WEBVTT

00:00:00.000 --> 00:00:09.100
 >> Good afternoon, ladies and gentlemen and welcome to the planning and zoning commission

00:00:09.100 --> 00:00:14.980
 work session for Wednesday, December 2nd. It is 4.02 and seeing we have a quorum, I

00:00:14.980 --> 00:00:19.960
 will open the meeting. Please let the record show that Commissioner Smith and Commissioner

00:00:19.960 --> 00:00:27.580
 Anderson are currently not in attendance. To jump right into our agenda, we have one

00:00:27.580 --> 00:00:35.480
 work session report tonight. The agenda has two listed. The second one, item 3B, is being

00:00:35.480 --> 00:00:41.040
 pulled. It wasn't heard by council yesterday and it won't be heard by us this evening or

00:00:41.040 --> 00:00:49.960
 this afternoon. So we will start with 3A PZ20-272 regarding code amendments. I think Ron is

00:00:49.960 --> 00:00:58.200
 leading that out. >> Yes. >> Ron, you have the floor when you're ready. >> Thank you.

00:00:58.200 --> 00:01:09.440
 Let me pull up my screen real quick or my PowerPoint presentation. And we will get started.

00:01:09.440 --> 00:01:17.160
 Good afternoon. Again, Ron Mingida, principal planner with development services. This item

00:01:17.160 --> 00:01:24.680
 is to go over some of the code amendments that staff has been working on for over last

00:01:24.680 --> 00:01:29.280
 past year. We haven't really started some of the discussion with the planning and zoning

00:01:29.280 --> 00:01:34.120
 commission until recently. We've had a number of meetings with the development code review

00:01:34.120 --> 00:01:42.840
 committee already, but we have some here that we would like to share with the planning and

00:01:42.840 --> 00:01:49.160
 zoning commission to let y'all know what we're working on. And this particular set is specific

00:01:49.160 --> 00:01:55.880
 to subchapter 2, which is administration and procedures of the Denson development code.

00:01:55.880 --> 00:02:01.600
 So I just wanted to introduce the code amendments to let y'all know. Again, you've seen this

00:02:01.600 --> 00:02:06.080
 slide before, but really it's important to know that what we're trying to accomplish

00:02:06.080 --> 00:02:12.080
 with these code amendments is really to address some of the nonconformities that were created,

00:02:12.080 --> 00:02:21.720
 and that is with the update of the development code back in 2019, April 2019 to be specific.

00:02:21.720 --> 00:02:26.920
 We also know that there were a number of house bills that were passed later that summer and

00:02:26.920 --> 00:02:33.240
 we are responding to those by aligning some of our requirements and standards to comply

00:02:33.240 --> 00:02:40.200
 be consistent with those Texas local government code requirements. Also, there are a number

00:02:40.200 --> 00:02:46.360
 of process improvements that the city has been involved in, and we are looking to codify

00:02:46.360 --> 00:02:52.720
 most of those through this exercise. And you will see that in subchapter 2, much of that

00:02:52.720 --> 00:02:59.120
 is part of this code amendment section specifically, just because it's under administration and

00:02:59.120 --> 00:03:07.360
 procedures. And last, we hear a lot of general feedback and input from the public, the development

00:03:07.360 --> 00:03:14.640
 community, PNC and city council. There are a number of substantive changes and non-substantive

00:03:14.640 --> 00:03:24.360
 changes specifically as it relates to error typos, incorrect references and the like.

00:03:24.360 --> 00:03:31.080
 So I'm going to go through the code amendments. Again, this is for subchapter 2 and this looks

00:03:31.080 --> 00:03:39.040
 like a lot. It is a lot of items. However, some of them will be short in nature. Others

00:03:39.040 --> 00:03:45.200
 will be a little bit more involved in that there are just a number of texts and languages

00:03:45.200 --> 00:03:52.080
 that we are provisions that we want to introduce or reintroduce into the development code.

00:03:52.080 --> 00:03:58.280
 Therefore, I just want to highlight some of those with you all this afternoon. So with

00:03:58.280 --> 00:04:06.080
 that, we'll go ahead and get started. The first topic or item is PNC operational procedures.

00:04:06.080 --> 00:04:15.720
 This is really to provide the operational procedures back into the DDC. As you can see,

00:04:15.720 --> 00:04:23.480
 letter A above states that it references the municipal code of ordinances. Although the

00:04:23.480 --> 00:04:28.980
 intent was to put it in the code of ordinances, we feel that it's helpful for the community

00:04:28.980 --> 00:04:36.960
 to have it in the development code. Therefore, we're putting it or reintroducing it back.

00:04:36.960 --> 00:04:42.840
 As such, we have a list of operational procedures, one through three that you see here. Again,

00:04:42.840 --> 00:04:48.840
 nothing that's significantly different from what we previously had or had in the past

00:04:48.840 --> 00:04:57.880
 related to PNC. The first one is that the PNC made up rules to govern its proceedings

00:04:57.880 --> 00:05:04.600
 provided, and that's just a standard statement there, that the chairperson has the ability

00:05:04.600 --> 00:05:11.320
 to call a meeting, a special call meeting, if at any time there is a need for that. And

00:05:11.320 --> 00:05:15.360
 of course, the planning, zoning commission shall keep minutes. We want to make sure that

00:05:15.360 --> 00:05:25.080
 all the records in our voting and our statements are kept and for public record. The next item

00:05:25.080 --> 00:05:35.760
 is related to the tie votes as relates to non-subdivision applications. One of the things

00:05:35.760 --> 00:05:45.720
 that we have is in situations where there is a tie vote, we bring it forward. What is

00:05:45.720 --> 00:05:53.160
 the result of that? So we want to be clear on what that means. Back in 2018, when we

00:05:53.160 --> 00:06:00.260
 were under the 2002 code, prior to the update, we did do a code amendment to specify how

00:06:00.260 --> 00:06:08.720
 a tie vote from PNC results moving forward to the city council. It was carried forward

00:06:08.720 --> 00:06:15.960
 to the city, sorry, to the 2019 development code. However, it only carried forward with

00:06:15.960 --> 00:06:24.840
 regards to rezoning, zoning map amendments. It did not carry forward or clearly state

00:06:24.840 --> 00:06:32.440
 that it also applied to specific use permits, any other recommendation that the planning

00:06:32.440 --> 00:06:39.400
 zoning commission provides to the city council. Partly the reason for that is when it was

00:06:39.400 --> 00:06:46.800
 in the 2002 code, the zoning amendment process covered most of these types of applications.

00:06:46.800 --> 00:06:55.000
 However, with the 2019 code, we separated those procedures and applications. Therefore,

00:06:55.000 --> 00:07:02.960
 it no longer was under or is under those SUPs and ALTESAs and similar applications. So what

00:07:02.960 --> 00:07:13.760
 staff is proposing is that we have an all-encompassing requirement or explanation of what happens

00:07:13.760 --> 00:07:20.520
 during a tie vote and this applies to all applications that one, the city, I'm sorry,

00:07:20.520 --> 00:07:27.460
 the planning zoning commission has decisions on final decisions and again, these are for

00:07:27.460 --> 00:07:35.740
 our non-subdivision applications. So an example of a final decision for the PNC would be similar

00:07:35.740 --> 00:07:42.760
 to the razor ranch site plan. For example, you all are the final decision on some respects

00:07:42.760 --> 00:07:49.400
 to the razor ranch site plan. We're also thinking of bringing back, having the PNC consider

00:07:49.400 --> 00:07:57.000
 subdivision variances. So that will be another final decision that the PNC would consider.

00:07:57.000 --> 00:08:02.360
 And then recommendations, that's probably the main thing as well, that if there was

00:08:02.360 --> 00:08:09.720
 a tie vote, what happens to that moving forward to city council. And so what you see here

00:08:09.720 --> 00:08:17.280
 is the same language that we have for rezoning. We are again carrying it forward or amending

00:08:17.280 --> 00:08:25.040
 the code to apply to all of the applications. So SUPs, ALTESAs and the like. So again, the

00:08:25.040 --> 00:08:32.200
 PNC, if there is a tie vote, it will be placed on the next available PNC for consideration.

00:08:32.200 --> 00:08:39.960
 Probably at that next second meeting, there are an odd number so that vote would not result

00:08:39.960 --> 00:08:47.720
 in a tie vote. If for whatever reason, there is still an even number and there is a tie

00:08:47.720 --> 00:08:55.880
 vote at the second meeting, that recommendation will be brought forward as a denial to the

00:08:55.880 --> 00:09:02.280
 city council. However, that denial that would be brought forward to city council would not

00:09:02.280 --> 00:09:10.480
 require the three fourth vote that normally a denial from a PNC recommendation would garner.

00:09:10.480 --> 00:09:16.920
 So I'm going to stop sharing my screen and see if there are any questions.

00:09:16.920 --> 00:09:22.400
 >> We do have one, Commissioner Beck. >> Thank you, Chair. So as I understand the

00:09:22.400 --> 00:09:30.160
 way our government works, power descends from council. And thus, my question, my first question,

00:09:30.160 --> 00:09:40.200
 I'll ask both of them, is how is tie voting defined in council? And also then my second

00:09:40.200 --> 00:09:47.200
 question is if this is different than council, is it different than every other commission

00:09:47.200 --> 00:09:52.720
 board, Chair, and if so, a C, why would you need that difference?

00:09:52.720 --> 00:09:58.920
 >> That's a great question. I think I've got an answer for the second part. But I'm going

00:09:58.920 --> 00:10:05.040
 to need some help from Richard and/or Mack on what happens on a tie vote for city council.

00:10:05.040 --> 00:10:17.120
 What is their remedy in that situation? >> I don't know if Mack has it handy. I don't

00:10:17.120 --> 00:10:20.720
 recall off the top of my head. I would just have to pull the board, the rules of procedure

00:10:20.720 --> 00:10:24.120
 in the code. >> Yeah, and I'm trying to look it up. But

00:10:24.120 --> 00:10:28.480
 I believe what the result is at council is if they have a tie vote, it pushes it to the

00:10:28.480 --> 00:10:35.320
 next subsequent meeting. And that continues until they can get a vote on the matter. I

00:10:35.320 --> 00:10:39.200
 don't think it necessarily goes away. But that was updated at some point. So let me

00:10:39.200 --> 00:10:43.600
 look at the code to see if that's changed more recently. And give me a few minutes.

00:10:43.600 --> 00:10:49.520
 I'll go ahead and interrupt if I need to. >> Okay. And Commissioner Mack, regarding

00:10:49.520 --> 00:10:55.180
 your second question, is the P&Z different from all the other boards in the commission?

00:10:55.180 --> 00:11:03.360
 Per our code of ordinances, there is a statement in there that allows the P&Z to identify its

00:11:03.360 --> 00:11:10.400
 voting procedures. And so, yes, slightly different. So we do have the ability to set that different

00:11:10.400 --> 00:11:17.280
 type of voting outcome. >> And I guess the C, why do we need that?

00:11:17.280 --> 00:11:22.220
 >> Say that one more time. >> The third question, question C is why do

00:11:22.220 --> 00:11:29.740
 we need -- what's the need to have a different set of rules than other boards and commissions?

00:11:29.740 --> 00:11:34.920
 And potentially, depending on Mack's lookup than council?

00:11:34.920 --> 00:11:41.840
 >> I just know that, you know, with P&Z, we have a lot of items to consider. And there

00:11:41.840 --> 00:11:49.000
 are a number of applications that we recommend to the city council that directly impacts

00:11:49.000 --> 00:11:54.320
 some of their voting requirements. So I think that's why we want to be different in addressing

00:11:54.320 --> 00:11:58.860
 those situations. >> Well, then let me follow up with a commission

00:11:58.860 --> 00:12:05.680
 that's very similar to ours, just so I understand the overarching goals of this change. And

00:12:05.680 --> 00:12:13.760
 that is ZBA, they also deal with substantially similar issues that we do. Or at least have

00:12:13.760 --> 00:12:19.000
 a high overlap. And so what is their procedure on ties?

00:12:19.000 --> 00:12:28.440
 >> So the ZBA is not a recommending board to the city council. Their decisions are final.

00:12:28.440 --> 00:12:35.180
 And their requirements are also different. Because you need at least six votes in order

00:12:35.180 --> 00:12:46.080
 to approve a variance request. So there is not a tie vote per se, other than, you know,

00:12:46.080 --> 00:12:49.680
 again, meaning that they would need at least six votes. And again, they're different in

00:12:49.680 --> 00:12:53.000
 the sense that they're not a recommending body to the city council.

00:12:53.000 --> 00:12:59.600
 >> Yeah. I take your point that they're asking -- people are asking for a variance on that.

00:12:59.600 --> 00:13:04.560
 And so it's a strong affirmative. But it does mean that if you had a tie vote, that would

00:13:04.560 --> 00:13:08.320
 be a negative. Because you need the six votes to get.

00:13:08.320 --> 00:13:14.880
 >> Correct. You would need at least six. >> So, you know, I'm just -- you know, I understand

00:13:14.880 --> 00:13:18.000
 that different bodies have different needs and necessities. That's why we have different

00:13:18.000 --> 00:13:29.400
 bodies in the first place. But I -- you know, I think it's important to make sure that we're

00:13:29.400 --> 00:13:39.800
 -- the changes in the way we handle these kinds of things are not arbitrary. That they're

00:13:39.800 --> 00:13:47.280
 following a goal. And anyway, I'll stop there unless Mac has a --

00:13:47.280 --> 00:13:51.920
 >> Yeah, I'll jump back in. I found the answer. So the council did change this earlier this

00:13:51.920 --> 00:13:57.520
 year, the whole process. And they reviewed it and adopted code changes. So for city council,

00:13:57.520 --> 00:14:02.800
 if there's a tie vote due to an absence of a council member, that item continues to be

00:14:02.800 --> 00:14:07.560
 placed on each subsequent council meeting agenda until there's a full council present

00:14:07.560 --> 00:14:13.560
 or it doesn't end in a tie vote. And so that's there. It continues on as long

00:14:13.560 --> 00:14:19.600
 as there's an absence due to -- I'm sorry, a tie due to an absence. With the rest of

00:14:19.600 --> 00:14:23.080
 the city, for the boards, commissions and committees, with the exception of this planning

00:14:23.080 --> 00:14:28.160
 and zoning commission, any time there's a tie vote, it's considered a denial.

00:14:28.160 --> 00:14:36.080
 >> So in a sense, going to a second meeting would be consistent, a second vote under this

00:14:36.080 --> 00:14:41.680
 proposal would be consistent with the continuance at the way council does. Although council

00:14:41.680 --> 00:14:45.920
 would have a continuance forever is what you're saying. Whereas we would only have a continuance

00:14:45.920 --> 00:14:46.920
 once. >> Correct.

00:14:46.920 --> 00:14:50.280
 >> Okay. Thank you. >> Commissioner Beck, if I'm hearing that

00:14:50.280 --> 00:14:53.000
 we need your mic a little louder, if you can speak louder.

00:14:53.000 --> 00:14:55.720
 >> Yeah, I'll turn it up. >> Thank you.

00:14:55.720 --> 00:15:01.280
 >> Commissioner Burnetta. >> Yeah. And real quick to address, I guess

00:15:01.280 --> 00:15:05.200
 one of the questions that Commissioner Beck was bringing up. You know, unlike a lot of

00:15:05.200 --> 00:15:10.320
 other boards, you know, we have to remember that the impact of the decisions we have basically

00:15:10.320 --> 00:15:17.080
 affects the city in terms of its growth and its money. It's not just, you know, a one

00:15:17.080 --> 00:15:20.760
 person being absent once that we're having to take into consideration. There are going

00:15:20.760 --> 00:15:26.560
 to be decisions where a commission member may have to recuse themselves from every vote

00:15:26.560 --> 00:15:30.480
 that could always leave us, you know, with an even number. So we have to address those

00:15:30.480 --> 00:15:35.560
 in this. But Ron, I guess my question is, when we went over this, I guess a couple of

00:15:35.560 --> 00:15:43.180
 years ago, so it was always that it shows up as a denial for us, but it doesn't require

00:15:43.180 --> 00:15:46.520
 the super majority on everything else for city council?

00:15:46.520 --> 00:15:51.560
 >> That is correct. That is the language we have that was approved that carried forward

00:15:51.560 --> 00:15:57.900
 for rezonings. And we're just making -- we're just applying it to all the other recommendation

00:15:57.900 --> 00:16:00.840
 applications that go to city council. >> Okay. I just wanted to make sure, because

00:16:00.840 --> 00:16:04.060
 it was bolded and I wanted to make sure that, you know, that bold meant that we were putting

00:16:04.060 --> 00:16:06.060
 it consistent with everything else. Thank you.

00:16:06.060 --> 00:16:08.520
 >> Correct. >> Commissioner Beck.

00:16:08.520 --> 00:16:15.680
 >> This is just a mic check. Is that better? >> Could be a little louder.

00:16:15.680 --> 00:16:19.080
 >> More? Okay. >> Yes.

00:16:19.080 --> 00:16:23.920
 >> Ron, maybe a touch on it, and I might have missed it, but again, if you remember in the

00:16:23.920 --> 00:16:28.680
 old code, we didn't have separate procedures for every application. Everything followed

00:16:28.680 --> 00:16:34.200
 the rezoning procedure process, and so that's where the TIVO provisions were embedded. Now

00:16:34.200 --> 00:16:38.560
 that we have different procedures established, we just need to carry that forward. It's really

00:16:38.560 --> 00:16:41.400
 -- I don't think too much of a change in that regard.

00:16:41.400 --> 00:16:47.320
 >> Right. And just to add to that, the language is basically the same that applied to rezoning

00:16:47.320 --> 00:16:56.240
 again. We're just making sure it applies to all the other applications that have a recommendation.

00:16:56.240 --> 00:17:03.360
 Any other questions right now? All right, Ron, let's continue forward.

00:17:03.360 --> 00:17:13.240
 >> All righty. So we'll move on to the next topic. This involves House Bill 3167, specifically

00:17:13.240 --> 00:17:21.080
 what's referred to as the Shot Clock Bill, and the fact that it applies to our platting

00:17:21.080 --> 00:17:27.840
 and subdivision review. I'll just read this real quickly to summarize House Bill 3167.

00:17:27.840 --> 00:17:36.040
 It was approved in 2019, the summer of 2019. It affected the timeline for which we accept

00:17:36.040 --> 00:17:43.440
 and review plats. It basically set a shot clock of 30 days from being filed to approval

00:17:43.440 --> 00:17:50.680
 or consideration for approval or consideration period, whatever it may be. That it also,

00:17:50.680 --> 00:17:59.200
 if there is a decision or determination that it is approved with condition or disapproved,

00:17:59.200 --> 00:18:05.640
 that a written statement be included as part of that decision or motion. And it states

00:18:05.640 --> 00:18:12.180
 in the House Bill or in the Texas local government code specifically, as you see here in that

00:18:12.180 --> 00:18:17.720
 last bullet, that each condition or reason specified in their statement must be directly

00:18:17.720 --> 00:18:24.920
 related to the requirements that it's cited to the law that includes a citation to the

00:18:24.920 --> 00:18:31.840
 law, statutes or municipal ordinances that the basis of the condition and disapproval

00:18:31.840 --> 00:18:39.240
 if applicable and may not be arbitrary. So that's a direct copy from the House Bill or

00:18:39.240 --> 00:18:45.720
 from the Texas local government code. So what we're proposing is that -- let's get this

00:18:45.720 --> 00:18:51.840
 slide to basically summarize what I just outlined earlier. We're proposing to codify that in

00:18:51.840 --> 00:18:56.800
 the Denton development code. We know it's in the Texas local government code, but we

00:18:56.800 --> 00:19:03.240
 feel that, again, to be customer friendly and to have it in one location, having it

00:19:03.240 --> 00:19:09.000
 in the development code is important. So we are adding the following under the subdivision

00:19:09.000 --> 00:19:17.240
 procedures. A, as far as relates to timing of city action. Again, that 30-day timeline.

00:19:17.240 --> 00:19:24.360
 Decisions and post-decision actions that there needs to be a citation if there is anything

00:19:24.360 --> 00:19:32.360
 that is either approved with conditions or denied in the recommendation or in the determination.

00:19:32.360 --> 00:19:38.480
 And that the plan or plan is if approved with condition or denied, that the reasons for

00:19:38.480 --> 00:19:46.220
 such conditions are provided in writing. The other part of that is if it were to be denied,

00:19:46.220 --> 00:19:55.200
 the applicant has 15 days -- I'm sorry, has unlimited time to resubmit. And if and when

00:19:55.200 --> 00:20:04.720
 they resubmit, the city planning zoning commission has a response time of 15 days. So the first

00:20:04.720 --> 00:20:13.440
 consideration is 30 days from filing to consideration. If it was to be denied, the applicant can

00:20:13.440 --> 00:20:20.040
 resubmit. However, at that point, we -- the city would need to consider it within 15 days.

00:20:20.040 --> 00:20:29.000
 So half the time. The planning -- the applicant does have option to request a 30-day extension.

00:20:29.000 --> 00:20:36.000
 However, it's only a one-time waiver for 30 days to extend it for another 30 days for

00:20:36.000 --> 00:20:42.500
 that first consideration. Anybody have any questions on this one? This is just to bring

00:20:42.500 --> 00:20:49.960
 into the DDC the provisions that were passed as part of House Bill 3167.

00:20:49.960 --> 00:20:58.840
 >> Chair Panetta. >> And on this one, I just -- it's a real

00:20:58.840 --> 00:21:04.700
 basic question. So my understanding already is if we were to deny something, and that

00:21:04.700 --> 00:21:12.000
 denial is not consistent with existing code, basically, legally, our decision is technically

00:21:12.000 --> 00:21:20.120
 nonbinding, right? Any developer can basically override that, right? Is that accurate?

00:21:20.120 --> 00:21:24.760
 >> I don't know if Matt can answer that question or would like me to try to attempt to answer

00:21:24.760 --> 00:21:27.920
 that question. >> Sure. And without getting too much into

00:21:27.920 --> 00:21:32.960
 legal advice, but yeah, if you don't have a justifiable basis in the subdivision regulations

00:21:32.960 --> 00:21:37.560
 for denying, it's not that it's not binding, it just puts the city in a very difficult

00:21:37.560 --> 00:21:41.040
 position because you have no real authority for the decision you made, and that could

00:21:41.040 --> 00:21:46.040
 be challenged in court, and if we didn't have a basis for that, then potentially that decision

00:21:46.040 --> 00:21:49.760
 would be overruled by a court. But it's not that it's not binding, it would just take

00:21:49.760 --> 00:21:56.720
 a subject, the city to challenge, and we would be most likely unsuccessful in such a challenge.

00:21:56.720 --> 00:22:01.680
 >> So in essence, all this is doing is adding into the code something that we already know

00:22:01.680 --> 00:22:05.400
 is true and tying it back to that specific House Bill, is that right?

00:22:05.400 --> 00:22:11.600
 >> That is correct. >> Okay. Thank you.

00:22:11.600 --> 00:22:18.560
 >> Thank you, Chair. So I have two questions. One is they have the right to -- applicants

00:22:18.560 --> 00:22:27.440
 have the right to a 30-day extension, but does -- help me clarify, I'm a little confused.

00:22:27.440 --> 00:22:34.000
 Can we give them additional extensions or it's one extension for all parties?

00:22:34.000 --> 00:22:43.840
 >> So we don't -- let me think about this. We don't require it. That's an option that

00:22:43.840 --> 00:22:51.480
 they have. So if they choose not to apply for or request a 30-day, they don't have to.

00:22:51.480 --> 00:22:59.920
 The one time is something that we have established as the 30-day, so we want to make sure that

00:22:59.920 --> 00:23:12.160
 the item is moved forward, either approved, proved, conditioned, or didn't help.

00:23:12.160 --> 00:23:15.200
 >> Okay. So the reason I'm making you confused faces, I don't think that really addressed

00:23:15.200 --> 00:23:26.160
 my question. Can we give them additional extensions as part of our conditions that we might apply?

00:23:26.160 --> 00:23:33.080
 >> It's one extension for up to 30 days. >> Whichever direction is coming from. Okay.

00:23:33.080 --> 00:23:38.000
 That clarified it. Thank you, Richard. >> Per applicant. So if it's a plenary plat,

00:23:38.000 --> 00:23:42.040
 you can grant the one, and then when it gets to final, they're correct.

00:23:42.040 --> 00:23:45.280
 >> Okay. That's great. I appreciate that. Thank you.

00:23:45.280 --> 00:23:50.280
 >> Commissioner Ellis. >> Thank you, Chair. But just to clarify, the

00:23:50.280 --> 00:23:59.200
 applicant has to request the extension. >> Correct. Good point.

00:23:59.200 --> 00:24:08.680
 >> All right. >> Go ahead and move on. So the other -- the

00:24:08.680 --> 00:24:16.640
 next few slides, I can tell you, just knowing what's upcoming, are mainly our opportunity

00:24:16.640 --> 00:24:24.080
 to add more clarification and be consistent with our review process, development review

00:24:24.080 --> 00:24:30.680
 process. So this right here, what we're adding, as you can see in green, is really describing

00:24:30.680 --> 00:24:36.880
 what an administratively approved plat is. So we're just listing it here to help provide

00:24:36.880 --> 00:24:42.360
 that clarification. So anything that is an amending plat, conveyance plat, a minor plat

00:24:42.360 --> 00:24:50.240
 or minor replat, is considered an administratively approved plat. So again, just to clarify that.

00:24:50.240 --> 00:24:56.920
 The other next one here is certificate of compliance. We added that as part of the code.

00:24:56.920 --> 00:25:04.960
 However, after practicing what we hope to do, we recognize that a zoning verification

00:25:04.960 --> 00:25:10.680
 letter serves in that same capacity, which we already have in place. So all we're doing

00:25:10.680 --> 00:25:16.320
 is replacing this process of a certificate of compliance with a zoning verification letter.

00:25:16.320 --> 00:25:24.480
 So again, more -- just replacing what was put in the code with a process that we already

00:25:24.480 --> 00:25:30.480
 have. Just to give you a little bit more clarification on what a zoning verification letter is and

00:25:30.480 --> 00:25:35.880
 that the zoning verification letter, what it does, it provides the city the ability

00:25:35.880 --> 00:25:43.980
 to issue a form that provides the confirmation of what is the zoning on that property and

00:25:43.980 --> 00:25:50.520
 what uses are allowed under that zoning. So any property owner or applicant or business

00:25:50.520 --> 00:25:59.920
 owner may require -- may request, that is, that zoning verification letter.

00:25:59.920 --> 00:26:06.660
 The other item that we added in -- we were processing and putting together in the process

00:26:06.660 --> 00:26:14.680
 of putting together is a business registration. This is not a CO. We want to get away from

00:26:14.680 --> 00:26:22.800
 a CO just for any businesses that want to use a particular unit. So the difference is

00:26:22.800 --> 00:26:29.200
 a CO approves the occupancy of that building. The business registration just allows us to

00:26:29.200 --> 00:26:38.680
 record -- keep record of what uses are proposed or are being proposed for that site. And again,

00:26:38.680 --> 00:26:42.280
 we want to make sure that that use is permitted in that zoning district, but what they would

00:26:42.280 --> 00:26:47.400
 do, what they would get, the business owners would get a business registration and they

00:26:47.400 --> 00:26:53.620
 would need to apply for that in the process that we're proposing.

00:26:53.620 --> 00:26:59.320
 This kind of provides a little bit more explanation of what I just described. The business registration

00:26:59.320 --> 00:27:04.800
 again provides that mechanism for the city to evaluate what use either is being introduced

00:27:04.800 --> 00:27:12.840
 or is changing to, is required for any business occupying a building. So maybe a small unit

00:27:12.840 --> 00:27:20.000
 or part of the building, they would be required a business registration and not a CO. Currently,

00:27:20.000 --> 00:27:25.460
 what happens today is any business occupying a portion of a building would need to get

00:27:25.460 --> 00:27:33.320
 a CO. We are saying that that should be a business registration rather than a CO. And

00:27:33.320 --> 00:27:39.400
 again, as I said earlier, business registration would be something that the business owner

00:27:39.400 --> 00:27:46.320
 or whoever representing that business can apply for.

00:27:46.320 --> 00:27:53.720
 The next item here is civil engineering plans. And you all are familiar with what we've mentioned

00:27:53.720 --> 00:28:00.720
 this in the past as part of the planning exercise. We require that the applicants submit a civil

00:28:00.720 --> 00:28:06.360
 engineering plan. We know that this exists, this application or this process. We just

00:28:06.360 --> 00:28:12.680
 wanted to put it in this table, table 2.2A, to provide a little bit more clarification

00:28:12.680 --> 00:28:19.360
 and understanding of when it applies and who makes that decision as far as if this or the

00:28:19.360 --> 00:28:24.680
 civil engineering plans are acceptable or not. And as you can see that the development

00:28:24.680 --> 00:28:32.520
 assistant team, which is made up of our engineers, our planners, any other department, parks,

00:28:32.520 --> 00:28:37.160
 fire, building safety, all the other ones that are involved in the development review

00:28:37.160 --> 00:28:43.760
 process are involved and are the decision making body on the civil engineering plan.

00:28:43.760 --> 00:28:52.940
 So just again, give the application or the process a place in the development code. We

00:28:52.940 --> 00:29:01.020
 also provide, again, the purpose, the applicability of when it is required so that anyone that's

00:29:01.020 --> 00:29:10.280
 submitting an application will know what to expect. So I went through those fairly quickly.

00:29:10.280 --> 00:29:14.880
 The zoning verification letter, the business registration, and the civil engineering plans.

00:29:14.880 --> 00:29:20.160
 Does anybody have any questions with regards to those new procedures? Now, they're not

00:29:20.160 --> 00:29:24.960
 new per se. Some of them are, but the civil engineering plans is something that we've

00:29:24.960 --> 00:29:31.840
 already had or have and we're just putting it into the development code. I do not see

00:29:31.840 --> 00:29:41.400
 any questions, Ron. Okay. We'll move on to the next topic and that is the ZBA composition

00:29:41.400 --> 00:29:47.320
 and operational procedure. Similar to the planning zoning commission, we had the intent

00:29:47.320 --> 00:29:54.300
 of referencing it in the code to the development, I'm sorry, to the code of Orensis. However,

00:29:54.300 --> 00:30:01.480
 after practicing, we recognize that it'd probably be best if it was in the development code.

00:30:01.480 --> 00:30:07.320
 And so what we're doing is just, again, bringing back what was already in the prior code into

00:30:07.320 --> 00:30:15.040
 the 2019 development code. So the composition of what a zoning board adjustment shall be

00:30:15.040 --> 00:30:24.560
 made of, as you can see listed here, they are a member, a seven member board. And again,

00:30:24.560 --> 00:30:34.920
 they follow a two year term and they are appointed by the city council. I won't go into this

00:30:34.920 --> 00:30:40.200
 specifically. I see there's a question. There is also a, you know what, let me stop and

00:30:40.200 --> 00:30:45.280
 yeah, let me get to Christian back. I think he had one on the previous slide. Yeah. It

00:30:45.280 --> 00:30:49.920
 was, it was just a question that occurred to me with the, with the weird COVID extensions

00:30:49.920 --> 00:30:56.280
 of all the terms of council members and the extension of actually some of the commissioners

00:30:56.280 --> 00:31:03.460
 of this board and others. What's our code and what's, how does that handled in terms

00:31:03.460 --> 00:31:08.900
 of the, the, the normal two year terms that were just described? I mean, maybe just actually

00:31:08.900 --> 00:31:14.980
 a general answer, not just for ZBA. Did they just do it less of a term? I, yeah, my understanding

00:31:14.980 --> 00:31:20.120
 is I know that there are a member of the, the ZBA, the zoning board of adjustment, as

00:31:20.120 --> 00:31:27.080
 well as the HLC, which I am self liaison to. Some of those members have, you know, extended

00:31:27.080 --> 00:31:34.680
 their term past August. But my understanding is until those positions are reappointed by

00:31:34.680 --> 00:31:41.740
 city council, they serve until that's done. So hopefully in January, I know that there's

00:31:41.740 --> 00:31:47.760
 going to be a number of nominations and appointments in January. If, and when that happens, we

00:31:47.760 --> 00:31:54.160
 should be having those positions that have expired either replaced or reappointed. But

00:31:54.160 --> 00:32:01.360
 for us a slightly smaller term. Well, yes. I mean, it would be, it would, they would

00:32:01.360 --> 00:32:06.840
 fill that two years. So yes, it would be smaller. They would just cover whatever is left from

00:32:06.840 --> 00:32:16.480
 that two years. Okay. Thank you. That's what I thought. But thank you.

00:32:16.480 --> 00:32:23.800
 Similar to the, well, not similar, but rather the ZBA is a different board in that again,

00:32:23.800 --> 00:32:30.440
 we mentioned earlier that they need at least six to at least to meet and or to approve

00:32:30.440 --> 00:32:35.760
 a variance request with such a high number. We want to make sure that we have at least

00:32:35.760 --> 00:32:42.560
 seven members present at all times. So there are alternate members assigned to the zoning

00:32:42.560 --> 00:32:47.960
 board of adjustment and these alternates are also appointed by the city council and they

00:32:47.960 --> 00:32:56.060
 are also also have a two year term. So they follow the same appointment in term limit.

00:32:56.060 --> 00:33:02.160
 The difference between alternate one, two and three that they specifically replace or

00:33:02.160 --> 00:33:08.560
 not replace, but rather sit in where a existing board member is absent. So again, we want

00:33:08.560 --> 00:33:16.960
 to make sure that that board member or that board is at seven at all times so that the

00:33:16.960 --> 00:33:29.040
 proceedings are heard by at least six, but hopefully by seven board members.

00:33:29.040 --> 00:33:34.440
 Continuing on with the composition and operational procedures for the zoning board of adjustment,

00:33:34.440 --> 00:33:39.680
 a lot of what you're going to see here are just again, what we've stated in the past

00:33:39.680 --> 00:33:46.880
 with again, the membership requirements or membership, but the quorum or need for six

00:33:46.880 --> 00:33:53.400
 members. They, the zoning board of adjustment may adopt rules. The chairperson of the zoning

00:33:53.400 --> 00:33:58.920
 board, similar to the planning zoning commission can hold a special call meeting if needed

00:33:58.920 --> 00:34:05.560
 and that they shall keep minutes and for public record. So again, very similar to what we've

00:34:05.560 --> 00:34:11.800
 already discussed with the planning zoning commission. In addition, there are special

00:34:11.800 --> 00:34:19.680
 requirements when it comes to an appeal. So what this header here is an appeal of administrative

00:34:19.680 --> 00:34:28.320
 decision procedures. This per the other house bill that was passed, 2497, which I included

00:34:28.320 --> 00:34:38.400
 in your backup states that any one that has an grievance to a decision can appeal a decision

00:34:38.400 --> 00:34:45.200
 from the, from staff. They don't have to be related. So not only are they not required

00:34:45.200 --> 00:34:54.920
 to be related, they can be anybody. So that's what was approved under 2497. So the first

00:34:54.920 --> 00:35:00.960
 paragraph you see here applies to anyone that is not related to a specific application dress

00:35:00.960 --> 00:35:08.520
 or project. The second one relates is related to our, sorry, is referencing anybody that's

00:35:08.520 --> 00:35:16.440
 who has a relationship to the specific application. So again, just to differentiate the two types

00:35:16.440 --> 00:35:22.400
 and then there's a section also as part of 2497 that speaks to when an appeal can be

00:35:22.400 --> 00:35:28.940
 made and that it is, cannot be more than 20 days after the decision is made. So between

00:35:28.940 --> 00:35:37.080
 the decision that has, was made in 20 days, an applicant or anyone shall submit an appeal

00:35:37.080 --> 00:35:42.440
 for an administrative decision. So there's a limit as to when that can happen. So that's

00:35:42.440 --> 00:35:49.840
 20 days. I won't go into much of these. These are more or less, again, additional information

00:35:49.840 --> 00:35:57.280
 that was carried over similar to what was in the 2002 code. It's, it's related again

00:35:57.280 --> 00:36:07.680
 to who can participate as well as what happens to a decision during an appeal and how long

00:36:07.680 --> 00:36:18.320
 that can last throughout the process. And again, this kind of carries that same notion.

00:36:18.320 --> 00:36:24.000
 The one thing I want to point out is that last bullet or last paragraph where it talks

00:36:24.000 --> 00:36:30.000
 about the Zoning Board of Adjustment shall decide an appeal at the next meeting. So this

00:36:30.000 --> 00:36:37.040
 was again, part of the House Bill 2497 where it requires that the Zoning Board of Adjustment

00:36:37.040 --> 00:36:43.520
 not decide on an appeal on that first meeting, rather they need to have a second meeting

00:36:43.520 --> 00:36:50.520
 and that has to happen within 60 days, 60 calendar days after which that appeal was

00:36:50.520 --> 00:36:57.840
 made. So just again, to provide that procedure within the development code, we just wanted

00:36:57.840 --> 00:37:05.240
 to put this back into the code and again, add some of it as part of House Bill 2497.

00:37:05.240 --> 00:37:11.640
 If I don't see any questions, I can go ahead and proceed. Let me drop my screens to make

00:37:11.640 --> 00:37:22.920
 sure that there's no one with any questions. I don't see any. Okay.

00:37:22.920 --> 00:37:30.440
 So moving from ZBA, we're going to the Historic Landmark Commission, HLC. Again, same story.

00:37:30.440 --> 00:37:37.560
 I'm going to repeat myself. Composition, we wanted to go to the Code of Orances. However,

00:37:37.560 --> 00:37:42.040
 knowing that it's important to have in the development code, we're bringing it back to

00:37:42.040 --> 00:37:50.160
 the TDC development code. We are, sorry, the Historic Landmark Commission is composed of

00:37:50.160 --> 00:37:58.880
 nine members, so a little bit more, and they must at least one representative be representing

00:37:58.880 --> 00:38:06.240
 one of the following that you see here listed A through F. I can tell you that the Historic

00:38:06.240 --> 00:38:13.120
 Landmark Commission is currently at nine members, and we do have all of the professions that

00:38:13.120 --> 00:38:18.720
 you see here. I think one of the important profession that we definitely need in the Historic

00:38:18.720 --> 00:38:25.040
 Landmark Commission is the redshirt architect. She currently is an architect and works for

00:38:25.040 --> 00:38:32.520
 UNT, so I'm glad that she's on the commission and helps us a lot when it comes to some of

00:38:32.520 --> 00:38:42.720
 the historic preservation applications that come through that commission. Similarly, the

00:38:42.720 --> 00:38:48.760
 members must meet one of those categories that we listed or that you saw on the first

00:38:48.760 --> 00:38:54.800
 slide or the initial slide, and that they also are appointed a two-year staggered term

00:38:54.800 --> 00:39:03.240
 in which is appointed by the City Council. The next few slides is a little bit wordy

00:39:03.240 --> 00:39:10.960
 in that it provides the powers and duties of the Historic Landmark Commission. These again

00:39:10.960 --> 00:39:17.520
 are a carry of what was in the 2002 code. We're bringing it into 2019, so I won't spend

00:39:17.520 --> 00:39:22.920
 a whole lot other than let you know that the Historic Landmark Commission does a lot of

00:39:22.920 --> 00:39:30.240
 work as far as historic preservation. They also establish a number of policies and guidelines

00:39:30.240 --> 00:39:39.360
 in which we have the opportunity to increase our preservation of our historic resources.

00:39:39.360 --> 00:39:47.480
 Again this list continues on and talks specifically to the powers and duties of the Historic Landmark

00:39:47.480 --> 00:39:59.160
 Commission. We're now on the next topic, which is exploration of approval. What we are proposing

00:39:59.160 --> 00:40:04.960
 here is adding additional language, so anything that's underlined is what we are proposing

00:40:04.960 --> 00:40:14.080
 to add under this section. Any application, we'll jump into number two specifically. All

00:40:14.080 --> 00:40:22.040
 previously approved applications for the same land shall also expire, and what we're saying

00:40:22.040 --> 00:40:31.080
 that upon the expiration of an approved application, for example, let me step back a little bit,

00:40:31.080 --> 00:40:40.360
 I went through that fairly quickly, preliminary plots, if they are approved and there is a

00:40:40.360 --> 00:40:50.080
 final plot that comes after that, there is a time limit in which they are valid, and

00:40:50.080 --> 00:41:00.920
 therefore if one expires, the previous application, final plot that's approved, the previous application

00:41:00.920 --> 00:41:08.800
 is a preliminary plot, that also would be expired as well. So that's sort of one example

00:41:08.800 --> 00:41:20.360
 of what number two stands for. A project is given a five-year time frame, so if you can

00:41:20.360 --> 00:41:28.120
 look at a preliminary plot or subdivision, if they continue to develop that property,

00:41:28.120 --> 00:41:36.960
 their five years will not expire, and that if when, say a subdivision does not continue

00:41:36.960 --> 00:41:44.840
 to develop and does not continue to plot, the subsequent development of property, if

00:41:44.840 --> 00:41:52.840
 after five years would need to comply with the current development code that's in place.

00:41:52.840 --> 00:42:01.120
 So this is more or less a besting provision, so we use five years as it is consistent with

00:42:01.120 --> 00:42:07.400
 the Texas local government code as what they define as a project and what that time frame

00:42:07.400 --> 00:42:15.040
 is. So five years is the years that we want to make note of and we want to continue to

00:42:15.040 --> 00:42:16.040
 follow.

00:42:16.040 --> 00:42:20.760
 >> Mr. Beck has a question.

00:42:20.760 --> 00:42:27.040
 >> Thank you, Ron. Ron, is there any exceptions in the Texas local government code or in our

00:42:27.040 --> 00:42:37.440
 own ordinances to that five-year sort of rolling continuance? Are there any, when we, what

00:42:37.440 --> 00:42:42.680
 parts of the development code are immediately applicable regardless? Does that ever happen?

00:42:42.680 --> 00:42:47.160
 >> Say that one more time and again, your volume is a little low, so I'm trying to.

00:42:47.160 --> 00:42:48.560
 >> So is that better?

00:42:48.560 --> 00:42:49.560
 >> Yes.

00:42:49.560 --> 00:42:56.000
 >> Okay. So if, are there any parts of either our municipal code or the Texas legal government

00:42:56.000 --> 00:43:00.720
 code that carve out an exception to where if city council makes a change, that's immediately

00:43:00.720 --> 00:43:08.440
 applicable in terms of development? Or is everything subject to the five-year continuance?

00:43:08.440 --> 00:43:13.720
 >> My understanding, and Richard, correct me if I'm wrong, if they are within that five

00:43:13.720 --> 00:43:18.680
 years, they are still, they're vested on that particular code, even if council changes the

00:43:18.680 --> 00:43:25.600
 rules on the subdivision standards. Now, this, there may be some special rules and requirements

00:43:25.600 --> 00:43:30.360
 that I'm not aware of, but when it comes to the subdivision requirements, say platting,

00:43:30.360 --> 00:43:33.200
 for example, they are vested under those rules.

00:43:33.200 --> 00:43:39.600
 >> And there's no exceptions, I guess, is what I'm asking.

00:43:39.600 --> 00:43:44.600
 >> There are exceptions, but they're specified in the statute, so if, I don't have them in

00:43:44.600 --> 00:43:49.000
 front of me, but building codes, floodplain, if those things change during that time, they'd

00:43:49.000 --> 00:43:50.880
 have to comply with the latest version.

00:43:50.880 --> 00:43:55.880
 >> Okay, that's good to know, thank you.

00:43:55.880 --> 00:44:00.920
 >> All right, Ron.

00:44:00.920 --> 00:44:08.240
 >> This continues that discussion related to the terms of the project and when an application

00:44:08.240 --> 00:44:22.400
 becomes an expired application. So we'll move over here. Okay, so next topic relates to

00:44:22.400 --> 00:44:30.240
 the zoning compliance plan review. What we are proposing here is what is currently, well,

00:44:30.240 --> 00:44:36.440
 sorry, not currently, but rather what was, or is in our code that's referred to site

00:44:36.440 --> 00:44:44.240
 plan, we are proposing to change that term and call it a zoning compliance plan. So everywhere

00:44:44.240 --> 00:44:51.440
 we have in the code site plan, it will be replaced with zoning compliance plan. That's

00:44:51.440 --> 00:44:59.340
 just to provide some clarification. We also want to provide the development community

00:44:59.340 --> 00:45:07.080
 and general public a list of what is required or what is and should be within a zoning compliance

00:45:07.080 --> 00:45:11.600
 plan. So at a minimum, we've provided them with a list of that and that's represented

00:45:11.600 --> 00:45:19.840
 here in the list A through C. As much information as possible, but the general requirements

00:45:19.840 --> 00:45:26.400
 are the following. So site data, the lot, the development impact area, easements and

00:45:26.400 --> 00:45:34.040
 right-of-way dedications, any of the locations and mentions of existing and proposed improvements,

00:45:34.040 --> 00:45:37.880
 and then environmental sensitive tree preservation and landscape areas. So all should be part

00:45:37.880 --> 00:45:47.920
 of the zoning compliance plan submittal. So that's just a quick reference to that. I don't

00:45:47.920 --> 00:45:51.240
 know if you all have any questions on that particular, but again, this is just again

00:45:51.240 --> 00:45:57.160
 to provide a change in the name and also to provide some additional language to identify

00:45:57.160 --> 00:46:04.440
 what should be included in a zoning compliance plan submittal. Moving on to the next topic,

00:46:04.440 --> 00:46:13.240
 and this is related to specific use permits and their effect and the approval criteria.

00:46:13.240 --> 00:46:18.480
 So the first part here, the first slide is related to the effect of approval. As you

00:46:18.480 --> 00:46:23.320
 all know, we, the Planning Zoning Commission considers specific use permits and recommends

00:46:23.320 --> 00:46:30.560
 them to the city council. And a lot of times, obviously most of them are related to a particular

00:46:30.560 --> 00:46:38.160
 use. So the question that we have is if a specific use permit approves a multifamily,

00:46:38.160 --> 00:46:43.920
 for example, does that limit that development or that property to just multifamily? And

00:46:43.920 --> 00:46:51.160
 we're saying that it does not preclude other development under that property, within that

00:46:51.160 --> 00:46:57.880
 property to develop as long as it is allowed or permitted within that zoning district.

00:46:57.880 --> 00:47:03.960
 So say, for example, multifamily specific use permit was approved by the city council.

00:47:03.960 --> 00:47:11.400
 If that zoning allowed for offices, that property could develop with office use and not have

00:47:11.400 --> 00:47:17.000
 to just develop with multifamily. So this is more or less the, to be able to clarify

00:47:17.000 --> 00:47:24.440
 that question and state that any use that's permitted under that zoning district would

00:47:24.440 --> 00:47:33.640
 be permitted even with an approved specific use permit. As, as it relates to the approval

00:47:33.640 --> 00:47:41.600
 criteria, this is the second part of this topic. We have, as you all know, a list of,

00:47:41.600 --> 00:47:50.320
 I won't say standard, but approval criteria for all applications, which we review. But

00:47:50.320 --> 00:47:55.800
 we also have specific approval criteria for all of our different applications. So this

00:47:55.800 --> 00:48:00.760
 one in particular is specific use permits. And what you see here is that we're striking

00:48:00.760 --> 00:48:08.440
 out most of what's already covered under the all application criteria for approval. So

00:48:08.440 --> 00:48:14.920
 number three, number five and number six are already covered under that section 245 to

00:48:14.920 --> 00:48:21.800
 be specific. So again, it's repetitive. We just feel that we need to focus on the remaining

00:48:21.800 --> 00:48:29.400
 criteria for approval for specific use permits. So this is what this code amendment is about.

00:48:29.400 --> 00:48:40.360
 Any questions on this one before we move on to the next topic? I do not see any run. Okay.

00:48:40.360 --> 00:48:47.360
 So next few slides relate to similar to what we saw earlier with the CEP, civil engineering

00:48:47.360 --> 00:48:53.360
 plans, traffic impact analysis, as well as real estate applications. We know that these

00:48:53.360 --> 00:48:58.960
 are processes that we have in applications. We want to make sure that represented in this

00:48:58.960 --> 00:49:06.040
 table 2.2 A. So we're adding it to this table and other sections that relate to these type

00:49:06.040 --> 00:49:12.440
 of applications. And you can see with a traffic impact analysis, that is the responsibility

00:49:12.440 --> 00:49:18.400
 and review and approval by the development assistant team. Real estate applications are

00:49:18.400 --> 00:49:24.680
 a little bit different in that ultimately city council will need to prove any applications

00:49:24.680 --> 00:49:32.400
 that involve real estate such as roadway encroachments or use agreements, easement encroachments,

00:49:32.400 --> 00:49:38.300
 that sort of thing. Those are our examples of real estate applications. So the first

00:49:38.300 --> 00:49:44.080
 one is the traffic impact analysis. And I think you all know what this analysis is,

00:49:44.080 --> 00:49:50.960
 is obviously it measures any potential impact to the traffic patterns of an area as a result

00:49:50.960 --> 00:49:57.340
 of a proposed development in including some of the existing conditions that are currently

00:49:57.340 --> 00:50:05.280
 at the area or within the area. We are adding the following sections under the traffic analysis

00:50:05.280 --> 00:50:12.200
 procedures, similar to what we already have for other applications with regards to the

00:50:12.200 --> 00:50:17.560
 purpose, applicability, the process in which they are reviewed and determined, and then

00:50:17.560 --> 00:50:25.320
 what happens after action is determined by the development assistant team, and also providing

00:50:25.320 --> 00:50:35.160
 this criteria for acceptance. The real estate applications, similarly, we want to add a

00:50:35.160 --> 00:50:41.680
 purpose that you see here. And again, I'm going to go through this real quick, easement

00:50:41.680 --> 00:50:50.600
 abandonments, right away abandonments, encroachments, use of gas pipeline license requests, are

00:50:50.600 --> 00:50:58.680
 examples of real estate application types. Then again, similarly, there are sections

00:50:58.680 --> 00:51:04.360
 that we are going to include in terms of purpose, applicability, and the actual procedures in

00:51:04.360 --> 00:51:12.880
 which they are reviewed and brought forward to city council. Okay, so that concludes that

00:51:12.880 --> 00:51:19.440
 section with regards to traffic impact analysis in real estate. If I don't see, I want to

00:51:19.440 --> 00:51:20.440
 make sure.

00:51:20.440 --> 00:51:24.800
 We have one question. It's Commissioner Beck.

00:51:24.800 --> 00:51:34.080
 Sorry to ask all the questions, Chair. It's my nature. Ron, one of the concerns that's

00:51:34.080 --> 00:51:38.000
 been brought, you know, of my own and that's been brought to me by the public is this sort

00:51:38.000 --> 00:51:42.940
 of interplay of development and the mobility plan. And this seems like the appropriate

00:51:42.940 --> 00:51:47.800
 time to ask you, because we just discussed real estate traffic impact analysis. And that

00:51:47.800 --> 00:52:03.640
 is to the extent to which the mobility plan and the impacts development gets in front

00:52:03.640 --> 00:52:12.040
 of the existing guidelines and that how we're not sort of -- I guess what -- let me rephrase.

00:52:12.040 --> 00:52:21.440
 My question goes to in this section, do we have language that covers how we follow future

00:52:21.440 --> 00:52:27.400
 land use and comprehensive plans in terms -- because we were mentioning the mobility

00:52:27.400 --> 00:52:34.040
 plan, or is that language all maintained within the language of the mobility plan?

00:52:34.040 --> 00:52:38.380
 So there are references to the mobility plan throughout the development code as it relates

00:52:38.380 --> 00:52:46.960
 to development and subdivision requirements. We know that when we look at plats, for example,

00:52:46.960 --> 00:52:52.840
 and if there are requirements for dedication, the mobility plan is referenced and reviewed

00:52:52.840 --> 00:52:58.880
 against to ensure that whatever dedication is required is consistent to what the mobility

00:52:58.880 --> 00:53:07.520
 plan is set forward. So that is one example. As it relates to the TIA, I'm trying to understand

00:53:07.520 --> 00:53:13.560
 if that is a question you had, the TIA really just looks at what the development is producing

00:53:13.560 --> 00:53:20.240
 or introducing to an area and how, if any, mitigation is required to address that potential

00:53:20.240 --> 00:53:21.240
 impact.

00:53:21.240 --> 00:53:27.520
 So I guess what I'm seeking is what section -- if it's not this one, then just say it's

00:53:27.520 --> 00:53:38.460
 not this one. But what -- the section of the code is governing what the current definitions

00:53:38.460 --> 00:53:48.280
 of usage and stuff are, usage in regards to going into the traffic impact models. Is that

00:53:48.280 --> 00:53:53.840
 covered -- is that to be covered in this section or in the mobility section? And I'll give

00:53:53.840 --> 00:53:59.760
 you an example to help clarify my question. And that is on the ground right now you might

00:53:59.760 --> 00:54:06.560
 see farmland, but it's anticipated that someone in the future would like to develop this as

00:54:06.560 --> 00:54:18.260
 a large subdivision. And so where in the code do we talk about the traffic impact analysis

00:54:18.260 --> 00:54:21.900
 and what conditions and how they're put into the development code? Is it in this section

00:54:21.900 --> 00:54:24.240
 or is it in the mobility plan?

00:54:24.240 --> 00:54:29.160
 So this section or the development code and specifically subchapter 2, again, is procedures,

00:54:29.160 --> 00:54:34.320
 right? It talks about how the applications are reviewed and considered and what happens

00:54:34.320 --> 00:54:42.000
 during that process. I can tell you that subchapter 7, which we will be bringing forward as well,

00:54:42.000 --> 00:54:47.840
 speaks specifically to access and circulation. And at that particular section, there's requirements

00:54:47.840 --> 00:54:52.800
 and standards that need to comply with. And I can tell you that some of those standards

00:54:52.800 --> 00:54:59.440
 often refer to not only the mobility plan, but also the transportation criteria manual.

00:54:59.440 --> 00:55:08.040
 So I think overall, they're covered under the DDC as required regulations or standards,

00:55:08.040 --> 00:55:13.680
 but rely on other references such as the mobility plan and the transportation criteria manual

00:55:13.680 --> 00:55:14.680
 as well.

00:55:14.680 --> 00:55:19.360
 Okay, that clarifies. Thank you. I appreciate it.

00:55:19.360 --> 00:55:29.320
 I promise we're almost there. I think we're about three quarters through. So moving on

00:55:29.320 --> 00:55:37.720
 to the next topic, and this is subdivision application procedures. Again, this will have

00:55:37.720 --> 00:55:46.120
 some applications as relates to House Bill 3167, but also wanted to provide some more

00:55:46.120 --> 00:55:52.800
 clarity as to when subdivision applications, and these are plats. So preliminary plats,

00:55:52.800 --> 00:55:59.880
 final plats, mending plats and the like. So when do they apply? So now the first statement

00:55:59.880 --> 00:56:05.440
 there says that subdivision procedures shall apply to all land and all developments within

00:56:05.440 --> 00:56:12.320
 corporate city limits, that it's in accordance with our interlocal agreement within county.

00:56:12.320 --> 00:56:23.240
 As you all know, division two is not within the requirements, but division one is, and

00:56:23.240 --> 00:56:30.160
 there is a map that identifies where that outline is or where that division separates.

00:56:30.160 --> 00:56:37.500
 So with regards to number three, civil engineering plans, that is also applied to division one.

00:56:37.500 --> 00:56:48.720
 So just to give some clarification on when certain applications are applicable and where.

00:56:48.720 --> 00:56:55.600
 The next slide here is really to cover how we want to be consistent with the expiration

00:56:55.600 --> 00:57:04.920
 dates. This one particular is related to final plats. We know that we want to be consistent

00:57:04.920 --> 00:57:12.920
 with other applications in that we look at a 24 months or two year expiration date. So

00:57:12.920 --> 00:57:19.640
 as you can see here, there is a statement that is being crossed out as relates to when

00:57:19.640 --> 00:57:27.080
 filing may occur. We want to make sure that the final plat is consistent. So we're saying

00:57:27.080 --> 00:57:35.200
 that it should be filed within the timeframe, similar to the other expiration dates of 24

00:57:35.200 --> 00:57:42.400
 months. And then the other items here that you see in the orange is more or less just

00:57:42.400 --> 00:57:48.880
 clarification and or correction instead of filing, it's recording. So really just non-substantive

00:57:48.880 --> 00:57:58.040
 changes as it relates to the filing. I'm sorry, the recording of plats. This is that continuation

00:57:58.040 --> 00:58:03.840
 of that discussion. And you see that it must be filed with the county or recorded. Sorry,

00:58:03.840 --> 00:58:08.680
 I need to correct myself there. And that is recorded with the county within 24 months

00:58:08.680 --> 00:58:16.960
 again to be consistent with other deadlines and timeframes and due dates. That is to other

00:58:16.960 --> 00:58:27.600
 applications. This right here relates to preliminary plats. We are again, the green area or the

00:58:27.600 --> 00:58:32.280
 green text that you see below are anything that's underlying and we are adding anything

00:58:32.280 --> 00:58:40.160
 that's struck through is being proposed to delete, be deleted. We don't require preliminary

00:58:40.160 --> 00:58:47.080
 plats in the ETJ. However, if one is submitted, it shall follow the same requirements as it

00:58:47.080 --> 00:58:55.120
 were to be in the city. So that's what number two is about. Number three, the director will

00:58:55.120 --> 00:59:01.840
 determine during the pre-application if a preliminary plat is required, this gives the

00:59:01.840 --> 00:59:09.720
 option for a, for example, a commercial development that can go straight to final plat and may

00:59:09.720 --> 00:59:16.700
 not require a preliminary plat to be able to do that. So this number three gives that

00:59:16.700 --> 00:59:23.360
 opportunity for a developer or property owner to not have to do a preliminary plat because

00:59:23.360 --> 00:59:28.760
 the site may not necessarily need one just due to the fact that of its size and/or its

00:59:28.760 --> 00:59:38.240
 complexity a final plat would be just sufficient. Next slide here again. I just want to illustrate

00:59:38.240 --> 00:59:44.160
 that it's not six months, that it is 24 months. Again, we want to be consistent with our timeframe.

00:59:44.160 --> 00:59:50.640
 Ron, I'm going to interrupt you here and call on Commissioner Beck for a question.

00:59:50.640 --> 00:59:55.560
 Thank you, Ron. Can you go, well, okay, you don't have to go back. I can just ask you.

00:59:55.560 --> 01:00:00.860
 And that is that final point of three about the ETJ. And I asked you about this in email,

01:00:00.860 --> 01:00:11.920
 but would it be easier on staff, more streamlined, more efficacious if we recommend people do

01:00:11.920 --> 01:00:21.400
 preliminary plat? I know it's an option for the applicant, but would it be better if everyone

01:00:21.400 --> 01:00:27.760
 in the ETJ, would it be smoother, easier, faster, more efficacious if we recommend it?

01:00:27.760 --> 01:00:32.460
 Even if it's not a mandatory requirement, would it be better for the city and staff

01:00:32.460 --> 01:00:41.040
 if we recommended a preliminary plat? That's a good question. I know that, and I don't

01:00:41.040 --> 01:00:48.880
 know, Richard, if you have a response to that, within the ETJ, we don't require it. However,

01:00:48.880 --> 01:00:53.480
 Commissioner Beck's suggestion was if something, it could be recommended. I know our code is

01:00:53.480 --> 01:01:02.160
 very specific in that it only has requirements in shalls versus, you know, May and whatnot.

01:01:02.160 --> 01:01:06.720
 So it may be something that we do as a policy, but, Richard, if you--

01:01:06.720 --> 01:01:12.080
 Yeah, I don't think that we would, we preclude it. For instance, the one that we, probably

01:01:12.080 --> 01:01:17.880
 the most notable is Stuart Ridge. That was one that was completely within ETJ-1, and

01:01:17.880 --> 01:01:25.720
 they did do a preliminary and then ultimately final. So that was in the ETJ-1.

01:01:25.720 --> 01:01:31.560
 I guess my point was more to the encouragement. So, but, Ron, you were saying you could encourage

01:01:31.560 --> 01:01:40.080
 that policy, but outside the DDC, I mean, which is fine. I mean, if, I just, I would

01:01:40.080 --> 01:01:45.520
 like to, you know, if that makes staff's life easier, that's really where I'm kind of coming

01:01:45.520 --> 01:01:52.080
 at this question more so than is this a wonderful tool for the applicant? It's an optional tool

01:01:52.080 --> 01:01:56.160
 for the applicant, but if it would make life easier for staff, then we might as well just

01:01:56.160 --> 01:02:01.000
 encourage people to encourage, not require people to do that.

01:02:01.000 --> 01:02:05.480
 We can certainly look at the wording and see what we can do. But again, the intent here

01:02:05.480 --> 01:02:12.100
 is to just outline that one is not required in that if it is something that the applicant

01:02:12.100 --> 01:02:16.400
 that's in the ETJ wants to, they certainly can. We're not going to prevent that. They

01:02:16.400 --> 01:02:22.680
 just have to follow the rules of office of a preliminary plat approval criteria. And

01:02:22.680 --> 01:02:31.840
 as I mentioned earlier, if there are ones that may benefit, we can certainly encourage

01:02:31.840 --> 01:02:35.720
 that, but maybe, maybe we just need to look at some of the wording again.

01:02:35.720 --> 01:02:38.880
 Well, I mean, if it's not going to help, I don't want to get in the way. I mean, if

01:02:38.880 --> 01:02:43.040
 it's just going to be messy, I'm not, the whole point was to make staff's life easier.

01:02:43.040 --> 01:02:47.940
 So if it's just going to increase the consternation of staff, then there's no point to doing that

01:02:47.940 --> 01:02:50.760
 because the goal was to make staff's life easier.

01:02:50.760 --> 01:02:57.200
 I know we have a really good engineering and development assistant team that works well,

01:02:57.200 --> 01:03:05.520
 I mean, works hard, that is, with our applicants. And if one is certainly encouraged, we definitely

01:03:05.520 --> 01:03:09.400
 make them know about the process.

01:03:09.400 --> 01:03:15.400
 Thank you, Ron.

01:03:15.400 --> 01:03:31.680
 Okay. Click on this real quick. Yeah, okay. Subdivision application procedures. Again,

01:03:31.680 --> 01:03:39.640
 this talks about the post decisions and limitations after which decisions made. We're just moving

01:03:39.640 --> 01:03:45.840
 a couple things to be a little bit more clear. This whole section actually moves down here.

01:03:45.840 --> 01:03:51.960
 We do add an expiration of approval for, again, the final plat, and in two years is what we're

01:03:51.960 --> 01:03:58.480
 referring to. Any plat withdrawn or voided must be resubmitted. Again, just again to

01:03:58.480 --> 01:04:01.920
 provide that clarification.

01:04:01.920 --> 01:04:11.320
 Okay. So now we're onto a separate topic, and this is a replat procedure section, again,

01:04:11.320 --> 01:04:19.720
 under the subchapter two. There have been some, again, changes to the Texas local government

01:04:19.720 --> 01:04:26.520
 code and some of the, what is being proposed reflects some of those changes. But we also

01:04:26.520 --> 01:04:32.920
 have added a number of sections under the replat procedures to, again, provide more

01:04:32.920 --> 01:04:42.080
 customer-friendly, user-friendly, and clarification. So, again, replat, the purpose, the applicability.

01:04:42.080 --> 01:04:50.320
 I think we all know that the replats are applications that are properties that already are platted,

01:04:50.320 --> 01:04:56.760
 and they're either amending it or changing it. And so that requires a replat, and again,

01:04:56.760 --> 01:05:05.520
 it applies to any property that's already subdivided as part of their current site.

01:05:05.520 --> 01:05:11.920
 We have the same sections as others in that purpose, the applicability, the procedures,

01:05:11.920 --> 01:05:17.400
 and the approval criteria. One of the things that I wanted to highlight and I apologize

01:05:17.400 --> 01:05:23.040
 this is a very wordied slide, but one of the things I want you to focus on is specifically

01:05:23.040 --> 01:05:35.760
 step six, which is right here below that if the replat does not require a variance, and

01:05:35.760 --> 01:05:44.200
 it shall be reviewed by the Planning Zoning Commission and considered, the notice for

01:05:44.200 --> 01:05:52.040
 that replat happens after the Planning Zoning Commission has reviewed and considered it.

01:05:52.040 --> 01:05:58.000
 And that is per section, checks with local government code section 212. Again, that is

01:05:58.000 --> 01:06:05.720
 just something that was part of 3167, House Bill 3167, and we're just including that into

01:06:05.720 --> 01:06:11.880
 the development code to be consistent with that local government code provision. For

01:06:11.880 --> 01:06:18.160
 those that do require a variance, and I'm bringing you back up here to number four,

01:06:18.160 --> 01:06:23.960
 that has to go through the process of public hearing notifications and follows what you

01:06:23.960 --> 01:06:29.840
 see here and what you normally would see as part of a public hearing process and notifying

01:06:29.840 --> 01:06:37.160
 property prior to the public hearing. The difference is this replat requires a variance

01:06:37.160 --> 01:06:45.720
 while the ones that do not require a variance does not need to be notified until after the

01:06:45.720 --> 01:06:49.640
 Planning Zoning Commission has considered it. So just want to make sure that that's

01:06:49.640 --> 01:06:56.240
 understood. Moving on to the next topic, and that is subdivision

01:06:56.240 --> 01:07:02.800
 variance. I sort of alluded to this earlier in the presentation. When we approved the

01:07:02.800 --> 01:07:11.320
 2019 development code, any variance period would go to the Zoning Board of Adjustment.

01:07:11.320 --> 01:07:18.120
 And although that was a great thought, we feel that the subdivision variance, which

01:07:18.120 --> 01:07:24.800
 again deals with platting and other subdividing requirements, should go to the Planning Zoning

01:07:24.800 --> 01:07:31.680
 Commission for any variance. One is because you all review them often and are more familiar

01:07:31.680 --> 01:07:36.560
 with those requirements. While the Zoning Board of Adjustment, although they serve an

01:07:36.560 --> 01:07:42.640
 important role, I think that it's better served by the Planning Zoning Commission if it was

01:07:42.640 --> 01:07:49.720
 a subdivision variance. So you can see from here that ultimately the decision is made

01:07:49.720 --> 01:07:54.800
 by the Planning Zoning Commission and if there is any appeal, it goes to the City Council.

01:07:54.800 --> 01:08:01.680
 But again, the deciding factor for a design body that is for subdivision variance is the

01:08:01.680 --> 01:08:05.320
 Planning Zoning Commission. That is what we are proposing.

01:08:05.320 --> 01:08:10.960
 Again, I won't go through the whole list, but again, we want to make sure we're consistent

01:08:10.960 --> 01:08:18.120
 in all of the procedures. We're providing the following.

01:08:18.120 --> 01:08:24.720
 I won't read this. I know that we all at some point have reviewed the subdivision variances

01:08:24.720 --> 01:08:31.480
 and it's been a while, but we have heard some of those variances when I say we, the Planning

01:08:31.480 --> 01:08:35.360
 Zoning Commission, and have decided on some of those. And one particular that I can think

01:08:35.360 --> 01:08:43.120
 of is a separation distance between an intersection and a driveway and that's one variance that

01:08:43.120 --> 01:08:49.600
 certainly can be brought forward as part of a subdivision variance application.

01:08:49.600 --> 01:08:57.960
 Again, some of the applicability, street design, as I mentioned, the driveway and intersection

01:08:57.960 --> 01:09:06.920
 separation is probably one that's in my mind. Street connectivity is another, driveway access,

01:09:06.920 --> 01:09:14.840
 the lot planning layout, block layout, there's a certain minimum and maximum block layout.

01:09:14.840 --> 01:09:19.760
 So if there is an application or a project that wants to deviate from that, they would

01:09:19.760 --> 01:09:27.720
 need to come through the city and if this were to be passed, the Planning Zoning Commission.

01:09:27.720 --> 01:09:34.080
 Okay, moving on to annexation procedures. As you can tell, this subchapter two has a

01:09:34.080 --> 01:09:42.720
 lot of information, a lot of procedures to cover. One of them is annexation. The annexation

01:09:42.720 --> 01:09:50.040
 we do have, I know that the Planning Zoning Commission isn't necessarily reviewing them,

01:09:50.040 --> 01:09:54.360
 however, we still need them for, say, the City Council when they consider annexation.

01:09:54.360 --> 01:10:03.160
 So we want to outline what that process is. We have two types of applications, an involuntary,

01:10:03.160 --> 01:10:10.040
 which the city annexes a property, and then we also have voluntary annexation as well.

01:10:10.040 --> 01:10:17.120
 So the most that we will most likely see moving forward is a voluntary annexation. Any involuntary

01:10:17.120 --> 01:10:22.960
 annexation, because of state law, has made it very difficult for us to do that because

01:10:22.960 --> 01:10:30.040
 it requires an election and a vote for any involuntary annexation. So what we'll probably

01:10:30.040 --> 01:10:36.960
 see in the coming years is more or less voluntary annexations.

01:10:36.960 --> 01:10:42.640
 I want to just again identify what those sections are, and as you can see, they're very similar

01:10:42.640 --> 01:10:52.560
 to the previous procedures and other applications. This slide here kind of outlines the criteria

01:10:52.560 --> 01:10:59.840
 for voluntary annexations. One through five is specific to that criteria. Is it consistent

01:10:59.840 --> 01:11:08.120
 with the annexation policy of the city? Has all the owners joined in with the request?

01:11:08.120 --> 01:11:13.600
 If there was any conflict with any non-annexation or similar agreement, we want to make sure

01:11:13.600 --> 01:11:21.100
 that that isn't violated. The annexation is necessary for it to be joined into the city

01:11:21.100 --> 01:11:30.360
 in terms of our service costs, increased traffic, drainage. So as any annexation application

01:11:30.360 --> 01:11:36.560
 which comes in, they have to provide a physical impact analysis to provide the city with an

01:11:36.560 --> 01:11:44.320
 understanding that if annexed in future development, it would not adversely impact the city. And

01:11:44.320 --> 01:11:50.880
 then number five, the annexation will ensure that the adequate land use and building controls

01:11:50.880 --> 01:12:00.080
 are in place in which we see growth happening in the city. The next section here, if I don't

01:12:00.080 --> 01:12:04.340
 see any other questions or hear any other questions, I'll go fairly quickly. It's an

01:12:04.340 --> 01:12:08.960
 appeal to administrative decisions. We've already sort of discussed this, but this is

01:12:08.960 --> 01:12:16.280
 a different section of subchapter two, which is specifically two appeals. And what is going

01:12:16.280 --> 01:12:24.240
 to be shown is what we've already discussed. We talked about not related and related to

01:12:24.240 --> 01:12:32.780
 a specific application. That's something that we're introducing into this section. The appeal,

01:12:32.780 --> 01:12:38.840
 what should be included, when it can be made, again, 20 days, 20 calendar days, again, to

01:12:38.840 --> 01:12:48.720
 be consistent with House Bill 2497. And then additional proceedings with regards to when

01:12:48.720 --> 01:13:00.800
 projects or decisions need to be at a standstill until that appeal is considered. Continuing

01:13:00.800 --> 01:13:07.520
 with that same appeal of administrative decision, the text that you see here in green talks

01:13:07.520 --> 01:13:14.400
 about that 60-day total and having the decision not made on the first meeting, but rather

01:13:14.400 --> 01:13:23.080
 the second meeting. So, again, that just illustrates it being introduced into this section. The

01:13:23.080 --> 01:13:31.040
 next procedure is alternative environmental sensitive areas. ALT ESA is as often referred

01:13:31.040 --> 01:13:41.400
 to. What we are proposing to add is a provision that outlines when an ALT ESA expires. Right

01:13:41.400 --> 01:13:48.680
 now it's not clear and it's not specified specifically in the DDC. We are adding that

01:13:48.680 --> 01:13:54.800
 it shall expire within 24 months if progress is not made toward the completion of that

01:13:54.800 --> 01:14:00.480
 project. So, again, that 24 months is you've seen that and we're trying to make it consistent

01:14:00.480 --> 01:14:05.960
 with all the other deadlines and timeframes. So that's just to add that clarification.

01:14:05.960 --> 01:14:13.800
 Also, we're also adding a set of conditions. These two conditions that you see here are

01:14:13.800 --> 01:14:22.080
 often conditions of an ordinance that is approved as part of an ALT ESA. We are making it clear

01:14:22.080 --> 01:14:29.160
 to the applicant and the person applying for that ALT ESA that you are going to knowingly

01:14:29.160 --> 01:14:35.720
 have to comply with these conditions and these are conditions that are common and will be

01:14:35.720 --> 01:14:47.360
 part of future ALT ESA applications. Next section is related to or next topic is related

01:14:47.360 --> 01:14:54.880
 to interpretations. Interpretations are very similar in that an applicant can request an

01:14:54.880 --> 01:15:02.200
 interpretation on a specific code requirement or standard that may not be as clear and that

01:15:02.200 --> 01:15:08.640
 goes to the Director of Planning. However, if that decision or that determination or

01:15:08.640 --> 01:15:17.000
 interpretation is not accepted, the applicant or the person that requests that interpretation

01:15:17.000 --> 01:15:23.040
 can appeal to the Zoning Board of Adjustment. So, again, the areas or the language in green

01:15:23.040 --> 01:15:33.240
 is what clarifies that. Procedures for historic landmark designation.

01:15:33.240 --> 01:15:38.360
 This is a, I can tell you a couple slides and it's very wordy. I just want to preface

01:15:38.360 --> 01:15:48.280
 this by saying that part of our code amendment, I'm sorry, our development code update, we

01:15:48.280 --> 01:15:54.080
 didn't include much of, most of what was included in 2002 code, so one of the things that we're

01:15:54.080 --> 01:16:01.720
 trying to do is add some of it and there are some that are new but some of them are carryover.

01:16:01.720 --> 01:16:08.600
 The area, the text that you see here is existing in our current code. We are proposing to add

01:16:08.600 --> 01:16:17.320
 the following. Again, these are procedures in order to designate a historic landmark,

01:16:17.320 --> 01:16:24.160
 mainly for the Historic Landmark Commission and City Council. So, these are mainly for

01:16:24.160 --> 01:16:32.800
 them to use in their consideration. And I won't go through this. There's a lot in here

01:16:32.800 --> 01:16:39.200
 and I want to make sure that you understand that the Historic Landmark Commission will

01:16:39.200 --> 01:16:43.520
 get this presentation, will see this presentation, so they'll have an opportunity and, of course,

01:16:43.520 --> 01:16:50.280
 City Council will also have the opportunity to weigh in on some of these procedures.

01:16:50.280 --> 01:16:59.000
 Okay, so I believe this is the last topic on our agenda. It is what we're calling the

01:16:59.000 --> 01:17:06.480
 rezone to a planned development district. There had been some discussion, I know, in

01:17:06.480 --> 01:17:18.240
 the DCRC related to, you know, when a planned development is considered or should be considered.

01:17:18.240 --> 01:17:22.440
 And I'm going to go fairly quickly. I know that you all know what a planned development

01:17:22.440 --> 01:17:30.240
 is. What staff is proposing is to add the following language. Our current code does

01:17:30.240 --> 01:17:39.880
 not have this now, so we are adding a purpose statement, an applicability section, and specifically

01:17:39.880 --> 01:17:45.840
 the types of PD. So, this is probably one of the slides that I probably would like to

01:17:45.840 --> 01:17:56.960
 ask some input from the Commission. Right now, we have proposed two types of PDs, one

01:17:56.960 --> 01:18:03.480
 that we're calling an overlay PD and a second one, which is what we normally would like

01:18:03.480 --> 01:18:12.040
 to think of as a standard PD, which is the more involved, greater complexity in terms

01:18:12.040 --> 01:18:17.880
 of the development in some of the standards that are being proposed. So, I guess the first

01:18:17.880 --> 01:18:24.680
 question or the question that maybe we can get some input from the Commission is, when

01:18:24.680 --> 01:18:36.520
 considering an overlay PD, the staff is looking at just subchapter 5, where the uses are listed

01:18:36.520 --> 01:18:47.160
 as proposed or permitted, that is. We feel that an overlay PD should only be part of

01:18:47.160 --> 01:18:57.120
 subchapter 5. So, for example, the application that we heard, the past P&Z, the birch track,

01:18:57.120 --> 01:19:05.040
 for example, they were coming in for rezoning, and they did not have any conditions, and

01:19:05.040 --> 01:19:12.840
 the Commission recommended that they limit those use or the use to just single family.

01:19:12.840 --> 01:19:20.400
 To us, that would be a PD, but right now, we don't have this provision. So, what we're

01:19:20.400 --> 01:19:26.120
 saying is that in that situation, because it only applies to the use and it is in subchapter

01:19:26.120 --> 01:19:37.960
 5, it would be considered an overlay PD. So, that's one type. Is that something that the

01:19:37.960 --> 01:19:45.320
 Commission would like to see us do, and if there is any input as it relates to maybe

01:19:45.320 --> 01:19:53.240
 additional conditions or additional standards that can be adjusted? The hope is that the

01:19:53.240 --> 01:20:03.160
 overlay PDs are simple ones and that are done in that manner, while the standard PDs are

01:20:03.160 --> 01:20:09.760
 a little bit different, involve a little bit more submittals and documentation versus what

01:20:09.760 --> 01:20:13.800
 an overlay PD is.

01:20:13.800 --> 01:20:17.480
 Commissioner Beck.

01:20:17.480 --> 01:20:28.720
 So, just follow on from that. Procedurally, you are expecting an overlay PD to basically

01:20:28.720 --> 01:20:37.280
 be, I mean, how significantly different, I mean, than the standard PD?

01:20:37.280 --> 01:20:43.320
 So, the standard PD, great question, the standard PD has a little bit more information, so they

01:20:43.320 --> 01:20:51.120
 would have to provide a development plan that identifies the differences in their standards

01:20:51.120 --> 01:20:55.120
 as opposed to the development code, so that's something that they would need to provide.

01:20:55.120 --> 01:20:59.560
 They would also have to provide a development zoning map that identifies a little bit more

01:20:59.560 --> 01:21:07.640
 detail of what areas is proposed to have certain uses, so that's something that would also

01:21:07.640 --> 01:21:13.200
 be included in the standard PD. While the overlay PD that we're talking about, often

01:21:13.200 --> 01:21:18.240
 referred to as the mini PD, would be just, again, subchapter 5, and it would just be

01:21:18.240 --> 01:21:25.460
 specific to that subchapter, and they would only be able to deviate from that, from the

01:21:25.460 --> 01:21:32.480
 uses and the use-specific standards. And when we say deviate, meaning that it would have

01:21:32.480 --> 01:21:42.400
 to be more stricter, so limiting it to a number of uses or having stricter use-specific standards,

01:21:42.400 --> 01:21:48.160
 and again, this would allow them to move forward with their application because obviously they're

01:21:48.160 --> 01:21:55.900
 maybe some concerns with other uses, or there may be concerns with the size of the development

01:21:55.900 --> 01:22:01.840
 that can all be covered under the overlay PD.

01:22:01.840 --> 01:22:07.680
 But otherwise, the underlining characteristics of a parcel would just predominate.

01:22:07.680 --> 01:22:14.160
 Right, so their underlining zoning or other development standards would still apply. It

01:22:14.160 --> 01:22:20.600
 would just be, as you all know, a condition on that property, and it would just be labeled

01:22:20.600 --> 01:22:29.440
 as an overlay PD. But the question I guess I'm trying to ascertain here is, is subchapter

01:22:29.440 --> 01:22:38.840
 5 the only subchapter we want to see, or do we see other more, I guess, restrictive standards

01:22:38.840 --> 01:22:44.920
 outside of subchapter 5 being included in overlay PD, or should it just be subchapter

01:22:44.920 --> 01:22:45.920
 5?

01:22:45.920 --> 01:22:46.920
 Commissioner Smith.

01:22:46.920 --> 01:22:53.360
 Thank you, Chair. Ron, you did this in the DCRC meeting, but can you give an example

01:22:53.360 --> 01:22:58.000
 of where an overlay PD would make sense in a product we've seen recently?

01:22:58.000 --> 01:23:03.800
 Well, I mentioned that maybe a few minutes ago, and I don't know if you were on the call,

01:23:03.800 --> 01:23:05.800
 but rezoning, for example.

01:23:05.800 --> 01:23:10.880
 I'm in. I'm in. I get it from the rezoning, but is there a specific project we've seen

01:23:10.880 --> 01:23:15.400
 in front of the commission that you can reference that maybe said this would have been, we would

01:23:15.400 --> 01:23:19.880
 have suggested it as an overlay PD rather than doing it as a straight PD or the straight

01:23:19.880 --> 01:23:20.880
 zoning?

01:23:20.880 --> 01:23:21.880
 Richard?

01:23:21.880 --> 01:23:24.960
 Yeah, the Mockingbird rezoning that we just went through, there were some conditions put

01:23:24.960 --> 01:23:29.680
 in place restricting it only to single-family detached. That would be one of those instances.

01:23:29.680 --> 01:23:37.360
 That's what I was looking for. Okay. Yeah, I think just my two senses that I've shared

01:23:37.360 --> 01:23:44.120
 in DCRC as well was that I think restricting it just to subsection 5 and not requiring

01:23:44.120 --> 01:23:50.200
 it to not having a development plan or anything else included in that, not expanding outside

01:23:50.200 --> 01:23:55.360
 subsection 5 is preferable because I think the intent is clear, but I think making it

01:23:55.360 --> 01:24:01.560
 more restrictive, just moving in to be redundant to what we already used the PD for.

01:24:01.560 --> 01:24:08.720
 Right. I know that in previous discussions also, when does an applicant know it's an

01:24:08.720 --> 01:24:13.840
 overlay PD? They may come in for rezoning and just think it's simply a rezoning, but

01:24:13.840 --> 01:24:17.920
 we also know that there are opportunities for the Planning Zoning Commission and ultimately

01:24:17.920 --> 01:24:27.680
 the City Council to add any restrictive conditions. Just so if that happens, then of course they

01:24:27.680 --> 01:24:34.760
 would be reflected as an overlay PD and mapped accordingly, but if we can have that discussion

01:24:34.760 --> 01:24:41.320
 with the applicant in advance and provide them this option, at least they know in advance

01:24:41.320 --> 01:24:46.760
 that that's something that would be a little bit smoother in their process and gives us

01:24:46.760 --> 01:24:51.600
 the staff, the ability to analyze and provide that explanation and presentation to City

01:24:51.600 --> 01:24:56.360
 Council and to Planning Zoning Commission.

01:24:56.360 --> 01:25:02.040
 Commissioner Beck.

01:25:02.040 --> 01:25:08.000
 Thank you, Chair. Ron, is there ever a time when we've run into other circumstances outside

01:25:08.000 --> 01:25:14.100
 of 5 that you wish that, oh, I just wished I could massage it just a little bit for other

01:25:14.100 --> 01:25:21.360
 sections so that maybe the language should be that we should limit it to the size of

01:25:21.360 --> 01:25:23.720
 the change rather than the chapter?

01:25:23.720 --> 01:25:34.840
 Yeah, I'm trying to remember some recent ones, but Subchapter 3 is your minimum lot sizes,

01:25:34.840 --> 01:25:43.640
 your height, and if that was the case, like building height or setbacks in building curvatures

01:25:43.640 --> 01:25:51.360
 are in Subchapter 3, so if that was something that the applicant wanted to deviate from

01:25:51.360 --> 01:25:57.400
 or change, that would probably either be a rezoning to a new zoning district to meet

01:25:57.400 --> 01:26:03.120
 that or if it's just a simple or it's not simple but rather something specific, I think

01:26:03.120 --> 01:26:16.720
 that would and should be a more PD rezoning, a standard PD that is, than a overlay PD.

01:26:16.720 --> 01:26:23.120
 You would rather see things outside of 5, 3 and whatnot kept in a standard PD even if

01:26:23.120 --> 01:26:26.000
 it was a small change. That would be easier on staff.

01:26:26.000 --> 01:26:33.400
 Right, I apologize, it's hard to hear you there, but you were saying.

01:26:33.400 --> 01:26:43.280
 Yeah, so it would be better if things outside of Subchapter 5 were, even if they were small,

01:26:43.280 --> 01:26:52.040
 say like a 1-foot variance in height or something, you'd still rather see that in a full PD rather

01:26:52.040 --> 01:26:53.040
 than a...

01:26:53.040 --> 01:26:54.040
 Yeah, that's just an example.

01:26:54.040 --> 01:26:59.160
 It sounds like, I mean, that can certainly be a ZBA as well, that's another option.

01:26:59.160 --> 01:27:06.960
 The standard PD that we're talking about, and I maybe misdirected you there, is where

01:27:06.960 --> 01:27:14.480
 there is an opportunity to provide some flexibility both ends with the requirements and standards

01:27:14.480 --> 01:27:20.520
 in that we can ask for more things on one part of their development while they can deviate

01:27:20.520 --> 01:27:26.360
 on others, and that's what you typically see in the PD, a plan development, but the example

01:27:26.360 --> 01:27:31.840
 I gave you, Commissioner Beck, with regards to building height, I take that more or less,

01:27:31.840 --> 01:27:37.680
 if it's just that one particular deviation, that would probably be a zoning board of adjustment

01:27:37.680 --> 01:27:38.680
 request.

01:27:38.680 --> 01:27:40.640
 No, I understand that.

01:27:40.640 --> 01:27:48.360
 I guess I was more trying to get at what I originally started is, should this be a question

01:27:48.360 --> 01:27:57.840
 of size of the change, or should it be specifically the topics in five?

01:27:57.840 --> 01:28:00.040
 What would be better there?

01:28:00.040 --> 01:28:06.720
 Yeah, I know that we've talked about size in the past and minimum size for a PD, but

01:28:06.720 --> 01:28:15.960
 I think maybe the more better route would probably be the complexity or the nature of

01:28:15.960 --> 01:28:25.600
 the proposal, so if, again, if it's just trying to eliminate some uses or try to address some

01:28:25.600 --> 01:28:33.360
 of the concerns of the size of the building that's under the provision of a use-specific

01:28:33.360 --> 01:28:40.040
 standard, that can be addressed through this, but if it's more than that, I think that we're

01:28:40.040 --> 01:28:46.440
 looking at a standard PD or if it can be handled through some other avenue, such as a minor

01:28:46.440 --> 01:28:50.960
 modification or a variance, that that can be part of it as well, can be an option as

01:28:50.960 --> 01:28:51.960
 well.

01:28:51.960 --> 01:28:52.960
 Okay.

01:28:52.960 --> 01:28:53.960
 Thank you.

01:28:53.960 --> 01:28:54.960
 Yeah.

01:28:54.960 --> 01:29:03.520
 Rhonda, answering the original question from a while ago is, I think limiting this to chapter

01:29:03.520 --> 01:29:10.280
 or sub-chapter five, I'm in agreement with in terms of the things you spoke about, of

01:29:10.280 --> 01:29:13.880
 how if it covers other sub-chapters, how it would be better addressed.

01:29:13.880 --> 01:29:20.120
 Commissioner Anderson, did you have a question, I did?

01:29:20.120 --> 01:29:21.120
 Commissioner Anderson?

01:29:21.120 --> 01:29:22.120
 Yeah, thanks.

01:29:22.120 --> 01:29:28.400
 It was kind of one of, sorry, I just got on a few minutes ago, but would this, what you're

01:29:28.400 --> 01:29:33.320
 talking about, would that have been beneficial to our last meeting when we had that multi-story

01:29:33.320 --> 01:29:37.040
 place that wanted to raise the level up by six feet?

01:29:37.040 --> 01:29:39.680
 This would have been more beneficial for that instead of having them come back.

01:29:39.680 --> 01:29:40.680
 Does that make sense?

01:29:40.680 --> 01:29:41.680
 Are you following me there?

01:29:41.680 --> 01:29:42.680
 Yeah.

01:29:42.680 --> 01:29:46.320
 That was a little bit more specific to the height in that sub-chapter and sub-chapter

01:29:46.320 --> 01:29:47.320
 three.

01:29:47.320 --> 01:29:49.560
 Three, right.

01:29:49.560 --> 01:29:55.440
 That one would probably best, Richard, if it was a height thing, I know there was an

01:29:55.440 --> 01:29:59.080
 option for a specific use permit, so that's what they chose.

01:29:59.080 --> 01:30:04.280
 But if there wasn't, there would probably be a zoning board of adjustment type of application,

01:30:04.280 --> 01:30:05.280
 in my opinion.

01:30:05.280 --> 01:30:11.720
 But if this, we couldn't have done an overlay, like a, with, no, okay, with the height thing.

01:30:11.720 --> 01:30:15.280
 I wouldn't think that that would be the proper procedure.

01:30:15.280 --> 01:30:19.720
 It would probably be the zoning board of adjustment.

01:30:19.720 --> 01:30:20.720
 Okay.

01:30:20.720 --> 01:30:23.600
 But the only thing I will add, I think that's something that we might want to, as we're

01:30:23.600 --> 01:30:27.960
 going through these standards, something we might want to look at further, is whether

01:30:27.960 --> 01:30:32.900
 or not that requirement for the SGP still makes sense, given that there's other provisions

01:30:32.900 --> 01:30:40.240
 and protections that we have written in the code with respect to height limitations based

01:30:40.240 --> 01:30:44.560
 upon, you know, the closer you are to a single-family property.

01:30:44.560 --> 01:30:50.160
 So I think it's just something we can look at again, whether it makes sense for someone

01:30:50.160 --> 01:30:56.520
 to go through an SGP for six feet, again, more of a policy decision.

01:30:56.520 --> 01:31:02.240
 Any other comments on this slide?

01:31:02.240 --> 01:31:04.800
 Commissioner Ellis.

01:31:04.800 --> 01:31:05.800
 Thank you, Chair.

01:31:05.800 --> 01:31:11.280
 Well, just going back to what that discussion was, they wanted a height increase, though,

01:31:11.280 --> 01:31:12.280
 with that.

01:31:12.280 --> 01:31:14.680
 And that's not really what we're talking about when we're talking about overlays.

01:31:14.680 --> 01:31:19.840
 I mean, we're talking about putting more restrictions on them.

01:31:19.840 --> 01:31:20.840
 Correct?

01:31:20.840 --> 01:31:21.840
 Yeah.

01:31:21.840 --> 01:31:22.840
 Correct.

01:31:22.840 --> 01:31:23.840
 Okay.

01:31:23.840 --> 01:31:29.320
 Yeah, and I think it's great that we're calling this something, because I know early

01:31:29.320 --> 01:31:34.800
 when we were trying to adopt this code and wanting to call everything PDs, thinking that

01:31:34.800 --> 01:31:39.000
 the overlay thing was going to go away, and clearly it hasn't.

01:31:39.000 --> 01:31:45.720
 So I think for us to be able to differentiate, clearly I think that's going to keep happening,

01:31:45.720 --> 01:31:49.120
 especially with re-zones, just to get, you know.

01:31:49.120 --> 01:31:54.240
 Right, and if we can be proactive and try to address that early in the process with

01:31:54.240 --> 01:31:58.000
 the applicants, we will certainly do so.

01:31:58.000 --> 01:32:03.920
 But we also know that that could happen after, in the case of, say, a planning zoning commission,

01:32:03.920 --> 01:32:10.120
 a meeting or a city council meeting.

01:32:10.120 --> 01:32:11.840
 Okay.

01:32:11.840 --> 01:32:20.880
 So, again, you see that we have similar procedures or sections under this section.

01:32:20.880 --> 01:32:27.920
 And, again, I won't spend too much time, I just want to illustrate that we are making

01:32:27.920 --> 01:32:32.880
 sure that we have the same procedures for all the different applications we have, when

01:32:32.880 --> 01:32:36.960
 I say procedures, sections covered.

01:32:36.960 --> 01:32:41.320
 So that brings us to our last slide, and I appreciate your patience, and I know that

01:32:41.320 --> 01:32:44.000
 that was a lot of information.

01:32:44.000 --> 01:32:49.320
 The sub-chapter two is a big chapter, it deals a lot with applications and procedures and

01:32:49.320 --> 01:32:50.800
 whatnot.

01:32:50.800 --> 01:32:57.120
 We had to deal with some clarifications and aligning with provisions of the Texas Local

01:32:57.120 --> 01:33:00.680
 Government Code that was introduced in 2019.

01:33:00.680 --> 01:33:05.800
 So I appreciate your patience, and hopefully we can move forward with some of those to

01:33:05.800 --> 01:33:11.120
 help our process and help our development community understand and our general public

01:33:11.120 --> 01:33:15.300
 understand what is required of developments.

01:33:15.300 --> 01:33:20.920
 So the slide that you see here is our future agenda items, stuff that we are currently

01:33:20.920 --> 01:33:22.080
 working on.

01:33:22.080 --> 01:33:28.400
 And as you can see, number two, we talked about just a minute ago or two, where the

01:33:28.400 --> 01:33:35.640
 building height with an SUP is something that we're reconsidering, because as Richard mentioned,

01:33:35.640 --> 01:33:44.600
 there are other provisions that address some of the impacts that might bring in that situation.

01:33:44.600 --> 01:33:48.460
 Dimensional standards, number one, table of allowed uses.

01:33:48.460 --> 01:33:55.040
 We have a number of uses that we would like to introduce and/or modify.

01:33:55.040 --> 01:33:59.860
 Use specific standards, again, as it relates to a specific, sorry, a use.

01:33:59.860 --> 01:34:07.400
 We want to modify and address some of the issues or concerns that we have experienced

01:34:07.400 --> 01:34:11.120
 as a result of applying the development code.

01:34:11.120 --> 01:34:16.360
 Short-term rental is something that's come up, I won't say recently, but when the code

01:34:16.360 --> 01:34:17.360
 was updated.

01:34:17.360 --> 01:34:23.160
 And accessory dwelling units is another hot topic that we will also want to share with

01:34:23.160 --> 01:34:26.860
 you all and talk about in an upcoming meeting.

01:34:26.860 --> 01:34:34.640
 And then SUP chapter seven, which is number seven, is a list of development standards.

01:34:34.640 --> 01:34:40.200
 And you see there, we have parking, we have landscaping.

01:34:40.200 --> 01:34:41.800
 I won't say there's a lot there.

01:34:41.800 --> 01:34:50.280
 We just have some clarifications and/or modifications that we feel is more in line with the trends

01:34:50.280 --> 01:34:52.760
 and what's happening in current practice.

01:34:52.760 --> 01:34:57.640
 So we want to make sure that we address those as part of these code amendments.

01:34:57.640 --> 01:35:03.080
 So just going to give you a little bit of what to expect in the upcoming meetings as

01:35:03.080 --> 01:35:09.520
 we bring forward additional code amendments to the Planning Zoning Commission.

01:35:09.520 --> 01:35:11.640
 And so that concludes my presentation.

01:35:11.640 --> 01:35:19.800
 And again, I appreciate your patience and I'll stand for any other questions.

01:35:19.800 --> 01:35:22.960
 Any questions for Ron?

01:35:22.960 --> 01:35:25.800
 Ron, I don't see any.

01:35:25.800 --> 01:35:28.520
 Thanks for the in-depth analysis on some of these code amendments.

01:35:28.520 --> 01:35:30.000
 Looking forward to the next presentation.

01:35:30.000 --> 01:35:31.000
 Great.

01:35:31.000 --> 01:35:32.000
 Thank you.

01:35:32.000 --> 01:35:36.800
 Just by way of point, does this go down to council or on to council for a vote or what's

01:35:36.800 --> 01:35:40.240
 the actual next steps from the information we received tonight?

01:35:40.240 --> 01:35:45.900
 So this would be a code amendment to the development code, which requires an ordinance and which

01:35:45.900 --> 01:35:49.640
 requires a public hearing with the Planning Zoning Commission.

01:35:49.640 --> 01:35:57.640
 So your vote and your recommendation would be made at a future public hearing and that's

01:35:57.640 --> 01:36:00.000
 where these would come next.

01:36:00.000 --> 01:36:01.000
 Great.

01:36:01.000 --> 01:36:03.280
 Christian or Beck?

01:36:03.280 --> 01:36:09.080
 To that exact point, can we expect that after all the presentations or we're going to go

01:36:09.080 --> 01:36:10.760
 section by section?

01:36:10.760 --> 01:36:16.520
 My hope is that we can do them by sub chapters or at least by category so that it's a little

01:36:16.520 --> 01:36:25.000
 bit more, I guess, easier, I don't know if that's the right word, to bring forward both

01:36:25.000 --> 01:36:28.000
 through the Planning Zoning Commission as well to say council.

01:36:28.000 --> 01:36:29.000
 Okay.

01:36:29.000 --> 01:36:30.200
 I was going to recommend that.

01:36:30.200 --> 01:36:32.160
 So thank you.

01:36:32.160 --> 01:36:35.760
 All right.

01:36:35.760 --> 01:36:38.760
 Thank you, Ron.

01:36:38.760 --> 01:36:46.480
 Real fast by just point of updating the agenda and some things on record first, let the record

01:36:46.480 --> 01:36:49.600
 show that Commissioner Smith and Commissioner Anderson have joined us.

01:36:49.600 --> 01:36:52.880
 Welcome to the meeting, guys.

01:36:52.880 --> 01:36:58.280
 Second, as you'll note, in my top left square, I'm not sure where he sits on your screen,

01:36:58.280 --> 01:37:01.800
 we have Mack Rinewand with us this evening.

01:37:01.800 --> 01:37:08.240
 Cynthia Kirchhoff is moving on to greener pastures, apparently, and so Mack is going

01:37:08.240 --> 01:37:12.600
 to be our city attorney serving with us for the time being.

01:37:12.600 --> 01:37:17.040
 I don't know how long we have the pleasure of Mack being with us, but Mack, welcome to

01:37:17.040 --> 01:37:18.320
 Planning and Zoning.

01:37:18.320 --> 01:37:19.320
 Thank you.

01:37:19.320 --> 01:37:21.280
 It's a pleasure.

01:37:21.280 --> 01:37:24.840
 Next to that, just some clarification on some of the agenda this evening.

01:37:24.840 --> 01:37:27.760
 One, our consent agenda is empty.

01:37:27.760 --> 01:37:32.720
 However, because of a legislature, something happened in which the minutes got put into

01:37:32.720 --> 01:37:39.320
 the IC, item D. We usually hear those first and outside of IC, we're just going to hear

01:37:39.320 --> 01:37:40.400
 them in order.

01:37:40.400 --> 01:37:45.640
 So that's going to be a little bit of a hiccup between C and E. We'll just listen, take a

01:37:45.640 --> 01:37:47.800
 quick vote for the minutes.

01:37:47.800 --> 01:37:51.200
 Also there was an update to the minutes that hopefully everyone received.

01:37:51.200 --> 01:37:55.000
 There are some corrections there that have been made.

01:37:55.000 --> 01:38:01.600
 If you haven't seen those, let someone know so you can review those.

01:38:01.600 --> 01:38:08.720
 Next is on the -- there is one item on the individual consideration where we got a late

01:38:08.720 --> 01:38:12.720
 update to the plat, and so staff has changed the recommendation, but we'll certainly hear

01:38:12.720 --> 01:38:14.800
 that in turn.

01:38:14.800 --> 01:38:22.160
 And then lastly, item 5C is being pulled.

01:38:22.160 --> 01:38:24.840
 The city is asking to postpone that.

01:38:24.840 --> 01:38:31.120
 And as noted in the agenda, item 5D is -- and DOG is being pulled.

01:38:31.120 --> 01:38:33.520
 So we have two public hearing items this evening.

01:38:33.520 --> 01:38:38.360
 Richard, I think I covered all of the changes, did I miss anything?

01:38:38.360 --> 01:38:39.360
 I think you got it.

01:38:39.360 --> 01:38:42.640
 I know Haley, I think they just circulated another plat, so we want to make sure everyone

01:38:42.640 --> 01:38:43.640
 got it.

01:38:43.640 --> 01:38:46.120
 If not, she'll be able to go through that here in a second.

01:38:46.120 --> 01:38:47.120
 Okay.

01:38:47.120 --> 01:38:48.120
 Sounds good.

01:38:48.120 --> 01:38:49.120
 Well, let's just dive into this.

01:38:49.120 --> 01:38:53.480
 Let's just start with item 4A, and we'll work from there.

01:38:53.480 --> 01:38:57.960
 This is Corrina Maldonado's item for preliminary plat.

01:38:57.960 --> 01:39:02.160
 Hi, can you hear me?

01:39:02.160 --> 01:39:03.160
 We can.

01:39:03.160 --> 01:39:04.160
 Okay.

01:39:04.160 --> 01:39:05.160
 Good evening, everyone.

01:39:05.160 --> 01:39:09.400
 So today, I'm presenting preliminary plat 20-0022.

01:39:09.400 --> 01:39:16.840
 This is a preliminary plat for Country Club Village Phase 4 for a proposed 13 residential

01:39:16.840 --> 01:39:17.840
 lots.

01:39:17.840 --> 01:39:26.920
 This was initially recommended as denial since the posting of the agenda and tonight, or

01:39:26.920 --> 01:39:33.080
 a couple hours ago, they have now met all the minimum requirements of our DDC and are

01:39:33.080 --> 01:39:37.160
 now being recommended for approval.

01:39:37.160 --> 01:39:39.600
 Great.

01:39:39.600 --> 01:39:44.680
 Any questions for Corrina?

01:39:44.680 --> 01:39:45.680
 I don't see any.

01:39:45.680 --> 01:39:48.360
 Thank you, Corrina.

01:39:48.360 --> 01:40:03.480
 Next is Haley with item 4B, FP 20-0025.

01:40:03.480 --> 01:40:22.920
 All right, let me unmute myself there.

01:40:22.920 --> 01:40:25.600
 This is the final plat for the Woodmere edition.

01:40:25.600 --> 01:40:29.960
 This is a residential subdivision that was previously approved through a PD that some

01:40:29.960 --> 01:40:32.600
 of you may remember from last year.

01:40:32.600 --> 01:40:36.840
 There are 151 residential lots and five open-space lots.

01:40:36.840 --> 01:40:40.840
 At this point, we are recommending denial as we're still working through a few items

01:40:40.840 --> 01:40:45.160
 with the applicant specifically related to the conservation easements and some electric

01:40:45.160 --> 01:40:47.240
 easements that are on the property.

01:40:47.240 --> 01:40:51.320
 So with that, the applicant has requested that extension to December 16th so that we

01:40:51.320 --> 01:40:53.160
 can continue working on those items.

01:40:53.160 --> 01:40:56.200
 I'm happy to answer any questions.

01:40:56.200 --> 01:40:57.200
 Commissioner Beck.

01:40:57.200 --> 01:40:58.200
 Thank you, Chair.

01:40:58.200 --> 01:41:00.360
 Haley, are these the kind of changes?

01:41:00.360 --> 01:41:05.240
 I ask this question often, but are these the kind of changes we can get done by that meeting?

01:41:05.240 --> 01:41:06.240
 Typically?

01:41:06.240 --> 01:41:08.200
 Just say typically?

01:41:08.200 --> 01:41:09.200
 Yeah.

01:41:09.200 --> 01:41:14.440
 We're hoping that we can resolve some of these as you remember from the PD.

01:41:14.440 --> 01:41:17.800
 This is one of the first subdivisions we've had that has conservation easements involved.

01:41:17.800 --> 01:41:22.600
 So that item, for example, is a little tricky, but we are working with MAC and the city attorney's

01:41:22.600 --> 01:41:27.760
 office to work through that expeditiously so that we can get that resolved.

01:41:27.760 --> 01:41:33.160
 So we are hopeful that we can have all of this cleared up by the 16th fairly reasonably.

01:41:33.160 --> 01:41:37.560
 And so to follow up, if it's not, what are the ramifications of that?

01:41:37.560 --> 01:41:43.440
 If we extend, if they're requesting we extend, which is what we typically do, I mean, are

01:41:43.440 --> 01:41:47.580
 there any ramifications if we don't get that resolved?

01:41:47.580 --> 01:41:52.960
 If things are not resolved by the 16th, the plat would, it would have to be acted upon

01:41:52.960 --> 01:41:56.280
 somehow by the commission, either approval or denial.

01:41:56.280 --> 01:41:59.740
 If there are still outstanding items, staff would be recommending denial at that point.

01:41:59.740 --> 01:42:05.640
 And that would, that would mean that the applicant would then have to come back and resubmit

01:42:05.640 --> 01:42:08.880
 at a later date and it would come back before the commission after they do that.

01:42:08.880 --> 01:42:09.880
 Okay.

01:42:09.880 --> 01:42:10.880
 That's what I expected.

01:42:10.880 --> 01:42:12.840
 And then I will follow up on a slightly different issue.

01:42:12.840 --> 01:42:17.960
 Did we ever resolve what was going on with the plat not being available or was that just

01:42:17.960 --> 01:42:19.240
 me?

01:42:19.240 --> 01:42:20.920
 I believe that was a glitch in legislature.

01:42:20.920 --> 01:42:23.520
 It was not just you from what I can tell.

01:42:23.520 --> 01:42:25.560
 I had the same issue when I tried to access it.

01:42:25.560 --> 01:42:26.560
 Okay.

01:42:26.560 --> 01:42:27.560
 Thank you.

01:42:27.560 --> 01:42:29.520
 Any other questions for Haley?

01:42:29.520 --> 01:42:30.520
 Great.

01:42:30.520 --> 01:42:44.960
 We're going to jump back to Karina for item C, PP20-0026.

01:42:44.960 --> 01:42:45.960
 I'm sorry.

01:42:45.960 --> 01:42:46.960
 Can you hear me now?

01:42:46.960 --> 01:42:47.960
 We can.

01:42:47.960 --> 01:42:48.960
 All right.

01:42:48.960 --> 01:42:58.040
 So this is PP20-0026 for a preliminary plat for a property at 100 North Loop 288.

01:42:58.040 --> 01:43:06.200
 The preliminary plat is for a subdivision of five commercial lots.

01:43:06.200 --> 01:43:10.920
 The applicant has some outstanding comments, so we are recommending denial.

01:43:10.920 --> 01:43:17.720
 However, they have requested a 30-day extension to the December 16th, 2020 planning and zoning

01:43:17.720 --> 01:43:19.400
 commission meeting.

01:43:19.400 --> 01:43:22.960
 And with that, I can take any questions.

01:43:22.960 --> 01:43:23.960
 Yeah.

01:43:23.960 --> 01:43:26.820
 We got one from Commissioner Anderson.

01:43:26.820 --> 01:43:30.240
 Thank you, Chair.

01:43:30.240 --> 01:43:31.640
 I have a quick question.

01:43:31.640 --> 01:43:39.440
 It says on the item title that it's located on the west side of Loop 288.

01:43:39.440 --> 01:43:41.320
 To me, it looks like it's on the east side of Loop 288.

01:43:41.320 --> 01:43:42.320
 Is that correct?

01:43:42.320 --> 01:43:43.320
 Yep.

01:43:43.320 --> 01:43:44.320
 That is a typo.

01:43:44.320 --> 01:43:45.320
 I apologize.

01:43:45.320 --> 01:43:48.040
 Loop 288, East 288, North of McKinney.

01:43:48.040 --> 01:43:49.040
 Yes.

01:43:49.040 --> 01:43:50.040
 Okay.

01:43:50.040 --> 01:43:51.040
 That's what I saw.

01:43:51.040 --> 01:43:54.040
 I just want to make sure I wasn't reading it wrong.

01:43:54.040 --> 01:43:55.040
 All right.

01:43:55.040 --> 01:43:57.200
 I don't see any other questions for you, Karina.

01:43:57.200 --> 01:44:02.000
 Thank you very much.

01:44:02.000 --> 01:44:04.600
 As previously noted, we're going to awkwardly jump into minutes.

01:44:04.600 --> 01:44:06.800
 Any other corrections for minutes?

01:44:06.800 --> 01:44:10.360
 Do we need any updates?

01:44:10.360 --> 01:44:14.400
 Did anyone not get the updated notes from city staff regarding lines?

01:44:14.400 --> 01:44:17.920
 I think 36 and 37.

01:44:17.920 --> 01:44:18.920
 Okay.

01:44:18.920 --> 01:44:23.200
 Seeing no hands or any motion of any kind, we're just going to proceed forward here.

01:44:23.200 --> 01:44:50.160
 From EPP20-0024B, where we'll go to Sean Jacobson for presentation.

01:44:50.160 --> 01:44:51.160
 All right.

01:44:51.160 --> 01:44:58.040
 So presenting PP20-0024, as you know, sent this out today.

01:44:58.040 --> 01:44:59.600
 We are now recommending approval.

01:44:59.600 --> 01:45:06.480
 It's a plat of a single lot for development of a medical clinic, and they have resolved

01:45:06.480 --> 01:45:11.400
 the outstanding issue related to the water line and the easement associated with it.

01:45:11.400 --> 01:45:16.000
 So they now meet all the criteria for approval.

01:45:16.000 --> 01:45:18.160
 Thanks, Sean.

01:45:18.160 --> 01:45:22.400
 Any questions for Mr. Jacobson?

01:45:22.400 --> 01:45:25.080
 All right.

01:45:25.080 --> 01:45:28.640
 Seeing none, we'll go to the next item, which brings us to Haley again.

01:45:28.640 --> 01:45:32.920
 Item FFR20-007B.

01:45:32.920 --> 01:45:47.140
 All right, good evening again.

01:45:47.140 --> 01:45:52.720
 This is a replat for two commercial lots at McKinney and Glengarry Way.

01:45:52.720 --> 01:45:57.480
 You may have noticed an email was just sent to you about 20 minutes ago with a revised

01:45:57.480 --> 01:45:59.400
 copy of this plat.

01:45:59.400 --> 01:46:04.880
 If you haven't seen that yet, the applicant was able to work quickly this afternoon and

01:46:04.880 --> 01:46:09.400
 address the remaining comments that staff had on this, so I can walk you briefly through

01:46:09.400 --> 01:46:11.340
 those changes.

01:46:11.340 --> 01:46:14.400
 There was an update to a couple of notes.

01:46:14.400 --> 01:46:19.840
 I believe it's note 10 regarding the tree preservation was updated, and then note five

01:46:19.840 --> 01:46:25.960
 was updated regarding the proximity of the floodplain and the requirement for base flood

01:46:25.960 --> 01:46:26.960
 elevation.

01:46:26.960 --> 01:46:31.760
 Additionally, this access easement was removed as it was unnecessary, and then a couple of

01:46:31.760 --> 01:46:36.040
 references on here for easements that are to be dedicated by separate instrument were

01:46:36.040 --> 01:46:37.040
 updated.

01:46:37.040 --> 01:46:38.040
 So fairly simple items.

01:46:38.040 --> 01:46:42.080
 They were able to make those changes today, and staff is changing our recommendation to

01:46:42.080 --> 01:46:46.200
 approval since it now meets all of the criteria for approval.

01:46:46.200 --> 01:46:50.100
 I'm happy to answer any questions.

01:46:50.100 --> 01:46:51.100
 Commissioner Smith.

01:46:51.100 --> 01:46:52.100
 Thank you, Chair.

01:46:52.100 --> 01:46:56.480
 Haley, you'll change that on the PowerPoint before the meeting, correct?

01:46:56.480 --> 01:46:57.480
 Yes.

01:46:57.480 --> 01:47:03.200
 I wanted to double check and make sure that says that, so we don't look at it and see

01:47:03.200 --> 01:47:06.000
 it and book denial or something like that.

01:47:06.000 --> 01:47:10.720
 Yes, I intend to do that after the work session.

01:47:10.720 --> 01:47:14.520
 I do not see any other questions, but Haley, thanks for working with the applicant even

01:47:14.520 --> 01:47:17.680
 to the last minute to get that taken care of.

01:47:17.680 --> 01:47:19.400
 Excuse me.

01:47:19.400 --> 01:47:23.040
 Next item is Ron Manguita.

01:47:23.040 --> 01:47:25.000
 He gets to come back.

01:47:25.000 --> 01:47:26.000
 Item G, FR20-0016.

01:47:26.000 --> 01:47:27.000
 Thank you, Chair.

01:47:27.000 --> 01:47:40.960
 I'll bring up the presentation real quick.

01:47:40.960 --> 01:47:47.600
 So this final replat is for a property you probably have seen before.

01:47:47.600 --> 01:47:55.500
 It recently, I had a preliminary plat as well as adjacent replats for this development.

01:47:55.500 --> 01:47:57.960
 It's called Eagle Creek.

01:47:57.960 --> 01:48:00.260
 It is being recommended for denial.

01:48:00.260 --> 01:48:04.960
 There is a section of the code that speaks to HOA documents.

01:48:04.960 --> 01:48:13.760
 The applicant has not satisfied the comments yet, but we hope that that would be done soon.

01:48:13.760 --> 01:48:20.640
 The applicant as part of this presentation has requested the 30-day extension, and the

01:48:20.640 --> 01:48:24.440
 staff does not have any opposition to that request.

01:48:24.440 --> 01:48:31.680
 Just really quickly, I wanted to share a concept plan, a phasing plan of the area that we're

01:48:31.680 --> 01:48:32.680
 looking at.

01:48:32.680 --> 01:48:40.280
 I'm just going to give you some context that Eagle Creek will have more development applications

01:48:40.280 --> 01:48:46.320
 or plots being brought forward to the commission, so I just want to give you some overall idea

01:48:46.320 --> 01:48:51.780
 of what this area is going to be looking like in the future.

01:48:51.780 --> 01:49:02.840
 But again, as for today's consideration, we're looking at Phase 1A of that development.

01:49:02.840 --> 01:49:04.400
 Any questions for Ron?

01:49:04.400 --> 01:49:08.120
 All right, Chris, you're back.

01:49:08.120 --> 01:49:16.280
 Sorry, I was in the wrong window, I apologize.

01:49:16.280 --> 01:49:26.280
 The common area is this is the HOA lot that is overlapping the KEPT wellhead, or is this

01:49:26.280 --> 01:49:29.640
 just HOA documents in general?

01:49:29.640 --> 01:49:32.840
 This is just for the common area documents in general.

01:49:32.840 --> 01:49:35.120
 This is just for the common areas, the open space.

01:49:35.120 --> 01:49:36.120
 Okay.

01:49:36.120 --> 01:49:37.120
 All right.

01:49:37.120 --> 01:49:38.120
 Thank you.

01:49:38.120 --> 01:49:41.320
 Any other questions?

01:49:41.320 --> 01:49:43.680
 Great.

01:49:43.680 --> 01:49:45.720
 Thank you, Ron.

01:49:45.720 --> 01:49:49.480
 That moves us to our two public hearing items.

01:49:49.480 --> 01:49:51.840
 The first one is presented by Haley Zygursky.

01:49:51.840 --> 01:49:55.840
 It's item 5A, Z20-0009.

01:49:55.840 --> 01:50:06.400
 Haley, whenever you're ready, the floor is yours.

01:50:06.400 --> 01:50:21.840
 All right, let me get the presentation pulled up here.

01:50:21.840 --> 01:50:45.720
 All right, this is Project Z20-0009, known as Urban Logistics 35.

01:50:45.720 --> 01:50:49.080
 The request before you tonight is kind of twofold.

01:50:49.080 --> 01:50:52.760
 There are two separate aspects to the zoning request.

01:50:52.760 --> 01:50:56.360
 First is a rezoning from Highway Corridor to Light Industrial.

01:50:56.360 --> 01:51:00.600
 That's on about 10 and a half acres, which is outlined in orange here on the map.

01:51:00.600 --> 01:51:04.920
 And then the second part of the request is for 13 acres to the south of that, which is

01:51:04.920 --> 01:51:10.220
 rezoning from Heavy Industrial to Light Industrial, and that area is shown here in yellow.

01:51:10.220 --> 01:51:16.540
 Both of these are part of a larger property that is currently owned by Acme Brick.

01:51:16.540 --> 01:51:19.760
 There was a gas well previously located on this northern end of the property that was

01:51:19.760 --> 01:51:26.560
 plugged in 2019 in anticipation of this area being redeveloped with some more commercial

01:51:26.560 --> 01:51:29.020
 or industrial type uses.

01:51:29.020 --> 01:51:34.940
 And the proposal with this rezoning is to combine these two pieces with the area adjacent

01:51:34.940 --> 01:51:39.160
 here that is currently zoned LI for a total of 35 acres that would be developed with a

01:51:39.160 --> 01:51:43.320
 mixture of Light Industrial and warehouse uses.

01:51:43.320 --> 01:51:46.380
 This is a look at the current versus proposed zoning maps.

01:51:46.380 --> 01:51:50.640
 You can see if you're looking at the total 35 acres that they would be seeking to develop,

01:51:50.640 --> 01:51:55.340
 there are three zoning districts on it, so they're looking to consolidate that into one

01:51:55.340 --> 01:52:00.460
 consistent zoning of LI across the entire property.

01:52:00.460 --> 01:52:06.200
 So there are multiple criteria for approval, as we've seen with rezoning requests previously.

01:52:06.200 --> 01:52:09.580
 These general criteria are outlined in full detail in your backup, so I won't go through

01:52:09.580 --> 01:52:13.920
 them here tonight, but we did find that they meet all of these criteria.

01:52:13.920 --> 01:52:20.360
 And then specifically, we'll look at the seven criteria that are specific to zoning applications.

01:52:20.360 --> 01:52:24.560
 So the first of those is consistency with our comprehensive plan, specifically with

01:52:24.560 --> 01:52:26.960
 the future land use element of that plan.

01:52:26.960 --> 01:52:30.720
 As you can see here, this site is designated for industrial commerce.

01:52:30.720 --> 01:52:35.200
 There is a sharp transition here on the east side of it, as there is a multifamily that's

01:52:35.200 --> 01:52:39.160
 been developed since approximately the mid-'80s on the property adjacent.

01:52:39.160 --> 01:52:43.900
 But this property itself is industrial commerce, which is intended for that mixture of both

01:52:43.900 --> 01:52:46.480
 light and heavy industrial uses.

01:52:46.480 --> 01:52:50.960
 The comp plan references warehousing, manufacturing, and various industrial processes as part of

01:52:50.960 --> 01:52:51.960
 that.

01:52:51.960 --> 01:52:54.880
 So LI would be consistent with that designation.

01:52:54.880 --> 01:52:59.920
 The light industrial district permits warehousing and distribution, as well as low-impact manufacturing

01:52:59.920 --> 01:53:02.920
 uses.

01:53:02.920 --> 01:53:06.640
 Another of our criteria is consistency with the purpose statement for the district.

01:53:06.640 --> 01:53:12.240
 So the LI district, again, describes that intent to provide highly accessible locations

01:53:12.240 --> 01:53:18.280
 for lighter industrial activity, such as manufacturing, assembly, warehousing, and distribution.

01:53:18.280 --> 01:53:21.680
 So this request would be consistent with that purpose statement that the site is highly

01:53:21.680 --> 01:53:23.800
 accessible along I-35.

01:53:23.800 --> 01:53:28.040
 It would be a continuation of that existing zoning pattern that they have to the south

01:53:28.040 --> 01:53:31.720
 on the Acmebrick site that's light industrial today.

01:53:31.720 --> 01:53:35.360
 And it would be reducing the intensity of zoning adjacent to that multifamily where

01:53:35.360 --> 01:53:37.240
 there's heavy industrial today.

01:53:37.240 --> 01:53:44.080
 This would decrease the intensity of the uses that are permitted there and make it a little

01:53:44.080 --> 01:53:48.320
 more compatible than it is today.

01:53:48.320 --> 01:53:52.000
 One of our other criteria is, rather, there have been significant changes that would warrant

01:53:52.000 --> 01:53:53.280
 the rezoning.

01:53:53.280 --> 01:53:56.380
 So I wanted to go a little bit through the history of this site.

01:53:56.380 --> 01:54:00.360
 This split zoning that you see has been in place since 2002, when the citywide rezoning

01:54:00.360 --> 01:54:04.800
 occurred with the adoption of the 2002 DDC.

01:54:04.800 --> 01:54:10.760
 Prior to that, since 1969, the site had had a solid heavy industrial zoning classification

01:54:10.760 --> 01:54:14.120
 across the entire property all the way up to the I-35.

01:54:14.120 --> 01:54:18.000
 So since 2002, it's had this split zoning on the site.

01:54:18.000 --> 01:54:22.880
 Those districts, as you know, directly transitioned from the O2 districts to 2019.

01:54:22.880 --> 01:54:27.200
 So now that they have a kind of higher purpose, if you will, for this site than just vacant

01:54:27.200 --> 01:54:31.120
 land with a gas well, they are looking to consolidate that so that it can be developed

01:54:31.120 --> 01:54:37.540
 in a consistent manner and be more consistent with our comprehensive plan.

01:54:37.540 --> 01:54:43.640
 And then looking at potential impacts to surrounding property, the LI district is consistent with

01:54:43.640 --> 01:54:44.640
 the zoning in this area.

01:54:44.640 --> 01:54:48.160
 As you can see, a large portion of ACME site and some of the other properties along Fort

01:54:48.160 --> 01:54:51.120
 Worth Drive are already zoned LI in this area.

01:54:51.120 --> 01:54:55.240
 And it's important to note, as I mentioned earlier, currently we have heavy industrial

01:54:55.240 --> 01:54:59.200
 immediately adjacent to an existing multifamily development.

01:54:59.200 --> 01:55:03.500
 This would be decreasing the intensity of uses that could go in this area and making

01:55:03.500 --> 01:55:06.840
 this more compatible with the adjacent multifamily.

01:55:06.840 --> 01:55:11.520
 The DDC would still require any development under LI or HI to have compatibility buffers

01:55:11.520 --> 01:55:17.080
 in place, but this would reduce some of those more nuisance potential uses that are permitted

01:55:17.080 --> 01:55:22.840
 in HI and would create more compatibility in the area.

01:55:22.840 --> 01:55:26.800
 So I just wanted to show you briefly an example of the industrial uses permitted in these

01:55:26.800 --> 01:55:27.800
 three districts.

01:55:27.800 --> 01:55:29.440
 The ones shown in red are those that are different.

01:55:29.440 --> 01:55:34.560
 So you can see many uses that HI would permit either by right or with an SUP would not be

01:55:34.560 --> 01:55:36.840
 permitted with this rezoning.

01:55:36.840 --> 01:55:40.560
 Even medium impact manufacturing would require a specific use permit that would come back

01:55:40.560 --> 01:55:44.960
 before the PNZ and council if they sought to develop that in LI.

01:55:44.960 --> 01:55:50.360
 So this would be taking away some of those uses that could be more noxious, such as feedlots

01:55:50.360 --> 01:55:55.680
 or storage of hazardous materials, for example.

01:55:55.680 --> 01:56:00.960
 And then looking at the final criteria, which is the availability of facilities and services

01:56:00.960 --> 01:56:02.800
 to serve the property.

01:56:02.800 --> 01:56:06.520
 Looking first at transportation, you can see here that the property does have frontage

01:56:06.520 --> 01:56:10.360
 and would take access directly off of the I-35 service road.

01:56:10.360 --> 01:56:17.020
 This corridor between 377 and FM 2181 or Teasley is slated for improvements by tech stop.

01:56:17.020 --> 01:56:23.800
 Their plans currently show a five to 10 year construction as the timeline for this segment.

01:56:23.800 --> 01:56:27.480
 So with those improvements, access to the site would be more than adequate.

01:56:27.480 --> 01:56:32.000
 The applicant did provide some trip generation for a preliminary analysis.

01:56:32.000 --> 01:56:38.520
 They based it off of the development of almost 450,000 square feet of warehouse on not just

01:56:38.520 --> 01:56:42.520
 this property, but also that adjacent site that I mentioned as part of their total 35

01:56:42.520 --> 01:56:44.640
 acres that they're looking at.

01:56:44.640 --> 01:56:52.920
 And the trips that they proposed would be a 770 total daily trips, 76 AM peak and 85

01:56:52.920 --> 01:56:54.180
 AM peak trips.

01:56:54.180 --> 01:56:58.960
 So with those, they did not trigger the need for a transportation impact analysis at this

01:56:58.960 --> 01:57:03.680
 point in time, but that will be further analyzed once they submit for a zoning compliance plan

01:57:03.680 --> 01:57:07.080
 or plan.

01:57:07.080 --> 01:57:11.360
 Looking at utilities to serve the area, both water and sewer facilities are available adjacent

01:57:11.360 --> 01:57:14.160
 to the site along the I-35 frontage road.

01:57:14.160 --> 01:57:21.240
 So these lines would be extended and continued internally to serve any future development.

01:57:21.240 --> 01:57:25.600
 And then finally, a public notification was provided regarding this case.

01:57:25.600 --> 01:57:30.240
 We received no responses prior to this meeting.

01:57:30.240 --> 01:57:33.360
 And staff is recommending approval of this request as we found it to meet all of those

01:57:33.360 --> 01:57:34.740
 criteria for approval.

01:57:34.740 --> 01:57:39.960
 And I will stop sharing now and I'm happy to answer any questions.

01:57:39.960 --> 01:57:40.960
 Thank you, Haley.

01:57:40.960 --> 01:57:46.120
 I do not see any questions, thorough presentation.

01:57:46.120 --> 01:57:53.440
 The next item of business is item 5B, AESA 20-0006A.

01:57:53.440 --> 01:58:00.440
 And Christy Upton is here to present this.

01:58:00.440 --> 01:58:27.440
 Good evening, Christy Upton, and tonight I will be discussing an alternative ESA plan

01:58:27.440 --> 01:58:35.200
 for the same property that Haley just presented.

01:58:35.200 --> 01:58:48.360
 The request is for the Acme Bricks site and related to the zoning request, and the request

01:58:48.360 --> 01:58:54.600
 is to permanently remove 1.26 acres of riparian buffer.

01:58:54.600 --> 01:59:07.160
 Prior to this request, there was a field assessment requested by Acme Bricks company to identify

01:59:07.160 --> 01:59:12.760
 the riparian buffers, confirm the riparian buffers on the site.

01:59:12.760 --> 01:59:20.280
 There is a femoral stream that is a tributary of Hay Creek Creek, and the vegetation supporting

01:59:20.280 --> 01:59:24.160
 that creek was found to be in fair condition.

01:59:24.160 --> 01:59:29.720
 Currently these riparian buffers, there's 50 feet on each side of the stream, however,

01:59:29.720 --> 01:59:36.440
 there is a berm that was created for access to the Acme Bricks site.

01:59:36.440 --> 01:59:45.080
 And this berm prevents hydrology to be able to support the riparian buffer vegetation

01:59:45.080 --> 01:59:47.120
 on the west side of the creek.

01:59:47.120 --> 01:59:52.880
 And since that vegetation does not exist, the protection requirements were removed from

01:59:52.880 --> 01:59:55.520
 the west side.

01:59:55.520 --> 02:00:05.160
 I also wanted to bring attention to the, there was a citywide map update in 2015, originally

02:00:05.160 --> 02:00:15.480
 when the code was adopted in 2002, a citywide map was adopted that, where it kind of, it

02:00:15.480 --> 02:00:23.080
 was a placeholder of areas that look like it would be able to meet the criteria of these

02:00:23.080 --> 02:00:24.080
 ESAs.

02:00:24.080 --> 02:00:32.440
 One of those areas, the cross timbers upland habitat, if you're familiar, one of the requirements

02:00:32.440 --> 02:00:38.240
 of the upland habitat to be protected is that it has to meet the criteria of greater than

02:00:38.240 --> 02:00:40.040
 10 acres.

02:00:40.040 --> 02:00:48.240
 And in 2015, the citywide update identified areas that both did not meet 10 acres and

02:00:48.240 --> 02:00:55.920
 unlikely would ever meet the 10 acre criteria for that protection requirement.

02:00:55.920 --> 02:01:04.320
 And these areas were all identified as the protection requirements being removed.

02:01:04.320 --> 02:01:14.040
 And these areas that are located on the ACME site were part of that citywide update.

02:01:14.040 --> 02:01:22.440
 Since the request is to remove the 1.26 acres, and that is because the applicant is, or the

02:01:22.440 --> 02:01:30.800
 future development is requesting to construct the warehousing in an area that overlays with

02:01:30.800 --> 02:01:32.400
 that riparian buffer.

02:01:32.400 --> 02:01:41.000
 In addition, in order to maintain the access to ACME brick, there will be further removal

02:01:41.000 --> 02:01:45.480
 of some of the riparian buffer to the south of these warehouse development.

02:01:45.480 --> 02:01:52.120
 Can, Christy, I'm going to pause you real fast, Christy or Bec, did you have a question?

02:01:52.120 --> 02:01:54.800
 Yes, thank you, Chair.

02:01:54.800 --> 02:01:59.120
 Christy, what, who is the source of the 10 acre definition?

02:01:59.120 --> 02:02:01.240
 Is that a state level?

02:02:01.240 --> 02:02:02.720
 Is that a Denton level?

02:02:02.720 --> 02:02:03.720
 I'm sorry.

02:02:03.720 --> 02:02:05.200
 What is the source of that minimum?

02:02:05.200 --> 02:02:06.200
 I'm sorry.

02:02:06.200 --> 02:02:07.200
 Oh, yeah.

02:02:07.200 --> 02:02:08.200
 No.

02:02:08.200 --> 02:02:09.200
 Again.

02:02:09.200 --> 02:02:10.200
 Yeah.

02:02:10.200 --> 02:02:12.280
 I don't know what's going on with my microphone.

02:02:12.280 --> 02:02:14.600
 What's the source of the 10 acres definition?

02:02:14.600 --> 02:02:17.320
 That's a local code.

02:02:17.320 --> 02:02:18.320
 Okay.

02:02:18.320 --> 02:02:21.840
 That was a local decision.

02:02:21.840 --> 02:02:29.880
 So you know, hypothetically, if our code was five, then when we would be bumping up against

02:02:29.880 --> 02:02:35.720
 this as a definition of a forested region, because this is, well, I guess it's 4.7 or

02:02:35.720 --> 02:02:36.720
 something like that.

02:02:36.720 --> 02:02:40.760
 Let's say it was four, then we would be bumping up against it.

02:02:40.760 --> 02:02:41.760
 Okay.

02:02:41.760 --> 02:02:42.760
 Correct.

02:02:42.760 --> 02:02:47.080
 And we make no special exceptions for having adjacent, I thought there was provisions in

02:02:47.080 --> 02:02:53.480
 one section for being adjacent to another upland habitat region, like you see to the

02:02:53.480 --> 02:02:58.040
 northeast, that that doesn't apply because this is under TAN, right?

02:02:58.040 --> 02:03:00.920
 No, actually, that's not in the code.

02:03:00.920 --> 02:03:07.080
 There's no, there's nothing specific about adjacency in the code.

02:03:07.080 --> 02:03:13.840
 It's something that we have put in this future criteria manual or document that environmental

02:03:13.840 --> 02:03:22.360
 services will be publishing, where we encourage the preservation of these habitats that are

02:03:22.360 --> 02:03:26.960
 adjacent to other habitats so that you create these transitions.

02:03:26.960 --> 02:03:38.080
 That's a preferable preservation because you have greater area in allowance for migration

02:03:38.080 --> 02:03:41.720
 between different habitat types.

02:03:41.720 --> 02:03:43.960
 All right.

02:03:43.960 --> 02:03:46.480
 Thank you.

02:03:46.480 --> 02:03:59.160
 So part of the mitigation that is being offered to offset for the removal of the riparian

02:03:59.160 --> 02:04:05.720
 buffer is related to the detention bases that will be constructed.

02:04:05.720 --> 02:04:13.680
 The applicant is proposing to support these warehousing developments that they will need

02:04:13.680 --> 02:04:21.760
 to construct the detention basin system in order to intercept the storm water flow.

02:04:21.760 --> 02:04:29.520
 And part of that will be to construct it per the City of Denton storm water design standards.

02:04:29.520 --> 02:04:37.520
 And for the purpose of offsetting the ecological services that are being removed from the riparian

02:04:37.520 --> 02:04:49.160
 buffer, the applicant is offering to construct these habitat uplift with native grasses and

02:04:49.160 --> 02:04:58.160
 herbaceous plants, wetland, drain fields and wildflower mix that will allow for migratory

02:04:58.160 --> 02:05:07.440
 birds and other wildlife to help support those type of habitats in the future.

02:05:07.440 --> 02:05:13.480
 The second type of mitigation that the applicant is proposing is a conservation easement that

02:05:13.480 --> 02:05:20.720
 will be placed over 2.11 acres of cross timbers upland habitat as an upland habitat designation

02:05:20.720 --> 02:05:21.720
 that was removed.

02:05:21.720 --> 02:05:29.200
 Again, that's less than 10 acres total of this habitat that had been identified previously.

02:05:29.200 --> 02:05:37.960
 And thus this area, this forested area has no protection requirements placed over it.

02:05:37.960 --> 02:05:42.960
 And so this conservation easement would place, by placing this conservation easement over

02:05:42.960 --> 02:05:50.520
 that area, it would permanently set aside those 2.11 acres of upland habitat.

02:05:50.520 --> 02:05:56.720
 Not part of this application, but the applicant has mentioned it in their plan and I wanted

02:05:56.720 --> 02:06:01.560
 to bring it to your attention that there's an additional 1.7 acres of remnant, of that

02:06:01.560 --> 02:06:12.200
 remnant forest just north of the conservation easement and along the edge of the multifamily

02:06:12.200 --> 02:06:17.080
 that will be also preserved in order to meet the tree preservation requirements for the

02:06:17.080 --> 02:06:22.600
 development.

02:06:22.600 --> 02:06:23.600
 Yes, Mr. Beck.

02:06:23.600 --> 02:06:24.600
 Yeah.

02:06:24.600 --> 02:06:25.600
 Thank you, Chair.

02:06:25.600 --> 02:06:27.680
 Christine, are those additional 1.7 being included?

02:06:27.680 --> 02:06:31.760
 I wasn't clear in the easement, in the conservation easement?

02:06:31.760 --> 02:06:34.440
 It's not in the conservation easement.

02:06:34.440 --> 02:06:40.760
 It is, and it's not part of this application specifically, but the applicant has mentioned

02:06:40.760 --> 02:06:45.640
 it in the plan and I just wanted to bring it to your attention that that also will be

02:06:45.640 --> 02:06:46.640
 set aside.

02:06:46.640 --> 02:06:49.920
 That is their plans right now.

02:06:49.920 --> 02:06:54.280
 All right, thank you.

02:06:54.280 --> 02:07:05.520
 Notifications were sent out for this proposed project and there were no responses that were

02:07:05.520 --> 02:07:07.000
 received by staff.

02:07:07.000 --> 02:07:13.200
 There was one response, I believe, that was emailed to all the commissioners in opposition.

02:07:13.200 --> 02:07:25.600
 However, that response was from a non-land owner, so that did not get included in this

02:07:25.600 --> 02:07:27.080
 calculation.

02:07:27.080 --> 02:07:33.600
 The recommendation is for approval with the following conditions, that the riparian buffer

02:07:33.600 --> 02:07:42.880
 removal be limited to the 1.26 acres as shown in the plan and that this alternative easement

02:07:42.880 --> 02:07:54.560
 be placed over the 2.11 acres, that the city will be filing that deed or filing that record

02:07:54.560 --> 02:08:00.600
 with the county and that the owner will pay all the applicable fees.

02:08:00.600 --> 02:08:07.480
 And then the applicant will within 14 days of the construction of the detention basins

02:08:07.480 --> 02:08:15.800
 apply the vegetative cover as described in the plan and lastly the two recommended conditions

02:08:15.800 --> 02:08:22.040
 that staff typically places over plans that include vegetation.

02:08:22.040 --> 02:08:31.080
 And with that, I will close those and take any further questions.

02:08:31.080 --> 02:08:38.720
 Thank you, Chair.

02:08:38.720 --> 02:08:43.360
 I noticed that the existing detention pond is getting kept and two more detention ponds

02:08:43.360 --> 02:08:45.160
 are being added.

02:08:45.160 --> 02:08:52.000
 Half of the forest is being removed and replaced with a detention pond to replace the riparian

02:08:52.000 --> 02:08:56.280
 and it feels like I mentioned this in our email, robbing Peter to pay Paul a little

02:08:56.280 --> 02:09:04.080
 bit on our ESA there, but was there any thought to combining the two detention ponds at the

02:09:04.080 --> 02:09:08.080
 south, on the south, half of that forested region?

02:09:08.080 --> 02:09:12.160
 I can't hear you again.

02:09:12.160 --> 02:09:17.640
 I'm sorry, I apologize, I'll say that again.

02:09:17.640 --> 02:09:24.960
 The roughly eight, nine acres of forested region has a detention pond in it and I know

02:09:24.960 --> 02:09:30.440
 that they're proposing putting an additional detention pond in the northern half.

02:09:30.440 --> 02:09:34.960
 And I said, it feels like we're robbing Peter to pay Paul on our environmental language

02:09:34.960 --> 02:09:36.440
 here.

02:09:36.440 --> 02:09:40.800
 I understand we need that drainage field to replace where they're going to put the warehouses

02:09:40.800 --> 02:09:44.280
 and overall I think this plan is really good.

02:09:44.280 --> 02:09:50.240
 And I'm just a little, I'm sad that we are balancing our environmental concerns against

02:09:50.240 --> 02:09:57.560
 each other rather than sort of adopting them fully and the riparian versus the upland habitat.

02:09:57.560 --> 02:10:05.520
 And so my question was, are we precluded from or was there discussion of combining, putting

02:10:05.520 --> 02:10:12.640
 the detention pond together with the southern detention pond that's already in existence

02:10:12.640 --> 02:10:19.560
 and save the forest on the north and put the detention pond on the south?

02:10:19.560 --> 02:10:25.240
 I would have to defer to the applicant on that question.

02:10:25.240 --> 02:10:32.840
 I think this is a design element that best answered by the applicant on why they consider

02:10:32.840 --> 02:10:37.580
 putting the detention basins in that location.

02:10:37.580 --> 02:10:44.760
 Then let me say that, is there anything precluding, if you need more detention pond riparian wet

02:10:44.760 --> 02:10:50.160
 space, is there anything that in our code that precludes us from expanding that addition,

02:10:50.160 --> 02:10:54.160
 that existing detention pond?

02:10:54.160 --> 02:10:55.160
 I don't think so.

02:10:55.160 --> 02:11:03.120
 I don't think that there is anything in the code that would lead to requiring the applicant

02:11:03.120 --> 02:11:10.280
 to design the detention basins in a different manner than what they are proposing.

02:11:10.280 --> 02:11:19.240
 And just keep in mind that that upland habitat, again, was not protected and thus whatever

02:11:19.240 --> 02:11:28.440
 they're setting aside is more than what our code would have required of them.

02:11:28.440 --> 02:11:29.440
 Yes.

02:11:29.440 --> 02:11:30.440
 I appreciate it.

02:11:30.440 --> 02:11:35.400
 I take your point.

02:11:35.400 --> 02:11:40.160
 But as I mentioned earlier, there's sort of that concept that the 10-anchor minimum

02:11:40.160 --> 02:11:47.160
 is our arbitrary standard at the dent level rather than any other standard.

02:11:47.160 --> 02:11:53.120
 And thus, we could potentially petition counsel not for this particular property, mind you,

02:11:53.120 --> 02:11:56.240
 but in general to alter that standard.

02:11:56.240 --> 02:12:00.080
 Okay, I appreciate your responses.

02:12:00.080 --> 02:12:03.080
 Thank you, Christy.

02:12:03.080 --> 02:12:04.880
 Any other questions for Christy?

02:12:04.880 --> 02:12:05.880
 Okay.

02:12:05.880 --> 02:12:10.120
 Seeing none, we can continue on.

02:12:10.120 --> 02:12:12.520
 Thank you for that presentation.

02:12:12.520 --> 02:12:16.440
 Item C and D are being postponed.

02:12:16.440 --> 02:12:21.520
 So that does actually conclude our agenda for our work session.

02:12:21.520 --> 02:12:25.200
 Seeing that, I will close -- oh, Commissioner Ellis.

02:12:25.200 --> 02:12:26.200
 Thank you, Chair.

02:12:26.200 --> 02:12:30.960
 With regard to 5C, are we postponing to a certain date or just indefinitely?

02:12:30.960 --> 02:12:33.600
 It's indefinite with a re-notice.

02:12:33.600 --> 02:12:34.600
 Understood.

02:12:34.600 --> 02:12:35.600
 Thank you.

02:12:35.600 --> 02:12:36.600
 Yep.

02:12:36.600 --> 02:12:37.600
 Okay.

02:12:37.600 --> 02:12:38.600
 I will close the meeting at 614.

02:12:38.600 --> 02:12:41.360
 We'll reconvene back here at 630.

02:12:41.360 --> 02:12:47.040
 Thank you.

02:12:47.040 --> 02:12:50.360
 Good evening, ladies and gentlemen, and welcome to the Planning and Zoning Commission meeting

02:12:50.360 --> 02:12:54.440
 for December 2nd, 2020.

02:12:54.440 --> 02:13:00.080
 Seeing that we do have a quorum here, I will call the meeting to order at 631.

02:13:00.080 --> 02:13:06.440
 The first item for business this evening is to provide a pledge of allegiance to the U.S.

02:13:06.440 --> 02:13:08.680
 and Texas flag.

02:13:08.680 --> 02:13:13.440
 Commissioners, if you'd unmute yourself to join, that's optional.

02:13:13.440 --> 02:13:19.800
 I pledge allegiance to the flag of the United States of America and to the Republic for

02:13:19.800 --> 02:13:29.440
 which it stands, one nation under God, indivisible, with liberty and justice for all.

02:13:29.440 --> 02:13:40.080
 Under the Texas flag, I pledge allegiance to thee, Texas, one state under God, one indivisible.

02:13:40.080 --> 02:13:44.360
 Next item of business is we have no consent agenda this evening, so we'll move right into

02:13:44.360 --> 02:13:52.600
 items for individual consideration, starting with item 4A, PP20-0022B, and I will call

02:13:52.600 --> 02:13:55.160
 Karina Maldonado for presentation.

02:13:55.160 --> 02:13:57.440
 Good evening.

02:13:57.440 --> 02:14:05.280
 This first request for PP20-0022B is for the approval of a preliminary plaque of Country

02:14:05.280 --> 02:14:12.680
 Club Village Phase 4 to the approximately 12.53-acre site located on the northwest corner

02:14:12.680 --> 02:14:18.440
 of Fairview Drive and Clubview Drive in South Denton, City of Denton.

02:14:18.440 --> 02:14:25.240
 The staff was initially a recommendation of denial; however, the applicant has addressed

02:14:25.240 --> 02:14:31.960
 all outstanding comments since the publishing of the agenda, so staff is now recommending

02:14:31.960 --> 02:14:33.440
 approval of this request.

02:14:33.440 --> 02:14:38.160
 A revised plaque was emailed to you tonight.

02:14:38.160 --> 02:14:43.560
 I just want to make note of one change that was not shown previously, this is a correction

02:14:43.560 --> 02:14:51.840
 to the label off Clubview Drive, just to correct the right-of-way labeling, and with that I

02:14:51.840 --> 02:14:54.840
 can take any questions.

02:14:54.840 --> 02:14:55.840
 Thank you.

02:14:55.840 --> 02:14:56.840
 I appreciate it, Karina.

02:14:56.840 --> 02:14:57.840
 I do not see any questions.

02:14:57.840 --> 02:14:59.800
 The Chair will entertain discussion or motion.

02:14:59.800 --> 02:15:00.800
 Commissioner Smith?

02:15:00.800 --> 02:15:01.800
 I make a motion to approve.

02:15:01.800 --> 02:15:04.360
 We have a first for approval.

02:15:04.360 --> 02:15:05.360
 Commissioner Anderson?

02:15:05.360 --> 02:15:06.360
 I second the motion.

02:15:06.360 --> 02:15:07.360
 We have a first and a second.

02:15:07.360 --> 02:15:08.360
 Any discussion?

02:15:08.360 --> 02:15:10.480
 Seeing none, I'll call for a vote via roll call.

02:15:10.480 --> 02:15:11.480
 Commissioner Ellis?

02:15:11.480 --> 02:15:12.480
 Aye.

02:15:12.480 --> 02:15:13.480
 Commissioner Smith?

02:15:13.480 --> 02:15:14.480
 Aye.

02:15:14.480 --> 02:15:15.480
 Commissioner Bec?

02:15:15.480 --> 02:15:16.480
 I think that was an aye.

02:15:16.480 --> 02:15:33.960
 I can't hear you, Commissioner Bec.

02:15:33.960 --> 02:15:38.280
 By signal of a big nod, we're going to go with an aye from Commissioner Bec.

02:15:38.280 --> 02:15:39.280
 Commissioner Anderson?

02:15:39.280 --> 02:15:40.280
 Aye.

02:15:40.280 --> 02:15:43.120
 I can hear that one.

02:15:43.120 --> 02:15:45.160
 Commissioner Cole?

02:15:45.160 --> 02:15:46.640
 This isn't working either.

02:15:46.640 --> 02:15:50.480
 Commissioner Cole, your mic on.

02:15:50.480 --> 02:15:51.480
 We got a thumbs up.

02:15:51.480 --> 02:15:53.000
 We'll take that one as well.

02:15:53.000 --> 02:15:55.000
 Commissioner Pernetta?

02:15:55.000 --> 02:15:56.000
 Aye.

02:15:56.000 --> 02:15:58.200
 Chair is also an aye.

02:15:58.200 --> 02:16:00.840
 Motion carries 7-0.

02:16:00.840 --> 02:16:01.840
 Next item.

02:16:01.840 --> 02:16:07.920
 Are we getting a lot of shaking of heads?

02:16:07.920 --> 02:16:12.160
 This Commissioner Bec was asking to see if we could hear him, but now that we could not,

02:16:12.160 --> 02:16:13.160
 we cannot hear him.

02:16:13.160 --> 02:16:14.160
 Gotcha.

02:16:14.160 --> 02:16:15.160
 Thank you for that interpretation.

02:16:15.160 --> 02:16:16.160
 Welcome.

02:16:16.160 --> 02:16:21.680
 Next item is 4B, FP20-0025.

02:16:21.680 --> 02:16:24.920
 This is Haley Zygursky's presentation.

02:16:24.920 --> 02:16:34.640
 Good evening, Commissioners.

02:16:34.640 --> 02:16:37.440
 This is FP2025.

02:16:37.440 --> 02:16:41.160
 This is the Woodmere edition.

02:16:41.160 --> 02:16:46.480
 This is a final plat for 151 single family lots, and at this point, staff is recommending

02:16:46.480 --> 02:16:50.600
 denial as it does not meet the requirements outlined in Exhibit 2.

02:16:50.600 --> 02:16:55.240
 However, the applicant has requested extension to December 16th, and staff has no objection

02:16:55.240 --> 02:16:56.240
 to that.

02:16:56.240 --> 02:16:58.560
 I'm happy to stand for any questions.

02:16:58.560 --> 02:17:00.560
 Thank you very much.

02:17:00.560 --> 02:17:02.640
 Commissioner Anderson?

02:17:02.640 --> 02:17:09.880
 I'll make a motion to approve the extension to date of December 16th.

02:17:09.880 --> 02:17:12.040
 Perfect, Commissioner Smith?

02:17:12.040 --> 02:17:13.040
 Second.

02:17:13.040 --> 02:17:16.960
 We have a first and a second.

02:17:16.960 --> 02:17:17.960
 Any discussion?

02:17:17.960 --> 02:17:24.440
 Seeing none, just for clarification, Matt, considering the mics are odd, am I able to

02:17:24.440 --> 02:17:31.440
 do a vote via a show of hands if I can see everyone?

02:17:31.440 --> 02:17:37.560
 Yeah, I suppose if it's the only alternative, if the mics aren't working, then they can

02:17:37.560 --> 02:17:38.560
 do it by hand.

02:17:38.560 --> 02:17:40.280
 No, I can hear Commissioner Beck.

02:17:40.280 --> 02:17:45.240
 Commissioner Kohl, can I hear you?

02:17:45.240 --> 02:17:53.000
 No, I cannot hear you.

02:17:53.000 --> 02:17:57.160
 I would say continue to do the roll call, and Commissioner Kohl can do a thumbs up or

02:17:57.160 --> 02:17:58.160
 thumbs down.

02:17:58.160 --> 02:17:59.160
 Okay.

02:17:59.160 --> 02:18:00.160
 Sounds good.

02:18:00.160 --> 02:18:01.640
 We have a first and a second for approval.

02:18:01.640 --> 02:18:05.080
 We'll start with a vote via roll call.

02:18:05.080 --> 02:18:06.080
 Commissioner Ellis?

02:18:06.080 --> 02:18:07.080
 Aye.

02:18:07.080 --> 02:18:08.080
 Commissioner Smith?

02:18:08.080 --> 02:18:09.080
 Aye.

02:18:09.080 --> 02:18:10.080
 Commissioner Beck?

02:18:10.080 --> 02:18:11.080
 Aye.

02:18:11.080 --> 02:18:12.080
 There we go.

02:18:12.080 --> 02:18:13.080
 Commissioner Anderson?

02:18:13.080 --> 02:18:14.080
 Aye.

02:18:14.080 --> 02:18:15.080
 Commissioner Kohl?

02:18:15.080 --> 02:18:18.080
 Let's do a thumbs up, thumbs down.

02:18:18.080 --> 02:18:19.080
 There we go.

02:18:19.080 --> 02:18:20.080
 Commissioner Pernetta?

02:18:20.080 --> 02:18:21.080
 Aye.

02:18:21.080 --> 02:18:25.640
 And I guess I should let the record show that Commissioner Kohl did give a thumbs up.

02:18:25.640 --> 02:18:26.640
 Chair is also an aye.

02:18:26.640 --> 02:18:28.780
 Motion carries 7-0.

02:18:28.780 --> 02:18:35.720
 Next item of business is item 3, 4C, PP20-0026.

02:18:35.720 --> 02:18:39.160
 This is Carina Maldonado's item.

02:18:39.160 --> 02:18:41.520
 All right.

02:18:41.520 --> 02:18:49.080
 This request, PP20-0026, is for approval of the preliminary plaque at 100 North Loop 288.

02:18:49.080 --> 02:18:51.920
 This is on the east side of Loop 288.

02:18:51.920 --> 02:18:55.480
 I apologize for the typo in the previous work session.

02:18:55.480 --> 02:19:00.320
 Staff is recommending denial of this request, as it does not meet the minimum requirements

02:19:00.320 --> 02:19:02.320
 in the DDC.

02:19:02.320 --> 02:19:08.320
 However, the applicant has requested a 30-day extension to the December 16th Applying and

02:19:08.320 --> 02:19:11.400
 Zoning Commission meeting, and we are not opposed to this request.

02:19:11.400 --> 02:19:13.720
 Behind that, I can take any questions.

02:19:13.720 --> 02:19:16.140
 I appreciate it, Commissioner Ellis.

02:19:16.140 --> 02:19:17.140
 Thank you, Chair.

02:19:17.140 --> 02:19:23.160
 Carina, just to clarify, you mentioned 30-day request for extension.

02:19:23.160 --> 02:19:31.400
 December 16th is two weeks from now, so is it December 16th that the applicant is requesting?

02:19:31.400 --> 02:19:35.400
 The request was tipped the allowances for up to 30 days.

02:19:35.400 --> 02:19:41.560
 However, just based on the way our meetings are scheduled, that would have to be by December

02:19:41.560 --> 02:19:42.560
 16th.

02:19:42.560 --> 02:19:43.560
 Okay.

02:19:43.560 --> 02:19:44.560
 Understood.

02:19:44.560 --> 02:19:45.560
 Thank you.

02:19:45.560 --> 02:19:46.560
 Commissioner Smith?

02:19:46.560 --> 02:19:50.840
 Make a motion to approve the extension to date certain December 16th.

02:19:50.840 --> 02:19:51.840
 We have a first.

02:19:51.840 --> 02:19:52.840
 Commissioner Pernetta?

02:19:52.840 --> 02:19:53.840
 I'll second.

02:19:53.840 --> 02:20:00.560
 We have a first and a second for an approval of this extension request of 30 days to date

02:20:00.560 --> 02:20:01.920
 certain of December 16th.

02:20:01.920 --> 02:20:03.760
 Is there any discussion?

02:20:03.760 --> 02:20:07.200
 Seeing none, I'll call for a vote via roll call.

02:20:07.200 --> 02:20:08.200
 Commissioner Ellis?

02:20:08.200 --> 02:20:09.200
 Aye.

02:20:09.200 --> 02:20:10.200
 Commissioner Smith?

02:20:10.200 --> 02:20:11.200
 Aye.

02:20:11.200 --> 02:20:12.200
 Commissioner Beck?

02:20:12.200 --> 02:20:13.200
 Aye.

02:20:13.200 --> 02:20:14.200
 Commissioner Anderson?

02:20:14.200 --> 02:20:15.200
 Aye.

02:20:15.200 --> 02:20:18.920
 Commissioner Cole, thumb up, thumb down.

02:20:18.920 --> 02:20:20.400
 That's an aye from Commissioner Cole.

02:20:20.400 --> 02:20:21.400
 Commissioner Pernetta?

02:20:21.400 --> 02:20:22.400
 Aye.

02:20:22.400 --> 02:20:23.400
 Chair, it's also an aye.

02:20:23.400 --> 02:20:24.400
 Motion carries 7-0.

02:20:24.400 --> 02:20:29.280
 Next item of business is item 4D, it's the consideration and approval of the November

02:20:29.280 --> 02:20:31.400
 18th minutes.

02:20:31.400 --> 02:20:35.240
 Our commission was sent a revised copy of the minutes.

02:20:35.240 --> 02:20:36.240
 Commissioner Smith?

02:20:36.240 --> 02:20:38.200
 Make a motion to approve as amended.

02:20:38.200 --> 02:20:39.480
 Commissioner Ellis?

02:20:39.480 --> 02:20:40.480
 Second.

02:20:40.480 --> 02:20:45.240
 We have a first and a second for approval of the minutes.

02:20:45.240 --> 02:20:46.240
 Any discussion?

02:20:46.240 --> 02:20:49.880
 Seeing none, I'll call for a vote via roll call.

02:20:49.880 --> 02:20:50.880
 Commissioner Ellis?

02:20:50.880 --> 02:20:51.880
 Aye.

02:20:51.880 --> 02:20:52.880
 Commissioner Smith?

02:20:52.880 --> 02:20:53.880
 Aye.

02:20:53.880 --> 02:20:54.880
 Commissioner Beck?

02:20:54.880 --> 02:20:55.880
 Aye.

02:20:55.880 --> 02:20:56.880
 Commissioner Anderson?

02:20:56.880 --> 02:20:57.880
 Aye.

02:20:57.880 --> 02:20:58.880
 Commissioner Cole?

02:20:58.880 --> 02:20:59.880
 No.

02:20:59.880 --> 02:21:00.880
 Commissioner Anderson?

02:21:00.880 --> 02:21:01.880
 No.

02:21:01.880 --> 02:21:02.880
 Commissioner Cole is an affirmative.

02:21:02.880 --> 02:21:03.880
 Commissioner Pernetta?

02:21:03.880 --> 02:21:04.880
 Aye.

02:21:04.880 --> 02:21:05.880
 And Chair, it's also an aye.

02:21:05.880 --> 02:21:06.880
 Motion carries 7-0.

02:21:06.880 --> 02:21:13.840
 The next item of business is item 4E, PP20-0024B, and I'll invite Sean Jacobson for presentation.

02:21:13.840 --> 02:21:17.600
 Good evening, Chair and members of the commission.

02:21:17.600 --> 02:21:26.600
 Just pull up presentation here, and we are, hopefully you can see that now.

02:21:26.600 --> 02:21:27.600
 Yep.

02:21:27.600 --> 02:21:35.000
 We're meeting PP20-0024 preliminary plat.

02:21:35.000 --> 02:21:41.680
 This was initially recommended for denial, but all concerns have been resolved with the

02:21:41.680 --> 02:21:45.680
 plat that you were sent this afternoon, and so staff is now recommending approval because

02:21:45.680 --> 02:21:49.840
 it meets all of the requirements for approval.

02:21:49.840 --> 02:21:51.560
 Great.

02:21:51.560 --> 02:21:52.560
 Any questions?

02:21:52.560 --> 02:21:53.560
 Okay.

02:21:53.560 --> 02:21:57.800
 Seeing none, Chair will entertain a motion.

02:21:57.800 --> 02:21:58.800
 Commissioner Anderson?

02:21:58.800 --> 02:21:59.800
 Seconded.

02:21:59.800 --> 02:22:00.800
 Motion to approve.

02:22:00.800 --> 02:22:01.800
 We have a first for approval.

02:22:01.800 --> 02:22:02.800
 Commissioner Smith?

02:22:02.800 --> 02:22:03.800
 Second.

02:22:03.800 --> 02:22:06.280
 We have a first and a second for approval.

02:22:06.280 --> 02:22:08.520
 Any discussion?

02:22:08.520 --> 02:22:12.240
 Seeing none, I will call for a vote via roll call.

02:22:12.240 --> 02:22:13.240
 Commissioner Ellis?

02:22:13.240 --> 02:22:14.240
 Aye.

02:22:14.240 --> 02:22:15.240
 Commissioner Smith?

02:22:15.240 --> 02:22:16.240
 Aye.

02:22:16.240 --> 02:22:17.240
 Commissioner Beck?

02:22:17.240 --> 02:22:18.240
 Aye.

02:22:18.240 --> 02:22:19.240
 Commissioner Anderson?

02:22:19.240 --> 02:22:20.240
 Aye.

02:22:20.240 --> 02:22:21.240
 Commissioner Cole?

02:22:21.240 --> 02:22:22.240
 Aye.

02:22:22.240 --> 02:22:23.840
 Commissioner Cole?

02:22:23.840 --> 02:22:24.840
 Aye.

02:22:24.840 --> 02:22:25.840
 Commissioner Cole?

02:22:25.840 --> 02:22:26.840
 Aye.

02:22:26.840 --> 02:22:27.840
 Commissioner Cole?

02:22:27.840 --> 02:22:28.840
 Aye.

02:22:28.840 --> 02:22:29.840
 Commissioner Cole?

02:22:29.840 --> 02:22:30.840
 Aye.

02:22:30.840 --> 02:22:31.840
 Commissioner Cole?

02:22:31.840 --> 02:22:32.840
 Aye.

02:22:32.840 --> 02:22:33.840
 Commissioner Cole?

02:22:33.840 --> 02:22:34.840
 Aye.

02:22:34.840 --> 02:22:35.840
 Commissioner Cole?

02:22:35.840 --> 02:22:36.840
 Aye.

02:22:36.840 --> 02:22:37.840
 Commissioner Cole?

02:22:37.840 --> 02:22:38.840
 Aye.

02:22:38.840 --> 02:22:39.840
 Commissioner Cole?

02:22:39.840 --> 02:22:40.840
 Aye.

02:22:40.840 --> 02:22:41.840
 Commissioner Cole?

02:22:41.840 --> 02:22:42.840
 Aye.

02:22:42.840 --> 02:22:43.840
 Commissioner Cole?

02:22:43.840 --> 02:22:44.840
 Aye.

02:22:44.840 --> 02:22:45.840
 Commissioner Cole?

02:22:45.840 --> 02:22:46.840
 Aye.

02:22:46.840 --> 02:22:47.840
 Commissioner Cole?

02:22:47.840 --> 02:22:48.840
 Aye.

02:22:48.840 --> 02:22:54.780
 We have a final replant of two commercial lots located at McKinney and Glengarry Way.

02:22:54.780 --> 02:22:59.720
 As we discussed in the work session, a revised plot was sent to you all this evening and

02:22:59.720 --> 02:23:03.920
 staff has since changed our recommendation from denial to approval as the new plant that

02:23:03.920 --> 02:23:08.040
 was provided to you and is now shown here on the screen does meet all of the established

02:23:08.040 --> 02:23:13.400
 requirements and with that, I'm happy to answer any questions.

02:23:13.400 --> 02:23:20.520
 I've been told I'm muted.

02:23:20.520 --> 02:23:21.520
 Thank you, Haley.

02:23:21.520 --> 02:23:25.160
 Any questions for Haley on the presentation?

02:23:25.160 --> 02:23:31.340
 Seeing none, I'll call for, well, Commissioner Smith.

02:23:31.340 --> 02:23:32.340
 He's muted now too.

02:23:32.340 --> 02:23:36.080
 I make a motion to approve.

02:23:36.080 --> 02:23:38.480
 First for approval.

02:23:38.480 --> 02:23:40.360
 The Chair will second that.

02:23:40.360 --> 02:23:43.120
 Any discussion on the item?

02:23:43.120 --> 02:23:45.180
 Seeing none, I call for a vote via roll call.

02:23:45.180 --> 02:23:46.180
 Commissioner Ellis?

02:23:46.180 --> 02:23:47.180
 Aye.

02:23:47.180 --> 02:23:48.180
 Commissioner Smith?

02:23:48.180 --> 02:23:49.180
 Aye.

02:23:49.180 --> 02:23:50.180
 Commissioner Beck?

02:23:50.180 --> 02:23:51.180
 Aye.

02:23:51.180 --> 02:23:52.180
 Commissioner Anderson?

02:23:52.180 --> 02:23:53.180
 Aye.

02:23:53.180 --> 02:23:54.180
 Commissioner Cole?

02:23:54.180 --> 02:23:55.180
 Aye.

02:23:55.180 --> 02:23:58.660
 Commissioner Cole has a thumbs up for an aye.

02:23:58.660 --> 02:23:59.660
 Commissioner Panetta?

02:23:59.660 --> 02:24:00.660
 Aye.

02:24:00.660 --> 02:24:01.660
 Chair is also an aye.

02:24:01.660 --> 02:24:02.840
 Motion carries 7-0.

02:24:02.840 --> 02:24:08.320
 The last item for individual consideration is item 4G, FR20-0016.

02:24:08.320 --> 02:24:13.440
 I'll invite Ron Meguida for presentation.

02:24:13.440 --> 02:24:16.360
 Thank you, Chair.

02:24:16.360 --> 02:24:24.200
 Bring up the presentation real quick.

02:24:24.200 --> 02:24:25.640
 So this is FR20-0016.

02:24:25.640 --> 02:24:31.400
 It is for a residential subdivision.

02:24:31.400 --> 02:24:39.720
 The site is located between Bonnie Bray and north of Rose Lawn Drive.

02:24:39.720 --> 02:24:44.320
 The applicant is proposing an extension.

02:24:44.320 --> 02:24:50.680
 It currently does not meet all of the requirements and standards of the DVC, specifically Section

02:24:50.680 --> 02:24:57.440
 832D, related to common areas and facilities of, again, the development code.

02:24:57.440 --> 02:25:04.000
 However, staff is not in opposition of the extension, again, of the 30-day extension

02:25:04.000 --> 02:25:05.000
 by the applicant.

02:25:05.000 --> 02:25:07.680
 I'll stand for any questions.

02:25:07.680 --> 02:25:12.880
 Ron, the other items listed here for 30 days have a date certain of December 16th.

02:25:12.880 --> 02:25:17.360
 Does that apply to this one as well, as it's going to the December 16th meeting?

02:25:17.360 --> 02:25:22.920
 It would, and similar to what Karina's explanation is that the next meeting is December 16th.

02:25:22.920 --> 02:25:25.200
 Therefore, that's when this item will be heard.

02:25:25.200 --> 02:25:26.200
 Great.

02:25:26.200 --> 02:25:27.200
 Thank you.

02:25:27.200 --> 02:25:28.200
 Thank you, Ron.

02:25:28.200 --> 02:25:29.200
 Okay.

02:25:29.200 --> 02:25:30.200
 Thank you, Ron, for presentation.

02:25:30.200 --> 02:25:31.200
 Chair will entertain a motion.

02:25:31.200 --> 02:25:32.200
 Oh, this might be too exciting.

02:25:32.200 --> 02:25:33.200
 Commissioner Ellis.

02:25:33.200 --> 02:25:34.200
 I move approval of the applicant's request for an extension to date certain of December

02:25:34.200 --> 02:25:35.200
 16th.

02:25:35.200 --> 02:25:36.200
 Awesome.

02:25:36.200 --> 02:25:37.200
 Thank you for that.

02:25:37.200 --> 02:25:38.200
 Commissioner Smith.

02:25:38.200 --> 02:25:39.200
 I'll second.

02:25:39.200 --> 02:25:46.200
 We have a first and a second for an approval of the 30-day extension to a date certain

02:25:46.200 --> 02:25:47.200
 of December 16th.

02:25:47.200 --> 02:25:58.200
 Any discussion?

02:25:58.200 --> 02:26:03.200
 Seeing none, I'll call for a vote via roll call.

02:26:03.200 --> 02:26:04.200
 Commissioner Ellis.

02:26:04.200 --> 02:26:05.200
 I.

02:26:05.200 --> 02:26:06.200
 Commissioner Beck.

02:26:06.200 --> 02:26:07.200
 I.

02:26:07.200 --> 02:26:08.200
 Commissioner Anderson.

02:26:08.200 --> 02:26:09.200
 I.

02:26:09.200 --> 02:26:10.200
 Commissioner Cole.

02:26:10.200 --> 02:26:14.200
 Commissioner Cole has a thumbs up for an I.

02:26:14.200 --> 02:26:15.200
 Commissioner Smith.

02:26:15.200 --> 02:26:16.200
 I.

02:26:16.200 --> 02:26:17.200
 Commissioner Bruneta.

02:26:17.200 --> 02:26:18.200
 I.

02:26:18.200 --> 02:26:19.200
 Chair has also an I.

02:26:19.200 --> 02:26:20.200
 Did I carry everyone?

02:26:20.200 --> 02:26:21.200
 I think so.

02:26:21.200 --> 02:26:25.200
 Motion carries 7-0.

02:26:25.200 --> 02:26:27.200
 Next item of business is our public hearing items.

02:26:27.200 --> 02:26:32.200
 The first one is Z20-0009.

02:26:32.200 --> 02:26:41.200
 I'll invite Haley Zygursky for presentation and open the public hearing.

02:26:41.200 --> 02:26:43.200
 Good evening, commissioners.

02:26:43.200 --> 02:26:47.200
 This is case Z29 for urban logistics.

02:26:47.200 --> 02:26:50.200
 The request before you is twofold.

02:26:50.200 --> 02:26:55.200
 There is a request for a rezoning from highway corridor to light industrial for approximately

02:26:55.200 --> 02:26:58.200
 10 and a half acres that is shown here in orange.

02:26:58.200 --> 02:27:03.200
 And then there is a request for rezoning from heavy industrial to light industrial on approximately

02:27:03.200 --> 02:27:07.200
 13 acres that is outlined in yellow on the map.

02:27:07.200 --> 02:27:11.200
 Both of these are part of a larger parent track that is part of the Acme brick property.

02:27:11.200 --> 02:27:16.200
 And I wanted to point out that this site was previously developed with a gas well that was

02:27:16.200 --> 02:27:21.200
 plugged in 2019 in anticipation of the future redevelopment of this property.

02:27:21.200 --> 02:27:27.200
 The proposal or the purpose for this rezoning is to facilitate the development of a mixed

02:27:27.200 --> 02:27:33.200
 use complex with light industrial and warehouse uses on a total of 35 acres that would also

02:27:33.200 --> 02:27:38.200
 include this portion of the property here that currently has an LI zoning.

02:27:38.200 --> 02:27:43.200
 So here you can see that the mixed zoning that was just described, so the property would

02:27:43.200 --> 02:27:47.200
 include this area here that's already LI and they're looking to consolidate that across

02:27:47.200 --> 02:27:52.200
 the entire property as you can see in the map on the right.

02:27:52.200 --> 02:27:56.200
 So the general criteria for approval for all applications were described in detail in your

02:27:56.200 --> 02:27:57.200
 backup.

02:27:57.200 --> 02:28:00.200
 I won't go through those in detail here, but I wanted to note that we did find that this

02:28:00.200 --> 02:28:04.200
 request meets all of these criteria.

02:28:04.200 --> 02:28:08.200
 There are seven criteria specific to a rezoning request and we'll look at each of those in

02:28:08.200 --> 02:28:11.200
 a little more detail.

02:28:11.200 --> 02:28:16.200
 The first being whether the proposal is consistent with the comprehensive plan, specifically

02:28:16.200 --> 02:28:18.200
 the future land use element.

02:28:18.200 --> 02:28:22.200
 As you can see on the map, this property is designated for industrial commerce.

02:28:22.200 --> 02:28:26.200
 That is our most intense industrial future land use designation.

02:28:26.200 --> 02:28:29.200
 It's intended for areas that would have a mixture of both light and heavy industrial

02:28:29.200 --> 02:28:35.200
 uses that includes warehousing, manufacturing, and various industrial processes.

02:28:35.200 --> 02:28:40.200
 So the light industrial district is consistent with that as it allows for a mixture of things

02:28:40.200 --> 02:28:46.200
 such as warehouse and distribution, as well as some low impact manufacturing.

02:28:46.200 --> 02:28:50.200
 The next criteria is whether the request is consistent with the purpose statement for the

02:28:50.200 --> 02:28:51.200
 zoning district.

02:28:51.200 --> 02:28:57.200
 You can see here the LI district purpose statement does indicate that it would be in areas that

02:28:57.200 --> 02:29:01.200
 would provide a mixture of light industrial and employment type uses that would be highly

02:29:01.200 --> 02:29:06.200
 accessible, and this request would meet that given the high accessibility of this area

02:29:06.200 --> 02:29:11.200
 along I-35, that it would be a continuation of an existing zoning pattern, as you saw

02:29:11.200 --> 02:29:16.200
 there's already LI to the south, and that it would increase the compatibility in the

02:29:16.200 --> 02:29:21.200
 area as it would be reducing the intensity of the zoning designation on this property

02:29:21.200 --> 02:29:25.200
 adjacent to the neighboring multifamily use.

02:29:25.200 --> 02:29:30.200
 So looking at the next criteria, which is whether there have been significant changes

02:29:30.200 --> 02:29:35.200
 that would warrant the request, I wanted to point out a little of the history of the site.

02:29:35.200 --> 02:29:40.200
 This entire property that is Acme Brick was originally zoned heavy industrial.

02:29:40.200 --> 02:29:44.200
 It had had that zoning since the 1969 zoning ordinance, actually.

02:29:44.200 --> 02:29:49.200
 However, in 2002, a split zoning was applied to this northern part of the property, and

02:29:49.200 --> 02:29:54.200
 that directly transitioned to the zoning that we see today with the 2019 code adoption and

02:29:54.200 --> 02:29:57.200
 citywide rezoning.

02:29:57.200 --> 02:30:02.200
 With the plugging of that gas well, the property owner was looking to facilitate development

02:30:02.200 --> 02:30:07.200
 of this northern end of the site that's been largely unused, and so now they have a potential

02:30:07.200 --> 02:30:11.200
 buyer who's looking to consolidate that zoning and have consistent development standards

02:30:11.200 --> 02:30:14.200
 applicable across the site.

02:30:14.200 --> 02:30:19.200
 Our next criteria is whether it would minimize adverse impacts on surrounding property.

02:30:19.200 --> 02:30:22.200
 The LI zoning is consistent with the zoning in this area.

02:30:22.200 --> 02:30:26.200
 It's not expected to have any adverse impacts, as this would be a continuation of the type

02:30:26.200 --> 02:30:29.200
 of uses that have been permitted in the past.

02:30:29.200 --> 02:30:33.200
 It is important to note that even with this current mix of zoning, those light industrial

02:30:33.200 --> 02:30:36.200
 uses could occur on the property today.

02:30:36.200 --> 02:30:39.200
 Warehouse and distribution are even permitted in the HC district, but there are some size

02:30:39.200 --> 02:30:43.200
 limitations that would make a comprehensive development of the site with an industrial

02:30:43.200 --> 02:30:45.200
 campus a little bit tricky.

02:30:45.200 --> 02:30:48.200
 So that's the reason for their looking to consolidate.

02:30:48.200 --> 02:30:53.200
 This zoning would -- one of the most important things about it is it would reduce the intensity

02:30:53.200 --> 02:30:56.200
 of uses that could occur on this portion of the property that is directly adjacent to

02:30:56.200 --> 02:30:58.200
 a multifamily use.

02:30:58.200 --> 02:31:04.200
 This adjacent property that's zoned HC has had multifamily use there since the mid-1980s,

02:31:04.200 --> 02:31:08.200
 and to date there hasn't been much use on this property, but there is a variety of things

02:31:08.200 --> 02:31:13.200
 permitted in HI, as you can see here, that would not be compatible with that adjacent

02:31:13.200 --> 02:31:14.200
 multifamily.

02:31:14.200 --> 02:31:17.200
 So this would reduce some of those more intensive uses that would have much more nuisance potential

02:31:17.200 --> 02:31:24.200
 and take away the prospect of things such as a feedlot or hazardous waste storage.

02:31:24.200 --> 02:31:28.200
 Even medium impact manufacturing, as you can see, would require a specific use permit to

02:31:28.200 --> 02:31:32.200
 come back before you all in city council.

02:31:32.200 --> 02:31:37.200
 And then finally looking at the availability of public facilities and services, the site

02:31:37.200 --> 02:31:41.200
 is adjacent to the I-35 East corridor, so they do have direct access off the service

02:31:41.200 --> 02:31:42.200
 road today.

02:31:42.200 --> 02:31:47.200
 This portion of the corridor from 377 over to Teasley is slated for improvement within

02:31:47.200 --> 02:31:52.200
 the next 5 to 10 years, according to TxDOT's current plans and schedule.

02:31:52.200 --> 02:31:58.200
 The applicant provided a trip generation based upon an estimation of about 450,000 square

02:31:58.200 --> 02:32:00.200
 feet of warehouse space.

02:32:00.200 --> 02:32:05.200
 That did not trigger the need for a TIA at this point in time, however, once they provide

02:32:05.200 --> 02:32:10.200
 plans for, a zoning compliance plan rather, for the specific development of the site and

02:32:10.200 --> 02:32:14.200
 configuration of uses, then that will be looked at again to see if there are any improvements

02:32:14.200 --> 02:32:18.200
 that would be warranted, but it is unlikely given their adjacency to a TxDOT right of

02:32:18.200 --> 02:32:20.200
 way.

02:32:20.200 --> 02:32:24.200
 And with respect to utilities, you can see on the map here with the blue lines representing

02:32:24.200 --> 02:32:29.200
 water lines and the red being sewer lines, that there are facilities subbed out to this

02:32:29.200 --> 02:32:32.200
 property immediately adjacent along the I-35 frontage.

02:32:32.200 --> 02:32:37.200
 Those would be extended across this site to serve this development.

02:32:37.200 --> 02:32:42.200
 Public notification was provided regarding this request and we've received no responses

02:32:42.200 --> 02:32:43.200
 to date.

02:32:43.200 --> 02:32:47.200
 And staff is recommending approval of the requested rezoning to light industrial as

02:32:47.200 --> 02:32:50.200
 it complies with all of our criteria for approval.

02:32:50.200 --> 02:32:51.200
 And I'm happy to answer any questions.

02:32:51.200 --> 02:32:55.200
 I believe the applicant is on the line as well and does have a presentation for you

02:32:55.200 --> 02:32:56.200
 all.

02:32:56.200 --> 02:32:57.200
 Great.

02:32:57.200 --> 02:32:58.200
 Thank you, Haley.

02:32:58.200 --> 02:32:59.200
 Is there any questions initially for Haley?

02:32:59.200 --> 02:33:01.200
 Commissioner Anderson.

02:33:01.200 --> 02:33:02.200
 Just quick one.

02:33:02.200 --> 02:33:11.200
 Haley, can you go to slide 11, I believe, please?

02:33:11.200 --> 02:33:20.200
 It's the one that shows the daily trips and I just -- down at the bottom it says 76 morning

02:33:20.200 --> 02:33:27.200
 peak trips and 85, but if -- I mean, I'm not the smartest person, but 85 and 76 doesn't

02:33:27.200 --> 02:33:30.200
 equal 770.

02:33:30.200 --> 02:33:36.200
 No, sir, these are -- these are strictly the peak hour trips, so based on estimations from

02:33:36.200 --> 02:33:41.200
 the IT, which is the International Transportation Engineers Society that estimates various uses

02:33:41.200 --> 02:33:45.200
 and how much traffic they generate, this is what would be estimated in that peak hour

02:33:45.200 --> 02:33:49.200
 of morning incoming traffic and then evening traffic leaving the site.

02:33:49.200 --> 02:33:53.200
 So that's just one hour of the day, whereas this is a daily total of all traffic.

02:33:53.200 --> 02:33:54.200
 Okay.

02:33:54.200 --> 02:33:55.200
 All right.

02:33:55.200 --> 02:33:56.200
 Thank you, ma'am.

02:33:56.200 --> 02:33:59.200
 Any other questions for Haley?

02:33:59.200 --> 02:34:00.200
 Okay.

02:34:00.200 --> 02:34:07.200
 If the applicant's available and would like to present, they can certainly do so.

02:34:07.200 --> 02:34:10.200
 I'm not sure if they're muted or unmuted.

02:34:10.200 --> 02:34:11.200
 This is Amy Bissett.

02:34:11.200 --> 02:34:12.200
 Can you hear me?

02:34:12.200 --> 02:34:13.200
 I can, Amy.

02:34:13.200 --> 02:34:14.200
 Thanks for being here.

02:34:14.200 --> 02:34:19.200
 As the applicant, you have 10 minutes to present.

02:34:19.200 --> 02:34:24.200
 I believe -- we're not going to take this amount of time, but we do have multiple representatives

02:34:24.200 --> 02:34:29.200
 here with us today, and I think that means we would have 20 total, but we won't take

02:34:29.200 --> 02:34:30.200
 10.

02:34:30.200 --> 02:34:31.200
 So --

02:34:31.200 --> 02:34:32.200
 Amy, you are correct.

02:34:32.200 --> 02:34:35.200
 You would have 20 with a combined team, so take your time.

02:34:35.200 --> 02:34:36.200
 All right.

02:34:36.200 --> 02:34:37.200
 Okay.

02:34:37.200 --> 02:34:39.200
 Well, I still think we'll be pretty quick.

02:34:39.200 --> 02:34:41.200
 Haley, thank you for pulling up the slides.

02:34:41.200 --> 02:34:44.200
 Will you advance to the first slide, please?

02:34:44.200 --> 02:34:47.200
 First, I do want to introduce my team here.

02:34:47.200 --> 02:34:53.200
 We have the developer with Urban Logistics Realty on the line who's going to speak to

02:34:53.200 --> 02:34:58.200
 you momentarily, and we also have our architect and our engineering firm on the line.

02:34:58.200 --> 02:35:05.200
 I want to -- before I get into the presentation, I do want to acknowledge that I listened to

02:35:05.200 --> 02:35:09.200
 the work session and just wanted to clarify a couple of things.

02:35:09.200 --> 02:35:15.200
 Haley did mention that public notifications went out and she received no responses.

02:35:15.200 --> 02:35:23.200
 We also did invite that same list of neighbors to a neighborhood meeting and received no

02:35:23.200 --> 02:35:24.200
 RSVPs.

02:35:24.200 --> 02:35:29.200
 It was a virtual meeting that we had set and no questions that came out of that.

02:35:29.200 --> 02:35:36.200
 So the other question that I heard in work session, which is really more related to ESA,

02:35:36.200 --> 02:35:41.200
 but I want to address now because we don't intend to make two presentations tonight for

02:35:41.200 --> 02:35:47.200
 each of these items, so it was related to why we have the detention ponds located where

02:35:47.200 --> 02:35:49.200
 we do and why there are two of them.

02:35:49.200 --> 02:35:57.200
 So in very brief response to that, the existing pond that was referenced by Commissioner Beck

02:35:57.200 --> 02:36:03.200
 that is south of our site is actually -- it's not functioning as a detention pond today

02:36:03.200 --> 02:36:09.200
 and our site doesn't drain into it, so we would have to route a pipeline to that property,

02:36:09.200 --> 02:36:15.200
 to that specific body of water in order to facilitate detention there, which would require

02:36:15.200 --> 02:36:21.200
 removing as many or more trees than we're having to remove in order to put the detention

02:36:21.200 --> 02:36:22.200
 where it is.

02:36:22.200 --> 02:36:27.200
 It's also split into two locations because there is a gas pipeline that runs in between

02:36:27.200 --> 02:36:30.200
 that we need to leave room for.

02:36:30.200 --> 02:36:36.200
 So we do have our engineer on the line, though, who can help walk through that in more detail

02:36:36.200 --> 02:36:37.200
 if necessary.

02:36:37.200 --> 02:36:41.200
 So with that, I'm going to walk through a few slides here.

02:36:41.200 --> 02:36:45.200
 The first one is just to kind of orient you to where this is located.

02:36:45.200 --> 02:36:50.200
 Obviously, Acme Brick, this site, they have been there for a number of years.

02:36:50.200 --> 02:36:56.200
 In fact, the town has really grown up around them, so we really see this as an opportunity

02:36:56.200 --> 02:37:01.200
 for redeveloping something that is more compatible with the neighborhood, but it is kind of in

02:37:01.200 --> 02:37:04.200
 the heart of Denton in a highly visible location.

02:37:04.200 --> 02:37:07.200
 Next slide, please.

02:37:07.200 --> 02:37:08.200
 Well, there you go.

02:37:08.200 --> 02:37:10.200
 You can see it a little more closely.

02:37:10.200 --> 02:37:13.200
 Next slide, please.

02:37:13.200 --> 02:37:18.200
 So you can see from this aerial view that Acme Brick does still operate on the site.

02:37:18.200 --> 02:37:27.200
 They are an active -- it is an active plant that will remain there, and we are coming

02:37:27.200 --> 02:37:33.200
 in to develop the northern end of that site in a way that would be compatible with the

02:37:33.200 --> 02:37:38.200
 adjacencies in the way that the town has grown up around it.

02:37:38.200 --> 02:37:40.200
 I'm going to introduce Jason Nunley.

02:37:40.200 --> 02:37:44.200
 He is with Urban Logistics Realty, and he is going to share a little more detail with

02:37:44.200 --> 02:37:50.200
 you about the company and their intended plans for this development.

02:37:50.200 --> 02:37:52.200
 Jason, are you on the line?

02:37:52.200 --> 02:37:53.200
 Yes, ma'am.

02:37:53.200 --> 02:37:54.200
 Thank you, Amy.

02:37:54.200 --> 02:37:58.200
 Good evening, first of all, and thank you all for the opportunity to talk to you tonight.

02:37:58.200 --> 02:38:03.200
 I got excited when Amy said we had 20 minutes until she told me not to filibuster, but I

02:38:03.200 --> 02:38:07.200
 get passionate about this, so forgive me if I ramble.

02:38:07.200 --> 02:38:09.200
 As Amy mentioned, my name is Jason Nunley.

02:38:09.200 --> 02:38:12.200
 I am a co-owner of Urban Logistics Realty.

02:38:12.200 --> 02:38:17.200
 We are a local North Texas-based real estate investment and development firm that really

02:38:17.200 --> 02:38:24.200
 has a 15-year history and track record of developing multi-tenant, multi-building

02:38:24.200 --> 02:38:28.200
 corporate campuses all over North Texas.

02:38:28.200 --> 02:38:32.200
 We are extremely excited about this opportunity on a number of different levels.

02:38:32.200 --> 02:38:37.200
 We're excited to work with the city of Denton, but we're also really excited to be part of

02:38:37.200 --> 02:38:41.200
 the evolution of what's a really fascinating land site.

02:38:41.200 --> 02:38:44.200
 Haley, if you could go to the next slide, please.

02:38:44.200 --> 02:38:51.200
 So, again, as Amy alluded to, this site has a very distinguished and long history.

02:38:51.200 --> 02:38:56.200
 Acme has actually owned the land for over 120 years.

02:38:56.200 --> 02:39:00.200
 We've gone back and done an extensive amount of research on the history of the site and

02:39:00.200 --> 02:39:06.200
 the characteristics of the site and how the site was located here and really how the city

02:39:06.200 --> 02:39:10.200
 of Denton has evolved and grown up around it.

02:39:10.200 --> 02:39:15.200
 When you look back over the history of the site, where it was then made sense, where

02:39:15.200 --> 02:39:22.200
 it is now is arguably not the best and highest use as it's been used for a mining pit and

02:39:22.200 --> 02:39:25.200
 a brick fabrication plant.

02:39:25.200 --> 02:39:29.200
 But we see an opportunity with this rezoning request to really embrace the city's future

02:39:29.200 --> 02:39:35.200
 land plan while paying respect and homage to the history of the site.

02:39:35.200 --> 02:39:41.200
 Our design will embrace kind of the history of Acme as we use their product through the

02:39:41.200 --> 02:39:48.200
 site and, again, it's just a unique opportunity to try to create something special and unique

02:39:48.200 --> 02:39:54.200
 and identifiable more so than an opportunity to, hey, let's go put up four buildings.

02:39:54.200 --> 02:39:59.200
 We believe that's fundamental and necessary to what we do because we do build on a speculative

02:39:59.200 --> 02:40:07.200
 basis and the caliber of tenants that we attract and demand, we will not be the low-cost option

02:40:07.200 --> 02:40:09.200
 or provider.

02:40:09.200 --> 02:40:16.200
 So our tenants expect and demand that level of attention and detail and really thoughtfulness

02:40:16.200 --> 02:40:17.200
 throughout the project.

02:40:17.200 --> 02:40:20.200
 Haley, next slide, if you'd please.

02:40:20.200 --> 02:40:24.200
 This is where we are at today with a site plan.

02:40:24.200 --> 02:40:30.200
 This is actually site plan probably about 64 in kind of the evolution of the design

02:40:30.200 --> 02:40:36.200
 and what we really identified as best and highest use for the site.

02:40:36.200 --> 02:40:40.200
 All four of these buildings are designed and intended to be multi-tenant.

02:40:40.200 --> 02:40:47.200
 We would envision somewhere between six and probably 10 different companies calling this

02:40:47.200 --> 02:40:49.200
 location home.

02:40:49.200 --> 02:40:54.200
 So, Haley, next slide, if you please.

02:40:54.200 --> 02:41:00.200
 To that attention to detail, if you look at kind of the elevations up in the upper left-hand

02:41:00.200 --> 02:41:06.200
 corner, it's very different, I would say, than what most of us have been conditioned

02:41:06.200 --> 02:41:12.200
 to think of industrial house, and that's very intentional on our part because we know our

02:41:12.200 --> 02:41:15.200
 target audience and we know our target tenants.

02:41:15.200 --> 02:41:20.200
 So we're taking very modern design concepts from office buildings.

02:41:20.200 --> 02:41:28.200
 We're sprinkling in design intent and details and nuance from restaurants, from hospitality,

02:41:28.200 --> 02:41:34.200
 really trying to create, and we say this over and over, but the evolution of a product type

02:41:34.200 --> 02:41:39.200
 that caters to our class of tenant.

02:41:39.200 --> 02:41:42.200
 That's not just accomplished through the building.

02:41:42.200 --> 02:41:46.200
 It's very much accomplished through attention to detail.

02:41:46.200 --> 02:41:54.200
 We try, when we orient buildings, when we locate buildings to create a sense of place,

02:41:54.200 --> 02:41:58.200
 we do that through landscaping, we do that through berms, we do that through textures,

02:41:58.200 --> 02:42:06.200
 we do that through materials, we do that through articulation, both horizontal and vertical.

02:42:06.200 --> 02:42:10.200
 Haley, could you back up one slide, pretty please?

02:42:10.200 --> 02:42:16.200
 So imagine pulling into the site there from the entry and the fact that you can see the

02:42:16.200 --> 02:42:18.200
 front door of all four of those buildings.

02:42:18.200 --> 02:42:22.200
 So nothing is buried and nothing is in the back.

02:42:22.200 --> 02:42:29.200
 We're striving to create a very dynamic and very dramatic entrance to a site, a lot of

02:42:29.200 --> 02:42:34.200
 which, again, is kind of counterintuitive to what most people would dub industrial, and

02:42:34.200 --> 02:42:40.200
 I'm highlighting that only because we don't think this product functions solely as industrial.

02:42:40.200 --> 02:42:45.200
 It really is a corporate campus environment when we're done with it.

02:42:45.200 --> 02:42:48.200
 Haley, could you go forward, please?

02:42:48.200 --> 02:42:55.200
 Again, just a little closer look at the elevations.

02:42:55.200 --> 02:43:04.200
 I know it doesn't show through this rendering, but the darker color there is actually a concrete

02:43:04.200 --> 02:43:05.200
 stain.

02:43:05.200 --> 02:43:11.200
 Fascinating aside, I'll be quick not to bore anybody, we pioneered the use of this horizontally

02:43:11.200 --> 02:43:17.200
 applied concrete stain over a decade ago, and we did it because we wanted something

02:43:17.200 --> 02:43:20.200
 unique and corporate and different, and nobody had done it.

02:43:20.200 --> 02:43:23.200
 We brought consultants in from the East Coast and the West Coast.

02:43:23.200 --> 02:43:28.200
 No one could figure out to do it until we found a concrete artist out of Denton.

02:43:28.200 --> 02:43:33.200
 Her name is Shelly Rigsby, and Shelly came out to the site, said she could do it.

02:43:33.200 --> 02:43:38.200
 She treated it not as a building or as a project, but almost as an independent living mural.

02:43:38.200 --> 02:43:40.200
 It's like a seven-step process.

02:43:40.200 --> 02:43:45.200
 It's beautiful to see once it's finished because it really brings out kind of the inherent

02:43:45.200 --> 02:43:51.200
 nature and quality and characteristics of the concrete underneath it.

02:43:51.200 --> 02:43:58.200
 And it's been extremely well received both by tenants and architects just across the

02:43:58.200 --> 02:43:59.200
 community.

02:43:59.200 --> 02:44:03.200
 So they are kind of living, breathing works of art right there on the front of the building,

02:44:03.200 --> 02:44:07.200
 and they all were made possible out of artists out of Denton.

02:44:07.200 --> 02:44:12.200
 Next, if you would, Haley?

02:44:12.200 --> 02:44:16.200
 Yeah, we talk about the evolution of these buildings and how they perform and how they

02:44:16.200 --> 02:44:17.200
 behave.

02:44:17.200 --> 02:44:23.200
 I highlighted two slides here, this one, and if you'd go forward to the next, just to show

02:44:23.200 --> 02:44:29.200
 this is what the interior of our buildings recently have looked like and how this space

02:44:29.200 --> 02:44:30.200
 is used.

02:44:30.200 --> 02:44:35.200
 And they are used by businesses that want to attract and retain talent.

02:44:35.200 --> 02:44:42.200
 We have a very high usership from technology companies, light manufacturing kind of on

02:44:42.200 --> 02:44:49.200
 the tech side, from training, from materials and supplies.

02:44:49.200 --> 02:44:54.200
 So just highlighting this to show again that it's maybe a little different than what some

02:44:54.200 --> 02:44:58.200
 people would have as a preconceived notion.

02:44:58.200 --> 02:45:00.200
 Next, if you would, Haley?

02:45:00.200 --> 02:45:02.200
 I guess that's it.

02:45:02.200 --> 02:45:08.200
 So I will be here for any questions afterwards or now or whenever.

02:45:08.200 --> 02:45:11.200
 Amy?

02:45:11.200 --> 02:45:16.200
 All right, I'll take it back over and just walk through these last couple of slides very

02:45:16.200 --> 02:45:20.200
 quickly because I do think Haley and Jason covered everything.

02:45:20.200 --> 02:45:26.200
 We are looking at a 35-acre project that's primarily a down zoning with multi-tenant

02:45:26.200 --> 02:45:33.200
 office and warehouse buildings, roughly 446,000 square feet based on the current site plan.

02:45:33.200 --> 02:45:36.200
 Next slide, please.

02:45:36.200 --> 02:45:43.200
 This kind of shows you overlaid on an aerial what the zoning change actually physically

02:45:43.200 --> 02:45:44.200
 would look like.

02:45:44.200 --> 02:45:51.200
 So we're maintaining some highway corridor zoning along the frontage while creating a

02:45:51.200 --> 02:45:57.200
 more comprehensive zoning across the entire site, including right up against the multifamily

02:45:57.200 --> 02:46:02.200
 next door would be the down zoning from heavy industrial to light industrial.

02:46:02.200 --> 02:46:04.200
 Next slide, please.

02:46:04.200 --> 02:46:09.200
 Do you want to provide a little bit of context for where this is located as you all know

02:46:09.200 --> 02:46:14.200
 where the ACME site is, but it tends to be a little bit out of sight.

02:46:14.200 --> 02:46:16.200
 It is right next to South Lakes Park.

02:46:16.200 --> 02:46:22.200
 It is right next to McMath Middle School and it is surrounded by neighborhoods, really.

02:46:22.200 --> 02:46:25.200
 Southridge being just on the other side of South Lakes Park.

02:46:25.200 --> 02:46:28.200
 Next slide, please.

02:46:28.200 --> 02:46:33.200
 And you can see in terms of the future land use plan, this area while it's designated for

02:46:33.200 --> 02:46:39.200
 industrial commerce, everything around it is more low density residential or parks and

02:46:39.200 --> 02:46:40.200
 community mixed use.

02:46:40.200 --> 02:46:46.200
 So the intent here is to meet the future land use plan in terms of industrial commerce, but

02:46:46.200 --> 02:46:50.200
 at the same time bring something that's more compatible to the area.

02:46:50.200 --> 02:46:52.200
 Next slide, please.

02:46:52.200 --> 02:46:58.200
 I'm just going to briefly touch on the alternative ESA because we do not intend to present again.

02:46:58.200 --> 02:47:03.200
 But as Christy went through with you in work session, we are proposing the removal of some

02:47:03.200 --> 02:47:07.200
 riparian buffer that is cutting right through the middle of the site.

02:47:07.200 --> 02:47:15.200
 And the intent is to offset the removal of those ecological resources by providing the

02:47:15.200 --> 02:47:21.200
 enhanced detention ponds that do provide alternative habitat opportunities for any

02:47:21.200 --> 02:47:25.200
 wildlife that might migrate out of that riparian buffer.

02:47:25.200 --> 02:47:34.200
 And then also we are proposing to place in a conservation easement 2.1 acres of upland

02:47:34.200 --> 02:47:41.200
 habitat that is not currently protected, but at one point in time was designated as an ESA.

02:47:41.200 --> 02:47:46.200
 So this would create a protection that is currently not there.

02:47:46.200 --> 02:47:51.200
 And as Christy mentioned earlier as well, we do intend to preserve the trees that are

02:47:51.200 --> 02:47:57.200
 between that 2.1 acre site that you see in yellow in the bottom right-hand side of the

02:47:57.200 --> 02:48:05.200
 screen and the detention pond above it as a part of our tree preservation plan.

02:48:05.200 --> 02:48:11.200
 However, we don't want to mix the two in terms of the approval in this particular application

02:48:11.200 --> 02:48:17.200
 for an alternative ESA because we are obligated to meet each of these requirements separately

02:48:17.200 --> 02:48:18.200
 and independently.

02:48:18.200 --> 02:48:25.200
 But in the end, it will create a contiguous preservation area between the detention pond

02:48:25.200 --> 02:48:28.200
 and the existing body of water that's south of our site.

02:48:28.200 --> 02:48:33.200
 And back to the discussion that you had in work session about the detention pond.

02:48:33.200 --> 02:48:36.200
 Haley, if you could put your cursor over.

02:48:36.200 --> 02:48:43.200
 There's an active gas well just to the northwest of the existing body of water that would also

02:48:43.200 --> 02:48:49.200
 create kind of a barrier to us being able to access that pond for detention.

02:48:49.200 --> 02:48:53.200
 We would end up having to come down with a pipeline through the existing trees in order

02:48:53.200 --> 02:49:00.200
 to access it, and it really doesn't drain that direction to start with.

02:49:00.200 --> 02:49:04.200
 Next slide, please, Haley.

02:49:04.200 --> 02:49:08.200
 This is just a quick summary of what we're proposing in our ESA, but I will let Christy

02:49:08.200 --> 02:49:15.200
 walk through that in detail and just appreciate everybody's time and am happy to answer any

02:49:15.200 --> 02:49:21.200
 questions or to bring any member of our team up to answer specific questions that you may

02:49:21.200 --> 02:49:23.200
 have that would be more appropriate for them.

02:49:23.200 --> 02:49:27.200
 Thank you.

02:49:27.200 --> 02:49:28.200
 >> Thank you very much.

02:49:28.200 --> 02:49:35.200
 Amy, is there any questions for Amy or Mr. Nunnally?

02:49:35.200 --> 02:49:36.200
 Okay.

02:49:36.200 --> 02:49:39.200
 I do not have any public citizen feedback on this.

02:49:39.200 --> 02:49:44.200
 I'm going to go ahead and close the public hearing on this item and ask for a motion

02:49:44.200 --> 02:49:47.200
 and then discussion.

02:49:47.200 --> 02:49:49.200
 Commissioner Ellis.

02:49:49.200 --> 02:49:52.200
 >> Move approval of the request.

02:49:52.200 --> 02:49:54.200
 >> We have a first for approval.

02:49:54.200 --> 02:49:56.200
 Commissioner Beck.

02:49:56.200 --> 02:49:58.200
 >> Yeah, I'll second that.

02:49:58.200 --> 02:50:00.200
 >> We have a first and a second for approval.

02:50:00.200 --> 02:50:04.200
 Any discussion?

02:50:04.200 --> 02:50:09.200
 The only thing I'm going to say is I know we still have the ESA to go through, but that's

02:50:09.200 --> 02:50:14.200
 really exciting to see the product that you're intending, and I think it would look good

02:50:14.200 --> 02:50:16.200
 driving through Denton.

02:50:16.200 --> 02:50:23.200
 So thank you for bringing such a high quality project, and hopefully it's well received

02:50:23.200 --> 02:50:25.200
 and sells out quickly.

02:50:25.200 --> 02:50:30.200
 So with that, I will go ahead and call for a vote via roll call.

02:50:30.200 --> 02:50:32.200
 Commissioner Ellis.

02:50:32.200 --> 02:50:33.200
 >> Aye.

02:50:33.200 --> 02:50:34.200
 >> Commissioner Beck.

02:50:34.200 --> 02:50:35.200
 >> Aye.

02:50:35.200 --> 02:50:37.200
 >> Commissioner Anderson.

02:50:37.200 --> 02:50:38.200
 >> Aye.

02:50:38.200 --> 02:50:40.200
 >> Commissioner Pernetta.

02:50:40.200 --> 02:50:41.200
 >> Aye.

02:50:41.200 --> 02:50:42.200
 >> Commissioner Cole.

02:50:42.200 --> 02:50:44.200
 He has a thumbs up as an aye.

02:50:44.200 --> 02:50:46.200
 Commissioner Smith.

02:50:46.200 --> 02:50:47.200
 >> Aye.

02:50:47.200 --> 02:50:48.200
 >> Chair has also an aye.

02:50:48.200 --> 02:50:49.200
 Motion carries 7-0.

02:50:49.200 --> 02:50:56.200
 That takes us to the next item tied to this, which is item 5B, AESA 20-0006A.

02:50:56.200 --> 02:51:18.200
 I will invite Christy Upton for presentation and open the public hearing.

02:51:18.200 --> 02:51:37.200
 And Christy, whenever you're ready, you have the floor.

02:51:37.200 --> 02:51:38.200
 >> Sorry.

02:51:38.200 --> 02:51:39.200
 Thank you.

02:51:39.200 --> 02:51:48.200
 Christy Upton, and I will be presenting an alternative environmentally sensitive area

02:51:48.200 --> 02:51:56.200
 plan tonight for the Urban Logistics 35 project that you just discussed.

02:51:56.200 --> 02:52:04.200
 The request is for the permanent removal of 1.26 acres of riparian buffer.

02:52:04.200 --> 02:52:07.200
 And a little background on the riparian buffer.

02:52:07.200 --> 02:52:14.200
 This is a tributary of Hickory Creek, and this ephemeral stream has riparian vegetation

02:52:14.200 --> 02:52:20.200
 that supports it, that vegetation was found to be in fair condition.

02:52:20.200 --> 02:52:27.200
 And typically, the buffer protection requirements are 50 feet on each side of the stream, and

02:52:27.200 --> 02:52:34.200
 that applies to everything below a berm that was constructed as part of access to the Acme

02:52:34.200 --> 02:52:35.200
 site.

02:52:35.200 --> 02:52:41.200
 The area upstream of that berm on the west side does not receive flow, and that interruption

02:52:41.200 --> 02:52:50.200
 of the hydrology means that the vegetation, the riparian vegetation that typically would

02:52:50.200 --> 02:52:58.200
 grow along these waterways because of the interruption of hydrology is not there, and

02:52:58.200 --> 02:53:04.200
 thus, with the lack of presence of the riparian vegetation, the protection requirements do

02:53:04.200 --> 02:53:05.200
 not apply.

02:53:05.200 --> 02:53:10.200
 A little bit of further background.

02:53:10.200 --> 02:53:19.200
 In 2015, staff had identified certain areas, specifically some cross timbers upland habitats

02:53:19.200 --> 02:53:26.200
 that had previously been mapped and were found to be fractured and isolated and would never

02:53:26.200 --> 02:53:35.200
 meet the criteria for 10 acres and that criteria being required for the protection requirements

02:53:35.200 --> 02:53:42.200
 to apply to those forested areas, and that's specifically the cross timbers upland habitat

02:53:42.200 --> 02:53:45.200
 protection requirements.

02:53:45.200 --> 02:53:51.200
 And with that identification of these areas that were less than 10 acres, staff removed

02:53:51.200 --> 02:53:55.200
 the protection requirements by removing the designation.

02:53:55.200 --> 02:54:07.200
 It just, it made sense to do this where the requirements would never apply.

02:54:07.200 --> 02:54:16.200
 So the specifics to the request and removing the 1.26 acres as Amy just presented is to

02:54:16.200 --> 02:54:24.200
 place the warehouse and infrastructure supporting the warehouse where the riparian buffer currently

02:54:24.200 --> 02:54:35.200
 overlaps, and then to realign the road for the, to remain or to keep the access, ACME

02:54:35.200 --> 02:54:43.200
 bricks access to their site, and all of that requiring that removal of the 1.26 acres riparian

02:54:43.200 --> 02:54:45.200
 buffer.

02:54:45.200 --> 02:54:53.200
 To offset the ecological features and functions that are offered by the riparian buffer, the

02:54:53.200 --> 02:55:02.200
 applicant will be installing or upgrading the detention basins with native grasses and

02:55:02.200 --> 02:55:08.200
 herbaceous plants and by planting a wetland fringe mix, a drain field mix and a wildflower

02:55:08.200 --> 02:55:16.200
 mix that will kind of transition along the banks of these detention basins and provide

02:55:16.200 --> 02:55:23.200
 habitat, future habitat to migrating birds and other wildlife.

02:55:23.200 --> 02:55:30.200
 In addition, the applicant is proposing this conservation easement that would be placed

02:55:30.200 --> 02:55:38.200
 over 2.11 acres of Crest Timbers upland habitat and permanently preserving that upland habitat.

02:55:38.200 --> 02:55:47.200
 Again, that habitat meets many of the features that has many of the features of upland habitat

02:55:47.200 --> 02:55:52.200
 as in soil topography and vegetation is just, it was less than 10 acres.

02:55:52.200 --> 02:56:02.200
 And as Amy also just recently pointed out, there's an additional 1.7 acres of remnant

02:56:02.200 --> 02:56:13.200
 forest that would be preserved by, with the intent of meeting the tree preservation requirements.

02:56:13.200 --> 02:56:23.200
 Notifications were sent out and there were no responses, except for a response from a

02:56:23.200 --> 02:56:29.200
 nonland owner in opposition to the project.

02:56:29.200 --> 02:56:38.200
 The recommendation is to permanently remove the recommendation is for approval with the

02:56:38.200 --> 02:56:44.200
 following conditions to permanently remove the repairing buffer that limiting that to

02:56:44.200 --> 02:56:52.200
 1.26 acres as shown in Exhibit C that this easement would be placed over the 2.11 acres

02:56:52.200 --> 02:57:00.200
 and filed with Denton County and within 14 days of the construction of the detention

02:57:00.200 --> 02:57:08.200
 basins that the detention basins be covered with the vegetative coverage that was described

02:57:08.200 --> 02:57:15.200
 in Exhibit C and then the last two conditions being the typical request by environmental

02:57:15.200 --> 02:57:27.200
 services that the applicant provide as a report and to ensure 90% survival of the vegetation

02:57:27.200 --> 02:57:37.200
 as was shown in Exhibit C. And with that, I will take any questions.

02:57:37.200 --> 02:57:39.200
 >> Thank you for the presentation, Christy.

02:57:39.200 --> 02:57:41.200
 Is there any questions for Christy?

02:57:41.200 --> 02:57:45.200
 The applicant is still on the line, I know they're not representing, but I'm sure they're

02:57:45.200 --> 02:57:50.200
 available for questions if there's any questions of the commission.

02:57:50.200 --> 02:57:54.200
 While y'all are thinking about any, I just want to let you know for this item we had one

02:57:54.200 --> 02:57:56.200
 person make comments using the online form.

02:57:56.200 --> 02:58:02.200
 There was zero support of this item and one against all these comment forms or this comment

02:58:02.200 --> 02:58:07.200
 form was emailed to the commissioners and our city secretary to be recorded.

02:58:07.200 --> 02:58:13.200
 With that, that kind of brings us to the close of anyone wanting to speak, so I will close

02:58:13.200 --> 02:58:15.200
 the public hearing.

02:58:15.200 --> 02:58:17.200
 Commissioner Smith.

02:58:17.200 --> 02:58:20.200
 >> Approved with staff recommendations.

02:58:20.200 --> 02:58:23.200
 >> First for approval, Commissioner Anderson.

02:58:23.200 --> 02:58:26.200
 >> I'll second, but can I say something real quick as well?

02:58:26.200 --> 02:58:27.200
 >> Absolutely.

02:58:27.200 --> 02:58:29.200
 >> I just want to reiterate what you said.

02:58:29.200 --> 02:58:37.200
 That whole section right there on 35 has been kind of an eyesore for years for Ditton.

02:58:37.200 --> 02:58:41.200
 No bad thing against ACME, but it's just barren land and it's just dirty and I think the

02:58:41.200 --> 02:58:46.200
 presentation they did and if they get to develop what they did, I think it's going to be awesome,

02:58:46.200 --> 02:58:48.200
 like you said.

02:58:48.200 --> 02:58:53.200
 And also I think it's great that they found a Ditton artist that adds even more value to

02:58:53.200 --> 02:58:55.200
 something that they're doing.

02:58:55.200 --> 02:58:59.200
 So anyway, kudos to the developers.

02:58:59.200 --> 02:59:01.200
 >> Commissioner Beck.

02:59:01.200 --> 02:59:03.200
 >> Thank you, Chair.

02:59:03.200 --> 02:59:07.200
 Yeah, I actually want to sort of agree.

02:59:07.200 --> 02:59:13.200
 I have -- if you noticed, I had no comments about the other item and actually seconded

02:59:13.200 --> 02:59:15.200
 the motion.

02:59:15.200 --> 02:59:24.200
 I think the development is reasonable development with, you know, interesting potential.

02:59:24.200 --> 02:59:34.200
 And I appreciate Amy's and Christy's explanation of sort of the limitations of our own code

02:59:34.200 --> 02:59:37.200
 and the need of the development.

02:59:37.200 --> 02:59:44.200
 I will point out -- I'm going to rant and scream about that 10 acres and then vote yes.

02:59:44.200 --> 02:59:49.200
 I'm going to tell you that right now because what we're doing is we're tearing out all the

02:59:49.200 --> 02:59:56.200
 green spaces and I think that the DSA plan for the riparian repair and the grasses are

02:59:56.200 --> 02:59:58.200
 a good job.

02:59:58.200 --> 03:00:01.200
 I commend the architects and the engineers on that.

03:00:01.200 --> 03:00:09.200
 I understand the limits of our existing code, you know, specifying that that is not quote

03:00:09.200 --> 03:00:11.200
 unquote a green space.

03:00:11.200 --> 03:00:15.200
 But Christy, I'm also a biologist.

03:00:15.200 --> 03:00:20.200
 So -- and I understand that, you know, I'm not going to hold -- I'm going to hold the

03:00:20.200 --> 03:00:23.200
 engineers and developers harmless on this one.

03:00:23.200 --> 03:00:33.200
 But I -- we are making a mistake to constantly pay -- you know, what's the phrase?

03:00:33.200 --> 03:00:35.200
 Steal from Peter to pay Paul.

03:00:35.200 --> 03:00:40.200
 You know, I think it's a mistake to -- I understand that we don't want to put pipes through a

03:00:40.200 --> 03:00:42.200
 gas well region.

03:00:42.200 --> 03:00:44.200
 We don't want to adjust the water table around a gas well.

03:00:44.200 --> 03:00:49.200
 Once again, we see gas wells contributing to lack of proper development in our municipal

03:00:49.200 --> 03:00:51.200
 environment.

03:00:51.200 --> 03:00:57.200
 I understand, you know, we need to maintain -- you're going to have waterfowl and whatnot.

03:00:57.200 --> 03:01:04.200
 They're doing -- I mean, the ponds themselves seem like from the plan that it's not a bad

03:01:04.200 --> 03:01:05.200
 alt ESA.

03:01:05.200 --> 03:01:11.200
 What we are doing, though, is chopping up what little green corridor goes from that park

03:01:11.200 --> 03:01:19.200
 to the northwest, the little strip of verge north, chopping that up, fragmenting the forest

03:01:19.200 --> 03:01:23.200
 even further around down to South Lakes Park.

03:01:23.200 --> 03:01:26.200
 We're just slowly chopping up all that green space.

03:01:26.200 --> 03:01:30.200
 So, you know, I don't want to hear any complaints when the coyotes eat your bunnies, when the

03:01:30.200 --> 03:01:35.200
 -- you know, when the -- you know, you hit a deer with your car because we ran those

03:01:35.200 --> 03:01:40.200
 things all out of there because we wanted to put a detention pond.

03:01:40.200 --> 03:01:46.200
 So I'm going to vote yes, and I'm not -- you know, I think Amy did a good job of describing

03:01:46.200 --> 03:01:53.200
 this, but this is where our ordinances are failing us, and we do not have good green

03:01:53.200 --> 03:01:58.200
 corridor, green space ordinances, and that really, really needs to be fixed.

03:01:58.200 --> 03:02:01.200
 So we don't -- I don't have a handle to grab onto.

03:02:01.200 --> 03:02:03.200
 I don't have a problem with the product.

03:02:03.200 --> 03:02:11.200
 I have a problem with this sort of unsweet spot that we find ourselves in and having

03:02:11.200 --> 03:02:14.200
 a good quality environmental existence in Denton.

03:02:14.200 --> 03:02:16.200
 So I'll leave it there.

03:02:16.200 --> 03:02:17.200
 >> Thank you, Commissioner Beck.

03:02:17.200 --> 03:02:19.200
 Commissioner Pernetta.

03:02:19.200 --> 03:02:23.200
 >> Yeah, and, you know, kind of along the lines of what Commissioner Anderson said and

03:02:23.200 --> 03:02:29.200
 what Commissioner Beck said, you know, I have a lot of people who send me their concerns.

03:02:29.200 --> 03:02:34.200
 I mean, anything to do with an all ESA or something like that comes up.

03:02:34.200 --> 03:02:39.200
 And this is one of those cases where, you know, you look at it and you go -- it makes

03:02:39.200 --> 03:02:46.200
 more sense what we're doing going forward, particularly because, you know, that patch,

03:02:46.200 --> 03:02:52.200
 that area is basically -- it might as well be a dump right now when you drive by it.

03:02:52.200 --> 03:02:57.200
 It's unsightly, and I always wonder what the hell is going on with it.

03:02:57.200 --> 03:03:00.200
 So I have no problem voting for this one.

03:03:00.200 --> 03:03:03.200
 You know, kind of along the lines of what Commissioner Beck said.

03:03:03.200 --> 03:03:08.200
 You know, I do have a little concern over the fact that, you know, as Denton gets, you

03:03:08.200 --> 03:03:13.200
 know, grows and becomes more dense and in and of itself I have no problem with density

03:03:13.200 --> 03:03:18.200
 because we need affordable housing in this area and we can only get that through more

03:03:18.200 --> 03:03:19.200
 density.

03:03:19.200 --> 03:03:26.200
 I do think, you know, if we are going to keep an eye on, you know, making sure as we

03:03:26.200 --> 03:03:31.200
 grow we keep Denton beautiful, it would be nice to have, you know, council, you know,

03:03:31.200 --> 03:03:38.200
 staff and everything kind of look into whether or not 10 acres is too much, you know, is

03:03:38.200 --> 03:03:39.200
 too large a number.

03:03:39.200 --> 03:03:41.200
 I don't know what the sweet spot would be.

03:03:41.200 --> 03:03:46.200
 But, you know, in the last year we did find a sweet spot with setbacks, you know.

03:03:46.200 --> 03:03:53.200
 And I think this is kind of a direction we should be looking into in terms of growing

03:03:53.200 --> 03:03:59.200
 our town but making sure that we are taking care of the environment because ultimately

03:03:59.200 --> 03:04:03.200
 it's one of the things that, you know, that we're not going to be able to build more

03:04:03.200 --> 03:04:05.200
 of as we go forward.

03:04:05.200 --> 03:04:07.200
 I support the project though.

03:04:07.200 --> 03:04:13.200
 Great looking project and, you know, a lot of good work and, you know, documentation

03:04:13.200 --> 03:04:14.200
 and everything.

03:04:14.200 --> 03:04:15.200
 Thank you.

03:04:15.200 --> 03:04:17.200
 >> Commissioner Beck.

03:04:17.200 --> 03:04:19.200
 >> I just -- something just occurred to me.

03:04:19.200 --> 03:04:25.200
 ACME being a brick facility, they have a lot of airborne pollutant heavy metal waste.

03:04:25.200 --> 03:04:27.200
 Do we test that soil?

03:04:27.200 --> 03:04:32.200
 I mean, I would hate for these developers to develop a lovely property and have

03:04:32.200 --> 03:04:34.200
 contaminated soil.

03:04:34.200 --> 03:04:36.200
 Does anyone know?

03:04:36.200 --> 03:04:38.200
 This isn't going to affect my vote.

03:04:38.200 --> 03:04:42.200
 This is actually more of a warning to the developers.

03:04:42.200 --> 03:04:47.200
 I hope that you do not have contaminated soil because I know traditionally like cement

03:04:47.200 --> 03:04:51.200
 factories, brick factories are dirty.

03:04:51.200 --> 03:04:53.200
 They're really dirty.

03:04:53.200 --> 03:04:58.200
 So I don't -- you know, I would encourage you to test your own property.

03:04:58.200 --> 03:05:03.200
 I guess I'll say that to the architects and the engineers.

03:05:03.200 --> 03:05:07.200
 Have we ever tested that land around there?

03:05:07.200 --> 03:05:09.200
 Maybe that's a Christy question.

03:05:09.200 --> 03:05:12.200
 >> I don't have any background on that.

03:05:12.200 --> 03:05:14.200
 Sorry.

03:05:14.200 --> 03:05:17.200
 >> That's okay.

03:05:17.200 --> 03:05:18.200
 Thank you, Chris.

03:05:18.200 --> 03:05:23.200
 >> Jason, if you would like to answer or if you have insights, Commissioner Beck.

03:05:23.200 --> 03:05:25.200
 >> Yeah, I certainly do.

03:05:25.200 --> 03:05:27.200
 Forgive me if I'm acting out of order here.

03:05:27.200 --> 03:05:30.200
 This is my first time doing this virtually.

03:05:30.200 --> 03:05:37.200
 But yes, sir, Commissioner Beck, we have extensively gone through phase 1, phase 2

03:05:37.200 --> 03:05:41.200
 environmental -- environmental.

03:05:41.200 --> 03:05:43.200
 I mean, for our sake, we have to.

03:05:43.200 --> 03:05:48.200
 I mean, we're looking at investing north of $35 million in the property to do this

03:05:48.200 --> 03:05:50.200
 and do it right.

03:05:50.200 --> 03:05:52.200
 So it's essential for us.

03:05:52.200 --> 03:05:54.200
 And we very much shared your concerns going into it.

03:05:54.200 --> 03:06:00.200
 But I can tell you that we are over that and understand that none exist.

03:06:00.200 --> 03:06:02.200
 >> I appreciate that insight.

03:06:02.200 --> 03:06:06.200
 We do have a first and a second for approval with the five conditions on the tables.

03:06:06.200 --> 03:06:10.200
 Any other further discussion on this?

03:06:10.200 --> 03:06:12.200
 Seeing none, I will call for a vote.

03:06:12.200 --> 03:06:15.200
 I will call for a vote via roll call.

03:06:15.200 --> 03:06:17.200
 We'll start with Commissioner Ellis.

03:06:17.200 --> 03:06:18.200
 >> Aye.

03:06:18.200 --> 03:06:20.200
 >> Commissioner Beck.

03:06:20.200 --> 03:06:21.200
 >> I reelect it, yes.

03:06:21.200 --> 03:06:22.200
 Aye.

03:06:22.200 --> 03:06:24.200
 >> Commissioner Anderson.

03:06:24.200 --> 03:06:26.200
 >> Aye.

03:06:26.200 --> 03:06:27.200
 >> Commissioner Pernetta.

03:06:27.200 --> 03:06:29.200
 >> Aye.

03:06:29.200 --> 03:06:30.200
 >> Commissioner Smith.

03:06:30.200 --> 03:06:31.200
 >> Aye.

03:06:31.200 --> 03:06:32.200
 >> Commissioner Cold.

03:06:32.200 --> 03:06:35.200
 Commissioner Cole is giving me a thumbs up as an affirmative.

03:06:35.200 --> 03:06:37.200
 Chair is also an aye.

03:06:37.200 --> 03:06:39.200
 Motion carries 7-0.

03:06:39.200 --> 03:06:41.200
 Congratulations and best of luck.

03:06:41.200 --> 03:06:43.200
 >> Thank you.

03:06:43.200 --> 03:06:49.200
 The next two items, item 5C and 5D, are being postponed to a date uncertain.

03:06:49.200 --> 03:06:51.200
 So they will be renoticed.

03:06:51.200 --> 03:06:55.200
 The commission tonight will take no action on those two items.

03:06:55.200 --> 03:06:59.200
 Which moves us to our concluding item, the Planning and Zoning Commission Project Matrix.

03:06:59.200 --> 03:07:07.200
 As always, I will turn this over to Richard for an update and then to the virtual dais for discussion.

03:07:07.200 --> 03:07:08.200
 >> Thank you.

03:07:08.200 --> 03:07:10.200
 Just a brief update.

03:07:10.200 --> 03:07:16.200
 The next meeting, we will have our GIS folks here kind of walking everyone through those project maps.

03:07:16.200 --> 03:07:19.200
 And as well as the weekly submittal project maps.

03:07:19.200 --> 03:07:23.200
 And then just to walk through the interactive map to show everything that's available.

03:07:23.200 --> 03:07:31.200
 As well as where we're starting to go with linking some of the application submittal information through track it into the GIS system.

03:07:31.200 --> 03:07:33.200
 And so it's a work in progress.

03:07:33.200 --> 03:07:36.200
 But at least wanted to provide that update.

03:07:36.200 --> 03:07:50.200
 In addition, I did speak to Christy this evening, and so we'll look to have her come back in January for a work session on the item that we had to be determined regarding the native plants and ESA.

03:07:50.200 --> 03:07:58.200
 So maybe there's additional discussion that we can have in light of our discussion today that could then lead into maybe some DDC discussions.

03:07:58.200 --> 03:08:04.200
 But just wanted to note that the only other thing I'll add at last night's council meeting.

03:08:04.200 --> 03:08:06.200
 They did take action on the birch track.

03:08:06.200 --> 03:08:09.200
 Both the land use plan amendment and rezoning.

03:08:09.200 --> 03:08:11.200
 Both of those were approved.

03:08:11.200 --> 03:08:17.200
 The rezoning, although PNZ did recommend the condition restricting the use.

03:08:17.200 --> 03:08:21.200
 Council did not include that restriction.

03:08:21.200 --> 03:08:24.200
 So it has the straight zoning of R6.

03:08:24.200 --> 03:08:30.200
 The other item they took action on and was approved was the SUP for that additional six feet of height.

03:08:30.200 --> 03:08:36.200
 The other item they took action on and was approved was the SUP for the multi-family project.

03:08:36.200 --> 03:08:39.200
 And those were the council action items from yesterday.

03:08:39.200 --> 03:08:43.200
 And with that, I'll be happy to answer any additional questions you may have.

03:08:43.200 --> 03:08:44.200
 >> Great.

03:08:44.200 --> 03:08:46.200
 Commissioner Bec?

03:08:46.200 --> 03:08:47.200
 >> Thank you, chair.

03:08:47.200 --> 03:08:53.200
 Richard, I pointed out the map once you pointed out to me a couple of meetings ago.

03:08:53.200 --> 03:08:56.200
 And I've gotten a lot of really positive feedback.

03:08:56.200 --> 03:09:10.200
 I think I want to encourage you to maybe actually consider doing a public -- just sort of as a feedback educational EOT training for the public.

03:09:10.200 --> 03:09:13.200
 We could certainly fulfill some of that role and staff can too.

03:09:13.200 --> 03:09:17.200
 But I've gotten a lot of really good feedback.

03:09:17.200 --> 03:09:19.200
 I had two questions.

03:09:19.200 --> 03:09:22.200
 People asked me -- they didn't see -- and maybe we just overlooked it.

03:09:22.200 --> 03:09:25.200
 It was in a different overlay.

03:09:25.200 --> 03:09:28.200
 Was tonight's ACME brick on that map?

03:09:28.200 --> 03:09:30.200
 I assume it was, but I didn't see it.

03:09:30.200 --> 03:09:34.200
 I saw the little frontage piece along Fort Worth or not Fort Worth.

03:09:34.200 --> 03:09:36.200
 Yes, that's right.

03:09:36.200 --> 03:09:37.200
 >> I'd have to check.

03:09:37.200 --> 03:09:39.200
 It should be on there.

03:09:39.200 --> 03:09:41.200
 It should be linked.

03:09:41.200 --> 03:09:42.200
 >> Maybe I just overlooked it.

03:09:42.200 --> 03:09:43.200
 >> Yeah, I could check.

03:09:43.200 --> 03:09:50.200
 >> And the other thing I wanted to ask you about that I mentioned last time when we talked about the matrix, but I got the request again.

03:09:50.200 --> 03:09:54.200
 And that is people love the map, so there's really positive feedback.

03:09:54.200 --> 03:09:56.200
 So I really want to encourage that.

03:09:56.200 --> 03:10:04.200
 But they'd also still like if there was a list, so if we could dump a list, that would be super helpful.

03:10:04.200 --> 03:10:12.200
 >> And I think that's something when Cody comes, he can show how to access that or if it's not being displayed properly, maybe that's something we can work on.

03:10:12.200 --> 03:10:14.200
 But I actually like your idea.

03:10:14.200 --> 03:10:18.200
 I think it's a good point of a sort of public education campaign.

03:10:18.200 --> 03:10:27.200
 Maybe that's something we can work with DTV and kind of put something out there for folks to further see what's going on in their city and how to access that data.

03:10:27.200 --> 03:10:31.200
 So I can report back as we progress.

03:10:31.200 --> 03:10:34.200
 >> I've used it a lot, actually, since you pointed it out to me.

03:10:34.200 --> 03:10:39.200
 I pretty much do every single backup and check over the map.

03:10:39.200 --> 03:10:45.200
 So I really appreciate it myself.

03:10:45.200 --> 03:10:51.200
 >> Richard, I have two things, one of great import, one of zero import.

03:10:51.200 --> 03:10:58.200
 The first thing is when Christy comes back, can she provide some justification on the 10 acres?

03:10:58.200 --> 03:11:10.200
 I imagine there's a critical mass with ESAs of what actually there has to be some sort of size to be able to encourage and promote growth and natural habitat.

03:11:10.200 --> 03:11:16.200
 And I'd love to know back to Commissioner Beck's point where that 10 acres came from and justification for that.

03:11:16.200 --> 03:11:18.200
 That's the comment.

03:11:18.200 --> 03:11:20.200
 >> For the upland habitat, right, the 10 acre.

03:11:20.200 --> 03:11:21.200
 >> Yeah, exactly.

03:11:21.200 --> 03:11:22.200
 Thank you.

03:11:22.200 --> 03:11:24.200
 That was the important note.

03:11:24.200 --> 03:11:30.200
 The one that's not important is that I'm in favor of the goatee being brought back, Richard.

03:11:30.200 --> 03:11:32.200
 Glad to see that.

03:11:32.200 --> 03:11:34.200
 You were in the office earlier with the mask on.

03:11:34.200 --> 03:11:36.200
 I didn't get to appreciate it.

03:11:36.200 --> 03:11:40.200
 Is there any other items for the matrix?

03:11:40.200 --> 03:11:41.200
 Okay.

03:11:41.200 --> 03:11:43.200
 Seeing none, thank you for a great meeting.

03:11:43.200 --> 03:11:45.200
 I'll close this at 730.

03:11:45.200 --> 03:11:46.200
 Have a great week.

03:11:46.200 --> 03:11:47.200
 >> Thanks.