1 00:00:00,000 --> 00:00:09,360 Okay. Good morning and seeing that we have a quorum present, I welcome you to the December 2 00:00:09,360 --> 00:00:16,560 16th, 2020 meeting of the mobility committee. First up under items for individual consideration 3 00:00:16,560 --> 00:00:24,280 is approval of the minutes. I will entertain action. I'll move approval. I'll second. 4 00:00:24,280 --> 00:00:32,720 It is moved and seconded. All in favor. Aye. Okay. Minutes are approved. Moving on to item 5 00:00:32,720 --> 00:00:37,440 B. Receiver report, hold the discussion and give staff direction regarding updates from 6 00:00:37,440 --> 00:00:56,240 the DCTA. Is DCTA here? Should we put this one off of it? Anyone know? Tracy's checking, 7 00:00:56,240 --> 00:01:03,120 I think. I'm checking. She has not communicated. Well, let's move on to item C for the moment. 8 00:01:03,120 --> 00:01:09,680 Hopefully we'll be able to circle back and get that update. So item C is receiver report, 9 00:01:09,680 --> 00:01:13,160 hold the discussion and give staff direction regarding the city of Denton transportation 10 00:01:13,160 --> 00:01:18,920 mobility project status report for the Denton area. And I understand that we do not have 11 00:01:18,920 --> 00:01:35,020 our usual text. I'm supposed to with us, but Becky is incredibly prepared. I'm going to 12 00:01:35,020 --> 00:01:41,120 ask Brian who's currently sitting at the city hall to pull up the presentation and I'm going 13 00:01:41,120 --> 00:01:47,120 to do a brief overview of the items that are in the packet. If there are specific questions, 14 00:01:47,120 --> 00:01:55,360 we will be prepared to get those over to Mr. Poulster. And so with that, you'll hear me 15 00:01:55,360 --> 00:02:01,560 say next slide for Brian. So Brian, thank you for assisting me as I am remote also. 16 00:02:01,560 --> 00:02:08,840 So Brian, next slide please. So today Mr. Poulster has prepared a packet. As you can 17 00:02:08,840 --> 00:02:14,440 see here is kind of a project overall summary with different let dates, contractors associated 18 00:02:14,440 --> 00:02:23,520 with the project and the construction cost. Next slide. And the FM 2181 project is currently 19 00:02:23,520 --> 00:02:28,640 under construction. I think we're all aware that the city has utilities, water and wastewater 20 00:02:28,640 --> 00:02:33,400 utilities that are being relocated. And the project is currently under construction with 21 00:02:33,400 --> 00:02:40,240 Zachary Construction Company. And the overall construction completion date is currently 22 00:02:40,240 --> 00:02:50,600 anticipated for November of 2021. Next slide please. Next slide. The US 377 Fort Worth 23 00:02:50,600 --> 00:02:56,420 Drive project is also under construction. There were water and wastewater utility relocations 24 00:02:56,420 --> 00:03:01,820 done as part of this project. And then the current construction completion date is February 25 00:03:01,820 --> 00:03:13,640 of 2021. Next slide. Next slide. The next project is the I-35E Mayhill project. This 26 00:03:13,640 --> 00:03:20,400 is a widening project in this area. And currently to date there are right away acquisitions that 27 00:03:20,400 --> 00:03:24,840 are underway. And you can see from the packet there are several parcels that are still either 28 00:03:24,840 --> 00:03:32,240 in the negotiation phase or possibly going through the eminent domain phase. And then 29 00:03:32,240 --> 00:03:38,360 there are several parcels that are currently in possession of TxDOT. It does appear from 30 00:03:38,360 --> 00:03:45,600 the packet that they're working through utility coordination with several different entities. 31 00:03:45,600 --> 00:03:50,620 And currently it shows that that right away acquisition is anticipated to be completed 32 00:03:50,620 --> 00:03:58,440 this month. The utility relocation is to be completed within April of 2020. And it appears 33 00:03:58,440 --> 00:04:02,480 that they are going to be working forward to moving that project to construction in 34 00:04:02,480 --> 00:04:13,000 June of 2022. Next slide please. This project is the US I-35E US 77 Dallas Drive Interim 35 00:04:13,000 --> 00:04:20,040 Improvements. And the city is currently working with TxDOT in this area. And there's some 36 00:04:20,040 --> 00:04:27,480 conversations that have been happening about the actual median opening or opening as you 37 00:04:27,480 --> 00:04:33,840 exit off of 35 and get onto Dallas Drive. And so we're working through with TxDOT some 38 00:04:33,840 --> 00:04:39,480 interim design and construction in this area. And working through what's the best solution 39 00:04:39,480 --> 00:04:45,320 from this area. And it appears that that environmental clearance for this specific project is for 40 00:04:45,320 --> 00:04:51,800 January 31st of 2012, which has been quite some time ago. So we will be working with 41 00:04:51,800 --> 00:04:57,200 and have been working with TxDOT to work through what are the next steps to get some of these 42 00:04:57,200 --> 00:05:08,880 interim phases executed. Next slide please. This project is the I-35, I-35E, I-35W Merge 43 00:05:08,880 --> 00:05:16,000 project. As you can see from the graphic, this is basically the Y intersection where 44 00:05:16,000 --> 00:05:26,480 35E and 35W come together all the way up to the 77 area north of Denton. Currently, the 45 00:05:26,480 --> 00:05:31,760 schematic approval and environmental clearance phase has been completed. It does appear from 46 00:05:31,760 --> 00:05:38,400 the information that they're working through right away acquisition, utility relocations 47 00:05:38,400 --> 00:05:45,240 are anticipated to be completed in June of 2022. And the project appears to be anticipated 48 00:05:45,240 --> 00:05:52,100 to start construction in January of 2023. You can see from the packet below, there are 49 00:05:52,100 --> 00:05:58,120 several parcels that they're still working through the right away acquisition on. 60% 50 00:05:58,120 --> 00:06:04,720 plans, which are considered plans adequate, were submitted, it appears in November, late 51 00:06:04,720 --> 00:06:11,000 November. And TxDOT is working through and negotiating the design fees for the Windsor 52 00:06:11,000 --> 00:06:18,520 interchange and that preliminary design of how Windsor Drive itself will interchange with 53 00:06:18,520 --> 00:06:30,440 the 35. Next slide please. So I-35 north, segments one and two is the next packet project 54 00:06:30,440 --> 00:06:36,320 that you see. It appears that they're working through right away acquisition. And there 55 00:06:36,320 --> 00:06:41,360 are several parcels as you can see there that are still in negotiation phase, some that 56 00:06:41,360 --> 00:06:47,080 are working through M&A domain and several that are already in possession. It does appear 57 00:06:47,080 --> 00:06:51,800 from the packet that they're hoping to have the right away acquisition completed in March 58 00:06:51,800 --> 00:07:01,920 of 2021. 100% plans ready for November of 2021 with a December 2022 let date. Next slide 59 00:07:01,920 --> 00:07:10,240 please. This project is specific to the I-35W main lanes. And this project is still moving 60 00:07:10,240 --> 00:07:17,800 through kind of that environmental clearance phase, schematic phase. The 95% schematic 61 00:07:17,800 --> 00:07:23,480 is at the design division currently for review according to the packet information. And this 62 00:07:23,480 --> 00:07:26,720 will be one that'll be moving through kind of the process. It's still in the beginning 63 00:07:26,720 --> 00:07:36,840 phases according to the information. Next slide. The I-35W frontage road project, TxDOT 64 00:07:36,840 --> 00:07:43,880 is currently working through and negotiating for the plans, the schematics and the environmental 65 00:07:43,880 --> 00:07:50,760 efforts with HNTB. And they're evaluating the priority project to do what they're possibly 66 00:07:50,760 --> 00:07:55,600 are looking into as breakout segments, which would require different portions of the project 67 00:07:55,600 --> 00:08:01,240 to be done in different phases. Currently from the packet information, you can see they're 68 00:08:01,240 --> 00:08:07,440 working on right away acquisition to be completed in December of 2021, utility relocations to 69 00:08:07,440 --> 00:08:15,540 be completed in September of 2023. And it shows the ready to let date of September 2023. 70 00:08:15,540 --> 00:08:21,760 They have requested a letter of support from the city and the city has provided that information. 71 00:08:21,760 --> 00:08:32,800 So next slide please. The next project is the U.S. 380/U.S. 77 project. And this project 72 00:08:32,800 --> 00:08:38,960 is specifically the city's portion of the project is sidewalks in this area. It was 73 00:08:38,960 --> 00:08:45,520 awarded to Regal Construction. And that's really the major impact from the city perspective 74 00:08:45,520 --> 00:08:51,680 is just the sidewalks itself. And so that project construction is anticipated to start 75 00:08:51,680 --> 00:09:03,080 here next month. Next slide please. And the 380 East project. This is specifically a project 76 00:09:03,080 --> 00:09:08,720 that looks from the information that they're still working through utility coordination. 77 00:09:08,720 --> 00:09:15,060 And it appears that they plan to let this project in May of 2021. And the city currently 78 00:09:15,060 --> 00:09:20,800 does not have facilities in this area that are directly impacted, but will make adjustments 79 00:09:20,800 --> 00:09:27,880 as needed. And this is specific to the 380 portion from U.S. 377 to the county, I'm sorry, 80 00:09:27,880 --> 00:09:35,240 the Collin County line, which is not specifically in the area of which Denton has facilities. 81 00:09:35,240 --> 00:09:44,880 Next slide please. Next slide. The loop 288 West project. This project is a project that 82 00:09:44,880 --> 00:09:51,280 Denton County is working to begin negotiations with Chank Patel and Yerby for the P.S. and 83 00:09:51,280 --> 00:09:57,400 East. Currently the project is showing a right away acquisition completion date of December 84 00:09:57,400 --> 00:10:06,480 of 2024. 100% plans appear to be anticipated for June of 2022 and are ready to let date 85 00:10:06,480 --> 00:10:18,640 of April of 2026. Next slide please. The FN1515 project, it appears from the information provided 86 00:10:18,640 --> 00:10:25,280 that Denton County is currently working with negotiations with LTRA for the P.S. and East. 87 00:10:25,280 --> 00:10:30,840 And it appears that the information shows they're working through the right away acquisition. 88 00:10:30,840 --> 00:10:37,600 They're hoping to have that completed in January of 2022 with utility relocations completed 89 00:10:37,600 --> 00:10:44,440 in December of 2022. And they're ready to let date shows of December of 2022 also to 90 00:10:44,440 --> 00:10:53,440 begin that project. Next slide please. The 1173 project, I understand there's been some 91 00:10:53,440 --> 00:10:59,160 environmental improvements that are continuing. There was a virtual public hearing that's 92 00:10:59,160 --> 00:11:06,960 currently available on the Keep it Moving Dallas website that you see in the packet. 93 00:11:06,960 --> 00:11:13,160 And right away mapping is continuing with currently it shows 60 parcels. And that project 94 00:11:13,160 --> 00:11:22,840 shows a ready to let date of December of 2023. Next slide. This project is currently also 95 00:11:22,840 --> 00:11:30,120 the integrated corridor. It is going through what we call the U.S. 380 feasibility study. 96 00:11:30,120 --> 00:11:36,640 You might have seen this information on the city website being able to allow and let individuals 97 00:11:36,640 --> 00:11:41,640 know that a public meeting has been scheduled. And this is really a public meeting period 98 00:11:41,640 --> 00:11:50,560 of which you can do online comment. That is from December 2nd up until this Thursday which 99 00:11:50,560 --> 00:12:00,040 is December 17th. So at the www.keepitmovingdallas.com-U.S. 380 Denton PM2 you can leave your comments 100 00:12:00,040 --> 00:12:10,480 specific to the integrated corridor 380 feasibility study project. Next slide. The Bonnie Bray 101 00:12:10,480 --> 00:12:18,120 Phase 6 project is currently working through its design phase. And there are no additional 102 00:12:18,120 --> 00:12:22,960 updates on this project at this time. It's just working through kind of that design phase 103 00:12:22,960 --> 00:12:28,520 and working through and coordinating with the high school opening. And basically there's 104 00:12:28,520 --> 00:12:33,120 a lot of easement acquisition that's currently working on and going through the process right 105 00:12:33,120 --> 00:12:43,720 now. Next slide. Bonnie Bray Phase 7. That is specific to a project that was working 106 00:12:43,720 --> 00:12:48,680 through with the city. We have worked with TxDOT and they have requested a lot of the 107 00:12:48,680 --> 00:12:53,760 schematic design that was put together for this area. And that project is now being handled 108 00:12:53,760 --> 00:13:03,160 through TxDOT. Next slide. The Mayhill Roadway project, as you can see from the graph, the 109 00:13:03,160 --> 00:13:09,360 Phase 1 construction is complete. And the city is currently working through the design 110 00:13:09,360 --> 00:13:16,160 phase for Phase 2. And that project is currently underway with the in-house capital projects 111 00:13:16,160 --> 00:13:24,520 division. Next slide. The McKinney Street project is currently under construction. Phase 112 00:13:24,520 --> 00:13:30,520 1 is completed and Phase 2 is currently under construction along with the intersection of 113 00:13:30,520 --> 00:13:37,360 the McKinney and Mayhill area. And that project is currently being managed by the capital 114 00:13:37,360 --> 00:13:45,680 projects division. Next slide. Hickory Creek Road. I think we can skip currently the project 115 00:13:45,680 --> 00:13:54,360 of Phase 1 and 2 is under construction and Phase 3 is under design. And you can go on. 116 00:13:54,360 --> 00:13:59,080 And I think that's it, Brian. That's just kind of a summary of terms. So with that, 117 00:13:59,080 --> 00:14:05,360 I will answer any questions that anybody might have. I'll do the best I can and anything 118 00:14:05,360 --> 00:14:10,620 that I can't answer, I absolutely will work with Mr. Polster. I'm sure he would have had 119 00:14:10,620 --> 00:14:14,760 a lot more information to provide to you. And that was really just kind of a high-level 120 00:14:14,760 --> 00:14:20,600 overview of the information in the packet. And then like Council Member Meltzer mentioned, 121 00:14:20,600 --> 00:14:25,440 Mr. Polster is not feeling well today. So we're happy to provide that information. The packet's 122 00:14:25,440 --> 00:14:30,560 also included on the city's website. So with that, I'll entertain any questions that you 123 00:14:30,560 --> 00:14:43,200 might have. Council Members? I have a question that you all don't. I have two. Council Member 124 00:14:43,200 --> 00:14:48,440 Briggs has a question. Yes, ma'am. Change the way this thing is displayed. Go ahead. 125 00:14:48,440 --> 00:14:53,640 Thank you, Chair. Just two questions. On the Loop 288 project, I know that we've talked 126 00:14:53,640 --> 00:14:59,560 about that as a whole, but there were some other projects on that regarding frontage 127 00:14:59,560 --> 00:15:08,400 roads that we were discussing that were going to come in first. Is there an update on that 128 00:15:08,400 --> 00:15:15,040 aspect of it? Yes, ma'am. You probably will recall the city did a letter of support for 129 00:15:15,040 --> 00:15:21,240 the Loop 288 West project. And so what currently is happening with that is TxDOT is working 130 00:15:21,240 --> 00:15:27,640 through, working to get that consultant on board to work on kind of that design and then 131 00:15:27,640 --> 00:15:33,880 look at specifically if there's areas that need to be done in advance of other areas. 132 00:15:33,880 --> 00:15:39,560 Currently, it appears in the way that the project's being planned is that those northbound 133 00:15:39,560 --> 00:15:45,480 frontage roads will be done first. And so that's the current update at this time is 134 00:15:45,480 --> 00:15:50,160 they're working through kind of that next step phase with right-of-way acquisition and 135 00:15:50,160 --> 00:15:56,400 moving forward into design. Okay. Just a real quick follow-up, and you may not know, but 136 00:15:56,400 --> 00:16:03,040 it would be helpful. The timing of those frontage roads as compared to the full project, I think 137 00:16:03,040 --> 00:16:08,960 we saw 2024 as like the loop. So, and I know that the frontage roads we were looking forward 138 00:16:08,960 --> 00:16:14,760 to go ahead and get done sooner. So is that whatever that date that is, that would be 139 00:16:14,760 --> 00:16:21,960 helpful to know? Absolutely. Sure. We can work with Mr. Poulster and get that type of information. 140 00:16:21,960 --> 00:16:28,840 The next question, Chair, I know that on 380 there's the sign flashing, work is about to 141 00:16:28,840 --> 00:16:36,280 begin, and I've seen some comments. People are really nervous about what that means. 142 00:16:36,280 --> 00:16:42,660 Do you know what the work plan is and what we can expect? Will the one lane be shut down 143 00:16:42,660 --> 00:16:50,200 both ways or do we have any idea we can put out ahead for people to expect? And are you 144 00:16:50,200 --> 00:16:58,700 talking specifically about east of town? Uh-huh. Yes, ma'am. Absolutely. I can get that information 145 00:16:58,700 --> 00:17:05,200 from TxDOT so that we can find out exactly what their, you know, what their traffic control 146 00:17:05,200 --> 00:17:10,600 plan is in that specific area so that residents can be aware, and we can work on trying to 147 00:17:10,600 --> 00:17:15,040 put that information kind of out on the website and, you know, to our social media front so 148 00:17:15,040 --> 00:17:19,400 we can share that information. I have not seen that traffic control plan specifically, 149 00:17:19,400 --> 00:17:24,480 so I can't answer that question, but we can work to get that information out to basically 150 00:17:24,480 --> 00:17:29,160 educate and allow residents and citizens to know, you know, how that will impact their 151 00:17:29,160 --> 00:17:33,520 day-to-day operations. Okay. Thank you so much. No problem. 152 00:17:33,520 --> 00:17:42,600 That's one for Ryan. Thank you, Chair. Yeah, I've got a couple of questions. The first 153 00:17:42,600 --> 00:17:49,680 one is on 377 regarding the railroad bridge. If they have any ETA on when they might be 154 00:17:49,680 --> 00:17:54,800 starting to set that since the project's only two months from completion, and they haven't 155 00:17:54,800 --> 00:17:58,000 brought that up at all as far as the dates, and that's probably something that'll have 156 00:17:58,000 --> 00:18:03,040 to go back to TxDOT, if I would imagine. Yes, sir. I will work to get an answer on that. 157 00:18:03,040 --> 00:18:07,000 I don't have an answer for that. Okay. Because it would make sense that they would set the 158 00:18:07,000 --> 00:18:13,480 portion over the southbound roads before they open that. Then the other one is on projects 159 00:18:13,480 --> 00:18:20,800 that aren't on here, specifically Bonnie Bray phases three and four. I know we've got the 160 00:18:20,800 --> 00:18:25,940 waterline project going in under phase three right now, but that doesn't seem to be having 161 00:18:25,940 --> 00:18:31,040 any momentum, and I'm wondering if there's any issues going on on that that we should 162 00:18:31,040 --> 00:18:34,600 be made aware of, because I've seen one track that has been sitting in the exact same spot 163 00:18:34,600 --> 00:18:42,360 for about three months. Yes, sir. Those two projects specifically are not related to the 164 00:18:42,360 --> 00:18:48,280 report that Mr. Polster puts together. Those aren't considered to be a part of his mobility 165 00:18:48,280 --> 00:18:55,160 report for an on-system report. We are currently working through with the contractor on that 166 00:18:55,160 --> 00:19:01,800 waterline project some concerns and issues that we have with that project specifically, 167 00:19:01,800 --> 00:19:05,240 and we're working through those currently, and as soon as there's more information that 168 00:19:05,240 --> 00:19:09,160 can be provided, we will absolutely provide that update. 169 00:19:09,160 --> 00:19:12,840 All right. Thank you. No problem, sir. 170 00:19:12,840 --> 00:19:18,640 Can I have a few questions? Forgive me if you addressed this while I was just in my 171 00:19:18,640 --> 00:19:27,080 interface, but my question is regarding whether there's any insight on any possibility of 172 00:19:27,080 --> 00:19:33,160 temporarily addressing the issue, and I think I might have heard you say something about 173 00:19:33,160 --> 00:19:44,120 the issue of the exit off of 35 onto 380 prior to the larger TxDOT project there, where we 174 00:19:44,120 --> 00:19:52,720 identified it as a dangerous and grievous area. Sure. Yes, sir. So specifically where 175 00:19:52,720 --> 00:20:00,600 35E and 35W come together at that Y intersection and near that intersection of the 380 exit, 176 00:20:00,600 --> 00:20:06,440 we have been in talks with TxDOT. We did have a meeting with them a few weeks back, and 177 00:20:06,440 --> 00:20:12,720 we have been collecting data for a traffic study, and that data we have received, so 178 00:20:12,720 --> 00:20:17,520 now we're working through that analysis phase. Once that information is collected, we'll 179 00:20:17,520 --> 00:20:21,080 then send that information over to TxDOT, and so we're just working through kind of 180 00:20:21,080 --> 00:20:27,480 a step process. The city and TxDOT are working in a collaboration partnership to see if there's 181 00:20:27,480 --> 00:20:32,960 some temporary measures that can be done in advance of the construction project, knowing 182 00:20:32,960 --> 00:20:37,560 that that time frame's a little bit further out, and so we are working through those steps. 183 00:20:37,560 --> 00:20:41,920 So at this point, and we're just going through that cycle of collecting the data, working 184 00:20:41,920 --> 00:20:47,120 through that study, and then going through the analysis phase to see what measures can 185 00:20:47,120 --> 00:20:51,680 be taken. There are several different options that we've discussed with TxDOT and Dallas 186 00:20:51,680 --> 00:20:58,280 District just a couple weeks back. So we'll continue to provide updates as those are available. 187 00:20:58,280 --> 00:21:04,880 Would you mind giving even sort of flavor of kinds of things that might be under consideration? 188 00:21:04,880 --> 00:21:10,600 Sure. There were several different things that were kind of talked about in that area, 189 00:21:10,600 --> 00:21:17,880 and really specifically, you know, some of those things are changing the entrance and 190 00:21:17,880 --> 00:21:24,320 exit ramp. So at Oak Street, after you go through that intersection, you can enter Oak Street, 191 00:21:24,320 --> 00:21:28,600 from Oak Street onto the highway immediately. And so we've talked about kind of flipping 192 00:21:28,600 --> 00:21:34,360 those two ramps. So the 380 exit, you will get off sooner when you're traveling northbound, 193 00:21:34,360 --> 00:21:38,960 and the Oak Street exit could come onto the highway sooner, or I'm sorry, after that. 194 00:21:38,960 --> 00:21:43,520 So just really kind of taking those two entrants and exit ramps and flipping those. And the 195 00:21:43,520 --> 00:21:47,800 other thing that's been mentioned, and there are several different things, but the other 196 00:21:47,800 --> 00:21:53,880 thing that's been looked at specifically is, you know, flipping where the 380 exit ramp 197 00:21:53,880 --> 00:21:59,320 will be sooner, but then keeping that Oak Street traffic and the frontage road traffic 198 00:21:59,320 --> 00:22:04,400 working through the intersection at 380, maybe making some modifications to the intersection 199 00:22:04,400 --> 00:22:12,040 at 380 and taking that traffic northbound to then enter north of the 380 and 35 interchange 200 00:22:12,040 --> 00:22:16,720 in that area. So there's several different options that are being looked at. And based 201 00:22:16,720 --> 00:22:21,200 on the traffic study and that information, we'll then work with TxDOT as to what, you 202 00:22:21,200 --> 00:22:26,160 know, is the best solution for that and whether, you know, that's something that they can handle 203 00:22:26,160 --> 00:22:30,080 through kind of some of their maintenance type contracts and do some temporary measures 204 00:22:30,080 --> 00:22:35,000 in advance of the major project that won't happen for a few years. 205 00:22:35,000 --> 00:22:41,080 Is the point of the traffic study to determine kind of where, what the pinch point is, whether 206 00:22:41,080 --> 00:22:47,480 it's coming from, whether it's coming from exiting off of 35 or, you know, what is it 207 00:22:47,480 --> 00:22:50,280 that you're trying to determine in the traffic study? 208 00:22:50,280 --> 00:22:55,120 Sure. We're just basically looking at that overall area, trying to decide and figure 209 00:22:55,120 --> 00:23:02,280 out exactly where traffic is coming from and whether traffic is using the service road. 210 00:23:02,280 --> 00:23:07,120 And that will help make the determinations as to how many cars are going through a particular 211 00:23:07,120 --> 00:23:12,520 area. The traffic study specifically was related to that Oak Street interchange and then working 212 00:23:12,520 --> 00:23:18,280 through what are measures that could be taken to take traffic off 35 sooner onto that frontage 213 00:23:18,280 --> 00:23:24,280 road area. So that specific information then will help an overall analysis of that entire 214 00:23:24,280 --> 00:23:28,960 area from really 380 to Oak Street. And we'll be working through those with TxDOT. 215 00:23:28,960 --> 00:23:35,120 Great. I really think all the extra attention is merited. Related to that, can you remind 216 00:23:35,120 --> 00:23:43,280 us what the timing is on the TxDOT project with the Y versus the completion of the widening 217 00:23:43,280 --> 00:23:48,280 of Bonnie Bray? Because they're really related, right? The idea would be to have Bonnie Bray 218 00:23:48,280 --> 00:23:58,960 as an operating full capacity bypass while work is going on. So are we back to function 219 00:23:58,960 --> 00:23:59,960 that way? 220 00:23:59,960 --> 00:24:09,080 Sure. So really, the TxDOT 35E, 35W merge, the current let date for that project is January 221 00:24:09,080 --> 00:24:17,120 of 2023. So the specific dates related to the quarter of which that Bonnie Bray phase, 222 00:24:17,120 --> 00:24:22,240 we're working through all of those options. But I would tell you at this point, it's very 223 00:24:22,240 --> 00:24:29,360 apparent that if that area is within a construction timeframe that other individuals, residents, 224 00:24:29,360 --> 00:24:35,160 citizens will be wanting to use Bonnie Bray as an alternate route, specifically if that 225 00:24:35,160 --> 00:24:39,160 area is under construction. So we're still working through kind of the timing of that 226 00:24:39,160 --> 00:24:45,840 intersection. TxDOT currently tells us that they plan to let within the January 2023 timeframe. 227 00:24:45,840 --> 00:24:51,560 And so we're working through when Bonnie Bray construction will happen in that area. So those 228 00:24:51,560 --> 00:24:55,520 specific dates are still kind of something that we're working through, but we are absolutely 229 00:24:55,520 --> 00:24:59,360 coordinating because we do understand. And I think that's what you're really kind of 230 00:24:59,360 --> 00:25:04,200 thinking also from your question is Bonnie Bray would be used as an alternate route. 231 00:25:04,200 --> 00:25:06,520 So we're working through the timing of that project particularly. 232 00:25:06,520 --> 00:25:12,880 Well, I think the TxDOT funding, just to put that up, the TxDOT funding on Bonnie Bray 233 00:25:12,880 --> 00:25:16,800 says that that's how they're thinking of it too. And sort of the worst possible scenario 234 00:25:16,800 --> 00:25:21,400 is not pinning that one down and having them both under construction at the same time. 235 00:25:21,400 --> 00:25:22,400 Council Member Briggs. 236 00:25:22,400 --> 00:25:29,560 Yeah, thank you, Chair. Just to follow up your question about 380 and 35 has sparked 237 00:25:29,560 --> 00:25:33,360 another question for me. I appreciate you asking about that. I know it's really important 238 00:25:33,360 --> 00:25:41,540 to the community. So when you mentioned TxDOT, their maintenance contracts, was that your 239 00:25:41,540 --> 00:25:48,360 way of saying that that's the way they're looking to fund it? Or would the city need 240 00:25:48,360 --> 00:25:57,320 to offer matching or how would that be funded? Because I know it's extremely important and 241 00:25:57,320 --> 00:26:02,960 it would be a priority for us to fix that intersection. So when you mentioned maintenance 242 00:26:02,960 --> 00:26:11,880 contracts, is that where they're looking to kind of fit those projects in? But sure, I 243 00:26:11,880 --> 00:26:17,600 don't think all those decisions have completely been made exactly how the funding is a TxDOT 244 00:26:17,600 --> 00:26:25,080 roadway and TxDOT will have to look through how their funding will be done. I know maintenance 245 00:26:25,080 --> 00:26:29,560 funding is something that has been mentioned. And so really, that's a TxDOT decision as 246 00:26:29,560 --> 00:26:34,440 to how they're going to fund that particular project. At this time, what they've asked 247 00:26:34,440 --> 00:26:39,640 the city and what our relationship is in the collaboration of trying to find a solution, 248 00:26:39,640 --> 00:26:46,000 an interim solution to this situation before the permanent solution of the roadway construction 249 00:26:46,000 --> 00:26:51,600 happens is to work through that study, that analysis, then work with the TxDOT folks to 250 00:26:51,600 --> 00:26:56,000 find out what the solution is. But currently at this time, the funding is not something 251 00:26:56,000 --> 00:27:02,280 that's been completely discussed or decided upon. Although I did mention that TxDOT has 252 00:27:02,280 --> 00:27:06,800 looked into and is looking at different things that can be done, whether it's from their 253 00:27:06,800 --> 00:27:11,920 maintenance funding or some advanced type of funding that needs to be done to fix that 254 00:27:11,920 --> 00:27:16,320 area. But at this time, those specific decisions have not been made. They're still waiting 255 00:27:16,320 --> 00:27:20,920 on the data collection, which we're still in that process. And then from there, they'll 256 00:27:20,920 --> 00:27:26,360 work through what the solution is and then how it will be funded. 257 00:27:26,360 --> 00:27:29,880 Okay. I just mentioned that because it always helps to have funding and know where that's 258 00:27:29,880 --> 00:27:33,080 coming from to get a project completed. 259 00:27:33,080 --> 00:27:38,120 Sure. Absolutely. And those decisions haven't been made at this time, but you're very much 260 00:27:38,120 --> 00:27:42,400 correct that it will take money to make anything happen in that area. So yes, thank you for 261 00:27:42,400 --> 00:27:43,400 bringing that up. 262 00:27:43,400 --> 00:27:55,400 Now, may I ask you a question regarding Locust Street 77, TxDOT for now. I just want to relate 263 00:27:55,400 --> 00:28:04,300 in an incident and give you an opportunity to give me some context. So I speak with a 264 00:28:04,300 --> 00:28:10,200 constituent and I brought it up in the context of how it was recently resurfaced as part 265 00:28:10,200 --> 00:28:17,720 of an arrangement for TxDOT to put it in good shape before it converts over to city ownership. 266 00:28:17,720 --> 00:28:28,040 And this ordinarily very well informed constituent said, "Yeah, we're supposedly going to redo 267 00:28:28,040 --> 00:28:35,800 a lot of infrastructure under there, pipes under there." And that seemed to have been 268 00:28:35,800 --> 00:28:40,080 totally dropped in that it was a surprise to the city that they went ahead and covered 269 00:28:40,080 --> 00:28:47,320 it. I blanched, I had no way to respond to that. I don't recall hearing that something 270 00:28:47,320 --> 00:28:51,240 happened that we didn't expect to happen. I would be very surprised if that were the 271 00:28:51,240 --> 00:28:58,880 case, but can you provide any context on the sequence of events of needed infrastructure 272 00:28:58,880 --> 00:29:03,600 work under Locust Street and resurfacing of Locust Street? I see Council Member Briggs 273 00:29:03,600 --> 00:29:10,200 would like to add something as well. Sure, Council Member Briggs. 274 00:29:10,200 --> 00:29:16,800 I was just going to mention that that is the case. It is a long section of road and there 275 00:29:16,800 --> 00:29:26,360 is a section that isn't the case for, but there is a section that it is true, that it 276 00:29:26,360 --> 00:29:33,480 will have to be pulled up and redone in the future. I remember when Mr. Estes was here, 277 00:29:33,480 --> 00:29:43,280 he provided a map or a chart of that road for us and it showed which sections that issue 278 00:29:43,280 --> 00:29:47,880 related to. Care to confirm? 279 00:29:47,880 --> 00:29:54,880 Sure. Absolutely. I wanted to give Council Member Briggs an opportunity to finish her 280 00:29:54,880 --> 00:30:00,840 statement. There is a project currently that TxDOT is working on for sidewalks in that 281 00:30:00,840 --> 00:30:05,000 area. If you have driven in that area, you will notice there are a lot of new sidewalks 282 00:30:05,000 --> 00:30:12,800 along both Elm and Locust. There are projects associated with the utility infrastructure 283 00:30:12,800 --> 00:30:17,640 that still needs to be completed in that area and at that time, we will be working with 284 00:30:17,640 --> 00:30:26,480 TxDOT for that resurfacing. There are basically this section from really north of the courthouse 285 00:30:26,480 --> 00:30:32,280 all the way to 380. There is utility infrastructure, whether it be water, wastewater, or drainage 286 00:30:32,280 --> 00:30:39,640 infrastructure that needs to be constructed in that area and TxDOT did resurface in some 287 00:30:39,640 --> 00:30:48,280 of that area in advance of that utility reconstruction. There will be a relationship of where we will 288 00:30:48,280 --> 00:30:54,000 have to have TxDOT go back through and we are still working through those specifics 289 00:30:54,000 --> 00:30:58,600 where that roadway will have to be resurfaced after those utility improvements are made, 290 00:30:58,600 --> 00:31:04,520 because you are correct, those utility improvements were not made in advance of that roadway construction. 291 00:31:04,520 --> 00:31:10,720 It was a resurfacing of that roadway that TxDOT had planned and executed. 292 00:31:10,720 --> 00:31:16,760 Did that make sense from our perspective to do it in that sequence? 293 00:31:16,760 --> 00:31:20,680 Really we would love to have the opportunity to get those utilities replaced in advance 294 00:31:20,680 --> 00:31:26,240 of that. That was not the opportunity that was presented at this time and do some coordination 295 00:31:26,240 --> 00:31:32,240 issues but we will work through that with TxDOT and TxDOT is aware and happy to work 296 00:31:32,240 --> 00:31:36,880 through that whole situation with us to allow us to get those infrastructure replaced in 297 00:31:36,880 --> 00:31:37,880 that area. 298 00:31:37,880 --> 00:31:46,960 Okay, see it leaves me with not a great answer to the constituent. Did we have control over 299 00:31:46,960 --> 00:31:47,960 the sequence? 300 00:31:47,960 --> 00:31:54,920 No, sir, that is a TxDOT roadway. We work with them to coordinate those opportunities 301 00:31:54,920 --> 00:32:00,840 to replace that infrastructure in advance but that is not what happened at this time. 302 00:32:00,840 --> 00:32:05,640 There was a coordination issue between the utilities that needed to be replaced along 303 00:32:05,640 --> 00:32:11,160 with the storm drain in that area and the resurfacing of that roadway. TxDOT is aware 304 00:32:11,160 --> 00:32:16,080 that those utilities do need to be replaced in advance of that roadway. 305 00:32:16,080 --> 00:32:21,080 This happened before your tenure, right? This would never happen under DeVine administration. 306 00:32:21,080 --> 00:32:27,240 Yes, sir, this did happen before my tenure but I will just tell you that we will work 307 00:32:27,240 --> 00:32:32,720 to collaborate as best as we can and we have had those conversations with TxDOT and they 308 00:32:32,720 --> 00:32:36,400 are aware that the infrastructure does need to be replaced and are going to coordinate 309 00:32:36,400 --> 00:32:38,800 with us the roadway resurfacing. 310 00:32:38,800 --> 00:32:46,800 Okay, thanks for fielding that. Anything else on this? All right, thank you for covering. 311 00:32:46,800 --> 00:32:52,000 No problem and we will get answers to those other questions that you had too. I appreciate 312 00:32:52,000 --> 00:32:53,880 all the questions. 313 00:32:53,880 --> 00:33:01,120 All right. I see nobody else pop up on the screen here. I am going to move ahead to item 314 00:33:01,120 --> 00:33:05,880 D, staff update regarding hickory bike lane bollard spacing, highway safety improvement 315 00:33:05,880 --> 00:33:12,480 program status, mobility plan status and next steps, 88 bike position update, hallway crossing 316 00:33:12,480 --> 00:33:14,640 diagonal ramps and markings. 317 00:33:14,640 --> 00:33:23,640 Thank you, chair and members of the committee. Brian Yon, traffic engineer. Let me call up 318 00:33:23,640 --> 00:33:24,640 presentation. 319 00:33:24,640 --> 00:33:40,640 How about we will take questions sort of after each item? That's all right? 320 00:33:40,640 --> 00:33:52,800 Something is locked, okay. Totally locked up. 321 00:33:52,800 --> 00:33:56,240 I know how that is. When you are interacting with the technology, it's hard to also -- 322 00:33:56,240 --> 00:33:59,840 I've got this giant screen of my presentation, but I -- 323 00:33:59,840 --> 00:34:09,120 You want me to smack it for you? 324 00:34:09,120 --> 00:34:18,200 Well -- okay. You all can't see it yet either, can you? 325 00:34:18,200 --> 00:34:19,200 Not yet. 326 00:34:19,200 --> 00:34:20,200 Okay. 327 00:34:20,200 --> 00:34:24,760 Did Nicole ever pop in for her update? 328 00:34:24,760 --> 00:34:27,280 Do we know? 329 00:34:27,280 --> 00:34:31,160 I'm seeing a blank -- oh, there she is. 330 00:34:31,160 --> 00:34:36,240 Yeah, I am here. I joined at like 9.02. You all are quite speedy today. 331 00:34:36,240 --> 00:34:41,400 Oh, well, you know, tick, tick. We've all got to -- all right. Well, then while Brian 332 00:34:41,400 --> 00:34:46,960 Wiley puts to that, we'll go ahead and handle item D, which is receive a report, hold a 333 00:34:46,960 --> 00:34:50,120 discussion and give staff direction regarding updates from the DCTA. 334 00:34:50,120 --> 00:34:51,120 You're welcome. 335 00:34:51,120 --> 00:34:52,560 Thank you. Happy holidays. 336 00:34:52,560 --> 00:34:53,560 You too. 337 00:34:53,560 --> 00:35:01,240 I do have some exciting updates to share today. We have been working on what we are calling 338 00:35:01,240 --> 00:35:08,600 the DCTA priority actions, and so we've got some really big projects on the docket right 339 00:35:08,600 --> 00:35:14,760 now. We just concluded task order number one with Accenture for the purpose of the Transformation 340 00:35:14,760 --> 00:35:21,800 Initiative, where the contractor or the consultants came in and kind of did a full-body scan 341 00:35:21,800 --> 00:35:28,240 of DCTA to determine where we were most efficient, where we were inefficient, and some recommendations 342 00:35:28,240 --> 00:35:35,440 for a path forward. So at last week's board meeting, the board did approve a list of priority 343 00:35:35,440 --> 00:35:41,520 projects. There were 30 projects in total that are slated for the next five years for 344 00:35:41,520 --> 00:35:49,360 the agency, and so we're really excited about that. One of the top five projects was doing 345 00:35:49,360 --> 00:35:56,720 an -- bringing in some on-demand service providers to look at where we could make service more 346 00:35:56,720 --> 00:36:02,080 efficient, perhaps increase ridership and look at maybe more areas within the three 347 00:36:02,080 --> 00:36:11,000 member cities to serve. So we have had an open procurement since -- oh, gosh, the summer, 348 00:36:11,000 --> 00:36:16,000 where the board selected two providers, so VIA is one of them, and then a combination 349 00:36:16,000 --> 00:36:21,760 of Spare and Lyft is the second provider. And so we have been in coordination with both 350 00:36:21,760 --> 00:36:28,560 of those service providers to put together proposals for on-demand service. So at last 351 00:36:28,560 --> 00:36:36,920 week's DCTA board meeting, the board did kind of all agree that they would like to see proposals 352 00:36:36,920 --> 00:36:44,440 where the majority of fixed routes were removed, and we became primarily an on-demand provider. 353 00:36:44,440 --> 00:36:51,200 And so really DCTA being a broker of services. So at this point, based on board direction, 354 00:36:51,200 --> 00:36:57,880 specifically in Denton, we would be retaining the UNT routes, and then we would be retaining 355 00:36:57,880 --> 00:37:04,680 route three and route seven for a period of time, but really layering on-demand on top 356 00:37:04,680 --> 00:37:09,480 of three and seven, so that we can look at data that's provided by the on-demand providers 357 00:37:09,480 --> 00:37:17,000 to see is fixed route really the answer in those areas, which staff feels like it is, 358 00:37:17,000 --> 00:37:24,880 but looking at on-demand kind of to serve the rest of the city. And Lewisville, respectively, 359 00:37:24,880 --> 00:37:30,160 removing routes 21 and 22 and having full on-demand in that city. And we already have 360 00:37:30,160 --> 00:37:35,960 a non-demand service in the city of Highland Village. So it's a pretty big change that 361 00:37:35,960 --> 00:37:41,640 we're looking at. We plan to have those proposals back and to review them with our board at 362 00:37:41,640 --> 00:37:49,560 our January 28th meeting. At that point, the board would provide their insight and their 363 00:37:49,560 --> 00:37:53,640 recommendation on which vendor they would like to move forward with. And then we would 364 00:37:53,640 --> 00:37:58,120 have in-depth meetings with the vendor, as well as each of the member cities to go through 365 00:37:58,120 --> 00:38:02,600 a service plan for the respective city in detail to make sure that we're getting any 366 00:38:02,600 --> 00:38:07,600 insight and feedback directly from not just the city's representative on our board, but 367 00:38:07,600 --> 00:38:15,720 also city staff. Most likely, we're probably looking at like the May, June, July timeframe 368 00:38:15,720 --> 00:38:21,080 for actually launching a service of this type. But that transition plan would be part of 369 00:38:21,080 --> 00:38:27,680 that proposal review and those roundtable meetings as well. But with the amount of public 370 00:38:27,680 --> 00:38:34,600 involvement that will be required by the FTA due to the actual removal of routes, there's 371 00:38:34,600 --> 00:38:39,520 quite a bit of a lead time in order to make a transition like that happen. So it's a pretty 372 00:38:39,520 --> 00:38:47,960 big change and a major priority for DCTA. With that on the horizon, we are aware that 373 00:38:47,960 --> 00:38:52,600 obviously the number of fixed routes would become much smaller and then the amount of 374 00:38:52,600 --> 00:39:00,440 on-demand service would become much larger. So our board has approved the CEO to sign 375 00:39:00,440 --> 00:39:06,120 a letter of intent and Trinity Metro did the same thing. And DCTA and Trinity Metro were 376 00:39:06,120 --> 00:39:12,600 working together to see how we could leverage Trinity Metro's technologies and their managerial 377 00:39:12,600 --> 00:39:18,240 oversight in order to operate those remaining fixed route services. So we are currently 378 00:39:18,240 --> 00:39:24,360 in the exploration process, but we anticipate there being some sort of partnership and an 379 00:39:24,360 --> 00:39:31,200 alignment with the timing on the transition away from fixed route and to on-demand with 380 00:39:31,200 --> 00:39:37,640 Trinity Metro assisting us in managing the fixed route components as well as the ADA 381 00:39:37,640 --> 00:39:44,120 paratransit services. So DCTA would retain the direct management of all of the on-demand 382 00:39:44,120 --> 00:39:50,120 services in our member cities and contract cities, but we would basically partner with 383 00:39:50,120 --> 00:39:58,040 Trinity Metro and leverage their technologies to operate those remaining fixed routes. Again, 384 00:39:58,040 --> 00:40:05,720 pretty big change. With regionalism in mind, we are also partnering with DART. So both 385 00:40:05,720 --> 00:40:15,120 DCTA and DART signed a letter of intent. They are looking at potentially sharing some rail 386 00:40:15,120 --> 00:40:23,800 resources in order to explore and kind of plan an opportunity for joint rail operations 387 00:40:23,800 --> 00:40:31,760 in a maintenance facility. So we have the land. Our A train line connects to the DART 388 00:40:31,760 --> 00:40:38,520 green line. And so there are some cost efficiencies for both agencies in regard to kind of leveraging 389 00:40:38,520 --> 00:40:44,400 that space. And so there is a letter of intent that's been jointly signed by both agencies, 390 00:40:44,400 --> 00:40:52,840 but we are right now in the exploration phase of kind of what that would look like. So more 391 00:40:52,840 --> 00:41:01,440 to come, but lots of regionalism in mind for sure and lots of big changes. The other program 392 00:41:01,440 --> 00:41:06,720 I just wanted to let y'all know about is the TRIP program, which is the transportation 393 00:41:06,720 --> 00:41:12,560 reinvestment program that our board recently approved. And that basically takes a certain 394 00:41:12,560 --> 00:41:20,080 percentage of prior fiscal year savings and makes it available to the three member cities 395 00:41:20,080 --> 00:41:26,160 for the purpose of transit related projects. So that has been approved. The city of Lewisville 396 00:41:26,160 --> 00:41:32,440 has submitted their first project that's currently under review. And so that could be for projects 397 00:41:32,440 --> 00:41:42,640 such as like sidewalks, access to trails, access to transit. It could be for amenities 398 00:41:42,640 --> 00:41:50,120 on trails. And so anything that kind of enhances the customers or the public's experience with 399 00:41:50,120 --> 00:41:57,640 mobility. And so that's any type of mobility, walking, cycling, using transit, et cetera. 400 00:41:57,640 --> 00:42:04,700 So that program is active. I know in the past council member Briggs has brought up amenities 401 00:42:04,700 --> 00:42:09,360 for the trail and things like that. And so just to make sure that y'all are aware of 402 00:42:09,360 --> 00:42:14,280 that program, I'm sure that you're having those discussions at council level, but that 403 00:42:14,280 --> 00:42:22,400 funding is available for projects that do qualify. That is about it for this time around. 404 00:42:22,400 --> 00:42:28,440 Again, we don't operate service on Christmas day or New Year's day, but our customer service 405 00:42:28,440 --> 00:42:33,880 teams do remain open just to answer any questions or to help folks reschedule their trips. But 406 00:42:33,880 --> 00:42:38,120 I'm happy to answer any questions that you might have. 407 00:42:38,120 --> 00:42:46,240 Council member Briggs. The study or report that you mentioned, is 408 00:42:46,240 --> 00:42:51,280 that available online or for the public to review and read? 409 00:42:51,280 --> 00:42:57,880 Sure. It was included in the December board packet, but I am happy to also send it to 410 00:42:57,880 --> 00:43:04,240 this group if you'd like to see it. Yeah, I would like to see it as well. 411 00:43:04,240 --> 00:43:11,040 Thank you. That's what we're waiting for. 412 00:43:11,040 --> 00:43:14,600 Just so the members here or anybody watching has a better understanding, can you give a 413 00:43:14,600 --> 00:43:19,360 brief description of where seven and three are as to where we're going to continue to 414 00:43:19,360 --> 00:43:24,680 have some bus service? Sure, absolutely. So route three runs basically 415 00:43:24,680 --> 00:43:32,920 from the DBTC out to like where the Salvation Army is located. So there's a lot of human 416 00:43:32,920 --> 00:43:41,040 services, agencies, apartment complexes, as well as some justice departments are located 417 00:43:41,040 --> 00:43:48,360 along that route. So it's heavily what we would consider a transit dependent population 418 00:43:48,360 --> 00:43:56,400 and access to human services, which from FTA's Title VI perspective is a critical area for 419 00:43:56,400 --> 00:44:02,720 fixed route service. Based on data, it also meets the criteria of a minimum of 10 boardings 420 00:44:02,720 --> 00:44:08,440 per hour along that route, which is why we're recommending that we at least test out that 421 00:44:08,440 --> 00:44:14,680 route. And then route seven runs from the DDTC through downtown, through UNT, and then 422 00:44:14,680 --> 00:44:22,360 out to Razor Ranch. There are some human services centers located along that route, but it's 423 00:44:22,360 --> 00:44:29,840 also just a very highly dense area, specifically with traffic to downtown apartment complexes, 424 00:44:29,840 --> 00:44:36,120 to university, and then Razor Ranch. And so it again, in the analysis that was done, exceeds 425 00:44:36,120 --> 00:44:42,400 the threshold of 10 boardings per hour. So the goal is really to kind of keep those routes 426 00:44:42,400 --> 00:44:49,440 for a period of time, I am assuming probably about three months, and we will layer on-demand 427 00:44:49,440 --> 00:44:54,040 service on top of it. And we'll really be able to do some A and B testing. And so we'll 428 00:44:54,040 --> 00:45:00,720 be able to see, are we garnering additional riders because those who use the fixed route 429 00:45:00,720 --> 00:45:05,800 prefer to use the fixed route, but we're getting new people who would prefer to use the on-demand? 430 00:45:05,800 --> 00:45:09,800 Or is that on-demand service cannibalizing the fixed route, and the folks using the fixed 431 00:45:09,800 --> 00:45:15,120 route really prefer the on-demand? And that's data that we just don't have right now. We 432 00:45:15,120 --> 00:45:20,720 don't have hour-by-hour or constituent-based data for our routes. And so that's going to 433 00:45:20,720 --> 00:45:25,480 give us the opportunity to get some true A and B testing done and have that data and 434 00:45:25,480 --> 00:45:30,840 have that discussion with our board to make the best decision for the community. 435 00:45:30,840 --> 00:45:38,640 I'm certainly interested in hearing and seeing what the results of real behavior would be 436 00:45:38,640 --> 00:45:43,400 rather than the predetermined conclusion that we're moving away from fixed routes. So during 437 00:45:43,400 --> 00:45:50,920 that testing period, the routes that I talked about, fixed routes, we talked about keeping 438 00:45:50,920 --> 00:45:59,480 up, roughly what percent of Denton ridership do those fixed routes represent? 439 00:45:59,480 --> 00:46:07,200 I would hate to throw out a number, but of the eight fixed routes that are in Denton, 440 00:46:07,200 --> 00:46:12,400 those are the two best performing routes. But I can certainly follow up with an exact 441 00:46:12,400 --> 00:46:15,200 percentage. I can get that for you. I have that available. 442 00:46:15,200 --> 00:46:19,160 Yeah, rough would be fine. I don't need it exactly. I mean, just, you know, are we talking 443 00:46:19,160 --> 00:46:27,200 about, you know, by, are we pruning away the 80% of miles that only represent 20% of ridership? 444 00:46:27,200 --> 00:46:33,320 That would be like the ideal answer, right? That would be, you know, very efficient. So 445 00:46:33,320 --> 00:46:35,360 I'd be interested in understanding that. 446 00:46:35,360 --> 00:46:37,360 Sure. I can absolutely follow up. 447 00:46:37,360 --> 00:46:48,360 And then my other question is, in the study that led to this recommendation, that's now 448 00:46:48,360 --> 00:46:56,280 being contemplated, what was the degree of, or amount of input from transit dependent 449 00:46:56,280 --> 00:47:00,760 members of the public? 450 00:47:00,760 --> 00:47:11,920 So let me clarify. The Accenture report was an analysis that was based on an in-depth 451 00:47:11,920 --> 00:47:20,760 exploration of DCTA in their current state. The Accenture report does not recommend moving 452 00:47:20,760 --> 00:47:27,400 away from fixed route and moving to on-demand. So that was not part of the scope of work. 453 00:47:27,400 --> 00:47:32,560 It did, part of the scope of work, however, was to say, how are your routes performing 454 00:47:32,560 --> 00:47:42,160 against standards? And so it was really the DCTA board's decision in looking at performance 455 00:47:42,160 --> 00:47:47,940 and how effective and efficient that service is to say, okay, how do we address the inefficient 456 00:47:47,940 --> 00:47:55,720 service? And so we have had these MAS contracts under, we've had them under contract for two 457 00:47:55,720 --> 00:48:02,160 and a half years and we hadn't leveraged them other than for some contract city work that 458 00:48:02,160 --> 00:48:07,040 we have in Frisco and McKinney. And so it was really a collaboration from the board 459 00:48:07,040 --> 00:48:14,320 and saying, how can we provide more service? How can we provide more efficient service 460 00:48:14,320 --> 00:48:18,840 and take some of this maybe inefficient fixed route service off the road? So you won't, 461 00:48:18,840 --> 00:48:23,480 in the Accenture report that I'm happy to send out, you won't see a recommendation to 462 00:48:23,480 --> 00:48:29,640 remove fixed routes and add on-demand. That was really kind of an output after the board 463 00:48:29,640 --> 00:48:35,360 had reviewed those, that report and had been having some ongoing discussion about maybe 464 00:48:35,360 --> 00:48:41,920 what does the future of service look like? So are there plans in any part of this process 465 00:48:41,920 --> 00:48:52,240 to get input from transit dependent members? Yes, 100%. So the FTA requires us to partake 466 00:48:52,240 --> 00:48:58,040 in the public involvement process. So basically what would happen is we would get the MAS 467 00:48:58,040 --> 00:49:03,000 proposals from Viet and Spare next month. We would share them with our board. Hopefully 468 00:49:03,000 --> 00:49:08,360 we would have one for recommendation. Once the board approves that, we would then have 469 00:49:08,360 --> 00:49:12,800 a workshop with the member cities and the city staff to kind of tweak those service 470 00:49:12,800 --> 00:49:19,080 proposals. Once those tweaks are done, we would then take that kind of final proposed service 471 00:49:19,080 --> 00:49:26,960 plan model out to the public. And because this is such a major deviation from the typical 472 00:49:26,960 --> 00:49:34,600 way we provide service, we would do most likely like two plus months worth of in-depth public 473 00:49:34,600 --> 00:49:40,320 involvement where we're going out, we're virtually going out to different groups, talking to 474 00:49:40,320 --> 00:49:46,160 them about what the changes are, how that might impact them positively or negatively, 475 00:49:46,160 --> 00:49:53,640 to collect that feedback. Our board cannot formally and officially approve a service change 476 00:49:53,640 --> 00:49:59,280 of this magnitude without reviewing the public feedback in conjunction with the materials 477 00:49:59,280 --> 00:50:06,880 for approval. Councilmember Briggs. Thank you, Chair. During this conversation, of course, 478 00:50:06,880 --> 00:50:14,720 I came up with other questions. So if you would just allow me just a couple. On demand 479 00:50:14,720 --> 00:50:21,880 costs, are they the same as the fixed route cost? It really depends on frequency and the 480 00:50:21,880 --> 00:50:26,600 number of people that you're carrying. There are situations where on-demand service can 481 00:50:26,600 --> 00:50:31,840 be more expensive than fixed route. There are also situations where it can be drastically 482 00:50:31,840 --> 00:50:36,280 cheaper than fixed route. So it's really going to depend on how many vehicles per hour we 483 00:50:36,280 --> 00:50:42,880 have on the road and how many people we're carrying. Okay. So I'm just, I have a little 484 00:50:42,880 --> 00:50:49,920 concern about eliminating those fixed routes. I think that that is a good part of a successful 485 00:50:49,920 --> 00:50:53,760 bus system. And I know that on-demand is, you know, coming up, but I don't know that 486 00:50:53,760 --> 00:51:01,200 that's the solution. And when we talk about improving performance, I don't know that elimination 487 00:51:01,200 --> 00:51:10,800 is the way to improve a performance. I think it might be easiest. And so if we eliminate 488 00:51:10,800 --> 00:51:16,080 fixed routes for majority of them and go to on-demand service, which is a contract that 489 00:51:16,080 --> 00:51:24,080 eliminates overhead, right? That eliminates staff buses, bus routes. So does that mean 490 00:51:24,080 --> 00:51:31,880 you take in less tax money from the residents of Denton if you're not spending it? No, because 491 00:51:31,880 --> 00:51:37,080 the, the half cent sales tax was voted in. So we would still receive that half cent sales 492 00:51:37,080 --> 00:51:42,640 tax. I believe, and I don't want to speak on behalf of the board, but I believe the 493 00:51:42,640 --> 00:51:51,600 thought process is we spend the same, but we're able to offer much better and more service. 494 00:51:51,600 --> 00:51:56,800 So we're able to cover a larger service area with more frequency, which then becomes much 495 00:51:56,800 --> 00:52:02,840 more convenient for the consumer. So it also allows them to go like from curb to curb versus 496 00:52:02,840 --> 00:52:09,240 having to go to a stop. We're able to cover areas that currently don't have service now 497 00:52:09,240 --> 00:52:13,640 rather than waiting 30 minutes during peak and an hour during off-peak, maybe you're 498 00:52:13,640 --> 00:52:19,160 only waiting 10 minutes for a ride. So I think that the thought process is, is if we could 499 00:52:19,160 --> 00:52:24,080 provide more coverage and more frequent service within the current, what we're currently spending 500 00:52:24,080 --> 00:52:29,320 on fixed route, that would be the best plan forward. 501 00:52:29,320 --> 00:52:37,080 Well, if it, if it costs more money, it's not going to be equitable for all bus riders. 502 00:52:37,080 --> 00:52:43,840 So I just, this is one of my last meetings and I just want to make the comment that whatever 503 00:52:43,840 --> 00:52:49,840 changes are made, please make sure that there's equity in, in your decision for, for all of 504 00:52:49,840 --> 00:52:57,140 us. Absolutely. And as part of the FTA requirement, we will do a title six analysis and that specifically 505 00:52:57,140 --> 00:53:01,960 addresses equity. Certainly there will be some trade-offs that we will have to discuss 506 00:53:01,960 --> 00:53:07,000 with our board. So moving to a more on-demand model, what does that do from an equity or 507 00:53:07,000 --> 00:53:11,800 a title six perspective, but also what does that do from a federal funding perspective? 508 00:53:11,800 --> 00:53:20,080 Because our federal funding is based on total ridership and on the on-demand TMCs track 509 00:53:20,080 --> 00:53:25,400 ridership differently. And we're, they're still working with the FTA on, on how to kind 510 00:53:25,400 --> 00:53:31,360 of officially count ridership that would then go toward our federal funding. So there are 511 00:53:31,360 --> 00:53:38,000 what Accenture would call, would be some considerations that our board needs to weigh before making 512 00:53:38,000 --> 00:53:41,200 this decision. Thank you. 513 00:53:41,200 --> 00:53:51,000 Yes, and I did see a study for mass service in Louisville. Is that something that was 514 00:53:51,000 --> 00:53:57,960 done through DCTA? Did y'all get that, those numbers, or was that someone else who did? 515 00:53:57,960 --> 00:54:02,120 We have not, through our mass contracts, we have not done a proposal specifically for 516 00:54:02,120 --> 00:54:09,600 Louisville. As part of this open procurement, both Via and Spare did provide original proposals. 517 00:54:09,600 --> 00:54:13,560 And within those proposals, they carved out pieces of Denton and pieces of Louisville 518 00:54:13,560 --> 00:54:18,120 where they made some recommendations. But that was before our board had kind of made 519 00:54:18,120 --> 00:54:23,240 some decisions about the future of service. And so that's why we're asking Via and Spare 520 00:54:23,240 --> 00:54:31,160 to come back with an additional proposal. So not a direct proposal for Louisville DCTA 521 00:54:31,160 --> 00:54:35,640 was not involved. Okay. Well, and based on what I saw on there, 522 00:54:35,640 --> 00:54:41,280 and again, this was prior to this, there was substantial savings by switching to the mass 523 00:54:41,280 --> 00:54:47,760 in the Louisville area. I can't remember the exact percentage, but you know, it was 524 00:54:47,760 --> 00:54:55,960 about 900,000. And for about 100,000, they could add in Sunday service. So the ability 525 00:54:55,960 --> 00:55:02,680 to add services by changing over to this where our ridership is at that below 10 is definitely 526 00:55:02,680 --> 00:55:08,760 there. Some of the other things that have been contemplated are holiday service, which 527 00:55:08,760 --> 00:55:14,240 we currently don't, or longer hours where right now we're cutting off at 930. If we 528 00:55:14,240 --> 00:55:20,040 could get a little bit later, maybe up to midnight even with mass service, that would 529 00:55:20,040 --> 00:55:24,520 be very beneficial to people who right now when they want to go down to Dallas, they 530 00:55:24,520 --> 00:55:28,400 have to drive because unless you're going to finish everything up and be able to get 531 00:55:28,400 --> 00:55:33,200 back to Denton by 930, the train doesn't work for you. 532 00:55:33,200 --> 00:55:39,560 So absolutely, absolutely. The cost efficiencies with on demand allow us to kind of scale up 533 00:55:39,560 --> 00:55:45,280 and scale down much more efficiently than we could with fixed route, 100%. And so we 534 00:55:45,280 --> 00:55:49,480 are looking at part of those proposals will include what does it look like if we add Sunday 535 00:55:49,480 --> 00:55:55,880 service? What does it look like if we just like you said, Mr. Ryan, if we increase our 536 00:55:55,880 --> 00:56:01,520 time frequency and, you know, look at days of the week and holidays. So I mean, there 537 00:56:01,520 --> 00:56:05,760 are definitely some benefits to moving to an on demand model for sure. 538 00:56:05,760 --> 00:56:10,080 Right. And I wasn't, I had to step out of the board meeting the other day, I wasn't 539 00:56:10,080 --> 00:56:16,440 there to hear what the final vote was on how to proceed. Was there also going, were you 540 00:56:16,440 --> 00:56:21,920 also going to look at changing the bus routes to 15 minutes so that matched up and didn't 541 00:56:21,920 --> 00:56:26,920 create, because right now our bus runs every 30 minutes and on demand was going to be 10 542 00:56:26,920 --> 00:56:37,240 minute peak and 15 minute off peak was estimated time for pick up. So there's an equity there 543 00:56:37,240 --> 00:56:43,320 that why would you wait 30 minutes for a bus when you could get an on demand in 10 or 15? 544 00:56:43,320 --> 00:56:47,960 Absolutely. We didn't get into that level, but I would anticipate that as we look at 545 00:56:47,960 --> 00:56:52,920 these proposals from both Viet and spare that any recommendations they make and then through 546 00:56:52,920 --> 00:56:57,280 the workshops with each member city, like once we have that final service plan, then 547 00:56:57,280 --> 00:57:01,400 we would go back and look at any of our existing fixed routes that are continuing to operate 548 00:57:01,400 --> 00:57:06,080 and we would tweak so that those connection points would make sense. And then that whole 549 00:57:06,080 --> 00:57:11,800 service plan, that comprehensive service plan is what we would then take to the public. 550 00:57:11,800 --> 00:57:20,520 Well, if I can make an unsolicited suggestion, if it were up to me to present of this, you 551 00:57:20,520 --> 00:57:24,640 know, sort of large change to the public, I'd include all the good stuff and not just 552 00:57:24,640 --> 00:57:29,880 that we're going to cut things. And I know there are some people who very sincerely believe 553 00:57:29,880 --> 00:57:35,960 it would be in the best interest of Denton to not fund public transit and instead fund 554 00:57:35,960 --> 00:57:41,000 the ability to write checks to corporations for economic development. That's a really 555 00:57:41,000 --> 00:57:49,120 poor framing. If in fact you can be moving toward, you know, greater service to the public 556 00:57:49,120 --> 00:57:55,000 and, you know, it may well be the case that if fully understood, you know, that on demand 557 00:57:55,000 --> 00:58:03,960 may provide better service to those same individuals. But all those good things, later hours or 558 00:58:03,960 --> 00:58:10,920 a train, you know, holistically one picture versus the other, it might be, you know, might 559 00:58:10,920 --> 00:58:15,480 be more tolerable. Absolutely. I feel like we're going to find out a lot in the next 560 00:58:15,480 --> 00:58:22,160 60 days. So the next 30 dedicated to kind of our board's decision on those two on demand 561 00:58:22,160 --> 00:58:29,460 proposals and then the following 30 days kind of tweaking the final proposal and developing 562 00:58:29,460 --> 00:58:34,320 something to take to the public. So I feel like we're still in the exploration phase, 563 00:58:34,320 --> 00:58:38,880 but that we'll have so much more to share over the next 60 days for sure. 564 00:58:38,880 --> 00:58:45,920 Okay. Interesting times. Thanks for coming to update us. Absolutely. Thank you for having 565 00:58:45,920 --> 00:58:52,280 me. Okay. Do we think we can do item D now? We're going to try it one more time. So let 566 00:58:52,280 --> 00:59:00,220 me work so seamlessly for Becky's presentation. I already read the whole thing. So, okay. 567 00:59:00,220 --> 00:59:07,440 So can you see that? Yes. All right. Let me go to full screen. Okay. So again, good morning 568 00:59:07,440 --> 00:59:11,680 everyone. Brian Young, city traffic engineer here to talk to you just about a couple of 569 00:59:11,680 --> 00:59:16,560 things. Just give you some updates. The first one is the Hickory street bike lane bollards. 570 00:59:16,560 --> 00:59:25,760 We put these in, I believe in June and our spacing at the time based on what we were 571 00:59:25,760 --> 00:59:31,940 reading from the manufacturer, we put them at 40 feet. We've since discovered that this 572 00:59:31,940 --> 00:59:38,240 allows because our speeds are a little bit lower, this allows the drivers to actually 573 00:59:38,240 --> 00:59:44,920 enter the bike lane and temporarily park to load or unload or make some other maneuver. 574 00:59:44,920 --> 00:59:48,680 And so our plan moving forward, this probably won't happen until after the beginning of 575 00:59:48,680 --> 00:59:54,400 the year, just based on crew availability. We do have material on hand and in stock. 576 00:59:54,400 --> 00:59:58,520 But we're going to go ahead and in those areas where they're 40 feet apart, we're going to 577 00:59:58,520 --> 01:00:03,400 install an intermediary bollard. So it's a 20 foot spacing. And we think that's going 578 01:00:03,400 --> 01:00:09,320 to be a much better solution. We've talked with the vendor and they're on board with 579 01:00:09,320 --> 01:00:15,400 the 20 foot spacing as well. So over the next couple of months, you'll see that situation 580 01:00:15,400 --> 01:00:24,800 change a little bit. And moving forward, we will also set a maximum of 30 foot spacing. 581 01:00:24,800 --> 01:00:30,780 And a lot of it's speed based, but we just find that the closer spacing of the bollards 582 01:00:30,780 --> 01:00:35,360 just kind of tightens up, gives a little bit more of a visual barrier and tightens up that 583 01:00:35,360 --> 01:00:39,080 security on the bike lane. >> Would you mind if we stop for questions 584 01:00:39,080 --> 01:00:44,600 between each item? That requires you to take it down so I can see. 585 01:00:44,600 --> 01:00:48,280 >> Okay. >> That's a technical challenge, I know. 586 01:00:48,280 --> 01:00:54,680 See, I had a feeling. That's one of our breaks. >> Thank you so much for looking into this 587 01:00:54,680 --> 01:01:03,160 and adding more. I guess my question is, so are you going to add ones in the add some? 588 01:01:03,160 --> 01:01:07,960 Are you going to just be resetting all of them and adding additional ones? 589 01:01:07,960 --> 01:01:11,160 >> So we talked with staff and I think what we're going to do because they're 40 feet 590 01:01:11,160 --> 01:01:16,360 apart is just to go ahead and put additional bollards to change to a 20 foot spacing, leave 591 01:01:16,360 --> 01:01:24,480 what's there and add one in the middle. It's not difficult to remove them and relocate 592 01:01:24,480 --> 01:01:29,240 them, but I think the 20 foot spacing is still going to be satisfactory. We're going to like 593 01:01:29,240 --> 01:01:34,160 that a lot better than the 40. It didn't make sense to move them, just the staff time to 594 01:01:34,160 --> 01:01:37,800 move them from a 40 to a 30 or a 20, it just didn't make sense. 595 01:01:37,800 --> 01:01:45,480 >> I agree. I know it will happen quicker that way too. And so just to clarify, these 596 01:01:45,480 --> 01:01:49,600 are already, you've ordered these and then they'll just be installed? 597 01:01:49,600 --> 01:01:57,120 >> Correct. We bought extra when we purchased these for the Hickory and the Welch. And so 598 01:01:57,120 --> 01:02:01,560 we've got enough on hand, we think, to finish out this project. If not, we can certainly 599 01:02:01,560 --> 01:02:09,020 order the turnaround time. There's not a lot of lead time on these. It's not a high demand 600 01:02:09,020 --> 01:02:13,080 product so they typically have some in stock and they can deliver those fairly quickly. 601 01:02:13,080 --> 01:02:19,580 We have other streets that we've got planned for implementation as well. So we'll be ordering 602 01:02:19,580 --> 01:02:22,240 additional stock in the near future in any case. 603 01:02:22,240 --> 01:02:28,160 >> Is there any kind of learning or, I mean, I guess, I guess there's no official international 604 01:02:28,160 --> 01:02:33,460 standard or we would have followed it, but what are we basing 40 on? What are we basing 605 01:02:33,460 --> 01:02:35,860 20 on other than it's better than 40? 606 01:02:35,860 --> 01:02:42,520 >> So the vendor has a range. There's a recommended range of spacing on devices and it's really 607 01:02:42,520 --> 01:02:50,480 based on speed so we picked kind of on the high end of the range initially for just cost 608 01:02:50,480 --> 01:02:57,000 effective and what we're finding is that the higher end of the range, if people are motivated 609 01:02:57,000 --> 01:03:01,640 to try and get into that bike lane, they will. It allows them to. So we just need, in certain 610 01:03:01,640 --> 01:03:07,280 areas we wouldn't, we may not have to, but specifically along Hickory adjacent to the 611 01:03:07,280 --> 01:03:11,320 commercial where people want to just run in real quick and pick up their pizza that they 612 01:03:11,320 --> 01:03:18,480 ordered, we're finding some violations and so we just, in that type of area we're just 613 01:03:18,480 --> 01:03:21,560 going to be consistent and take it to a 20 foot spacing. 614 01:03:21,560 --> 01:03:28,040 >> Do we know what's implemented in other cities that are similarly situated and have 615 01:03:28,040 --> 01:03:29,040 similar problems? 616 01:03:29,040 --> 01:03:36,360 >> Again, it's across the board. It's some cities, if you've got a lot of vehicular traffic 617 01:03:36,360 --> 01:03:44,360 that are going to a 15 foot spacing, 30 seems to be kind of a universal average, but again 618 01:03:44,360 --> 01:03:50,800 a 30 foot spacing is more than a car. Easily can maneuver, especially a small car, can 619 01:03:50,800 --> 01:03:55,640 maneuver into the bike lane to temporarily park if you don't see any cyclists, even if 620 01:03:55,640 --> 01:04:00,460 you do, people don't care, but we're going to take a little bit now, a little bit towards 621 01:04:00,460 --> 01:04:05,600 the lower end and use that 20 foot spacing. I think we're going to find that that's going 622 01:04:05,600 --> 01:04:08,400 to work for us in most places in town. 623 01:04:08,400 --> 01:04:12,840 >> Or it could set off like an arms war, where now everyone switches to Mini Coopers. 624 01:04:12,840 --> 01:04:16,720 >> Yes, the slalom run, yes. Or skateboarders. 625 01:04:16,720 --> 01:04:22,760 >> Okay, thank you. I'm going to continue now, thank you. 626 01:04:22,760 --> 01:04:26,680 >> John, did you have any question on this? 627 01:04:26,680 --> 01:04:29,680 >> No, I'm fine. 628 01:04:29,680 --> 01:04:40,360 >> Okay, thanks. All right. I can't see this. The next one is Highway Safety Improvement 629 01:04:40,360 --> 01:04:48,160 Program. This is a program really funded and led by the state by which we identify locations 630 01:04:48,160 --> 01:04:56,400 that have high fatality and serious injury crash history, and typically we will focus 631 01:04:56,400 --> 01:05:03,640 on intersections that are signalized because those are normally where the fatalities occur, 632 01:05:03,640 --> 01:05:11,840 but they're also some of the easily fixed locations. We've got six locations currently 633 01:05:11,840 --> 01:05:19,520 underway with this program. The three in green are actually under -- they've been bid and 634 01:05:19,520 --> 01:05:28,720 awarded and are going to construction early spring of 2021, and that's McKinney at Mockingbird, 635 01:05:28,720 --> 01:05:35,920 McKinney at Audra, and Teasley at 35. So those will either be modified or reconstructed. 636 01:05:35,920 --> 01:05:43,760 You've seen Council agenda item not too long ago about the funding, and we had to pay some 637 01:05:43,760 --> 01:05:51,440 overage on those, so those are moving forward to construction in early '21. I guess it's 638 01:05:51,440 --> 01:05:57,880 Magento. The ones on 288 are nearing completion of design. Those will be awarded probably 639 01:05:57,880 --> 01:06:05,040 bid and awarded May of '21 going to construction later that year. I guess King's Row at 288, 640 01:06:05,040 --> 01:06:11,240 McKinney at 288, and University at 288. So those three intersections will be receiving 641 01:06:11,240 --> 01:06:17,760 primarily technology upgrades, but King's Row is a full reconstruction. Again, you saw 642 01:06:17,760 --> 01:06:24,080 a Council agenda item on that not too long ago as well. When they're on system, we have 643 01:06:24,080 --> 01:06:29,280 the advantage of paying for 100% of the construction, and when they're off system like McKinney 644 01:06:29,280 --> 01:06:36,800 at Mockingbird, we pay 10%. So it's still a good deal, even if we have to pay our 10%. 645 01:06:36,800 --> 01:06:39,980 But just to give you a quick update on the status of those projects, you'll see the three 646 01:06:39,980 --> 01:06:45,000 in green there go to construction in a matter of months, and probably a year from now, you'll 647 01:06:45,000 --> 01:06:49,600 see those in the Magento color go to construction along 288 as well. 648 01:06:49,600 --> 01:06:58,400 >> Okay. I want to take it down to see if there's a question. Anybody? Councilmember 649 01:06:58,400 --> 01:07:02,240 Briggs. >> You mentioned McKinney and Mockingbird. 650 01:07:02,240 --> 01:07:10,840 That's a T intersection. Well, what will be done there? Just a new light? Like a -- 651 01:07:10,840 --> 01:07:15,820 >> So a lot of these are technology upgrades, which gives us the opportunity to sense traffic 652 01:07:15,820 --> 01:07:24,080 better. Well, we're, you know, advancing to LED street light attachments. A lot of it's 653 01:07:24,080 --> 01:07:29,620 inside the cabinet, really, rather than the uprights themselves. So it's either -- they 654 01:07:29,620 --> 01:07:34,840 may be getting some -- if it's an old intersection, and I don't want to speak at a turn on McKinney 655 01:07:34,840 --> 01:07:42,800 and Mockingbird, some of them are getting new. They're 25, 30 years old. They've paid 656 01:07:42,800 --> 01:07:49,520 their dues and they're ready to be upgraded. Some are span wire, and that's the wood pole 657 01:07:49,520 --> 01:07:54,920 with the cable across and the lights. Those are going to a steel upright with a mast arm. 658 01:07:54,920 --> 01:08:01,960 And then -- but the bulk of the improvements are technology based, just giving us, you 659 01:08:01,960 --> 01:08:06,720 know, better connectivity, running fiber, changing out the controllers to the modern 660 01:08:06,720 --> 01:08:11,880 version that we're using. So a lot of it is just really technology. It creates a safer 661 01:08:11,880 --> 01:08:15,440 intersection because we have better equipment in the field. 662 01:08:15,440 --> 01:08:20,680 >> Thank you. >> But when I asked about this in full council, 663 01:08:20,680 --> 01:08:25,240 some of the technology enhancements were described as improving sensing. 664 01:08:25,240 --> 01:08:27,760 >> Right, detection. >> As pedestrians and cyclists. 665 01:08:27,760 --> 01:08:34,420 >> Yes, yes. We're working with our provider, our vendor, to, again, I think I mentioned 666 01:08:34,420 --> 01:08:41,040 that they are -- pedestrian detection module is in testing mode, beta testing, and they're 667 01:08:41,040 --> 01:08:47,360 developing a cyclist bike detection module. So this particular device is that fisheye 668 01:08:47,360 --> 01:08:51,400 camera that hangs over the intersection and really looks at all four of the approaches 669 01:08:51,400 --> 01:08:57,640 at once versus having four different cameras. So it allows us to do a lot of things because 670 01:08:57,640 --> 01:09:02,160 it sees everything at once. It's a single device that's looking at all the input, and 671 01:09:02,160 --> 01:09:08,360 we don't have to interface between different devices. We've had good success with it, and 672 01:09:08,360 --> 01:09:13,840 the vendors continue to add modules. We can collect data with this camera, and we can 673 01:09:13,840 --> 01:09:19,000 sense, you know, now we can sense pedestrians, or we will be able to soon, and they're working 674 01:09:19,000 --> 01:09:23,280 on bicycle detection. So it's a very robust device, and that's really what we're moving 675 01:09:23,280 --> 01:09:26,600 towards in the future, using this everywhere in town. 676 01:09:26,600 --> 01:09:38,640 >> That's great. Okay. >> So the next one is the mobility plan update. 677 01:09:38,640 --> 01:09:46,540 So we have finished our community input. That ended in October. And the month of December, 678 01:09:46,540 --> 01:09:52,200 Walter P. Moore, our consultant, is finalizing the draft final, whatever you want to call 679 01:09:52,200 --> 01:09:56,840 it, the final draft or the draft final report and associated maps, and this is all three 680 01:09:56,840 --> 01:10:03,320 maps, the bike plan, the PED plan, and the transportation thoroughfare plan, what we 681 01:10:03,320 --> 01:10:10,760 used to call it. They will be submitting that to staff for review this month, and we will 682 01:10:10,760 --> 01:10:16,840 be taking probably most of January to go through that with a fine-tooth comb, make sure all 683 01:10:16,840 --> 01:10:22,520 of the citizen input that can be addressed has been addressed, and returning that, our 684 01:10:22,520 --> 01:10:27,360 comments, back to Walter P. Moore, and then in the month of February, they will be taking 685 01:10:27,360 --> 01:10:33,280 our comments, rolling that into the document, rolling out, again, that draft final report 686 01:10:33,280 --> 01:10:38,800 for -- we're looking in March to begin a work session with council to start talking 687 01:10:38,800 --> 01:10:46,360 about the document itself and the maps you've seen, but a lot of the associated text and 688 01:10:46,360 --> 01:10:50,360 policies, et cetera, you have not, so we'll spend the month of March going through that 689 01:10:50,360 --> 01:10:56,840 with council and looking forward to an April adoption. Hopefully by the end of April, we'll 690 01:10:56,840 --> 01:11:01,520 have all of the questions answered, and I'll be ready to move forward with the formal adoption 691 01:11:01,520 --> 01:11:06,200 of the immobility plan update. 692 01:11:06,200 --> 01:11:07,200 >> Questions? 693 01:11:07,200 --> 01:11:11,400 >> Sure, there are questions. 694 01:11:11,400 --> 01:11:12,400 >> Okay. 695 01:11:12,400 --> 01:11:13,400 >> Sure. 696 01:11:13,400 --> 01:11:19,000 >> Oh, excellent. Moving along. 697 01:11:19,000 --> 01:11:26,000 So the senior planner by civil ministry coordinator position was advertised in November, and the 698 01:11:26,000 --> 01:11:31,040 way we structured it was we were leaving it open until filled, so as of now, we've got 699 01:11:31,040 --> 01:11:37,520 probably 17, 18 applications. Staff is going through those applications and looking at 700 01:11:37,520 --> 01:11:45,080 each candidate, and our goal is to identify those that we are most interested in and start 701 01:11:45,080 --> 01:11:52,280 interviews in January, so we'll be coming back to you either January or February with 702 01:11:52,280 --> 01:12:00,440 some feedback on the process there, but we -- again, this is an interesting combination, 703 01:12:00,440 --> 01:12:05,600 to say the least, of skill sets that we're looking for, so the qualified candidates are 704 01:12:05,600 --> 01:12:09,680 few and far between. Like I said, we've got -- I've looked at them, we've got several 705 01:12:09,680 --> 01:12:16,840 very good candidates. I don't know that anybody is 100% satisfies all the different demands, 706 01:12:16,840 --> 01:12:23,880 but we're looking for that -- the right person. It's obviously some of it can be learned on 707 01:12:23,880 --> 01:12:32,480 the job, but that right person that fits the characters and the, you know, the expertise 708 01:12:32,480 --> 01:12:36,720 and the experience that we're looking for, like I say, I think we've got a couple in 709 01:12:36,720 --> 01:12:41,800 the pool right now, but we're going to continue to accept applications until we decide that, 710 01:12:41,800 --> 01:12:46,040 you know what, we found the right person, so we'll hopefully be conducting those interviews 711 01:12:46,040 --> 01:12:49,840 in January and have some more information for you following that. 712 01:12:49,840 --> 01:13:04,240 >> Council member, questions? Are you looking for someone who is mostly an engineer or someone 713 01:13:04,240 --> 01:13:10,360 who's got that -- not to say that engineers couldn't have this skill set, but are you 714 01:13:10,360 --> 01:13:15,840 looking for the skill set involved in a lot of public engagement? 715 01:13:15,840 --> 01:13:20,000 >> So very much the latter. Yeah, if it was going to be an engineer, it would have to 716 01:13:20,000 --> 01:13:26,320 be an engineer with crayons, as I call it, but very much a planner type person. It is 717 01:13:26,320 --> 01:13:35,080 a different approach. Planners just -- their education, their background is typically not 718 01:13:35,080 --> 01:13:40,200 like an engineer's, and we really appreciate that those characteristics in this type of 719 01:13:40,200 --> 01:13:49,200 role are key. That public engagement and the experience even, and the jobs knowledge is 720 01:13:49,200 --> 01:13:54,240 very, very different from engineering. It's not necessarily 100% data-driven. It's the 721 01:13:54,240 --> 01:14:01,160 softer side, and it's folding in the community needs and desires and combining those and 722 01:14:01,160 --> 01:14:05,400 marrying those up to what we can and can't do, but yes, it's very much the latter of 723 01:14:05,400 --> 01:14:06,400 your two choices there. 724 01:14:06,400 --> 01:14:10,680 >> Okay. What else you got? 725 01:14:10,680 --> 01:14:22,000 >> One more. Well, there was one more. Oh, it's here. It's not a separate page. So the 726 01:14:22,000 --> 01:14:29,040 last one is the -- we're calling now the all-way crossing, no longer the all-crosswalk. The 727 01:14:29,040 --> 01:14:34,480 committee on persons with disabilities has asked us to take the word "walk" out of it, 728 01:14:34,480 --> 01:14:42,320 since not everyone using this is walking. We met with them in November to get their 729 01:14:42,320 --> 01:14:57,600 guidance on the type of ramp, and let me share another -- I've got another -- well, it doesn't 730 01:14:57,600 --> 01:15:05,580 show up here. Okay. I'll go back to this. So if you remember, these four intersections 731 01:15:05,580 --> 01:15:11,480 are the ones around the square, and I was trying to share my explorer. I've got Google 732 01:15:11,480 --> 01:15:18,800 maps up. The intersections around the square adjacent to the actual square are fairly spartan, 733 01:15:18,800 --> 01:15:26,900 a lot of concrete, not a lot of plantings or furniture, et cetera, but the corners away 734 01:15:26,900 --> 01:15:34,960 from the courthouse have significant amounts of landscaping, or some have traffic signal 735 01:15:34,960 --> 01:15:41,400 hardware, some have street furniture, and what we went to the COPWD to gain was their 736 01:15:41,400 --> 01:15:46,480 preference on the type of ramp, the accessible ramp for these diagonal crossings, and that's 737 01:15:46,480 --> 01:15:51,720 really what this project is focusing on, is the diagonals. If you remember, you approved 738 01:15:51,720 --> 01:15:59,160 the continuation of the all-ped phase and asked staff to go back and add the diagonal 739 01:15:59,160 --> 01:16:03,520 crossings with ramps and markings so that everybody knows that they can go across instead 740 01:16:03,520 --> 01:16:08,600 of making an L shape to get across from one corner to the next. So this program, this 741 01:16:08,600 --> 01:16:13,800 project is really focused on putting in those diagonal crossings, and associated with those 742 01:16:13,800 --> 01:16:20,680 crossings is the new accessible ramping that's required to get to those diagonal crossings. 743 01:16:20,680 --> 01:16:25,800 We offered the committee a couple of different options. One would be what they call a transition 744 01:16:25,800 --> 01:16:30,480 where you lay the entire curb down all the way around the radius, and then you put the 745 01:16:30,480 --> 01:16:35,040 tactile surfaces where your crossings are going to be. They didn't like that because 746 01:16:35,040 --> 01:16:44,040 they were afraid that there may be some tipping issues with chairs or scooter-type devices, 747 01:16:44,040 --> 01:16:49,360 and then what they settled on was very much like what we have, is a directional ramp in 748 01:16:49,360 --> 01:16:55,320 the middle of the radius pointing diagonally to another directional ramp across the intersection. 749 01:16:55,320 --> 01:17:03,520 And so we are now working towards a design contract with a consultant, because we don't 750 01:17:03,520 --> 01:17:08,600 want to do this necessarily in-house. It could become a fairly complicated design if we've 751 01:17:08,600 --> 01:17:14,520 got to move signal hardware, and we do want to determine what the impact is on the plantings 752 01:17:14,520 --> 01:17:19,480 that are there. A lot of the landscaping, we're going to try and salvage as much of 753 01:17:19,480 --> 01:17:25,480 it as we can, obviously, or maybe move it to other areas around the crossing. But that's 754 01:17:25,480 --> 01:17:29,960 our next step is that consultant contract, and we hope to have that in place and be able 755 01:17:29,960 --> 01:17:36,080 to bring a contract to council for approval if need be, if the dollar amount is high enough 756 01:17:36,080 --> 01:17:41,480 in the month of January, so if not, then early February. So with that, I believe that is 757 01:17:41,480 --> 01:17:46,480 the last thing I've got, and I'll stop sharing and take questions. 758 01:17:46,480 --> 01:17:55,880 Questions? You're nearly about to ask something. Go ahead. 759 01:17:55,880 --> 01:18:04,120 Well, maybe a question, maybe just a statement. So on the diagonal crossway, will there be 760 01:18:04,120 --> 01:18:10,080 on the all-way crossing, will there be paintings as well? 761 01:18:10,080 --> 01:18:14,740 Yes, yes. We'll have to modify the signals. We'll have to put push buttons close to those 762 01:18:14,740 --> 01:18:19,080 ramps, and then we'll have the accessible ramps themselves, and then the markings that 763 01:18:19,080 --> 01:18:25,120 go across. The other way to do the, what they call the ped scramble, this all-way crossing, 764 01:18:25,120 --> 01:18:31,640 is to simply color the entire intersection, but we've got a lot of pavers and we've got 765 01:18:31,640 --> 01:18:37,200 a lot of treatments down there. I think just the regular white markings will be adequate. 766 01:18:37,200 --> 01:18:43,480 Anything else? All right. Thank you. 767 01:18:43,480 --> 01:18:44,480 All right, thank you. 768 01:18:44,480 --> 01:18:54,680 A lot of good stuff going on. So we're at concluding remarks. Is that what it's called? 769 01:18:54,680 --> 01:19:01,360 Concluding items. Okay. I'm going to go to Councilmember Ryan, because he so hogs the 770 01:19:01,360 --> 01:19:02,360 spotlight. 771 01:19:02,360 --> 01:19:14,080 Yeah, yeah. So true. Thank you, Chair. We used to have a matrix for mobility that I 772 01:19:14,080 --> 01:19:20,000 haven't seen in the last few meetings. I'm wondering if there was a reason, or I guess, 773 01:19:20,000 --> 01:19:24,080 if it's possible to bring it back, I'd like to see it come back. One of the items I had 774 01:19:24,080 --> 01:19:31,880 on that matrix was any of the major projects, and some of them got picked up by ITS, by 775 01:19:31,880 --> 01:19:37,760 John Bolster's group on that sheet, but not all of them did. Some of the other big projects 776 01:19:37,760 --> 01:19:43,240 that I think about are the other Bonneberry phases and Hickory Street that I'd like to 777 01:19:43,240 --> 01:19:48,240 see in more than just that one line that we have on the Friday reports. 778 01:19:48,240 --> 01:19:55,280 Sure. Councilmember Ryan, we can absolutely work through bringing back that matrix and 779 01:19:55,280 --> 01:20:00,520 adding additional items as they come up and working through the agenda. If there are some 780 01:20:00,520 --> 01:20:05,840 standard items that you want to see, something that we make an update to on the monthly basis, 781 01:20:05,840 --> 01:20:10,960 we absolutely can do that. So we'll work to recreate that matrix and make sure that the 782 01:20:10,960 --> 01:20:15,640 items that are appropriate are on there and be able to fulfill that for you. That's no 783 01:20:15,640 --> 01:20:16,640 problem at all. 784 01:20:16,640 --> 01:20:20,240 I think it's sort of anything bigger than a bread box, right? I mean, we kind of know 785 01:20:20,240 --> 01:20:26,240 what the major items are. I trust you to draw the line, but I agree with Councilmember Ryan, 786 01:20:26,240 --> 01:20:33,000 you know, whether it's Textud or City, we kind of want to see that overview. 787 01:20:33,000 --> 01:20:39,200 Sure. I think sometimes it's very interesting to see the projects that are included in Mr. 788 01:20:39,200 --> 01:20:43,200 Polster's report. Some of them are, you know, kind of projects that also Textud is working 789 01:20:43,200 --> 01:20:47,800 with us on and so we can work to provide that update to some of those major projects without 790 01:20:47,800 --> 01:20:51,440 a problem. That's no issue at all. 791 01:20:51,440 --> 01:20:55,200 Councilmember Briggs? 792 01:20:55,200 --> 01:20:58,720 Thank you. Also, I was wondering about the matrix as well, because I know there were 793 01:20:58,720 --> 01:21:04,960 a few items that were listed on there still. So I just want to go ahead and plug those. 794 01:21:04,960 --> 01:21:11,160 I know that the road diet for Carol was something that I had asked for and I think was coming 795 01:21:11,160 --> 01:21:15,360 back at some point. Just want to throw that out there to see if that was still on there 796 01:21:15,360 --> 01:21:25,700 and add a couple more as I'm leaving. I'd like to see you guys discuss the Cyclodea 797 01:21:25,700 --> 01:21:32,200 Open Streets event maybe next year if that would be a possibility. And also, I know that 798 01:21:32,200 --> 01:21:38,240 Bell is closed right now for, I think, water distribution, but in the process I mentioned 799 01:21:38,240 --> 01:21:45,120 that it was suggested to maybe be closed permanently and it opened up some conversation. So if 800 01:21:45,120 --> 01:21:52,240 you guys could discuss that or have a presentation on the future of Bell as with the mobility 801 01:21:52,240 --> 01:21:58,960 discussion coming up. I think that would be helpful for individuals out here. Thank you. 802 01:21:58,960 --> 01:22:08,000 Well, if I may, a couple items. About two years ago, I asked your predecessors to put 803 01:22:08,000 --> 01:22:13,680 together a map just so we could see holistically. It might be something that would be good right 804 01:22:13,680 --> 01:22:20,480 after John's, you know, here's all the money page. It would be actually a sequence of overlays. 805 01:22:20,480 --> 01:22:25,160 Tell me if this is like a ridiculously heavy lift, but if not, I think it would be useful. 806 01:22:25,160 --> 01:22:31,000 A map that shows here's everything being worked on in the present timeframe, whether text 807 01:22:31,000 --> 01:22:37,160 out or city. Then next layer would be here's everything in the next cycle. I don't know 808 01:22:37,160 --> 01:22:42,320 what the reasonable time cuts are. I don't want to be arbitrary about it, but you know, 809 01:22:42,320 --> 01:22:47,000 maybe it's construction season if there is such a thing. So for simplicity sake, let's 810 01:22:47,000 --> 01:22:52,680 say here's the 2020 view, here's the 2021 view, everything that's going on. What's our 811 01:22:52,680 --> 01:23:01,680 city look like? You know, and then subsequent years and, you know, the ability to overlay 812 01:23:01,680 --> 01:23:08,680 to say here's everything that's going to happen. It definitely led to just our clear perception 813 01:23:08,680 --> 01:23:15,240 among us that oh, every way in or out of DEN is going to be getting worked on at the same 814 01:23:15,240 --> 01:23:20,400 time. You know, it's something to just be able to understand and communicate. So, you 815 01:23:20,400 --> 01:23:27,160 know, I'd be interested in knowing whether that's reasonable, helpful to you, and not, 816 01:23:27,160 --> 01:23:34,000 you know, not just a backbreaking lift, but you have to answer that now. And then lastly, 817 01:23:34,000 --> 01:23:40,880 I would just like to comment that participation in these council committees is entirely optional 818 01:23:40,880 --> 01:23:47,060 for council members, and council member Briggs has served on this committee and many, many 819 01:23:47,060 --> 01:23:58,160 others willingly and energetically and constructively. And I'm grateful for all of her participation 820 01:23:58,160 --> 01:24:05,520 to date. I know we'll have other opportunities to wish you well in your next endeavors, but 821 01:24:05,520 --> 01:24:10,040 from the point of view of this committee, thank you. 822 01:24:10,040 --> 01:24:16,560 Thank you. And thanks to staff for all your hard work. Thank you. 823 01:24:16,560 --> 01:24:20,340 With that, we will adjourn at 1025. 824 01:24:20,340 --> 01:24:24,240 Have a good day.