 535 01:01:43,600 --> 01:01:50,240 get started i'll wait until nick pulls it up good morning uh madam chair members of the pub i believe 536 01:01:50,240 --> 01:01:55,920 the next one is water and followed by wastewater i'm pretend a smoke deputy director for water and 537 01:01:55,920 --> 01:02:04,240 wastewater and i'm going to go through the next two slides uh starting with water um if you look at 538 01:02:04,240 --> 01:02:08,960 the first half or the first three bullet points there are some uh large capital projects that are 539 01:02:08,960 --> 01:02:16,240 really important and our our focus areas for the water side of things and then the remaining three 540 01:02:16,240 --> 01:02:23,760 are studies or plans that we definitely want to uh enhance or update and um get everything um you 541 01:02:23,760 --> 01:02:28,480 know wrapped up within those studies so starting with the first one great roberts water treatment 542 01:02:28,480 --> 01:02:35,840 band it is an upgrade um sometimes it's called upgrade but upgrade project where we will be 543 01:02:36,480 --> 01:02:42,720 adding adding approximately five million gallons uh capacity to the ray robert's water treatment 544 01:02:42,720 --> 01:02:49,280 plants um i think recently in the last couple months we've gotten the design contract to be in 545 01:02:49,280 --> 01:02:57,600 council uh the design is going to go up until the end of the year and uh the construction will follow 546 01:02:57,600 --> 01:03:05,360 in 2022 all year until the end of 2022 uh as part of this project as well what we've done 547 01:03:05,360 --> 01:03:12,080 um given our snow good conditions there were uh considerable impacts to this particular plant ray 548 01:03:12,080 --> 01:03:21,360 robert's equipment facility and we are planning on adding some of the weatherization elements to it 549 01:03:21,360 --> 01:03:28,800 and in the near future we will may have to add those to the design contract as well as include 550 01:03:28,800 --> 01:03:34,800 include that in the construction piece so that that is being worked it's nice it's good to have 551 01:03:34,800 --> 01:03:39,040 a design project at the treatment facility and just add on to that that would give us 552 01:03:39,040 --> 01:03:43,840 make sure that we are ready for the next weather event 553 01:03:43,840 --> 01:03:51,440 the second one is northwood booster pump station it's another larger project it's close to total 554 01:03:51,440 --> 01:03:57,680 cost is close to 20 million dollars it's adding a booster pump station on the north side of the city 555 01:03:57,680 --> 01:04:04,160 and then laying a transmission main between two of our elevated structures on the north side 556 01:04:04,800 --> 01:04:14,800 between the between elm and loop 288 and 35 so that's the general area the third project 557 01:04:14,800 --> 01:04:22,000 is a transmission main it's north side water this is the continuation of the one that we 558 01:04:22,000 --> 01:04:28,480 recently mapped up there was a north side water main that was laid on bonnie bray south of 35e 559 01:04:29,040 --> 01:04:35,920 this is the piece that is north of 35e and then it ultimately goes and connects to the mckinna 560 01:04:35,920 --> 01:04:43,120 water tower at scripter and bonnie bray that project is currently facing some challenges 561 01:04:43,120 --> 01:04:50,640 we are working with the bond company to make sure that we get a good contractor the original 562 01:04:50,640 --> 01:04:57,280 contractor at this point as i understand it has gone bankrupt he's wrapped up his business 563 01:04:58,320 --> 01:05:04,960 and we're looking to move this project forward current timeline i think we're planning on 564 01:05:04,960 --> 01:05:11,360 wrapping this up by end of next year just given the issues that we're facing with the 565 01:05:11,360 --> 01:05:19,040 surety and and the getting the new contractor on board cost of service i think nick can add to 566 01:05:19,040 --> 01:05:24,960 more to that a little bit give you a timeline and we're with it and what are the next steps nick 567 01:05:28,320 --> 01:05:35,360 yeah sure thank you pripam so the water cost of service study was recently completed we did 568 01:05:35,360 --> 01:05:40,720 actually present the results to you last week in that presentation for both water and wastewater 569 01:05:40,720 --> 01:05:44,720 definitely answer any questions if you have any after seeing that presentation 570 01:05:44,720 --> 01:05:51,280 otherwise we will use that study to walk you through the 2022 budget process for the rates 571 01:05:51,280 --> 01:05:55,040 in the budget so that will be incorporated into this upcoming budget cycle 572 01:05:57,920 --> 01:06:01,760 moving right along we are planning on updating our impact fee study 573 01:06:01,760 --> 01:06:09,440 the original study was completed back in 2018 typically we have a five-year cycle that we use 574 01:06:09,440 --> 01:06:15,600 to continuously update and upkeep our list of projects and the impact fees that we're 575 01:06:15,600 --> 01:06:22,400 collecting to implement those projects in this particular case we did have one large 576 01:06:22,400 --> 01:06:28,640 development which is the coal hunter come in we did have we did look at some of the improvements 577 01:06:28,640 --> 01:06:35,040 that are needed as part of that their development but that's not yet folded into the impact fee 578 01:06:35,040 --> 01:06:40,720 study and since it's been close to three or four years we think it's a good time to 579 01:06:40,720 --> 01:06:46,160 update the study and include the coal hunter development within that that's a next 580 01:06:47,280 --> 01:06:53,360 focus area for us to get that thing going and wrap it up and then last but not least just given 581 01:06:53,360 --> 01:07:02,240 the freezing conditions in February we are going back to looking at our emergency response plan 582 01:07:02,240 --> 01:07:09,600 and implement some of the lessons learned from the inclement weather events that happen we're 583 01:07:09,600 --> 01:07:17,760 definitely going to add some of the responses how do we respond to certain elements and how do we 584 01:07:17,760 --> 01:07:26,240 be prepared next time something like this happens so we're going to update that any questions on the 585 01:07:26,240 --> 01:07:41,520 water focus areas karen go ahead hi so sorry i had to had to get all my screens figured out 586 01:07:41,520 --> 01:07:48,160 um so pre-time can you confirm what i thought i heard which is that the contractor on bonnie bray 587 01:07:48,160 --> 01:07:57,840 has gone bankrupt correct so the original contractor s and j um stopped work stopped responding we had 588 01:07:57,840 --> 01:08:04,400 several meetings since october and what we hear is the bonding company has now jumped in and they're 589 01:08:04,400 --> 01:08:12,800 running it and as far as i know that that company is is wrapping up it's so those pipes are going to 590 01:08:12,800 --> 01:08:20,640 be sitting along there like indefinitely uh actually uh we're really uh pushing hard for the 591 01:08:20,640 --> 01:08:27,040 bonding company uh we're close to selecting the new contractor i think that really turned around in 592 01:08:27,040 --> 01:08:34,800 last couple months uh and then um we can bring back a an update if you may on that particular 593 01:08:34,800 --> 01:08:41,280 project because everyone's so interested and it's front and center you can see those five sitting 594 01:08:41,280 --> 01:08:47,840 there yeah we were wondering if they were going to become part of the new playground at mckenna 595 01:08:47,840 --> 01:08:57,200 yeah no that's that's not going to happen we we have it we'll have the contractor we're um we're 596 01:08:57,200 --> 01:09:03,120 hoping we can get the contractor on board uh this summer and then get that project going in the fall 597 01:09:03,120 --> 01:09:07,520 right thank you i will spread the word at my neighborhood groups because they're wondering 598 01:09:08,080 --> 01:09:12,960 i got a situation madam chair i gotta go oh okay all right thank you billy 599 01:09:12,960 --> 01:09:22,320 i have a quick question um there was a discussion of a presentation of a water cost study 600 01:09:22,320 --> 01:09:25,760 did we have that and am i not remembering it 601 01:09:25,760 --> 01:09:32,560 mr ryback that's correct it's part of that presentation last week we did provide you a 602 01:09:32,560 --> 01:09:37,360 high level summary of the cost of service study for both water and wastewater our full intent is 603 01:09:37,360 --> 01:09:43,040 um as the consultant publishes the final report is for us to submit that to you as an informal 604 01:09:43,040 --> 01:09:47,680 staff report so yes the presentation you can afford at a high level we do plan to submit the 605 01:09:47,680 --> 01:09:54,240 complete report to you okay i will look forward to that thank you 606 01:10:04,240 --> 01:10:11,120 all right moving along let's talk about the wastewater operational focus areas um this we 607 01:10:11,120 --> 01:10:22,000 it's one master plan i think we we're we're really looking at um creating a wastewater master plan 608 01:10:22,000 --> 01:10:29,920 currently what we have is um several areas of the city are being modeled and and we're tracking that 609 01:10:29,920 --> 01:10:35,760 but they're separate it's not a cohesive plan it's not something that we can um move forward 610 01:10:35,760 --> 01:10:43,360 and create a capital capital project list so that is our really big focus area we're pushing that 611 01:10:43,360 --> 01:10:51,520 forward you can see a contract fairly soon in the next uh four to six weeks come to puv and council 612 01:10:51,520 --> 01:10:57,040 for getting a consultant on board and getting the master plan started typically it's anywhere 613 01:10:57,040 --> 01:11:03,040 between 12 to 18 months for the entire plan to complete but we're we're looking at our 614 01:11:03,040 --> 01:11:10,480 consultant see if we can expedite some of that and given our current challenges um solid handling 615 01:11:10,480 --> 01:11:21,440 okay uh solids handling project is at our reclamation plant on concrete um it has been 616 01:11:21,440 --> 01:11:28,000 a project for a while and we recently last couple months we had a contract for a consultant to go 617 01:11:28,000 --> 01:11:35,680 through puv and council it's for the design phase for this particular project the design will be 618 01:11:35,680 --> 01:11:43,280 completed by uh end of the year and then similar to the ray robert upgrade project this project 619 01:11:43,280 --> 01:11:50,960 will be wrapped up by end of next year as far as construction so uh for this also similar to what 620 01:11:50,960 --> 01:11:57,840 we did with ray robert's we're going to include uh weatherization elements at the wastewater 621 01:11:57,840 --> 01:12:04,080 reclamation plant we're going to add to the scope we're currently discussing with the consultant 622 01:12:04,080 --> 01:12:10,880 what are additional things that we could add and get more bang for the buck if you may with that 623 01:12:10,880 --> 01:12:18,400 particular project robson ranch water reclamation plant we currently have a really small reclamation 624 01:12:18,400 --> 01:12:25,440 plant uh in an ocean ranch that we want to decommission and uh get remove it um and then 625 01:12:25,440 --> 01:12:32,960 kind of divert all the flows to back to our concrete water reclamation plant so that is a 626 01:12:32,960 --> 01:12:40,080 project that's currently under design we have a consultant that's working on designing um this 627 01:12:40,080 --> 01:12:49,280 particular project there are a couple steps here also we have to go through the um the state and 628 01:12:49,280 --> 01:12:56,720 pcq to get permission and go through the steps for decommissioning this particular plant so uh 629 01:12:56,720 --> 01:13:06,480 this project we're planning on um completing the design by late summer early fall and then 630 01:13:07,040 --> 01:13:14,000 getting it constructed by next um may i think the may 2022 is our timeline currently for 631 01:13:14,000 --> 01:13:20,560 decommissioning this um treatment facility and then the last is just the hickory creek basin 632 01:13:20,560 --> 01:13:28,080 we have several capacity improvements in that as as you may know this is a really uh fast paced 633 01:13:28,080 --> 01:13:35,200 growth area where a lot of development and a lot of um interest um you can see when when you look 634 01:13:35,200 --> 01:13:42,640 at the hickory creek basin we also include the industrial area next to the airport so you can see 635 01:13:42,640 --> 01:13:50,640 that that area is also getting a lot of attention from developers we based on all of these growth we 636 01:13:50,640 --> 01:13:57,200 do have a couple of large interceptor upgrade projects along the hickory creek interceptor 637 01:13:57,200 --> 01:14:06,720 itself phase one and two we went out to bid we have a contractor on board and we will be starting 638 01:14:06,720 --> 01:14:13,440 construction this summer on that particular project but right after that it will be followed 639 01:14:13,440 --> 01:14:20,080 by phase three which is currently under design we're 90 percent design and we're going to move 640 01:14:20,080 --> 01:14:28,800 forward to go out to bid immediately after uh we wrap up the um this design phase and then last 641 01:14:28,800 --> 01:14:36,320 but not least is the drive forward interceptor it's a smaller piece of connection um and this 642 01:14:36,320 --> 01:14:43,600 uh particular one we will be starting design fairly shortly and then uh that will follow the 643 01:14:43,600 --> 01:14:49,120 two hickory creek interceptor project as far as construction timeline all these projects are 644 01:14:49,120 --> 01:14:57,680 scheduled to wrap up uh end of next year 2022 um that's the current timeline that we're anticipating 645 01:14:57,680 --> 01:15:05,440 but we're moving forward as fast as we can madam chair before before we move on i do want to just 646 01:15:05,440 --> 01:15:11,280 quickly introduce uh stephen gay he's our new uh director of water wastewater he's the guy in the 647 01:15:11,280 --> 01:15:18,400 white shirt um is stephen came to us by way of colorado uh we really like him so please do not 648 01:15:18,400 --> 01:15:25,600 scare him away um he's so uh so again you know stephen stephen worked closely with pre-tem on 649 01:15:25,600 --> 01:15:31,600 on these uh list of items and um and you know and he and i have had some good conversations he's 650 01:15:31,600 --> 01:15:35,520 been here i think a whole month now uh but certainly want to welcome him and i want to 651 01:15:35,520 --> 01:15:38,400 introduce him to you guys so welcome aboard 652 01:15:47,680 --> 01:15:51,440 pre-tem if that finishes your slide i don't have questions for wastewater otherwise 653 01:15:51,440 --> 01:15:52,720 the next slide is solid waste 654 01:15:52,720 --> 01:16:03,600 looks like you're good thank you thank you all right well uh good morning madam chair uh members 655 01:16:03,600 --> 01:16:07,760 of the board my name is brian burner i am the director of solid waste for the city of denton i 656 01:16:07,760 --> 01:16:12,880 do appreciate the opportunity to uh present to you our operational focus areas that we have planned 657 01:16:12,880 --> 01:16:20,880 for uh fy 2122 as with all good departments in the city continuous improvement is the mantra that we 658 01:16:20,880 --> 01:16:26,160 continue to try to abide by uh we're going to be focusing on service delivery cost reduction and 659 01:16:26,160 --> 01:16:32,880 most importantly safety as i've reported after our uh winter weather uh update a lot of our 660 01:16:32,880 --> 01:16:38,000 decisions were made on and and a result of safety keeping our residents safe keeping our operators 661 01:16:38,000 --> 01:16:42,800 safe trying to reduce the risk management costs aligned there and so a lot of things that we'll 662 01:16:42,800 --> 01:16:49,840 be focusing on uh is uh goes around uh safety and the delivery of such uh we'll be looking at our 663 01:16:49,840 --> 01:16:54,560 yard waste brush and bulk collection programs in see how we can make them more efficient 664 01:16:54,560 --> 01:17:03,520 make the the process with the uh citizens uh more uh inclusive uh we'll be uh you remember 665 01:17:03,520 --> 01:17:07,520 may remember at your last meeting we approved a new scale house software system so we'll be 666 01:17:07,520 --> 01:17:12,880 focusing on implementing that and as we talked a little bit earlier now that we have the rubicon 667 01:17:12,880 --> 01:17:18,000 smart system implemented we'll be looking at optimizing it within our routes within our 668 01:17:18,000 --> 01:17:25,920 operations to ensure that we have a a high service level delivery within solid waste one of the big 669 01:17:25,920 --> 01:17:30,320 key items we'll be looking at is the implementation of our comprehensive solid waste management 670 01:17:30,320 --> 01:17:36,240 strategy we look for final delivery at the end of this fiscal year within the next couple of months 671 01:17:36,240 --> 01:17:42,960 you'll be seeing some information flowing from a draft copy to provide feedback and comment on so 672 01:17:42,960 --> 01:17:51,360 please uh wait with bated breath on that uh report we have a recycling contamination issue 673 01:17:51,360 --> 01:17:56,960 within the city of denton while the material that we've been collecting over the past several years 674 01:17:56,960 --> 01:18:04,000 remains uh consistent because of global forces requiring higher qualities of materials hitting 675 01:18:04,000 --> 01:18:12,400 that the the uh uh the the third party market a lot of the material which may have been accepted 676 01:18:12,400 --> 01:18:19,040 gladly in you know as most recently as 18 months ago is now being considered contamination so we'll 677 01:18:19,040 --> 01:18:26,400 be again trying to continue our outreach with empty clean dry and loose material as well as better 678 01:18:26,400 --> 01:18:33,440 focused on on the material that's in the in the cart themselves uh solid waste is a very mechanical 679 01:18:33,440 --> 01:18:39,920 dependent operation when we run into our backup pieces of equipment and sometimes short on 680 01:18:39,920 --> 01:18:46,240 equipment it significantly impacts the amount of of the way that we service our our customers 681 01:18:46,240 --> 01:18:52,960 in the city of denton so we'll be working closely with fleet to ensure that the performance and our 682 01:18:52,960 --> 01:18:59,120 uptime and availability are optimized within the fleet and then finally disposal capacity management 683 01:18:59,120 --> 01:19:04,160 to ensuring that we get the most weight uh waste in the least amount of space uh increasing 684 01:19:04,160 --> 01:19:09,520 diversion uh decreasing the amount of actual landfill material that's that's going into our 685 01:19:09,520 --> 01:19:17,360 our fill cells so uh it's a it's a it's a fairly uh uh full bucket that we we've identified here 686 01:19:17,360 --> 01:19:23,360 for fy 2122 uh but would appreciate any questions or comments you might have with regard to the focus 687 01:19:23,360 --> 01:19:31,440 areas lee go ahead i see your hands up yes thank you um i'm wondering what uh diversion uh tactics 688 01:19:31,440 --> 01:19:37,840 or plans you have to uh manage the capacity could you give us a little bit more detail on that 689 01:19:37,840 --> 01:19:43,360 well currently we're diverting almost 30 percent of all the material that's collected within the 690 01:19:43,360 --> 01:19:49,280 city of denton a lot of that's due to yard waste what we're doing at the curb but based on the 691 01:19:49,280 --> 01:19:54,000 feedback that we're getting from solid waste our solid waste management strategy uh looking at 692 01:19:54,000 --> 01:20:00,080 increased organics diversion looking at potential metals uh probably possibly partnering with third 693 01:20:00,080 --> 01:20:07,520 party reuse programs so that materials that may have some beneficial reuse uh uh that just you 694 01:20:07,520 --> 01:20:11,920 know it's not worn out but you just don't want it or need it anymore a lot of times it ends up in 695 01:20:11,920 --> 01:20:17,120 you know as bulk waste or in the cart if we can find a third party opportunity where it can actually 696 01:20:17,120 --> 01:20:23,600 be reused and put to some good use and benefit uh that that's the kind of material we're looking at 697 01:20:23,600 --> 01:20:31,200 so again uh capturing that type of waste and then moving uh to the next step forward thank you go 698 01:20:31,200 --> 01:20:43,600 ahead welcome you're on mute barbara you're on mute brian don't you have a program like that now 699 01:20:44,720 --> 01:20:50,960 we do but again uh we want to take this next step uh you know we've you know we're currently uh we do 700 01:20:50,960 --> 01:20:57,360 provide the feedstock for our beneficial reuse program but uh the amount of organics that we're 701 01:20:57,360 --> 01:21:03,760 accepting uh as far as food waste from residents and commercial is very very low is there an 702 01:21:03,760 --> 01:21:08,320 opportunity for us to increase so that's some of the some of the opportunity that we'll be looking 703 01:21:08,320 --> 01:21:15,280 for uh from an organic standpoint uh and while you know from a a a beneficial reuse or beneficial 704 01:21:15,280 --> 01:21:21,840 reuse but from a third party uh you know uh like like a goodwill or a salvation army or something 705 01:21:21,840 --> 01:21:28,000 like that while we continue to promote that a lot of the material that we are seeing at the curb and 706 01:21:28,000 --> 01:21:33,600 in the cart uh has life but again you know once it gets into the cart of the curb uh we have to pick 707 01:21:33,600 --> 01:21:38,000 it up and dispose of it in the landfill so we want to try to create opportunities to stop that 708 01:21:38,000 --> 01:21:48,720 before it gets to that point oh go ahead karen uh so brian this is the this is the same this 709 01:21:48,720 --> 01:21:54,480 comprehensive plan is the same as the task force that we've that's been meeting via zoom 710 01:21:54,480 --> 01:22:03,040 yeah that well what what the the the strategy the the task force is that is that is part of that 711 01:22:03,040 --> 01:22:08,320 development so really it's the third third step in the strategy development and again we've we've 712 01:22:08,320 --> 01:22:14,560 done a a city-wide waste characterization so we know what's in our waste now uh we've completed 713 01:22:14,560 --> 01:22:22,640 the survey to from a big macro and what's important to the community and now through our think tank and 714 01:22:22,640 --> 01:22:29,840 focus groups we're trying to dial in in a micro standpoint to figure out you know exactly uh uh 715 01:22:29,840 --> 01:22:36,400 how might some programs look what's important how much additional might be might we be willing to pay 716 01:22:36,400 --> 01:22:41,120 are we doing something now that we shouldn't be doing and then once we get all that together 717 01:22:41,120 --> 01:22:47,680 looking at at state federal local laws that may either help support us or hinder us looking at that 718 01:22:47,680 --> 01:22:53,200 at bigger global markets uh shares economic development issues the comp plan that we're 719 01:22:53,200 --> 01:22:59,040 currently being updated trying to throw all that in together to really identify the tools uh that 720 01:22:59,040 --> 01:23:05,680 we have and will need to move our solid waste uh uh program forward yeah i participated in 721 01:23:05,680 --> 01:23:12,960 one a few weeks ago i had to miss the last one but i was sort of impressed but also curious at the 722 01:23:12,960 --> 01:23:18,640 macro level discussion i mean it was almost i think there were actually some powerpoint slides 723 01:23:18,640 --> 01:23:26,480 from the moon yeah looking at the earth so i'm hoping that the and i'm sure this is going to 724 01:23:26,480 --> 01:23:32,000 happen but just since the purpose of this part of the agenda is to give you advice i'm hoping 725 01:23:32,000 --> 01:23:39,600 that that becomes more narrow and that we can look at it that the final recommendations are specific 726 01:23:39,600 --> 01:23:47,360 to dentin because the dentin is fairly unique um i think there's a lot of willingness for more 727 01:23:47,360 --> 01:23:56,080 recycling and more composting just tap into the education aspects of it but i'm sure that's all 728 01:23:56,080 --> 01:24:03,120 already um you know already in the in the works but just make sure that it's the recommendations 729 01:24:03,120 --> 01:24:13,120 are specific they will be yeah thanks thank you all right any other questions 730 01:24:13,120 --> 01:24:21,040 susan i think there's just one more slide just to summarize the presentation then 731 01:24:21,040 --> 01:24:25,200 we can take any additional feedback that you have for us so we work to develop the budget 732 01:24:26,080 --> 01:24:32,400 for each of these utilities so really just next steps you know here today to solicit input from 733 01:24:32,400 --> 01:24:37,920 the pv regarding additional budget priorities if you have any please let us know now is definitely 734 01:24:37,920 --> 01:24:44,240 the time as we work to develop the fiscal year 2022 budget we are currently working to conduct 735 01:24:44,240 --> 01:24:49,680 internal reviews of the submitted budgets with directors so conversations with the city management 736 01:24:49,680 --> 01:24:54,000 team will be happening in the next few weeks within the next month or so we'll be circling 737 01:24:54,000 --> 01:24:59,600 back to puv with further conversations and then we'll work to develop those presentations to 738 01:24:59,600 --> 01:25:04,400 bring forward to you so definitely plenty of time for input as we proceed through the fiscal year 739 01:25:04,400 --> 01:25:09,360 2022 budget this is really just a kick-starting presentation you're really getting feedback that 740 01:25:09,360 --> 01:25:17,440 you have for us today thank you uh any other feedback from any board members 741 01:25:19,760 --> 01:25:28,000 looks like you're good to go thank you thank you okay that leads us to concluding items does any 742 01:25:28,000 --> 01:25:33,040 board member wish to make any comments or add anything to a future agenda item 743 01:25:33,040 --> 01:25:43,760 doesn't look like it all right do we have a motion to adjourn it is 1026 so moved all right we are 744 01:25:43,760 --> 01:25:47,120 adjourned. Thank you.