 Okay, it is nine o'clock and we do have a quorum, so we're called to order the public

00:00:10.640 --> 00:00:16.400
 utilities board for the city of Denton on April 12th, 2021.

00:00:16.400 --> 00:00:23.480
 The first item is public comment, do we have anyone who's wishing to speak?

00:00:23.480 --> 00:00:26.480
 This is Tyler Smith with staff, no ma'am, you do not have any public comments at this

00:00:26.480 --> 00:00:27.480
 moment.

00:00:27.480 --> 00:00:30.560
 We're going to the regular meeting.

00:00:30.560 --> 00:00:36.640
 Consent agenda, does any board member wish to pull any of the items A through D on consent?

00:00:36.640 --> 00:00:37.640
 Billy?

00:00:37.640 --> 00:00:40.960
 I'd like to pull item number A.

00:00:40.960 --> 00:00:41.960
 Okay.

00:00:41.960 --> 00:00:43.560
 All right.

00:00:43.560 --> 00:00:44.560
 Letter A.

00:00:44.560 --> 00:00:46.760
 Letter A.

00:00:46.760 --> 00:00:47.760
 Anyone else?

00:00:47.760 --> 00:00:48.760
 All right.

00:00:48.760 --> 00:00:54.640
 Do we have a motion to approve items B through D?

00:00:54.640 --> 00:00:57.760
 Okay.

00:00:57.760 --> 00:00:58.760
 Karen?

00:00:58.760 --> 00:01:00.120
 So moved.

00:01:00.120 --> 00:01:04.120
 Karen moved and I think Barbara seconded.

00:01:04.120 --> 00:01:05.120
 Okay.

00:01:05.120 --> 00:01:07.120
 Billy, item A.

00:01:07.120 --> 00:01:18.640
 Let me pull this up, excuse me.

00:01:18.640 --> 00:01:31.640
 I'd just like a little more insight into where this was and I'm looking at the, I'm sorry.

00:01:31.640 --> 00:01:36.680
 Morning, ladies and gentlemen, Jason Brown, Denton Energy Center.

00:01:36.680 --> 00:01:37.680
 Great.

00:01:37.680 --> 00:01:38.680
 Go ahead, Jason.

00:01:38.680 --> 00:01:41.680
 I'm sorry, Susan, but I just.

00:01:41.680 --> 00:01:42.680
 Okay.

00:01:42.680 --> 00:01:43.680
 It's all right.

00:01:43.680 --> 00:01:44.680
 My question.

00:01:44.680 --> 00:02:00.840
 Hold on just a second.

00:02:00.840 --> 00:02:18.160
 Okay.

00:02:18.160 --> 00:02:19.160
 Sorry about that.

00:02:19.160 --> 00:02:21.200
 I couldn't really hear y'all.

00:02:21.200 --> 00:02:30.760
 Okay, so item A is the contract with Asset Works for a CMMS system.

00:02:30.760 --> 00:02:32.860
 Correct?

00:02:32.860 --> 00:02:41.640
 We are basically getting into a whole lot of maintenance activities and work orders and

00:02:41.640 --> 00:02:46.520
 correct work orders and that type of stuff to where we are needing a asset management

00:02:46.520 --> 00:02:53.320
 system to track and control and keep historical data for the facility itself.

00:02:53.320 --> 00:03:01.400
 In addition to work orders and corrective work orders and maintenance activities, it

00:03:01.400 --> 00:03:08.620
 will also be taking care of all of our parts and that kind of stuff.

00:03:08.620 --> 00:03:20.920
 Do you have a percentage of what the cost of this new software will be as to the possible

00:03:20.920 --> 00:03:29.160
 expenditures coming from its analysis or maybe I don't understand what the software does

00:03:29.160 --> 00:03:30.880
 that much, Jason.

00:03:30.880 --> 00:03:38.800
 Yeah, so really I don't have a comparison versus the cost of the system versus the analysis

00:03:38.800 --> 00:03:40.960
 that will be done.

00:03:40.960 --> 00:03:48.480
 Basically a CMMS system is if you have issues on a piece of equipment, you would fill out

00:03:48.480 --> 00:03:51.160
 a work order and track work order.

00:03:51.160 --> 00:03:57.080
 Currently what we're doing now is all paper ledger and that kind of stuff, so it's very

00:03:57.080 --> 00:03:59.420
 time-consuming for staff.

00:03:59.420 --> 00:04:01.120
 Within this, it's a system.

00:04:01.120 --> 00:04:08.000
 You go in, you load all of your equipment, your assets, that type of stuff, and you would

00:04:08.000 --> 00:04:12.800
 actually fill out a work order in this system and keep it going that way.

00:04:12.800 --> 00:04:13.800
 Same with parts.

00:04:13.800 --> 00:04:20.400
 You can track your parts that go to that piece of equipment or that asset and it would keep

00:04:20.400 --> 00:04:25.820
 all of your associated cost for that piece of equipment and in the future, you can run

00:04:25.820 --> 00:04:34.800
 a report and see how much that piece of equipment has costed, maintenance, hours, parts, downtime,

00:04:34.800 --> 00:04:35.800
 that kind of stuff.

00:04:35.800 --> 00:04:39.320
 Lee, you had your hand up, do you have a question also?

00:04:39.320 --> 00:04:40.320
 Yes, ma'am.

00:04:40.320 --> 00:04:46.920
 Are you going to be taking your current paper-based system and moving it into the computerized

00:04:46.920 --> 00:04:53.020
 system or will you be starting from scratch to create a new database in that system?

00:04:53.020 --> 00:04:55.840
 A little bit of both, sir.

00:04:55.840 --> 00:05:04.320
 Basically what we'll do in the beginning is gather all of the data that we have currently.

00:05:04.320 --> 00:05:10.000
 Right now, we're storing them in files, so engine one has a file.

00:05:10.000 --> 00:05:17.320
 What we don't have is by asset broken down or subcomponent, so that will be an ongoing

00:05:17.320 --> 00:05:26.300
 task, but originally off of the start, if this is awarded and approved, we'll be loading

00:05:26.300 --> 00:05:31.680
 all of the assets and then as we continue, we'll keep putting all of that documentation

00:05:31.680 --> 00:05:37.000
 in the system, so eventually it will all be in the system.

00:05:37.000 --> 00:05:42.640
 Okay, so will the historical data that you currently have be uploaded into this computerized

00:05:42.640 --> 00:05:43.640
 system?

00:05:43.640 --> 00:05:44.640
 That is correct.

00:05:44.640 --> 00:05:45.640
 Okay.

00:05:45.640 --> 00:05:46.640
 Thank you.

00:05:46.640 --> 00:05:47.640
 Yes, sir.

00:05:47.640 --> 00:05:48.640
 Other questions?

00:05:48.640 --> 00:05:49.640
 Okay.

00:05:49.640 --> 00:06:01.960
 That's all I have, I want to do, it's a lot of money to convert and I think every system,

00:06:01.960 --> 00:06:07.280
 right now, everybody's converting a lot with technology, continuing to grow.

00:06:07.280 --> 00:06:12.760
 Wish I was in this technology business, but with that having said, I'll move approval.

00:06:12.760 --> 00:06:13.760
 Okay.

00:06:13.760 --> 00:06:14.760
 Do we have a second?

00:06:14.760 --> 00:06:15.760
 Mr. Ryback.

00:06:15.760 --> 00:06:18.760
 All in favor say aye.

00:06:18.760 --> 00:06:19.760
 Aye.

00:06:19.760 --> 00:06:20.760
 Aye.

00:06:20.760 --> 00:06:23.560
 Motion carries.

00:06:23.560 --> 00:06:32.680
 The next item is consider the approval of minutes for March 22nd, 23rd, and April 5th

00:06:32.680 --> 00:06:33.960
 of 2021.

00:06:33.960 --> 00:06:35.520
 Are you moving approval, Karen, or?

00:06:35.520 --> 00:06:38.440
 No, I just had an amendment.

00:06:38.440 --> 00:06:41.880
 Oh, okay.

00:06:41.880 --> 00:06:52.840
 I'm pretty sure that we approved consent agendas A through C, not A, B, D, and E.

00:06:52.840 --> 00:06:59.640
 In the March 22nd minutes, it's just, it said that we, for the consent agendas, it said

00:06:59.640 --> 00:07:04.200
 that we approved A, B, D, and E, but there were only three consent agenda items.

00:07:04.200 --> 00:07:05.680
 Oh, okay.

00:07:05.680 --> 00:07:07.480
 Good catch.

00:07:07.480 --> 00:07:13.080
 There was no D and E, and there was a C. That's my memory anyway.

00:07:13.080 --> 00:07:20.720
 Well, and Kim, can we go back and look at the video and have that corrected?

00:07:20.720 --> 00:07:21.720
 We can do that.

00:07:21.720 --> 00:07:22.720
 Okay.

00:07:22.720 --> 00:07:32.600
 So, maybe we would amend it to be minutes approved with the corrections.

00:07:32.600 --> 00:07:33.600
 Yeah.

00:07:33.600 --> 00:07:34.600
 Okay.

00:07:34.600 --> 00:07:35.920
 Everything else looks fine.

00:07:35.920 --> 00:07:36.920
 Okay.

00:07:36.920 --> 00:07:39.760
 So, are you making that motion, Karen?

00:07:39.760 --> 00:07:40.760
 Sure.

00:07:40.760 --> 00:07:41.760
 Yes.

00:07:41.760 --> 00:07:42.760
 All right.

00:07:42.760 --> 00:07:43.760
 And the second?

00:07:43.760 --> 00:07:44.760
 Multitasking here.

00:07:44.760 --> 00:07:45.760
 Second.

00:07:45.760 --> 00:07:46.760
 Okay, Barbara.

00:07:46.760 --> 00:07:47.760
 All in favor say aye.

00:07:47.760 --> 00:07:48.760
 Aye.

00:07:48.760 --> 00:07:49.760
 Aye.

00:07:49.760 --> 00:07:50.760
 Motion carries.

00:07:50.760 --> 00:07:55.200
 Okay, the next item is consider recommending the adoption of an ordinance for the city

00:07:55.200 --> 00:08:00.760
 of Denton, a Texas Home Rule Municipal Corporation, authorizing the city manager or their designee

00:08:00.760 --> 00:08:06.680
 to execute a contract with Wartsilla North America, Inc. for the supply of routine maintenance

00:08:06.680 --> 00:08:11.200
 supplies and services for the Denton Energy Center, providing for the expenditure of funds

00:08:11.200 --> 00:08:17.120
 therefore and providing an effective date to award Wartsilla North America for three

00:08:17.120 --> 00:08:21.840
 years with the option of two additional years extensions with a total five-year not to exceed

00:08:21.840 --> 00:08:26.040
 amount of $3,448,184.

00:08:26.040 --> 00:08:32.560
 Who's doing that one?

00:08:32.560 --> 00:08:33.880
 Jason Brown again.

00:08:33.880 --> 00:08:34.880
 Yeah.

00:08:34.880 --> 00:08:35.880
 It's me again.

00:08:35.880 --> 00:08:38.080
 Hold on just a second.

00:08:38.080 --> 00:08:57.440
 I think I got this figured out now.

00:08:57.440 --> 00:09:20.840
 Ms. Kim, I'm having trouble.

00:09:20.840 --> 00:09:30.320
 Is it sharing it?

00:09:30.320 --> 00:09:47.160
 All right, y'all can see me and hear me.

00:09:47.160 --> 00:09:50.680
 Sorry, I thought I had it.

00:09:50.680 --> 00:09:56.640
 So, Jason Brown, Plaint Manager, Denton Energy Center again.

00:09:56.640 --> 00:10:01.840
 The Denton Energy Center Equipment Maintenance Parts and Services prepared for you a short

00:10:01.840 --> 00:10:06.680
 presentation this morning to briefly discuss the need for maintenance parts and services

00:10:06.680 --> 00:10:11.120
 for this, for the equipment at the Denton Energy Center.

00:10:11.120 --> 00:10:17.400
 In this, we'll briefly discuss the major objective of this contract, types of maintenance, maintenance

00:10:17.400 --> 00:10:24.940
 intervals, and lastly, the bid summary for this purchase.

00:10:24.940 --> 00:10:30.240
 The objective of this contract is to help achieve the highest possible unit availability

00:10:30.240 --> 00:10:32.200
 for each engine.

00:10:32.200 --> 00:10:38.920
 The units must be available during high-priced hours to insulate DME customers for high-priced

00:10:38.920 --> 00:10:45.200
 market exposures and for performing equipment preventative maintenance to ensure unit reliability

00:10:45.200 --> 00:10:48.040
 and availability is maintained.

00:10:48.040 --> 00:10:54.000
 Despite best efforts, mechanical systems are subject to random failures, however, performing

00:10:54.000 --> 00:11:00.960
 routine maintenance and having spare parts on hand is the best practice to ensure unit

00:11:00.960 --> 00:11:04.380
 reliability and availability is maintained.

00:11:04.380 --> 00:11:09.760
 By performing equipment preventative, predictive, and corrective maintenance, we are doing everything

00:11:09.760 --> 00:11:15.160
 in our power to ensure the asset is maintained in tip-top shape to maintain efficiency and

00:11:15.160 --> 00:11:20.080
 reliability and availability to remain cost-effective for our customers.

00:11:20.080 --> 00:11:27.120
 In the next few slides, I'll briefly discuss routine maintenance schedule parts and the

00:11:27.120 --> 00:11:31.360
 benefit of these parts to help understand why we need this purchase of routine maintenance

00:11:31.360 --> 00:11:36.440
 parts and why it is a long-term solution to achieve our objective.

00:11:36.440 --> 00:11:43.000
 Please feel free to ask any questions at any time as we go.

00:11:43.000 --> 00:11:50.360
 The denture engine center, much like your car engine, it must be maintained routinely

00:11:50.360 --> 00:11:56.040
 as recommended by your equipment manufacturer to operate correctly.

00:11:56.040 --> 00:12:01.120
 This is called preventative maintenance program, where predictive, preventative, and corrective

00:12:01.120 --> 00:12:03.020
 maintenance activities occur.

00:12:03.020 --> 00:12:07.640
 Many components require routine maintenance to proactively inspect for where premature

00:12:07.640 --> 00:12:15.400
 failure and critical parts must be replaced or repaired.

00:12:15.400 --> 00:12:20.840
 The preventative maintenance activities are performed consistent with OEM recommendations

00:12:20.840 --> 00:12:21.840
 guidelines.

00:12:21.840 --> 00:12:25.440
 OEM is equipment manufacturer.

00:12:25.440 --> 00:12:30.000
 Based on operating hours, this chart just depicts our current estimation of when maintenance

00:12:30.000 --> 00:12:32.360
 activities will occur.

00:12:32.360 --> 00:12:40.400
 So 2020, 2022, 2023, all minor maintenance activities, and then it just keeps progressing

00:12:40.400 --> 00:12:43.960
 as operating hours continue.

00:12:43.960 --> 00:12:48.880
 All maintenance activities require a shutdown of the individual units, but we want to minimize

00:12:48.880 --> 00:12:52.320
 the length of time that they're unavailable for generation.

00:12:52.320 --> 00:12:59.160
 So having contract in place for parts and services on hand is crucial.

00:12:59.160 --> 00:13:03.000
 As you see in this chart, we are due for minor maintenance currently, and in the following

00:13:03.000 --> 00:13:10.300
 years until the first major maintenance activity takes place at about 12,000 operating hours.

00:13:10.300 --> 00:13:17.440
 As you can see from this chart, 12,000 operating hours were projected to be 2024, 2025, somewhere

00:13:17.440 --> 00:13:24.240
 in that time range, but keep in mind with the denture engine center being dispatched

00:13:24.240 --> 00:13:32.000
 against the ERCOT market, the time frames could change a little bit forward or backwards.

00:13:32.000 --> 00:13:36.120
 Our objective is to make the units available as often as possible, as I said earlier, to

00:13:36.120 --> 00:13:38.480
 generate the most revenue from the market.

00:13:38.480 --> 00:13:46.640
 So we must be prepared to perform the maintenance task to ensure efficiency, availability, and

00:13:46.640 --> 00:13:48.600
 reliability of the equipment.

00:13:48.600 --> 00:13:52.160
 Jason, I have a question.

00:13:52.160 --> 00:13:54.040
 Yes, sir.

00:13:54.040 --> 00:14:00.800
 The hours that you showed are generic, I presume, and do not apply to a specific piece of equipment?

00:14:00.800 --> 00:14:05.500
 So everything at the plant, well, let me go back just a little bit.

00:14:05.500 --> 00:14:09.080
 Most everything at the plant is hour-based maintenance.

00:14:09.080 --> 00:14:17.280
 So if the unit has a start command, it's all of the hour-based pieces of equipment that

00:14:17.280 --> 00:14:18.760
 fall into that category.

00:14:18.760 --> 00:14:26.320
 There are a few pieces of equipment that are calendar-based, so monthly, quarterly, annually,

00:14:26.320 --> 00:14:33.840
 but most of those are like safety eye washes, some of your motors for increasing intervals

00:14:33.840 --> 00:14:37.840
 and that type of stuff.

00:14:37.840 --> 00:14:38.840
 That answer?

00:14:38.840 --> 00:14:43.200
 I guess I was trying to get at the major equipment, the generators, so is that like the average

00:14:43.200 --> 00:14:49.360
 of their run hours or total run hours of all the units, I just wanted to get a little clarification.

00:14:49.360 --> 00:14:51.600
 It's individual pieces of equipment, sir.

00:14:51.600 --> 00:14:56.480
 So each one operates individually, so unit one through 12.

00:14:56.480 --> 00:15:02.080
 Unit one is engine generator and auxiliaries.

00:15:02.080 --> 00:15:04.100
 And then you have two and three and four.

00:15:04.100 --> 00:15:11.720
 So as unit one hits 4,000 hours, we do the maintenance interval for unit number one,

00:15:11.720 --> 00:15:15.280
 and then so on and so forth throughout the engines.

00:15:15.280 --> 00:15:16.280
 All right.

00:15:16.280 --> 00:15:20.680
 So that was a generic list, but you have multiple pieces of equipment, so it wasn't an overall

00:15:20.680 --> 00:15:21.680
 review of those.

00:15:21.680 --> 00:15:22.680
 Correct.

00:15:22.680 --> 00:15:23.680
 Gotcha.

00:15:23.680 --> 00:15:24.680
 Yes, sir.

00:15:24.680 --> 00:15:25.680
 Thank you.

00:15:25.680 --> 00:15:27.280
 Yes, sir.

00:15:27.280 --> 00:15:32.040
 So the major benefit of entering into this contract is that the best overall price for

00:15:32.040 --> 00:15:35.640
 the material on the market was achieved.

00:15:35.640 --> 00:15:40.600
 We will have OEM support on parts and services and troubleshooting, and best of all, we're

00:15:40.600 --> 00:15:46.360
 doing everything that we can do to ensure that we're maintaining efficiency to the OEM

00:15:46.360 --> 00:15:55.840
 standard to ensure reliability, availability, and cost effectiveness for our customers.

00:15:55.840 --> 00:16:01.920
 So late last spring, we began proactively preparing for current and future maintenance

00:16:01.920 --> 00:16:05.520
 activities, outages, minor maintenance, that kind of stuff.

00:16:05.520 --> 00:16:14.000
 So we hit streets seeking prospective bidders for this type of equipment with a formal IFB

00:16:14.000 --> 00:16:18.840
 for the parts needed for all of the minor maintenance intervals.

00:16:18.840 --> 00:16:20.960
 The specifications were posted.

00:16:20.960 --> 00:16:26.120
 They were sent to 95 potential suppliers, two companies submitted bids, one the OEM

00:16:26.120 --> 00:16:31.040
 and then a third-party company.

00:16:31.040 --> 00:16:35.520
 Of the two, one was partial and had higher prices than the OEM.

00:16:35.520 --> 00:16:41.680
 The partial bidder was rejected as an incomplete bid and also for not being qualified to work

00:16:41.680 --> 00:16:44.920
 on all aspects of the equipment.

00:16:44.920 --> 00:16:49.080
 We are recommending and requesting the approval of the maintenance parts and services in the

00:16:49.080 --> 00:16:57.440
 amount of $3,448,148 towards a lead to be funded from the Denton Energy Center operating

00:16:57.440 --> 00:17:02.840
 annual budget as needed based on operating hours.

00:17:02.840 --> 00:17:04.880
 And I'm free for any more questions.

00:17:04.880 --> 00:17:07.440
 Jason, I have a question.

00:17:07.440 --> 00:17:08.440
 Sorry, Ben.

00:17:08.440 --> 00:17:09.960
 I'll just jump in here quickly.

00:17:09.960 --> 00:17:14.800
 So do you currently have a company doing this work and this is a replacement for that company

00:17:14.800 --> 00:17:17.000
 or is this a new service altogether?

00:17:17.000 --> 00:17:19.040
 No, sir.

00:17:19.040 --> 00:17:27.720
 The major aspect of -- sorry, hold on just one second.

00:17:27.720 --> 00:17:30.960
 There you go.

00:17:30.960 --> 00:17:33.880
 Is that better?

00:17:33.880 --> 00:17:35.280
 That's fine.

00:17:35.280 --> 00:17:42.960
 So currently, the major aspect of this contract is not really a services, it's the parts based.

00:17:42.960 --> 00:17:51.160
 The services aspect of this is for unplanned emergencies and items that site staff can't

00:17:51.160 --> 00:17:52.920
 work on.

00:17:52.920 --> 00:17:58.200
 So logic based issues, control module issues.

00:17:58.200 --> 00:18:04.800
 If we have, say, a head or a turbo that needs repaired, we can send it out to their shop,

00:18:04.800 --> 00:18:07.560
 have them work on it, return it.

00:18:07.560 --> 00:18:14.000
 As far as the parts aspect of this, which is the big bulk of the money, right, to 2.6,

00:18:14.000 --> 00:18:19.920
 almost 2.7 million, we currently do not have a contract for parts.

00:18:19.920 --> 00:18:27.320
 What we've been doing thus far is using our current stock, our inventory parts, for the

00:18:27.320 --> 00:18:31.680
 maintenance activities and now we're running out of those parts and need to replenish so

00:18:31.680 --> 00:18:34.400
 that we can keep doing preventative maintenance.

00:18:34.400 --> 00:18:39.320
 All right, so this is a new service or operation to support the plant.

00:18:39.320 --> 00:18:40.320
 That is correct.

00:18:40.320 --> 00:18:42.240
 I'm sorry, Ben, I'll yield the floor to you.

00:18:42.240 --> 00:18:46.120
 Jason, you actually answered my question, so I'm good to go.

00:18:46.120 --> 00:18:47.120
 Oh, perfect.

00:18:47.120 --> 00:18:51.840
 Yeah, let's remember that Wartsilla is the manufacturer of these engines.

00:18:51.840 --> 00:18:52.840
 Correct.

00:18:52.840 --> 00:18:55.840
 Karen, go ahead.

00:18:55.840 --> 00:19:00.400
 You're muted.

00:19:00.400 --> 00:19:06.040
 Just to make some clarification, it seems like we've been over a similar issue in the

00:19:06.040 --> 00:19:09.920
 past when we were talking about warranty.

00:19:09.920 --> 00:19:16.480
 I mean, the plant is quite new and it's been under warranty and the warranty is now expired.

00:19:16.480 --> 00:19:21.560
 Is that what we're dealing with or the warranty period has run out?

00:19:21.560 --> 00:19:22.560
 So correct.

00:19:22.560 --> 00:19:24.160
 The warranty period ran out two years ago.

00:19:24.160 --> 00:19:25.160
 Two years ago.

00:19:25.160 --> 00:19:26.160
 Okay.

00:19:26.160 --> 00:19:27.160
 Yes, ma'am.

00:19:27.160 --> 00:19:33.160
 So in that, the only thing the OEM warranty had during the construction time period and

00:19:33.160 --> 00:19:38.560
 one year after that was issues, corrective issues and that kind of stuff.

00:19:38.560 --> 00:19:46.240
 The warranty never took care of maintenance and prolonged maintenance activities.

00:19:46.240 --> 00:19:53.200
 And Jason, you said you started this nine months ago, started looking into this?

00:19:53.200 --> 00:19:54.520
 Yeah.

00:19:54.520 --> 00:19:59.000
 We started the process late fall of last year.

00:19:59.000 --> 00:20:00.480
 Okay.

00:20:00.480 --> 00:20:01.640
 Okay.

00:20:01.640 --> 00:20:04.200
 Any other questions?

00:20:04.200 --> 00:20:06.200
 Right.

00:20:06.200 --> 00:20:08.960
 Do we have a motion to approve?

00:20:08.960 --> 00:20:10.440
 Barbara?

00:20:10.440 --> 00:20:14.320
 Barbara's motioning and Lee is seconding.

00:20:14.320 --> 00:20:15.880
 All in favor say aye.

00:20:15.880 --> 00:20:16.880
 Aye.

00:20:16.880 --> 00:20:17.880
 Aye.

00:20:17.880 --> 00:20:18.880
 Opposed?

00:20:18.880 --> 00:20:19.880
 Okay.

00:20:19.880 --> 00:20:20.880
 It carries.

00:20:20.880 --> 00:20:29.240
 And the next item, sorry.

00:20:29.240 --> 00:20:33.440
 Consider recommending the adoption of an ordinance for the city of Denton, Texas amending the

00:20:33.440 --> 00:20:40.080
 fiscal year 2020, 2021 budget and annual program for the services of the city of Denton to

00:20:40.080 --> 00:20:46.720
 allow for adjustments to the electric fund in $140 million for the purpose of purchasing

00:20:46.720 --> 00:20:52.240
 power during the winter storm Yuri event, declaring a public person purpose and providing

00:20:52.240 --> 00:20:58.640
 several several ability clause and an open meetings clause and an effective date.

00:20:58.640 --> 00:21:02.560
 Good morning, PB members, chair, Nick Benson, assistant director of finance.

00:21:02.560 --> 00:21:07.440
 Let me get the presentation pulled up really quick.

00:21:07.440 --> 00:21:10.720
 Okay.

00:21:10.720 --> 00:21:14.400
 So one slide, Susan, is what we have for this item really quick.

00:21:14.400 --> 00:21:17.080
 So I think this is the first time I've been in front of a lot of the new PB members.

00:21:17.080 --> 00:21:18.480
 So I just want to say welcome.

00:21:18.480 --> 00:21:22.040
 We're actually really glad that you're here and look forward to the conversations today

00:21:22.040 --> 00:21:25.400
 in the coming months as we talk about the upcoming budget cycle.

00:21:25.400 --> 00:21:32.000
 So we are in front of you today to amend the 2021 operating budget for the electric fund.

00:21:32.000 --> 00:21:36.560
 As you're aware, and it's been discussed by the public utility board of last several months,

00:21:36.560 --> 00:21:42.140
 we have had increased purchase power expense associated the recent storm event.

00:21:42.140 --> 00:21:48.720
 Those net expenses were $140 million, approximately, so we are looking to increase our appropriation

00:21:48.720 --> 00:21:55.600
 authority in the operating budget from $231.1 million to $371.1 million.

00:21:55.600 --> 00:22:00.480
 So this will cover those additional purchase power expenses and keep us within that budgetary

00:22:00.480 --> 00:22:04.960
 authority that the PB and city council approves.

00:22:04.960 --> 00:22:05.960
 That's it.

00:22:05.960 --> 00:22:15.000
 Thank you for questions if you have any questions.

00:22:15.000 --> 00:22:16.080
 I have one.

00:22:16.080 --> 00:22:21.240
 So the public purpose of this is that it was basically an emergency and under the law,

00:22:21.240 --> 00:22:26.520
 you can go ahead and do what you need to do and then come back and get approval.

00:22:26.520 --> 00:22:32.160
 Is that is that my correct understanding is correct, Susan, but but actually, you know,

00:22:32.160 --> 00:22:36.120
 in our expenditure authority that we have within the budget, the majority of the purchase

00:22:36.120 --> 00:22:41.300
 power expenses are actually covered in the original adopted budget of $231 million.

00:22:41.300 --> 00:22:42.960
 But but the you're correct.

00:22:42.960 --> 00:22:45.440
 We did come back after the expense occurred.

00:22:45.440 --> 00:22:49.840
 So yeah, we do we do like you know, for new PB members, if you're not familiar with it,

00:22:49.840 --> 00:22:54.960
 the fiscal year runs from October 1 to September 30 of each year, and we always try to come

00:22:54.960 --> 00:22:58.500
 back to you in advance if we think we're going to exceed the budget.

00:22:58.500 --> 00:23:01.400
 But in this situation, like Susan said, it was an emergency situation.

00:23:01.400 --> 00:23:03.440
 We're actually coming to you after the fact.

00:23:03.440 --> 00:23:06.840
 That's absolutely correct.

00:23:06.840 --> 00:23:10.280
 Any other questions?

00:23:10.280 --> 00:23:12.360
 Do we have a motion to approve?

00:23:12.360 --> 00:23:17.920
 We think we have an option, so I'll move approval.

00:23:17.920 --> 00:23:18.920
 Thank you, Billy.

00:23:18.920 --> 00:23:19.920
 Do and Karen seconding.

00:23:19.920 --> 00:23:20.920
 Okay.

00:23:20.920 --> 00:23:21.920
 All in favor say aye.

00:23:21.920 --> 00:23:22.920
 Aye.

00:23:22.920 --> 00:23:26.680
 And I see Mr. Ryback needed to step away.

00:23:26.680 --> 00:23:33.520
 So the next item management reports.

00:23:33.520 --> 00:23:38.360
 Madam Chair, PB members, the first item that we have here for you and the management reports

00:23:38.360 --> 00:23:46.800
 is the the January 2021 deck informal staff report and in the actual dashboard and certainly,

00:23:46.800 --> 00:23:50.760
 you know, Nick and other folks from finance are here if you if you have if anyone has

00:23:50.760 --> 00:23:58.200
 any questions regarding that report looks like none.

00:23:58.200 --> 00:24:05.080
 All right, so so the next item that we have for you is just the the future agenda item

00:24:05.080 --> 00:24:10.680
 matrix and obviously today we're going to be going through some wrap up presentations

00:24:10.680 --> 00:24:13.960
 of the previous fiscal year as well as an update of the current fiscal year for the

00:24:13.960 --> 00:24:20.020
 various utilities and I think Nick or Cassie will be going through that with you and then

00:24:20.020 --> 00:24:27.600
 on April 26 we do have scheduled a work session with the PB to kind of go go through but you

00:24:27.600 --> 00:24:32.320
 know what priorities you have for for the upcoming budget and certainly want to take

00:24:32.320 --> 00:24:37.960
 that feedback as we as we develop the budget and just you guys know we are already in that

00:24:37.960 --> 00:24:42.400
 mode and so we are already working with the finance department working through the various

00:24:42.400 --> 00:24:47.560
 budgets and and submittals for for the next fiscal year.

00:24:47.560 --> 00:24:51.240
 So this I think a good opportune time and just as a reminder this really kind of came

00:24:51.240 --> 00:24:57.440
 out of a discussion that Billy and Susan had with city management about you know PB's role

00:24:57.440 --> 00:25:01.880
 and and where things might fit in we thought this would be a good opportunity I think in

00:25:01.880 --> 00:25:07.700
 the future if we continue to do this we'll probably do it a little bit sooner than than

00:25:07.700 --> 00:25:11.720
 April but but again I think it's a good opportunity for if there's some things that you want to

00:25:11.720 --> 00:25:16.240
 see in the budget you want to give us a heads up that way we can become you know be better

00:25:16.240 --> 00:25:21.640
 prepared for them and then obviously come June we'll we'll be heavy into the budget

00:25:21.640 --> 00:25:27.600
 and we'll be coming back to the PB going through the various you know budgets you'll you'll

00:25:27.600 --> 00:25:32.840
 get you know line item information for each of the utilities and we'll be happy to answer

00:25:32.840 --> 00:25:36.920
 any questions that you have and as well as why certain things are being proposed and

00:25:36.920 --> 00:25:42.360
 needed but with that if there's anything else that I've missed on the on the future agendas

00:25:42.360 --> 00:25:46.840
 or if there's something that you'd like to see just feel free to let me know now or you

00:25:46.840 --> 00:25:54.040
 can always shoot me an email okay and then the last item that we have for you is the

00:25:54.040 --> 00:25:58.960
 new business action item again we still have some items on here and and Susan you would

00:25:58.960 --> 00:26:04.120
 probably I apologize for stealing your thunder here but you know some of these were were

00:26:04.120 --> 00:26:10.960
 questions that we had from Commissioner Ed Soph and Ed's Ed's has recently resigned from

00:26:10.960 --> 00:26:17.960
 the PV to to be a member of another another city commission or board and so but some of

00:26:17.960 --> 00:26:21.960
 these questions are still there certainly think they're still valid we'll be bringing

00:26:21.960 --> 00:26:28.900
 back the majority of these through our comprehensive solid waste management report that we'll be

00:26:28.900 --> 00:26:35.240
 bringing to you here in the next few months but with that certainly happy answering questions

00:26:35.240 --> 00:26:42.000
 that you may have or if you have for staff regarding any of these items questions all

00:26:42.000 --> 00:26:48.760
 right there's no question I think I think Barbara has one oh I'm sorry go ahead thank

00:26:48.760 --> 00:27:06.020
 you oh you're muted okay I wanted to ask you about on the it's mentioned that you did a

00:27:06.020 --> 00:27:12.120
 commercial bulk program to help property owners manage illegal dumping could you briefly tell

00:27:12.120 --> 00:27:18.680
 me what that I don't recall anything of that nature would you would could you tell me a

00:27:18.680 --> 00:27:22.920
 little bit about it yes ma'am I think Brian Warner's on here he'll be happy to respond

00:27:22.920 --> 00:27:30.000
 to that Brian yes ma'am just like our our you know residential bulk if a commercial

00:27:30.000 --> 00:27:34.560
 business owner has found that there's bulk on their property they've got materials they

00:27:34.560 --> 00:27:39.640
 can't fit into their dumpster normally because it's one-off or or something of that nature

00:27:39.640 --> 00:27:44.420
 they can call customer service and just like your residential crew we will send it out

00:27:44.420 --> 00:27:52.000
 send out a a truck to pick that material up for a fee I believe it's a $20 mobilization

00:27:52.000 --> 00:28:00.280
 fee and then a $5 per item fee all right so that that mattress and springs that's flinged

00:28:00.280 --> 00:28:08.180
 up against my dumpster I can get rid of it yes excellent thank you very much I wasn't

00:28:08.180 --> 00:28:12.620
 aware of that and again you know just call customer service nine four zero three four

00:28:12.620 --> 00:28:18.840
 nine eight seven zero zero and they will take care of you thank you very much Brian you're

00:28:18.840 --> 00:28:28.480
 welcome oh Karen go ahead I just quick follow-up for clarification Brian so the the business

00:28:28.480 --> 00:28:35.680
 owner who's already paying for the dumpster is also paying for the unauthorized dumping

00:28:35.680 --> 00:28:43.440
 correct okay I mean it's only $25 but it's bad the business owner has to cover it but

00:28:43.440 --> 00:28:48.680
 well and again pursuant to state law any any material that is on your property is your

00:28:48.680 --> 00:28:53.560
 responsibility to handle and manage regardless of who put it there so that's why it's important

00:28:53.560 --> 00:28:58.840
 for as we go through this process you know we've got revetments we're managing that material

00:28:58.840 --> 00:29:03.760
 remain we're managing access appropriately to our properties and that's the same thing

00:29:03.760 --> 00:29:11.740
 with graffiti you're responsible for repairing graffiti right it's along the same lines correct

00:29:11.740 --> 00:29:17.440
 okay same principle thank you I guess one out of three in bad residential you can get

00:29:17.440 --> 00:29:30.640
 two items picked up a week yes bulky items so okay any others all right on to concluding

00:29:30.640 --> 00:29:37.040
 items does any board member wish to congratulate somebody or something on a future agenda I

00:29:37.040 --> 00:29:43.320
 do want to thank Ed so for being on the board he's going to sustainability which everyone

00:29:43.320 --> 00:29:50.040
 who knows Ed will know that he'll be absolutely fabulous on that committee so I doubt he's

00:29:50.040 --> 00:29:59.200
 watching but if he does it is thank you Ed for your service yes he will congratulations

00:29:59.200 --> 00:30:05.320
 to you Susan on your new grandchild that's why you weren't here last time yes he's absolutely

00:30:05.320 --> 00:30:16.160
 adorable but what grandma doesn't say that right all right the next item is work session

00:30:16.160 --> 00:30:20.560
 receive a report hold a discussion and give staff direction regarding the fiscal year

00:30:20.560 --> 00:30:27.160
 2020-21 budget capital improvement program rates five-year financial forecast for water

00:30:27.160 --> 00:30:33.000
 wastewater solid waste and the electric funds good morning again Nick Benson assistant director

00:30:33.000 --> 00:30:38.700
 of finance and Susan there's four four presentations so I'll walk the pub through water wastewater

00:30:38.700 --> 00:30:44.360
 and solid waste and then Cassiog and the director of solid waste walk you through electric so

00:30:44.360 --> 00:30:49.080
 the water presentation is like 20-21 slides long if you want we can go through the entire

00:30:49.080 --> 00:30:53.160
 thing then take questions or we can stop halfway there is somewhat of a natural break in the

00:30:53.160 --> 00:30:59.840
 presentation so we'll get started please let me know if you have any questions we'll be

00:30:59.840 --> 00:31:07.800
 happy to answer them okay so really quick a summary of the presentation and what we'll

00:31:07.800 --> 00:31:13.400
 discuss today we'll talk about the 1920 end of your actuals look at the 10-year forecast

00:31:13.400 --> 00:31:16.920
 I know this may be the first time some of the PB members have seen it so be happy to

00:31:16.920 --> 00:31:20.640
 walk you through that in detail and ask ask any questions that you may have we'll address

00:31:20.640 --> 00:31:25.680
 them the capital agreement plan we'll look at that capital plan and what's included in

00:31:25.680 --> 00:31:29.700
 it and the cost of service overview so we did recently complete a cost of service study

00:31:29.700 --> 00:31:34.200
 for the water utility I'll review that with you shortly we'll have a little bit of rate

00:31:34.200 --> 00:31:48.760
 discussion that we'll talk about next steps as Tony mentioned earlier so this is the actual

00:31:48.760 --> 00:31:53.920
 water revenue for the water utility for the PB members have seen this before and those

00:31:53.920 --> 00:31:57.920
 that haven't I'll start on the left-hand side and walk you through it so our revenue is

00:31:57.920 --> 00:32:02.120
 grouped into different categories you can see at the top interest operating you have

00:32:02.120 --> 00:32:08.320
 some residential revenue commercial water for resale other white other water transfers

00:32:08.320 --> 00:32:13.780
 in and impact the revenue and talk about impact fees and a little bit also and 1819 actuals

00:32:13.780 --> 00:32:17.880
 you can see this is a couple fiscal years ago this is the most recent fiscal year that

00:32:17.880 --> 00:32:22.720
 ended the one we want to talk to you about today so as 1920 this fiscal year ended September

00:32:22.720 --> 00:32:28.640
 30th of 2020 this is the adopted budget so this budget was adopted during the budgeting

00:32:28.640 --> 00:32:35.480
 process last year and it took effect October 1st of 2020 you know actual revenue what I

00:32:35.480 --> 00:32:39.920
 wanted to walk you through you could see residential water cells are really close to that budgeted

00:32:39.920 --> 00:32:48.760
 number of 2.5 they did come in at 2.4 commercial was budgeted at 17.6 and came in at 17.1 so

00:32:48.760 --> 00:32:54.200
 a little bit below the budget but but fairly close water for resale is some of the contracted

00:32:54.200 --> 00:32:58.760
 wholesale agreements that we have out there with different entities did come in a little

00:32:58.760 --> 00:33:06.200
 bit above budget which is great so total resources for the department is 48.3 we did use reserves

00:33:06.200 --> 00:33:14.640
 of 1.2 for 49.5 and total resources the adopted budget did include reserve usage of 2.9 so

00:33:14.640 --> 00:33:19.080
 as you can see we did finish the year about 1.8 million dollars better than originally

00:33:19.080 --> 00:33:25.720
 budgeted water expenses by different operational units so within the water utility we have

00:33:25.720 --> 00:33:30.200
 different operational units we divide them by divisions we have an admin division utility

00:33:30.200 --> 00:33:36.500
 administration public affairs production distribution metering lab miscellaneous and these categories

00:33:36.500 --> 00:33:41.560
 help us in the cost of service model to establish the cost for each one and plug those costs

00:33:41.560 --> 00:33:49.120
 in to establish our rates so same thing here we had 1819 actuals 1920 budget 1920 actuals

00:33:49.120 --> 00:33:54.960
 and then 2021 adopted I did note on here that utility administration no longer has a budget

00:33:54.960 --> 00:34:00.880
 2021 and this budget was combined with water administration and public outreach and so

00:34:00.880 --> 00:34:05.760
 it was divided between those two one other thing I want to do is just congratulate staff

00:34:05.760 --> 00:34:10.720
 they did a great job when COVID hit last year of going into that 19 and 20 budget and really

00:34:10.720 --> 00:34:15.760
 looking at their operating expenses and doing some reductions during that difficult time

00:34:15.760 --> 00:34:19.640
 so just wanted to point that out we did have a note here at the bottom but you can see

00:34:19.640 --> 00:34:27.720
 we did have a savings just shy of 2 million so it's a great job by the operational staff

00:34:27.720 --> 00:34:31.160
 this is the 10-year forecast for the water utility I know this says five-year appear

00:34:31.160 --> 00:34:35.000
 but this is actually a 10-year period and there's a lot of numbers on this page I will

00:34:35.000 --> 00:34:41.560
 do my best to walk you through it from the left to the right so 1920 adopted budget as

00:34:41.560 --> 00:34:46.880
 the budget we just talked about so you can see 48.1 in revenue with that 2.9 million

00:34:46.880 --> 00:34:52.720
 in reserve usage 1920 actuals you can see that 48.3 that we reviewed a couple slides

00:34:52.720 --> 00:34:59.720
 ago with 1.2 in reserve usage as you work your way down the page you can see the adopted

00:34:59.720 --> 00:35:07.840
 expenses for 1920 and you can see the actual expenses for 1920 on this green line we always

00:35:07.840 --> 00:35:11.320
 do like to point out if there was any rate increases the 1920 budget did not include

00:35:11.320 --> 00:35:16.720
 a rate increase or decrease there was nothing and then going a little bit further down what

00:35:16.720 --> 00:35:20.080
 I want to point out to everybody is our operating reserve and we'll talk about this a little

00:35:20.080 --> 00:35:24.400
 bit later in the presentation and talk to you about what our current policy is and what

00:35:24.400 --> 00:35:28.680
 the recommendation is moving forward so currently you can see we have an operating reserve it's

00:35:28.680 --> 00:35:34.520
 made up of two components a working capital and operating reserve itself so total budget

00:35:34.520 --> 00:35:39.760
 we budgeted at 21.5 where we ended the year with using a little bit less than reserves

00:35:39.760 --> 00:35:45.480
 we finished about 23.2 keep moving down the page a little bit you can see we have an impact

00:35:45.480 --> 00:35:50.680
 fee capital reserve this is for a large capital project which is the Lakebury Roberts plant

00:35:50.680 --> 00:35:55.760
 expansion coming up in a few years we do have nine million setting aside in cash to fund

00:35:55.760 --> 00:35:59.600
 the design of that project so I want to be sure to point that out to the PEB today that

00:35:59.600 --> 00:36:04.440
 is a big project coming up moving down the page a little bit further down here in the

00:36:04.440 --> 00:36:07.760
 bold I definitely want to point this out to you these are those targets that we'll talk

00:36:07.760 --> 00:36:12.440
 about in a few slides so we have a minimum and a maximum we try our best to be in the

00:36:12.440 --> 00:36:18.160
 middle of those two as an indicator you know how the fund is performing do we need to consider

00:36:18.160 --> 00:36:25.000
 rate increases or operational you know decreases or savings within the fund to get us back

00:36:25.000 --> 00:36:33.080
 in that that range so in 1920 you can see the range was 16.9 and the max being 25.5

00:36:33.080 --> 00:36:39.000
 so that actual 21.5 falls well within that so that's one of those key indicators we talked

00:36:39.000 --> 00:36:43.720
 to the PEB and the city council about every single year during the budgeting process so

00:36:43.720 --> 00:36:52.200
 1920 actual we actually finished at 23.2 with that minimum being 16.3 and that maximum being

00:36:52.200 --> 00:36:58.040
 24.8 so we're definitely where we need to be just really quick I want to go through

00:36:58.040 --> 00:37:03.360
 2021 because we are in the adopted this person say adopted we're in the adopted 2021 budget

00:37:03.360 --> 00:37:06.720
 some of the new PEB members are not here we went through this budget cycles want to make

00:37:06.720 --> 00:37:12.520
 sure you are aware what's in it we have 49 million in revenue we are currently forecasting

00:37:12.520 --> 00:37:19.280
 or budgeted to use 3.9 million in reserves in 2021 so we'll continue those discussions

00:37:19.280 --> 00:37:23.080
 as we go through the 2022 budget process we'll keep you updated with an updated end of your

00:37:23.080 --> 00:37:29.560
 forecast but the budget does have some reserve usage included in it o and m budget you can

00:37:29.560 --> 00:37:35.440
 see we had expenses of 52.9 with a two percent rate decrease so the water utility did have

00:37:35.440 --> 00:37:42.520
 a rate decrease for customers which averaged about a dollar and eight cents for the average

00:37:42.520 --> 00:37:48.120
 residential customer and I'll talk to you about an average here shortly then just the

00:37:48.120 --> 00:37:53.280
 reserve target you're here at the bottom the adopted budget had 19.3 is what we were had

00:37:53.280 --> 00:37:56.800
 in the adopted budget for the end of reserve so it's still above that minimum target is

00:37:56.800 --> 00:38:04.600
 17.5 a couple couple big expansions I hear in the future and the point these are really

00:38:04.600 --> 00:38:09.780
 quick we'll move on the lake expansion you can see the debt service so this is the debt

00:38:09.780 --> 00:38:14.360
 that the fund issues to fund those capital projects this is the debt payment for that

00:38:14.360 --> 00:38:21.800
 debt and you can see a 2027 it's 11.6 then 2028 it's 18.1 that big jump there is that

00:38:21.800 --> 00:38:26.680
 Ray Roberts plan expansion project of 90 million some of the recent improvements staff had

00:38:26.680 --> 00:38:32.280
 made to that plan and plan to construct actually push this lake construction out the 2029 we'll

00:38:32.280 --> 00:38:38.760
 put the new budget together so I want to be sure to point that out to everyone this is

00:38:38.760 --> 00:38:45.480
 the five-year capital plan so we budget for very several things in the capital budget

00:38:45.480 --> 00:38:51.320
 you can see total was 51.8 it's got different components within it so one of them being

00:38:51.320 --> 00:38:58.360
 debt that debt payment I just showed you so in 2021 we had budgeted issue 35.5 in debt

00:38:58.360 --> 00:39:04.040
 we did recently approve a reimbursement ordinance for 23.7 million of that and then we do have

00:39:04.040 --> 00:39:08.400
 a notice of intent coming forward soon for your consideration revenue funding so this

00:39:08.400 --> 00:39:12.960
 is funded through the water rates and this is cash funding a portion of those projects

00:39:12.960 --> 00:39:16.920
 we do have some internal targets we like to meet with different type of projects within

00:39:16.920 --> 00:39:23.760
 the fund impact fee funding this is those projects within water they're impact fee eligible

00:39:23.760 --> 00:39:28.720
 most of those projects are growth related and so we did complete a study regarding that

00:39:28.720 --> 00:39:34.000
 in 2019 we updated it and those are updated approximately five years a little bit of aid

00:39:34.000 --> 00:39:42.160
 in construction the vehicle replacement of 275 000 so that total of 51.8 this is a fund

00:39:42.160 --> 00:39:46.240
 balance analysis we wanted to put this in here and update the pub so prior to the winter

00:39:46.240 --> 00:39:51.880
 storm event the finance department had started an in-depth fund balance analysis and really

00:39:51.880 --> 00:39:56.320
 what we wanted to do was to look across the utilities and see if our reserve requirements

00:39:56.320 --> 00:40:02.400
 were sufficient really when comparing ourselves to other municipalities or those professional

00:40:02.400 --> 00:40:07.640
 organizations and I'll show you some of those organizations on the next slide so nick before

00:40:07.640 --> 00:40:14.960
 you move on I'd like to ask a question from the previous slide yes sir okay I was a little

00:40:14.960 --> 00:40:22.840
 confused looking at revenue being added to debt and fees so I'm assuming that debt is

00:40:22.840 --> 00:40:29.000
 a payment and revenue is income it is I'm looking at this in the column I'm just a little

00:40:29.000 --> 00:40:34.040
 confused seems like something should be a taking away and other things should be an

00:40:34.040 --> 00:40:40.600
 ad or vice versa yes sir Mr. Abak let me um if it's okay I'll back up another slide and

00:40:40.600 --> 00:40:46.080
 show that to you I should have pointed that out to you um so on the on the pro forma is

00:40:46.080 --> 00:40:50.360
 probably the easiest place for me to explain it so these are the expenses here within the

00:40:50.360 --> 00:40:57.000
 water fund um in 2021 um you can see this revenue funded capital that's right here on

00:40:57.000 --> 00:41:03.960
 this line um this 13.96 that's an expense and then that debt that you're seeing this

00:41:03.960 --> 00:41:08.880
 is the debt payment for that debt so really what we try to do is not debt fund 100 of

00:41:08.880 --> 00:41:13.920
 all assets in the water utility we typically try to do 25 percent of plan expansions and

00:41:13.920 --> 00:41:18.440
 100 of those field service replacements so if we're going out to the street and replacing

00:41:18.440 --> 00:41:22.520
 the line that's already existing we've already incurred that debt for it that replacement

00:41:22.520 --> 00:41:28.120
 of that line is usually cash funded so they're both expenditure items um shown in the o and

00:41:28.120 --> 00:41:33.640
 m expense budget it's just one's revenue funded um utilizing rate revenue and then one has

00:41:33.640 --> 00:41:41.000
 a debt component associated with it does does that make sense rancher Nick this is tony

00:41:41.000 --> 00:41:48.760
 uh so mr rybeck um the grand total that you see on that that 51.7 million um equals equals

00:41:48.760 --> 00:41:55.160
 the expense so it's a so it's a balanced cip budget um so it's both it's both the the money

00:41:55.160 --> 00:41:59.320
 that's going to come in which is what's shown here but it's also equal to the expenditures

00:41:59.320 --> 00:42:06.000
 that are anticipated to be made in that particular year yeah yeah thank you tony and in in one

00:42:06.000 --> 00:42:11.000
 of the thing um terry nalti was reminding me too is this may help us um really what

00:42:11.000 --> 00:42:15.560
 this could say is revenue expense and this is a expenditure item and not a revenue coming

00:42:15.560 --> 00:42:21.400
 into the fund okay so it's revenue expense not income so that is my confusion okay yeah

00:42:21.400 --> 00:42:27.360
 so that's the cost of degenerating the revenue not the revenue okay yeah thank you that's

00:42:27.360 --> 00:42:32.920
 my confusion thank you yeah yeah we could simply call it cash funded um capital if we

00:42:32.920 --> 00:42:39.680
 wanted that may be a better term for it um but that is that revenue funded thank you

00:42:39.680 --> 00:42:44.320
 did susan name anybody else have a question maybe this i was just going to say it's really

00:42:44.320 --> 00:42:50.880
 just showing the sources of where we're going to fund the capital that that's correct we're

00:42:50.880 --> 00:42:55.280
 going to well we're going to use revenue to cash fund that capital so rate revenue but

00:42:55.280 --> 00:43:03.640
 you know it could simply be called cash funded capital absolutely yeah um someone else has

00:43:03.640 --> 00:43:08.800
 any questions i'll keep going along here please feel free to stop me again um so the current

00:43:08.800 --> 00:43:16.560
 reserve as i showed in the previous slide is 23.3 million was the minimum or 46 um based

00:43:16.560 --> 00:43:20.800
 on our findings that i'll walk you through here shortly staff does not recommend changing

00:43:20.800 --> 00:43:25.640
 any making any changes to the water fund balance policy but we definitely wanted to show it

00:43:25.640 --> 00:43:30.200
 to you in transparency and show you that we did do an extensive analysis of different

00:43:30.200 --> 00:43:35.960
 municipalities so um city of denton water utilities here at the top um at the time we

00:43:35.960 --> 00:43:41.600
 did it for the 1920 operating budget which is 51.1 million with that minimum target of

00:43:41.600 --> 00:43:47.840
 being 33 um the minimum reserve that equates to about 16.9 um and then looking at some

00:43:47.840 --> 00:43:53.520
 different utilities you can see in here lewisville mckinney garland frisco mesquite and grand

00:43:53.520 --> 00:44:00.040
 prairie and then you can see our 33 really falls really in line with these just below

00:44:00.040 --> 00:44:10.300
 frisco being 58 so professional organizations within the water fund we do look at several

00:44:10.300 --> 00:44:15.200
 different organizations when looking at metrics like this and really even looking at our rate

00:44:15.200 --> 00:44:20.000
 survey for each year that we participate in so the first one is the international city

00:44:20.000 --> 00:44:24.960
 management association also referred to as icma and the american water works association

00:44:24.960 --> 00:44:30.380
 which is awwa and i will put note that they do an annual rate survey that we participate

00:44:30.380 --> 00:44:35.360
 in within the city that really does a great job of benchmarking our rates with other similar

00:44:35.360 --> 00:44:41.760
 utilities throughout the state the water environmental federation which is wef and the government

00:44:41.760 --> 00:44:46.640
 finance officers association which is gfa and as i said on the previous slide based

00:44:46.640 --> 00:44:52.280
 on these different percentages in these organizations staff does recommend keeping the reserve the

00:44:52.280 --> 00:45:00.360
 same and not making any changes so this kind of gets into the second part of our conversation

00:45:00.360 --> 00:45:05.200
 which really a rate discussion and what i wanted to do is walk the pub through some

00:45:05.200 --> 00:45:09.960
 basic water rate terms review the cost of service study that we recently completed with

00:45:09.960 --> 00:45:14.800
 you look at those current rates and then look at some rate comparison charts and talk about

00:45:14.800 --> 00:45:22.360
 those next steps so water terms and some the two most common terms that you'll hear throughout

00:45:22.360 --> 00:45:27.680
 the budget in the rate discussion is the facility charge which is a fixed fee this is charged

00:45:27.680 --> 00:45:32.880
 to customers monthly based on the meter size and so does not alternate month to month or

00:45:32.880 --> 00:45:38.600
 change or vary it is one static fee that is adopted by pub and city council annually and

00:45:38.600 --> 00:45:42.900
 the volume charge is the volume metric charge is charged per thousand gallons in the water

00:45:42.900 --> 00:45:48.120
 utility i'll review those here with you shortly and those rates are grouped in different tiers

00:45:48.120 --> 00:45:53.320
 within the fund and then just some others going down you'll see these acronyms and their

00:45:53.320 --> 00:45:58.400
 rate ordinance and the utility rate ordinance is passed annually by the pub and city council

00:45:58.400 --> 00:46:01.820
 and that is available on the city's website so if you haven't seen it i'm definitely reach

00:46:01.820 --> 00:46:08.240
 out to us we can provide you a link to it and you can review it if you'd like this is

00:46:08.240 --> 00:46:11.160
 the cost of service rate design just kind of an overview of it so i'm going to give

00:46:11.160 --> 00:46:14.800
 a little bit of history when the last cost of service study was completed for the water

00:46:14.800 --> 00:46:21.960
 utility and the last one was completed in 2014 in 2019 the city contracted graph with

00:46:21.960 --> 00:46:27.880
 graph telus to update it again those studies are usually updated every five years um so

00:46:27.880 --> 00:46:32.800
 just over a year to get to get to get that completed and coba did slow it down a little

00:46:32.800 --> 00:46:36.880
 bit the staff is i'm glad that we did get this completed and we do want to note that

00:46:36.880 --> 00:46:41.880
 our consultant from raf telus is here today if we get into the results and you have detailed

00:46:41.880 --> 00:46:48.000
 questions and you'll be happy to answer those but the main goal of the cost of service study

00:46:48.000 --> 00:46:53.000
 is to establish cost of service based rates ensure revenue stability in the fund and ensure

00:46:53.000 --> 00:46:57.320
 fair and equitable rates and i do want to know to also give staff a working model that

00:46:57.320 --> 00:47:02.440
 we can update in those interim years so the consultant helps us update it every five years

00:47:02.440 --> 00:47:08.200
 but from year one to four one to five staff is actually using that model to update the

00:47:08.200 --> 00:47:11.240
 rates every year as part of the budgeting process when we bring them forward to you

00:47:11.240 --> 00:47:18.280
 so i think that was important to note this is a high level summary of the results of

00:47:18.280 --> 00:47:23.860
 that study the actual published document will soon be ready once it is ready we do plan

00:47:23.860 --> 00:47:27.560
 to share that with the public utility board but we wanted to give you a summary of what

00:47:27.560 --> 00:47:32.720
 the results were for the water utility and so residential you can see the cost of service

00:47:32.720 --> 00:47:38.400
 so the cost of providing service to residential customers is just about 22.8 million and the

00:47:38.400 --> 00:47:45.920
 current revenue is 21.2 so a little bit of deficit about 1.5 million which is 6.6 percent

00:47:45.920 --> 00:47:51.200
 under recovery so we want to make sure the pub was aware of this and commercial cost

00:47:51.200 --> 00:47:56.800
 of service is about 10.1 million the current revenue is 12.7 with a little bit of over

00:47:56.800 --> 00:48:04.320
 recovery about 2.6 million so 26.2 percent over recovery um irrigation um you can see

00:48:04.320 --> 00:48:10.760
 4.6 million um cost of service for current revenue 3.5 so just about a million difference

00:48:10.760 --> 00:48:16.440
 and then fire hydrants is is you know close to cost recovery just about thirty one thousand

00:48:16.440 --> 00:48:22.320
 dollars shy of it then wholesale is listed there at the bottom

00:48:22.320 --> 00:48:31.000
 um uh nick this is lee i was wondering um where do you um get a cost of service from

00:48:31.000 --> 00:48:36.880
 fire hydrants i presume the fire department doesn't pay to use the hydrants or do they

00:48:36.880 --> 00:48:41.560
 um so well that's a great question the fire hydrant the the fire department does use the

00:48:41.560 --> 00:48:47.840
 hydrants um for um emergency situations um and then we also get it so contractors around

00:48:47.840 --> 00:48:52.360
 the city have a meter that they can hook on to the fire hydrant that meters how much water

00:48:52.360 --> 00:48:56.600
 is taken out of that hydrant for it could be a construction project or a different case

00:48:56.600 --> 00:49:01.160
 so that that drives that cost for that and that's where that cost of service comes from

00:49:01.160 --> 00:49:08.040
 okay very good thank you for that clarification yes sir

00:49:08.040 --> 00:49:11.880
 so this was great information that the consultant put together for us um i'll start on the left

00:49:11.880 --> 00:49:16.400
 hand bar graph here and kind of walk you through it so what this does is shows you the distribution

00:49:16.400 --> 00:49:21.920
 of bills per thousand gallons of water um so you can see 3 000 gallons there's just

00:49:21.920 --> 00:49:28.840
 over 50 000 customers that fall in that tier 4 000 gallons over 50 000 so as you go you

00:49:28.840 --> 00:49:33.880
 know higher to the right of this chart you see larger water consumption um really the

00:49:33.880 --> 00:49:38.000
 way the rates are set up now and i'll walk you through in a second are really to incentivize

00:49:38.000 --> 00:49:42.120
 water conservation in the city and this is what this table shows so i wanted to be sure

00:49:42.120 --> 00:49:48.440
 the pbs saw this because it was a great message um the current deal the current bill distribution

00:49:48.440 --> 00:49:53.560
 um you can see here on this top right hand corner so the first tier within the water

00:49:53.560 --> 00:49:59.680
 utility for that volumetric rate so per thousand gallons and there's 89 percent of the bill

00:49:59.680 --> 00:50:05.400
 distribution in that tier which we definitely thought was important to point out 85 percent

00:50:05.400 --> 00:50:11.000
 of the consumption the second tier is 15 000 to 30 000 gallons which eighth percent of

00:50:11.000 --> 00:50:15.000
 the bill distribution being that second tier and then so forth going forward you can see

00:50:15.000 --> 00:50:20.280
 very few of the bills are in that 50 000 plus which is the largest tier we have in the city

00:50:20.280 --> 00:50:24.200
 so the majority of the residential customers are in that first tier and then this bottom

00:50:24.200 --> 00:50:29.200
 table of course is just a meter size based on uh residential customers so the most common

00:50:29.200 --> 00:50:34.440
 meter in the residential customer class is that three-quarter inch meter and i'll point

00:50:34.440 --> 00:50:40.880
 that right out to you here shortly this is the commercial distribution um same thing

00:50:40.880 --> 00:50:46.280
 here with this this graph you can see um the 1000 gallons is just over three anything below

00:50:46.280 --> 00:50:53.120
 that excuse me back up so 10 000 gallon increments on this so this would be zero to 10 000 gallons

00:50:53.120 --> 00:50:58.760
 on your left hand side 10 to 20 000 gallons then so forth going forward um so the majority

00:50:58.760 --> 00:51:04.840
 of the customers in that zero to 10 000 gallon range um meter distribution you can see the

00:51:04.840 --> 00:51:10.240
 three-quarter inch meter um about 1800 meters out there and then a two-inch meter being

00:51:10.240 --> 00:51:18.440
 the most common those two just over a thousand yes ma'am or does someone have a question

00:51:18.440 --> 00:51:23.920
 yeah barbara how often do you change those meters out i know you're on a regular system

00:51:23.920 --> 00:51:30.440
 i i would have to um ask pre-tim or steven maybe to address that question i'm not sure

00:51:30.440 --> 00:51:37.640
 on the change out change out time period hi uh this is pretendation of deputy director

00:51:37.640 --> 00:51:45.040
 can you guys hear me yes pre-tim we can hear you right yeah typically our program currently

00:51:45.040 --> 00:51:54.560
 is a 13-year yeah for those residential meters every 13 years we um have them on a cycle

00:51:54.560 --> 00:51:57.520
 thank you thank you pre-tim

00:51:57.520 --> 00:52:05.320
 all right so residential rates those are the current rates for the water utility i will

00:52:05.320 --> 00:52:08.560
 point out this slide is a little bit different that was included in your backup i had some

00:52:08.560 --> 00:52:13.560
 changes i needed to make to the current irrigation rates so i'll walk this um i'll walk you through

00:52:13.560 --> 00:52:17.760
 them here shortly um but the two components that we talked about earlier so the facility

00:52:17.760 --> 00:52:23.960
 charge is a fixed charge based on the meter size the volumetric rates are um they're seasonal

00:52:23.960 --> 00:52:28.320
 so we have a winter rate and summer rate and it's shown down here in this table so you

00:52:28.320 --> 00:52:32.240
 can see the the facility charge is consistent throughout the year is fifteen dollars eighty-four

00:52:32.240 --> 00:52:42.280
 cents this is for a three-quarter inch meter sorry did someone have a question okay and

00:52:42.280 --> 00:52:47.600
 then this is the volumetric rates um so you can see zero to fifteen thousand gallons um

00:52:47.600 --> 00:52:51.480
 that per thousand gallon rate is consistent between the winter and summer but once you

00:52:51.480 --> 00:52:56.380
 step up to that second tier from fifteen to thirty thousand gallons and that rate does

00:52:56.380 --> 00:53:00.920
 increase in the summer so as i mentioned earlier you're really incentivizing water conservation

00:53:00.920 --> 00:53:06.120
 this summer in those hot months when people tend to use more water and then the current

00:53:06.120 --> 00:53:09.840
 irrigation rates want to put these on here these are for individuals with separate irrigation

00:53:09.840 --> 00:53:15.520
 meters and this is for a two-inch meter also so fifteen eighty-four um and that volume

00:53:15.520 --> 00:53:20.800
 rate for that first tier in the winter being four or five second tier four or five and

00:53:20.800 --> 00:53:26.680
 of course over 30 is 405 but in the summer and it is higher for irrigation is 576 and

00:53:26.680 --> 00:53:33.000
 the second tier is 795 and 30 000 plus is 1064 and then you know staff does plan to

00:53:33.000 --> 00:53:37.040
 bring this back to the public utility board and fiscal year 2022's budget discussions

00:53:37.040 --> 00:53:42.180
 that will start here in the next month we'll run different scenarios answer any questions

00:53:42.180 --> 00:53:46.960
 you may have about these rates and how they fit into the pro forma so but these are the

00:53:46.960 --> 00:53:53.040
 ones that are currently in place commercial rates so same thing here you have a facility

00:53:53.040 --> 00:53:59.060
 charge and a volumetric rate it is broken to a winter and summer rate for irrigation

00:53:59.060 --> 00:54:04.240
 customers for regular commercial water usage there is no winter and summer block it's just

00:54:04.240 --> 00:54:08.880
 one rate so you can see the facility charge here of fifty dollars and ninety-nine cents

00:54:08.880 --> 00:54:12.360
 and that volume charge of four thirty-four so that bill does not change throughout the

00:54:12.360 --> 00:54:16.600
 year like a residential customer and if you're a commercial irrigation customer there is a

00:54:16.600 --> 00:54:21.260
 winter in a summer charge with the volume charge being slightly less in the winter than

00:54:21.260 --> 00:54:29.520
 it is in the summer this is the residential bill distribution and this was recently updated

00:54:29.520 --> 00:54:33.760
 as part of the cost of service study so you can see the city of denton here in the middle

00:54:33.760 --> 00:54:39.240
 seventy-eight fourteen this is based on seventy-six hundred gallons for the average residential

00:54:39.240 --> 00:54:50.440
 customer each month this is the average commercial bill rate comparison so you can see the city

00:54:50.440 --> 00:54:55.580
 dent in the middle of four fifty-one fifty-one and this is based on forty-five thousand gallons

00:54:55.580 --> 00:55:04.340
 which is that average commercial customer and this is something we put together last

00:55:04.340 --> 00:55:07.760
 year as part of the budgeting process and really what we wanted to show was is the rate

00:55:07.760 --> 00:55:13.160
 changes over the various fiscal years so you can see in the table from fiscal year twenty-fifteen

00:55:13.160 --> 00:55:18.540
 to twenty-seventeen the utilities had some rate increases starting in twenty-eighteen

00:55:18.540 --> 00:55:23.040
 we've actually had several rate decreases in the utilities with no increase so we thought

00:55:23.040 --> 00:55:26.700
 this was definitely important to point out to the public utility board and city council

00:55:26.700 --> 00:55:35.260
 but a great rate history for each of the utilities and then upcoming budget discussions no tony

00:55:35.260 --> 00:55:39.080
 mentioned these earlier so this is plan to go to city council on april the twentieth

00:55:39.080 --> 00:55:45.160
 next tuesday circling back with you on april the twenty-sixth with a priorities presentation

00:55:45.160 --> 00:55:50.560
 and then starting that fiscal year twenty-twenty-two operating in capital budget discussions may

00:55:50.560 --> 00:55:55.460
 through september i'm just willing to put those on there i know it's a lot of material

00:55:55.460 --> 00:56:06.560
 so i will pull it down and we can address questions that you may have any questions

00:56:06.560 --> 00:56:14.320
 i see none all right well great well let me pull up the next presentation which is wastewater

00:56:14.320 --> 00:56:28.000
 see if i can get it to share here all right i won't go all through all these individually

00:56:28.000 --> 00:56:32.000
 like i did in water it's basically set up the same way so the end of your actuals we'll

00:56:32.000 --> 00:56:35.880
 look at the pro forma and then we'll have a rate discussion afterwards and talk about

00:56:35.880 --> 00:56:44.520
 next steps so this is the 1920 actuals that we want to put on here so very similar to

00:56:44.520 --> 00:56:49.400
 water there's different water um i'm sorry wastewater categories that we receive revenue

00:56:49.400 --> 00:56:55.400
 into um so you can see we have a little bit of operating interest up here uh residential

00:56:55.400 --> 00:57:02.080
 revenue we have commercial revenue effluent irrigation we have wholesale other wastewater

00:57:02.080 --> 00:57:06.400
 we have drainage fees drainage drainage is included in this utility we'll see a separate

00:57:06.400 --> 00:57:10.920
 pro forma for that shortly some transfers in those transfers in our majority of cost

00:57:10.920 --> 00:57:18.160
 of service transfers from other utilities um to wastewater um and then impact fee revenue

00:57:18.160 --> 00:57:23.680
 so in 1920 the adopted budget had thirty six point seven million in revenue we finished

00:57:23.680 --> 00:57:29.160
 the year about thirty six point one million so really close to that budget um the adopted

00:57:29.160 --> 00:57:33.280
 budget had one point six million in reserve usage uh we actually ended up using about

00:57:33.280 --> 00:57:39.640
 seven hundred eighty three thousand so great news this fund this is the 2021 budget so

00:57:39.640 --> 00:57:44.280
 this is that current budget that we're currently in um current revenue at thirty seven point

00:57:44.280 --> 00:57:55.360
 six with no reserve usage and the adopted budget question yes sir so your actual and

00:57:55.360 --> 00:58:03.640
 budget for impact fees was exact it's a great question mr cheek absolutely so um what that

00:58:03.640 --> 00:58:07.440
 is that's a great point so the city does receive impact fees in the water and wastewater

00:58:07.440 --> 00:58:12.680
 utility when those fees are received they go into the impact fee reserve what we do

00:58:12.680 --> 00:58:17.360
 each year from a planning standpoint is we look at the impact fee study we visit you

00:58:17.360 --> 00:58:21.760
 know with the pub and the city council through the capital program and we determine a set

00:58:21.760 --> 00:58:26.480
 amount to pull from that reserve into the operating fund to fund those projects so that

00:58:26.480 --> 00:58:31.560
 number will always be equal to budget it is set up on an annual transfer great question

00:58:31.560 --> 00:58:40.800
 okay yeah i didn't remember that okay thank you um expenditures by operational units so

00:58:40.800 --> 00:58:45.720
 you can see administration rec reclamation collections filled services beneficial reuse

00:58:45.720 --> 00:58:50.200
 laboratory and so forth going down uh we'll point out that drainage is included in these

00:58:50.200 --> 00:58:55.480
 expenses and i'll show you a separate reform shortly um but you know total expenses in

00:58:55.480 --> 00:59:03.200
 the 1920 adopted budget about 38.3 uh with the actuals being about 36.9 uh they adopted

00:59:03.200 --> 00:59:08.280
 2021 budget 36.8 million expenses and similar to water is want to point out staff did a

00:59:08.280 --> 00:59:12.920
 great job in this utility uh really looking at those covid expense reductions last year

00:59:12.920 --> 00:59:16.960
 when we were going through and talking about that internally i mean with the pb and city

00:59:16.960 --> 00:59:24.440
 council so it come in below the budget on the operating expense side it's a 10-year

00:59:24.440 --> 00:59:28.760
 performance is similar to water we do like to look at things in a 10-year forecast some

00:59:28.760 --> 00:59:33.120
 of the growth come in the community is definitely a good thing to do um so very similar it's

00:59:33.120 --> 00:59:38.000
 set up exactly almost exactly the same as water so you can see the adopted 2020 budget

00:59:38.000 --> 00:59:43.920
 here in this column the 36.7 million in revenue we discussed with that 1.6 million in reserve

00:59:43.920 --> 00:59:50.240
 usage operating expenses here's that 38.3 million we saw on the previous slide uh with

00:59:50.240 --> 00:59:54.640
 that zero percent rate increase or decrease last year so we didn't have any increases

00:59:54.640 --> 01:00:00.000
 or decrease in 2020 we did have a five percent rate decrease in 2019 in the wastewater fund

01:00:00.000 --> 01:00:06.880
 and then 2021 here's the adopted budget that we're currently in 37.2 million in revenues

01:00:06.880 --> 01:00:16.240
 um basically a balanced budget and then operating expenses 37.167 um operating reserve definitely

01:00:16.240 --> 01:00:21.120
 want to show you this for the wastewater fund um so we finished the year at 14.4 million

01:00:21.120 --> 01:00:25.440
 you can see that number here uh moving down the page you can see what the existing target

01:00:25.440 --> 01:00:31.520
 is so 10.3 being the minimum 14.4 being the maximum so we're right there at that max

01:00:32.320 --> 01:00:37.520
 finishing the fiscal year which is great news for this fund i mean 2021 you can see we're

01:00:37.520 --> 01:00:45.280
 at 14.2 million um with the minimum being 10.4 and the max being 14.5 um going out in the future

01:00:45.280 --> 01:00:50.480
 years i did want to point out that the reserve does uh dip slightly below the reserve requirements

01:00:50.480 --> 01:00:56.640
 starting in fiscal year 2026 but this does not anticipate currently any rate increases in the

01:00:56.640 --> 01:01:00.960
 future so i want to make the public utility board familiar with that and make sure you're aware of

01:01:00.960 --> 01:01:06.000
 it as it said there's no rate increase is currently forecasted that's when we dip below it

01:01:06.000 --> 01:01:13.600
 the drainage performance so this is very neat performance that you just saw it is part of the

01:01:13.600 --> 01:01:18.160
 wastewater fund we do like to show the public utility board and city council this separately

01:01:18.160 --> 01:01:23.040
 each year and the drainage function within wastewater is supported by drainage fees

01:01:23.040 --> 01:01:28.800
 the drainage fees are made up of residential fees and commercial fees which is non-residential which

01:01:28.800 --> 01:01:34.960
 is the same thing so you can see residential is about 1.9 but commercial being about 3.1 for a

01:01:34.960 --> 01:01:43.680
 total of 5.5 so they did have a balanced budget of expenses of 5.5 you can see here they do fund a

01:01:43.680 --> 01:01:50.080
 lot of their capital from operating funds from revenue so revenue funded capital of 1.8 million

01:01:50.080 --> 01:01:56.320
 you can see that number here in this column we do set aside a drainage reserve is a million dollars

01:01:57.040 --> 01:02:00.640
 this is a component of wastewater but we do like to show it separately to show we do have a reserve

01:02:00.640 --> 01:02:10.160
 for this fund five-year capital plan similar to water there are different components within here

01:02:10.160 --> 01:02:16.720
 you can see the debt component so how much debt we plan to issue the adopted budget included 32.9

01:02:16.720 --> 01:02:22.800
 million to date we've approved the reimbursement ordinance for 26.1 million with the notice intent

01:02:22.800 --> 01:02:28.880
 coming forward to the pbn city council in the near future this is that cash funded capital this is

01:02:28.880 --> 01:02:34.880
 from the operating fund this is paying cash for those assets instead of debt funding on a 5.4

01:02:34.880 --> 01:02:40.640
 million impact fee funding we had i think believe one project that was eligible for impact fee funding

01:02:40.640 --> 01:02:46.880
 in fiscal year 2021 so this is an expense this is taking those funds and paying cash towards that

01:02:46.880 --> 01:02:53.280
 project for the appropriate amount so aid in construction and vehicle replacement 1.2 million

01:02:53.280 --> 01:02:55.840
 so total of 40 million

01:02:55.840 --> 01:03:03.600
 this is the fund balance analysis so very similar to water we looked at different municipalities a

01:03:03.600 --> 01:03:08.240
 lot of municipalities their water and wastewater utilities are combined so we did list them both

01:03:08.240 --> 01:03:13.360
 on the same table just wanted to point that out to everybody so currently the wastewater fund balance

01:03:13.360 --> 01:03:20.480
 a minimal reserve target of 28 with a maximum of 39 you see that number here so the current reserve

01:03:20.480 --> 01:03:27.200
 is 16.3 which is 42 and then very similar to water based on these findings based on the fund

01:03:27.200 --> 01:03:31.840
 balance percentage of the other cities and the other professional organizations that we looked at

01:03:31.840 --> 01:03:37.120
 we do not recommend a change to the wastewater reserve currently and this is something we can

01:03:37.120 --> 01:03:41.600
 continue to monitor every year as part of the budgeting cycle i think this is a great great

01:03:41.600 --> 01:03:48.560
 process the finance department went through this year and definitely is valuable this professional

01:03:48.560 --> 01:03:53.120
 organizations that we look at on the wastewater side very similar to water but we wanted to list

01:03:53.120 --> 01:03:59.280
 these out for you so you can see awwa there icma gfoa and the water environment federation

01:03:59.280 --> 01:04:05.200
 and then of course staffs recommendation keeping that reserve target the same i see uh lee has his

01:04:05.200 --> 01:04:15.520
 hand up yes lee uh yes uh nick if you could go back one slide thank you um i noticed that the

01:04:15.520 --> 01:04:25.920
 on both the water and wastewater frisco had much higher utility reserves than everybody else is

01:04:25.920 --> 01:04:33.200
 there a particular reason for that are they anticipating a new plant or plants to bring

01:04:33.200 --> 01:04:38.960
 online or to construct or do you know uh mr i'm back i'm i'm not familiar with their capital plan

01:04:38.960 --> 01:04:45.120
 i do know that the size of the fund is 100 million and it's likely that that that reserve

01:04:45.120 --> 01:04:49.520
 that you're seeing there 58 percent is for both water and wastewater we're looking at them

01:04:49.520 --> 01:04:54.000
 separately here's the water and wastewater are separate so if you if we were to combine these

01:04:54.000 --> 01:04:58.720
 and look at them together we would be fairly close to that number um but but you're absolutely

01:04:58.720 --> 01:05:02.080
 correct it currently looks like it is a little bit more but i'm not familiar with their capital

01:05:02.080 --> 01:05:04.480
 program okay thank you

01:05:04.480 --> 01:05:15.280
 okay um let's see here so this is the second part of the conversation just like water i want to

01:05:15.280 --> 01:05:20.080
 review some basic wastewater terms with you look at the cost of service results for wastewater

01:05:20.080 --> 01:05:25.040
 look at the current residential and commercial rates and look at some rate comparisons

01:05:25.040 --> 01:05:31.920
 um so very similar i don't have to go through the facility charge and volume charge again

01:05:31.920 --> 01:05:38.160
 uh but very very same concept and wastewater is water um some of the codes that you'll see

01:05:38.160 --> 01:05:42.400
 in the rate ordinance is sr which is residential wastewater service

01:05:42.400 --> 01:05:48.960
 sc is commercial and industrial water service and then sm is metered wastewater inside and outside

01:05:48.960 --> 01:05:54.400
 the corporate limits and then wastewater is the self-treated wastewater effluent which is irrigation

01:05:57.280 --> 01:06:03.040
 so the cost of service results um you can see uh residential is really close to cost recovery so

01:06:03.040 --> 01:06:10.480
 cost recovery being about 12.05 million but the current revenue being about 11.9 so within 64

01:06:10.480 --> 01:06:16.880
 thousand the cost recovery which is great and then commercial is 10.9 is the cost of service for it

01:06:16.880 --> 01:06:23.360
 it's that number here but the current revenue 10.7 so within 124,000 which is really close to cost

01:06:23.360 --> 01:06:29.600
 recovery also um equipment services and eating establishments cost of service is currently 1.3

01:06:29.600 --> 01:06:36.720
 1.27 with that current revenue weighing 1.5 so just about 238,000 over cost recovery

01:06:36.720 --> 01:06:44.320
 metered wastewater is 200,000 is the cost of service with that current revenue being 220,000

01:06:44.320 --> 01:06:50.320
 so wastewater is really close to cost of service um just want to make sure the pb was aware of that

01:06:50.320 --> 01:06:55.760
 definitely looks good um so the current rates for residential and commercial customers we just put

01:06:55.760 --> 01:07:02.240
 them on one slide here so different than the water utility wastewater service is billed per

01:07:02.240 --> 01:07:07.200
 thousand gallons um so there's two components to the rate very similar to water you can see a

01:07:07.200 --> 01:07:14.080
 facility charge um of 11 but the volume charge being three dollars and 80 cents and the average

01:07:14.080 --> 01:07:20.160
 bill for a wastewater customer or 31.52 and then for a commercial customer the average

01:07:20.160 --> 01:07:27.200
 bill is 233.84 um want to point out that the average on the wastewater side is a little bit

01:07:27.200 --> 01:07:34.240
 less than water um just you know contemplating the water does not go back to the wastewater treatment

01:07:34.240 --> 01:07:39.440
 plant facility so maybe use for irrigation purposes so for residential customers 5,400 gallons

01:07:39.440 --> 01:07:42.720
 and for a commercial customer it's 42,750

01:07:47.440 --> 01:07:51.600
 this is the residential rate comparison um so you can see the city of denton um right here

01:07:51.600 --> 01:07:56.880
 that 3152 that i mentioned that was several other cities that are surrounding or in our area

01:07:56.880 --> 01:08:06.240
 and then commercial there's that 233.84 that i mentioned just around middle of the chart

01:08:06.240 --> 01:08:14.640
 and then these next steps so april the 20th city council and then circling back to the public

01:08:14.640 --> 01:08:20.720
 utility board in april 26 with further discussions and i will pull it down susan for questions

01:08:20.720 --> 01:08:28.960
 all right any questions oh karen go ahead

01:08:28.960 --> 01:08:37.440
 uh sorry just a quick question um clarification the wastewater usage is not

01:08:38.320 --> 01:08:45.600
 metered that would just be gross the wastewater usage is based on the meter coming in and then

01:08:45.600 --> 01:08:50.560
 that's a percentage is that right that's correct yeah it's based on the winter um i was just trying

01:08:50.560 --> 01:08:54.240
 to look here really quick so it's based on the the winter average that's a great question so

01:08:54.240 --> 01:08:58.800
 wastewater service in the city is a non-metered service so how do we get that average usage for

01:08:58.800 --> 01:09:04.240
 a residential customer and it's based off the winter average and the winter average is established

01:09:04.240 --> 01:09:08.880
 established december through february if you're a new customer and you move in you don't have an

01:09:08.880 --> 01:09:14.960
 established winter average you're built a minimum of 5400 gallons until that average is established

01:09:14.960 --> 01:09:22.080
 once that average is established it would take the place of that okay yeah okay thanks there was

01:09:22.080 --> 01:09:29.840
 some confusion on uh social media about that billy go ahead yeah follow up we discussed this i know a

01:09:29.840 --> 01:09:35.920
 few weeks ago but how are we going to weight that with the crazy february that we had this year

01:09:35.920 --> 01:09:42.880
 so i may ask tony to speak to that i do believe that that was um tony you want to speak to that

01:09:42.880 --> 01:09:48.080
 yeah i'm here billy if if you remember um you went to council and we made the recommendation

01:09:48.080 --> 01:09:52.800
 to exclude february and so so that winter averaging is just going to be for those two

01:09:52.800 --> 01:09:57.040
 months for december and january just because we knew there'd be there was probably going to be a

01:09:57.040 --> 01:10:02.320
 high usage in february you know with all the line breaks and you know issues people were having at

01:10:02.320 --> 01:10:06.880
 home and so i think that was the right decision to make um and the council gave us that authorization

01:10:06.880 --> 01:10:10.880
 yeah just wanted to make sure it got out there again thank you yes sir

01:10:10.880 --> 01:10:22.080
 okay all right um in my final presentation like i said cassie will present electric i'll walk you

01:10:22.080 --> 01:10:25.920
 through solid waste really quick it's a little bit shorter not quite as many slides

01:10:27.040 --> 01:10:41.600
 okay so very similar to water and wastewater we'll look at the 1920 actuals we'll look at

01:10:41.600 --> 01:10:45.680
 the five-year forecast we'll look at the capital plan we'll look at the fund balance policy and

01:10:45.680 --> 01:10:53.120
 staff's recommendation so 1920s budget so i guess first here's the different revenue categories

01:10:53.120 --> 01:10:58.640
 that we have within the solid waste fund so we separate out residential residential recycling is

01:10:58.640 --> 01:11:03.680
 separated out for transparency we look at front load and side loads so this is commercial service

01:11:03.680 --> 01:11:08.800
 look at that roll-off open top service that's in the community then commercial recycling landfill

01:11:08.800 --> 01:11:14.320
 gate revenue which is that traffic coming into the landfill the dispose of items and then those

01:11:14.320 --> 01:11:19.280
 wholesale agreements that are yeah landfill wholesale agreements that are in place for this fund

01:11:19.280 --> 01:11:24.640
 and of course we have some transfers in which are cost of service transfers so 1920 adopted budget

01:11:24.640 --> 01:11:30.640
 you can see here we had total revenues of 35.4 million the fan use of reserves of three million

01:11:30.640 --> 01:11:39.200
 total resources of 38.5 so the end of your actuals we finished a lot better than that we did not use

01:11:39.200 --> 01:11:46.240
 any reserves in 1920 as we originally adopted budget had included one thing i do want to point

01:11:46.240 --> 01:11:51.360
 out you can see in the landfill wholesale here it increased from an adopted budget of 2.6 million

01:11:51.360 --> 01:11:55.920
 the actual coming in of four million so there's some additional agreements that were approved by

01:11:55.920 --> 01:12:02.000
 city council in the pb at that time so that number did come in above the budget 2021 of course this is

01:12:02.000 --> 01:12:08.080
 the current budget that we're in we do have planned use reserves of 4.3 million and then as we continue

01:12:08.080 --> 01:12:14.160
 through the 2022 budget process or we get started in it we fully intend to have a 2021 end of your

01:12:14.160 --> 01:12:18.320
 forecast for you to look at they really forecast where we think we're going to finish the end of

01:12:18.320 --> 01:12:22.080
 this fiscal year so that is to come just want to make sure the pb is aware of that

01:12:22.080 --> 01:12:29.440
 expenses by division so these are different operational units or divisions within solid waste

01:12:29.440 --> 01:12:34.800
 it's administration residential commercial um they have a collection special projects

01:12:34.800 --> 01:12:41.200
 and then diversion processing vmr and then keep getting beautiful which is kdb and then side

01:12:41.200 --> 01:12:46.000
 operations i do want to point out that kdb was moved to the parks department as part of the 2021

01:12:46.000 --> 01:12:51.600
 budget process i'm sure several of the pb members remember that discussion and so total expenses for

01:12:51.600 --> 01:12:59.120
 2021 were 44.1 million and we came in last year we finished last year's budget um just about

01:12:59.120 --> 01:13:04.480
 two and a half million uh almost three million below budget so very similar to water waste water

01:13:04.480 --> 01:13:09.040
 solid waste staff did a great job of looking at these operating expenses and making adjustments

01:13:09.040 --> 01:13:15.200
 accordingly so wanted to point that out this is expense by detail so you can see the different

01:13:15.200 --> 01:13:20.560
 expenditure categories you can see personnel occur at the top materials and supplies maintenance and

01:13:20.560 --> 01:13:25.920
 repair franchise fees are some different things moving down the page but those cost of service

01:13:25.920 --> 01:13:31.200
 transfers here at the bottom um debt service one thing we've talked about in the solid waste fund

01:13:31.200 --> 01:13:36.400
 for the new pb members is this fund has been doing a great job of transitioning from debt funding

01:13:36.400 --> 01:13:40.880
 projects to cash funding so you can actually see is that debt payment for this fund actually

01:13:40.880 --> 01:13:47.840
 continuing to decrease so in 1819 it was 8.9 million the adopted budget has it at 6.9 million

01:13:47.840 --> 01:13:53.200
 so staff's done a great job at looking at those projects and identifying the ones that we cash

01:13:53.200 --> 01:13:58.960
 funded and really prioritizing them so a great thing this fund i have a quick question if i

01:13:58.960 --> 01:14:07.040
 could jump in yes sir uh back on uh slide four actually um let me go back really quick here i

01:14:07.040 --> 01:14:13.360
 noticed uh solid waste disposal jumped up quite a bit for this budgeted year did you explain that

01:14:13.360 --> 01:14:19.440
 or what's going on there i can so in this number this 11.4 million and we'll talk about this in the

01:14:19.440 --> 01:14:24.880
 capital side and the landfill is actually cash funding and excel development and i'll point those

01:14:24.880 --> 01:14:30.000
 numbers out to you um let me see if i can skip ahead here and i can show them to you so this um

01:14:30.000 --> 01:14:37.120
 landfill cell construction that you see here this qaqc number that you see um in this landfill

01:14:37.120 --> 01:14:42.240
 equipment these numbers are buried in that 11 million dollar number that you see mr jumper over

01:14:42.240 --> 01:14:47.200
 there um on that on that pro forma so that is the reason for that increase this one year is just

01:14:47.200 --> 01:14:58.400
 cash funding that cell development thanks so here here's the five-year forecast um so you can see

01:14:58.400 --> 01:15:03.040
 the adopted 2020 budget here in this column we're in that three million in reserve usage that we

01:15:03.040 --> 01:15:09.120
 talked about we actually finished fiscal year 2020 with no reserve usage um so that left our fund

01:15:09.120 --> 01:15:15.840
 balance about 12.2 million uh with the targets being five to six point four million so well

01:15:15.840 --> 01:15:22.320
 above that target i mean 2021 we do have planned use reserves of 4.3 million drawing down on that

01:15:22.320 --> 01:15:27.200
 fund balance that i pointed out over here so it'd be 7.9 million finishing this fiscal year

01:15:27.200 --> 01:15:36.160
 still well within the reserve targets of 6.2 to 7.9 um and then continuing out in the future years

01:15:36.160 --> 01:15:41.520
 we do slightly dip below the reserve target in 2025 similar to water and wastewater that's not

01:15:41.520 --> 01:15:45.840
 contemplating any rate increases in the fund this is definitely something we'll consider to look we'll

01:15:45.840 --> 01:15:52.560
 continue to look at in the 2022 budget process um a couple other things some of the new pb members

01:15:52.560 --> 01:15:57.280
 i definitely want to make sure you're aware in this rate um revenue number that you see up here

01:15:57.280 --> 01:16:02.880
 the wholesale contract agreements that we have with some private entities uh will end in fiscal

01:16:02.880 --> 01:16:10.800
 year 2023 so when you see the decrease from 39.5 million in rate revenue to 34.6 million that is the

01:16:10.800 --> 01:16:16.880
 reason why so this contemplates those agreements going away and not being renewed just to make

01:16:16.880 --> 01:16:24.160
 sure everybody's aware of that this is the capital plan for the solid waste fund um just pulled this

01:16:24.160 --> 01:16:28.960
 up a short while ago but we did have a reimbursement ordinance for three million dollars

01:16:28.960 --> 01:16:34.160
 for a fleet expansion building that will be at the solid waste facility that will be included

01:16:34.160 --> 01:16:38.880
 in the notice of intent here in the coming weeks to issue debt for that but everything else in this

01:16:38.880 --> 01:16:43.360
 fund as i mentioned earlier they have transitioned from debt funding to cash funding and you can see

01:16:43.360 --> 01:16:50.560
 all the cell development is cash funded and the vehicle replacement is cash funded so definitely

01:16:50.560 --> 01:16:59.040
 a positive thing for the solid waste fund in the city the reserve analysis that we did for solid

01:16:59.040 --> 01:17:03.760
 waste very similar to water wastewater looked at several different organizations um that were out

01:17:03.760 --> 01:17:10.000
 there um we are not recommending any changes so the current reserve targets is 14 to 18 percent

01:17:10.000 --> 01:17:15.200
 that we saw on the pro forma and that current reserve about around 11 million or 29 percent

01:17:15.200 --> 01:17:19.760
 based on status finding we're not recommending changes to this reserve and you can see the

01:17:19.760 --> 01:17:24.960
 different cities that we compared ourselves to down here at the bottom so the city of arlington

01:17:24.960 --> 01:17:30.800
 dallas fort worth garland and plano and what their percentages are and then what that minimum reserve

01:17:30.800 --> 01:17:36.000
 target is in each one of these funds of course city of dallas being the largest about four times

01:17:36.000 --> 01:17:41.920
 the city of denton's annual budget size about 122 million it's definitely a larger entity

01:17:41.920 --> 01:17:47.600
 this is next conversations that are coming up that we talked about in the last couple

01:17:47.600 --> 01:17:55.680
 presentations and that concludes solid waste i'll pull this down for questions if you have any

01:17:56.880 --> 01:18:09.440
 questions all right thank you very much well good morning pb i'm cassie augen director of finance

01:18:09.440 --> 01:18:14.480
 and i'm going to walk through the electric presentation with you so let me share my screen

01:18:23.280 --> 01:18:27.360
 and similar to water waste water we are going to talk about the post winter storm

01:18:27.360 --> 01:18:30.960
 financial conditions which is a little different than what we've discussed with water and wastewater

01:18:30.960 --> 01:18:38.000
 but obviously we had some unexpected large expenses associated with the storm and electric

01:18:38.000 --> 01:18:44.080
 so we're going to go through those those and then what staffs recommended options for

01:18:44.080 --> 01:18:49.520
 for some of those expenses and then again the five-year forecast and also the fund balance

01:18:52.240 --> 01:18:58.080
 so you're probably already aware the the post winter storm condition for electric we did incur

01:18:58.080 --> 01:19:08.560
 209 million in collateral and ancillary charges with ercot for that winter storm event so after

01:19:08.560 --> 01:19:16.480
 we've netted all of the expenses it really totals 140 million and we did issue 100 million in

01:19:16.480 --> 01:19:24.160
 extendable commercial paper to fund that those expenses during the storm as a result of the

01:19:24.160 --> 01:19:31.840
 storm s and p did downgrade the the the city's utility bond rating and fitch placed all texas

01:19:31.840 --> 01:19:38.720
 public utilities on a negative credit watch as nick mentioned earlier before the winter storm

01:19:38.720 --> 01:19:44.560
 we had actually started looking at fund balance the policy and then doing an analysis of each

01:19:44.560 --> 01:19:51.600
 fund's fund balance needs post winter storm our analysis changed and as long as as well as our

01:19:51.600 --> 01:19:57.680
 recommendation for the electric fund we also have done a deeper dive of the capital program to

01:19:57.680 --> 01:20:05.520
 ensure that we we are selling bonds for the projects that we really need and in utilizing

01:20:05.520 --> 01:20:14.320
 cash where we can and then just some outstanding items that we may have an impact to the

01:20:14.320 --> 01:20:18.880
 to the fund in the future but we're we're unsure right now is that uplift and market repricing

01:20:18.880 --> 01:20:25.600
 obviously that that's still unknown but when we do have more information we will bring it back to you

01:20:25.600 --> 01:20:34.880
 so we wanted to discuss some debt funding options with the with the purchase power expenses for

01:20:34.880 --> 01:20:41.920
 electric we did issue the hundred million dollars of long or i'm sorry of extendable commercial

01:20:41.920 --> 01:20:49.040
 paper and that is coming due in may so we do need to make a decision on what to do with the

01:20:49.040 --> 01:20:55.520
 hundred million dollars of commercial paper staff's recommendation is to refund it using

01:20:55.520 --> 01:21:02.400
 30-year bonds but as i mentioned earlier the total cost of the event was 140 million

01:21:02.400 --> 01:21:09.440
 so we could issue an additional 40 million in commercial paper to cover the total of the

01:21:09.440 --> 01:21:15.840
 purchase power expenses and really um spread that major expense over several years instead

01:21:15.840 --> 01:21:25.760
 of hitting the fund all in one year and or option two is um we do not use extendable commercial

01:21:25.760 --> 01:21:30.320
 paper and the fund pays for it out of the fund balance and i'll show you that what that looks

01:21:30.320 --> 01:21:36.960
 like um as i mentioned the fund balance analysis that was recently completed before the winter

01:21:36.960 --> 01:21:43.360
 storm we staff was going to recommend no increase to the fund balance for electric however as a

01:21:43.360 --> 01:21:50.080
 result of the storm we we saw that the need for a large healthy fund balance and after discussing

01:21:50.080 --> 01:21:57.760
 with our financial advisors at hilltop we are recommending an increase of the operating reserve

01:21:57.760 --> 01:22:05.200
 fund to 100 million with a max of 150 million and you can see the bottom of the screen shows the

01:22:05.200 --> 01:22:11.200
 chart with the minimum targets and how we compare with other cities i do want to note these cities

01:22:11.200 --> 01:22:17.040
 this information is before the winter storm so we're likely going to see some increases in their

01:22:17.040 --> 01:22:24.720
 reserves as well especially given the the bond uh the credit watch and the bond downgrading

01:22:24.720 --> 01:22:32.560
 and so with a five-year forecast we wanted to show you what it would look like with

01:22:32.560 --> 01:22:40.240
 um the 100 million dollars if we refunded the 100 million with 30 year notes and kind of the

01:22:40.240 --> 01:22:46.800
 impact to the fund and you can see um you can see the debt service on that purchase power debt

01:22:46.800 --> 01:22:55.440
 service expense line or my mouse is um so it would be about 4.2 million dollars a year for a 30 year

01:22:55.440 --> 01:23:02.000
 note for the 100 million and you can see that additional 40 million of expense coming from

01:23:02.000 --> 01:23:08.320
 the fund balance and so um you can see this is the the fund balance that would be remaining

01:23:08.320 --> 01:23:14.080
 that's projected to be remaining if we did not issue another 40 million in commercial paper

01:23:14.080 --> 01:23:18.080
 so it'd really be taking it out of the fund balance and then you can see the

01:23:18.080 --> 01:23:25.520
 where we land on those targets as well as the recommended target and this is the amount over

01:23:25.520 --> 01:23:32.160
 under the new recommended target so it would really take substantial rate increases to to increase

01:23:32.160 --> 01:23:38.080
 back to that recommended target level and I did not include rate increases on this per forma

01:23:38.080 --> 01:23:45.520
 because we will be coming back to you during the FY 22 budget discussions to discuss rate increases

01:23:45.520 --> 01:23:50.880
 um but we're not we're not prepared yet and obviously the debt service will hit

01:23:50.880 --> 01:23:57.680
 next year so that will be a future discussion and I did want to point out we've made um this

01:23:57.680 --> 01:24:03.200
 projection for 2021 we've made everything match budget obviously that that's not going to happen

01:24:03.200 --> 01:24:08.400
 but we will come back with um how we ended or how we're forecasting to end the year during

01:24:08.400 --> 01:24:12.880
 the budget discussions but really wanted to be able to call out the purchase power expenses

01:24:16.960 --> 01:24:23.760
 and so the next option that I'm showing is the 140 issuing 140 in commercial paper

01:24:23.760 --> 01:24:32.560
 um you can see this this increases that debt service amount to 5.9 million every year but

01:24:32.560 --> 01:24:38.080
 that's again spreading it over 30 years instead of impacting that 40 million directly to the fund

01:24:38.080 --> 01:24:48.240
 balance so if we um if if pub recommends this option um it will keep our opera our fund balance

01:24:48.240 --> 01:24:53.680
 pretty steady um we'll probably have to have future rate increased discussions obviously

01:24:53.680 --> 01:24:58.400
 but we still stay at that hundred million dollar um fund balance target

01:25:01.200 --> 01:25:08.240
 I have a question so what would be the impact well I guess you're going to do that in future I was

01:25:08.240 --> 01:25:13.280
 going to say what's the impact to the rates of 5.9 million dollars but you're going to do that in the

01:25:13.280 --> 01:25:21.840
 future yes um we've looked at several different scenarios um and it really depends on how we get

01:25:21.840 --> 01:25:28.320
 through the summer too if um we have if we our revenues increase over the summer higher than what

01:25:28.320 --> 01:25:34.400
 we anticipated that will you know lessen the rate increase for next year so that's why we really

01:25:34.400 --> 01:25:40.160
 wanted to wait to talk about rates um to see how we end the year okay I understand

01:25:40.160 --> 01:25:48.240
 and then just just briefly if I may I apologize for interruption um when is the end of the fiscal

01:25:48.240 --> 01:25:55.120
 year the fiscal year ends September 30th and the new fiscal year begins October we're going to start

01:25:55.120 --> 01:26:01.600
 um the budget discussions like Nick mentioned in May so we'll be forecasting and you'll we'll be

01:26:01.600 --> 01:26:06.320
 having those budget discussions with you during the summer and so hopefully we can have a better

01:26:06.320 --> 01:26:14.160
 projection of where we're going to land at the end of the year thank you and so just in summary

01:26:14.160 --> 01:26:19.120
 these are some options for your consideration um I really wanted to get your recommendation for

01:26:19.120 --> 01:26:25.360
 council um again the issuance of 100 million we do have the outstanding commercial paper notes

01:26:25.360 --> 01:26:32.000
 that are coming due and we need to make a decision we are recommending long-term bonds and then the

01:26:32.000 --> 01:26:38.560
 second item is really that additional 40 million in purchase power should we um issue a commercial

01:26:38.560 --> 01:26:43.680
 paper to cover those expenses or or pay for it out of the fund balance and then the third item

01:26:43.680 --> 01:26:50.880
 is the fund balance policy itself um we do have a fund balance uh document that we if PB recommends

01:26:50.880 --> 01:26:55.760
 this option we'll we'll update it and bring it back to you for consideration and approval of the

01:26:55.760 --> 01:27:03.680
 actual policy itself um but we are recommending an increase um to 100 million for a max of 150

01:27:03.680 --> 01:27:10.000
 million in the electric fund and then just like we've just already talked about you know we will

01:27:10.000 --> 01:27:15.520
 be bringing back um the budget discussions over the next couple of months and have a better

01:27:15.520 --> 01:27:22.320
 forecast for you um as we start the 21-22 budget process and that last bullet point is bolded

01:27:22.320 --> 01:27:27.680
 because I did want to make sure everyone um knows that this will this will increase rates but we're

01:27:27.680 --> 01:27:33.120
 just not sure of how much yet and so we wanted to make sure that we are being transparent with that

01:27:33.120 --> 01:27:44.800
 but we want to we'll bring that back at a later date okay discussion

01:27:44.800 --> 01:27:54.640
 what do the board members feel on the items that they're asking direction for go ahead Billy so I

01:27:54.640 --> 01:28:02.080
 mean unfortunately we're in a circumstance where that hundred to 140 million 150 million possibly

01:28:02.080 --> 01:28:13.280
 does fall under an eca adjustment but I think it's barely honestly and still cost of service I

01:28:13.280 --> 01:28:20.880
 I do obviously think we have no choice but to finance this thing um so we don't hit the

01:28:20.880 --> 01:28:29.040
 right payers really quick here and run businesses off and run stop our development but um I mean

01:28:29.040 --> 01:28:32.480
 I certainly want to support staff's recommendation here

01:28:32.480 --> 01:28:42.640
 well and we we have started looking at the rate impacts and um we feel like if we if the purchase

01:28:42.640 --> 01:28:48.720
 power does fall under that eca component of the rate and it would have a less impact to customers

01:28:48.720 --> 01:28:56.000
 if if then if we put it say in the facility charge or your base rate we are running those

01:28:56.000 --> 01:29:04.160
 scenarios and we'll we'll be bringing those back for your consideration oh sorry just the one time

01:29:04.160 --> 01:29:11.680
 that one time hit in february that now goes into the eca rate for the next possibly 30 years so

01:29:11.680 --> 01:29:18.560
 that's I guess where I have a little bit of philosophy confusion I understand it was an

01:29:18.560 --> 01:29:26.000
 energy cost I mean but anyway it's just it's confusing a little bit in my head about what we've

01:29:26.000 --> 01:29:31.680
 done at the rate in the past and what we're doing with it now I understand that we're having those

01:29:31.680 --> 01:29:37.440
 staff discussions internally also we've been debating that very thing well Billy and this

01:29:37.440 --> 01:29:42.800
 tony uh I will add you know and um I think Cassie alluded alluded to this I mean we're

01:29:42.800 --> 01:29:48.000
 in the process of going through a cost of service study as well and so part of that process will

01:29:48.000 --> 01:29:53.440
 include that very discussion that you talk about is what should be in base rates versus eca and

01:29:53.440 --> 01:29:58.480
 what recommendations that we come we'll we'll be bringing that back to you um here in the next

01:29:58.480 --> 01:30:03.760
 several months and then the other thing too is um just know that we continue to work at the state

01:30:03.760 --> 01:30:10.160
 level on um you know trying to advocate for our customers and seeing if there might be opportunities

01:30:10.160 --> 01:30:15.680
 down the road for some more favorable financing through the state or at least through some

01:30:15.680 --> 01:30:20.640
 state-backed financing if those are if those are available to us then some of this debt could

01:30:20.640 --> 01:30:25.840
 potentially move to a more favorable finance which should reduce the cost of borrowing

01:30:25.840 --> 01:30:32.960
 that you know should lessen the impact over that 30-year period so yeah oh sorry go ahead Billy

01:30:32.960 --> 01:30:42.240
 Lee go ahead oh thank you ma'am um I have two questions if I'm looking at the math correctly

01:30:42.240 --> 01:30:52.800
 that's 40 million a year over 30 years is that 1.2 billion dollars um it's 1.69 million per year

01:30:52.800 --> 01:30:59.840
 in debt service so that includes you know we did um get downgraded on our bond rating um and then

01:30:59.840 --> 01:31:08.640
 I think I believe we're using a 3.5 percent interest um projection but I can verify that

01:31:08.640 --> 01:31:13.840
 and bring that back to you okay my other question to tony's point is there any activity

01:31:13.840 --> 01:31:21.760
 in the legislature currently um towards looking at some um either relief or as you mentioned some

01:31:21.760 --> 01:31:28.160
 kind of financing a vehicle on more favorable terms for utilities based on this unusual event

01:31:30.080 --> 01:31:38.880
 um yeah the um no no no direct relief um so there won't be necessarily a bailout if you will

01:31:38.880 --> 01:31:46.240
 that's been discussed um that's um that's unfortunate um but what's happening is that

01:31:46.240 --> 01:31:52.480
 there has been discussion this is bill called a securitization bill that does include uh the

01:31:52.480 --> 01:31:57.200
 possibility of doing something similar like we see on the on the water side with the water

01:31:57.200 --> 01:32:03.440
 development board where they extend financing at a triple a rated because it's it's backed by the

01:32:03.440 --> 01:32:10.960
 by the state of texas and so again um anytime you can you can go into a more favorable rating debt

01:32:10.960 --> 01:32:14.880
 that lowers the cost of borrowing so certainly that's something that's being discussed and

01:32:14.880 --> 01:32:19.520
 something that we're actively working with our legislative consultants as well as other mo us

01:32:19.520 --> 01:32:25.520
 and frankly the entire electric industry across the state of texas oh i'm sure everybody was

01:32:25.520 --> 01:32:33.120
 impacted so um ma'am if we do get a better rate are we looking at something like 3.5 to 1.7 or

01:32:33.120 --> 01:32:41.920
 3.5 to 3.1 or do you have any sense of that i don't have a sense right now um but as we as

01:32:41.920 --> 01:32:46.880
 we move through the process i i should be able to tell you a little bit better on the projections

01:32:46.880 --> 01:32:53.600
 for the interest rate oh thank you i appreciate both you thank you i'm assuming you'll do a call

01:32:53.600 --> 01:33:00.400
 date that's a shorter period than we typically do so that if this financing does come we can call

01:33:00.400 --> 01:33:06.400
 them and replace them yes and we're going to work with our bond council on what's the um the best

01:33:06.400 --> 01:33:15.440
 way to go about that given the potential um securitization okay um i'm with billy i i don't

01:33:15.440 --> 01:33:22.640
 like this but i think that it's it's what we need to do to finance the 140 million um moving forward

01:33:22.640 --> 01:33:31.440
 and just is what it is go ahead ben so i mean the issue is that the money has to come from somewhere

01:33:31.440 --> 01:33:38.240
 and so we're we're basically just trying to minimize the impact on customers correct right correct

01:33:43.200 --> 01:33:54.240
 so you you need some direction as does anybody disagree with staff recommendation no i don't

01:33:54.240 --> 01:33:58.640
 disagree just i want to make sure we bring it back and discuss about where it will be

01:33:58.640 --> 01:34:05.280
 or you know versus right versus the uh energy cost adjustment rate yes and we will do that

01:34:06.960 --> 01:34:14.880
 all right then thank you um then our final item is we'll be adjourning into a closed session

01:34:14.880 --> 01:34:20.080
 we will not come back but i need to read this before we go into closed session

01:34:20.080 --> 01:34:26.160
 deliberations regarding certain public power utilities competitive matters under texas

01:34:26.160 --> 01:34:35.440
 government code section 551.086 consultation with attorneys under texas government code section 551.071

01:34:37.120 --> 01:34:41.440
 receive a presentation from staff regarding the public power competitive

01:34:41.440 --> 01:34:47.680
 and financial matters about the delivery of power wholesale energy supply and risk management plans

01:34:47.680 --> 01:34:53.840
 hedge plans and strategies as it each relates to dme electric power and gas portfolio

01:34:53.840 --> 01:35:00.400
 and to the february winter storm discuss deliberate and provide input to staff regarding

01:35:00.400 --> 01:35:07.120
 the same consultation with the city's attorneys regarding legal issues legal status legal analysis

01:35:07.120 --> 01:35:12.640
 and legal strategy associated with the above matters and pending and potential litigation

01:35:12.640 --> 01:35:16.560
 where the public discussion of these legal matters would conflict with the duty of the

01:35:16.560 --> 01:35:22.240
 city attorneys to the city of denton and the denton city council under texas disciplinary rules

01:35:22.240 --> 01:35:28.480
 of professional conduct of the state part of texas or would jeopardize the city's legal position for

01:35:28.480 --> 01:35:40.320
 any administrative proceedings or potential litigation all right so i think i'm just going

01:35:40.320 --> 01:35:44.720
 to try to give um kim